Board: Planning Board
Date: 2024-11-07
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:51–01:09)
Good evening, and welcome to the 13th meeting of fiscal year 2025 for the Municipal Planning Board. At this time, I'd like to now call the meeting to order and begin with introductions of the board and the staff. If you'd like to go around the room, since we have everyone in attendance.
Speaker 2 (01:10–01:14)
Meg Yieldfield, member. Cheryl Tagaya, secretary.
Speaker 3 (01:14–01:16)
Jim Davis, member. Sean Fahey, member.
Speaker 1 (01:17–01:20)
And we're glad to have you back, Sean. So nice to see you this evening.
Speaker 3 (01:20–01:28)
Good to be back. Before we go on, if you don't mind, I just wanted to take a minute to express my gratitude to.
Speaker 4 (01:29–01:32)
Meredith, if you're speaking, we can't hear you.
Speaker 1 (01:32–01:47)
You cannot hear me? Okay, I'm on. Is that better? Yes.
Okay, I'll put it up a little bit higher. So yes, so Sean was just about to say a word or two.
Speaker 3 (01:47–02:49)
Yeah, I just wanted to express gratitude to all of you guys for the support. I think everybody knows at this point that my beautiful wife Janice passed away recently. It was a very sudden diagnosis of pancreatic cancer and just in 13 weeks Janice was gone. But the support that I've had from the community, board members, our board, the select board, staff, the reach out.
We're really blessed. So, my children, myself, and Janice has been very well cared for by the community. And I just wanted to express my gratitude to everybody here. And as I said, so many of the staff and the select board and the members of the community of Milton, it's been really, really helpful.
And we'll continue to be helpful. We got a long way to go. So thank you all so much. I appreciate it.
Speaker 1 (02:49–02:55)
Thank you, Sean. Glad to have you back. Now to introduce our staff, Tim,
Speaker 5 (02:58–03:01)
Tim Zierwinski, Director of Planning and Community Development.
Speaker 4 (03:02–03:09)
Cheyenne. Cheyenne Frazier, Assistant Director of Planning and Community Development. And Julia.
Speaker 1 (03:10–03:33)
Julia Getman-Clerk. And myself, Meredith Hall, serving as chair. I mentioned that. All right, for the first item, we have two sets of minutes to be approved from October 10th and October 23rd.
Has everyone, I know Sean was not here, so you can abstain, but have the others had a chance to review?
Speaker 6 (03:34–03:38)
Unfortunately, I have not yet had a chance to review. Okay.
Speaker 1 (03:38–03:40)
So if you don't mind, I'd like to defer.
Speaker 6 (03:40–03:41)
That's our next meeting. Right.
Speaker 1 (03:43–03:50)
So a motion to defer the minutes from October 10th and the 23rd to- Excuse me, Meredith.
Speaker 6 (03:50–04:01)
There should be three sets, 23rd, 24th, and the 16th. I think one is just the- I'm sorry. Yeah, it looks like the opening- That was just in my packet.
Speaker 1 (04:01–04:09)
Yeah. Sorry, the 23rd, 24th, and the 16th, you said, Julia?
Speaker 2 (04:10–04:11)
I believe so, I'm not sure.
Speaker 1 (04:12–04:59)
I have the 10th in mind. The 10th, the 10th, yes. So the 10th, 23rd, and 24th, great. Yeah.
Okay, so we had a motion, is there a second? Second. Okay, all in favor to move the minutes, great, thank you. And now we have the discussion of next meeting dates.
We have currently a scheduled forum for the 14th, which we will discuss under the MBTA. We have our regular scheduled meeting for November 21st, and then the following meeting will be December 12th. So those will be the current upcoming dates. Now, Tim, do you have any updates that you'd like to report?
Speaker 5 (05:02–06:02)
Not too much. We are in the process of trying to wind down my tenure. I know it's been a little bit of a long goodbye, as it were, so I've had plenty of time to start to try to communicate with all of our consultants that we're working with. I've been working with the town administrator trying to figure out, you know what things he needs to have his hands on, you know what things will be able to pass off to Julia and Cheyenne.
Meredith we've. I forget if you've received probably did will be having a meeting the week of the 18th to kind of go over any kind of last. you know, issues and make sure that everyone from staff to the board has a clear understanding of kind of where things stand, you know, once I'm out. So we're in that process.
Things are going pretty smoothly. And yeah, I don't know, Cheyenne, if you have anything you wanted to share.
Speaker 4 (06:03–06:18)
Not too much, but I just want you to know we had an email read a couple days back just with a list of bike, walk, and transit grant opportunities. I'm looking into those. Future, future, everything kind of pans out, but that's just what I'm looking at right now.
Speaker 5 (06:19–06:50)
And we've, we'll also be meeting with representatives of the Climate Action Planning Committee to kind of firm up our support of them, you know, through different state grant opportunities. You know, we're shut out of a lot of opportunities right now, but that won't last forever. And we want to make sure that, you know, we're, you know, working with, you know, all the various boards and committees in town to help them, you know, in their efforts. Thank you for that.
That's all we've got for now.
Speaker 1 (06:51–07:55)
Great. Thank you, Tim. And I just wanted to add, I was asked. by the Chair of the Warrant Committee just to come and give an update on next Wednesday at their meeting.
They just want to hear what potential articles we may have. They're looking at sort of a town, possibly a special town meeting some point in February. It sounds like maybe more likely towards the latter part, but just wanted to give them an update on all of the things that we're working on and sort of where we are in the process and what we might think is realistic to get done. So that will be next Wednesday that I'll be attending that.
And yep. And so now we can move to citizen speak. If there's anyone in the public who would like to speak on anything that is not on our agenda this evening, please feel free to come forward and you can state your name and address for the record. And also online, on Zoom, if there's anyone who would like to speak as well.
You can raise your hand. Q?
Speaker 7 (07:56–07:56)
Chair.
Speaker 1 (07:57–08:02)
Oh, yes, yes. I'd like to speak. Oh, yes, please come forward. Sorry, I didn't see you back there.
Speaker 8 (08:04–08:04)
Good evening.
Speaker 1 (08:05–08:08)
Welcome, good, yes.
Speaker 8 (08:08–09:04)
My name is Brian O'Halloran, and I'm a resident of 7 North Terrace here in Milton. And I'm here to express my concern about recent discussions on plans for full implementation of the MBTA EOHLC guidelines in Milton. The residents of Milton voted in February of 2024 in a referendum to reject the plan at full implementation. The guidelines are currently under review by the SJC and are likely to be ruled invalid.
Until such time as we get a ruling by the SJC Any further discussions and presentations to town residents about MBTA implementation in Milton is irresponsible. Thank you.
Speaker 1 (09:05–09:42)
Thank you, Brian. Anyone else from the audience here? Something that's not on the agenda? Are there any hands up?
Tim? Not on Zoom. Not on Zoom. Thanks, Ryan.
Okay. So we do have a public hearing, which we will be opening at 8 p.m. So before that, if it's okay with the board, I'd like to move up the new business items, which are 10 Bassett Street and 193 Central. So if you would like to join us, we have time to get you on.
Speaker 9 (09:42–10:12)
Good evening, Michael Modestino representing the applicants, Michael McNoser and Mark McNoser. On behalf of my clients, we submitted a letter asking to withdraw the application that's pending without prejudice, hopefully. And we appreciate your attention. You put a lot of time into this and we'd like to come back again, but I think we have to change the plans to accommodate the public in the board.
And I think we can do that, but it's going to take a little bit of time.
Speaker 10 (10:12–10:14)
Certainly. Thank you. Appreciate that.
Speaker 1 (10:17–10:26)
Does anyone want to discuss this or do we feel like we can have a motion to accept their withdrawal while they work on the plan further?
Speaker 3 (10:27–10:32)
Can I ask a question first? Sure, yes. Is there a timeline of when you think you may be before the board again?
Speaker 9 (10:33–11:01)
I don't really know. I know we need to do some plans, and we have to have some discussions about, you know, the big issues. The number of bar seats, as we discussed, we're trying to bring that number down considerably, and we have to have some discussions about that. We also have to look at the hours, and we know that we need to bring the hours back to an earlier time.
We're just trying to figure out what hours. I mean, I think it's probably in a month or so that we'd be back.
Speaker 11 (11:02–11:04)
Thank you. And are you before the ZBA?
Speaker 9 (11:05–11:16)
No, we're going to follow the ZBA as well on the time, but we're trying to figure out the time. Right. Because it will be different than what we had asked for. Sure.
Speaker 6 (11:16–11:51)
OK. Does that answer your question? No, I just wanted to make a suggestion. If you would meet with the Director Butters, especially Antwerp and I believe it's Church there.
Yeah. They're the ones that I think will be most impacted by any change in the uses here. And it just would be beneficial, I think, to everyone to have a meeting that's dedicated to them and to hear their concerns before you come to us.
Speaker 9 (11:51–11:56)
We had one meeting before. We'll certainly do another one. Okay, great. And we'll do the direct abutters.
Speaker 1 (11:57–12:26)
Great. Thank you. And I would just ask that when you're looking at your new concept, that it's something that would really draw daytime traffic. I'm really concerned about the businesses, the small businesses that are upstairs.
And being in more of a nighttime would really hurt the businesses up there. So drawing earlier in the day and more of a child-friendly atmosphere.
Speaker 9 (12:26–12:36)
I think you'll see that they want to do some things in the morning, serve breakfast, and then maybe cut back in the later night hours, particularly on Friday and Saturday.
Speaker 1 (12:36–12:54)
That's great. That's great. Thank you so much. So with that, I would entertain a motion to accept the request to withdraw under, and I should.
Without prejudice. Without prejudice, yes. So moved. Second.
Second. And all in favor.
Speaker 12 (12:55–12:56)
Aye.
Speaker 9 (12:56–12:59)
Thank you very much for your time. Appreciate it. Absolutely.
Speaker 2 (12:59–13:05)
Thank you. Great. All right.
Speaker 1 (13:05–13:17)
So now do we have anyone on Zoom possibly regarding the update on 193 Central Ave. Goddard School landscaping?
Speaker 4 (13:21–13:24)
We have one hand up. Oh, she put it down.
Speaker 12 (13:27–13:27)
There we go.
Speaker 10 (13:27–13:28)
Is it Marion?
Speaker 1 (13:30–13:34)
Jenny Russell. Jenny, okay.
Speaker 5 (13:35–13:38)
Is Marion not in the room?
Speaker 6 (13:38–13:42)
I do not see Marion now. Maybe she wasn't expecting to be moved up.
Speaker 11 (13:44–13:44)
Oh, right.
Speaker 1 (13:47–13:57)
Tim, can you shoot Marion maybe a quick… text her an email, just letting her know that we've moved her up in advance on the agenda.
Speaker 5 (13:58–13:58)
I will do that.
Speaker 1 (13:59–13:59)
Thank you.
Speaker 10 (14:01–14:11)
Okay, Jenny, if you would like to say something. And introduce yourself.
Speaker 13 (14:12–14:49)
Hi. Yeah, it's Helen Russell actually, and we are directly across the street from 193 central we've been in conversation with the owner of sunny Burma about the dead trees. that are on the front landscape. And he wrote an email to us suggesting he'd like to put in a fence.
And we're in support as long as the fence is kind of the expectation we have. We don't know specifically what the fence will look like, but we think a fence would solve some of the problems.
Speaker 1 (14:53–15:06)
So I think we can, while we're waiting for Marion to come on, I don't know, has anyone been able to go out and take a look at the site? I know we're all familiar with the Goddard School and the project.
Speaker 11 (15:06–15:39)
Yeah, I have. I've driven by. OK. And parked on the front street at it.
And there are four big pine trees that are dead. And I was wondering if they could just replant them. But I understand now there's ledge under there. So it's probably not going to happen.
I just wonder, in looking at the map that they sent, there's a little red line that shows where they want to put a fence. I think that there are dead trees on both sides of the sidewalk. So I'm wondering if they need a fence on both sides of the sidewalk, basically. That's what I was going to ask.
Speaker 5 (15:39–15:58)
Yeah, and Meredith, if I can, if I can just kind of street side. That we've gotten this Russell on on the line, what it so aside from the trees being dead and and kind of contributing to not a great looking landscape, what is the what is the problem that the fence is meant to solve.
Speaker 13 (15:59–17:30)
Well, I think in the initial application when Goddard was coming, you know, was planning the building their intention, at least that was made clear to the neighbors was they were planning to build a berm. and then plant the berm so that the cars and in particular the headlights from the parking lot would be shielded. So currently the parking lot faces our house. So all of the lights from the cars and essentially the glare from the whole school face directly into our windows.
The trees have not been successful. And so we think that a board fence similar to what they have along the side of the school, it's not a six foot fence, but it's a lower fence. I didn't actually go over and measure it, but I think it's probably around four and a half. five feet would shield the headlights so they won't be shining into our windows.
And then the only other requirement or I guess request would be that the board fence isn't planted right adjacent directly to the sidewalk that's set back a little bit so that there can be some landscaping in front of the fence to soften the fence along the sidewalk. But I haven't seen any of the specific plans that Mr. Verma has may be presented to you. So we're in the dark a bit about that.
Speaker 11 (17:32–17:58)
So it looks like the fence is right in the middle between the parking lot. That's good. Between the parking lot and the street sidewalk. Yes.
And I think you're right about maybe a four or five foot fence. But I figured that because we're taking out vegetation, we could do what we did at Bentz, maybe a four or five foot fence with a lattice on top. And then maybe they could plant some vines, some wisteria or something. I don't know how you all feel about that.
Speaker 6 (17:58–18:07)
There's already a couple of different fences at this property. I think it would be a little incongruous aesthetically to introduce yet a third. Oh, OK.
Speaker 1 (18:08–18:45)
But what I was going to actually suggest, and I didn't know if Jenny, what she would think about this, is actually to the right side property, running right along where it's almost indistinguishable whose property it's on, there's a cedar fence. And I was thinking if we did So if we actually put it on the parking lot edge, set it all the way back on the island, you'd have all the vegetation in the front and you'd have a cedar fence in the front, which would just gray and fade out and essentially disappear and do it at a four foot height.
Speaker 13 (18:46–18:52)
Oh, yeah, that's interesting. I mean, all of their fences are vinyl, so I don't know.
Speaker 1 (18:52–18:55)
Yeah, I would. I don't love vinyl fence. Yeah.
Speaker 13 (18:55–19:38)
I think a vinyl fence would be fine, honestly. But, yeah, I mean, they could plant, you know, initially they had, if you remember, and Maggie knows this well, the planting plan had a ton of very small, you know, very small pots of vegetation, so they could reintroduce those. And I think the idea would be to have the fence go, as you're looking at the building, the left side of the front walk, and then a couple of panels to the right side, and then the existing landscape of rocks and mature trees would cover the rest of it. But again, I don't know what they're planning.
Speaker 14 (19:39–21:01)
Yeah, right. So I mean, what they sent over, there wasn't a big plan. It just was they took their original landscape plan and just through just drew a red line right across the left planting bed. As you're looking at the school on the left, Tim or Cheyenne, bring that up on the screen.
So I was that. Yeah. So I was over there as well. And you know, it is, it's an unfortunate, it's just unfortunate that it looks that way.
And I'm not 100% sure that, you know, the trees are dead because of ledge. In this particular timeframe, we have been, we've had the driest weather and there's no irrigation out there. And if you notice to see what plants are doing well, it's the ornamental grass and some of the lavender. And those plants can do survive in dry conditions.
So the mountain laurel that were planted, it's a woodland plant native. It's just full sun. So they're kind of struggling a little bit. And the birches are kind of struggling.
So I just think it's dryness, not necessarily
Speaker 6 (21:01–21:13)
Maggie, a question on that. So would it be, without irrigation, would it be difficult to, if they planted new, just to water them with a hose or something like that, or those bags that you can put on trees?
Speaker 14 (21:13–24:11)
Yeah, so, you know, usually in the fall is a great time for planting, so I'm not sure what their planting schedule plan was. It's the needs of plants are less at this time of the year because they're going dormant. So they could just go out, bring a hose out there and water for the next week or two after planting. And then they should take.
But as Jenny mentioned, I mean, Helen mentioned the original plan did talk about a berm. And so when I went out there and met with Mrs. McGettrick, I asked about the berm because on the right side of the building as you're looking, if you look at it, there are rock outcroppings and it's kind of a natural setting. When we talked, it was supposed to sort of be the same on the left side, but Mrs.
McGetrick pointed out that actually in the final plan, Berm didn't make the final landscape plan. So that's why when they installed it, they didn't do a Berm. And I think a berm would have been helpful if there was ledge, because then you're adding more soil, which would allow the roots to grow. So I think it's a little bit unfortunate.
And the applicant didn't seem willing to create a berm, which I think would have been a little bit nicer. So what also we noticed when we were there, If you look at the left side planting along Columbine Road, they planted the correct size material as was stated in the plan. They planted the five-gallon Mount Laurels, and in the front, they did not plant the correct size plant material as was noted on the landscape plan originally. And the original landscape plan had five-gallon lavender, which expressed that nobody grows five-gallon lavender, so that would be very difficult to source.
And sure enough, everything was undersized. So when I met Mrs. McGettrick out there, we came up with a plan to It didn't make sense to make the applicant dig out the undersized material. We were just going to add more to it.
So they agreed to adding one more fir tree and they agreed to adding six more hydrangea bushes, which grow fast and would fill in and they're native. So when I went out there to check it out, they did plant the four. the original three firs and then the one extra, but they never planted the hydrangeas. So I'm not- They were limelight?
Yeah, they were limelight because they can get 10 or 12 feet tall fairly quickly. And how many of those would you say? Six. Six of those.
They were supposed to be six.
Speaker 13 (24:11–24:21)
Maggie, I think what we heard from Sonny was that corporate would not approve the, whatever that means, would not approve the hydrangeas.
Speaker 14 (24:21–24:34)
So I have like an email from Mrs. McGettrick and I, you know, kind of agreeing to the plan. So I didn't hear back that it wasn't accepted. So I'm not familiar with that.
Speaker 2 (24:35–24:38)
Cheyenne, can you scroll up just a little bit because.
Speaker 5 (24:39–24:49)
Meredith, I was going to suggest in the absence of the applicant that's actually asking for this minor amendment that maybe we table this discussion until Marianne gets here.
Speaker 1 (24:50–24:53)
OK. I was just thinking we could utilize the time.
Speaker 5 (24:53–24:56)
It's up to you all. I just think there's a lot of discussion going around that they're not perfectly clear.
Speaker 1 (24:56–25:11)
Well, this is just sort of a background. So I think when Marion shows up, we will at least have had a chance to think about this. Could you just, Cheyenne, just scroll up just a bit to… Yeah.
All right.
Speaker 10 (25:11–25:16)
So that's it. And so this, it looks like it's incomplete.
Speaker 6 (25:18–26:10)
So just to be clear, Maggie, from what you're saying, I recall the meeting where we all agreed that you would be the board liaison with Marion and the applicant, Sonny, to get the landscape plan. modifications that we might need because of things being difficult to get or what have you. So, but we all expected that there would be a robust landscaping installation. That's what we all talked about.
So are you saying they didn't provide us with that robust landscaping plan ever really? And now it's just coming kind of back because of the how noticeable the dead trees. I mean, they're very noticeable. I just think I messaged Meredith when I noticed it too.
just because it's very noticeable. But I mean, I still think it's an issue beyond the dead trees if they didn't install the robust landscape plan that we all approved.
Speaker 14 (26:10–26:46)
Yeah. So I think that is the plan. I mean, the problem. It's a big mulch bed, not a planting bed.
And I know things take time. And that's why we sort of agreed on limelight hydrangeas because they are such fast growers. Mountain laurels are so slow, they're not going to get very quick, very fast, very quickly. So we were trying to work and come up with a plan.
And so, you know, we agreed to it. So I was a little surprised that it wasn't there.
Speaker 6 (26:46–26:49)
What you agreed to with Marion didn't actually get installed. Correct.
Speaker 14 (26:49–26:50)
Yeah.
Speaker 11 (26:51–26:55)
Maggie, do you think those pine trees would grow in a berm? The original.
Speaker 14 (26:56–27:28)
Yeah. Yeah. Yeah. The first they should.
They they should be fine. I mean, they probably would grow a little bit more slowly. They just need a little bit more care. It's a long central lab.
It's fairly busy. You know, then you has the sidewalk. So and then it has a parking lot. So it's not an ideal planting bed just because there's a lot of heat and a lot of sun.
But, you know, water and more deeper. compost, more soil around it would be helpful.
Speaker 11 (27:28–27:36)
I'm thinking in the winter with the hydrangeas, they lose their leaves, right? So the light's going to go right through and hit the neighbor's house regardless.
Speaker 3 (27:38–29:20)
You know, a couple of opinions. It was noted on this plan that there is ledge, right? When you look at the note at the top of this particular sheet, there's an acknowledgement that the trees and shrubs in that particular location need to be planted to avoid you know, the existing rock and ledge. And when a planting plan is established and agreed upon, the burden for irrigating is the applicant's burden.
