Board: Milton School Building Committee

Date: 2024-07-15


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:50–00:54)

So we have our quorum is Dr. Miranda.

Speaker 2 (00:54–01:18)

Thank you for jumping on. All right, so let's get going on it. So agenda item number one is called a meeting to order. So it's Monday, July 15th at 7.10 p.m.

I'll call the meeting to order. As we typically do, I'll just do a roll call vote of the members that are here. Just how I see on the checkerboard, Glenn Hoffman.

Speaker 3 (01:24–01:25)

John Cohen?

Speaker 2 (01:27–01:31)

Here. Selena Miranda?

Speaker 4 (01:32–01:32)

Here.

Speaker 2 (01:34–02:23)

Sean O'Rourke? Here. And somehow it looks like Mark Loring had dropped off and he comes right back on right at perfect time. So, and Mark, I know he dropped off for a second.

So we're just doing a roll call, attendees, so if you've got audio. I'm here. All right, cool. Scott Tereshak's gonna jump on in about five minutes, so we'll give some more, but just to get going.

Second thing on our agenda is citizen speak. We allow the first 15 minutes of our meetings for any citizen that would like to speak. We ask that you just raise your hand, limit your comment to three minutes, and please just state your name and address. And Mr.

Kern, Mr. Joe Kern, you're recognized.

Speaker 5 (02:26–04:04)

Hello, thank you, Joe Kern, Grafton Ave. I'm in support of the schools and understand the town has space issues. I don't understand why a detailed budget is not presented to the school committee before tonight, or the school building committee before tonight. As you know, the residents have tasked the select board to do their job and place that exclusion on the November ballot.

There has been much conversation directed at the select board, but I've not seen the same level of urgency requested by the residents to the school building committee as we near the critical milestone to complete the budget. Now it's time for this board to do its job and provide the budget for the critical date of November and meet the timeline. The lack of urgency over the last 12 to 14 months is concerning to me, as this board understands better than all. As the subject matter experts, the space issues we have, I'm here tonight to task the leadership of this award to provide a budget and complete it.

In addition, I wish to emphasize words matter. The term construction cost and total project cost refer to different aspects of the overall expense involved. At a minimum, the construction cost is 30% less as to what would be required on the debt exclusion to fund the project. And the board should be using the word total project cost.

PMA can explain this to you if you don't know the difference is a commonwealth house doctor. They're very familiar with the terms. Thank you. All right, thank you.

Speaker 3 (04:14–04:18)

All right, if there's anybody else. outside of Mr. Curran that would like to speak.

Speaker 6 (04:28–04:31)

Sean, can you give me a video access? I can't turn on my video.

Speaker 2 (04:32–04:33)

Yeah, sorry about that.

Speaker 3 (04:39–04:42)

If I could choose Mr. Motink.

Speaker 2 (04:43–05:29)

Keep an eye out for Scott. I'm just going to wait for Aqua to jump in and then I'll get his video going too. All right. And not seeing any other hands raised.

I'm sorry, I'm still having hand raised. I think that's just a mishap, but it's fine. So what we will do is move on to agenda item 3, which is approval of past meeting minutes, Monday, July 1st, 2024. So as everyone's aware, Shamus PMA puts together our packet for us.

The minutes were distributed, so just look to see if there are any comments or suggestions for the meeting minutes.

Speaker 7 (05:35–05:40)

Sean, I see Joe Curran's hand raised. Was that addressed already?

Speaker 2 (05:41–05:45)

Correct, he had spoken so to speak. Yep. Okay.

Speaker 3 (05:45–05:54)

Thank you. Yeah. Yep. No problem.

Speaker 8 (05:55–06:33)

I just, I just, I, sorry, I, I just noticed on the meeting notes at the bottom, it was saying that the. Item 0111, that the select board's deadline to vote on the inclusion for November 6th ballot is August 6th. It sounds awful close. I mean, it has to be to the Secretary of State by the 7th.

We have to give it to the clerk first. I don't know if this was, I don't remember that date, but anyway, I'm just mentioning it.

Speaker 2 (06:34–06:46)

Yeah, so I think, I actually think that's a typo. I think the intent or what the comment was on there was to the second, the deadline to get it to the Secretary of State. So, I think overall.

Speaker 9 (06:46–06:54)

Let me get it. Yep. So, John, it's to get it to the Secretary of State by the 7th. Is that correct?

Speaker 8 (06:55–07:12)

I forget exactly what, six or seven, it has to be to the Secretary of State. And it first has to go to our clerk, then to the Secretary of State, was my understanding. I mean, we're talking days, but still, it's critical.

Speaker 2 (07:17–07:37)

All right. Liz Schamus, you can make that edit and redistribute. Any other comments or edits to the minutes? And so if none, I'd obtain a motion to approve with a friendly amendment for the edit, if that's all right.

Speaker 10 (07:46–07:49)

Your motion, Sean? Motion to accept the July 1st minutes?

