Board: Milton School Building Committee

Date: 2025-09-15


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:22–00:23)

Cool, let's get started.

Speaker 2 (00:24–00:37)

Good evening. It's September 15th at 7.04 p.m. I'll call the meeting of the Millburn School Building Committee to order. As we do with each one, we'll call just attendance.

Kerry Irwin?

Speaker 3 (00:37–00:37)

Here.

Speaker 2 (00:38–00:47)

Scott Tereshak? Present. Glenn Hoffman? Here.

Nathan Hutto? Here. Superintendent Taylor? Here.

And Mark Loring?

Speaker 3 (00:48–00:48)

Here.

Speaker 2 (00:49–06:11)

Tim Lombard? Present. I grew up on. And Tom McCarthy.

Yeah. All right, perfect. We do have a quorum. Keep an eye on the attendees to make sure.

All right. First thing on the agenda is we reserve the first 15 minutes for citizen speak. If you're here and would like to speak, please just raise your hand. We'll call on you.

We'll give you 15, three minutes, sorry. And please just state your name and your address, if you would, for the record. And seeing none, move on the… Third thing on our agenda is approval of past minutes.

Our last meeting was in July. I do not have the minutes for here. So hence, we're going to table this for our next meeting and then just kind of dive into kind of the meat of everything that we have to discuss. So item four, update discussion MSBA module one.

So for everybody on the call and present, I want to make everyone aware. school building committee, the district, so Superintendent Phelan, Tom McCarthy, everybody got everything in as of July 30th. So that's hence why we didn't have a meeting in August, so we've been waiting. The next step is MSBA will be holding essentially an enrollment where they take our documentation that they look at, look at the options that we're going to do, present enrollments, and then members of the school building committee town, the school district will meet with them and basically come to an agreement on what that enrollment number is going to be.

Timeline on that right now is the latest they can do, I think is October 28th or something like that. So I emailed them SBA today, still no date. So a lot of hurry up and wait right now. So with us, kind of in a holding pattern for the next month, from what it seems.

So with that, I'll just kind of open it up. I'm sure some people may have questions or comments or anything like that. So feel free. People, I have a panelist.

We may not be able to answer this. Do you anticipate any change in the enrollment numbers from what we've been dealing with? It's the projection that they're going to do for the new project. Remember from when we were working with the OPM, MSBA has their space template where you populate it with the number.

So that number for the enrollment that lays out all the square footage It's the projection for the options that we're looking at for either an upper middle school or a new elementary school. Essentially, all the data that we provided was construction projects ongoing in the town, permits pulled, birth, all the stuff that we've gone over. We're looking over module 1 for all that. Essentially, assembling all that data along with other things that are there.

I know Nick, And mentioned MBTA communities because the planning board, if I recall, did, as part of their study, an enrollment analysis. It was like 264 students, but that's over the full build load of it a long time. So, but they're going to weigh all that in. Do we have a projection of what we think the numbers should be?

We would use, if I recall correctly, I think it was 700 for the upper middle school was 350 and 350 or somewhere around there like 325, 325 per grade. 650 to 700 for the total upper middle school. And I think the preschool component was like 120. But that was 120 split between half day programs.

So 16 in the morning, 16 in the afternoon. And those are like ballpark off the top of my head numbers. But if we Yeah, I'm just thinking, how do we negotiate with them once they come up with a number? I've never dealt with them, so is it a negotiation?

Yeah. I have a formula we use. Unless they change, which I doubt. Well, hopefully, as part of the meeting, they'll explain the formula and the data we gave them.

It'll make sense from that explanation, hopefully. Yeah. Yeah, so I'll keep reaching out to them and hopefully try to push it as much as I can. But my understanding was there were a number of districts that they have accepted.

They've got all the information from them. And it's basically just a queue of people that they're working through for there. Any questions online or comments online?

Speaker 3 (06:13–06:13)

OK.

Speaker 2 (06:21–06:31)

Megan's on, sorry about that. I think Megan is fabulous.

Speaker 1 (06:34–06:36)

This is a Zoom user, so I think that will be Megan.

Speaker 2 (06:48–06:53)

There we go. Megan, is that you, username Zoom user?

Speaker 4 (06:57–06:57)

Yes.

Speaker 2 (06:58–07:40)

There we go. All right, cool. Welcome. So in regards to MSVA, that's kind of where we're at right now.

So the next phase is they would set that enrollment. After that enrollment is agreed upon, process would have to go to their board for a vote. So the board meets every other month. So they meet in December.

