Speaker 3 (01:20–04:38)
Well, two weeks ago I was told, three weeks ago, sorry, that we'd have an update. So now we're a week behind from that goal that they told me. They said we're going to be here within two weeks. We're going on three weeks.
We already passed over the year. We passed over the year February 14th, yeah. could happen today. At least I got the confirmation that it was coming.
So, that's all I have. I'm sorry. I wish. They're a very secretive organization.
So, Bonnie and I met with That was like two weeks ago, maybe. Yes, it was probably about two weeks ago. Two weeks ago. Just a little bit of background.
My wife was on the youth tennis course, probably. And then, you know, I don't really know exactly their mission. Obviously, when I was there, there's one team on the court. But they keep talking about team programming and things like that.
So I thought it was useful to like learn the team, but I was a little disappointed in the representation that was around the youth task force. Just one team. There was only one team. And then my wife just said, we're done.
But I also know that they improvements and people and more appointments, so I don't know. I think it would be good in the future to get like a representative from the parks on there, but maybe we need to have a discussion with other town leadership to get a representative from the parks on there so that they're intermixed and kind of know what's going on. Because I don't really think that, like the force ahead is, you know, And so I know that there's been talk about getting programming, the firehouse, but there's challenges to that. So Bonnie gave them kind of a briefing.
So it's just something to think about, I think, as we go forward, maybe email. email like emails like or or somebody who creates those appointments because I also know that there's just vacancies on that board so I think it would be it would be good for our representative to sit on. Are they looking for like stuff to do at night for like high school kids is that there? Yeah, so I was, it was more for like high school kids.
So I think on that board too, they're supposed to have three high school kids and there's one kid right now. And I think in the past they had four, but I also think it's for two kids, for high school kids and for older kids.
Speaker 4 (04:39–05:09)
Yeah, I felt bad because he could tell he was clearly frustrated because, you know, like he used to, was just the one on the board and, he's been to these meetings he seems I think he's been consistent in going to the meetings when they do have them and you know we talk about we talk about not much you know comes from it because again we're limited you know so it's frustration right it's like weird to have it
Speaker 3 (05:10–05:27)
You know, if you want to do something for high school students, like, so like at the teen center, we have a teen center coordinator, but all the staff is high school kids. So can't have high school kids watching high school kids, you know, if we got to that point.
Speaker 4 (05:28–05:42)
Yeah, we'd have to hire, and I think we discussed that, you'd have to hire a teen coordinator that would work. at night, you know, that would be able or a consistent volunteer, but that can always be a little unpredictable, you know.
Speaker 3 (05:43–06:18)
So it's a good question. We can just decide. For me personally, I just see that I see that committee just a road, right? And like, be honest, I have a crazy business go to my wife's like this committee doing Right.
So, so it's also like finding someone who's. People on it. Right. And I was actually surprised that someone wasn't similar to how we have the CDC, where we have people.
Speaker 4 (06:19–06:23)
I believe Scott was.
Speaker 3 (06:23–08:07)
Yes. Yes. or started it, started floating edges around building a youth center. So, thinking of all these sites before we got to the church and then the pandemic.
It's changed a lot. It's changed a lot, like the pandemic hit and now it's like really, right? Maybe the way we could start this is we could have if or when they have the next meeting, if someone could go, it's just like a liaison. I think what happens is sometimes in the communities, they don't know there's stuff the parks are already doing, some of our limitations, so maybe not get one of us there at every meeting or consistent if they're not having their own consistent meetings yet, but there once, maybe hear some of the ideas they have, roadblocks or any concerns they have and express them like, we've talked, we would love to have We're really limited in where and to build team programming right now, it will take us a while because we'd have to get the teams interested, right?
Like, I think we've talked, like I would love if the Huntington Park team swim during the summer, but they would have to, they would like to trust with the kids to get them all to start coming because they're not used to going against the pool, but it's a good opportunity. So maybe there's opportunities like that around town. It takes a long time. The task force has to adapt.
probably different if you find out what the next meeting is. I mean, they reached like Rachel Richelle. Yes, and I'll get to the last one. So I put her at the bottom.
