Speaker 1 (00:50–01:04)

Okay, this is the August 28 meeting of the macro plan implementation committee, and we are joined by pal Johnson of the concept esplanade initiative.

Speaker 2 (01:05–04:08)

Hi, thank you. My name is Kyle Johnson, I am at 127 Blue Hill Avenue, and here representing a informal grassroots community effort focused on bringing community development to our neighborhoods around Tucker School and around the Neponset River, the Neponset Esplanade Park in particular area. And we kind of began with an interest in 7 Brush Hill Road that many of you may be familiar with, the abandoned former police substation of DCR there at the border of Mattapan. And DCR has been looking for someone to become what they call the curator of the building.

So they have a program where some entity, whether it's public, private, takes is willing to put up money to renovate the building in exchange for a long-term lease and there's models of different types of ways that they've done this and open to different types of uses as long as it serves the community and is consistent with TCR's mission in terms of conservation and recreation. So we're very interested in trying to ensure that any use that comes to that building serves the town and serves the neighborhoods around us, which are in significant need of recreational space, community gathering space, and or amenities such as cafes, restaurants, stores, very little of which exists on the side of town. So we have put together an application to the A CPC application that has been deemed eligible working on the full application now and seeking support from other boards and committees of that application, which requests funding for. feasibility and design of a potential use of the building, which of course puts the cart a little bit before the horse.

And so in the meantime, we're also seeking design and planning and community engagement support in the shorter term to help determine a use that serves the community. and also mindful of the fact that the town owns the adjacent property to the south, and would love to just push a conversation about what it could look like to intentionally plan and develop for that area and serve some of the needs that our community has. That's one of the most dense parts of Milton, one of the most economically and culturally diverse parts of Milton, and potentially one of the most walkable parts of Milton, if we could think of creative ways to bring some walkable recreational and community needs to the area. We are looking for support of our CPC application and looking for opportunities to get support in community engagement and visioning to determine what we would be interested in at that space and in general in that area.

Speaker 1 (04:12–04:35)

Great. Okay, is everyone familiar with the area that Kyle's referring to? Yeah. Okay.

Kyle, can you at least tell us a little bit, I mean, I can too, but maybe you would like to, you went to the planning board and also sought planning board support. So you wanna just give a recap of that?

Speaker 2 (04:35–05:17)

Sure. Yeah, we have spoken to the planning board and they are supportive of our CPC application. And we have asked them similarly for if they would be willing to offer support through some means in community visioning and engagement. Um, either in communication with, uh, the MAPC and also involving, hence, uh, the MPIC and also, uh, the Parks Commission.

We're communicating with them as well, and I'll be meeting with them, um, in September to discuss this as well. Um, and we've also received support of our CPC application from the youth task force as well.

Speaker 1 (05:19–06:46)

Right. So the planning board, um, did, um, vote in support, to send a letter in support. Hasn't yet taken a vote about leading any initiative, any visioning initiative, but was generally supportive of contacting MAPC and seeing if there was, if MAPC had any grant funding available and if there was a match needed. Um, there was no decision made about who might lead, who might lead that, who might participate in terms of planning board or MPAC.

Um, and I believe Cheyenne that Tim was reaching out to MAPC, um, about, um, what they saw as a way for them to assist, uh, in, in, uh, in the visioning. So, um, I don't think when we had parks in before, you may recall that they haven't been involved in strategic planning and sort of thinking through what they might be interested in the future. But I'd be interested, too, to see what they think about how they might participate in this, especially with the town parcel that's in their jurisdiction next door. And Kyle, did you say when DCR is looking for, did you mention the letters of interest and when they're looking for those?

Speaker 2 (06:47–07:20)

Yeah, no. So they have put out a general call for letters of interest. And I've been and a few others involved have been in touch with them. They don't have a firm deadline.

The last I knew, they don't have a specific plan to transition to calls for proposals at the moment. So I think they have a generally still open process. But you know, we're thinking that we would like if we're going to express a more firm interest would love to do that, you know, as soon as possible, early fall, I think would be the right way to be thinking about it.

Speaker 1 (07:21–10:40)

So Kyle mentioned this to me shortly after I think the RFP or the RFI request for interest was issued. And I had suggested that he contact people at DCR and ask if we could get a tour of the building. So I did participate in a tour. And at that tour, the representative indicated that they are pretty flexible in terms of not just the schedule, but the kinds of structure of an entity that could express interest.

It could be a town. It could be a nonprofit. It could be a business. He suggested that we take a look at a DCR property called the Speedway in Brighton.

And so I actually know the director of the entity that redeveloped or was designated for that. It's the Architectural Heritage Foundation in Boston. And so I reached out to them, and we went for a visit. And we spoke to them about how they went about it.

And they're a nonprofit, but they have four profit businesses, it's kind of like incubator, like small, local, very small businesses that have sort of some synergy together, plus an event space, which they lease out. And the sources of funding were very diverse, including CPC funding for their, Kyle, you mentioned, I was looking up something when you were first giving your intro, did you mention how it's, like a lease structure where the payment is actually the renovation of the building, right? Yes, exactly. Not a monthly lease arrangement, but that the steward would have to invest in a historic preservation building.

They had estimated about a million five, I think DCR had for the renovation, which would just address maintenance and code things, I believe. So the other thing that the Architectural Heritage Foundation mentioned was that from designation to beginning of construction or end of construction, I'm forgetting which one, it was seven years. So they did allow a lot of flexibility in getting the financing and the whole package together and in negotiation of the lease. So I just want to throw that out there because while there might be more an entity that's interested in taking it, it's a small building.

And, you know, the location is a little bit challenging for depending upon what the use is. And being right next to the park and the river, I think, Kyle, some of the ideas that the neighbors had really had to do with community and recreation. But if it needed some kind of business support to help make numbers work, that that was something that you were interested in thinking of exploring, right?

Speaker 2 (10:40–11:06)

Yeah, and that's what's kind of cool about the Speedway model, that other curatorship, is it's rented out to businesses, but there's portions of the building that are available to public use, like the public restrooms are available to public access. So it serves like a mixed community use while also having those revenue opportunities to keep it sustainable.

Speaker 1 (11:08–11:15)

Okay, so questions for Kyle? Yes, Tabor?

Speaker 3 (11:15–11:31)

So a couple of ones, given the seven years, it sounds like probably not surprising, especially if the DCR is involved. Are there requirements to build under state rules and rights other than code?

Speaker 1 (11:32–11:47)

I mean, do you have to… It's the National Trust for Historic Preservation. standards for rehab and historic properties is a requirement. But I don't know of any other.

I don't think they said any other requirements, Kyle.

Speaker 2 (11:47–12:10)

No. And it sounds very willing to negotiate. I think exterior changes are off would be the main thing that's not possible. But they were open to talking about layout changes within those constraints.

And then I should also mention that they're open to negotiating how much of the grounds would be part of the lease as well, how much of the grounds around the building are.

Speaker 1 (12:11–13:31)

Because there's a question. canoe launch in that area and bike path is right next to it. There's picnic tables there, but they seem pretty flexible about being able to use shared use of some of those things with the general public and then some use for the building itself. It didn't sound as if they were going to put a demarcation in the land in terms of where the lease would be.

This initial request for interest, is first, and then DCR would actually issue a request for proposals later. So first, they want to see what interest is out there. And that's the first step. And kind of being able to kind of further this idea is something that sort of grassroots as um, neighbors there, they're going, they need some assistance, which is why they're looking to CPC for funding, but that funding won't be until next year.

And, um, so that's sort of the first part of the ask. And then the second part of the ask is whether we would have an interest in working with them before then, uh, using, potentially using MPIC funds for visioning and engaging with someone like MAPC.

Speaker 3 (13:32–14:54)

So is there a, uh, requirement, if CPT funds are used, that it would be strictly limited to milk. And I'm only getting this, the Ponce River Watershed was approached with this, by the DCR with this bill, and they're currently attempting to put it on a pocket pile of golf course. And being right on the river, this seemed like an obvious choice, but the employees that we have, too far away, and this would just be another 10 or 15 minutes of extra travel time. It wasn't worth it.

But the Fonsa Greenway, which is Fonsa Wood Watershed, has a seat on their board. But generally, it's Boston-oriented. And it's the right way. They are interested in a facility somewhere.

And I know that the gardens right across the river in Mattapan I forgot my name, but they are also interested in some other local facility. And the city of Boston doesn't seem to have anything. So I'm not suggesting that they would necessarily be partners, but they could be saying, we'd like to be a long-term tenant on a weekly basis to do a farmer's market type of thing or a community gathering space type of thing. And would that help with the DCR application at the end of the day?

Or would it not make any difference?

Speaker 1 (14:54–15:00)

I think I guess it depends whether they were going to apply it directly themselves or express interest themselves.

Speaker 3 (15:00–15:24)

Yeah, the ability to what if they did, then you've got a competitor. But since it is in Milton, it seems like it would be better to control it and then have the common public space open for others to use it would be precluded from being used by outsiders. Because that's, I think the DCR would beat that as a exclusive development versus open to the public at large.

Speaker 1 (15:25–15:34)

Yeah, so I guess those are, if you have some contacts for those organizations, Tabor, maybe we can pass those along to Kyle.

Speaker 3 (15:34–15:50)

And he can have a look at the meetings we were on early on. I think we've had a couple of folks there. I'll remind them that this is now gotten further and maybe I'll get them to reach out to you.

Speaker 4 (15:51–15:52)

Great, thank you.

Speaker 1 (15:54–16:07)

And if that makes it a stronger application, if they're not pursuing it themselves, then yeah, I think it could be beneficial if they have access to funding sources too, like grant funding.

Speaker 3 (16:07–16:10)

And they deal with OVCR all the time on the bikeway and other stuff.

Speaker 1 (16:10–16:15)

Right, okay. Any other questions or comments?

Speaker 5 (16:16–16:21)

Yeah, I have a couple, Cheryl. Kyle, who do you envision being the lessee in this?

Speaker 6 (16:23–16:25)

That's a great question.

Speaker 5 (16:25–16:26)

Yeah.

Speaker 2 (16:27–16:55)

Yeah. So I mean, yeah, so I think From our vantage point, we would love to see the town to be in that position, but are also open to us as a community organization be forming our own nonprofit and being in that position. We're kind of open to lots of different ideas. Our kind of main concern is how can we kind of direct us to do something that's of service to the community and are happy with, you know, I think interested in a variety of different outcomes.

Speaker 5 (16:56–17:42)

Because that sort of ties into who would be responsible for the renovations for, I guess, that's part of the whole rental lessee, lessor agreement that you'd have. So I think we would want to take a little sort of a deep dive into that as to what the, you know, at the end game, what would be the town's responsibility or liability on something like this because I think that's something which certainly has a long-term impact on what we're talking about. A couple of just quick questions. You said you had support from the youth task force.

Have you already decided there's going to be a youth component in this facility for them to support you?

Speaker 2 (17:43–18:00)

Not necessarily. I think they're supportive that, you know, we hope that this generally serves families in the community. And so that includes youth, but there was not necessarily, like, there was not, support was not contingent on it having like an explicit youth focus.

Speaker 5 (18:01–18:33)

So they supported you in sort of a macro sense, this is good for the town and good for you. And I won't ask you to define community for me, but I got a pretty good sense of what it is. in terms of this is good for the youth of the town, but there's no, you know, sort of a handshake between you, your group, your, you know, your de facto group and the youth task force as to you were going to provide some sort of facilities or opportunities for them to do things in the building. Is that correct?

Speaker 2 (18:33–18:34)

Yeah, no, nothing, nothing like that.

Speaker 5 (18:35–19:03)

No. Okay. In terms of parking, I'm a little familiar with that piece of property. If we're going to try to generate some interaction and activity there, what do you have for parking?

I saw when I looked at the handout that was someone sent to me, there seems to be three parking spots, you know, in the existing building as it is right now. Is there a parking around there? I'm not totally familiar. Could someone help me with that?

Speaker 2 (19:03–19:24)

Well, there is. Let me see if I have the map handy. But there is parking behind the building about, I want to say, about 8 to 10 spaces, actually. And then there is open parking there on Brush Hill on the other side of the road, like headed towards Boston.

