Board: Milton Conservation Commission

Date: 2025-05-13


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:50–01:39)

Good evening, ladies and gentlemen, and welcome to the May 13th, 2025 meeting of the Milton Conservation Commission. Commission members are appointed by the Select Board to implement the rules and regulations of the State Wetlands Protection Act and also the Milton Town Bylaw governing the wetlands. We have two issues of formality, I guess. And the first is that we introduce ourselves.

And the second is that we invite all citizens, participants, homeowners, interested parties to participate, ask questions, make comments. But we do ask that you identify yourself with the record, since we're in compliance with the open meeting law. So we'll start with the introductions. My name is John Kiernan.

Let me read across the top. Steve, can you go next?

Speaker 2 (01:39–01:43)

Sure. I'm Steve Ivers, conservation agent.

Speaker 1 (01:44–01:44)

Arthur Doyle.

Speaker 3 (01:45–01:46)

Arthur Doyle, conservation member.

Speaker 1 (01:47–01:48)

Phillip Driscoll.

Speaker 3 (01:48–01:50)

Phillip Driscoll, conservation clerk.

Speaker 1 (01:51–01:52)

Charles Bosworth.

Speaker 4 (01:52–01:55)

Charlotte Bosworth, conservation member.

Speaker 1 (01:55–01:56)

Tom Palmer.

Speaker 5 (01:57–01:59)

Tom Palmer, conservation member.

Speaker 1 (02:01–02:01)

And Wendy Garpo.

Speaker 6 (02:02–02:05)

Hi, good evening. I'm Wendy Garpo, also one of the commissioners.

Speaker 1 (02:07–02:21)

And I'll speak slowly because I just saw Hans Van Lingen. It is almost on. Where are you?

Speaker 2 (02:22–02:23)

He's on the second line.

Speaker 1 (02:24–02:27)

All right. Hans, good evening. Can you introduce yourself?

Speaker 7 (02:28–02:32)

Hi. Hans Van Lingen, commission member.

Speaker 1 (02:32–02:47)

Great. Thank you very much. A small adjustment to the agenda, I'm going to call them a nine first. It'll be a very short presentation.

Charlie, can you help me? I don't see Steve on.

Speaker 8 (02:48–02:50)

Yes, I'm here chairman.

Speaker 1 (02:51–02:57)

Oh, by perfect. Thank you. Can you just tell us what you're looking for for the project at 131 Elliott Street?

Speaker 8 (02:58–03:35)

Yes, I will. Thank you. My name is Stephen Connelly. I'm the manager for 131 Elliott Street LLC.

And we're requesting an extension permit for the order of conditions. And the purpose of this is to finish the work, which is the planting of five four-inch caliper trees at locations to be determined by the town of Milton. And once we've received these locations, we'll plant the trees, and then we'll return to the commission with a request for a certificate of compliance for the project.

Speaker 1 (03:37–05:21)

All right, thank you, Steve. And by way of background, a year ago, we extended the order of conditions for one year. That year expires on May 24th of 2025. And pursuant to the statute, an extension can be requested as long as it's requested within the Existing time period, which it is, and that's why Steve had to come in this evening to ask for it.

Additionally, those trees were part of a long, long ago, a resolution of an issue for tree cutting at the site. This is a mixed use development at Central Avenue and Elliott Street. And I think that Steve was working with Chase Berkeley. And I think we have to now get Marina involved.

And we can weigh in on this as to what would be an appropriate location for these trees to be planted throughout Milton. They're not going to be planted on site. There's no room there because of the landscaping plan. These are to be planted elsewhere.

We don't have to address that now, but once Marina Fernandez has been involved as director of DPW and still town engineer as well, then we can all take a shot at our suggestions for location. So this evening, we're only going to vote on whether or not we can extend this for an additional year in order to comply with the Conservation Commission's order to plant these trees somewhere in Milton. Are there any comments, questions, suggestions by commission members or anybody else, others or members of the public? Yes.

Speaker 6 (05:23–05:57)

Thank you, Mr. Chairman. I'm wondering if it's possible that these five trees might be placed in the nearby proximity of 131 Elliott Street, like in the surrounding neighborhood, because I know that that That neighborhood really did love and appreciate the large trees that were on that site. And I think that perhaps those immediate neighbors might also appreciate some of the new trees to be placed there instead.

Speaker 1 (05:58–06:31)

I think that's a great suggestion and maybe what we can do. We don't have to decide that this evening. This evening, we're only deciding whether or not we can extend the order of conditions for another year. But Wendy, my suggestion is that you correspond with Marina Fernandez, take suggestions from members of the public, but certainly from Conservation Commission members as to appropriate locations.

Then we can put this on the agenda for next month as to the actual locations.

Speaker 6 (06:32–06:33)

Okay.

Speaker 1 (06:33–06:34)

Is that acceptable to you?

Speaker 6 (06:34–06:41)

Absolutely. Marina Fernandez, is she the new environmental coordinator for the town?

Speaker 1 (06:41–06:57)

No, she is not. She is the director of the DPW and she is the town engineer. My apologies. She was the town engineer and still is.

until replaced, but she's also, she took the position that Chase Berkeley had previously.

Speaker 6 (06:57–06:57)

Okay.

Speaker 1 (06:58–07:27)

All right. And she's accessible and responsive and I'm sure you'll be able to coordinate very quickly with her. Any other comments or suggestions? Questions?

Members of the public? Hearing none, seeing no hands raised, I'll make the motion myself to extend the order of conditions for an additional year which will go from 524.25 until 524.26. Is there a second to that motion?

Speaker 3 (07:28–07:29)

Second, Mr. Chairman.

Speaker 1 (07:29–08:03)

Thank you. Any discussion? Roll call vote. Arthur Doyle, do you vote?

Yes. Tom Jones? Yes. Wendy?

Yes. Hans? Yes. Charlie?

Yes. And I John Kiernan vote yes as well. So that's unanimous. Uh, thank you very much.

Thanks Steve for appearing tonight. Um, and, uh, we'll be back in touch with you. Next on the agenda is number one, uh, which is Milton, the Ponson Estuary Survey Project. This is a presentation by, um, Apex Environmental.

Speaker 3 (08:05–15:19)

Thank you, Mr. Chairman. Um, I'd like to welcome, uh, to our meeting, Tom Callahan. For those of you who do not know Tom, he is chairman of the Community Preservation Committee and has been a solid supporter of the estuary project.

The chief engineer for Environmental partners, Jamie Vallette, with whom we have been working, is away at present, not returning until tomorrow evening. So she will not be with us. So what I'll do is give a brief review, and then if it's all right, turn it over to Tom for any questions, and then elicit a couple of pieces of information from him. We received a very generous $75,000 grant from the CPC to that is very environmentally sensitive and had been acquired by the town in the early 1960s, but had not been tended to for preservation and recreation purposes, which is essentially, in shorthand, the purposes of the grant that the Conservation Commission was awarded.

Three major steps have been accomplished through the grant. One, the entire 33 acres has been thoroughly surveyed. Notices of intent went to all of the butters for that purpose. Second, it has been staked and notices of intent went to all of the immediate butters for that activity as well.

And the, Engineers have been drawing up a proposed set of plans for the use of that area in three contexts. One is a pathway. along the abandoned New York, New Haven, and Hartford trail, which extends from the intersection of Thistle Avenue and Granite Avenue, along the line of the President's Golf Course, out to essentially the Quincy border. And Since that time, we have also had through funding from the Conservation Commission, a Conservation Commission sign posted there within the past three weeks and at two other locations in the area of concern with respect to this particular project.

The second area of activity would be abandoned road from the end of Riverview Avenue extension out to what's called Black Rock. And the Milton Quincy line runs across that about two-thirds of the way out to Black Rock. Tom, so that you know, we have had a working group in the past among not only departments in town such as the DPW represented by Marina, but we have also had engaged with us the chief engineer for the city of Quincy, a member of the Quincy Conservation Commission, a member of the Quincy Planning Board, and a natural resource officer in the city of Quincy. The land on the other side of the line in Quincy is not owned by the city.

It is owned by Blue Cross Blue Shield. So we have diligently been in contact with them and obtained permission to do the siting and surveying along their property as well. A hope in the future is to have a trail. I'll send you under separate cover a photograph from January 15th, which shows you in the snow how heavily trafficked that area is even in the dead of winter.

And there is a second conservation sign near by that at the end of Riverside Avenue. The third area is at the end of Thistle Avenue, where there is an entry that has a gate on it. to what's called the canal, which was dug probably as part of the quarry trade and bringing stone out to Mount Hope Cemetery in Boston. That is a trafficked area with respect to fishermen.

And we're looking at ways to mitigate the traffic to preserve the marsh because the marsh suffers due to the Baker Dam. Ordinarily, if that dam was not in location, silt coming down from the Nepenthe River would replenish the salt marsh, continuing to make it a very healthy estuary. The dam prevents that from happening. The only silting takes place with a small residue that comes in on high tides.

We hope to have a trailing in that area as well as, uh, an opportunity for a canoe and kayak launch site, a couple of parking spaces. And again, there is now a conservation commission sign at that location. We hope to have, um, this finalized, um, very, very shortly. We'll have a working group meeting later this month and, uh, then, um, do two things.

and we'll need your advice on both of them, Tom. One is to file a report that we owe to the CPC for this particular project and get an idea of how you would like that report prepared and presented would be very, very important to us. Secondly, the possibility of entertaining an application for the first of the three activities, which we've designated as the trail from Granite Avenue, Thistle Avenue, out to the Riverside Avenue extension. So that's a brief overview of the work that's been conducted there.

We have a whole series of maps and supporting information, and Tom, we can get that to you and any other parties that are interested in it. We'll also be having a public hearing in the site like we did two semesters ago, which the CPC had members attending, along with members of the neighborhood and members of the Conservation Commission. So at this time, let us give you an opportunity to ask any questions that you may have of us.

Speaker 9 (15:22–18:22)

Thank you, Arthur. Thank you for that update and briefing and congratulations to you and the commission members on the and advancing this forward, we were very proud unanimously I have to call out Wendy. I proudly serve with Wendy on the CPC, the Community Preservation Committee, but the members were unanimous in supporting this project and were really excited. The site walk was very much appreciated, by the way.

For those of us, I've lived here 30 years and hadn't been out to that part of the marsh. So that was really educational and really helped place this in Milton and also place this in terms of its importance to the estuary and to the region even in partnership with Quincy and Boston's efforts as well. So, I don't have specific questions I applaud you on your work. We do have a deadline of May 30 for the initial eligibility applications.

And so we'd encourage you to get an eligibility application in. That is a first round for those members who might be unfamiliar with our process. Wendy certainly is very familiar with it. But we do a two-stage process where we invite eligibility applications, which is pretty simple, straightforward application, just to determine whether a project may or may not be eligible.

Given the CPA guidelines statewide that can only be spent on open space, parks and rec affordable housing and and historic preservation projects so. This undoubtedly would qualify your work in this area, but it is an important stage of checking the box there. And then our final application, once your eligibility is approved, would be due September 26th this year. So you have some time over the spring and summer to put that together.

for our consideration in the fall and into the winter. Again, we would make recommendations again to town meeting for next May. But yeah, I think the work you're doing there is great. Obviously, it's a nine-member committee, and we'll all weigh our applications.

And we do have limited funding. About $1 million is available this coming year. But that's kind of where we're at.

Speaker 3 (18:24–18:36)

Thank you, Tom. Would it not make sense for us to have a report to the CPC prior to submitting an application?

Speaker 9 (18:36–19:20)

I think, yes, I think you could do that simultaneously. I think you could include the report as part of your eligibility application. I think the committee, Wendy, you know, I mean, I know Wendy's on both committees, but to me, I think that would be very helpful so that you know, do it just simultaneous with the application. We try to make it user-friendly as much as we can.

We know we're all volunteers here, so I don't think you need to worry about getting it in advance of the application, but a simultaneous report-slash-eligibility application, I think, would be very acceptable.

Speaker 3 (19:21–19:34)

That's very helpful. Thank you. Much appreciated. May we ask if any members of the Commission have questions of Tom or about the project in general at this time?

Speaker 1 (19:39–20:00)

I have a question, but it's probably more to you, Arthur, in terms of readiness for a joint meeting, because it sounds like, Tom, you would support a joint meeting, Conservation Commission and the Community Preservation Committee for the public. Arthur, do you have any kind of timeline for when do you think that could take place?

Speaker 3 (20:03–20:34)

I would think June or July would be ideal, but that depends upon people's vacation schedules. We had the last one in the summer, and that one seemed to work out okay. Maybe Tom and I can put our heads together with you, John, and come up with a date and have a joint meeting of the CPC and the CONCOMM with their respective postings.

Speaker 1 (20:36–20:44)

with that. Absolutely. We just need to move it forward in that direction. So I want to make sure that we don't just come up with an idea we need to implement.

Yeah.

Speaker 3 (20:44–21:34)

I thought maybe we could come up with a calendar date after we have the next working group meeting with Marina and the other people, if that makes sense. It does. Good. And possibly invite, um, the people from the city of Quincy, as well as representative of the watershed association, And Tom, we've been working very closely with them on this because of the major project that they have underway that encapsulate this work as well.

And the ideal world will be over our MBTA hurdle because we want to take a look at not only CPC money to be fair, but also monies that might be available through coastal zone management and other resources. And I'll include that in the report.

Speaker 9 (21:36–22:08)

So just to be clear, the joint meeting you're talking about would be a site visit. Yes, that's correct. Yes, I think, again, it was appreciated last time, and I think we would look forward to it. And not every member was able to make the site walk, so maybe we'd be able to.

This date might work better for some or work for some of the members who weren't able and we will have at least one new member joining our committee from the housing authority too.

Speaker 3 (22:08–22:17)

And as soon as we have the working group meeting behind us, then we'll get back to you with some possible dates for a joint venture out into the wetland.

Speaker 1 (22:19–22:21)

Sounds like a good plan. Wendy.

Speaker 6 (22:23–22:31)

Yes, please. Arthur, do we have an ETA for when the final report will be ready from the consultant?

Speaker 3 (22:31–22:39)

We're hoping within a month's time. And that would include the cost estimates for the proposed work.

Speaker 6 (22:42–22:53)

And is the consultant, my understanding is the consultant would be able to join us for that site walk? Is that the case?

Speaker 3 (22:53–23:16)

We can ask them. They know about the May 30th deadline. for putting in an initial proposal for the CPC, which is why we want to have all of the cost estimates in advance of that, because the application form does require that we indicate a cost estimate.

Speaker 6 (23:17–23:37)

Speaking of cost estimates, Tom, would you be willing to share with the commission the concept of the CPC bonding so that the committee might be able to fund larger projects?

Speaker 9 (23:38–27:19)

Yeah. Great question, Wendy, and great prompt for me to do that. The Community Preservation Committee recently along with town staff, the town treasurer, the town accountant, and the town administrator, met with Stuart Saganor, who is the executive director of the statewide nonprofit community preservation coalition. They provide support.

Milton, like most of the communities that have adopted CPA, are members of the coalition, and they provide a lot of support for us. as a local CPC, technical assistance, a connection to other communities that have passed CPA. Anyway, Stuart came to us and did a excellent presentation on bonding. Many of the towns, over half the towns that have passed CPA have bonded based on the CPA revenue stream.

So essentially taking out a bond, dedicating a portion of the CPA revenue stream towards paying off that debt service over time, but as Wendy indicated, it does allow us to consider potentially larger projects. Now, of course, we don't want to um, bond, um, so much that we have no, uh, discretionary money every year to do new projects that come, come before us. Um, so we have to be, um, careful with, with our bonding decisions, but, but, um, we, um, I think Stuart, uh, if I can speak for myself, I guess I, Stuart, uh, reassured us that the, um, The challenge of bonding is not so much a big mountain to, to, to climb that many towns have done it, there is expertise in some of our surrounding communities. It was great having the town treasurer and the town administrator there because I think they asked Stewart some really good questions and I think they walked away feeling reassured that Milton could indeed do this.

So we have not made any commitments to bond this year or in the future even. But I think now that we have a little bit of, we're 3 years into this CPC effort, we're feeling a little more comfortable as a committee. I think it's fair to say, Wendy, with the entertaining the idea of potentially bonding down the road. that could stretch the million-dollar revenue stream we have to, like I said, potentially consider some larger projects.

However, I know there's other projects in town that are already thinking about our ability to bond, too. Again, it will be a competitive situation, but But I think, Wendy, that's an excellent point that we should continue to spread throughout town. That's something that we can do. It's really easy with the town's existing bonds.

It wouldn't really be a huge administrative cost to do it.

Speaker 1 (27:23–27:32)

Thank you. That's very helpful because we are looking for as many funding sources for this, because this is an ongoing phased in kind of project that we have.

Speaker 9 (27:32–27:40)

Right. So a bonding situation might be actually particularly, you know, a good fit with a phased in project like that. Correct.

Speaker 1 (27:42–27:51)

All right. Thank you. Any other questions? I think there's a hand raised by Chris Lyman.

Are you there, sir?

Speaker 10 (27:51–27:55)

I am. I don't believe I have a hand raised though.

Speaker 1 (27:55–28:28)

Okay. That may be, that may be an artifact of my, my cursor. Sorry, Chris. Thank you.

Well, that's helpful. And we'll, we'll be looking forward to reports back from Arthur and we'll work the working group. We'll be driving forward a date certain so we can plan for joint meeting. And it's not just members of the committees, it's the public.

This is potentially a big deal for the town. So we look, thank you, Arthur. Thank you, Tom, very much. And thank you, Wendy.

Thanks all.

Speaker 3 (28:28–28:30)

Thank you. Thank you, Tom.

Speaker 1 (28:30–28:31)

Thanks, Tom.

Speaker 3 (28:31–28:31)

Thank you.

Speaker 1 (28:31–28:39)

All right, next on the agenda is Climate Action Planning Committee report. Arthur, I'll defer to you on that one.

