Speaker 1 (00:23–00:44)
All right, so welcome to the Milton Community Preservation Committee meeting of January 12th, 2026. First time I said that. So the approval, so let's do introductions. I am Tom Callahan, the chair of the CPC.
Speaker 2 (00:45–00:47)
Kathleen O'Donnell, committee member.
Speaker 1 (00:47–00:49)
Rob Lee, the Ash Park Commission.
Speaker 3 (00:50–00:51)
Steve O'Donnell, Historical Commission.
Speaker 4 (00:52–00:54)
Cheryl Tadanos, Planning Board.
Speaker 3 (00:55–01:00)
Pete Jackson, Advantage, and Fiscal Liaison. Robert Powers, Housing Authority.
Speaker 5 (01:02–01:02)
Jenny Russell, Vice Chair.
Speaker 1 (01:02–01:15)
All right. Welcome, everybody. And we have the approval of the minutes from the December 16th meeting. Any motion?
Speaker 2 (01:16–01:18)
I move to accept those minutes.
Speaker 1 (01:18–01:23)
Second. Any discussion? All in favor?
Speaker 6 (01:23–01:24)
Aye.
Speaker 1 (01:25–02:58)
Aye. And since we have no one online, we don't have to do roll call, right? Right. So I just wanted to also report, Jenny, I sent today, this is just this afternoon, all four last minutes that you had forwarded to me to Nick and Lynn to figure out how to get those posted.
Yeah. Thank you very much. All right. We have invited our town treasurer, Joanna McCarthy, to join us.
Thank you so much for joining us. And thank you for the conversation you and I had a couple of weeks ago preparing for this meeting. And that was very helpful for me. So I sort of wanted to just open the floor.
And Joanna and I talked about a variety of things, but sort of the town process for bonding, upcoming bonding, anticipated bonds that we're gonna float maybe later this year. So she can talk about that. Administrative costs, debt service on a hypothetical $750,000 bond. And also the dedicated revenue stream issue and how that creates a different type of not responsibility for the town, but it doesn't really, well, I'll let Joanne explain that before I butchered that explanation.
Speaker 7 (02:58–07:19)
So there's a bunch of things there, but- I think it was probably now close to a year ago that Tom and some others had had a conversation with me about bonding CPA, CPC project, right? And I think that's a great idea. This is a great way of capitalizing on something that we could potentially already be doing with the town using your known revenue stream, which are your CPA surcharge on residential and commercial real estate taxes. Using that as your, which the bonding occurs.
So one of the things that Tom just alluded to and something that I always keep in mind is the cost of doing these issuances is not cheap. And we factor that in for sure to the timing and the cadence for which we do issuances for various things and various products. And I think a really interesting way of potentially funding a project at this size for this committee is doing so in connection with a larger issuance that the town is intending to put forth. So it would kind of act the same way as other issuances, right?
Like you'd need a legislative body to approve it. So it would need a two-thirds vote at town meeting. and you need to kind of back it up, and we can show the CPA projections. And there's some spreadsheets that I think, I don't even know what that, that Community Preservation Coalition had pulled together, right?
That are really good about kind of talking about like your forecast, right? But I think that you can do that in lots of ways with just knowing that 2.5% tax rate increase year over year, right? So there is an issuance coming up that we're intending to do, that the town is intending to do. There's several projects, capital projects, that we'd like to bond for.
There's also some large issuances that were large projects that we would likely kind of wrap into the same issuance. So sometimes these are done in like two different tranches based on dollar size and then also like term like years of the project right so i think what we're estimating i'm just pulling up what we were what um actually nick um town administrator and our financial advisor we work with um UFASI, which is the Unified Financial Advisory Service. A lot of municipalities do that for bonding issuances. And they kind of handled us through all the legalities with respect to it and the funding and all of that.
But it looks like we're going to do two series. We're going to go forth to town meeting, two series. And the first would be, again, various capital projects. The second would be larger issuances for the fire station.
building and the Cunningham building project. So there's an opportunity. And our timeline for that is August to September, somewhere in the fall. And we do that from a town's perspective as we're trying to manage cash flow and think about principal and interest payments and all of this stuff for year one and then out years.
But that's kind of our anticipated timing with that. And again, so the administrative costs with this is that there is one. But we typically will allocate that across the various projects. So a nice way, I think, for us, for you, for this committee to capitalize on an existing issuance would be to kind of come in if there's sort of larger projects that the town is thinking about.
So you'd only pay a portion of them.
Speaker 1 (07:19–07:22)
So you would prorate those administrative costs.
Speaker 8 (07:22–07:22)
Yeah.
Speaker 1 (07:23–07:38)
And what's the, I mean, I won't, we won't hold you to this, but like a $20 million bond issuance would have costs, administrative costs of 50,000 or less or more or.
Speaker 7 (07:39–07:40)
Between 50 and a hundred.
Speaker 1 (07:40–07:40)
Yep.
Speaker 7 (07:41–07:51)
Yep. Yep. All in, including legal stuff, transcripts, you name it.
Speaker 1 (07:52–07:57)
So we can do the math and figure out our portion would be X. Yeah.
Speaker 6 (07:57–07:58)
Yeah.
Speaker 1 (07:58–08:01)
Yeah. Yeah. Yeah.
Speaker 7 (08:03–08:13)
Um, what else? So, so when I spoke to you earlier, Tom, you were thinking kind of. this committee was thinking that there was one project that was of interest.
Speaker 1 (08:13–08:51)
We have one in front of us, as a matter of fact, behind you and in front of us, the Town and Wharf Project. But we also wanted to continue to educate ourselves about this in general too. We anticipate, that's actually maybe some of the questions, we anticipate future projects in front of us in the coming years that would Be asking for amount large enough for us to consider a bond for that. So this would be our 1st consideration of a bonded project, but probably not our last.
Speaker 7 (08:51–09:38)
Yeah. And so with each issue, and we get a debt service schedule, like, we do for every service project. So that debt service schedule for. Hypothetically, this or project for would be no.
And that amount will be known due each year from CPA funds. And we can talk a little bit about timing. Like I said, we're currently, from a cash flow and a budgetary standpoint, trying to manage our FY27 and FY28 budgets. And so we're thinking about this issue and it's very thoughtfully about if we if we try to accelerate a principal payment or decelerate a principal payment.
And so we can talk about that if we go down that route about like kind of where you'd wanna fall.
Speaker 1 (09:38–10:08)
Can I just, let's get to those other issues, but just, I wanted to also put out, because one of the first things you said to me when we talked last week, was it last week or? No. Two weeks ago. It was December.
Yeah, it was December. Was this issue of because we have a dedicated revenue stream, it doesn't impact the town's bond rating or bond cap, or at least that's what I understood, right?
Speaker 7 (10:08–10:29)
If you think about it, bond rating will be a sort of return thing. We will go out for a bond rating and an issuance of what we're intending to do in the fall. this would be part of that. I don't think that there's any sort of ramifications for town funds because this would be a known funding source.
Speaker 1 (10:29–10:41)
I guess it's not competing with the general operating general funds that you have to pay other debt service with because this has a debt. That's, I guess, what I was trying to get.
Speaker 7 (10:42–11:13)
Never use CPA funds to fund debt service on any other project. So having that known would be important, and that would be easily verifiable. And we can project that out, yes. So I think, like I said, I do think it would be part of the bond rating discussion, because it would be part of the issuance if we so choose to pull all of this stuff together.
But it would not handcuff any general funds.
Speaker 1 (11:13–11:17)
Yeah, OK. That's what I was looking for. Pete, and then Jenny.
Speaker 7 (11:17–11:17)
Yeah.
Speaker 3 (11:17–11:32)
When you issue, let me get the ball to the body. Can you have different terms within the same package? How is it probably going to be, like 15 years, probably?
Speaker 7 (11:32–12:18)
Yeah, so I was just looking at our anticipated projects that we have. There are some that are seven, there are some that are 10, there are some that are 20, there are some that are 30. have sort of a very, but it, the way you package it is important because that will then determine the rate that is given to that specific issuance. But I think we'll let the really smart people in this, UFASI, help with that.