Speaker 2 (07:51–07:54)

Yeah, with the friendly amendment for the edit.

Speaker 10 (07:54–07:55)

With the correction, yes.

Speaker 2 (07:56–08:01)

Yes.

Speaker 7 (08:01–08:02)

I second.

Speaker 2 (08:04–08:39)

Second by Dr. Miranda. Any other discussion? Hearing none, we'll do a roll call vote.

Just double check, make sure Scott's not here yet. All right. So, Glenn Hoffman? Yes.

John Cohen? Yes. Dr. Miranda?

Yes. Mark Loring? Yes. Akua Baum?

Yes. And Sean O'Rourke? Yes.

Speaker 11 (08:39–08:54)

All right. Hey, Sean. I joined in a couple minutes ago. My camera isn't working.

It says it's turned off by the host. I just turned you on. All right. Thanks.

Speaker 3 (08:55–08:56)

Yep.

Speaker 10 (09:01–09:02)

Do you want to vote, Scott?

Speaker 11 (09:02–09:11)

I say that again. We've just come to the end of that discussion, so I'll let you, as long as you had enough people.

Speaker 2 (09:12–10:13)

Yeah, it was just approval of meeting minutes, Scott, so you can put yours in abstention or absentee, just for the vote. All right, let's sit. Sounds good. Okay, moving on, agenda item number four, old business discussion update, architect update, which is the cost estimate set review.

So as everyone received their copy, I believe it was Saturday morning, I sent it out to everyone. It's basically a culmination of the work we've been doing for the past six to eight months to develop a pricing set that's now in the hands of our estimator to develop the cost estimate for the project. I'll turn it over to Shonali to kind of walk through that feasibility study. And then I would ask Shonali, if you could, just kind of give a high-level walkthrough of it.

And then as people have questions, we can kind of dive into specific areas of it.

Speaker 4 (10:13–18:15)

Great, I just want to start off by thanking everybody here at the school building committee. You guys have been phenomenal answering questions. I know it's been a hard push meeting every week and we at the design team really appreciate all of the really quick response that you've been giving us to help move this forward at a really intense pace. So thank you.

I'm gonna go ahead and share my screen. Unlike last time I think I got my laptop fixed so hopefully we'll be able to see everything at full screen. If you can't see it please let me know. This is a culmination of about six to eight months worth of work, meeting with all of you, the working groups and the core working group, which was the superintendent and the principals of the middle school and the preschool.

We went to and did six visioning sessions, two tours and had numerous meetings talking about the size of the building, the spaces, the quantity, and the types of spaces that they wanted. This is just the index view of the beautiful site. We started off with the survey, the existing survey that BSC provided to us, and I'm just going to click through it. This was a survey that BSC had done earlier prior to Arrow Street joining the team and this indicates the location of the new road.

The cost of that will be included in this construction estimate. And I want to just also clarify, I'm talking about construction. cost estimate today. Sean and Seamus will be talking about project costs.

So what we do with PMA is specifically construction costs. As we move into these, everybody's familiar with the existing condition site plan. This will help Peter Bradley from PMC locate the building and understand the physical property line constraints. as we move into the new campus site plan, understanding the amount of parking and the two building configuration that was approved.

This is a drawing that many of you have probably not seen prior to this weekend. This was done by Terra Inc., the landscape architect. And we'll be having further conversations with them and all of you as we move forward into schematic design. But this gives a high level approach of how the playground area and some of the greening of the site and some of the other areas in terms of the outdoor classroom that we've talked about and some of the outdoor plaza space.

and the canopy connection that you should be aware of. So this calls that out and will help Peter price all of that out for you. Then we get into some of the more specifics of the interior layout of the pre-K with the admin building area, the connection, the gym or playroom area, special education, and some of the classrooms on the upper levels. Um, we've also called out the grace gross square footage on each of the plans as you see, as we move through, which aligns with the space summary that we had talked about in the last meeting.

we're moving into the first floor of the middle school area, and you can see that we call out the canopy connection from the pre-K connecting with this corridor that moves right directly into the admin area, which is something that you saw before. It's really important for us to note the gross square footage of the first floor versus all the other levels, because this will indicate how much of the foundation that we need. And I'm gonna go through the upper floors pretty quickly. These are things that I believe that you've all seen already with the team layouts.

This layout shows the seven team configuration. It also shows, indicates a double height space. And we're also indicating where some of the rooftop mechanical will go and serve some of those double height spaces. And this was related to a conversation that we had with GGD, which they call out in their narratives that occur at the end of the report.

And then some more of the classroom levels. And then the world languages will live in the middle of the teams so that all teams will have easy access to them. And then here's the eight. And this is familiar to you as well, which is the axon showing the stacking.

This will help Peter understand the size and the mass of the building as he prices it out. This summary should be familiar to you all as well. It indicates the 127 row square footage for the upper middle school and then the 24 915 for the pre-K, which stayed consistent with the last reduction that we did. Now we're moving into the narratives.

