Board: Select Board

Date: 2026-08-04


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:21–02:27)

All right, thank you, everyone. I would like to call to order tonight's meeting of the Milton Select Board here Tuesday, August 4th, 2026, 7 p.m. in the Dunphy Conference Room at our fire headquarters. I invite you all to stand with me for the Pledge of Allegiance.

All right, we will now open the floor for public comment. Public comment will have a total of 21 allotted minutes. Each speaker will have three minutes, and I will keep the time here. I will invite Ms.

Debra Felton to join us. Thank you. Good evening. Debra Felton, Precinct 2 Town Meeting Member on Willoughby Road.

I'm here to speak about short-term rentals and the need to get this regulation or bylaw on the books now and not have it pushed down the road. I've been concerned that short-term rentals have a negative impact on our housing stock. Just in a two block area in my neighborhood, there are two, two families and they're all short-term rentals. That's four units that housing that people could be living in.

I did a lot of research. I gave it over to the planning board. The town's attorney, Carolyn Murray, she drafted a clear bylaw and I think it is ready to go now. Regulating short-term rentals is something that residents are asking you to do and asking the town.

Speaker 2 (02:28–02:39)

I really don't want to see this pushed down the road. The building inspector has the tools to inspect short-term rentals. And he can pull in the health department on a case by case basis.

Speaker 1 (02:39–03:29)

And that's what many towns do. Um, I know that when I first started researching this, I reached out to some of the neighbors in East Milton, spoke to John Cohane, um, gave him permission to use his name at the planning board. He was very happy that something was going to be done about regulating short term rentals. So I ask you to move this along and not wait until the spring.

Thank you. All right, can we see a hand raised on the line? Mr. Corey, can you hear us?

Can you hear us?

Speaker 3 (03:30–03:30)

Can you hear me?

Speaker 4 (03:30–03:31)

Yes.

Speaker 3 (03:31–05:06)

Okay, great. Thank you very much. Dear Select Board Chair and members, good evening. I reside at 1452 Canton Avenue, and I appreciate the opportunity to speak during public comment.

I'd like to request that the Select Board notify the Massachusetts Department of Transportation mascot about our concerns regarding the Randolph Avenue road diet and its impact on Canton Avenue. As you may recall, Mascot testified on May 26, which is 10 weeks ago, that the road died at adverse effects on Canton Avenue, leading to increased traffic volumes. In fact, some of the vehicles on Canton Avenue are traveling at speeds exceeding 60 miles an hour, and some are approaching 80 miles an hour. I understand that the town administrator has been working closely with Mascot to address these issues.

However, I believe it would be beneficial for the select board to invite MassDOT to attend the next select board meeting. This would allow us as residents to receive an update on the progress of the situation and gain insights into their proposed solutions. In collaboration with my neighbors, I have compiled a report outlining feasible solutions to address the traffic and speeding concerns on Upper Canton Avenue. We believe that working together, we can implement badly needed traffic calming measures to enhance the safety of our neighborhood.

I await your discussion on this matter during the public comment response, and I appreciate your attention to this significant issue. Thank you.

Speaker 1 (05:09–05:51)

Thank you. Seeing no one in person and no hands raised online, I will now close public comment and respond later in our agenda. that close we move to item for discussion of the approval of the proposed local historic district for Milton Village an article for fall town meeting the historic district did speak about this last meeting I invited Mr. JD Wildman and a couple of other developers in town to join us to hear from some of our business community about the article.

Gentlemen if you want to join us.

Speaker 5 (05:58–16:58)

I made a few notes, so if you don't mind, I'm going to read a few of my notes just so I make sure I cover all my bases here. Good evening, members of the board. My name is JD Miles, and I own property in Milton Village. I'm also a local business owner.

I own and operate Muscle & Flow, which is a business down the village. I'm also a resident of Milton Hill. I live right up the street. So the local historic district bylaw disproportionately, in a lot of ways, affects me, which is part of the reason why I've been very vocal in encouraging more community engagement.

I care about this neighborhood's character as much as anyone in this room. I have such a direct long-term stake in what happens there that I think it's important that we have an honest conversation about the implications of putting together a local historic district. With me tonight, I have two additional property owners behind me, Kyle Harnish and Bob Falcone. On the call, I did reach out to a handful of the other property owners that I talked to.

I do not know if they are on the Zoom call because it was August, they were unable to attend. But I do have two property owners on High Street, an additional property owner at 5064 Adams Street, and then I have several business owners that have expressed concerns as well and said they'd be happy to provide letters expressing their concerns. That's so true on the part of the board. I also want to acknowledge, before I raise any concerns, I've had the chance to look at the updated draft in tonight's packet, and I do appreciate that Town Council has cleaned up a number of issues from an earlier version that I'd seen.

My concern tonight isn't with historic preservation as a value. It's about whether this specific bylaw in its current form is ready to go before town meeting, and whether it reflects genuine broad-based consensus among the people who will govern. What I'm gonna do first, if you don't mind, is I'd like to present my kind of high-level macro concerns, and then I will jump into some of the specific bylaw provisions that I have concerns about. Number one is that the process has not matched the scale of the ask.

So a local historic district, as many of you know, is not a minor overlay. It requires a majority voting town meeting and the attorney general approval. It's one of the highest procedural bars in Massachusetts municipal law, reserved specifically for changes that lasting legal and binding effects on private property rights. Community discussion and outreach to gauge resident and property owner interest is laid out in the state guidelines as the first step in a properly sequenced process.

Before a study committee is even appointed, One of the questions I have is that, did that outreach occur? Or at a minimum, did that reach the 30 effective property owners prior to establishing the local historic district in the village? Or has that engagement mainly been concentrated among a subset of residents who are interested in adding the local historic district? A proposal this consequential deserves a level of demonstrated buy-in proportional to its two-thirds threshold, not just committee consensus.

Number two, and this is a macro concept I think going across the town, I think this local historic proposes a divisiveness risk. Historic districts regulate private property in ways that ordinary zoning does not. They require prior government approval, in this form it's called certificate, before an owner can alter their property. When that level of control is imposed on 30 specific properties by a town meeting vote, it invites a lasting sense of done to us, not with us, among the very owners most affected.

This dynamic tends to persist well past the vote, surfacing in every future certificate application, every future commission election, every future dispute over what appropriate means. I think it's fair for this board to ask whether the current process has done enough to convert affected owners into stakeholders rather than subjects. A district that a majority of its own property owners feel was imposed on them starts its life with a legitimacy deficit that no amount of design guidance can fix later. Number three is that it's a deterrent to investment and revitalization.

Milton Village is explicitly described elsewhere in town planning materials as an area targeted for mixed-use revitalization, mirroring a second potentially conflicting regulatory regime on top of that, one that requires commission review before any building permit touching exterior features can issue, creates real uncertainty for owners considering investment. Just for context, as I'm sure most of you are aware, no building permit for construction or exterior alteration and no demolition permit may be issued anywhere in the district until a certificate has been granted. This is a categorical precondition on private capital improvement, not a narrow historic preservation carve out. Even under the bylaws own deadlines, that's a potential 60 plus day gate before a building permit can even be sought.

Real friction for small commercial mixed use projects in the area of town that separately targeted for revitalization through the Milton Village PVD zoning district. The memo's own practical considerations issued by the state section flagged the town's, excuse me, the memo's own practical considerations section flags the town's existing Milton's PUD zoning as design guidelines that need to be considered and reviewed for consistency within the proposed LHD guidelines. As far as I'm concerned, that review has not happened yet. I still see the comments in the existing bylaw and asking town meeting to vote before that conflict is resolved.

Risk creating two regulatory regimes actively working against each other in the same 30 parcel footprint. Number four is a lack of demonstrated community support. The study committee was appointed, I believe, in 2021. Don't quote me on that.

It has issued its recommendation, I believe, in 2023, based on my research. A multi-year process driven by a committee culminating in a report. Nothing in the memo describes a resident or property owner referendum survey or vote specific to the affected partials. I have had conversations with members of the committee before about a survey that went out.

I, as a property owner, did not get that survey. So although one may have gone out, I don't think it was ever actually sent to the specific property owners. It's fair and reasonable to ask what is the actual documented level of support among the affected owners, as opposed to the level of support among the study committee and the preservation committee generally. These are not the same constituency, and the two-thirds town meeting threshold exists precisely because binding property rights changes should not rest on the enthusiasm of the subset.

And then there's still some open legal questions. that I'm not entirely clear on in the existing bylaw, one of which the new draft showed a quorum versus a threshold mismatch. So the revised draft that I read prior to coming in here that the select board's package sets a quorum as a simple majority of those appointed, which I believe would be commission members potentially as few as three while a certificate approval clause still contains an unresolved marginal vote. And it's unclear if there's a scenario where a two-to-one vote would deny a project.

There was also some language in there in a prior version that was regarding the setbacks, and I saw that that was removed. As far as I'm aware, I think that's really important. I don't think it's appropriate to have non-zoning departments weighing in on zoning matters. So I'm happy to see that removed.

You know, I'm just going to fly through some of my micro concerns. You know, one is the scope of permit trigger is unchanged, and it's essentially a blanket. Every building and demolition permit that touches an exterior feature is gated by a certificate, regardless of scale. The concern there is that it's hard to, as a property owner, to invest in property when you do not know if the fruits of your effort in collecting budget, scope, time, and architects is going to get approved.

And unfortunately, the way this worked out is you actually can't get before the local historic district until you've spent money. And this group of future appointed individuals on this board, we don't know who they are. We don't know what their design guidelines are. It very likely could be a board that technically overrides the planning board and the zoning board.

So I would ask that if this doesn't go before a vote and the committee is willing to go back to the table and engage the business community, We have a conversation about routine, life-for-life replacements, and if those should qualify as non-applicable, maybe try to make some of these smaller improvements that we can encourage property owners down there to invest in their properties and fast-track those versus some of the larger projects that might require a little bit more diligence. I saw that signage was removed. I'm happy to see that was removed to make this board aware that there's a new sign bylaw in town. We recently went through it with the approval of 2 Pence Market down at 2 LA Street.

And it does create a much longer process for business owners. Many signs in town are pre-existing non-conformance. So by changing the business, changing the shape, you essentially trigger a non-conformance sign that requires only one relief. which I'm sure is all you can imagine.

When you go to open a business, waiting 46 months to have a ZBA approval and a building permit from the building department to hang a sign is a huge deterrent, especially for some of these smaller spaces that we have in the village that require pretty light turnover. And then I think probably before I jump into my closing statement and happy to answer any questions, I think we should really have a conversation about, is this the right fit for the village? I don't see a scenario where we can have the design guidelines in place before we vote as a town on this. And one of the concerns is we would have to adopt the commission's authority before its guidelines even exist, which means that owners are being asked to accept binding review under criteria to be determined later by a body not yet seated.