Speaker 3 (28:39–31:04)

Thank you. The report was previously shared with all members of the conservation commission. Um, you may recall that, uh, from earlier meetings, there is one takeaway that, uh, we defer it to this meeting and that is whether or not, uh, the conservation commission would recommend, um, uh, a communication, um, to it's, two in the House of Representatives and one in the State Senate in support of legislation that is currently in committee that is designed to accelerate the wetlands restoration in Massachusetts. Historically, Massachusetts has lost 40 percent of its salt marshes And overall, salt marshes and of non-salt or freshwater statewide wetlands have decreased by one-third, which is an enormous loss.

With the increase of stormwater and rising sea levels, there's a great need to restore the salt marshes and other wetlands. To that effect, the legislation that is in committee would call for doing a number of things, exempting certain projects from the requirements of Chapter 91, providing general permitting relative to certain invasives, wetlands restoration streamlining and the permitting process and piloting innovation in coastal wetland management. So the question before us as a carryover is whether or not the commission thinks that it ought to send a communication to our three legislators supporting this legislation. The impact is to streamline coastal restoration in the permitting process and accelerate the work that needs to be done.

Speaker 1 (31:06–33:59)

Great presentation, great idea. Arthur and I have talked about this before, and I had perhaps given evidence of my own skepticism because I've seen legislation being crafted and drafted and revised and edited and stuff, and it's a scary process. So I said to him, Arthur, it's probably a great idea, but I'd really like to read it. And Arthur was good enough to send me the bills, the Senate bill, and a couple of summaries from the, I think it was from the MACC.

And it was actually a very easy read and it's really straightforward and it narrows the permitting process and it tries to eliminate or at least limit the bureaucratic obstacles in the way of permitting wetlands restoration. And I was much impressed and I will fall on my sword on this because I should have immediately sent it to everybody. And what I suggest is I'm enthusiastically in support of us passing a resolution asking our legislative representatives to support this. And I went into it as a cynic, and I came out as a true believer that I don't see any downside to the legislative proposals.

It's to streamline and make easier the process of getting permits to do exactly what our mandate is, and that is to protect and enhance the natural resources. My suggestion is that we all read it, and I will endeavor to get that out to you tomorrow. But so that there's no delay on this. I don't know.

The legislative process is lengthy. So I think we'll have time. But what I suggest is that if I can get this distributed to everybody, this that I'm talking about, the actual legislative bills, and then the synopsis from the Mass Association of Conservation Commissions, If everybody has a chance to read that, I think tonight we're gonna schedule some site walks, which for the public's benefit, those are public meetings. We could actually, if everybody was in agreement, we could vote to pass a resolution at our next meeting, which will be less than a month from now.

I don't know what date it will be, but that's my suggestion, unless people have already seen it. But I was much impressed and I would endorse Arthur's suggestion that we do pass a resolution to support it. Has anybody else seen it? I don't know if Tom or Wendy or Hans or Charlie, if you've seen the bills.

Speaker 5 (34:00–34:08)

No, but I would vote for it on the word of you and Arthur.

Speaker 6 (34:08–34:10)

I bet Steve's seen it.

Speaker 2 (34:10–34:13)

Sorry, I've just been too busy these days.

Speaker 6 (34:14–34:17)

No time for light reading, right?

Speaker 2 (34:17–34:20)

Exactly. Although I would like to see it.

Speaker 1 (34:20–34:37)

Yeah, I think due diligence suggests that everybody actually put their eyes on the bill. I don't know if anybody else, Hans or Charlie, have you had an opportunity to see it? I have not seen it.

Speaker 7 (34:37–34:38)

I have not.

Speaker 1 (34:38–36:43)

All right. I think it's a worthwhile read. It's actually pretty quick. And I, and I don't suggest that for purposes of delay.

I think we could actually move this along pretty quickly. Uh, if we put it on the agenda for the site walk, which will be probably within a couple of weeks. Uh, any other comments or suggestions or, um, members of the public that would like to ask a question or weigh in, um, It actually makes sense because one of the problems with the big projects for, as an example, restoration of Marsh, it's a regional effort. So the marshland that Arthur and Tom Callahan were just talking about, we've got a private landowner, Blue Cross Blue Shield.

We've got the city of Quincy. We've got the town of Milton. And right across the river, it's essentially the same marsh area as the city of Boston. So right there, you've got different permitting avenues.

And that's one of the problems that the sponsors of the bill saw it's it's a mess, because you've got your engineering department for the cities you've got planning commissioning in the metropolitan area commission we've got all kinds of. different entities, and sometimes that creates inconsistent results. It's an attempt to streamline it and make it a single permitting process, which seems to make sense to me. But again, if you read it, it's a pretty quick synopsis, and you can see it, and I think it would be a worthwhile read for you.

All right. So is there a consensus? I don't think we need to vote right now until we see it, but if we can just continue this discussion until our next public meeting, which will be the sidewalk, we can get the data out to you, take a look at it, and we can vote it at the next meeting.

Speaker 3 (36:43–36:43)

Okay.

Speaker 1 (36:44–37:02)

All right, good. So we'll continue that. Thank you very much, Arthur, for that. And Arthur has been the driving force on this.

All right, next on the agenda is number three, Certificate of Compliance, 21 Low Circle. Mr. Chairman, I received an email this morning.

Speaker 11 (37:02–37:08)

This applicant would like to move to June 10th meeting. They have a family emergency.

Speaker 1 (37:08–37:12)

Understood. Thank you very much. So we'll put that. What is the June meeting date?

Speaker 11 (37:12–37:16)

June 10th.

Speaker 1 (37:17–37:31)

All right, with the request by the applicant, we accept that and continue this until June 10th. Number 4 on the agenda is notice of a 1030 Curtis Road. Do we have a presenter?

Speaker 12 (37:31–37:47)

Yes, good evening Chair and fellow commissioners. Devin Howell from Beals Associates here on behalf of the owner and applicant, the Unquity House Corporation. Um, if it's okay with the chair, I just have a, uh, a brief presentation I would like to share tonight.

Speaker 1 (37:48–37:54)

Oh, that's great, Devin. Thanks, Steve. Can you help, uh, uh, sharing the screen share? I hope to.

Speaker 12 (37:56–37:59)

Yes, I can always count on Steve to help me.

Speaker 1 (37:59–38:01)

So that is true.

Speaker 12 (38:12–38:39)

Well, Steve gets it going. So we did file with MassDEP. We have received a file number for this notice of intent, 046-0650. I sent an email to Philip this morning with that confirmation as well as the green cards.

Speaker 13 (38:43–38:44)

Okay.

Speaker 2 (38:48–38:49)

Are you trying to share now?

Speaker 12 (38:49–38:55)

Yeah, I'm still not seeing it. It says I can send a request. I don't know if that helps.

Speaker 2 (38:56–39:01)

Along. Yes, thank you. That I think did it.

Speaker 12 (39:02–39:04)

That did it. I see the option now.

Speaker 2 (39:04–39:05)

Good.

Speaker 14 (39:06–39:07)

Good.

Speaker 12 (39:07–47:27)

So as has been stated, we filed a notice of intent for the Unquity House, which is located at 30 Curtis Road. There we go. Just get my laser pointer up here. So the property itself, the Unquity House, it's located right on the Mattapan line.

The Neponset River follows right through here, which is the dividing line between Mattapan in the town of Milton. On the left-hand side, you have Blue Hill Ave, Curtis Road, which loops down to Elliott Street. Elliott Street continues down this way, and Cliff Road on the right-hand side of the screen. The property itself, 30 Curtis Road is outlined in yellow here.

And really the northerly side of this image really generally follows along the Neponset River, the major natural resource as part of this project. We did identify three resources for this notice of intent. The Neponset River, as I stated, kind of generally follows this northerly property line. There's a non-jurisdictional stream that we had identified in the field.

We had identified that there's a pretty large culvert right at this corner of the property that takes probably a large portion of the off-site neighborhoods. But we did not identify, excuse me, resource areas upstream of those culverts to make this a jurisdictional stream. So that's why we had identified that as a non-jurisdictional stream. There is also a FEMA floodplain, which is assigned an elevation, which we've depicted on our project plans.

So the reason why we are filing for a notice of intent is really to repair some erosion that we've identified on the property. The first work area is located right here, kind of circled in orange. It's located right next to a service area. And what I've done on this slide here is included some photos that I can't recall if we had, as part of our informal meeting with the commission, walked over to this area.

But along this existing edge of pavement, there's some pretty significant erosion that's occurring. So this is looking westerly towards this parking lot here from down in this service area. So you can see that erosion kind of follows and continues along the edge of the pavement. until it kind of looks like a portion of the water may spill towards a catch basin that's located within the service area, but primarily just, there's just a lot of erosion.

The reason for that is there is no curb line here, and that's what we're looking to establish within this first work area is to install a new Cape Cod berm on top of this existing impervious so there's no increase in impervious surfaces to make sure that this water as it falls along this edge is directed into this catch basin without causing erosion. One thing I would like to note is that the commission expressed some interest in water quality. This property built One, I recall about 40 to 50 years ago, a lack of stormwater management other than it was really catch basins connected together to the outfall. So no water quality treatment as part of this existing development.

So what we're proposing to do is retrofit this catch basin remove it and install a new water quality unit in its place, which would provide treatment where no treatment exists today. The second proposed work area is located on the eastern side of the building, again outlined in orange here. When We were actually first brought on to this project to help the owners and applicant. I crawled under the fence here through a large portion of erosion, which is the result of a collapsed culvert, just to try and see if I could find where the culvert was collapsed, if there was any indication where The pipe actually was underneath all the debris up here.

And that's when I noticed that there was a large amount of trash and debris piled up against that fence line. you can see it kind of extends, this is the non-jurisdictional stream up in this direction. So that fence line is generally right along the property line and that embankment is just, it's full of trash. So what we're requesting permission from the commission is to number one, repair the collapsed culvert, It's for a elderly housing facility such as this that's an important aspect and safety concern that we want to make sure that we can get that repaired before a sinkhole or something like that forms and could be a trip hazard to the residents.

The second thing that we are requesting is to remove all this trash within this embankment, be a good steward that we identified this big issue here and rebuild it with riprap, provide that stabilization along the Neponset River. Similarly to what we were proposing with this catch basin, On the western side, we would also propose to remove the existing catch basin that's kind of located central of this parking area, replace it with a water quality unit, provide that treatment to stormwater where none exists today before it kind of everything goes this way towards the Neponset River. The last thing that we would be requesting to the commission is that trees have been identified in the field with flagging, which we would be seeking to remove. Some of them are extending over into the development area and just with elderly residents.

We want to ensure that there's no safety concerns as people walk along the, the river here. It's important to note that in what we've noted on the plan is none of those trees we would propose to stump so the roots would stay in the ground to ensure that there remains good stabilization along the river. With that I will turn it back over to the chair and answer any questions or comments that you may have.

Speaker 1 (47:28–49:54)

All right, well, one of the things you mentioned, Devin, was you indicated a non-jurisdictional stream. We're pretty sensitive to jurisdiction. And for the public's benefit, please understand that the commission had a public meeting and we inspected the site, which was very, very informative. So we've been and seen all the things that were mentioned by Devin, and he did so very accurately, including the trash that's right up next to the fence there.

The collapsed culvert is an issue, and we happen to have been doing some work in the adjoining property. which I think is 531 Elliot. I'm not sure the number, but I think that's close. And I don't know if that's an intermittent stream or non-jurisdictional stream, but I suggest it doesn't matter.

I wouldn't wanna declare it non-jurisdictional because I think that area is probably within 200 feet of the deposit bank. I'm not sure of that, but I don't think jurisdiction is gonna be an issue. The same with a culvert. I don't know where that water is coming from that, as you said, could cause a sinkhole in the parking lot.

So I'm just trying to stay away from the verbiage non-jurisdictional. I think we've got it anyway. And I don't want to declare something as something other than an intermittent stream. So I think it should be a non-issue is what I'm suggesting.

The other issue is on the tree removal. We do have a tree replacement plan, but it doesn't apply if it's maintenance. If the trees are dead and creating a public hazard, certainly you could take them down and that would be a recognized exemption from the Wetlands Protection Act. But if it's done for other reasons, you know, construction of, you know, rebuilding the culvert or to some other reason, even the statics, then we would look to have some kind of a tree replacement component to the plan.

And we've seen it, and I don't necessarily think we need to go back and see it again, because we are familiar with what you described. But is there a tree survey? I've got the book in my hand. Have you identified the trees that you anticipate taking down?

Speaker 12 (49:56–51:10)

At the last time I was on site, which was a few months ago at this point, they had not yet been identified. You know, there are some trees that, you know, even just looking at this plan, you know, this photograph here, you can see there's some trees and vegetation. So I don't recall what the, we have not, to first answer your question, we have not done a tree survey. Um, but there would certainly need to be some level of trees and or saplings, depending on how we will.

Define it, um, that would need to be removed as part of this, um. This repair work, I guess I would. I would ask, you know, is would would the commission offer some relief? Um.

To that, uh, to the tree, given that, you know, the, the reason that we're proposing this work is, you know, it's not like we're trying to expand the parking lot or, or something of that nature where we're just trying to be a good steward of the land here and. Fix some erosion that's occurring down into the, um, into the river.

Speaker 1 (51:13–53:03)

Well, I think the answer is yes and no. If it's part of your project to remove trees, that falls into two categories. One, we have a performance standard which requires replacement of trees, not necessarily on site, although it's preferable to have them on site. And it's basically to replace the sum of the circumferences of the trees that are taken.

to be replanted. Now, obviously, if you get to take a big tree, you have to have, you know, two or three small trees to be replaced. And we calculate that at $500 per tree. If it's a question of taking down a dead tree that poses a falling hazard for the residents, whether they're elderly or not, that would fall into the maintenance category and would not require tree replacement.

But we try to be pretty consistent in the application of this performance standard. So I think the answer to your question is, if they're dead, you can remove them. If they're not, and it's part of your plan to, you know, even though it's a great plan, by the way, because we've all been there and so on, and I think there was a general consensus that this is a pretty good idea, particularly fixing the culvert, which leads me to a question. And that is at the end of the meeting that we had on site, there was some discussion about some state grants that are available for culvert repair.

And I didn't know if you had any success in finding that, because I did mention a cost, $500 per tree that you're replacing. So we are sensitive to costs, but I was hoping that you were able to find some state or even federal grants to assist in this project, because it is a good project.

Speaker 12 (53:03–54:36)

We, we have not been able to find anything. Um, I, I just would also. I'd be remiss if I didn't state that, you know, we, we think we've, you know. Understanding the position on the trees, there is also some significant cost associated with these water quality units, where we may be only talking $5,000 to $10,000, say, of curb replacement along this edge of the pavement.

The water quality unit itself, those are running about $25,000 right now each. So in water quality units alone, we're looking at about $50,000 worth of financial burden to this HUD financed project. And I guess what I'm asking is, for what we're doing in the water quality standard, receive some flexibility in your tree ordinance as well as understanding that, you know, I think the alternative is if this project becomes too economically burdensome to get funding for this project, I think that the risk of not moving forward with this is, it's a bit of a concern.

Speaker 1 (54:38–55:28)

I don't mean to be unsympathetic because I am, you know, sensitive to costs and I know this is a not-for-profit organization and it's, you know, a valuable asset to the town of Milton. But I'm not persuaded by saying that enforcement of our tree standard, which we try to do uniformly, It would be a reason to stop the project. I'm not sure that's a persuasive argument with me. It might be with some of the others, but I don't think it's a big ask to stay in compliance with our tree policy.

And as I said, if it's public safety, that's a no brainer, then the tree should come down. I mean, if it's in danger of falling down and clunking somebody on the head, then we're with you.

Speaker 12 (55:28–56:38)

Well, I guess if the chair would allow, You know, the, the other consideration that we had, you know, in the whole reason for this, the slope repair work is, you know, we've we. We're, we're uncertain on the extent of that trash. Um, extending up along the edge of the embankment and we just. You know, right now it's the, the retaining wall.

Is the fence line, um. So we, you know, we, we had viewed that as another. Um, safety concern and that's, you know, that's what's necessitating some of the trees. I think if we, if we separate the 2 issues where, you know, we.

Um, we're doing the slope work, which is. You know, to what degree it's a public concern. I'm not sure. but we think it is of a public concern to rebuild that embankment.

And certainly if there's trees that are alive outside this area, I think it would be fair that those would need to be part of the tree replacement.

Speaker 1 (56:42–56:46)

I guess that reinforces the need for tree surveys so we know what you're talking about.

Speaker 12 (56:47–56:47)

Yes.

Speaker 1 (56:47–57:20)

But I'd like to hear from other commission members. Because I don't want to put form over substance, but what I do put forth is that we need to be uniform in our application. Because we get applications from non-governmental organizations, from schools, from hospitals, to churches. We try to be good to everybody, but we try to be uniform with everybody.

I don't know. And Wendy, I know your hand's not up, but you're a tree person. So what do you think?

Speaker 6 (57:22–57:47)

Uh, thank you, John. I, I agree with you. Um, I think that consistency is really important in us implementing our, our tree policy. And, um, um, I, I also, um, I think maybe this, this conversation might be premature since we don't know how many trees that we're talking about.

Speaker 1 (57:51–57:53)

Anybody else thoughts, comments, questions?

Speaker 4 (57:54–58:06)

Yeah, John, if you don't mind, I have a question for the design team. What make and model of the water quality unit are you proposing?

Speaker 12 (58:08–58:15)

It was a storm scepter 450i, so one of the smaller ones.

Speaker 4 (58:20–58:38)

Well, those ones are those water quality units are on the less expensive end of precast water quality units. So, at least you didn't specify the most expensive one.

Speaker 12 (58:38–59:11)

We, we have heard some pricing come back on. We've recently had to use some much larger units and those were up in the 80,000 dollar range. So it, it's certainly. It certainly has a range on it and depending on the type of.

Um, treatment you're looking for, um. If it's okay with the chair, I think it, you know, we can certainly do the tree survey. I don't want anyone to think that we don't want to do it. Just for clarification, what is the DBH on the trees?

