Good evening, and welcome to the August 26 2025 meeting of the Milton Select Board. Please join me as if you can and rise for the Pledge of Allegiance. I pledge allegiance to the flag of the United States of America, and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all. Thank you.

We are going to go ahead and move to public comment. Our board rules on public comment are that we have a lot, a total of 21 minutes, which Mr. Milano will keep track of. and that each speaker is limited to three minutes.

I will let the speakers know when they are at two minutes and 30 seconds. Sometimes I miss it and sometimes I only say you got 20 seconds left because I’m paying rapt attention to what you’re saying. It’s not a conspiracy. I just forget to look at my phone.

So I’m guessing that Miss Augustino, you’re going to be our first speaker this evening. Do we have a sign-up sheet, anybody else?

Speaker 2 (01:39–01:41)

Actually, I’m the first and only one.

Speaker 1 (01:41–01:43)

You’re the only one on the sheet, okay.

Speaker 2 (01:43–01:50)

I do just want to mention before you start your timer, I’m having difficulty talking this evening, so I’ll talk as fast as I can.

Speaker 1 (01:50–01:59)

Okay. Yep, car accident, back pain. Oh, I’m sorry to hear that. All right, so we’ll get you, go ahead and get started.

Speaker 2 (01:59–05:39)

Thank you very much. The first item, I do have four topics, the election. And I ask you to do the right thing. The bylaws and the laws of the state actually allow the funding of an election.

And just listening to you last week, I know you have a very heavy load of items. So having a fifth select board member is really critical to getting through what you need to get through. Second item is the hiring of a law firm. And Since I was on the Board of Selectmen, this is firsthand knowledge, especially during the Quarry Hills contract.

The present, I wanted a new law firm even 30 years ago. I was the one who questioned the representative if they also represented the developer, Quarry Hills, while we were meeting to issue a contract. In fact, I provided each of you, voices come back, provided each of you with the staircase lawsuit that this existing, we should immediately be refunded because of the federal law, American with Disabilities Act. Thirdly, If town council, I know that the town administrator wasn’t here during this time.

This is a very serious, sensitive issue. So I would simply say that personnel issues must be addressed confidentially. When I was a selectman, we actually had to fire a police officer for misbehaving. And what I heard during the discussion last week should have been in executive session with the person allowed to have an attorney with them.

in executive session. I’m very concerned that we could have exposed ourselves to a liability. It has to do with the, you are all, I’ll leave it at, you are all personnel of the town of Belton, select board members of personnels, and that’s what the law provides. I’ll just quickly, comes and goes the voice, I’ll just quickly read through.

Last Tuesday, we had an impromptu roads and traffic safety gathering. Many town meeting members were there. As a former selectman, chair of the Warren Committee Public Safety Committee for years, and a town meeting member since 1983, I request that the select board has the immediate obligation to save more lives from death and disabilities on Mass Highway Route 28, Randolph Ave. from Chickataw and Reedsdale Road down to St.

E’s. The interesting thing in the discussion of- 30 seconds. into the discussion of talking to some people about having a meeting, other areas of the town were interested. So, July 5th, three people died.

July 8th, the town administrator gave an update at that meeting. July 22nd, there was public comment. You heard about that. MassDOT report, you asked for it.

You had a subcommittee. MassDOT got you the report within days, and within seven days, it was publicized. August 18th, the select board agenda included Route 28. However, there were only two members, so it questions whether that was legal, because was that a quorum?

August 19th, I’m just going to lead you. We broke the town into four zones. And today, it happened to me on Granite Ave. An ambulance had to get down Granite Ave, where the construction is.

and he could not get through. The Randolph ambulances have a system. They can turn the light off. The fire chief has checked into it.

None of our lights do that yet. OK, we’re past well past time now. OK. Thank you very much.

No delays. No more deaths. No more injured people. And I have a summary here for you.

Speaker 1 (05:40–05:40)

Thank you.

Speaker 3 (05:41–05:45)

Oh, my God. Like I said, it was a car accident.

Speaker 1 (05:46–05:47)

I’m sorry to hear that.

Speaker 3 (05:48–06:01)

That’s why I am so Oh, good. Thank you. And it is on YouTube for you all to view the gathering.

Speaker 1 (06:01–06:18)

And we do have one speaker with their hand up online, Ms. Felton. Mr. Milano, if you could promote her.

Ms. Felton, can you hear us?

Speaker 4 (06:18–06:20)

I can hear you. Can you hear me?

Speaker 1 (06:20–06:22)

We can hear you. You’re a little quiet, but yes.

Speaker 4 (06:23–07:25)

I’ll try not to be too quiet. Thank you, Deborah Pelton. Tell me to member precinct two. I just wanted to speak on two matters, although I could speak on many.

One, It’s come to my attention that there seems to be a proliferation of ADUs in Milton. And I’m not sure if it’s the select board or the planning board or whoever the new planning director will be. But please consider in the future addressing this unregulated matter because it is really concerning to me. We have an ADU that has just appeared in back of me.

It had a fire pit and I thought my house was on fire. I think that for the health and public safety of the residents here that we need to look at regulating ADUs.

Speaker 1 (07:25–07:31)

Ms. Felton, can I just ask a quick clarifying question? Do you mean ADUs or Airbnbs?

Speaker 4 (07:31–07:37)

I’m sorry. I don’t mean ADUs. I mean, Airbnb. Okay, thank you.

I definitely misspoke.

Speaker 1 (07:37–07:39)

That’s totally fine. Thank you.

Speaker 4 (07:39–08:33)

Please go ahead. Okay. The other thing I just want to talk about Article 7. We have discussed this a lot in my house.

Many of you know that my husband is a retired district court judge. And we’re really confused about this article. And We just, we have a question about why do we need to sanction drinking outside on public property? I mean, do people always have to drink when gathered together in outside spaces?

And so, as you’re considering Article 7 for the Warren, and if it does make it to town meeting floor, I really think it’s a bad role model. The schools have done a lot, the Milton Coalition about drinking and teenagers and times have changed. And we’re both very concerned about that. Thank you.

Speaker 1 (08:33–09:10)

Thank you very much. I don’t see any other hands up online and I don’t see any hands up here in person. So I’m guessing that we are finished with CitizenSpeak. So moving along, we’re going to move to the item 4, mass DOT update regarding potential changes to Randolph Ave.

Route 28, and I know we have some folks here from DOT, so please. Oh, I’m sorry, Ms. Hegarty is going to excuse herself.

Speaker 5 (09:12–10:52)

Thank you Chairman Zoll, members of the Select Board and Administrator Milano, on behalf of, you know, Massachusetts Department of Transportation, we’re happy to come back and address you today regarding the Route 28 corridor Randolph Street, Randolph Avenue, sorry. fielding is unfortunately is out this week was unable to attend but on behalf you think thank you all for giving us this opportunity as you know we were here back in July and at that time you know we were looking at quick options that we thought we could do you know when when the immediate thought was that we would just put something up down the middle of the road You know, we quickly look back at, you know, what what that would have entailed. You know, and I did I I will admit that I was the one that said we’d like to try to get something in place by Labor Day to do it right and do it the correct way to get the safety and the benefit for what we’re looking to do here. much more is involved in that process.

You know, just dropping Barry down the middle of the road is not only going to push the problem to another area. So, we wanted to take a harder look at the options. So, what we have tonight is we have a presentation that’s going to walk you through the evaluation of a couple of different alternatives. You’ll find its way back to a hybrid, which we’re going to present, which you think is the best it solves.

providing for access where needed to allow cross-movement traffic and entering and exiting on the side streets, but also provides that center median protection where it’s important. So with that, I want to turn it over to Kayla Sousa from our chief engineer’s office who will present the presentation.

Speaker 6 (10:52–27:42)

All right. Thank you. Thanks for having us. Thanks for the intro, Neil.

So with us today, my name is Kayla Souza. I’m the senior program manager. I manage our intersection and safety programs out of the chief’s office and MassDOT headquarters. We’ve always I’ve always been involved in this project in the background, tracking the intersection and have worked on similar quick build safety projects.

So I was tagged to manage this effort in coordination with headquarters traffic in District six. So a big team has been involved in this in the past month. With us today, you just heard from Neil. We have Mark Abbott from the District 6 Traffic Office, Matthew Jasmine, the District 6 Project Development Engineer, and then our consultant, our design firm, Howard Stein Hudson from HSH.

We have Jessica Lizza, and I’ll hand it over to her at some point to go through the design in a little bit more detail. So for an agenda, we’ll keep it pretty brief on background and existing conditions because we’re coming back to the select board at this point. There’s been a lot of public involvement on the corridor to date through the intersection project and now also the corridor. But I will give a little background as to how we got here, remind everyone of the existing conditions, what we know about the roadway.

So far, we’ll look at the alternatives that we evaluated this summer, one being the drop the barrier in the road approach that I think at first we were sort of leaning towards. And we’ll talk about how we evaluated the different options and came to our preferred that we shared last week with a smaller working group of town staff, fire, police, and some of the legislators. And then we’ll talk about next steps and feedback. heading into background.

Just to orient everyone, at this point, we’re talking about Route 28 Randolph Ave, the corridor, thinking past the Chickatawba intersection project. The limits that we are evaluating for our pilot road diet and safety project are from Route 28 at Reedsdale Road. heading south, tying into that roundabout project, which is still progressing independently. So all the major intersections highlighted on the project limits, and then all the residences and driveways along the way.

So there’s many steps, I think, for Route 28 and the design development, but just for some of the highlights here, we’ve been at the roundabout project at Chickatawbit for, you know, a little over seven years, I would say that was initiated as a isolated intersection project for the number one crash location in the state and is close to being ready to advertise for construction. But through the public process of the intersection project, it was consistently communicated to us that the residents are also concerned about safety along the corridor north of the intersection. And so a road safety audit had already been done at the intersection, but it was expanded for the project limits that you saw on the slide. Previously, a road safety audit is when town and state staff get together with fire and police, review crashes over a certain period of time, identify issues and work together toward short and midterm and long-term countermeasures.

So the district’s been sort of chipping away at as many short-term countermeasures as they can, speed feedback signs and signal timing. But we also enlisted HSH to do a corridor study you know, following that road safety audit sort of over the summer into the winter and spring. Also initiated through public concern about what could we do from the RSA and then also evaluating what the roundabout would do for access. So it was very focused on that and then also at the town’s request that did evaluate a road diet.

So that brings us to this summer, where we’re gearing up to pretty quickly design and implement a road diet, which I suppose we haven’t defined yet. But that would remove travel lanes from Randolph Ave, from Reesdale to Chickatawbit, to some extent, with widening at the intersections. So that’s where we’re at today. So why would we do a pilot road diet?

Safety, obviously, first and foremost, that’s the primary goal of the pilot road diet. It’s due to the crash history along the corridor, ongoing public safety concerns and advocacy from the community. Why to do it in a pilot sense? We do these pilots sometimes so that we can incrementally improve a corridor instead of waiting for a full reconstruction project.

As you’ve seen through the Chiktawba project and probably others in town, it can take a little bit if you’re trying to solve sort of all the problems on the corridor. But if you hone in on a few, safety being the primary one, what can you do right now? And another reason to do it in the pilot sense is to do a field test of the road diet that was studied in the corridor study. So we use traffic modeling to try to anticipate what will happen if you do something like take away a lane or two lanes on route 28.

But at some point, you can only calibrate those models so much to assume what humans will do. Will they stay on 93 instead of cutting through Milton? Will they go into the neighborhoods? We hope not.

And we’ll try to mitigate that, but the models can only go so far. And so the point of piloting is to see what happens. And then the goals here are simple, reduce fatalities and serious injuries, and reduce speeds and conflicts along the corridor. So what makes something a pilot road diet?

What were the constraints that we had put upon ourselves to allow us to do this quickly, both from an implementation standpoint and then also be flexible to adjust? Because we have studied this. It is thought out. But things do happen, and pilots are meant to be able to be adjusted and changed as we monitor.

So the temporary materials that we can change, things that are in play, is changing the pavement markings. So the paint on the roads, adding signage, and then using modular curbing type temporary vertical barrier materials. to restrict lefts in some areas. And we’ll get into that.

We can also continue to tweak the signal timing. And it’s necessitated, actually, when you start to restrict lefts to see where you can add U-turns and left turns. And again, we’ll get into the specifics of the design. And then really limited traffic signal equipment changes are possible.

We can’t be replacing mast arms or doing full signal reconstruction or adding in new signals. But we could make adjustments to the signals that are there to allow us to do the design that we’re going to show today. So what’s not in play is major reconstruction. So we’re working within the curb-to-curb for the most part, which means no major streetscape or sidewalk reconstruction.

We’re not moving the curb line because of the utility coordination and impacts that that would entail. no intersection redesign, just staying within the curbs. And then, of course, our right-of-way process takes some time, so no property takings. OK, so we’ll do a quick review of existing conditions.

If you don’t know, Route 20 in Randolph Ave has four travel lanes, two in each direction, with really pretty minimal shoulders and sidewalks, no bike facilities. And then because the curb to curb space is taken up in this way, there’s not really opportunities for left turns, dedicated left turn lanes or pocket lefts or anything like that. So this is pretty consistent, except that some of the major intersections And then from the road safety audit and the corridor study, I mean, we know a lot about this corridor. Here’s just a bulleted list of maybe the summary.

We know that there’s congestion, that there’s a lot of traffic during the peak periods, both from neighbors trying to use this as what it is, an arterial to get to where they’re going and likely cut through traffic. And because it’s corresponding with the peak periods, you know, definitely commuting school traffic. There are high travel speeds of vehicles when there’s not congestion, especially off peak. People are going very fast.

As I mentioned with the cross section, there’s a lack of left turn lanes or turn lanes in general. People are having difficulty entering and exiting driveways and side streets, which is the one of the main concerns behind the corridor study. There’s some substandard unsignalized intersection geometry, so sight lines that make it difficult when you’re approaching the street to see if a car is coming on Route 28, making it challenging to judge those gaps. Signal timing evaluation was needed at the time of the road safety audit and the lack of bicycle accommodations.

On a pilot project, we’re not going to get everything, and that’s not the point. The point is to focus on the most urgent need and the highest need, which for us is that bottom line, which is that the straight alignment of the road, the high speeds and the high volumes are creating safety concerns and really safety issues. So those safety concerns just sort of shown in data points, starting with the intersections, so there’s three intersections within our project limits that are considered high crash so they’re within the top 5% of the greater Boston region. There’s Route 28 at Reedsdale, which had 13 crashes, including five fatal injury in the most recent closed year.

So the most recent, the current crash clusters are 2019 to 2021. So that’s a crash cluster. For that time period, Route 28 at Chickatawbit, of course, has been a crash cluster. in the top 10 or so for probably as long as we’ve been checking crash clusters that had 69 in the most recent study period with 37 fatal injury and is still the number one crash location in the state.

And then Route 20 at Reed Street and Access Road, while not a current crash cluster, was one in 2018 to 2020 with 17 crashes and seven fatal injury. So in addition to the intersections, we also calculate high crash corridor segments. And so this map is showing, in the black dashed lines, corridor segments along Randolph Ave that are in the top 5%, again, of the greater Boston region. These are essentially Reedsdale Road to Pleasant Street with, I don’t have these memorized, and it’s a little blocked for me.

five crashes from 2017 to 2021. Highland Street to just north of Ridgewood with 10 observed crashes, and then Hillside to Susie Lane with 17. And there’s also a high crash segment south of Chickatawbit beyond the Milton border. So what do we draw up to look at for these pilot alternatives?

So essentially, we started with two concepts or two cross-sections that would have some variability as they approach major intersections like signals, but this would be the most common typical section. So alternative one is really a pretty standard road diet as defined by Federal Highway. It’s the conversion of a four-lane road into a three-lane road where you have one lane in each direction of through travel and then a center left turn lane to facilitate left turns into side streets and driveways and businesses. We have some examples of where these exist in Massachusetts that Jessica will show a bit later.

Alternative two was sort of the drop down the zipper barrier that we have now. Medianize this road, remove all conflicts, and see how we fare with traffic, with everyone taking U-turns at major signals. Both of these provide a wider shoulder, which is great. Get some space.