I'm sure all of you who have residential properties in this town would probably feel uncomfortable a group of individuals that you do not know who they're going to be in design guidelines, that you do not know what they are, getting to show up and tell you what to do with your own property when you want to replace the roof, replace the shutters, replace your deck. So I hope that same courtesy gets extended to us just because we're business owners and property owners. I don't think we should be treated any differently. Lastly, I want to recognize that this draft is meaningfully improved from the version I reviewed previously.

And by no means am I asking the board to dismiss the study committee's work. Myself and Larry have spent a lot of time going back and forth. And I know that they are volunteer positions and they're doing this with good faith in their heart. I'm just asking that before this goes to a town meeting for the vote, the board require a few things.

One is a finalized internally consistent bylaw with no placeholder language or contradictory provisions. So town meeting can vote on something that they can look at in advance and not show up day of. Two is documented outreach and a clearer read on support specifically among the affected property owners, not just the preservation community. a resolution to acknowledge conflict with the Milton Village existing zoning design guidelines before, not after adoption.

That's not opposition, that's preservation, and it's due diligence on a proposal that will bind roughly 30 of my neighbors in my own properties for the long term.

Speaker 1 (16:58–17:05)

Thank you. Thank you. That's a lot of information that we'll leave it. I'll open it up to the board for any questions or comments.

Speaker 6 (17:08–17:17)

Can you give me a copy of your testimony? Can you give me a copy? Yeah, sure. Sure.

Yeah.

Speaker 1 (17:17–17:23)

Sure. I can leave this here. Or you can email it. Or I can email it.

Speaker 7 (17:23–17:59)

Yeah. I think it's, thank you for coming. I think it's really helpful to understand from the business owner perspective where things potentially are in conflict, right? I think our goal is to make sure that there is a robust process that is able to streamline things for business owners.

We want business owners to be successful in Milton, and we don't want to have a lot of barriers, I think, in the way while maintaining the character of the community.

Speaker 5 (17:59–18:48)

So thank you for sharing. I recently helped open Two Pets Market. That's an example of the work that I'd like to see further in the village. I think we can achieve that outcome with collaboration.

I don't think it needs to be a device of over-regulating, board-heavy approach. You know, I often stick my neck out there and come to these public meetings, present all the information myself. My cell phone's always on, the building department, town administrator, anybody can call me at any given time. I look forward to collaborating with the boards in this town and producing a village that families kids can ride their bikes to and are more foot traffic friendly and less of a pass through where it's hard to cross the street because the cars are flying so fast.

Speaker 1 (18:48–19:03)

Yeah. Mr. Wild, I want to thank you for what you're doing down there in a couple of great properties. You're probably the majority owner of the most down there, right?

Right now? Yes, sir. Yeah. So I appreciate you coming in and explaining a lot of this for us.

Speaker 8 (19:04–19:14)

And sometimes too much government's not good. And I'm very appreciative of what you've done down there.

Speaker 1 (19:14–19:24)

And I hope we all try to help you out and make it a lot easier moving forward. I'd like to see the rest of your properties develop like that.

Speaker 5 (19:24–19:26)

I agree. Thank you.

Speaker 9 (19:26–19:26)

Thank you.

Speaker 5 (19:26–21:28)

One of the difficult things is that even if, you know, we don't know what the design guidelines are yet, we don't know what the individuals are, we're going to sit on the future board. But one of the problems is that even if we get the most business-friendly, forward-thinking individuals on that board, we're still out of the gate adding 60 days to a permit timeline. Practically speaking, this is kind of how it looks. If you wanted to do a project like Two Penns Market, you would actually start.

I know there's been some confusion about where this would come into the process in the timeline. You would never go to the local historic district at the end of the project because The way it's read now is that they have unilateral binding authority to deny a building permit or not issue a certificate which would deny it. So there's a hypothetical scenario where you could go present to the planning board, have spent hundreds of thousands of dollars, a ton of time, get an approval, go to the local historic district, and for whatever reason, somebody doesn't like your project, get everybody to decide no on it, and then all of a sudden your project is stuck and it can't move forward. So now we've got an elected group of individuals at the planning board whose authority should be more heavily weighted than an unelected appointed group of individuals, but it's not.

This is unilateral authority. So the zoning board could say yes, the planning board could say yes, and then you would show up to the local historic district. So the way we practically handle that in real life is we'd actually go to the local historic district on the front end, because we never put all that capital and all that time at risk to then have no leverage in that final conversation. When you're talking about design and stuff that, if there is a substantive change that comes from those local historic conversations, you're going to have to go back to the planning board, you're going to have to go back to the zoning board and modify your application and your plans to adjust for the things that have been asked.

So it becomes a parallel approval process. That's generally how it works is you try to get in front of all the boards informally early on, get that feedback loop. But, you know, it's just one more area to entry. It's certainly an additional cost.

It's adding a ton of time for small businesses to open that want to do a paint or window replacement. So, you know, even if it turns out in the best possible way, it's still going to make it harder to open a business. and be a property owner down in the coast.

Speaker 1 (21:28–21:40)

Thank you. Thank you. I have a hand raised online. Charles Hajar, I think he's one of the business owners as well.

Mr. Hajar, can you hear us?

Speaker 9 (21:40–22:32)

Yes. Can you hear me? Yes. Okay.

I'd like to start by, well, good evening, everyone. I'd like to start by saying I agree with everything that JD has said. It's going to be another barrier, another board of really well-meaning people but uninformed and it's going to run up cost, professional cost. It's so expensive to make anything work these days.

A lot of projects are not getting done because the cost of construction is so high and this will only make it higher. So you'd have less things getting done, less things renovated, less beautiful markets like J.D. just built as a result. So I want to go on the record of being completely against it.

I know when we, I'd like to ask J.D., how long did it take you to get your permits to build the two-pence market?

Speaker 5 (22:33–23:02)

Yeah, we were, we did not have a commissioner at the time. So we had an acting commissioner that was in, so there was a substantive delay associated with that. But it took about a little over a year for an adaptive reuse of an existing building. between planning approval and building approval, both of those processes independently.

were probably six to eight months, but because there was a lapse there without an acting commissioner, it slowed down the process a little bit. So that, again, that's without this involved. It's already for an adaptive, relatively straightforward use project like that.

Speaker 9 (23:02–23:51)

It's already been- This will only make it longer. Absolutely. Fortunately, you were able to carry the building and pay your taxes and your mortgage and everything else. A lot of people can't do that.

I know we did the facade over. I have the building across the street from the two-fence market where Citizens Bank is, and my office is there. It took us so many meetings, so much time, and I didn't get any more rent from citizens as a result. They have a very long-term lease.

When I did it out of pride, I wanted to make the area look nice. If there was a historic district in another layer and more expense, I would have said, you know, the heck with it. Why go through all that? Pull my hair out.

So I am completely against this. I think it's really bad for that part of town, and the opposite will… happen. There'll be less development as opposed to more.

Thank you. Thank you for time. Thank you.

Speaker 5 (23:53–25:48)

If I could just add to that, a good example is one of the buildings that I own is it's a two-story building. It's 73 to 79 Adams Street. It's got eight office spaces on it, but I redid. I did a copper stainless steel roof.

So because there wasn't a local historic district, I could go down to the building department with a light set of plans just to replace a front roof section. It was old cedar shakes. I don't know if any of you remember, they were very beat up, very distressed. Very easy permit for the building department to issue because it's a simple front roof replacement.

I don't think I would have pursued that project if I had to go before board, put together a set of plans. The project was already expensive. It's a very small roof section. If I had to add additional costs and additional time on top of that, I would have just said, you know what, I'll just let that continue until I absolutely have to replace it.

Those are the types of improvements that aren't going to happen. And if you look at the village right now, a lot of it is asphalt shingles and vinyl siding and vinyl windows. Like a lot of the character of some of these older buildings has already been kind of stripped out. And I would love to see all of that come back to a wood clap or a slate roof, copper flashing.

The problem is, is I don't think that the smaller properties are in a financial position to commit to that. And I don't think they're going to pursue any sort of improvement because they're going to be terrified that if they touch their siding, someone's going to tell them that they have to replace it with something more significant. And if the response is that, no, that's not what they're going to do, then I have to ask the question, why are we doing this? Right?

If you're going to allow them to put vinyl siding back on it, then why are we going through this exercise? Why are we adding this letter of regulation? It's one or the other. We either make a commitment to make all of the village come up to historic design standards, or we don't.

And I think if you hit that side, more property owners are going to show up because they're going to realize that they can't afford to keep their property if this gets imposed. So I think it's concerning and I think there needs to be more public outreach and more community engagement.

Speaker 1 (25:51–26:54)

Thanks for the information. I feel like in sort of the underlying tension between the issue here behind the bylaws on the one hand, you know, and in interest in preserving sort of a uniquely historic part of town, particularly, you know, significant alterations or worse. On the other hand, allowing the right amount of, you know, growth in the area. And if not for this bylaw, What what's to sort of protect on the front end of the issue?

I mean, from your perspective, having gone through that process, I'm partly asking so that someone you're not familiar with the existing process to understand like what's involved. Like it, it, it, our, our, from your perspective, is there adequate sort of protection against those concerns in place now?

Speaker 5 (26:55–31:00)

Um, so when it comes to minor repairs, no. I think as it's written right now, anybody can replace the sign on their house down in Milton Gorge with whatever they'd like, and I think that shows. Unfortunately, the opposite is also true, that if you were to impose a harsh standard on individuals who've owned property for a long time where they have to do cedar clad boards and aluminum clad windows, you are now essentially, it's essentially a government taking where you're putting overly costly burden on them where they're not a finance, they cannot afford to repair the property, so it's forcing the sale in a lot of ways. With taxes going up, I think it's a delicate issue, and I think it needs to be more thoroughly discussed.

On larger scale projects, we just modified the site plan review process as part of this town, which is a much higher barrier to entry for applicants. So historically, it was kind of gray on what exactly was needed in the application to get in the door for a site plan review, which is the planning board's process for determining kind of larger scale projects. And with the new site plan review by law, it's much more spelled out exactly what that is. So with that comes pros and cons.

The pro is, is that the applicant has a much better understanding of what's ahead of them and what the board's gonna expect. And the board can presumably be more efficient in their processes review. The downside of that is it's, you can't get in the door without spending six figures. I mean, it's a massive lift off front end to show up with a complete application.