Speaker 1 (59:14–59:19)

What is that diameter at breast height?

Speaker 4 (59:19–59:19)

Is that what you mean?

Speaker 1 (59:20–59:41)

Yes. That's what it is. But we actually, the way we adopted it, we actually went with circumference at breast height. Although everybody always, when we're talking, we always say DBH.

And a lot of the plans show that. It doesn't matter mathematically. I have a take that- You can replace DBH or CBH.

Speaker 12 (59:41–59:45)

I have a tape that measures circumference, so it's easy enough.

Speaker 1 (59:45–01:00:07)

Yeah, it's easier than coming up with a caliper. I got a tape measure, but I don't have a caliper. And the other thing, a diameter is sometimes difficult when you've got some misshapen trunks as to, you know, if it's more oblong or egg-shaped than it is a circle. So circumference is easier for us.

Speaker 12 (01:00:07–01:00:18)

I won't bore the commission, but we were recently measuring a tree where it took two people to get around the tree. We were not looking to remove it, let me be clear.

Speaker 1 (01:00:18–01:00:44)

Good, yeah, I bit my tongue on that one. Yeah, it's like that story in England where somebody cut down the Great Sycamore at Long Hadrian's Wall, and they were just both prosecuted. The two guys had cut it down. And that was a gigantic tree that had become a national monument, I guess.

Speaker 12 (01:00:44–01:00:47)

No, no, you're not going to see the news for that.

Speaker 1 (01:00:47–01:01:00)

Good. Good enough. Uh, thoughts from commission members. Um, maybe we could do is go out and take a look at it.

Uh, I know we've seen it, but after the tree survey, that would, that would be pretty helpful to me. I know.

Speaker 5 (01:01:10–01:01:27)

Could I just ask, I haven't really poured over the plans that we see here in the inset photos. Uh, holding the garbage back, what will replace that fence? I assume there'll be another fence, is that right?

Speaker 12 (01:01:29–01:02:17)

Let me go further, it's a little bit easier to see these photos. So you can actually, you may be able to see a little bit better. There's this kind of rusty old fence here. We would be proposing to remove that second fence in its entirety.

Good, it doesn't look like you can save it. Yeah, yeah, there's no need for the retaining wall fence anymore. We would be looking to just maintain, I don't have a good photo, a gate. It was one of the comments during our site walk to have a gate to maintain access down to the river.

So we would maintain this fence up at the top of the slope, putting a five foot wide gate to allow access down to the river.

Speaker 5 (01:02:18–01:02:35)

I think I see. a shoe in that picture. Kind of the middle lobe, like the bottom of it. At any rate, congrats on the great photos.

You really worked your flash to get these photos.

Speaker 12 (01:02:36–01:02:40)

They turned out a lot better quality than I would expect. I can thank iPhone for that.

Speaker 5 (01:02:41–01:02:43)

This is like beautiful trash.

Speaker 12 (01:02:44–01:02:56)

I tried to look up the some dates you can pull out. I think there was like an old Miller light can in there or Cola can I want to say it wasn't even a logo.

Speaker 5 (01:02:56–01:03:12)

I recognize anymore Well, you know, this is a investment in the property which is always good to do really Any other thoughts comments

Speaker 1 (01:03:14–01:03:16)

Wendy, your hand is up now, I see.

Speaker 6 (01:03:17–01:03:42)

Thank you, John. Devin, you just mentioned about possibly having access to get down to the water. Is that, in the context of when you said that, was that for For you and your team, or was that to actually facilitate access for.

Speaker 12 (01:03:42–01:04:14)

For the residents of that community, I wouldn't expect it to be for the residents of the facility. Um, this would just be a gate for. Long term, if, you know, for example, someone needs to get down here and, um, you know, when. if the commission approves the project and there's a new culvert down here to be able to get down there, inspect the culvert, maintenance, that kind of stuff.

So I wouldn't say it would be, I would not expect it to be used by the residents.

Speaker 6 (01:04:16–01:04:48)

I know certainly not in its current state, but I know we had sort of done a little brainstorming and, um, visiting when we were there for the site walk. But do you, do you think that there's enough land there that, um, if funding were not an issue, that there might be able to be some access down to the water itself?

Speaker 12 (01:04:52–01:05:45)

I don't think it's a, I had a discussion with my client on it. It didn't seem like it was something that in the short term, there was much interest in trying to get that access down. It may not look like it, but there are some topographic issues just getting down here. And the river does, there is some bare ground here.

I'm not sure how high that water can come up. We've obviously mapped the mean annual high water line, but we wouldn't want to put a gravel path or something like that right along the velocity zone of that river and then have it get washed away.

Speaker 6 (01:05:46–01:05:57)

What about something like terracing? to get down to the water. Again, assuming that cost was not an issue.

Speaker 12 (01:06:00–01:06:18)

If cost was an issue, I can assure you, I could come up with some engineering way to get access down there. I think it's just, it really comes down to, it just, from my conversations with the client, I just don't think it was something that we want to pursue at this time.

Speaker 6 (01:06:19–01:08:23)

Yeah, I certainly understand that. you know, when we're looking at the topography of the site that it is challenging at best and would require some significant engineering. But the perspective that I'm looking at it is that there is really very little access to the river itself in that area. And I know we had We had talked about, you know, different funding sources that might supplement the work that the that the owner is pursuing.

But really, this is just, you know, from my from my limited experience in grant writing in conservation projects, this would be just such a sweetheart of a project for something like a 319 grant, which is significant money. You know, a couple hundred thousand dollars that perhaps more that could be available through state and federal that state and federal grant program. I understand that the owner may not be in the position to move forward with something like this on their own, but that is a dialogue that I, for one, would love to have. with them and provide whatever assistance and technical support to at least explore submitting a 319 proposal for something like this.

Speaker 12 (01:08:25–01:08:44)

What I can do is obviously the commission's not going to, well I don't want to speak for the commission, but my take is the commission's not going to take a vote tonight. So I can certainly have that conversation with the client. and let her know that.

Speaker 6 (01:08:44–01:09:05)

Thank you. And also to be clear, a 319 project, funded project, it would also help pay for the cost of the stormwater treatment that you're proposing here tonight.

Speaker 12 (01:09:10–01:09:12)

I'm not ignoring it, I'm just writing this all down.

Speaker 1 (01:09:15–01:09:40)

And Wendy, that could be a phased plan as well. I mean, just simply putting a gate in the fence to provide, as I understand it now, it's basically maintenance access. But that same gate would be like the gateway to a 319 project to provide a walkway along the river. Even if it's not done this year, it could be done next year or something.

Speaker 13 (01:09:40–01:09:42)

Yes, exactly.

Speaker 1 (01:09:42–01:09:43)

They have more significance than we think.

Speaker 6 (01:09:47–01:10:22)

And there's there are other funding sources, too. I mean, this this is also, you know, the type of. Of project that might be. Suitable for funding from the community preservation committee in town as well.

But in that case, it would just be for the access and the recreation component, but not for the engineering and the stormwater treatment that you're proposing tonight.

Speaker 1 (01:10:22–01:10:35)

All right, any other thoughts, questions from commissioners? I don't see anybody, but because of the screen sharing, I don't see anybody. I don't see any hands, any comments from members of the public about it or otherwise.

Speaker 5 (01:10:36–01:11:43)

I want to just make one more remark, John. It's not really feasible to have a linear path along that bank because it's covered with large boulders from all of this property down nearly to Cliff Road and particularly immediately downstream. It's just a big rubble of large rocks. So unless you completely redid the bank, you couldn't have a walkway, but right at that spot, you could have perhaps a very good overlook, like a sort of a fenced in benches or something.

And there's something similar, Martini Park and up Truman Highway, where a sort of sitting area is perched above the water. I think that could work in that spot. And, uh, I really like Wendy's idea to get something, some more access out of it somehow. But I appreciate it.

It might be a long term idea.

Speaker 1 (01:11:47–01:12:31)

All right, planning ahead. I don't think we're in a position to vote and I would suggest that Assuming we have the assent of the applicant that we continue this, but not for a long period of time. And I would like to see the tree survey done. And I think we're going to have some other items for a site walk later in the agenda anyway.

So does anybody think that they would like to see the trees that are designated? So if we can get the survey done and fast enough that we can have a site walk. The whole purpose, Devin, is not to slow you down. So we'll, you know, as soon as you can do the tree survey, we can get there and check it out.

Speaker 12 (01:12:31–01:12:36)

Oh, certainly appreciate that.

Speaker 1 (01:12:36–01:12:38)

How long do you think that would take for you?

Speaker 12 (01:12:41–01:13:06)

Honestly, I don't, we're in Boston, so whenever the commission wants to do their site walk, I could get it, I could submit to getting it done before then. Um, 1 of the reasons I say that is, I, I know the commission's busy. Um, my schedule on weekends is filling up very quickly. Um, so I'd rather get something on the books that works for everyone.

Speaker 1 (01:13:09–01:13:38)

All right well, anticipating we're going to have some other site walks. Let me just read across the screen. You're on the top left, Steve. Are you available or not available on any particular Saturday mornings?

And Devin, we typically do our site walks on Saturday morning, beginning at 6 a.m., right, Wendy? That's late. 8.30.

Speaker 2 (01:13:39–01:13:44)

Available, yes. The next couple of weekends, absolutely.

Speaker 1 (01:13:46–01:13:48)

All right, I'm available. Arthur just left. Phillip?

Speaker 11 (01:13:49–01:13:51)

I can't do this Saturday, but any other is fine.

Speaker 1 (01:13:53–01:13:54)

All right, Tom Palmer?

Speaker 5 (01:13:56–01:13:57)

I'm generally available.

Speaker 1 (01:13:59–01:14:04)

Okay, Wendy? Yeah, you're on mute, Wendy.

Speaker 6 (01:14:04–01:14:23)

Sorry. Sorry, Philip, but my preference would be for this Saturday, if at all possible. Although I don't want to exclude anybody, but I'm with you, Devin. The summer calendar is filling up really quick, so the sooner the better.

Speaker 1 (01:14:23–01:14:35)

What's the date on Saturday? 17th. All right, now just let's be practical. Devin, is that too soon for you?

Speaker 12 (01:14:35–01:14:38)

We'll get it done.

Speaker 1 (01:14:38–01:14:38)

All right, and Hans?

Speaker 7 (01:14:42–01:14:48)

You're on mute. Saturdays are particularly challenging for me this time of year through probably the end of June.

Speaker 1 (01:14:50–01:14:51)

OK.

Speaker 7 (01:14:52–01:14:54)

I'm coaching soccer, and all the games are in the morning.

Speaker 1 (01:14:56–01:15:03)

Hey, take the team with you. Good education.

Speaker 4 (01:15:04–01:15:13)

Charlie, how about you? The next two Saturdays are booked, but I can always go by the site once the trees are flagged and see it for myself.

Speaker 1 (01:15:17–01:15:34)

OK, so, Arthur, I skipped you. I went by you on the screen. What about this Saturday, Arthur? You're still on mute, Arthur.

Speaker 3 (01:15:36–01:15:51)

It was difficulty unmuting. I have a tickle in my throat, so I've been avoiding you having to hear my coughing. Allergy season. We have a first communion in the family on Saturday, so I think I'd have to pass.

Speaker 1 (01:15:51–01:15:55)

That's a big deal. All right, what about the next Saturday?

Speaker 6 (01:15:59–01:16:03)

The next Saturday is Memorial Day weekend.

Speaker 1 (01:16:06–01:16:13)

That's early, isn't it? Yup. 24? Yes, it is, yeah.

What's the next Saturday after that?

Speaker 3 (01:16:13–01:16:15)

That's June 7th.

Speaker 1 (01:16:16–01:16:19)

No, no, I don't think so. It can't be that fast.

Speaker 3 (01:16:19–01:16:20)

May 31st.

Speaker 1 (01:16:20–01:16:25)

17, 24. Oh, did you say second? Is that what you said, Arthur? Second?

Speaker 3 (01:16:26–01:16:32)

Seven. No, 31st is Charlie's right. 31st of May is a Saturday. Okay.

Speaker 1 (01:16:34–01:16:45)

All right. I'm okay. Okay. On the 31st.

Is that what you said, Arthur?

Speaker 3 (01:16:46–01:16:47)

31st is fine for me.

Speaker 1 (01:16:48–01:17:00)

Okay. And Tom, you're okay with that? I'm here on 31st is good for me. Okay.

Wendy, can you do that one?

Speaker 2 (01:17:00–01:17:02)

Yes.

Speaker 1 (01:17:02–01:17:16)

All right. Great. I already talked to you, but that works for you, Charlie. Yes, it does.

All right. So let's, let's set it up for May 31st at eight 30 at 30 Curtis.

Speaker 12 (01:17:17–01:17:24)

Okay, good. That was going to be my only request is I have a event, but it's late during that day. So that works for me.

Speaker 1 (01:17:24–01:17:54)

Perfect. All right, good. So we'll see you then. And we'll be able to look at the tree survey and move on from there.

That's great. And do we need anything else? Or because I'd like to be able to move it if we can for a vote. It's a public meeting.

So any other questions that we need Devin to fill in the blanks, we should ask him now. Hearing none, seeing none, we'll continue this. Just really quick comments from the citizens. Yes, Hans.

Speaker 7 (01:17:54–01:18:22)

Just I just I think it's worthwhile to consider the value of invasive versus native plants. So if we're talking about, you know, trying to have a conversation about tree replacement, if if majority of those plants are invasive or don't have high ecological value, I think that the we might be able to have some leeway on how we apply the standards.

Speaker 1 (01:18:27–01:18:49)

That's called the spark that starts the prairie fire. If you're talking about Norway maples, which is a tree. I don't know. I'm only looking at 33 years of we've included Norway maples, if that's what you're talking about.

I don't know, why don't we postpone that issue?

Speaker 6 (01:18:52–01:19:00)

Just trying to help out. But the tree survey will have the species of tree as well as the size and location, correct?

Speaker 1 (01:19:01–01:19:15)

Yes. Correct. Yes. OK, so we're on at 830 on site.

We met there previously, so we're good to go. Devin, thank you very much for your courtesy and presentation.

Speaker 12 (01:19:15–01:19:19)

Of course, thank you, thank you everyone.

Speaker 1 (01:19:19–01:19:28)

All right, thanks. Next on the agenda, number five, notice of intent, Max Uhlen Memorial Skating Rink. And thanks everybody that's waiting to speak. So I appreciate your patience.

Speaker 15 (01:19:32–01:19:46)

Good morning. Good evening, Mr. Chair. This is Tom Keel from AECOM.

I'm here tonight on behalf of DCR, representing the Ullman Skating Rink Parking Lot Resurfacing and Stormwater Management Project.

Speaker 1 (01:19:48–01:19:52)

Welcome. Thank you very much for attending and for your patience.

Speaker 15 (01:19:52–01:19:56)

You're welcome. I am attempting to share a screen. Please let me know if it works.

Speaker 2 (01:19:58–01:20:01)

It looks like it's going to look like you're in the right.

Speaker 15 (01:20:03–01:23:18)

So here we have the link to the east or to the west, rather, is Pine Tree Brook with its 200 foot riverfront area that extends partially to within the parking lot here. There is a bordering vegetated wetland associated with Pine Tree Brook, and that casts the 100 foot buffer zone. through about half halfway through the parking lot probably takes up about 60% of the parking lot in its entirety. DCR would like to come in and resurface this parking lot.

It's in really rough shape. And while we were out there doing our site inspection, We made a little discovery that no one had ever looked at in the past since it was probably paved the last time. There's no stormwater management whatsoever on this parcel. When you look at it, the lot is extremely flat.

With the naked eye, it's pretty tough to tell which way flow is going. For the longest time, people just assumed that this catch basin here was for the parking lot flow. but we actually have the 42-foot contour here, the 41 in the back, and then the 40 right along the edge. This catch basin only catches what rolls in off the street, and then the entire parking lot sheet flows right out the back towards the wetland that borders Pinebrook.

In order to remedy that, We've looked at a few options, and we came up with shrinking the size of the parking lot here in the back end. So we're going to remove a couple thousand square feet of pavement in this area, shift all the parking spaces forward, and install a long linear infiltration basin in this area here. we've managed to fully meet a majority of the, or that we've fully met the applicable standards within the stormwater management policy. And we can come down here to sign.

So it's going in that area instead of like trying to push it out or move off to the side, especially here to the left hand side of the plan, which would be the south. It's just heavily wooded. So in order to install the basin in that area, we would have had to cut down numerous trees over, you know, a four thousand five thousand square foot area. So instead of that, we're just removing asphalt.

We're pulling everything back. We have the long linear feature here at the end and a spillway and I will zoom in so bear with me for a few seconds here. And as you can see here is the existing tree line to give you a little perspective. We're not venturing out into that tree line with the basin.

So the grading, everything will be done basically from where that guardrail on the edge of the pavement, as it currently exists, moving towards the street and the parking lot.

Speaker 1 (01:23:18–01:23:22)

Tom, do you have a distance there from the wetland flags to the spillway?

Speaker 15 (01:23:23–01:23:51)

It is fairly close. It's less than 5 feet in some areas. Because it's right at it's a toe of slope wetland, so the parking lot was built up i'll zoom in a little so you can get an idea of some contours. And we jumped from 40 right down to 37 in the in that wetland area in a matter of about five feet.

Six feet okay.

Speaker 1 (01:23:52–01:24:20)

This seems like a, just from a jurisdictional point of view, that makes a difference to us. It sounds like a great project, so it shouldn't be a problem, but we have a 25-foot non-disturbance zone that we would have to address separately. It's a separate vote for us, and we'd have to show that there is no significant adverse impact on the resources that we protect. That's a specific vote we have.

Speaker 15 (01:24:20–01:24:53)

While the activity is occurring within 25 feet of the wetland, it's occurring in an area that's 100% disturbed. It's already asphalt. Right, understood. Yeah, so we did address that within our notice of intent, the variance.