Speaker 5 (19:25–19:47)

So we'd be talking about if people wanted to use it at night, for example, for whatever you decide your group wants to do with it, they would be parking pretty much on the street at night. I mean, not the street overnight, but during the street at night. Is that the way it would work? I'm just thinking about how people could access this facility from a general standpoint.

Speaker 2 (19:47–20:02)

Sure, yeah. So yeah, parking on on the, I guess we'd call it outbound side of threshold road, lots of the neighborhood like I live around the corner on the corner of Oak and blue lab, lots of open street parking there. And then there are, I think about eight spots in the back of the building as well.

Speaker 5 (20:02–20:58)

Because I think we have to be a little concerned about the public access to and from this building. Sure. Yeah. And it's a busy intersection.

It really is. And I think that's I think we all would agree to that, that it has to be something certainly at night. I mean, during the day, you probably can make a goal of it. But at night, you know, when it gets dark, it could be a little, little dicey.

And that's and that's pretty much it. And here's just a general question. But Cheryl, if we were to, and I have no issue with this, support this proposal, what I understand in a brief email conversation with Cheyenne, there's no deadline for proposals. So if we were to say that we were gonna support Kyle's group proposal right now, and let's say, and Kyle, this probably will never happen, two weeks from now, after we say we vote and we say we'll support this, someone else comes in and say, gee, I think this is a better idea.

What happens then?

Speaker 1 (20:58–22:20)

Do we have two… So, Dick, the CPC had an initial deadline for applications that's passed. Then most applicants, but not all, were asked to submit for the second round, which is a more detailed round. So that's where we are with this one.

So there won't be a competing one as far as the CPC is concerned. And so there's the supporting, the first sort of ask is support of their application for the CPC. And then the second is support for some planning initiative before that. So if they want to DCR this fall, which initially, so the deadline for CPC is September, end of September.

And then my understanding is that DCR was looking for letters of interest this fall, but they didn't have a hard, fast deadline. So I haven't heard of anyone else express interest, even though this is, I think it was first covered and I first learned about it in the Milton Times. when the RFI went out. Does that answer your question, Dick?

Speaker 5 (22:20–22:50)

Not really. What I'm trying to get at is if in fact we supported Kyle's proposal, and then two weeks from now, someone came to us and asked us also for their support, not for the CPC, but for the DCF portion of this. Will we get ourselves in a situation supporting two proposals? Or do we want to set an arbitrary deadline for ourselves to say, listen, if people want our support, we need to see if you have any interest before such and such a date?

Speaker 7 (22:52–23:03)

What can we support more than one if they're both good options? If we felt like they were both good uses of the building, I feel like it's appropriate to support multiple proposals.

Speaker 2 (23:05–23:17)

And I'll just say like, you know, our request is to help determine a use. So we don't have a specific use in mind. So I think that in a sense is to see is to go out and see what ideas are out there in the community and what would be viable.

Speaker 1 (23:18–24:18)

Okay, so what I understand is like neighbors to this property, you know, want to have some kind of say, and if there's opportunity to use that meets needs in that you know, community that's nearby there, that they are able to take advantage of it instead of losing it to something else. And so I think that's why the interests, you know, that Kyle's met with neighbors and there's a committee that they have membership and been doing some outreach. I think as of last weekend, you did some outreach too. So if there's others who are willing to do that and get to us, I guess, before, you know, we can entertain it.

But I do know that there is this deadline for the CPC. So I would like us to be able to take a vote on that tonight. And then as far as whether another proposal comes in, we would just entertain it. That's what I think, Dick, as Elaine said.

Speaker 5 (24:18–24:30)

Elaine, is that what you're saying? So we could support multiple proposals coming to us and say, that's fine with the D. As far as we're proposing, we're supporting those proposals with the DCF.

Speaker 7 (24:32–24:35)

In my mind, yeah. I mean, I think that's the case.

Speaker 5 (24:35–24:38)

I'm fine with that. I just want to make sure we're all understanding.

Speaker 8 (24:39–24:42)

OK. Sorry, you froze for a second.

Speaker 7 (24:42–24:45)

You're still frozen.

Speaker 1 (24:45–24:52)

But Regina, sorry, Dick's frozen. So I'm going to give Regina a chance to speak. And then Dick, when you're unfrozen, we can come back to you.

Speaker 9 (24:55–25:05)

I'm just curious, Kyle, if you have some thoughts about how you want to go ahead and collect community input about possible ideas.

Speaker 2 (25:07–25:44)

Yeah. We have talked about a community meeting of some sort, maybe asking one of the churches if they're willing to host something or working. You know, we love to work door-to-door, trying to talk to people as best as possible. But I think that's really what we'd be looking for support with is determining what the best process is for getting community buy-in and engagement is.

That's what the expertise we'd be looking for from the MAPC or whomever could be hired to help with that step.

Speaker 1 (25:44–26:13)

Yeah. I know that MAPC has a group within them that focuses on community engagement. I met one of those folks at the conference one time. So that's who Tim was going to reach out to, to see what they could do.

And so we can report back on that at our next meeting, I think, if we think that we'd like to potentially be involved in this process.

Speaker 2 (26:14–26:27)

And I will say it's important to me that whoever does lead that is capable of helping us do it in a multilingual way is really important to me.

Speaker 1 (26:28–26:31)

So you mean like from an MAPC, for example, or whomever?

Speaker 10 (26:32–26:36)

Whoever is helping us is able to facilitate that.

Speaker 1 (26:36–26:36)

OK.

Speaker 3 (26:36–26:48)

MAPC has set up translators before. They have them themselves. There is a way to do that. I know the folks you spoke to haven't been able to do that.

Speaker 1 (26:48–26:56)

Okay, great. Elaine, sorry, I'll come to you next for a second, but Elaine, I think you were going to speak when Dick started speaking.

Speaker 7 (26:56–27:06)

Yeah, no, I just, Kyle, do you mind elaborating a little bit on the details of the CPC application and kind of what exactly you're asking for?

Speaker 6 (27:06–27:08)

Yeah, for sure.

Speaker 1 (27:08–27:14)

If you want to share anything, I enabled the multiple screen share. So you should be able to share now if you would like to.

Speaker 10 (27:15–27:18)

OK, great. Let me find the right document.

Speaker 2 (27:24–28:31)

So our specific ask was $30,000. for a feasibility study and planning contingent on determining a use by that point, that that would be used or needed. So it would really sort of be the first steps in a renovation project. Not just to meet the specific renovations that DCR has outlined so they have listed kind of what they see as the main kind of renovations needed for it to be viable, but then, you know, with a use determine determine what other needs, they would be to make that use feasible if there's layout changes or, you know, if it's a restaurant or a cafe with kitchen and things like that.

So it's sort of contingent on determining what the use would be. The number that DCR has given is 1.2 for kind of basically to make the building usable, but that's without any other upgrades or layout changes or anything like that.

Speaker 1 (28:36–28:48)

Thank you. And I'll just mention that part of that building is a garage. If it's meant to be occupied space, that might need some more improvement than other parts of it.

Speaker 10 (28:52–28:55)

That I don't remember.

Speaker 1 (28:55–29:16)

There's some photographs of it. I think if you scroll down in your application, you have the actual. Let's go back a little bit. There you go.

Okay. So that's one of the garage spaces there on the upper right.

Speaker 10 (29:17–29:18)

Yeah, there's two of them, two bays.

Speaker 1 (29:19–29:29)

Two bays like that on either side, as you can see. And then that central stair in the middle. And office and meeting space. There's the floor plan.

Speaker 8 (29:29–29:52)

Do you know if… So if the exterior is required to stay as is, do you know whether that means that that garage door stays a garage door, or whether it could be changed to something like, if you say you had a cafe, like you wanted that garage door, a door that looks like a garage door, but isn't actually.

Speaker 1 (29:52–31:47)

We asked something like that of, the Director of the Architectural Heritage Foundation. And he mentioned that that was a back and forth with the Mass Historic Commission and the National Park Service, who makes the determination of whether you're compliant with those guidelines on the historic preservation. And from my own experience, they've required a garage door, but it could be a glazed garage door. You know, so it wouldn't have to be a solid door, so if you want to get natural light in.

And it also could be fixed. And it could have to be fixed, so it looks like a garage door, but actually not function like a garage door. So it's more about the aesthetic than the function, is what they're concerned with. But those, if you scroll back, those look like they were a replacement.

So the question is, what were the historic doors? Or was it always something solid like that? Because those don't look historic to me. Some of the windows were replaced with wood windows that were made by students at the North Bennett Street School.

So they're really like crafted beautifully. So not all of them were replaced, though. And I don't know if that's something where the, hey, you know what, Kyle, that might be another good outreach for you to do. Maybe, was it Ian?

I forget the name of the person from DCR, but maybe he could provide you with a contact person at the North Fenness Street School, if they already have drawings for the windows. Would they be a willing partner in those?

Speaker 2 (31:48–32:23)

Yeah, it's a great question. And I was also going to say, to me, the existence of the garage already, I'm trying not to steer the ship, but suggests a couple of potential uses. I think you can make the argument that our neighborhood's a food desert, and I think a small market could make a lot of sense. And that would already be set up for receiving deliveries.

Or it's a requisite that every microbrewery has to have a garage door too. So that's a few different ways of thinking about it.

Speaker 1 (32:23–32:26)

One of the microbrewery at the Speedway and right in the other one.

Speaker 2 (32:26–32:27)

Yeah, that's their main tenant.

Speaker 1 (32:29–33:16)

That's allowed the other businesses to actually be there. So that could be something where there's a tenant that allows the town functions to be there because it pays a lease. Right. Again, the director said he's happy to talk to us again if we wanted to get into that.

We didn't get into the particulars of their lease arrangements with DCR, with their tenants, but you seem willing to have further conversations about it. Because that's where I imagine if this does move forward, as Dick said, those would be some of the maybe more complicated things to work out, the responsibilities and liabilities. Roxanne, I think you were next.

Speaker 11 (33:16–34:44)

Yes, I think Elaine asked basically one of my questions, which is how much they were asking for. So how did, I guess my question would be, how did you determine that that was the right amount for the feasibility study and planning? And what sources have you been looking at for funding if you get this project, because we already know it's going to be at least a million, right? Because you have to renovate the building.

So just wondering, have you formed a nonprofit at this point? Or what's going on with that end of things and how you determine 30,000 and what you envision, like, is that going to be when you say feasibility setting plenty? Is that going to include, you know, meetings with the immediate neighbors and also the community at large? because if we're using CPC funds, I envision it for something for the community.

That's one or two of my questions. And the other point that I think Dick brought up is parking is an issue, especially in the evening would be an issue. There've been a lot of accidents on that roadway. I'm very familiar with it and some deaths on that roadway.

And that's a super busy area. I know that DCR, not DCR, I'm sorry, parks only adjacent parcel. But I'm just wondering in terms of you know, some of the ideas that were brought up that sound great, just you would, even if people are riding bikes, you're still going to need parking for people to come in and out. So I think those are considerations and just wondering, you know, what your thoughts are on that too.

Speaker 2 (34:45–35:48)

Yeah. Yeah. On parking, yeah. You know, there's what is a little bit that's there and there is some street parking, but yeah, it's definitely a problem that has to be addressed.

And again, that's kind of what I would be, you know, we'd be looking for expert input on how to think about that. And does that put any constraints on the, on what kind of use makes sense or what other, you know, workarounds or options there could be in that regard. The 30,000 was, input from a few of our members that have more expertise in this area than I do. So like Rob Lee Vash helped me with some of these estimates and things like that from his experience.

But we felt that was a pretty, pretty reasonable benchmark for feasibility and for developing more specific plans once a use is determined.

Speaker 11 (35:51–36:24)

And just the second part of my question or the first part at the beginning was sort of, have you formed a nonprofit officially? And what have you been doing in terms of, you know, trying to perhaps potentially fundraise for some of this? Because we know the renovation, you know, at the minimum, it's over a million, right? So of the building.