This is fairly technical, so if you've had a chance to read it and you have questions, please feel free. There's a lot. It's 150 pages of narratives. So we're going to start with the architectural narrative.

Now, I just want to remind everybody, this is a feasibility study, feasibility cost estimate. It's not a schematic or DD. So these narratives are giving Peter a high level understanding of the scope of the work. It doesn't call out every single item, but it gives him an understanding of the larger, broader understanding of how we're going to approach the building as we get into more detail.

So we call out the initial site prep tree clearing and that there's going to be 2 buildings constructed initially, and then we get into some of the foundation and the building enclosure. as well as the doors and then sort of the level of finishes that we're calling out in the interior. And I would also like to point out that everything that we've called out in the narratives will meet the new energy code that's coming into effect in January. So we are preparing for that code so that there won't be, nobody will be surprised by any design changes in the near future.

We just talk about plumbing services, finishes, equipment, the gym equipment, display cases, fixed furnishings. This is all typical stuff that we can. Now into the site work area. We've called out the parking, the drop-off, the expectation of how we want the site to operate, which Terra Inc.

with their lands gate drawing, this all is sort of coordinated. We've also called out for a retaining wall along the eastern edge of the property near the athletic fields. We need to figure out what that length is and if in fact we really do need it, but we do want to own it in this feasibility estimate. So again, so we're not surprised further down the road.

Mark, I know you have a question.

Speaker 6 (18:16–18:20)

Sorry, just what length do we currently own? I'm sorry if it says that and I miss it.

Speaker 4 (18:20–18:31)

I did not call out a length, but if I go back, we're going to talk to Peter. We have a meeting with Peter tomorrow. I'm going to just go back to the site plan.

Speaker 12 (18:31–18:37)

Yeah, I guess I'm just wondering if we should try and name a

Speaker 4 (18:38–19:29)

So yeah, so what we've done here is we've I don't know if you can see the red dotted line here. on the left, if you can see my cursor, that's where we're calling for a tall foundation wall because the site slopes down and it's slightly below the first floor elevation. So we are going to talk to Peter about that overall length, but he could also measure it off of the drawing because we've given him a bar scale. We've also called for two locations of the approximate retaining wall.

So one is right here. and then the other is curving along this edge. The hope is as we get further along and we get into further details, we'll understand and we'll be able to minimize that length, but this is the length that we're calling out for right now.

Speaker 6 (19:29–19:33)

Okay, but do we provide that link clearly?

Speaker 4 (19:33–19:40)

Not in the report, no. It's going to be part of the conversation with Peter tomorrow figure out how he wants us to deliver it to him.

Speaker 6 (19:41–19:55)

Okay. Oh, and again, maybe this is a small thing, but only a thing I'd say is the 50 foot zoning buffer looks very similar graphically to what you have for retaining walls and site foundation. So I don't know if that should be changed to a different color or different.

Speaker 4 (19:55–22:09)

Yeah, we can definitely change it to color and make it a little darker. I think we were trying to just label everything, but I think, yeah, we could certainly update that for the next issuance. Or rather the final issuance that will when we get the estimate, we're going to assemble it with this package. So we can make those updates.

So we called out fixed furnishings, like millwork, the reception desk. the library circulation desk, cubbies for the pre-K, all that stuff out here. And again, we did get into a little bit of specific detail like motorized shades and that kind of stuff. But again, we're trying to keep it high level because Peter understands what the current construction cost estimates are.

Here, This is the structural narrative, and I'm sure that a lot of you have noticed the red markups on this. EDG, who's our structural engineer, is updating this. We had marked it up last week and weren't able to get the updated narrative into the package on Friday, but we wanted to make sure that Peter understood Our comments and included those in the updated pricing and I think the major thing is that we needed 3 inches of rigid insulation underneath the slab to meet the new energy code. And also that we don't actually have classrooms above the double height spaces, which would be a very expensive thing to do.

And so he's working on updating the narrative and that'll get into the final. And then we get into the civil narratives, and I'm not gonna click through everyone, because it's like another 100 pages, but we have the mechanical, electrical, plumbing, fire protection, there's a traffic report, and the geotech that talks about the borings and the soils. So if there's, oh, Mark, hi.

Speaker 6 (22:09–22:34)

Sorry, just one other thing. And again, I know each of these things is very small in the overall cost. And so it's probably not going to change anything. But just for the sake of detail, equipment and furnishings, I see a lot with the gym stuff, but I don't see anything about bleachers.

Did we, are we putting bleachers? Do we have enough space? I know we're making the gym a little bit bigger than obviously, but I didn't know if it was big enough for bleachers.

Speaker 4 (22:34–22:56)

It was definitely designed with space for bleachers. And I thought there was a comment, but after this, I will go through and see if I can find it. If not, I could put it in and we can definitely include that in our conversation with Peter tomorrow. So let me just, sorry, I'm gonna, hold on, let me grab a pen.

