Board: Milton School Building Committee
Date: 2024-09-09
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:49–01:06)
So it's 708 September 9, 2024. I'll call the meeting to order the school building committee. As we always do, just do a roll call attendance. So start with Ms.
O'Leary. Here. Carrie Hurley. Here.
John Cohane. Here.
Speaker 2 (01:08–01:16)
Online, we have Glenn Hoffman.
Speaker 1 (01:16–02:54)
I need you on mute, Glenn. And Tim Lombard. I'm here. And then I just recorded Aqua.
So Aqua is joining now too. Just give me a second. Malak was joining. We'll move on to agenda item number two, which is citizen speak.
We reserve the first 15 minutes of the meeting for any citizen that would like to speak. We ask that you hold your commentary to three minutes. Please state your name and address. So if you're online, please raise your hand or in person, please step up and you'll be recognized.
I think Akra will be rejoining, it looks like, so keep an eye out for him. Okay. Seeing no citizens, agenda item number three is approval of past minutes from Monday, August 26, 2024. Everybody got a copy of these in your packets?
So just open up to see if there's any comments, edits, questions, and if not, I'll entertain a motion to approve. I'll make a motion to approve. Second by Kerry. Any discussion?
Seeing none, roll call vote because we're hybrid. So Mark? Yes. Kerry?
Speaker 3 (02:54–02:55)
Yes.
Speaker 1 (02:55–03:31)
John? Yes. Tim? Yes.
Glenn? Yes. And myself, yes. All right.
Moving on, agenda item number four, old business item A, schematic design update. So here with us in person, thank you for joining, is Shanali and Larry Spang from Arrow Street. And Andrew is online with us too. So just to kind of give us an update on where we're at right now with the schematic design.
So turn it over. Sure, thanks.
Speaker 4 (03:32–03:34)
I can share my screen if that works.
Speaker 5 (03:35–03:47)
Yeah, I can. That would be great. Thanks, Andrew. So as Andrew's pulling that up, we are on course to deliver a schematic design set October 18.
Speaker 2 (03:48–03:51)
Sorry, just to make sure.
Speaker 5 (03:51–05:26)
So we're on course to deliver the schematic design set October 18. And we're currently working with the working group to go through some of the interior layouts of the classrooms of the teams. We met with them last Thursday. And we are aiming to meet with them next week again and include the landscape architect in that meeting to talk about some of the site conditions.
As many of, you know, the site has a lot of variation and it's great. And we're going to talk through some of the options on how to navigate that and how to walk around the building. So that's coming up in the next 2 weeks. Tonight we have the presentation with some updates from last Thursday's meeting.
So we got some feedback during that meeting and we implemented as many as we could for tonight's presentation. The plans that you're going to see tonight are a slight variation on the ones that we talked about on Thursday. So we're going to primarily focus on the academic levels, three and four, and then touch on one and two. At the next meeting, we'll give a further update on those more public spaces, but really the gist of it is to understand how the teaming and the adjacencies of the classrooms and those interspersed academic areas work.
And then Andrew's going to walk us through how we got to where we are and some of the third and fourth teaming options.
Speaker 4 (05:30–14:21)
Great. Can everybody hear me okay? Yep. Yep.
Yep. Loud and clear. Okay. Good evening.
And thanks, Shonali. So what I'm going to do is start us off with where we last, when we last spoke about the organization of the building, just as a kind of reminder of where we were. And then I'll walk us through what we've developed since then. So what you're seeing here is What we call an exploded axon where we've kind of spread out the building and this is something we looked at with this group on July 1st and the At that time this was still looking at an eight team organization and one of the major things that we have looked at since then was to progress a design that uses seven teams because it makes for a more efficient building.
And so we're going to kind of start on the top of the building and work our way down where we're looking at the team organization and how that we think can play out with seven teams instead of eight. And before we get into the plans, I did want to take a minute to just walk you through some of the sort of design thinking that we're doing during schematic design. Because up until this point, it's been a lot of discussion about what are the spaces, what are the adjacencies, which is all very important. But also during schematic design, we start to think a little bit about what is what we call the massing, what is the shape and look of the overall building.
And I just wanted to take a minute to kind of walk you through sort of our progress. So I'm going to show you four diagrams that kind of walk you through how we are responding to the site and how the building is responding to the site and how we sort of have arrived at the shape of the building and the organization of the building as a result of understanding the needs and demands of the site. And so the first one is, sorry, I think this is going to, there's a lag, so this might… Um, changing on me, but, um, as we all know, the 1st step has been about relocating guile road.
And so the heavy sort of solid line here is the existing approximate location of guide road and the dash blue line is where it's getting relocated to and. The main benefit of doing that is that we're capturing territory in order to build the school. And in doing that, we create this zone where the majority of the arrival and drop-off activities happen and the parking happens. The red line here represents the main mass of the building and how it's responding to that.
And it's like the inversion of Guile Road. And the benefit of that is that the building will have a very nice way of presenting itself when you're arriving to it. It has this cradling shape that allows you to approach it in a way that feels very comfortable. And that's been present in the diagrams that we've shown you throughout.
And then when we started to get a little bit more detailed about the layout, we also thought about how you enter the building from the two sort of primary sides off of Guile Road. And so we sort of have these three kind of forces, if you will. One is sort of this arching shape that's opposite of Guile Road that defines the big move. And then on the ground level, we have these sort of two paths that are kind of coming in and through the building.
And so, that way of looking at it starts to sort of set up some basic organizing shapes that we're starting to look at in three dimensions. And so when you look, I'm going to zoom in on this one a little bit, but when you start to think about those shapes as a building form, we can sort of see how those ideas about these lines that I just went through are starting to take shape as a building. And so if we look at that as a three-dimensional view, Just zoom out here. If this arcing line here on the bottom of this image is Guile Road, then you see how the kind of overall mass of the building is opposite that.
And then at the ground level, there are these opportunities for the paths to kind of move into and through the building and relating to the pre-K space beyond. So that's just some of the thinking that's going on, you know, while we're fine tuning adjacencies and layouts, because at the end of the day, you know, it's going to work and everything's going to be well located, but we also want the building form and shape to be something that is architecturally sound as well. So, okay. So I'm going to start here on the fourth floor.
Oops. Apologies. And I think the main thing here to point out is that we've got three teams on this level. And with each team, we are centering it around a shared learning common.
So at the sort of two ends, you're seeing The hallway is getting wider to kind of create this space. And at the team that's located in the middle of the plan, which is sort of at the bend in the bar, we're imagining that that Learning Commons can be located along the southern edge, which would get the benefit of a lot of great natural light and would be related to the space where the stair will be located. And so these clusters that you're seeing here are the four primary classrooms, one of which is the science room. And that's happening At the two ends and at the center as well, we have you'll see as we go down through the floor plans that we have located the special education programs interspersed throughout.
One of the pieces of feedback that we got last week was that there were a couple of places where it was perhaps too concentrated. So we'll look for feedback on that tonight if the new arrangement feels better. But one thing I want to point out is that there is a very straightforward structure to the building. So I'm going to try to draw a couple of lines here.
Hopefully that shows up, but from that location this way and from this location to the left on the plan, You have a very straightforward orthogonal structural grid and sort of repeating bays. We've made sure to stack the floors on top of each other going down and align hallways and things like that. And what that means is that, yes, there is this sort of bend where the building is sort of responding to the site. But we think that this is something that can be achieved because it's limited to a very specific area.
And it's also happening in a place where it's not very difficult to do that, which is to say where we've got most of the vertical circulation in the center of the school. So I'm going to go down to the third level now. And you'll see that it's very much similar. So again, we've got three teams, a little bit of a different mix in the special education, but again, working to sort of locate those in between teams.
And so they're sort of equidistant from the different groups. And I'll now move down to the second floor. Actually, before I move down, are there any questions about these two floors? Because they're very, very similar in how they're set up.
Speaker 1 (14:26–15:08)
I've got one question to Andrew. Just let me know if you can hear OK, too. I can hear you. I know, but and I know with with 3 science classrooms, you know, it's kind of like a learning question, but I know before we had 4 teams per floor of the science rooms are sharing prep space.
Yes. So, you know, like, now, even if we were to get new rooms next, we took each other sharing. Um, it would just basically delete 1 prep space. So I think, you know, for you guys, it was just more convenience for location and just add additional prep space on there for.
Speaker 4 (15:09–16:35)
Right. So that's a good point. So yes, when there were four teams per floor, you could sort of set two teams back to back, mirrored around the science rooms and have one prep room shared by the two science rooms. That is not so easy to do now for a couple of reasons.
One is because we have seven instead of eight teams, but also because we realized that it's really much more preferred in general by, not MSBA, but by DESE, which will have some commentary about this, I believe, that it's better for the special education programs to be all intermixed evenly throughout. What was starting to happen where we had the shared science rooms was that we were getting sort of higher concentrations of special education in one area. So, you know, that's to say that instead of right now there's there's one prep room per science room. So in these plants, there are seven prep rooms.
Something we could talk about is whether the prep room that is adjacent to a hallway could serve multiple science rooms. And maybe it's not adjacent to the science room and it's just sort of more equidistant. There's some options there.
Speaker 1 (16:37–16:50)
Yeah, for me, I was just bringing it up more just for others that may not have done it before. But I think the addition of it's totally fine if it's there to intermingle the special ed with the remaining four.
Speaker 4 (16:52–17:00)
Right. And I think it makes for a more sort of logical layout in accepting that.
Speaker 2 (17:00–17:02)
Yeah.
Speaker 6 (17:03–17:15)
different in sort of the more traditional way you think about this. All the science classrooms would be in sort of one area of the building, and often we put it on the top because of the exhaust needs and things like that.
Speaker 7 (17:15–17:31)
And here the science is built into the classroom nodes in a way that I think helps the education, but it makes the infrastructure a little more difficult. It might be good, Andrew, if you can zoom in on one of the sort of
Speaker 2 (17:31–18:06)
in segments, just to see it. And, you know, this is sort of a module as we've been talking to the educators about, you know, three classrooms and a science room. And the science room is sort of like a fourth classroom with a little bit more activities. And then the SG small group work rooms, a planning room in red there for the teachers.
and the science prep room around this learning commons, which at the moment is sort of the big bulge in the middle of the Python there.
Speaker 7 (18:06–18:13)
But that's essentially trying to create a neighborhood where the kids and the teachers are all working together.
Speaker 6 (18:13–18:25)
And so that's, to me, the interesting part about how science is now integrated into the classrooms as opposed to the old, you know, down the hall, up the stairs, to the top of the building, which is where we used to put them.
Speaker 7 (18:31–19:12)
Yeah, Mark. I guess one thing I see is the small group room is only accessible through the classroom, is what it appears here. And so that's like that. I guess that's more maybe a programmatic question for you, Peter, of just, do we, I could see that being disruptive.
Like, do we need to use that? And like the teachers pulled the kids from a couple of spaces and walking into there. Again, the only way to get there is through the class. the other teacher in that room is doing.
I don't know if those could just be- You could stack it this way. Yeah, I don't know if they can just be termed or based on square footage layout like that, you know, prefer having it that way versus kind of more shotgun.
Speaker 5 (19:13–19:14)
To have a corridor access.
Speaker 7 (19:14–19:22)
Yeah, to have corridor access within the spaces. That would make sense just to provide more flexibility. Yeah.
Speaker 6 (19:24–19:41)
I guess part of it, and it varies a lot in certain districts like in certain ways and others the other way, but, So the way they're shown is from the classroom. So you'd be basically serving those two classrooms. If you're right, it'd be hard to say, oh, kids, we're going to march past this other class to get in there.