And, you know, it's a conversion of an impervious surface to a pervious surface at this point within that area, that's not going to require vegetation removal.

Speaker 1 (01:24:56–01:24:58)

Right. As I said, I think it's a great, great project.

Speaker 11 (01:25:05–01:25:09)

All right.

Speaker 15 (01:25:10–01:25:19)

That's a relatively short presentation. It's ripping up asphalt, putting it in an infiltration basin, but I'd be happy to answer any questions you have.

Speaker 1 (01:25:20–01:25:30)

All right. Can you tell me what the ownership is of the land where the rink itself is, where the building is?

Speaker 15 (01:25:31–01:26:07)

Who owns it? I'm going to switch figures. I'm going to go back to the environmental constraints figure here and shrink it down. So if you see these purple lines here, Mr.

Chairman? Yes. That is the lot that the rink in the parking lot is on. So it's one lot, both side of the street with Unquity Road cutting through the middle of it.

It's one continuous parcel. It's I forget off the top of my head, but I think it's 60 some odd acres. And it's all part of the Blue Hills reservation.

Speaker 1 (01:26:08–01:27:02)

Murphy, all right. And this is, you don't think I'm a nag, because this goes back 20, 25 years or so, but we had a bit of a go round with DCR years and years, decades ago, because at the top right hand corner, see where the yellow outline is of the building in the parking lot? They dropped the ice shavings from the Zamboni, and they used to drop it right in the wetlands. Oh, but so we went round and round, and they put boulders there, and then they finally put a guardrail right there.

And so the deal between the Conservation Commission and DCI was that you'll keep it on the, as I'm looking at, I guess it's the south side of that yellow line. Yes, there is a guardrail.

Speaker 15 (01:27:03–01:27:12)

What's that? Uh, there is a guardrail now, um, in that area to make sure the Zamboni can't just go drive in a country to drive right into the wetlands.

Speaker 1 (01:27:13–01:27:42)

Yes, but they've been good for the last 20 years or so. So I salute them. Thank you. All right.

That's, that sounds like a, uh, a good plan. Um, would anybody like to go out and see it? I don't need to. I have a couple of remarks.

Speaker 5 (01:27:45–01:28:23)

Shoot. On the plan we were looking at before this one, showing the parking lot. Could we go back to that? Of course.

Yes. Do you see where it says upper left grass restoration? Could you just point me to it's just a label I've been close to the top of the image on the left restoration right here. Yes.

Yeah now There's no grass there now, right? Isn't that the case?

Speaker 15 (01:28:23–01:28:27)

No, it's it there's it's mostly poison ivy at this point.

Speaker 5 (01:28:28–01:28:37)

I would disagree. I would say it's mostly Japanese not we that entire corner is all really thick with a knotweed.

Speaker 15 (01:28:38–01:28:44)

When I was out, I didn't get past the poison ivory. I basically, I stopped my site inspection right then and there.

Speaker 5 (01:28:44–01:29:09)

Well, as you go along the backside of the lot to the right, eventually, yes, you do get into some trees, but that field edge you were talking about at the corner on the left, where it goes around the corner, it's completely become a thicket of knotweed. Now, as you say, there's a guardrail there. When you put in this basin, are you removing the guardrail?

Speaker 15 (01:29:11–01:29:19)

Yes. Yes, because the guardrail is at the edge of the pavement, so that will come up, and it will be relocated right to the new edge of pavement.

Speaker 5 (01:29:20–01:29:50)

All right. Now, as a wetlands person, you know about invasives, and I would think that you know that this is a really obvious and robust takeover of a public area by an invasive, but your plan really doesn't propose to do anything about that. Is that okay with you or do you think you could do something about it?

Speaker 15 (01:29:50–01:30:20)

Well, DCR does have an invasive management program for the Blue Hills in its entirety. They will have to be diligent here. I agree with you completely. After they loam and seed this area here, they're going to have to be diligent to prevent the spread of any invasives that come up here.

They're going to have to properly dispose of any soil that they excavate. It might have rhizomes in it as well.

Speaker 5 (01:30:21–01:32:21)

I think that's very good, but the fact is, all the area where you're not working, namely the slope down the well is the area that has been taken over. So you may be successful keeping it out of the basin, but you will not have improved it at all. And so, yes, I hope that part of this project could be dealing with the knotweed. Earlier, we were discussing permitting requirements that have made Restoring wetlands is difficult.

This admittedly is just a fill slope, but it's right next to a wetland. And I would say the knotweed is only the second invader here because the phragmites was here and gone and spread out into the wetland to the north. So I'm just saying that there is another issue here if you're looking at it from a vegetation standpoint. One more comment I have is around the back of the building, you are extending the bituminous pathway all the way around on the backside.

And I think you said in your report, well, that's sort of a safety issue because there's two emergency exits on the backside of the building. Now, I would agree with that, but I would just point out that you can walk back there today. If you do, it's entirely shaded by trees that are along the well on edge and it's all gravel. And it remains open almost by itself because it's shaded and a gravel base.

So I would just say that, uh, if you're looking for something to save on, so you can deal with it in days of species, I'd say it's not really obvious to me that you have to pay this area in back. Considering that the footing seems to be good. Anytime you come out one of those doors.

Speaker 15 (01:32:22–01:32:50)

That's correct. I agree with you. Walking back there is no problem, but it's emergency exit and somebody who has a wheelchair, or if an emergency crew needs access, a stretcher or anything like that, they wanted the paved surface. That was a request directly from the rink manager for this project.

It was not something we intended to do when we originally started to address stormwater management.

Speaker 5 (01:32:50–01:33:35)

But I don't have any problem with it. It's just a little extra that didn't seem to be critical. So, um, do, do we need to see it? I drive by there all the time, so I know what it looks like.

I don't have to see it. This is, yeah, I agree. This is a good project as far as stormwater and better treatment, but it is one of the worst sites. in the Blue Hills for invasives, I think.

One of the most obvious ones. So I don't really know how to get rid of knotweed. If I was hired to get rid of this knotweed, I'm not sure what I would do. But I would say it needs work right there.

Speaker 15 (01:33:36–01:34:16)

I have been tasked with that very unfortunate item in the past. And it is a multi-year, multi-season, um, heavy chemical laden process. Um, so the way it's done nowadays. Yeah.

The DCR, um, in regard to their overalls, uh, invasive species management, and perhaps as we're doing this work here, we could put this on the, uh, you know, bump it up the list for their priorities.

Speaker 5 (01:34:16–01:34:23)

Well, I think an opportunity when you're working right there, that would be a good piece to add.

Speaker 15 (01:34:27–01:34:57)

Yes, I would agree. And I will talk to that with DCR and come in. In the past, rather than broadcast spraying, I've done this in Quincy over at the granite quarry site that's over there. And they actually went and injected the stems of each with basically the, uh, the roundup is the common name for it.

Yeah.

Speaker 5 (01:34:58–01:35:05)

Yeah. I would support adding that. I, I think if you don't do it, there's be no improvement in that respect.

Speaker 1 (01:35:10–01:35:16)

Let's find out, is that doable from your perspective, Tom?

Speaker 15 (01:35:20–01:36:06)

Everything is doable. Whether it will be successful or not, I do not know, and I wouldn't hazard a guess at this juncture. I, you know, I, the one site that I, I've worked on for five years was the new Bedford Harbor cleanup and salt marsh restoration. And five year, we started treating the knotweed and the frag in year one, and we were still treating the same areas in year five.

And we had, we had eradicated the species. Wow. We had shrunk it quite a bit. I can't tell you that it wasn't partially successful.

But five years in, we were not totally successful.

Speaker 5 (01:36:09–01:36:13)

Well, somebody needs to advance the science here so it becomes doable.

Speaker 1 (01:36:15–01:36:39)

So Tom, what are you suggesting though? Because I don't want to impose some kind of a condition that blows the whole project, because I think it's a good project. If DCR says we can't do it, if they're willing to give it a try, God bless them and everybody's happy. But if we get pushback, is this a condition precedent from your perspective?

Speaker 15 (01:36:39–01:37:42)

We, I mean, we can attempt, I would hate to have removal be a condition that you have to adhere to in order to get a certificate of compliance, because like I said. I just don't have a lot of faith in 100% eradicating what I think we could do is have. DCR contact Steve and. you know, work out a plan as part of their, like the overall Blue Hills Invasive Species Management to come out and address, you know, parts of this area here.

You know, because they do have the conservation management plan that's been approved for Blue Hills, just in the, you know, wider scope of things. So they're authorized to do a whole lot of work under the management plan. And invasive species removal is one of them. So I think they could probably work that out with Steve rather than tying it to this particular DEP file number.

Speaker 2 (01:37:45–01:37:50)

That would make very good sense. This is Steve.

Speaker 5 (01:37:50–01:37:59)

Yeah, I would be OK with that, too, because we don't really have a magic bullet to say, you'll do this one time and problem is solved.

Speaker 2 (01:38:02–01:38:04)

And we haven't been issued flamethrowers yet.

Speaker 1 (01:38:06–01:38:15)

True. All right. So if you can live with that, Tom, is that acceptable?

Speaker 5 (01:38:16–01:38:40)

Yeah. I think consulting with them and seeing if there's a way to combine the work, that would be fine. I think when you're there and you're working, you could perhaps, uh, do what you do, namely inject all those stems. And how long would that work?

How much would you remove? I don't really know, but it would be a start.

Speaker 1 (01:38:43–01:38:58)

All right, Steve, have you seen the site? Are you comfortable? What I'm really leading up to is, do we need a site walk? I do not.

I mean, I grew up there, so I used to skate where the parking lot is. That's before the building even existed.

Speaker 2 (01:38:59–01:39:04)

I've seen the site many times, John, most recently about a month ago.

Speaker 1 (01:39:05–01:39:24)

All right, I don't think we need it, and the wetlands line seems to be to a slope. So I don't think it's an issue of soils. I'm comfortable without a sidewalk. However, I ask everybody else.

Hans, you get your hand up.

Speaker 7 (01:39:24–01:40:21)

I don't need a sidewalk. Um, I've been dropping my daughter off there for camp for years. Um, walked around it. Who knows how many times, um, my suggestion on the invasive species side.

Um, I would just ask that in the SWIP or either that, or in the order of conditions, we have some language in there on, um, contractor, um, um, maintenance of vehicles. So, uh, truck wash, um, leaving the site, any materials so that any any seeds or any of the maybe contaminated soils are maintained on site. And then also it would be helpful if, like you said, DCR would provide us under separate cover information on where this wetland area sits in the overall plan for invasive species control.

Speaker 1 (01:40:25–01:41:10)

I agree. Yeah, that that truck wash is important because I know the seeds get transported by the trucks and it helps. The Japanese, we expand its presence, but that's and I think, Steve, you've got language that would. You could just kind of block and copy on that.

I think we use that same condition for 107, 111 Highland Street, the memory camp. I think we can just block and copy. And Tom, for your benefit, it's an easy, I know it puts the onus on the contractor, but just wash your tires and secure any kind of a soil transport that you're using, because those seeds will go everywhere very quickly.

Speaker 15 (01:41:10–01:41:30)

Exactly, especially with the rhizomes as well for knotweed. It's a little filament like a hair and that's really, you don't need much more than that. So when we excavate, we cover the material with a tarp in the back of a truck for transport. So we don't have that stuff just blowing around the neighborhood.

Speaker 5 (01:41:33–01:42:04)

All right, good. All right. One more question quickly. I did read through the report.

You did the DEP routine for mapping the wetland line. including doing a sample site upstream and one down in slope of the wetland line. But I could not find on any plan where you had said where the sites were that you did the work on. There was one upland and one wetland site.

Speaker 15 (01:42:05–01:42:11)

Oh, you know, I apologize for that, Tom. They should have been located on this figure.

Speaker 5 (01:42:12–01:42:17)

All right. I, I looked at all the figures looking at you.

Speaker 15 (01:42:17–01:42:29)

You didn't miss anything, Tom. It was not there. I know one of them was done here and the other was done in this area over here.

Speaker 5 (01:42:29–01:42:35)

All right. I was just, um, I thought they were done, right? I just couldn't figure out where they were done.

Speaker 15 (01:42:36–01:42:39)

Oh, you didn't miss it. That was, uh, we forgot to put it on.

Speaker 5 (01:42:41–01:42:41)

All right. Thank you.

Speaker 1 (01:42:45–01:42:52)

All right, is that something that at time you think should be put on a plan that so because we're going to have in our file. You know, the approved plan, so.

Speaker 5 (01:42:54–01:43:00)

Yeah, if it's easy, just, you know, would be. Only take a 2nd, I would think.

Speaker 15 (01:43:02–01:43:23)

Yeah, well, there's there's no wetland alteration here. Um, Mr chairman, so it's not. you know, the top priority where you'd have a wetland alteration and a replication, and you're looking to mimic what was impacted, but we could basically just add them to this figure and email this right to Steve.

Speaker 2 (01:43:23–01:43:25)

Yes, that would be helpful.

Speaker 15 (01:43:25–01:43:28)

That's very good.

Speaker 1 (01:43:28–01:44:46)

All right. Any other comments, questions? Hans, your hand is still raised on the computer. I don't know if you meant that or not.

No, all right. Any, I can't, because of the screen sharing, I can't see everybody. Anybody else have a hand up, whether it's a commission member or a member of the public, Butter or otherwise? So then with that said, and with the agreement to have a special condition for the contractor to ensure that there's no spread of the rhizomes or seeds.

for truck washing and the addition to the plan that we just discussed. And if you don't know, Tom, we do require, I don't know how long this project's gonna take place, but we do require that any overnight storage of mechanized equipment not limited to, but particularly those with hydraulic hoses, there'll be no refueling or overnight storage within our jurisdiction. That parking lot, you know what's jurisdictional and what's not. So it's important to us that the contractor know that condition, that special condition, that they don't refuel or store overnight within our jurisdiction.

Speaker 15 (01:44:46–01:45:15)

Yeah, that will not be a problem. As you said, there's ample room to make sure we move everything outside of the commission's jurisdiction on the site. And the work will be done not immediately, but as quickly as possible, because we have a very limited window of when that rink is closed and when the town wants to use it for other purposes. So we have to get it done this summer.

Speaker 1 (01:45:17–01:45:58)

Understood. Well, with those conditions, is there a motion to approve this notice of intent and issue an order of conditions? Second. All right.

Was that your motion? I didn't make my will. Oh, I thought you did, John. No, I was asking you for one.

Motion. OK. And is there a second to? All right, good.

So Charlie made the motion and I second it. Is there any discussion among commission members? Hearing none, seeing none, I will take a roll call vote. Um, Arthur, how do you vote?

You're on mute. All right. Wendy, how do you vote?

Speaker 7 (01:45:58–01:46:00)

Yeah.

Speaker 1 (01:46:00–01:46:38)

Hans, how do you vote? Yes. Tom, how do you vote? Yes.

Charlie, how do you vote? Yes. HAB-Michael Leccese, moderatoring): And I john Karen vote, yes, as well, so that's unanimous you've got your order conditions with those special conditions. HAB-Michael Leccese, moderatoring): And I look forward to cleaner water going into a pantry brook Thank you.

HAB-Michael Leccese, moderatoring): Thank you very much for your time I appreciate it. HAB-Michael Leccese, moderatoring): Take care, thank you all. HAB-Michael Leccese, moderatoring): Thanks. HAB-Michael Leccese, moderatoring): Next on the agenda six notice of intended 20 brookside park and thank you for your patience, I know it's it's.

HAB-Michael Leccese, moderatoring): it's a long agenda.

Speaker 16 (01:46:40–01:46:52)

Hi there, I'm Henry McLean. I'm architect here representing you and Kristen Donnelly at 20 Brookside Park, and I've got some slides to share.

Speaker 1 (01:46:52–01:46:58)

I can. That's perfect, Henry. Can you assist in that, Steve?

Speaker 2 (01:46:58–01:47:00)

Yeah, he should be able to put them up right now.

Speaker 16 (01:47:00–01:47:04)

Right ahead, Henry.

Speaker 2 (01:47:05–01:47:06)

Excellent, excellent.

Speaker 16 (01:47:06–01:50:06)

There, okay. This is the site plan. If I zoom in a little bit, you can see this is the existing house. It's actually a double lot that they've owned.

This is the line of the limit of the 100-year flood in the green, and the 50-foot buffer and the 100-foot buffer to Shrine Tree Brook. You can see that the whole house is actually within pretty much that 50 to 100 foot buffer. And we're just looking to add on an addition in this area right here that I can go to the next slide, right in this area here with a wraparound deck. There is currently a deck there now, which you can see here, which is, and I have some pictures, but this is basically in pretty bad shape and needs to be taken down.

It's sort of rotting. The new deck will tie into the addition. It's a double layer deck actually, as it steps down a little bit. We just went through a process with the ZBA and were approved for a variance because there's a 20 foot setback here to the lot line, even though there's a lot of open area here and there's a lot here.

And if I just go back one slide, this is a look from the town GIS showing the driveway and then the lot. as I say, goes out. This is town property here, but it's all green. This is, of course, the flood line of the 100-year limit.

Again, the existing deck and the existing garage back here. Just going back to the first site there, and then this is the addition that we're looking to do. Let's just go back here. This is a couple of pictures from the site.

looking from that area, the northeast actually. And then the next one is your view of that deck and the back entry, which we will keep, but we'll be rebuilding this. There's a look at the tree line here and another view here from looking at both and then back across the tree there. So again, we're just looking for relief to, I think Steve has been out to this site.

We've had the wetlands have been marked. And we're excited to be through the CBA process. And if you like, I can show you some 3D views of the house, which are just a view from the front. We're sensitively trying to tie it in to the neighborhood.

PB, Harmon Zuckerman. PB, Harmon Zuckerman. PB, Harmon Zuckerman.

Speaker 1 (01:50:07–01:50:13)

PB, Harmon Zuckerman.

