Board: Board Of Appeals

Date: 2026-01-05


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:23–03:33)

So I'm going to call to order the hearing. On the application of Stephen Gillings of 109 Smith Road, dated November 4th, 2025, seeking a special permit to build a nine foot by 20 foot second story addition and to remove the existing roof, adding one and a half stories to the existing residence structure. The property is located in the residence C zoning district, whereas the proposed project would increase the current nonconformity of the structure, the permit was denied. We have a file that has been available to look at for neighbors that might have wanted to look at that have the application.

architectural drawings and plans of the proposed renovations to the home there, as well as a plot plan. My name is Virginia Donahue-King, and I'll be acting as the… Oops, my… Okay, I think my computer's working okay right now.

So as anyone is going to be talking today, if they'd speak up clearly and state their name and address so that we have a good record of who's participating in the evening, that would be great. One thing that I do not have in this file that is going to be of importance today, And we may in fact have to delay this a couple of weeks in order to get that is a finding by the building inspector if the. The cellar of this home will be considered a first floor in so far as it's built on a hill that slopes downwards toward the back, meaning that the first floor could be considered, once a calculation is done for what the square footage of the area is, six feet up from where the ground lays. That needs to be determined as well as we don't have a calculation for the proposed attic that's going to be built on to this home.

Your architect may have that, I'm not sure, but it needs to be, or I have to make a finding in fact, it needs to be only two thirds the size of the floor below it at a height of four feet up. So we'll get into that a little bit shortly. But what I'd like to do is I see that it looks like Mr. Gelling is here and if he would like to present his case, I'm ready to hear it.

Speaker 2 (03:35–03:36)

Hi, good evening, how are you doing?

Speaker 1 (03:37–03:37)

Good evening.

Speaker 2 (03:38–06:57)

My name is Stephan Gelling, I'm the owner of 109 Smith Road in Milton. The reason why I'm at this meeting right now is because of the, I'm trying to do a renovation at the property at 109 that I purchased. So the existing property is three bedroom, two bathroom, one bathroom was in the basement and a bathroom on the second floor. The The actual grade for the existing house, it's like 80% of it is below grade, of the basement is below grade.

That's what's existing right now. At the back, it's a little bit just because of the garage, the way they snooped the property just for the garage. So my proposal is, at 18 feet at the back that was there, that was existing because the deck, there was a deck on the existing house. And that deck was actually like 20 feet from the house.

The deck was 20 feet by the whole length of the house. So basically what the addition that I'm doing is just take up that section of the deck. of that deck was there because the deck was existing. So, I removed the deck and I'm doing the addition at the back.

Okay. So, the issue I run up into, the existing house is nine feet, six inches on either side of the property. When I was going through the drawing and the permit phase, I asked my architect and I asked the a survey guy if it's going to have any issue. So they explained to me what I could do is I could, for the new addition, I could shrink it one feet on either side of the existing.

So I could, instead of six, nine feet, six, I have 11 feet on either side. Because I shrink that addition, I make it much smaller on both sides. I went to the building department and I was asking, hey, is this going to be an issue? And they said, as far as we understand, it shouldn't be an issue because you have enough property at the back and you have enough at the front.

So I go ahead and I put a demolition permit and they issued a demolition permit. And while I was there doing the demolition, I submit the new drawing and everything. And it's been, it was taking a little bit of time then I go to the building department myself and then that's when I learned that it's not gonna They're not going to issue me the permit because of the existing houses non-conforming because of the nine feet.

Speaker 1 (06:58–07:21)

We did have some discussion. We have a fairly new building inspector that was used to doing them a different way. And so we have that's what we that's what the delay was in the fall. But what we don't have right now is a calculation that he has done to show that the the basement would not be considered a first floor.

Speaker 2 (07:21–07:55)

So I think it's I think it should be on the drawing because we we definitely asked for that because of the so when they when the survey guy and the architect do the The calculation, they said it's not. 70% of it is, I don't remember that word they call it. It's, I don't remember the name of the word they call it.