Speaker 11 (22:57–22:58)

about the bleachers.

Speaker 4 (23:00–23:02)

Sorry, what was that?

Speaker 11 (23:02–23:11)

I was just saying, I did read somewhere that bleachers were in there. It talks about bleachers on one side of the gym and then aisleways on the other three sides of it.

Speaker 4 (23:11–23:56)

Yeah, I'm pretty sure. I remember marketing it. How's that? But I will make sure to find it and make sure that it's highlighted.

Because I think that's a good comment. I think what's really important. This is a high level cost estimate but all of these comments are critically important, because this ends up becoming a document that we refer to quite often. To make sure that we have all of the scope in when we're designing the building at much more detailed and specific stages, and we'll be using this document to jumpstart conversations as we move forward.

So, even though you may think it's a small comment, it's really important to us to make sure that we're capturing all of this information. So keep it coming please.

Speaker 2 (23:58–24:41)

Yeah, so on that note too, you know, for the members, uh, you know, as they ask, just kind of, you know, dig through this document, summarize what you have for comments there, uh, and send them over. Um, you know, as Shanali said, you know, part, part of, part of the process by which we're, we're going about is, you know, Peter Bradley. So Shanali, can you talk a little bit too about like, you know, for, for the work that Peter's doing, um, You know, we, we have kept him in the loop on this project, so it's not hitting him cold as of Friday. Yeah, so can you talk a little bit about, like, some of the, some of the.

Colleague, greasing the skins of, you know, keeping him up to speed on on some of the work that we've been doing over the past couple of months too.

Speaker 4 (24:41–26:39)

Absolutely. So, initially, when we kicked off the project, we had conversations. With all of the consultants about schedule and scope and reiterating that we were going to walk into this. I'm going to say feasibility.

deadline with one option. Soon after that, we had a conversation with Sean O and Ewald about moving some of those deadlines up further. So we quickly engaged with the consultants again and talked to them and made sure that Peter had his schedule cleared for this time period to focus on the Milton project. And as decisions were being made, for instance, one of the biggest decisions that all of you made was confirming that we were going with the option where it was two buildings, the upper middle school and the preschool.

And again, we had another conversation with Peter about that and that we were talking to him and structural about effective ways to bring down the costs of the pre-K, you know, by using either wood frame system or lower floor to floor, all kinds of options so that he was aware of what we were looking for and so that when he received the drawings that he was already prepared to walk into this estimate and this document with all of that previous knowledge. And so that's how we approached it, including Terra Inc. for landscape. That's why they were able to turn around a landscape drawing so quickly Between the time that we made the decision about which option and then that drawing, we had already prepared them.

We had a charrette where we went through a lot of different design options. And then they were able to produce that drawing that really captured the scope pretty clearly. So it wasn't just Peter, but it was all of the consultants that we were working with consistently. I don't know who had their hand up first, Mark or Scott.

Speaker 6 (26:40–26:41)

Scott, you can go.

Speaker 11 (26:51–27:32)

struggling to get off mute. Can you hear me? Yes. Yep.

I'm good. Just wondering what the best format to share the comments are. I went through and just marked up the PDF with comments, but that can be extracted out into a CSV file or something of that sort. Just wondering.

I probably have about 25 comments. Most of them are based on information I thought would be helpful for the estimate. So I thought it would be good maybe for your meeting with Peter tomorrow. But again, just looking for the most efficient way for you to receive those comments.

Speaker 2 (27:33–27:51)

Yeah, so if you did them in Bluebeam, Scott, and you can export the comments through there, through a CSV file, you can do that. I would say send them both. Um, you know, I mean, the, the, the overall PDF markup, and then if you have, if you can extract the comments individually, that'd be great.

Speaker 4 (27:53–28:30)

I would say just to follow up with. What Sean saying, if you have comments that you think are going to impact the cost estimate. To set them as is, or however, what's most convenient to you as soon as possible so that I can pull them all together and we can use that to talk with. Peter, but if they're just general comments about the project moving forward or whatever, you can send them at a later date and we'll roll them into the.

To the report when we issue the final one with the estimate, but Scott, however, is easiest for you. I can accept them. However, you want. I can.

Speaker 11 (28:31–28:38)

Also, I'll send it over, but I'll send the PDF. The blue beam back with the notes on it, and then the 2.

Speaker 4 (28:39–29:04)

Okay. Also, just keep in mind Scott that. Air street cannot accept. attachments over 10 megabytes, and I think the reports over 10 megabytes, you might have to send it through like a WeTransfer file or something like that.

And if you need help doing that, just let me know. I can talk to you offline about how to do that. We just have a very strict email protocol system.

Speaker 13 (29:04–29:11)

If it's easier, Scott, you can send it to me, and I'll be happy to put them on a file share that we have with AeroStreet, and I'll get them over to them.

Speaker 11 (29:12–29:12)

OK. Thank you, Sean.