And if we don't get on in December, February is the timeline associated with the 270-day framework that they give us. So earliest we'll probably go is December. Latest we'll probably go is February.

Speaker 1 (07:46–07:47)

Yep.

Speaker 5 (07:49–08:01)

Is there anything we can say we can do to push to May or December? Like, is there any personal we have, people we can bother to explain the timeline?

Speaker 2 (08:03–08:27)

I don't know. I mean, knowing they're a government agency, I would just say, whatever your state reps are, contact them. But, you know, outside of that, with, you know, the current MSBA, I don't know any other way of doing it. So, we'd love to, if you know of any, Mark, I'd love to know.

Speaker 5 (08:30–08:37)

I'm always happy to bother people. So, I'll reach out. Appreciate that.

Speaker 2 (08:38–13:31)

Welcome, Tim. All right, so if no other questions or comments, I mean, like I said, I just want to use tonight to kind of relay this information publicly so we're all on the same page. Next on the agenda, item 4B is school building committee fall town meeting article. So some good news on this.

So since we last met, I've gone in front of the Warren committee, myself and Mark, We presented the article, the reasoning behind it. So, as you just saw with MSBA, you know, I mean, as I talked about in our previous things, you know, this is a slow process. So, as we plotted that out, even when we plotted it out last time, we thought we'd be going in the fall with that. Now, if we're not going to, say, December or February or something like that, that timelines that I was doing before it, So with that, we presented it to the Warren Committee.

They listened to it. So one of the new things the Warren Committee is doing this year, for people in the construction and engineering industry, they have subject matter experts. So rather than sitting down live with the whole Warren Committee and going fresh with everything, into it to get some feedback. So essentially when the author leaves the room where there's other discussion, they have experts that are like well-versed.

So I met with Brian McGuire and Elaine Craighead. So we met, went over everything, and there was a lot of discussion. Some just on you know, because it is a big project, but, you know, as we focus on the timeline, people have acknowledged that, you know, yeah, it would be a problem if we were to keep going forward. So, essentially, it went in front of the Warrant Committee.

It was voted, I want to say unanimously, but there was one abstention, so I don't know if that counts as unanimous, but everything else was a yes. So, it looks good for us for a full town meeting. So, you know, we're kind of, it was the first warrant article to get approved. With that, open up, any questions or anything like that?

Can I ask a question? Sure. What is the article? The article, so when we did the land swap in 2023, we had, when we passed the land swap over there, we put essentially a inverter clause onto the land.

So the swap that we did took a portion of parkland, a portion of conservation, five years later, 2028, we would revert back to conservation and parks. When we did that, we had no anticipation of getting MSBA. And, you know, as we've done this project, we've gone on parallel paths. So the path we went before MSBA, we were going on the project on our own to, like, fund it by the town and do that, knowing that, or with the anticipation there was never a chance getting into MSBA.

So we went down that path last summer. We lined up a concept design construction estimate ready to go to a ballot for a debt exclusion. The select board didn't put it on there, and that was fine. And then, so what it did is when we went into MSBA now, it basically drawed up that timeline for when we'd be able to get to a vote.

Because essentially, as you can see now, we just hit the reset button, you know, we're waiting. So a couple of meetings ago in July, I believe of the committee kind of timelines, Nick provided for other MSBA programs that are ongoing and the timelines that told them to do. And we took the starting point of kind of where we're at or where we thought we're at and extrapolated it out. Two of them came right up to 2028.

Like, we might be able to get a vote on a town meeting right before that, but the other two went way beyond it. And then now, with the further delay we're seeing now, when I update those graphics for town meeting, probably all four of them. So, for us, it wasn't to resurrect the whole land swap and go through all that fun again. It was mainly there to just acknowledge, like, this is a longer process now that we're at the MSBA, and we don't want to get to a point with MSBA and then all of a sudden revert to closed exit, and, right, we've got no land.

So, you know, for us, it kind of made sense to do it, so that's what was the issue. Yeah, no problem. Yeah, Mark?

Speaker 5 (13:33–13:57)

Uh, I think just give an update on the school committee side. We took up after the work. We discussed it at school committee and school committee voted unanimously to support the Warren article that we usually took. That's related to any of the school building committee articles about unanimous approval at the school committee a few weeks ago.

Speaker 1 (13:59–14:03)

Thank you. Any other questions?