Five feet on the two-way left turn and seven in the median barrier. So originally, these were the two we looked at. And we wanted to find a quantifiable way to compare them. So we came up with an evaluation matrix that, for some of these factors, had a data-driven methodology behind them, like actually calculating the reduction of crashes and speeding.

and delay, and another one sort of relied on a more qualitative case study, research engineering judgment approach, and then also feedback from police and fire. But our four main categories are safety, which was primarily looking at the reduction in crashes, especially fatal and injury, reducing the number of conflict points, and on and off-peak speeding. Operations is next, which is trying to calculate the level of delay that each of these cross sections will add to people traveling when you remove two lanes from a major road like this. Access was the third, so the ability to make left turns, access these businesses and residences, sort of the convenience factor, as well as emergency vehicle access.

And then the fourth, which is unique to a pilot, was implementation. And so how quickly can we deploy each alternative? What are the requirements for maintaining them? This is supposed to be up through the winter.

And then, as I started to mention before, flexibility to adjust. So we tried to put our evaluation matrix into these little circles. So an empty circle is negative and is not meeting the goals, or it doesn’t apply. And then sort of a judgment of something that partially met one of the four goals, and then completely meeting the goals.

So when you compare alternative one and two, just to see. the probably known fact, no alternatives that are going to remove lanes will improve operations. Alternative one with the two-way left turn lane improved access and was well-suited for a pilot because of the simplicity of the materials being paint. Alternative two, which was that median barrier with probably some steel on it, improved safety the most because it removed all conflicts with turning vehicles and prevented people from crossing over into the other lane of travel, but introduced the most access challenges, kind of compounding the operational delay that we’d be adding, and was less convenient for quick implementation and flexibility.

So then we came up with this new alternative, which is a hybrid, which made sort of two changes to alternatives one and two. It essentially applies the cross section of one and two as appropriate based on the context of like that part of route 28. So depending on where you’re at. which block you’re at and, you know, side streets and the needs of the road, it would alternate.

And then it also looked at using a more modular material, which we will have to order, but then will be more, you know, flexible for changes that are needed. So the overall scope of what we’re calling the hybrid alternative, which is our current preferred, is removing one through lane in each direction of travel, applying two-way left turn lanes in area of dense side streets and driveways, which Jessica will show, adding the median barrier and targeted locations for access management, and then signal timing changes to add protected lefts now that we have space for that with the removal of the extra throughs and to accommodate the U-turns that will be required. So this is a schematic drawing. Jessica will share a more conceptualized design.

But essentially, this shows what I was trying to describe, which is that we’re switching between the two-way left turn cross-section, which is shown here in yellow, to the modular curve barrier. And there’s a picture on the top right of what that material could look like. What this schematic doesn’t really show is the breaks in the barrier at major signals. But we’ll get into that when I hand things off.

And so then when we added this alternative into the evaluation matrix, we saw that it approached the corridor in a more balanced way, still very much prioritizing safety, but attempting to maintain or strengthen access and allow us to really pilot this and learn from it and adjust as needed. Okay, I’m going to hand things off to Jessica now.

Speaker 7 (27:42–27:48)

Don’t run away, we’re gonna have questions. At least I won’t. No, no, yeah, we’ll wait, we’ll wait.

Speaker 8 (27:51–30:16)

Thanks, Keela. All right, so getting into some more of the details of the pilot design, the next few slides we’ll walk through first the cross sections again and then some local examples and then we’ll go into section views of different areas of the corridor. So, this is showing the same graphic that Kayla just walked through. So, this is representative of the cross-section where we’re proposing the modular curbing barrier.

And the goals through here are to, you know, reduce the conflict points by, you know, limiting turning movements. and maintaining access in the areas where the two-way left-turn lane will be provided. And so this is proposed in areas that do not have that same dense access needs along the corridor, so less of the business areas and more of the areas that are adjacent to parkland that we’ll show in a bit. So some examples of tactical medians.

On the left of the screen, there is an example in Route 6 down on the Cape with a two-lane roadway that has the modular curbing median down the center. This was implemented as a safety measure. Unfortunately, we don’t have, like, before-after information here. but that’s one location that you can see this.

And on the right is a much more like urban location in Medford where this was utilized to restrict turning movements. And then here we have an example of the application in Hingham during a road diet pilot along Route 3A. This cross section shows the two-way left turn lane where you have the single travel lane in each direction and then a two-way left turn lane in the center that vehicles would be able to enter to safely make left turns in either direction. The shoulders are five feet in this alternative, so similar to the barrier, they’re still wider than existing.

The barrier shoulders would be about seven feet. but vary through different sections as the corridor width changes. Since the two-way left turn lane is a bit wider, the shoulders would be more about five feet through this stretch of the corridor.

Speaker 7 (30:17–30:34)

Quick question, go back to that picture, because I think I would know the answer when I’m asking. Are you proposing putting sidewalks on both sides of the entire, because much of it is only sidewalks on one side, not both sides? No, this is just an illustration.

Speaker 8 (30:34–30:35)

Yes.

Speaker 7 (30:35–30:40)

But the sidewalk layout as it is on that section of roadway is going to stay the same.

Speaker 8 (30:40–30:40)

Yes.

Speaker 7 (30:40–30:43)

Which I believe is just one side. Okay. Thank you.

Speaker 8 (30:46–35:48)

So an example of a two way left turn lane. This is route 28 through reading. And this was a road diet pilot that was made permanent, because it was considered successful. And on the right on the table are some safety statistics from before and after that do show.

a significant increase in non-fatal injury crashes as well as property damage only crashes. So about an 11% decrease of non-fatal injury and 37% of property damage only. Other examples of two-way left turn lanes that show some of the treatments that are proposed along here. The example photo on the left of Route 114 in Middleton shows a center two-way left turn lane that transitions into a left turn lane on a traffic signal.

And then the example photo on the right shows a two-way left turn lane transitioning into a painted median with the modular flex posts. expect transitions like this along Route 28. Right, and then here on this screen again is just generally where we’re recommending these two different cross sections. So towards the north near Reedsdale Road, we’re proposing to, you know, maintain and strengthen that full access where we can with the two way left turn lane approaching Reedsdale Road.

We’d maintain the lane use at the signal south of Pleasant Street through to Ridgewood Road. We would have the modular curb barrier proposed. But there is a break at the barrier proposed at the Reed Street signal, so we’re not proposing to restrict turns through there. Then moving south from Ridgewood Road, we have the two-way left turn lane and you’ll notice another section of red there.

We are proposing a short stretch of modular curb median down the center for some center line hardening. approaching the hillside street intersection along the horizontal curve. For the road diet pilot right now, we’re proposing the residential driveways along the blocks where the modular curve median is proposed will be restricted for left turns. And then the side streets and business driveways that are along these stretches that would be impacted would include Howland Avenue, Highland Street, Carriage House School.

All of the other side streets and businesses along the corridor, we are planning to maintain access for. All right, the next few slides are just going to walk through some schematic drawings of this cross section on route 28. So, this is starting at the north and then it works its way south. So starting at reedsdale road.

we are going to be revising the phasing, so the sequencing of the traffic signal on the Reedsdale Road right turn lane. Right now, there’s a time in the signal where that right turn lane goes with the left turn lane coming from Route 28. When we accommodate U-turn movements northbound off of Route 28, we can no longer allow that overlap. For the safety of the U-turning movements, That would be changed.

And then the U-turns would be accommodating the folks whose turning movements are proposed to be restricted. So you’ll see along this drawing different colored arrows. The red represents restricted movements. and the green represents an existing movement that would be maintained.

The blue is where we would anticipate additional volume being rerouted due to those turn restrictions. Here, we’re anticipating that folks who want to go southbound that are on the east side of the street would utilize that U-turn at the Readsdale Road signal to reverse their direction. Moving, yeah, moving south from there, at the, actually, do you mind going back? At the Milton DPW, that’s okay.

At the Milton DPW, we do start to open up that turn access, and that continues to Pleasant Street, where we transition into a left turn lane. So we propose a southbound left turn lane onto Pleasant Street. And then south of Pleasant Street is where we start that modular curbing barrier. So you can see that down the center of the road there with the one travel lane in each direction.

Speaker 7 (35:48–36:09)

So the business, can you go back to that slide? So the business that is, I think it’s those first two, or they could both go. Okay, I think that answers that, because these two here, they’re both commercial.

Speaker 8 (36:09–36:10)

Okay.

Speaker 7 (36:12–36:18)

I’m referring to the first two businesses which are commercial. The first two buildings are commercial.

Speaker 8 (36:18–36:19)

I appreciate that. We’ll make note of that.

Speaker 9 (36:20–36:32)

Can you go back one more as well? So the U-turn proposed at Reedsdale Road, how do we mitigate me turning, making a U-turn with the oncoming right turn traffic?

Speaker 1 (36:35–36:40)

coming in from Reedsdale. I think that’s what she was saying is they’d have to cut that arrow short.

Speaker 9 (36:41–36:43)

So is that going to be a change in the signals?

Speaker 1 (36:44–36:52)

No. We are mic’d up, Ms. Agostino. If you want to hear, you can come to the front.

It’s okay. Okay. All right.

Speaker 8 (36:54–37:05)

Yeah, correct. We would be removing that portion of the signal phase that the right turn goes right now with that left so that that conflict does not exist.

Speaker 7 (37:07–37:43)

Okay. Can I just follow up on this question? Because that blue arrow, that U-turns diagram right there, which is now south of the crosswalk at Reedsdale and 28. So that’s a crosswalk from the dental office, comes across to the accents.

People would be able to make a U-turn coming north to go back south there? How? Just make a U-turn on the intersection and head south? No.

Speaker 8 (37:43–37:50)

Yeah, when the left turn movement goes, we would allow someone to be U-turning during that phase without conflict.

Speaker 7 (37:54–38:51)

Okay, that causes me, I have some angst with that, but go ahead, I get it. I mean, just the pressure that that intersection takes daily as it is, because the one thing, everything you’ve talked about so far, I get it, you’re trying to address speed and safety, but you and I both know we have a volume issue. as well. And volume exacerbates just about everything when it comes to turns.

And as you know, going back to your previous slide, at both Reed Street and the AM commute, so in the AM flow, both Reed Street, which is signalized, and Halinav, which is not signalized, both have 709 DNRs for left-hand or right-hand turns, either or. There’s do not enters restricting on both of those, which it can be an issue in itself. It’s another issue in itself that we’re not even getting to in this. I get it.

I just, no one worries me. I’m just telling you.

Speaker 8 (38:51–38:55)

Okay. We appreciate that comment.

Speaker 7 (38:55–38:56)

Go ahead. Sorry.

Speaker 8 (38:57–39:52)

No, no problem. Yeah. So this is where the modular curving barrier begins. And then yeah, you can go to the next one.

And that general cross section continues until you get to read street at access road where we open up a left turn lane in each direction. At the traffic signal and we’d be proposing protected permitted left turn so basically there would be a portion for each direction of the turn where there’s the green arrow and then the portion where there’s the green ball. at that intersection, and we are also assuming that folks will be utilizing the southbound left turn to U-turn because of the turn restrictions that the barrier is placing on folks to be able to turn left from those driveways to the north.

Speaker 1 (39:52–40:10)

That’s where, for example, if someone was coming out of Carriage Street, Carriage House. My kids went there for a couple of years. I would imagine that that’s where they would come out and then they’d turn around. That’s further south, isn’t it?

It’s not even in the picture. It’s the next slide.

Speaker 7 (40:10–40:11)

Okay.

Speaker 8 (40:11–40:13)

Yeah, but any driveway along that.

Speaker 7 (40:14–40:14)

Right.

Speaker 8 (40:14–40:14)

Yeah.

Speaker 7 (40:14–40:25)

Okay, got it. Did you have conversation with them at all, the carriage house? I think they regulate it anyway. I think they’re one way in, one way out on their own.

I think that’s just how they do it. Yeah.

Speaker 8 (40:25–41:45)

One of their driveways is on the side street, so it only impacted in. Yeah. Moving further south, this is just showing that same general cross-section of the modular barrier down the center. This one’s near Halinav, and then this continues to just north of Ridgewood Road.

Here is where you’ll see the cross-section start to differ, where we’re opening up left-turn lanes in each direction at the Ridgewood Road intersection. Then from here south, there’s stretches that transition between two-way left-turn lane and then left-turn only lanes in some of the shorter blocks where we wanted to avoid very short stretches of two-way left-turn lane. So left turn lane southbound at Naha and left turn lane into Heather Drive So we are proposing, you know left turn lanes into all of the side streets where we’re not restricting turns It’s so from an enforcement point of view You’re going solid yellow line on both sides, which is no turn with the exception of a

Speaker 7 (41:47–41:54)

I see the dotted line allowing those are the intersections where you could turn. This is more from a regulatory, from a enforcement point of view.

Speaker 8 (41:55–43:38)

Exactly. This shows the design proposed at Hillside Street. So here we transition to some turn restriction southbound centerline hardening approaching Hillside Street. And then northbound, we provide a left turn only lane with some modular curving next to it for additional center line hardening to tighten up the turns through here and discourage any crossing over the double yellow center line into an opposing direction.

Moving south through here, so south of Hillside Street to north of Chickatawbit Road, you know, this area becomes much more dense with driveways on each side of the road. So we’re proposing the two-way left turn lane through here so that we’re maintaining access as much as possible for people. So you can see there’s no turn restrictions through here. And then again, at the Eager Road intersection, we’re transitioning into a left turn lane there.

And this is just showing that cross section continuing through further south. Once we get to Chickatawbit Road, we are proposing dedicated left turn lanes in each direction with protected only so the left turn arrow only left turns northbound and southbound at this location. And that takes us through the limits of the pilot design.

Speaker 3 (43:38–43:49)

Why don’t you finish up the slides and then we can we can go through it.

Speaker 8 (43:51–47:25)

These next few slides just walk through the anticipated timeline of the pilot and the pilot evaluation. We’re anticipating installation will be able to occur this fall, and we would maintain that pilot design throughout the winter. We’re not going to put anything out there and then take it right away come winter season. With every change, it’s going to take some time for drivers to adjust to the area, adjust to the new design, learn new travel patterns, and settle into the change essentially.

To allow time for that to occur before we start taking after measurements, we’re anticipating that the evaluation could likely occur in the spring. In order to evaluate the pilot, we’ll be taking traffic counts both before the pilot is put in place and after the pilot is put in place in order to compare the impact. Some potential measurements of the pilot will include crash frequency and severity. How is this impacting safety?

Are the numbers moving in the right direction? Corridor vehicle travel speeds both during the peak times and outside of the peak times when you tend to see some of those higher speeds occurring. Corridor volumes on not only Route 28, but side streets and the adjacent routes that people might be likely to divert to because we are aware that traffic tends to flow like water, and we don’t want to just be pushing the problem to local streets that tend to be less able to handle those issues. Then corridor travel times.

We are, you know, hoping to seek feedback during the pilot, and we’re planning to develop to post project information updates, either on the town or mass dot website to develop an online mapping tool for the public to, you know, learn about and engage with the project. And then we’ll be doing, you know, supporting that with direct outreach to advertise the website and the feedback resources so that the word gets out, people know where to go to find information and to provide their comments and their thoughts. And then we would pair that with some targeted stakeholder outreach. So we’d want to meet with town officials, emergency response to get, you know, additional perspectives beyond the public’s.

So estimated next steps. As I mentioned the implementation of the pilot in the fall, collect data in the, you know, winter early spring to evaluate solicit feedback from, you know, the town and the public. through online maps and meetings. And then, you know, we’re also very aware that this project is, you know, butting right up against the roundabout construction, which is expected to begin next year.

In the spring, you know, it’ll be some limited like utility, you know, short-term construction setups. And then really more of like that next summer is when some of the more significant roundabout construction is anticipated to begin. So we’ll be sure to, you know, coordinate between the two projects. to make sure that any adjustments that need to be made for the traveling public to transition between the two is made.

That’s our presentation.

Speaker 1 (47:26–47:27)

Questions from the members?

Speaker 9 (47:28–48:05)

I have a lot, but. Go ahead, go ahead, go ahead. Mr. Daley.

A few questions. These are not in any particular order. You talked about tracking the impact. Can you share more about how you track these metrics and what you’re looking for?

Are you going to be doing this just from our reports on accidents? Will you? anything. I’ll just go here.