You know, we should never accept from any applicant that, well, we didn't put an irrigation system in and it became dry and the trees died. You know, If the applicant decides, any applicant, this is my opinion, any applicant submits a planting plan and they don't put in an irrigation system, it's their burden to water to make sure that the planting plan that they submit succeeds. We shouldn't have to accept, you know, on behalf of any resident that, gee, it got dry and the plants died. So we want an alternative that doesn't depend on water.
And I guess furthermore, rock is removed consistently for a variety of reasons. And if we have a planting plan that's impacted by the presence of ledge, take the ledge out. But this idea that any neighbor can't have what was aesthetically submitted and accepted, I think is unfair.
Speaker 6 (29:20–29:44)
I think Sean, may I just quickly jump in on that? It's one of the main things that we have some jurisdiction over on site plan approval on a Dover Amendment protected use. It's the planting and the buffer to the impact. So this is why I think this keeps coming back as a concern to us.
So I just want to reinforce what you're saying, basically.
Speaker 3 (29:44–29:58)
Yeah, I don't think I don't think any of the neighbors should have to make a concession for the reasons that I stated. And I guess my last question, Maggie, is what's the order of magnitude cost of these two trees?
Speaker 14 (30:00–31:00)
So there'd be four trees. And I understand if the Russells want a fence, I do understand that that's probably could be beneficial to them, and it would be a cost to the applicant. So if the fence goes in somewhere, and I'm not sure if I would recommend putting it right where they suggested, because it doesn't tie into any, it's just a freestanding wall, so I would have probably moved it back closer to the parking lot. But if they did a fence and spent some money on a fence, maybe Maybe some smaller trees, evergreens would be a good trade off.
So there are still some evergreens to soften looking at the fence and there's evergreens for the winter and they can slowly get taller.
Speaker 1 (31:00–31:07)
Like a green giant that would grow into a larger tree quickly, but starts smaller.
Speaker 14 (31:07–31:36)
Yeah, so a green giant arborvitae, once established, it grows three feet a year. And so maybe they could, if they do a fence, maybe they start with a five-foot tree instead of a ten-foot tree. So you're kind of working with the applicant. But I still think they need more plant material.
I still think they should plant six more hydrangeas. It's just a very big, it's very big. It's a very big planting bed.
Speaker 15 (31:36–31:37)
It's very sparse.
Speaker 14 (31:37–31:38)
And it's super sparse.
Speaker 13 (31:40–32:09)
Yes, and I just want to add our preference really would be to have a robustly landscaped, you know, space that had a watering system. And I think at this point, we're just our concession is OK. Yeah. Put a fence in because it doesn't require any maintenance.
But I think, you know, thank you for mentioning that it's the applicant's responsibility to water the plants that they put in and to have a system for that. I appreciate that.
Speaker 3 (32:09–32:29)
It's their responsibility or it becomes their burden to hand water. It's not reasonable to present a planning plan and not have also a plan to irrigate. So if there is no automatic irrigation system in there, it becomes the burden of whomever it is to water it in a different way.
Speaker 11 (32:31–32:52)
I mean, right now we know that the plants aren't going to survive. So this is a perfect opportunity to bring more soil in. It's not that expensive to build up a berm and then plant the green giants in enough soil so that they will survive. If you have more soil, you'll have to water them less.
Maybe we do a little bit of both. Fence, more soil. I guess three things.
Speaker 5 (32:52–33:01)
Vegetation back to the applicant Meredith it the board is really going pretty far down this road without the applicant having a chance to hear any of this input or response.
Speaker 1 (33:02–33:39)
That's what I just wanted to just so we're everyone's caught up now. I think we can pause this. I'm sorry, Jenny that and Helen that. that this, moving this up, Mary didn't know.
So why don't we just put a hold on this until the applicant does come and we can move to our site plan approval discussion because I think there's some good, I'd like to make some good progress on this tonight if we can. Cheyenne, if you could pull up sort of the framework draft
Speaker 6 (33:41–33:58)
Yes. I sent to Cheyenne, Tim, and you, Meredith, quite a few edits to that. I don't know if you want to share that. Are those the red lines?
I think they're added in there. They should be, but it would be added. It would be added, yes.
Speaker 5 (33:58–34:03)
No, we didn't add any of Cheryl's things. It's a separate document if you want to look at it.
Speaker 1 (34:03–34:04)
It's a separate document.
Speaker 6 (34:04–34:04)
I'm sorry.
Speaker 1 (34:04–34:13)
Yeah, we should incorporate that. I thought it was the red, what was in red. Oh, those were yours. It was great, I loved it.
So I thought it was Cheryl's.
Speaker 6 (34:14–34:31)
I didn't recall if we agreed to incorporate them into the main document and I had already started working on some edits a while ago, so I just kept it in a separate document. But if you want to start with what Tim did with Maggie, that is then go to mine.
Speaker 14 (34:31–34:45)
No, and my I didn't really have edits I was just adding in Tim probably did not was not too excited when he walked in today and saw everything that I added. So I apologize Tim for that.
Speaker 1 (34:46–35:01)
So, why don't we why don't we then. pull up the framework that Tim has, your edits, and sort of what I had. But let's look at Cheryl's, if we could cross comparison. And maybe we just start with the purpose, and we go through section by section.
Speaker 4 (35:03–35:08)
Sorry, just to confirm, we want the original one, or do we want the one that Cheryl sent at 4 o'clock?
Speaker 1 (35:09–35:25)
If we could put the wideness on the website, the framework with Maggie's updates and my updates, but then go through and maybe we can add Cheryl's sections. Are yours just language edits?
Speaker 6 (35:26–35:40)
Minor language edits, but I just, I don't know if I have, I have what? Tim had in the box, I think. So I'm not sure I have your edits in my version. I'm sorry.
I'm just not sure about that. All right.
Speaker 1 (35:40–35:59)
So let's start. We can start with purpose under number one. And there is an edit on this in blue at the bottom. Let's see.
Oh. Your district.
Speaker 4 (36:02–36:04)
It said guest user, but I don't know who the guest user was.
Speaker 1 (36:07–36:28)
So the purpose in the framework that Tim had, and this is what is actually currently in our site plan approval bylaw, ends with permitted in the district. And I was good with all of that. And we're not voting on this tonight, so we can just sort of move through.
Speaker 6 (36:29–36:36)
I'm sorry, the one that, this shows more of these rules. So you're saying at the end of district, but there was more to that.
Speaker 10 (36:36–36:45)
Yeah, these rules and regulations are adopted for the purpose of establishing uniform procedures and requirements. Submissions to the site.
Speaker 1 (36:45–37:12)
We are just starting and Marion just got here. So before, should we let Marion just come and we'll just finish what we were doing there. So we, We moved up a few items on the agenda and I'm sorry because you you didn't know that we were moving them up, but we can. We started to begin the discussion on 193 Central Ave and we can continue that if you'd like it this time.
Is that okay?
Speaker 16 (37:12–37:18)
I was in a Zoom meeting at home, so I didn't see Tim's message. That's all right. No, it's our fault.
Speaker 1 (37:19–37:30)
No, that's our apologies for moving things up. So Cheyenne, if we could go back to that plan one more time and just pick up where we left off. Thank you.
Speaker 4 (37:30–37:30)
Yes.
Speaker 1 (37:33–38:01)
Sorry. Thank you, guys. All right. So, Marianne, we're when we were just giving a brief discussion, it was sort of an update on how do we get to the point where we are right now and just so you know, the issue with the with the trees and how we're trying to resolve it with a fence and possibly some additional plant material and move and move forward with a solution.
Speaker 16 (38:02–41:46)
I think the applicant, and Sonny isn't here tonight, it's his wife's birthday. If I absolutely have to get him, I have a telephone number, but I think we can discuss this without him being here because really his approach at this point is to say to the planning board, first of all, would you approve the idea of putting a fence up, which is now what the neighbor is asking for? And then if so, how high should the fence be? And then how far back should it be?
If you can give advice tonight about that, that would be great. You can see the red line on the drawing, that's what he was thinking of as the location, which leaves the possibility of, the problem with that front area, as we've seen from the planting of the three trees, is that, first of all, if I'd known they had to take out ledge to do those trees, I probably would have brought it back to the playing board right away because having worked with the animal shelter over in that access road, the ledge removal is enormous that has to be done in order to produce a surface that's deep enough so that you can plant something and have it do well. So anyway, the trees didn't do well and planting more trees won't do well either. So I think a fence is a good solution.
And there may be some shallow rooted plants that would do fine on the surface, whether it's, you know, in both places, there's still some plants behind there, but it's basically fairly bare looking because it just hasn't done well, that particular area. So I think if you could sort of divide up your discussion, first of all, do you like, I mean, is the fence idea one that the planning board would accept? And that would be the same fence that you see, I think it's gray, around the rest of the property. And I was thinking about height.
When I think about fences, I think I'm five feet tall. So if a fence is five feet tall, I can't really see over it. That's pretty high for this location. I mean, if the planning board wants it to be that high, it can be.
If it were four feet tall, then you'd still be able to see over it. But the purpose of the fence is to block car lights as they come out of the parking area. And it's also to block the view of the neighbor of the front of the building where there's parking. Not the whole building, you can still see the building because it's going to be higher, but right now that neighbor has the most direct view looking straight into the parking area in front of the building.
So we need advice about height. We need to know whether the planning board will endorse this idea of putting a fence up instead of these three trees. And then if you wanted to discuss further or provide further advice about landscaping around the fence. Anytime is fine, it's kind of late to put in landscaping now anyway, but we do need to think.
I think he could get his contractor to come within a few weeks. Who knows what the weather is going to be like? It's possible that a contractor could still put the fence in, but it's gonna take probably three or four weeks to get that, just to get the contractor to come. That's what he told me.
That's why I'm asking you tonight whether you'd give us the go-ahead on doing the fence and whether you are content with the midway point location for the fence, which gives you the option of doing some more plantings in front if you can get something to grow, or even just flowers or something. And then it leaves room in the back so that if you're plowing the parking lot, snow can still push over on that edge. Any thoughts and ideas on that? If you can't decide tonight, it's OK.
Speaker 1 (41:46–42:04)
We were amenable to a fence, certainly. We were thinking, I think, a lower than five feet, more of like a four feet. But we were also thinking if we did support a fence, moving it further towards the parking lot, maybe just within the grasses or?
Speaker 14 (42:04–43:11)
Yeah, so in that planting bed, there are two light fixtures. And so the black light fixtures sit on a concrete base, which isn't super attractive looking. So if a fence was going to go there, maybe I would do the fence just on the other side of the on the street side central outside yeah so the bottom concrete bases aren't seen by the neighbors and at least the fence would sort of be anchored by the light fixtures? Because it's kind of random.
Just putting a fence randomly, it doesn't line up to anything. It doesn't line up to any fence on either side. And that's another question I have, which is a little off topic. But on the left side, it seems like they've added another fence.
Like it's a black fence.
Speaker 16 (43:11–44:19)
You mean that metal fence? Yeah, it's a black. That's a requirement for a school, a preschool, in order that, and we went through all this with the building inspector and everything. It's so that if somebody loses control of their car at the side of Columbine Road, they'll have a barrier.
And they didn't regard the inside fence as an adequate barrier. They wanted that outside metal fence. So that's why there are two fences. Yeah, because it looks a little odd.
It's sort of a building code requirement, but it's particularly applicable to a school where there's a playground outside. So if a car went astray, it's possible that it could go right into a bunch of kids in a playground if the other fence is inadequate to protect them. Well, they have a fence, they have a fence at Tucker. The original fence at…
The problem was that the fence that was there was not considered adequate. I don't know what the, you know, whether you could have done a chain link fence instead of the fence that they did.
Speaker 14 (44:19–44:32)
It sits on a stone retaining wall, which I would… Well, the stone retaining wall was part of the original. Yeah, so I would have thought that that stone retaining wall, which the fence sits on top would have been adequate to stop a car.
Speaker 16 (44:33–44:44)
I completely agree. Anyway, I can tell you because I remember this going back and forth and back and forth, but it just not with you, with the building inspector and with whoever, you know, promulgates these regulations.
Speaker 14 (44:44–45:02)
So just the point is there's a mix of fences at this point. And so that's why adding another section of fence in a location where it's just going to look a little bit, it's just going to look odd.
Speaker 6 (45:02–45:10)
It's going to look odd anyway, because like the the natural landscape on the other side looks nice.
Speaker 14 (45:10–45:11)
Yeah.
Speaker 6 (45:11–45:25)
And I wonder, like, Well, you can come over and get some rock from my property and move it over there and just have it be a bit more natural and put some shrubs and they would look better. I'm concerned that it's going to miss the aesthetics of it, honestly.
Speaker 16 (45:26–45:53)
But well, I mean, you could eventually I know where there are plenty of rocks at the moment, but you could put a few just a few boulders in an irregular way in front. It's not a huge length, but maybe a couple at least. And then you could plant something that doesn't have to go down five, you know, four feet or five feet like a tree, and I think it would probably do fine. I mean, there must be, there is some soil on the surface, it wasn't just bare.
Speaker 14 (45:54–46:24)
Yeah, and if, as I was saying, remember we had gone out and we had met and I brought up an email summarizing when we met. And I'll read that my understanding is the plan included the creation of a berm on the left side of Central Ave that would match what is already existing on the right side and the berm was not installed. And then you had said to me that the berm never actually made the final landscape plan that was approved.
Speaker 16 (46:24–46:25)
That was taken out, I think.
Speaker 14 (46:25–48:26)
Yeah, so it was taken out for whatever reason. But we talked about that adding a berm there, you could set some boulders in it that would create a more natural landscape. you know, because this is what I said, that's what's lacking on the left side of the bed. You know, it's totally flat.
And the two sides of the planting bed are vastly dissimilar. And it's not a cohesive landscape. So I said the creation and planting of a berm would create more privacy for the neighbors and would create a more interesting landscape. And I said, additionally, the plants that had been installed don't match the size of the plants approved on the plan.
There's a vast difference in the size of material planted along Columbine Road versus what is planted on Central Ave, in particular the Mount Laurels and the firs. And so that landscape on Columbine is thriving. It looks really good. I said since the undersized material had already been purchased, I think planting of a few more additional plants would be a good alternative than to having the applicant replace all the undersized material.
So he had to plant three additional firs, so we agreed to plant four. And then we also agreed to plant six limelight hydrangeas in a five-gallon size. And I said, and I went out and I, you know, spray painted where the plant material should go. But I also think, you know, obviously, if they ran with any ledge problems, they could have moved it.
And it's supposed to be natural, so it didn't have to be totally perfect. So when I went out there to check it out, I noticed that the limelight hydrangeas weren't planted. So they're not planted.
Speaker 16 (48:26–48:30)
Were they supposed to be right next to the trees or further back?
Speaker 14 (48:30–48:37)
It was sort of just to fill in. It was all, you know, kind of staggered just to fill in any of the gaps.
Speaker 16 (48:37–48:55)
Now, if you're talking about a fence, though, you like the idea. I like the hydrangeas myself. What you're saying is that you still like to see those planted at an appropriate distance, but outside or inside? Think we could do it?
It would work outside, do you think, with this ledge? Yeah. You think you would?
Speaker 7 (48:57–48:57)
Yeah.
Speaker 16 (48:57–48:58)
Anyway, it would be in the spring.
Speaker 1 (48:58–49:16)
If you took out those four big trees, what would be acceptable would be to do something small, like a five or six foot green giant, which would be a much smaller root system and more likely to grow.
Speaker 11 (49:16–49:22)
If we brought in more dirt. I think if we made an effort to build a little bit of a berm, those green giants would survive.
Speaker 16 (49:22–49:25)
So do you want to do that instead of a fence? Is that what you're saying?
Speaker 11 (49:25–49:27)
I actually want to do both, but I don't know how far I can push it.
Speaker 16 (49:28–49:45)
We can't do the trees now because it's too late. So you have a neighbor now. And I understand what you're trying to do. You want to make it nice, make it look good.
The neighbor's going to have to look at nothing because the tree's all died. So I'm not saying that it's crazy. I mean, she just wants to find a solution.
Speaker 14 (49:45–49:49)
Yeah, we're still planting. We plant all the way up to the second week in December, if possible.
Speaker 16 (49:49–50:03)
I know. You have to get your contract to get the person to come. You don't call them. I can't promise that it could happen next week.
That's what I'm saying. Because we don't have a contract with somebody. I don't. And I don't do it anyway.
But I'm worried about it now.
Speaker 14 (50:03–50:54)
I think it should be whatever the neighbor wants. OK. If they feel the need for a fence, I would suggest putting it, as Meredith said, a four-foot fence on the outside the lampposts so they don't see the base and then plant everything on the central lab side. So I don't think we necessarily care what the view is from the Goddard school out.
That's not really our concern. Sure. It's more from what the neighbors. So even if they took some of their ornamental grasses that are in a straight line along there, the parking lot, they could just transplant them randomly throughout the planting bed.
Speaker 16 (50:54–50:59)
But they're also not expensive, are they, to buy? No. Yeah. I mean, I don't know about the time.
Speaker 1 (50:59–51:19)
I think the size of the plantings is going to something much smaller is much less expensive. Yeah. It would offset. So I think a fence, it's not unreasonable to ask for for green giants to be placed in some hydrangeas.
Why the green giants? Because they grow quickly.
Speaker 16 (51:21–51:26)
I'm very hesitant to recommend a tree of any sort after what's happened twice now.
Speaker 14 (51:26–51:46)
So if you also look, they do have some of their other evergreens are doing well, like the one on the right side of the planting bed is doing well. So the problem is when you have larger evergreens, like firs and pines, their root balls are mostly clay.
Speaker 16 (51:46–51:48)
So what do you mean by other evergreens?
Speaker 14 (51:49–51:50)
So all the evergreens.
Speaker 16 (51:50–51:52)
Hydrangeas? I mean, no.
Speaker 14 (51:52–52:41)
Yeah, like firs, evergreens, or firs, or pines. So they're all grown a little bit further south in soils that are dense clay. you have to water them really, really well, or add a lot of compost around it to promote new root growth, to grow outside the clay root ball. So green giants, sometimes you can find them grown in a pot or they're grown more north, so they're used to our soil, so it's not as dense clay.
So I think part of the problem they ran into was not just ledge, maybe there was some ledge, but as you said, they excavated some ledge, was just they dried out. We're in a very, very dry period of time and everything is
Speaker 16 (52:41–52:50)
I understand, I'm sorry to interrupt you, but we thought the problem actually could have been overwatering originally. There's a sprinkler system all around this site.
Speaker 14 (52:51–52:53)
There is in that front bed because I didn't see it.
Speaker 16 (52:53–55:06)
Well, he said that, you know, that's what he told me back in the beginning that we have the ability to water whatever we plant there. And so it was, I agree, it was surprising to me that things did so poorly there, but he did tell me that in order to get any, do anything at all in that location, and maybe he should have moved it, you know, I think, you know, Sonny Verma is doing a very good job running this school. He's doing very well. He runs schools.
He's not a landscaper, and I know, you know, we've received the recommendation other times, why don't you just get a real landscape designer out there? But, you know, every day he's dealing with the administrative issues at the school. So we would really like to give him a pretty, you know, a step by step way of proceeding and not. So I think, number one, if the neighbor says, yes, I do want the fence, Four foot high fence is what the planning board is recommending.
And the location that you're recommending, and I like the way you described it because I can make it specific, is that where the light supports are, the fence should be located outside that area towards Central Ave, but not too far outside because the idea is to hide those cement bases. So that's fence. Then the question is, well, you know, the reason he asked about height was he said, I know the planning board will be concerned about how this looks from central lab. The idea is, is it going to look nice or is it going to look not very nice?
So I think landscaping is the answer to making it look nicer. And the specific landscaping, I think if they can get the fence in before maybe we get bad weather, winter weather, That would be a good thing because that would block some of the view for the neighbor. I think the landscaping may or may not be possible to be determined yet. I'd be happy to come back with an actual plan showing and I understand what you're telling me.
Tell me more if you have more advice with a plan for you so you can see that this is what we think. would look nice, and how do you feel about a planning board? I can send it to you, you don't even have to have a meeting, you can send it around, you can give the comments back to the planning director, whatever's easier for you, because you have a lot of other things on your plate.
Speaker 3 (55:07–57:03)
Marion, we had a pretty, and it was unfortunate, we get into this discussion prior to your arrival, and you can play the tape. You'll hear what we had to say. But to be fair to you, I think it's only responsible for me to express the point of view I expressed earlier. And while I think it's great that the applicant is an operator of a school and he's doing very well operating the school, I also feel it's his responsibility to meet the expectation of what was presented and accepted in terms of planting.
So I think what we'll come up with is something that we Whatever the challenges are, earlier it was thought that there wasn't an irrigation system. We were discussing that, and my opinion was, Marion, and I want to make sure I restate it since you weren't here to hear it earlier, if an applicant doesn't put an irrigation system in, it's his burden to irrigate whatever he plants, whatever way it happens. So, you know, again, I don't want something to have been said earlier and have you not have the opportunity to hear it. And I don't want you to have to go listen to the tape.