Speaker 6 (29:16–31:09)

All right, Mark, you're up. Scott, just for my own personal interest, if you see me on it, I just like seeing other people's thoughts on projects like this. So I'd love to look at your notes. I just had a couple other things based on my experience and just what generally is missed and left out of these things.

One is security system. I didn't see that in the electrical scope or in any of the part at the top. And so I don't know if we know, obviously, exactly where the security system will be, but obviously door contacts and card swipes and maybe some cameras in certain places. So some type of system, I assume, is something we will need.

The other is just any of the IT infrastructure. I assume we can get some funding through E-rates, and so maybe the town is able to kind of fund a lot of that, but I don't know if the IT director has been kind of involved in that were a couple years out, so they could obviously apply for e-rate funding in the future. But assuming we don't, I don't know, like, you know, wireless access points, routers, you know, firewalls, things like that, there's some cost that could be subsumed within this proposal. And then, you know, obviously the hope is that we pull it out.

I didn't see that either. And then the third one I did see some information on, it mentioned the playground. It just didn't have a lot of information. It just said playground.

I think maybe just within y'all's conversation with Peter, just being clear as to the square footage of the playground, maybe that's the piece that would drive it. I just know playgrounds can be quite pricey, the equipment, depending on what you're putting there, especially if you're doing like a large kind of climbing structure. That's very different than just kind of like an individual, like two or three individual items. So I just think some consideration of that, given that those costs can be a few hundred thousand dollars.

Speaker 3 (31:16–31:17)

All right.

Speaker 6 (31:17–31:22)

Any other? I'd be remiss if I didn't say thank y'all. This is a lot of work. And so, again, I really appreciate that.

Speaker 4 (31:23–32:13)

No, no, I appreciate all the comments. I agree about the plate structure and we'll talk to them, talk to Peter about that more in depth tomorrow, just for the security and it that sort of rolled in as part of there's basic assumptions that Peter will make an about including a bit that even though we weren't. Explicit in our narrative, but I will make sure that we have a line item. So, at least that, you know, that we've captured it moving forward, but there are some things in the narrative that's just assumed that he's going to include and we don't have to be.

Obvious, like, I did not call out toilets or, you know, showers in the locker rooms. It's just assume that he's going to include all that stuff in the. In the estimate.

Speaker 2 (32:15–32:36)

So, 1 of the things I might suggest to shenanigans similar to what we're doing for kitchen equipment and stuff like that, how we have kind of an allowance or a placeholder there for that marks comment on the playground structures. We can talk with when we talk with Peter, that's probably the best way to do it is set an allowance for it, set a budget for it and hold that there.

Speaker 4 (32:37–33:00)

Yeah, so I just as a an interesting side note, so quick equipment, Peter doesn't price kitchen equipment. We have to give him the allowance, but for playground equipment, he'll he'll include it in his base pricing so we can talk to him about sort of the scope that we want for the play. So his estimate can either be higher or lower based on what the town of Milton wants.

Speaker 2 (33:03–33:05)

Sounds good, thank you.

Speaker 3 (33:05–33:06)

So just

Speaker 2 (33:06–33:32)

Mark Benthien, ECAG, he or hes, COB? Sorry, I was yelling down to my daughter. I turned the TV down. She had it up way too loud.

I didn't know if there was any background noise.

Speaker 10 (33:33–33:52)

I went through it a couple of times, and I think despite a couple of little things we talked about missing, I thought the scope was pretty well covered for the level we're at right now, if that makes sense. Obviously, the more detailed, the better. But I think it was in pretty good shape. Some comments, I'll pass them along as well as Scott had said.

Speaker 2 (33:54–34:11)

Yeah, I appreciate that. So on that same note, Sean Burr, can you weigh in for the estimate that we're doing now at this level of detail, how this aligns with the MSBA process for a typical project? Sure.

Speaker 13 (34:12–35:04)

This would be the feasibility study estimate. And at this point, the MSBA would take our estimate, we would add our soft costs onto it. I know Mr. Curran spoke to it earlier on.

He hit kind of right on the nail on the head there. We add around about a 30% buffer or increase on top of construction costs to cover this feasibility study and schematic design and also OPM and designer costs. FF&E, testing services, and all the other soft costs that roll into that are outside of the construction costs. So at this point, we would submit a budget after our estimate to the MSBA, and they would review it and lock in our project scope and budget agreement.

So on a normal MSBA project, this is the time where they would set our project budget for the rest of the project, and we'd have to adhere and keep to that budget.

Speaker 3 (35:08–35:08)

Cool. Thank you.

Speaker 2 (35:15–37:29)

All right, so any other questions? Again, just put it out there one more time before we move on. Not seeing any. So, yeah, you know, for those of you who, you know, have gone through and have comments, if you could just send those over, it would be appreciated.

And so, with that, there's a question. All right, item four, old business, item B, which is a land swap update. So it seems like every time we have a meeting, there's more and more progress being made, which is good. So we might have to have more meetings in the coming weeks just to kind of keep it going.

