Speaker 1 (00:21–00:22)

Good evening.

Speaker 2 (00:22–02:15)

Welcome to tonight's meeting of the Melbourne Public School Committee. We'll start this off by calling the meeting to order. Please stand and pledge allegiance. I pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.

Thank you very much. Second item on the agenda is to approve tonight's agenda. If everybody could look it over and let me know if there's any committee reports that need to be struck. Seeing no objections, I will take the agenda as approved.

We will move on to item number three, public comments. For public comment, in accordance with school committee policy, we welcome members of the community to share their perspective with us during public comment. We have set aside up to 15 minutes for this part of the meeting and individuals may speak for up to three minutes each. While the school committee does not respond directly to public comment, there may be opportunities for members to address issues that are raised over the course of the meeting when relevant topics are on our agenda.

We strive to engage in respectful discourse during our meetings ask that public comment speakers keep that in mind. Speakers should introduce themselves and provide their address or their record. Is there anybody here for public comments? One person in person which we'll go ahead and welcome up and if you are online and looking to speak if you can just Don't forget to introduce yourself.

Speaker 3 (02:15–02:27)

Okay, thank you. For those of you that don't know me, I'm Erin Bradley, former Select Board member and town meeting member of Precinct 4. I have one child that graduated from Milton Public Schools in 2021.

Speaker 4 (02:28–02:28)

Ouch.

Speaker 3 (02:29–05:00)

And the other one who is currently a junior in the school. I'm here because I had the pleasure of watching you guys work for many years when you tried to figure out your new calendar. for the school year. Remember that?

Some of you sat here for many months, discussed it, tried to figure it out, make sure it was equitable for all the students. I'm here today to talk to you about a reoccurring issue that continues to happen with the Milton High School track team. Last year, it was the graduation that was in conflict with the Division III state championships. This year, it was the prom.

I completely understand about graduation dates. I get that. I get it set in stone. Understandable.

However, the prom is not set in stone. The prom is a date that we pick, and we pick it at the beginning of the year from our student body, and we make a reservation. When my son's father called the principal when we first found out when the date was, the principal said to him, well, do we even know that we're fielding a team there? So let me just tell you what the track team did at the Division III State Championships because it seems to me that there might be a disconnect with how big of a team this is and what exactly they do for our town.

We had five state champions, five people medaled. They are the champions of the state, just like the hockey team, just like the football team, just like the theater team that won, same thing. I'm gonna say their names tonight because it's not often that they get their names said. in a public forum.

The first one, oh my gosh, it just refreshed. The first one's name is Jonah Stevens Roy. He's a sophomore, so this is gonna be a consideration for the next few years, because let me tell you, he's gonna medal. Not only did he win one, but he won two medals.

He won both the 110 hurdles and the 400 hurdles. Amazing, amazing athlete. The next one is my son, also an amazing athlete. Robert Beato, who won the Division III 800 meter.

Ella Turner also won gold in the high jump. Annalise Aguilar was the fifth gold medalist, and she won the 100 hurdles. All in all, they fielded, scrolling back up in the coach's email. I only have 30 seconds left.

Can I take somebody else's time too?

Speaker 5 (05:01–05:03)

All right, I'm going to keep going.

Speaker 3 (05:03–07:16)

So they won 20 medals. Top eight, 20 medals were won. When we tried to talk to Principal Cahill about this, she informed me that there's no conversations that happen between the AD and the principal regarding scheduling of these items. I understand that there's a lot of sports.

I understand there's a lot of activities. However, this is now the second year in a row that the track team has had to, can I keep going or not? Thanks. This is the second year in a row that the track team has tried to make arrangements for this to happen.

Now, let me just say this. I know track is really difficult and it's complicated, and I don't get half of it, but they have to put in their relay teams weeks in advance, right? So they couldn't field the relay teams that were going to run on Sunday because they thought that it was supposed to be on Saturday, and they had the problem. So more than half of the track team was not going to be there for the second half, but because of the storms, they pushed it off, right?

So we still couldn't run in that. So we couldn't even medal. These teams are teams that have won indoor. The girls just won the indoor championships.

The boys won last year. These things are important. These athletes give their all and they should not be treated as second class citizens just because they're not on a giant football team, a giant soccer team, a giant whatever team that this town, you know, relishes over and funds over. I'm not asking for special treatment for the track team.

All I want is for the AD to come up with a calendar over the summer because let me tell you, I already know what the track meets are for next year. The schedule's already out. I want him to come up with a schedule and I want him to give it to the principal so that they can have a record of when these dates are gonna be so they know what impact it's gonna have on these kids. That's it.

That's all I'm asking that you guys do is break down the silos within your high school so that we can have a calendar and maybe the track team doesn't get messed up next year. I was gonna use another word, but I'm using messed up. So that's all I have to say. Thank you all for your work.

Thank you for your work that you gave on the calendar for the school. I just want a little attention to be done as we do things for our seniors and our juniors because it matters. So that's it. Thank you so much.

Y'all have a great week. Oh, and happy graduation.

Speaker 2 (07:20–07:26)

Any other, there's no other members in person for public comments. Body online, remember, please raise your hand.

Speaker 6 (07:27–07:50)

Yes, Nicole Boyson has her hand raised online. Hold on, Nikki, I have to promote you there.

Speaker 4 (07:50–08:14)

Okay. Hi there. I'm fighting a little bit of a cold, so hi. I'm fighting a bit of a cold, so I apologize for my voice.

I just wanted to say quickly that I really appreciate your considering my petition, the work we're doing with homeschooling kids, and all the wonderful treatment and help that you've given me. I'll look forward to the vote later in the meeting. Just wanted to say hello, thank you.

Speaker 2 (08:15–08:18)

I'm sorry, just for the record, could you provide your name and address?

Speaker 4 (08:18–08:30)

Oh my gosh, of course, Nicole Rexallis. 26 Columbine Road. Thank you so much. Thank you.

You can unpromote me now.

Speaker 6 (08:30–08:43)

Okay. I can't figure out how to do it. We'll try and figure out how to do it. Bye guys.

Thank you. I go remove, right?

Speaker 4 (08:43–08:45)

I'll sign back in if I get lost. Thank you.

Speaker 7 (08:50–08:53)

Any other hands raised?

Speaker 6 (08:57–09:02)

I just want her to be able to rejoin if she wants to do that.

Speaker 2 (09:02–09:15)

Any other hands raised? No. Seeing no other hands raised and no one else here in person, we will conclude public comments. Move on to item number four, which is the superintendent's report.

Speaker 8 (09:15–15:11)

Thank you, Chairperson Lohr. A quick report out on some things that are happening around the district. We just had, prior to our meeting tonight, the reception for Mildon Public School retirees. We were so happy to have folks come out tonight for a short reception.

Chairperson Lori gave nice speeches about each one of our retirees, and I'd like to read their names so you know, in the public, that these folks were here tonight and honored as retirees of the Mildon Public Schools. The first one, Marie-Laure Brown from Glover, Gail Chase from our business office, Rita Chen, grade five teacher at Cunningham, Mary Ellen Coyne, special education at Cunningham, Eleanor Jones, paraprofessional and all-around leader for the paraprofessional role at the Tucker School, Maureen Blank, nurse at Glover, Kathy Mallory, librarian, Grace Marinelli, worked for our office staff as well as as a paraprofessional at the high school. Owen McElhinney, grade eight history teacher at the Pierce. Barbara Perry, nurse at Pierce Middle School.

Maggie Rathley, physical education at Milton High School. And Joyce White, who was culinary arts at the high school. Congratulations to these hardworking and great educators. And they did a great service to our students over the past, to some folks, I think it was 34 years.

So lots of years of good experience. So thank you on behalf of the Milton Public Schools. We get to the next big group that we're recognizing at this time of year is our senior class. Last night, thank you everybody for being at the senior award ceremony.

We saw $205,000 worth of scholarships handed to our seniors, along with a lot of other awards in recognition. So we're so thankful that the families and the students, the school community, and more most importantly, our donors were there to present those awards. The seniors are having a great week. Last week was the prom on the 30th of May.

Tuesday, June 2nd, was seniors awards night, which is last night. Today was graduation practice. Tomorrow will be graduation practice as well. And they will all be on time.

We hope they'll all be on time. The boosters varsity celebration is tonight for all of our athletes. Senior field day is on Thursday the 4th. And Friday, the clap out on June 5th.

when they have lunch in yearbooks for the students. And Sunday will be graduation at 2 p.m. If it is outside, it will be at Brooksfield. If it is inclement weather, it will be inside at the Copeland Fieldhouse.

Monday, June 8th, we have Katie Greer, who is speaking to our families and students connected to technology and social media. We have Katie working with our fifth graders and eighth graders, as well as parents, so please check our website for those. for those nights, it is Monday night at 6.30, June 8th, is that, that's Monday, correct? Instrumental Music Lesson Night is Tuesday, June 9th at 6 p.m.

for those folks who take advantage of that. And on June 11th, the Milton Arts Center from five to seven will hold its Milton Public Schools Arts Showcase. So we thank the Milton Arts Center for doing so and recognizing our students and staff who are artists as well. Bus registration, sorry to pack in some serious news here, but registration is open until June 30th.

We had a great meeting with the bus company last week. I want to thank Katie Blake for her leadership on this. The school committee has added an extra bus. We have met with the bus company in order to them to really pay attention to our middle and high school bus runs, which were problematic last year.

We believe that adding an extra bus and also the bus company is providing capacity, then we will be able to provide a service for middle and high school students at a much higher level than we did last year. And we thank Katie for her work on this with the bus company, and we look forward to that working out this year, next school year. So please register about June 30th. A couple more highlights.

Milton High School Theater. We just found out that the theater program's production of Frozen and the Drowsy Chaperone were nominated for nine Massachusetts Educational Theater Guild Theater Awards. This is another recognition for theater that also was the best in the state over the spring and winter season. The 52 high schools across Massachusetts participated, and they are incredibly honored to be one of the six schools nominated for Best Overall Production.

So again, a huge deal for our theater art students. In music, The awards and honors keep coming for our music community as well. The music department is recognized as one of NAMMS, which is the National Association for Music Merchants Best Communities in Music Education. Milton continues to be a music and arts community.

The theater program, the music program, and our arts program is outstanding. There's a list of music awards that we want to let people know that we'll be publishing and our next newsletter. But as we sat last night at our awards night, I actually thought back of just how many great things are happening with our students in school and outside of school. The awards that we heard about last night, every athletic team in the fall, in the winter, in the spring made tournament.

All of our theater groups that participated this year made state finals. Our band made state finals. Our STEM program competed, our robotics competed. Our elementary Tucker School future problem solvers are off to the nationals next week.

These are just great things that are happening in and outside the classroom that we're really proud of. And we just wanna announce that to the community and celebrate it with the community. So thank you very much, that's my update before we get to Reagan Business.

Speaker 2 (15:12–15:16)

Next item, the preliminary approval of the music department future.

Speaker 8 (15:20–16:29)

So this is the first reading of the trip for the music department. The second reading we'll have at a fall school committee meeting, but we wanted to get this in front of the school committee early. The Milton School Band and Choir, under the direction of Rebecca Damiani and Julia Hanna, will perform at the destination is Walt Disney World in Orlando, Florida. And this is not just a trip to go to Disney World.

This is where they will participate and take part in a program there. And they're asking for the school committee to read through this application. And then when we get to the fall, any details and questions that you have, we'll be able to answer that. The itinerary is part of the packet that you have.

They will leave Wednesday, February 3rd, and they will return, I believe, on Friday, Saturday, February 6th. Any questions about this? Folks want to leave that, so we see Rebecca will be at the meeting that we have.

Speaker 9 (16:30–17:17)

At the meeting where we will be speaking with Rebecca, will we be talking a little bit more about, this is my first field trip I've been on this side of. Will we be talking more about the details of like the, I see that there's like a nurse and there's like 120 kids and there's going to be like the plan sat 10 kids per chaperone. I did a little bit of research just to prepare myself for this. I read some things about different requirements, policies for administering medication if you're going out of state for a nurse and licensing and all this other stuff.