But I also feel the neighbor, Jenny, who spoke earlier, the fence was something she was conceding. she was accepting offense because she couldn't get plants, or at least that was her interpretation. We don't want, you know, any resident to concede because we haven't tried hard enough to accomplish what was presented and expected. So, you know, my point of view is I'm hopeful if the applicant wants to provide the name of both offense and planting, I think the planting is something we should figure out how to do.
I've had my own experience with green giants. They're fabulous. They're unbelievable. So if green giants are the most appropriate to go in there, then great.
Speaker 16 (57:03–57:22)
Well, is the purpose of the planting to be attractive or to block the view? Probably both. Because I think green giants are pretty unattractive. Sorry.
We plant them all over the place. I have so many developers that plant them. And I don't, I'm not criticizing your recommendation because you're right. They grow fast and the little ones get bigger and they're nice and full.
Speaker 3 (57:22–57:27)
It's a great screen. If the intent is to create screening, it is probably the most effective.
Speaker 1 (57:27–57:30)
That's why the hydrangeas mixed in with it would soften.
Speaker 14 (57:31–57:40)
Yeah. And if they were planted closer to the fence, there would be a backdrop when the rustles look out.
Speaker 16 (57:40–57:43)
I would think would be really nice to have.
Speaker 14 (57:43–57:50)
And then the birches are in front and then the hydrangeas could be in front of the birches. So it's a layered look.
Speaker 16 (57:52–58:42)
Right, okay. I'm making a little diagram, that's why I want to really understand. So I know the birches are there, they're in the front, and then you could have hydrangeas or other plants, you know, or a mixture maybe. Still maybe a fence.
Because the fence is the thing that would probably go in now. And we want to leave space for the landscaping. And if some of it could go in now, fine. I mean, I did plant grass in my front yard and it's growing, but I think we're just lucky because we've had warm weather.
So, I mean, I can certainly take from this meeting for Sonny to go back and talk to Jenny Russell again. I do feel pretty convinced that, you know, any larger trees are going to have trouble.
Speaker 6 (58:43–58:46)
Do you know the length of fence that we're talking about here?
Speaker 16 (58:46–58:51)
I can get an estimate. That's where it would be.
Speaker 6 (58:52–59:08)
Because I wonder whether if you do some kind of staggering of the sections so it doesn't look so odd, you can have it come a little bit forward and this one comes back. I mean, not too random, but like every other. I understand what you're saying.
Speaker 16 (59:08–59:25)
So like this, this, this, this, right? I don't know how many lengths of fence we're talking about. I probably will at least have to give you back a plan showing you, because this is so vague, showing you that type if you think that's a good idea.
Speaker 6 (59:25–59:33)
I mean, depending upon the plant materials, you might get something growing in between the sections. So it just doesn't look like this weird thing there.
Speaker 3 (59:34–59:38)
If the parking spaces are nine foot spaces, it's probably 30 feet of fence.
Speaker 6 (59:38–59:40)
So you definitely have room.
Speaker 7 (59:40–59:40)
Yeah.
Speaker 6 (59:40–59:41)
to do that.
Speaker 3 (59:42–59:44)
I wasn't paying attention. Yeah, I think that looks great.
Speaker 16 (59:44–59:47)
So what's an average section of fence, do you think? Eight feet. Eight feet?
Speaker 3 (59:47–59:48)
Yeah.
Speaker 16 (59:48–59:48)
Oh, sure.
Speaker 3 (59:48–01:00:01)
And from a standpoint of weather and time, if that's what it is, he's got five post holes. I mean, he can get it done, whoever it is.
Speaker 16 (01:00:01–01:00:29)
Oh, yeah. He thinks he can. He does. He thinks, too.
I mean, he even thinks, and we never have really that. bitter cold weather, that it gets frozen down that deep. So he thinks that he can do the fence sections and talk to his fence, the same person that installed the other fence. And I don't know why you couldn't do what you're talking about, because the idea here isn't to keep people from escaping or something.
It's just to provide a visual barrier, and the idea is to make it more interesting.
Speaker 6 (01:00:29–01:00:39)
It'd be nice to have four pieces so it's not just one forward and two back. Or five, yeah.
Speaker 16 (01:00:39–01:00:42)
Four times, they're eight-foot pieces of 350.
Speaker 6 (01:00:42–01:00:50)
I'm just looking at this, as John says, our parking space requirement's nine feet, so there's four-ish spaces probably within that.
Speaker 16 (01:00:52–01:00:56)
So as many as can fit in there, either four or five pieces. Right.
Speaker 11 (01:00:59–01:01:07)
Should we do a section on the other side of the sidewalk as well? Meaning the blue hash marks? Because when I was there, there were two dead trees on that side.
Speaker 16 (01:01:09–01:01:11)
Other side of the sidewalk. You mean on the other side of the driveway?
Speaker 17 (01:01:11–01:01:14)
The walkway. See the blue hash mark, the blue squiggly?
Speaker 16 (01:01:16–01:01:18)
You'll have to show me. Do you mind? Yeah.
Speaker 17 (01:01:18–01:01:27)
I'm calling this a sidewalk. Maybe it's a walkway. It is a walkway. So I know there's dead trees here.
So we could have put some beds in there as well.
Speaker 11 (01:01:28–01:01:32)
Because I think we're going to have the same problem with light hitting at Russell's house.
Speaker 16 (01:01:32–01:01:47)
Well, I think the fence should be as long as it needs to be to effectively block what we're talking about, which is, but it is, yeah, it's cars moving around after dark, and the place does close at six, but at this time of year, it's dark, so it's dark at four o'clock.
Speaker 14 (01:01:47–01:01:52)
I mean, I think it just, like, aesthetically, that is gonna make it look even more odd.
Speaker 6 (01:01:52–01:01:55)
Yeah. Yeah, me too, with the rocks that are there, and the big trees.
Speaker 16 (01:01:55–01:02:03)
Yeah, there's already a lot of columbine-type rocks, right? Isn't that why we, didn't do a lot of change over there.
Speaker 11 (01:02:03–01:02:08)
Yeah, I don't remember seeing rock right on that side of the fence, but if it's there, it's there.
Speaker 1 (01:02:08–01:02:10)
Yeah, it's all good.
Speaker 15 (01:02:10–01:02:11)
Yeah, exactly.
Speaker 11 (01:02:11–01:02:15)
Like right there where it's flat, you could have the same problem.
Speaker 6 (01:02:15–01:02:17)
This is a very natural look in here, though.
Speaker 14 (01:02:19–01:02:25)
I think it would be a little odd because it's the other side of the sidewalk. But I think it might just look a little bit weird.
Speaker 11 (01:02:25–01:02:28)
No worries. We just don't want to miss an opportunity to put more fence in.
Speaker 14 (01:02:29–01:02:33)
And the only other thing we talked about was the cedar fence.
Speaker 1 (01:02:34–01:02:55)
I had mentioned that there is a cedar where Tino's, between Tino's property and- Yeah, it's a different style of fence. It's a cedar. That's a cedar. And I was thinking cedar really disappears.
It grays and it almost is more natural. I don't love vinyl fences, but- No, I know.
Speaker 16 (01:02:55–01:02:59)
The reason this was proposed is because that's what's around the other side.
Speaker 1 (01:03:00–01:03:03)
And it sounds like Jenny's, okay. I mean, it's, again,
Speaker 16 (01:03:03–01:03:17)
A natural cedar that would that would just weather It's not that it's I don't know that it makes a difference. I mean, I think it probably is could be done either way I'm, not an expert on this, but it disappears.
Speaker 13 (01:03:17–01:03:57)
Yeah I think actually the fence should I think to make it look more consistent, it could match the fence on the side of the school that's lower. And I don't know what the height of that is, so I don't want to say for sure it's four feet, but there is a lower fence. that runs along the side of the school, closest to the school, and it's a gray vinyl. It's not horrible.
I mean, I wouldn't put it up, but at least it would be consistent with what's there. And I think the combination of fencing and more landscaping would really be ideal.
Speaker 16 (01:03:59–01:04:03)
So I'm not sure which fence that is, because you said there's two now on the other side.
Speaker 1 (01:04:03–01:04:05)
She meant the gray vinyl one.
Speaker 16 (01:04:05–01:04:12)
Yeah, so do use a matching fence, but add landscaping to it. I mean, try to design it in a better way.
Speaker 1 (01:04:15–01:04:24)
That's pretty helpful, actually. And I think pulling out those, you've already got your holes dug from where the four dead trees are, so popping in something evergreen and smaller.
Speaker 16 (01:04:24–01:04:40)
Right, because those are those trees further to the right towards Central Avenue. The dead holes, you know, the remaining holes. They are. Okay, so they'll be available to put something in, right, and put some soil in around them.
Speaker 14 (01:04:41–01:04:46)
And it could probably get a good deal. Yeah, probably people are put things on sale.
Speaker 13 (01:04:46–01:05:14)
Um, and I just want to add, I don't, I think they're the only things on the property that haven't done well. So, yeah, I would just confirm Marion that there is a watering system in place because the side along Columbine. And the back all have done, we don't see any dead trees there. So I don't know why those trees in that front section didn't grow.
I'm not convinced there's a watering system. But again, it has been very dry.
Speaker 16 (01:05:14–01:05:23)
Well, I know. But I will definitely check on that because I certainly understood from before that there was. So if there isn't, then they do need to put something in there.
Speaker 12 (01:05:24–01:05:24)
That's great.
Speaker 16 (01:05:24–01:07:14)
So I've got a few elements here. Four foot high fence, I guess, would be the same material as the fence along Columbine Road. It will be between Central Ave. It will be just outside the light post bases toward Central Ave.
That leaves the holes that are there for the trees that all died available for other types of landscaping, if possible, that could be put in now if we can find something. But certainly that would be where it would be put. And I will check on irrigation, but I do understand. I agree with you that the responsibility of the owner is to irrigate one way or the other.
There's no point in planting if you don't irrigate. And so I'll confirm. I'll certainly get back to you on that point. I want to let you know.
If it's not in there, it'll have to be somehow put in. So that's a lot of information, and that's why I'm here tonight, because it was so vague. I didn't know exactly how to proceed. I couldn't give you a plan.
Normally, I would try to do that, but I think it's better to get the advice first, because some of your ideas have been interesting, and they're very specific to us, the location. And Jenny, you're still there, right? I'm sorry. So, that's okay.
So, I mean, I want, you know, to, to sketch out what advice has been provided tonight. And then I really would like sunny to put in place. a more specific plan and review it with you to make sure that it's what you are expecting. And I want to get moving on it quickly because of the weather and everything.
So are you going to be around in the next week or two? Are you going to go away for Thanksgiving or?
Speaker 13 (01:07:15–01:07:21)
We're here. We're here until mid-January, so it's great to use that as a deadline.
Speaker 16 (01:07:22–01:07:49)
Oh, yeah, definitely, yeah. Okay, well, unless there's a lot more, if there's more you want to tell me, I'm happy to listen. Otherwise, this is really what I was hoping to get, lots of advice. No, and specific advice.
This is much more specific, and I think you'll be able to work on this. The one thing I will get back to you on is the irrigation. I'll just let you know, there was never any irrigation there. That would be a surprise.
Speaker 3 (01:07:49–01:07:52)
And Marion, do note to Sonny what Cheryl had indicated.
Speaker 16 (01:07:52–01:08:13)
Yeah, the staggered. I've got that down here. Staggered fencing, maybe four or five sections of fencing. The location, Maggie has described that very specifically.
Suggestions for planting, hydrangea, and maybe the arborvitae, you know, if there's a way to do it that's attractive.
Speaker 14 (01:08:13–01:08:13)
Or a white pine.
Speaker 16 (01:08:14–01:08:15)
Or even pine.
Speaker 14 (01:08:15–01:08:17)
You can do white pine. They're native.
Speaker 6 (01:08:17–01:08:34)
I think that having it look natural with some variety and height and layers is, like you suggested, I think it's important because otherwise it'll look out of sync and out of character with what's on the other side of the sidewalk.
Speaker 18 (01:08:34–01:08:35)
Okay, that's good.
Speaker 16 (01:08:36–01:08:37)
That's good, thank you.
Speaker 13 (01:08:37–01:09:23)
And thank you, Marion, for all of this. The only thing that I would add is if you're thinking about doing a staggered fence is to make sure there aren't any gaps. So you really have to use more linear board feet of fence, because really what we're trying to avoid is all of the lights from the cars coming in and out. And if there's gaps in the fence, it sort of defeats the purpose.
And I think it's really short. I sent Sonny an email some months ago. I think it's about four sections of fence. So it isn't, I think, a big outlay.
But to be able to soften it with landscaping would be great. And thank you, planning board, for all of your attention to this. It has gone on for a long time.
Speaker 2 (01:09:24–01:09:27)
Thank you for your patience. Okay. All right. Great.
Speaker 16 (01:09:27–01:09:28)
Thank you very much.
Speaker 2 (01:09:28–01:09:30)
Sorry I missed you initially.
Speaker 16 (01:09:31–01:09:35)
All worked out. Thanks for going over it again. Yeah.
Speaker 1 (01:09:35–01:09:49)
So now we can reopen our Zero Blue Hill Ave. Parcel 57-5 site plan approval continued from October 24th.
Speaker 19 (01:09:50–01:10:00)
Thank you. Hi. Thank you. I'm going to try and take control if Cheyenne or Tim will allow it.
Speaker 5 (01:10:03–01:10:08)
Chris, are you, are you in the, I got to promote you to panelist and then you should be able to.
Speaker 4 (01:10:11–01:10:12)
He has just promoted.
Speaker 18 (01:10:12–01:10:19)
You should be able to go there.
Speaker 19 (01:10:28–01:10:40)
I'm a little bit late, but it should be okay. So I just put together a few slides just to kind of catch us up on, you know, five or six weeks ago, the comments, all the renderings, all of that, and then we can discuss it.
Speaker 10 (01:10:40–01:10:42)
Great. And if you could just introduce yourself. Sure.
Speaker 19 (01:10:42–01:12:21)
My name is Chris Fassenden. I'm with Viking Development, the applicant on this project. I'm part of the Gardner School team. So, like I just said, objective, we'll recap a little bit.
We have a new member that wasn't here last time, so we'll give you a little info. And then we'll kind of run through kind of the high-level, you know, big topics that we received feedback and comments on. Recap, we're located between 665 Blue Hill Ave and 711 Blue Hill Ave. Total site area is about 6.87 acres, zoned RA residential.
What we're proposing, 16,200 square foot building, just under 5,000 square foot playground. And we now reduced our parking lot size to 45 spaces. Enrollment capacity, we're looking at 195 students and 32 staff at full capacity. Something that was brought up was kind of comparison to some of the other schools in the area.
I pulled data for Goddard and Little Sprouts. Goddard is 16,800 square feet, 175 kids. Their age range is similar to ours, eight weeks to five years. Little Sprouts, just down the street from our site, a slightly smaller two-story building, 9,900 square feet, 125 children, same age range, eight to five.
eight weeks to five years old. Reminder, hours of operation 7 a.m. to 6 p.m. Monday through Friday, no weekends.
And then we talked about it briefly before, drop-off and pick-up. We don't have a set schedule for that. It's really at the convenience of the parents and what fits their schedule. We've done parking studies that do show that it sort of follows what we would expect, 7.30 to 9 is peak drop-off and then 3.30 to 6 is kind of our peak pick-up hours.
Speaker 6 (01:12:23–01:12:35)
So can I just, just for the public that's listening, do you want it from 57 parking spaces to 45? Correct. So, okay, so 12, a reduction of 12. Correct.
Okay, thanks.
Speaker 19 (01:12:35–01:15:03)
So on that topic, site plan updates, we heard board feedback, neighbor feedback at the last meeting, kind of identified six things in all of those comments. I went back and watched the tape. Site layout and details, landscaping, lighting, architecture, drainage, and traffic. On the left are some comments I pulled, on the right kind of explain what you're looking at in the plans.
Shifted the building and playground to the north 18 feet. We reduced parking count by 12 spaces, 57 down to 45. By shifting north 18 feet, we gained that 18 feet from the southern property line. So we got another, some more buffer there.
We're now 77 feet from the southern property. In doing so, we reduced our limit of disturbance by about a quarter of an acre. We actually reduced our earthwork quantities down to 500 cubic yards of export. As requested, we repaired site sections, north, south, east, west, to kind of show our relation to the adjacent properties.
We also prepared a rendering, kind of giving us the view from Route 138. We removed all vinyl fencing. I've provided a fencing spec sheet for the fence we are planning to use. I gave you some retaining wall details and some materials that we're looking to use.
And then I provided a safety sheet on the artificial turf. I know there were some questions on that. So this is the site plan. We can kind of flip back to that if there's any questions.
Same with the site sections here showing our relationship to the adjacent properties, earthwork cut fill diagram. Landscape, as I mentioned, we had done a tree survey for about 3.7 acres, which should cover kind of our disturbed area here that identified 586 trees, 3 inch diameter and larger. 441 trees are being removed. That's reduced from when we were here last time.
It was 471. 325 of those have been identified as an invasive species. Seven are classified as in poor condition or dead. I've identified average diameter of what's being removed at 8-inch and the median diameter at 5-inch.
We're proposing 89 new trees, a slight increase from before when we were at 81. Most, I'd say 75% of them are proposed at six to eight feet tall, and then the remaining are 12 to 14 feet tall. Those are mostly along the front elevation along the retaining wall area. We've also kind of, those additional trees were mostly added to the adjacent shared property lines to kind of fill in any gaps of trees being removed due to grading retaining wall landscape.
Speaker 20 (01:15:05–01:15:13)
Excuse me, I noticed that you have this projected, is there a way for me to get that up as well?
Speaker 6 (01:15:15–01:15:26)
To join the Zoom? Yes. You can join the Zoom via the town website under the calendar. So if you go to the homepage and scroll down to the bottom, you should see a calendar.
Speaker 5 (01:15:28–01:15:35)
Cheryl, if she's asking to actually see the materials, they're on the planning board website under projects and proposals.
Speaker 20 (01:15:36–01:15:48)
I'd like to have this as a… As a document? Yeah, just put it on for here.
Speaker 6 (01:15:48–01:16:05)
So I'm on… If you go, what Tim suggested is if you're on the homepage under boards and committees, At the top. So that's to see this live, but if you want to see this as its own document.
Speaker 5 (01:16:06–01:16:12)
Yeah, actually going to the meeting materials form is probably the best way to do it.
Speaker 6 (01:16:12–01:16:15)
Yes, go and get it later by going up to the planning board.
Speaker 2 (01:16:15–01:16:18)
Oh, no problem. It's up there. Yeah.
Speaker 19 (01:16:19–01:17:56)
Next one's lighting. There was a couple questions on lighting. Just thought I'd address it quickly. Still showing a photometric plan with zero light trespass across property lines, and the plan is to be dark sky compliant.
We've worked out a lighting timing plan. We'll be off from 7 p.m. to 6 a.m. We've reduced pole heights from 18 down to 12, and then further refined locations with shields to make sure we're pointing inward.
Architecture, we've incorporated a mansard roof design that really helped kind of bring the asphalt single roof line edge across our entire elevation, full extent of the building. We've replaced the brick water table along the bottom base of our building with a stone water table to help kind of fit the stone accents. We maintain the gable roof design, figured that kind of helped tie to the residential feel. We looked at exterior finishes.
We've decided to kind of stick with the combination of board and batten, lap siding, shingle siding as kind of contrasting elements to help bring it all together. I reviewed Goddard. Goddard's entire elevation is single side shingle siding. Little Sprouts is completely lap siding.
So ours is kind of a mix of all of those elements together. Again, those are high-quality finishes commonly used in residential construction. There was a comment at our last meeting about the height of the building. The height of the building is 22 feet.
That's no taller than a typical two-story residential building, and a portion of that 22 feet is actually sort of elevated to provide rooftop equipment screening.
Speaker 6 (01:17:57–01:18:13)
Can I just stop you there for a minute? It's 22 feet from the new grade, which is 17 feet up from existing grade, right? Which is also up from sidewalk. So when we think about the height, I'm looking at this.
Speaker 19 (01:18:14–01:18:19)
Yeah, if you're looking at it from the street, you're looking at a 14 foot retaining wall with 22 feet of building.
Speaker 6 (01:18:19–01:18:32)
If I look at the section from the street, so we're not really looking at a 20 foot high building. But we can come back to that. I just wanted to mention that here while you mentioned the height.
Speaker 19 (01:18:32–01:20:40)
Sure. And then the last point on architecture. While we added those elements to try to get a residential feel to it, I also just want to point out that we did elements of retaining walls and landscaping and grading to try to help fit the building into the slope. The stone water table, for instance, from some angles is invisible.
So the stone retaining wall, the plantings kind of help hide some elements as well. Elevations, rendering, drainage. These ones can be quick. You guys are probably aware it was in the packet.
We received peer review comments on 1021. The submittal included revised plans, updated drainage report, and a comment response letter as part of that. Last time, there were some questions related to the implementation of the plan and intent to match that plan in construction. I spoke to the town engineer.
I looked at some of the requirements. I just want to make it clear that there is a requirement for as-builts. There is a requirement for a certification by the engineer of record. We're required to put an operation and maintenance plan together where that requires inspections annually as well as after rainfall events.