But yes, so you wouldn't have to like, yes. Correct, exactly, yeah. And I think what we had talked about is a 15-year term.
Speaker 2 (12:19–12:24)
We wouldn't be putting the term in the vote anyway.
Speaker 7 (12:27–12:30)
But that at least will allow us to protect out the debt service.
Speaker 1 (12:33–12:43)
And then Jenny and then Rob. And then Cheryl. I'm sorry, I'm looking at this side of the table. So Rob and then Cheryl.
Speaker 5 (12:43–12:56)
So I beg my ignorance on process, but you said that we needed a two-thirds vote for this particular bond. Does that mean you need a two-thirds vote for the other issuances that you're talking about? So every issuance requires a two-thirds vote.
Speaker 7 (12:56–12:56)
It does.
Speaker 5 (12:57–13:07)
And then so that would not, when would that happen then for this issuance that you're talking about? if you're talking about August, September, that would be for the fall members meeting?
Speaker 7 (13:07–13:18)
That's a good question. I think we might, I don't know the answer to that. I think it would be too, maybe we're trying to do it for this year.
Speaker 2 (13:18–13:20)
We would be voting it for this year.
Speaker 5 (13:20–13:25)
I know, but if it's being bundled with… Well, it's just the authorization is the rule.
Speaker 2 (13:25–13:28)
We're not doing the bonding, we're just authorizing it.
Speaker 3 (13:28–13:31)
So we would be doing it, and it's not me. Yeah, it would be me.
Speaker 5 (13:31–13:39)
Well, we would have to, but it was your question, what the other… Yeah, and then if it's packaged together, then it's okay to separate the authorization of it.
Speaker 7 (13:40–13:45)
No, I think the authorizations would all kind of happen separately.
Speaker 5 (13:45–13:53)
Yeah, I'll tell me. I'll tell me, but at the same time meeting, presumably, or not, but you're saying not you're.
Speaker 1 (13:54–13:58)
But we only we only have 1, we only have 1 before August.
Speaker 7 (13:58–14:02)
So, I'm pretty sure it would have to be this May.
Speaker 1 (14:02–14:14)
Have some of them been approved already know the Cunningham. On by town meeting in past 10 minutes, I'm just trying to.
Speaker 7 (14:15–14:21)
Authorize but an issue that I don't know where I think this last month this last week.
Speaker 1 (14:21–14:21)
Okay.
Speaker 7 (14:23–14:36)
All right, so we'll have to, it will definitely be a vote at this meeting about projects for which. I need an authorization to issue. This could be one of those.
Speaker 5 (14:36–14:37)
Each one takes a separate vote.
Speaker 1 (14:37–14:39)
Yes, definitely.
Speaker 5 (14:39–14:40)
Thank you.
Speaker 1 (14:40–14:47)
And even this would be a separate vote from our normal, as we talked about. Rob, and then Cheryl.
Speaker 9 (14:48–14:58)
So I guess what was the, on a 15 year bond, what's the hit to this budget, a yearly budget?
Speaker 1 (14:58–15:01)
Well, we have that.
Speaker 7 (15:02–16:05)
Yeah. Right. You could you could have a level debt service payment schedule in which you just pay the same amount for 15 years. You could have a level schedule where you decline.
Like there would be there would be options. We can talk about kind of how to structure that on. But it would be anywhere. So we're assuming a 4.5% interest rate.
I bet it would be a little bit lower than that. Just because Utah City does this for a lot of municipalities, we get copied on recent issuances, which is kind of nice. You get to see where people are coming in. But I'm guessing it would probably be between $70,000 and $80,000 a year for $15,000.
So it would be year one. So it would either be then 69 for 15 years or 80 declining down to 52.
Speaker 1 (16:05–16:27)
Yeah. So, and it's not, you know, that, that interest rate, we had run it initially at four and a half and it was like 71,000 level service and brings it down to 69. I forgot what the, the, the level principle one was, but whatever, it decreases a little bit, but it's in that ballpark.
Speaker 7 (16:32–16:57)
Yes or no. I think we can make an act. I don't know if it affects the whole package. I don't know if we would have to follow the same.
No, we'd have the same. You'd have a separate debt payment. So I think you could do either.
Speaker 9 (16:57–17:01)
I mean, it probably doesn't matter all that much. It's 70 or 80,000.
Speaker 1 (17:01–17:20)
I mean, right. We're in that. Yeah, and my reason for mentioning if we're wrong on interest rates and it's four and a quarter instead of four, it's not going to make that much. It's not a huge difference in terms of $10,000.
It's only a couple thousand dollars. Cheryl?
Speaker 4 (17:22–17:27)
What is the total amount that this is being thought of?
Speaker 1 (17:27–17:32)
It's plugged in at 750, but yeah, which is the request, obviously.
Speaker 4 (17:33–17:37)
And it's time to go out to fund. When will be the next opportunity to do the thing?
Speaker 7 (17:38–18:43)
So we could do this at any time. Again, we could do. It just is, I wouldn't want to buy that. Exactly.
So it has been doing it every two years since I've been here. And these things are kind of a bit of work. So it's generally, I think, at minimum, maybe a year, every year. We do some bond anticipation notes, which is just like short-term financing to bridge town gaps when we know we want capitalize something in larger issuance.
And that's just kind of almost more of a cash flow management tool that we use. So sometimes you might hear like on the anticipation notes and in terms of borrowing that the term does, but that's not actually kind of a full long-term issuance that we're talking about here.
Speaker 4 (18:44–18:58)
So with the school coming up, new school coming up in two years, Oh, I don't, I don't know. Yeah. Thank you. You said a large one.
I'm thinking fire station, Atherton, but then next is probably the school.
Speaker 10 (18:58–19:02)
Yeah, but there are big, there are big things, right?
Speaker 7 (19:02–19:18)
So we, we, there's a, I'm looking at projects that are on the horizon for this particular one, but there's like, you know, like a dump truck and roadway construction and generator and, you know, fire engine,
Speaker 4 (19:19–19:23)
So is there a total amount that goes out every two years? I'm just trying to guess generally.
Speaker 7 (19:23–19:27)
Yeah. So there is. Yes, there is.
Speaker 4 (19:27–19:46)
So because back when I was on the Warren committee and there were discussions about certain things kind of come off of the debt roll and other things kind of come back in, and there was an idea to kind of keep them about even so that the amount that's dedicated to debt service is about the same.
Speaker 1 (19:48–20:36)
But again, that's what it was my point on the first, this would not affect that in any way, shape or form is my understanding because we have a dedicated revenue stream. So it doesn't factor into the amount of debt the town is taking on really because it's CPA debt. So I think, It also just is really right. Both the school and a fire station would need not only a town meeting, but it would need a, and most likely I would guess an override.
So. I think we're really speculating about those. I mean, obviously we know those are projects people are working on and hopefully will come before the town at some point, but, but I don't know if we really need.
Speaker 4 (20:38–20:56)
go out to the bond market. And if it's every two years, then that's fine. Because this won't be the first, as you said, that's going to seek funding. And we need to know, is it an opportunity that's available to us at a reasonable cost next year, or might it be two years or five years?
And that's why I asked the question.
Speaker 9 (20:56–21:00)
Yeah, sorry. Are you doing it yearly or not that frequently?
Speaker 7 (21:00–21:19)
No, I haven't. We have not been, no. To that point, I can get some more information about it, like exactly how much it would cost if it, I mean not exactly, but the ballpark costs of doing an issuance just for the next project.
Speaker 1 (21:19–21:23)
Doing a CPA million dollar issuance or something like that. Yeah.
Speaker 3 (21:24–21:26)
That would be helpful.
Speaker 2 (21:26–22:22)
Yeah, I mean, I do have history of other towns where I've represented them or we've had 3 or 4 different bonding CPC and those are just done. You know, they're not packaged with other bonding that the town does because they're funded by the CPC and it's a different sort of organization. So you don't have that same obligation of law, bring it all with the rest of the debt that the town is incurring from all kinds of other projects. And so we do get the authorization.
We don't use it. If we get grant money or something like that, we don't end up having to take it. but we do have that out there. And we get the authorization, and then you have to go back, Johanna would have to be keeping track of like what we have authorized for borrowing, but then never used, and come back and take that off, have another town meeting article to remove that authorization, because it does sort of affect our, you know, our bill placing.