Speaker 16 (01:50:15–01:50:54)

The back deck is currently right here, John. And these are the steps that come up that I showed. This is the drive back here in the garage. And we're keeping those steps, but we're kind of pulling the deck around there.

You can see actually the old deck there. And this is a new upper section of the deck in the lower section. The addition actually steps down. about a foot from the house just to get a little closer to the landscape.

You can see that with the 3D views. There's the step down there.

Speaker 2 (01:50:54–01:50:55)

Yes.

Speaker 1 (01:51:01–01:51:08)

All right. Understood. Can you show us where the erosion controls are going to be?

Speaker 16 (01:51:09–01:51:28)

Yeah, this is the line right here of the erosion control. The sock essentially will go from the garage right along here and all the way through even onto the property of the, you know, this is the, that little yard that's sort of extension of their yard, but it is town property right out here.

Speaker 1 (01:51:33–01:51:44)

Understood. All right. Do you know what kind of equipment you'll need for the addition for the work.

Speaker 16 (01:51:45–01:52:22)

back though here just to, you know, pull up the, dig down, put the addition, you know, we are doing a basement here that's going to be sort of a truncated basement, but there'll be storage down there. And because the house steps up about almost four feet from the grade, we're going to sort of sensitively address that issue with some stone. You can see it there, but this is going to be stonework here. Let's go back.

Wrapping around the corner just to tie into the rest of the foundation of the house.

Speaker 1 (01:52:26–01:52:38)

Oh, and this area of the brook is all hard walls here, correct? This is not a bank.

Speaker 16 (01:52:38–01:53:06)

And I think Hugh Donnelly is on board with this. He can explain a little bit. But I think there was a, whoops, sorry about that, There was some re-work done on this section here, maybe a few years back by the town on the brick walls there. But it's pretty well treed over.

Let me just go back here.

Speaker 2 (01:53:06–01:53:08)

It's very close to vertical.

Speaker 16 (01:53:09–01:53:12)

Yeah. Vertical.

Speaker 2 (01:53:13–01:53:13)

Yeah.

Speaker 1 (01:53:14–01:53:19)

No, understood. And you're not doing any work there, correct?

Speaker 16 (01:53:19–01:53:32)

Absolutely. We're back from that, yeah. And as I say, the whole house is essentially within the 100-foot buffer, as it is right now.

Speaker 1 (01:53:35–01:54:16)

OK, understood. And I think you heard, we had a discussion with the last applicant, DCR, storage of equipment refueling and storage of equipment outside of our jurisdiction. So I'm not sure how long it's going to take. I know you said a backhoe, but it's a problem for, it may be a problem for the contractor, but the order conditions will specifically state that the hydraulic equipment, any mechanized equipment has to be stored overnight outside of our jurisdiction.

So just make sure that your contractor knows that.

Speaker 16 (01:54:17–01:54:25)

Outside of the jurisdiction of the, oh, okay, I'm not quite sure I understand. The jurisdiction of Milton?

Speaker 1 (01:54:25–01:54:26)

The Conservation Commission.

Speaker 16 (01:54:27–01:54:27)

Okay.

Speaker 1 (01:54:28–01:54:48)

So I don't know if they're going to try to use a staging area or something, but that's actually, I mean, that's our regular standard, and that's a 200-foot jurisdiction next to Brookside Park. It'll require some discussion with your contractor.

Speaker 16 (01:54:49–01:55:02)

In other words, to move the equipment off 200 feet away from another 100 feet down the street, is what you're saying? Yes, correct. During construction, even overnight, obviously not when they were doing the work.

Speaker 1 (01:55:02–01:55:07)

Yes, obviously when they're working, they need the equipment.

Speaker 16 (01:55:07–01:55:08)

Yes, they do.

Speaker 14 (01:55:08–01:55:08)

OK.

Speaker 16 (01:55:10–01:55:22)

And yeah, okay, that's well, certainly that'll be a discussion when they go for the permitting and they will, that will be passed along to the billing department from you in writing of sorts.

Speaker 1 (01:55:23–01:55:46)

Oh, it's part of the order of conditions. It's going to be recorded in the registry of deeds and it'll be up to you to make sure that the contractor actually has a copy of the The applicant, I didn't mean to put it on you, Henry, but the applicant is required to give that order of conditions with the special conditions to the contractor. Okay.

Speaker 2 (01:55:46–01:55:58)

And we'll have a pre-construction meeting, Henry. Okay. With the contractor. And he or she will have had to read the order of conditions because there's a quiz.

Speaker 16 (01:55:59–01:56:06)

Yes. No, he's a great guy and he'll be very, you know, Yeah. Sure.

Speaker 2 (01:56:07–01:56:07)

Yeah.

Speaker 16 (01:56:07–01:56:10)

Matt Henry's. Oh, fine.

Speaker 2 (01:56:10–01:56:10)

Yes.

Speaker 16 (01:56:12–01:56:16)

He's a great guy. He's done a lot of work in Milton. And yes.

Speaker 1 (01:56:18–01:56:39)

Yeah. Good news. I don't see any hands. How about the Butters, members of the public?

I can't see them because of the screen sharing, but up I see Hugh Donnelly.

Speaker 14 (01:56:40–01:56:56)

This is Kristen Donnelly, actually, the homeowner. Henry, maybe you've got it, but I'm just trying to understand what it means to store the equipment outside of the jurisdiction. Is there a defined?

Speaker 1 (01:56:57–01:56:58)

Jurisdiction, yes.

Speaker 14 (01:56:59–01:56:59)

Yeah.

Speaker 1 (01:57:00–01:57:16)

There is. That's a perennial stream, so the jurisdiction is 200 feet. If it were an intermittent stream, it would be 100 feet. So you just have to park it out.

Not you, but the contractor would have to park it 200 feet away from the brook.

Speaker 11 (01:57:17–01:57:18)

The red line.

Speaker 1 (01:57:19–01:57:20)

That's all the night.

Speaker 14 (01:57:21–01:57:21)

Right, right.

Speaker 16 (01:57:22–01:57:35)

This is 100 feet here, Kristen. Exactly. You have to go further up the street and conversation with the neighbors or with the contractor. And Steve says we'll have a pre-construction meeting.

Speaker 2 (01:57:35–01:57:37)

Pre-construction meeting. Yes. OK.

Speaker 16 (01:57:38–01:57:47)

We can review all that with Matt and make sure that, you know, it may be that they can do it all in a day and be done and then there won't be an overnight. So.

Speaker 14 (01:57:50–01:57:55)

Got it. Thank you. I just wanted to make sure I understood that.

Speaker 1 (01:57:55–01:58:16)

It shouldn't be a problem. The only time it becomes a problem is if the contractor ignores us. Usually the homeowners apply and say, OK. But that's why that pre-construction meeting with Steve is important, just so that they know that it is a condition of the permit.

But it's workable. It's not going to be an obstacle for you, or it shouldn't be anyway.

Speaker 14 (01:58:16–01:58:32)

Okay. And does that need to happen at a certain cadence in advance of construction starting? Or like, can it happen on the site the day construction starts? Or like, does it have to happen three weeks before?

Speaker 2 (01:58:33–01:58:52)

That's a fair question. I'd like to see this. I'd like to see the site once the erosion controls are in. We check the erosion controls and then review the orders at the same time.

Okay, so that's that's when you just give me a call. How's that? Or an email?

Speaker 14 (01:58:53–01:58:54)

Sounds so simple.

Speaker 2 (01:58:55–01:58:59)

I try to make it as simple as possible for everyone involved.

Speaker 1 (01:58:59–01:59:23)

That's the erosion controls will go in very close in time to when they break ground. A day or so. So it is close to the to the beginning of the construction. You just have to be sure that happens before you begin the construction.

but after the erosion controls are put in place. That's easy. I mean, they can put the erosion controls in a few hours.

Speaker 16 (01:59:25–01:59:36)

Yeah. John, I think Bill scheduled this Saturday walk of the site. Is that right? That's all been scheduled or is that necessary?

Speaker 1 (01:59:37–02:00:05)

I it isn't for me, we don't I don't think we need a site walk, because this is top of bank that we get the site walks usually come about. If we're looking at where the wetlands have been delineated. And we like to verify the wetlands. But this is that's why I asked.

It's a hard bank there. It's a wall that we've been many times. So you take a measuring tape from the top of the wall, and it's easy. So we don't need to verify that.

Speaker 16 (02:00:05–02:00:07)

Great. So no site visit this week.

Speaker 1 (02:00:09–02:00:19)

No. And by the way, that, that, so that everybody understands that site visit is, uh, what is it? June 2nd. May 31st.

Speaker 2 (02:00:20–02:00:21)

Yes.

Speaker 1 (02:00:21–02:00:39)

I just wrote it down, but it's, it's not, we talked about this Saturday, but it's not going to be this Saturday. It's going to be Saturday, May 31st. Okay. I should ask the commission.

Does anybody feel that a site walk is warranted? Again, I can't see everybody, but speak up if you do.

Speaker 3 (02:00:41–02:00:47)

I think what you said earlier, John, is apropos to this site. We've been down there in the past. I know the vicinity pretty well.

Speaker 1 (02:00:50–02:00:55)

OK. So the answer to your question, Henry, is no, we don't need to see it. Great.

Speaker 16 (02:00:56–02:00:56)

Super.

Speaker 1 (02:00:58–02:00:59)

All right.

Speaker 16 (02:01:00–02:01:09)

So this is a I'm sorry. Oh, we just we'll have we'll coordinate with Steve on that visit once the once the SOC is in place. Sure. Yes.

Speaker 1 (02:01:11–02:01:27)

Yeah. Great. I asked before when Kristen spoke up, if there are any butters or members of the public that wish to be heard, ask a question, make a comment. And I can't see all the people, so I can't see hands, but I don't hear anything.

Steve, can you see people?

Speaker 2 (02:01:28–02:01:35)

I cannot see any other folks, no. Okay, I see Arthur, you, Philip, and Henry.

Speaker 1 (02:01:36–02:02:15)

All right. Henry, could you take your screen down just so we can see if there are members of the public? There we go. Perfect.

All right. I don't see any hands. I don't see any hands. Okay, that's great.

So that I think we're in a position, we've got a notice of an, I mean, a DEP number. Correct? I'm looking at it here. So I think we're ready for a vote.

Is there a motion to issue an order of conditions? Uh, with the special conditions that we've announced the erosion controls and the no storage overnight, no refueling, et cetera. Is there such a motion?

Speaker 3 (02:02:18–02:02:19)

I'll make that motion chairman.

Speaker 1 (02:02:20–02:02:43)

Okay. You made the motion. All right. Is there a second?

All right. After the second, is there any discussion among the commission members? Seeing and hearing none, we'll go through a voice vote. Arthur Doyle, how do you vote?

Yes. Wendy Garpo, how do you vote? You're on mute.

Speaker 6 (02:02:47–02:02:49)

Yes. I'm having some trouble with my computer.

Speaker 1 (02:02:49–02:02:57)

My apologies. No, thanks, Wendy. Hans, how do you vote? Yes.

Tom, how do you vote?

Speaker 13 (02:02:57–02:02:57)

Yes.

Speaker 1 (02:02:59–02:03:00)

Charlie, how do you vote?

Speaker 13 (02:03:00–02:03:01)

Yes.

Speaker 1 (02:03:03–02:03:34)

And I, John Kiernan, vote yes as well. That's unanimous, so you have your order of conditions. And just stay in touch with Steve for that pre-construction meeting. Definitely.

All right. Henry, thank you very much. Kristen, thank you very much for your patience. Thank you.

Thank you. Have a great night. You too. OK, next on the agenda is a certificate of compliance, Boston Gas Company.

Molly, is that you?

Speaker 17 (02:03:36–02:05:21)

Yes. Hi. Good evening, everyone. My name is Molly Lennon.

I'm with TRC. I believe I'm joined tonight by Erin Worski-Cahill from Boston Gas Company. So we submitted a request for a certificate of compliance for the Milton TIG Station culvert replacement project. This involved the replacement of three culverts under the access road leading to the Milton Take Station.

These culverts hydrologically connect wetlands on either side of the access road. Prior to work, we installed erosion controls, which included straw waddle around the perimeter of work, and we put steel plates in the road over the culverts to allow for vehicle access. The work took about a month and a half, which is a little longer than we participated, but that was due to higher levels of precipitation at the time, so groundwater levels were high. Once construction was completed, all disturbed soils were stabilized with straw and a native seed mix was placed on top, so vegetation reached greater than 75% coverage.

later that growing season. So yeah, all work was completed in compliance with the order of conditions that we received for the work. And there are no deviations from the original plan as belts were included in the request for certificate of compliance. Happy to answer any questions y'all might have.

Speaker 1 (02:05:21–02:05:40)

I do have a couple, because I understand that this is, in the original order of conditions, the commission was to receive construction reports, regular construction reports, and I don't think we received them. Am I correct?

Speaker 17 (02:05:42–02:05:47)

I just, I sent this over earlier today to Philip and Steve.

Speaker 1 (02:05:49–02:05:55)

Right, but the construction reports were to be given to us during construction, correct?

Speaker 13 (02:05:59–02:06:09)

Yeah. I think so.

Speaker 17 (02:06:09–02:06:11)

It's not sent over. Okay.

Speaker 1 (02:06:13–02:06:38)

And I am looking at the P.E. from Steven. Read. Did I already say that the substantial compliance letter has to come from a.

P, and I think that's Steven M. Is it read or reader read? I guess it is. Am I correct?

Speaker 17 (02:06:41–02:06:43)

For the, the Asbelt plan?

Speaker 1 (02:06:43–02:07:47)

Yes. Well, for the compliance, we require the engineer to attest to the, and I know you did. I didn't mean to go right by that. I know you attested to the completed and substantial compliance from the environmental perspective, which we appreciate, but we rely on the engineer stamp, which I see that we've received here.

It says April 23rd. 2025. But Steve, I have not seen the construction report. I would actually like to see it.

And that's not just, I'm not trying to put form over substance, but these were pretty important to us. And that drainage is a pretty special area for us because it shoots down from the at a golf course and crosses the road or goes on the road. And Tom, have you been to the site?

Speaker 5 (02:07:48–02:07:54)

I know that's- I haven't lately, although I did see the pictures in the report.

Speaker 1 (02:07:57–02:08:04)

Yeah, I'm looking at the pictures there. They actually look pretty good. But Steve, have you done an inspection?

Speaker 2 (02:08:04–02:08:19)

I've been to the site about a month and a half ago. Yes. Yes, but I don't see anything on my email. I'm looking at my email.

Go ahead.

Speaker 17 (02:08:20–02:08:24)

Sorry, I sent it at like 430 I think.

Speaker 2 (02:08:26–02:08:43)

No, I don't have anything from you. I spoke to Erin earlier today about that. She said she would send it. And I don't have anything from either of you.

Philip, do you have anything?

Speaker 11 (02:08:45–02:08:46)

I don't have anything either.

Speaker 2 (02:08:47–02:08:50)

Okay. Well, I'll look forward to it.

Speaker 17 (02:08:51–02:08:54)

Okay, sorry. I sent it at 4.50 today.

Speaker 2 (02:08:54–02:08:58)

Oh, you might have sent it to my old email.

Speaker 17 (02:08:59–02:09:06)

Oh, okay. I think that's the case. S-I-V-E-A-S at townofmilton.org.

Speaker 2 (02:09:07–02:09:21)

No, I don't have that in the email. That's not my email. My email is steveibus at gmail. I'm sorry, but they've never deigned to give me an email address in the town.

Speaker 17 (02:09:22–02:09:26)

Okay. And I will send that right over.

Speaker 2 (02:09:26–02:09:36)

I know. Thanks. I'm not complaining. I have enough.

Oh, I'm not sure I'd want one.

Speaker 11 (02:09:37–02:09:42)

Oh, I guess. Well, I didn't receive it either. Philip Driscoll.

Speaker 17 (02:09:44–02:09:46)

Okay, is yours Pete Driscoll at Mountain Mountain.org?

Speaker 11 (02:09:47–02:09:48)

That's me. Yes.

Speaker 17 (02:09:49–02:09:52)

Okay. I'll forward it again.

Speaker 2 (02:09:52–02:09:54)

Sure. Thank you very much, Molly.

Speaker 17 (02:09:54–02:09:55)

Yeah.

Speaker 1 (02:09:56–02:10:35)

So I'm just looking at the order of conditions here and the special conditions. It's a provide 43, provide construction inspection reports, 44 project reporting on a bi-weekly basis, a pre-construction meeting With representatives. I assume that took place, Steve. Project will be done.

Okay, so we just, my understanding is we didn't get any reports.

Speaker 2 (02:10:35–02:10:36)

That's correct.

Speaker 1 (02:10:36–02:11:34)

I'd certainly like to. Look at them and I don't mean to slow you down at all. But I prefer to take a look at them. Because they, you know, it was a special condition, but I also don't mean to slow you down so we could actually put it on the agenda for.

The 31st of May. Yeah. You don't, you don't have to be there. I just like to have our file complete because we don't, we don't have the reports.

Um, so I don't, I don't see an obstacle or a problem, but I'm just, maybe I am a form of a substance guy. I claim not to be, but I really would like to receive the reports for our file. Um, now any, any questions from commission members? I mean, the pictures look good.

And Steve, you said the site appeared to be appropriate?

Speaker 2 (02:11:35–02:11:36)

Yes, absolutely.

Speaker 1 (02:11:37–02:12:13)

Okay. So why don't we, if you can just, you know, redouble your efforts to get the email connection, we'll get the report. And Philip, if you could just send out those reports to, I don't think there'll be bulky. Send those out to the commission members and then we can put them on the agenda for May 31st.

And I don't think it's, if we had a problem, Steve will call you, but you don't have to show up on the 31st. It's a public meeting, so we can take a vote at that time. Any other suggestions or comments?

Speaker 2 (02:12:15–02:12:22)

No, Erin said that she could bulk them with digital copies. So that's a wonderful way to go.

Speaker 1 (02:12:25–02:12:39)

Yeah, that would allow us to complete our file. Sure. Any thoughts, questions, comments? All right.