But essentially right now, the land swap, as we talked about last meeting, got passed over to the house. is now progressed through the House to their third reading. It's in their committee for a third reading right now. The committee had reached out for some follow-on documentation exactly similar to what the Senate House for a third reading did.

Some of the documents we get over to them on Friday because they're readily available, and then myself and Nick Milano had sent over the remaining ones today. So, you know, as of now, I believe they have everything they need to get that through. The items we sent over were a couple of assessor's maps that were there. The BSC survey that actually was the boundary survey that created the parcel that we had.

And then, finally, the alternatives analysis and the appraisals, I believe. So, basically, all the documentation we submitted to EEA and Senate Committee for a third reading. Uh, so all that's over with them. I've talked to representative Driscoll last week.

He's telling me everything's on track. Uh, so, um, looking good. So open up, see if I, if anybody has any questions, I'll do my best to answer them. It's complex, but, um, you know, do whatever I can.

Speaker 3 (37:35–37:35)

Yep. Mark.

Speaker 6 (37:36–37:39)

I'm sorry, I'm talking too much.

Speaker 2 (37:40–37:44)

If this was a game show, you would win. You're hitting that button way too quick, man.

Speaker 6 (37:46–39:01)

Go ahead. I apologize. I just want to make sure I'm understanding where we're at in each of the steps clearly so that I can communicate that well to others and bring this back to the school committee. Again, from a budget acquisition perspective, as the concern was raised during public comment, we are where we were at our last meeting, which is that we expect that back by sometime next week, likely towards the end of next week, the 26th.

So that's, I guess, number one to just confirm. And then that was one piece we were working on, which is the budget that the town needs and deserves. The other is the land swap, securing the land. And so we're saying now that We were kind of stuck in the Senate for a while.

We're through with the Senate, we're at the House, we're at the third reading of the House, I think you said. And so, you know, we are with several weeks left, a really good position that we expect that similar to kind of our progression with the budget, we are there with getting the land swap and addressing the outstanding issue of like, do we fully control the land, right, as I pass the legislature. Is that both, because those are like our two giant outstanding issues, I think, as this committee. Is that fair to say that that's where they are?

Speaker 2 (39:01–40:27)

Yeah. Yeah, that's correct. So the timing, we got the feasibility study over to the cost estimator on Friday. He needed two weeks, which was until the 26th.

Like Shanali said, we're having a meeting with him tomorrow just to see if he has any questions, direct some of the stuff and relay some of the commentary that we have. But with that, he's going to develop that overall budget for us to present, you know, essentially by the end of the month. So the 26th, when we talk about future meeting dates, I'm assuming we'll probably want to meet on the 29th to kind of review that. And then the numbers there, we'll have it ready.

In regards to the land swap, yes. Similar, if you watch the news, there's something about the legislature, you know, every night about new things. They're kind of in their rush right now to get things passed. This is when most of the stuff actually happens.

Um, it's actually, you know, from what I could tell or from what I've heard, it's good timing. So, you know, it seems by the, you know, that our next meeting, we may have the land swap fully done. And if so, you know, the process would be, uh, it goes through, it gets read a third time in the house. It does a roll call vote in Senate.

It does a roll call vote in the house, and then it goes up to the, um, uh, to the governor for signatures. So, um, you know, and knowing that ends on the 31st, you know, I think we're in line for that, or I'm hoping. So, yeah, I hope that answers your question.

Speaker 6 (40:28–41:34)

Yeah, it does. And just to loop that back with our broader timeline that we've been talking through since last September, October, right, when we decided we were going to approach the town to ask for the funding for the architects, right, and got on the, you know, got on town meeting in the fall, in December, to get that and we got it allocated, right? Throughout that whole process, starting last September, October, whatever it was, talked about kind of this timeline in order to get on the fall ballot, because that was the soonest possible opportunity we have. And we have been moving as, you know, Mr.

Curran mentioned, like moving with urgency, right? That this is an urgent issue. We need to do everything we can to move as quickly as possible. And so that was the soonest timeline we felt was feasible.

And so again, what I'm getting from this is that we are, you know, despite feelings that maybe things have been delayed, we have moved quickly and now we have a path forward to kind of having all that information at our fingertips so that Select Board can make the determination to put that on the fall town meeting. There's no real logistical hurdle that should be stopping us.

Speaker 2 (41:38–43:47)

Yeah, I'll leave it open. So, you know, the meetings right now for the Select Board is for July 23rd. So my hope at that meeting is I'll be giving kind of an in-depth presentation of everything we've been doing for the past eight months and, you know, cost the town about half a million dollars. Update everybody on, you know, everything that's gone into this feasibility study.

I know we're looking at it tonight. We're walking through a couple floor plans, a couple narratives and stuff like that. But, you know, she not only said there was there was the visioning and the teaming exercise that we did with the district basically starting, you know, March. Yeah, I mean, we formed the project team in February.