So, you know, you may have somebody that can come in and do some of the, you know, demo or whatever, but there's some constraints. It's historical, you know, And you have to look at what you can put in that building so I'm trying to get a sense of that as well.

Speaker 2 (36:25–37:47)

Yeah. Yeah. We're basically looking, we're in the market of looking for as many options as we can find. So we started with CPC and then looking for the funding for planning and.

We've had a couple, we've just had some like kind of more informal networking with organizations that work on different types of projects like this. One called, we just spoke to the other day, CoEverything. They helped kind of plan and design the Dorchester co-op. And they help people find, they help kind of projects like this find grants.

So we're seeing if they have any recommendations or opportunities. But we're and then exploring also what would it would look like to start a nonprofit so we're kind of like looking at all these options together at once but you know our our goal is is to find. as many basically, you know, put together as many funding sources as as possible. And kind of our, our pitch, if the town were to have a direct stake is that, you know, we want it to be in a way that would be budget neutral for the town, or at least as an investment perspective for the town so that it's not because obviously, right now, taking on more costs is not palatable.

Speaker 1 (37:49–37:51)

Okay, and Regina?

Speaker 9 (37:53–38:16)

Yeah, I was just wondering if there had been any thought around the parcel of land that Milton owns next to this property and how the town may be able to leverage that for parking or some other uses.

Speaker 2 (38:18–38:44)

Yeah, that's a great question. And part of, you know, that's why I think we want the kind of visioning and planning to have both in mind and to see how they could relate to each other. My understanding is that it is designated as parkland, so that would put certain constraints, but I'm not sure anyone knows for sure exactly how set in stone that is from what I've heard so far.

Speaker 12 (38:49–38:52)

travel as well.

Speaker 10 (38:53–38:54)

Maybe.

Speaker 1 (38:55–39:03)

Well, maybe it's not. Maybe it's my first.

Speaker 13 (39:03–39:07)

I was like.

Speaker 1 (39:07–39:45)

All right, so as far as CPC support, are there other questions? Because I'd like to take a vote on that piece tonight. Okay, no further questions. All right.

So do folks, is there anyone who wants to make a motion or you want to have further discussion about it?

Speaker 3 (39:45–40:10)

I'm going to support this endeavor, which is vague at the moment, but general support for the general idea to further explore and further explore. And, you know, I think it's going to flesh out if it's either going to be popular or not, just going to have to support timeline or not. but we won't know unless we try. I think this is a perfect example of what we're here for.

Speaker 1 (40:10–40:30)

Okay, is there a second? Second. All right, we'll do a roll. Oh, any further discussion?

No, then we'll do a roll call vote. Elaine? Yes. Tabor?

Yes. Roxanne? Yes. Dick?

Okay, coming back to Dick Regina?

Speaker 5 (40:31–40:31)

Yes.

Speaker 1 (40:34–40:35)

Dick, do we have you?

Speaker 5 (40:36–40:38)

Yes, this is the CPC only, right?

Speaker 1 (40:39–40:40)

Yeah.

Speaker 5 (40:40–40:40)

Yes.

Speaker 1 (40:42–41:05)

And yes, for the chair. All right. And then on the involvement in our involvement in this visioning and support to pursue MAPC or others as a consultant. Do we want further discussion tonight?

Or would we like to have that at our September meeting?

Speaker 9 (41:10–41:25)

I'm sorry, Cheryl, can you clarify, um, is that. Uh, requesting support of a letter of support for MAPC or are we, or is there something else?

Speaker 1 (41:26–42:51)

Our involvement, like we've worked with MAPC twice, once related to the town center here and once under a couple of extensions of their contract in Milton village. The planning board is working with MAPC and East Milton Square. They are our regional planning agency. So Milton pays in to, and Tabor's our representative on MAPC.

So we usually can get grant funding to help support. So if we have to spend money on something, it's a match usually. We provided the match for East Milton Square work that the planning board's doing, if you recall. Um, and we don't know yet, you know, where this may land if this goes far with MAPC, but, um, I, I guess I'd like to say, uh, I'm generally supportive of, um, of us being involved and we'll see where the planning board decides they want to be.

There's a lot of things on the planning board's plate. Uh, and you know, in terms of zoning, um, but, uh, You know, I'd like to see a scope of work from MAPC and the fee and whether some of that funding comes from MAPC or from us, you know, it would at least allow something for this. So I guess.

Speaker 9 (42:51–42:52)

Thanks for clarifying. I appreciate that.

Speaker 1 (42:53–43:05)

Yeah. So generally supportive. have a conversation with MAPC, come back in September. Is that something that people would support?

We don't need to vote on that. We just need a consensus, I think.

Speaker 3 (43:06–43:19)

We need more information before we vote on something. Yeah. Talk to MAPC, see what their fee, do they have any move in their schedule, and then come back and set up at that point once we have all the information.

Speaker 7 (43:19–43:24)

Okay. And this is a request from Kyle and his, yeah, for support. Yeah, and general support as well.

Speaker 1 (43:24–43:28)

Yeah, and this is, This is a request coming to us.

Speaker 6 (43:28–43:28)

Yeah.

Speaker 1 (43:28–43:31)

Right. So not us initiating a request. Yeah.

Speaker 11 (43:32–43:35)

I just think we don't have any information to make a decision. Right.

Speaker 1 (43:36–43:38)

And then Regina and Dick.

Speaker 5 (43:39–43:46)

When do you when does the group, Kyle's group, expect to hear something from the CPC?

Speaker 2 (43:50–43:55)

I don't know if they've given us a deadline for responding to applications. I can check my guesses.

Speaker 9 (43:55–44:05)

So the September 27th is the deadline for submitting. But yeah, I would anticipate a few months, but that's just me.

Speaker 2 (44:05–44:07)

I was assuming January.

Speaker 1 (44:08–45:12)

Yeah, there's going to be an interview probably of each application, and there's a lot of applications. So I'm thinking that's going to be in the winter, maybe a few months. I think what Kyle, if you have some further information about some outreach to these other organizations that we just spoke about, if you get some further clarification from DCR on a deadline for an expression, I think that's important. We don't want to lose an opportunity.

If it goes to somebody in another community or to a business, it would be a shame that we didn't at least put our ideas in. you know, from a grassroots organization. So I guess what I'd say is, you know, I know Tim is already doing the outreach to MAPC. We'll put it on the agenda for discussion in September, invite you back for an update.

All right. Sound good? All right. Thank you.

Thank you.

Speaker 6 (45:12–45:14)

Thank you, everyone. Thank you.

Speaker 1 (45:16–49:42)

Okay. The town center slash library parking needs analysis opportunity discussion, including possibility of new parking co-located with other uses. I made that the description of the agenda item after the forum where there were some folks that I saw on some social media that maybe the description of the agenda item wasn't as descriptive. They didn't necessarily know that there was some opportunity of another use.

So, That will be what it's described at going forward. So we had some follow-up from our last meeting. So first, I'll go with the town hall and you all received a copy of it where Tim and Cheyenne did the survey. The spreadsheet has more detail than the summary.

that Tim gave an email, but the summary that he provided was that there are 48 employees who drive to town hall and park, and there are 11 town cars. And so that is 59 users at town hall. He says there's 65 spaces around Town Hall plus a handful on Engine Road. I didn't think we had it at that many before.

I thought we had it at a little bit, maybe a different number. But that's the number that Tim's provided. Then he said that there's natural churn of visitors throughout the day. And that with some employees being out on sick or vacation, you know, there might be times at which those 48 employees aren't all using their spaces.

So the 48 plus the 11 for the town cars. Yeah. So let's say someone comes in their car and they take the town car out for a site visit for a couple hours. There might be times, you know, a couple hours when there's one of those spaces that's not being used, but it also, the town cars can't be parked any place else is what his answer to that question was.

So then, you know, we had questions that really needed to be answered by the police chief and the DPW director. You saw on the police chief that the parking area that they have right in front of the building, couldn't be used for another use without impacting the police department. And then he had no concerns about upslope land, which is where we've been focused thus far, or on the grass area in front. And then you saw from Chase, Berkeley, the director of DPW, that in his email, that he commented that there would be some, concerned, he would be concerned about parking along Reedsdale in its current configuration, given the downgradient slope, vehicles often moving excess of 40 miles per hour.

And the Route 128 study which she provided a presentation and notified us of which pages to look at, shows some reconfiguration of the road, which would preclude having parking there. And she didn't know of any other projects or impacts for that.

Speaker 3 (49:43–50:03)

I think I've already got the anecdotal, but it's from the library though. can't have parking. So many participants in the library events are reluctant to use it anyway, especially with kids. So it's the road, street parking, it's not.

Speaker 1 (50:04–50:05)

Even the can't have side, right?

Speaker 3 (50:05–50:06)

Yeah, even the can't have side.

Speaker 1 (50:06–51:34)

Which is not as fast. Drivers aren't as fast, right. And then the council on aging, I think was the other place that was discussed and Tim's response to that was it could potentially be used after business hours at nights or on nights when there are not meetings scheduled there. I think we all know the select board meets there and I don't know if others meet there occasionally.

So is there any discussion about, I have done some analysis of the layout although I'm having difficulty getting it loaded on my laptop. But I think I can follow up to show that that area in front of the police station where it's grass, it is hemmed in a little by 25 foot, do not disturb from the wetlands. And so I did a layout which netted about 38 spaces. And I'll see if I can manage to share that before we're done.

But any other thoughts about those items that we've been talking about these things for quite a while? Roxanne, you were going to follow up too, but before we get to that, is there any other question or comment about these items?

Speaker 11 (51:35–51:46)

Not directly about that, but I'm just wondering, can we just review again how many spaces the library actually has within their parking lot and how many additional you're looking for again?

Speaker 3 (51:46–52:01)

Let me get the presentation up for that.

Speaker 11 (52:04–52:08)

Let me just do a screen share of the presentation.

Speaker 1 (52:08–52:11)

Yeah, I have this presentation. So I'm going to do a screen share of that. Just give me one second.

Speaker 11 (52:11–52:14)

It's been a while. Yeah. It's been a while since we met.

Speaker 1 (52:14–52:16)

I know. All these numbers.

Speaker 3 (52:18–53:06)

I just think the problem we have here is the proximity to the library. In my business, nobody wants to walk at all. And there's only so many spaces near the front door. And that whole parking lot at the library is at the front door.

Even going to another site across the street or on the street, it just seems like it's so difficult to get. I just don't know. And this is somebody who might know the answer to it. But if you were to build it, would they come?

Would they just say, ah, that parking lot's too far away? I've already made my circle around the library parking lot. Nothing there. and then leave, I don't know.

Is that something, how do we?

Speaker 1 (53:06–55:06)

Well, so just back to the question of the numbers, Dave or Roxanne, up on the screen, 58 at the library parking lot, 28 or 24 rather on Canton Ave. I don't know if the crosswalk removed to space or two, it may have. So the 24 might be, it's definitely before that. It might be less now.

But I have used the crosswalk. I do like the crosswalk. And then we had, I'm sure I have, sorry, I'm trying to navigate here. The town number.

The MAPC work that we did, they identified, I think, possibly 13 spaces that could be added around town hall. And I think that's similar to what you discussed, Roxanne, at our last meeting. So there are, at town hall, 86 spaces and unrestricted. So when I say unrestricted, there's six handicap and 13 are restricted to the fire department.

So there are, 67 unrestricted spaces and a need of 65 plus visitors during the day. That coincides with the busy times that the library has for daytime programming. Our 58 here is pretty similar to what it was in 2020. These numbers up here from 2020, So it was 46 drivers, and now Town Hall has 48, and Town Vehicles were 12, but now they're 11.

So pretty similar from 2020 to 2024. And… There's less now, right?

Speaker 7 (55:06–55:08)

There's 65 places versus 67?

Speaker 1 (55:09–55:40)

Correct. That might be the way it got laid out with the fire station. Because this is all pre, you know, I don't know that we ever got the final plan for the, in front of the old fire station without the parking laid out there. So this is based on all the plans that we had.

So to answer questions about that. And the total number they're looking for.

Speaker 11 (55:42–55:45)

Yeah, so the total number. The total number new you're looking for.