So do we have your assent to continue this until the 31st of May?

Speaker 2 (02:12:43–02:12:44)

Molly, that's a question to you.

Speaker 18 (02:12:45–02:12:50)

Yes. Yeah, that's fine.

Speaker 1 (02:12:50–02:13:04)

Okay. All right. Thank you very much. And we'll contact you.

As I said, you don't have to be there. So I don't expect any issues or problems, but we'll either Philip or Steve will call you after that public meeting.

Speaker 2 (02:13:06–02:13:06)

Okay.

Speaker 1 (02:13:06–02:13:10)

All right. Thank you very much. Grateful.

Speaker 2 (02:13:10–02:13:11)

Thank you so much.

Speaker 14 (02:13:11–02:13:12)

Yeah.

Speaker 1 (02:13:13–02:13:24)

Next on the agenda is notice of attendance at 405 Blue Hill Avenue. Hi, who's presenting?

Speaker 2 (02:13:24–02:13:28)

I bet you're going to see Debbie Anderson right now. Hi, Debbie.

Speaker 19 (02:13:28–02:13:29)

Hi, how are you?

Speaker 2 (02:13:30–02:13:31)

Very well, yourself?

Speaker 19 (02:13:31–02:15:45)

Good, thank you. So I'm Debbie Anderson. I'm here representing the owners of 405 Blue Hill Avenue. One of the owners is here.

We do have any questions. So I don't know if you're familiar with this site. It's basically a single family house that was in the process of being reconstructed and the owners had a building permit and then were told that they needed a wetlands permit as well. So I was hired to go out and delineate the the bordering vegetated wetlands that border on an intermittent stream along the back of the property.

The site is a 20,500 square foot parcel on the westerly side of Blue Hill Avenue, and it's developed with a single family house about 1,200 square feet in size, constructed in 1950. Prior to them starting the work, as they had started some of the demolition of the existing structure, there was an existing one car garage detached, and it was a single level home. So as far as what they did demolish, they did go down to the foundation and part of the structure. I can share some photos and such in a bit.

and they had taken down the existing garage. I went out and I delineated, as I mentioned, the border and vegetated wetlands along the intermittent stream at the rear of the property. Then there was pretty much a stop work until the property was delineated and we did file the notice of intent that we're reviewing tonight. Um, do you want me to share the plan at this point?

Speaker 1 (02:15:46–02:15:47)

Oh, that'd be great. Thank you.

Speaker 19 (02:15:48–02:15:59)

Okay. Can you see the plan?

Speaker 1 (02:16:01–02:16:02)

Yes. Yes, we can.

Speaker 19 (02:16:02–02:16:04)

Okay. Do you want me to zoom in a little?

Speaker 1 (02:16:05–02:16:07)

Yeah, that'd be helpful.

Speaker 18 (02:16:08–02:16:14)

Let's see. Where is my zoom? Oops, that's interesting.

Speaker 19 (02:16:15–02:16:20)

We don't want to look at that, even though it is adorable. Let's see.

Speaker 2 (02:16:22–02:16:22)

Try again.

Speaker 19 (02:16:23–02:16:34)

I'll try again. And now my plan has disappeared. It is late in the day, so just give me one sec to put that back up.

Speaker 1 (02:16:35–02:16:38)

No, we are used to computer glitches.

Speaker 18 (02:16:38–02:17:08)

Yes. Okay, that is an older plan. This is the… Okay, well, this is the plan that I have.

Speaker 19 (02:17:09–02:19:41)

Okay. This will do. We don't have a DEP file number just to get that out of the way. So this is the existing structure.

As I mentioned, part of it has been demolished down to the foundation. And there was previously in this area and a detached one car garage. So the garage was removed prior to the stop work and the the building is basically down to the foundation closer to the 25-foot buffer zone. As you can see, the wetlands go along the rear portion of the property, follow along the intermittent stream, and come up to right about here on that side of the parcel.

The 25-foot buffer zone does come out to this area. Part of the existing foundation is located in that area. They were not proposing any additional ground disturbance or any work within the 25-foot buffer zone. This proposed porch and second floor balcony is no longer part of the application, so no work would be taking place in that area.

The work that is proposed is to construct a new two-story garage and a mudroom breezeway connecting that to the existing house. Let's see. To infiltrate the roof runoff from the additional impervious area, The groundwater is very high on this property, so a traditional Qualtech system wouldn't work. Our engineer is proposing this rain garden in this area, and there's more detail on the other part of this plan as far as plantings and seed mix and that type of information.

Would you like me to share some pictures? Would you find that helpful?

Speaker 1 (02:19:42–02:20:04)

Yes, but just before we move on. Sure. I know I would like to see the wetland line. And I suggest that we should take a sidewalk on this on the 31st.

But I'm concerned that if we're asked to approve a plan, that it's got something on the plan that's not part of the proposal. That needs to be.

Speaker 19 (02:20:04–02:20:21)

So that is on the other plan that I was trying to pull up. which it was revised by the engineer to remove that. So there is a note on there to remove that from construction, and that's the plan that was submitted to you. My apologies.

Speaker 13 (02:20:21–02:20:23)

All right, thank you, thanks.

Speaker 19 (02:20:23–02:20:34)

Sure. In addition, I think that I had checked off on the WPA form that this was a perennial stream, which it is not, it is intermittent.

Speaker 2 (02:20:35–02:20:39)

All right, good, I caught that today, Debbie, just FYI.

Speaker 19 (02:20:39–02:20:48)

Oh, thank you. Appreciate it. Sometimes you used old forms that have things checked off that you don't want to be checked off.

Speaker 2 (02:20:49–02:20:49)

That's right.

Speaker 19 (02:20:50–02:21:03)

Yep. So this was the filing. I'll go down to the end where the pictures are so you can get a better idea of where they are in the process.

Speaker 18 (02:21:13–02:21:14)

OK.

Speaker 2 (02:21:15–02:21:20)

Yeah, this is an interesting wetland, because it's a sloped wetland. It comes down the hill.

Speaker 19 (02:21:21–02:22:28)

Right. Yeah, I know. I was talking with the engineer, and he was talking about how it slopes towards the road as opposed to towards the wetland, which is unique. So when the project was stopped, this is the front of the house.

And this is along the left side of the house. So they were just bringing it down to the foundation in this area. This is the back of the house. And so it still has the foundation.

They had started constructing on top of that when the park was stopped. That's kind of a closer up look. So that's the portion of the house that's closest to the wetland, the 25-foot buffer. This picture is also down the left hand of the house.

This is the rear of the property. So the intermittent stream channel runs along the back. There is a lot of woody debris in it.

Speaker 13 (02:22:30–02:22:35)

And that's a good thing.

Speaker 19 (02:22:35–02:23:00)

Well, yes, to some degree. So this is looking from the wetland behind was behind me and that's the rear of the house currently. This is the driveway, so the garage had been demoed previously. And that's just the stream channel.

Speaker 5 (02:23:02–02:23:04)

Do you know where the well end discharges to?

Speaker 2 (02:23:08–02:23:11)

That's the $64,000 question.

Speaker 19 (02:23:11–02:23:12)

Yeah, right.

Speaker 5 (02:23:14–02:23:16)

Does it have a low end? Where's the low end?

Speaker 2 (02:23:17–02:23:31)

The low end is a point down gradient. So it goes into the ground. It basically goes into the ground. Not into a pipe or something?

I did not see one. Did you see one?

Speaker 19 (02:23:31–02:23:41)

No, I did not see one either. No. And none of the GIS maps picked up on that either.

Speaker 5 (02:23:41–02:23:48)

Right. It's odd that you have a stream channel that doesn't, it just ends.

Speaker 2 (02:23:51–02:24:01)

True. The wetland is not a stream channel. The wetland is a BVW. The stream channel goes off to the eastern, I'm sorry, northern side of the property.

Speaker 5 (02:24:04–02:24:08)

So it flows away from Blue Hill Ave.

Speaker 2 (02:24:09–02:24:11)

It parallels blue to that.

Speaker 19 (02:24:12–02:24:24)

Yeah, so if this is the property, so the wetland, you know, came up towards the street and along the rear of the property is where the stream channel is.

Speaker 5 (02:24:25–02:24:27)

So it flows northwest?

Speaker 2 (02:24:28–02:24:28)

Yes.

Speaker 5 (02:24:29–02:24:31)

Got it. Right.

Speaker 2 (02:24:33–02:24:37)

Okay. And there's a larger wetland up gradient off property, off site.

Speaker 5 (02:24:38–02:24:43)

Yeah, it really is pretty big. It's like the size of three house lots or something.

Speaker 2 (02:24:43–02:24:53)

Yes, exactly. Yeah, I was surprised to see it up there. But you know, that's what the glaciers did. Right.

Speaker 5 (02:24:54–02:24:56)

Doesn't perk at all, no doubt.

Speaker 19 (02:24:57–02:25:03)

No, no, no. Had a very high groundwater.

Speaker 13 (02:25:06–02:25:06)

Yeah.

Speaker 1 (02:25:08–02:25:12)

So how does the stream appear on the USGS?

Speaker 2 (02:25:15–02:25:20)

Oh, that's a good question. I didn't take a look at USGS.

Speaker 19 (02:25:20–02:25:26)

Oh, I do have USGS. And it didn't. Yeah, it doesn't show up.

Speaker 2 (02:25:27–02:25:29)

Yeah, I'm not surprised.

Speaker 19 (02:25:29–02:25:32)

Yeah.

Speaker 2 (02:25:32–02:25:33)

It's really small.

Speaker 19 (02:25:35–02:25:35)

It is.

Speaker 1 (02:25:38–02:25:50)

Yeah. So, you know, I was just curious when you said there was a mistake when it was checked off as perennial, was that just like a blocking copy from another form or did- Exactly.

Speaker 19 (02:25:52–02:26:03)

No, I knew it. I always look at the GIS and USGS maps before I go out to a site so I know what I'm looking for. So that was just left over.

Speaker 2 (02:26:05–02:26:06)

Yeah, that's good wetland science.

Speaker 19 (02:26:07–02:26:10)

Got to know what you're looking for.

Speaker 2 (02:26:10–02:26:18)

That's right. What have other people seen on site so you can find those items?

Speaker 1 (02:26:21–02:26:33)

All right. I have a question. I think I verified the lines. We should put this on the site walk agenda for the 31st.

I'd certainly like to take a look at it.

Speaker 5 (02:26:34–02:26:37)

12 wetlands lacks.

Speaker 1 (02:26:38–02:26:38)

Yes.

Speaker 19 (02:26:42–02:26:49)

Do you want me to go with you on the sidewalk for you.

Speaker 1 (02:26:53–02:27:38)

My preference would be to have you there, but I don't want to drive up the, to be blunt, I don't want to drive up the cost for the homeowner because I'm assuming that, nor am I trying to take work away from you, but you don't have to be there, but there could be some questions on relocating a flag or something. I don't know. We sometimes do that. Steve speaks highly of you, Debbie, so I wouldn't expect relocation to be an issue.

But we do our tradition for at least the last 33 years is to have the commission verify the flags. I see. So yeah, your choice, I guess. Or the applicant's choice.

Speaker 19 (02:27:38–02:27:48)

OK. I'll talk to them about it after. I know that they're anxious to get going on this because I think they've been stalled for two months at this point.

Speaker 2 (02:27:49–02:27:57)

Um, if you're there and we need a flag moved, it's a lot easier. Just to let, you know, yeah.

Speaker 19 (02:27:57–02:28:00)

What time I'm sorry was your site meeting planned for.

Speaker 1 (02:28:01–02:28:24)

Well, we started at 830. But that's at 30 Curtis road. I we've, we've actually done that site before. So I don't think we're going to be there very long.

That's really just the tree survey issue. And I would, I would think that we'd be at four Oh five by nine o'clock.

Speaker 19 (02:28:25–02:28:29)

Okay. Oh, if I get there by like eight 45.

Speaker 20 (02:28:30–02:28:32)

Yeah, that'd be fine.

Speaker 1 (02:28:34–02:28:43)

All right. Any other questions from commissioners or members of the public about it or otherwise?

Speaker 19 (02:28:45–02:28:53)

I know the owners were wondering if there was any work that they could do during this interim period.

Speaker 1 (02:28:56–02:29:10)

I think the simple answer is no. I mean, you're already at a 25-foot And the picture showed some disturbance there. I know the demolition was there. So you're, they're operating without a permit.

Speaker 19 (02:29:10–02:29:28)

Well, there wasn't any, yeah, there wasn't any ground disturbance per se in the 25, but it just went down to the patient in that area. Um, you know, I'm sure they understand, but I did say that I would, I would ask.

Speaker 13 (02:29:28–02:29:29)

So, okay.

Speaker 2 (02:29:32–02:29:47)

And I just wanted to make another note that this wetland is above the upland here on this site. It's really interesting. We see this kind of thing in Marshfield as well, quite often actually.

Speaker 19 (02:29:47–02:29:48)

Oh really?

Speaker 2 (02:29:49–02:30:00)

Yep, near the North River. Where you'll be chasing a wetland line and then it'll disappear. And then it'll pop up 200 feet down gradient.

Speaker 14 (02:30:01–02:30:01)

Wow.

Speaker 19 (02:30:02–02:30:03)

That's challenging.

Speaker 2 (02:30:04–02:30:05)

Extremely.

Speaker 19 (02:30:05–02:30:12)

I'm glad I I stick to stick to this area, right?

Speaker 1 (02:30:12–02:30:25)

Alright then, so with the ascent of the. Applicant we will. And I suppose I should have made that a question, but I certainly think that in order to get the data that we need, we need to see it.

Speaker 19 (02:30:27–02:30:30)

Right, and we don't have a DP file number anyway, so.

Speaker 1 (02:30:31–02:30:46)

Okay, that makes it easy. No vote without a number. All right, so we'll continue this until May 31st at about nine o'clock on site. Is there enough room in the driveway for us to park there?

I don't know what the Blue Hill Ave looks like.

Speaker 19 (02:30:46–02:30:52)

Yeah, there's several spaces, so probably three or four cars.

Speaker 2 (02:30:53–02:30:58)

On the side of the Blue Hill Ave as well, on the west side of Blue Hill Ave.

Speaker 1 (02:30:59–02:31:01)

All right, good. All right, good. Thank you.

Speaker 19 (02:31:02–02:31:06)

So this will be continued to the June meeting?

Speaker 1 (02:31:07–02:31:10)

No, we can do it on the 31st. That's a public meeting.

Speaker 19 (02:31:11–02:31:11)

Oh, I see.

Speaker 1 (02:31:12–02:31:15)

And we can vote. It'll be Saturday, the 31st of May.

Speaker 19 (02:31:16–02:31:17)

Oh, OK. OK, great.

Speaker 1 (02:31:17–02:31:20)

You don't have to wait until the next regular meeting.

Speaker 19 (02:31:21–02:31:26)

That's great. OK. Thank you so much. We will see you then.

Speaker 1 (02:31:26–02:31:30)

Thank you, Debbie, very much. All right. Night. Good night.

Speaker 2 (02:31:30–02:31:31)

Good night.

Speaker 1 (02:31:32–02:32:22)

Uh, next, uh, number nine, we've already done. That was the first one. That was the extension of the order of conditions for an additional year. Number 10 is certificate of compliance, 17 woodlot drive.

Um, and I would ask, uh, Arthur Doyle to, uh, take over as, uh, Chair, I have to recuse myself. And for the public benefit, I have recused myself from day one. This is a development by Pulte Development. And my firm represents Pulte Development.

Not in this case, not in Milton, but in other issues. So I have and will continue to recuse myself from this. Can somebody give me a text when you're done? Arthur, would you take over, sir?

Speaker 3 (02:32:23–02:32:31)

Thank you, Mr. Chairman. Steve, could we follow on your background information with this particular?

Speaker 2 (02:32:32–02:33:23)

Sure. The situation here is that there is no order of conditions for this specific lot. There was an order for the entire development. but not for this lot.

There's nothing within 100 feet, no wetland resources within 100 feet of the lot. My suggestion is that the commission provide what I would call a partial certificate for this specific lot, excluding the rest of the development. That's the way the order was written for the entire development.

Speaker 3 (02:33:25–02:33:32)

That's because of the previous discussion that I recall. Matt, did you have a question?

Speaker 7 (02:33:32–02:33:35)

Did you say there's no wetlands within 100 feet of the lot?

Speaker 2 (02:33:36–02:34:01)

That's correct. There is a built retaining basin directly adjacent to the west side. That's not a jurisdictional wetland. That was something that was built for the development.

Speaker 7 (02:34:01–02:34:05)

There was something built for the development, but it's not on the lot.

Speaker 2 (02:34:06–02:34:11)

That's correct. It's adjacent to the lot. And it's basically a drainage structure.

Speaker 7 (02:34:13–02:34:34)

So that applied to that property before it was subdivided? The structure was not there until… No, I know that the property prior to subdivision was where the permit was applicable to. So when it was subdivided into the individual lots, that lot itself is non-jurisdictional.

Speaker 2 (02:34:36–02:34:36)

That's correct.

Speaker 7 (02:34:37–02:34:49)

So we shouldn't issue a permit or we shouldn't be able to issue a permit or a certificate of compliance for it. We don't have any say.

Speaker 2 (02:34:50–02:35:01)

Okay, if that's true, then what does the owner do about the bank or the proposed owners do about the bank issues?

Speaker 7 (02:35:05–02:35:07)

So there's a lien on the property?

Speaker 2 (02:35:08–02:35:11)

No, I believe somebody wants to purchase the property.

Speaker 7 (02:35:12–02:35:17)

And the bank is saying that there's a covenant on the property from an order of conditions?

Speaker 2 (02:35:18–02:35:25)

No, they are looking for a certificate of compliance.

Speaker 7 (02:35:25–02:35:26)

I've never heard of that before.

Speaker 2 (02:35:27–02:35:37)

Neither have I. And I haven't spoken to anybody at the bank directly. Do you suggest that I do that?