Speaker 2 (19:42–19:50)
And I think if we see them as more of a shared resource, then you're right. Let's put them out on the floorboard.
Speaker 6 (19:51–20:44)
And then the question is always, well, do you try and have a door from each classroom, which sort of reduces the kids out in the hallway and back in? Or you say, OK, then we'll just have the one door. So it's either two doors, and you come in that way, or you have one door, and you come in that way. Or you try and have three doors, which eats up a lot of floor space.
But those are little bits in detail that I appreciate. I mean, I guess I think not having to go out of the hallway is nice. But the reality is, in a classroom environment, if there's one teacher in that classroom, it's not that hard for a student to go outside and into that small group space and then come back. But it's probably not an intervention space, meaning you would have it staffed with someone.
Speaker 5 (20:45–20:59)
No, I think this was sort of like we were treating it as an extension of the classroom based on the visioning sessions and sort of the way we developed the program. But if it's a staffed space, then yeah, we would change it around.
Speaker 6 (21:01–21:18)
Yeah, I don't think there would be a staff space. I just, I'm thinking kind of like a long-term, it's a trade-off, right? Long-term, like 10, 20, 30 years down the road, it might be nice to have the flexibility of hallway access.
Speaker 7 (21:18–21:31)
Yeah, I think so. Yeah, because there could be a staff space. Right, just as, yeah. Special education teacher's office or like, you know, whatever else as we continue to grow and have to, you know, space.
Speaker 8 (21:32–21:38)
OK, that's good. That's great. Thank you.
Speaker 4 (21:43–22:00)
We can come back to these floors if there are any questions that come up for people. I'm going to, I don't know, is the refresh really slow for you all as well? Because for me, it's not just me.
Speaker 2 (22:02–22:03)
It's painting it slow.
Speaker 4 (22:05–22:14)
Drawing it in real time here. Well, I'm going to try to go to the next page anyway.
Speaker 2 (22:27–22:36)
It's on the desktop, believe it or not.
Speaker 4 (22:36–24:47)
So I don't know. It seems to be catching up quickly. Yeah. Yeah.
Okay. All right, so now we're looking at the second floor, and this floor's got one team up on the northern wing, similar setup to what we were just looking at. It's got the media space on the southern sort of lobe here that's above the cafeteria, and there's a zone where we imagine there could be some overlook, a sort of double-height space. along the edge where there will be a nice sort of view to nature out this side.
And then the remainder of the floor is composed of world language classrooms and special education classrooms that are sort of trying to be evenly intermixed. And This, so I think one of the things to think about is if the seventh grade and the eighth grade each have three teams and one of the years has the need for an extra team, this would be likely the way that it works. I mean, I suppose there's a couple of ways that it could be done. But I think thinking through the utility of having this team on this floor is something worth the group talking through or just thinking about.
What you're seeing in some of these other areas are sort of canopy or roof areas below that are outside and below where the sort of plan is cut. And you'll start to see here that on the left, that's the second level of the gym. It's not floor space. It's just sort of volume.
And also the auditorium. These are two of the larger volumes that are sort of present at this level. If there's not questions about this one, I will go down to the first floor and then maybe we can circle back.
Speaker 5 (24:48–24:54)
Let's say one thing, Andrew. So those other four blue classrooms are the world languages.
Speaker 3 (24:54–24:55)
Yes.
Speaker 5 (24:56–25:19)
And just first with the special ed, but kept them close to the media so that there's a liveliness of the interactivity between the classrooms and the students going in and out of that media center so that that this floor had the feeling of activity because we know there's only one team on this floor, but to have that active feeling all the way throughout.
Speaker 8 (25:20–25:23)
Andrew, can you zoom in a bit so folks can see?
Speaker 3 (25:25–25:26)
Yes.
Speaker 7 (25:27–25:32)
Yeah, I would say if we could zoom in just a sort of a cross piece so they can see the world language.
Speaker 4 (25:33–25:41)
Let me know if I should go closer.
Speaker 2 (25:41–25:46)
You guys can see that. Yeah, okay.
Speaker 4 (25:52–26:22)
Yeah, so to Shonali's point that this will be a pretty lively area because students will be coming from all of the teams down to this floor for world language classes and for media class time in the media center. One thing to point out, something we've talked about in the past was about co-locating the guidance programs with media, which is what you're seeing here in this sort of orange boxes here embedded in the media space.
Speaker 7 (26:26–26:38)
Is there any particular reason to put the guidance on the bottom of the media space versus closer to the main corridor?
Speaker 5 (26:43–28:10)
Yes. Well, no. I mean, I think it should be closer to the corridor. uh ended there um in our last conversation because all the pieces have been moving around moving around like this is going to be one of like 50 iterations that you're going to see between now and October 18th um but there has been conversation about opening up that back wall that's the view right like that's where the windows are going to be and it's where we can get that space plugged into the plate so there's still a little bit of programmatic chest thing or chipper thing, like trying to put new spaces around.
The key for us was to get those teams and those academic spaces really sort of stacked and organized that reflected all the conversations. And you're going to see in the, not only in the second floor, but the first floor, there's still some massaging that needs to happen. And part of what's driving that is we've shifted our focus away from the stacking of the building as the academic area is held and to really understand what the site, sort of the ups and downs of the site elevations are and what that, how's that impacting the building, accessing the building. And those are the conversations we're going to be having over the next couple of weeks of like, how do we resolve that?
I can bring up all of these things that we're talking about, but I don't have any resolution, real resolution for you this evening. That's what we're working on at the moment. But that's going to impact second floor as well.
Speaker 1 (28:13–28:32)
The question I have too is the view that's there on the right side. Or the opening, yeah, that one, Andrew, that you mentioned the view. There's no other site out there. That's just basically the terrain differential between the There's really no view.
Speaker 5 (28:32–28:49)
Well, you're up on the 2nd floor. So, if you're on the 1st floor, I would agree just looking at you'd be looking at sort of the retaining wall. Yeah, but here you're on the 2nd floor. So the view is really up above at the field.
If you don't want that view, we can talk about it, but that's what we're that's what we're calling it. Yeah. Okay.
Speaker 4 (28:49–29:37)
Yeah, and we'll talk, I think, in more detail about this point with the landscape discussion. But we are, when we go down to the first floor, hoping to sort of define an area out here on the lower level outside of the cafeteria, which is backed up by the rising terrain. But we think that there's a really nice opportunity to make a really satisfying outdoor space for the students to inhabit in a number of different ways. But that's something I think we're going to be digging into more as we're looking at how much retaining wall is needed to do that and so forth.
So that would be at the next discussion.
Speaker 1 (29:37–29:40)
Yeah, Mark, sorry. Yeah, just chime in. Sorry.
Speaker 7 (29:41–30:22)
Sorry. Appreciate it. The curve around the world language in the planning room, that exists on the third floor. And I guess I'm just wondering, given that there's a low roof below it, I don't know if that's just not quite a roof, but more just an overhang.
But anyways, it makes the planning room space itself kind of awkward in terms of kind of that tight angular corner. I just didn't know if there was a reason other than like, you know, a curved edge is more architecturally pleasing and kind of just like a straight box over, but any reason not to just carry that line kind of straight over in order to better square out those spaces.
Speaker 4 (30:24–31:59)
Yeah, so I think one of the reasons I wanted to start to show you the ideas behind how the massing of the building is developing is that there is this sort of push and pull between the shape of the building and how that helps support circulation patterns from the larger site coming in. And that's definitely happening on the first floor, which you'll see in a second. But, you know, the scale of that entry that we're creating at the time that we've created this plan, we think that there's value in it, sort of that curve being present on two levels. And, you know, So that's present.
And then we're also working through the locations and sizes of the different rooms. And I agree with you that that teacher planning space there is a little bit awkward. And so we're pushing and pulling with how we're inhabiting these curved walls to find, is there a better layout for that, or does the curve itself need to be modified so that it's, you know, not making an awkward space? And so we're all on the same page that we don't want to land on awkward looking spaces, or ones that are hard to use.
And I think that, you know, that's, you're, you're very correct that this is an area where, you know, we're kind of need to need to look at regularizing it. I think it can probably handle a little bit of a geometry that's not perfectly square. But if it's too much, then yeah, it's not where we want to be.
Speaker 2 (32:08–32:11)
So I'm going to go down to the first floor.
Speaker 4 (32:11–32:17)
I think it's refreshing relatively quickly now.
Speaker 2 (32:25–32:31)
Jinxed it.
Speaker 4 (32:31–33:52)
It's the suspense, you know. Well, as this is drawing for us, I will preface this floor a little bit with, in the last week or so, we've been digging in more deeply with the civil engineer about the grading and especially where the north wing of the building comes alongside the athletic field of the high school. And in understanding exactly what's going on with the existing conditions there, decided to move some of the mechanical and spaces that don't need to have windows and so forth into that zone and are starting to think about using the building to act as the retaining wall in that area, rather than having classroom spaces that we then have to just build a retaining wall. not that far off of them in order to create, you know, to get light in there.
And so, that's why you're seeing the sort of block of the dark gray on the right-hand side of the northern wing up here.
Speaker 5 (33:53–34:01)
I think this is the biggest change that we made from last Thursday's meeting to today. So, I don't think you've seen this at all.
Speaker 1 (34:02–34:12)
So, one question with that, Andrew. I know we've talked about firefighter access potentially having to be fully around the building. I assume we haven't talked to them.
Speaker 5 (34:13–34:52)
So we've talked to Code Red and right now they've given us some dimensions and you can see the little corner of the roadway on the northeast. So we don't have to have the road continue or be continuous behind the building. It just has to extend a certain dimension. Pass so that the hoses can reach.
So I think it's 250 feet from 1 side and 250 feet from the other. So that's why you see a little bit of that extension. Then. If we have the rest of the site plan to the South, you would see a little bit of an extension there as well, but it doesn't have to be continuous.
Speaker 6 (34:53–35:02)
We should confirm with the fire department that too, because we have that. Yes. Override code and say, you know, they might have a tower or something like that.
Speaker 5 (35:02–35:40)
So the way that we're anticipating that is we'll take the schematic set once we've done that and then talk to, um, again, the head of the fire department, but we probably also want to talk to somebody in the police department to initiate any security conversations. And those would happen prior to like the kickoff of DD. So we can anticipate any of their comments and start incorporating them at that time. I think there was one more agency.
It's on my schedule. When we get to schedule.
Speaker 2 (35:42–35:43)
Back to you, Andrew.
Speaker 4 (35:44–38:09)
Okay. So the major organization of this level, besides what we just talked about, is similar to where we were, which is to say that the dining and cafeteria zone is sort of located here off of the main entry and lobby space. And as I was saying before, our hope is to be able to develop the outdoor space along here as something that can be sort of a spillout space for the cafeteria. And then moving to the left, we're sort of going into the arts wing, so to speak, where we've got the auditorium with the stage and drama.
And then we located the ensemble piano lab chorus and practice rooms adjacent to that so that the music rooms could serve as sort of green room spaces when there's a performance in the auditorium where people who are waiting to perform can sort of be getting prepared. And then they can sort of move into the stage without having to go through the more sort of public areas. And above that is where the gym is. Sorry, I can't see my cursor here.
So that's why I'm drawing in strange places. The gym is in the same location. And I'm going to zoom in here. We've tightened up the plan here a bit locker rooms adjacent to each other and to the gym so that you can sort of move into the locker room, get changed, and then move directly into the gym.
And the other thing that we've tried to do here is create a path that goes from one side of the building to the other, which we're imagining for nighttime, off-hours, weekend performances in the auditorium and or the gym, that would allow you to close down the building somewhere close to here and then not just that wing would be in use. There would be restrooms for those that are there for those events in that in that zone. So we thought that that was starting to work out pretty well.