So all of that kind of contributes to ongoing maintenance and completion of what's designed and approved. And then traffic, we received comments back on that 1029. As we sort of expected, they did make the recommendation for additional traffic counts. We were able to complete those yesterday.
So we'll be analyzing that data and hopefully putting together an updated report. So summary, site development plans have moved in a positive direction. We've reduced disturbance. We've reduced earthwork.
We've reduced the number of removed trees. We've reduced our impervious area. We've increased our proposed trees. Peer reviews have been constructive.
We currently meet all the applicable articles of the zoning bylaw. excited to hear what you guys think of this latest version and discussing, you know, next steps moving towards maybe an approval. With that, I have my architect and the traffic engineer here tonight, and then civil engineer had a family matter come up, but I believe one of his colleagues may be on Zoom if we need him.
Speaker 3 (01:20:40–01:21:08)
Okay. Can I ask you to go back to one plan that you went through? Sure. Could you go back to the cut-fill analysis?
Yes. I just want to make sure I understand How much earthwork is here? That's right. I have it on my screen.
That's okay.
Speaker 21 (01:21:22–01:21:26)
Do you know the volumes? The volumes of cut?
Speaker 19 (01:21:26–01:21:40)
Yeah, so it looks like they're on the table. 10-6 of cut and 10-1 of fill, 500 export. Likely doesn't include, yeah, foundation, drainage, utility, trenches, any of that.
Speaker 3 (01:21:40–01:21:49)
So you're assuming that all your cut material can be used on site? If you have 10-6 a cut and 10-1 a fill and you're saying.
Speaker 19 (01:21:49–01:21:52)
No. Well, so yes, in this calculation, it's considered.
Speaker 3 (01:21:52–01:21:55)
I mean, that's, that's just, that's just straight math. Right. That might not work.
Speaker 19 (01:21:55–01:22:04)
Right. No. And we know it doesn't, um, there is, there is some sort of undocumented organic fill on this site that probably won't be able to be reconditioned and reused. Yeah.
Speaker 3 (01:22:04–01:22:10)
So your export could be, yeah, could be much greater than that. Okay.
Speaker 6 (01:22:16–01:23:49)
Can you go to the site sections? So when I was looking at this and well, first of all, thank you for your presentation and your response to our comments. You know, having them laid out the way you did and really addressing them is helpful, you know, to move this along. But this section, these sections are concerning to me.
And that's why I think I requested them at our last meeting. And so you see it here in terms of the cut and the fill. And it makes me wonder about your site design strategy. If you reverse the building and the parking, you could drive up to a parking and slope up to a building, and you would need a lot less fill.
And I recognize that we don't love seeing parking from the street. However, when I go to the 3D view, I'm looking at something which is a stone wall or whatever the retaining wall will be. I'm going to see that primarily. And I'm not going to see the building so much here.
You know, I think some of the site strategy here is causing more impacts than it has to. So I'm wondering if you have looked at it, if you've thought about it.
Speaker 19 (01:23:52–01:24:20)
Yes, I mean early on in the process, you know, you evaluate different layouts to see you know Earthwork is typically a target at the beginning to try to minimize that I Think putting the parking in the rear was seen as an advantage for everybody It's I mean look at what you just spent the last, you know, 30 45 minutes discussing In general a parking lot and a building kind of sit at one elevation so whether you flipped them or didn't you would still have relatively similar
Speaker 6 (01:24:21–01:27:06)
You don't have to, though, right? I mean, you don't have to have the parking. I mean, this is the thing. I look at this, and we're trying to work on some of our site plan approval process and requirements.
And this topographic change is something that continues to come up. And because we're not working with the land, you know, the land has slope, and you want it to be totally flat. And it doesn't have to be totally flat, you know, to have a site work. And there's plenty of places that they work with the topography.
and you have parking and you have to walk on the sidewalk or something to get to the place that you're going. And so the strategy of this site is working against the topography in all ways, the most it absolutely can, because it's having so much retaining wall, that that's the design feature that you're seeing is the retaining wall. And we haven't talked about the materials of that so much yet, but I'm going, we're going to get to it where you're coming, you're suggesting that this is the block. And again, You know, these also are designed to have water come through them.
So, you know, the appearance of that wall, that's the design feature that we're all going to see. So, you know, that I would see parking with a landscape buffer. This building is set quite a bit further back. It doesn't have the same kind of site considerations as the central lab that we were just looking at.
And so. We had asked whether the building needed to be a straight rectangle, whether there could be some design. Changing the roof a little bit doesn't really accomplish that in my view. Then looking at the geotechnical report, the other thing that concerns me about it, and we don't have a construction management plan, But in other projects, since I've been on the board, when you remove this much from the landscape and you have any water, storms or anything, that the soil becomes unstable.
And it says so, that that's a concern in the geotechnical report. So I think the least amount of this kind of heavy slope change could be badder in terms of any runoff that you might be looking at trying to manage. And I say trying to manage because the kind of storms that we're getting these days, there's coming down so much rain so quickly. And I can find the exact language in here that addresses that.
If others want to go ahead and talk while I look for that.
Speaker 3 (01:27:08–01:27:16)
Could I just to continue with Cheryl's question, have you tried to cite the building, as Cheryl had said, in the back of the site?
Speaker 19 (01:27:17–01:28:05)
Yeah, I wouldn't say as anything recent that I could tell you how things laid out. I think we've sort of chosen this. We've worked to make it the most applicable in this layout. It meets all of our setback parameters.
It gets a confined footprint. We've reduced it even further with conceding on some playground widths. We find it pretty economical. to your point on working with the topography.
Operationally, it becomes a challenge for us a little bit to look at stairs and ramps. Parents with two or three kids, parents with car seats, it's convenient and a benefit to be able to have the easy access.
Speaker 6 (01:28:07–01:28:57)
I'm just going to point out in the geotech report, it's page 12, the weather performance criteria. It says the glacial till is generally moisture sensitive. Every effort should be made to maintain drainage of surface water runoff away from construction areas by grading and limiting the exposure of excavations and prepared subgrades to rainfall. And it also says Under subgrade protection maintenance, the glacial till is generally moisture sensitive and may degrade if exposed to inclement weather, freeze-thaw cycles, or repeated construction traffic.
So I do think At a minimum, we need a construction management plan that references the geotechnical report. There's a lot of recommendations and suggestions in this report.
Speaker 19 (01:28:57–01:29:29)
I completely agree with you. And it's something that in construction, we would we would focus on its means and methods. It's certainly, you know, for going down that avenue, the last thing I want to do is put anything that we're spending money on and building at risk of failure. I just say it's hard for me, we will, it'll be a requirement of construction for us to put such a plan together.
But, like, I'm already sort of seeing here in asking me to flip a parking lot in a building is a big ask to me to put together a full construction management plan. I. see that putting the cart before the horse a little bit. I completely understand your concerns.
Speaker 3 (01:29:29–01:30:00)
You know, I think what we could ask, Cheryl, I mean, Boal is an excellent firm, but I think what you're reading is, and this sometimes happens, projects get approved, and then when they get to the stage of construction, the viability of the plan when it becomes reality. Sure. Problematic. And I've spent my entire career in construction and I've had to design plenty of sites that probably not enough thought went into it.
Speaker 19 (01:30:00–01:30:01)
The guy who designs it never builds it.
Speaker 3 (01:30:02–01:31:04)
Well, you know, you are moving every yard of earth that you possibly could move either under the building where the building is going to go under the parking lot or that's, I believe that's, that's some sort of a drainage basin in front. Every, yard of earth onto all of that area your entire construction area is being the front is being cut out and it's moved to the building the back is being cut out and it's being moved to the building I mean it's it's a tremendous amount of work and you know if the soil is a subject to stability based on weather, rain, this is gonna be a nightmare for a site contractor, a nightmare, because you're just not able to work with stable soils if you're dealing with inclement weather, you know what I mean? It'd be good to have a point of view, like a real, Boal is not a site contractor, but this looks like a very expensive site project, very expensive.
Speaker 19 (01:31:04–01:31:18)
And there certainly will be costs in the earthwork. I will say in the site plan set that was submitted, there are a few pages of erosion control that probably includes sill fence, and I believe the stormwater peer review even talked about it. But I understand where you're coming from.
Speaker 3 (01:31:18–01:31:42)
I'll read the geotech report. I apologize. I haven't read it. But what I'm talking about is stability of soil.
When you look at how much earth you're going to move in compacted layers of fill, it's an enormous problem if the soil is not stable. You're talking long term, not temporary. I'm talking about when you're trying to build it. I'm talking about where we're trying to build it, which I think is really what that geotechnical is talking about.
Speaker 6 (01:31:42–01:33:33)
Yeah, and the reason I bring this up is we have a site in Milton where, you know, it was during construction and, you know, trees were removed and topsoils were removed and it was a lot of slope to it. And during heavy rains, there was a lot of runoff from that and soil from that onto neighboring properties. that caused significant damage and those homeowners came back to the planning board and asked for some and they went to the building department and everyone asking for some attention to it and the board did pay attention to it there was litigation there was a lot I'm just raising it because it was, you know, a pretty significant challenge for everyone involved with that. And, you know, so I see that, you know, Mr.
Platt from Bowler's here. I was going to say he has his hand up. But, you know, I'm hopeful that you will think about and at least come back to us with having talked with your team about this idea of flipping the property, the location of the building on the property. And then some of this discussion might change a bit with that in terms of how much soil you're really going to need to do this extensive work because You know, they can look at how this might grade with the parking lot and, you know, the idea that you would, you know, maybe you can have a drop-off and then, you know, the parking for staff is on a different level.
You know, it's something just to think about rather than the default of a flat site when you're not working on a flat site.
Speaker 3 (01:33:34–01:33:44)
Sure. One last question on the topic that Cheryl was talking about in terms of those parking spaces, how many of those are staff and how many are needed for the drop-offs?
Speaker 19 (01:33:45–01:34:06)
So that's a hard question to answer because it's so fluid. But 32 staff members, uncommon to have all of them there at the exact same time unless there's some sort of on-site event. We typically see, we've studied it in 15-minute intervals. And at most, we have about six parents come or go in that 15-minute interval.
Speaker 3 (01:34:08–01:34:27)
So I think our number is 37 that we absolutely target. But in some way, shape, or form, you have 195 students. So you have 195 drop-offs and 195 pickups. And that's probably what you're concerned most about in terms of people making their way from a lower level to the school.
Is that really your concern?
Speaker 6 (01:34:28–01:34:54)
So if you had the entrance at the front, so not only would you move the building, but you have the entrance on the other side, at least you could conceivably have a drop off in front and then parking spaces lower. I just something, I'm not trying to design the site here in the meeting, but I do think
Speaker 19 (01:34:55–01:35:04)
Respectfully, I'll go back and look at it and see if there is a way to. be efficient with the grading that comes on the site.
Speaker 3 (01:35:05–01:35:25)
That'd be great, and if you don't mind while you do it, and I'm behind, you probably heard what I said at the start of the meeting, I'll catch up, but it'd be good for us to understand the benefits to the position you're showing on the plan now and the limitations if it were to be where Cheryl said. Just so we can understand that.
Speaker 19 (01:35:26–01:36:31)
To be clear, to a point, we want to come into your town and we want to fit within the residential area and plan appropriately, but we have a brand and a standard of what Gardner School is. Parking right out front, easy access, everyone has to get in, code in, go through a couple doors for security, having to weave up a ramp or upstairs, it goes against our standard and what we're trying to offer to our students and our parents. So this is certainly our preference. We like to work with you guys.
But again, I think we fit within a lot of boxes here on what's required. So I can't promise you anything. Your idea of a staff level parking at a different elevation, maybe there's a consideration there. But there's already a lot of work that's been done.
So I'm going to see it very difficult to really get too far away from this plan. Flipping building and parking is a consideration. I'll give you that just because it is kind of a flip-flop. But I'll tell you, I think we're in a pretty good spot at this point.
I don't know that we're going to see any huge changes in terms of site layout.
Speaker 22 (01:36:31–01:37:39)
Yeah, if I could jump in on the site layout issue. Yes, so go ahead. Thank you. Yeah, I'm Andy Platt with Buller.
I work in the site design here. So a lot of the issues that Chris just mentioned are correct. We went through a few iterations on grading. As you saw from the cut fill volumes, this thing is pretty much balanced, as close as you can get.
So no matter what we do, if we start changing, like adding tiers, We're going to have, you know, more cut definitely on this grading plan kind of allowed us to put the building almost pretty much as low as we could, while keeping everything balanced. And then to Chris's point with, you know, with the type of people using this site, you know, get parents, bringing kids in, possibly even carrying them. In kid carriers, you kind of have to have a level parking lot. And then there's also ADA access to consider, especially from the street.
So to have steep slopes up from the parking lot to the building probably isn't going to work too well for this site or for this use. So I just wanted to add to that.
Speaker 6 (01:37:40–01:38:14)
You know, I guess I if I hearing a recent reluctance that you're coming to us with what you presume to be a final plan with a few minor tweaks, I think it's a shame that you didn't come to the board and advisory capacity or come to the planning department in advisory capacity. I also think it's a shame that you think that you can just bring in a prototype and pop it on a site that doesn't fit your prototype. That's not working with the community and not working with the neighborhood in my view.
Speaker 19 (01:38:15–01:38:23)
Can I ask what you mean by advisory? Because I did a pre-app, I sat here last time and we took a lot of notes and I took a lot of feedback.
Speaker 6 (01:38:23–01:39:18)
So this is engineered out and you said that you've already done a lot of work. But that's required for my submittal. Yeah. But you can do an advisory, which is you're not having the submittal.
You're going to say, I'm going to submit. I'm going to be submitting. Sure. You want to get your feedback before we submit in case there's anything you want to change.
Because it's a problem for us when you come in with something that's fully baked that you say you can't change. because then this is just a rubber stamp process, which I don't like. I think our process is to help make, to look at this and see where the impacts are and to see if we can help make it better. And it's not just, you know, a few trees and a few parking spaces in my view.
So I would like to at least have you take a look and show us at least something in sketch format, which says, you know, to justify that this is the best site layout. That's just my one opinion.
Speaker 19 (01:39:19–01:40:40)
And I understand it. And I was at no point advised or indicated that advisory meetings were possible. I had the pre-app. I've had conversations with Tim.
I didn't realize that there's a step because I spent a lot of money to put a full site plan set together. Had I known I only had to put a site and a grading plan together to get feedback from you guys, I certainly would have considered it. The last meeting, we probably wouldn't have had a full plan set. I probably would have had a couple of sheets.
But yeah, there's an aspect of this that we target sites based on what we believe we can fit our plan into. I understand I've got large walls. I'm happy to decorate them, plant them accordingly, really help us blend into the site so we don't stick out. I understand it's on an elevated grade.
But again, we targeted it knowing we could fit this building, we could fit our parking, we could operate, we could provide access to the right of way, all of those things. Fully within your criteria. So, you know, I don't come in here Trying to bully or be rude about it, right? I've done my research to know that we can propose a building on this property And I come in, you know, willing willing to work with you cooperatively on You know kind of our brand So it's just my understanding though and I understand it's a dover use and I know that probably You know
Speaker 14 (01:40:41–01:41:59)
makes you think that you can do things as a right, which you can, but what we can do is we can impose reasonable regulations in the areas of the bulk and height of the structures. yard size, lot size, setbacks, open space, parking, and building coverage requirements. So there's a lot of latitude for the board to actually have input and request some changes. You know, I think this is a totally I'm not as nice as Shannon and Sean.
I don't think this is an acceptable look. I think this looks like that prison on 128. And I just don't. think that is what we want in our town.
I was against another project which had 17-foot retaining walls. That's 14 feet. And all you did was plant those look like green giant arborvitaes. And you're deforesting what was it, two acres?
Speaker 6 (01:41:59–01:42:00)
Three.
Speaker 14 (01:42:00–01:42:50)
Three acres. And putting lawn. So to me, I don't think this is acceptable, the way this looks right now for the town as a whole, and specifically for the neighbors. And I'm not sure.
you know, planting 89 trees is like, that doesn't excite me. So I do think, you know, Cheryl and Sean have much greater experience. And I think you'd be wise to listen, you know, and take their advice. And just personally, it's just, I don't know, it does not fit in to the neighborhood or the town.
Speaker 19 (01:42:52–01:42:55)
with the concern being its elevation above adjacent grade.
Speaker 14 (01:42:57–01:42:59)
Yeah, and the removal of all those trees.
Speaker 19 (01:42:59–01:43:47)
There's no way around it, right? The site we've chosen, the trees are going to be removed. A large number of them are invasive. I've read through the bylaw.
We talked about a replacement policy. Just so you're aware, it's kind of incomplete. They haven't chosen a fee in lieu yet, as far as I've heard. I understand your perspective.
I don't know that the walls go away in any condition. We talked about a two-story building. It just doesn't really lend itself to this situation any more than the one-story building. Like I said, we're pretty balanced here.
We've minimized our footprint. We've looked at going back. We talked about this last meeting. Going back only puts us into a steeper slope.
Speaker 11 (01:43:48–01:44:31)
What about going down, just down with the elevation? So this wall isn't 14 feet, it's more like seven. It just puts the wall on the backside, puts more cut into the side of the slope. Yeah, I'd rather see it back there than here.
I mean, it looks like we have a very big wall and we also have a very tall building. So if you could get that 22 foot height, I don't know if that's at the peak of the entrance, but if you went 20 feet, I'm sorry, lower than 20 feet, you shrunk the building and shrunk the wall. I think it would be a little bit more appealing from the street. and I get it, you may have to do a two-tiered retaining wall in the back and take down a few more trees, but I think that is less impactful than looking at this every day.
I mean, is there a reason why you can't drop the actual elevation?
Speaker 19 (01:44:31–01:44:52)
Just the substantial export that then comes at that point, right? You would just basically take that plan. I'll draw just to make it a little clearer, right? This red line, you would basically take that red line and lower it to this point.
So this is all becoming cut. So now we've just taken the site and dug an even bigger hole.
Speaker 11 (01:44:53–01:44:56)
But based on the geological report and the amount of, what do they call it?
Speaker 19 (01:44:56–01:45:23)
There's a lot of rock. So our parking lot sits on rock right now, which is part of the reason we brought up tree plantings. We, for two reasons, chose shrubs to remain within our parking lot islands. We're probably going to have to put some drainage under our parking lot anyways.
So that lowering from that aspect is also gonna hold me into this site plan a little bit more, just because of the substantial rock we'd have to dig out. I'm going through it.
Speaker 11 (01:45:23–01:45:29)
Or maybe you tear your employee parking on the ledge, right? So there isn't a rock under the building.
Speaker 19 (01:45:29–01:45:45)
I can separate a few spaces, but again, my parking isn't employee parent, really. In peak hour, it's mostly parent. So it's hard for me to, I can do it a little bit in terms of tiered.
Speaker 11 (01:45:46–01:45:59)
Yeah, if you could take that front wall down, I think for me, I would, I would really welcome that. And if you could, the height of the building came down a little bit. That's just one guy speaking.
Speaker 19 (01:45:59–01:46:07)
I can talk with the architects here. He can weigh in if he needs to. Height of the building, you want me to lower the 22 feet in addition?
Speaker 11 (01:46:08–01:46:10)
Well, I'm just thinking for a one-story building, why does it have to be 22 feet?
Speaker 19 (01:46:10–01:46:16)
It's just to hide our RTUs at the top. So if… Sure, if you want to come up there.
Speaker 1 (01:46:17–01:46:21)
Sure. Yeah, yeah. Because I think there'll be some… There's another microphone you can…
Yeah.
Speaker 7 (01:46:24–01:46:24)
Come.
Speaker 23 (01:46:25–01:47:26)
Hi, I'll introduce myself. I'm Josh Helsel Sauer. I'm with NORM, the project manager for architecture and engineering on this project. So basically when we look at the size of the building, right, let's say we use 9, 10 foot for your overall ceiling, right?
Roughly just based on on size what we need for structure weight of our to use drainage You're looking at about two feet of steel and then I need about two feet to two and a half feet of room for duct So above my ceilings I need about four or five feet just for all of that above that you're looking at Standard height is maybe three foot for your rooftop unit. So most planning boards prefer, if you look at your sightline diagram, you're looking at trying to minimize that impact. So at that point, you're at about 17 feet, which is the Mansard roof is I think 17.6 is what we call it to be.
Speaker 19 (01:47:26–01:47:47)
If you look at the elevation, you'll probably find it. And that's good info. What I was going to say then is given our relationship to Blue Hill, although we have neighbors to consider as well, you may be able to reduce the Mansard height only because we're already elevated a little bit. So visibility would help.
So we could certainly look at that. Yeah, thank you.
Speaker 3 (01:47:51–01:48:24)
Yeah. I think what makes it challenging Josh is, you know, it's the road elevation to what Cheryl pointed out earlier is the 22 feet is probably not. It's not as daunting if your building isn't as elevated as it is, right? So we're seeing a significant amount.
I mean, that whole grade change between your building slab elevation and the roadway is retaining wall. A lower retaining wall and then a higher retaining wall. So what did you say it was, 13 feet of wall? I mean, overall.
Speaker 6 (01:48:24–01:48:25)
17 feet of wall.