So we certainly have that. We do have a demolition delay for anything historic in this town. I know it's only two years. And candidly, if this local historic district only was trying to deter demolition because that two years is inadequate, I wouldn't even be here right now.

I have no intention of tearing anything down that's historic. If I ever did, I would be engaging the community just as I always have, and I'd be engaging that discussion. But this isn't just demolition. This is any building permit.

So, you know, I think if you look at the village over the past 70 years, it's pretty much all stayed in the same hands of the same individuals. It's finally trading hands. And fortunately, I would argue that they're in hands that care about this town. You know, I live right up the street.

I'm a property owner down the area. I'm also sitting on the building committee for the wharf park. I'm trying to help fundraise for that. I coach youth football, heavily engaged in the community.

I care deeply about this town. I care about my brand and my reputation. For all intents and purposes, I would say that the three most historically, four, excuse me, the four most historically significant buildings are 1 Elliott Street, which I currently own, R2 Elliott Street, which was just converted to Two Pence Market. Third, I would argue is the Masonic Building, which is where the post office and the hardware store is.

I own that building as well. And then the fourth, I would probably say is the Joseph Fennel House, which is the brick front to the left of the Citizens' ATM at Charlottesville. So all four of those buildings are in my hands, and all of those have been improved. Joseph Phenomenos, I redid the entire brick facade on the front of the building.

Redid all the shutters, repainted the whole building. Two LH streets was just converted to Penn's Market. One LH street was stabilized into adaptive reuse, brought in new tenants, new offices. I've done a pretty significant property cleanup over there.

So I think a lot of our concerns are addressed by having ownership who wants to collaborate and come to these meetings and present and have honest conversations about what we want as a community, not just as an applicant. And then lastly, it was all kind of taken out of the MBTA zone, so that doesn't really apply. The only buildings, and Nick could probably correct me if I'm wrong, but I believe the only buildings down in the village that are part of this that did get included in the MBTA zoning are 108th Street, the extra space storage in 88th Wharf, is that correct? Yeah.

So most of the buildings that would be of concern that are maybe smaller and probably could be torn down aren't gonna get the benefit, and then they're gonna go through the overlay and the design guidelines that come with it. So there already are established design guidelines that were over multiple years back. So I know it was a long-winded answer. Hopefully, that was helpful.

Thanks.

Speaker 2 (31:01–31:03)

Yeah.

Speaker 1 (31:03–31:22)

So I'm a little bit confused because when we had the proponents of the historic district bylaw presented, I was on the understanding, based on the testimony, that this would apply only to demolition.

Speaker 7 (31:24–31:52)

And it seems as though perhaps it doesn't. And I understand that there's probably more work to be done, like back and forth, to get more business buy-in to this before it goes forward. But say if this were just to apply to demolition,

Speaker 1 (31:53–32:14)

Would it be fair to say that it would be better for a business owner to encounter restrictions on demolition earlier in the permitting process, before, as you mentioned, zoning, including before approval, than at the very end?

Speaker 5 (32:16–33:23)

Yes, if this would only apply to demolition, And I can't speak for any of the individuals on the call or anyone sitting behind me, but I certainly would be substantively less concerned and probably would have no real resistance to this. Practically speaking, the way, if you were gonna try to do a substantive project that involved demolition, the way you'd handle that is you would start with this local historic district on the front end, provide a noticeable project intent, where you essentially explore it, figure out the feasibility before you start spending the money to pursue the… Yeah, sure. Yeah.

You know, and that's, I mean, candidly, that's, I would ask you guys to think about your own residential properties. This is going to affect our property values, right? The marketability of our property gets decreased substantially because majority of individuals that buy commercial real estate do not want overregulation over commercial real estate. It creates unpredictability, creates friction.

So overnight, we're losing value in our properties. And in my particular situation, again, I can't speak for anybody, but I've invested millions of dollars down in Milton Village. I've paid millions of dollars in taxes cumulatively across all the properties. And to have that value taken away is frustrating.

Speaker 2 (33:25–33:30)

Does it add value to your business by having historic district guidelines in the area?

Speaker 5 (33:31–33:48)

So my understanding is that there's, so on the business, I am a real estate broker, but on the sales side out, there is no value improvement because of it. Most people shy away from properties that are regulated because it does affect your ability as a homeowner to do a lot of improvements.

Speaker 2 (33:48–33:59)

So it's on the regulation aspect of this, not in the relative aesthetic quality of the buildings in your immediate incentive.

Speaker 5 (34:00–34:01)

I'm not sure I fully, do you mind?

Speaker 1 (34:02–34:25)

So you're saying that the regulation drives down the value of the property, like the regulation in the area is what drives it down, but the aesthetic standards in the immediate vicinity of your property don't have a bearing on your property's value.

Speaker 5 (34:26–35:48)

So if all of the buildings came up in aesthetic, the village would be worth more economically from a valuation standpoint. The issue with that analysis is that overregulation often leads to unintended consequences, like rent control is a good example of that. On its face, a relatively facially neutral and productive policy, but the actual implications are that landlords just choose not to improve their property and keep rents lower because it doesn't make financial sense to invest in it. So I think what you'll see is a village that historically has had legacy ownership that hasn't invested in their properties.

Anybody that is considering doing improvements, depending on the financial position, will probably pass on it because they will not be in a financial position to make the improvement. And that's what I was saying about, if the answer to that is no, we're not trying to make it more expensive, Well, then it's, what are we doing here if we're going to allow people to move outside and back on their houses? And that's the hard part. If everything came up, would I be happy with it?

Of course I would. Do I think that that's even remotely practical or realistic? No. I think that would be a financial suicide for many of the property owners down there to be forced to spend that level of money on their property if they're not in a financial position to do so.

Speaker 1 (35:48–36:05)

Many questions for me. That was very thorough. Thank you, Mr. Wilder.

Quick question. Is there anything in this article that's written that you found to be an additive to the district as a resident or business?

Speaker 5 (36:05–37:25)

Anything that would add value, you're saying? I mean, I don't think it's unreasonable to want more control over demolition. I think 1 Elliot Street and the Masonic building are probably the two nicest buildings in the town of Milton. It would be an absolute shame if they ever disappeared.

And I can see how there's a concern about the demolition delay only giving the board two years maximum. I just don't think that that's reality in today's economic times. I don't think anybody would ever purchase any of those buildings and then tear them down. The math would never make sense.

you know, pre-existing beautiful brick buildings that you're paying for on the front end. It is so expensive to build those buildings now. They're all small sites. It's not like you can squeeze in a ton of construction there.

So, you know, I can see the argument for a demolition restriction capability in the village. I think that's a fair request. I don't, I personally don't see making it harder for businesses, make it harder for, I think we should be rolling out the red carpet property owners in Milton George to improve their properties and spend money to replace the roof, replace the window. I think we should be doing whatever we can to make it easier and fast track the property for them.

So, yeah.

Speaker 1 (37:25–38:19)

Thank you. Also, thank you for, and congratulations on opening of Two Pints and your work in the town, not only as a business owner, but again, as a resident and parent in the town. I think it's really important for you all to join us just so we have or more complete view of the article, particularly with zoning and anything related to properties and building, we need to have an understanding of all of the impacts, whether intended or not. Because these things can get very complicated and complex, and the fallout can be dire.

I think all of us that would like something more in Milton, whether it's aesthetic or for quality of life, it's really important that we understand can be created for our residents. So thank you for your time, Mr. Wild. I do see a couple of folks in the back.

But no other questions from the board?

Speaker 5 (38:20–38:29)

I think we have to go. Thank you. I appreciate it. Thank you.

Much appreciated. I have my notes on this. Do you want me to just email it to Tom? Yeah, if you email it to the board, we'll have it.

Speaker 1 (38:29–38:49)

Thank you very much. I appreciate your time. Thank you. Can I?

Yeah, so Ms. Laffer, I'm going to give you some time to sort of share. I can do this in three minutes. But I will say that the intention is not for it to be kind of a point-counterpoint.

Speaker 10 (38:49–41:32)

No, no. I just wanted to let JD know and the board know, factually, when something becomes an historic district, values do go up. They absolutely go up. In this case, the other issue is, that the definition of historical can end up being just one building in that area.

It's not all of the buildings. All of the buildings will not fall under this. And my understanding from working on this for four years is it's going to work at the same time as everything else. I agree with J.D.

You should go first to the historical committee that there won't be a slowdown. There is, I mean, two pence is another gentrification. It's awesome. And that bank building, I mean, that's a beautiful renovation.

It never would have been not permitted. So the other thing that happened over those four years is we on Milton's website, we had, well, in four years, we probably had 40 meetings, all of them public. We had called for three public meetings when we only needed to have one. That's all in the past.

Between now and town meeting, we're going to ramp that up. We're going to speak to every individual business owner and property owner. And we're going to provide them information how this enhances the area, not detriment to any of the building. Milton has been building and changing for years.

We want to keep a flavor of that. We do not want to slow down growth at all. And this particular bylaw was written with that in mind. What happened before with other towns is not necessarily what's in our bylaw.

And I think that's a difference. And I'm looking forward to reaching out to the public with more information including J.D. I think J.D. has done an absolutely wonderful job with everything he's done.

And he is an asset, a huge asset to this town.

Speaker 1 (41:33–41:48)

Thank you. The answer to the question is yes. First, on the polls that you said were on the website, do you have any gross numbers on how many respondents you had to the poll? I'm having a hard time hearing it.

Speaker 10 (41:49–42:15)

Do you have any number of respondents you had to the polls? They happened at the very beginning, four years ago. I don't remember that, but we can get that information. And we asked very generalized questions.

Would it be a good idea? Would it be a good idea? And there were three of those polls and they were up on the website for a good long while.

Speaker 1 (42:16–42:26)

Secondly, you said you spoke about buildings being designated as historic. Is that the intention of this body, to designate certain buildings as historic? No.

Speaker 7 (42:27–45:56)

Could I just, sorry. Sure. If I could just add in. So this is, it is a historic district.

So we have the historical commission has said anything that's 75 years or older would come under review if they were being demolished in the town. But there are, and there's a large list of inventory items. There are newer buildings and buildings that have been altered significantly in this area. The reason why it is a district and every building actually would fall under this, the historic buildings and the not historic buildings, because, and a lot of those I think would be welcome to be torn down and rebuilt, but you want the new buildings, the renovations to work in context and to be sensitive to the historic buildings.

So if you have these beautiful, and again, compliments to JD, if every developer was like JD, I just, You know, that would be amazing, but we can't guarantee that every developer is going to be JD. So this just gives some, when a new building is built, what they're going to do is in context with the rest of the neighborhood. And so that's why there is a mapped area. And this is really a location that already we're seeing the potential.