Speaker 2 (38:09–38:24)
Also in that pulled the ensemble room and others down to the end of the near the stage.
Speaker 6 (38:25–38:46)
And Peter, we talked about that on Thursday about making those sort of the green room or the prep area or the backstage activity. So that seems to be working in the right direction. And that corner of the building actually has some really nice light. And rather than give all that to the mechanical spaces we flopped into, it seems to be starting to work out.
Speaker 5 (38:48–39:27)
So yeah, so where the fact of how space is that gray rectangular area is, is where we're going to be required to have a retaining wall. and retaining walls. It's going to be tall enough that it's going to cast a shadow, so it doesn't make sense to put classrooms there. It just makes sense to put any of those back of house spaces, plus you have that fire access road turning in a little bit, so If those spaces need to be serviced, it can be serviced from that backside without having to have a whole bunch of utility trucks sitting in the front of your building, or blocking the access road that's between the middle school and the preschool.
Speaker 7 (39:27–39:35)
The building wall, are you going to rename the wall or is it going to be separate?
Speaker 5 (39:35–39:37)
It's a separate location right now.
Speaker 6 (39:38–39:54)
Ultimately, it'd be nice if we can get the buildings. So, um, you're not referring to the first asset. Yeah, I remember talking about that, but then they get like, and while it's sometimes integrated in there, right?
Speaker 5 (39:54–40:56)
So, Andrew and I have been studying a section of where the land can slope up. What we're trying to do is get it so that somebody can walk all the way back there from either the preschool or from the far side of the middle school all the way up to Gall Road and turn right and get into, head towards the high school, either that parking area or if there's activity and people are parking and so that there's like this continuity of a path. The challenge right now is the slopes and navigating them so that it's an accessible walkway rather than a ramp with handrail, so that's not the nicest experience. So that's what we're working on right now between civil and landscape.
And as Larry said, one of the solutions could be making the building itself a retaining wall or having a separate. Again, this is all these things that we're studying this week and next week.
Speaker 1 (40:56–41:03)
We got one question online from Tom. Go for it. You had your hand raised. Apologies.
Speaker 9 (41:03–41:31)
It's actually just a statement. When we did our tours of a couple of the schools, I'm noticing the woodshop way up here in the far corner, and the auditorium and stage down on the other end. Those two schools have the woodshop close, because obviously they need to build set pieces. And I thought it was just a great idea.
I just wanted to throw it out there. I know we're not close to being complete here, but just wanted to throw that idea out there.
Speaker 7 (41:32–41:37)
That W shop, is that a wood shop or a workshop? It's a workshop.
Speaker 5 (41:37–41:38)
It's the building facilities shop.
Speaker 7 (41:39–41:43)
Tom, that's more for your guys than for students.
Speaker 6 (41:43–41:53)
Oh, okay. Never mind then. If we were going to build stuff in this building, we'd probably be in STEM, like, tech rooms, though, right?
Speaker 1 (41:53–41:58)
Yeah. Part of your idea, too, is the ensemble room, to use that. Right. Is that the idea?
Speaker 7 (41:59–42:07)
Well, when you think of the ensemble room, like, where the kids gather before they go on stage, and put on their costumes and all that kind of stuff.
Speaker 3 (42:07–42:07)
Sorry.
Speaker 7 (42:07–42:16)
That's different than what Tom was saying. Yeah. What we were thinking was trying to flip the admin and the art room and have this sort of
Speaker 2 (42:16–42:27)
Stuff being hands-on learning. Andrew, if you can zoom in on those top two spaces. Yeah, sort of there might be good.
Speaker 4 (42:31–42:34)
You want to get the STEM and tech in there as well?
Speaker 7 (42:36–42:41)
Yeah, I think we got one of them. So we've got two STEM rooms.
Speaker 2 (42:41–42:50)
And if we can flip the. admin space, which is in red, across the entryway to where the art room is shown.
Speaker 7 (42:51–43:04)
Put the art room back and then you've got sort of STEM tech spaces with the art room all in one big area. And I think that, to me, feels like it'd be an interesting space to encourage hands-on learning.
Speaker 5 (43:04–43:18)
And then it goes back to what Tom was asking about the wood shop. But if those tech steverms become your workshop, then your art spaces can also be your messy spaces to help support those construction pieces and assembly.
Speaker 2 (43:28–43:31)
Next round of stuff.
Speaker 7 (43:34–43:41)
Yeah. Size of the gem. We did make it slightly bigger than the front.
Speaker 5 (43:41–43:53)
It is bigger. You caught me off guard. It is bigger. I don't remember what it is offhand, but it has enough for the three bleachers on the one side, plus there's overall all the way around.
Speaker 7 (43:53–44:01)
The storage for the gym, is there a separate storage? Is that skinny storage outside the auditorium? It's right now the skinny storage.
Speaker 5 (44:01–44:02)
We're working on it.
Speaker 7 (44:02–44:05)
Yeah. You can't even fit a ball in there.
Speaker 10 (44:05–44:07)
Stay tuned, I think.
Speaker 5 (44:09–44:15)
Actually, that actually is a good question. Can the storage live inside the cardio yoga room?
Speaker 6 (44:17–44:18)
A separate room?
Speaker 5 (44:18–44:27)
Within the room, access within that room. Because that… That's a separate room access within that room. Yeah.
Yeah.
Speaker 7 (44:27–44:29)
We should look at it.
Speaker 6 (44:29–44:30)
Yeah.
Speaker 5 (44:30–44:33)
There's a couple of things that need to be involved.
Speaker 11 (44:37–44:49)
I think auditorium just size wise. I'm just curious with having the high school right next door with a huge auditorium. I'm just curious, could you steal space from that?
Speaker 5 (44:50–45:20)
For these, so currently we're holding square footage enough. For 350 seats, but we really have to do a layout to see where we land because obviously we're trying to work with the slope of the land to see, you know, as you navigate down and accessibility and all of these things and see how they play out with that. particular shape so I think that's also one of the next steps is to see where we land but the aim was to get 350 seats but we're open to discussion about if that's the right size.
Speaker 11 (45:22–45:32)
I just was curious since there's kind of reduced space with us might be some sharing opportunities with the school right next door?
Speaker 1 (45:34–46:10)
Yeah that was one that came up during the visioning too when we were meeting with the The teachers for that, because, you know, the introduction of the, of the auditorium was all new, you know, for us, you know, based on the concept study we got from the RA, you know, two years ago or something like that, it didn't have an auditorium. So, that was one of the things as we, good thing about doing the visioning that was there is as we did it, it all of a sudden, certain things became relevant or aware to us that we weren't aware of before this being one of them. So.
Speaker 7 (46:13–46:32)
Yeah, we weren't remitting those. That's a smaller than Pierce Auditorium. And the total enrollment for the building would be less than what Pierce is right now. If that makes sense, but…
I have a little bit of differences.
Speaker 1 (46:39–46:44)
You can keep going, Andrew, if you have others. Sorry, no more questions, I think, on the first floor.
Speaker 4 (46:45–47:08)
OK. I think that that's the extent of what I've got on the building update. Now, I'm wishing that you guys had shared the presentation, and I just said next slide.
Speaker 3 (47:08–47:13)
Totally fine.
Speaker 5 (47:18–47:48)
So that was pretty much the end of the slide deck. When we email it out, it will have the schedule in there. But again, as I said at the beginning, we're aiming for October 18. for the schematic design, and then we've scheduled out from January onwards for the pickup of DD and all the way to construction.
And you've already seen that schedule, so we can include that. But really, we're just barreling towards this October 18th deadline. Lots to do.
Speaker 10 (47:50–47:51)
Looking good.
Speaker 5 (47:52–48:04)
Also in the appendix, which we don't have to go over, are the plans from the July 1st. So we'll include those as well so that you can be reminded of where we were and how we landed here.
Speaker 1 (48:08–48:20)
Any other questions for the architects? Comments on schematic design that we were just looking at? that we'll check online, make sure nobody has a hand raised.
Speaker 7 (48:20–48:23)
Thank you.
Speaker 5 (48:23–48:24)
Good comments, thank you guys.
Speaker 1 (48:26–49:37)
All right, keep moving on. So item four, B, MSBA update. So as everyone remembers from our last meeting, we got invited by MSBA into, I think it's called their senior study or something like that, where they're going to be coming to District to visit the Cunningham school. It's basically the next step on our statement of interest.
Um, so they're coming, um, 17th. Yeah, so they'll be coming to Cunningham. I believe it's 12 30 to 3 30. Um, but they're coming.
Uh, so there's, you know, a certain amount of us that are going to attend with them, you know, to kind of walk through and, you know, give them the tour. So we met for meeting with, uh, Dr. Redmond, uh, scoping out, uh, a list of things to see there specifically, even the fourth floor Cunningham that we're looking at for, uh, renovation. Um, and just basically walk them through the school at that point.
So. As far as our update with MSBA, that's kind of what they have. See if anybody has questions or comments.
Speaker 7 (49:37–49:40)
Is this a new application or the original?
Speaker 1 (49:40–50:58)
It's the one that we submitted in April. So when you submit to MSBA, they get them all in in April. My guess, I don't know exactly, but they go through these applications that come in over the summer, into the fall, and then It's like a filtering process. So this is the first pass that they filtered out certain people that don't get the site visit and we got invited to it.
So the last time we got invited to it was in 2020. I think what Scott talked about last time that he corrected us at the meeting. So in 2020, when they came out, it was during COVID. So we had to hold that.
They had an iPad held up to give them the tour, which really wasn't impactful. And there weren't kids in the class. So it doesn't, you know, made it hard to kind of really show what the overcrowding was. This time, we'll actually be able to get into school, walk around, see the classroom, see the converted spaces, see the professional spaces and stuff like that.
So then essentially, because we've made it past that first filter, the final one is in December. And that's where the board meets and they vote to see who gets an invitation into their core program for renovation. So potentially in December, we could be invited into their core program, in which case that's a kind of big decision for us at the time.
Speaker 7 (51:00–51:17)
Is that something that's available that you have that I could see in our application? I'm just trying to bring myself up to speed. I'm just trying to get up to speed.
Speaker 1 (51:28–53:48)
Any other questions on MSBA? We'll check online. All right, hearing none, moving on. So item 4C, which are our fall meeting articles.
So at our last meeting, we discussed the potential of having two articles for a fall town meeting, one for interim project funding, which is basically the amount for the architects in the OPM to kind of continue through design development, or DD as we call it. And then the second one is talking about full project funding There are drafts that I have of them, so I'll just share my screen. Yeah, so this one that's here. So what we'll be doing tonight is basically voting to recommend these to the select board, along with the caveat that, you know, obviously, town council would have to review them and probably make minor edits and stuff to them.
The other one that we're working on with Arrow Street and also PMA Consultants is the final number. We know it's somewhere around four million, maybe a little higher. So that's Kind of where we're at. This would, as Shanali referenced it, they're holding January as a starting point to get going again and stuff like that.
So essentially they were on their, so middle on the 18th of October, their contract is complete. So they stopped work at that point. So from October until whenever we get those next funding, we're doing them. We're designed.
So all the design that you're seeing basically stops. And we need to pick that back up to kind of keep the project moving. So I'll just kind of open it up, see if anybody has any questions just on this article regarding just the funding for the design development.
Speaker 2 (53:48–53:54)
Let me double check to make sure.
Speaker 10 (53:54–53:58)
I mean, I myself would have difficulty voting on it because I haven't seen it.
Speaker 1 (53:59–53:59)
Seen?
Speaker 7 (54:00–54:03)
This project funding article is up here.