Speaker 7 (22:22–22:49)
And we do that, you know, that's one of the parts of town meeting now, we will take off authorized and unissued. That when we know those projects are no longer going to be kind of on the radar screen and you bring up a great point like that. That's This could be really done at any time that authorization can be done at any time doesn't mean that we have to go out and do it. Just if you get the authorization that will then that allows this to happen.
Speaker 1 (22:50–23:26)
And it seems, I mean, I don't know, just playing back of the envelope. It seemed like we would have the administrative funds to pay if, if Cheryl's scenario where we had to bond by ourselves, we would have the administrative, you know, given that we can spend up to 5% on administrative funds. We we'd like, I think, I think that, yeah, I'm assuming that I know there's some fixed costs I'm going out, but obviously our, Administrative costs wouldn't be as much as a $20 million bond issue.
Speaker 9 (23:28–23:41)
Is this like I'm just curious for you guys know that history, this seems like a small amount of right for the committee, the courthouse and a lot larger.
Speaker 1 (23:42–24:06)
But I think it depends on communities though, because we're not a tiny, you know, we're receiving about a million dollars total between the town. So I think a lot of communities collect less than that. So I think it has really, Jenny, I don't know if you, somebody on this committee did some looking at the CPC's website and they're really all over the map in terms of bonding. There are some.
Speaker 7 (24:06–24:22)
There is something out there that talks about the bonded projects from different Yeah. But importantly, you only will be able to bond against the revenue stream for the funds that we collect here, not that match.
Speaker 1 (24:22–24:24)
Correct. Which is not guaranteed.
Speaker 9 (24:24–24:36)
I mean, you can think about it this way. At the same point, the income stream is gonna be at least two and a half percent every year. So it's really not.
Speaker 1 (24:36–24:54)
It's probably about 10% of the locally collected revenue to join this point. Yeah, but because we can't factor in the state match, because theoretically that could go to zero. Other questions for Joanna?
Speaker 10 (24:56–25:02)
I brought a notebook so I could take some Good question. Respond back with all the answers I didn't know.
Speaker 9 (25:03–25:12)
The biggest one, I think it would be that. Yeah. Yeah.
Speaker 1 (25:13–25:14)
Now, this is great.
Speaker 7 (25:16–26:20)
You know, for my, I guess, personal and professional opinion, I think this is a nice way to use the known funding source as a way to accelerate some of the work that you're trying to do. And, you know, take advantage of this is probably a pretty smart idea. It will require some capital planning as you guys come together. Maybe you can help with that and, you know, we have some resources and help think about that if you so choose.
If there's anything more I can do, let me know. I'll get back to you on how much kind of roughly a single issuance or a single product would cost for women to market with it. The other thing with that is that the rate will be different. I think you're going to get a better rate and a lot more folks looking to buy our notes when it's a big dollar.
Yeah, right. So that's what, that was also the. Yeah.
Speaker 4 (26:20–26:37)
Let's just say next year, there was a decision to recommend bonding project, which weren't doing, weren't going out otherwise. And that carry over, that organization carry over to the next year. So like it would take two years to accumulate something.
Speaker 7 (26:37–26:44)
I believe so, because it's still authorized. It's still authorized to borrow. Yeah.
Speaker 9 (26:44–26:49)
So I mean, it's a good time for this committee to bond something because you're building it.
Speaker 7 (26:50–26:54)
Yes. Because I think the rate would be a better rate.
Speaker 9 (26:54–26:58)
And we get to share costs. Yeah.
Speaker 4 (27:00–27:15)
Does the consultant work with you? You mentioned 15 years. Is there an analysis, whether 10 years, 15? I don't know if it came from China.
But is there some analysis that's done to like, what's the right term?
Speaker 7 (27:20–27:48)
Yes. I think I will, I will get back to you on that. But I, my suspicion is that that is something that we choose. Well, yeah, I'm just curious.
Because it would have an impact. It's market validated, essentially, I think, by the rate that is.
Speaker 1 (27:49–28:25)
I did run in your spreadsheet, I did run 10 years, just not based on any financial advisor telling us that that would be advisable. But the debt service for a level debt service is $96,000. For a 10-year project, the level principal thing would start at 105 and go down to 78. But we pay it off in 10 years instead of 15.
That's to give you a sense of rough. Go from 70 to 96, basically, roughly speaking, and lose the five years.
Speaker 3 (28:26–28:43)
If we get an authorization and you go up, you get to buy. and say, for whatever reason, that project doesn't start for a couple of years, you're not drawing down on that bond for the borrower at that point?
Speaker 7 (28:45–28:52)
No, I think we need one to borrow when, yeah, no, we're drawing down at that point.
Speaker 11 (28:52–28:54)
We don't want it.
Speaker 7 (28:59–29:00)
Yes.
Speaker 3 (29:01–29:15)
Yeah, so students- Right, right. Yeah. Starting.
Speaker 5 (29:18–29:19)
Can you say the name of the advisor again?
Speaker 7 (29:20–29:22)
It was- Yeah, UFASI, U-F-A-S-I.
Speaker 1 (29:24–29:25)
And it's part of Unibank?
Speaker 7 (29:25–29:26)
It is, yes.
Speaker 4 (29:27–29:45)
So when would you expect it to go to- When did you actually go to the bond market? So to the point, I guess the question of you're not, you should borrow when you're ready. August, September. August, September.
Speaker 10 (29:45–29:48)
Yeah, Univink Financial Advisory Services, Inc.
Speaker 1 (29:52–30:02)
Okay, any other questions for Juliana? Um, thank you. This is very helpful to have this conversation and with the full committee.
Speaker 7 (30:02–30:16)
Yeah, keep us posted on your thinking so that we can kind of align and right or not. And if there's anything else, I have a couple couple questions about follow up with you on and I'll shoot being voted on.
Speaker 3 (30:16–30:19)
Absolutely.
Speaker 2 (30:19–30:55)
Yeah, I, but I think it's very, yeah, it's usually that gets reviewed, but I mean, that's just a different question. I have is that we have a new town council and our prior town council didn't review articles as much as. my experience with that firm, the current firm is. And so typically, I mean, I would be suggesting that we'd be sending all of our articles to KP Law to have them be reviewed by KP Law.
We have to check to see whether that's, whether Nick has set that up for this year or not. And usually, typically those articles are also reviewed by Bond Council.
Speaker 3 (30:55–31:10)
But I mean, like, you know, I prepared drafts of the other ones, but I had no idea what information I need to put in it. And I recall, you know, her body. So I'll need some help on that. Well, we as a committee will need some help.
Yeah, it's pretty simple.
Speaker 2 (31:10–31:15)
We don't put in the terms of the bond or anything like that. Well, we just we just have the authorization. That's it.
Speaker 7 (31:15–31:27)
Yeah, it is great. It's pretty vanilla, pretty vanilla language compared to, I think, the articles that you typically put in, that has more meat to it.
Speaker 9 (31:27–31:30)
You're basically asking to offer a bond. Just borrow.
Speaker 7 (31:30–31:33)
Yeah, borrow the amount.
Speaker 6 (31:33–31:34)
Borrow, yeah.
Speaker 7 (31:34–31:50)
Yeah, yeah. But I do think we are getting all of the articles contributed by consul. So I can work with that as well, too. Great.
All right. Any other questions, just let me know. Happy to join us.
Speaker 1 (31:50–31:53)
We will. Thank you. Appreciate it. Thank you.
Speaker 9 (31:55–32:06)
No, not really. I was reviewing the articles, the one you sent us from like 2025.
Speaker 3 (32:06–32:10)
I think there was something that was attached to one of them. That's it.
Speaker 9 (32:10–32:26)
Yeah, but one. So yeah, is there. So it's just like your first, it was like your first copy. And then, and then the second.
Yeah, that's true. We potentially have
Speaker 1 (32:27–32:46)
It would be three, our usual budget article, the actual recommendations for the non-bonding, yeah, and the funding, and then the bond if we, yeah. So, Wendy, you want to introduce yourself? I know you've been here for a while, but just officially.