The name of JD's company is Elevated. He has elevated this area already. And it's so exciting to see what the potential is down here. But we're still we're very vulnerable to demolition.

You know, again, JD is not going to tear down the buildings. He owns most of the, you know, historically significant buildings. But there's a lot that can still happen down there that we just want to make sure that somebody doesn't come in and say, wow, I thought this really, you know, wild looking building with a nail salon, it would be perfect here. We don't know that.

So this just this just allows oversight. Yes, we do have the planning board does have the guidelines in there. But as we talked about, it's they're just not enforceable. So this is a layer that just would make sure that those standards and standards really that J.D.

has set the bar high for anyone who does work down there. Also, You know, I think this is, it's an opportunity, but I think just tonight's conversation and hearing JD and I hear everything he's saying as a business owner a developer. I'm real estate myself I'm very sensitive to market conditions and in his experience and development. I think this is more of a reason, and I do think, I actually talked to someone, Nick Armata, who is the, I just want to have his title here, this past week, he's the Senior Preservation Planner in the Office of Historic Preservation for the state.

Um, he actually just moved, but he was a resident of Lower Mills living on the Dorchester side. And he said, I can't think of a better local historic district. But he said, he said the one thing that he really recommends is really getting community input on this and doing community outreach. And I think this is part of, and I'm, I think we both feel this way.

really doing some community outreach on this and having Chris Skelly, if we could, I would be willing to put this, you know, to hold off. I know this.

Speaker 10 (45:57–45:58)

We disagree on this.

Speaker 7 (45:58–46:05)

This board has worked so hard. They're ready to go to town meeting. But I think until the fact that JD wasn't part of that conversation, we want

Speaker 10 (46:05–46:12)

We want to have this… Wait a minute, JD was part of the conversation and he's always been included. Always been included, yes.

Speaker 7 (46:13–47:51)

But I think what my point is, having someone like JD speak is wonderful and be involved, but we also need someone who can show the cons of this, because I think that's what you all are all weighing. What are the cons and the pros, you know, how do they balance out and somebody who could come to who has statewide experience with how this works in different towns communities can come address your board, the warrant committee. the planning board, the historical commission, and sort of usher this to town meeting, and then have a presentation, which Chris Skelly does for other towns, other communities, present this, and then town meeting decides. Because obviously, there's a balance, and the pros and the cons.

And I think if we could see both sides, or at least have that opportunity, and have maybe a more robust outreach, because I know Larry has done a lot We are going to do more outreach. We talked about that in our meeting last night. So is the timeline, you know, and I would look to the select board on that, but the bylaw is pretty much ready. It's pretty much boilerplate for what the state offers.

But I think having a consultant on board to really be able to talk about this from You know, we're volunteers, but somebody who does this professionally, who can really talk to the effects of this and what the pros are versus the cons. You know, what is the balance? How do you see the balance?

Speaker 1 (47:51–48:00)

In a lot of the conversations tonight, I've heard demolition said often. I don't think we've had any demolitions in Milton, New Jersey.

Speaker 7 (48:01–48:07)

Um, not in the military area. So, um, we've had, yeah.

Speaker 1 (48:07–48:36)

So if that is one of the main, uh, causes or purposes of the historic village, could we not make this more narrow to limit demolitions instead of in all encompassing, uh, historic village and an unelected board that would sort of move on the whims of the body at the time without set historic guidelines before developers? Absolutely.

Speaker 7 (48:37–51:49)

I mean, I think that would be a question that we certainly could look into. Again, it leaves, and I'll just, you know, you look at what's happening in East Melton right now, there's inconsistency. And I think that's where having a cohesive, look to a historic district is part of the goals because we want this to be experiential. So when you go down to Charles Street and if you go to Newbury Street, you're looking, there's an aesthetic that's a cohesive aesthetic.

So you can take out the demolition, but I think it's to our advantage to have some sort of, and again, oversight, not over scrutinizing a property. And again, this board would actually elect the commission. So you would have control over who the appointees are. There would be one appointee for one year, two appointees for two years, and two appointees for three years.

You won't control that. So if you're seeing an issue, it's under your control to not reappoint that commissioner. And so that piece you do have a say in who that commission would be. But yeah, I think we could definitely talk about the demolition because I know the Historical Commission, that's been the biggest issue is that we don't have a tool to prevent demolition.

And again, some of those buildings, I would be fine with having them or we would love to see them demolished and something nicer put in there. But it would be nice to have things that work in relationship to one another to have a cohesive look because I think this is this is going to be a destination for people to come, you know, for equity and the economic development that will come out of this actually the, the opportunity tourism, I mean I think that's something that Milton and the Select Board for financial reasons, Milton really is, could be a destination for historic tours, the museums that we have here, some of the assets that we have, really sort of capitalizing on that, on the historic areas that we have. And I think this area is really one that would draw from outside of town. As we all know, we go to Newburyport, we go to, you know, we go to these different areas that we're like, wow, isn't this great.

Don't we wish Milton was like this, that we had more gathering places. And I think Milton Village has the potential to be that. And already, again, with what JD is doing, activating the waterfront, having view sheds where you can sit outside over gas fire pits, overlooking the water. This we want to draw people in, but we know JD, we don't know who else could come.

So this is more of not for current owners who are really vested, who care, who are in the town, But that doesn't always happen. And some people really don't care. It's more of a financial decision that they're making in their development projects. And this just gives some parameters.

Speaker 10 (51:49–52:34)

The demolition issue would not get to the historical committee. It would be worked in before that. We're looking at physical aspects of it, not demolition, but how does it look and how does it match? And we are not going to dictate what other buildings are That's not our job.

We won't do that. That's the planning commission. That's the zoning board. We're just there to protect the historical nature of what Milton is for 300 plus years and for another 200 or three.

That's the objective. And demolition is not part of our bylaw.

Speaker 1 (52:34–53:47)

Well, I was going to ask something similar to try to explore whether There's like, whether it be there's opportunity or appetite to take the next few months to see if there's room for further discussion around a compromise that could significantly raise the threshold of what would need to go to this, this historic commission. And I don't, I don't think there's appetite. I just think these are two just fundamentally different views that we need to decide whether to go to town meeting on or not. I don't see I mean it seems like you know.

Larry, you and JD have worked in good faith, tried to kind of bring it closer together. And at this point, you know, I'm not sure, I'm not hearing an appetite to get to the questions of making this like, you know, demolition only or like major changes only. Like, I think it's an interest in kind of trying to regulate sort of the aesthetics, right?

Speaker 10 (53:47–54:35)

Yeah. And the aesthetic really comes down to individual buildings that would be determined to be the best example of that type of architecture. All of the buildings, everything in that historic district is the historic district. The reason why Milton Village was chosen were two reasons.

One, it's part of the planning group had decided that. And two, it's the only area that wasn't designated either state or federal in any protection. And we have many federal and many more state places that are restored. Milton Village was not protected in that way.

Speaker 1 (54:37–55:28)

I guess one comment and then a suggestion. One, I just sort of, want to commend the dialogue. I mean, I think we're talking about pretty different perspectives on how to handle the issue. And I think everyone's really spoken about each other and each other's positions with high level respect.

I think that's a very good thing. I think it's my perspective that we should just decide whether to send this to town meeting. I just think that it's been at it for a couple of years now. I'm not sure what the benefit is to, you know, further defer that decision.

You know.

Speaker 7 (55:31–55:54)

Well, I also I think that I am concerned if there's if two sides are this separate at this point. When it gets to town meeting, it may not be a productive conversation, right?

Speaker 1 (55:54–56:03)

We may end up having to rework it. It may fail.

Speaker 10 (56:03–56:25)

Where the two sides come together, both sides want the best outcome. That's where we come together. It's how we do that. And in JD's understanding, and I totally agree, anything that slows down that process is a problem to a builder.

It's a problem to a developer. And we would rather not do that.

Speaker 1 (56:30–56:41)

How does that impact the 60-day add-on help service? How does that? You said you would not like to delay a developer but I believe there's a lot spoke about this commission.

Speaker 10 (56:42–57:05)

I think there's two things. One is where they go to the, where and when they go to the historical district. And I agree completely with JD. Find that out before you spend any money, because that's going to determine some things.

But I lost myself.

Speaker 1 (57:05–57:20)

Where would you see historic district? being in the process. So at what point do you think that developers and builders should go to the historic district? Should they be first, or as it is right now, last on the checklist?

Speaker 10 (57:21–57:54)

You have to be determined. I think they should go first. A builder or developer can go anywhere at any time they want to. They determine where they want.

And there are some certain things, the planning board and all that, they have spent a lot of money to make that presentation. They're going to do that anyway, so they might as well take that presentation to the Historic Movement Commission and let them approve so they don't have to worry about it. Thank you. Thank you both.

Speaker 1 (57:54–01:00:42)

Interesting time. Thank you. Thank you for coming and sharing. Nick, do you need a motion about adding this to the warrant tonight?

Does this need to go to the Warrant Committee? Yes, so for the special town meeting for October 19th, that warrant needs to be completed and printed by the second week of September. So we are up against a deadline here if the warrant committee is aware that this may arise to them. It has been submitted by the local district committee to the study committee to be included on the warrant.

So the action of the board as to whether to include it or not, generally the board has been deferring to its committees. version if we vote to send it to the night in LA, which will be changed. Yes, we address the quorum issue. So there are five members of the commission.

Quorum is three, and a simple majority, which is three votes, would be required to approve. So it's always the quorum of whoever is present in that meeting to vote. So that has been cleaned up, and that brings it in accordance with the special act that governs quorums and everything. The rules of our farm is not that important.

So before we vote, I will say I'm hesitant to not include this in the warrants because of how much time has already been spent on this article. I think we're going on at least four years of work. I share Member Hagerty's concern with if it does not pass, worth bringing it to the town, but that is the process. If it does not pass the vote, if the town says no, then it is the will of the residents.

I would not say that we should not include it. The work has been done. Language can still be changed and resized or updated. We will have our opportunity to weigh it before town meeting.

In our opinion, we still have time there. The Warren community will have their time to weigh in as well, and so will the town meeting members. But I would not want to prevent the rest of the town from seeing and having their say. So before we take a motion, if anyone wants to comment on that, we'll move forward.

So I think if the proponents are willing to try to work to

Speaker 2 (01:00:45–01:00:56)

enhance this, that would be better. I am concerned. I sometimes feel like things get to the floor of town meeting that are not in a state of readiness.

Speaker 7 (01:00:57–01:01:06)

And I don't think that's always good for the body.