Sorry. Can you share how you will be tracking those metrics? Will you be on-site and watching the flow of traffic? Are you waiting just on our police reports for accidents or any incidents that happen, or are there things that you’re doing internally?

Speaker 8 (48:05–48:31)

How will you know? will not be on site, you know, perpetually, but we would definitely be doing site visits to observe how things are going firsthand. And then on the accidents tracking, typically we, you know, do work with the crash reports that the police take and work with those statistics.

Speaker 6 (48:33–48:53)

And then when we did We’ve done a different kind of quick build project on Route 114. And there was a situation where we needed that kind of monitoring. And if there’s space, you can kind of set up cameras. And so we’ll work with you and figure out what level of monitoring is needed to understand what’s going on.

But there’s a couple of options.

Speaker 9 (48:53–48:57)

Are you monitoring speed as well for the average speed at different times?

Speaker 6 (48:57–49:00)

I think our speed feedback signs that are out there.

Speaker 9 (49:00–49:01)

I think you got them out there now.

Speaker 7 (49:01–49:02)

They’re already out there. They’re doing it now.

Speaker 6 (49:02–49:21)

Yeah, they capture speed. So we should have pretty real-time, constant speed data. And then that’s something we would also take at targeted locations in the town. And we also use probe data, which is available online from Bluetooth technology that can be fairly accurate on a road like this.

Speaker 9 (49:21–49:28)

During the pilot, do you normally make any changes if you’re needed or is the pilot as done and then you judge at the end of the pilot?

Speaker 6 (49:29–50:09)

It really depends. If it seems like it’s something that people just haven’t settled into yet, there are some level of growing pains that we would need to see out for a little bit and see if the traffic. It’s just all about where people divert. If we feel like it just needs to be there for a little bit longer, it would stay.

If something came up that we weren’t aware of, like a house we thought was a house is secretly a business and they have a truck and it can’t make the turn. Now it’s going to, you know, something like that or some like really dangerous cut through stuff is happening. That’s when I think we would make the adjustments like as quickly as we can. So sorry, that answer is terrible, but it depends a little bit.

Speaker 9 (50:10–50:33)

Personally, I have some concerns on that U-turn at Reedsdale. That does feel and seem very dangerous to me, that U-turn. For the two-way turn lanes, was there any thought on adding traffic signals so that those turns could be a little easier? Because now I’m thinking of people being stuck in that middle lane waiting for the flow of traffic to pass.

Speaker 8 (50:35–50:44)

That wasn’t something we were considering as part of the pilot scope. Did you have a specific location you were thinking?

Speaker 9 (50:44–51:05)

No, I just, I was just thinking when I saw the third slide was kind of a long stretch of that two way, two way turn lane. And I said that, you know, thinking of I know the traffic will be a little slower, because of us going down the two lanes. Yeah, I’m just imagining that people may be stuck in that left turn lane now waiting for the person that lets them in, as they’re trying to make that turn without a stops to stop light that stops the traffic.

Speaker 8 (51:05–52:36)

Yeah, we do anticipate there will be delay turning against a pretty heavy flow of traffic. Right now, we are not considering adding any signals through there. Most of those volumes and most of the driveways and side streets through there are relatively low volume. In order to consider adding a traffic signal, we would have to meet these volume thresholds called signal warrants.

And essentially, when you don’t meet those, you can actually be introducing safety concerns if a signal is not, you know, considered necessary. So that’s something that would have to be considered, you know, if any new signals were to be looked at along the corridor. But it’s not something we were including within the pilot. Yeah, and the conflicts are reduced for those turning movements so not only do you have a lane to turn into, but because you’re now only turning across one lane.

There’s also a lot less turning conflicts for folks so while gaps might be, you know, difficult. You’re only turning across one lane of traffic. So it does eliminate what we call Courtesy crashes that you see pretty commonly along these roads where like one vehicle sees you going to turn so they stop and then the person in the adjacent Lane doesn’t see you doesn’t notice and goes and then the crash occurs. So this does help mitigate those situations Thank you

Speaker 7 (52:37–52:43)

So I have a few. So do you have a preference on which one of these alternatives you like?

Speaker 6 (52:45–52:57)

Yeah, our current preferred, I can’t tell if it’s working, is the hybrid alternative. That’s the one that we intend to run with that we showed to the working group last week and seemed to have some internal consensus around.

Speaker 7 (52:59–54:30)

Which is the one that does a little bit of both. So to that point then, let’s talk about winter. So you know it’s a mass dot road, so you add road crews to cover that section. So Milton is very unique in that it can produce its own weather.

What I mean by that is Great Blue Hill is one of the highest elevations in the metro Boston area, natural elevations. It could be pouring rain on 93, and it could be a blizzard on 138 and 28. One of the difficulties of that 28 corridor is it’s in between, and I only go in there because my dad was chief 20 years ago. He was a huge weather buff.

He studied weather his whole life. and you’re between two hills. You’re between Great Big Blue Hill and Chickatawmit Hill, and it makes its own. And if you were to have some of the old veteran DPW workers that work, because the DPW yard, as you know, is right there, that section for your crews has been really, I can’t tell how many times it’s gone gridlocked ice.

So will those hybrid, because I know they’re barrier, will they be able to sustain really harsh winters? Like, will they be able to sustain it? Because tomorrow’s fine, you know, it’s August, but we’re talking December, January, I mean, that takes, I mean, I think if you look and see the amount of salt that MassDOT has to deploy in an average year, just in that section, I think you’ll be shocked.

Speaker 6 (54:30–54:31)

Yeah.

Speaker 7 (54:31–54:32)

Totally different than Grand Rapids.

Speaker 6 (54:32–55:25)

We have used materials like this that have stayed up through the winter. I mean, it definitely is maintenance, like these are pilots for a reason, and we’ve been working with the district to maintain the road hand-in-hand to make sure that they kind of agree to the maintenance burden that this will cause, don’t get me wrong. But because they’re kind of situated in the middle of the barrier and they’re offset from the road, we don’t expect them to get hit as often. It’s not like when they’re right up along the side of a road, like protecting a bike lane, plows often hit those because it’s right where they’re going.

With this being right in the middle and buffered a little bit from the travel lane, it will be less than some other flex posts locations. It’ll definitely be a little bit of a maintenance lift and we’re willing to do that because this is a safety first kind of project.

Speaker 7 (55:25–55:27)

And just my last, oh, go ahead, I’m sorry.

Speaker 8 (55:27–56:22)

Oh, I was just going to add, you know, like, one of the reasons that we moved towards, like, the more modular as opposed to steel, which obviously would be, you know, hardier, was when we started looking at that access and we wanted something that emergency vehicles would be able to mount if needed, because the corridor While it’s a wide roadway, for turning movements, it’s actually not that wide for large vehicles since the shoulders today are so narrow. The widened shoulders should help provide more enforcement opportunities. Then these modular curbings being something that an emergency vehicle could drive over also means that we’re not significantly impacting. you know, their ability to respond to an emergency at one of the locations that were restricting turns, which was important to us.

Speaker 7 (56:23–57:03)

And then this, my final two points, one’s a request. The first one is, I like, you used the word likely, cut through traffic. You use a good definition though, if you pull through water, it’ll find the, I used to use Swiss cheese, it’ll find the, This is more for people at home who are watching that while this will make this corridor safer, the volume is not going away. We’re still going to deal with the same amount of volume and people don’t want to sit in traffic.

They find alternative ways. So that is something particularly, my two greatest concerns are Highland Street and Hillside Street because they got to catch the bulk of it. They just and I think from the town’s point of view We’re gonna have to look at that as well.

Speaker 8 (57:04–57:07)

Yeah, sorry. What was the second Street Highland and Hillside Hillside?

Speaker 7 (57:07–57:23)

Yeah, it’s the most on that And then finally Could you make sure you send this to my state house office to my rent and to Senator school as well? Just so that we can have a copy of this to see it good We’re taking a lot of calls and that’s a lot of girls.

Speaker 8 (57:23–57:23)

I

Speaker 7 (57:23–57:27)

Thank you very much. Thank you for your time on this. Thank you, Mr. Chair.

I’m done.

Speaker 1 (57:28–57:48)

So I just have a couple of quick questions. In terms of fall installation, so fall runs from, you know, September 21st to December 21st. Do we have a, is there a more precise if we’re using specific, and I don’t know how specific you want to get, but that’s the question that brings it from the back.

Speaker 10 (57:48–57:54)

Yeah. We’re going to call in our district representative, Mark, here to explain the complexities. Sure.

Speaker 11 (57:57–58:51)

As you probably know, the fall is one of the busiest time for our maintenance work because it leads into the winter when we have to stop all work. One of the issues is we have to coordinate probably four of our maintenance contractors for this project. And so we have to order the modular curbing that Liz was talking about. So what we’re hoping is probably towards the end of September, beginning of October to start, but that’s contingent upon when we can get the modular curbing ordered and supplied to us by our contractor.

And then once we get, we have the final plans and everything, we’ll bring in our contractors and work out a schedule with them. We’ll also, we’ll give them a heads up that this is coming. They’ll know it’s coming, but we will have to pin down dates. And once we do that, we’ll give the schedule back to you to inform Milton what we’re planning on implementing.

Speaker 1 (58:51–59:02)

changes and and how much lead time you usually get like we’ve got figured out everybody’s available for October 1st, you know, so you might find out the middle of the month middle of September.

Speaker 11 (59:03–59:27)

Yeah, we’re supposed to be getting the final plans from HSH. So we’ll be doing a lot of the coordinating around then because we’ll know definitively what we’re doing out there what we need to order and get everybody’s schedule lined up. We do have some pull with the contractors, because this is a very important project for us. So We’ll, you know, kind of push some stuff to the wayside on our maintenance work and make this a priority.

Speaker 1 (59:27–59:53)

Appreciate that. Yep. The second question is related to the timing. You know, I’m glad that we’re going to have, you know, websites and, you know, hopefully media on this.

One thing that I’ve seen, you know, just driving around, not any traffic expertise, but you have those portable signs that say, you know, this road will be reduced to one lane. Is that something that we would We will be doing that.

Speaker 11 (59:53–01:00:04)

We’ll be putting out several of our VMS trailers along the corridor, both north and southbound, advertising in preparation. The work’s going to be ongoing at a certain date and then while the work’s going on as well.

Speaker 1 (01:00:05–01:00:38)

Okay, great. And then, so this is alluding to sort of to Mr. Wells’ question earlier. So obviously, this is pilot, so we’ll come back and reevaluate this spring of 26 maybe.

Would you, would there be then a suggestion potentially, let’s say it goes swimmingly, would we want to think about replacing the more temporary curb structures with a steel structure? Or would we, you kind of imagine keeping these posts, I don’t know what they’re called.

Speaker 11 (01:00:39–01:01:15)

plastic posts the flex posts flex posts yep um i don’t think we’ve discussed that yet so okay um what the next steps would be beyond evaluating the project at this time so i mean that could be an alternative um with a hardier steel barrier or something like that um but that also has some issues with that we have to put attenuators at each end to make sure that there’s no blunt ends for oncoming traffic and things like that. And if we do go with the metal barrier, it goes back to what Wysa was saying about the access for emergency vehicles. So I mean, that’s a very critical thing, especially for police and fire.

Speaker 1 (01:01:16–01:01:25)

So in some of the other roads where you’ve put the flex posts and you kind of see them as a more or less full, like, you know, permanent structure-ish.

Speaker 11 (01:01:25–01:01:54)

Yeah, we have done that. Not on highways, but on arterials. The only highway, we have it up on the, I mean, up on the Zaken Bridge before with the HOV lanes, and we replace those. We have them across the Mass Ave Bridge for delineating the bike lanes and things like that.

So, we do have to replace them. They do get knocked out. They get lost, things like that, but they don’t, more of them stay in place than not, so.

Speaker 1 (01:01:55–01:02:52)

And then my final question is more of a suggestion, really. So I appreciate that you’re going to be looking at the sort of the offshoots of the traffic that will be happening elsewhere. And you mentioned 138, which I think is a natural place that people might try. Canton Ave also comes to mind because if you come off of 138, or if you come off of the highway, you can turn onto Canton Ave pretty quick off of 138.

And if folks are trying to cut through, they may use that as well. So I would just suggest, you know, knowing that Canton Ave has Town Hall, has our high school on it, has, you know, a significant amount of traffic already, Milton Academies, well, that’s technically Center Street there, but I would suggest maybe looking at that as well as one of the places that could potentially see a lot of the overflow. Great, so Mr. Milano, yes.

Speaker 12 (01:02:53–01:03:14)

I was curious in terms of, so what is the congestion impact? Have you kind of looked at that? I’m just curious, do you expect all the intersections to be kind of at a failure level? Is that different from where they’re at today?

Do you expect it to be kind of bottlenecked up at Chickataw, but not as bad on the rest of the corridor? Have you looked at that closely?

Speaker 7 (01:03:17–01:03:22)

You realize all eyes are on you? Did you feel it? I could see it. All eyes are on you.

Speaker 8 (01:03:23–01:04:27)

Fun questions. Yes, we’ve looked at it. We’ve looked at it, however, with the skepticism of we’re anticipating the roadway to be overcapacity. Once you get overcapacity in a traffic model, they tend to get less accurate.

So yes, we are anticipating significant queuing at all of the signals, even just looking at an isolated segment the demand today exceeds what you would accommodate in a single travel lane of each direction. So yeah, we are expecting significant impacts of traffic operations. You know, If people do not divert, I think, you know, once it becomes a less attractive cut through, probably it’s going to hit capacity and people will start seeking alternate routes. So, you know, we expect it to be at capacity or over capacity, depending on how people stick to the route or divert to other options.

Okay.

Speaker 12 (01:04:28–01:04:48)

I think that’s a good point. I think that’s a good point. I think that’s a good point. I think that’s a good point.

I think that’s a good point. I think that’s a good point. I think that’s a good point. I think that’s a good point.

I think that’s a good point. I think that’s a good point. I think that’s a good point. I think that’s a good point.

I think that’s a good point. I think that’s a good point.

Speaker 7 (01:04:48–01:04:49)

I think that’s a good point.

Speaker 5 (01:04:49–01:06:16)

I think that’s a good point. I think that’s a good point. I think that’s a good point. I think that’s a good point.

we’re looking to get kind of some concurrence that this is okay. We don’t want to do something that is going to cause you more issues, but we also heard overwhelmingly that there’s a desire to do something on the court. And so where it’s a pilot, and even as we were talking about the curbing, it’s a, it’s a modular curbing. It’s made out of recycled tires.

It’s very heavy. Um, you bolt it down, it could come up easily. So if we had to pull stuff, we can make changes. Obviously we can’t make striping changes in the middle of the winter.

Um, but in any, any road diet that we’ve done, whether it’s the Hingham pilot or. the one in Redding and stuff like that. It takes a while for the dust to settle before people get used to it, and then it seems to work. And it’s a change.

People don’t like change. Obviously, the demand, 28 is being fed from one lane, so it’s the demand coming off of 93. That’s the people that we’re hoping to discourage from continuing to travel in this corridor. I mean, I don’t know how you operate if you need to have an official vote, but this is what we would like to do.

We need to get quantities to order them so we can get something in the ground this fall.

Speaker 1 (01:06:17–01:06:42)

I think it’s a great question, Mr. Milano. My suggestion would be that the board maybe does just have a quick vote to agree on whether or not, you know, to endorse the exploration of this pilot, or we could just sort of say, if we all agree that we all agree that this is something we should try to do, and then we’ll just stay posted on things as they develop. Mr.

Wells?

Speaker 7 (01:06:42–01:07:00)

I’ll take option two, only in given the conflict I have in two, which I support this in my state, but I want to be able to do that, because that’s where I’m getting more of it than most of it is there. So if you want to come up, I’m with you. And I don’t want to leave it just the two of you to vote, because then… Well, we can’t.

Speaker 1 (01:07:00–01:07:04)

Yeah, you can’t. But I think we can just sort of agree that there’s a consensus. I agree.

Speaker 9 (01:07:05–01:07:31)

I agree. Is that okay with you? I’m in agreement there. My only concern is, so what are our options in this time, in the beginning, for this oversaturation of traffic?

Like, are we putting police details out there? Because I’m thinking of all the streets that are going to be backed up in this first probably three to five weeks of the changes. Are we putting up signage? Are we sending out alerts?

Like, what are the options for us in the town? And what can the residents expect during this time?