Speaker 3 (32:46–32:52)
All right.
Speaker 1 (32:52–33:28)
It's quite all right. All right, gentlemen. Come on up. So the next item on the agenda is discussion and possible vote on the wharf park project request.
So, I think we're going to start off with just an update. Obviously, we had a good discussion last time and. I know there's been conversations and work that's happened. Probably still some work that is happening, but.
Scott, turn it over to you and let you, and why don't you just reintroduce yourself, each of you, your team.
Speaker 12 (33:29–33:41)
My name is Scott McKay. I am a former park commissioner, and I was born in Milton Farmer's Market and a friend of the community.
Speaker 13 (33:41–33:46)
Good evening, my name is Bill Madden, landscape architect, Lombardi Design, also a Milton resident.
Speaker 8 (33:47–33:54)
My name is Joshua Well and I'm a Milton resident, a local business owner here in Milton, and also a proprietor down in Milton Village.
Speaker 1 (33:56–33:58)
Thank you all for coming.
Speaker 12 (33:58–35:25)
So we just wanted to send around, Phil's going to talk about the differences between the last presentation we made and this presentation, but I just wanted to send around a couple photos to you guys remind me of what this project is once it's built in. So just our first page is just an aerial view of what this park is proposed to look like. And then this is the second page is a view from the NBTA parking lot looking out into the park. And then the third page would be what a typical market would look like.
as well. This is the end goal for this project. So I just wanted to start there. There's a couple additional pages in there if there's questions.
But we just wanted to again thank you guys for your time and consideration for the project. So we'll give it over to Bill to discuss the differences.
Speaker 13 (35:26–41:56)
Thanks, Scott. So we wanted to just keep this sort of short and sweet, really, and be here to answer any questions that you guys have. But just to sort of backtrack, Pete, did we meet in December before the holidays? So We had a little work session with Pete and Jim Pasquantonio from Towntree to just go over some of the grading concerns.
When we left the meeting last time, there was an interest of trying to reduce the global cost of their work, essentially the cut and fill. And there were reasons why we had to design the way that we did, but after sort of brainstorming with Pete and bouncing ideas off of Jim, we were really able to make some adjustments. They're not significant because a real guide for this entire project is ADA compliance for the site. So the key sort of site connection points that we're tying into is the sidewalk or the curb lines along the edges.
So if you can look at the sort of the, to orient you guys, sorry, if you go to the sketch. I just want to walk you through the sort of technical changes, the design intent more or less stayed the same. But we've reduced the number of risers at the steps. And as a reminder, the steps were generated based on this idea of connecting the Adams Street sort of radial steps that are coming down off of the street and then connecting that into the park.
Whether or not we can get some additional money or funding at some point down the line to restore those steps, which would be great. From a planning standpoint, we would like to make that circulation connection. In doing that, we were able to reduce some of the steps to make that connection from Warped Street down into our park, maintaining that connection with the steps off of Adams Street. We raised that grade about a foot.
And then the other big driver was the connection, if you look to the right, which is essentially connecting you to the circulation, to the ADA work, the condo, ADA work. So we maximize that slope to a 4.9% slope. That's just what we're designing it to. So there is some tolerance.
Pete and I were talking about, I think when you left, I was like, well, maybe we maximize this to bring in a wall or a handrail or something. The more internally we were talking about it, we were like, we don't wanna add handrails in another wall, that's just gonna increase costs. And also handrails are, as much as we'd like to think they're not maintenance, it's gonna be a maintenance component in five years. So we were just trying to sort of manipulate the ground plane.
So we were able to essentially to sort of visualize this. We have essentially taking that circle and sort of lot so you can see where we've noted a new 18.2 spot grade sort of along that street side you can see the concourse sort of stepping up which we actually think could make the design even better because now it's sort of perched up that space will be planted and won't be lawned again I'm sort of letting you guys behind the curtain. Our rule of thumb for any steep slopes is three to one in terms of me standing them. These are all designed to be a three to one slope.
So with the subtle grade changes, we raised the grade about a foot at the steps and approximately one and a half feet at the far end of the circle, which is reducing the cut, which is great. We're essentially sort of balancing. And so based off of our cost estimators numbers, with this pretty subtle adjustment, we're saving about $56,000, which is good. And we didn't, when we were brainstorming the concept of bringing in handrails, we just eliminated that because we didn't want to add that addition.
So we were just treating the ground plane to come up with this solution. So we're really excited about this change and you know we wanted to share the images, just as a reminder, because it's been a while I think since you guys have seen sort of the model images. Sorry, one last. subtle adjustment to the design was the radius or the flat space for the lawn and the circle.
So we reduced the overall lawn space from 70 to 64 feet diameter. And essentially we had to do that to accommodate the grades along the sidewalk. So there is a little bit of a redemption with that. But Checking with my client, he was fine with the reduction in terms of the marketplace, being able to do the layout.
We're excited about this. We're still, just as a refresher too, we're still at the 75% construction document level. We didn't want to go full tilt until we sort of had the endorsement to move this forward. And then also, we will also need to, and this is something that from a planning standpoint, we're gonna need to talk to, if this does ultimately get authorized or approved, We have to talk with Nick working with you guys and also some of the business owners on local business owners that are willing to contribute, like how we actually execute this.
So our final chunk of fee at the end is making sure that our documents are in a way. And we have JD here because he's sort of our, he's our urban planner on the project. Um, but maybe if we can just sort of, like, refresh everybody's sort of memory in terms of how we've seen this impact in the recent.
Speaker 8 (41:56–45:24)
Sure, so 1 thing that's interesting about Milton Village right now is that it's very transactional. There's really not a lot of reason to stay down in the village. So what we experience is only as a business owner's provider. I see a lot of people coming and going and.
When this project first came up, it created a lot of excitement amongst the business owners and myself, because it created a destination. So I'm sure this board is familiar, but we're in the process now of doing the renovation of Go Back to America, which is going to be a market. And that's a really community-centered food concept, which is kids can ride their bikes down there, mothers and strollers can walk down there. As we were designing that, one of the things we really spent a lot of time on is how are they going When these people get down here, how are they going to use this site?
How are they going to engage down here? And when this park came up, one of the things that, like, the juices just started flowing was, wow, that's another space that people, you know, you can grab a bagel and then go over to the park and let your kids run around while you, you know, fire off some emails, return a phone call, sit outside. Just those components don't really exist in the townhomes right now. So when I came to the meeting last night, one of my goals was just to communicate to this board how important it is not only the outside, but to have places you can go in this town where you can take your kids, where you can sit down, where there is green space, where there are places where you can go.
And then also the opportunity for programming. You know, I've spoken a bit about donating free community yoga classes. I think, you know, we've joked around about Shakespeare and poetry, all of that becomes possible through a project like this coming to reality. So the village as a whole becomes an ecosystem where historically no one could really Landowners couldn't really invest in their properties because tenants couldn't really pay any rent because no one made any money out of it.
So there's no commercial tax base. Landlords are just deferring maintenance and not really investing in the properties. And then businesses can only afford to pay a short rent because they're either the hair salon or, you know, nails or any sort of business that just doesn't produce enough revenue. So as these things all start to mature, it allows new concepts to come in that can generate more revenue, property values can raise, commercial tax base can go up, people can stay down there, and it creates an ecosystem where things can start to come and survive and thrive.
So every business owner that I brought this up to was extremely excited about it. I brought Dan from Steel and Ride to the last meeting. His ears perked up. He was really excited.
You know, one piece I'll share with this group is that when I bought the Bank of America, one of the constraints there was that It was hard to recruit talent to the town of Milton. The rhetoric out there based on everything that's going on in the media stuff just wasn't great. So I had actually approached Dan, who's still writing about expanding into that space. And the timing in 2023 just wasn't great.
The market was in a very tough spot. But I was selling being in the dream of what the village could become. And that's eventually what kind of changed his perception on how that corner could change. So this part becomes a hugely important part of that dream.
And, you know, when I first came to the conversation, I was very excited about the direction he was headed. So, I'm just here to endorse it and answer any questions that this group might have regarding business utilization, proprietorship concerns, stuff like that. So, look where it's at.