We started in March. That is laying out all the visioning did tours of the schools did tours of new schools. So we can kind of see what those things were. So my hope is on the 23rd is just basically give a full in-depth, you know, presentation of everything that's gone into it.

There's also additional work that we've been doing on our own, you know, the boring analysis to make sure we're doing the right type of foundations. There was some wetland things that were outstanding out there that myself, PMA, and BSC group, and the uh the conservation commission agent Steve Ibis went out we confirmed it we're in good shape so there's a lot of you know outside of just the feasibility study there's a lot of other things going on you know than may use to you know just basically present and get everybody up to speed on kind of what we've been doing i hope what that is knowing it's on the 23rd and our estimate is coming in on the 26th they don't plan to go inside i'm not trying to rush the estimator i'm not trying to ask him to get it done in a week or anything like that My hope is if we can have a follow-on select board meeting, hopefully meeting with the chair to request this, either on the 30th or on the 6th, two weeks later, that would give time to kind of digest all the information that we're doing. And then, you know, that would align with that, you know, date for the Secretary of State. That's kind of the point.

Speaker 6 (43:47–44:14)

Yeah, that's really helpful as it relates to just like my understanding as I bring this back to the rest of the school committee members. And certainly I know Mr. Collins got his hand up and I hope that the select board would be open to having additional meetings given the urgency and priority of this project for the town as certainly has happened with many other things like MBTA and other projects as they come up. Any board has special meetings, but I appreciate that summary.

Thank you very much.

Speaker 3 (44:14–44:16)

No problem. John, you're up.

Speaker 8 (44:18–45:04)

I'm just looking at a calendar, and the 6th is too late. You're not going to get this to the Secretary of State if you're voting on it on the 6th. And if we vote on it on the 30th, we're seeing the budget for the first time on the 30th. I'm just stating facts.

I just saying that vote can be on the 6th, I think is unrealistic. I think it's too late. And having it on the 30th is too soon. So I don't know whether we postpone it.

Would the select board do that, have the meeting later in the week of something? I don't know. I have two that week.

Speaker 2 (45:06–45:59)

Yeah, so part of the one thing I didn't mention too is on that in-depth presentation. we'll be able to have some type of estimate window. It won't be precise for what we're going to have on the 26th. But from PETA, we'll be able to have some type of window for it.

So for the select board, the hope is on the 23rd, we can give an overall budget plus or minus a certain number. And that would allow, put us in a ballpark for you guys to kind of review it at that point. And then, you know, after that, take it up on the 30th with a finite number. But I agree, it's, you know, it is getting tight, you know, we're doing it, but this is a very critical, you know, very important issue, so.

Yep, Mark?

Speaker 6 (46:01–47:35)

Yeah, I just, I agree. I mean, I know it is tight, but I, John, just given you are our select board member and our rep here, I just respectfully ask that as a member of the school building committee, right, you kind of carry that message to the select board that's saying like, hey, we might need like two or three more days. Can we have it on a Thursday meeting? I know that's not typical.

Or can we have it Monday the 5th, right? You know, it seems to me that giving getting an extra two or three days in order to make that decision so that shows up on the fall given the urgency of the need and the fact that any delay increases costs makes it makes a lot more sense to have one of those special meetings than to say like oh we ran we were two days too short and we ran out of time and so let's now wait until may to vote on this like that that type of impact to kids and impact the cost to me is not acceptable to just say, you know, you know, hey, we, Tuesday's a little tight Thursday, you know, would have been within fine or next Monday. So, you know, I obviously respect the Select Board's decision to schedule their own things. I just emphasize the point I think Sean made, which is that this is a talent priority.

It's something that we've been working on for five years. I hope this Select Board would address it as such and would create special meetings at times that are are necessary in order to accommodate the information that we are getting as we are trying to move with urgency to provide all the information the town and the select board needs to make the decision.

Speaker 3 (47:38–47:43)

Yeah, John, go for it.

Speaker 8 (47:43–47:54)

I'm just stating it's a challenge. I mean, it's hair splitting challenge. I don't disagree with the need or anything, but it's a hair splitting challenge.

Speaker 6 (47:55–47:58)

That's why we get paid the big bucks here, John.

Speaker 2 (47:58–49:52)

The one other thing I'll say, I know most of you guys already know it, is the vote by the select board isn't in favor of the budget. It's in favor of putting this out to a vote. If the budget comes in and it's $10 trillion, some crazy number like that, We're not asking the select board to approve that budget number. We're asking them to just allow it to be voted on by the public.

That's it. So I think all this discussion came out of Mark's original question on timelines of different things. So as we stand right now, just to keep it to what we have, we have a select board meeting on the 23rd. And my goal with that is to give a presentation, ideally a cost window at that point based on input from Peter, letting them know that the final estimate will be coming on the 26th, and then, you know, respectfully request a follow-on meeting that would allow us to get to a vote in November.