Speaker 1 (54:04–54:25)
Yeah, and it's basically more of the intent of what we're doing. So the final article actually gets, for us, this is the article for just saying, you know, this is the amount of money we're looking for. It's basically the exact same article that we did the previous funding for. It's just the amount has changed and the description is from schematic design to design development.
Speaker 7 (54:34–54:40)
Again, just the number of 4 million.
Speaker 1 (54:40–54:47)
Yeah, so part of this is that number, like these are draft articles that we submit up to them and that number we get to formalize this.
Speaker 2 (54:47–54:50)
We're getting our final numbers in from the Arctic.
Speaker 10 (54:56–55:10)
Now's the time to bring it up because I brought it up the last time. You know, the 173 is a new fact.
Speaker 7 (55:11–55:20)
And from what I hear, it'll be difficult to pass.
Speaker 10 (55:20–55:27)
And I'm just wondering if we're, you know, do we have a plan B?
Speaker 7 (55:27–55:34)
Because, you know, come, what I hear is most likely it'll fail. Might pass again a second time.
Speaker 10 (55:35–55:53)
it'll fail and then where are we and that's that's my concern and that's i think should be all of our concerns because it's likely from what i hear so i'm just
Speaker 1 (55:57–56:07)
is to put it to a vote, you know what I mean? So, you know what I mean? A word on the street is one thing, but a public vote is something totally different, so.
Speaker 7 (56:08–56:09)
It seems to me as an indication.
Speaker 1 (56:09–56:26)
Understood. It'll happen. Yeah. But, you know, that was part of the reason we were pushing to try to get it in November, to get it out to a vote, to kind of see the tree limits that's for this thing.
So, at some point, we have to go to a vote.
Speaker 12 (56:26–56:39)
Correct. But we also, I've also learned in this short amount of time that it takes a long time to get the public to know. And that's, I'm all in favor of a vote, but first everybody has to know.
Speaker 7 (56:39–56:50)
It was too quick for them to know. Everybody, all of us know because we're active in it, we're involved in it, but I walk down the streets and I talk to people and they have no idea what's going on.
Speaker 10 (56:50–56:54)
So that's the challenge is letting people know so they can vote.
Speaker 1 (56:55–59:16)
So if you go back to my presentation to the select board that I gave, there was a timeline that dealt with engagement of the public. So we didn't want to start doing that until we knew it was going to a vote, right? Because if we did it now and there was no vote in November, people would forget about it. So again, with a campaign like that, you have to ramp it up to when the vote's going to be.
You don't want to do it six months before, then go dormant, and then call a vote six months later. So if you look at the presentation they gave to the select board, it had a timeline of everything. And the last portion of that timeline, after hopefully they got on to the secretary, was a full engagement campaign to do all that. So we fully recognize, you know, it's It's gonna be a lot.
The number, I'm sure a lot more people are aware of it now, too, hearing what the number was. That's why, for me, it's just more of, it's a large number, but at the same time, when you look at it, the big thing you hear me start saying about this, this isn't an expense. This is 100% investment in the town, right? This is a facility that's gonna house 700 kids over the next 50, 60, 70 years that that building is going to be there.
Figure out how many kids that is, and then do the expenditure for those kids. That's the thing that a lot of people when they talk about this and get scared by the number, this thing is an investment. That's what you're going to hear from me through this whole thing, that this is not an expense. We're not taking 173 million and burning it in the backyard.
We're building a school for kids. So for me, everyone's going to have their own take on where this is going to line up, how they're going to vote. Let them vote. The article we're talking about now is just to keep the design going.
Part of the concern is, what is the plan B? As of October 18th, when their funding runs out, there's no plan B because we have no more architects, we have no more professionals. What we're trying to do with this article is to get funding to keep us going.
Speaker 12 (59:17–59:19)
But the point B is outside of this.
Speaker 1 (59:20–59:47)
It potentially could be part of this. But, you know, I mean, there are options that we're looking at for other things. For example, you know, we've started looking at reducing the cost. If you remember, we started at over 200,000 square feet.
We brought it down to 167. We're bringing it down even further. So part of the refinement, we understand cost is a concern, and we've been working on refining that. I don't know, you know, square footages were there.
Speaker 5 (59:48–01:00:10)
They're close to the $127,000 school. So combined with the preschool, $152,000. I think we're a little, like a couple thousand over. But again, as we're refining, if we were $20,000 over, that would be a bit different story.
But I think we're just a couple thousand. We're still massaging that center core. As you heard, we had some extra pop spaces.
Speaker 1 (01:00:10–01:00:40)
So we're in the ballpark. Glenn texted me to make sure he didn't have his hand up. So, we, yeah, so essentially, you know, the article that we're talking about here, this is one that we all talked about at our last meeting. So, this for us, like, I understand the language is the first thing you've seen here, but this is all talked about at the previous meeting.
So. Oh, yeah, thanks.
Speaker 13 (01:00:40–01:01:05)
Yeah. Yeah, Sean, I thought, and maybe I misunderstood, I thought part of the reason for continuing to fund the design effort was to assist in answering the questions that I think it was the select board had about some of these costs, both operational and construction hard costs. Correct. Okay, thank you.
Speaker 10 (01:01:13–01:01:25)
And I would actually talk to them about if the questions are going to delay and cost money, I would talk to them about withdrawing those questions. Well, it's only Roxanne.
Speaker 6 (01:01:25–01:01:27)
She's the only one that asked any questions.
Speaker 1 (01:01:30–01:01:33)
Not trying to be cute. We're still waiting for that.
Speaker 7 (01:01:33–01:02:03)
Just generalizing the board. I have to be honest, this item coming up about the classroom needs assessment and my analysis changed everything for me personally. That's the main question. Not the report, but my analysis that I just quickly did of the classrooms and the class sizes based on the population and that's why I was looking for the population today.
That's my
Speaker 1 (01:02:04–01:02:19)
That's where I'm at. Yeah. And we'll get into the classroom assessment portion of it. So essentially, our main one here, again, just bringing it back, that we're talking about an article to get additional funding for the architects to keep moving on.
Speaker 7 (01:02:20–01:02:29)
Yeah. To be clear, without this funding, we're not doing it. We're not answering any more questions. We're not refining the project, bigger or smaller.
We're doing nothing.
Speaker 1 (01:02:29–01:02:29)
We're on hold.
Speaker 7 (01:02:30–01:02:30)
Yeah.
Speaker 1 (01:02:31–01:02:37)
And we are going to be on hold from October 18th until whenever this funding article gets approved, gets fixed.
Speaker 7 (01:02:37–01:04:45)
Yeah. And we know that every day we lose the day of escalation and construction costs. And, you know, what was $173 million project, because it's not going to be built by August of 2027. We really probably shouldn't be saying 173 because it's probably an extra I don't know if it's 2.5% or 5% escalation.
So that's another $5 million, $8 million that we're just going to add it on from here. So now we're going to have a closer to 180. Any delay is not good for our kids, not good for our staff. We have to walk through the buildings all the time.
We get stuck to the brim. We have the largest student enrollments The third largest in Milton's history. Well, second largest in Milton's history, third largest kindergarten class in Milton's history. Larger than we were last year.
It's not going down. People keep saying it's going down. Great to go down, because that would mean the kids had more space. Staff had more space.
Not happening. It's hopeful thinking. It's not solutions-based thinking, in my opinion. I think we got it.
move forward in some direction. I'm completely with you, Sean. My preference is to get in front of, because I hear the opposite, John. I hear people all the time saying how much we need the school and how much we need to vote for it.
I think both those things are true. I think it's true if you're hearing that, I think it's true if you're hearing me, and I agree with Sean that we don't have any polling in this town. It'd be great if we had polling. We don't have that.
The only way to poll is to get in front of people and vote, which is, And it gets back to the idea of getting in front of town meeting and to fall under the bull funding article, because then at least we get feedback from town meeting. And that it's at least a larger representative body than, you know, this group, school committee and select board, which at this point are the only three groups that have voted on this. And two of those three have voted to support it. So I will make the motion to recommend this one article to the select board for the fall meeting.
Speaker 1 (01:04:46–01:05:10)
That was one friendly comment with edits by Tom Console. Just in case there's anything. Any other discussion? And only one thing I would note is the approving people that you were saying on there.
Once this goes, just for other people that might not know, this will go in front of the Warren Committee.
Speaker 7 (01:05:10–01:05:23)
The Warren Committee will be voting on it too. Yes. It's like what else is the one that those put it on the wall and warranted committee just wants to support it or recommend it or not recommend or.
Speaker 2 (01:05:28–01:05:30)
Any other discussion.
Speaker 1 (01:05:37–01:07:40)
So Roll call vote. Mark Warren? Yes. Terry Harrell?
Yes. John Cornyn? I'm abstaining. All right.
Tim Lumber? Yes. Glenn Hoffman? Yes.
Sean O'Rourke is a yes. I'm just double-checking to see if I was able to join. I don't see him on there. All right, our second article is, as we discussed, was in article four.
This is essentially, I think, Mark, you talked about it last time, and Kerry, you mentioned it too. So we looked at basically drafting an article that reflective of the debt exclusion article that was done for the fire station building committee. It's basically the same form and field, larger number, of course. But it's basically there for this, for the appropriation for the entire project that's here.
So just for everyone's understanding, if the $4.5 million that we just talked about, $4 million, call it $4.5 million, somewhere in that window, the, if that did get appropriate, that would then get rolled into this. So it's not additive. It's not 173 plus four and a half million. That's some of the language we'll need town council to kind of weigh in on this one too.
Essentially with this, the article basically spells out what the product is, the funding request, description of the property, and then the recommendation that's down there, again, kind of follows what was there previously for the fire station building committee for their projects.
Speaker 7 (01:07:51–01:08:38)
My question kind of gets back to my point on the escalation. Is the original estimate of 110 degree mode assumed at a certain start date? Do we believe that with the current timing, we need that start date or at least six months? I don't, I guess my question is, I know we, there's no way we're going to be, obviously, August of 2027, right now, to survive a year.
It doesn't really help us because, you know, but groundbreaking might, I guess, not be delayed as much as we open up the building, and that's usually when the kind of escalation is kind of important. But anyways, just wondering that as it relates to kind of this number, is that, again, that we actually need to cut the project in order to meet the 173, given that we've added escalation time to this.
Speaker 1 (01:08:39–01:09:46)
So my take on it is the 173 million that was there had a certain amount of contingency built into it, right? And if this were to pass, say in the, so a couple things too. So if this were to pass in the fall town meeting, it would be good essentially for 90 days. And within that 90 day window, the select board would have to call a valid question for the public to vote on.
If they do not call a valid question, a ballot question would essentially expire. So, you know, it's only been for eight days. But my take is if we were to do this at the fall town meeting, if it were to pass and there was a ballot question within 90 days, I think we're in a tight enough window there where before we were saying we'd do it in November, if we got all the funding, you know, 60, 90 days later or something like that, I'm not that worried about the escalation cost you're bringing up. If it deleted by two or three years, I'd be a little more like, yeah, we might want a larger number there to cover that.
But just on that kind of timeline, that's where I was comfortable.
Speaker 11 (01:09:48–01:09:53)
Here is a possible reduction of scope, correct? Yeah. That might offset that 173.
Speaker 1 (01:09:54–01:10:15)
And the key thing with this, as I said before, it's a ceiling. So it's 173 million It's an authorization issued debt. It's not a blank check. It's not a $173 million check.
It's basically a budget number that you have to work to. So yeah, but we can keep it lower in certain things mode that we don't want to have as part of it. For example, if we could share the auditorium and cut up the auditorium.