Do we have details about where we are with that, that we'd like, or will we have those details when we have our next meeting?

Speaker 8 (17:17–18:12)

We will. I can say that we just experienced that when we went to D.C., the nurse went on the trip. There is a specific detail regarding the licensure who can administer outside of the state. That's why our nurse goes on the trip.

We actually pay for that nurse to be there because that's a paid duty for them. And so I think in the spring of 25, which would be last school year, That became a factor that people really had to look at it and see how it worked. And I believe that they've figured out what the formula is, and I'm interested to see as well where it looks like to go in another state, but we can definitely have them talk about that. The other pieces are fundraising.

I think Rebecca and the team wanted to get this up and running so we could have them let the students know to begin thinking about if they wanted to go and what the fundraising would look like. So they could begin to reduce the cost for all of our students.

Speaker 7 (18:14–18:26)

And just to be clear for the public, since they might not be reading that, this is February of next school year. Any other questions from members?

Speaker 2 (18:30–18:43)

Hearing none, we will continue. Up next is the school building committee presentation.

Speaker 8 (18:44–20:47)

Our chair of our school building committee, Sean O'Rourke, here to provide us a bit of a… Very happy to announce some of the larger positions we have that were vacated. We had search teams for a director of finance position, which we have offered a contract to an individual who will be hopefully signing on by the end of the week. At that point, they will give notice to their district about their exiting and coming to Milton.

They will start on July 1st. We want to thank Katie Blake for her time, but also, as I identified, two days in June, we will try to overlap Katie with the new individual starting, so we have some overlap in preparation for starting the school year and actually ending this fiscal year. So we're very happy with that hire. We have also hired a new technology director for education and data analytics.

We have a young man coming to us from the Needham Public Schools, who was vetted by a team in a search committee that was led by Calicosa. That person will be a Unit B employee, and they'll start also in July 1. Because they're in Unit B, they don't work a full year. So we'll work a schedule out to get that person up and running, and get them introduced to the district and be onboarding as well, that position.

And lastly, we had the finals interviews for the Human Resources Director yesterday. Kyle and I and Laurie Dunn met three candidates from three different school districts in the state. We have very, very good finalists and we're really struggling with that decision right now and we're calling references today and tomorrow to make that final decision. So by next week we'll have all three positions hired, prepared to onboard in July and prepare for the school year coming up in the summer.

In the buildings, we have building-based teams doing the hiring and the interviewing for each of those schools individually that are led by our principals and teacher interview teams as well.

Speaker 7 (20:50–20:57)

Questions about the hiring?

Speaker 2 (20:57–21:47)

Thank you. Now we'll move to the school building committee presentation, just to kind of orient us and provide some training for Sean Jemsen. Sean graciously agreed to come and give his time as he does so much since I'm so appreciative of you, Sean, to kind of get the school building committee lens as to kind of where their role is here and what they're seeing as it relates to La Barre and as it relates to kind of the ongoing work of the committee or related to Guile, the Guile site. After we hear from Sean and members I will ask questions and talk about that.

And then pivot over to the superintendent and the school department team will share some of the slides that have been in the materials around the options are two from our conversation two weeks ago. So those are things we provided to members. There's nothing about that.

Speaker 10 (21:47–22:01)

I'll pass it over to you, Sean. Thank you so much. Thank you. And just for the record, Sean O'Rourke, school building committee chair, town meeting member of precinct D.

Is it okay if we share the screen? Please, yeah.

Speaker 7 (22:01–22:11)

Can we promote Sean? Yes, hold on, let me see if I can do that. Talking more to people than that.

Speaker 6 (22:12–22:28)

I did run into the challenge of removing you. I might just deal with that when we get to that. You're a panelist now, so can you share?

Speaker 4 (22:38–22:38)

Yeah.

Speaker 10 (22:38–31:31)

Perfect. So yeah, as Mark mentioned, tonight, I just want to give an update for MSBA, kind of where the School Building Committee is at. And then also follow up, following the new discussion a couple of weeks ago regarding with MSVA right now, and also how it doesn't fit within the path for what we're doing with MSVA. So what you see here is the flowchart with MSVA, which are the nine modules that we have there.

We had worked the past year on module one, which we completed in February 25th of this year, which basically had a certain outcome from it, which is sentient moments. And right now, we're moving on to module two, which is formation of our project team, an owner's project manager, and an architect and engineer. School building committee is actually meeting on Monday to go through a short list. So for applicants for the owner's project manager, we had 11 applicants, and we shortlisted just recently down to three.

So we're gonna be interviewing each one of them on Monday soon. As I mentioned, the outcome from module one was essentially, call it boundaries, that they have us under MSBA that we have to operate under. So what that is, is they looked at certain data that we provided them to develop enrollment analysis for three options. And those three options are an addition and a renovation to Colliecock Cunningham School to accommodate 1,400 students.

And they do this as a baseline for any statement of interest. The other two that are there, I think, are the ones we focus on. There's a new elementary school, grades K to 5th, plus a preschool component. The other option that we're looking at also is a new middle school, grade 7th and 8th, plus preschool.

And the enrollment for that was 660 students plus pre-K. So again, that's kind of the framework if we're working with MSVA under our current timeline that we've got a hold to. So those two options, the new elementary school, the new middle school, there's no site constraints on there. So we're able to look at Gow Road that we have there, that we got through the land swap, and Library College.

So Gow Road, just again for comparison, is a 6.4-acre site. Library is a 4.7-acre site plus three existing buildings that are there. Just an update, too, for you guys. Information just came through today.

So the land swap, if you recall, in the special town meeting, I think, last year, we put an extension to the land swap. Sen. Driscoll texted me this morning that it got passed through the House and it's on to the governor for signatures. So the land swap had an expiration date of 2028.

It's now probably going to go to 2033. So just for context. So when we talk about Gow Road, the two options that we're looking at there, again, are a middle school with a certain enrollment of 660, and a preschool enrollment of 112, elementary school, 495, and 112 again. So again, a 6.4 acre site, no existing buildings, and essentially it's all new construction that we're gonna do there.

So that is kind of what we're working with MSVA right now. If we purchase Lab Array, and want to continue down the path that we're doing with MSVA right now, the only two options we can look at are those same two. Essentially, a middle school with an enrollment of 660 or an elementary school with an enrollment of 495. So because those are the kind of constraints that we're putting on there, that's what we're looking at.

Now, as I said, preschool is an option that we're allowed to define as part of that with looking at the work that we did before on Gow Road. both of these options are going to be tight on the library site. So I would assume there would be no preschool component on there. We'd have to, if we had to squeeze it in, that would probably be what I would anticipate would be part of the option that we'd have to squeeze off.

The other part of this too, as we compare the two, is The other differential that we'd have to look at is the acquisition cost for Laborate. So we'll have to pay money for Laborate, which we wouldn't have to pay for Galway. So again, under the framework, if we were going to continue down the MSBA path that we're going down, this is kind of where we're at. Your last meeting that we talked about, you know, knowing MSBAs on one side, there were a number of options that you guys looked at.

And I appreciate you guys diving deep into this because these are other feasible options that we need to look through. So, but essentially with those, they don't fit within the boundaries of the constraints that MSBA is putting on us. So essentially, that becomes a non-MSBA path that we don't qualify for reimbursement. So one of the things, as I listened in to the last meeting, I just wanted the public to understand that if we do that down a library path that's non-MSBA, we're not qualifying for the reimbursement that's there.

Now, we could go back to MSBA and offer to restart again with some of these non-MSBA options. But essentially, you hit a reset button. You go back to Module 1. So that's still an option, and that's honestly for you guys to decide.

But in the context of what we're looking at, for lab array right now, this is essentially what you have for the building that's there. So in green is what's shown as building A, also known as the mansion that we talked about. Building B is an adjoined office space, multi-level that's there. And building C, which is the majority of the classroom space, and it's connected, as you see in gray, by a hallway that's there.

So a couple of things to keep in mind as you're having discussions here. The existing classroom sizes that are there are approximately 725 square feet. There's no cafeteria. There's no gymnasium.

Building C has minimal bathrooms. So whatever program you're putting in there, we'll have to add bathrooms to accommodate. And then the other one, the main one that I'm looking at here is whatever renovations we do, I want to keep to building C, which is the red area. And the reason for that is for the energy code triggers that will come up, that we don't want to go into these historical buildings and have to renovate that entire portion of that.

So for us, as I mentioned multiple times at our meetings, school building committee, as far as this decision goes, it's an advisory role. what we're looking at from school committee is to provide us a program. We've signed on DLR group as an architect, so we've been working kind of ahead of you guys on this to prepare, to have an architect ready to kind of take the program that you guys provide, and then basically do a fit out of that. So they're gonna come up with a conceptual design, and they're also gonna come up with a cost estimate.

Now, the program that you guys provide and the cost estimate all go to the select board, again, as advisory roles to let them make their decisions. So the key part for me, like what are our roles here? So for you guys, as far as I see it, and feel free to correct me if I'm wrong, is to define the educational program and the grade configurations associated with that. Evaluate those options of how they impact the existing overcrowding we experience.

And then at the very end, evaluate this option against Cal Road. Again, that's not our decision to make. Our job is just to provide you guys options. You are the elected leaders of the town along the select board.

So that, honestly, for us, that's our role. So again, for us, it's to develop those conceptual program layouts, the obvious construction costs, And then, again, provide it to you guys. And the select board is to negotiate the purchase price, execute the sale, and then schedule all the required votes that have to occur. So with that, that's the end of my presentation.

If there's questions, if there are, I'll happily entertain them. And if not, I'll happily sit back. Thank you so much, John. No problem.

Speaker 8 (31:31–32:21)

John, can you provide us an idea? We've talked a little bit about timeline. What is the timeline for this to happen? First of all, I appreciate your work, and I appreciate you outlining the different roles that each body has.

So the schools has to provide a program that we feel, out of our pre-K to 12 grades, what one or two grades do we want to pull out, and what makes sense for students, and the size, et cetera. And when we do that, then the town will be working exclusively with the architect firm that you've identified, And then when will that firm need to produce a document or a summary or a conceptual model for the school committee and the school department to review and decide whether that makes sense or not?

Speaker 10 (32:21–33:45)

Yes. So in regards to the timeline, they want to start now. So I'm looking to get them into the building to do a site walk probably next Friday. And then the anticipation or the hope of that is to provide them the educational plan or the grade number configuration that we're looking for.

So following the last meeting, I just wrote the original contract under K pre-K, but they're open to whatever option you guys come up with, but essentially only one option. They're not going to explore five to six. The intent with them or the contract that we're looking at is to work with them over the month of July, you know, June and July. to build up for an August informational session or a decision of here's the floor plans, here's the cost estimate.

So the intention is their deadline is the end of July, beginning of August. And the reason we're doing that is if this is to go on the ballot for the November election, 5th or early August. So we're trying, knowing that's a decision that the select board would have to make, we're trying to work as quickly as we can to do that. And again, that's why we took the initiative first to reach out to architects to do that so we weren't coming here tonight saying, oh, we'll talk to them in two weeks or three weeks.

We were trying to be proactive on that stuff.

Speaker 8 (33:54–34:21)

the school committee and the school administration of the school committee tonight decides to provide you with what that grade choice would be. And if that happens and we walk through this process, is there any ability after we decide, if the town does decide to purchase the space, will there be any other time to revisit the grade configuration or is this kind of set in stone? Or would the asset be ours at that time and there would be chances

Speaker 10 (34:26–35:23)

Yeah, good question. You guys are open to do whatever you want. So the work they were doing is to only influence what potential the property has, not define like a constrict boundary of this is where we have to go with it. For me, I'm in favor of buying it.