I'm just here as a conduit, you know, but I'm like, listen, I also don't want the committee just to be a committee to do nothing. So I think… So if you mind, I'm on the committee, if you guys don't mind.
Speaker 4 (08:09–08:18)
So we decide we actually need to be, that person will need to be appointed by the select board because they appoint, you know. Yeah.
Speaker 3 (08:18–09:47)
Yeah. And appointed by the select board. Right. So I should still go on.
I think, I think we should like get in touch with the select board and say that they're interested. I think it's a good opportunity. And then I think that they would basically do it for like more full-time than that would get some energy I think. But also, we'll find out.
I know Rachel pretty well. And so we'll just find out. And then hopefully they get it. You know, I think there just needs to be some energy around that board, personally.
I mean, I was kind of disappointed. Two people on the board. Right. And I think it's fantastic.
Do you have any schools representing any of the schools? Which is what we always do. Schools was next. I mean, there's like this guy.
I feel like you need people that are on that board or on other boards. Someone from the schools, someone from the parks. Yeah. Right?
Different baskets, just so that it can be. So maybe, you know, I'm happy just to write an email that said we spoke about it. We'd like you to get like, you know, get appointed to it. And if we can put, I will let you know about the next meeting.
Because I think now it's going to be more regular. or reach out to them. But they would have to appoint you longer term, but maybe it's easier just to go to a meeting first.
Speaker 2 (09:47–09:54)
Can I ask a question? Is there still a line made up for the budget for youth in the police department?
Speaker 5 (09:56–09:56)
No.
Speaker 3 (09:56–10:28)
There always was. There was a youth department, the key department. And then the youth department was transferred to the police department. It came out of their budget.
There was a line I had for you. I don't know what. Remember the guy Max Corbett? Yeah, that's before.
Yeah, he was it. Like when I was, he was the coordinator. He did a really good job. Did a great job.
And then he retired. Programming up and cutting in. High school kids. Weekends.
Speaker 4 (10:29–10:44)
Well, there's a resource officer that's back there now, community resource officer. So that might be, I probably, I haven't looked, you know, to see where that was coming from. That said, Jordan Sink, parks, police, schools.
Speaker 3 (10:44–11:00)
And then maybe somebody from the, um, whatever they call it, the coordinating committee for repairs and so on. I don't remember the name of it.
Speaker 4 (11:00–11:07)
No, we have been in talks with him and we're going to do a couple of programs in joint with them so we can have that part of the conversation.
Speaker 3 (11:13–11:50)
I came in with that thought. I think some of the people have worked across the country but for whatever reason just don't I don't know, maybe like, volunteer. Get these task force behind with their cars. Yeah.
Get 30 kids to come out and volunteer or whatever. You know, the brothel. I don't know. Whatever we find in the cars, I can get that.
We're going to get these together. We're going to get these task force on this Saturday. We're going to start volunteering. Whatever.
So, I'll go. Okay, great.
Speaker 4 (11:52–12:32)
I love the Blue Hills this weekend, they're celebrating the 75th anniversary and they're gonna be open till midnight with a band or a DJ and a ski. Yeah, yeah, it's like $25. Saturday night, yeah. They're doing something Friday night also, but they're gonna have a DJ and all kinds of little things going on and races.
Yeah, yeah, they did. Yeah, yeah. I love the new management out there. They're doing a lot.
They've had a great season. They've held a lot of events and a lot of them are team-driven also. So I've loved it. It's been great.
Speaker 3 (12:32–20:58)
Yeah. CDC project updates. Steve Jackson. As I guess the quote works, I love making the recommendation we got.
Earlier in February, we got bids in on the dugout project. We got 11 bids, which was amazing. And the low bidder was Folsom Corporation. We had $179,000 budget.
In fact, their low bid was $174,400. They're a really good company. They've done some work in Milton. They did the handicap access ramp for the library.
He also did drainage work at Huntington School. I've worked with him on a couple of projects. And Quincy, I do a lot of work with Quincy. And I work on there.