Speaker 14 (55:45–55:48)

40 to 60 more.

Speaker 12 (55:48–56:10)

So I think one of the questions about the town center was, was there any availability for the library to use it? I think that seems like great math to answer this now. Not during the day. Nothing.

Speaker 3 (56:11–56:27)

I mean, it tends to show that there are always people leaving from the official town office and going out on the job site or wherever we're at. So invariably there are five or seven parking spaces that are almost always available.

Speaker 1 (56:27–56:31)

We just can't account for it because- And there might be visitors who are coming. Right.

Speaker 9 (56:31–56:35)

And that's still 10% of what's needed, right?

Speaker 1 (56:39–56:40)

Right.

Speaker 4 (56:41–56:41)

So,

Speaker 1 (56:43–56:45)

Roxanne, I think you had something else, right?

Speaker 11 (56:46–57:40)

So I was going to give you a little update. OK. So I talked with the fire chiefs, and as I said when we met last time, they're just finishing up the finishing touches. And so it's been hard to really gauge what's available there because a lot of the construction people were parking in those spots.

So immediately behind the fire station, There are some spots that are just for their firefighters. And so I think there's like 12 spots right immediately in the back. Those are for the firemen. Then there's 18 spots near the green shed, 16 alongside of the old firehouse, three open spots between the chemical building and the rear driveway of the church, five spots in front, three are handicapped.

So two regular and three handicapped in front. That's what he sent me today.

Speaker 1 (57:40–57:55)

So how many is that total? Does that add up to the same number that Tim said, that there are 65 around town hall? And I'm looking up here. I know that we're by the chemical building.

Speaker 11 (57:55–57:58)

That's like 34 or something, I don't know.

Speaker 1 (57:58–58:15)

So if you look over here on that, it does show the new fire station on this aerial image. The five that are next to the chemical building right now is not really five, because there's storage units there. I don't know if those are permanent or not.

Speaker 11 (58:15–58:19)

He said three, between the chemical building and the rear driveway of the church.

Speaker 1 (58:21–58:38)

Yeah, so that's because of those storage. So there's three less than this. So that means 64 unrestricted for a need of 59. So five for visitors.

Plus, as you said, they were some in and out.

Speaker 11 (58:38–59:03)

But, um, and so that was what I talked with him about. And then I talked with, um, I think DPW and consolidated facilities about the other issues. So there's the engine road. I think we talked about that before.

Probably you might be able to get three, maybe four spots there and seven to eight along the driveway and pulling out of town.

Speaker 1 (59:03–59:08)

That's kind of matches up with that. Probably. Five and eight there. Similar.

Speaker 11 (59:08–01:01:24)

Yeah. So you can probably get a total of 12 or so spots right there. And I know you had asked about like, how would they do that? Like, so if you're pulling out at the fire station now and you're going straight down, you know, I met the fire chief, I guess at the last time there, at Consolidated in Chase, Berkeley from DPW.

You can get through, they would like a little bit more room because of the mirrors on the side of the fire trucks. So they could do, they could look at, and they're going to look at this, I think, because I talked with them today about it, the curbing of moving it over towards the rock that's there. So this would be parallel parking or perpendicular? No, parallel.

People are doing it now. People are parking it now. So it would just be perpendicular already. you know, like the four spots on the side.

But this would be like another, probably seven or eight that you can get right along that drive. That's what he thought. I mean, they have to measure it out, but you would have to move the curving. And that's all it's really about is moving the curving.

And so they're going to try to find out, like, if that's possible, you know, things like that. And then the other thing that was said is that, you know, During the day, there is a lot of fluctuation because, for instance, if you go to the building department, they're in the office, I think, maybe nine or 10, and then those guys are out on the road. So contractors, a lot of them, it's in and out pretty quickly because sometimes they go in in the morning to talk with the building department, for instance, but then they're out. Those guys are out inspecting.

So there's a lot of flexibility with that type of thing. Town vehicles, my understanding is they're supposed to be parking in the back and not in the front, the town-owned vehicles. And employees, I think, are supposed to be parking in the back, too, is what I was told from Town Hall. So just to give you an idea of what I've had so far.

So I'm still working on it. I'm still working on this. But they're going to look into how much it's going to cost if we move the curb, because it's basically just resetting the curb. But there is a cost to that.

But you might have some official spots. People are parking there now anyway.

Speaker 3 (01:01:24–01:01:40)

It was like a crosswalk. People were crossing the street anyway. Now it's an official crosswalk. If they're parking in any way, it seems like it needs to be widened, whether the library needs spaces or not, because the fire department's going to end up with a problem someday if somebody isn't tucked in tight.

Speaker 11 (01:01:41–01:02:07)

Well, it's not even the tucked in tight. It's really like if you had a pickup, for instance, and you're parked there, and your mirrors are out, and your mirrors don't come in, those mirrors on their fire truck could hit it going up. There's usually plenty of room, but he said, you know, in these kinds of cases, we'd like a little bit more just because of that swing with the mirrors. Yeah.

So I just wanted to give you an update on that. Yeah.

Speaker 1 (01:02:07–01:02:10)

Did they say when they would have some kind of a plan?

Speaker 11 (01:02:11–01:02:21)

Well, he said that basically they're finishing up, for instance, the fire station. Oh, for the other thing, for the curbing. Yeah. He's going to work on that right now because I reminded them since that meeting when I met with them.

Speaker 4 (01:02:22–01:02:22)

OK.

Speaker 11 (01:02:22–01:03:53)

And then I know you asked me about the fire station and the use of meeting spots. So I talked with the fire chief about like how many regional meetings he thought they'd have. He said maybe one or two. Those are going to be during the day and they're not that many.

One or two per month? Yeah. Oh yeah. Maybe.

And he said, So our downstairs conference room holds like 40, but don't forget, some of these people are going to be our people in there that are already there. So it's not going to be, he doesn't anticipate it being a big issue. So the 40 is within the new building or in the old building? The 40 people in the conference room?

The new one, I believe it's the new one. Yeah. So it's a 40 person. Well, there's also a training room and the other one that's, that's, yeah, it could be either building.

I forget because they also have a conference room that's like this big. The new building has 40, I thought. No, I think the other one's smaller. in the regular, I think it's only like- No, I think the old one has a conference room of like 40.

I think the old one has like a one conference room that's sort of like this, like a table, like about this big, maybe 10 people or so, but they also have another training room in there. And I think, but I don't think it's 40. Anyways, he seemed to think that that wouldn't be that big of an issue in terms of parking. He didn't foresee it as an issue.

Okay. Because then you're asking like how often they'd be using. Yeah. During the day or night or whatever.

Speaker 1 (01:03:54–01:05:28)

And Cheyenne did a spreadsheet, which I see Regina has her hand up. Just one moment, Regina. A spreadsheet of the conference room use. But I also wanted to pop this spreadsheet up, which is which I shared with you, which Cheyenne and Tim also prepared, which is from a survey of the town departments.

So you can see in columns G and H and I, it's about the, well, maybe even J, on the visitors, how often, how many, and you can see that some, it's only occasional and some throughout the day. And so we can parse through that a little bit more carefully and see if there's times of the day that have a lot of overlap, like especially with the library need, like of, I know you said the 11 o'clock, but there was a, there's an overlap between two programs, right? And maybe Will has that answer because here you can see a lot of this is like from eight Engineering has eight to 10 and then 12 to two. And accounting is 10 to 12, eight to 10, 12 to two.

You know, there's like various, that eight to 10, 10 to 12. I mean, those seem to be like very popular times if I'm looking at the spreadsheet. So Regina, I'm gonna ask for Will to look at that or answer that first and then I'll come to you, okay?

Speaker 14 (01:05:28–01:05:35)

I would say 10 to 12 in the morning is our busiest story hour time as far as children's programming goes when we're looking at that window.

Speaker 1 (01:05:36–01:05:49)

Okay. So when we have maximum use of visitors and staff at Town Hall, it's at the same time that you have our busiest at the library. Okay. Thanks, all.

Speaker 9 (01:05:49–01:06:17)

Regina? Yeah, I just have a quick question. If we're thinking about the spots that are in the driveway at Town Hall that are not currently marked official spots, then doing something about that, does that add to our parking count in a real way if those spots are already currently being used even though they're not in our count?

Speaker 1 (01:06:18–01:06:56)

I guess the question is becomes whether that's construction workers. And that's, I think, another good question is what we got from Tim was what we know that staff and visitor needs are, but we don't know when Josh did the utilization before there were still construction, right? So we did talk about doing an update to the utilization after the construction work is done, which we said was be about this time, and it looks like it's almost done. Maybe we can ask.

Josh did it before, but I don't know now.

Speaker 9 (01:06:57–01:08:32)

We're talking about adding a potential, just want to review this, 12 spots maybe? Up to 13, I think it was. Up to 13. Okay.

The. I remember we were trying to thread the needle on, like, coming up with the perfect number that we feel is a realistic number of spots the library may be able to use that town hall. compared to the number of spots that the library would like in order to increase programming. And we were at 40 to 60 for the desired parking spots, and now we're thinking maybe 13 more or so at Town Hall.

Does it make sense if we're trying to thread this needle to say, okay, 40 to 60 is the range. Let's shoot for 40 to 50 and start the planning process around that number and then update as we get additional information. I'm just concerned that And I've expressed this before, that waiting for that perfect number is going to delay a project significantly as we just continue to refocus on the spots that we may be able to get, which are still not close to enough. Does that make sense?

Speaker 1 (01:08:32–01:10:20)

Yeah, so I think, you know, based on what we see as town need from the survey, and what the visitor need is from the survey spreadsheet. I don't see any parking spaces being available now. So then the question is you have is whether 13 spaces will get used up by others or would they be available for library? I think, you know, that's certainly something that we can answer, but I think your point is, well, that just addresses a small percentage of what's needed.

So let's continue to move forward with addressing that larger need. So really, I think what I've seen is You know, there's the scenario that we've been looking at. I don't see Reedsdale as a viable way to add spaces. If you parked in the parking lot in front of the police station, let's just say it's 38 spaces.

I know it wasn't 40 when I did a layout and I'll share a layout for our next meeting. It takes all the grass away, and it's a quarter mile upslope to get to the library. So it doesn't address certain needs, like if you're using a walker or wheelchair or strollers, because I've done that walk plenty of times myself. It's a walk for able-bodied easily, but for some other users, it's not the most user-friendly.

So I also… I wanted to share, I had a couple of conversations, actually several conversations about developers too. Yeah. Can I just ask one question about the cabinets?

Speaker 12 (01:10:20–01:10:53)

So those are existing employees. Do any of those town departments have plans to expand, or do they have open spaces, or are they trying to, like, it seems like every time I come to a town meeting, there's always, I need more fire, you know, fireworks, I need more of those. So does anyone in town plan to expand? I mean, is that- That's a good question.

Is that a need for the next five to 10 years, or is it just currently? I mean, it looks like it was the same as it was in 2020, so do you think it's not gonna grow between now and another five or 10 years?

Speaker 7 (01:10:54–01:11:45)

It's a really fair point. And when we think about some of these larger developments that are coming in, East London, for example, there are more people that are moving into town, though, you know, it looks kind of, in my mind, like, the town hall, the way it's set up now, it's like, and it feels like we have parking on the side, and we, like, needed more parking, so we plopped some in front, and then we needed more, then we bought, I don't know, in the order of what you have, but I just feel like we cut away here, we cut away there, and we haven't put it here, and it's like, I agree. I think it's going to have more parking needs as time goes on. And instead of saying, let's grab three here, let's grab five there, we actually need more parking.

A designated parking spot or parking area for the library needs for us trying to take a few here and a few there.

Speaker 12 (01:11:45–01:12:00)

The view that we need would not allow us to expand apartments. 12 to 13 doesn't allow us to expand the program, which is what we were trying to do, to be able to offer more.

Speaker 11 (01:12:00–01:12:42)

Right. Roxanne? I have a question maybe for Adam. I mean, the question I have is, with regards to the programming, have you ever had a consultant or somebody come in and look at the programming and how you're timing the programming and how you're fitting it into schedule as far as maybe some suggestions that might be helpful?