I think it's a great asset for the town. I think the town should buy it. That's my personal opinion, not going off school building committee chair and stuff like that. Does it work for a school?

That's kind of what I think what we're all trying to figure out. So, to your point of the report that we get from the architect, the input and the cost estimate, that's going to influence whether we buy it or not. Potentially, they might decide to buy it regardless. Right.

But the opportunity to shift from that, if something comes up later on that we would like to go from one option A to option Z, we can do that.

Speaker 4 (35:23–35:23)

Great.

Speaker 10 (35:23–35:24)

Thank you.

Speaker 2 (35:28–35:53)

John, I have a couple of questions. I should probably know the answers to these, a couple of these as a delegate to the School Building Committee. The preschool option, is that, or the preschool part of the MSBA program, did I hear you right that that is optional under any circumstance, like we could lop that off if we wanted to, whether it's LaBarre or whether it's the Guild Road site?

Speaker 10 (35:54–36:28)

Correct, so the enrollment component of it what I was saying was optional. They didn't prescribe an enrollment to us that said you have to provide a school for this many kids. What they said is, you want to provide preschool, let us know what that enrollment number is. And then there's a certain formula that builds into the reimbursement.

It's not as heavily reimbursed as the overall school, but there are some reimbursements for it. That is what was open to us.

Speaker 2 (36:28–36:41)

So if we wanted to do a K-5 option under the MSBA is authorized for K-5. Yeah. If we could squeeze that into La Borre, but we couldn't fit preschool, we could just remove preschool and still be eligible for the program. Correct.

Speaker 4 (36:43–36:43)

Okay.

Speaker 2 (36:44–37:07)

Are the, so if I understood you right, the three buildings, you were saying we only really want to touch the main academic building so that we don't trigger the stretch code for the entire site. So under that code, they view the three buildings as three distinct buildings? To be determined. Okay.

That feels like a big deal.

Speaker 10 (37:08–38:01)

Yeah, my interpretation of it, because you have, you put a building, say, that I think has separate electrical and gas services to it, so essentially it acts as its own, and it's interconnected only by that hallway that interconnects them, you can make a case that the renovations are isolated to that building. We're only drawing kind of the boundary of the upgrades to that building there. And that's one of the things within the architect we're going to ask them. But through initial discussions, that's kind of where we're heading.

And that's why for program space, I don't want to aim to anything in building B or A, because if we start doing anything in there under, call it this overall project, if it becomes a project, I don't want to trigger anything over there that causes us to renovate the entire mansion, because that's quite nice.

Speaker 2 (38:01–38:08)

How much of the, how much, what percentage of the whatever building do you have to touch to trigger stretch code?

Speaker 10 (38:09–38:29)

I don't know. Off the top of my head, I don't know. But again, that's one of the things that we're gonna work with the architect. Like my goal for that, again, is whatever that, keep the renovations isolated, the buildings see, so that way, you know, it's not triggering all the others.

That's like kind of the goal going into it.

Speaker 2 (38:29–38:41)

And last question. Will the architect be also looking at new construction needed, potentially needed for the building like a cafeteria?

Speaker 10 (38:41–39:35)

100%. Yeah. Okay. So it's not just interiors.

Yeah. So the scope of the architect is to take whatever program that you guys prescribe, look at how we fit it into the existing building. And then also there's obvious need to add on to the building. So what that add on is going to be.

And then that will get turned over to a cost estimator that will have a certain renovation cost that will be there and a new construction cost. that I was showing on the slides, I can share that later, that had like red square on that, they had already planned to do an addition there previously. So we're trying to leverage some of that previous work that was already done to say, you know, it was additions planned. Here's where they were looking to do it.

Can you just use that? Cool, thanks, Sean.

Speaker 6 (39:35–40:32)

Lizzie? You had pointed out the need to do some sort of comparison and contrast between this non-MSBA path and the staying MSBA, which, as you were just saying, could include a K-5 school at the site. But I guess I'm wondering how would we really be able to do that if we have to deliver one option Because we won't be able to do both with the architect, like both the K5 in the building and the pre-KK in the building, right? So how …

It just seems like we wouldn't be able to do a very thorough comparison.

Speaker 10 (40:34–41:01)

Think of it this way, we're going down the school building committee parallel paths. We're on the MSBA path. We're hiring on this project manager. We're going to hire a new architect for that.

As part of that path, that option falls under that path. So if we continue down that path, Oh, under the… I see. Correct.

Gotcha. If we purchase MSBA, it would be a different architect, different team that could look at that option. So that's a longer timeline that we're working with right now.

Speaker 6 (41:02–41:06)

The MSBA. Correct. K5 at Labarace timeline.

Speaker 10 (41:06–41:06)

Got it.

Speaker 6 (41:06–41:07)

Okay.

Speaker 10 (41:07–41:28)

So as I mentioned with MSBA, we don't have site constraints. So as we open up, we have building constraints or building options that we have to look at. That option can be on any site. So if, when we get to that point, the town has purchased the library and we're still on that path, we can now add library to that site analysis into the program on that site.

Speaker 6 (41:28–41:42)

So that would just require the town to purchase the site without certainty of which path we were going to pursue. That would just, they would have to be willing to do that. Got it.

Speaker 9 (41:42–42:19)

Thank you. You were saying that if we wanted to look into Lab Array and couldn't make the current constrictions work that we would have to start over or we could start the process all over again. We're on module two, so we've gone through one module, but it sounds like that was a very long haul, but it sounds like it was also mostly about coming up with some numbers. Can you give me some more information about what that module one consisted of and why Why is it gonna take that long again?

Speaker 10 (42:19–43:49)

So the funny part is, I hope MSBA does not watch when I say this, but working with the state agency is very slow. So we were accepted to the MSBA in May of last year. The required documentation they required us to submit, we had like 270 days, we had it done in 90 days. We submitted it in July.

So it dealt with housing production, birth rates, a historical enrollments, a number of different things. The maintenance records that Tom McCarthy put together, which was great. And they asked for those maintenance records because they're going to reimburse us a large chunk of money. They want to make sure the assets they're investing in are maintained.

So the cool thing is we have all that stuff. We can resubmit it really quick, but it still took a year. I mean it still took like six to eight months after we submitted all that documents. So even if they told us to reset and we immediately submitted everything the next day, it's still this long delay because you're dealing with the state agency that has a queue of other projects and we just go to the back of the queue and then when it gets to our turn, we leave there.

So there's no way to kind of jumpstart that. And again, that's not our decision, but I'm just trying to, again, explain to you guys what the options are and what the consequences of those options. If you decide to do it, that's fine too. But again, just trying to put things in context as you're having this kind of very important discussion.

Speaker 8 (43:49–45:54)

Yes. Getting back to this matter of cost and comparison, When we put a program forward and they explore that over the next month and a half, and they'll come up with what they think it could cost, we still, the town, all of us together as the select board and this building committee and this school committee, may not have a real clear idea of what the MSBA project would cost. So if it does go down that pathway, a non-MSBA path, which is we buy it outright, buy it as the town, we're not looking for reimbursement because we think that it would be something that will maybe move faster, might be cost effective otherwise. But I think it will, to say out loud, do you agree that it may be hard for the public to kind of reconcile that choice without all those facts at the time when we have to vote?

Because that information, from a time perspective, just might not be available. So the idea of the town-wide divide as an asset, as a taxpayer and resident, I would agree 100%. This is an asset that I think the town another way. Just want to try to make sure that as we walk our way through this work in June and July, August, and then we begin to get in front of voters that we're really explicit about what we can show them for comparisons and what we can't and why.

And that's just a function of the timing and so forth. Just to start that narrative now, letting people understand that there will be some of us not disclosing that information as much as a function of the timing of this project up against the OSBA and then the time that we have to vote it. And that this is an open purchase. It's a real estate purchase in an open market.

It's not something that we're bidding. We have to decide when we're going to go to the open market to purchase the space. Kind of want to get that traction going. with the public as we begin to socialize this with the community.

Speaker 10 (45:55–48:30)

Yeah, and just to that point, so for the MSBA, you know, module that we're looking at, we have two options. Previously, the School Building Committee, many of you were aware, we were going down a path on our own, but we weren't accepted to MSBA. And the reason we're doing that is, as we're seeing with MSBA, it's a slow process. And the reason we were doing that is we can get to a solution faster.

So in the summer of 2024, we finalized our conceptual design for a middle school option that was there for the similar enrollment. So the cost of it at the time was $173 million. The timeline, again, if we had passed it then, was to have a school open in 2027. Keep that in mind.

So that was not put forward by the select board at the time, and that was fine. Immediately afterwards, we were selected to MSB. One of the questions we asked our OPM at the time was, what is our reimbursement? And our reimbursement under MSBA is a 45% reimbursement on eligible costs.

So an overall project has eligible costs and has ineligible costs. You can come up to an effective rate. So looking at past projects, that 45% gets diluted down to an effective rate. The effective rate that our OPM suggested was about 28%.

So when you take a $173 million project, and you look at a 28% reimbursement on there, roughly $45 to $50 million. So that $173 comes down in the $125 million. So when you are asked to compare these two options, you can use that as a baseline for it. If today it was a $173 million project, with the reimbursement that we're anticipating from MSVA, it really is about $125 million.

And then, yeah, for the option that we're looking at here for, you know, again, whatever option is here, the architects are going to give you an option for that program and the cost estimate there. So, like the joke I keep making about this, and I use it in my work all the time, it's like we're comparing apples to pineapples. They're both, you know, fruits that are there that taste different, but, you know, there's similarities, but they're very different in different things there. And I think that's, where everyone's going to look to you guys to say, here is an option for X dollars.

How does it address our overcrowding for where we're at now? And here's another option for X dollars that does something else. And then that's honestly for you guys to make that determination.

Speaker 4 (48:34–48:34)

Thank you.

Speaker 2 (48:34–53:13)

I just want to go back to the question that Lizzie raised. We have an agreement with an architect to do a design analysis of whatever program we give them. And I assume we've, I don't know if that, I don't know if whatever we're paying is publicly known. I can't remember if we discussed that, but it's some reasonable sum of money that's coming out of the school building committee budget.

And I assume if we paid them twice that amount, they could do two design analysis. And I'm wondering like the idea of like, okay, we can figure out one option and they'll tell us whether that option will work. And then if we want the second option, first we have to spend a figure sum of money to buy the land and then we'll figure out whether some other, whether the K-5 option will work and then we'll get MSBA reimbursement. I'm kind of wondering if there's been a discussion of paying for an analysis of two options.

One, the one we're talking about, and one that will be eligible under MSBA. So that we know when the select board, just to finish my thought, if this goes on the ballot, we have a clear sense of what the purpose of the purchase is. It's either we think it's most likely for a school, because one of these two options will work, or it's most likely not for a school. You know what I mean?

Yeah, I totally agree. I think that'd be great. We have three options, right? We can say you're our top three and let's do that.

We don't, the issue is time. And so the threshold in public procurement is for design services is $30,000 and $300,000 in construction costs. If you go over both of those thresholds, you have to do a public procurement process, which is gonna be for eight weeks, right? And we don't have three weeks to lose.

The budget cost is going to be more than $300,000. So we have to keep the design under $30,000 in order to not have to go through an extended procurement process, given that the select board has to make a decision by August 5th, and that the laboratory is going out to bid or kind of publicly starting to get interest in the sale of property on July 30th or August 1st. And the architect is going to need several months to create even one design, much less multiple designs. We just don't have the running room to get both of them, which is why the difficult challenge in front of this committee tonight is, what is one that we want to study?

And I think the best we're going to be able to do for the select board as we try and get them direction as to if this is a useful investment for the town for a school project perspective. is to say, is there a school project that could fit on the site? Not necessarily that that is the one we want to do on the site, but it is feasible we could do a school project on the site. And then as Sean said, we have a separate path where in about two months, hopefully we'll have an architect on board and an architect can start kind of coming up with these designs.