Speaker 3 (01:48:25–01:48:28)
17 feet of wall, correct. Overall. I mean, that's…
Speaker 6 (01:48:28–01:48:31)
And then you've got the retention basin, which is dropping down, too.
Speaker 3 (01:48:32–01:48:52)
17 feet of wall, as we're in here, is probably the underside of the roof joist. That's a lot of, that's, right? I mean, 10 plus, that's probably, it's a lot of, you're just driving by looking at wall. Yeah, and I think you'd be okay with 22 feet if you didn't have 17 feet of wall.
Speaker 11 (01:48:52–01:48:55)
Right, it's almost like one or the other, or just reduce both by a little.
Speaker 14 (01:48:56–01:50:00)
And unfortunately, what's going on in town now is the 40B project on Randolph Ave. So they went in and deforested that whole section. And they have the back, you know, you just look up and it's It is just naked. The whole site is naked.
And so we know what to expect. And I don't want that happening again in Milton on this side of town. I think that was a shame what happened over there. Trees could have been saved and they didn't.
They weren't. Nobody cared for them. And I understand it's easier to build, but to be honest with you, that's not our problem. If it's easier for you to build, we're here to protect the neighbors and the town.
And if it's a little bit more work for you to protect The trees and the existing topography, that's kind of our job.
Speaker 19 (01:50:00–01:50:57)
So, and I'll start by saying this, I never go into a project approaching 40B or in our case 40A, right? And I know that people have mixed feelings, 40B can be approached in the wrong way, which is why I come in here asking for thoughts, incorporating feedback. With that being said, we aren't just saying, here's our plan, take it or leave it. I will build a stone-like retaining wall.
I will build elements and materials that help it blend in. within reason, right? That's the phrase that we always come back to. There's nothing, and again, I don't do this on purpose or to be rude about it.
There's nothing in the criteria that says what we've proposed today doesn't meet the standards of Milton, right? And I don't wanna work or operate in that way, but we have to work together and come to a meeting point.
Speaker 1 (01:51:01–01:51:59)
So I just would like to add a little bit to that. I would like to see that it is right now when you drive down the lab, what you're looking at are trees, you're looking at forest. I would like to see some of that preserved because I think that would also go a long way with offsetting the height because obviously you're gonna have to have So even if you reduce it somewhat, it's still going to be elevated. So keeping a buffer of forest that we did that with, you know, various projects, well cut woods, you know, they were required to keep certain buffers.
So I think rather than having all of this lawn area, if you kept and have it fenced during the construction process in the construction management plan, that you protected all of those trees along that streetscape, that would go a tremendously long way.
Speaker 6 (01:51:59–01:52:07)
On their grading and drainage plan, they're proposing so much regrading there that you're not going to be able to keep any trees.
Speaker 1 (01:52:07–01:52:10)
That was my question with that retention area there.
Speaker 19 (01:52:10–01:52:17)
So the regrading, there are a stretch of trees along Blue Hill Ave that were shown as to remain in our original plan.
Speaker 1 (01:52:17–01:52:22)
What is the depth of that? How many? What is the setback on that from the road?
Speaker 19 (01:52:22–01:52:46)
Oh, they're pretty close because they were right on our property line. The problem was looking into the drainage concerns and the issues that were raised. We are taking the approach of improving that swale to make sure that we're getting the drainage where it needs to go, making sure we aren't creating any issues. And in doing so, we've widened it, we've deepened it, we've made it adequate.
And in doing so, we've pushed ourselves.
Speaker 1 (01:52:47–01:52:49)
Are you required to have any sort of fencing around that?
Speaker 19 (01:52:50–01:52:52)
No, there's an existing guardrail.
Speaker 1 (01:52:52–01:52:52)
Okay.
Speaker 19 (01:52:53–01:52:54)
And as of right now, no sidewalk.
Speaker 1 (01:52:55–01:53:00)
Okay, I did see you requested to have that guardrail removed at some point.
Speaker 19 (01:53:00–01:53:04)
We will have to work with DOT for a portion of it to get the access.
Speaker 1 (01:53:04–01:53:11)
Alright, but you don't need, because we have a really unattractive, the Thatcher Montessori School, which has a a really unattractive.
Speaker 19 (01:53:11–01:53:17)
That got brought up last time and I need to drive by and make sure. Yeah, it's really bad. It's not on Google Earth yet.
Speaker 6 (01:53:17–01:53:48)
You can take a look at well cut woods also has retention basin in front where there's some natural buffer. I mean, Meredith, may I just jump in? Because what you're commenting about the trees, I mean, maybe another idea would be to shift everything back further, which means you would have less need of fill. You would have cut, but you're not cutting as much as you're filling right here.
to give yourself a buffer zone that's an undisturbed zone towards Blue Hill Ave.
Speaker 19 (01:53:48–01:54:03)
And I like that idea. I considered that when we were thinking about how to get a stone wall, which was brought up, there was really nowhere to put it there. We had looked at like a stone wall with evergreens of some kind right there to kind of screen our site right off of Blue Hill Ave.
Speaker 1 (01:54:04–01:54:08)
So maybe we… If you take the guardrail out, can you then fit the stone wall in?
Speaker 6 (01:54:09–01:54:52)
Because if you move it back and you preserve some trees, and if you move it back and you have a shorter retaining wall, then maybe it's accomplishing some of what we're trying to do with suggesting the flip. So it could be an alternative to that that works better for you. It'll be more disturbance, probably, this side, but if you can… You know, the trees that you would be removing here, you can consider an offset to keeping the trees here.
So your total tree loss should be the same as long as you can protect those trees in front. I can see that as being, you know, an alternative that's not as significant change to you that would accomplish some of what we're seeking here.
Speaker 1 (01:54:53–01:55:57)
And I think that just, and then the next thing that the architecture is, but I do feel like it's very generic, and it's probably, you've done this project probably in a number of locations, a number of sites, and I don't think this is customized for this site in our town, but I would like for you to maybe, I haven't gone on your website to look through your portfolio of other projects that you've done in residential, suburban communities that do have, a little bit more I would say, of a New England feel. Somebody uses the term, this could be anywhere in the country. I feel like it could be anywhere. I think what we're looking for is something that has more of a New England, a little more classic.
I'm glad you added a little bit more of a peak on the roofline. I think even more adding some dormers, maybe some style of windows.
Speaker 19 (01:55:58–01:56:13)
you can do certainly I think there's I think maybe look at other projects like that I can I can I can support I think those are relatively simple ads they you know don't don't steer too far away from what the Gardner school is
Speaker 1 (01:56:13–01:56:19)
And I think the neighbors had some really, I think the neighbors had really good comments. You know, adding that stone wall trees.
Speaker 19 (01:56:19–01:56:40)
I'm not from here, so I don't see it a ton, but you know, it felt like a couple of those outside of the dormers. And like you're saying, the character in the windows, it's just lapsiding. It's just, you know, this has a little more texture and character to the materials. It sounds like what we need to do is look at, like you're saying, maybe some decorative arched windows.
I'll leave that to you.
Speaker 3 (01:56:40–01:56:51)
Can you explain to us what is your protected aesthetic? You talked about your brand, the Gardner brand, architecturally. What is it? What is the
Speaker 19 (01:56:51–01:57:27)
Well, so in Massachusetts, it's still being worked on. This would be our fifth location. But we've got four schools that are this scheme of materials, color, textures. So this is what we're bringing to the Massachusetts market.
And we've changed things. We have a different asphalt roof material on certain schools. We changed the stone material on this one. But for the most part, all of our schools have these three-siding materials, have the stone with the black and white contrast.
There's a gray alone in there that doesn't come through.
Speaker 6 (01:57:27–01:57:40)
You don't have a covered area outside the entrance, so like if you wanted to open an umbrella or something like that, like a portrait-like appearance.
Speaker 19 (01:57:40–01:57:53)
So this is two feet deep. And I would say we would be open to that, but given that the building faces the other direction, I think there's other aspects of the building that we could focus on.
Speaker 23 (01:57:54–01:58:56)
Yeah, I'll say we approach this. I mean, obviously there's, there's a brand standard from, you know, as you locate from location to location. Um, Massachusetts, as you, as you drive down, you see a lot of lap siding, uh, you know, single sloped, um, you know, single gable and roofs, very salt blocks, very traditional, um, getting into some of the Cape Cod style designs. You try to balance that with what you see in a lot of planning boards and planning zone regulations as far as roof height undulations, variation in materials, and having a little bit of depth that often you miss with that residential architecture when you try to merge the two styles together on a building that's larger for the scale.
Obviously, in this case, you can look at something like the gray material and shifting the couple of different sidings we have there. is an attempt to break up that horizontal span that we have, kind of reduce the footprint and the heft of what could possibly be there.
Speaker 6 (01:58:57–01:59:52)
I think it's going to be hard to do in such shallow changes in plane on a 16,000 square foot building. You know, that's another thing, you know, if you, you know, hear our concerns about the design in terms of the walls and the bulk of the building, like we mentioned last time in terms of that overall length. You know, as you consider what modifications you can make, if you had a greater change in plane, you know, you took part of the building and you shifted it. You know, I understand there's cost efficiency to having just a box, which, you know, that's what this is, but it's not.
It's not a huge jump to have some shift in that architecturally, I don't think.
Speaker 1 (01:59:53–02:00:05)
So that's just a response. And this was just one of the residents who's actually in the audience tonight. He had sent us a really thoughtful letter on who's a neighbor and a butter. And these are extra copies.
And I don't know if you saw those, one for the architect and one for yourself.
Speaker 19 (02:00:05–02:00:06)
These are new. These aren't from last week.
Speaker 1 (02:00:06–02:00:10)
This is from last week. I don't know if that was something you received.
Speaker 11 (02:00:10–02:00:12)
It was a couple weeks old.
Speaker 1 (02:00:12–02:00:19)
But yeah, that was from a couple of weeks ago. Yeah, you just saw that from Tim. I thought it was a really thoughtful memo that I just wanted to make sure.
Speaker 3 (02:00:19–02:00:26)
When you mentioned the materials and the texture, you made no reference to the windows and doors.
Speaker 19 (02:00:27–02:00:34)
To be fair, I'm not an architect, so I'm not an architect.
Speaker 3 (02:00:34–02:00:43)
Are you flexible in terms of changing the windows? Achieve the same amount of light but something that doesn't look as commercial as how that looks?
Speaker 23 (02:00:44–02:01:11)
I will have to pass that by the brand standard man, obviously, but I mean, it's certainly an option. I mean, there's flexibility in what you look at. If you go to a residential style window, you lose a little bit of the height. It's much more expensive cost-wise.
These are, you know, being storefront, we have a little bit of flexibility with how we can do it and still meet, you know, standards for maintenance, things to that effect.
Speaker 3 (02:01:12–02:02:03)
Yeah, selection on doors and windows, in my opinion, we have an architect at the table, it has an incredible impact on any building. Absolutely. In my opinion, it really draws your eye, that style of window. As our resident who had given that to you, he's making a point to, and this is what Maggie and you probably heard this from Charlotte earlier, while we all appreciate brand, we also have a responsibility to the residents to do our very best to preserve the character of the town as much as we possibly can in a residential district.
It just makes sense to try to do that.
Speaker 19 (02:02:03–02:02:13)
And I don't mean to repeat myself, but we are becoming a member of this community. So I'm going to find every opportunity to meet you in the middle on some of these things.
Speaker 3 (02:02:13–02:02:15)
Good. You sounded more rigid earlier.
Speaker 19 (02:02:15–02:02:52)
coming around i just want i just the site is where i struggle these are our taxpayers sitting here i get it and the folks watching tonight i get it i do i i've you know we've been through a number of these and they can we can find a line in every situation where we meet board who represents the neighbors in the community. And so I think we can do that again. Just to your point on being rigid, I don't think it's going to be necessarily on site layout in terms of placement of parking and building, but maybe it is about exact location, you know, lowering things, putting the wall in the back, maybe changing some of the architectural elements, things like that.
Speaker 3 (02:02:53–02:03:58)
I do want to go back to just a question, and I appreciate Andy's comment about achieving a balanced site, but while it's close to a balanced site, I have enough experience to know that whatever Andy calculated is not going to happen. You're going to be trucking more than 500 yards off the site. probably everybody realizes that, but you're moving a tremendous amount of earth. While the math says 500 yards leave the site, your math also says that you're about 21,000 or 22,000 yards of movement in terms of continental and so forth.
But I think the factor here that's really daunting is what Cheryl started with earlier. It's that elevation of the building and the retaining walls. What's the reason that the, um, uh, what's the reason that the. Andy touched on it before the placement of the building.
You haven't heard my question yet. Uh, or all of it. What's the reason that the elevation of the slab has to be that high? I guessed.
Right.
Speaker 19 (02:03:58–02:04:12)
So Andy touched on it earlier that the ability to get our building to that elevation is somewhat driven by an ADA slope up to the parking lot. The slope of the parking lot, the driveway.
Speaker 3 (02:04:12–02:04:24)
Take us to a site plan and just show us this. And if Andy's here with us, if Andy wants to speak to this instead of, since Andy's representing Boulder, we'd be happy to hear from Andy.
Speaker 22 (02:04:25–02:04:56)
This is the plan, but it's lines Chris said we needed to keep the building at an elevation that work with the cut and fill volumes, but also still accessible from the street. So, we've got a sidewalk leading from the street up to the parking lot. And that's just under the 5% allowed by requirements. So to change that, to go steeper, we really can't go steeper.
I guess we can go a little bit lower, but that definitely affects the earthwork calculations.
Speaker 3 (02:04:57–02:05:14)
It wouldn't be steeper that we'd be asking for. I guess just what I'm looking at is if that, what did we say, 17 feet of wall? Is that what we said? If that 17 feet of wall was, eight feet of wall, it'd be much more appealing.
Speaker 19 (02:05:14–02:05:36)
I agree. And I think that your colleague brought that up and I agree with, even if it's a sacrifice in a little bit more export, that is something that I would happily look at because I agree with you, we stick out of the ground a little bit and that's certainly a topic that we could potentially address. I'm pretty confident. I'm worried about the rock, but I'll take that back to my side.
Speaker 3 (02:05:36–02:05:55)
I'm pretty confident if you had a site contractor, take a look at it. you know, for an evaluation, I don't think you're going to create more expense. Honestly, I don't think you will, because you're moving all that earth anyway. You know, you would be lower, but remember, every foot you lower is one less foot that you're placing fill back in.
You're taking all that fill out anyway.
Speaker 19 (02:05:56–02:06:08)
I agree with you. The rock, I can't lower the parking lot and I start getting into rock, and that's 20,000 square feet of rock breaking that I'm going to get into. You know, then you talk about blasting, which that we could.
Speaker 3 (02:06:08–02:06:17)
Let's not talk about it, right? You know, we can't design this in the meeting, but I think I think we're probably. I understand why you guys are. Yeah.
Enough ideas to explore. I do.
Speaker 6 (02:06:18–02:06:21)
I just don't want to ask a question.
Speaker 1 (02:06:21–02:06:23)
And then I want to let any of the neighbors speak.
Speaker 6 (02:06:23–02:07:29)
Yeah. was is the stormwater design based on the soils that are identified in the geotechnical report? Because I think the drainage report is from September, I mean from August and the geotech report is from September. And we kind of ran into this on the memory care that we reviewed where the stormwater was based on sort of assumed based, I think it's federal standards or state standards on the location.
So I guess that's my question for maybe you or Bowler. Because I did also notice that there were a couple of borings where you did run into groundwater, even though it's very dry, as Maggie said. And one was in front in that retention basin. So anyway, I did want to understand if your design is based on what was found in the borings and in the report.
Speaker 22 (02:07:31–02:08:08)
Yeah, you're correct that the drainage design was done before we had the geotechnical information, but we made some conservative assumptions up front, which turned out to be proven true by the geotechnical report. So everything should match up now. In fact, the geotechnical report had some infiltration testing in there, which showed that infiltration rates in the basin are actually at least twice as high as what we estimated in our analysis. And we kept those original rates of infiltration just to be safe.
So everything lines up, including the groundwater elevations.
Speaker 6 (02:08:08–02:08:15)
So given that, would you be able to reduce the size of the basin if your infiltration is faster than what you were assuming?
Speaker 22 (02:08:18–02:08:38)
Well, it's always good to have a factor of safety. I mean, in theory we could, but I think one of the things we're trying to do is reduce the runoff as much as possible. So we're trying to hold back as much water as possible because we know there's a flooding issue downstream. So we're trying to do everything we can to reduce that.
And that's just the size of the basin helps with that.
Speaker 19 (02:08:38–02:09:08)
The flooding concerns that were raised last time, Andy and I had a conversation about if there was a way to actually hold more water than required by standards to sort of in good faith do our part to ensure that we weren't causing any more of the problem. And in sort of deciding to keep the infiltration rate conservative was our kind of approach to saying we should be helping, not hurting the situation.
Speaker 6 (02:09:08–02:09:26)
So if I understand it correctly, there's a pretty big swale, what we're looking at, top of plan here, and then there's a small retention basin, and it's piped over to the larger retention basin, is that right? Or piped over to the other swale?
Speaker 22 (02:09:26–02:09:29)
Yeah, the small, sorry, go ahead.
Speaker 6 (02:09:29–02:09:30)
No, go ahead, sorry.
Speaker 22 (02:09:31–02:09:43)
Yeah, the small detection basin you're referring to is a sediment forebay. So it's removing sediment. It's part of our DEP treatment train for sediment removal. And then that overflows into the larger actual infiltration basin.
Speaker 6 (02:09:44–02:09:48)
I was actually thinking on the other side of the drive, there's a, so if you scroll plan down.
Speaker 19 (02:09:48–02:09:53)
Yeah, she's talking about like the scour. The one at the rear parking.
Speaker 22 (02:09:53–02:10:22)
Oh, okay. Yeah, that has no, no function as tension base and it doesn't hold any water back, but it is like Chris said, an armored scour hole. So you've got a swale to the left of that on the plan that's coming down like a rock armored swale that comes down from the hillside and empties into that. that hole there, which is kind of where the water goes right now.
I mean, we're not changing the drainage patterns at all. Then it just enters that pipe and goes along the roadside as well.
Speaker 6 (02:10:22–02:10:25)
Are you deepening that hole from what's there now?
Speaker 22 (02:10:26–02:10:35)
I think it's roughly the same. It might be a foot or two deeper than the existing grade, but it's roughly the same. There's a steep slope there to start with.
Speaker 6 (02:10:36–02:11:32)
So in terms of like helping with runoff, you're concentrating it now into two places on the other side of your site, right? North and south, I guess. So it's, or top and bottom of this plan, you're drawing it around your retaining walls and then taking it down to these places in a concentrated way, right? I guess I'm wondering what happens.
So you've designed for the 100-year. We've talked about how the 100-year is getting updated at the state level, what that means. So can you comment about that? Do you anticipate that it'll work with some new standards that might be taking into account how climate change is affecting the rain events?
Speaker 22 (02:11:33–02:11:42)
Yeah, we used the current NOAA 14 rainfall data, so that's higher than the TP40 that's typically been used in the past with the DED.
Speaker 12 (02:11:42–02:11:43)
Okay.
Speaker 22 (02:11:43–02:12:01)
So those are the current rainfall amounts. And just to your point about concentrating flow, really, the water kind of, well, the water is going to end up exactly where it was before, which is in that existing swale right by Blue Hill Avenue. So we're not really changing the drainage patterns at all. It was always going to be concentrated, or it is concentrated even under existing conditions at that swale.
Speaker 6 (02:12:02–02:12:03)
Okay, thank you.
Speaker 22 (02:12:04–02:12:07)
Thank you.
Speaker 1 (02:12:07–02:12:23)
All right, so I think this is a good time to say thank you and let you all, you know, I don't know when you think how much time you might need to continue the public hearings. We do have to continue it to a date and time certain.
Speaker 19 (02:12:23–02:12:40)
I think another month out, I think it was December 12th, yeah. We should target that and we'll go, I'll go watch the meeting back, make a bunch of notes, we'll review these things, obviously we'll let them speak and I'll hear what they have to say as well.
Speaker 1 (02:12:40–02:12:56)
Great, okay, so great, thank you, that helps. And then any residents who would like to speak, you can come. Sure, yes, if you'd like to come to the table. And just state your name and address for the record.
Speaker 24 (02:12:56–02:14:21)
My name is Tony Harani. I live at 665 Bohel Avenue. I'd be 50 feet away from the driveway. Okay.
So I just hope you guys haven't paid for this traffic study because it's not worth the paper it's printed on. They're advising you that in June the traffic is 9% more than usual. Okay, I work at the VA hospital in Boston. I'm seven miles away.
It takes me 22 minutes in June, July, August to get to work, and it takes me an hour in September, October, November, December, okay? Who chose the date of the traffic study? The traffic study was done June 26 and June 27, okay? If you're looking at the traffic study on a state road that has a school, 200 feet away, it has two other daycares, and it has Curry College.
You don't learn that study.
Speaker 1 (02:14:21–02:14:36)
Yeah, they're doing another traffic study. I don't know if you heard that they are doing another study. They should be doing this. And they did a count from yesterday.
They did a new count. This is a disgrace. They should do the traffic study.