And also, I contacted the head of parks construction for Quincy. And he's done a lot of work with them. Every year, they kind of have a set-aside project that they hire them to do all kinds of work. Their biggest work is masonry and concrete, but they also do fencing and erect structures and do demolition and excavation.
So they've got all the requisites, expertise. So I recommend that you guys approve them for a contract and go ahead and execute a contract in the amount of $174,000 to do the pickups at Kelly Field. I just also want to note is I wasn't involved in the project Um, but I put together plans and specs. We'll see plans that you had worked on for the town, big project and no cost to the town.
Um, and I hope I'm done. I will help, you know, if you guys need something in the field, but as involved, I was happy to do that, but I think my participation. I guess I have three questions. One is.
that representative, you can put together pretty comprehensive specs. And so the quip that he put in there was that they will be using the Beacon, Beacon, the Beacon. The second question, does that fall on you to the management of all this project? Yeah.
Okay. There shouldn't be a whole lot to it. It'll be submittal. And then, and then my last question would be, the budget for that is $79,000 something.
Well, the rest of that money, does that go back to the CPC? What is that? What happens with the rest of it? Well, first of all, you've got to get through the projects.
If there's going to be change orders or, you know, any extra work that has to be done. If there's any kind of things that, well, I don't want to advertise everything because the advertisers just don't think it's good. So I don't know if they'll be willing to give it to us. You don't want to give it back.
A lot of time doing dugouts, the area around it gets kind of messed up. So there's some for site restoration. You have to put it, if there was like three tiles above, put it back into fixing the field around that area. through these recommendations to do the dugout.
No, he'll send out the board letter to them and then we can get the contracts executed. August 3rd? August 3rd. It's like you said, if I'm, I don't know what to say, hopefully honest.
I believe I'm honest. You're going to stop? Yeah. Because of some of them.
But they'll order their equipment and everything ahead of time. And that's a good time with Kelly. It's kind of quiet there. But that, so this also means that we're still Yes.
Right. So they can't open up. Yeah. Yeah, it does because it has to pass through the CPC.
Oh, no, no, no. That's great. That's perfect. Sorry, I got it.
No, they can't do it now. It's too… There's about a 12-week… There's a 12-week lead time to get the equipment.
Yeah. Yeah. Yeah. Yeah.
It's all right. We've waited this long. We can move forward. Master plan.
All right. So the master plan, the update on the master plan. It had to go out. This project has to go out to RFP.
I've been in contact with Kevin and Nick for a while. I drafted the RFP. Well, Nick drafted the RFP. I made a whole bunch of comments and edits on it.
We met probably a month ago, again, to amend it. Nick sent it yesterday. So it's ready to go. The RFP is in the streets to get people to come back and we should add it.
So I'd like to make a motion to approve that RFP gets put out on the street. Second. So I think it'll be about 30 days. And then just so you guys know.
Yeah, so I think we'll like also put it, I mean, it's just like the But the difference is, I will say the difference between this exercise and what we did for the dugouts is you're looking for services. And what we need to do is it's an expect it's established. So what will happen is once we get those bids back, it will also be under our control that they'll come in. So it's a little bit different because we can then evaluate them and we have evaluation criteria.
So we don't necessarily need to take the next bid either. So we need to just make sure we pick the right consultant to do it, knowing our budget, being wise, but also they'll come before us and they'll tell us what we're thinking. So I look forward to that. And we wanted to get it in early and I wanted to make sure that we were all included too, so that we all have input.
Where is it at, 60? It's about 80. It's about, I think it's around 80. Beverly Park.
Beverly Park, okay. That's a good question. Who put that one? Did you?
I did. I did too. So we went to Bob's house. Beverly Park, playground people.
Who's doing the ice house? Myself. I facilitated the meeting. So, we got quite an offer.
Nicely asked him for, well, he knew it was coming. He was very organized about it. He was very nice. He said he could do one of two things.
He said he could make a donation. I won't tell you exactly how much it would be, but he could make a donation. Or what I suggest is I will offer the site work. I'll donate at least $50,000 of site work.
The rest I would do with the rest. That's what he's on.