Speaker 11 (01:10:16–01:10:34)
Well, I don't want to do that. I love the arts and my kids are in drama, so I'm not proposing that that's a great idea. I'm just trying to be critical, because I know that everybody's talking about this number. So I don't want to get rid of it.
I would build two of them if I could. I think we need arts a lot more than we need a lot of things in this town.
Speaker 9 (01:10:34–01:10:34)
OK.
Speaker 1 (01:10:35–01:10:46)
Yeah. But essentially, in response to your question for the $173 million, that's kind of my thought process. Anyone has anything to say?
Speaker 11 (01:10:46–01:10:48)
And a bigger gym. And a bigger gym.
Speaker 1 (01:10:50–01:10:53)
Two-level gym, right? And stacked on top of each other.
Speaker 11 (01:10:53–01:10:59)
Oh, I spend a lot of time in fountains. Massive.
Speaker 2 (01:11:01–01:11:02)
We have more land.
Speaker 5 (01:11:02–01:11:04)
We do. We have a lot.
Speaker 2 (01:11:05–01:11:06)
I found my greenhouse gases.
Speaker 7 (01:11:14–01:11:24)
I'll make a motion to recommend this one article as well to the select board and submit it to the Warren Committee for the fall calendar.
Speaker 11 (01:11:26–01:11:26)
Seconded.
Speaker 1 (01:11:27–01:11:33)
Carried seconds. All right. Any other discussion? Again, just keep an eye on the line just in case I miss somebody.
Speaker 11 (01:11:34–01:11:40)
And I think with this one too, we need the caveat that Town Council may make some edits.
Speaker 7 (01:11:40–01:11:42)
Correct.
Speaker 1 (01:11:43–01:11:46)
Sorry, Tim dropped off his text.
Speaker 10 (01:11:46–01:11:47)
He did.
Speaker 1 (01:11:47–01:12:07)
Yeah, but Glenn's still on, so we do have a forum, so we're good. Yes. Thanks, Glenn. All right, any other discussion?
And hearing none, so we'll go to roll call vote. Mark Warren. Yeah. Carrie Hurley.
Speaker 10 (01:12:08–01:12:13)
Yes. I haven't seen it. I have to abstain until I can see it.
Speaker 1 (01:12:13–01:12:42)
Glenn Hoffman? Yes. And Sean O'Rourke? Yes.
Here's some easy votes. Review and approve project invoices. Vote for PMA, invoice number seven, which was for the work done in July of this year, and invoice number eight for August of this year. They're in your packets.
Speaker 8 (01:12:43–01:12:55)
It's just one thing to note, they are listed as draft, just because I haven't gotten the final, final from my account compartment. So I won't submit them to the town until I get the actual final, like the value of that change.
Speaker 7 (01:12:57–01:13:10)
Okay. I know you all sent the budget, the master project budget. The bill to date, does that include these or not include them? It would include those, yes.
Speaker 11 (01:13:23–01:13:31)
I'll make a motion to approve PMA Envoys 007 and 008. I will second.
Speaker 1 (01:13:32–01:13:38)
Second, same discussion. Hearing none, roll call vote. Mark Florey? Yes.
Gary Hurley?
Speaker 3 (01:13:38–01:13:39)
Yes.
Speaker 1 (01:13:39–01:14:48)
John Cochrane? Yes. Glenn Hoffman? Yes.
And John O'Rourke? Yes. All right, moving right along. Item 5A, Item five, new business, a discussion classroom needs assessment 82724 report.
So as everyone knows, they got a copy of the classroom assessment report that was sent to the select board. Yeah, no problem. That was sent to the select board for their review. So we had a copy of that got sent to us to kind of take a look at.
So I forwarded that to everybody so they had a copy of it. Myself being in the numbers. So this brings back essentially memories from like three or four years ago, like after our first year where we kind of ran through these numbers, dove into it. So I get a presentation because for me, the graphics just speak easier.
So let me dive into it. I'll share my screen. Double check to see. Let's double check.
Speaker 10 (01:14:49–01:15:06)
So,
Speaker 1 (01:15:07–01:18:20)
As everyone's aware, with this graph that we have here, this is the overall enrollment for the town. It's updated every year for town meeting. We go through it. The main one that we talk about every time is that horizontal yellow line at 1900, which is the elementary school capacity.
That's the key one when we're looking at this. Our goal is to get all the buildings back to their as-designed capacities, not their, you know, what they're being used for today. So what we did, you know, I'm trying to understand what was going on with ERA's study previously. We were looking at some stuff, right?
All right, so, as we went through, you know, you have to understand what the buildings were built for. So, the buildings, if you take the original floor plans and walk through those floor plans, looking at them for what he uses classroom spaces, grades 1 through 5. Kindergarten or preschool classes, which are a different size classroom that have dedicated bathrooms to them. Other rooms that are there are using computer labs, cafeterias, and special ed.
So as we've gone through these before, and basically, you know, had the color coding that we have here for what the spaces are. So as we add up all those spaces that are there, and I apologize for kind of running through these quick, but they'll be printed and provided. But the summation of them, when you look at those classrooms for Glover, Tucker, Cunningham, and Klobuchar, You come up with a total number of 77 classrooms for grades one through five, and kindergarten and preschool classrooms of about 17. When you look at the total students per classroom, what the buildings were designed for, they were designed for approximately 21 students in a classroom for grades one through five, and 18 students in kindergarten and preschool.
So when you take those numbers, Yep. When you take those numbers and multiply the kids in the classroom by the number of classrooms, you come up with the building capacity is. Similarly, for preschool or kindergarten, about 18 kids, 17 classrooms. Bring you to 356.
Total enrollment is 2311. The thing when you walk through the remainder of this, but this is more just a summary slide here. When you're looking at the analysis that was done by the citizens, They use the actual enrollment of 2018 as their starting point. All right.
When they're doing that, it doesn't acknowledge the overcrowding that existed at those times. So, at those times, you had 338 extra kids in grades 1 through 5 over the building capacity. You also had 50 extra kids in preschool or kindergarten. And there, again, there was overcapacity.
So roughly, unaccounted for, there was about 400 kids. When they did their analysis, that's where some of the confusion, I think, came out, that they weren't accounting for classrooms that were already existing at the time.
Speaker 10 (01:18:23–01:18:34)
So the- Can you go back to that? Sure. The 19, what is that? 23.
1955, they had actual enrollment.
Speaker 9 (01:18:35–01:18:35)
Yep.
Speaker 10 (01:18:36–01:18:39)
Okay, I get it.
Speaker 1 (01:18:43–01:25:54)
So, page 7 of the DRA Space Needs Study looked at, had three columns for it. It had current usage, assumed program, and then essentially the shortfall, which is the delta between the two. the report that we got utilized current usage as basically the starting point of the analysis. The problem with that is that current usage was in what was being used in 2018.
So, when you look at them for 2018, there are already a number of classrooms that were converted at that time. The presentation on this, I can see how it gets confusing. The architects, when they gave this presentation to the school committee, you gotta remember they gave this in 2019, where the school committee was on board, there were multiple previous presentations or working groups to get them to where they were. So I don't think they understood the audience that would be looking at this.
What are we 5 years later now? Right? So. Looking at it five years later, they probably would have been better to have an initial column of what were the buildings built for, what is their current usage in 2018, what is the assumed program, and then kind of see what those differentials are there.
The other one that plays in, you know, so the report that we're reviewing it looked at grade sizes. So as you saw previously when I was calculating, we had 18 in kindergarten and we had 21 in the grades one through five. Their analysis looked at kindergarten with 22 and grades 1 through 5 with 23 students. Again, the problem with that is that was based on 2018 of current usage at 2018, not what the buildings were designed for.
So the starting point of their analysis, it just started at the wrong point. So that the way they calculate everything out, the arithmetic to come up with the classrooms is correct. But the the process by which they're started off was wrong. So, their analysis that they looked at, you know, basically focused in on kindergarten and classrooms grade one through five.
So, part of what I was trying to do too is confirm, you know, the grades, these grade configuration of class sizes when they did that. So, when I looked through, This is the page four of our DRA Space Needs Study. The numbers for the long-term projection, 1990, you see here, were for grades one through five only. The kindergarten that was here was 378.
So when you take the total classrooms that were envisioned before, the 95 that we just talked about, take 1990 divided by 95, the way that came to that is they had 21 kids per classroom. Kindergarten had 20 classrooms, and when you look at that, it assumes a classroom size of 19. So, those two assumptions that they use for space sizes align with, you know, what schools were designed for. So when you look at the graphs or the mathematics that they use for it, like I said, they were computing a delta.
So they were taking the projected number here, 1944, which was a three-year projection, and then 1990, which was a 10-year projection. They were subtracting off a certain number, 1821 in both of these. That 1821 is this point on the graph. If you remember from previously, calculated capacity for grades one through five was something about 1,600.
So what happens is that's where their numbers come off. So like I said, the arithmetic they were using to do it was right. You're taking a projected minus an actual come up with a delta and dividing it by a number of kids per classroom. Just the numbers they were using were off.
The other one to note, too, is in the study they said they focused on, I think it was pages 4, 7, and 8, or 4, 6, and 7. Page 3 is more the important one that's there. So page 3, which is shown on the right, includes preschools. So the numbers, when you add up the numbers and look at it from the graph they were looking at on the left, the graph on the left are two separate graphs.
This is the black line, which is grades 1 through 5. And then there's the yellow line, which is kindergarten. If you know, preschool is not included there. So if you add those two numbers up on the yellow dots that are there, you come up with the total enrollment of 2177, which is not right.
The total enrollment at that time for all schools, pre-K to fifth grade, was actually 2457. It was a difference of 134 for preschool. So again, when you go back and you look at the calculated capacity of the schools at 1923, you focus in that 2018 number that's there, that's where you start seeing where the differentials are or why their numbers were off or what they were doing. So when you plug those baseline numbers back in from what we had for baseline capacity for the schools, the numbers actually work out.
Previously, their calculation was 0.9, not four. Our calculation shows 3.68, 3.7. So basically four, right? The other one that we looked at when we did the same capacity numbers there, our numbers came up to 16 and 18, which are actually higher.
So it shows you the architects were using a little more conservative of a number there. So as I dug through these and looking, again, it became clear that they were looking at this, and they noted it in their text, that they're looking at what's in the district now. So the quote from that is from the meetings of the school committee at the time. The meeting that they referenced there from the school committee is when DRA came in to give the presentation to the school committee to say, here's our study, ask us questions and all that.
I recommend everybody go back and watch it. I watched it this weekend. Again, just to get further context, and to confirm some of the stuff that we're looking at here. So this is where, for me, again, they're looking at stuff as it was in 2018, not when the schools originally were built and designed.
So a couple of last slides. Again, when we're looking at this, in 2018, you can see we're roughly 400 kids, as I said, 388 over capacity at that time that we had. And as a reference point to people in 2018, these are what our rooms look like. We had art in our car.
We had kids in the stage, you know, sitting on the floor. We had classrooms and libraries. We had classrooms and gymnasiums. So, you know, with all this, this is kind of, you know, if we were to take those numbers and just say, yeah, they're right, this is what we'd be going back to, not to what the buildings originally were done for, were built for.
Speaker 2 (01:25:56–01:25:59)
With that, I'll just open up, see if anybody has any questions.
Speaker 11 (01:26:04–01:26:06)
Thank you for doing that.
Speaker 7 (01:26:06–01:26:10)
Thank you. And you're going to share it, so I get, like I said, oh yeah, definitely. I got to process it.