Speaker 1 (07:55–11:00)

because there's some different percent of it it's it's below it's below grade so low grade yeah let me just um let me just read to you what the zoning bylaw is it's found in um chapter 10 section 275-9.1 of the um of the zoning bylaw. It defines the term story as used in the subsection shall not include a basement so this is what we're looking for to make it to make it work for you shall not include a basement so long as the finished floor height of the first story is no more than four feet above the mean grade of the ground contiguous to the building provided with with So that means that there's a portion of the, say, the area that's underneath what used to be your deck. That is going to be six feet above mean grade. The rest of it, it cuts up so that it may, in fact, fall into the proper dimensions of that, but I don't know that from this.

So what I'm going to propose to do is that we, so it has to be, let's see, what did I say here? No more than four feet above the mean grade of the ground contiguously rounded. So it needs measurements done of what the ground is around it and so forth compared to the whole structure of what the building is going to look like. So What I would like to do is if we could put this off for a couple of weeks.

I know you hate to hear that at this stage of the game, and I don't blame you but I want to make sure that this is something that is going to hold his water and be able to. You know that you're not going to have legal problems with it down the road. So what I'd like to do is have perhaps your architect could make that calculation and we could look at it. We can have our building inspector do that calculation as well.

And also, if the calculation could be made. And I don't have. I don't have in my packet, perhaps your architect does, I don't have what the dimensions are of the attic, where it stands above four feet high, so that if you've got just where it's four feet high and you have a sloped roof above that, the dimension of that part just needs to be in the vicinity. Well, you need a variance from the Board of Appeals if it's bigger than two thirds of the square footage of the floor directly below it.

So that could well be in the framework of it right now. I just don't know that. And so to make sure that you don't have problems down the line, I wanna make sure that we have those two calculations on the cellar and the attic.

Speaker 2 (11:01–12:01)

the with the attic there's an existing or attic space right now it's like seven feet so it's not like i'm adding like on the existing i don't know if they i don't see like the architect have it but there's an attic right now that's existing a walk-up attic so there's a full space right now to go up into the attic the reason why The architect is not me because I was going to leave it the way it is, but because of the rafters, they are not. They are 2 by 8. So the architect told me that, which is going to cost me a lot more, I have to change from 2 by 8 to 2 by 12. So the first floor rafters have to get bigger, and the second floor rafters have to get bigger.

So that's why the whole building has to move. That's why I touched the roof line because I wasn't planning to do that, but because of the, she said the joist is not big enough and it's not gonna meet.

Speaker 1 (12:01–12:36)

No, I understand that. I think that it probably does meet the standard, but I don't know that from the drawings that I have and where measurements aren't there for me. So I just need to know that. And so if we can have your architect Calculate what the square footage is of the second floor of the home as it will be built, and then calculate what the square footage of the attic would be at a height four feet from the floor of the attic.

Speaker 3 (12:37–12:37)

Yeah.

Speaker 1 (12:37–12:57)

And then we can compare those. And if they're close, if they're just under 2 thirds, you're golden. If it's over that, then we have to make a finding of that and that it's not injurious to the neighborhood. But before we make that finding, we need to know if that actually passes the test or not.

Speaker 2 (12:57–13:29)

OK. So when I look around in my neighborhood and my street, my house is like one of the lowest house. All the rest of the house is above me. I think my neighbor to my right, they have like a single-story house.

That's the only single-story house on that street. All the rest of the house is two-story and they have the attic. My neighbor to my left, they have three-story also. Three-story?

Yes, they utilize the attic.

Speaker 1 (13:30–13:34)

Oh, that's OK, as long as it's the two thirds, just the two thirds.

Speaker 2 (13:34–13:35)

Right, right.

Speaker 1 (13:35–13:40)

So and that's what you're looking to do. And I hope that we can allow that as a matter of fact.