Speaker 2 (01:01:07–01:01:10)

I agree with Megan. I think that

Speaker 1 (01:01:11–01:01:17)

even amongst the committee members, differing opinions, right?

Speaker 7 (01:01:17–01:01:33)

And I think we've heard very different opinions from folks this evening. And so I think it's hard when a small body, right, it's not clear what this all means.

Speaker 2 (01:01:34–01:01:38)

And I think that the committee has asked for help, you know, making this very clear.

Speaker 1 (01:01:39–01:01:45)

I think we're a long way from this being clear for town meeting.

Speaker 2 (01:01:46–01:01:49)

And that's where I'd like to go on.

Speaker 1 (01:01:49–01:03:19)

And there would be one more. OK. I will take a motion for us to vote if this would be included. Move to include in the special town meeting warrant the article to establish a motion to establish a Milton Village Local District.

Motion made. Do I need a second? Second. Do I need a second to vote?

No. Motion? Yes. No.

No. I will abstain. Motion does not carry. We're not being included in the vote.

Billy, I'm gonna go home and get on the computer, all right? I'm not feeling too good. Okay, all right. Right on.

I feel better. All right, with that, we will move to item five, discussion and approval, recommendation of our audit committee for audit from fiscal years 27, 28, and 29. I will defer to Amy Dexter, town finance director and town accountant. And you have Amy's memo, as well as the proposal from CESA.

I'll just finish. Give it a second, Amy. OK. Pardon?

Give it a second. I want to make sure we can hear you.

Speaker 4 (01:03:23–01:03:24)

Thank you.

Speaker 1 (01:03:36–01:03:38)

OK. Floor is yours.

Speaker 2 (01:03:38–01:05:16)

OK. So I'm here to represent the Audit Committee. The chair is traveling overseas, so she asked me to present the recommendation. But the Audit Committee chose to, or decided it would be a best practice to go out and issue an RFP for audit services for fiscal years 27, 28, and 29.

And we did that, and we received three responses to that RFP. The firms being Hague, Sahadi, and Company CPAs, CBiz, CPAs PC, and Clifton, Larson, LLP. CBiz is the current audit firm that performs the town's audit. And the committee had a robust discussion about the three firms to the size of the firm, the experience of the staff, the number of municipal clients, if they had any experience auditing and performing test work on retirement systems, and the references we did with the help of Assistant County Administrator Cody.

He helped us send out a click of Google Form to get references on the three firms. And the audit committee voted to recommend to this body to appoint Seabiz PC as the town's audit firm for fiscal 27, 28, and 29.

Speaker 6 (01:05:19–01:05:20)

Questions?

Speaker 2 (01:05:20–01:05:30)

Yes, ma'am. Can you speak to the insolence This is the same work that we've used in the past.

Speaker 7 (01:05:30–01:05:53)

Can you speak to the proposal in terms of the amount of money, the increase in potential costs, the increase in cost, and also the relative value of the prior contract? And so that's like, we get more of our money, less of our money, same amount of services for our money.

Speaker 2 (01:05:53–01:08:46)

OK. So of the three proposals we received, Hague Sahadi came in total cumulative for the three years at $232,500. Seabiz came in at $250,500. And Clifton, Larson, Allen came in at $306,000.

After the lengthy discussion, the audit committee was unanimous in its belief that Clifton, Larson was cost prohibited. So then it came down to the two firms. Hague Sahadi is, they have 17 staff people in their firm, of which there's one audit partner. And 10 of those staff people have municipal experience in the state of Massachusetts.

So the general consensus there was that the firm was too small and that we would be better served with CBiz. They're medium-sized. They have gone through a transition over the last couple years where they used to be Powers and Sullivan. They were purchased by Markham LLC and most recently by CBiz.

There is news out there that there's a potential buyout from Grant Thornton of CBiz, but it's The belief is that it, you know, the hope is that it will improve service, if anything. Our experience with CIVA, it was a little rocky through those transitions, but overall, they, you know, they work well with the town staff, very professional, knowledgeable and supportive on a daily basis. If I have to call them with a question, they're available, they're responsive. And their level of service has been very good over the last several years.

Between the three of them, the RFP was pretty specific. One of the main points that the audit committee was concerned about was meeting deadlines. And so they were all agreed to the timeline where it was requested, I believe, to have drafts by the end of June. She in December, January, I think, January, January, because the deadline for the filing with the federal clearinghouse is March 31.

So we just want to make sure that we have enough time to meet that deadline. So they all seem to meet that. I think all three firms are great, but they have different reasons. why the audit committee chose to move forward with CEQAs.

Speaker 7 (01:08:46–01:08:57)

And just to clarify, does the committee felt that the acquisition by GrantForge would be potentially good in terms of added capacity?

Speaker 2 (01:08:58–01:10:18)

So that information came to light last week. And the committee did not meet to discuss that. But I sent out an email informing each of them, asked them to respond to me. And to me, only if they felt the decision should be reconsidered and there was no strong response that that should happen and that we should move forward as originally planned.

I mean, I would assume that they're right. I think the importance with the size of the firm was if you have a firm as small as I'm the one with only 17 people. You don't have an opportunity to change a lot of staff. And it's just, there was concerns there.

In the information they provided, it didn't seem like they had a lot of experience with retirement systems as well. They had some more city experience, like the city of Attleboro was one of their Massachusetts clients. They're more focused. They're located in Fall River, but they seem to have more of their clients in Rhode Island.

And they have a lot of school districts.

Speaker 1 (01:10:22–01:10:36)

What protections does the potential contractor as a past contract included for the town give

Speaker 2 (01:10:37–01:10:49)

say if the relationship changes through this acquisition, you know, can Grant Horton change the terms for the level of service on the contract?

Speaker 7 (01:10:50–01:10:57)

And what are the town's needs of reforce in a given year?

Speaker 1 (01:10:57–01:11:05)

The performance isn't up to snuff. Like are we, I know it's a three-year contract, do we have any

Speaker 7 (01:11:05–01:11:22)

Do we have any ability to terminate the contracts if after a year, the first year of the contract is not working well and it's a different vendor?

Speaker 2 (01:11:23–01:11:49)

It's my understanding that we have a signed contract that it will be honored. And I believe, Nick, maybe you can help me out here. I believe there is a section in the RFP that the performance wasn't met as outlined in the RFP that we could terminate. Is that your understanding?

Speaker 11 (01:11:50–01:12:16)

Yes. The town can terminate at its convenience. The contractor can. They can assign it with the town's approval.

In this case, we likely would be contracting, depending on the timeline, most likely we'll see this. And there might be a debt that's assigning that contract then to Grant Thornton, but that is a lot of it. The town may terminate, but not the business.

Speaker 1 (01:12:16–01:12:40)

That's it for my questions. All right. Any other questions or thoughts? I read the materials.

I think they have extensive municipal town for an audit firm for fiscal years 2027, 2028, 2029. All right, motion made. Second. Motion made and seconded.

Ms. Roach, I'll make it. Yes.

Speaker 2 (01:12:41–01:12:43)

Yes. I agree. Yes.

Speaker 1 (01:12:43–01:12:57)

And myself, yes. Thank you, Amy. Thank you very much. Thank you.

Appreciate it. OK, we'll move to item six, discussion of approval of our water and sewer rates for fiscal year 2027. Thank you.

Speaker 11 (01:12:58–01:13:18)

We are joined tonight remotely by DPW director Tom McCarthy, who will be joining us momentarily. We also have with us Todd Prokop and Scott Talbucci from Word and Current, who assisted with our rape report that I provided via email and as well on the packet.

Speaker 1 (01:13:19–01:13:25)

Todd and Word and Current have prepared a brief PowerPoint

Speaker 11 (01:13:25–01:13:36)

I will, I'll display that now and let Tom lead us through. Unless Tom, there was any other introductory comments that you wanted to make before I turn it over to Wooden Kern?

Speaker 8 (01:13:38–01:13:42)

Let's leave it to the professionals.

Speaker 2 (01:13:42–01:13:46)

Tom, thanks for calling in from the field.

Speaker 8 (01:13:46–01:13:49)

No problem. I apologize for not being there in person.

Speaker 2 (01:13:49–01:13:50)

No worries.

Speaker 1 (01:13:51–01:13:52)

I appreciate the guidance.

Speaker 8 (01:13:52–01:13:53)

We'll get through this quickly.

Speaker 1 (01:13:54–01:15:08)

So the rate setting that we work on for water and sewer rates in Brooklyn is relatively straightforward. We've got a budget established by the town meeting warrant that expenses. We look back at the last, in this case, five years worth of consumption of water and sewer, consumption of water, which is also the sewer usage. and figure out what rate the town needs to charge to meet those financial obligations based on the amount of water and sewer that's going to be used.

So again, very simple kind of calculation from that standpoint. We're looking here at the FY27 revenues and expenses. So we'll go through water first, then sewer. Overall water, we don't, we haven't, maybe we can advance the, do you have the, how do I advance this slide?

I got it. Oh, you got it, okay, perfect, there. So, overall water, the total revenue needed is relatively flat, it goes up about $24,000 from FY 26 to FY 27, which is, you know, modest, certainly for an $8 million budget, you can see over half of that budget is the assessment from the MWRA who supplies water to Milton, to the town of Milton at about $4.4 million.

Speaker 10 (01:15:08–01:15:48)

We have, in this case, with the five-year look back, we have 2021, which was a large usage year falling off. And so that's driving the anticipated amount of water that will be consumed down a little bit. So in this case, even though the numerator and the calculation is kind of staying almost the same with only a $24,000 increase, we're expecting a potential decrease in usage. And so that does drive the rates up slightly.

If we go one more slide, we'll see the usage trends for water. This is consumption trends. And you can see, you know, with the exception of maybe 2023 being a little bit of a high year, that things have been relatively stable.

Speaker 1 (01:15:48–01:16:22)

We've seen some increases, especially at the Tier 4 level in like 2024, 2025, and now into 26. But again, things relatively, you know, Milton is relatively built out. No major expansions. Things are relatively stable here.

And so when you look at those revenues and these water consumption trends, you can see what the rates are predicted to be, or proposed to be, rather. And I'm not even sure. There we go. So for water, we're looking at a 3.5% increase over FY26 into FY27.

Speaker 10 (01:16:23–01:16:47)

You can see that base rate was 710 in FY26. That's per 100 cubic feet, or 748 gallons. still relatively cheap in the scheme of buying water, I think. But yeah, again, across the board, we're looking at a 3.5% increase.

Milton uses what's called an increasing block rate structure.