Speaker 2 (20:59–21:07)
So, I don't think they were keen on the site work idea. I think they just want the money.
Speaker 3 (21:09–23:34)
They need the site work. Right. He's been several times over and over again in that. Take the site work.
Yeah. Take the site work. He's Boston, he's P.U. and I have no idea who he is.
site workers or something like that, I don't know. Yeah, I mean, they have to be prepared to fight the fight, but that's the only process. And then you got to work with the actual installer, whoever gets picked for that, and what they need for, like, I need you to sit down. Usually the installer does everything.
Yeah, yeah. But if we, if they can get him and work with him and say, yeah, I need 10 inches thick, crushed gravel brought in, So they did have to hire a lawyer, a law office to submit the 501c3 plan, and then they try to put the bill in with the money they've already received CPC. But Pete, you can talk in this. Well, when Julia Gatlin submitted the invoice to Compton, Compton said, you know, there's nothing in the award of them.
It's money. The money was awarded for construction, not for legal services. So they didn't feel they could pay it, and there's been back and forth about that. So what's been decided with CPC and with accounting and everything is that the CPC committee is recommending another grant award to them.
And this year, it's about $7.5 million being paid. But when we describe the money, what that money's for, it'll say for construction and related costs. how people accept that invoice that we've made in the past and we can pay it back. So we reached out to Julie, was it?
Jack. Jack.
Speaker 2 (23:34–23:35)
Jack.
Speaker 3 (23:35–25:34)
I let her know yesterday that that was the case. Yeah, that's what he did too. She said, wait until the response is due. It was like $5,800, I believe it was.
$5,800. You said you don't know the platform. That seems like a state. They took this and placed it all.
But that's yeah. Yeah. I mean, it is work for somebody, but someone who was in this town. I mean, I think the issue is they need, you know, the money that the project will have to go out.
I'm not sure whether to talk to the park department. So the money will be held in the town. And the private fundraising, they got the 501c3 so they could get private fundraising. That is tax deductible.
But that money will have to be transferred to the town in order to pay for the project. So the town will be putting it out. But if they're a 501c3, could they get the money collected? Not from us.
not from us, but from on the scene. The DAPC could. There's been precedent that if you're a 501c3 account, they could get the money to do it. If it's work on town property, it's gotta be done by the town.
I don't know if we've done any with the private people.
Speaker 4 (25:36–25:47)
I'm thinking back to the playground cleaners, all the playgrounds that went down. I'll just have to see if that was, Because I know they also have one too. So I'm thinking that they were able to.
Speaker 3 (25:48–28:32)
Well, like Andrews Field or Mercy Lane, the work that was done. I mean, you were involved in things like that, but the money went through the town, although we really kind of managed it all. But that's a perfect example of what I'm talking about with the county. They, in the past, year or two on top of everything.
They're very conservative. It's not saying no. First of all, I put this on because I heard from a few folks this week about what's happening So it was like the second year, right? And so I didn't realize the money was there.
So I didn't realize I didn't know I could stay here. So I guess the history of that was Nick put out, I think he probably threw out $75,000 and ended up having a family of 40,000. I guess when I'm asking you guys, what would it take to make improvements there? So some of the things that I've heard, like new baskets, some of the feedback I got for Andrews was the fence isn't high enough.
And so I'm just curious, was there ever an estimate of anything that we would know what it would take? I just looked around there and looked at it. like he doesn't even know what is what is the pavement but it doesn't need to be redone yes yes so it seems to me that that's he is he said they were originally given 75 and then they were only given 40. he said um He said they're a little short right now, but I talked to them yesterday about this.
They said they have every intention of doing that project over there. Yeah, because it doesn't have the existing pavement. It's fine. They'll just either do a repair or an overlay.
They do need new uprights and things. And then there was a question of putting doing some kind of barriers of the ball that go down into the history.
Speaker 5 (28:32–28:33)
You do fencing on that side.
Speaker 3 (28:33–29:16)
Fencing or something on that side. Oh, just one side. They just, in painting, everything's not cheap. They just run.