Speaker 9 (45:25–45:43)
And you, Jack, have you planned for lighting in this part? Yeah, so that there's enough lighting for security and stuff like that. that will all be used in this product.
Speaker 13 (45:44–46:02)
It's currently in the process. Yeah, everything you're seeing in the model, model images, with the exception of the tents, that's the market. The picnic tables were not included, but the benches.
Speaker 9 (46:03–46:08)
There is a staircase, what we did at one point, we had a staircase.
Speaker 13 (46:10–46:27)
Yes, that's so that's right now we have that in our documents as a panel for them. Because we would love what we've made, maybe touch on this at the last meeting, there's this little sneaky alley in between the buildings that we would love to sort of make that connection.
Speaker 1 (46:27–46:34)
Um, I walked through that alley for the first time in 30 years, but I didn't connect.
Speaker 9 (46:34–46:37)
Yeah. Yeah. Yeah.
Speaker 1 (46:37–46:38)
Yeah.
Speaker 13 (46:38–46:47)
Yeah. What's the cost of it. I don't have that. Oh, we just did a pre-fabricated, it was pre-fabricated notes that steps essentially.
Speaker 9 (46:49–47:12)
Um, I'm just, I'm just curious because that, like, if you're creating this to me, it seems like that's it. you know to me it seems like it would be an important piece because I saw it in the renderings and thought man that would be you're basically just have a wall there and trees or that level would park it in that.
Speaker 12 (47:13–47:29)
So if you look at the last page yeah it breaks up the budget not at Auburn it's no 85. Okay so down at Auburn at one that would be the additional project.
Speaker 14 (47:35–47:43)
So let's open it up for other questions.
Speaker 4 (47:44–48:38)
Cheryl, yeah. So the mechanics of having a public good project and bonding where you need the money to be ready to spend the money, what's that gap? So that was basically privately funded. So did you talk with Nick Milano about the contracting so that you are sure that you can, I know you kind of divvied it up so that some of it didn't have to be under that public bid contract.
So are you in a place where you have, when you take it from your 75% to your 100% that you will itemize that work such that you'll have the contract ready by August or September when this would be the bond you could be funded, that it's actual contract in hand, that you're ready to go. I mean, that's it.
Speaker 13 (48:38–49:05)
That's the plan. OK. Yeah, so that's our next step. is to sit down with him, sit down with the constituents or the business owners that are interested to sort of come to the table with whatever those sort of resources are, and plan for ad alternates or removal of scope or base bid or whatever.
So we need to sort of document this properly, and that's what we need to talk about.
Speaker 4 (49:05–49:10)
So that you will be shovel-ready for August, September? Correct.
Speaker 12 (49:10–49:39)
And again, just to sort of reiterate what this means, the first column is kind of CPA funds and town funds, what those are going to be used for. I think you had a question about that last time. I didn't have a way to find it. But this kind of maps out, you know, foundations, private money, in-kind donations, kind of where that's going to supplement the primary
Speaker 4 (49:43–49:47)
So the 53,000 savings would come off of the 825?
Speaker 12 (49:47–50:15)
Well, actually, the 825 is the hard cost to direct. There will be one additional one for the 100% documents that's going to drive down the cost as well.
Speaker 4 (50:16–50:26)
On that question that I'm asking, is the 53 just off the construction number, is that including all the other percentages that get added on to that?
Speaker 12 (50:27–50:31)
We would reduce those percentages as well, the corresponding percentages.
Speaker 4 (50:31–50:35)
So the savings would actually be more off of the total project cost?
Speaker 13 (50:35–50:44)
I would say that's for Mr. Bill, because Bill… So I'm not exactly sure what you're… Are you talking about this number?
Speaker 4 (50:45–50:45)
Yeah.
Speaker 13 (50:45–50:48)
Oh, no, yeah. So I don't think you've incorporated that into this. Right.
Speaker 4 (50:48–51:03)
But if you… But normally construction costs, you total it up, and then you add all these percentages from GC and everything else, and your total cost is highest. So I'm asking, is it 53 off of the total, or is it 53 off of the construction cost? Just the construction.
Speaker 12 (51:03–51:03)
Right.
Speaker 5 (51:08–51:20)
Well, I'm just in terms of the, I guess, almost a half a million of the other funding sources. Do you need to have that in hand in order to be shovel ready? I'm not quite sure the timing of that.
Speaker 13 (51:23–53:21)
The so this is what we're. This is what we're going to discuss with me is what is the so there's a. So I'm a designer, but I think that there's a really amazing opportunity here. And I understand you and Nick's very conservative with open space and public space, which is exactly how we should manage all this for sure.
But I think the public and the private coming together in a creative way to execute a part of this scale could be a really great opportunity. We went through that with him with Peverly Park. And so he, there was a little education with Sourcewell and then also with the state contracts. that it took a little time to get there for everyone to be comfortable.
So he's purchased all the equipment. I don't know if you guys are privy to this, but so he's purchased all the- We're a funder. Yeah, he purchased all the equipment. So that's sort of in process versus going the source well direction.
So that, for example, that set of documents is just gonna be infrastructure essentially. So the site, and then we're also getting, contributions from a developer, the local developer, to do the site work. So there's a lot of different layers. This is an example of multiple layers and multiple sources of funding and capabilities to execute a park in the Town of Milton.
So I think it's analogous to this, where we might have other funding sources.
Speaker 2 (53:22–53:26)
Or service donations, where somebody would
Speaker 13 (53:27–53:34)
Exactly. Yeah. That's what we need to iron out. And that's what we need to have a conversation.
Speaker 5 (53:34–53:39)
And will you be responsible for managing that? I mean, that's going to take some coordination.
Speaker 13 (53:39–53:39)
Yes.
Speaker 5 (53:40–53:40)
You will be doing that.
Speaker 9 (53:41–53:41)
Yes.
Speaker 13 (53:42–53:44)
Scott hires me.
Speaker 9 (53:44–53:47)
But also at some point, I think Nick does want
Speaker 12 (54:06–54:39)
town has some responsibility in terms of management as well. We're going to be essentially we've pushed this product to where it is now and we're not going to stop being involved in that process. But it's definitely going to be a combination of working with the town to make sure that bills are getting paid, you know, that the contractors are fine. There is a bargain.
So it's going to be by the Congress too.
Speaker 4 (54:41–56:09)
For example, the project that took forever, the animal shelter, you know, I have served on the animal shelter building committee for over 10 years. But just to the point on the construction side, he stayed involved in the whole way through because he felt like the expertise was needed, they asked him to, and he stayed there to cut the ribbon. But they had the planning director was involved, Nick was involved, so it was Tim Swierczewski, and also the facilities department. But I really think, to your point, there needs to be, if it were an institution, like let's say a Harvard University, The whole facility department that has the expertise, they know how to manage it.
You know, we haven't filled our engineering position, so we're still having folks in planning department get caught up. So, you know, we are short, really, so the more the committee can help, I think it's beneficial, just like they had to do in the animal shelter to get that over the finish line. because they were over budget, they weren't going to be able to build a shelter, they had to come up with that modular that some people don't think looks very attractive, but it's immense.
Speaker 1 (56:10–56:12)
They need to go inside because it's beautiful.
Speaker 12 (56:12–56:45)
There are seven or eight of us who have been meeting, the three of us. We've got a board member from 88 Wharf who's also on the committee, Pastor Antonio, There's a group of seven or eight of us who are going to be the ones who are responsible. Nick's going to have to be involved and at the table, too, but making decisions and helping try to save money when we can, keeping the project on track.
Speaker 1 (56:45–57:21)
One of the things I like, too, is obviously, Scott, you and Chris Gillen, I know, and maybe others were involved in the playground, multiple playground projects, which had similar Um, juggling, um, and, and also some private money or that was all private money, right? There was a little, there's some public money too. And so, yeah, so some mixing of funds and some, some juggling. So it's an experienced team from that.
Yep.
Speaker 4 (57:21–57:28)
Yeah. Procured project.
Speaker 8 (57:30–57:30)
Right.
Speaker 14 (57:31–57:32)
Steve. Steve. Steve.