Speaker 1 (01:26:11–01:26:50)
Yeah, yeah, it's a lot to jump in, but like, I just want to let you know, it was like, we had dove into this literally, we've been doing this now for five and a half years, right? We did this four, oh, four years ago. specifically when I took over as chair is I want to make sure, similar to what you're doing, or what we're operating from is right, so we don't run off in the wrong direction. So that's why, for me, it was easy to kind of jump into this and basically dig back up, you know, my numbers, the same stuff you're doing, I've already done.
So I'm happy to trade notes as much as you want.
Speaker 7 (01:26:50–01:29:39)
Yeah, and me too. This kind of was a sidetrack. My main focus was where are we? Where are we right now?
That's what I started looking into. Yeah, so a couple of things just to add on, I think you know, great points. A couple things in addition to what you're saying is none of this addresses students with disabilities, right, which is a huge part of our space constraints in terms of the need for spaces outside of the regular classroom. Mandated spaces, right, based on IEPs, are percent of students with disabilities is a straight line up, right?
You can just go through the desk and profile. All this stuff is publicly available and very easy to find. If you want to use 2018 as the metric, which I agree, it's like not a good, not a good baseline. So that was 15.4 in a smaller district.
In 2024, we're at 18.6. Very short amount of time we've grown. That's a difference of about 150 kids. in addition that require special needs services.
And that's just K-12, it's not counting the pre-K extension. The pre-K, I think when the building was originally built, needed two pre-K classes, and now we're at seven, right? And those are very specific class sizes, restrictions, as you heard when we did the building floor with John Redden, Dr. Redden, and we talked about those, like how quickly you can make those spaces, what the mandates are from the state regarding spare footage.
So all of those are additional impacts on spaces that did not exist when the building was built, and they're things that have only gotten worse since 2018, since the original assessments, enrollments, Again, as we talked about, it was in 2018, 42-11. It's now 43, last year was 43-17. This year it's 44-30. That's a beginning of school.
These things aren't going away. School building committee was started five years ago because of, it's six years ago at this point, right? Five minutes. because of building constraints that just have not changed.
And again, they've only escalated. I also got to say, John, my feedback from how you went about this is that I first heard that at a select board meeting of these questions that you went to outside people and commissioned a study, essentially, versus like bringing that up in this group.
Speaker 12 (01:29:40–01:29:57)
You have to realize when I bring things up in this group, it's usually not received well, as in the last time with your email the very next morning about what I said, Richard said, about 173 million.
Speaker 7 (01:29:58–01:30:07)
I mean, that's a classic example of how, and besides which, this is a committee that reports to the select board.
Speaker 1 (01:30:08–01:30:19)
It does not. Okay, sorry. We're appointed by the town moderator. So, we report the town meeting.
Speaker 12 (01:30:20–01:30:24)
So, if I'm going to present something, I'm going to present it.
Speaker 7 (01:30:25–01:31:13)
But you have questions about the school building project again being the newest member, which I totally understand you're trying to get up to speed. But like, you could have come here with these questions with your data and said like, hey, this is my this is my findings like what's going on. You could have talked to. Peter and Glenn and Katie on the school park after the fact, though, John.
And you could have talked to John and Terry and these people. I've only been doing it now for a little over a year. So I don't mean to make myself the expert here. But at the last meeting, you made it clear.
This committee is 100% behind this new building. So therefore, any ideas outside of that Don't come.
Speaker 1 (01:31:13–01:31:32)
Yeah, I guess if I could, you know, I mean, no, but if I could chime in on that, John, as you stated in this meeting, you're getting up to speed. This committee has been working for five and a half years. I'm sorry I missed that. We've been working for five and a half years.
Speaker 12 (01:31:33–01:31:34)
And I appreciate that.
Speaker 1 (01:31:36–01:34:11)
There has to be a certain amount of respect for the work this committee has done over five years. to understand that we've pressure tested this, we've looked at it. And over those five years, we're working towards a solution. And we've come to a solution.
How meeting actually supported that solution, you know, I think by voting on a landslide, which you also voted on, too. So I think you supported the I understand your concerns of Would it be better to augment buildings to do that? That's a discussion we went through three years ago. So we went through that three years ago by adding on to the buildings, right?
Putting additional classrooms on. We further tax the common spaces of cafeterias and stuff like that. Whereas theoretically, could we build on a bunch of spaces onto the buildings and put 26 classrooms in? Possibly.
Would it work? No. Now you're running cafeteria classes for kids eating at 10 in the morning. They're already at 10.30, so that means they're going to go to 10, right?
You ever see a kid eat at 10 and last until 2.30 in the afternoon? So my point is, all the things that are being brought up, we have covered all those. We have exhausted all those. The funny part as we went through the land swap and I was talking to people about it, the acknowledgement that we needed a new school was evident.
Everybody says it. The chair of the select board says it, right? Yes, we need a new school. Everybody has said that, right?
When the land swap was going on, it was more of, yes, we need a new school. Is this the right spot? That's what everybody was saying, right? Because the ideas of augmenting the schools just doesn't work.
And it's been, That's kind of the exhaustion that we went through, again, three years ago. Now, if you and others want to go about it, please go. Honestly, I'm not saying not to. But again, we're not going to go back studying stuff that we've done three or four years ago and go back in time and hold up everything else that we're doing.
That's not our plan. The tone of that report that goes to select board, honestly, it should have came to us. The select board doesn't understand the detail that we've done. We don't.
We're charged with dealing with this, not the select board, right? And the tone of that, of hold all expenditures, don't pay the consultants, reappoint the entire school building committee and stuff like that. That's a bit drastic.
Speaker 10 (01:34:12–01:34:13)
That's a little bit.
Speaker 1 (01:34:14–01:35:02)
John, that is what you took on. That's not what I said. I understand, but this is the torch you're carrying. It seems you're carrying it, right?
So for us, you've come on, you've asked for specific things, right? You asked for the financials. We got you all the financials. Let me just finish making my point and I'll stop at this one.
You asked for financials, we got you that stuff. We've asked for other things, we've got you everything you asked for. Over a month ago, I've asked for dates for town meetings, I've asked for dates for warrant articles, I've asked for dates of this, I've asked for a to-do list. You've had two meetings at Select Board, not once has it shown up on an agenda.
When will it show up on an agenda?
Speaker 12 (01:35:03–01:35:08)
I can't, at this point with what's newly developed, I can't promise.
Speaker 1 (01:35:10–01:35:28)
First of all, you are our liaison to the select board. So you're saying you will not present this to the select board? Not right now. That is concerning.
That is, I mean, your job is to relay our needs to the select board and you're saying you will not do that.
Speaker 11 (01:35:29–01:35:38)
I can't, what are you asking me to do? Aren't you just a conduit? Ammo? You make a decision on what comes and goes.
Speaker 12 (01:35:38–01:35:46)
The last time it went on for the board, Nick did it totally on his own. The last time it went up there. So I assumed he'd do it this time, to be honest with you.
Speaker 1 (01:35:47–01:35:56)
You are a liaison. You and Glenn Hoffman. So the makeup of this committee, that's why every time I give a presentation, I go over the makeup. Can I?
Sure.
Speaker 12 (01:35:56–01:36:18)
I'll stop. So this all started five and a half years ago. What was the number? What was the budget?
We didn't have the program five and a half years ago. There was no discussion at all of any number? Nope. Okay.
When was the most recent number that was used?
Speaker 1 (01:36:18–01:36:23)
It was done when we did the land swap and we looked at square footage costs.
Speaker 7 (01:36:26–01:36:28)
we would work on 80 to 90 million.
Speaker 1 (01:36:28–01:36:35)
And that was construction costs of the buildings. But so what changed is 173 million.
Speaker 12 (01:36:35–01:36:58)
That's what changed. And it's a threat that this won't get approved. And then where are we? Six, eight, nine months, a year from now, where are we?
It's a very strong likelihood that it won't. If history is any indicator, So we let it fail. If it won't get approved, then we know.
Speaker 11 (01:36:58–01:36:59)
I just don't understand.
Speaker 7 (01:37:01–01:37:37)
I'm just like, at this point, it's your opinion, and it's the opinion of other people you hear from, which is like potentially the right opinion. Maybe you're correct. Maybe I'm wrong. But we do not know.
until we vote. And when we vote, at that point, if it fails, that provides a decision point where we can say, okay, this project is not going to get supported. And we can pivot to something else. But it doesn't make sense to abandon something that you've spent this much time on when you're this close.
If you can just ask people and say, hey, what do y'all think about this?
Speaker 12 (01:37:37–01:38:05)
And that's why I bring up my topic earlier about it takes time to let the people know. And the 173 just came up. It takes time to let people know. That's why November was too fast, because people didn't know.
Like, yes, I want them to vote, but people need to be let know. I walked down my street, I talked to people. They have no idea what's going on. I'm just saying, that's my, you're asking me where I stand, and that's where I stand.
Speaker 1 (01:38:05–01:38:16)
So, just to be clear, we're going to decide a president, a new president, right? A new Democratic electee. in a shorter time frame than what we would have had if we put this on the ballot in August.
Speaker 10 (01:38:17–01:38:19)
What is that point, the point being?
Speaker 1 (01:38:19–01:38:25)
That you're saying there's not enough time to understand this if we were to put it on in August for the November election.
Speaker 12 (01:38:26–01:38:36)
You're comparing letting people know about this school to the President of the United States letting people know about it. It's kind of a little bit of a stretch.
Speaker 1 (01:38:37–01:38:38)
There was time to do it.
Speaker 12 (01:38:39–01:38:43)
So you're using that as a comparison. That's quite a stretch.
Speaker 1 (01:38:43–01:38:43)
That's fine.
Speaker 12 (01:38:43–01:38:51)
So I'm saying we need to think about an alternative. So ladies and gentlemen.
Speaker 1 (01:38:52–01:39:11)
So to be clear. the request that we sent to you, I will send them to the chair of that and I'll send them to the remainder of the select board.
Speaker 11 (01:39:11–01:39:28)
John, can I ask a question? Are we operating in a situation where anything that we need to go to the select board going forward has to pass your judgment before it will go? I'm just trying to understand.
Speaker 12 (01:39:28–01:39:45)
You just said you're not- I have to be the only conduit. It hasn't been that case that I'm the only, but you're making it sound like I'm the only conduit to the select board, and that's not the case. So just let me go back. I mean, you just said you don't report to the select board, right?
Speaker 11 (01:39:45–01:39:48)
I guess it's historical. I guess it's historical.
Speaker 12 (01:39:48–01:39:50)
The person who sat near Steve.
Speaker 11 (01:39:51–01:40:04)
was that person who, if we had a conversation in this meeting and we talked about material going back to the select board, that person who used to be in your seat was in charge of doing that.
Speaker 1 (01:40:04–01:40:47)
And now there's a different person there. So just to be clear, the makeup of this committee, right? The committee was formed in February 2019, five and a half years ago, by town meeting. The makeup of that committee are five members that are appointed by the town moderator, right?
Gary, myself, Aqua, Tim, Scott. There are two members from the school committee, Mark and Celine. There were, as part of the makeup of that as it went through the Warren Committee, were requests to have school committee representation on there, and then also select board representation on there. Yourself and Glenn Hoffman are the two appointees to this committee.
Speaker 2 (01:40:47–01:40:48)
Good.
Speaker 1 (01:40:48–01:41:31)
So as appointee to the committee, your job is a liaison between us and the selector. That's part of the role that was done to form this committee. So if I may, so other committees you sit on, do you do the same exact thing for any of the other committees that you sit on when they ask you to bring something to the select board or do you consistently say no to them too? Because at this point, it seems so liberate that we just wasted a month for this, we asked you these things over a month ago.
I have the emails. It's been now a month and nothing's come. And now, a month later, you're saying you will not send this. You got to understand the pressure.