Speaker 2 (14:04–14:59)

Comments? On the new business? New business. So, let me…

So, Good segue from the land swap. Town administrator brought up or sent over from MAPC this pathway or corridor, it's probably a better way to look at it, through Milton that they're looking at bike walk-run connections. In here, look through a lot of this because wasn't really looking at this, but what happens is there's a section of the area that they're looking at.

Speaker 1 (15:06–15:13)

Collection speeds. So I should go back to that.

Speaker 2 (15:19–19:20)

This section of Milton running right down here, the area that they're looking at is essentially Blue Hills Parkway. If you know where Gow Road comes down, touches Blue Hills Parkway, what they're looking at is reusing or redoing the lanes. Currently right here along Blue Hills Parkway you have two lanes of traffic, a bike lane and a parking lane, one lane back in this direction. I forget which one is north or south into the page or out of the page.

But what they're looking at is taking this configuration that's here now and they're looking at different options. So for us, I'm making the assumption our school will be on this side. So for these options, you know, looking at, you know, buses right now would flow out, hit the parkway and basically turn pan because there's no breakthrough in the median. So what they're looking at is the first option of essentially just switching parking and biking.

So flip-flopping them on each side to protect the bikers. And you see that all over Boston. The other one is kind of extending the biking lanes. So on this side, you know, getting basically eliminating the traveling, putting a parking lane, parking spots here, and basically extending the bike.

Um, further. Or football for another bike lane doesn't look like any parking. Not sure. But the most dramatic 1, I think, where some of these where they were extending the island in the middle reading or walking.

others, and then the final one was this one, which was probably the most dramatic, which would extend, you know, basically reduce Blue Hill Parkway down to basically one lane each direction. And this, if this was the decision that was made, you know, for us, would provide a large buffer, you know, leading up to essentially where we see this video. So, you know, Town Administrator Nick Milano sent this to me to kind of share with everybody. So it's on our radar.

So as we're going through our design, our process and stuff like that, you know, these are things we're going to want to have our architects and traffic engineers start at least getting integrated in as this may I see Glenn leaning forward, so I know there's questions. No, I'm just watching. There's an alternate six too, but it's just adds one lane to this one, I think. Yeah.

It's interesting, it says alternatives five and six could only be implemented south of Pine Tree Brook Trail. Is that where the brook is? So it's… Yeah, so…

So it would stay as it existed? Yeah, let me move that over. Let me see. So, okay.

It is south of Pine Tree Brook Trail. Yeah, so we've got a road right here, so all that portion from basically along Pope's Pond would be the portion that they're looking at doing this. How that would transition back to existing there, I don't know. Yeah, I think there's just a different project that I grew up on.

Oh, the bike path? Yeah. It's probably connecting this. Yeah, I know the former town planner, Tim Zawinski, had plans.

We were looking at the land swap and talking about land and land use and stuff. There was a plan to along the brooks or some of the waterways to create bike paths along there to basically navigate to go all the way down. So that would explain why it only goes that far up Bluebell Bridge.

Speaker 5 (19:20–19:53)

Yeah, there's currently a CPA-funded feasibility study to connect the full of Pinebrook Trail, Pine Tree Brook Trail from beginning to end through Milton, so 3 1⁄2 miles. I think they're a year or so away from doing anything with that. In the original designs, or see what exits out of the school that it didn't imagine. So I'm, I'm, I'm a little far apart.

Speaker 2 (19:53–22:16)

Yeah. So you're talking for buses and stuff like that. Let me, let me, so just so people are watching this, they don't get confused. One of the things when we're looking at Blue Hills Parkway, when we're coming out, the median that's here, I believe this is a historic roadway controlled by MDC, right?

So we weren't able to make cuts, or if we did, it would be very significant and cause a lot of abuse. So we didn't get anywhere near, like, diving into what would be for traffic and stuff like that. But if this area from here south was all debated and stuff like that, that would give opportunities for buses, my assumption would be make both directions, which would be ideal, I think, rather than having all the buses go north. Yeah, okay.

How close is the building going to be to the parkway? We're at minimum, so just to recap, So right now, it's crazy. Oh, I just coach football. I'm looking at our practice field there with the dirt down the middle.

Let's table that discussion. Oh, yeah. It's there for a meeting. Yes.

So roughly, we've got about 300 feet offset from the front of the road window from where we're going to put where our parcel starts. So essentially back in the Seattle area. Yeah. Yeah.

So there's part of the concessions, along with the reverted families that we did, was originally using all the conservation land on the side. And then what we're looking at taking is Dow Road and along the boundary of the portion that we're taking here. realigning guide road over here. So that takes a portion of the park and a smaller portion of the conservation, merges them, and just makes one big parcel.