Speaker 7 (02:35:43–02:35:54)

Does that make sense to the rest of the commission? No, I mean, this should be, Charlie, tell me if I'm wrong here, but this should be their attorney being, knowing how to do their job.

Speaker 2 (02:35:57–02:35:57)

I agree.

Speaker 4 (02:36:00–02:36:09)

Yeah, well, without knowing all the facts, Hans, in what was included in their initial application, because there could be a reference to this.

Speaker 7 (02:36:10–02:36:10)

Yeah.

Speaker 4 (02:36:10–02:36:46)

And it could be just caught in the language of the original application. So when the bank goes to release it, or the owner asks the bank to release it, they want the final cert that's going to be filed with the Registry of Deeds. And if this lot isn't specified, if it was originally specified in the original documents, then they can't get it cleared. Does that make sense, the way I phrased that?

Yes.

Speaker 2 (02:36:46–02:36:48)

That's up to Pulte, right?

Speaker 4 (02:36:51–02:37:20)

Well, it depends how it was written by the Conservation Commission in the initial application. If the Conservation Commission included this lot in the initial application, that may not necessarily have been the entire fault of the developer. Because maybe it was never, should never have been considered part of a jurisdictional review.

Speaker 7 (02:37:21–02:37:41)

For this subdivision, it was similar to other subdivisions where the roadway, the stormwater management, those aspects were part of the application. And then the individual house lots where required would seek, I think, NOIs.

Speaker 2 (02:37:41–02:37:43)

in our eyes, that's correct. That's good.

Speaker 7 (02:37:46–02:37:47)

That's why I'm so confused.

Speaker 4 (02:37:48–02:38:01)

Yeah, and without seeing the original documents, Hans, it's tough to make an assessment. Maybe this is something that the attorneys are going to have to give us some guidance on.

Speaker 2 (02:38:06–02:38:07)

I'm okay with that.

Speaker 3 (02:38:07–02:38:17)

Yeah, I am too. This conversation before we can make a decision on this. Does that make sense to everybody?

Speaker 15 (02:38:19–02:38:19)

Yes.

Speaker 3 (02:38:21–02:38:35)

Hans, are you comfortable with that? Yeah. Wendy? Okay, we got your nod.

Tom? Yes. Okay, so we will continue this?

Speaker 2 (02:38:37–02:38:40)

Yes, let's continue until the 31st.

Speaker 3 (02:38:41–02:38:52)

Okay, and in the meantime, we will get additional information as discussed during the course of the meeting. All right, let's bring Mr. Cannon back.

Speaker 6 (02:38:52–02:39:00)

Thank you, Arthur.

Speaker 4 (02:39:03–02:39:08)

Does anybody know what that weird horn sound is? I was just about to ask that, Wendy.

Speaker 21 (02:39:09–02:39:11)

It sounds like an air alarm, like an air raid.

Speaker 5 (02:39:13–02:39:15)

It's probably my computer.

Speaker 3 (02:39:17–02:39:23)

Yep, I can. And it turns on its way.

Speaker 2 (02:39:23–02:39:32)

I think that's what it is, Wendy. I think it's Tom's computer. There it is.

Speaker 6 (02:39:33–02:39:36)

I thought it happened every time we mentioned John's name.

Speaker 1 (02:39:38–02:39:43)

What's that? Computer problems? The air raid siren.

Speaker 3 (02:39:44–02:40:01)

Mr. Chairman, just so that you know, we will be continuing this item to the meeting on the 31st of May awaiting additional information that would enable the commission to make a substantive decision.

Speaker 1 (02:40:02–02:41:05)

Great, that's good, thank you. Let me ask a question because the first inquiry for this house lot came to me and the issue was, is it a private lot or is it within the development? And essentially that, translated into, is it a separate order of conditions and a subsequent sale? So I got a call from the attorney saying, can we get a certificate of compliance?

But when I realized where it was, I passed it back to Steve and said, I can't participate. But when I first got the inquiry, my understanding was that there was a sale pending and I thought it was the 16th of May. Am I wrong?

Speaker 2 (02:41:06–02:41:07)

Sounds right to me, John.

Speaker 1 (02:41:09–02:41:24)

Okay. The only reason I say that, I don't even know if the applicant was there. I have no idea. But the 16th was in my mind, so I don't know if the 31st is going to help anybody.

Speaker 3 (02:41:24–02:41:27)

I don't know. I don't see anybody here.

Speaker 2 (02:41:29–02:41:30)

No, there was nobody here.

Speaker 1 (02:41:33–02:41:38)

Okay. All right. All right.

Speaker 3 (02:41:38–02:41:43)

So let's have enough information for a decision and there was nobody here to represent this.

Speaker 1 (02:41:45–02:42:04)

Yeah. I understood. Um, so that's 5 31. Um, All right, next is number 11, request for determination of applicability, 39 Hurlcroft Road.

Do we have an applicant? Yes, we do. Hi.

Speaker 21 (02:42:04–02:42:10)

Hi, my name is Caitlin Thomas. I am the homeowner of 39 Hurlcroft Road. Thanks for seeing me tonight.

Speaker 20 (02:42:11–02:42:12)

Thanks for your patience.

Speaker 21 (02:42:13–02:43:07)

Oh, hey, you know, I was looking for something to do. So I'm glad to be here. So we are looking to create usable space in our attic for the purpose of a playroom. This project does not include any modifications to our existing footprint.

Our home is approximately 50 feet from the fence that then marks off our backyard. The marsh in question is beyond that fence. Again, there are no modifications to the existing footprint. The biggest part of this project is going to be to put two dormers so that the height is up to code.

I have specs of the backyard as well as pictures of the plan, but I don't want to show you anything that isn't already in front of you there.

Speaker 1 (02:43:11–02:43:15)

So the big thing for us is that there's no change in their footprint.

Speaker 13 (02:43:16–02:43:17)

Accurate. Correct.

Speaker 1 (02:43:17–02:43:22)

But I don't know, is there, I mean, are you taking heavy equipment? Do you have some kind of a boom truck or get up high?

Speaker 21 (02:43:22–02:43:55)

No, no, we wouldn't require that. And if that were to happen, none of that would, you know, it would really be on our lawn as opposed to it would, we have about 50 feet of lawn in between the marsh, you know, so our, our land, you know, we have a pretty sizable backyard that would not nothing would be even close to the Martian question. Would you like to see an aerial shot of the lawn?

Speaker 1 (02:43:56–02:43:57)

That would be perfect.

Speaker 21 (02:43:58–02:44:45)

Sure. I'm going to share my screen. And I'm not going to make you look at my work that I promise I wasn't doing while we were on the screen. I had, I brought up this app called Measure My Lawn here.

This is our, this is the house. It's just under 50 feet to the fence. And beyond that fence is the marsh. So you could see that the footprint here would not be modified.

And we have a very large open gate area here that if any equipment would be required, it would come through that gate and would come right over here where my cursor is. Is this helpful for your determination or should I pull something else up?

Speaker 1 (02:44:47–02:45:47)

It is for mine, but quite helpful. All right, this is a request for determination of applicability. Correct. If we were to issue a negative determination, and I'm not getting it yet because you're going to get questions from other commission members, but typically what we would do is if we issued a negative determination, which means you don't have to file a notice of intent, but we'll attach special conditions.

One of the special conditions that we'd attach would be that your contractor has to agree not to store overnight. uh, their equipment or refuel their equipment, um, uh, in our jurisdiction. So that's really, uh, sometimes it's a contractor problem, but, you know, typically they know that if they, if they do the work in Milton, they understand it because we've been pretty consistent a long time.

Speaker 21 (02:45:48–02:46:11)

Contracting company. Sure. The contracting company that we're using is Finbeck construction and they've done 39 jobs. I did pull up that information.

in Milton very recently, so they, I'm sure, are very familiar with the specs in question, and I would be happy to reaffirm that as I'm committed to the cause as well.

Speaker 5 (02:46:13–02:46:34)

John, I just looked at the town's GIS, and it indicates that there's really no part of the lot that is not within 200 feet of Gulliver's Creek. Yes. The equipment would have to be on the street, which is more than 200 feet.

Speaker 2 (02:46:34–02:46:36)

Overnight. That is right.

Speaker 1 (02:46:36–02:47:21)

Yeah. I think I understood your time. You're saying that that Hurlcroft itself is more than 200 feet from the street. Yes.

Okay. So it's, uh, shouldn't be a problem. All right, they just can't store it in the backyard, you know, you know, close to like 50 feet from the marsh that that's where you can't store overnight. You can move it through there, but you can store it or build it there.

Don't really want it there anyway. Questions from commission members. I know where you're located, because I live down the street from you.

Speaker 21 (02:47:22–02:47:27)

You know, I thought you might. Do you have the big gated house? Do you have the house with the gate?

Speaker 13 (02:47:28–02:47:30)

Gate, yes. Yes, I do.

Speaker 21 (02:47:30–02:47:46)

My kids play there. You've probably seen them in your ring cam. There was a beautiful deer in your lawn, and my two kids were pressed up against the gate. I don't let them go any further, but they were in the bushes looking at the deer.

Speaker 13 (02:47:46–02:47:48)

Yep, that's us.

Speaker 1 (02:47:51–02:47:53)

So commission questions, members?

Speaker 2 (02:47:56–02:48:03)

John, I do have a question, but it's a funny question. Are those bald cypress trees behind you?

Speaker 21 (02:48:04–02:48:16)

They are, yeah. I work at National Geographic, and I changed my Zoom background to showcase the programs that I'm working on currently. So those are. Good eye.

Speaker 2 (02:48:18–02:48:19)

One of my favorite trees.

Speaker 21 (02:48:20–02:48:20)

It's a good one.

Speaker 6 (02:48:21–02:48:30)

Yeah. What's not any other questions from commission members. Wendy. No, I was just commenting on the Cypress trees.

Speaker 1 (02:48:31–02:49:11)

Oh, all right. I can't see any. I can see Chris Lyman, but any members of the public about is that have a question or comment. Hearing none and no questions from the commission, I would suggest that we issue a negative determination with the special conditions of no storage of mechanized equipment or hydraulic equipment overnight and no refueling within our jurisdiction.

But other than that, I don't think we need erosion controls on this. It's all interior, correct? I mean, I know some of the donors will be exterior. Anybody think that we should have an erosion control in the back?

No.

Speaker 2 (02:49:12–02:49:13)

No.

Speaker 1 (02:49:13–02:49:20)

Yeah, I'm shaking your head, Steve. I don't, but… I said I'm shaking it no. That's what I thought.

Speaker 2 (02:49:21–02:49:21)

Okay.

Speaker 1 (02:49:21–02:49:26)

All right. I agree. You said you agree, Arthur?

Speaker 3 (02:49:27–02:49:30)

That it's not needed. Okay.

Speaker 1 (02:49:30–02:49:40)

Okay, good. All right. So then that overnight storage would be the only special condition for you. Is there such a motion?

So moved. Thank you, Arthur. Is there a second?

Speaker 4 (02:49:42–02:49:43)

Yes, second.

Speaker 1 (02:49:44–02:49:56)

Thank you. Any discussion? Hearing none, we'll take a roll call vote. Arthur, how do you vote?

Yes. Wendy? Yes. Hans?

Yes. Tom? Yes. Charlie?

Speaker 4 (02:49:57–02:49:57)

Yes.

Speaker 1 (02:49:58–02:50:08)

And I, John Kiernan, vote yes as well. So you have a negative determination of applicability with that special condition about storage and refueling. And other than that, you're good to go.

Speaker 21 (02:50:09–02:50:17)

Why, thank you, neighbor. Um, do I wait for some sort of official documentation before we begin this work? How does that proceed?

Speaker 1 (02:50:18–02:50:28)

Uh, actually we might be faster than normal because we now have our resolution. Philip, do you know whether or not the electronic signature resolution has been filed in the registry of deeds?

Speaker 11 (02:50:29–02:50:34)

Um, I don't believe it has. I'll check. Um, I'll check with you.

Speaker 1 (02:50:36–02:51:07)

Okay, because we do need to get that science. So the answer to your question is what we all have to sign this negative determination. So sometimes it takes a few days. I mean, I could sign it tomorrow.

Okay. And it but we have to have enough signatures on there that show the Uh, the majority of the commission voted actually was unanimous. Um, but we're trying to speed that process up. So we just voted to go to electronic signatures, but we're not quite ready for that yet.

All right. But it'll be, we should be able to do it by Friday. Fair enough.

Speaker 21 (02:51:07–02:51:09)

Thank you all very much. I appreciate your time.

Speaker 1 (02:51:10–02:51:10)

All right. Thank you.

Speaker 21 (02:51:10–02:51:10)

Bye.

Speaker 1 (02:51:12–02:51:13)

Good night.

Speaker 21 (02:51:13–02:51:13)

Thank you.

Speaker 11 (02:51:13–02:51:18)

Good night. I won't be there tomorrow, but Thursday I'll be there to have things signed.

Speaker 1 (02:51:19–02:51:53)

Okay, great. Next is 12, Notice of Intent, Randolph Avenue, Route 28, Chickadobbit Road. And for the public's benefit, we were there at a site walk. What was the date then?

A week or so ago? And we did collect a lot of data there. We had an opportunity to see the Well, it was delineation, looked at some of the issues, vernal pool, etc. And the purpose of today's meeting is to gather additional information and ask additional questions.

And Chris, can you get us up to date?

Speaker 10 (02:51:56–02:53:02)

Yeah, yeah. So I know there's a tree question. We were on the site about, I think somebody asked how many trees are being removed on the site. There's 80 total trees being removed on the site with 64 of those being within DCR land and 10 being within MassDOT, state highway layout, and then four on private property.

And I know there's another question again about stockpiling, specifically in the parking lot to the Blue Hills Reservation there, which is closest to the Verna Pool. And as I said in the field also that DCRs vary against any stockpiling of any material on their own land themselves. So I don't see a problem with having an order of conditions that stated no stockpiling. And I know you guys have had Heard all night that you guys also don't prefer having equipment stored overnight within your jurisdiction, which I don't see being a problem either, with DCR not wanting anything stockpiled or stored on their property.

Speaker 1 (02:53:04–02:53:12)

Yeah, can you go back a step there to the 80 trees? You said 64 DCR, 10, what was it?

Speaker 10 (02:53:12–02:53:18)

10 MassDOT highway layout, within the state highway layout, and four on private properties.

Speaker 1 (02:53:19–02:53:29)

But are the four on private property, is that the land that was taken by eminent domain, or I assume that's how they got it, that corner house?

Speaker 10 (02:53:29–02:53:45)

I believe two of them are, and then two of them are directly across the street from that property. Okay. So technically, I guess they'd be mass duty property tradesmen. So it's a private parcel or a public parcel.

Got it.

Speaker 1 (02:53:49–02:53:53)

Okay, so trees stockpiling and what did you say there was a third?

Speaker 10 (02:53:55–02:54:13)

I believe those are only two questions. I believe if I remember correctly brought up from our site visit, I believe everybody was fine with the wetland flagging. From what I remember, there wasn't any issues with the wetland flagging. I believe the big issue is just the trees question and really the stockpiling close to the vernal pool.

Speaker 1 (02:54:17–02:54:45)

Okay. So on the loss of tree side of it, we do have a performance standard for the town where we require a replacement, not necessarily on site, but at some place. That's a lot of trees with a lot of measured circumference. And then you can either plant the trees or give us the money.

The money is figured at $500 per tree.

Speaker 10 (02:54:46–02:54:50)

Is that a local bylaw? for a question?

Speaker 1 (02:54:50–02:54:54)

Yes, it is. And I know you're the state, so does that you get exempted from the local?

Speaker 10 (02:54:54–02:54:58)

Yeah, MassDOT is exempt from all local bylaws.

Speaker 1 (02:54:59–02:55:43)

It's actually a performance standard that we apply to, well, under both. Because it's always been a condition of the wetlands protection Act, we've never actually litigated that very issue. But we've always said, if you want a permit, that's a condition of the permit. And without distinguishing, I know some people do distinguish, say it's a bylaw issue.

But we've actually never had a cage fight over that issue, whether or not it's one or both or either.

Speaker 10 (02:55:44–02:56:18)

Yeah, I just, I know that the trees being held through the MEPA process, because this isn't within, it's obviously a different permit, but it is an environmental justice area. So we have to file an EIR for this, because they are public shade trees since they're on DCR land. And I know mitigation with that is being worked through that process. I know there is some landscaping trees being added.

I don't know, again, if it's, going to fill the whole 80 that's being removed, 64 of those being public, considered public shade trees that are on DCR land.

Speaker 1 (02:56:20–02:56:55)

Well, let me talk to Peter Mello on that, because I've had the discussion, not an argument, but we've had the discussion before as to whether or not we could imply that as a condition for a wetland permit under the state regs, just as within our discretion. And I've always considered it as such, it's just our own performance standard as opposed to under the bylaw, the town bylaw. But let me check with Peter. But so others, I mean, NEPA is concerned with that as well.

That is public shade trees. Let me.

Speaker 7 (02:56:55–02:57:01)

What's the anticipated mitigation for the public shade tree removal under NEPA?

Speaker 10 (02:57:03–02:57:40)

I know it is adding budget and tree plantings. My company is not publicly or personally involved in the MEPA process. It's through Epsilon, another sub-consultant. So I know they're working on that, but I know just from our landscaping plans we received, it's not fully measuring it, but I also know the product is in the benefit of the public itself, adding both access and safety.

So I know it's a pretty, I would say it's a process that's kind of moving through where that seems to benefit towards the towards the community itself in an EJ community.

Speaker 5 (02:57:45–02:57:46)

Understood.

Speaker 1 (02:57:49–02:58:38)

I'm at a loss because I've always in my head anyway said it's under both. that is the performance standard that we've applied traditionally in custom and practice for many decades without distinguishing whether that discretionary condition is under the state or under the municipal bylaw. But I'll defer to Peter Mello on that issue. That's our town council, Chris.