Speaker 5 (01:07:31–01:08:08)

Yeah, so obviously, we’ll be We’ll be putting up message boards well in advance that there’ll be new traffic patterns and new conversion from two lanes to one lane. We’ll do a public outreach campaign. So this would be something that we have to do a public outreach plan, which has to go to the governor’s office. And then our legislators and our communications people get it out to media even.

So this would be something that we would want the general public to learn about, to be prepared and make their decisions about thinking about another route. You know, those people that don’t have to come through this court, that have an option.

Speaker 9 (01:08:09–01:08:14)

How long is it before that filters through ways and it tells people don’t go through this court?

Speaker 5 (01:08:14–01:08:34)

Well, I mean, we have the ability to talk to Waze and Google and we can tell them that the lane, it’s not a restriction. So we’ll just tell them that it’s going from two lanes to one lane each direction and give them that information. Thank you. Unless we’re closing the road, they won’t publish anything on the site, but their algorithms will learn quickly.

Speaker 7 (01:08:37–01:09:51)

Just one final question. So have you tried to model this out projecting on a little bit like When the Rotary Roundabout, I just came back from an official mission to Iowa, Northern Iowa. I think I counted, we went through 98 roundabouts in our three-day trip, 33 legislators. Have you modeled this on a roll to see what it might look like when the roundabout is completed?

with how the roundabout, do you think the roundabout has an impact on the flow at all, either north or south? The construction’s gonna exacerbate it a little bit anyway. It’s just going to, because it’s just gonna, like you say, police state’s gonna be a mess there for the period of the construction. Have you thought about this, how it’ll look when it’s done?

I know how the intersection’s gonna look. Have you thought about how this helps feed or maybe alleviate some of this. I know it can’t make volume go away, but… And I don’t even know if you can answer that.

I mean, I… Yeah, no, that’s a really interesting question. I always like to ask visionary questions. Some of them are impossible to answer.

Speaker 8 (01:09:52–01:10:46)

We haven’t explicitly modeled that situation. But thinking through some of the ramifications, I mean, theoretically, southbound now, you will have less traffic feeding into the roundabout on Randolph because we’ve reduced the capacity of the road leading up to it. From the south, it’s already one lane today. So I don’t anticipate this significantly changing things approaching the roundabout from the south.

But the key will be how does the roundabout design transition into the road diet so that we’re not backing traffic up through the roundabout, because then it impacts the functionality of the roundabout, which we would not want to do. So I think that would be the key to marrying these two together.

Speaker 1 (01:10:47–01:11:18)

I know that was something that, and when you guys were here, I think it was last year, one of the questions that I had too was once the roundabout is in place and you lose that signal and you sort of lose that sort of natural break in traffic that happens with a signal, then how will that, that’s something else that I would just be curious to hear as we continue this, to think about the impact of not having that signal on left turns and, You know, particularly right north of where the roundabout would be.

Speaker 8 (01:11:19–01:12:26)

Yeah, I think you know the impact left turns is twofold right because you’re now only turning against one lane of traffic so you have less conflicts, it’s an easier movement. But there’s more traffic in one lane opposing you. So gaps are still going to be difficult to turn. So that’s kind of the impact.

The roundabout is a fantastic traffic calming measure. Signals have been brought up a lot. I know from the public and from folks that to control the speed along the corridor, stop people with signals. The roundabout does that naturally.

So we don’t have to stop people. The geometry of the roundabout slows you without you having to sit at a red light that maybe in the middle of the night, someone blows through and it’s a safety problem. So the roundabout’s providing that level of traffic, calming without stopping people. Now, that’s not going to last through the two mile corridor here that we’re talking about.

But in the vicinity of the intersection, it will be effective in slowing people down. It’s designed to be.

Speaker 5 (01:12:26–01:13:16)

OK, the only other thing that I’d add is where we’ve we have a number of obviously roundabouts in Massachusetts. And one of the things is, even if there are driveways close by, whether it’s a commercial driveway or residential driveway, because of the slower speeds and the way they operate, people are actually more accommodating with letting someone out and in. Because you’re already at a slower speed, and it’s not like one car is going to make it that much of a difference. Versus when you’ve got a green light, people are like, no, this is my time, I’m going.

So I think it’s generally from all the experience that we’ve had with them, I can’t say that all your residents will be compassionate, but the theory is that they’re just more willing to let the person out. That’s from experience all across the state where we have these. Some are multi-lanes.

Speaker 1 (01:13:16–01:13:49)

It makes sense at a base level. I think, unless we have any more questions, you have the select board’s agreement that this is something that we want to see happen. And we look forward to you keeping us posted on the timing. And I’m sure that we’ll get some regular updates on that as well.

And we’ll leave it to Mr. Milano maybe to schedule an update at some point after the installation. But even hearing before the installation what the timing is going to be would be fantastic.

Speaker 5 (01:13:49–01:13:59)

Yeah, through Dan Fielding, we’ll actually keep you up to date. Now that we have direction, we start putting the numbers together, we’ll get things ordered, and then like I said, the district is poised to jump on this.

Speaker 1 (01:14:00–01:14:16)

And we appreciate that, and I think it was helpful to sort of remind everyone that we’ve been talking about Chicka Taubat since 2017, 2018, so the fact that we’ve been able to turn this around in a very short period of time as far as government work is considered, we’re greatly appreciative of that.

Speaker 5 (01:14:17–01:14:18)

Thank you very much.

Speaker 1 (01:14:18–01:17:48)

Thank you. Have a good night. Thank you. Thanks for coming down.

Yes. I’m going to take a quick two minute break. No worries. So our next item on our agenda is a discussion update approval of special town election to fill select board vacancy and approved special town election warrant.

And I know we have our town clerk with us. So if you would join us up here, I think we’re just going to have a quick discussion about this. We started this last week and Mr. Wells is with us now today.

Speaker 13 (01:17:48–01:17:50)

Thank you for having me.

Speaker 1 (01:17:50–01:17:53)

Thank you for being available two weeks in a row. We appreciate it.

Speaker 13 (01:17:54–01:17:54)

My pleasure.

Speaker 1 (01:17:55–01:18:30)

So we’ve had this discussion. Last week, already kind of got a sense of the timing, the town clerks recommendation of having the election, I think it was November 3 for for like you have the Tuesday. That’s that’s synchronous with the Boston election. And so I think what we wanted to do here is, A, make sure Mr.

Wells was present for this discussion, and then any final questions that we had for the town clerk, and then make a decision about whether we want to go ahead with that or not. So, Mr. Wells, since you weren’t here last week, I’d turn it over to you.

Speaker 7 (01:18:31–01:18:37)

I want to make a motion that we approve November 4th to have a special town election to fill a select board vacancy.

Speaker 1 (01:18:37–01:18:57)

Okay. That’s just fine. The motion’s been made. We have a second?

I’ll second. Seconded by Mr. Daley. We can leave a little time for discussion.

Okay. If anybody has any final questions or thoughts or things that they’d like to either ask the Town Clerk, ask Mr. Milano. If we don’t have that, then we can…

I have full confidence in your ability.

Speaker 7 (01:18:57–01:18:58)

I’m not worried at all.

Speaker 14 (01:19:00–01:19:43)

I just want to go on the record stating while I’m going to support this for November 4th, because it’s important for the governance of the town. I think it’s an incredibly regrettable situation that we’re in, that we’re gonna have to spend up to $65,000 in a year where we passed a level service override to have to do two elections within the same calendar year for the town. and that whomever runs going forward, we need to have candidates who will fill their terms because we really do not have the money for this.

Speaker 1 (01:19:44–01:20:22)

I think that’s an excellent point. And I would say, too, if there’s one issue that drives you as an individual, we have committees, we have lots of different ways for you to get involved in that issue. Being on the select board, being on the planning board, these are positions that require you to address a whole host of different issues. really get very deep into town business.

If that’s not what you’re interested in doing, please take these elections very seriously because this is a real cost to us as a town to hold this election. Mr. Wells.

Speaker 7 (01:20:22–01:21:33)

I just want to say that I can’t think of a time when this happened in the past, but I don’t know Mr. Cohane very well. I do feel that this was not a decision he made lightly. I think he felt he had to make this decision.

I come from a world where, I often speak of it, what we see is not often what the reality of an individual’s life is. And for whatever reason, he felt he had to make that decision. And while, yes, it’s going to cost us some money to do it, I don’t think we have any choice because I think it’ll be 26 inches by 830 tomorrow morning if we don’t vote to do it. Right.

it is the price of doing business. And I wish him the best and I wish him well. And I thank him for the time that he was here because he did roll up his sleeves and try hard. And I say this to the two of you, like you’re brand new and you’re already getting hit with major decisions that are really, really tough.

And sometimes some people just can’t handle it. So I wish him well. I’m sad it happened, but we gotta move forward. We gotta do it.

Speaker 1 (01:21:34–01:21:48)

I agree. So in that spirit, we have a motion, a second. If no one else has anything to say, we can just do a standard vote on this. All in favor?

Aye. Opposed? OK, unanimous. Thank you, Ms.

Galvin.

Speaker 13 (01:21:48–01:21:54)

The nomination papers will be available tomorrow. So any candidates that are interested in running, we hope to see you.

Speaker 12 (01:21:54–01:21:57)

And they’ll be due back on September 16.

Speaker 13 (01:21:57–01:22:02)

So just shy of three weeks. OK. OK. Thank you so much.

Speaker 1 (01:22:04–01:22:27)

All right. We have the application of Verizon Wireless New England for small wireless facilities installation on Thatcher Street Pole. This is a public hearing process. So I am going to open the public hearing by reading the hearing notice into the record.

Which one’s the hearing notice? This whole thing? Yeah. Nope.

No.

Speaker 12 (01:22:27–01:22:28)

I have it right here. Sorry.

Speaker 1 (01:22:28–01:22:46)

Hang on one moment. I can read it for the board. Okay, that would be great. Mr.

Milano is going to read the hearing notice into the record and state that the abutters were also mailed the meeting notice.

Speaker 12 (01:22:47–01:23:41)

So the Select Board will conduct a public hearing at 7.05 p.m. now, 8.23 p.m. on Tuesday, August 26, 2025, pursuant to the town’s small cell equipment policy on an application by Centerline Communications LLC on behalf of Verizon Wireless to install a small cell wireless facility. At 150 Thatcher street on existing pole utility pole plans for the proposed facility are available for public inspection the select board office located in town office building 525 can’t nap from 830am to 430pm Monday to Thursday and on the town website, the hearing will be conducted in person.

momentarily at the Milton Council on Aging 10 Walnut Street and include remote access in accordance with Mass General Law’s Chapter 31A as amended. The notice also gave instructions on how to access it by Zoom. This exact notice was mailed to abutters within 300 feet of Utility Pole 18 on Thatcher Street.

Speaker 1 (01:23:42–01:23:51)

Okay, so it becomes my duty now to request the applicant present the petition and application and provide any pertinent background information. So please, sir, go ahead.

Speaker 15 (01:23:52–01:26:14)

Thank you, Chair, members of the board. Sean Conway, I’m here with Verizon Wireless. I have with me also Christopher Tracy, who’s with Centerline Communications, a site acquisition engineer. And also on the Zoom call, I have an RF engineer from our RF team, Brian Williams, who can answer any questions about RF.

This application Verizon is proposing to install a small wireless facility as said at one about approximately 150 Thatcher Avenue or Thatcher Street and at the intersection of Houston Avenue. The cell will cover that area. It’s an area of congestion that the RF and system performance team came to us and said they needed some new network. So at that point, we go out and we look at the local ordinance, follow the guidelines of the ordinance, work with the local utilities to submit an application for a utility pool that will allow our attachment of the small wireless facility.

through our surveys, this pole turned out to be the best location for us to install the small wireless facility. So at this location, we’re putting a key antenna. It’s very similar to a transformer, electric transformer that you would see on a utility pole. That will be located at the top of the utility pole at 34 feet.

Lower on the pole, actually, the key antenna itself would be about 14 inches in diameter and no larger than 35 inches tall. The equipment from there will go lower on the radio, lower on the pole. There’ll be a bracket with four radio radios in it. It’s about 12 feet high in the utility pole.

From there, it will go down to a electric diplexer and then a meter, which will power the site. And there’ll also be cables running from our radios up to the antenna that will be in a U-guard cupboard. They won’t be exposed on the pole. Let’s see.

So yeah, the facility will not have any backup batteries or any generators or any lights, and it will operate well within the guidelines set forth with the FCC on RF safety. I do have Brian on the Zoom. If we could let him in, he will show us the existing coverage in the area and why we decided we needed a location here at Thatcher Avenue.

Speaker 12 (01:26:18–01:26:29)

He’s joining now.

Speaker 1 (01:26:29–01:26:30)

Thanks. He disappeared.

Speaker 16 (01:26:30–01:26:33)

Oh, there he is.

Speaker 1 (01:26:33–01:26:40)

Brian, can you hear us okay? I think you’re on mute.

Speaker 7 (01:26:40–01:26:42)

I think he’s going to promote him. He’s promoted.

Speaker 16 (01:26:44–01:26:48)

Okay. Um, can you hear me now? Yes.

Speaker 1 (01:26:48–01:26:49)

Yes, we can.

Speaker 16 (01:26:50–01:27:01)

Okay, perfect. Basically, um, Emma, are you okay with my accent? Because I have a kind of a strange accent. And also I’ve had a cold.

Speaker 1 (01:27:01–01:27:08)

So just as long as you tell us what it is, so we can enjoy it. Scottish. Okay, Scottish. That’s what I thought.

Speaker 8 (01:27:08–01:27:08)

So

Speaker 16 (01:27:09–01:27:25)

Yes, so basically, I’ll try to share a presentation with you, just it’s a basic presentation, that shows the coverage that the site would get. So, if you can see the presentation.

Speaker 12 (01:27:27–01:27:29)

Yes, it came up for us. We can see it.

Speaker 16 (01:27:29–01:27:56)

So basically, this is just the yellow areas would be coverage where we would, a reasonable expectation that we would get indoor coverage. So, you know, that is the kind of guidelines that we use, that you should be able to make a phone call inside your… We may have lost your audio.

Speaker 1 (01:27:57–01:27:58)

I think he was just pointing out the area.

Speaker 16 (01:27:59–01:28:17)

So we would expect to fill in that gap in that area with regards to coverage. The other thing, is everyone OK with that?

Speaker 1 (01:28:17–01:28:22)

Could you just flip back and forth? We lost your audio a little bit, but I think we got the point. OK, sorry.

Speaker 16 (01:28:22–01:30:31)

That’s OK. Sorry. The first one, coverage, as it is right now, yeah? So yellow area is a signal level where you would reasonably expect to make indoor calls.

Yeah? Got it. So, yeah, so that’s basically it. So the second one is when we add the site, what the expectations would be, the coverage gained, you know?

So basically, it fills in that gap between those two, that area, you know, the site is actually excellently located in the centre of where the surrounding sites are. And I can sort of explain to you why that’s got a second benefit. What I believe, system performance we’re saying, is the site is going into congestion. So they say this area, a lot of the problems are actually congestion and so as you see this, this move area you see here.

Yes. It’s actually like what, exactly what you would call the serving area or the equal power boundary area. All these things are, all these plots are done in scale. So you know that this is the area where we would expect that the print and the coverage is on this site, the surrounding sites just have high band MTE, which basically means that it’s poor capacity, but not fantastic for coverage.

As you go lower in the frequency band, you increase your coverage. So basically, the difference between this site and the surrounding site is that we’ve added low band to make the coverage more robust. or cover a bigger area. Are there any questions or anything I can clarify?

Speaker 7 (01:30:31–01:30:34)

Aren’t there others of these in town?

Speaker 16 (01:30:34–01:30:36)

There are, yes. Okay.

Speaker 7 (01:30:36–01:31:06)

So one quick question because one resident did. This is more going to your house. So for as long as I can remember, when you leave here and go right on Canton Avenue towards Upper Canton Avenue, both the side of the high school and what is called Indian Cliff Estates and down into that hole, cell phone coverage is almost non-existent. And I thought years ago, going back to when I was police chief before I was even here, You were going to add a couple of these in that area.

Speaker 15 (01:31:06–01:31:34)

We did. You did? We did. We added two right outside of the Indian Cliff area.