Speaker 5 (22:17–22:27)

Which of those schemes do we think works with our potential school? I don't know. Okay, we haven't made that determination yet.

Speaker 2 (22:27–26:08)

No, like I said, this just came up from me. I didn't really dive into it. I wanted to just disseminate it to everybody so everybody can start thinking about it. And then as we bring in architects, engineers, we do our interviews for them as part of it.

You want to catch a question, that's a good one to ask how they plan on integrating that. And I can guarantee it, they won't be ready for it. Unless they're watching this meeting and then they'll be ready. You were saying you've got alternatives five and six with the extended medium.

The medium would be on the high school side of the Little Parkway. Yeah. And just looking at this, you know, for me, I would assume they're going to want that up against conservation. Yeah.

All that. I was wondering if that would affect our ability, like if that would affect the departure there, if that road would get closed off. Yeah. So, yeah, I don't know.

Yeah. I don't think the road will get closed off because they actually It would exit into this median, that's what I was wondering. One of the, one of the, well, I would assume it would extend all the way across. So the key thing to remember about this, and you'll probably remember it from when they created this, that's not a road, it's actually a driveway, technically.

So Gow Road coming down there is actually a driveway up to the high school, technically, is what it's known as. So my assumption would be where that comes down and touches Blueville Parkway right now, So are we saying, this is so far down the road, but are we saying out loud that we're considering or not considering or just leaving it for future discussion about whether or not we can cut that median and be able to have buses and traffic go north and south? Or do we think that that's gonna be too big of an answer? No, well, as part of the project, I'd like to ask for it, definitely.

Anything to mitigate traffic, if it's an additional hurdle, for example, like going in front of NBC or whatever, generated from an initial layer of muscles, I think, would warrant doing. I'm definitely not saying I don't want to do it, but for me, I want to get through the traffic analysis once we bring on the designers and their traffic engineer. because we'll have to look at scheduling of the buildings, because high school and the middle school, upper middle school might be different times. So it ideally wouldn't be buses at the exact same time and how that gets layered in, we'd have to look at that.

That was something that we initially started looking at with a traffic engineer. And then when we brought on the new team with Arrow Street and stuff like that, we didn't use them. So there was a traffic engineer from BHP, a friend of mine that I reached out to was one of their traffic people and now we've got one. Okay.

They're actually pretty good. Yeah, I've got a lot of projects, not with their school people, so the team that we work with, Shanali and Larry and Andrew, they do the school transportation and they do a lot of work at the airport with them, and they're phenomenal. They were good, hopefully. Hopefully get them back, so we'll see.

Yeah, Mark, sorry, I didn't see your hand up.

Speaker 5 (26:09–27:13)

No problem. I know we, unfortunately, probably have a lot of time on our hands here with how this project develops, but I think typically state agencies, we see with MSDA, are quite slow on all of this, so I think it might even behoove us You know, we don't quite have a design, like, I think, in many scenarios for developing on that parcel, regardless of what the program is, a curb cut through that median would be nice. And I think if we could reach out to NAFDOT, if that's the agency, or whoever it is, to try and talk to somebody about the kind of initial conversation what is the pathway right like what are the approvals and the things they will need um so then we can you know make sure that is clear within any RFC we end up doing for architectural services through the NSBA. I just think that those are steps you're going to have to take kind of regardless I don't necessarily know if right now you need to wait for an OPM or an architect to at least have an outreach board.

Just stay open to

Speaker 2 (27:15–27:26)

Yeah, and I believe the state agency would be dealing with those DCRs, not MassDOT. But I would, there's somebody on the committee I know that can take a look at that.

Speaker 4 (27:26–27:48)

Hey, it's Megan. Even if it were MassDOT, you know, all the environmental permits and everything would take us through EEA. So I would, I would start with DCR and DEP. Okay.

since it's technically a parkway.

Speaker 5 (27:56–28:02)

Shown as a civil and state engineers outside of the architectural consultants.

Speaker 2 (28:02–29:37)

In other words, they work directly for us, correct? No. No. A lot of time they do it on schools.

Yeah. They work directly for the owner. Yeah. I don't know with this process of MSBA.

I thought it would just be a singular team. It is everything except whatever reason civil site tends to do. I thought Geotech was us. Geotech is definitely it.

So we did Geotech over there. I'll check on that. So you don't actually have to do the delineation for a little check. That was just building on what Mark was saying.