That's going to drag us a little bit past timeline so we could, to your point, pivot a little bit later on. We aren't 100% locked in. We just don't have a lot of time for August. The select board could delay their decision because the August 5th is in order to put in an audio vote for the November election.

They could delay that. They could separate it from the November election and do it at a later date. Part of the question there is, what is Lottery's timeline it to us and so that's another piece that we don't know here. Select Board of Town Administrators are responsible for.

I mean we just don't have an answer today in terms of I would laborate wait until December to sell to us. That would give us a lot more time to figure this out. That would be great. Maybe they would, probably not.

And so we have to kind of make a decision today as a committee based upon what we know and what we know in we're working with really is like the beginning of August we need to have a sensible plan and the architects we work with is like they need to know two weeks ago in order to really get us something for August so they'll work their tail off to get something for us for August but they don't have enough time to do multiple projects.

Speaker 10 (53:13–54:58)

Sorry. Sorry just to provide some more context that might help your discussion later on too so prior to school building committee being awarded in 2019 it's architects that built all the schools and designed everything to do a space state study. So that space state study was done in 2018, and the outcome of that had multiple options on there, which were additions or renovations to existing schools, and these were seen as short-term solutions that weren't there. The long-term solutions that they had was a new elementary school, K-5.

They also looked in the Early Childhood Education Center, and they had kind of conceptual floor plans for it on the back side of the high school and stuff like that. So the options that you're talking about tonight aren't just coming out of thin air. They were studied by professionals before they were outcomes that came out of an overall study that was there. So I just want to let you know, the school building committee, when we took those on, we were looking at a new elementary school at the time, and then as we on migrating up to the middle school, that's where we said, all right, is there a different way of doing this?

And while we were going down that path of looking at a program or an alternate program, that's where we identified the land on Val Road, and they both kind of merged at the same time. So I'm just providing that as context, that if Laverie is decided upon, there were previous kind of independent professionals that looked at this and looked at those options and said that those are actually feasible options too. But again, at the time, it was like 2018. not thought about before.

That's great history that you've mentioned.

Speaker 11 (54:59–55:11)

Sean, I did have a question. I know you mentioned in 2024 the cost of the proposed new school is $173 million. Do you know roughly where it is now, or is it roughly around the same?

Speaker 10 (55:12–55:33)

It's a good question. I don't. I would assume, I think at the time we were saying aim for like a 2% to 3% escalation per year, so roughly You know, off the top of my head. But definitely more than 173,000.

Okay.

Speaker 11 (55:34–55:46)

And then, because Lover is an existing site, is it all under a different reimbursement rate through MSBA, or is it similar because the structure is there? Yeah, good question.

Speaker 10 (55:46–56:12)

I don't know on that one. So, because it's not an ad reno, because it's not an existing school, it's a site that we're building, and it's not a school that we own. So I honestly don't know how they would look at the new construction costs there. Obviously, it would fall under whatever it falls under for the reimbursement that we're having, but the renovation costs that are there, I don't know how they would address those.

Speaker 11 (56:13–56:24)

Okay. And then what if we're following through with our module? completing whichever path we decide to go.

Speaker 10 (56:24–57:18)

Yeah, if we stayed down the path that we're going without hitting the reset button that I talked about to return back, we're hoping to have the overall ballot question for whatever project it might be in 2028, so a couple years out. We want to get the architect on board, start our design, and then get to a place, I think where we have a price and we can put it in front of everybody of, here's the project, here's how much it will cost, here's the impact to the taxpayers that we're gonna see. So our aim for that, I think, is around 2028, the annual town meeting, 2028 in May. And then construction, final design and construction following that, so probably a school open in 2030.

2030, 2031, something like that. Thank you. Yeah, no problem.

Speaker 7 (57:21–57:21)

Steve?

Speaker 9 (57:21–57:58)

Sorry. Do we have any concept of how well utilized that main building, the mansion, would be? That and the side building that would have OT, PT stuff. And given what we have in the district now for administrative staff and all those roles, how well we actually utilize in that space, moving people over.

I just remember walking through the mansion and seeing there are a ton of offices. There's a lot of office space, and it was hard for me to imagine that we would actually utilize. I'm just curious about that.

Speaker 10 (57:58–58:26)

Yeah. So for me, my focus has mainly been student focus. Sure. The administrative end of it, I don't know.

I know in your previous discussion, we were talking about the space that we're creating as part of the Gow Road, like middle school before, and creating additional administrative space. And that was a goal to try to move some of the administrative out of the high school, to kind of free up everything all the way down. But as far as specific, like how administrative existing space would migrate over there,

Speaker 8 (58:42–01:00:10)

in that area, but not—and the public should know that folks did—other school board folks did tour the site as well. So now you're actually getting a chance to see that there are so many nooks and crannies in that building. But, you know, if we move the central office business functions, the superintendent's office, special education services, If we wanted to be part of that building, we'd obviously be welcome. But it would be really nice to go through the space for space count, because it does feel like there'd be a little bit more space than we would need.

My goal would be to have, if we were planning in the future, would be to have a family center there, which would, I think, really take up a lot of the first floor for our families to be coming in, whether or not we can have our school community meetings I think that if they can actually move that into their work or scope of work, that would be great. Because maybe I kind of have the same. I'd like to walk the building nine more times. Because every time you turn a corner, you find another little space.

Speaker 9 (01:00:11–01:00:15)

Yeah. You want to maximize. Yeah. You want to make sure you're maximizing the space that you're buying.

Speaker 10 (01:00:16–01:00:31)

Yeah. I mean, the one nice thing, the initial walk that we went on, the basement of the office, the classroom building, the academic building, Tom McGrath was looking down there. their staff and utilize it as a facility staff. Absolutely.

Speaker 8 (01:00:31–01:00:32)

Our rental staff.

Speaker 10 (01:00:32–01:00:54)

Yeah, that's the space that some of us use as facilities. Yeah, and to my point, as an advocate for purchasing it, like I said, I think it's a great asset for the town to buy. And again, whether it's a school or not, I think it's kind of what we're all trying to get out of. But could there be other opportunities that

Speaker 6 (01:01:01–01:01:21)

It sounded like at the select board meeting, they were discussing the need to do that parallel. That would be a parallel path for them to be pursuing. But while we're looking at this, they're fully exploring what those other non-school options would be to utilize the space.

Speaker 12 (01:01:21–01:01:52)

I have a question. Sean, you had mentioned earlier that the project that you want the architect to look at is going to be on building C. So how can we make building A and B feasible, workable for all, for the school, human resource department, et cetera, without any renovation? Because even we walk through it, there's still, the ceilings might have to be fixed and there will be a lot of plumbing issues with the old toilets and all that stuff.

Speaker 10 (01:01:53–01:02:45)

Yes. because that'd be good things. So my anticipation would be, we can still have the architect look at everything, to Stevie's question. We have the floor plans, we know what everything looks like there.

We can look at the floor plans without really going through it. It's an ID, this program can go to this space, this program can go here. But when you're talking about like upgrades and stuff like that, I think the way I would do it is for this overall project that we're talking about is isolate everything in building C, do that overall, I mean, we'll have him walk through the space, both Val and Stevie the other day, and Sean.

Speaker 11 (01:02:45–01:03:24)

It was really nice to be able to see the space, and to Stevie's point, there feels like a lot of space, right, especially in that main mansion. It's very comfortable. So I would say, to your point, focusing on that last, the actual classroom building first, and then looking at renovating those others minimally, like slowly, would make more sense. Because it's definitely usable.

There's some cosmetic upgrades I would do, just ceiling tiles and things like that. But overall, it's pretty well

Speaker 10 (01:03:29–01:03:39)

we're here too. We're in one of the new conference rooms right now. It's beautiful. I think everybody likes it.

There are a couple of very nice conference rooms over there too.

Speaker 8 (01:03:59–01:05:44)

So Sean, before I go and show my slides, and if you're staying that would be great, the way I framed the updated presentation goal was to revisit our May 20 options and bring forward a recommendation to the school committee in order to provide the architectural firm an initial option to review the space needs assessment and potential program for the site. to choose one to have them take a look to see if it's actually in the ballpark of feasible to use, you know, regular words. And if that makes sense, we can hand it to them. They can give us what they need to say.

You know, if the town wants to buy a grade, if the town wants to buy it with a potential school option, there's one that kind of makes sense. And you can actually change that if you do purchase it if we want to revisit that conversation. And to summarize, if we want to revisit it through an MSBA path, it's either going to be a K-5 or a preschool. So we already have that pathway that we can actually go down, because our MSBA partnership is not site-specific.

If we want to do it without the MSBA, we still have time to revisit and say, you know what, let's go back to that eighth grade option, let's go back to that K-6 option, let's go back to that, whatever other option, we'll have time to do that. So I only say that to kind of lower the pressure of the decision that we're about to make, because time is very, very valuable in getting this work up and running anywhere. to have the window of work done in order for it to be decided in time for the action to be considered seriously and move forward or not. And that depends on us just moving that ball forward.

So kind of a preview of setting the expectations for how we may want to talk about these options.

Speaker 7 (01:05:48–01:05:52)

Any other questions for Sean before we move to the second part of the conversation?

Speaker 8 (01:06:07–01:06:22)

building committee that has been working on this issue since 2019. I want to thank them for all their hours and time in pursuing the really worthy goal of providing schools more space in order to serve the students of the town and that this is a

Speaker 10 (01:06:43–01:06:46)

Thank you, Sean, and thank you to the team as well. Appreciate it.

Speaker 4 (01:06:46–01:06:47)

Thank you.

Speaker 10 (01:06:47–01:07:07)

I mean, as you're aware, it's multiple times we've done this. So yeah, we've looked at fun fun, looked at this parallel path that I talked about. We've had multiple parallel paths along this whole road. So I mean, we're excited to get something.

And the one thing I enjoyed about hearing the discussion at your last meeting was everybody's acknowledgement that we need more space for you.

Speaker 2 (01:07:13–01:08:04)

Okay, those are the slides, if you can pull those up, again, to kind of provide the framing for the group. The goal of this part of the conversation will be to hear from the school department on the recommendations, just ask whatever clarifying questions, but to get to a design, a singular design that we would like to recommend John's points, you know, help us get in the ballpark of feasibility for the site. in order to give the architect that we are purchasing through the MSBA, I'm sorry, through the School Building Committee some direction we can move forward with. And the goal of that is to kind of give the select board some information related to their decision on whether or not to purchase this property and for how much.

So those are, I appreciate John sharing those steps.

Speaker 8 (01:08:08–01:20:03)

Thank you very much. So on the off week of our school coding meetings, I meet with Mark and Anna to kind of think about what's on the agenda for the next meeting. And we kind of scratched out a little bit. It would be helpful if we revisited the options and then had this visual of what we think will work and what we think will not work.

So trying to provide that quick assessment in this slideshow. As these are self-scanning presentations, they also want to make sure that we provide the context as well. So this is the 2.0 version of our Laboree presentation for June 3. On the next slide, you can see, as Sean has showed as well, that we have the Laboree site is building A, which is the home slash mansion part of the building that would not be renovated, that would be housing.

central office and other essential functions that are non-school related in terms of classroom-based work. It could also house any town-based office as well. In the aqua color on the left-hand side of the screen is building B, which would be support staff space and other types of space used as well. And then in orange, building C would be the main space that the building would be for school classrooms, for whichever grade we go in.

potentially with any kind of an addition that would need to happen to increase space depending on the cohort that we choose to move over. On the next slide, reiterating what we just said, this is the potential that we're looking at in terms of how the building can be utilized. This is a very high-level look at how we can utilize that space. Then we'll go to slide four.

We're looking at the context. I think it's been very helpful to have Sean Hansonite for the School Building Committee to now, in the MSBA path, that could be utilized for this LaBarre option, and or have it be a non-MSBA option. But it has been determined, to Sean's point, that the space needs of the school are real, and that we could use more space to service our students pre-K to 12, and that the first thing we want to actually look at is whether or not a LaBarre site option could actually achieve that goal. So if it can achieve the goal of saving for our students, then it's something that we would pull back from.