I mean, they’re mainly, as Brian was talking here, they’re taking a lot of capacity. So they’re not able to do as much coverage because it’s a lot of congestion that’s in the area. Again, these are small cells. It’s not like one of our big towers that can cover a big giant area.

So if they get into an area where there’s trees and a lot of other use on the network, then the spread of the signal will degrade.

Speaker 7 (01:31:35–01:31:44)

I get it. Okay. I knew that. I’m like, when I got that, I’m like, I remember years ago, because that’s still what I call a hole today.

Speaker 15 (01:31:45–01:31:54)

It’s a huge hole. The two cells are up and active. You know, we looked at them and they’re more capacity fixes right now.

Speaker 14 (01:31:54–01:32:19)

What is the formal process for feedback on something like that? In this situation, you put a new small cell in if coverage doesn’t improve. you know, and if residents have a challenge, do they just call Verizon? Do they work with us to work with you?

Speaker 15 (01:32:19–01:33:17)

It can be a mix of all of all this. I mean, we are always monitoring our network. It’s very important for our customers to have good service. Yeah.

But yes, I mean, if there’s locations out there that the town or the city is willing to look to give us somewhere to put a tower up. It’s going to make things a lot better for us. These small cells are small fixes. They can do, as you guys can see, a small area.

We’d like to come into towns like Milton and build a tower somewhere that’s going to cover a big, giant area. But yeah, there’s the avenue of going to Verizon directly. We listen. If there’s a lot of complaints coming in in a certain area, it gets bubbled up.

Again, we certainly will see the problem areas. We probably know of them. There may be a reason that we’re not able to fix it. It could be we’ve had permitting issues in the past or something has come up in an area where it’s just not possible to do.

But if you guys have areas that we could work with to look at for macro towers, that would be great. Fantastic.

Speaker 9 (01:33:17–01:33:21)

Are those the only two solutions, either the small cells or the large towers?

Speaker 15 (01:33:21–01:33:30)

I mean, we do we do rooftops, you know, you can do you can do antennas on rooftops, water tanks. There’s there’s multiple solutions out there.

Speaker 12 (01:33:31–01:33:52)

And I’ll just add that Sean and I spoke this afternoon. We talked about potential locations. I’m going to get a list of facilities that Verizon can take a look at. If it goes somewhere, great.

If it doesn’t, we can keep plugging away. And I mentioned both the Indian Cliffs issue that we were apprised of, and Cape and Street, I’ve received complaints about. So I shared those with Sean earlier today as well.

Speaker 15 (01:33:53–01:34:05)

Like I said to Nick, we’ll take those coordinates. We’ll put them right into the system. If there’s something that hits the RF team, the system performance team, they’ll be thrilled to come and talk to you guys. I’ll come and talk to you guys.

They’ll send me in. We’ll be happy to build something in Milton.

Speaker 7 (01:34:06–01:34:46)

I remember when Bill Clark was playing, you tried very hard to put what on Ankerty on DCI as like a tree, one of the fake pine, they’re actually fake trees, but they’re actually tall. They’re all along the mass pike, but DCI was just dead against it, they wouldn’t do it, but it would It’s really, still today, it’s a public safety issue because of just how much, you’ve got the high school, you’ve got Pine Tree and potentially another school. You and Rick, that’s one of the most dense areas of town and it literally is, as you know, it’s a hole. Right, yep.

Speaker 15 (01:34:47–01:34:57)

Yeah, I mean, if we’re looking there, there’s probably other players that are looking there too, so it would be ideal. Okay.

Speaker 1 (01:34:57–01:34:59)

Any other questions from the select board?

Speaker 15 (01:35:00–01:35:00)

No.

Speaker 1 (01:35:02–01:35:04)

Is there anything else that you wish to present?

Speaker 15 (01:35:04–01:35:13)

No, I mean, you brought up the last thing I was going to say was that, yeah, you know, we’re always monitoring the network, and if you guys want to collaborate or have your residents call, please do so.

Speaker 1 (01:35:13–01:35:32)

Okay, so this is a public hearing. We don’t have any members of the public in the room. I see there’s a few people on Zoom, so I’ll give them a chance to put their hand up if they want to ask a question. They have the ability to do that during the public hearing process.

We do have one hand up.

Speaker 4 (01:35:33–01:36:04)

Hi, I have many friends who live at Home Inc. up Blue Hill Parkway and a lot of them just have cell phones now and their calls, that’s a senior housing, their calls are always dropping when I speak to them and they’ve been told that it’s because they need an antenna somewhere up there. It’s at the end of Blue Hill Parkway, Blue Hills Parkway and Canton and where the Canton Hab intersection. So I think that it would be great if that could be looked at.

Speaker 1 (01:36:05–01:36:24)

Thank you, Ms. Felton. Yeah, that’s the exact hole we were talking about there, too. It’s homemade because another another factor there.

All right, so it would be great to follow up on that on the antenna thing. And then, so if we don’t have any more questions from the public or the board.

Speaker 7 (01:36:24–01:36:26)

I’ll make a motion to close the hearing.

Speaker 1 (01:36:26–01:36:30)

We have a motion to close the hearing. Second. Seconded by Mr. Daly.

All in favor?

Speaker 7 (01:36:30–01:36:31)

Aye.

Speaker 1 (01:36:31–01:36:36)

Aye. So we can have a discussion now. I would take a motion on this.

Speaker 7 (01:36:36–01:36:47)

I’ll make a motion to approve the application to install one small cell wireless facility on the existing pole number 18 located approximately 150 Thatcher Street, Milton.

Speaker 1 (01:36:48–01:36:58)

Motion made by Mr. Wells. Seconded. Seconded by Ms.

Hegarty. Any discussion? All in favor? Aye.

Aye. All right, unanimous. Thank you very much. Thank you, gentlemen.

Speaker 17 (01:36:58–01:36:59)

Thank you. Have a good evening.

Speaker 1 (01:36:59–01:37:02)

You’re welcome back in the dock tonight, though. You’re welcome.

Speaker 3 (01:37:03–01:37:04)

Need some directions.

Speaker 1 (01:37:05–01:37:33)

Great, all right. Moving ahead, we have town council services. We did have an interview yesterday with Murphy, Hesse, Toomey, and Lehane. So now we’ve had four interviews total.

Mr. Milano, I might turn this over to you, because I know you’ve been aggregating some of the feedback from the board members. And so I don’t know if you want to share any sort of initial impressions from that feedback. I know that I gave you mine.

Speaker 12 (01:37:34–01:38:09)

Yes, and the feedback that I received was prior to the MHTL interview yesterday. I’ll just note of Mr. Wells, I did not hear from him and he had been traveling, but when received the three members who did respond had me, Taralyn, ranked first. All three of them did, all three of you rather, not them.

And I bet I just would note that that was prior to the MHTL interview that took place last night. If that helps get the conversation started. or hurts, I’m not sure, but that is the feedback that was provided to me prior to the interview last night.

Speaker 1 (01:38:09–01:38:15)

Okay. So, comments from the members. Obviously, this is a big decision.

Speaker 7 (01:38:17–01:44:17)

So, I had a different one. But again, I first, and I wanna give deference to the two of you first because is a really tough decision for two people to have to vote on, that have been here literally for 15 minutes, as not in an entity that has been framed into this community for 40 years. They were not my pick. But I did listen intently to Murphy Hesse last night.

I think that I was very impressed with Proposed League because I do know Charis North very well. We’ve worked on numerous cases together, both internally, airplane noise, issues in the town, and I have a high degree of confidence in her. I did talk to today, though, I heard from a former colleague, a lawyer, because one thing, I am not as a lawyer. I may have testified in a lot of courts, but I’m not an attorney.

And she has been following this intently and really spoke at length to me about why we should retain Murphy Hessey to a million. and I trust her judgment emphatically. And so I did tell Mr. Milano today that I wanted to talk to two of the most senior committee chairs that deal with them more than us.

And one of them is John Cannon, who’s a brilliant attorney in his own right, and who’s been chair of the Conservation Commission. And as you heard, and you guys will learn, land use, two of our biggest cases right now are Lower Guile and 642, 648, 652 Canton Avenue. I really, and John was pretty emphatic with me today that, and I believe he said he echoed this to you, that he’s extremely happy with Murphy Hessey, Toomey O’Hane, and he is extremely happy with the change of who lead counsel would be. And I, in my heart, and I, Katie Conlon, who I’m going to name now, who I have from the legal aspect of this job, I don’t know any member of this board that I’ve ever worked with, perhaps other than Mrs.

McGettrick, who so focused so diligently on the legal aspects and the relationship between town council and us. And She was absolutely impressed. I actually texted her last night to ask, are you watching this? She says, I am.

And then she sent me some comments today on the things that she thought about. And one of the things that Attorney Hessey talked about that I didn’t really think about is institutional knowledge. And the second thing, which was me telling him it was not my pick. Because the two biggest things that both Attorney Keenan and Katie talked to me about, and one other attorney from another town, is depth, bench depth.

And I didn’t think they had that. The only one that I thought closest to, and Kathleen O’Donnell’s the third one I talked to, which was this morning, and she’s in Nova Scotia and I feel bad for bothering her on her vacation, You want to have bench depth. And for most of, almost all of my career, both as a department head and now nine years here, up until recently, Murphy Hesse always had that. So my thought is, and you may not agree with me, before we turn this barrel in 40 years of commitment and partnership with this town, because they really are your partner in so many ways, perhaps we allow the swap of lead counsel and extend this for a year.

Now we don’t have to vote tonight and I even said to you today, I told you this today, this is such a big decision, I’m even willing to let everyone sit and think about what I’m saying here. Because I didn’t expect to have to think about it in this way as much as I have now that I’ve talked to all three of them and thought about this. And really, I was as impressed with, and I wasn’t even in the room, you guys were in the room, I wasn’t. And particularly with Attorney…

Conley. Conley. Attorney Cannon was extremely impressed with her, and has been. And so, just given all the things that we have going, my thought is that I’d like to give them the opportunity to extend them for a year and see how this goes.

And then for you guys, because as I said, I don’t think you were here on the day when we did the last interviews, and I said it to you, Mr. Daly, and you, Mr. Zoll, you’re going to make a decision that is going to look beyond all of us in this room. And I had fully expected that we might be making that decision.

And then the more that I thought about it, I thought about all the different cases and all the different things that have gone on, I thought to myself, this may not be the right move to make. And I know I’m the lone voice here, but I It would be, and in my 41st year serving this time, you already know this, I used to say it, I still can’t believe it, I’m now used to hearing about my father, he did 43 years, I would have gone along before you. I think given, and I think the battles and the history that we’ve had with Murphy House, and the depth that they have on the bench, that perhaps we think about just for tonight and think about extending them for a year. But that’s just my two cents on this.

Speaker 1 (01:44:17–01:44:21)

Okay. We’ll turn to the other members for their thoughts.

Speaker 18 (01:44:22–01:44:23)

Everyone’s looking at me.

Speaker 1 (01:44:24–01:44:30)

Well, I just turned in this general direction that Winston was looking. It’s all in the way to look, now it’s up that way. That’s just the way it is.

Speaker 14 (01:44:30–01:47:50)

Yeah, getting used to this dynamic. So, I’ve been here since May. Same. And followed, yeah, and I’ve been following the events of the town for the past couple of years.

So I am of the opinion that it is perhaps time for change. I think that MHTL, While they’re lovely, lovely people, I think there’s a lot of room for improvement in the legal services that the town receives. And as somebody who receives legal services in my day-to-day job, I think I know some things to look for. My top two were MTC and KP Law.

I really, really liked what MTC brought to the table in terms of their municipal experience and expertise and how I got really the sense from them that They were not just thinking about things in legal terms, but also thinking about things in operational terms, which is, I mean, that’s probably my bias, but I think that that’s so crucial when dealing with things in a government context is that you need to be able to see the successive implications of whatever you’re dealing with. KP law, I think, kind of has that depth. And I was particularly impressed with them. and just like their general approach.

So that is where my thinking is. When I think of Murphy Hesse, I guess my question is, it seems like these challenges have been here for a little bit. And the fact that we were going out to bid for another firm. And they tried to make some changes at the last minute to get back in and talk to us.

I’m just wondering why they would make their change in their lead counsel after the fact. I think for me, that’s kind of the question. you know, why did the firm care to make that shift at this point and not sooner?

Speaker 9 (01:47:55–01:47:58)

Mr. Daly, do you want to share your thoughts?

Speaker 8 (01:47:58–01:47:58)

Yes.

Speaker 9 (01:48:01–01:50:35)

I’m very, very respectful and thankful for the service of MHTL over the last 40 years. And I thought this would be kind of the conflict of having them back in the running and them not being there from the beginning is that they’ve done a lot of great things for the town and been a part of a lot of really big decisions for the town over four decades. But my understanding is that this process has had a lot of stops and starts. for the last 10 or 15 years.

We’ve been thinking about looking for a new town council, new labor council. And now the process has started. And so, you know, Meade-Tallamy was also my number one. I like what they presented to us in terms of who would be our lead attorney.

They seemed very ready to jump in and be fully embedded. I did not have any questions in their ability to really pick up the ball and keep it going. And I had the same reservations that Member Hagerty had about why did the MHTL changes come now? If questions had been asked over the last few years, if issues had been raised, why weren’t those things addressed?

Why wasn’t that deep bench employed in times when we needed them in the last few years? Because it seems that it was not. And it’s to say, when you work with someone for 40 years, they have more opportunities to make mistakes, right? And so the shiny new thing always is the shiny new thing.

I’m not against taking some more time if we feel that this is a big decision, if we want to talk to a few more people in town, if we want to talk to a few more of the department heads to get their feeling based on the history. I’m still a little bit in the camp of right now of, it felt a little bit too late. Although I will say Murphy Hessey was incredibly impressive in the interview yesterday. I thought they were great.

I thought all three of them were fantastic. And them being Milton residents also is to me a bonus as well. But I don’t think if I just went off that, if I just went off the interviews and what was presented by each of the firms, For me, they would not have jumped me telling it. But again, I’m not against if we say this is a little too much for right now to make the decision.

Because the first time we’ve had the chance to have the conversation. And maybe one conversation is not enough to make this big of a decision.

Speaker 14 (01:50:35–01:50:39)

Usually these decisions are not made in one conversation.

Speaker 9 (01:50:40–01:50:44)

And so it’s good for us to get this all out. That’s kind of where I am.

Speaker 1 (01:50:45–01:50:55)

Well, I would say, I mean, I think Mr. Milano kind of gave it away. He said MTC was the top pick for all of us. For me, it was a narrow choice.

Speaker 7 (01:50:55–01:50:56)

No, it wasn’t for me.

Speaker 1 (01:50:56–01:53:06)

It was not mine. Yeah, but for the written comments that he had received. For me, it was narrow between MTC and KP. I felt, as Ms.

Egerty said, You can’t really deny that KP has the biggest bench, but I do worry that in a firm that’s that big with that many lawyers that you get a little lost in the shuffle sometime. And I felt like MTC kind of had that mixture of depth, but also not being too big. So kind of the Goldilocks sized firm that we might want to have. I also thought the knowledge of land use for their lead attorney was very, very deep.

It was, I think, extremely impressive. And they also kind of showed up and they knew certain things. they had done their homework a bit. And I think MHTL kind of automatically has that homework done for them because they’re familiar with the town.

But, you know, there wasn’t enough in the MHTL interview to really push me over to feel like MTC was The wrong choice. I think what Mr. Wells has said here to have like the idea of potentially holding on for them a year I would rather just make a decision, and, and, and go with it I see where that’s coming from. I, but I also agree that I don’t think that we need to make that decision tonight.

I think we’ve heard some good thoughts from all of the members. And it does seem like we have at least an agreement that there are two of these firms that we would be, that we’re most interested in, I think, with gratitude for Harrington Heap and KP Law for submitting proposals. So Mr. Milano, I’m curious from your perspective, You’ve got any thoughts if you’ve heard from any department heads Or if there’s anything else that you’d like to add to that and then mr.

Wells, thank you No, I appreciate the conversation.

Speaker 12 (01:53:06–01:54:32)

I think I Have not gone through this process and whether it’s a Milton or another community. I thought this was helpful and I think evaluating the materials meeting with The different firms, I had more opportunity to do so because we did kind of two full rounds of interviews with all four firms. So I’ve seen them multiple times now. We had reached out and requested links to videos where they presented and spoke at meetings, so I had an opportunity to review that, do reference checks and speak to other communities.