I think what they came up with was like $60,000, but it wouldn't go to cost. Well, so I think there's a similar group of folks that are like, that were behind the play, would be behind that. So if they could liaison, whatever it costs, if it is $60,000 per acre, whatever, if they needed more money, they could go out and get a private site for $60,000 to see where it goes. I'm just curious, like, how's that even?
Like, what's the history of it?
Speaker 4 (29:17–29:24)
I pulled it up on the GIS. It's technically called Fireman's Field. And
Speaker 3 (29:24–33:07)
technically, I think, originally was part of the firehouse, and it's all part of one big facility. Yeah. It was part of the firehouse field. The original playground plan was a one-foot-big playground, but they got permission from the select board to use that site for a big community-wide playground.
It's all up and running. There was a contest, and they met the kids at school, and the firehouse field was selected. And the day we started construction, we feel there was a court injunction that stopped the construction. Back in the late 80s?
Right, that was a couple of days ago. So we took the monies that we had raised for playgrounds and put our pavement playgrounds in. We took that money, so it was, you know, it was going to be a big damage to the land and playground up there. And so that's what, but it is been under the jurisdiction of the select board forever.
That's where the, no use on these. They took it out. I was doing, I need to skip a lot of boxes. Yeah.
Yeah, it was a building. The building was called the Milton Hughes Center. We could use that now. It would probably be MMA at this point, of course.
No, it's not. I mean, it's that it's a, but it's a, we'll probably do a fill up, still in the facility. Paul and I gave them a contractor that we've dealt with in Pete, and they reached out to them, everything ready to go, and the price has gone. So I think they just kind of put up the bet.
They asked. Once again, I think it's communication, it's sitting there. It's been over a year, just $40,000 locked up. So like, let's move on, right?
And so I think what I'm gonna do is to push that. So let me just put this up here. I think with the RFP, the master plan, and once that gets going, I guess, I think it would be good to get feedback from some of the programs and such. But I think that's going to be, I know it's quick, I'm just, I mean, they're going to do a survey.
I think they will end up doing a survey and mix that in with what's in the facility. So I think we'll probably, we can control. Yeah. Yeah, exactly.
Like, I think it would be good. I mean, it opened my eyes like two months ago when Bonnie and I went to this conference forum and the survey, a public survey came up and we saw the results. It's good to hear feedback from the public about our parks and rec so that we can improve things and such. So I think it'll be a part of that.
in August. And to your point, I think once we go through this RFP and we meet with consultants, we talk to them, then we can control this as we go.
Speaker 4 (33:07–33:36)
I believe a year or so ago, though, the Health Department or MPAC put out Because it was through Tim Zielinski. Yeah, yeah. I mean, maybe it's two years ago. And we were included in that.
I don't know if we can pull any results from that. I don't want to be repetitive or want this just focused on us. That's a different story. But we can look to see what's there also.
I'm sure we could get access to that.
Speaker 3 (33:42–36:53)
Yeah. Yeah. So, yes, have us down to Andrews. See who's out with a nice weather.
And there's a bunch of kids on the baseball fields. I mean, basically standing in mud. I mean, it's a lovely trip. Thank God the other two were covered in snow.
The softball and the little kids, you know. It's just stuff that we're going to have to watch. You got to let this dry out. I know leagues are chomping at the bit, but winter's far from over right now.
It is, and we're going to get another freeze. Yeah, it's just, yeah. So, um, that's where I'm at on that. Everything else is just, everybody's good.
Yeah. It was kind of early this year, but with a lot of requests to rent fields from other places and Bonnie Botman yesterday. I think every town is kind of in the same boat. Not every town, but a lot.
They're looking for fields. They think Botman has plenty of them. And then they all want the high school. Up top, the Brooks.
The football. They want that. hand them off to the schools when they get back home. Yeah.
Well, I mean, it's interesting because Jane tried to get that deal for soccer for losers, which they've had for years, and they were denied the share. So they're doing it at Milton Academy for a couple of weeks. And I'll say this again. I'll say this again.
I know a lot of people at Milton Academy. Yeah, right. there. But I mean, everything, everything we asked they get.