So that's the major goal. So we're asked for this high-level analysis. The updated goal on slide five is to really kind of slow this down a little bit for tonight and take the hot air out of the balloon that we're not setting anything in stone tonight. What we want to do is revisit the May 20 options, bring forward a recommendation to the school committee in order to provide the architectural firm our initial program option to review a space needs assessment and potential program fit for the site.

So as Sean had said earlier, that if we go forward with anything tonight and vote on it, and have that explored over the summer, that if the building was purchased and then we have it as an asset for the town, and the town would like the schools to be able to utilize that, there is room for that assessment to be different or that course of action to be changed. And remember, our MSBA pathway parallel to this, it could be the K-5 school or it could be a preschool. and fit right into this VA pathway. So a lot of options, we're not locking ourselves into anything at this time.

The timeline has been consistent, as Sean outlined in his slides, and I will provide in mine as well. Last week, or two weeks ago, we had a rubric that we went through on slide six. First of all, it has to address the space needs of the Milton Public Schools. Can the grade actually fit with additional renovation and potential additions to the site?

and now there are operational costs associated with that. And when we talk about the grade program fit for the site, that's also meaning, are these transitions, these educational transitions in how we organize our district, good for students? Not just a fit of the school, but a fit of how we want the grade configurations for the district in the future to be made up. So the next page on seven is the list of options that we reviewed through that rubric at our last meeting.

A new K-5 school, a grade nine sub-standing one grade school, a grade eight and grade five separately, a one grade school, meaning that each one of those grades would be the only grade at the library site and not part of any of the buildings, so the ninth grade would no longer be part of the high school, the eighth grade would no longer be part of the middle school, and the fifth grade would no longer be part of any of the four elementaries. There was also a move for a self-standing grade, just kindergarten, as we thought about that, kindergarten and pre-K together, and then we talked a little bit about just pre-K. The school committee at that meeting on the 30th also talked about, can we review a little bit and talk a little bit further on adding a K-6 school? So we'll talk a little bit about that in a slide or two as well.

So when we look at the brief overview of what we talked about on May 20th, A new K-5 school, if it was at the LaBarre site, we would have to make sure that it can fit how many sections we would like to have there. So if we were to build a new school, we would look at creating enough space for students and taking students from each of the other elementary schools that would actually free the space up at those schools. Redistricting our current neighborhood maps at home schools. which I think is something that we really want to say out loud.

This means that we would draw all those maps differently. We would also, if it was a separate school, we would have a full administration in the needs of fully equipped that with our world language specialists, a different level of art, music, and physical education that we would have to provide as well. So that would be a brand new school just to service those K-5 students. If we did a K-5 school, would have to think about also, what would the other schools look like if we did build a new school?

How many sections of first grade would there be at the Tucker or at the Cunningham or Collier Park or the Glover? And we'd have to make sure that we were aware of, when we did build that new school, what that school culture would look like in each one of the schools after the building got shifted over. And not only from a space perspective, but from, does that work? And the reason why I say that is that if we were to draw students out of our schools, Tucker was only a three-street school.

We would never, I don't think, want to educationally have it be a two-street school. I think a three-street school is the smallest school that we would want in terms of a healthy school environment with three classes per grade. And so different conversations about that, I think, would need to happen. And I do think operational costs may be on the higher end of that.

Moving grade nine there, I think we were all pretty clear that we wouldn't want to separate that grade nine from the high school. We have a state-of-the-art high school. We just bragged about it in the superintendent's update earlier. Grade eight had some legs a little bit around, do we want to isolate our eighth graders and try to have them have their own experience that might not be a middle school-like experience, but more of a transition to high school-like experience, whether that's from a social-emotional lens and, or more importantly, from an academic preparation lens, which I think right now, Principal Cahill Dr.

Fish are already working on that and trying to create that relationship between 8 and 9 in a more healthy way. I want to applaud. We've already started with the step-up day happened last week that folks have been asking for for a long time. We have a step-up day that's scheduled for the fall as well.

And we have teachers co-observing 8th grade classes and 9th grade classes. So there's a lot of work going on that I think are already good viable options for that transition for me tonight. We thought also about just taking out a fifth grade. And I think, again, I think we all worry about isolating any one grade that is in the middle of our sequence of grades.

Picking one out of the middle and isolating it as opposed to picking something at the beginning or something at the end. Would that be a good idea or not? And why would it be effective and what would make it work? But my personal opinion is that when I see isolating a grade in the middle of our pre-K-12 continuum, The next shows the move of kindergarten standing by itself.

That does free up space, but it doesn't address our pre-K needs. Having a pre-K in self-standing early childhood center with just pre-K, it'd probably be too much space in the library. So there is thought that maybe a pre-K could be something that can be a little bit entrepreneurial. We could be charged for fee service for pre-K.

We all know that potentially a pre-K expectation from the State Department of Education could be coming down the road, so we would be building capacity if we thought about just having pre-K there. I'm not sure that would justify the full building cost, and also whether or not that would actually remedy our space issue, which is the first thing that we're trying to solve. After walking this again through with the leadership team, the option of the pre-KK We feel it takes our earliest learners at the beginning of our continuum of pre-K to 12 grades. It provides a learning and early childhood center that we feel can be really immersed in what all early childhood students need and have professionals dedicated to just that work at one site where we can prepare our students who are coming to us at three years old, four years old.

and then at five years old, and really enriching them in a way that prepares them for what is traditionally an elementary setting for one through five. And that is something that people still have verbalized real support for, in terms of moving something forward. We also, at this table, two weeks ago, talked about the K-6 school, and I apologize to the group, my head wasn't wrapped around it, and so we actually talked about it a couple of times, But this would really look at, you know, how would Glover fit a sixth grade? How would Tucker fit a sixth grade?

What we would do is actually thin out every school just enough to have a fifth school that was K-6 and take some students out of each building and add sixth grade to that in order to provide space at the middle school. And obviously, all of these options provide space for the high school because central office and all the other auxiliary offices come out of the high school and go down. This, too, would require us to redistrict the school, have a fifth elementary school, and I think the resources of world language and all the other things that we have to provide might stretch a little bit. And I think that we're already kind of stretching that area.

But it's certainly something to consider. The other part of this would be, what would we do in sixth grade? Would we go back to a one-school, one-classroom-based sixth grade setting, like an old, setting for that group to keep them young. Would we have team teachers there?

Would we want to model a middle school option? And one of the things that I've learned in my previous world of doing this kind of work is every transition should be preparing, every last grade should be preparing that grade to make the transition to the next grade. So if we had a sixth grade, we'd want to make sure that there was something a little different about it that prepared them for what seventh grade would look like at Pierce.

Speaker 4 (01:20:03–01:20:06)

Just like we're trying to make eighth grade

Speaker 8 (01:20:06–01:21:55)

look a little different, even academically, to get them prepared for what ninth grade would look like. So when we have a chance to draw this from scratch, we'd really wanna really look at our transitions as best we can. So that would be, in this case, if we did a pre-K to, a K to sixth school and one of them would have to have a pre-K option, making sure that that sixth grade educational model was preparing students for that seventh grade experience. And more importantly, if we have a pre-K experience, How do we get those K students ready for grade one if they leave there?

So preparing transitions is important. And we've been talking about transitions for the last three weeks, around 8 to 9, 5 to 6, and pre-K to K already, and how that district's already coordinated. So this overview, we identify the leadership team again. And this is the slide that just kind of shows, as we start to look at things and we have to make a decision, I, we as a leadership team, felt that we could strike these off and really recommend the pre-KK, which would be roughly 340 or 350 students, plus another 120 preschool.

But remember, those 120 are not all in the preschool all the time. There's a half-day program, so the capacity of the building isn't for the full 120. And we really believe that that early childhood center would best serve the students in Wilton moving forward. The, we've left on the why preschool A and or K is a fit document and statements, and I'm open to any questions that the group has.

Thank you, John. Questions from members?

Speaker 9 (01:21:55–01:22:29)

Steve. Thank you. So I just wanted to Go back a little bit to the middle school. So the middle school does still have a space constraint, yes?

Pierce still has space constraint. And my only hesitation about this is how we are helping Pierce when we do this, because I feel like the long-term strategy is to try and carve out space so that we don't, right? So is there, what are we doing for Pierce?

Speaker 8 (01:22:41–01:23:57)

as much as we are giving it to elementary and we are giving it to high school. So the honest answer is we're really not, and that has to be factored into what decision we make moving forward around whether or not the other option's better and we might want to stay with the MSBA or stay with this. And also, as I tried to make sure that we were saying a few times, if we feel like that is a major piece that's missing in the fall or in the winter after this building is purchased and becomes an option, do we want to revisit that if that becomes a priority? Talking with Bill Fish, he thinks he's fine, but that's fine.

That's not great, right? And so we understand that that's one of the trade-offs that we have. And our enrollment increases are really seen at the elementary level. In the high school, we do have a transitionary period where folks do not come into middle school, they come back for high school.

We want everybody to come into elementary, middle, and high school, so we would like to build capacity and have it available because we want everybody And I do think probably a lure of a 7th and 8th grade school that Sean has been working on is really creating that new, built, fresh idea of how 7th and 8th grade can work in order to keep all those parents in the middle public schools, which is actually a priority.

Speaker 11 (01:23:57–01:24:16)

I know a couple of years ago what we were doing was space studies for the individual, all six buildings in Milton Access. Now that if we're looking at potentially Laboree and there's all this additional space there that could be, look at maybe convincing them to move.

Speaker 2 (01:24:16–01:25:21)

No, I looked at that in depth. First of all, it's like one small classroom is the space they have. So it wouldn't, even moving them doesn't really move the needle that much, but the issue is that it's the head-in room, which cannot be moved. It's very integrated within the infrastructure.

It's the head-in room of the network. So that is in that space, and so that is why they are there for their public broadcasting, and that cannot be moved. What is that word that you're saying, head-in? Head-in.

It technically doesn't tell communities, it's the brains. Okay, it's the brains of the system, because that used to be the high school, and that was like the central of the district, and so that still remains in there, even after the constructions. They didn't use that, it was just talk to them, because they were going through a whole IT kind of upgrade stuff with the work, like Zulus was doing around IT infrastructure, and so this is the time to move it, and they didn't. And so, it's there, they're gonna be there,

Speaker 10 (01:25:25–01:25:39)

Just one comment to yours, too, is if this was an option and middle school became a focus that you wanted to look on, you could look at the additional project in the future that could address that.

Speaker 11 (01:26:16–01:26:29)

I know you initially mentioned looking at additions years ago. Was there an option for the middle school potentially of adding on? Was there any risk site constraints?

Speaker 10 (01:26:29–01:27:13)

Yeah, that's a funny one because they looked at the back of it and they had an addition off the back of it. Through the work I did with the Conservation Commission for what we did with the land swap, I was educated upon by that add-on that they're looking at. So the add-on that you might see as part of that might not, could be that big, but there was potential that you could look at to add on to those at some point. So, and that's why I just wanted to bring it up, I appreciate you remembering that too, because again, it's not something that can never be done later on, or something like that.

But there also would be costs associated with that, so that gets back to

Speaker 8 (01:27:19–01:28:17)

And I think that that's the essence of the dilemma, right? Does it meet the space needs? What meets most of it, but not all of it? What's the cost?

Is the cost at a value that's less than the other project that it's worth not having space added to the middle school of one part of this puzzle? But it's also not for the puzzle at the cost. we really want to be able to. So the other element that we want to pay attention to is just time and execution of the added space for the families that we have moving in.

And so all those variables.

Speaker 2 (01:28:22–01:28:52)

Could we… So in my mind, the… Like we debated this option quite a bit and it does seem like probably the most credible option. It also seems like the second most credible option is a K-5 option because it's the one that will be approved for financing through the MSBA program.