So I think the process has been really helpful. I think everybody here is really qualified, certainly. For me, I think some of the themes that members have raised, I agree with in terms of greater depth at KP and Mead Tileman than at MHTL presently. So I think that as a plus for those two firms and weigh that against the smaller general municipal council services that the attorneys at MHTL are currently providing.

But the other factor is cost in my mind. And I think where the board seems to be circling based on this discussion is between MHTL and Mead Tileman. And I think those two firms offer the most opportunity for cost control.

Speaker 14 (01:54:32–01:54:49)

I was going to mention that. And in my point about MTC is just they they they seem to they had a cost structure that I found appealing, especially compared with KP law.

Speaker 12 (01:54:49–01:55:43)

Yes. And so their hourly rates were lower. Mead-Tileman and M.H. Taylor are basically pretty similar in hourly rates.

Mead-Tileman offers a flat fixed fee where it’s all in regardless of what kind of litigation occurs. So thinking about the budget, thinking about, you know, enabling Enabling everybody to have the conversations with counsel if it’s been approved without worrying. What is my bill gonna look like next month? We have that today with MHTL because a lot of it is covered under the flat fee $75,000 retainer It works well with MHTL.

Obviously litigation is billed at an hourly rate. So I think the conversation that the board has had. I could see myself working with all four of the firms. I’m flexible.

So the board, it’s direction where we’re willing to enable to jump in. But I think the discussion that you have had is matches with my take on the situation in general.

Speaker 7 (01:55:44–01:58:34)

So just a couple of points, because to Mr. Davis, so it is true that the talk has been, this has surfaced over the past ten years, but it was never from a select board. It was always from a warrant committee because they felt we should bid legal services. But the feeling that I’ve always known was that the town was so happy with MHTL that they resisted that.

And I remember coming in my first year, and that was a discussion that David Burns was chairing, had with me, and so we were getting pressure then that year for a while, they want to look at it, because they’re always looking at money, they’re always looking, it wasn’t so much the people behind representing. The second aspect of that bench, I will say this, Just thinking of the variety of complex issues that I’ve seen come before these boards in the town over the past few years, and this has been, every one of them that I’ve talked to has said this to me, having that bench is critical. I’m not going to say that I didn’t worry about the bench. And the last thing is, I believe the reason they made the change was because we didn’t interview them initially.

And I think they thought, they came up with, we got to do something. And so that’s what they did. And in hindsight, we should have. Just out of respect to them.

We should have had them in here. They shouldn’t have been lost. They should have been first. And that’s, I regret that.

That is a regret I have right now myself. As I said, this is something that will outlive regardless if there is a change made, and it seems that the three of you and the town administrator want to do that. This is something that you’ll be making that’s going to live beyond us. You don’t want to miss, because then you notice flipping, you don’t see changes very often.

I mean, the two other towns comparable to us that were always compared to it, Natick Where’s the other one? They have denim? Do they have denim? No, they don’t have denim.

Nana can need them. There were two other communities that they had similar to us, and they still have them today. So that’s my two cents, but you guys can do what you want. I’m obviously in the minority here.

Do you want to share who your number one was before? If it had not been Murphy Hesse, KPUR, based on all three of those conversations, the importance of having a diverse bench and just some of my in-town colleagues from other communities, the reputation like you gave me two towns, he gave me two towns that KPUR had. I made inquiries to both of them. And the one thing both of them said, depth.

I know we’re not dealing with it right now, but I’m telling you, the one thing I can guarantee you as freshmen, because I’m living as a freshman in another world right now, you have no idea what’s gonna happen here tomorrow, you just don’t know.

Speaker 1 (01:58:34–01:58:49)

Well, so I think this has been good food for thought, and it’s been a good conversation. I might suggest that we continue to ruminate on this a bit. Our next meeting is on the 9th, so it’s not too far off. And yes, sorry miss Hegarty.

Speaker 14 (01:58:49–01:59:27)

Yeah, I mean Usually when I get to this type of a place in a procurement where it’s close with two candidates What’s what’s the thing that we want to know? Right. Like what do we what do we need to go back and figure out? Is there a question that we need to ask?

what’s the Like, what are we resistant to, or what do we really need to unpack or understand to get comfortable with one or the other?

Speaker 17 (01:59:28–01:59:29)

That’s a good question.

Speaker 14 (01:59:29–01:59:33)

Right? Yeah. And how do we uncover that?

Speaker 7 (01:59:34–01:59:35)

I’ll give you an analogy, if I may.

Speaker 14 (01:59:35–01:59:36)

Yep.

Speaker 7 (01:59:39–02:00:37)

So, for the six months prior to you getting here, and for the year of us on this board, the main issue we’ve had to deal with in this room has been what department? And I don’t say this in accusative, like what has been our greatest challenges to deal with this past year? What have we had to deal with? No, no, no, no, no, no.

Internally, internally. Internally, yeah. It’s pretty easy. I mean, we just had a $9.5 million ride.

I mean, we’re balancing the school budget. And look what the schools did, where they picked a command to right the ship. part of the reason they did. It’s not just his skill as an administrator.

It’s institutional knowledge of the system. And I just give that, and it’s why I can’t underscore how important that is. And that is the only other thing that I put next to Ben’s strength. Ben’s strength is critical.

Critical.

Speaker 12 (02:00:38–02:01:50)

I’d just add a comment to that. I agree on the institutional knowledge question. And I don’t want to appear to be I also want the board to make a decision based on the facts that are out there. Anyway, in terms of institutional knowledge, I don’t disagree, and I agree.

I’m only three years in. It’s funny that the town clerk and I were talking about it, and if we didn’t have Jimmy Mullen to call at times, I think that institutional knowledge is truly important. But this would now be the third attorney at MHTL in three years, Kevin Freitag to Peter Mello to Kate Connolly. So that knowledge exists within the firm, you know, former town councilor John Flynn is retired.

So like there is knowledge with the firm, but it’s not necessarily with the applicants. So I, I just don’t want that. I worry about that a little bit, because I think in terms of how much there is there? And if that’s a question that we want to chase down a little bit.

Speaker 14 (02:01:51–02:03:06)

I have a nuance on the institutional knowledge piece, which I don’t want to say is not important or discredit at all. But I think there’s a difference between going back to an old hand to study the ship when there’s a big problem in an operational capacity The law firm that we select moving forward, we are their client. They’re our agent. The institutional knowledge is important with us and having that in the right places.

I mean, it’s good. It’s helpful to have that in one of your agents or a group that you’re outsourcing to. I also think that from what I’ve observed, there have been some challenges with this firm. I don’t know if we’ve always gotten their best people.

I’m not saying, I’m just, we’re all airing it out right now.

Speaker 12 (02:03:06–02:03:24)

And if there’s something we can request or to probe on that issue, if it’s important to the board, we’re happy to do that or we can try to get an answer on that or try to find more tangible feedback. I think to your point in terms of what are the decision factors that would contribute to the board kind of making a final call here.

Speaker 9 (02:03:25–02:05:36)

I would say what, to member Hagerty’s question about what would we be looking for, I would want to have some of those conversations that member Wells has had. Maybe with some other folks that have worked with Murphy Hesse over time and see if they do have concerns about what would happen if they went to a new firm. I think the law is the law. I don’t know if institutional knowledge plays as big a part in this role.

They’re going to understand the law. They’re going to have the history of how to apply it, how to address it. Maybe some questions about the bench, but I think one of the questions we had when we went into this process was that Murphy Hesse no longer has the bench that they used to have. That was part of our conversation as well.

So I would want to, out of respect for the process, to continue to have some conversations, because this is the first one we’ve had. Institutional knowledge, less important to me in terms of What will they do if a new firm came in? What is their process coming in? Do we have the confidence that they can catch up very quickly?

Will those office hours actually happen? Which I think every firm told us they would hold, but I don’t think we’ve had them over the last few years, right? So promises made, promises have to be kept. In terms of sort of using the schools as an example, I think there’s also the idea that someone like a new superintendent is coming in with new eyes.

He’s been away for a while. So while he has some knowledge of what the town was, it’s not what he was when he left. And he’s coming with a different experience and a different view of how to execute some of these things as well. So there is also the view of a new set of eyes.

What can that offer us? Because perhaps we’ve been a bit complacent. Perhaps we are a bit stuck in there. We’re talking about revenue, housing, changes, like really kind of updating what we’re doing as a town.

And perhaps a different firm would offer that. But I do have an immense respect for history and folks that have put in the time and have worked for the people of Milton. And so I think we stop and go have those conversations and ask those questions.

Speaker 1 (02:05:36–02:06:46)

So maybe what we could do is ask both MTC and MHTL to provide a couple of references that we could call up individually. I know Mr. Wells has already had some individual calls. And then if you also, Mr.

Milano, have suggestions for people that we could reach out to at Towns Managed by MTC or MHTL, I think that would be helpful for Mr daily integrity myself and Mr Wells if he wants to continue to have those conversations. And then, if we could get that information at some point, by the end of this week. we would have a week plus to make calls and ask around. And also, I will say, I’m sure others have, but I’ve also heard from members within Milton with their thinking on this.

So it would also give us time for more public feedback to the select board. And then optimally, we might have enough information at that point to make a decision on September 9th. Does that sound like, Mr. Wells?

Speaker 7 (02:06:47–02:06:56)

Did any of you interview the department heads or the citizens that were on the first interviews? I talked to some of the department heads.

Speaker 9 (02:06:56–02:06:57)

Not the town department heads.

Speaker 7 (02:06:57–02:07:16)

I talked to the moderator. I talked to the moderator. They had a different thought than you had. And I don’t think they got the interview.

Yeah, they did. Yeah, they interviewed all four. But it was current, not the panel.

Speaker 12 (02:07:16–02:07:25)

They were all there, though. From MHDL, it was Peter, Kate, and Karis. with Peter as lead in answering most of the questions, to be clear.

Speaker 7 (02:07:25–02:07:51)

I mean, we’ve talked about it a lot, so I think it’s important to do that and then come and make the decision sooner versus later. My only question is, what about the two significant cases? That was one of the things John brought up today. As you know, he’s in court now on 648-652 and the MHTL and lower guide was going any day.

And that’s, okay, that’s gone.

Speaker 12 (02:07:51–02:08:29)

Throughout the interview process, all of the firms all said there’s going to be stuff that we would recommend that you keep with regular counsel, as long as MHTL would finish those. For 648-652, Canton have the town filed a dispositive motion. We’re waiting on a ruling on that. And then Laura Geil, yes, we just filed all the testimony.

The site visit is in early October with the public hearing in October. And my view would be that they’re knee-deep in that. It wouldn’t make sense for anybody to change that and continue to use them for lower litigation.

Speaker 1 (02:08:31–02:09:02)

Okay, so it sounds like we have some agreed upon next steps here. And I agree with Mr. Wells, I don’t think we wanna wait too long to make a decision on this. So I think that when we come back on the 9th, we should be able to make a decision.

Great. If there’s nothing further on that, then we’ll move to item eight, the Warren article, October 27th, 2025 special time meeting, Warren articles for potential inclusion on the warrants. First, can I get a motion to open the warrants?

Speaker 7 (02:09:02–02:09:03)

I’ll make a motion to open the warrants.

Speaker 1 (02:09:03–02:09:11)

Motion’s been made, kind of a second. Seconded by Mr. Daley. We have to vote on that, yeah.

All in favor, open the ward.

Speaker 19 (02:09:11–02:09:12)

Aye.

Speaker 1 (02:09:13–02:09:24)

Mr. Milano, do you want to let us know? We’ve got a couple of red lines. So, let’s go to the next slide.

So, we have a couple of sheets here on the for article. This is for what was supposed to be article seven.

Speaker 12 (02:09:25–02:12:23)

Yes. So, this is the alcohol on town land article. There are two versions in the packet. The ones we’ve been sharing with the board all along.

The bigger red line with the gray comments on the right hand suggestions that came out of the town meeting and follow up from there. The the other version is a shorter version that I had drafted, kind of reflecting some of the same discussion that had happened. So really where we’re left is I think the intention behind them is similar to to try to add more control and within the bylaw itself. The version that I had initially drafted left some decisions to the select board to be made kind of later, not include them in the bylaw itself.

The one written and submitted. that’s longer for Mr. Zulis again, has more stipulations that are in the bylaw that I think they’re all things, I don’t know that anybody disagrees with them necessarily broadly. And I think that came out of the conversation accordingly.

There’s requirements in there about wristbands, about no advertisement. I think the key difference really between the two gets down to, if there’s going to be required to be a cordoned off area where alcohol service would be allowed. For example, if you’re using, I don’t know, Wharf Park, for example, you couldn’t, under this version, allow alcohol service anywhere within Wharf Park. There would have to be a smaller area within the park itself where the alcohol consumption would have to take place.

And that is something I’ve seen in in Boston, they do it that way. The way that the other 1 that I had drafted says the select board may require that, but doesn’t. It leaves it to more of a case-by-case determination. If there are smaller locations, that wouldn’t necessarily be feasible, so it doesn’t require it.

Alternatively, if alcohol consumption would be allowed at Wharf Park, then nobody under the age of 21 would be entering it in that case, because it would have to be 21 plus only, or you’ve got a little tiny corner that’s Right. So I think that is one of the key differences. I think a lot of the other requirements and the longer one could probably be rolled into into both or combined from the discussions that we’ve been having. I think that was the main kind of decision point is how do we want to control the actual location where a one day license might be allowed?

And how strictly does the site plan want to be laid out for that?

Speaker 1 (02:12:26–02:12:27)

Thoughts or questions from the members?

Speaker 7 (02:12:29–02:13:01)

So, Koi, I’ve signed hundreds of liquor licenses here over the years. You know, this is not something that we have an issue with. The discretion on any individual should lie with us. You know, it’s a big difference between if the MAC’s having its open Friday and they want to have it outside on June, July, and August.

Someone wanted to have something, and I don’t know anywhere in town, because I think, are we omitting parks in this, or parks included?

Speaker 12 (02:13:01–02:13:06)

It’s included if the park commissioners and the select board were to sign off on it.

Speaker 7 (02:13:06–02:14:34)

I think something more significant, I know that the 350th was at the high school, it was a huge event, but alcohol was rampant because we could not There was no way to prevent it, so people just brought it BY. And it was, there’s so many people who came with it. So, I’m just going to go from my experience, and especially 13 years running Milk Music Festivals, which is one of the biggest things in town. It’s on private, Eustace is private.

There’s all the Wakefield, they’re all having them. I’m, I think the discretionary event between this board, the town administrator, and the police chief who weighs in and signs on every single one of them. I think some of the things that Mr. Lewis is putting in there, we can on any individual case.

I mean, you’re not going to need wristbands outside the MAC, or if you want to have a thing on a Friday night at Woff Park with 100, 200 people. Like, I don’t think you’re going to need it for all that. And the other issue is, you heard from the police chief, we never had a single incident. Even Milton Music Festival, which gets hundreds and thousands of people now.

never had a single incident. So, not to say things can’t happen, but I’m comfortable with your condensed version. I really want to give the board discretion on a specific event, as well as the police chief. I don’t have to make them do a thousand things that, you know, a lot of smaller, but Mac’s not going to make a business to have to do stuff like that.

Speaker 14 (02:14:35–02:15:15)

I mean, this to me kind of speaks to I am not a fan of over prescribing in a bylaw or any type of reg because the operation of it can be very different in the end. and especially when it’s written from somebody outside of the operational activity, it’s problematic. So I actually, I do like the one that you have, Nick, because it is condensed, it’s clear, it’s easy to read, and leaves some things at the discretion of the town employees who operate the event.

Speaker 1 (02:15:19–02:15:21)

Mr. Daley, any thoughts?

Speaker 9 (02:15:43–02:15:45)

very quickly.

Speaker 1 (02:15:46–02:15:51)

You might be low on your mic. Am I low? No, this is just not my night.

Speaker 9 (02:15:51–02:15:52)

It’s not my night.

Speaker 1 (02:15:53–02:15:56)

I think it’s like it’s sitting on your collar like upside down or something.

Speaker 9 (02:15:56–02:15:57)

This is how the influencers do it.