Speaker 1 (01:16:47–01:16:57)

So as you use more and more water, the higher volumes get a little bit more expensive just to try to encourage conservation and spread the cost around to those who are impacting the system the most.

Speaker 10 (01:16:58–01:17:32)

You can see that, you know, with this increase, the MWRA publishes an average sort of family, and that bill would go from about $248 a quarter to about $256. So again, relatively modest. We can then jump right into Seward. Sewer, you can see we do have a little bit higher of expense increase in sewer at 3.6%.

So that's $340,000 up on that $9.8 million, $9.9 million total utility cost.

Speaker 1 (01:17:32–01:17:57)

You can see with sewer, the vast majority, 75% of that cost is money that's assessed by the MWRA to the town of Milken, right? Costs that are really largely outside of the town's control. We don't expect, luckily, we don't have quite the same decrease in expected sewage, and so that does help us hold the rate closer to the same rate. We can jump one, yep, there we go.

Speaker 10 (01:17:57–01:18:10)

So we're looking at the sewer consumption trends. For the vast majority of homeowners, water and sewer bills are gonna be based on the same number as what the water meter reads, but some folks will have meters that are only used for water, especially irrigation.

Speaker 1 (01:18:11–01:18:18)

other things like that. And so that's why we do have different consumption amounts for water and sewer because there's some water that never hits the sewer.

Speaker 10 (01:18:19–01:18:32)

When we look at those trends and that increased the just over 3% increase in expenses, that leads to about a 2% rate increase across the board for the sewer rates.

Speaker 1 (01:18:33–01:19:00)

Move forward one there and the rate should show up. So you can see, again, four tiers, just like water gets more expensive, the more sewage that you use. Like I mentioned, it's a 2% rate increase. So in this case, even though the expenses are up a little bit over 3%, we are able to hold that rate increase a little bit lower than that just because of the likely increase in consumption.

Speaker 10 (01:19:02–01:19:06)

You can see that it's charged in the same rates per 100 cubic feet.

Speaker 1 (01:19:06–01:19:15)

That base rate will jump from $898 to $916, and that'll drive that average bill from $459 to about $468, $469 per quarter.

Speaker 9 (01:19:17–01:19:22)

We've got one more slide that's very dense. It's probably better to look at it in the packet than on this slide.

Speaker 1 (01:19:23–01:19:44)

But it shows that rate increase for a lot of different example users within the town of Milton. The highlighted case in the middle is the one I was citing the numbers from. That's under various sort of standard, you know, average bill that we really look at to understand how it's going to affect most of the residents in town. That's the last slide of my brief PowerPoint presentation.

Speaker 11 (01:19:45–01:19:58)

I'll just add a little bit of additional context that on the sewer side, you know, the pressure that we're seeing is that MWRA assessment has gone up pretty quickly the last few years.

Speaker 1 (01:20:02–01:20:18)

also to their own costs to treat their island for the entire district so we're feeling pressure on the suicide, largely related to them WRA assessment. And then in terms of what as these are enterprise funds are standalone funds they have

Speaker 11 (01:20:27–01:20:55)

which is 35 to 45% of its budget, so it's a very strong reserves. The fiscal 27 budget draws down a little bit of those reserves to buy down that rate increase a little bit. So invest some one-time money into this year's budget to help offset the rate increase. By the flip side, sewer, although it is close to a $9 million, $9.5 million budget, its reserves are close to the $1.6, $1.5 million, so a little bit more vulnerable to a big swing or a very wet year.

Speaker 1 (01:20:56–01:21:49)

If our rate drops, our costs aren't going to drop, our revenue will significantly drop. So that's why we have pretty significant reserve balances in both enterprise funds. Our costs are very static. The revenue can vary significantly.

So in terms of the overall stability of the enterprise funds, they're both very stable. I'd say that sewer is a little bit lower than we would like it. Water is a little bit higher. just a little bit of the broader and depth of scratch and injury.

Thank you both. Questions or comments from the members? If not, we'll take a motion.

Speaker 2 (01:21:49–01:21:54)

Move to approve the FY 2027 water and sewer rates. Second.

Speaker 1 (01:21:55–01:22:00)

Motion made and seconded. Ms. Rosha? Yes.

Ms. Nolan? Yes. Ms.

Agnew?

Speaker 4 (01:22:00–01:22:00)

Yes.

Speaker 1 (01:22:00–01:22:17)

And I believe Mr. Griswold's on that. Yes. Yeah, he's on summer.

Yeah. All right. And yes, Tom, I'll give you a chance. We didn't go to you for anything you want to share.

Speaker 8 (01:22:17–01:22:27)

No, I think we covered just about everything. And Woodward and Karen does a great job. And obviously, Nick and his guidance helped me along. I'm impressed getting into this myself.

Speaker 12 (01:22:29–01:22:29)

Thank you.

Speaker 4 (01:22:31–01:22:32)

Thanks, folks.

Speaker 1 (01:22:42–01:22:45)

Thank you, everyone.

Speaker 8 (01:22:45–01:22:54)

Thank you. Thank you, Todd.

Speaker 1 (01:22:54–01:23:53)

We'll move to item seven, discussion of the Elaborate College potential acquisition. And I believe Mr. O'Rourke is online. All right.

The floor is yours. If you want to do some introductions Mark Loring, Chair of the School Committee and Vice-Chair of the School Building.

Speaker 13 (01:23:53–01:24:07)

Hi, I'm Shauna O'Rourke, Chair of the School Building Committee and then also John Ali introduced himself also.

Speaker 14 (01:24:08–01:24:12)

I'm Jenna Sophie, I'm principal in charge from DLR group.

Speaker 6 (01:24:18–01:24:18)

Thank you.

Speaker 13 (01:24:22–01:24:29)

Yeah, so Mr. Milano, do you want me to run the slides or are you going to run them?

Speaker 1 (01:24:29–01:24:33)

I can hold them if you give me a minute.

Speaker 13 (01:24:33–01:24:41)

No, I have them ready. I just, I know last presentation we're running, so I'll share my screen if that's all right. Sounds good. Thank you.

Speaker 8 (01:24:49–01:24:56)

Just let me know when it comes through. Okay. Thank you.

Speaker 13 (01:24:58–01:27:05)

We're here tonight, essentially what we're here tonight to present is a culmination of our efforts kind of over the past two months, working with DLR group in the school district for the educational program. So, as you're all aware, library college became available shortly thereafter, school building committee and school committee really started investigating this. High level, the initial buildings that we look at or talk about are essentially three interconnected buildings. Building A, which is also known as the mansion.

Building B, which is connected to building A, which is essentially office space. And then building C, which is the majority of the classroom spaces that are there. And building C is connected through the gray hallway that you see on the left. Some things to keep in mind when we first looked at the building was building C has existing classroom space, but there were roughly about 725 square feet.

And the program that we're looking at, you know, required us to make bigger classrooms. Also, there's no cafeteria as part of that building. There's no gymnasium. And then also in building C, there were minimal bathrooms.

And then finally, you know, with the amount of renovations we'd have to be doing, you know, we just want to be cognizant of the energy code. So, for us, you know, the process by which, you know, we've been looking at this is, you know, the school building committee looked to the school committee to develop an educational program that they thought would fit with this facility. So, they determined a pre-KK facility would work best. So, school building committee from that point on partnered up with DLR group, and we'll go over a timeline on the next slide.

And then collaboratively, the school committee, the school building committee and DLR group have essentially worked, you know, in concert over the past two months. Janna, you know, Shanali, I'll let you guys talk a little bit on, you know, some of your efforts that you've done.

Speaker 2 (01:27:07–01:28:31)

Thanks, Sean. So Janna and I met with the school building committee to do an initial pick off to understand what the expectations were for this project. And it was essentially to understand what were the space constraints, the opportunities and the challenges of converting this into a viable learning center for the town of Milton. We brought on FBRA as our structural consultant to do a high level understanding of what are How is the building put together?

Can it support this kind of learning community? And then we also brought in PMC as the cost estimator to help us understand, what are the implications of looking at a couple of different options? And what does that mean for the town of Milton? Jana's going to talk a little bit about how we got to the design options.

But we ended up presenting two options initially The first option, which I believe Sean's going to walk through in a minute, was just looking at the existing space without really adding anything. We had to make a little bit of addition for a stair and a lobby, but really using the footprint as is. And then another option of what do we do if we wanted to add more? And the reason we looked at these two options is to understand what the enrollment was for the Town of Milton.

And Jenna, do you want to jump in and just talk about that for a minute?

Speaker 14 (01:28:31–01:30:49)

Sure. Thank you. So in that first initial meeting with the early education director, Ms. Butler, as well as the superintendent, Phelan, it was to understand their high level goals.

Like, is this a temporary building? It's a long term building. And everybody said if we invest, you know, the town makes this investment, it's a long term investment switch. When you look at a long-term investment, you want to understand what's the potential for growth, as well as the ability to flex and change over time.

We were given a set of space requirements that like, okay, this is what we want to fit you know, into a project at a minimum. But then we also talked about like, all right, well, how much growth and there are different ways to think about it. Like, is this maximum capacity? Is it optimal capacity, i.e.

you don't want every classroom to be 100% full, because therefore, somebody shows up, you have no seats available. And then do you want to do What they have now, which is half day or do you also want to then have the option to go to full day. And so, you know, in a nutshell, as I mentioned, the first option was just see how much we can fit in the existing building. The second option was to provide the number of classrooms as well as the space like for admin and things like that, that were requested.

And then third one took a more expansive and future-facing option that was like, all right, if we plan for growth, if we plan for full day pre-K as a for instance, what would that look like? Because we wanted to do a test fit sort of like thinking of it in terms of maximum. So we had smallest, medium and then maximum options that gave the full range. And of course, if the project went ahead, you would do, you know, full programming and everything and truly hone in on that design enrollment.

And so the end result might be somewhere in, you know, in between the options and not any one of these three. But we wanted to give a full range so that the school building committee could just understand what's possible.

Speaker 13 (01:30:52–01:34:53)

You know, just to echo the efforts, you know, the work that's been done since, you know, over the past month on this through DLR group really takes a lot longer. So, we ask, you know, as you're reviewing some of the stuff, just keep in mind there's a lot more work as we progress with these options. Leading up to tonight, I just want to kind of give an overall timeline for what we're doing. So in April, there was an initial site visit by myself, town administrator, superintendent, and other representatives of the town.

School committee shortly thereafter took on discussing educational options or program options that would be there. The week following that, school building committee allocated funds that we had remaining to secure architectural services. The week after that, the school committee voted on this educational program and we contracted with DLR Group. DLR Group, two weeks after that, walked the site.