Speaker 2 (13:40–14:07)

It's not like something I'm trying to do that the neighborhood is going to change or that street is going to change. Most of those house, they have two full floors and then they have attic space where they utilize of the attic space, because I just the reason why I'm trying to utilize of the space is because just The house is already small, just so that's why I'm with my kids and stuff like that. I'm a mom.

Speaker 1 (14:07–14:14)

Okay. Oh, so your mom lives with you as well? Yes. So that's, it's you and your wife.

How many children?

Speaker 2 (14:14–14:15)

Three kids.

Speaker 1 (14:15–14:16)

Three kids and your mom?

Speaker 2 (14:16–14:17)

And my mom, yes.

Speaker 1 (14:17–14:25)

Okay. So the previous three bedroom houses is not going to work for you currently.

Speaker 2 (14:25–14:41)

No. Okay. I like this street so I'm just hoping and praying that it work out for me because I'm a builder myself and I want to build a house on that street.

Speaker 1 (14:42–14:56)

Well, I can't make a determination on it today, but I think if we could just get those, is your architect in town, not on vacation or anything, or not in town, but you know, local.

Speaker 2 (14:56–15:06)

I could check and say tomorrow if it's possible for you to just shoot me an email for all the stuff that you're looking for, because sometimes I'm not gonna remember so much.

Speaker 1 (15:06–15:12)

Okay, I'll send an email to Bill and he'll send it to you on what it is that he's looking for.

Speaker 2 (15:12–15:16)

Right. And I could just forward it to the architect on the survey.

Speaker 1 (15:16–15:20)

Okay. And how much time do you think you'll need to do that?

Speaker 2 (15:21–15:26)

I would say a week. Okay. Because I need I need to break ground.

Speaker 1 (15:27–15:36)

Yes, yes. If it's not frozen for heaven's sakes, it's we knew that we were gonna have snow. Okay, so let's, um, let's see.

Speaker 2 (15:38–15:42)

The house is like this. Hello.

Speaker 1 (15:43–15:45)

Hello. You froze.

Speaker 2 (15:51–15:54)

I did not hear you. It froze.

Speaker 1 (15:54–16:00)

Yeah, the video on you froze, so we didn't hear what you had to say just then. What was that?

Speaker 2 (16:02–16:24)

Oh, no, I was just like, I was going to show you the house is like this since November. It's all right now. It's yeah. I at the time they told me I could get a permit, so I go ahead and I do get a demo permit.

Never expected. Yeah, it's so yes, I understand.

Speaker 1 (16:25–16:26)

Do we have something next week though?

Speaker 4 (16:29–16:39)

I think we could well. Yeah, we don't have to re advertise. We have the two days to put in the notice. So yeah, we could do it.

I think Monday through Friday next week.

Speaker 1 (16:40–16:45)

Let me just quickly check. I should have brought that with me. Hold on one moment. I will be right back.

Speaker 3 (17:00–17:21)

Let's see, the 12th, Monday the 12th, should we try for that? 12.

Speaker 2 (17:22–17:57)

So, okay, what I will do is, I'm away, I'm away. I'm gonna be away. on the 10th so can I have my lawyer come and advocate for me yes okay okay I'll do that will you be will you be there later in the week oh no I'm coming back the the 23rd the 23rd yes um and that is hmm

Speaker 1 (17:59–18:11)

Should we make it when we know you're going to be there? That might be more comfortable for you. I know it's I know it's, you know, another week away, but if my lawyer could advocate for me.

Speaker 2 (18:11–18:14)

Oh, yeah.

Speaker 3 (18:20–18:26)

So the 23rd, so it will be the 12th and the 23rd.

Speaker 1 (18:28–18:31)

So 23 is a Friday, which is probably not gonna work.

Speaker 3 (18:31–18:33)

Right, so the 26th?

Speaker 1 (18:36–18:38)

Would have to be a Monday through Thursday, probably.