Speaker 24 (02:14:36–02:15:34)
They're doing a new one. I mean, this is incredible. You shouldn't have paid for this. I mean, this is not Michigan Avenue in Chicago.
I heard you're from Chicago. The traffic on the damn thing is horrible. You're not taking into account Curry College. You're not taking into account Delphi Academy.
You're not taking into account the small sprouts. You're not taking into account the other school at the end, Montessori School. So they choose June 26, 27, and they make the disgusting claim that June is usually 9% more. This is garbage.
This is not the traffic study.
Speaker 11 (02:15:34–02:15:37)
So they did another one. I hope so. We're going to see it soon.
Speaker 1 (02:15:38–02:15:41)
Yeah, we haven't received it yet, but there will be a new study.
Speaker 24 (02:15:42–02:16:00)
This is unbelievable. I mean, I do medical research at the VA. It's like doing a sleep study at 12 noon. I mean, you choose two, three days before and you do a traffic study.
Speaker 10 (02:16:02–02:16:04)
Thank you. Thank you very much.
Speaker 14 (02:16:05–02:16:42)
I forgot. Can I ask if we can do when you're entering into the site, no left turn. And then when you're exiting the site, right turn only. Can we request that?
for safety reasons. Because what's going to be damaging if you're coming down 138 and taking a left into the site, I think that's going to be problematic. So if you cannot take a left-hand turn, that might help. And you can only enter the site the other way.
Speaker 6 (02:16:42–02:16:49)
That could generate more traffic for folks, but we can ask the traffic consultant.
Speaker 11 (02:16:52–02:16:53)
Because you may have to go.
Speaker 6 (02:16:53–02:16:53)
You want to comment?
Speaker 11 (02:16:54–02:16:54)
Sure.
Speaker 14 (02:16:55–02:17:17)
Because they also said that most of their clients are coming three to five miles away. And most of Milton is north. True. So if they're going to be drawing customers from Milton, they would be coming from Milton, not from Kansas.
Speaker 11 (02:17:17–02:17:22)
Sort of train them to use Robin Street.
Speaker 7 (02:17:22–02:18:44)
Scott Thornton with Vanessa and Associates. And so one thing that I think you alluded to with something like a right in, right out kind of access, people may be looking for other locations to do U-turns and to come back around. So that's not something that's desirable. The other thing is that MassDOT is gonna have jurisdiction over the curb cut.
So they're going to review it. I don't know that they would agree based on the traffic study that it warrants that kind of condition. We're not showing, I understand that the, you know, There's concerns about the speed that's out there. There's concerns about the volume of traffic that's there.
Based on the, and we are doing new counts, and there'll be a new study that'll be issued. But the results of the study so far show that it's not a significant issue to turn left into the site. There's a little more delay associated with turning left out of the site, but again, it's not, It's not like level of service F or any kind of supremely negative condition there.
Speaker 1 (02:18:46–02:19:02)
Really? I was on it today. I went up to go look at this site and it's very difficult, you know, coming out, you know, Green Street, you know, all different points to get in and out from any of the side streets. It's a challenge.
Speaker 7 (02:19:03–02:19:14)
And to cross over the lanes. And I'm not saying there's no, I'm not saying you just pull right up and leave. There's going to be delay associated with any of those side streets, but.
Speaker 14 (02:19:14–02:20:00)
It's not a problem at noontime, but who's dropping their kid off at daycare at noon? you're using the daycare at the hours that everybody's on the road. We're all parents here, so we understand the concept of a daycare because we've all used it. We understand baby things and being a pain in the butt trying to walk from another parking lot.
That's what you do when you pick a site. You just deal with how the site is. So if we can make the site better for our town and our residents, we're not really concerned with the customers of the site.
Speaker 7 (02:20:00–02:20:02)
Yeah, no, I think.
Speaker 19 (02:20:02–02:20:02)
Yeah.
Speaker 10 (02:20:02–02:20:07)
Thank you. That's OK. That's great. Thank you so much.
Yeah, sure.
Speaker 19 (02:20:07–02:20:37)
I'll just put it here. Like I said earlier, we're becoming a member of the community. The people coming to this place are in the community. They are familiar with traffic patterns and when touring the site, when choosing to go there, they probably have a familiarity with, this is a busy road, we're probably going to have to turn right when we drop our kids off.
They also know the dangers of turning left if they are there, what the risks are. They're not unfamiliar with it at the time that they come in and look at it as well.
Speaker 10 (02:20:38–02:20:47)
Great. Thank you. Anyone else from the voters? Yes, if you'd like to join us and just state your name and address for the record.
Speaker 20 (02:20:47–02:22:49)
Sure. My name is Deborah Fitzgerald. I reside at 705 Blue Hill Avenue and I'm one of those driveways where I have to time it to get out. So I'm with you.
I actually am concerned. I think the last meeting I couldn't make it, but somebody, my good friend over here, had brought up the considerations about the drainage, and I know that there was a, the Horley-Witten group made some, so I know there's some, progress being made on that. And after hearing, though, that about the the way it's looking at now with the water coming down. So that's a big concern.
I just want to kind of reinforce that because I keep hearing about the hundred year storm. And we haven't had a hundred year storm, but again, I know that you saw photos that it wasn't that long ago. And apparently things are getting worse and worse. If you can think about North Carolina and other areas.
So I just wanted to reinforce that. And I also wanted to say how much that I think I'm selling this for other people, but we're very encouraged that you are taking this so seriously. And this is my first time coming in to meet with you all. And I really want to thank you for taking our concerns very seriously and giving us a little voice.
Speaker 1 (02:22:50–02:23:06)
Thank you. Just in response, well, I know it was in the memo, actually, the Horsley-Whitton. Are you going to be putting together, drafting some answers to the questions that were posed in, I don't know if you've seen their letter?
Speaker 19 (02:23:07–02:23:14)
The Horsley-Whitton, the pollers should have put a common response letter together. Okay. I believe it was in the submittal package.
Speaker 1 (02:23:15–02:23:18)
Has there been, I didn't see a response letter.
Speaker 22 (02:23:22–02:23:33)
Yeah, we submitted a letter in response to those comments. I think it was submitted on the 31st. Actually, November 1st, I think it was submitted.
Speaker 10 (02:23:34–02:23:37)
Tim, did you receive a copy of that? response letter?
Speaker 18 (02:23:37–02:23:44)
Yeah, we got that. I sent that out late. That should be in everyone's inbox and in the materials folder.
Speaker 1 (02:23:45–02:23:49)
Terrific. Okay, great. That's great. Then I probably do have it in here.
Speaker 22 (02:23:50–02:23:56)
If you want me to quickly summarize it, I can tell you they're all technical issues. It really had no impact on the overall design or anything.
Speaker 1 (02:23:57–02:24:07)
I think tonight, I think this is a good point, because we have other items on the agenda. So I think, thank you. I just wanted to make sure that there was communication between the applicant.
Speaker 14 (02:24:08–02:24:18)
And if you're going back to redesigning things, maybe consider not doing an artificial playground. That's just my last pitch.
Speaker 19 (02:24:20–02:24:22)
Can I ask one?
Speaker 14 (02:24:25–02:25:08)
So we want to, I'm on the Climate Action Committee meeting here in town and we work closely with Sustainable Milton and Sustainable Milton has submitted a letter on another project. talking about how they're not in support of anything that's artificial and all the negative effects on public and environmental health. And they recommend using natural grass fields because it outweighs the benefits. So especially in the location where you are, you're in the middle of the Blue Hills, it would just seem very odd to have something artificial.
Speaker 19 (02:25:10–02:25:12)
So the preference being a natural?
Speaker 14 (02:25:14–02:25:26)
A natural. Or it could be wood chips. Wood chips or something like that. I grew up on a wood chip playground down the street at Tucker School.
That's how I survived. That's the way it is.
Speaker 11 (02:25:31–02:25:58)
Just one more thing regarding traffic while we're all throwing our advice out. There's a street called Green Street about two miles south on 138, same side of the road as your site. If you come out of Green Street and try to take a left onto 138 to head north, anywhere from like 7.30 to nine o'clock, I suggest you guys try that. You'll get a good feeling of what your customers are gonna experience pulling out of your site.
Speaker 19 (02:25:59–02:26:01)
Green sheet would be south end of Willow Sprouts.
Speaker 11 (02:26:01–02:26:03)
Exactly, just south of that light.
Speaker 19 (02:26:03–02:26:04)
Expressway.
Speaker 11 (02:26:04–02:26:11)
It's right across from the Blue Hills parking lot. And it's a great indication of what your customers are gonna feel when they pull out of your space.
Speaker 1 (02:26:12–02:26:19)
Great, thank you all. And I know you traveled for this meeting, so I appreciate that.
Speaker 19 (02:26:20–02:26:23)
We'll take everything back to take value when you come back.
Speaker 1 (02:26:24–02:26:32)
So with that, could I have a motion to move to continue the public hearing to December 21st at 710? 12? 12?
Speaker 18 (02:26:32–02:26:33)
I'm sorry.
Speaker 1 (02:26:34–02:26:46)
December 12th? Did I say the 21st? Sorry, I was looking at two different dates. To December 12th.
At 705? Or 705, yes. So moved. Second?
Second. All in favor?
Speaker 19 (02:26:47–02:26:49)
Aye. Thank you all. Thank you.
Speaker 1 (02:26:54–02:27:31)
Okay so now thank you all for coming. Sorry we can now let's go we can now go back to the site plan approval discussion. And so Cheryl, you said you did make some edits to Tim's, um, the original draft. So I'm wondering if we go by section and then you can, if there's things that we can maybe, um, that you can send over to Tim that we could add, um, Tim, Tim has what, um, cause maybe we can merge some things together.
That's not too difficult.
Speaker 6 (02:27:32–02:28:42)
I think what they have up might be what, what I added. So that first paragraph that under purpose, you know, I think Tim said he got from different places, right? And it's actually the beginning is in our current site plan approval. Yeah, there's I don't remember where I got this, but apparently there was a bill that was pending in the legislature, and I'm not sure where it is.
But I've also heard from I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this. I'm going to go back to this. I'm going to go back to this. I'm going to go back to this.
I'm going to go back to this I liked kind of the fact that it was something that they were already considering, but it added a little bit more than what's there currently in terms of consistency with character and scale of surrounding. So it kind of puts a little more definition to it.
Speaker 1 (02:28:45–02:28:50)
So we could consider adding that to what is also there. It sort of reinforces that whole section.
Speaker 6 (02:28:50–02:29:01)
It's either that or replace one sentence. I don't know, Tim, if you've had a chance to look at this or think about it. If you haven't, maybe you could let us know what you think the next time we talk about it.
Speaker 1 (02:29:02–02:29:11)
I think we can go back and read it and say, OK, this is redundant. Because some things that I've added are redundant to some of our things that we'll have to walk through.
Speaker 6 (02:29:11–02:29:38)
Because what I was thinking is once we get It's going to need somebody like an attorney to review it because it's so much tied to law. At least they'll see our ideas of what we'd like to see and they can tell us whether it should be organized differently or whether some things are off limits that we hope for. But I thought we should put as much in as we think we might like.
Speaker 5 (02:29:38–02:29:55)
Yeah, I've been talking with town council. Town council would be happy to look at any draft language that the board comes up with. And in fact, if you feel that you've got something at the end of the night that's in a state to have him look at, I can do that first thing tomorrow.
Speaker 1 (02:29:55–02:29:56)
Okay, that would be great.
Speaker 3 (02:29:57–02:29:59)
All right. Cheryl, what would the red text replace?
Speaker 6 (02:30:00–02:30:31)
Well, see where it says the second sentence site plan review as a means of managing aesthetics. Yeah. I thought you still need to probably keep regulation of permitted uses, not their prohibition. But it could be something kind of worked into that.
So I do think it might need a little language rework there. But I just thought for the moment, I would just take it verbatim from that. That's great.
Speaker 1 (02:30:31–02:30:32)
That's a great addition.
Speaker 6 (02:30:32–02:30:33)
Yeah.
Speaker 1 (02:30:33–02:30:38)
OK. Because it ties in with some of the things that I had.
Speaker 6 (02:30:38–02:30:47)
Did you all have, Maggie or Meredith, anything else in that paragraph? No. Mine was all added at the end. Oh, at the end, OK.
But like pages and pages of it. Oh, no, really?
Speaker 1 (02:30:47–02:31:06)
I haven't seen that, then. All right. Yeah, so I think purpose, I think that's good. I had brought in the applicability, I can't speak after 9.30, applicability, inserting that, and Tim was able to add.
Speaker 6 (02:31:07–02:31:26)
Yeah, so on that, it seems to me, shouldn't we be able to include mixed use? This says no multifamily building. And then we go on to Oh, I'm sorry. You know what?
I did have, sorry. Commercial, but we don't say mixed use in here. So this is under applicability.
Speaker 1 (02:31:26–02:31:39)
Oh, sorry. You know what? I had added one thing under the original framework that I thought we could insert, which I noticed in another site plan had authority.
Speaker 6 (02:31:40–02:31:41)
Do we have authority down lower?
Speaker 1 (02:31:42–02:31:53)
It's down lower, I think, Miranda. Oh, maybe that could, okay. Is that what, from your perspective, what I sent over? Okay, as long as it's in there, that's fine.
Okay.
Speaker 6 (02:31:53–02:33:03)
All right, so moving on to applicability, that's… So I guess what I was thinking is, do we need to be explicit to say it includes mixed use? And then, The other thing is under item B, it says interior renovation work that makes no change in the exterior appearance is excluded. However, I feel like just this last application shows us that interior renovation work could have a significant impact on neighbors if it goes from something that's five days a week to seven and the hours are extended.
So I feel like we shouldn't exclude interior for that reason. I don't think, you know, it may be that it's something that You know, we haven't really talked about staff review. This might be something where a staff could take a look and say, look, the things are, you know, it's just the same use. They're just making renovations and we don't need it.
But I don't think it should be excluded carte blanche because of. Right. For that reason. Exactly.
Speaker 14 (02:33:03–02:33:12)
And I do believe the more we put in, the better. Yeah. You know, and then we can waive things if it's not if it's not applicable.
Speaker 6 (02:33:12–02:33:13)
Right. Yeah.
Speaker 12 (02:33:13–02:33:13)
Yeah.
Speaker 6 (02:33:14–02:33:17)
So that was. Those were the two things I thought under applicability.
Speaker 1 (02:33:17–02:33:20)
So should we cross that, should we say interior renovation work?
Speaker 6 (02:33:20–02:33:41)
That needs, yeah, so we would need to add mixed-use somewhere and I wasn't sure if it should be under commercial or under A or B or should we need a C for mixed-use, I don't know. But then I think we should strike that the interior renovation work. Yeah, I agree. Let's strike that sentence.
Speaker 1 (02:33:42–02:33:49)
And I think it makes sense to do a C and do a separate for next use just so it's clear to the reader, the applicant.
Speaker 3 (02:33:53–02:33:56)
Was striking the interior renovation?
Speaker 6 (02:33:56–02:34:00)
It's because it says it's excluded. We can just say it shall be included.
Speaker 3 (02:34:01–02:34:11)
What if you said if there were any change of use, interior renovation causing any change of use, increase, decrease, or different use?
Speaker 6 (02:34:11–02:34:12)
Yeah, like that.
Speaker 3 (02:34:15–02:34:17)
That's really what you're getting at.
Speaker 6 (02:34:18–02:34:21)
Yeah, so this says interior renovation work that makes no change.
Speaker 15 (02:34:21–02:34:23)
This is just construction on the property.
Speaker 6 (02:34:25–02:34:40)
Right. So what I was saying is right now, the last sentence says interior renovation work that makes no change in the exterior appearance of a commercial building shall be excluded from the site plan review requirement, which I didn't agree with because of what we just saw.
Speaker 3 (02:34:41–02:35:02)
So say it again, Sean, the way you had interior renovation work that would make any change of use, increase, decrease, or different. I think that's, I don't know, I'd have to listen to the tape. It sounded better when I said it the first time.
Speaker 2 (02:35:02–02:35:05)
It always does, any change of use.
Speaker 5 (02:35:05–02:36:28)
So I just, Cheryl, I wanted to chime in on your characterization here. I don't think that the 10 Bassett Street example is a good one because the reason why it's in site plan approval right or not anymore but it had been in the state that it's in is really because of if you think about if that project had been done in the way that the board would have recommended it would have been a straight site plan approval based on the 800 square feet of exterior change so that that project was caught by the normal site plan approval standards. And, you know, really what brought it back into site plan approval was the change to the original plan. So I don't think that including interior changes does anything for you that would have caught that project in a way that it didn't already get caught, I guess.
And I think the danger that you're running into now is throwing any you know, any construction project in the commercial district into site plan approval has a really strong chance of having a chilling effect on redevelopment for businesses in the business district.
Speaker 6 (02:36:30–02:36:43)
So a change of use, though, could change the end impact if it goes from an office use to a medical office use in terms of the parking requirements.
Speaker 3 (02:36:44–02:36:56)
So Tim, I understand what you're saying. What advice would you provide? Because I definitely understand what you said. We wouldn't want to be so restrictive.
Speaker 1 (02:36:59–02:37:00)
For any internal challenge.
Speaker 5 (02:37:00–02:39:37)
Well, I think you need to think. I don't have an exact answer to this question except, I mean, to Cheryl's point about change of use. And I think when we talk about change of use, we need to we're talking about lowercase u use, because, you know, this is applicable, you know, to commercial projects in the business district. These are all business district uses that we're talking about.
So when we talk about a change of use, we're talking about, you know, from an office to a restaurant or whatever. I think that to the extent that an interior change is having a different impact, you need to look at how the other components of the zoning that are meant to address those impacts are operating on those different uses. I mean, parking is kind of the highlight example. You know, different uses have different parking requirements.
So if you change from office to restaurant, you're also going to trip you know, a different parking requirement that frankly, you know, would probably require some type of exterior change to the site, you know, which would again hit your 800 square foot threshold. So I think to the extent that, you know, the concern is that an interior change is going to have other types of impacts, you need to look at, you know, because these are all projects that are going to be subject to zoning otherwise. And so what is site plan approval actually doing vis-a-vis those other requirements? I just think, again, folks are doing, we had one of the salons on Adams Street, it became a bridal suite.
Are those different uses? How does that distinction get made? The uses that are listed in the business district zoning are not great when it comes to differentiating between kind of similar types of businesses. So I just think you need to think about, you know, is this going to bring someone who's just, you know, going from one type of business to another?
Is this going to trip site plan approval, which, you know, again, is supposed to be for you know, larger or more unique or more disruptive projects, not just simply, you know, there's a different type of business coming in here. So, Sean, not a great answer to your question, but I think the ultimate kind of answer is, what are your other dimensional and other requirements in your zoning doing to address those impacts?
Speaker 3 (02:39:38–02:39:41)
Yeah, no, I think your answer is really helpful. I understand.
Speaker 1 (02:39:41–02:40:21)
What about if we kept the current sentences in here and said, unless there is significant change of use to be determined by the planning board? which gives us the decision, is this so significant? Is this going from a restaurant to, you know, or a retail store to a restaurant? Is this enough of a significant use?
And leave that determination. So it wouldn't trigger anything if we didn't find it, you know, if a normal site plan approval came before us and we didn't feel that there was any significant change of use. It was one boutique to another boutique, or you know.
Speaker 3 (02:40:22–02:40:36)
But yet it's still for someone who's reading the language, you know, it is subjective, right? It's the planning board's determination that would be, you know, we'd be the ones determining that, you know.
Speaker 14 (02:40:36–02:41:10)
So that's sort of what, like, I struggle with when you, as an applicant, It would be nice to have a document. that you can read and you know what is expected of you. And it doesn't matter if you're in a business district or in a residential district or, I don't know, it's just there should be a uniform set of rules. And that's what like I struggle with is there's not a uniform set of rules.
Speaker 6 (02:41:10–02:41:57)
So I can tell you like in the building code, there's a distinction between what's called the business use and an assembly use. the assembly use has a lot more people and it's still a business use but it triggers more requirements. I'm kind of thinking about it's like an assembly use which is just a bigger impact on what potentially to neighbors. So you go from something that's an office space to a movie theater or something that has a lot or a restaurant or something like that.
So I don't know if that would help to say from a a type or a business use to a business that is considered an assembly use. We could give an example such as restaurant.
Speaker 15 (02:41:57–02:42:05)
Could you say a greater impact, a use to a sort of a use that has a greater impact on the area?
Speaker 6 (02:42:06–02:43:11)
So one thing I would say is like, what determines the impact? I think like- I think assembly means, yeah. Assembly just means a lot more people, which to me means a lot, potentially more parking. So, or more, if it's a restaurant, it could be, you know, where's your exhaust?
You know, because if exhaust is dumping onto the sidewalk because there's no other place to put it, you wanna look at that. So because, you know, you've all may have parked below something on the street where the exhaust is there and the grease is coming down. And it sounds so hypothetical now, but there's situations like that. So I'm just trying to capture those situations.
But I get Tim's point. So if we can think of language that goes from business some type of a business use that a business use that's considered an assembly use in the building code or something like that might be a way at least to be able to identify you know you look it up.