You know, for instance, I don't know if maybe in between programs, if you need to have a little bit more time or spread them out. I don't know enough about that. But I know there are consultants that do this kind of thing for libraries. And I'm just wondering if that was something that you have looked at.

Speaker 14 (01:12:43–01:13:38)

So we haven't hired outside consultants for this. We do have use of the MassLibrary system. And we've used the programmers collaborative, which is a group of library programmers throughout the state. And we've looked at what other libraries do, kind of standardized throughout messages and further out than that.

And we use our programming falls within kind of the standard range for that. We've also done surveys of families and caregivers about the most preferred times for programs for our residents. And that that also feeds into the times that we're doing things now. So while we haven't used it like an outside consultant, we've worked within kind of the library world to look at what the norms and standards are.

And and we're within that range right now.

Speaker 11 (01:13:40–01:13:50)

And just another follow-up question, in between the programming, you know, when the programming ends, how much time is allotted between that and another program coming in? Just out of curiosity.

Speaker 14 (01:13:50–01:14:19)

Yeah, no, that's a good question. It's usually 15 to 20 minutes between those morning programs, but people, yes, people have different, what do you call it, like traditions or whatever they do. Some people come in and use the children's room before the program. Some use it after the program.

That comes in cycles as people age in and age out. So even though the program might end, the people's use of the library and the building don't necessarily end at that time.

Speaker 1 (01:14:21–01:14:44)

Thank you. Yep. And Kristen will I know we had said after the forum in June whether anybody had any other comments they could contact the library or planning department I haven't heard anything from the planning department about any other comments have you heard any other comments from folks.

Speaker 12 (01:14:47–01:14:49)

I mean, the only other one is one question.

Speaker 1 (01:14:49–01:20:06)

Okay. So, one resident. Right. So that was where this notion of in front of the police station and the line came from was from that one.

All right, so, you know, it's, A little hard to see here. This is what I was hoping to have in a little better format to show you. But you see right here, this is the parking in front of the police station right here. And this is the police station.

So if you all follow where this is. And then the library is over here. And that house is in this area. So this line here is the sidewalk or the walkway in front to get to the police station right here.

And then this is the public parking they have. So this parking is filled out to where this is the tree line. And this line right here is the 25 do not disturb 25 foot do not disturb from this wetland right here. So this, as I said, is about COB, Erika Vandenbrande-Hartman .

: 38 spaces and so just by comparison to footprint, this is something i've been looking at to. COB, Erika Vandenbrande-Hartman. : See if we can have. COB, Erika Vandenbrande-Hartman.

: More parking and more. potentially if we did housing enough units and I'll get to enough units to meet what could work here. So that I'll show you in September, at our September meeting, this piece, just so that we can see what that might look like. But this, to answer that parking in front of the police station right here, can everybody see that?

I don't see opportunity for additional parking in there other than one. The challenge here is for the user, getting people up to the library. It now makes the front lawn of the police station paving. I mentioned at the last meeting, I would have a couple of conversations with developers who do both.

market rate and affordable housing and some combination. And whether if you did a combination, whether you could, or one of those or another, whether you could get the parking spaces paid for. And basically the answer is fully paid for means you probably would have a lot more development than what we've been talking about. But if we did some, public payment and some mix of those two, then you're likely to get it paid for, at least half of it paid for.

But the threshold for housing is probably 30 units rather than 20. So definitely one parking space per unit. And the sizes would need to be a range of one, twos, and threes. because there would be some cobbling of different sources of funding to put it together.

One of the people that I spoke to was willing to come talk to us about the way he's viewing it, but he wasn't available tonight. So we can see if you want to come to the September meeting if you're interested. In the meantime, I was going to look at what we had before if we did Um, 50 parking spaces and 20 were for housing and only left 30 for the library. So it's going to see if we could get more for the library and get that up to 40.

And then if you did 30, um, units, what that looks like with 30 parking spaces and how big a footprint is that just so we can see what that looks like compared to what we've been looking at. I'm working on it and I'm not ready yet to, um, to show you. And this kind of graphic, it's hard to read. So.

The other thing I'll note that I heard from them was that the housing bond bill is, it's not 100% sure how it's going to flow yet, but there is money that's going to flow for affordable housing to communities. And so whether there would be some opportunity to use that, to use low-income housing tax credits, to use CPC funding, And if we were eligible, which we're not now, but maybe we will be in six months or so, for MassWorks grants, then the parking would be considered infrastructure, and we could apply for a grant to get the parking paid, at least part of the parking paid for that way. So that's my report on that.

Speaker 15 (01:20:09–01:20:10)

Thank you for doing all that.

Speaker 1 (01:20:11–01:20:36)

It's a lot of work. Well, you're welcome. I want to see this through the finish line, not something pending for years. At least a finish line of we do our work, and then we see if it's possible.

So would folks like to have Did this developer come to our September meeting? I can see if this date works.

Speaker 3 (01:20:36–01:20:40)

I make decisions on all this stuff. We don't know more. Obviously, that's what some of it is.

Speaker 1 (01:20:40–01:20:58)

That's what some of it is. I mean, I'm relaying to you some of what the conversation I have, but you might have questions you can ask directly, you know, from this person's experience doing this type of work. This is where, you know, these sort of grants and things, the types of financing I'm learning from them.

Speaker 12 (01:21:00–01:21:06)

I mean, it's hard to create a viable option or a proposal or recommendation without more information.

Speaker 1 (01:21:06–01:21:25)

Yeah. I mean, I asked Point Blank, I said, what's our lowest threshold in order for this to likely be able to work? That's the 30 units. That's why I want to go back where we were showing 20 before and look at what 30 looks like from how big a footprint it is and the parking spaces and how big a building it is.

Speaker 12 (01:21:26–01:21:30)

If we were to get grants for affordable housing, would that be able to bring it back down to the 20?

Speaker 1 (01:21:30–01:21:46)

Because you wouldn't need a developer that had to develop 30 because- Yeah, it depends, I think, on the grant funding. If MassWorks grants became available, that's where it might be that- You could find a developer willing to do that if you gave them some money.

Speaker 12 (01:21:46–01:21:48)

Yeah.

Speaker 1 (01:21:48–01:22:29)

It might be that. you know, if you did request for it for interest. The one thing is if if somebody goes through the work of running through a scenario that works, and then they give it out to the public. Now their scenario is open for anybody to compete with them against.

So it's almost like it needs to become you know, an RFP kind of process, so that it's kind of protected intellectual work in some ways. But, you know, certain amounts of this, we can kind of go and ask these questions, right? Like, what do you think, without having to turn over like a work product?

Speaker 3 (01:22:29–01:23:01)

Right? in their gut, they know what these things are cost and then what the thresholds are. Personally, my competition has a different threshold because they fly a little closer to the sun. We don't really do that in our business, but a lot of businesses view themselves as players in a certain niche within that development group.

So I think that some of these would say that 20 might be too few, but we can work with 25 and somebody else's threshold is 30.

Speaker 1 (01:23:01–01:23:29)

Somebody else's is 60, I can tell you. Yeah, exactly. So it's like it becomes like there's a lot of well, even like on the interest rates, if they come down. you know, if construction costs come down, all of these things factor in.

And if a scenario, a cost scenario in terms of how it's done, you know, is less expensive than another scenario, that could be a factor.

Speaker 3 (01:23:32–01:23:42)

You know, subsidize the affordable housing, it's either a grant the town helps out with it, or lots of units help out with something.

Speaker 1 (01:23:42–01:25:41)

Right. So it would be, you know, if an RFP went out, you know, it could be said that it either needs to be, you know, grant funding needs to be sought in cooperation with the town because, you know, we could cap the number of units and we could see if anybody can make it work, right? They can assume CPC funding. They can assume that they're going to get a MassWorks grant or not get a MassWorks grant.

And somebody might come back and say, okay, I can do it for 25 minutes, right? But maybe they only can do less parking. And somebody says, I can do it for 35 minutes and I can do more of your parking. I mean, that's, and it will all be a little bit dependent upon where we are in the market, right?

If they make an assumption of today and things get better or worse, they'll put a big contingency into it like usual. But I think at least at this point with the 30 and with more parking, we can see what that's physically going to look like. The other thing is if we think that in front of the police station has merits, we could get that costed out just to know what it would cost. And we can have an engineer take a look at it and see if they agree with my layout.

I don't know how they would handle the stormwater, for example. space in between here, just like at the library for like a rain garden, thinking that that would be part of the stormwater management. But, you know, this is a very low area already that flooded a lot, and it's wetlands across the island. And so adding this much impervious, you know, I'd like to get an engineer's opinion about.

So,

Speaker 12 (01:25:43–01:25:50)

which has been checked for the neighbourhood authority and waiting for the memory care unit to have it.

Speaker 1 (01:25:51–01:26:16)

Yeah, you know, it's interesting because if this is the times that we're talking about, it's not what's considered the peak time because the peak would be earlier and later. So at least it would be off of those peak times, I think. But that intersection was something that was looked at for the memory care facility. And it's not an easy intersection.

All the traffic from that is being sent to that intersection, basically.

Speaker 12 (01:26:17–01:26:27)

And so… And if people couldn't find parking in the library and then had to come down the street and turn to Bonner at light and then go into a parking lot.

Speaker 1 (01:26:27–01:26:31)

And then come back up the hill and look on… And then come back and look for curbside on Camp Mav.

Speaker 12 (01:26:33–01:26:35)

That way you can make some major upgrades.

Speaker 1 (01:26:36–01:26:56)

The light's challenging because of that stagger in part because of the no left turn. If the 40B on Canton Ave is built, that's that traffic as well.

Speaker 11 (01:26:57–01:27:11)

Well, you're also going to have more traffic, though, too. I mean, just with, you know, ambulances and things coming in and out of Kearney Post. I mean, yeah, they should go retail, but you know, they're going to go everywhere. You know, so I think you're going to have a lot of impact with that, too.

Speaker 5 (01:27:13–01:27:36)

I got a question for Adam and for Chris. What I have in my notes is that- I mean, Bill, I'm sorry. Well, I apologize. What I understand is you've been looking for funding for this project, this expansion of parking for 2016.

That sound about right.

Speaker 14 (01:27:37–01:27:43)

Yeah, we've been talking about parking since at least 2016, if not before. But that's when we formally started working on it.

Speaker 5 (01:27:44–01:27:48)

OK, what has been what has been the resistance up until this point?

Speaker 14 (01:27:49–01:28:25)

Well, I guess I shouldn't say, we haven't been looking necessarily for the funding for it. We've just been looking to see where in town and what we think it would cost. And so far, some of the resistance has just been, we've looked at Reedsdale and we're told that's no good. We worked with the Yellow House next door for a while when it was between ownership and there's a potential to buy a piece of that land that fell through.

So there were a couple of things that we, looked at as potential projects, and we've had to restart over again a couple of times over that period of time.

Speaker 5 (01:28:25–01:28:56)

Okay, so I'm looking at this thing, I see two pieces here, I see immediate demand or issues in terms of what you currently need between, what I have down here is 20 to 40, but I was writing it very quickly. And then there's an expansion of your programs. If we did 20 to 40 parking spots right now, do we have any idea what that would cost the town? Do we have any, is anybody?

What's that?

Speaker 1 (01:28:57–01:28:58)

Where would the parking be?

Speaker 5 (01:28:58–01:29:12)

I don't know. I said, if we were to find someplace to put it, and we were to build 20 to 40 parking spaces, what would that cost? Let's say land, the cost of land is not an issue, just to build the parking space.

Speaker 1 (01:29:12–01:29:25)

Well, it depends. If you build it on a slope, then you're going to be more expensive than building it on a flat. If you're building in an area that has to be raised up because it's wet, it's going to be more expensive than if you don't. So it really is site-specific?

Speaker 5 (01:29:26–01:29:34)

Give me a ballpark. Let's say on a hill, worst case, best case. Flat ground, what would it cost?

Speaker 1 (01:29:34–01:29:54)

On a hill, what would it cost? union prevailing wage versus open shop. It's like 30% difference, but we have the price for doing just the parking, you know, for the 60 spaces, it came in about $5 million on the two levels of structure.