Speaker 11 (57:32–57:36)
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve.
Speaker 3 (57:37–57:38)
Steve. Steve. Steve. Steve.
Steve. Steve. Steve.
Speaker 11 (57:38–57:39)
Steve. Steve. Steve. Steve.
Steve.
Speaker 3 (57:39–57:46)
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Speaker 4 (57:47–59:17)
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
Steve. Steve. Steve. Steve.
special. And I really think it needs a Friends of Milton Landing or Friends of Port Tarr. We should really do the whole landing area, in my opinion, at Friends, because I'd love to see more improvements there. And I'm just going to go back to my planning board role.
You know, planning board, after the master planning committee spent three years, the planning board spent some more time in town meeting planning the past, going to help reinvigorate Milton Village, and we have had zero applicants. We've had one project come in in the 10 years that I've been on the planning board in Milton Village, and it's the Bank of America building. So, you know, it's one of the most beautiful places with the most opportunity in Milton. And, you know, I'm hoping that this vote private, the public investment will help the private sector, and hopefully the private sector will be able to in turn help with programming it, but also maintaining it, so that it can become the place that so many people have hoped it could be, that revitalization depends what happens.
Speaker 1 (59:17–59:25)
Yeah, no, it's a good question. What's your reaction to a Friends of Milton landing group right now that's, you gotta get there first.
Speaker 8 (59:28–59:49)
I think it's an extraordinary opportunity for the public and private to come together. But if this park was on the other side of town where there's no business community, it'd be really hard to sell the dream to the business community of why they should really participate in this. I'm sure some would, but it certainly isn't a part of the dream itself. It's very easy to see how this can benefit everybody.
Oh, yeah.
Speaker 11 (59:49–01:00:04)
I mean, it's a great design. I just don't want to see it become like the Deccan Eastmoor. You all know what that looked like for most of the summer until private contracting really cleaned it up.
Speaker 8 (01:00:08–01:00:17)
What this location brings that's different than Lees-Montauk is the proximity and the functionality of how it interlays in the village.
Speaker 2 (01:00:17–01:00:24)
Well, it's already next to all this recreational space. I mean, so we kayak there, we bike there.
Speaker 1 (01:00:24–01:00:25)
Successful restaurants.
Speaker 9 (01:00:26–01:00:29)
Even for the performance, I think, for that connection back up to the village.
Speaker 13 (01:00:39–01:01:15)
I'm like so on board with what you're saying, because it's a landscape architect. And these architects, the beauty of their building is like they want it. It's like this amazing thing. For me, it takes 20, hopefully it's 40 years.
I mean, Pete knows. Pete is living this life, still lives it. But it's the 40-year window of what makes it amazing. So to have the friends of the park or whatever we want That's the group or the people or the garden club or someone like we can, I think we could generate interest with that.
Speaker 3 (01:01:16–01:01:26)
And somebody's got to cut the grass.
Speaker 11 (01:01:26–01:01:32)
It's more like a garden than a park, which is good. I mean, just don't.
Speaker 9 (01:01:33–01:01:39)
I think there's a I think there's a landscaper on the floor.
Speaker 1 (01:01:39–01:01:43)
That's right there. There is.
Speaker 3 (01:01:44–01:02:14)
Pete is one thing I would I suspect. I mean, Nick won't let this go to bed. So all the resources are in place to build the entire project. So there's really, you know, the 1.5 number, that's, you know, what it is, somehow it's got to get in place before this is going to be on the streets.
And that's, you know, so it's not only this board and the capital improvement project, but these private
Speaker 9 (01:02:19–01:02:27)
Absolutely, yeah. Have you done any other fundraising, like, for it? Or is it time now?
Speaker 12 (01:02:27–01:02:32)
There's preliminary feelers out there that can pour us a roll, but that's just another issue.
Speaker 3 (01:02:32–01:02:35)
It's about the capital plan. That's already an issue.
Speaker 8 (01:02:36–01:02:51)
On the private side, there's been some good, helpful conversations and pretty significant interest. So do we need a vote?
Speaker 1 (01:02:52–01:03:01)
We would need a yes, that's a possible vote I put on the agenda. So we, we are open to a motion.
Speaker 4 (01:03:02–01:03:16)
Do we, so we don't get involved in whether it's a 10 year or 15 year, even though the amount that it encumbers for us is no. No.
Speaker 1 (01:03:16–01:03:21)
I think we take the advice of the bonded. We don't make this decision.
Speaker 4 (01:03:23–01:03:30)
Budget then up to $100,000 a year for this. We don't know what that term is going to be.
Speaker 1 (01:03:30–01:03:35)
Well, we would have another. Yeah, exactly. Well said.
Speaker 9 (01:03:36–01:03:37)
Yeah. Yeah.
Speaker 1 (01:03:37–01:04:00)
I think it's gonna be 15 for, but I'm not an expert in bonding. So I think, but that's what, and Joanna, the initial conversation we had, that was what we were both, I think my conversations with Stuart have been a typical size CPA thing generally thinks about a 15 year term.
Speaker 4 (01:04:00–01:04:44)
So one of the things that I think we may be asked is, you know, Now, how do we come about having this be our first project to be funded other than this first application? I do think what we were just talking about with Milton Village and the potential of Milton Village overall is a very sound. If I'm asked at town meeting or the planning board why this one, that to me, so I think the more we talked about the project for its potential, as a component to the reinvigoration of Milton Landry, Milton's Village, I think it gives a lot of strength to having it be the first and final.
Speaker 1 (01:04:45–01:04:52)
Yeah, I mean the collection, your team that came in last time was, yeah, it was impressive.
Speaker 12 (01:04:52–01:05:29)
And I said this at a prior meeting, there's going to be maybe getting a two-thirds vote at town meetings just because I typically haven't been a town meeting member for six years. There's issues that come up, like there's a clear line, there's one person on one side, one group's on one side, and one's on the other, and that has not been
Speaker 1 (01:05:37–01:05:51)
You've gotten successive select boards, different select boards, to endorse this. I know you don't have a formal vote of the planning board, but you've had… They're saying I'm being asked to present. Oh, okay.
Speaker 4 (01:05:51–01:06:01)
Okay. To the planning board about this committee's work. Yep. So, I don't think it's a formal vote, but there
Speaker 1 (01:06:02–01:06:04)
The planning board members have been publicly supportive.
Speaker 2 (01:06:04–01:06:13)
I know of this, this concept makes a difference that it has a dedicated revenue stream. So it's not like you're already paying the tax. It's already on your bill.
Speaker 1 (01:06:14–01:06:16)
It's not to pay for the debt service.
Speaker 2 (01:06:16–01:06:18)
Yes.
Speaker 4 (01:06:18–01:06:20)
It's yep. Yep.
Speaker 1 (01:06:21–01:06:25)
To explain that. So sure.
Speaker 13 (01:06:26–01:06:39)
I went up when I, in terms of the thing where they were, integral in the shaping of this park in terms of the overall concept as well. So they've been part of this conversation very early stages of it.
Speaker 1 (01:06:40–01:06:45)
Yeah, I remember planning board members at one of your very first public forums.
Speaker 9 (01:06:47–01:07:20)
I just want to thank you guys for actually listening to us the last time and still for you making some changes. I think that was saved here. And I do think the project got better. You know, if you can get that connection and then raise some more extra money there, that would be awesome.
I think it's gonna help your, you know, that connection to your new business. And I'd like to make a motion to support this for $750,000. And I'll second.
Speaker 1 (01:07:20–01:07:31)
All right, a motion, a second. Any further discussion? All right, all in favor.
Speaker 6 (01:07:32–01:07:33)
Aye. Aye. Aye.
Speaker 1 (01:07:33–01:07:35)
Aye. Aye.
Speaker 3 (01:07:35–01:07:36)
Aye. Aye. Aye.
Speaker 1 (01:07:36–01:07:39)
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye.
Speaker 3 (01:07:39–01:08:37)
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye. Aye.
Aye. Aye. Aye it's hot and dry down there as it is now. This is just like a worse.
The idea of having a gathering place and a place to keep it to do, you know, more activities and things like that. I think that's, that's a great thing. And you know, all the things about the safety for, for market users and all that kind of thing. It's a nice space, but I just, I'm not thrilled with some of the decisions that were made.