Speaker 1 (02:43:14–02:43:24)
We can put a pin on it and yeah that's what I was going to say maybe we should just come back to that but I do you want Tim to to write that down what you just said that the assembly use.
Speaker 6 (02:43:24–02:43:34)
You know they could, if Cheyenne's doing that, maybe just put a comment there that the board wants to come back to this and consider this. Consider assembly use.
Speaker 10 (02:43:34–02:43:39)
A change of.
Speaker 1 (02:43:44–02:43:49)
Okay. And then you wanted to add for mixed use a line.
Speaker 6 (02:43:50–02:44:10)
Do you have a recommendation for that? I didn't come up with language, but… Maybe we could put it into A. I think it would just be fine, similar to A, or just add it to A.
A, maybe A. Tim, do you have a thought about that?
Speaker 5 (02:44:15–02:44:16)
Can you repeat that?
Speaker 6 (02:44:17–02:44:23)
Whether we can just add mixed use to paragraph A or do we need a separate paragraph that?
Speaker 5 (02:44:26–02:44:27)
I think that would be fine.
Speaker 6 (02:44:28–02:44:29)
adding it to.
Speaker 5 (02:44:29–02:44:45)
I mean, I don't have, you know, attorney could look at that and say, no, you're, you're an idiot. Do it the other way. But I, I think, you know, the, the types of buildings that we're looking at multifamily or mixed use, you know, are substantially similar types of things. So that's capturing kind of the same, the same thing.
Speaker 6 (02:44:45–02:45:04)
I don't think there should be a problem. Sorry, Tim. Okay. Thank you.
I would say right after the word, no, but mixed use, and then it goes to multifamily. All right, mixed use, comma, multifamily, and continue. Because the rest of it really kind of refers to the multifamily.
Speaker 1 (02:45:04–02:45:06)
Yeah, right there, Cheyenne. Perfect.
Speaker 10 (02:45:06–02:45:16)
Yeah. Mixed use, comma, multifamily.
Speaker 6 (02:45:26–02:45:34)
I was looking through the Lexington, Newton. What else do we have? Brooklyn. I don't know if I have Brooklyn.
Speaker 15 (02:45:34–02:45:35)
Brooklyn didn't have one, right?
Speaker 6 (02:45:35–02:45:48)
So if you go to now B, so it's 3B under submission requirements. Are we on submission requirements now? That was the next thing, right?
Speaker 14 (02:45:49–02:46:11)
So one thing before we get to that, to your point to these guys earlier, you talked about a pre-meeting. Yeah. Meeting. So I don't know if that's where that would go.
So I added a pre-application conference. OK. Where did you put that? Oh, in.
Speaker 18 (02:46:12–02:46:12)
Or.
Speaker 14 (02:46:12–02:46:26)
Way down in my notes that I added, but that's good. Petitioners are encouraged to discuss proposed applications with the staff of the office prior to formally submitting.
Speaker 11 (02:46:27–02:46:31)
So I'm seeing that as number four, like right after what we just discussed. Am I missing something?
Speaker 6 (02:46:31–02:46:33)
Under procedures, I would put it.
Speaker 11 (02:46:35–02:46:43)
Submission requirements, pre-application conference, that's exactly what Maggie just read. Still on page one. Do I have a different document or something?
Speaker 6 (02:46:44–02:46:49)
I'm sorry, I'm just looking at this up here. It's in red?
Speaker 11 (02:46:49–02:46:50)
Oh, it's not that, okay.
Speaker 6 (02:46:50–02:46:57)
So I would say then you want to put it number three and move submission requirement down.
Speaker 14 (02:46:57–02:47:18)
Well, I sort of was going through like when if you were going in to start a project, like what's the sequence of events? The sequence of events is you read this thing and you're like, okay, what do I have to do? And so one of the first steps is a pre-application conference.
Speaker 6 (02:47:19–02:47:25)
I think it would go, you would have a new paragraph between applicability and submission requirements.
Speaker 11 (02:47:26–02:47:32)
I'm actually seeing that in my, I don't understand, it's actually here on my document. Did you write this, Maggie?
Speaker 2 (02:47:32–02:47:33)
That was Maggie's.
Speaker 14 (02:47:33–02:47:36)
I just added mine on the bottom.
Speaker 3 (02:47:36–02:47:44)
Well, there's one in here that says pre-application conference, right? Is that what you're reading, Jim? And it reads, petitioners are encouraged to discuss proposed applications with the staff. Maybe Tim captured that?
Speaker 14 (02:47:45–02:47:46)
Yeah, okay.
Speaker 5 (02:47:46–02:47:53)
Jim, if you're looking at the document that's in the folder, that is a different document from what's on the screen right now.
Speaker 11 (02:47:53–02:47:56)
Okay. So which one should I be looking at? Just looking at the screen?
Speaker 6 (02:47:56–02:47:58)
Yeah, just look at the screen.
Speaker 11 (02:48:02–02:48:06)
So how do I get the one on the screen? I'll send it to you.
Speaker 5 (02:48:08–02:48:18)
Cheryl sent this this afternoon and we didn't get a chance to send it out to everybody. I didn't, I wasn't sure which one we were going to be looking at on the screen.
Speaker 6 (02:48:18–02:48:26)
So if we want to, we can just run through one and then run through the other. It might be easier rather than jumping back and forth. That's what, if you want.
Speaker 5 (02:48:26–02:48:33)
I thought because, because all of Maggie's changes were at the end, we could get to that other one at the end.
Speaker 14 (02:48:33–02:48:37)
No, I don't mind. No, I mean, and you can cut out everything you want. I just.
Speaker 11 (02:48:37–02:48:43)
No, yours is right here, and I think it's great. I'm just saying it's literally number four, right? So right after what we just discussed, it's right here.
Speaker 6 (02:48:43–02:48:45)
Yes, I was confused because I didn't see it, but.
Speaker 11 (02:48:45–02:48:46)
Yeah.
Speaker 6 (02:48:46–02:48:48)
So let's go back to Cheryl's where we were.
Speaker 11 (02:48:48–02:48:50)
Nice to all be literally on the same page.
Speaker 6 (02:48:50–02:49:59)
Submission requirements. Under submission requirements on B, I thought we should add these words. This is just really, we should have, these are on a standard survey, but we can be clear about that. Okay.
Yep. And then, Also, I added again this come of these come from looking at some of the others a zoning narrative Usually they provide a table, but it's I think it's good to be clear what we're looking for and then There were Landscape plans and architectural plans were lumped into the same paragraph. I don't think that's appropriate so I separated them and then made it clear it was building elevations and building sections and added the site sections representing the slope cuts and fills, structures retaining walls and significant land features. I mean, like tonight, I mean, that's just one of the most significant pieces of information we can have.
Speaker 3 (02:49:59–02:50:07)
Do we want to add volumes there too, Cheryl? When we say site sections that graphically represent all slope cuts and fills, do you want to know the volumes too?
Speaker 6 (02:50:07–02:50:08)
You want a volume calculation?
Speaker 3 (02:50:08–02:50:11)
It would be good to know. Yeah, it would be good to know the volumes.
Speaker 6 (02:50:12–02:50:14)
Okay, we can add volumes.
Speaker 3 (02:50:19–02:50:29)
Cheyenne, if you put the word and volumes, it's probably fine. Probably volumes is good too. That's OK.
Speaker 6 (02:50:29–02:52:24)
And then on the photometric plant. It seemed like you don't want to do that for a small project that's probably not going to have sight lighting. So I picked 10 parking spaces as a trigger point for it. Does that make sense for everyone?
And the same thing for the traffic impact analysis. I think on a three unit, we don't need a traffic impact. It seems like one site having 10 spaces. That seemed like to be a trigger in others too, 10 to 20.
And then I saw a trigger for a different height in a different one of the other bylaws, but I thought we're allowed 35 pretty much anywhere as our standard. So it seemed like a shadow study should be triggered anything above that height. So we can be a little bit more clear about that. And then I really think a preliminary construction management plan is helpful just to understand because some of these sites are built out so tight that like if they if it needs if they're going to need to close or take parking spaces like for 440 Granite Ave.
That's what I was going to say. I think 440 Granite gave us space. Those kind of sites we should just have something in the record for. And then The parking, we haven't really focused on that part of the bylaw.
That is the word, the parking and transportation demand management, but it's in our zoning. And that's in the same section that has the mitigation fees. Those are only triggered in certain instances, so it wouldn't be triggered like for this project that we were looking at tonight, a Dover amendment use. It's just an overlay or a special permit, but there are times when we'll be doing both.
Speaker 14 (02:52:25–02:52:29)
I think Dover allows for a parking review.
Speaker 6 (02:52:29–02:53:06)
But not the mitigation fee. in our bylaw. Our bylaw says it's just for special permits or overlay districts. I actually think it should be in the business district.
We tried to change that once it didn't get approved at town meeting or it was sent for further study and never got further study. You can say we studied it. Let's see. Tim had a question on the narrative of compliance with the design standards.
So I think that's a question really for Town Council in terms of whether we can put those in.
Speaker 1 (02:53:09–02:53:23)
I think we did see some, I think we did see some in some, I want to say Brooklyn, I don't know if it was Brooklyn or Newton, but I feel like they had some design standards within their site plan approval. And I, did you put, and I think you added those.
Speaker 14 (02:53:23–02:53:23)
I put some in, yeah.
Speaker 1 (02:53:23–02:53:26)
It came from other towns that have been, that were approved.
Speaker 14 (02:53:27–02:53:32)
I mean, I just, I don't know if it's appropriate, like the standard itself.
Speaker 1 (02:53:32–02:53:36)
With the MBTA, because I think they did it at the time. Yeah.
Speaker 6 (02:53:36–02:54:42)
So we can look at those under procedures. I won't give a number now, but under procedures, I thought we should remove the language site plan review authority and just put planning board. So there was three instances of that. And then I had seen this previously when doing the MBTA community zoning that you can put in, and it was confirmed in one of the workshops I did with Judy Barrett at that time, that you can put this requirement for outside consultants into site plan review.
So I just, we're getting it, but what if some, just like tonight, you know, if it's not like explicit, They don't have to really do it. I think we should put it in. I think that's a good addition. I did under review standards.
I had a few.
Speaker 1 (02:54:42–02:54:57)
I pulled from Natick. I like some of the things that they, some of the things are duplicitous, but some things we don't have that they have. So maybe we should just walk, we can walk through.
Speaker 6 (02:54:57–02:55:45)
Okay, so I'm just going to walk through what I put and then you guys can walk through what you put. So instead of saying siting of facilities, I thought, again, being more explicit and say consideration of site design. And then I list location and configuration of structures and the relationship of the site structure to nearby structures in terms of major design elements, including scale, massing materials, roofing corners, lines, and color. So that was just, and then under historic significance, I added, and impacts on historic structures or landscapes.
And I added towards the end, avoidance of major topographical changes.
Speaker 14 (02:55:49–02:55:51)
Is that strong enough language though?
Speaker 6 (02:55:52–02:56:26)
Well, we can get, yeah. I added another, I think, or maybe I took it out because I was unsure, but I think I must have taken it out being unsure. So maybe I could, should I just read, oh, you keep going with yours. No, no, no.
Well, I'm almost done with what I changed as I made design guidelines. I put that in that we could adopt them because I'm pretty sure that in that same workshop, I was told that we could do that Maybe it's not under Dover Amendment, so we might have to wait for that.
Speaker 1 (02:56:26–02:57:09)
Sorry, not to interrupt, but can we just stay with site plan approval? Sure. And then I can, the things that I added, I could just add, I could read off and we could add into this document now, just to sort of move through the section. One of the things that I liked was the design of the streetscape and transitioning between abutting properties.
Because I think we run into that. And we can go back and take this out if we don't think so. Could you just add that, Cheyenne? Sorry.
It's the design of the streetscape and transitioning between abutting properties.
Speaker 11 (02:57:10–02:57:15)
So is that more like streetlights, or is that more like awnings on buildings?
Speaker 1 (02:57:15–02:57:31)
It's more streetscape, like plantings in between, like how it's buffered. The site is buffered, transitioning between. And it may even be frontage streetscape. There's a connection between the various buildings.
Speaker 17 (02:57:31–02:57:31)
Thank you.
Speaker 1 (02:57:39–02:58:09)
Sorry. It's actually, yeah, right above, it's under site plan review. We'd be just adding another line item, yeah. Okay.
Yep. Sorry, could you just repeat that line for me? Sure. The design of the streetscape and transitioning between abutting properties
Speaker 4 (02:58:26–02:58:28)
Outfits the formatting.
Speaker 1 (02:58:29–02:58:37)
That's OK. And you know what? Is it easier to cut and paste the section from the other document going over?
Speaker 12 (02:58:40–02:58:41)
Yes.
Speaker 1 (02:58:41–03:00:43)
That might be easier. Yeah, it's just this section and some things are duplicates. Yeah, if you want to just cut and paste that whole section, and then we can eliminate some of these things that are duplicates. But if you just take all of that, yeah.
And then we can pop that over and then go through. Because some of these Cheryl has already addressed. So, yeah, so we could take out number one and number two on that that I just because the layout and the site that's Cheryl just basically Added that. And then after the design of the streetscape, the protection and mitigation of adjoining properties against detrimental impacts.
I sort of like, and that is to include surface water, drainage, light, sound, and site buffers, and preservation of views, light, and air. We can change this if we want, but I just thought that was Good, I think the provision of vehicular access parking and circulation, I think that was in the other one. But they also added, which is the accommodation of non-vehicular multimodal access and circulation. So that was bicycle, like giving, you know.
So we could cross out the vehicular access parking and circulation, if that's already in there. Is it already in ours? We should think about whether it does have multimodal. Yeah, so let's actually, Cheyenne, let's leave that for now and just to make sure we already have it in another location.
But yes, so the multimodal access.
Speaker 6 (03:00:43–03:01:00)
If we go back to like E and F, circulation and connectivity that is safe and accessible for all. And then it says effective, efficient transportation systems and the adverse impacts of motor vehicle transportation. But it's not explicit to multimodal, but that's where it would go, I think, somewhere in there.
Speaker 1 (03:01:00–03:02:42)
So we can think about like just rewording that and maybe the next one, the management of emergency service and loading slash delivery operations, access and circulation. I think that's really important. We always are talking about our loading and delivery operations. The next one was the location and arrangement of municipal, public, and private infrastructure and utilities.
Because that also does come up, like where they're putting their utilities. is something that I think we'd like to include. I think this is already in there, but the provision of stormwater management features and measures. And this is also the protection and management of surface and groundwater.
I think the way we currently have it is probably fine. So I think you could take out these two, because I think we cover that. stormwater management in our existing. The management of solid waste and snow removal.
I don't think we had that in ours, so I would ask to keep something regarding that in there. The development of a sustainable, climate sensitive and environmentally conscious site. That's up in B. We've got that.
OK, so we can eliminate that one. the development of sustainable can be crossed out. I thought this was interesting. Site and building security and fencing.
Speaker 6 (03:02:45–03:02:45)
Comes up.
Speaker 1 (03:02:46–03:03:25)
Yeah. So let's keep that in. Site lighting. I think we have that in there, but I can't recall exactly.
But site lighting, we can keep in and see if that's a duplicate. Site and building signage. I think we just have signage maybe in ours. So this is site and building signage.
It's a little more specific. And then this was interesting. They had other aspects of site design that may be reasonable or reasonably within the spirit and intent of this section and the purview of the planning board.
Speaker 6 (03:03:27–03:03:30)
That will be good for non-Dover amendment uses, but
Speaker 1 (03:03:31–03:03:44)
I know that goes to your being subjective, but maybe we keep it in there and think about that because this is in there. All right, that was it that I had for that section.
Speaker 6 (03:03:48–03:05:13)
So that comes back, like the beginning of this says, review standards. The planning board in its regulations shall establish standards for site plan review that will, at a minimum, address the following. So that means we need to develop standards for all of those things. But then I just put I put something else in which I pulled from what was in the MBTA zoning that we could we could adopt by simple majority design standards.
which maybe is similar to what you were doing, but like the location of garage entrances, the protection of significant natural site features, the location and design of open spaces, because open spaces sometimes are just the setback areas and they're not really significant open spaces. So I think maybe we need to think about these two sections a little bit more. You know, so maybe like the design guidelines can be first and then some of these other things can, or maybe we pull out some of what's in this and add them in the list format, you know.
Speaker 1 (03:05:15–03:05:22)
Would you, would what you have be a good time to insert at this point with the design or You've got a whole section, maybe we.
Speaker 14 (03:05:23–03:05:30)
Yeah, so this was just taken from the Westport site plan approval.
Speaker 1 (03:05:31–03:05:33)
Does it start up here, Maggie, on the right-hand side?
Speaker 14 (03:05:35–03:06:53)
And I wasn't sure what's appropriate or not. So I'm having a hard time really understanding what we can regulate in site plan approval. You know, I just think about if you're an applicant and you're coming here, you want to know what is expected of you. And so, you know, I'm always harping on the size of trees.
And if like this other plan that just came in, their tree size were six to eight feet. So I think we should just have a standard of a tree size. And I don't. having a necessary opinion right now, but it should be, you know, at least 10 feet.
So this every person who's coming to town when they do their landscape plan, they they give it to their landscape architect and they know to design a plan with 10 feet. So then they're not going back to their landscape architect and saying, oh, Milton, you know, you put six to eight feet, but Milton wants 10 or 12 feet. So I don't know, is that allowed to be that specific? Because I think it should be the same, no matter if you're on one side of town or another, the tree size is important.
Speaker 6 (03:06:54–03:07:15)
I think it depends on the site, though. Like, if you have a very small site, you're not going to need the same size as a large site. I do like here, though, if we're looking at what you have on the screen, that paragraph about adjustments, but that's not on the design side yet.
Speaker 14 (03:07:16–03:07:42)
But we're not saying what type of tree, because to your point, yes, a certain site might not require a tree that gets to be like a maple or an oak, but you still need a tree. And it could be a crab that maxes out at 15 feet. But you're starting at least with a 10 footer. You know, there's no.
Speaker 6 (03:07:42–03:07:58)
Yeah, so I think in the standards so review standards and the design and the guidelines that we could add something that is landscaping to provide sufficient buffer.
Speaker 14 (03:07:58–03:08:05)
Yeah but sufficient to me is like being an app because I was an applicant and I'm putting my um.
Speaker 1 (03:08:05–03:08:30)
Sufficient to provide screening so. Well I think that's where we have review sites are in our I'm sorry. In our what do we call it? Our review standards that we have.
Open space, natural feature landscape. Is just.
Speaker 14 (03:08:32–03:08:47)
And even like to for the volume of cut and fill, would we ever consider having a maximum? Like you cannot cut more than X cubic yards.
Speaker 6 (03:08:49–03:08:54)
I just think some of these things are going to be… Unless you give a waiver.
Speaker 14 (03:08:56–03:09:15)
Because if they can't, like the guys who were here earlier, what are they cutting? 10,000 cubic yards. So if they knew that they couldn't cut more than 5,000, maybe they would have come in with a different plan. And again, it saves the applicant money.
Speaker 3 (03:09:16–03:09:34)
Because they're not going back and forth. Some of that is just, all of these things are going to be relative to differing sites. A 10 foot tree, we might find it to be too big on some particular sites. And if a site is 20 acres, cutting 10,000 feet is not, you know what I mean?
It's just, I don't know.
Speaker 1 (03:09:34–03:09:35)
That's too much?
Speaker 3 (03:09:35–03:09:37)
We could be so restrictive with some of this that it creates a problem.
Speaker 1 (03:09:37–03:09:55)
So just for efficiency of time, what I'm thinking, maybe, because you added so much good stuff that I think I haven't really had a chance to read through it. So maybe for tonight, we go through, we'll let Cheryl go through her edits, because I really don't have anything else after this point.
Speaker 2 (03:09:55–03:09:56)
And I don't know what other people do.
Speaker 6 (03:09:56–03:09:57)
And again, you can.
Speaker 1 (03:09:57–03:10:01)
No, but I thought a lot of it was really good. You pulled from some things.
Speaker 6 (03:10:01–03:10:03)
Yeah, I haven't had a chance to look at it.
Speaker 1 (03:10:03–03:10:18)
So why don't we finish tonight, finish through this, and then for the next meeting we read through Maggie's things and it may be, we'll figure out how to insert those things in different places because I think they're really good.
Speaker 3 (03:10:18–03:10:26)
I agree. The document in our folder is 17 pages long. And this is not our best time.
Speaker 1 (03:10:26–03:10:34)
We are not at our best. I still want to save time to touch on MBTA. It's just what we're going to maybe add and beef up.
Speaker 11 (03:10:34–03:10:39)
I want to save a little time to touch on MBTA also. Our forum is coming up, and it's past 10.
Speaker 6 (03:10:39–03:11:06)
So I turned into a pumpkin. So let's finish. That's all good. Yeah.
I know there's not a lot more added here, honestly. So design guidelines. I just thought under authority of the board, being explicit that we could impose reasonable conditions. Because we can.
And then we add that to where I authority up top.
Speaker 1 (03:11:06–03:11:14)
So that's the question. Or this is maybe take mine out and put what I wrote down here. But they might be.