Speaker 5 (01:29:54–01:30:03)

So that's 60 spaces. So if we cut that back at $5 million, if we did 30 spaces, it would be two and a half million bucks.

Speaker 1 (01:30:04–01:30:45)

Well, if we did the same approach, you know, but it depends if you stretched it out and didn't do two levels, you know, you wouldn't be as expensive per space. So, you know, that's the other thing is it's compact in order to have less trees removed. But I mean, we can do a scenario in which you stretch it out, it's just a parking lot and it still requires fill and retaining walls because of the slope, but it's probably not $84,000 a space. But then what it costs to do it down on, you know, a flat like in front of the police station, you know, that's something we would have to, you know, ask our cost estimator to provide.

Speaker 5 (01:30:45–01:31:00)

So if we brought in a developer, I think what I heard you say, Cheryl, is they would sort of, we think that developer probably could take 50% of the cost of the parking. they would pick up.

Speaker 1 (01:31:00–01:31:08)

Yeah, that's what my conversations has led to so far, from what we know so far.

Speaker 5 (01:31:09–01:31:14)

So it would be a million to a million and a half to two and a half million bucks.

Speaker 1 (01:31:15–01:31:19)

Two and a half. Well, we're working off the numbers we had, so it would be two and a half million.

Speaker 5 (01:31:19–01:31:24)

And for that, we would allow a developer to build, what, 30 units? Is that what it is?

Speaker 1 (01:31:25–01:31:49)

Well, they were working, yeah. Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT We need to do more to answer that.

Speaker 5 (01:31:49–01:32:59)

Yeah, I mean, I think I think that's where the rub is going to hit the road on sort of this. I think that for me personally, I think that I certainly understand expanding and meeting the current needs of the library in terms of working out something. to deal with 20 to 40 spaces. The expansion of the programs, I think that'll take a little time for me to get my arms around it.

One of the issues I'm having is, as we keep on adding traffic or people on some of our major thoroughfares like Canton Avenue, I think that's gonna cause some issues. And I think we've heard it certainly in some of the projects down on Highland Street, certainly further up in Canton Avenue, and some of these issues that are coming up. There's only so much traffic these streets can handle. And I'm very sensitive to that.

And I think we all should be in terms of how all this stuff works, especially as we're adding traffic, as we're asking people to come from the high school or Anvil or Pierce to cut across the street to use the library.

Speaker 1 (01:32:59–01:33:04)

You don't have to talk to me about traffic on Canton Ave, Dick. I live it every day.

Speaker 5 (01:33:04–01:33:18)

I know you do. So does my son, so I hear it from him every day also. So I'm just talking about in terms of adding additional traffic there. I'm just saying we've got to be a little sensitive to that.

Speaker 1 (01:33:20–01:34:08)

One thing, Dick, that came up in the memory care facility discussion and the traffic analysis that was done there, there are intersections that should be looked at. The intersection here on Canton Ave, Reedsdale, and Center Street. There are things that can be done there. There are things that can be done at Highland, Thatcher, Canton Ave, But it was not put on that project to do it.

So whether there's an infrastructure like a MassWorks grant that would help with that is something to evaluate. But we're out of compliance with the MBTA communities, we can't apply for MassWorks grants.

Speaker 5 (01:34:08–01:34:57)

So that's my… Well, we'll find out where we are on that and hopefully in four or five months. So then we'll put that to bed one way or another. But the idea is that we are going to need some help.

Anything that goes into that, That intersection of that five-way intersection, certainly as we get down to Reid's Hill Road from Canton Avenue, we got to be pretty sensitive because we got a daycare across the street, we have the town hall, we got the police station, we have the fire station, we got a lot of action going on within 500 yards. I think we just have to be a little careful. I'm certainly willing to listen to a developer to come in with this plan. I think that's always interesting.

But I want to deal first and foremost with the current need of the 20 to 40 spaces for the library.

Speaker 1 (01:34:58–01:35:16)

Now, the developer wouldn't come into us with a plan. It would be coming to us with providing us with information and feedback about what could work. It's not at this point coming up with a plan. The plan, I think, would come out of an RFP process.

Speaker 13 (01:35:17–01:35:17)

I think it would happen.

Speaker 1 (01:35:20–01:35:23)

I'm sorry, Elaine or Dick, were you done with that?

Speaker 5 (01:35:24–01:35:30)

No, I was all done. I would just say it would have to be an RFP process. I don't think we're in a position to suddenly, surely pick anyone.

Speaker 7 (01:35:32–01:36:21)

Right. OK, so Elaine. So just thinking of like, and this is all hypothetical and all, you know, ideas and to equip the library with next steps or better equip them. you know, thinking of 30 units in that being what might be able to help, you know, offset the cost and make it, you know, more feasible.

And just also thinking of the appetite in town for housing, can we also explore market rate? And I certainly personally, I'm a huge, you know, supporter of affordable housing. I'm just thinking that the appetite may only be for 10, 15 units. And if we look at that, you know, as an option, just to compare, I think it could be beneficial to explore both.

Speaker 1 (01:36:21–01:39:44)

So what kind of the feedback you get is, let's say it's 10. And let's say your land cost therefore is $5 million for 10 units. That means you're paying $500,000 per unit for your land. And that's just too high.

Like, so what I was hearing was that, like, first of all, there are not a lot of condos in Milton for comps. And, you know, if you look at the condos that were at 131 Elliot, they were on, they've been on the market for a while, and they're selling in the 700s, which I I don't know the exact square footage, but one just was recently in the Milton Times in terms of the sale price. We could probably find out what that square footage is. But basically he was saying like the cost to build and that cost for land cost, you know, it's just too high.

You can't sell those condos at a high enough price. The market's not there for it. So then you back into what you can pay for the land. I mean, that's the way you look at it is, let's say the land costs in the actual land is zero, but what your equivalent of land cost is, is the cost of the parking.

So it's really becomes then, if we could get grant money to help pay for the parking, And then get, you're more likely though, to get grant money for affordable housing than you are for market rate housing, since Milton has so much market rate housing. And, you know, so that's why it seemed more viable to go this sort of affordable with grants route, because those reasons. Now, maybe if the cost of the parking, if we're doing more parking, then you're going to have to do more units, right? Because it's only making our numbers worse, not making them better to add parking and not more units.

And so that might just be too much. And it might be that you can't do it that way. But at least we'll find an answer or get closer to an answer of what could be a scenario if it were something that people supported. And the other way would be to be a surface lot with fill.

I mean, so I can lay out a surface lot off of Canton Ave too. And we could see what that is, the cost of that is. But I see those, it's basically then what's the best solution? It's gonna be a balance of how you pay for it.

and how much tree loss and what we see and all of that. Because one thing about parking with a building above it is you see the building and not a surface lot. And it can be a smaller footprint if you're going vertically than if you spread it all out. But if you did one lot of 60 spaces, you can see what that looks like.

It's just that's the current size of the parking lot of the library. So that's, you know, an amount that you could, it's just that that's more of a rectangle shape. If you kept it so that you don't have to do so much fill, you can keep it linear.

Speaker 3 (01:39:44–01:39:52)

Or you could terrace it doing a lower one, upper one. I mean, this is a steep slope. You could slope it, yeah.

Speaker 1 (01:39:53–01:40:01)

We still need retaining walls. Lots of retaining walls, which are where the money comes in, really, those retaining walls.

Speaker 12 (01:40:01–01:40:07)

I want to request parking lot sizes of the standard for the town.

Speaker 1 (01:40:07–01:40:11)

Yeah, everything I've been showing is 9 feet by 20 feet, 24 feet.

Speaker 3 (01:40:12–01:40:24)

The library has themselves into this mix with not having conformed to zoning. You obviously have too much business for the amount of parking that was provided at the beginning.

Speaker 1 (01:40:25–01:40:40)

Well, there's this idea that they're going to reduce the parking spaces, and that way you get more. But car sizes, people have not bought into smaller car sizes, at least when you have a lot of kids and other stuff to haul around.

Speaker 11 (01:40:41–01:42:18)

So I have a question, a couple of things. One is, and this has come up before when we've talked about this, that if you do a different use along with parking for library wherever you put this, that, whether it's a business or affordable housing you still or any housing, you still, how do you patrol like okay lane goes to the library and. know somebody's somebody visiting somebody at a housing development or something and they're taking over some of those spaces so now those spaces are available like it's hard I think when you have a situation where you're looking we're looking for parking for the library and now we're adding a different use it's hard to control like who's going to patrol You know, somebody who's there and has a couple of friends over and now they're eating up some of those spots. It's for the other use or vice versa.

I think it's difficult to do that. That's my one thing that I was thinking. And then the other thing is the bigger you go, you're going to be taking out more of the trees and more of the land, you know, and you also have the issue with the slope in the back. So, you know, I mean, I look at it and say, sure, you can find out what we find out.

But I'm always about looking at all different ways to do it. Maybe it's not all in one spot. Maybe you're able to add 20 down at the PlayStation and 10 here. There's got to be other ways to look at it besides this one idea.

That's all I'm saying.

Speaker 1 (01:42:18–01:42:21)

We've looked at a lot of ideas. If you have more to look at,

Speaker 11 (01:42:23–01:42:41)

Well, I'm just saying, like, you know, instead of like sticking everything in one spot with a mixed use, which I worry about, you know, like you go places and sometimes there are designated spots for certain things you go there and you're like, I can't even park there because somebody else is using that like if you have to.

Speaker 1 (01:42:42–01:43:25)

use it, you know, how do they manage that the way it's when you have two levels one levels for housing one levels for public and then that gets hot so if the town is using town funds. then it's not library-specific funds. I think we've talked about that the primary user is the library, but if a couple got used by somebody else, you know, visiting somebody in the building, you can't say that's something that needs to be policed. But it's segregated by floor in a scenario where you're using the slope and you're stacking.

So you would say library users, you're on whatever, lower floor. Housing users, you're on main floor, and that's it. And it's like an access or something.

Speaker 12 (01:43:26–01:43:41)

Yes, for the for the residential users, yes. And I think if you're talking 20 or 30 apartments, how many users might they have that might take the parking away from the library? Well, I'm just saying if you have friends, you know what I mean?

Speaker 11 (01:43:42–01:43:49)

I'm just going on different scenarios. Like, I'm not saying they're all going to be that way, but you do have to factor in that some people will, you know.

Speaker 1 (01:43:49–01:44:00)

Well, people park here, people park at the library now who may not be going into the library. I mean, it's not something that's at least in general, because I don't know why that would be done any differently.

Speaker 11 (01:44:01–01:44:21)

I mean, the other thing I would say is at the library meeting, there were quite a few people that did have Opinions on, like, you know, doing such a development there. So, you know, I think there's all different viewpoints. That's all I'm saying. So, I have no problem listening to somebody coming in.

I think there's a variety of views.

Speaker 9 (01:44:21–01:45:46)

I was just gonna remind us that we got to this building in part, or this potential mixed use building in part because of the expense that the town would have to take on if it wasn't a multi-use facility and if there was not a public-private partnership. And we all kind of balked at the price of you know, just straight parking lot and what that would be for the town. And so I think it's kind of false to say that we landed on this one option and are running with it. I think we did the work of evaluating several other options, even if they weren't taken to, you know, fruition and using Cheryl's knowledge to develop them all.

I think we did. We've done a lot of due diligence. We've sat with the idea of reaping as many parking spaces from other alternatives as possible. We've done the work.

So I just don't think it's quite fair to say that we've focused on this one and are kind of running away with this one use against people's wishes or anything.

Speaker 1 (01:45:46–01:46:17)

And I'll add that the library looked and spoke to two churches and the hospital as options. So I think lots of options have been studied. Obviously, none of them has been ideal. And maybe this is not ideal either.

And so which one we end up with, I think, remains to be seen. So it remains to be seen what can meet the library's needs and what the public will be willing to support in order to meet those needs.

Speaker 9 (01:46:18–01:46:30)

I forgot to mention, we've looked at Randolph-Abd, we looked at the police station, we have really, and Council on Aging, we've looked at a lot of different opportunities for trying to solve this problem.