Could we just spend, I don't know if we could go back to the slides, if we could just spend a few more minutes on that one.

Speaker 6 (01:28:53–01:29:03)

And just to clarify, a K6 would not be counted as a K5. So that's just off the table for MSBA. Correct.

Speaker 10 (01:29:04–01:29:13)

And then just for other context, a K5 one would have to be for 495 students, not for the 350 that we're discussing.

Speaker 2 (01:29:13–01:29:31)

So that's where I wanted to start. So MSBA is approved for 495 students. Do we even, we must have some kind of theory. square footage divided by a number of people, whatever, can building C hold 495 students?

No.

Speaker 10 (01:29:31–01:29:40)

So the simple way we can do it is MSBA. The reason they give you these enrollment numbers

Speaker 2 (01:29:59–01:30:05)

So we have building C. How much bigger would building C need to be to hold 495 students?

Speaker 10 (01:30:07–01:30:19)

I mean, if you take an average class size, call it 25 kids, 495 divided by 25, that's how many classrooms you'd have.

Speaker 2 (01:30:29–01:30:36)

So 20, so we need seven more classrooms than what's currently in there, which we can build, right?

Speaker 12 (01:30:36–01:30:38)

And you have to build a cafeteria and gymnasium.

Speaker 2 (01:30:40–01:30:46)

You have to do that again. Yeah. Oh, you don't have to build a gymnasium for early childhood, right? Cafeteria.

Speaker 5 (01:30:46–01:30:47)

Cafeteria. Cafeteria.

Speaker 2 (01:30:48–01:31:22)

Okay, so you'd have to build an additional seven classrooms. and like an additional facility room. Yeah, and just more than seven classrooms would be the core classroom. You need all the ancillary philosophy spaces, you need the music room, the art room, any of that other stuff.

So it does end up being more, there's probably some of those ancillary spaces that also apply for a pre-K-K, but more so if you have a full K-5 model.

Speaker 8 (01:31:22–01:32:03)

And having just gone through this, the MSBA square footage requirements are for classrooms a certain size, but then there has to be a corresponding number of equitable space for special education students, half rooms, small rooms, and small spaces for Yale and special education that would be baked into that too. And that is not negotiable. To Sean's point, there is a spreadsheet, and you plug in your number, and they have an algorithm that says the X percentage would be students your generic classroom spaces, the corresponding spaces are on special education, EL offices, etc.

Speaker 10 (01:32:04–01:32:12)

Yeah, and to that point too, so one of the things when we were going on our own before, we were fine-tuning the design

Speaker 2 (01:32:36–01:34:15)

I don't want to belabor this point. I know we're evaluating the education program, but I also just want to at least try to mentally model the financial impact here. Do you think I'm asking you to do things that we're paying an architect to do in your head right now. I don't know what's buildable on the site, but let's imagine, I don't know, it sounds like we would have to build a building that is the size of building C, something added on to that.

Can we even go that big on that site? It's hard to know. I mean, again, I think you asked the question, how big is Tucker? Tucker's 440 square feet.

Ultimately, a facility that is larger than Tucker in order to do this as a comparison. And you probably, and it depends on, again, what do you have to do with building B? If you're keeping the mansion and not touching it, probably that's a space constraint on the site. Because the site's fairly large, and if you're going to demo it all and fit something there, maybe that's something.

But we're not going to want to do that. So it's feasible. I think you're right. I totally agree with you.

I think the K5 is still a really interesting thing, because it gives us an MSBA. It gives us that reimbursement. What is the size of the addition that you put on compared to how big does that need to be? in terms of bigger than the pre-KK, compared to then what is the financial benefit of staying in this VA.

Speaker 1 (01:34:16–01:34:16)

That's exactly what it is.

Speaker 2 (01:34:17–01:35:34)

Yeah, I totally agree. I think that's right. And I think there could be some benefit. It might just be make the site too tight.

But again, we have Tucker. And Tucker is already a pretty tight site. We can figure it out. And it's a great school and great community.

So I just think as we think about what our architect can do, and to Sean's point, like how we're moving down parallel paths, I'd be really interested in trying to see if we could test fit a K-5, if we end up getting a 495 student K-5 on the site, if we end up getting the property, and we move forward with an SBA. I think for the information to give to the select board, like is this a feasible site for any type of school programming? In my mind, going with the smaller, the more conservative option of like, this is not going to solve 100% of our space needs, neither is a K5, because a K5 still doesn't address peers. But it's not going to solve quite as many of our space needs.

But if it's a small program, see if that fits. If that fits, we have something. That doesn't even fit, we know it's not gonna fit. But if that fits, and we can figure out that working, then we can move forward with the architect through an SBA.

We can try and do a quick test on that, and do we think that would fit? And then that brings in these questions of financial, should we investigate this further?

Speaker 8 (01:35:34–01:36:16)

Because there are real benefits for staying with an SBA. Which almost makes it a good opportunity to go with a pre-KK, because that option will be explored by Sean's folks now, And the K-5 can be actually explored by the MSBA group. So we just have to be a little patient for that to kick in, but we actually have a, that can happen under this model, you know what I mean? Because it's already would be paid for under the OPM and the design team's work.

So it's kind of a, you know, we can get this done by these folks for the 30 grand real quick and see if it's even fit, you know, would fit. And then if it does, to Mark's point, then we can always do the K-5 through the MSBA modeling to find out if we want to stay within that model.

Speaker 10 (01:36:21–01:37:04)

We have a methodology or a path to go. We actually wrote Lab Array as an option to look in there. So we physically wrote that in, knowing that we wanted them at some point, potentially, if we purchased it, to have as an option with MSBA. Whereas if we didn't write that in and tried to bring it in later, again, it might have got us to reset.

So we were trying to be proactive on this whole thing, knowing this was a potential option. So we wanted to make sure that it was included with the work.

Speaker 2 (01:37:04–01:37:24)

school building committee can finance both a design review of lab array for a k5 option and continue down the path of the 7-8 option kind of simultaneously that's that's the idea right I just want to make sure that there's yes I can actually write on right now for MSP good thing

Speaker 10 (01:37:37–01:38:03)

that we can look at all those different options that are there. The one thing I'd caution, though, is when we go with MSVA, we limit it to just these two sites because if something else comes up and we open up to more, we'll get into analysis paralysis and we'll spend all that money and never get to where we want to go. I just say that for everybody to know, but the funding to do all that work, we have that

Speaker 11 (01:38:07–01:39:13)

I do think this is just a really smart, well thought out path forward in terms of trying to go with that smaller option that makes the most sense on this space in terms of renovation, how much we have to do to the space. And then exploring that other option so that we're still exploring, following this parallel path with both of them. Time is of the essence. I think that's the biggest thing.

So it's just getting aligned on moving forward. I mean, a lot of things could happen between like once August comes, you know, we might, you know, we talked about the November timeline that might, I don't know if that's something that they're willing to wait for. So there's a lot of things that we have to hurry up and do, I feel like, to show that we're enthusiastic about this property. And so, yeah, I'm like, I really appreciate how the detail that went into this presentation, your presentation as well, to kind of share where we are and what our options are forward.

So this is great, thank you both so much.

Speaker 10 (01:39:13–01:41:01)

Just one other thing too, just a preview of what may come with the architect and stuff like that. So if the decision is to go with the K pre-K, as I mentioned, the existing rooms under there elementary schools right now are about 1,200 square feet. So when you're talking classrooms to classrooms, it's not a one-to-one comparison. So if the intention is to keep smaller classrooms there, that's fine.

The enrollment within that classroom has to reduce. So your biggest classes that you have now in kindergarten are in Caldecott. So it's 23 kids in a 1,200 square foot classroom. So if you're going to take those same kids and move them over to a 725 square foot classroom, I think that's a really good point.

I think that's a really good point. I think that's Because we're going to be doing work on this, and this is one of the things that they're going to ask you guys of programmatically, start thinking about the stuff that's there. So I just wanted to bring that up just so, you know, when they do come along and stuff like that. And then my final point, the architect that we did hire is actually the architect that was doing the previous program at the middle school.

She left her firm that she was at. She's at a new firm. So it would be a familiar face to some of you.

Speaker 7 (01:41:03–01:41:21)

I'm going to be mindful of the time, but I also want to give members a few minutes of conversation.

Speaker 2 (01:41:21–01:42:13)

So I think, I know, I appreciate the note. I know there's no vote on the agenda. You still are allowed to vote on it. There's no meeting requirement, but you have to say vote.

direction on what path forward, that also is going to dictate some work that the school department's going to have to do with the architect in terms of meeting with them for some of these things that Sean's kind of bringing out, some programmatic information. And so I'll make sure we're being aligned on what we're asking them to do. If there are no more questions, I might take a motion. If somebody wants to make one for proposing which path you would like the architect, I propose the school building committee, your chair and architects move down.

Speaker 7 (01:42:14–01:42:16)

I'll have the exact language in mind here.

Speaker 2 (01:42:19–01:42:35)

I'll make a motion that we recommend the school building committee's architect explore design for pre-K and kindergarten school at Leverett. Well motioned. Is there a second?

Speaker 12 (01:42:35–01:42:35)

Second.

Speaker 2 (01:42:37–01:44:37)

Any further discussion? All in favor? Sean thank you so much for helping guide this conversation. is to come.

I just want to hedge my own concerns about this whole process with the community that we don't own the land. So that's something we should be very clear. We do that as like, great as this thing by library, we don't own it, library owns it. We might not get it.

I'm still, I'm really hopeful that us like board and town administrator can position us really well, but we should keep that in mind. It's great as this might seem. So let's cross our fingers. Okay, we'll move over.

Chair support, school committee governance retreats. We are trying to figure out some changes potentially to dates. We've thrown out 15th, thrown out the 17th. So I think that's still something that we try and talk with John offline about to figure out there is a date.

The goal is we obviously want everybody here because having all the members be a part of that, especially the goal conversation for next year will be very important. Pushing it late into August is a problem because one of our members is going on a phenomenal trip and will be gone a significant amount of August. And so, you know, not wanting to delay this until September so that we have some direction going into the year, because there's a lot of work we have. I think trying to figure out what we can do in the next two weeks would be important.

So sorry for the back and forth. I appreciate the members' flexibility and everybody's time and commitment.

Speaker 6 (01:44:37–01:44:43)

It seemed like the 16th might still be a live option. I might be the only one.

Speaker 2 (01:44:43–01:47:14)

I can't have a work day on the 16th. OK, I'm sorry. If it works literally for everybody else, not me, then I'm out. No, you'll keep us both small, yeah.

I did have just a couple other things I wanted to just mention, just echo John's points about the senior awards. Thank you all for inviting us. Thanks to the high school staff for putting on just a great show, as always, and obviously the kids were, I should say, young adults at this point. money and time and care for our kids year after year.

And so that's really impressive. I really appreciate it. The retirees, Charlene, big shout out to Charlene for organizing that. Said some very nice things that I got to read, luckily, but again, she helped us with all the principles, and so just appreciate all the work on that end.

The time and dedication those folks had, as you said, just decades upon decades, and will be missed, and we're really blessed to have great people who care about our kids. Excited to see all of you at graduation on Sunday. So hopefully the weather is still looking good, and we can do it out on the field. I did want to share, I got an update from Richard Wells the other day.

We did pass through the, it was a house in the Senate vote, $250,000 in funding. a fair share for the Tucker Playground Project. So we were anticipating that going through, but it has gone through and now it needs to be signed by the governor. But really big thanks to Richard, to Bill Driscoll, especially to the Tucker PTO who applied for this and look, seeking this funding for the playground projects.

I just want to thank all those folks who were involved. And then last thing I want to make sure to say is that tonight is Katie's last meeting with us. We tried to lock her down to her desk, and she slipped out of the cuffs. She is leaving us, but just want to say thank you once again, Katie, for all that you've done in the last two years.