That's basically the timeline that I'm working towards. Any other questions? I know the item we're on is the land swap. So just other questions as it relates to land swap or anything else.

Hearing none. All right. Item five, I think was just a carryover. Seamus had his new business, I think.

We've got enough old business going on right now that we're trying to wrap up, so we don't really have any new business on here right now. So I'll jump to item number six.

Speaker 4 (49:52–49:55)

Apologies, Sean, for interrupting.

Speaker 3 (49:55–49:57)

No, no, no.

Speaker 4 (49:57–50:04)

There's an attendee who posted a question that I think we missed in previous item.

Speaker 2 (50:05–50:50)

Yeah, we, yeah, part of it is, we don't respond to questions. Okay. So, yeah, there's a policy that the committee adopted early on. For any, so for input from the public, they can email me at sbc at town and Milton dot org, and we can respond to it that way.

But, and then also with public comment, similar to how the school committee does it, we don't directly respond to it. But what I try to do is when people do make comments. I try not to respond to it directly, but I do try to address it in such a way as we go through the meeting. For example, the cost that we talk to those brought up tonight in public speak.

You know, rather than address it directly, we still, in general, try to cover it so that it's covered.

Speaker 4 (50:50–50:53)

I just want to make sure it was missed. That's okay. Thank you.

Speaker 2 (50:53–51:06)

Okay. Yep. So, essentially, future meeting dates are open, but obviously knowing that we're getting our process 1 on the 26th, what I would propose is a meeting 2 weeks on the 29th, if that works for everyone.

Speaker 6 (51:12–51:13)

I can do that.

Speaker 3 (51:20–51:34)

So far, so good for everyone. Scott, are you in?

Speaker 2 (51:34–51:46)

Overall, it seems like consensus. I'll check with Tim and Kerry, who weren't here tonight, too. So Seamus, if you could just tend to coordinate with Charlene on that one. Yeah, Mark.

Speaker 9 (51:47–52:02)

So that one should already be on our calendar, but I'll correspond with Charlene to make sure that we have a room or anything organized for it. Do we want to set it up as Zoom only again, or do we want to meet in person?

Speaker 2 (52:04–52:13)

My preference would be to meet in person, just to go through it. Mark, you had your hand up, sorry.

Speaker 6 (52:13–52:28)

Sorry, I just want to make sure from Arrow Street's perspective, Shelly, that there's no reason, there's no additional information that meeting on the 22nd would really be helpful to push along or refine the cost estimation process. I assume the answer is no, but I just wanted to.

Speaker 4 (52:28–52:53)

Yeah, it's going to be in Peter's hands, and if there are questions that he has, he'll convey it to us, and if we need to reach out to you, we can deal with it through email. I don't think there's a need for a formal meeting. I don't think it's gonna help Peter in any way. I think the best thing is for us to be hands off after tomorrow's meeting and let him just put his head down and work.

Speaker 2 (52:59–53:04)

All right, so plan is we'll meet in two weeks on the 29th in person. Yep, Shane.

Speaker 9 (53:04–53:18)

I just have one item under 48 hours. In the packet, I sent, I attached an invoice for PMA. I was wondering, are we able to approve that this meeting or should I put it on the agenda for next time?

Speaker 2 (53:19–54:07)

If you put it on the agenda for next time. I saw that on there, but it wasn't on the agenda. So that's, I didn't catch that when we were reviewing the agenda originally. Two weeks out, we'll get you paid, I promise.

All right, so we'll meet in two weeks, in person at the high school, as we typically do. Last thing before we go, you know, Shanali, for all you guys at Arrow Street and, you know, the work that you've done, Mike Perrello, all that, I mean, honestly, over the past eight months, to see all the documents come together, to see the, Massing and stuff like that and the detailed work that you guys put in. I honestly just want to say thank you. It's been, you know, it's been a pleasure working with you.

Speaker 4 (54:07–54:09)

Well, thank you. It's mutual.

Speaker 2 (54:11–54:13)

And the guys at PMA are okay.

Speaker 13 (54:14–54:23)

So, I agree. I agree with you. It's been a fantastic work with our street and we're hopefully to continue this for a long time and get the school built.

Speaker 2 (54:23–54:34)

All right, so on that note, I'll entertain the motion to adjourn. I'll move a motion to adjourn. All right. Is there a second?

Speaker 8 (54:36–54:36)

I'll second.

Speaker 2 (54:37–54:48)

All right. Let's go ahead and we'll do a roll call vote just so I see you. John? Yes.

All right. Dr. Miranda?

Speaker 7 (54:48–54:48)

Yes.

Speaker 2 (54:50–55:06)

Mark Loring? Yes. Scott Tereshek? Yes.

Aqua Dibong? Yes. All right. And Glenn Hoffman.

Yeah. Yes. Yeah. Perfect.

I knew you had to drop off.

Speaker 1 (55:06–55:09)

All right. Thank you, everyone. See you in two weeks.