Speaker 6 (03:11:14–03:13:05)
OK, well, we can take a look at this on that. But I do think it should be somewhere. I don't know what's the best spot for it. This next one I highlighted in yellow because this is where, you know, we were talking about if we could.
Resend a decision, and I don't know exactly how to phrase that, but I just wanted to flag it. And then just in the spirit of keeping moving, that's just pinned, right? And then the decision, this came from Lexington, the decision of the planning board shall be a majority vote. The board is constituted, so three.
And then project phasing. I forgot where I saw this, but I don't know yet. You know, we haven't seen projects in my time on the board that are phased, except for Wolcott Woods is like three or four phases. So it just seems like it's worth having.
Because you also don't want projects to be phased to avoid affordable housing requirements. Yep, which I thought was good. And then I thought, again, this is from somewhere else, this appeal that there is a right to appeal and maybe that doesn't need to be here because it's implicit somewhere else. And then It would be good to get the Dover Amendment uses that are listed here from Lexington.
Just whether we need to be more explicit anywhere else in all of this about how Dover Amendment is handled.
Speaker 1 (03:13:05–03:13:42)
And I wanted to add, actually, and I forgot this under review standards too, but I wanted to maybe add this line and add it to the limited review standards. A line, and Tim was not sure if we could do this, but this is a question for our council. Consistency of aesthetic character, including bulk and height of surrounding buildings. Yeah, if we can write.
consistency of aesthetic character, including bulk and height of surrounding buildings.
Speaker 14 (03:13:51–03:13:52)
And you know what I recently learned?
Speaker 1 (03:13:52–03:14:13)
We also put that under where we had the design review standards also. If we scroll up and just add that same line and see if it's acceptable to include that. Because I think that's what we run into a lot. Like just tonight we were saying, is it aesthetically, does this fit in?
Speaker 14 (03:14:13–03:15:08)
So I recently learned that on the state government's website, there's a municipal law unit. They have a depository of decisions. And so if you type in the search, you can type in, like scope of site plan, and it brings up all the decisions. So I started typing in, you know, scope of site plan, and then it brought up all sorts of decisions to see what was accepted and what wasn't accepted.
So, I mean, there's a lot. So just to go through and see if I just found this out today. So I didn't go into check to see if you know, it's legal to put in some of the things that I thought, or if it really is more of a, like, our aspirations of what we're looking for.
Speaker 2 (03:15:08–03:15:11)
But didn't you take them from other town site plan approvals?
Speaker 14 (03:15:11–03:15:19)
Yeah, so, but I wasn't sure exactly if it was site plan approval or if it was one of their rules and regulations, because they were together.
Speaker 6 (03:15:20–03:15:23)
It was like a special permit versus site plan approval.
Speaker 15 (03:15:23–03:15:25)
Yeah, they're right next to each other.
Speaker 6 (03:15:25–03:15:40)
Yeah, when looking at them, sometimes they are kind of lumped together and they're not separated out. But I'll be happy to review what you put together and beg you for the next meeting. Yeah, and take a look at that. Yeah.
Speaker 1 (03:15:40–03:16:00)
Yeah, and Tim, I don't, you know, you can take a look too to see. I'll try and get back to you folks before the last minute. Yeah, and I'll read those because it looked interesting, you know, what you put together. So good.
Well, this is, I think this was a good, the first opportunity we really had to get into this so we can come back and revisit.
Speaker 6 (03:16:01–03:16:15)
So Cheyenne, can you share out that marked up that you worked on? And then you said the one with Maggie's is in our folder for tonight. OK. Yes, it was updated.
Speaker 14 (03:16:15–03:16:22)
Yeah, it was just on the document. Like in the Google, yeah, the folder that I just found.
Speaker 7 (03:16:23–03:16:23)
OK.
Speaker 15 (03:16:24–03:16:26)
Okay.
Speaker 1 (03:16:29–03:16:35)
So and we'll definitely have this on for the 21st. We'll continue this discussion.
Speaker 6 (03:16:35–03:16:49)
So when you speak to the Warren committee, are you going to tell them that this is one that we think we're going to shoot? Do you think we can try and get something for February? That's what I'm hoping, yeah.
Speaker 1 (03:16:49–03:18:24)
So what I was going to, and I was just going to talk to you all about this, is it is my goal and it's going to, but I think we can get it done. I would like to have a site plan review and an ADU article. Because February 2nd, I know some of you were on the UHLC's little talk on ADUs. It's going into effect February 2nd, but they're not going to have any guidelines or any regulations now that they're saying they're going straight for.
So it's going to be open to somebody comes in and applies for an ADU. and we'll have nothing. If we don't pass something, and we can always amend it later, but if we don't have something, somebody can come in and won't have setbacks, won't have sort of all the things that we've, we studied this extensively before you were on the board. We really, there was a lot of good things in the article.
It really came down to a difference, a split on the board of whether it should be by right or special permit. We now know that it has to be by right. We don't have a choice. But there are things that we can control.
We can limit the number of ADUs per site. We know that things that we can't do, like we can't require it to be owner-occupied. So in the law, there's certain things that we know. So I think Tim has already done a draft.
Or you've sort of, you've looked at taking out what's not allowed in the law, but we don't have a choice.
Speaker 5 (03:18:24–03:18:40)
Yeah, we've got a markup of the last ADU article that kind of tries to make it as consistent as possible with the legislation. So we'll share that for the next meeting whenever you guys want to talk about it.
Speaker 1 (03:18:40–03:19:12)
So I think that would be my goal. is to be able to get these two ready, especially if it's, I would prefer the end of February, which sounds like that's what they're, maybe the Warrant Committee is thinking it would be more likely, and of course. So when would we, I guess we need to find out when we would need to submit. That's what the draft.
Tim, we have to have 90 days of public hearing. 90 days prior to the town meeting?
Speaker 5 (03:19:13–03:19:26)
No, the public hearing could be, you don't want to do it the day before, obviously, but it doesn't have to be 90 days before. I'll take a look at the timeline and try to map it out.
Speaker 1 (03:19:26–03:19:36)
So maybe that was when we have to have a draft to the warrant. Well, they would like the draft to be to the warrant committee, but we could be working on it still and making some tweaks and changes.
Speaker 6 (03:19:36–03:20:09)
I think the way, if I recall correctly, it goes to print at least a month before town meeting. So let's say it goes to print at the end of January, and then they need to review it, you know, I don't, you know how it is, sometimes there's a green sheet, they don't have a recommendation when it goes to print, but it'd be nice for them to have something, right? So I think if we tried to target the end of the year, so that left January for review and revision and going to print. I think it's doable.
It's not too many meetings, but.
Speaker 11 (03:20:09–03:20:14)
But I'd like to give them whatever we're working on, just so they can, even if it's incomplete, just as a courtesy to them.
Speaker 14 (03:20:14–03:20:17)
Anyway, we could add meetings if need be.
Speaker 11 (03:20:17–03:20:21)
That was always Dave Helper's complaint, is that he gets things late. Yeah, I think. Always rushed.
Speaker 1 (03:20:21–03:20:39)
But if we could narrow this down, I think this is, the site plan review is not too complicated. We just have to get it to a lawyer and make sure we have everything in it that we want. But the framework is, you know, I think we're pretty solid with the framework. The ADU, which everybody will see,
Speaker 6 (03:20:39–03:21:27)
It's a good template and then we can work to see what we would want to update on that and So that Tim's been I think if Tim Maybe if you're speaking to town councils, you know say after our next meeting we might have a draft ready for them to look at and Just to get an idea, we don't want to spend too much time going down a road that we're going to have to backtrack from. So I'd like to get a sense from what we've put in so far, what you're looking at, Maggie, you know, do we need to separate out Dover amendment uses versus other site plan? And even I know we have restrictions under site plan because you can't, you're not really supposed to be denying it, but we're But we want a little more, I think anyway, a little more oomph to guide the design, which we don't have as much of currently.
Speaker 1 (03:21:27–03:21:31)
Which is helpful, I think, to the applicants. Yeah, if we can do that.
Speaker 14 (03:21:32–03:21:45)
My understanding is I think maybe we could send a draft over to the Municipal Law Unit and they could review it if we're, you know, for them to review and then they can come back and let us know.
Speaker 1 (03:21:46–03:21:54)
But maybe we send it to Peter Mello first, just to give a quick cleanup of things, and then send that over. I think that's, yeah.
Speaker 6 (03:21:54–03:21:57)
Yeah, I think I'd like to see what his advice would be on that, too. Right.
Speaker 2 (03:22:00–03:22:00)
OK.
Speaker 1 (03:22:00–03:25:30)
All right, good. So I just wanted to just talk to you all and see your thoughts on this. We're scheduled to have a public forum next Thursday, currently. I, this week, have had some concerns and want us to consider whether we should postpone this public forum for a variety of reasons.
The first, and I think it's just, we might be a little premature in doing this. And Cheryl, I know you've been working on these slides and I'm grateful. It may be premature for, first of all, like the gentleman said who came, we have a pending, a significant case pending before the Supreme Judicial Court. And so I am very cautious on what we're saying, what we're debating, what the public is, how they're approaching this and looking at this, but really, I think, I think we don't know what the SJC is going to decide.
I think this could go in, it can go in a number of different directions and they can be looking at this on a variety of different levels. And so we have no idea exactly how the decision is going to be made at this point. I'm thinking about our time and resources of this. I really, I think we can get these two things done.
and maybe using our time, our time would be best used focusing on this and not, you know, because we can tweak and we can keep tweaking. We've had 65 meetings on this. I feel like we've laid a really good groundwork. So all of the work that we've been doing, going through the scorecards, everything, I think we have a really good understanding of where, what districts we think are, you know, would be best, you know, we just don't know what scenario that we're going to be, we're going to be looking at.
So rather than producing, as we said before, the three different plans, we didn't know we had to do an ADU, you know, we have to get ADU done too, in the short period of time. So I also am just a little concerned that in this forum, we don't really even have a plan quite yet. We still have the last two districts that we're evaluating. And I just don't wanna set ourselves up and the community to start getting their anxiety levels raised, thinking, oh, this is gonna be a 25% or you're looking at East Milton or you're looking at Granite and start debating these things when we're not even to that point.
And we might not, we might not necessarily need to discuss all of these different districts. So my feeling is I think I would like to postpone doing this. We're going to have to absolutely do a public hearing and everything that we've been talking about is public. So nothing is not being transparent.
I just don't know that I feel that we want to go to a forum and get people worked up unnecessarily, if that makes sense. But I would leave it up to, I mean, I would like to ask what others.
Speaker 14 (03:25:30–03:26:26)
So I heard that next Thursday is also the Randolph-Abbott roundabout. So that's what I, you know, I said that I wasn't even sure if I was going to be able to make the MBTA forum. The roundabout is really important to my neighborhood and 1800 residents signed the petition to not support the roundabout and it is through MassDOT in which we don't have control over MassDOT scheduling. And it's really at the end of the design phase.
So that's what I was going to say is I might not have been able to attend the forum anyway. So a postponement would be very beneficial to me.
Speaker 1 (03:26:27–03:26:31)
I would like to go, too. I haven't really been partaking in any of those.
Speaker 11 (03:26:32–03:27:01)
I would be afraid that we're tipping our hand to the Supreme Judicial Court if we start coming up with plans and saying, oh, look, we've got this. We're on track for this plan. We're on track for that plan. I mean, I doubt they're listening to our meetings, but I'm sure they're getting word as to what's going on in Milton.
So I think if we wait for them to render their decision and let us know what we should be doing, I think at that point, we come up with a plan, we have the forum, we write the article.
Speaker 6 (03:27:02–03:29:39)
I think we can act pretty quickly. We started discussions on this in a contract with MAPC in the spring. Their contract is in May, I think. OK.
So we've taken from May until now. If the AG, if the court decides with the AG that the remedy is that we have to have zoning, whatever level, within three months, of that decision, we will say the decision comes in December, which is again what the AG requested. If we don't have, I just don't think three months is a lot of time to get public feedback, which is something we said that we, the public came to us in February and said, We want to be informed. You need to keep us in the process.
People have said that at multiple meetings. So I am concerned that we haven't talked about the scorecard. We haven't talked about the survey results. And we haven't said we've looked at commuter rail locations.
And it's just this giving them the background of what we've talked about. And we're exploring, and I take exception to the fact that the referendum was a rejection of the full implementation. What the rejection was, was zoning that was approved by TAMI, and that's all that we can infer from it. So if we say, if we look at other sites, we show people that it's not as easy as some might think to pick a different site in a different location.
And we run through how, our consultant runs through how these things work. So I don't think it's anything that's showing any solution, any proposal. It's showing that the board isn't just sitting on its hands and waiting for a decision. So we've advertised it.
The town has put it out there. Milton St. has put it out there. I don't know where else it's been put out.
So it's just to show the public. And if it's postponed for conflict, I don't have a problem. But I have a problem with canning it completely and waiting for a decision.
Speaker 14 (03:29:41–03:30:20)
Yeah, and the other thing I had a problem with, I don't know if you read the Times today, but on the front cover, I mean, there was a huge article about about MBTA zoning and what it never mentioned. like, the possibility that the SJC could rule that it's an opt-out, an opt-in. So I sort of felt that that article wasn't 100% accurate.
Speaker 6 (03:30:20–03:31:02)
You know, I think the thing to remember is it says shall, but what the question that I understood from watching is whether that's the sole remedy is loss of grants. And I will point out, as I said in the email that I forwarded all of you, that there was recently announced $161 million in one-stop grants, which we are ineligible for. that went to 300 projects in 171 communities. So it's not that we just opt in or out.
We lose access to funding and significant amounts of funding. And that's the other thing that will be decided. I think that's going to be part of the SJC.
Speaker 1 (03:31:02–03:31:08)
And that's where they're going to also determining the penalty, like what penalties can be imposed.
Speaker 11 (03:31:08–03:31:16)
I don't think we've been sitting on our hands. I think we've been working pretty hard, and I think we have our districts almost determined. We haven't gained any public comment.
Speaker 3 (03:31:16–03:33:54)
I think we have them all scored, and I think we're ready to go. Obviously, I haven't put an awful lot of time in over the last few months into any of this. the time I have put in, and then I read Tim's email this morning or today about the analysis that Tim and Cheyenne did on St. Pius and on 7-Eleven, Randolph Ave.
And it appears that no matter what becomes the requirement, we're pretty limited in what we can do. Let me finish though, if you don't mind. We are pretty limited, and I mean, I know time evaporates. And I understand what you're saying about, well, three months is a short period of time.
But based on what we've all learned from what we've gone through, we don't have a lot of options. And I consider what we went through. Probably the most tension and conflict that I can remember our town having you know this whole issue Townwide yes versus a town wide. No, and you know, I I Would I think we're gonna resume, you know That conflict once we start getting into a public forum, you know I feel like the work and I'm gonna give you guys a lot of credit because I haven't been present for many meetings and I was here in the beginning, but I feel like the analysis on what it could be and what it probably will be, whatever percentage we're deemed required, it's not going to take us long at this point to finish it.
What happens in the public forum is, you mentioned anxiety. while it'll be anxiety for some, it's gonna be excitement for others. And once we start going down that road of anxiety for some and excitement for others, those that might become excited are the ones that get relieved, that feel like there's a potential burden in their particular area, and they start getting excited because we're presenting something that would eliminate that potential burden. I just…
So while I definitely understand that time goes really fast, I don't think given what we've all learned in terms of what we can do and what we can't do, that three months is a short period of time at all. It really isn't.
Speaker 1 (03:33:56–03:34:19)
Once I know what the SJC's decision, I feel like it's also a better use of our money and resources for the town. I look at our time, I look at UTL's time, and what we're paying UTL to maybe be running down a rabbit hole that may be completely not what we end up
Speaker 3 (03:34:19–03:35:15)
You know, I kind of fall, you know, I fall in this area that, you know, my preference is let's resolve the dispute before we engage the community. I mean, we can engage the community, but, and people have had an opportunity to attend the meetings or go back and listen to what we talked about in the meetings. That's all out there for people to do that. And I love a public forum, you know, but I, I think right now we can't say anything to anybody.
If we gather the public together, we can listen to them, but we're going to face questions that we, you know, we don't have a lot of answers to questions. And then we're going to have people both anxious and, you know, and like I said, excited. I, you know, don't know that, in my opinion, I think the costs outweigh the benefits of gathering everybody together at this particular point in time. And like I said, I don't think three months is a short period of time, because it appears from everything that we've done, we don't have a lot of options.
Speaker 6 (03:35:16–03:37:06)
Well, I will say that there were, I don't know how many public forums, and we got to the zoning in December, and then we got to a referendum in February, and people said it was sprung upon them, they knew nothing about it. And it had been worked on for a year, and there were plenty of meetings and plenty of public forums. You say today and we say today we think we know what's going to be. We have communicated zero other than our meetings to the public and most people don't watch our meetings and most people aren't checking our agenda items to see and waiting till 10 or 11 to see whether we're going to talk about MBTA committees.
That's the only time we've gotten to it is very late. So, I think, as I said, if we delay this, I don't think it's realistic to think that we should have a process that is concluded in three months that includes public input, because we're going to be in the same position that we were in before, and now instead of the select board making the decision, people are going to say the planning board makes the decision. And it's the public that needs to weigh in on all of the things, including the district scorecard. If you look at the survey results like I did since last week, and I could have used my time for other things, so I would have appreciated a heads up.
that the public input on the community survey is consistent with our district scorecard. And so I think the public needs to hear about the scorecard and how we plan to use it before we show them a zoning plan, because they need to be brought along in the same way. They shouldn't just be delivered a final plan. And I'm going to say that as my last pitch.
And I'm outnumbered here. So whatever you want to do with when we schedule this, I want to be on the record that we need plenty of time to have public input before we think that we've got a plan we're going to take to this town meeting.
Speaker 1 (03:37:07–03:37:24)
Thank you, Cheryl. I appreciate that. But we have done outreach with that survey. And we clearly because people do come and request it.
We made sure that that survey was put on our website. Our scorecard, I believe, is on the website to Tim now. And the criteria?
Speaker 5 (03:37:25–03:37:28)
I think the latest version, I think, should be up there.
Speaker 1 (03:37:28–03:37:46)
Yes, it is up there. OK. All right. So I think we are putting as much information as as we can out there without, you know, I think bringing people together to say, what what is the plan?
And, you know, I think at this point, it just we're just a little it's a little premature.
Speaker 14 (03:37:46–03:38:04)
Yeah, because I, you know, I feel like, not feel like, but the AG didn't sue us because we rejected a particular plan. They sued us because we did not comply with the law and the guidelines. You know, so that's.
Speaker 6 (03:38:04–03:38:38)
Well, the referendum was a exact vote on what the town meeting voted in December. The referendum didn't say, should we reject the law entirely? The referendum didn't say, should we be 10 percent? The referendum was purely on the zoning that was approved at town meeting.
And so that the town then went and did whatever it said in its lawsuit was not what people voted on. It was what the select board decided to say in its lawsuit. The town didn't get to vote what the select board chose to say in its lawsuit.
Speaker 11 (03:38:38–03:38:41)
The town did not weigh in. That wasn't a lawsuit.
Speaker 6 (03:38:41–03:38:44)
We countered their lawsuit. It's a counter lawsuit, so it's the same thing.
Speaker 11 (03:38:44–03:38:47)
The select board didn't go and sue the state. The state sued us.
Speaker 6 (03:38:47–03:39:01)
It's a counter suit to it, so it's a lawsuit. So, you know, the public has not weighed in on those arguments is my point. Because the only thing the public weighed in on in their vote was a particular zone.
Speaker 14 (03:39:01–03:39:25)
I hear what you're saying. Okay, so. So I would appreciate it not being held. next week because of the conflict.
And I don't think it's appropriate that we've got these two really big issues in town and that you're making residents have to choose which forum to go to to get information.
Speaker 6 (03:39:26–03:39:50)
As I said, the 14th, I don't, because of the conflict between the two meetings, I think that's a sound reason to reschedule, but I think it's a reschedule, not a, we'll wait and see, and then we'll bring people up to speed and say, by the way, we've got a plan for you, and it's done. That will not be well accepted.
Speaker 1 (03:39:50–03:40:18)
No, I think that would not be our approach. So we do, I know it is because I did see it was in the paper today. So Tim, can we do something? Can we post something and just get a notification out on the town website that we are gonna be postponing the meeting?
We'll have to post something at the council on aging next week, just signage. I'll be happy to take care of that.
Speaker 5 (03:40:19–03:40:23)
Yeah, we'll get that out on the town website and social media.
Speaker 1 (03:40:23–03:40:35)
And I think it does make sense at this point, so. All right. Is there anything else that anyone else has?
Speaker 15 (03:40:36–03:40:37)
Good.
Speaker 1 (03:40:38–03:40:42)
Okay. All right. Well, then I would entertain a motion to adjourn.
Speaker 11 (03:40:42–03:40:43)
I'll make a motion to adjourn.
Speaker 1 (03:40:43–03:40:46)
Is there a second? I second. Okay. All in favor?
Speaker 12 (03:40:47–03:40:50)
Aye. Aye. Okay. All right.
Good night. Thank you. Thank you.