So I'm not going to go express some concerns and we'll just extend.
Speaker 1 (01:08:39–01:08:47)
Fair enough. All right, gentlemen, thank you. Both for your work on the project and for coming back again.
Speaker 2 (01:08:47–01:09:00)
Oh, it's been Scott. I downloaded that from Milton. All right. Went to the state library.
I was so excited because she said, somebody saw that Facebook post. Yes, it was me.
Speaker 1 (01:09:01–01:09:20)
All right. Thank you. Thank you. All right.
The last item on the agenda is a discussion and possible vote on language for the town meeting articles. Pete had circulated. Um, thank you Pete for your work on this, um, had circulated, um, possible town meeting articles.
Speaker 3 (01:09:21–01:10:35)
Um, Pete, do you want to walk us through this? The funding article is the same format that we have done for all our projects up until now. Then we added a very brief description of what all these projects are, just so that people may have a lot of questions at our meeting. So it's the format that we've done all the time.
So if there's any questions, I know, Jenny, you had a couple of thoughts about how we can maybe format it differently. But to me, it seems that town meeting members are used to seeing this format. It's been successful up until now, so I'm kind of following the same thing. Everybody's welcome.
Speaker 1 (01:10:35–01:10:49)
You change something, you invite questions. And then the second one is the… So Pete, just though on that, I'm sorry, the footnotes, essentially the explanations.
Speaker 3 (01:10:50–01:10:54)
If anybody has anything they want to suggest or anything.
Speaker 1 (01:10:54–01:10:57)
But were those in the previous articles or?
Speaker 3 (01:10:58–01:10:58)
Yeah.
Speaker 1 (01:10:58–01:11:03)
They're in as in the comments or they're actually in the bottom of the article.
Speaker 3 (01:11:03–01:11:04)
Yeah. OK.
Speaker 1 (01:11:04–01:11:09)
All right. All right. I just. Yep.
Thank you.
Speaker 3 (01:11:09–01:11:14)
There's a question that you don't have to.
Speaker 9 (01:11:14–01:11:22)
Yeah. Yeah. Yeah. Well, I think, I mean, that's the one you would have.
But basically, that's basically if you just piece what he sent the second.
Speaker 2 (01:11:23–01:11:28)
I mean, it may be that, you know, maybe town council will want a different format for that.
Speaker 1 (01:11:28–01:11:30)
We have a new town council, so yeah.
Speaker 3 (01:11:31–01:11:41)
So I guess they'll be sent to him for the town council to review prior to anything they want from the area. So I don't know.
Speaker 2 (01:11:41–01:11:46)
Yeah, I don't know the timing on that, but yeah, I mean, as I said, typically we reviewed the articles.
Speaker 3 (01:11:47–01:13:20)
Yeah, we review them. whatever he takes it from there. But if anybody has any questions, comments, or a description, I try to, the descriptions, I try to make them general enough, because we, you know, a company will say, it says you can do this, this, and this, but it doesn't say something else. And so, you know, so I say it's hand-related work, you know, to do the project designs like that.
So it's a little more broad in language, and take a look over. Then the second article is our annual budget article. So this is getting authorization for the budget that we'll be approving projects this year. And these numbers come from the accounting.
The accounting for the fiscal year isn't complete, so there'll be some minor changes. The other thing here, we underspent our budget a little bit But since those have been previously authorized, you know, we're not looking for authorization. And the money from the administrative funds that we don't spend that fiscal year, they roll into our restricted amounts. And the amount that was authorized for historic preservation projects that we didn't use.
And again, all that stuff will roll over there. That's not represented in these numbers. 2026 this year.
Speaker 5 (01:13:21–01:13:23)
Should it be 2026? I'm confused.
Speaker 3 (01:13:23–01:13:38)
The money comes in in 26. Yeah. And we spend it in 27. So why would the budget be 27?
Because these are the estimates that came in in 26. Yeah, I think it's just that.
Speaker 2 (01:13:38–01:13:45)
Yeah, but in the article number where you have on the draft budget article, it sort of says for fiscal year 2025. Yeah.
Speaker 9 (01:13:46–01:13:58)
Yeah, yeah, yeah, yeah, yeah, yeah, yeah, yeah, yeah, yeah.
Speaker 3 (01:14:03–01:14:07)
language that I have from last year and just revised it and didn't see it.
Speaker 9 (01:14:08–01:14:16)
At first I was responding to you like, and then I was like, oh, and then I opened the second one.
Speaker 3 (01:14:16–01:14:26)
I was like, okay, this makes sense. Yeah. I was like, wait a minute. All these are brackets.
Speaker 9 (01:14:26–01:14:40)
So Yeah, that's great. Yeah, that's awesome. There is definitely a project that are open.
Speaker 1 (01:14:40–01:14:48)
So we, yeah, and we can discuss that in detail tonight, but because it's on an agenda, but we can put that on the agenda definitely for the March 2nd meeting.
Speaker 3 (01:14:52–01:15:02)
The only update that I've got is there is a contract to do the windows now at the lockup. I don't know if there's any place to do that.
Speaker 9 (01:15:02–01:15:06)
Oh my goodness. But there is a brick work, right?
Speaker 3 (01:15:06–01:15:27)
Well, they separated it because they didn't know if there'd be enough plus the whole contracting thing of, you know, mixing trades and things like that. So, but there is money that is left over in the account from the windows that have been towed toward the masonry. I don't know if it's enough for all the masonry or not.
Speaker 11 (01:15:27–01:15:36)
I don't have the original amount. granted was for both windows and masonry. So it kind of depends on how you divide it up.
Speaker 3 (01:15:37–01:16:02)
But one thing I'm aware of for the windows is still a chunk of money there for masonry. That was the plan was because of the mix of the trades. They wanted to put the windows out separately and make sure they got the windows done. Hopefully that the bidding was such that there would be enough to get the masonry done.
There is money left, whether on ways that we did, you know, we'll include everything or not.
Speaker 11 (01:16:02–01:16:08)
We haven't even approached that yet. That's right. The wheels of progress move exceedingly slowly.
Speaker 1 (01:16:08–01:16:41)
I just wanted to go back to the budget article, Pete. I don't know if there's a typo in the version I opened up. It says 90 state trust fund distribution. I just think, I think it should be just state trust fund distribution.
But unless I'm, it says something about 90 state. Yeah, it's just a typo. Yeah. So, so, okay.
Speaker 6 (01:16:41–01:16:43)
Yep.
Speaker 1 (01:16:44–01:17:13)
All right. So I don't. I don't believe we have voted on these articles in the past formally, or have we, or for some reason, I think it, I think we voted our approval, right? Because, because sometimes.
We don't meet after approving these, so I don't think we need a formal motion or vote on them, but, but it might be changing. Exactly exactly town council might suggest.
Speaker 3 (01:17:13–01:17:31)
So, I recognize that. Yeah, no, we appreciate you putting together, and then we'll need a third one obviously now with the vote on the bond, I guess it'll be very simple.
Speaker 9 (01:17:32–01:17:37)
Yeah, I'm sure, but you will have to, I'm sure meeting presentation or something.
Speaker 1 (01:17:38–01:18:14)
Yes. Oh, yeah. Yeah. Yeah.
I mean, I think to Cheryl's point and Steve's point, yeah, there'll be this will be the 1st time we're. We're coming to him with 3 separate articles and 1 that needs a 2 3rds majority. So I'm sure. It, um, yeah, we'll have to, um, I mean, I've done a presentation last 2 years.
You did a presentation 1st year. So that's been our tradition. We've taken it out of the consent agenda for that reason to, to allow us to. 1, to get an affirmative, we've gotten overwhelming votes with 1 or 2 no votes on the past votes.
Speaker 9 (01:18:14–01:18:15)
Yeah.
Speaker 2 (01:18:15–01:18:19)
I think it's important to talk to people. And I think it's their tax dollars.
Speaker 9 (01:18:19–01:18:20)
Yeah.
Speaker 2 (01:18:20–01:18:21)
This is what we spent.