And then, you know, we had that visioning session that John had talked about with the superintendent, the director of early childhood education. All that input led into a draft report that the DLR group put together very quickly for us. And then tonight, you know, the overall final report and cost estimate. As I mentioned, I tried to keep this presentation brief, high level, you know, call it executive summary.

We do have floor plans, a 51-page detailed report that we can pull up and dive into as, you know, you have questions, but I wanted to keep it high level. The first option, as John and Shonali talked about, was basically looking at the existing building and how we could utilize that and how much space we could get out of it for classrooms. So for classroom counts, for preschool, we were at four preschool. Just got to move this.

Sorry about that. Zoom was blocking the counts. So four preschool, two special education. And then for kindergarten, there were 10 regular classrooms and one special education.

This didn't meet the needs that were described in that visioning session that we had. But again, we did it as kind of the smallest case that we're looking at. The next one consists of a two level addition on the side of the property that you see here. That gets us up to the space count that we needed that was prescribed by the schools.

which are five general pre-K classes, two special ed classes, 18 kindergarten classes, and one special ed class. And then because we had that addition, you know, DLR group looked at what a third level on that space would look like. And, you know, with that, it expanded pre-K out to nine total classrooms, two additional special ed, Kindergarten had 20, and special ed again had two. So what they've done is, you know, we've looked at all these options and presented them to our cost estimator.

So essentially for the options, we'll walk through them for option one, the construction cost was roughly $32 million. And the overall project costs, including SOX costs, would be a total of $42 million. Sorry about that. The option two that we looked at, the two-level addition, which is in the middle, total construction costs estimated at $57 million and a total project cost of $74 million.

And then finally, the third option that we looked at of a total project cost of $65 million and an overall project cost of $85 million. So, As I mentioned, we do have much more detail that we can share. But again, I just wanted to keep it high level for this meeting. Knowing time is always critical with this board.

Speaker 1 (01:35:00–01:35:00)

All members.

Speaker 2 (01:35:01–01:35:07)

My first question will be to Mr. O'Rourke.

Speaker 1 (01:35:07–01:35:10)

What is your definition of total project cost?

Speaker 13 (01:35:12–01:35:33)

Total project costs is essentially all soft costs for architects, engineers, permits, the, what is it, FF&E, the furniture and everything that builds it out. It does not include, if you're talking about salary costs or other additional costs like that, it does not include those.

Speaker 7 (01:35:35–01:35:41)

Does it include like lease details, construction contingency, like all that?

Speaker 13 (01:35:42–01:35:58)

Correct. Yeah, so what we did is we can forward the cost estimate to you. So the initial cost estimate we had, they carried a 15% contingency. But knowing that we've only worked on this for roughly two months, we asked them to bump that to a 20% contingency.

Speaker 1 (01:36:02–01:41:32)

Okay. Yep. Just to clarify, also for the public, it obviously does mean through land acquisition. Right.

Yep. My question is not only construction, but on the program. So I see listed about 450 students in pre-K and kindergarten. I just want to hear a little bit more about the program, and if pre-K and kindergarten move into this site, the impact it has on the schools, and any potential growth that would be either covered by the space, or that we would predict for the space.

And what it means for taking those students out of each elementary school. What's the impact, what do we get for having this set up? Jock Bail is for third schools. We, at the June third school community meeting, went through a rubric of several different options to get to the programming options for KK.

What it does, our elementary levels, and I'll describe what that would look like. It does not provide relief to the middle school level, because those grades will stay the same. There will be no impact. And it does provide relief to the high school, because the administrative offices of the middle and upper schools will leave the high school space and go down to the upper A space in the elementary part of the school.

So it doesn't fully address the needs of all three levels. but it does address two of the three. From a program perspective, each of our elementary schools said they would lose each of their kindergarten classrooms. So if you're a three-strand school, like Tucker, you'd lose your three K classes, so you'd have two spaces open.

And they also housed two of our preschool programs over the time. So each school would lose the amount of kindergarten classes they have, which at the clubhouse, four, the polyclubs, four, sometimes five. And the Cunningham also houses all the other pre-school classes that are related to sub-separate classes and half-day programming as well, which will leave the pressure on that larger facility of Cunningham College Park, which seems to be where the most pressure for enrollment squeezes is this year. So that would be the main driver of this work.

I think what it would do to the schools is they would all miss the little seats. Everybody wants kindergarten in the school. It really is K-5 is that longest span that our families have in one building to grow relationships with their school teachers and principal and create community. So it would be one less grade of that moving into the school.

Where I believe the positive sides are to the pre-KK is that we're creating an early learning center that's consistently implemented for all of our students across the town in one space in preschool and kindergarten to get them prepared in one group before they move on to a great one, so they're called neighborhood schools. And we're really addressing that early childhood need for a flush with literacy, number of sentence, community, and preparedness. Some of our students will be there at the age of three in preschool. Some of those students in preschool will be typical students that will be part of the process that we have to have preschools that will be in there.

And we create a great learning community for our youngest learners. to then be prepared all in the same space in regards to what's in the equipment. So there's definitely pros and cons. It doesn't solve every box that I know the school committee, in the school building committee was hoping to check, i.e.

it doesn't address middle school. And I do believe that the third option, which does provide for some growth over time, right now we're averaging about, I looked at the enrollment this morning, we have some grades that have 370 students, but they add over time. to get students that come in each year. We just registered this summer about 80 students leaving the district.

The kindergarten right now is in the lower end of the 330s, 320s. But very recently, we had 350s and 360s. So I think that the leaders of this design have built in what's projected and what we could be to give a little bit more room. Because unlike the elementary schools, it might need one more kindergarten.

Sometimes you go to 5Ks at Collier Park, 5Ks at Clover, when we have a high enrollment spike. This space will need to absorb that at one point in time, and we won't have four students to choose from to make that happen. So we do have a little bit of a restricted option base, so building in more capacity with that third option, I think, would be very, very helpful, and money well spent now in order to make sure that the future is protected for those who are enrolled in the space provider. Are you in a position at this time to have a flip and dirty to the impact on bus routes and transportation costs?

Speaker 7 (01:41:33–01:41:44)

I assume that this is a different bus stop. Does that necessarily increase routes?

Speaker 1 (01:41:44–01:42:40)

It'll have to be its own route. We will have to extend the bus transportation, being it expensive to an ongoing operating cost to the district. It's not a walkable school. In all of our case students, probably the majority of them would be bused to where their parents are driving.

Right now, almost every kindergarten student gets on a bus to go to school. They live at least certain miles from the school. We would have to draw the lens very high above whether or not we need to add any buses to make that work. we create some synergy around start time.

And just for the public to know, our budget didn't include one extra bus this year. That was the recommendation. We have negotiated with our bus company five buses that actually carry 15 more students, so we have no longer buses. So we're trying to be more efficient with how we get students to school.

And we'll have to tackle that challenge. Transportation will be potentially at cost to the other

Speaker 6 (01:42:42–01:42:44)

But we just don't know in what degree.

Speaker 1 (01:42:45–01:50:49)

Correct. I would say that one of the factors of our operating costs were part of our thinking when we chose the pre-K thing. Pre-K doesn't have the same amount of time with physical education. Our musical specials are done a little differently.

And we can kind of incorporate that a little bit with how we do our kindergarten students. So we have a little flexibility about the specialist teachers that we use, because we did also consider which could be considered part of our MSBA proposal. And we thought that we might be diluting a little bit the resources across five elementary schools, that the operating cost might become a factor in deciding what does that teach us about travel, or maybe add more phys ed, or add more music, in order to make those connections work. So we're trying to think operating to a high level, not to burden the town with a higher operating cost as well.

I just want to, before we change topics, follow up on Winston's initial question about sort of how we feel about how this addresses overcrowding. It's helpful to hear Superintendent Phelan sort of your breakdown in which schools this would help and which it wouldn't. You know, sort of the line I've seen or maybe one of the standards I've seen in valuing the options, it was included again in the e-newsletter today from the public schools was considering, you know, any building project would need to address a substantial portion of our current space needs. I'm trying to sort of understand if we feel this could do that.

Let's rule out for a moment option one, which doesn't meet the requested classroom needs. If we focus on being in either option two or three, which either meets sort of the classroom number requests or exceeds by 15 or so percent the plan for future growth, does the district feel that while not addressing middle school, not providing middle school relief unless you can do something with the mansion later on the administrative side, are these options potentially doing? Potentially, you know, substantially addressing some of the space or overcrowding needs that I think it creates excellent space, really, for our elementary schools that have the most overpowering potential, for example. CUNY qualifies as a very hard space.

The ability for the district to address the needs of our children, especially our children in preschool, will require a lot of different types of services, require a lot of different types of spaces that are just different to the rest of the district. So for me, walking the buildings every week, I think it does an excellent job of providing that space in the elementary programs. And when one would ask, well, Glover doesn't have preschool, they just have the music for kindergarten. So what would those classrooms turn into?

Already we're talking about essentially taking an iClass away. Every other year, Glover gets a fifth class and sometimes it goes back to fourth. So we can really ensure that those specialist classes have their own space. We have a first grade class in the art room and the traditional designs in our room 20 years ago.

And we also have a robust after school that need space. So, dedicating space in each building that we can use for after school homework is also important. There's no getting around, the middle school doesn't get any space from us. Their numbers stay relatively the same.

I think that's the point. First of all, the middle school and the first school is actually built in. I think right now we have four teams in the sixth grade and we have three teams in seventh grade and eight in the instruction space. So, I think we can be flexible with that.

as Dr. Fish has gone up to four teams in grade six. But we've legally re-expanded and gone down back to three teams if needed to create space that is large. And the high school, quite frankly, could use the space because high school has been the school that has added the most students over time in the past five or eight years.

And having central office, business office, special education office move out of there and utilize the space that we're offering to provide well-needed space. Do I think it works? Do I think it works? Is it perfect?

Does it fit every box? Do we check every box? We don't check every box. Would you agree with that one?

Yeah, I would. I mean, I agree with a lot of what John said. I think the thing I take away from this is how fantastic the designs were, and I appreciate John and his team always work on them. I think the question for the site is like, what can fit on the site?

Can the site provide some of these? And so I think what they've shown is that It absolutely can't from this type of model. I think it also shows that upper middle school idea, which is the one project idea that solves all the space that we're having, that's not gonna fit here, right? You saw how much they maximize the space.

There's no cafeteria still with a, you know, it's 200 less kids. There's no auditorium. There's no full-size gymnasium. There's just like a lot of things that the site cannot fit for that.