Speaker 3 (01:46:31–01:46:42)

One thing we haven't really dug into much because we implied enormous expense with decking the existing parking lot.

Speaker 11 (01:46:42–01:46:43)

I did.

Speaker 3 (01:46:43–01:47:15)

And how would you possibly do that cost-wise? And how would you possibly do that without giving up all the parking that's there right now for the year that it takes you to build it? Because when you go to sell this to the public, you've got to have the specific dollar amounts and the time frame that it's going to take so that we can say, this is ideally, and I think for the library, that would be the best thing because your parking will be right there. But we can't afford it.

So here's our next spot, which would be.

Speaker 1 (01:47:15–01:48:26)

It's not even actually ideal because it doesn't work. Well, I I did this. I consulted with a parking specialist at my office works that we've done just together with about this. You've got your existing stormwater system that serves the building and the parking underneath the existing parking lot.

So that has to go somewhere else. And then just to meet the slope requirements to park on, you can't go too steep and be parking on that slope. And so you need 200 feet to go down one level. So you don't have room for a turnaround.

And so you'd have to have two ways in. And then you'd basically be using Canton Ave as your turnaround. It's just not a feasible, we know it's not a feasible solution because we know what the problem is currently. People can't find parking, that's why the loop was put in.

Can't now, it's not a viable turnaround. And it would cost more than $100,000 of space. And you don't have the use of that, any of that in front of the library while under construction.

Speaker 3 (01:48:26–01:48:48)

So- With that other proposal up with the 30 units at $5 million, what is this proposal, that's got to be sitting right next to it to show you why it doesn't make sense. Because otherwise, people are going to say, well, they haven't investigated it. Just like we didn't investigate the churches or whatever. Everything's got to be itemized, because you know the questions are kind of complex.

Speaker 12 (01:48:48–01:49:08)

Yeah. I mean, the total list went out. But I think just in your, because you had asked about that before, like in the case of Florida, and I think Sherrilyn was talking about. And maybe advantages and disadvantages of each of them.

Speaker 3 (01:49:08–01:49:21)

So there might be more than that for space because you do a turnaround in there and you eliminate a number of the spaces. So a lot of that. But I think it just has to be practical because everybody's been in the mall and they know it can be done.

Speaker 1 (01:49:21–01:50:23)

But the size, the parking is one of the building types that's very controlled by dimensions. You can only go at certain slopes. your widths of your aisles and your length and widths of your spaces only have so much flexibility. And when you do a structure, you're going to have to have room for the structure in there as well.

And you have to have an elevator and stairs to get out of that lower level. So, you know, all of that is borne by the cost per space when it's only parking. when you put another use with it. Now that elevator and those stairs are being shared across all this work, but it's not just the parking.

So that drives it. And then, you know, there could be, there's utilities, you know, that without having a true engineering and spending a lot of money and all that, you'll never know the precise cost. You're going to only get order of magnitude kind of cost, but this is-

Speaker 3 (01:50:24–01:50:45)

imagining a garage up the street a little bit with some rough numbers too. And I think we just have to use some rough approximations so that the public at large, when they're finished reading this narrative, they come up with the same conclusion that we do, because otherwise, you're fighting.

Speaker 9 (01:50:47–01:51:37)

That's right, and I think we saw with the school building committee that questions still persist despite the long, hard work that they put into that about, you know, put a third floor on Glauber, right? Or work on the fourth floor of Cunningham. Even though those have been ruled out for very good reasons, it's about presenting all of the work and the options in a realistic and intelligent way so that everybody else comes to the same conclusions that we've worked so hard to try and come to, that there really right now is only one even viable option, even if it's not a perfect one.

Speaker 1 (01:51:38–01:52:01)

So looking at this, This looks like it's about 80 spaces. And then if you add that one level below, that adds another 40, so about 120. Maybe a little less by the time you take the stairs and elevator, but something in that magnitude.

Speaker 3 (01:52:02–01:52:17)

All right, so we'll say 100 spaces for if you have a turnaround or something else. But yeah, and then the cost of the structure is the same when you do 120 or 100, because it's the same structure, generally speaking.

Speaker 12 (01:52:18–01:52:19)

Generally speaking.

Speaker 11 (01:52:20–01:53:33)

So I guess the other thing I'd like to say is that I know that we were talking about this is the option. Other suggestion would be that that is one option, but sometimes you have to piecemeal things together to get what you need too. So sometimes, you know, maybe you're able to put 25 spaces down at the library. Maybe you're able to put 10 spaces here and whatever, and not the library, sorry, the police station.

Like sometimes instead of doing the one big thing, sometimes you're able to piecemeal things together to get the same thing that you need. I guess the other question I would have is I know that the libraries approached the house next door and that didn't work out, I know, for extra space. Has there been any thought to any of the homes that are in the vicinity, you know, across the street from the library? There's a church, but then there's houses right there.

I'm just thinking because there's also a crosswalk there, too. You know, I mean, I'm just thinking creatively because, you know, Again, I know this, we're looking at this option, but I think we should be looking at and then we have looked at a lot of things, Regina, I get that. But I think that we should also look at some other potentials. So I'm just curious.

Speaker 9 (01:53:34–01:53:38)

We also we did look at the hospital too. I forgot about that one too. Thank you.

Speaker 12 (01:53:39–01:53:46)

We have not reached out to any neighbors. I reached out to me to ask them if they want to sell the property for a parking lot or

Speaker 11 (01:53:47–01:54:10)

What I don't know, I'm just I'm not sure what you're well, yeah, I guess I'm thinking, you know, is there any property I'm not that familiar with, if there's any property right in that vicinity, that's for sale that someone may be willing to sell that in the long run, you'll be able to get 20 spots there. And then you've got 10 here and 20 there, you know, instead of the big project. I'm just asking.

Speaker 12 (01:54:11–01:54:20)

We haven't asked anybody in any homeowners. I know which zoning even allows for a parking lot right in the middle of two single family homes.

Speaker 11 (01:54:20–01:54:29)

I'm thinking closer to the other. I don't know. I'm thinking like the church on the corner. I know there's some houses right there.

It's just I'm throwing out all different areas.

Speaker 12 (01:54:29–01:54:34)

I guess I'm not sure where you're which side of the street is walking across. That's the church.

Speaker 11 (01:54:35–01:55:16)

So the church owns that property. There's some homes right there. There's only two or three houses there. Yeah, that's what I was wondering.

I'm just thinking because you already have a crosswalk there. It's very close to the library. So directly across from the libraries and that corner there. Yeah.

I'm just throwing it out as another idea. That's all. Because if we're thinking creatively and we're thinking of money and so forth, I mean, I'm just trying to throw out other scenarios. That's all.

Because I think, you know, we're thinking a lot of money here. So, you know, either way, even if we get someone to help us with this, it's still I'm just trying to think creatively. That's all. I'm not saying that's viable or not.

Speaker 12 (01:55:16–01:55:47)

I know what you're saying is that of all of us, so there's still a big parking garage next to the library. There's some kind of housing, you know, slash parking here. There's put 10 spots here and five here and four here and three here and two here and that equals 30. That's kind of your solution.

Not your solution, but what you're saying is one of the options. So we can lay that out there. That could be one of the ways to provide 40 to 60 is to have 10 at the town hall and 20 over here, 30 over here.

Speaker 11 (01:55:47–01:55:54)

And that would be one of the options that- I'm just trying to think of like all the, well, I'm just thinking of like, we should have all options out there.

Speaker 1 (01:55:54–01:56:11)

So those options where you're putting them all scattered about will be town paid for. There's no option to get, or maybe, I doubt you'll get, well, you might, maybe a MaxWorks grant could help with that, but you won't get private investment in that. Dick, yes.

Speaker 5 (01:56:12–01:57:03)

Yeah, the question I have Cheryl is the level of detail we're getting into is very impressive and it's a lot of hard work by you and other people down here. I'm just wondering if we're getting a little bit beyond the scope of the committee in particular. I thought we were supposed to take a look at the master plan see if a project like this meets some of the items identified in the master plan as being important, which I think generally think this is, and then recommend to the select board and the planning board, giving them our recommendation as to move forward and to do something with it. I'm wondering, when does the planning board and or the planning department get involved in this type of project, or should they be involved in this project?

what are we really trying to do here, I guess?

Speaker 1 (01:57:05–01:57:13)

Well, we're trying to have something which are viable options, which we are working our way through what's viable.

Speaker 5 (01:57:14–01:57:36)

Right, but couldn't we just recommend to the select board and to the planning board that we think that the The project as identified by Will and Chris is certainly worthy of consideration and fits into the tenants of the master plan and for them to then decide what to do with it.

Speaker 1 (01:57:37–01:57:43)

What do you mean? What are you saying? Adding parking and not have any idea of how to do it?

Speaker 6 (01:57:43–01:57:44)

Yeah.

Speaker 1 (01:57:46–01:57:52)

Well, that's like going back two years, I think. But from what we've started with, Well, I understand that.

Speaker 5 (01:57:52–01:58:12)

I don't mean, I'm not, this is not being critical. I'm just saying that as we get down into this level of detail, I'm looking at the original charge of the Master Plan Implementation Committee. And I'm trying to juxtaposition what we're doing, the level of detail we're getting into, but with what the charge is.

Speaker 1 (01:58:13–01:58:16)

And then- So, Dick, you know, when we, sorry, go ahead.

Speaker 5 (01:58:17–01:58:17)

Oh, no, you finish.

Speaker 1 (01:58:18–01:58:48)

Go, please. You know, we had agreed, I don't remember how many months ago it was, that I would go to the select board and give them an update where we were and seek their guidance about whether we should continue. And I was told that, yes, our committee should continue and continue to do our due diligence. And that's what we've been doing.

Planning Board members came to the forum.

Speaker 5 (01:58:48–01:59:02)

At what point do we pass this off? I think we have some pretty good ideas. I think we'd probably be almost unanimous. I think we'd almost be unanimous in saying we want this project to go forward.

What happens then?

Speaker 1 (01:59:02–02:00:22)

Yeah, well, you know, once we have our options laid out that we think are viable, then I think we we come up with the recommendation and we include all of the options and we pass it off. I mean, it can't be done. Any of these things can't be done, obviously, without select board approval, whether, you know, it requires any zoning change. You know, I don't, it depends, I guess, the town property, I don't, you know, it's municipal property is it zoned as municipal property I'm not quite sure what that looks like, but you know a town sponsored project doesn't have to follow zoning.

So, you know, It's unclear yet what role a planning board may have. The RFP that the select board issued for the town farm did not involve the planning board in any way. We weren't asked to look at the RFP. We're asked to have one representative along with this committee to review committee for those responses, but we weren't asked to weigh in at all on that RFP.

you know, whether the select board would decide to ask, you know, the planning board to weigh in on an RFP for something here, I guess the select board would decide, or we can make a recommendation, you know, once we pass it off.

Speaker 5 (02:00:22–02:00:31)

Right, but we would be recommending to both according to the charge, both to the planning board and to the board of select, excuse me, the select board.

Speaker 1 (02:00:31–02:00:38)

Yeah, so remember in Milton Village how we passed off the landing study to the select board and we passed off the zoning to the planning board?

Speaker 6 (02:00:39–02:00:39)

Right.

Speaker 1 (02:00:40–02:00:47)

That was kind of envisioning, you know, we pass it off to who we see has the jurisdiction, but I mean, it certainly could be passed off to both.

Speaker 5 (02:00:48–02:00:54)

And then what role and what role and what time does the planning department get involved in this?

Speaker 1 (02:00:56–02:01:00)

Well, planning department's involved through Cheyenne now, and Tim's been kept abreast of all of it.

Speaker 5 (02:01:00–02:01:14)

I don't want to put Cheyenne on the spot here, but in terms of, you know, how do they get involved in some of the stuff we're doing right here? that we're looking at right now.

Speaker 4 (02:01:14–02:01:36)

From what I know is that we've just been keeping in touch with Cheryl and everything regarding the parking. We've been having internal discussions on the presentations that come up. We're at the same point as everybody on this committee, but if there's anything further, obviously, we'll take that, discuss it, and work on it. Anything else?