Speaker 2 (18:39–18:41)

Right, so the 26th is the Monday.

Speaker 1 (18:44–18:46)

Yes, that would be fine. Is that okay with you, Bill?

Speaker 4 (18:48–18:49)

The 26th?

Speaker 1 (18:49–18:50)

Yep.

Speaker 4 (18:51–18:51)

Yes, absolutely.

Speaker 2 (18:52–19:08)

Four o'clock? Yeah, and question, question please. Mm-hmm. Once I, once you guys go through and you get approved, I have like 20 days you said for me to have to before.

Speaker 1 (19:09–19:13)

The 20-day appeal period after the decision is written, yes.

Speaker 2 (19:18–19:20)

Okay, I will definitely stick to the 12th.

Speaker 1 (19:21–19:23)

The 12th? Okay.

Speaker 2 (19:23–19:27)

Yes, I'm gonna have, I'm gonna have my lawyer take care of it.

Speaker 1 (19:28–19:40)

Okay. Okay. So he'll have those two. Well, I'll send Bill what he needs to have the information he needs to have with him and then Bill will send it to you.

Speaker 2 (19:41–19:43)

Yes. Okay, great.

Speaker 1 (19:43–19:45)

Awesome.

Speaker 2 (19:47–19:51)

What was that? No, I said thank you very much. Awesome.

Speaker 1 (19:51–19:54)

Oh, okay. I thought there was something else in the background. I wasn't sure.

Speaker 4 (19:55–20:04)

Okay, so unless there's anything else, I'm going to adjourn this until… Do we want public comments or to open the floor or are we going to wait until the continuation?

Speaker 1 (20:05–20:07)

Is there somebody that would like to speak?

Speaker 4 (20:07–20:09)

I'd like to see, there are two call-ins.

Speaker 1 (20:09–20:10)

Oh, okay.

Speaker 4 (20:12–20:30)

Let's hear those now so that… Caller with the phone number ending in 192, did you have any comment? Glenn Pavlicek would like to… Please state your name and your address.

Speaker 5 (20:34–20:36)

Hello? Is this Glenn?

Speaker 1 (20:36–20:37)

Yes, Mr. Pavlicek?

Speaker 5 (20:37–20:43)

Yes, Glenn Pavlicek, 115 Smith Road in Milton. I'll refrain from making any comment until the next meeting.

Speaker 1 (20:44–20:53)

Okay. And the other caller?

Speaker 4 (20:55–21:04)

Did any of the callers want to speak? I didn't hear that call. I've unmuted the two callers if they want to speak.

Speaker 1 (21:10–21:13)

Is that the caller ending in 582?

Speaker 4 (21:13–21:25)

Yes. No response. I'm not sure. I've unmuted them.

Speaker 1 (21:27–21:29)

Are you there, 582? 192.

Speaker 4 (21:29–21:38)

No response. It doesn't sound like it, okay.

Speaker 1 (21:39–21:57)

Well, they have noticed, I hope, from listening in, that we will be reconvening on January 12th at four o'clock. again, at the same call-in, dial-in numbers that we have for Zoom or the telephone.

Speaker 4 (21:57–22:00)

Just to clarify, that's January 26th, correct?

Speaker 1 (22:00–22:02)

12th.

Speaker 4 (22:02–22:04)

Next week, next Monday? I thought it was the 26th.

Speaker 1 (22:05–22:15)

Well, Mr. Dillings thought it would be better if it was sooner rather than later. If you can do that, I'll go along with the 12th.

Speaker 4 (22:15–22:18)

Okay. Is that okay, Mr. Dillings? Yes.

Speaker 1 (22:18–22:24)

Okay, we will reconvene on the 12th at four o'clock. Same time, same channels.

Speaker 2 (22:24–22:25)

Okay, great. Thank you.

Speaker 1 (22:26–22:26)

You have adjourned.

Speaker 2 (22:27–22:29)

Yeah.