We really appreciate it. It's been a pleasure working. I think I speak for all the members and just the value you brought to these conversations in really difficult times and less difficult times now because of your work. And so we greatly appreciate it.

You will be missed. Don't be a stranger.

Speaker 13 (01:47:14–01:47:19)

Thank you. Thank you. I appreciate it. Thank you.

Speaker 2 (01:47:19–01:51:15)

And that will do it for my chair's report. We will move over to the finance subcommittee report. I'm going to pass this over to you, Mr. Hall.

OK. I'm going to try to do my best Mark Loring impersonation for the finance subcommittee report. So we met on Wednesday, went over a couple of things. Katie, if I get anything wrong here, feel free to correct me.

Katie went over just kind of end of year logistics. There's a purchase order freeze in effect for the rest of the year. Lots of advanced purchasing for next year, payroll stuff happening, and then looking to close the books by mid-July on the prior fiscal year. So that's great.

Talked about Katie's transition plan and the hiring, which Superintendent Phelan already gave an update on. It'll overlap for a couple days in June and the new person will hopefully start at the beginning of July. We spent a lot of time talking about the budget development schedule or some time talking about it, which I shared around to the group and happy to field any questions on this that people have, and we can continue to talk about it because it is a living document. But this is a significant work product coming from the Budget Coordinating Committee, which John, Katie, Mark, and I have been participating in, that probably for the first time in a long time, or maybe the first time ever, kind of outlines the timeline and responsibilities and expected collaboration from various parts of town government to build the following year's budget, and really asked us to start that work in August, largely through discussions and planning.

and then progressively collaborating kind of more intensively with other parts of town government over the next few months, and ideally approving a budget in voting on a budget in January of 2027. So, That's kind of the purpose of this document. I think we'll use it, reflect on it. It'll evolve and I suppose we may rebuild it every year after we learn more and use it.

And then maybe I'll just close out the finance report. Sorry, let me find my notes here. We also talked about finance committee goals for next year, which we might talk about at the governance retreat in a couple of weeks. So three things that kind of came up for the committee.

One was successfully executing the building of the FY28 budget. The second is thinking about our sort of, I don't know what the right word is, but policies or principles around how we want to structure fees and how to set expectations around fees for the community. And the third are continuing to build out revolving fund policies or maybe like sort of an overarching policy for revolving funds. We did that work this year for Circuit Breaker and for the Special Education Stabilization Fund, which is not really a revolving fund, I don't think, but sort of continuing the work of documenting how we want to govern those accounts.

And I would just ask, you know, other folks to think about other work that you might want the Finance Committee to take on next year if something occurs to you. And we can put that in the hopper. Any questions that I do better than Mark? I'm going to leave it at that.

Speaker 8 (01:51:15–01:52:47)

Hello, Mark. Not at all. Hi, Mark. Can I just add, I think we spent the end of the meeting talking about the good work that happened this year.

And this will be where I can be able to say a couple of nice things about Katie as well. In her two-year tenure, identifying challenges in FY26 and supporting the closure of the FY, I'm sorry, 25 budget, and then working diligently in order to make sure that those policies in place that we created in 20, during this school year, so that didn't happen again. So the policies that we implemented this year were really important. They were safeguards for the school community and the school department in order to operate in a way that was very transparent and available for the community to be able to know what was going on with the other involvement funds, which were a big piece of what we were trying to work through and what the time was working through.

So I want to thank Katie for that work in just two years, and really in just one year. First year was in identifying the problem, and the second year was remedying the problem, and then setting policy So that problem didn't come up in a way that was as kind of popped up in a way that people had to then be reactive. We would be proactive in that report. So I congratulate the Finance Committee for doing that work this year, and also doing some fees work as well, and getting the budget announced this year.

So thank you, Katie again. It's a lot of work in two years.

Speaker 2 (01:52:50–01:53:55)

You want to read out the awards that were approved? Yeah. So tonight, I signed. Oh, no.

I signed one last week, too. I don't have that. I heard the motions. Oh, OK.

Hold on. I can read them off. Do you have it open right there? Yeah.

Okay. So the following two warrants have been previously signed and approved. Warrant number 46 dated 5-21-26 in the amount of $537,394.21. And warrant 47 dated 5-28-26 in the amount of $822,472.42.

I also signed warrant 48. tonight in the amount of $577,891.88. We will keep moving. Up next is policy subcommittee report, and we have some expedited policies to approve.

Speaker 11 (01:53:55–01:57:25)

So the policy subcommittee met, I think it was last week, We've met remotely. It was the only time we could make work, unfortunately. But for policy, we had the subcommittee review the homeschooling policy, IHBG. There we discussed the inconsistency in the language between the actual policy and the student handbook raised to us and brought to our attention.

So per John's recommendation, we considered a one-year exception to the current homeschool students to help address the issue. The issue is basically about not being able to participate in sports, and there was some in athletics if you're homeschool students. So there was some confusion, so what we did was make an exception that would just be for this year, and then there would be, this exception would not apply to new homeschool students, so students who start, who register to go homeschool in August, they would be able to take part in this exception, but for current students, we're just giving that one year exception, and then the committee also clarified that AP course participation would be similar, it would be only available to students who started, the school year in school under the current arrangement and not for future students. So we do have the original policies in your folder and also the redlined version as well as the final edited one.

And as you will notice, we tightened the language and just simplified everything so that it's very, very clear for anyone who sees that. So just really tightening up that language so we appreciate the community member who brought this to our attention so that we were able to look at this in detail and just kind of make those corrections and make that exception. And then we went, so we'll have to do an expedited reading and vote on it tonight, since this is officially our last meeting. And then the next one was the camera systems policy that we had.

And what we did was we kind of reviewed it further. making sure the agreement between the police department having access to distressed camera systems. The police would have access limited in emergency situations, but not have access throughout all the time as needed. So someone would be designated from the district to provide access to the cameras in case they needed to review that.

You just again type in that language and there were some concerns and questions that members had, including how the logging into the system would be tracked if it would be manually logged in or automatically. be logged every time someone had access or was able to access DV. That was a great point that Stevie raised. So we're going to get some clarification in terms of what the technology can actually do and what we would have to do manually to make sure.

So just that's something that we would look at again in the fall, I think, when we recruit for policy. So just a couple more questions, just making sure that everything's streamlined and makes sense.

Speaker 2 (01:57:28–01:57:35)

Questions for members? specifically around the one we're going to be voting on here, which is the municipal policy and municipal application.

Speaker 9 (01:57:40–01:57:57)

So just so that I'm clear, what we're voting on is the previous policy had provisions for making exceptions where someone could participate in these things, and the redline policy, the one we're voting on tonight, takes those exceptions out and just

Speaker 8 (01:57:57–01:57:59)

Did I finish your question?

Speaker 9 (01:57:59–01:58:03)

And just straight up says, no, you cannot participate in athletics.

Speaker 8 (01:58:03–02:01:26)

Right, so the policy, the current policy, it says, first of all, the policy, the application, and the student handbook said different things, were not aligned. So the first part was just aligning it. That was a really confusing point because it said different things. And then the decision to use languages that was either no or yes, current language was at the superintendent's discretion.

So when you have that, now you're giving people the hope that it will happen. So when they're making this out and they're going to homeschool and they're talking to their child, they're saying, oh, it'll work out. And if that superintendent decides to say no, then we're back to that confusing gray area that that current parent exposed to us. We thought it was very, if we felt it wasn't something that we would approve or a regular I think Paul should be more clear like that and not give, sometimes that flexibility makes it harder for those individuals who have to hear the case and continue to make decisions based on a continuum.

If I do it for you, am I gonna do it for the next person? And even though every case is different, I just think that the saying no, if that was what we would reasonably say if we were asked, of our students and what the accommodations and the other pieces that it takes to execute that. It's really hard to have anybody from the outside come in. We have already had the practice of not allowing students outside of the public schools.

Milton Academy students call up a lot. Other schools call and say, oh, you have the economics. We don't have economics in our school. It really is a challenge to introduce anybody into that that's not students that we're aware of and what their accommodations are.

And then for the athletics, it was a no because we hold our students who are in school and we get to a certain standard of behavior, grades, and good standing, and we just have no way of comparing that in a homeschool situation, and we didn't feel like that was a balance that we wanted to, or a decision that we had to make. If I had a student who didn't, was asked not to play anymore on the basketball team because of their grades, well, how come the homeschool child can play? We don't even know how their grades work or if they're in school and good standing. That was the kind of the general rationale.

And then the big piece of this was clarity and not leaving people with any kind of false hope and mean greatness and when they applied exactly what it meant for their child. And I think that the family that brought this to our attention had a very good example that touched on all of this. And so it allowed us to have a really healthy conversation about the policies of communities. And then we did say that there'd be an exception was unable to participate, we did say that we would grant an exception for next year, because we did feel like we did a disservice to that.

We thought it was important to right that situation. So that feeling will be made whole next year if they choose to close schools.

Speaker 1 (02:01:29–02:01:30)

Questions?

Speaker 6 (02:01:35–02:02:23)

I've appreciated the conversation over the past few meetings, and I just really appreciate, John and Carla, your sort of openness to the conversation and to, you know, neither of you were, had anything to do with creating that set of conflicting documents, but I felt, I really appreciated your willingness to try to problem solve. with the current situation that we found ourselves in. And, you know, I think there are a lot of nuances to the issue, a lot of factors to consider as there are with basically everything, but yeah. thankful for the process that we've been able to have.

So thank you, Anna, for leading us through that.

Speaker 11 (02:02:24–02:02:40)

Yeah, no, and I appreciate just making that language absolutely clear. I think it just less is more, in a way. So it's just very clear. So hopefully, that's helpful for families going forward in decision-making.

Speaker 7 (02:02:40–02:02:48)

Can I just ask? I don't want to go over the point, but how many homeschool applications have you had in a year? I think that we have maybe 12.

Speaker 8 (02:02:49–02:03:06)

Yeah. Kids will be able to fill both districts. Gotcha. And so, therefore, that would, instead of these, this is generally high school-driven, the ADP and the athletics, so I was thinking about how many are in the actual high school.

Speaker 2 (02:03:06–02:03:13)

Hannah, just a question. So there is a discrepancy between the policy, the handbook, and some third source.

Speaker 11 (02:03:14–02:03:19)

I think it's the application for home instruction, which is also on our form.

Speaker 2 (02:03:20–02:03:27)

Yeah. So all three said something different? Or this policy said one thing and those two things said a different thing?

Speaker 8 (02:03:27–02:03:32)

Yeah, it was hard to follow the dots if you would know one document.

Speaker 2 (02:03:34–02:04:06)

I don't know how often this comes up. It could be worth like I don't know, taking all our policies and our handbooks and running them through AI or something and asking it to identify areas of discrepancy, just so, because this one feels like, I don't know, this is not a critique of anybody, but like, this one feels like probably, you know, one, there's only 12 homeschooled families, so this doesn't come up very often, but one that had you looked at both of them, you'd be like, oh yeah, these don't match. I wonder if we should just,

Speaker 7 (02:04:10–02:04:24)

Any other questions or comments? If there's a motion. Thank you.

Speaker 11 (02:04:24–02:04:42)

I can make a motion. using the expedited approval process to approve the following policies, policy IHBG homeschooling policy, and policy IHBG-E application for home instruction. Do I have a second?

Speaker 7 (02:04:43–02:04:56)

Second. All in favor? Thank you. Is that a proposal?

Yes. Thank you so much. Thank you. We appreciate you.

Negotiation subcommittee update.

Speaker 6 (02:04:57–02:06:10)

Yeah, so this will be brief just to keep you all informed that negotiations are ongoing. We met on Monday of this week for a bargaining session with the MEA still on unit A. We have our next session next Monday. You know, we're continuing to make progress.