No, I know. But Nick has said he has a connection. Talk with him too. Do you Yeah, I feel like that's an opportunity.
Because also we're going to have to get, I don't know who at Carine, who at Milk Academy, when we do this survey, they're going to be going to those towns, right? I mean, to those properties. And we just don't want them showing up, you know, unexpected. So we're going to have to let Carine know.
when they're there just to look at their facilities, correct? Yeah, I think we should, like Kevin, we should reach out to some of those folks and let them know what's going to happen. We have plenty of time before July 1. I want to hit this thing July 1.
That's what I want. But then maybe we can do some advanced connections, communication, because Gary Kelly will come in if we want. Yeah, we need to have them in that hurry, Milton, Kevin. I think those are the three.
Yes. Yeah. I'm not even sure. I don't remember if we included potents or not.
Speaker 5 (36:53–36:53)
I don't know.
Speaker 3 (36:53–42:30)
I don't know if we included TCR. We did. But it's interesting. It's on the RFP.
It is. It is. It's listed, but it just says in a quotation, TCR. The field is redone.
Yes, it was. But they supply the bases, correct? I think so. That's why I don't know.
It's been a few years for people since they've been up there. So I don't know. No, I don't think that's the issue, right? So then we can't, if we can't store equipment there, that means we'd have to supply every team that goes.
I don't think we, we don't necessarily for some of the other teams, that's a huge bell to us. So, but I figured I told them on the board, I was like, they're not going to let you put it. We'll have to figure that out. I've only been to the baseball.
Is it charged, the softball? Baseball is not. I can't use it that way. For a lot of reasons, I think, like, we do all this planning and bring the right people on the phone.
Start talking. Well, it's under the control. That's the issue too. Like they want money for that deal.
We should have some relationships that are understood that they should get the field. Yeah. Oh yeah. We're all kind of all together, right?
We should be. We should be. It's frustrating. I'll tell you.
The only thing that in the summer pays. Yeah. We just paid a $4,000. $4,000.
For the year or one program? For basketball. No, for basketball. It's to be in the gym.
It's not how it is. What are we talking about? The gym, right? The gym.
Anything else, Tony? No, I'm good. All right, quick, we just finished February vacation baseball training. We had 51 participants in that program.
Brendan Morrissey, Greg Lannan, the diversity coaches from Milton Academy and Milton High. Greg Landon's at Omaha. They ran an excellent program. They brought in all their high school players to run it.
We just staffed the check-in table, so 50-50 split. We covered the cost of the custodians. That was it. So again, all partners can make money.
That's how they make it. They bring in their players for community service. So it worked out very well. I told them, the only way it's going to work is to bring in your players.
Spring basketball starts this Monday. Close to 300 participants in that, ages grades three to eight, boys and girls. Kevin and I are going on a field trip Tuesday. I think right now we're about 75 kids going.
And in the process now, getting ready for the summer. Here in Birmingham, Birmingham area. He's only 60 years old, jumping on it. Summer programs, take shape.
We have to lock things down now. Just get the summer program ready to go. He's letting us use it. I know there's going to be some fees, but that's fine.
Did he get to play baseball in that time? I'm not sure what his rates going to be, but he has to sit us down and let us know the rates before we put the program out there. It's a place to run it, and they know it. It's the best program in town.
That's it for me.
Speaker 2 (42:32–42:46)
Oh, yeah, we'll need straightfast. In the cemetery. I just heard. On Old Stanley.
Speaker 3 (42:46–42:53)
That's huge. Yeah, that's Able 13, so we'll probably need it as well.
Speaker 2 (42:53–43:17)
Oh, next meeting.
Speaker 4 (43:24–43:33)
If you, I should mention Rob. If you want to decide.
Speaker 3 (43:33–43:43)
Yeah, that would be fine. I know I'm gone for a second.
Speaker 2 (43:43–43:52)
You told me your plate's going to be full. 27.
Speaker 3 (43:52–44:35)
I think that's my second one. JL. JL. What?
Oh. Tuesday. Yeah. You got any more in here?