But in terms of moving this along, are there any other issues other than that in terms of issuing an order of conditions. We've seen it, we've talked about it. Any concerns, Steve? We've addressed the stockpiling, the vernal pool.

Speaker 2 (02:58:40–02:58:57)

No, I think we should have a nice site meeting for a pre-construction, of course, Typical, you know, with the quiz, of course.

Speaker 1 (02:58:58–02:59:05)

In regular reports like we got from… Exactly, in regular reporting.

Speaker 5 (02:59:08–02:59:18)

Could I just mention something Chris may not be aware of, namely when we count trees to be replaced, we only count the ones that are in our jurisdiction, correct?

Speaker 1 (02:59:19–02:59:20)

Oh, yes.

Speaker 5 (02:59:21–02:59:34)

Yes. Yeah. So the 80 trees you named, only the ones that are within a hundred feet of wetland would be ones that we would normally require to be replaced.

Speaker 10 (02:59:34–02:59:48)

So you guys don't, you guys don't include endangered species habitat as you're just, just the question, if not, cause we're also with, I know most of the sites then endangered species habitat also. That's a good question.

Speaker 2 (02:59:49–02:59:50)

Yeah, very good question.

Speaker 1 (02:59:53–03:00:15)

Yeah, no, I mean, I know in my head, I haven't, I've always looked for the wetlands delineation for jurisdictional purposes. Yeah, right. That's a fair question. But having said that, do you know, from among the 84, how many would fit within our sort of what I'll call the traditional jurisdiction of 100 feet from the wetlands?

And that

Speaker 10 (03:00:16–03:00:46)

I do not. I'm trying to get to the plans right now, because we do have them delineated there. They say what is being taken down and what is not. I couldn't get you a full number.

But I'd say there's probably at least, if I'm saying just from eyeballing from the plans, I'd say there's probably at least half of those trees would be part of within that 100 foot buffer of BBW.

Speaker 1 (03:00:49–03:01:15)

All right. Well, I think we've got, if that's the only issue we could delay, and our purpose is not to delay. I mean, that's, we tried to move things along quickly, but we couldn't delay this until May, at which time I can get a way in from Peter Mello, town council on this issue. And, um, I don't know.

Speaker 14 (03:01:15–03:01:16)

Secondly, we could.

Speaker 1 (03:01:16–03:01:29)

If you can give us an exact count on how many fall with it. I know you said about 50%, but is there any way you can do that without, I'm not suggesting you send out a team and. You know, You know, take a picture of every tree.

Speaker 10 (03:01:29–03:01:58)

But can you, is that something you could put onto a plan? I guess from that plan, I guess I could count them, but they are on, if you go, I don't know if you guys have the plans necessarily in front of you, but each tree that's being removed is called out as being removed on the NOI plans that we gave.

Speaker 1 (03:02:00–03:03:17)

All right. Well, we don't have to slow it down for that because we could make a condition to follow our tree replacement plan, then we can consult with Peter Mello when he says we can't do it, then I guess it's void. But if we can't do it, it's already in place. So we could issue a condition, at least for voting purposes, to approve the order of conditions with the special condition that our regular tree replacement plan be complied with.

And then if Peter tells us later on we can't do it because it's just under the wetlands town bylaw, then so be it. I'm not suggesting that we vote for something that's illegal, but I think that would be the most expeditious way of doing it. So that would be my suggestion, that we do it one of two ways, that we vote today to do it in accordance with our regular custom and practice. that each of the trees within the jurisdictional land.

So it would be half of the 84, but they replaced by the sum of the tree circumferences replaced.

Speaker 10 (03:03:18–03:04:00)

I would also like to point out that the project can be viewed as a limited project. It is eligibly limited as reviewed as a limited project also. under 310 CMR 10.53 section 3 subsection F because it's a maintenance and improvement of existing public roadways but not limited to widening less than a single lane and adding shoulders and correcting substandard intersection and improving inadequate drainage systems. We do meet all the performance standards of the Wildlife Protection Act but Under that also, it can be viewed as a limited project.

Speaker 1 (03:04:03–03:04:45)

All right. So unless there are other issues that people haven't brought up, I would suggest that we take the vote and sort of extend our jurisdiction as if we had the authority to do it, to order it, if it complies with both state and municipal law. And that'll give us an out to get to Peter Mello, and he can give us an opinion. And if we can't do it, we can't do it.

So it's almost like a conditional vote. Because I'd like to be able to protect the shade trees as much as possible. Sounds like MEPA is doing the same thing. So we might end up at the same place.

Speaker 10 (03:04:46–03:05:07)

Yeah, and DCR. I mean, it's been a six year process of bringing all the agencies together. I mean, we're trying our best to not obviously disturb. This is a very environmental sensitive area, but obviously.

So we've tried our best to not impact it to the maximum extent practical. Sometimes it's just how the intersection line out kind of the area that's in.

Speaker 1 (03:05:09–03:06:29)

All right. All right. So I think that gives us an option that we could, we can vote tonight and say that, um, one of the special conditions to the extent that it complies with both state and municipal law, uh, would require the, you know, the replacement under our performance standard, which is the, the sum of the circumference at breast height of all the trees removed to be replaced. And the financial equivalent of that would be at $500 per three and a half inch caliper tree planted.

And that would be a special condition that I would suggest But the language that's sort of a caveat there is to the extent that it is in compliance with state and municipal law. And I understand the state may preempt or trump the municipal law. I shouldn't use trump. I should say preempt.

It's better. That would be my suggestion that we do it that way. Then we can confer, but so that it's in place. If we can do it, if we can't do it, then it's so States to the extent that it's in compliance with state law.

Speaker 10 (03:06:29–03:06:36)

I'm completely fine with that. Again, I think in the same interest of just trying to make sure the project doesn't get delayed and keeps moving forward. Like you said, I'm fine with that.

Speaker 1 (03:06:39–03:06:46)

Okay. Anybody have any other suggestions for that? Go ahead.

Speaker 2 (03:06:46–03:07:17)

This is Steve Ibis. Just thinking about access into the work site, and how have you thought about access in and access out? And under bad weather conditions, washing trucks, et cetera, et cetera, do you have a spec on that? in the documents?

Speaker 10 (03:07:17–03:07:55)

I don't know if we have a specific spec. You're talking about like, I mean, MassDOT has standard specs about, you know, not putting debris in the active roadway, especially when it comes from tires. I know there's definitely standard specs for that that are included in all bid contracts that MassDOT has. It's in their boilerplate language.

So those will definitely be included, which includes, like you said, not tracking mud or dirt into and out of sites and active roadways. So it obviously goes into drainage systems or anything like that. So I know they definitely have standards boilerplate specs for that.

Speaker 13 (03:07:56–03:07:57)

Okay, good.

Speaker 1 (03:08:02–03:08:17)

Uh, any other special conditions and Tom, uh, I want you to take on the proximity of the vernal pool. Should we have a separate special condition that says that you're going to, you know, say out of that a hundred foot area?

Speaker 5 (03:08:19–03:09:17)

Well, that's our, our bylaw, which I think is waived. I would say that the users of that pool are coming from Chickatawa Hill. They're not coming across the intersection. They're not coming from the parking lot.

They're not coming across Shikotaba Road. So I really think it's not particularly vulnerable to work in that area. I think it's survival depends on the woods to the southeast of the pool, going up the hill, remaining undisturbed. And there is no proposal for that.

So I think there will be a minimal impact from the loss of upland where these trees are going to be cut if they're in that corner. But other than that, I don't really anticipate impacts.

Speaker 1 (03:09:19–03:09:49)

All right. But it should be included within the don't pack your, uh, backhoe or road excavator within 100 feet of the vernal pool. I get the municipal part of it, but I think we can exercise discretion, particularly because it's DCR and DOT and MEPR, and I think we're probably going to be heading in the same direction on some of these.

Speaker 10 (03:09:50–03:10:00)

Yeah, I can promise that if you don't use your discretion, DCR definitely will. It's been told to DOT specifically.

Speaker 1 (03:10:00–03:10:14)

Okay. All right. Any other special conditions that people can come up with? Wendy, anything for you?

Arthur?

Speaker 2 (03:10:14–03:10:18)

We talked about regular reporting, didn't we, John?

Speaker 1 (03:10:18–03:10:19)

Yeah, that's mentioned.

Speaker 2 (03:10:20–03:10:22)

Yeah.

Speaker 1 (03:10:22–03:10:29)

Along with reconstruction meeting, regular reporting, and you've got an environmental monitor on site, right?

Speaker 10 (03:10:31–03:10:42)

There will be. Yeah, there will be. Yes, there definitely will be. I know there'll also be a wildlife scientist, obviously, because it's an endangered species habitat.

Speaker 1 (03:10:45–03:10:53)

Okay. So with those conditions that have been mentioned, and I know, Steve, you're taking notes on this.

Speaker 2 (03:10:55–03:10:55)

I'm trying.

Speaker 1 (03:10:55–03:10:56)

Am I correct, Steve? OK.

Speaker 2 (03:10:56–03:10:57)

Yes.

Speaker 1 (03:10:57–03:10:58)

All right.

Speaker 2 (03:10:58–03:11:01)

Thank you. That's what I'm doing. All right.

Speaker 1 (03:11:01–03:14:37)

All right. So if you have another special condition, please speak now or forever hold your peace. Hearing none, and without having to repeat all the things that Steve just took down by note, is there a motion to approve the order of conditions with those special conditions? I move that we approve it with those conditions.

All right. And one of them, I don't know if you put it down there, but the erosion controls, I think that's obvious, but that's, you know, that something as vague as appropriate Uh, erosion controls. All right. So the motion was made by Tom.

Is there a second? Arthur. Thank you for the second. Any discussion among commission members?

Hearing none. Uh, Arthur, how do you vote? Yes. Wendy.

How do you vote? Yeah. Hans. Yes.

Tom. Yes. Charlie. Yes.

And I, John Kiernan, vote yes as well. So you've got your order of conditions with those special conditions that we discussed. And I'll get a hold of Peter Mello right away. And I think you're probably right in terms of the state versus municipal bylaw.

But I think we're probably going to end up at the same place given the role of DCR and MEPA. So it looks like we're good to go. Thank you very much. Thank you.

Thank you. Have a good night. Take care. Good night.

Uh, next is, uh, approval of meeting minutes, site walk April 5 25. And then we've got in the next breath, uh, the approval of minutes from, uh, April 8th, 2025. Um, I don't, I don't have any comments on them. Anybody.

All right. So let's take them one at a time. If, uh, if there are no revisions or amendments, um, is there a motion to approve the minutes of April 5, 2025? That was a site walk.

So much anybody. Okay. Thanks, Charlie. Um, a second for that.

Thanks, Arthur. Uh, minutes, uh, April. They're doing the vote, John. No, no, I am.

I'm just. I'm just comparing. No, no. All the, all the votes.

Okay. Because I'm looking at the agenda. And it says approval of meeting minutes for site walk held April 5, 2025. And then I'm looking at the minutes.

So one of them has to be amended and I don't have a, I can look at a calendar and we know it was a Saturday. Um, let me go to April. It's April, it's April five. Okay.

So the meeting minutes have to be revised to say, um, Oh five, April 25 at the top right hand corner.

Speaker 2 (03:14:39–03:14:40)

Thank you.

Speaker 1 (03:14:40–03:15:16)

Okay. All right. So with that revision, the motion's been made and seconded. All in favor and I've got to go roll call Arthur.

Yes. Wendy. Yes. Hans.

Yes. Tom. Yes. Charlie.

Yes. And I, I joined Karen and say yes as well. Uh, next on the agenda is the, um, eighth of April, 2025. That was our regular meeting.

Um, any suggested revisions on this?

Speaker 5 (03:15:18–03:15:52)

Uh, if not, I would, I mentioned in, uh, in article three, the, um, first paragraph at the end, it said, Charlie noted that a large tree forfeit diameter came down across a pathway. That's a pathway between the building and Hope Spot. Came down and was cut at the pathway. I just mention it because I was there about three weeks ago and I didn't think it was cut.

It was hard to get around it.

Speaker 2 (03:15:53–03:15:53)

It wasn't cut at all.

Speaker 5 (03:15:53–03:17:05)

I was there today. It's gone. Oh, good. All right.

By the way, if anything, If any of you are interested in what an elm borer, well, forget it. I won't go on. I just have some interesting insect life in that cut down tree. I think it was a double-trunked swamp lime maple.

And one reason it went over was the trunk went in the direction opposite of where its roots would have been. but it did not have them because the other trunk was where those roots would have been. So it didn't have the anchoring on that side, namely on the Northwest side, and perhaps a big Northwest wind came through and blew it down because it wasn't dead. It was, uh, and I hope, yeah, I hope the trunk that remains now that is leaning Oddly, I hope it will survive because it was the biggest tree in the area.

Speaker 1 (03:17:10–03:17:24)

Okay. Going back to the motion at hand, uh, no other comments or revisions on April 8th, 2025 minutes. Hearing none. Is there a motion to approve the minutes?

Speaker 3 (03:17:28–03:17:28)

So moved.

Speaker 1 (03:17:29–03:18:07)

Thanks, thanks, Arthur. Second? I'll second. All right, thanks.

And is there any discussion? Hearing none, I will take a roll call vote. Arthur? Yes.

Wendy? Yes. Hans? Yes.

Tom? Yes. Charlie? Yes.

And I, John Kiernan, yes as well. And that takes us to new business and then an adjournment after new business. Steve, do you have new business?

Speaker 2 (03:18:08–03:18:23)

One item. Remind me of the number on Canton Ave across from the Suffolk Resolve House. Mr. Sabri Torkey.

Speaker 11 (03:18:23–03:18:25)

1620, I think.

Speaker 1 (03:18:27–03:18:31)

Yeah, I don't think it's higher than 12. It's down by 1200, isn't it?

Speaker 2 (03:18:32–03:18:33)

I thought it was like 12 something.

Speaker 11 (03:18:33–03:18:38)

Maybe it's 1260. Maybe I got my numbers wrong.

Speaker 1 (03:18:38–03:18:43)

We did 1365, which is up the driveway next to the Suffolk resolve sums.

Speaker 2 (03:18:44–03:19:28)

Right. Okay. In any case, I had a call from Mr. Torkey earlier this week.

And actually late last week, forgive me. And He asked, or no, he actually told me that he was putting down turf in the rear yard. And I wanted to let the conservation commission know that I said to him, I'm not sure that you're allowed to put turf down. I think it was a seed, grasses in that rear yard.

It goes from the lodge house down to a friend's who built the basketball court.

Speaker 1 (03:19:28–03:19:37)

Oh, sure. Okay. That's the house that Marion represented them. Yes.

Yes. Backs up to Mr. Vo, who has a sports court off of blue.

Speaker 2 (03:19:37–03:19:47)

That's correct. That's correct. And, and I said, I'm going to ask the commission about this because I'm not, I'm not comfortable with turf.

Speaker 1 (03:19:48–03:19:57)

being placed. That's Ballster Brook. Yes. That runs right alongside and that is a perennial.

Speaker 2 (03:19:59–03:20:07)

Yes, that's correct. I just wasn't comfortable with turf, frankly. How does the commission feel?

Speaker 3 (03:20:07–03:20:09)

The reason for your discomfort, Steve?

Speaker 2 (03:20:12–03:20:19)

It won't be native grass. It'll be some other, you know, hybrid. That's what I'm worried about.

Speaker 1 (03:20:20–03:20:26)

Wait, wait a minute. Are you talking about artificial turf or? No, no.

Speaker 2 (03:20:26–03:20:30)

I'm talking about grown turf, you know.

Speaker 1 (03:20:30–03:20:32)

The sod that you roll out? Oh, okay.

Speaker 2 (03:20:33–03:20:43)

Yes. Yeah, New Jersey sod or Connecticut sod. How does the commission feel about that? I'm just asking the commission for recommendations.

Speaker 3 (03:20:44–03:20:57)

Tom, how do you feel? From my experience, both of my own properties and when I worked in construction that it adheres better and it retains soil better. There's less erosion.

Speaker 2 (03:20:57–03:20:58)

The sod?

Speaker 3 (03:20:59–03:21:03)

Yeah. That's my point of view.

Speaker 2 (03:21:03–03:21:05)

Okay.

Speaker 3 (03:21:05–03:21:07)

Okay. Anybody else?

Speaker 4 (03:21:08–03:21:09)

I agree, Arthur.

Speaker 13 (03:21:14–03:21:15)

You're nodding. Go ahead.

Speaker 6 (03:21:16–03:22:05)

I would agree with what Arthur is saying, but also I agree with you, Steve, in that I'm not familiar with any sod that really has grass types that are specific to this part of New England. When I've used it in a pinch in the past, I've overseeded it with a more native turf type tall fescue seed. But it is instant gratification. And I think that it also uses less water to get established than a seeded lawn.

Speaker 2 (03:22:07–03:22:12)

OK. Thank you, I appreciate your time on that one.

Speaker 1 (03:22:13–03:22:17)

All right, good. So it sounds like we're okay with that. I mean, I'm okay with it.

Speaker 2 (03:22:18–03:22:20)

Sounds like, yes, that's fine.

Speaker 1 (03:22:20–03:22:25)

When you first brought it up, I thought he was doing like a putting green with artificial turf.

Speaker 5 (03:22:27–03:22:38)

They shouldn't call that stuff artificial turf, because it really doesn't resemble turf at all. In my opinion. All right.

Speaker 1 (03:22:38–03:22:39)

True enough.

Speaker 2 (03:22:39–03:22:40)

All right.

Speaker 1 (03:22:40–03:22:42)

Any other additional business, Steve?

Speaker 2 (03:22:42–03:22:43)

Not for me.

Speaker 1 (03:22:43–03:22:59)

Arthur, anything? Nothing. We're good to go? Motion to adjourn?

Yes? Yes, please. Yes. Yes, please.

Right. It's late. All right. Thanks all.

God bless. Good night. Good night.

Speaker 13 (03:22:59–03:23:01)

Thank you all. Night all.