If there's anything we can do with preliminary. Yeah. It's easier if it was an independent contract, independent engineer. Yeah.

where their limits of work are going to be, we'll probably want to have that defined to extend that. You're right, it must be a minimum requirements for who's part of the design team. Yeah, because when we were doing it before, the goal previously was to do a Chapter 30 package for all the horizontal construction and the 149 stuff for all the vertical and do that for Yeah, I'll ask MSBA. We get the geotech, but they may need additional warrants too.

Speaker 5 (29:39–29:57)

If it's helpful, I think I'm on a different project I'm working on for my job. I'm working with DCR, so I'm trying to connect with people I've talked to on AppSuite. There are other people they recommend we have an initial conversation.

Speaker 2 (29:57–33:21)

Okay, and I can reach out to my friend at BHP too. So if you want to do that, Mark, and I'll do it on my end. And I mean, just, you know, see where we end up, but hopefully the response will be the same. Maybe we just reach out to the people who produced this report.

Might be a good spot. Yes. Some of the MAPC, the planning people, not really the technical people that would be in the weeds for, you know, what we need. The other one we'd have to look at is what their timeline is on that.

And I mean, if that's far out and stuff like that, beyond what we're doing, then they would not incorporate whatever we built. And I mean, so if we did the median cut to make it two way, and then we'd always ask for at this point is consideration Call it a race. Yeah. Yeah.

Yeah. Obviously, Nick said that for us, like they want engagement, I'm assuming, for some of the stuff that they're doing. So, a shout out to them, too. Sorry.

You guys mentioned geotech. Are we doing geothermal for? We'll see. So, originally, so we did geotech mainly just for structural foundation borings to know the subsoils and stuff like that.

When we were working with Arrow Street, they promoted a geothermal HVAC system, mainly due to the rebates and everything that were there. Whether those are still in line with the current administration or if they're going to expire during that time, that would play into all of it. Because essentially, their analysis when they looked at it was higher front costs, longer less operation-positive, but a long-term. So it was money that we'd be fronting up front, but basically making out of it at the time.

And that's, for us, made the decision to do it. And one of the schools that we actually visited, I think it was Acton, was the one we went to. It had a geothermal system, so we were actually able to walk in and see some of it. I just got through with a $295 million project in Belmont.

We had geothermal for the whole thing. It was great, 7 through 12. Okay, yeah, your project was the one I was when. Yeah, so just hearing the committee and started looking at some of the projects that are pretty good up for cost, but the projections were pretty interesting.

Yeah, there's a couple if people want to dive into it. I think Concord did a real like their financial people that were on the school building committee did a really detailed finite cost estimate on the operating costs and all that. and almost every one of them that you dive in, if you've got enough time to watch it, you'll see the details of it. So knowing it's already been balled back multiple times, I'm fine with it.

If we had some weird subsoil thing, like if it was all sand or different types of fill, it wasn't as conductive, I'd be a little more nervous, but typically what we saw out there was standard, at least from the report that we saw. Anything else on the parkway?

Speaker 3 (33:24–33:25)

All right.

Speaker 2 (33:26–34:40)

Almost there. All right. So basically, moving on. So future meeting dates, what I was thinking was, again, just have a touch-in next month on October 6th.

ahead of the rhythm that we're trying to sit on. If, for whatever reason, nothing comes up with MSBA or nothing comes out of, you know, a hiccup with town meeting or anything like that, we may just want to cancel it rather than, because, you know, put it this way, if the agenda is going to be extremely light, then we should text it up. I'll let you cancel it, but if you do it right now, it's got to keep that as a placeholder. that work, how we're able to jump online, right?

Right. Outside of that, I think the only thing left on the agenda is the adjournment. So unless anybody has anything else they want to talk about.

Speaker 5 (34:40–34:42)

I'll make a motion to adjourn.

Speaker 2 (34:43–35:10)

All right. Second by Nathan. All right. Motion's been made and seconded.

I assume no discussion, so we'll go to a roll call vote. Tim Lombard? Yes. Gary Viggen?

Yes. Scott Tereshek? Yes. Glenn Huff?

Yes. Nathan Hutto? Yes. Mark Loring?

Speaker 3 (35:11–35:11)

Yes.

Speaker 2 (35:12–35:19)

Akora Baum? Yes. Megan Haggerty?

Speaker 4 (35:19–35:20)

Yes.

Speaker 2 (35:21–35:22)

And China will work. Yes.

Speaker 1 (35:22–35:24)

Thank you very much. Have a good night.