Speaker 12 (01:41:31–01:41:43)
I know. I know. I just, just as I was abstaining from that vote, I just not 100% behind all of this.
Speaker 1 (01:41:43–01:41:44)
Like you are.
Speaker 12 (01:41:45–01:41:47)
That is not the size of it.
Speaker 11 (01:41:47–01:42:03)
Your opinion aside, that's my point. You've got a whole voting population in Milton because you don't agree with it. You're not going to put it up to the select board. I'm just trying to understand this.
Speaker 12 (01:42:03–01:42:17)
Am I the only one that can do that? You're telling me that I'm the only one that can do that? No, what it is is that it's not… No, I just told you, historically, that's how…
But I'm asking you, am I the only one that can do that?
Speaker 1 (01:42:17–01:42:32)
There is what I would call a professional courtesy between boards or committees, that the relaying of information would essentially flow through the liaisons. If you're saying that's not happening, it's fine, we can send it to the… Let me rephrase it.
Speaker 12 (01:42:32–01:42:51)
At this point, I can't agree with going forward with full funding on this project for $173 million. As an elected official, as a board member, that is my prerogative. And I just can't support that right now.
Speaker 11 (01:42:53–01:43:38)
I guess you're missing my point, which is I don't really care what your opinion is. I care about the process. And if you can't represent this committee with just information, You don't have to have an opinion on it, but you do, we were under the impression, unless you said to us, I'm not gonna do it a month ago when we started this conversation, you should have been up front then, but you weren't gonna do this a month ago. But we're all under the impression that the way things have worked for five and a half years was that we have a conversation, whatever information that we need to flow up to select board and back down, and a response would be through that liaison on the select board.
Speaker 7 (01:43:38–01:43:45)
I guess the problem that I'm having is how do I present them something that I don't agree with?
Speaker 1 (01:43:45–01:43:48)
You can publicly say at the meeting that you don't agree with it. You've done it.
Speaker 11 (01:43:49–01:43:54)
I have been asked by the school building committee to come to the select board with this query.
Speaker 12 (01:43:55–01:43:57)
That I don't agree with.
Speaker 11 (01:43:57–01:44:00)
I don't care if you agree or not. But I would say that.
Speaker 12 (01:44:00–01:44:04)
But I would have to say that is what I'm saying. You might, I mean.
Speaker 11 (01:44:04–01:44:26)
I'm so confused by the voting rights of this town and how process works, because if we're going to continue, we need to understand if you're never going to present. I guess you've cleared it up. Actually, I'm going to back off. You're right.
I just I think it's absurd, absurd that that's your approach.
Speaker 7 (01:44:32–01:46:30)
I appreciate the transparency with which you're communicating today so we understand your position and how to act and move forward. And that lets us know that you do not want to be in conduit. That's helpful, and we know that. So I think that clarity pushes us forward and allows us to move forward.
I do think, as it stands, our goal to get this to a public vote at some point requires Select Board four out of five of them to vote, to allow the town to vote, right? Not vote to support the project. Select Board can still recommend to the town, vote no. Select Board, you know, through Milton's laws, has to at least allow, vote four to five, two thirds, to put it out to the town.
Right? And so I guess my question to you from a process question is like, you know, a lot of what we heard at the select board meeting when it was voted down to put it on the November vote was things like timelines, like too fast. We have questions that need to be answered. You're now saying, though, you don't support the project.
And so I guess my question is like, are there actually questions that we could answer or things about the project that would need to be changed? Or like, what is it that would, I know you can't speak for the whole select board, but you can speak for yourself with saying like, that would allow you to vote yes to allowing the town to vote on the project. To me, that is the key question for you, Roxanne and Richard, to see at least how we get two out of those. And, you know, if there's turnover in the select board, obviously anybody new who comes on to say, how do we get four out of five members to agree that this project is at least refined enough to go out to the town, regardless of your individual.
Speaker 11 (01:46:31–01:46:36)
Well, I believe, Sean, you just have to send the questions directly to the chair of the select board, correct?
Speaker 1 (01:46:36–01:47:22)
That's where I'm going. But I think Mark's point, Just going back a month ago, right? Like, after the vote from the Select Board to not put on a November ballot, which we understood, it's fine. It happened.
Nothing we can do about it at that point. But for us as a committee, yeah, just real quick. For us as a committee at that point, as I mentioned a month ago, was to say, right, there are three no votes. How do we get them to a yes?
And essentially, what do they need to know? My understanding from the chair before he acknowledged we need to do school, he just didn't want to do it then, he wanted to do it in the future. So, remaining votes would be you and Roxanne. You at that meeting here said, if there's not a debt exclusion in May, you will put it on the ballot.
Speaker 3 (01:47:22–01:47:23)
Right?
Speaker 1 (01:47:23–01:47:34)
So, that answered my two questions there. So, you know, as far as I understand it, come May, if there's no operational override, you've already stated that you'd put it on the ballot in May.
Speaker 12 (01:47:36–01:47:52)
I will, but I just think we need an alternate plan. I do, because I'm worried that this is not going to… What happens? What happens?
What happens when it fails? Let's just play devil's advocate. It fails. Then what?
Speaker 1 (01:47:53–01:50:29)
So there's already plans in the woods, from my understanding. because we have to talk at some point. This project is now delayed over a year, right? So we had, if we were in November and it passed the ballot, our operation was to open fall 2027.
We all understand fall 2027 is not happening. We just got the land in July. Awesome. Okay.
But that just happened. So we kept telling everybody it's going to happen. I understand, but still nothing could happen until that happened. Anything could happen.
But I'm just saying. No, no, no, no, no. But anything could have happened before that, right? But my point going on it was, so your point was for temporary solutions, right?
You're talking, if this doesn't pass, what do we do? All of the temporary solutions up to this point. Not temporarily, not temporarily. Let me get to this, all right?
solutions to kind of ride us over until we need a new building, which for me would be temporary, right? The Facilities Advisory Subcommittee of the School Committee has been dealing with the conversions and some of the temporary solutions, at least historically for the past five and a half years, right? They have been carrying that while we've been carrying the overall bigger project. So that's kind of where people ask, what are we doing in the temporary to fix some of the stuff?
We've delegated that to the Facilities Advisory Subcommittee, because they were doing it actually years before we came on. So the 2018 presentation that was there, talking about rooms that got converted, all those happened before we got formulated. That was Facilities Advisory Subcommittee under Bill Ritchie, covering all that stuff, doing all the bill votes and stuff. He would give us the information up here, some temporary things that we can look at and stuff to kind of ride us over.
But the overall goal of this, we took a vote again four years ago, to build a new building, right? So that's, again, where some of the emotion comes out for other people that we've been working for five and a half years now to build a new building, right? That's been the track we've been going down. The Facilities Advisory Subcommittee has been doing other, you know, the temporary solutions.
So the questions when you have those, I would say go to the school committee, go to the Facilities Advisory Subcommittee, understand what they've been doing as part of their work there. That will lead into some of the stuff. Go for it. Say it.
Just to make sure I respond. I'm not talking about not building a new building.
Speaker 10 (01:50:29–01:50:32)
I'm just talking about an alternative new building.
Speaker 12 (01:50:32–01:51:12)
I mean, we could build a new building, but… So start over. I'm just saying, as an alternative plan, because… What would the new building be?
I don't know. You know, one of the early plans. Well, we'd have to develop that. One of the early plans that were put out there that were ruled out.
One of the real confusing things to me is we're still talking about all this analysis is all about the elementary school and we're not doing an elementary school anymore. We're doing seventh and eighth grade, pre-K. I know, but we did all this analysis on the elementary school.
Speaker 7 (01:51:12–01:54:21)
That was from five years ago. And we talked about at that point, and we've talked about it since I joined school committee before, Sean's been talking about it, of how the problem is migrating to the middle school. I digress. I digress.
The middle school is the largest it's ever been. It grew by 150 kids, so over 100 kids in one year, just the middle school. That's coming to the high school. The high school grew by 90 kids.
But these are getting bigger. The problem, kids get older, and the problem is continuing upwards. And it's not like the grades are getting smaller down low. So the solution of the upper middle school was a unique idea of trying to solve the problem across all the sites.
Because any other plan to expand on any other individual building addresses the space constraints of that building, but it doesn't address the space constraints of any other building. And if you build another elementary school, you address space constraints of that building. You don't address space constraints at Pierce or the high school. You build another middle school.
You don't address every elementary school. So you need a project that addresses all of it to make it as cost effective as possible. Because otherwise, you're having multiple mobilizations, multiple project designs. You're compounding the impact to students, to staff, to facilities.
You're increasing costs. None of those things make the project cheaper. And that's all stuff the committee looked at many times over. Again, you could build a couple classrooms on Cunningham and help Cunningham, but how does that help Tucker?
It doesn't help Tucker, just saying. 123 is probably not going to pass. So the question then is, what's the number? In my mind, it's like, is it 150?
Is it 100? Is it 40? Is it 12? What is the number?
Because you could design something to any number. The issue is that we don't actually know that 173 won't pass. We don't know that 150 won't pass. We don't have any feedback from the town.
We've gotten feedback from three committees. school committee, select board, and school building. And out of that, two have voted in favor of the project, and one had a three to two vote against it. So even the majority of those boards are voting in favor of the project.
As Sean said, this town meeting voted in favor of the land swap. which you should assume they're not gonna do unless they vote generally in favor of like a new school project was going to happen. They might not be in favor of the 173. Maybe that number's too big.
It's very possible. Certainly it's bigger than I would like it to be. But we don't know, John, unless we have people set. Like anything else is pure speculation.
Speaker 12 (01:54:21–01:54:39)
The complaint about escalation and the complaint about we're doing it a long time is the decision you're making. Extended. Because if it gets turned down and it's very likely, based on past experience,
Speaker 7 (01:54:39–01:54:43)
I know you're going to say no. If you were concerned about escalation, we would have voted November, John.
Speaker 12 (01:54:44–01:54:48)
No, I'm saying you're the one who's concerned about escalation.
Speaker 1 (01:54:48–01:55:20)
You're the one who keeps bringing up as soon as possible. I think at this point, it's still on item 5.8, discussion of classroom assessments, right? I think we got a little off agenda topic in the air. You know what I mean?
to kind of close it out, I think. You know, everyone said their piece. You know, I think we know what it means to them. You know, John, I appreciate what you're saying.
I'm closing it.
Speaker 12 (01:55:20–01:55:41)
I apologize, too, for the bringing it. Half of it was that we really wasn't sure how to do it. Truth be told. At the time, I wasn't sure how to get it on the agenda.
The last time, and truthfully, the time before that, it was just on the agenda. I guess Nick got ahold of it from somebody or someone who was on the agenda.
Speaker 7 (01:55:41–01:55:45)
So I'm guilty of being uninformed.
Speaker 1 (01:55:46–01:56:00)
Are you talking about the… Trying to get it on the agenda with a select board. Trying to get the questions put on the agenda. And how did the space needs get on the agenda?
this topic we're talking about. Because I've since learned.
Speaker 12 (01:56:00–01:56:02)
I know how to get it on the agenda now.
Speaker 1 (01:56:03–01:56:04)
So that went on the agenda before I asked?
Speaker 12 (01:56:06–01:56:14)
Yeah. OK. I'm stuck. I'll be honest with you.
I'm stuck. The truth of the matter is I'm stuck.
Speaker 11 (01:56:15–01:56:16)
Close out the item.
Speaker 12 (01:56:16–01:56:18)
We're done. I'm stuck.
Speaker 1 (01:56:19–01:56:36)
All right. Moving on. I don't buy the facilities advisory committee report. So, as I mentioned.