Speaker 18 (02:15:59–02:16:03)

Winston’s back in campaign mode. He’s got his mini mic.

Speaker 9 (02:16:03–02:16:12)

So if we could add a couple of those pieces and I can talk to you from outside here is what I think would be useful in the article.

Speaker 14 (02:16:12–02:16:16)

Well, yes, and I think… Is there anything critically missing, though?

Speaker 1 (02:16:16–02:16:55)

We would want to get, from a timing perspective, I think we would want to try to have this over to the Warrant Committee, like, this week, if we decided to include it. So I’m fine with… For example, based on your comments, Winston, I could imagine saying in Mr. Milano’s version on number two, we could just easily put non-transferable age-identifying wristbands at the beginning of that, and then that takes care of that.

So if there’s anything else in here you think is critical to include, why don’t you suggest it now? We can discuss it if we want to add it.

Speaker 9 (02:16:55–02:17:01)

My only other question other than the wristbands would be the caterers licenses. Why is that included in this longer version?

Speaker 7 (02:17:02–02:17:05)

Because that’s here.

Speaker 12 (02:17:05–02:17:06)

It’s in both actually.

Speaker 7 (02:17:06–02:17:13)

It’s in both because I’ve been a proponent of that since we went out and pursued it to make sure that, because that, the Cater’s License.

Speaker 9 (02:17:13–02:17:16)

No, that’s okay. I was just looking at only the highlighted red portions.

Speaker 7 (02:17:16–02:18:23)

It has so many restrictions in it versus you come once in daily and you want to have you want to rent the Mac for a night. Not only the Mac all out, but let’s say you want to rent a… Well, the Mac uses the caterer’s licenses. They do, because they don’t want to deal with the one day.

They don’t want you coming in and then you getting… Like Milton Music Fest, we used to apply for one day. We don’t want the… Because it has so many of the restrictions on the statute already built into it.

Tip serving, training, all that. And the other thing that we need to remember is the inside one already applies with none of this. So you can rent here, you can rent, this only was sculpted out as the outside when we tried to, remember that we passed it on the inside. It doesn’t have any of this stuff in it.

So I don’t want to make it too, I think, I hear you saying, but I’m fine with the fact that the board and the department heads have the discretion on any, because no two are the same. At least the public safety bones in me are like comfortable with that.

Speaker 1 (02:18:23–02:18:47)

Yeah, I do think it’s important to like, the select board doesn’t always, like we, you know, when we get applications for one day liquor licenses now, like we usually kind of know it’s the David Chestnut Jazz Festival. So we know, like, if we get something for somebody to have a giant kegger at Kelly Field, we’re probably going to say no. Also, too, I mean, we so that’s it. I mean, that’s it.

We don’t need a regulation that says no keggers at Kelly.

Speaker 14 (02:18:47–02:18:57)

Between the two of them. So, you know, the the more dense one, we have a select board shall

Speaker 7 (02:18:58–02:19:00)

Yeah, you don’t, you gotta give the select board discretion.

Speaker 14 (02:19:00–02:19:45)

And this one, the select board may, like, yeah, like it’s just, um, we need the appropriate, the appropriate contours of a rag and not too much. So if everyone- And I think that substantively, if this covers the public safety aspects that everybody, you know, we get to think of the outcome, right? We want a safe event. We want to make sure that the sale of alcohol is regulated, that the proper people view it before we get to the end point, et cetera.

As long as this does it, like we don’t need to meddle in it too much.

Speaker 1 (02:19:46–02:19:48)

Okay. I’ll take a motion.

Speaker 7 (02:19:48–02:19:56)

I’ll make a motion to approve. Does yours have a number on it? Seven as amended by Mr. Milano.

How’s that?

Speaker 12 (02:19:57–02:19:59)

Yeah. And the only, sorry.

Speaker 7 (02:20:00–02:20:00)

Go ahead.

Speaker 12 (02:20:00–02:20:12)

I just had a clarifying question. The only change that has been made so far has been just to clarify that they’re age identifying non-transferable wristbands. Yes. So that will be required.

Speaker 7 (02:20:12–02:20:15)

You want to do that at all of them or you want to make that the discretion of the board?

Speaker 1 (02:20:15–02:20:20)

No, I think that it does those are it’s just those like they’re pretty simple.

Speaker 12 (02:20:22–02:20:53)

Just again looking in other the other one I wanted to ask about was in response to your question and Is, is there any land that the board would want to exclude, or such language as which was in is in the longer one it’s Roman numeral, seven, no such one day license shall be issued for town land that includes a playground and or children’s play space areas. Or, again, that could be left to the discretion of the park commissioners. Yeah, because then it’s like, what’s a children’s play space area?

Speaker 7 (02:20:53–02:21:04)

Let’s just leave that to discretion. I mean, you’ve got to give the select boards credit for making rational decisions. Common sense has to play into this. And the chief as well, because the chief’s got to sign off on this.

Speaker 1 (02:21:05–02:21:13)

So, Mr. Wells has made the motion. Do I have a second? Second.

Seconded by Mr. Daly. All in favor? Aye.

Speaker 20 (02:21:13–02:21:13)

Aye.

Speaker 1 (02:21:14–02:21:23)

Okay. So, we’ll send that over to the Warrant Committee, Mr. Milano. Okay.

Do we have anything on any of the other warrant articles?

Speaker 7 (02:21:24–02:21:26)

Have you approved? Did you approve any of these?

Speaker 1 (02:21:26–02:21:46)

I think we’ve all been approved for the warrant. Yeah. I know the Warrant Committee just signed off on one last night, I think. already.

But I think we’ve Yeah, they’ve already gotten through one. I’m there. They want to talk to me about the light trespass article. So I’m setting up time there.

Speaker 12 (02:21:48–02:22:02)

And the public hearing just is for the zoning articles as required under the law will be held at the Planning Board’s meeting on September 11th. Okay. So everything else has been approved for the warrants and is with the Warrant Committee at this time.

Speaker 1 (02:22:02–02:22:21)

I will say the Warrant Committee Chair is very happy about getting all the information in several weeks before the meeting. So hopefully there will be very soon. So you’re not getting any emails? Green sheets.

I’m still getting emails. You want to motion to close? Yes. I’ll make a motion to close the warrant.

Motion to close the warrant. Seconded.

Speaker 17 (02:22:21–02:22:21)

Seconded by Ms.

Speaker 1 (02:22:21–02:22:31)

Hagan. All in favor? Aye. All right.

Mr. Milano, item number nine, East Milton Fire Station RFP visioning session with assistance from MAPC.

Speaker 12 (02:22:33–02:22:45)

Thank you, Mr. Chair. So we had discussed this briefly at our last meeting. We have a proposal from MAPC for approximately $6,000.

I don’t have the exact amount right in front of me. $6,000?

Speaker 7 (02:22:45–02:22:46)

I thought it was $1,200.

Speaker 12 (02:22:47–02:23:22)

No, the total is different phases. So to facilitate a visioning session. $5,600. $5,600.

A visioning session regarding the potential disposition of the current East Milton Fire Station. And we’re targeting likely October to have that. We’ll try to obviously do that in East Milton to solicit feedback and ideas and thoughts as we put together an RFP for that site as it will be vacated hopefully within a year from now for the new East Milton Station.

Speaker 7 (02:23:24–02:23:24)

Great.

Speaker 1 (02:23:24–02:23:26)

Do you need action, Mr. Wells?

Speaker 7 (02:23:26–02:25:55)

So two points. Because I went back and looked at them as I sat on the fire station and they were meeting tonight. So I hate to go back in history, but when we purchased the land to build the new station and we spent $900,000. We went to the town meeting and asked for $900,000.

But part of our promise then in the fire station building committee’s promise was we would sell the old building at the time it was done, which they estimated was worth between three quarters of a million and a million dollars, and that that money would go back into the town’s coffers. So I think that’s gonna come to us. I think you’ve already heard from Chair Walsh, right, that didn’t he come here while I was away and ask you, tell you how to sell it? I don’t know.

I don’t know that we’re able yet to decide where that money goes if we do sell it, but I think one thing that we do know, there’s a commercial interest in it at that value. And to quote you, who says all the time, we need more commercial space. And not that this is, but a million dollars is a million dollars. And one of the things that people don’t realize that I talk about a lot is that the amount of just, and I don’t know what could go in there, but let’s say it was something that generated similar taxes to, you know, Navarra, Abbey, Stalingrad, the meals taxes that we get are significant in this town that we never got years ago.

And as we know already, and I’ve read some of the correspondence that you’ve gotten while I was out of the country, that the financial pressures have not gone away yet. So that’s, my only thought is, are we, should we decide, are we going to decide to sell it or put it on RFP to get the best available dollar for it? Because if you get into a vision and you get into nine, I mean, you saw what we went through in the Discovery School. I mean, it took years.

And the last thing that I, well, I probably won’t be here, but I say this, especially the three of you, especially the two of you who are just starting, is you don’t want, that fire station, the new fire station opening that building sitting there empty in the square. You want to try and this is an opportunity we want to try and move in this now and you did get interest on the RFP that you sent out and I know that that interest exists and I know it’s just one but I know there are others so this is my thought. I think time is very important for us. They’re gonna have that station done sooner than later.

Speaker 1 (02:25:56–02:26:36)

Yeah, I don’t think there’s any real interest from, at least from me, I can speak for myself, for retaining a building that we could, I don’t think we have a lot of uses for from a town perspective, but we could certainly, you know, use it from a commercial perspective. So, but I don’t think that that’s going through with this process here with the RFP envisioning statement is more of a asking, you know, making a making sure that these Milton folks feel like they have input into what’s what’s happening here, and be to kind of understand what kind of business might go in there.

Speaker 7 (02:26:36–02:26:48)

Yeah, because it is going to be difficult. Yeah, it’s not like there’s a ton of parking there or anything. You have to maintain the four corners. It’s a historic building.

You’re not going to be able to tear it down.

Speaker 9 (02:26:48–02:26:49)

Is it a historic building?

Speaker 7 (02:26:49–02:26:54)

Yeah, similar to the Mack. So is the Mack.

Speaker 1 (02:26:54–02:26:57)

So, Mr. Milano, do you need action from us on this, or this is more of an update?

Speaker 12 (02:26:57–02:27:29)

No, as long as the board is okay to move forward. And the only additional context to that is that if the board could be so inclined to say, or the community could say, we really want this kind of a commercial use, so the RFP could say, okay, we want a commercial use, and applicants who focus on this type of uses, we’re going to score more highly. and take into account cost as well as the preferred use. So it’s just, it’s another kind of information gathering point to help inform the evaluation criteria that are critical to the RFP.

Speaker 9 (02:27:29–02:27:46)

If what comes out of this is the residents want something that’s not the highest dollar, that we’re not the biggest financial windfall for us, do we then reject it? Do we go with what the residents say?

Speaker 12 (02:27:46–02:27:49)

That’s the job of the board.

Speaker 7 (02:27:50–02:28:32)

I wanted to make that point because that was part of our argument when the existing board went to town meeting and asked for nine hundred and something thousand dollars to buy the land. I believe it was Webb Collins who did the presentation from the Fire Station Building Committee which gave a presentation that the existing building was between $750,000 and $1,000,000, and you would use the sale of that to offset the borrowing that you were asking for. Because that $900,000 was never thought of. We never expected that we were going to be buying a piece of land to build the fire.

It was never. Mike Zulus and I were the two that, we negotiated it with the Archdiocese for the time, the two of us.

Speaker 1 (02:28:33–02:29:16)

I mean, with the discovery of Schoolhouse, it was really more of a what was the market going to bear? There was a sense among certain people that the RFP process was faulty or that what the discovery bid was was not up to market value. And then so they made them go through the process again, same thing, same result. And so I think it’s for my lesson from that is more of a learn what the market teaches you.

And you know, you can have a vision of, you know, a pottery barn or whatever that you want to put there. But ultimately, if what comes through is something else, then that’s the town has to make those decisions that that’s what we’ll do there, or we won’t do anything.

Speaker 7 (02:29:16–02:29:46)

Well, the school pressures weighed into that in the beginning was, you know, do we make that, convert that, and it just didn’t work for them. And so we kind of lost a window of what was a really, might have been a much more financial benefit commercially had we sold them by the time, and so you’re right, we bid at, Discovery School bid twice on the same price both times. It took two years to do it. And that’s why I’m saying that it went on way too long.

Just my thought.

Speaker 1 (02:29:47–02:30:14)

Yep. Okay, so if there’s nothing more on that, then we’ll move to item 10, useful designations for various capital equipment and vehicle purchases approved by town meeting. Mr. Milan, I’m assuming that this is what we’ve got here, this little spreadsheet with pickup trucks and transit vans and all sorts of fun things.

Yes, in order to… I’m sorry. No, that’s already happening. We don’t need a motion for the business.

Speaker 12 (02:30:14–02:30:18)

No, we can go ahead and we’ll look at that schedule and start working on the agenda for that.

Speaker 7 (02:30:19–02:30:19)

Right along.

Speaker 12 (02:30:22–02:31:31)

This is a record. In order to issue debt for capital equipment, we’re restricted to a maximum borrowing term of five years under the law, unless the select board determines that the useful life of the equipment is longer than that. And when we put together the capital budget, we request the department heads submit what their anticipated useful life of equipment is. So what this vote is asking is that the select board agree and set useful life expectancies for this equipment as shown on this chart.

And this useful life is also voted by the town meeting when the capital budget is approved. So all this has been approved by the capital committee, really the select board already and town meeting, but in order to check the box and finality we’re asking the board to vote it as well and on the chart the the useful life that we expect for this equipment is in the in the column labeled useful life vote at town meeting and i’ll share it on the screen but it can be voted as presented you want a motion

Speaker 1 (02:31:32–02:31:37)

Yeah, I don’t know, does anybody feel like discussing this in detail? No. I’ll take a motion.

Speaker 7 (02:31:37–02:32:00)

I knew you would. I move that the select board determines that the maximum use of life of capital equipment approved at the 2024 and 2025 annual town meeting shall be displayed on the chart below in the column labeled useful life vote at town meeting. It’s listed on the screen here. What is the motion?

That’s the motion, right?

Speaker 1 (02:32:00–02:32:25)

Seconded. Seconded by Ms. Hegarty. Any further discussion?

No. All in favor? Aye. Okay.

Item 11, select board retreat. So, I still think that this is something that we really ought to find time to do in September. So, if we can all take two minutes to look at our calendars and find a penciled in date. We have a penciled in.

Speaker 12 (02:32:25–02:32:31)

Sorry, go ahead, Mr. Milano. October 4th was the date the other members were available. That’s right.

Speaker 18 (02:32:31–02:32:32)

Sorry, October 4th.

Speaker 12 (02:32:33–02:32:33)

Yeah.

Speaker 7 (02:32:34–02:32:39)

Oh, God, I have something on. I don’t know. I don’t want to look. I just…

I’m not here.

Speaker 14 (02:32:39–02:32:40)

You’re hanging out with us, Richard.

Speaker 7 (02:32:40–02:32:50)

I’m not. It’s pan-masked. It’s pan-masked, unpaved, and the brick shears. I’ve already committed to work it.

As soon as you just said it, I’m like, I can’t be October 4th. No, I can’t till the 4th. My bad.

Speaker 14 (02:32:52–02:32:54)

Um… Can we do the 3rd?

Speaker 7 (02:32:54–02:33:00)

Yeah, I could do the 3rd, yeah. The 3rd is… If we could do it in the… I’d be leaving.

Speaker 12 (02:33:02–02:33:08)

Five o’clock, I don’t know. That morning? I can’t do that morning, I have a board meeting.

Speaker 1 (02:33:10–02:33:12)

What about the Sunday the 5th?

Speaker 7 (02:33:12–02:33:13)

I’m back.

Speaker 1 (02:33:14–02:33:15)

Can we do Sunday afternoon?

Speaker 7 (02:33:15–02:33:18)

Do you want football on?

Speaker 17 (02:33:18–02:33:24)

Oh, let’s see what the… Do you know what’s on the schedule? Do you want a clock game? It’s fine, I don’t care.

I’m joking.

Speaker 9 (02:33:24–02:33:25)

We’re good. October 5th.

Speaker 7 (02:33:26–02:33:29)

You expecting something out of this team? We’ll put the TV on.

Speaker 8 (02:33:29–02:33:30)

Playoffs.