I think we decided that it would make sense to hold off on an executive session or further detailed discussion of sort of the agreements that were. moving towards until we've had like one more layer of progress, which we anticipate for next week, hopefully. So we'll have to keep everyone in the loop on being able to schedule that opportunity to share some more updates, which would, of course, be before. and appreciate the MEAs on continued engagement with us in this process.

Anything any of you would like to add?

Speaker 7 (02:06:11–02:06:13)

Negotiation will be next Thursday.

Speaker 6 (02:06:13–02:06:17)

Next Thursday, sorry, the 11th, right? Yeah.

Speaker 2 (02:06:23–02:06:31)

Nothing else, we'll keep it moving. Thank you very much. Next item is the Superintendent Search Committee Report.

Speaker 6 (02:06:32–02:11:13)

yes so thank you so we the superintendent search commit subcommittee met last week for the first time and it was a good sort of opening meeting I'm I'm providing this report because one of the things we did there was determined that I will be chairing this subcommittee. But I'm very excited to be working with Stevie and Nathan on the committee. Anna also joined for part of the meeting, which was great. Thank you.

And it's just a reminder that, like our other main subcommittees, these are going to be cross-posted if any of the rest of you would like to join. We had a good discussion. The key pieces that we talked about included Just doing a little bit of context setting for where we've been with superintendent searches in the past, going back to 2022. So we discussed that a little bit.

We also talked a little bit about the ways in which the expedited interim superintendent search that we undertook last year is really different from the process that we're preparing to embark upon for this full school committee superintendent search for the next permanent superintendent for Milton Public Schools. We talked a little bit about pros and cons of things we've done in the past, including using MASC, Massachusetts Association of School Committees, as the partner that we used in the previous full superintendent search. A lot of districts do use them as a partner. We talked a little bit about that.

We also discussed what other options would be that school committees can pursue, and those include working with, NSDAC is another agency similar to MASC that offers that service to districts, member districts. The Collins Center at UMass Boston is another entity that leads a lot of municipal searches, including superintendent searches. I believe they actually helped Milton hire Nick Molano as our town administrator a few years back. But they are sort of a different type of an option because UMass Boston is a public entity.

The third sort of bucket of options we discussed involves going out to do an RFP process in which we would welcome proposals from private search firms, which is another thing that districts often do to hire a search firm that leads a process for you. So we kind of like put those different ideas out on the table. I think we had some general consensus on the group that we're, you know, we're recognizing the challenges of the turnover that we have faced as a district in these recent years. Given that, we feel like a really important responsibility to run a very rigorous, professional, and ultimately successful search to get the best possible candidate for Milton.

And that led us to kind of think about the subcommittee's interest in pursuing some of these different options that I've tried in these most recent iterations. and center being one and possible RFP process being another just to get as many options as we could. And then as a committee, as a full school committee to evaluate like what makes the most sense. factors we would need to consider include the cost of working with any provider, including the Collins Center, which I gather is, you know, less expensive than working with a private search firm.

But that would be a process of cost benefit analysis for us to just figure out, you know, what are they proposing to do for the process? What track record of success do they have etcetera? Those would be things for us to weigh together and then, you know, look at. budgetarily what's possible and make a decision for how to move forward.

This is something that we will be needing to pursue over the summer. Like Sean said, we're going to be here working anyway on the school building project, so we might as well just work on this too.

Speaker 4 (02:11:14–02:11:14)

Just kidding.

Speaker 6 (02:11:14–02:12:22)

But we do have work to do because we need to kind of identify our partner for the search over the summer in order that they're in place and ready to help us launch the search as we return to school and help, you know, bring the community into the process early in the school year. The timeline we also discussed as a subcommittee would generally look like over the summer identifying our sort of partner who will help us lead the search and then through the fall would really be an active period of community engagement, getting a search committee in place and all of that in order to be early in the pool and trying to hire somebody by January, hopefully, or July 1st of 2027. So those were some of the general things we talked about. And I think Stevie, Nathan, did I miss anything?

Or would you like to add your point of view? Or Anna, for the part you were there?

Speaker 2 (02:12:25–02:12:26)

You covered it. Nailed it.

Speaker 6 (02:12:26–02:14:35)

So we don't, you know, I think one thing we talked about was at our governance retreat, whenever we're able to do that, assuming we can identify a date, like at the beginning of the summer, perhaps to that, this feels like it fits under governance. I mean, it is our primary responsibility in governance to hire and work with the superintendent. So what I was proposing was the idea that we could bring additional information to the governance retreat if it is possible to have the superintendent search on our agenda at that. I, for example, made an inquiry to the Collins Center.

I haven't heard back from them yet, but on behalf of the subcommittee, I went ahead and did that just to see what is their process if they don't need to go through an RFP because it's UMass. Do they provide a proposal? what is it that they do for the process? And I think we had talked about wanting to maybe do both of those, like another parallel path option, really just to try to get ourselves as many options as possible.

And So the idea would be we could try to gather some additional information to share with the whole school committee at the governance retreat, if that's possible, in order to come to a decision this month that would allow us to launch an RFP process. Officially, if we formally decide together that we agree that makes sense to do. And in the meantime, we could have the info from Collins Center to help inform us about that. But I don't know what you think about that.

We kind of just wanted to bring this update and see what you think.

Speaker 2 (02:14:37–02:15:24)

Yeah, I mean, I love the idea of moving forward with an RFP sooner than later and trying to get that ball rolling so we can have everything kind of sort of somewhere. I love the idea of the RFP or the Knowledge Center kind of being more robust professional organization. and just how essential this is that this goes well. And so I appreciate the committee looking for ways to just maximize your impact and ensure that this is a successful search.

So the idea of putting out a governance retreat, yeah, let me just walk into that. Again, is it governance or is it somewhat substantial? But either way, I think us needing to meet on this and completely agree with that point. I think we need to figure out how to make sure that happens.

Speaker 7 (02:15:25–02:15:29)

Give you all the approval you need so that subcommittee can move that forward.

Speaker 6 (02:15:30–02:16:00)

Well, we can start working on, like, that's another thing we talked about was starting to try to draft an RFP in the event that we all agree that's something to do. So there are some of the, like, some of that work can be happening between now and when we might you know, whether it's part of governance or something separate since, you know, we can work that out, but.

Speaker 2 (02:16:00–02:16:16)

Yeah, I mean, ultimately, what would we need to vote the RFP itself? At least the RFP is probably what we would need to take a vote on as a school committee, because otherwise we could provide general consensus at the beginning of tonight,

Speaker 6 (02:16:18–02:16:45)

I mean to be honest I actually I think need to do more diligence due diligence on that as far as like what we haven't done an RFP process for this specific service you know so I actually would want to double check like what's the Do you have any thought on that?

Speaker 13 (02:16:45–02:17:47)

So in order to do an RFP, the procurement process goes based on a dollar threshold. So if it's up to $10,000, it's just sound business practice. You don't have to do an RFP. For schools, you can procure goods and services up to $100,000, just based off of three quotes, but you have to define a scope of work.

So you, I think it would be really important for that committee to define what they would like this consulting firm or partner to do as a part of the superintendent search. So the scope is going to be meeting with stakeholders and kind of all of those key pieces. And then when you have that, if it's under $100,000, you can just solicit three quotes based off of that scope of work. If it's over $100,000, that's when you would formally have to issue an RFP.

OK.

Speaker 2 (02:17:47–02:17:48)

Better not be over $100,000.

Speaker 6 (02:17:50–02:18:16)

What we've talked about is actually, I don't think we have an expectation that would be over $100,000. just based on some initial research of what firms charge for this type of process. So I guess then it's just, it's a distinction between a formal RFP and soliciting bids.

Speaker 13 (02:18:16–02:18:30)

Soliciting quotes, yes. But you just need to make sure you have that clearly defined scope of work so that when you're reaching out to all the different companies that you're asking them to quote the same product.

Speaker 2 (02:18:31–02:18:44)

So it's like a closed procurement process, we solicit the quotes, and then do we need to provide evidence that that happened and have that sort of reviewed by somebody, some body?

Speaker 13 (02:18:45–02:18:46)

No, you just have to keep documentation.

Speaker 2 (02:18:48–02:18:58)

Okay. All right. What's that? Assuming you're going to send it out through email and you'll get an email reply or a proposal submitted, that's documentation.

Speaker 6 (02:18:58–02:20:10)

That's a public record. And so that's where you are directly contacting providers to ask that they submit a bid. I mean, it's easy enough to find through the research of all other districts that have gone through this process. It's really not that hard to identify who what seemed to be the most successful farms districts we would compare ourselves to might use.

So is it OK if I follow up with you to just maybe check in around the details of that? Yes. And if that's something that we're going to do in which we don't have to launch a formal RFP process per se, then it seems like it would actually suffice at this point in time to move forward just with a general consensus from the committee that this is a direction that people support so that I can move forward with that.

Speaker 2 (02:20:10–02:20:18)

So the committee can put together a scope of work or a scope of services

Speaker 6 (02:20:18–02:20:56)

Which, again, is pretty standard. I mean, I think we're not looking to create something that isn't replicated in every district that takes this path. And just to state for the obvious, embarking on this process commits the school committee to nothing. lets us start to learn what options we have to then formally make a selection when we would get to that point, right?

Speaker 2 (02:20:56–02:21:26)

Yeah, yeah. To say it out loud in terms of like, I think the places that committee, maybe one of the four committees, maybe have the full committee, again, get the scope of work just so we all are aligned and that's the scope of work we want. And then obviously when we get the quotes back, you do interviews or what that selection process is, you know, and I've deferred subcommittees. We don't know exactly what that looks like, but obviously we would have to vote on signing the contract and the financial indications.

Right.

Speaker 7 (02:21:26–02:21:34)

That would need a selection process at that point. Okay. Does that sound? Yeah.

Speaker 11 (02:21:36–02:21:37)

Makes sense. Thanks.

Speaker 6 (02:21:37–02:21:44)

That's helpful. That's great. Get excited.

Speaker 2 (02:21:49–02:22:01)

Great. Moving on, approval of meeting minutes. So those were in the folder for the May 20th meeting. Anybody have any edits or concerns?

Speaker 12 (02:22:02–02:22:04)

Just one small edit that I made.

Speaker 2 (02:22:05–02:22:06)

You made it in the document?

Speaker 12 (02:22:07–02:22:20)

I just commented on it. for dispelling of the student ramps last week.

Speaker 7 (02:22:20–02:22:34)

Sorry. Thanks. Great. Let's just change it.

Thank you. Anything else? If not, I will take a motion.

Speaker 2 (02:22:37–02:24:39)

I make a motion to approve the Milton School Committee meeting minutes of May 20th, 2026. Is there a second? Second. Thanks.

No discussion? No further discussion? All in favor? Raise your hands.

Thank you so much. Next up, we've just talked about our next meeting agenda, and it will be governance retreat. We'll figure out the exact dates, and then we'll figure out the dates when we get back in August. and we will likely, as we've said, kind of schedule some on-off meetings over the summer to sort of work forward and possibly elaborate and possibly negotiations.

So there's a lengthy framework, so I'm excited for everybody to stay connected over the summer. Sorry in advance to your families jumping out of your beach trip to jump on Zoom. Great, if there's nothing else on that, then we will move to item 12, which is actually an executive session This is related to an open meeting law complaint that's been shared with the board. So we will be going into executive session.

And before I make a motion to speak, folks will go into executive session and adjourn directly from executive session. So we are about to adjourn from public session. So with that said, I will make the motion. Motion is made to go into executive session pursuant to Mass General Law, Chapter 30A, Section 21A3.

to discuss strategy with respect to litigation, if an open meeting may have a detrimental effect on the bargaining or litigating position of the public body, and the chair so declares. Specifically, an open meeting or a complaint, and to adjourn directly from executive session, not to return to open session. Is there a second? Second.

Second. There's a roll call vote. We'll go around. Nathan?

Yes. Stevie? Yes. Val?

Yes. Lizzie? Yes. Anna?

Yes. And I'm yes. We are adjourned into executive session.