School committee has facilities advisory subcommittee. Mark sits on that one. Selina sit on that one with you too.
Speaker 7 (01:56:37–01:56:38)
No, no. Okay.
Speaker 1 (01:56:38–01:56:43)
Yep. So, if you could take it away.
Speaker 7 (01:56:43–01:58:15)
Yeah, just wanted to give an update. Obviously, again, as Sean said, there's been a lot of reports previously about all of the short-term stuff the Facility Advisory Committee has done. And essentially what that does is look at existing space within the building and how we can convert that into more usable instructional space, staff-facing space, so taking storage spaces, taking cutting up spaces, converting things, staff work rooms into kindergarten rooms and all kinds of things. And so a lot of that work has been done by the school staff.
Again, shout out to Glenn and people even before him, and that work now continues. Tom is a big part of that now. Chris Haden was part of that last year and folks before that. essentially looking at what the existing spaces because we do not have a budget to add on and the most cost effective way to improve spaces to use what you already have so over the summer.
You know, we look at a lot of things, too, beyond spaces, but I know we all care most about space. Essentially, what we did was we had a large incoming kinder class, and most of those kids were from Calicut, zoned for Calicut. So in order to help that, we cut up part of the Cunningham Library. It was one of the spaces that used to have partition walls.
Tom and his team, shout out to him, took those walls all the way up in order to make a more sound, appropriate space. It does mean we have now got a more permanently lost space within the library.
Speaker 1 (01:58:15–01:58:31)
Please. Yes. So is that the second grade classroom that was already there that had the pictures that we had before that had the partitions? Is it that space on a floor plan that's not a second grade space now, but full kindergarten with walls all the way up?
Or is it another space within the library?
Speaker 7 (01:58:31–01:59:19)
No, so the last year, so two years ago, there was a classroom in the library with the half partition walls. That was a second grade space. Last year, that space got turned into a teacher workroom. It was a second grade space because we had the flooding issues of the Cunningham, right, which displaced two classrooms.
Um, well, anyways, we, we turned, it was a teacher worker last year. It's now been converted back to a classroom. It's not a kindergarten space. It's a, I'm not sure which grade, maybe second.
Okay. Uh, but that's the space that's been remade a classroom. It was a classroom two years ago. It's not a classroom back with full walls.
Okay. You were talking about the large kindergarten class. That's why I thought you were talking to the large. So the reason why is because colleague, again, it's like a puzzle.
Speaker 1 (01:59:19–01:59:19)
Yeah.
Speaker 7 (01:59:21–02:02:37)
We had a large fifth grade cohort at Glover. that moved up to Pierce, but Pierce is big, but the kids were not zoned for Glover. They didn't want to put them out of school. They weren't zoned for.
This is one of the restrictions of the space stuff, right? So you have a large East Milton group. You don't want to have them go for the next six years to a school that they're actually not zoned for and their kids, their friends and neighbors don't go to. So we need to put that at Collicott.
How do we do that? Cunningham was stealing a room for Collicott. We take that room, give it back to Collicott, to Cunningham, put them in the library. This is also why, by building that room, the Glover now gets an extra room for this coming year, which they're turning into an art room.
And all likely the Glover next year will take it over to kind of the balloon classes. Because essentially every one of these years, there's like one school that takes the balloon class, the extra kindergarten class that stays with them throughout the course. And then when they get fifth grade, let it go and take in a new kindergarten. So Collie Hawk took that extra kindergarten this year, even though they didn't really have the space for it.
But just because of zoning and Glover is the beneficiary of an extra art room. At Pierce, Tom and again his team put up two other walls and spaces that had been temporary and a classroom and pull out spaces that had been temporary at this point eight years, nine years. So there's a lot of this stuff where it's, you know, they were hopeful it was temporary, didn't spend any money on it, so they did some partitions and it just, you know, at this point it is permanent. And so, put those walls fully up to help with the sound and make those spaces much more usable.
There have been some, you know, conversions. We've been working on the Cunningham fourth floor. That was another big thing. We obviously, as you all know, got funding for that last, last town meeting.
The Tom and his team, again, shout out to Tom. It's kind of cleared out a lot of the fourth floor, opened up corridors to make it kind of code compliant, and they moved the teacher workroom up there. It does not have the heating, fire stuff that we could put students up there, which means that at this point, it's very limited in terms of what we can put, because there aren't a lot of non-student-facing spaces within a school building. But the teacher workroom can go up there.
That's the shared teacher space for both Collicott and Cunningham. and so they're maybe just cutting in. It's just cutting in. And so they're up top and will be for this year.
You know then Thompson made it look pretty nice but still pretty bare bones space. We are working with Arrow Streets who are working on designs for the fourth floor build out as well as the current library reconfiguration because the current plan would be to convert the fourth floor into the library along with some pullout spaces for students that would require co-compliance, ventilation, fire sprinkler systems, things like that all on the top floor as well as student bathrooms. So that's on the fourth floor and then the current library would be cut up further than it already has into additional classrooms to add some additional classrooms.
Speaker 1 (02:02:38–02:02:46)
space. So essentially at that point, the library is fully gone on that floor and relocated up.
Speaker 7 (02:02:46–02:03:48)
That's right. That would be the plan. And that's because the ceilings are very large. It's a very nice space on the fourth floor, but it's very, very large and kind of open.
So unless you're cutting all that off with drop ceilings, it's good for a library. So that is kind of where we're currently at with that. We only got the funding on July 1st, so we're not able to do much more than what Tom was already able to do with the fourth floor space. But we need a design, and then we need to go out and bid.
And we are looking at cost estimates for the next meeting. Eric Streeter's joining the facility advisory committee, and we'll go over cost estimates for that project and talk about kind of what what we can do, but our current budget is $2 million, which was estimated at about $500 a square foot. That's where we're at.
Speaker 10 (02:03:48–02:03:49)
Any questions?
Speaker 1 (02:03:50–02:04:09)
Let me double check online, see if everyone's still on there, just to make sure. Questions, comments? Seeing none, and item 5C is an enrollment update, student enrollment update. So you're giving that one too?
Yeah, I can give that.
Speaker 7 (02:04:09–02:05:23)
It's just, I mean, that's something we look at also with the facility advisory, obviously, as we did with our old Collicott, Lover, Cunningham, kind of kindergarten, re-integration stuff, just where this gets going. So I shared some of the numbers before, but, you know, overall, total district enrollment last year was 4317. And actually, if you look at the DESE numbers, it was 4320. And as of when we met last school committee meeting, it was this year 4430.
So that's, you know, 100, extra 100 kids. A lot of that is at Again, the high school, I'll clarify, high school has 10 extra kids, not 90 extra kids. Pierce is where we have 100 extra kids. Again, we're at over 1,000 students at Pierce now.
And then the other schools all up a little bit, down a little bit, but overall, again, lovers down a little bit, but they've also on those classrooms, up a little bit to the game classroom. But overall, we're at about 113 kids. more than we were last year.
Speaker 11 (02:05:25–02:05:32)
Is the increase of peers in the 5th grade, that large 5th grade class coming out, or is it because people didn't leave like they normally do in 7th grade?
Speaker 6 (02:05:33–02:05:37)
I think it's the class coming out more than doing that.
Speaker 7 (02:05:38–02:06:16)
The departures was somewhat static. Well, our 7th grade last year was 331 and our 8th grade right now was 332. or sixth grade was 352, or seventh grade this year is 359. So those cohorts are not getting smaller, at least.
It might have left, it might be that the same number of kids is leaving, but we're just getting more kids coming back or moving into the district at that age. But yeah, the sixth grade got bigger, seventh grade got bigger, and the eighth grade got a good bit bigger, because the eighth grade was the smallest cohort.
Speaker 11 (02:06:17–02:06:30)
I just know that BC had Usually Milton is the largest and they're wondering what happened to Milton at BC High this year in the seventh grade, because we didn't show up in the same numbers.
Speaker 1 (02:06:31–02:06:43)
I think the sports programs, they're doing pretty well. So the kids may want to stay.
Speaker 11 (02:06:43–02:06:49)
I think it's awesome. BC High's sports teams are pretty amazing and nobody can get on the teams.
Speaker 1 (02:06:50–02:06:53)
I was at Fenway this year, and they recognized a bunch of other schools.
Speaker 11 (02:06:53–02:06:55)
So they made you have a better chance, Dan, than Milton.
Speaker 1 (02:06:55–02:07:01)
Literally. I was at Fenway, and they recognized a bunch of high school teams. Literally, I think there was like five or six BC High.
Speaker 11 (02:07:01–02:07:03)
Rugby and baseball were there, yeah.
Speaker 1 (02:07:04–02:07:06)
I was in a Catholic conference against them while I was in high school.
Speaker 11 (02:07:06–02:07:13)
And it also could be BC High had a 10% increase in their tuition costs. Right.
Speaker 7 (02:07:13–02:07:16)
One other thing, just with enrollment, I think this goes back a little bit.
Speaker 11 (02:07:16–02:07:19)
Just curious, selfishly.
Speaker 7 (02:07:19–02:08:48)
A little bit to the report, the reference to NASDAQ. And this is something, again, I credit Glenn because he talks about all the time, is just how much you need to take NASDAQ-projected enrollments with a grain of sand, a grain of salt, a little bit of sand. And so again, like the NASDAQ projections last year for this year said we'd be at 4419, we're at 4430. They said, you know, you go back to 22, the 22 NASDAQ projections, they said our enrollments this year would be, you know, 4209.
So they're just, you know, they're just not vital. They need to be taken, with a grain of salt and understand that they have been off, they can continue to be off, especially the further out we go, as you can read these reports that are now 10 years out using the second projections. They're just very wildly inaccurate at that point. But even a couple of years out, they have been off for us.
Speaker 1 (02:08:48–02:09:39)
Any questions? Hearing none. All right, moving on. Second to last item, future meeting dates.
So we've got September 23rd in there. I think at this point we'll keep it as a placeholder, just see if there's any updates of anything. And essentially that's the night before the next select board meeting. So I think we need to kind of hold it as a placeholder and then depending on if we don't have any agenda items, there's no need to hold the meeting, just hold the meeting.
So, unless anybody had a problem with that, we're just going to keep that on there for now. If we cancel, we'll just audible and figure another meeting after.
Speaker 10 (02:09:39–02:09:45)
I assume we're going to have some updates if you guys are ready though.
Speaker 7 (02:09:46–02:09:51)
Yeah, that's my guess. You know, we've got to work with you guys on something.
Speaker 5 (02:09:51–02:09:58)
Yeah, I've been talking to Charlene, and I don't think our next meeting with the working group is until the 24th or the 25th.
Speaker 1 (02:10:00–02:10:06)
thing big comes up, the audible and then we give you guys a chance to present an update.
Speaker 10 (02:10:07–02:10:11)
All right, that's good.
Speaker 1 (02:10:12–02:10:12)
Sound good?
Speaker 9 (02:10:13–02:10:13)
Yeah.
Speaker 1 (02:10:13–02:10:25)
All right. Good meeting. Everybody's favorite agenda item, item seven, adjournment. So I entertain the motion to adjourn.
So moved.
Speaker 12 (02:10:25–02:10:26)
Second. Second.
Speaker 1 (02:10:26–02:10:29)
All right. Roll call vote. Mark Loring? Yes.
Kerry Hurley?
Speaker 12 (02:10:29–02:10:30)
Yes.
Speaker 1 (02:10:30–02:10:36)
John Cohen. Yes. Glenn Hoffman. Yes.
And Sean O'Rourke. Yes.
Speaker 14 (02:10:36–02:10:38)
Thank you very much. See you all in a couple weeks.