Speaker 5 (02:01:37–02:01:57)

Great. Thank you. Thanks. I'm just wondering as to, once again, staying within the charge, and then as we expand to the charge, because we think this is important for the town to know all the information.

At what point do we stop doing this and passing it on?

Speaker 1 (02:01:58–02:03:55)

Pretty soon, I'd say. Like I said, when we know once we've got some viable option that we say, you can solve it this way or you can solve it this way, and you can decide which way you want to go. It might be that we have a recommendation for which way, it might be the library trustees have a recommendation for which way that it gets solved, or we say we don't take a position on which way, these are all the options. I think until we We have this idea that channel land is scarce.

And if we're going to just build parking, it's a missed opportunity to meet other needs for the town. And then we talked about how to pay for. this parking. So that's where this other idea of combining it with another use.

But if we test it out and we run it through and we find that it's a big building and it's going to not be really able to pay for the parking, then that might be another attractive option. And it might be that it's a piecemeal option. But we don't have the answers fully yet. We don't know what the parking would cost at the police station yet.

We don't know what surface parking on Canton Ave would cost and we don't have a number, a final number from Chase or others about what can be added here at Town Hall. But we've done a lot of due diligence about options and we can show which ones we we looked at and why we think that they're not going to meet the needs of the library. But I think we're close. And I hope everyone's working on an agenda item that's next, which is our draft report, which we will hopefully start discussing at our next meeting.

So does that answer your question, Darren?

Speaker 5 (02:03:55–02:04:08)

Yeah, yeah, sure, it does. I mean, I'm still, I still, I'm not fully on board, but I certainly understand where you're coming from. And thank you for that, that explanation.

Speaker 11 (02:04:09–02:04:43)

Okay, thanks, Dick. Roxanne? Thanks. I just wanted to clarify something that was said earlier, with talking about different land and so forth.

So the Governor Stoughton land is a trust. So it's a trust that has land in the town of Milton. So it's a little different than this, which is town owned with a select board overseer. We sit as trustees over that.

But it's a little bit of a different It's a little bit of a different situation. So just to clarify, it is a little different.

Speaker 1 (02:04:43–02:04:46)

But the trustees didn't ask the planning board for their feedback is my point.

Speaker 11 (02:04:47–02:04:48)

They didn't really have to though.

Speaker 1 (02:04:48–02:04:48)

Right.

Speaker 11 (02:04:49–02:05:33)

And then actually, to be honest, they probably, we have a review committee. I'm not certain if we needed to do that, but we have one and that's fine. And that's a good thing. With regards to this, I do hear a lot of what Dick's saying.

I mean, I think We don't want to go too far down the line either, because we do have a planning board and a select board that ultimately are going to have, if there's a project that goes forward, they're going to have to review it. And we have to figure out in terms of monetarily, whether it's private partnership, public partnership, whether the town does it itself. So I think to Dick's point, I feel like sometimes we're getting a little bit too far in on these issues with regards to this.

Speaker 1 (02:05:34–02:05:39)

So you feel like you have enough information to make a recommendation today?

Speaker 11 (02:05:39–02:05:58)

I think the recommendation is that we're hearing that obviously they need parking. And we have a piece of land over here. We have this. We have that.

And perhaps that's what should be looked at. But I'm willing to hear what somebody has to say coming in. But I'm just saying, I'm not so certain we

Speaker 1 (02:05:58–02:06:28)

Do you want to know that there's a viable option in the public-private partnership? Do you want more information to test out that idea? I'm willing to hear what somebody says. Because I'm spending a ton of time on this.

I know you're spending a lot of time. I don't want to waste my time if we don't have support that we think that this should be taken to a point where we have an answer to that. So I will ask everyone on the committee whether they think we should continue to get to a point where we can make a recommendation, and we've teased out that option.

Speaker 11 (02:06:29–02:06:33)

So I guess my question is, there could be many options, right?

Speaker 9 (02:06:34–02:06:36)

So that is one of them.

Speaker 1 (02:06:36–02:06:41)

Which more option do you think is that we haven't looked at that we should put on the table?

Speaker 11 (02:06:41–02:06:47)

We've talked about a lot of them tonight. We've talked about all different scenarios. I don't want to get in this adversarial thing here.

Speaker 1 (02:06:48–02:07:23)

I'm just saying I kind of be clear about what we're doing next, Roxanne, because, frankly, looking at the scenarios have been me. and then asking engineers to look at it and spending some money for that. So I want to be clear about what other things. I don't personally feel that looking at somebody's house and putting a parking lot where their house is, is something I want to do.

Because I just feel like there's going to be pushback on that. Why would we consider that? Why aren't we looking at town-owned assets? So town-owned asset, town-owned asset, town-owned asset.

Speaker 11 (02:07:23–02:07:29)

That's what I've been trying to do over here. I've been trying to see if we can add in things over here, because it is right here. So what? Yeah.

Speaker 3 (02:07:30–02:07:41)

Cheryl's asking for, do we want to make a recommendation? If we do, what is it?

Speaker 1 (02:07:42–02:08:03)

My question was, do we have now? We're ready to wrap it up and pass off our recommendation. Do we have all the information we need today to make our recommendation? Because what I'm hearing is we're going too far.

Well, how are we going too far if we haven't answered some questions? That's my question to the committee members.

Speaker 7 (02:08:04–02:08:45)

I personally do not feel like I have enough information. I'd like to see more information around the public-private partnership. I also very much value your time and understand how valuable time is. I personally have too much work to do when I get out of this meeting.

But so I want to thank you for all the time that you put into it. And I certainly don't take it lightly of how much effort it takes to continue down this path. But I personally would like to see it, if you're willing to continue to put effort into exploring that.

Speaker 9 (02:08:45–02:10:48)

I feel the same way. I think, you know, between The, the approach of looking for small opportunities for additional parking, whether it's at the police station or the hospital. or right on Canton Ave or at Town Hall. I think we've done our due diligence of trying the piecemeal approach and we're not done with it.

I think those numbers are going to keep coming in as we see the contractors recede from doing their work at Town Hall. But I think what we keep coming back to is that the library still needs more parking. Even with the 13 spots we can get from here and maybe the three or four spots that we could get from the police station, there's still this need. And so I don't think, unless I'm missing something, that there is any other option.

that we have explored that will get us to 40 to 60 parking spots for the library. It's just not there. As much as I would love to see that as an option, I don't see any other option right now for us to have an even reasonably affordable parking structure that the town may be able to contribute to in order to solve this issue and form some type of a partnership. And please correct me if I'm wrong, if I'm missing something, because we've gone through a lot of numbers, not just today, but in every meeting, going back to how many spots are here, how many spots are here.

If I'm missing something, please remind me of where we can find these spots, even in a piecemeal way.

Speaker 1 (02:10:49–02:11:30)

So one thing, Regina, I think in terms of when put the sort of final recommendations together, you can say, well, in the short term, the solution could be, you know, 10 or 15 spaces at Town Hall, you know, whether part of the solution is 20 or 30 or 40 in front of the police station. But then, you know, you put to it that, you know, this falls short of, you know, what the goals are, but maybe that's all that can even be afforded, right? So I'm not opposed to putting all the options out there. What I'm suggesting is that we haven't fully fleshed out this option of a public private partnership.

So, right, because they're going to ask us for the number, right? Yeah.

Speaker 9 (02:11:30–02:11:32)

So that's the immediate question.

Speaker 1 (02:11:32–02:12:54)

We need to still need to find out, you know, how much is parking costs down at the police station? How much is parking costs? Even if you did a lot on can now, and then If it's this 30 units, how does that fit? I'm going to just go with the 30 units.

I don't think we need to ask anybody to do a pencil performer for us to tell us it's 30 or 28 or 35. We just say 30 units with 30 parking spaces and whatever it is for the library, 40 there and 15 over here. We just see what that looks like and then what that cost is and what that potential is. Then the library will advocate for what they think is the best solution for them.

We see how it can be paid for. I see it as just like the committee did in Milton Landing where we ran through options and we turned it over. There we paid for you know, things like dredging reports and all sorts of stuff to kind of continue to tease out the dots. You know, we did a lot of stuff there.

And that was before everybody, not everybody in this committee today was on the committee back then, but, you know, I see it pretty similar to that. Dick's hand and then Roxanne.

Speaker 5 (02:12:55–02:12:57)

I'm sorry, I want to take mine down.

Speaker 1 (02:12:58–02:12:59)

Okay, then Roxanne.

Speaker 11 (02:13:00–02:13:47)

Sure, I just want to clarify. I certainly appreciate what you're doing, Cheryl, and you spent a lot of time So I do really do appreciate that. I guess my concern was how much further are we going in terms of like, I'm fine with finding out the cost of this, but we spent a lot of meetings doing this and we're trying to wrap up the report and the other things that the master plan does. So that's where I'm coming from on it too is, so I appreciate all the work you've put into it.

And of course I'm willing to hear whatever, because I'm very open minded like that. I also know in a cognizant that we're trying to wrap up the committee. So I want to make sure that we don't lose focus on that piece either, you know, so we've talked, we've talked a lot about parking here at town hall.

Speaker 1 (02:13:47–02:14:47)

Yeah, some folks don't want to talk about it more. I don't think we need to talk about more here at town hall. I personally don't think we need to talk about any other location like we're single family houses are. I think we tease this out, and then we summarize it.

And if anybody wants to think about what we've looked at, where they think, you know, you can piece it together. If you want to look at all we've looked at and all these locations and put a schedule together and say, it'll work, you know, at this church, because I've looked at this schedule that they gave us. And I look at this schedule from town hall and put this schedule together to say, you know, because somebody, you know, we've looked at all of these things and we've all continued to say we're not meeting the library's needs. So at a certain point, there may not be a way to do it without, you know, doing one of the options that some people don't like, I think.

Yes, David.

Speaker 3 (02:14:48–02:16:19)

So I think that the low-hanging fruit of a couple of parking spaces here and there around the town are all can't have crosswalk. A lot of things have been accomplished. It's easy for us all to conceive how that works. But the parking garage with the deck over the existing parking is kind of everybody's thought of how an easy solution, expensive but easy solution, that if we can set that on the one side and then do this public-private partnership on the other, that's a harder concept.

And the public-private concept that I've dealt with in my professional career has been much larger facilities, where there's economies of scale. And here, I don't know that there will be. And so I'd like to hear more about it, because I think I'm ready to make my own decision, recommendation, except for that one piece. And that's missing in my head.

If it's not there, it's not there. And I think if we can come up with 38 parking spaces, that's the best we can do. Then we can go back to the library and say, this is the best we can do. make your programs fit, because that's the best we can do.

And we've done our job. But until we've pounded this last one out, I'm not so sure we really can say we've done our job. And that, I would say, wouldn't be the last thing. But as Roxanne said, we've looked at all the little details all around.

But that's a more complicated one, and I think we need some education on that.

Speaker 1 (02:16:21–02:18:00)

All right. We'll go with what I outlined before, which is see what this 30 units looks like, what the cost would be. I think we need to get a proposal from the engineering firm to take a look at that surface lot, both on the police station and on Kenton Ave. And then, if the cost estimator is willing to do another cost estimate based on that.

So I'd say it's not going to be, first we're going to need to know what the costs are to engage those folks, and then they're going to have to do it. So I see a couple of, at least a couple of months to get that done. And in the meantime, you know, we can, I'll see if there's interest in having this discussion with this developer. If there's not interest in getting some of his feedback from his experience doing this in other communities, then we don't have to invite him in.

It's not an opportunity for us to kind of grow him. It's an opportunity for us to learn. So if we're interested in that opportunity, then I'll invite him for September. All right.

I'm going to move on to say that we will defer item seven on the agenda, which is the discussion of our report. And I'll take a motion to adjourn. I'll make a motion to adjourn. Second.

All right. Roll call vote. Elaine? Yes.

Tabor? Yes. Roxanne? Yes.

Speaker 5 (02:18:01–02:18:01)

Yes.

Speaker 1 (02:18:02–02:18:04)

And Regina? Yes.

Speaker 15 (02:18:06–02:18:08)

Thank you. Thank you.