Speaker 7 (02:33:31–02:33:35)

You were expecting playoffs? I was too, but I wasn’t a fan of the day.

Speaker 1 (02:33:35–02:33:38)

It’s a night game against the Bills, 8, 20 p.m. Is it really? It’s a night game?

Speaker 7 (02:33:38–02:33:39)

Oh, yeah, I can do Sunday.

Speaker 14 (02:33:40–02:33:43)

That’s the fifth one. All right.

Speaker 1 (02:33:43–02:33:49)

All right, so fifth, maybe let’s say we could get lunch and then meet in the afternoon. Let’s do that.

Speaker 7 (02:33:49–02:33:53)

What are we going to do? Want to just go to Corona? Or do you want to go somewhere?

Speaker 14 (02:33:54–02:33:56)

It’s a good, trustful location.

Speaker 7 (02:33:56–02:34:04)

So we’ve gone to Curry. I can call. Do you want me to call? We’ve had them at Curry before.

Do you want me to call the kids? Kids will be there on the 5th.

Speaker 12 (02:34:06–02:34:14)

We’ve had it in the console and aging. The new fire station meeting room is available. We can take off.

Speaker 1 (02:34:14–02:34:15)

Well, let’s use the new fire station meeting room.

Speaker 7 (02:34:15–02:34:18)

I was going to say the Mac, too. I thought of that.

Speaker 1 (02:34:18–02:34:33)

Oh, the Mac? They’re getting new windows in. And I don’t know if they’re going to be open, actually, in October. I was just talking to Kevin on Saturday.

I think they might be closed at that first weekend of October.

Speaker 7 (02:34:34–02:34:34)

Speaking of that.

Speaker 1 (02:34:34–02:34:47)

I can inquire if interested. Yeah. So if the Mac is there available, if not, I think the new fire station meeting room is a nice option. OK.

And start time, I’m sorry, was? Why don’t we say we’ll start at 12 and we’ll have lunch.

Speaker 7 (02:34:47–02:34:47)

All right. Sounds good.

Speaker 1 (02:34:49–02:34:54)

and then everybody can be well done before the kickoff against the Bills.

Speaker 7 (02:34:55–02:34:55)

on my schedule.

Speaker 1 (02:34:56–02:35:02)

Okay. Item number 12, select board policies and code of conduct. Mr. Milano.

Speaker 12 (02:35:03–02:35:12)

I don’t have any new update. We’re pulling together some examples to distribute and share with the board to discuss further in terms of a potential code of conduct.

Speaker 1 (02:35:12–02:35:18)

Okay, and then but for item 13, I believe you do have an update for us that’s going to be training for elected board members.

Speaker 12 (02:35:19–02:35:31)

Yes, I’ve been I’ve received a name, reached out, working on firming up some details, but somebody who came highly recommended, and hopefully to have more news in the next week or so.

Speaker 1 (02:35:31–02:35:52)

Okay, great. This is all boards? This would be for all boards, yeah. Elected boards.

Okay. All right, well then we’re moving straight along to item 14. We have discussion approval boards and committees appointments. I don’t know if somebody feels like making some motions.

Speaker 7 (02:35:52–02:35:55)

I’m chair of that committee, so I don’t want to make the motion, but I’ll vote.

Speaker 1 (02:35:56–02:35:58)

Mr. Daly, do you want to make some motions?

Speaker 9 (02:35:58–02:36:05)

All right. Motion to approve the members for… What is this? The Capital Improvement Planning Committee.

Speaker 8 (02:36:06–02:36:06)

Yeah.

Speaker 9 (02:36:06–02:36:19)

Move to reappoint the following individuals to the Capital Improvement Planning Committee for a one-year term. Amy Dexter, Thomas McCarthy, Elizabeth Carroll, Jim Davis, John Driscoll, John Folcarelli, and Michael Hale. I’ll second.

Speaker 1 (02:36:21–02:36:23)

Did you want a second, Mr. O’Farrell?

Speaker 7 (02:36:23–02:36:25)

No, you got it. You second. Go ahead. I’m ready.

Speaker 1 (02:36:25–02:36:30)

Aye. All in favor? Aye. Okay.

Mr. Dale, you want to continue?

Speaker 9 (02:36:30–02:36:33)

Move to appoint Lorraine Dee to the Capital Improvement Planning Committee for a one-year term.

Speaker 7 (02:36:33–02:36:34)

Second.

Speaker 9 (02:36:34–02:36:50)

All in favor? Aye. Move to appoint Brooke Plotkin to the Milton Cultural Council for a three-year term. Second.

Seconded by Mr. Wells. All in favor? Aye.

And move to appoint Helen Russell to the Shade Tree Advisory Committee for a one-year term. Second.

Speaker 1 (02:36:50–02:37:02)

Seconded by Mr. Wells. All in favor? Aye.

Okay, we have now one day liquor licenses to discuss Barn Fest. It’s coming up.

Speaker 7 (02:37:03–02:37:46)

Yes. Oh, where are you? What number are you at number 15? Okay So I moved to a point one day like license for Forbes House Museum Bob fest September 4th and 6 to 9 Trustees September 6 2025 from 3 p.m.

To 5 p.m. For jazz constant at the Hutchinson field is that Hutch? Yes Hutchinson field Did you get a parking? Do you have any kind of plan on that?

I’ll make that as a motion, but you want to look at that. You have to have a parking plan because they have no parking there. In San Diego, this is Paris, September 13, 2025, 5-9 p.m. for a Paris festival.

Speaker 1 (02:37:47–02:37:58)

Motion is made by Mr. Wells. Second. Seconded by Mr.

Daley. All in favor? Aye. Okay.

Next up we have discussion approval of meeting minutes.

Speaker 7 (02:38:00–02:38:08)

I’m gonna do a motion to keep, I’m gonna do a motion to do without me the 13th, no not the 13th, June 30th.

Speaker 1 (02:38:09–02:38:10)

Not June 30th.

Speaker 7 (02:38:10–02:38:13)

May 21st. There you go. June 16th?

Speaker 1 (02:38:13–02:38:15)

Yep, yep. June 10th also.

Speaker 7 (02:38:15–02:38:18)

June 10th. June 30th, I wasn’t there June 30th.

Speaker 1 (02:38:18–02:38:19)

And June 17th?

Speaker 7 (02:38:20–02:38:26)

I am 17th. And June 20th? And June 20th, I said the 20th. And the 26th did you say?

26th, I said all those.

Speaker 17 (02:38:26–02:38:26)

Okay.

Speaker 14 (02:38:27–02:38:27)

I second.

Speaker 17 (02:38:29–02:38:35)

Okay, second, made and seconded, all in favor? Aye. Abstaining on the 13th and the 30th. Can I get a motion on those two?

Speaker 14 (02:38:35–02:38:42)

I’d like to move to approve the meeting minutes dated May 13th, 2025 and June 30th, 2025.

Speaker 1 (02:38:42–02:38:54)

Okay, I’ll second. All in favor, aye. Aye. Mr.

Wells, abstaining. Abstaining. Okay, so now we are moving on to the Town Administrator’s Report. Mr.

Milano.

Speaker 12 (02:38:54–02:42:12)

Thank you Mister chair. It’s the night before first day of school as most folks are aware, so traffic will be returning to Milton right and early. So we welcome back the teachers have been back for a couple days, welcome back all the students as well. The Cunningham project is complete and except for some lighting that needs to be installed, those classrooms and offices are open, so appreciate The work of consolidated facilities, school department, and BC construction, and the OPM is hill I row, and the designers are arrow street so that was a tough project to pull off the summer, and it went very smoothly, so appreciate everybody’s work on that.

I missed the night out at Milton Police this week while I was away on vacation, and unfortunately they did get rain, but I did hear they had strong attendance. Regardless, just fingers crossed for better weather next year. And then lastly, I just wanted to share, and I shared this with the board, is that we, ahead of the upcoming debt issuance in September, we had a ratings call with S&P Global Ratings last Friday, and S&P has affirmed the town’s AAA bond rating. They typically comment on factors that are positive and factors that are negative.

recognize the town’s continued budget results overall where we continue to bring in revenues over expectation and continuing to build reserves and maintain our reserve ratio. The SP did ask about the fiscal 25 school budget and how that was addressed through the year. So some questions around how that will be managed going forward which we answered and responded to. They did flag OPEB as potential credit risk, and they were more direct about it than they have been in recent years.

The good thing for the town is that we are fully funded on the pension liability. So right now we’re putting more money into the pension system than we need to, to build a reserve in the pension system. That’s about a million dollars a year, and we’re using one and a half million dollars a year to put in the OPEB trust. So last year was the first year we contributed 1.5 million, Now we’re contributing a little bit over 1.5 and fiscal 26 and we, the policy states that will continue to do that so we have a funding plan in place.

If and when the retirement board adjust their funding schedule that might make more money available to contribute to open up so. We have a outstanding liability of about $139 million on OPEB, which is essentially retiree health insurance and a few other benefits. It’s 2.5% funded, so we have a long way to go. The position that we are in is of a position strength is that we have achieved funding on the pension system.

So that long-term liability pressure has been addressed and hopefully it will remain full funding. So now we can more directly address the OPEB one, but I just mentioned it because it was a credit risk they identified, they called it out specifically. So just to flag it as something that they’re keeping an eye on, but we have an OPEB policy, we’re adhering to it, and it means that we just need to make sure we continue to adhere to it moving forward.

Speaker 18 (02:42:12–02:42:18)

So overall- How do we compare to other, our peers on our OPEB liability in funding?

Speaker 12 (02:42:18–02:43:13)

We’re certainly low on the OPEB side, but as a counterexample, I think Norfolk County Retirement just pushed out their retirement system funding date to 2033 or 2035, and they had been 2029 at one point, so all of those communities that they still have eight more years to go on the retirement side where we’re ahead of them. So they might be slightly ahead of us on OPEB, but we should be able to hopefully catch up and surpass because we’re able to focus on just one of the two crushing liabilities that cities and towns face. But we’re on the low side. But we have a policy in place.

That’s why we put the policy in place, because it was low. And we’re going to steadily build that. The money gets transferred to OPEB trusts, and then it’s invested with the state retirement system. So the earnings stay with the trust.

So it grows beyond just the contributions that the town makes into it.

Speaker 7 (02:43:14–02:43:27)

I think it’s in the town’s pensions, like 11, it’s in like the top pension systems in Norfolk County, even though we’re a sole. We’re one of the few that are full funded. We’re definitely in the driver’s seat.

Speaker 12 (02:43:27–02:43:41)

It’s a good place to be. And it’s decisions that were made many years ago by prior boards and prior warrant committees to get that done, and by the retirement board as well to get that done. And it puts us in a stronger financial position moving forward.

Speaker 7 (02:43:41–02:43:43)

Big shout out to Katie Conlon.

Speaker 12 (02:43:43–02:43:45)

That was her baby.

Speaker 7 (02:43:45–02:43:57)

From the time she was on the warrant committee through the 10 years she served on this board, she really made each year the town focus on this as an important aspect.

Speaker 12 (02:43:57–02:44:22)

In an easier decision back then, it would have been to say, well, let’s just push back the full funding date, but then we would be dealing with both issues rather than just the one. So that’s it for my report. The ratings report, if anybody wants to see it, is on the town accounting website. We’ll put it up on the front page and share it so it’s available and accessible for people to review and digest.

Speaker 1 (02:44:23–02:44:58)

Great. For the chair’s report, the only thing I want to flag for folks is the Chamber of Commerce is doing their first Friday on the East Milton deck again this year. It’ll be September 5th, which is a Friday starting 4 p.m., maybe even earlier than that. And it was a really great time last year.

A lot of local businesses are out, local musicians are out. So I would encourage folks to come to that and keep your fingers crossed for good weather. but I don’t have anything else from the Chair’s side. Public response, public comment response.

Speaker 7 (02:44:59–02:45:01)

I think we pretty much covered that.

Speaker 1 (02:45:01–02:45:11)

I think we covered all that. Our future meeting dates are Tuesday, September 9th, and Wednesday, September 24th, as the 23rd is Rosh Hashanah.

Speaker 7 (02:45:12–02:45:14)

I think you told me that already. You told me that, right?

Speaker 1 (02:45:15–02:45:21)

So just flagging that for everybody else. Any future agenda items that folks want to discuss?

Speaker 7 (02:45:23–02:45:38)

So, I see we have Governor Stolteneck. We do. I have not reviewed this yet, so I’m not prepared to vote, because I was not here. That’s the meeting I missed when they came.

So, if you intend to vote on this tonight, I’d like to defer.

Speaker 17 (02:45:38–02:45:41)

We can defer the vote until the night. We can defer the vote until the night.

Speaker 7 (02:45:41–02:45:45)

That’s my only, and I know it’s 10 to 10, and we have executive session.

Speaker 1 (02:45:45–02:45:50)

Okay. So we’ll defer the meeting of the Governor Stoughton trustees.

Speaker 7 (02:45:50–02:45:53)

See, that’s the only issue you have on it, right? That’s the only issue.

Speaker 1 (02:45:53–02:46:03)

It’s the RFP we were gonna. Yep, that’s fine. We can defer that to the night. We’ll vote on it then.

Any future agenda items other than that?

Speaker 7 (02:46:04–02:46:04)

No.

Speaker 1 (02:46:04–02:46:11)

Okay. Then we are going into executive session? I don’t know, are we? I’m kind of phrased that as a question.

Speaker 12 (02:46:11–02:46:16)

I have quick updates for 22 and 24. And then we should discuss 23.

Speaker 1 (02:46:17–02:46:49)

Okay, we should go in for all three. I think they’ll be briefed. All right, so I am going to move to adjourn from Open Session and enter into Executive Session to discuss strategy with respect to collective bargaining. Milton Clerical Unit of the Southeastern Public Employees Association, Milton Professional Management Association, Milton Public Employees Association, Milton Firefighters Local 1116, Milton Police Association, Milton Superior Officers, Milton Library Association, based on my belief that discussion of this matter in Open Session may have a detrimental effect on the bargaining position of the Select Board.

The Select Board will not return to Open Session.

Speaker 17 (02:46:51–02:46:51)

Second.

Speaker 1 (02:46:51–02:46:55)

Seconded by Mr. Wells. All in favor, this has to be a roll call vote, right?

Speaker 7 (02:46:56–02:46:56)

Yes.

Speaker 1 (02:46:56–02:46:58)

Yeah. Ms. Hegarty? Yes.

Speaker 7 (02:46:59–02:46:59)

Mr. Daley?

Speaker 1 (02:46:59–02:47:00)

Yes. Mr. Wells?

Speaker 7 (02:47:00–02:47:08)

Yes, but I have to exempt, I’m going to abstain. I’m going to leave on any discussion on Mount Firefighters because I have a conflict.

Speaker 1 (02:47:08–02:47:57)

Okay. and myself, yes. I’m going to move to adjourn from open session and enter into executive session to approve executive session minutes. Meeting minutes dated January 9, 24, February 26, 2024, February 27, 2024, March 4, 2024, April 22, 2025, June 10, 2025, June 20, 2025, and June 26, 2025, and to approve the release of all executive session minutes Related to Attorney General v.

The Town of Milton et al. No. Number SJ-2024-0078 and SJC-13580, Supreme Judicial Court, Suffolk County, and potential litigation regarding MGLC-40A, Section 3A. The Select Board will not return to open session.

Second. Seconded by Mr. Wells. Roll call vote.

Ms. Hegarty?

Speaker 13 (02:47:58–02:47:58)

Yes.

Speaker 1 (02:47:58–02:48:47)

Mr. Daly? Yes. Mr.

Wells? Yes. And myself, yes. Finally, I’m going to move to, oh, that’s in Executive Session.

Finally, I’m gonna move to adjourn from Open Session and enter into Executive Session to discuss strategy with respect to litigation regarding the Lower Guild Turf Field OADR proceeding, OADR docket number WET-2025-004, DEP file number 0460630 based on my belief that the discussion of this matter in open session may have a detrimental effect on the litigating position of the Select Board. The Select Board will not return to open session. Seconded by Mr. Wells.

Ms. Hegarty? Yes. Mr.

Daly? Yes. Mr. Wells?

Yes. And myself, yes. We are adjourned from open session. Thank you, everyone.

Speaker 20 (02:48:47–02:48:48)

Thank you.