Speaker 9 (01:18:21–01:18:35)
Absolutely. And I'm just wondering from the strategy for town meeting, I think their group is great to have Scott and JD as a business owner there that's invested in the village. Yeah. Might be smart.
Speaker 1 (01:18:35–01:18:37)
I think they should be prepared to speak to speak.
Speaker 3 (01:18:38–01:18:43)
I don't know. Right. No.
Speaker 1 (01:18:45–01:19:05)
Yeah. Yeah. Yeah. I mean, all right.
Um, so our next meeting is May, March 2nd, uh, for the March 2nd agenda.
Speaker 4 (01:19:05–01:19:22)
Yep. Yes. Yep. Yeah.
So outreach is something that we might have to see. But I definitely think we need to do a little bit more outreach.
Speaker 3 (01:19:22–01:19:43)
And I think we need to talk a bit about our process and the whole thing. I think on the website, you don't have to go into detail, but there should be a CPC application. Then you open it up and it talks about the two states. I think we've got to make it very clear that anybody who wants to be considered for funding
Speaker 1 (01:19:50–01:20:40)
So we, I think we need to have a discussion, I agree with you, at a minimum, we need to have a discussion and make a decision as a committee. Do we do we grandfather. previously approved projects at the eligibility stage in so that they can skip that first stage or do we not and but we have. I think we're all in agreement, we have to we got us our position, we have to be crystal clear.
Either way, but we, I want to, you know, on March 2nd have it discuss it and then make a committee decision on on that, because I think there's an argument either way, but I think we need to be crystal clear.
Speaker 2 (01:20:40–01:20:49)
Well, so I have two things. It just sort of means that when we get some idea about what's out there, you know, what they ask the eligibility.
Speaker 1 (01:20:50–01:21:29)
He had an interesting suggestion of not calling it eligibility preliminary. And that goes to a little more of finding out what we're dealing with more than, but again, that is a fulsome discussion that we'll do. All right, so I have the update on the administrative position, administrative support process on the application and publicity of the application, the two-stage application discussion. And website updates.
Speaker 5 (01:21:29–01:21:36)
I mean, what probably should be done immediately is the dates are not updated for applications. I don't know. I don't know who got access.
Speaker 9 (01:21:36–01:21:40)
I think it's get well. So, yeah, I don't know who is doing the website.
Speaker 1 (01:21:40–01:22:23)
Yes. Or at least she facilitated the updates. I don't think I don't think she made the changes herself, but, but, but somebody, so I know. So one quick thing I will just say is I mentioned this to Jenny, that I had sent the minutes to Nick this afternoon in that email, including the past minutes to try to get those up on the website.
I did ask him an updated question or updated my question to him about the progress or lack thereof on the administrative position. So I that was just late this afternoon. So I haven't heard from him yet. But but I can.
But we should definitely put it on the agenda on March 2nd.
Speaker 5 (01:22:23–01:22:39)
Well, I suggest that if something happens before then that we have like a meeting, I mean, like just a zoom call or something like that. Can we call a meeting to say if we want to approve somebody to get going. If somebody is available now.
Speaker 1 (01:22:39–01:23:27)
Yes, since the burden has fallen on you and Pete a lot. Yeah, I think we could do an emergency Zoom meeting to do that. March 2nd's not that far away, so I don't anticipate, since I haven't heard anything, but yes, let's be prepared to do that if needed. If needed, yes, yeah.
So the other thing, you know, we're, I mean, this is maybe more from our second, you know, we have, we've kind of been waiting for the town to fill that position. There is no mandate on us to hire the person that they hire.
Speaker 9 (01:23:27–01:23:35)
That's right. So, so, so the list looks like in for full time thing.
Speaker 5 (01:23:36–01:23:37)
Does anybody know anybody?
Speaker 9 (01:23:40–01:23:41)
I mean, there's part-time.
Speaker 1 (01:23:41–01:24:04)
There's definitely some advantages to having somebody embedded that is working for the town, at least part-time, because of ease of access to the website person. So there are definitely some advantages coming with hiring. But there's also, as we're seeing, delays in the town hiring.
Speaker 4 (01:24:04–01:24:34)
And there's a lot to process. Yeah, I think it's we have the funding. It's not like having some funding challenges and maybe that's why they can't piece together a full time position. But I don't think this members of this committee should be expected to have to step in.
For this on now, and especially coming into what needs to be done next. Yeah, so I.
Speaker 1 (01:24:35–01:24:43)
Well, if anybody knows of anybody out there with some skills in this regard that would be interested, we could start entertaining that.
Speaker 9 (01:24:43–01:24:52)
I mean, I feel like this committee really needs some, you know, I mean, yeah, like Jenny shouldn't have the minutes.
Speaker 5 (01:24:52–01:24:55)
Well, it's not just the minutes, but it's a lot more.
Speaker 1 (01:24:56–01:24:56)
What's that?
Speaker 9 (01:24:56–01:25:00)
We hire someone. Yeah, I mean, I don't know why we, I don't know. Yes, we have.
Speaker 1 (01:25:01–01:25:14)
I mean, that's essentially what we have. But that's essentially the deal we had, you know, Julia worked. She wasn't working for us as a town employee. That was a private contract.
Speaker 2 (01:25:15–01:25:28)
Yeah, because you always get into trouble, you know, with paying. She's already got a full time job, you know.
Speaker 1 (01:25:28–01:25:30)
Well, it was a half time, it was a part time job.
Speaker 3 (01:25:30–01:25:38)
She had a part time job. Nine part of your time through the town where you're saying, I don't that's not how it was explained to me.
Speaker 1 (01:25:38–01:25:41)
I don't, I mean, I didn't see the.
Speaker 11 (01:25:41–01:25:45)
Separately.
Speaker 1 (01:25:46–01:25:46)
Right.
Speaker 2 (01:25:47–01:25:48)
Right. Right.
Speaker 4 (01:25:49–01:25:55)
For both by the town.
Speaker 1 (01:25:56–01:25:59)
No, I didn't I didn't I wasn't involved in any of that.
Speaker 11 (01:25:59–01:26:09)
She was supervised by the tech. Yeah.
Speaker 1 (01:26:10–01:26:53)
Yeah, it's confusing. All right, so I did ask that question this afternoon. I will endeavor to give an update sooner rather than later from Nick. He's been pretty good recently about responding to emails.
So I will let people know before the March 2nd meeting what the update is and how dire. It is for I mean because it's possible that we'll hear they haven't made much progress on filling that position and and then we're we kind of know we have to redouble our efforts for finding.
Speaker 9 (01:26:53–01:27:03)
A person or something that usually does that. solely on Nick to do that too?
Speaker 1 (01:27:03–01:27:26)
Well, I would think it would be the planning, you know, in, right, this is an administrative assistant to the planning director. So working in that department. So I think normally the planning director would take the lead on screening interviews and hiring. Nick would have final sign off is my understanding, but I, but that's, but that's it.
Speaker 2 (01:27:26–01:27:27)
That's it.
Speaker 1 (01:27:27–01:27:39)
We follow the same model that we did before, which, you know, not not for us just to hire the halftime administrative, because there's a million other things.
Speaker 2 (01:27:39–01:27:41)
And she's only working part time and she's working hard.
Speaker 1 (01:27:44–01:27:48)
Yeah, I just recently was told that surprise.
Speaker 2 (01:27:49–01:27:51)
She's great actually.
Speaker 1 (01:27:51–01:27:54)
And is that is the deputy.
Speaker 9 (01:27:55–01:27:58)
There is a is there a deputy is an assistant.
Speaker 1 (01:27:59–01:28:01)
Yeah, assistant planner.
Speaker 9 (01:28:02–01:28:10)
Okay. It's a, it's a, it's a full time.
Speaker 1 (01:28:11–01:28:25)
All right, so I'm a little worried because we've discussed a lot of things that weren't officially. So let's close this down. Motion to adjourn? So motion, a second, all in favor?
Speaker 6 (01:28:26–01:28:26)
Aye.
Speaker 1 (01:28:26–01:28:30)
Aye. We will see. I impose any abstentions.
Speaker 15 (01:28:30–01:28:33)
We will see everybody on March 2nd.