So that's kind of off the table for the site. I think it's one of the things the school committee was talking about. We really wanted to see multiple little design ideas that just didn't have the time. But I think my takeaway is, that can't fit.

The thing that could fit is this pre-K program. So then it gets into the calculus of, is the pre-K program accomplishing all of these things? It's from the cost estimates, it looks like it would be a cheaper project, depending on what the land acquisition cost would be. Then you get into the timeline question of developing SBA money, And so you use that financial resource, it's all those kind of other implications obviously that go along with this.

To make it up to the site, is this a better project than the one on Guile Road? And ultimately, is the town gonna support this project better than the one on Guile Road, right? Like a, whatever perfect project we might have at any site, the town doesn't vote to approve it. We're getting no space for kids at any site, and we're still suffering with this five years from now or whatever it is.

I think, you know, I hesitate here to speak too much because the school committee has not had a discussion on this. Obviously, we just had a final discussion last night at the school building committee. So, we're having a discussion here. I know the timeline is very tight, so we're trying to make a determination here.

But yeah, I think the school committee feels urgency around creating a solution to address a very longstanding problem that Sean and the team has been working on. Uh, and so lots of similar excitements kind of to this. Uh, so I'm glad you brought up, uh, Mark. So can we speak about that?

I think we have not said really the specifics yet that is this project or not be doing both. So Sean, maybe you have the better. I've grasped on this as we're working on this since day one. The savings, can you speak to the savings versus option three, max option versus where you think we'd be right now with the Calville project?

Speaker 13 (01:50:52–01:52:32)

Yeah, so the Gow Road project, if you recall, we had it estimated in July of 2024 for $173 million for total project costs. So just keep using that term. We did follow on work as school building committee after that into November. We were able to kind of fine-tune that estimate and do some of the revised design, and we brought it down to $167 million.

If you take those costs and just use the standard, like, 4% escalation, I believe… Let me just look at my calculator, because I knew this question would come up. Escalating at 4% from $167 million, in today's dollars, we'd put it at $181 million. Some of the work we did previously with our OPM was determining our effective rate from MSBA for what the reimbursement would be.

So our project reimbursement was 45%, but essentially the effective rate when we take out non-eligible reimbursement items in the design was about 28%. So at $181 million at a 28% reimbursement, which is roughly about $50 million, that total project cost after the reimbursements comes down to $130 million. I could run similar numbers for what we're looking at for option three, but I just didn't have that readily available right now.

Speaker 1 (01:52:35–01:53:58)

Okay. Are we factoring in any additional costs for the classrooms that are free for middle schools to be redesigned, is if those classes are right now pre-K and kindergarten, I assume there'd be some redesign for new usage of those spaces in the existing schools. Sorry, do you mean? Yeah, it's kind of the K-5?

Yeah, so let's say you're at Tucker, Tucker gets four freed up classrooms. Those classrooms have housed pre-K and kindergarten for the last few years. is there any redesigned costs for those classrooms to now be used differently? But in either project, those costs will happen.

So as we're comparing the two things, either you're redesigning because you're pulling out fifth grade, right, for the upper middle school project, right, you'd be pulling out fifth grade to Pearson, and you'd be pulling out eighth grade. And so you're gonna be framing space kind of at the K-5s. and also freeing up space at the Pierce Middle School in addition. So there might be a little bit more cost because you're dealing with the space issue at Pierce in a way that the pre-K and K is not doing anything at Pierce, or you wouldn't touch Pierce.

So there might be a little bit more cost with the upper, or the Gow Road project, but it's probably, for the sake of the conversation here, the costs are probably gonna be pretty similar across those two projects.

Speaker 7 (01:54:00–01:54:22)

And I think that's a really good point. I think that's a good point.

Speaker 1 (01:54:22–01:54:43)

potentially substantially lower on La Brea versus what operating increase might be on Dial Road. But it sounds like the transportation might not totally be there yet on La Brea in terms of understanding what that might look like.

Speaker 7 (01:54:44–01:54:47)

Do you have any sense of magnitude at this point?

Speaker 1 (01:54:47–01:56:12)

At a very high level, I would say that transportation is going to be an issue of whether you go because we have a second building in order to address the needs. The pre-K and K will need to be programmed. Your 7th and 8th students don't, quote, have to be in the U.S. state at all.

So you could actually, if you went to that, we probably wouldn't do that to our families. The mobile unit, if that is the pre-K, comes with an administrator, it comes with all the services that are already there. It will go right to the pre-K, K school. The teachers in grade seven and eight will just go to that school and transfer over.

But again, you're talking about those specialist positions. How do you, you don't want to have everybody be, do you want all your presented music and art be point seven? Or do they share schools? Do they go across?

There'll begin to be those types of choices you will have to make in order to maximize the service delivery, but minimize the costs. And having gone through those in the previous districts, there is somewhat of an increase in operating costs, but the teachers are already there. The health professionals are already there. You might have to add a nurse, because you're adding both.

You're going to add some custodians, because you're adding square footage. You're going to add some things, but generally speaking, I think that we're moving sets of people that do the same work somewhere else in the space, and then there'll be some costs surrounding that.

Speaker 6 (01:56:14–01:56:17)

I just think as we go forward in this dialogue,

Speaker 1 (01:56:18–02:03:23)

just keeping in mind sort of the corollary with operating expenditures, just keeping pace with it along the way, and not having to have people do their own guesswork on what would be. Yeah. Well, to that point, I think there's, moving forward, they're probably going to need to start doing more concrete numbers around the operating piece, so that we're sharing If we are to move forward with this pre-K and kindergarten at Labor Day, assuming that we are able to acquire the property, that we are doing a budget analysis of the additional either teachers or custodians, or the impacts on the overall school and town budget. I think that's gonna be a really key point to us presenting this to our residents and our parents, that we need to have a really complete picture of what this means, in the long-term, not only the relief that we get at the elementary schools.

And I thank you, Superintendent Phillips, for saying us having an early childhood center, the impacts of that, where it can be really a launchpad for our young people going into first and second grade, and being able to really focus on that population of students in one space with all the resources there to really give them a great start. That impact, as well as what it would cost long-term the best implications for us to do that as well. Any other thoughts you guys want to share? Just on a general feeling about the quality of the pre-K and K experience.

You've already touched on it, so maybe there's nothing more to add. And Mark, I understand the school committee Well, I guess there was some earlier dialogue on that option, too. So I don't know if there's just any other color you want to share around the enthusiasm or not of that option. So from the leadership team perspective, there's a lot of enthusiasm for a pre-K program.

With the asterisk that our educators will miss their colleagues, and they'll miss their local students, and it's a real big deal to be a kindergarten and elementary school. But there is, when people stop at the trajectory of what a student's journey would be from pre-KK into a neighborhood school and into the college. The leadership team had a lot of good energy around that. They feel like it's a good idea.

They feel like it's good for children. And if we're going to have a great point and add a different destination on that journey physically, by having another stop, whether it's 7-8 or pre-KK, they really like that pre-KK idea. And so there's good energy around it. I haven't gone out and spoken to staff specifically about it.

That's why we have it in the update. We're trying to let folks know from the staffing perspective that we're keeping this in front of them all the time. It would be very transparent. This is being considered where we're getting, this is going down another step this weekend to keep them in tune to what is going on so they don't feel surprised if at some point in the fall or at some point this year, this might be moving forward in a concrete way.

And at some point, we're really gonna have to surveyed that a little bit and get some feedback from our staff as well. That this condensed process that when Sean kind of broke down the timeline we've responded to, it's pretty amazing that this amount of work I've done in one month. And at the point where we need to include more voices in this, we will want to make sure that we get that from our educators. I was going to ask about that, so can I just do that now?

I was actually trying to… bucket my questions into sort of pre-property acquisition considerations, like costs, and then what do we do if we get the property? But you opened the window. So just on the community engagement piece, and we don't need to map that out tonight, but I did want to ask, you know, knowing you all would be here, if you just had any early visions on what that might look like.

And frankly, who might drive that? whether it's school committee, district, school building committee, I don't know, other, just wanted, while we're all together, I don't know the next time we're all together, wanted to just open the floor to any early thoughts so that folks the next couple of weeks, August, September, can kind of hit the ground running on that piece potentially. Invite any thoughts on what that engagement might look like? We can take several different ways.

First of all, communicating it and making sure people are reading it and it's in front of folks on a regular basis. We could do it through our PTO meetings with our elementary schools. 3KK is the initial part that we really want to discuss. And we do that with staff meetings with our staff as well.

It is going to be The hard part about pre-KK is that families that are going to be impacted not hearing it, they may be just moved in, or they may just, thinking about… Yeah, other than the younger siblings. When we do the 7-8, you're going to have a real wide body of folks that we want to weigh in on that, both third grade parents and fourth grade parents, as they envision what their 7-8 is going to look like. So we'll have to be thoughtful.

We have a preschool source where we can identify our three-year-old parents, and we can kind of get that up and running But I envision an elementary-heavy kind of conversation where it becomes about program and impact on students and families. And then the larger audience, obviously, when it comes to financial purchasing of the property and the cost of living, as Sean just explained, that's going to be a town meeting discussion and how do we educate folks around that prior to any votes or prior to any town meeting. There's gonna be some questions that might not be just fully answered, and that might be hard for folks, but that's, I'm gonna tell the truth and say, I don't have an answer to that question, then kind of run something and say, well, it just might look like this, or, you know, we're gonna have many answers, but we might not have every answer, because we're at a really intense timeline. And it's a great opportunity.

It works great, and if it doesn't, John seems to be doing a great job with the original proposal, and there's something in place that's already has a process with MSBA and a connection, That's a good news story. The MSBA engagement in being a module one, we're getting ready for module two is a really big deal at the time. So this is a good news story in both parts, we have options.

Speaker 5 (02:03:25–02:03:34)

I'll just, Sean has his hand up, and I'll jump in before him. I think, yeah, I mean, I think all of the above is in terms of who's involved.

Speaker 1 (02:03:34–02:04:13)

I will highlight the school building committee, because I think they've been kind of given the charge by the town to say, you know, help drive the work towards addressing what is being acknowledged as an overcrowding problem for young public schoolers. So, you know, the school department lives with it every day. The school department works with the school department, oversees that, and interacts with families to deal with that every day. It's been really a commitment of Sean.

It's done a tremendous job of, like, hosting information sessions about the Gallo Road project as that was going along, right, what are the different things that's been It's not just Sean, it's many, many years in which they're doing that. I think that will continue.

Speaker 5 (02:04:14–02:04:24)

I think the other thing that this initial new idea around pre-KK, you know, unfortunately the timing was towards the end of the school year, lots of people were busy. Summer, everybody's kind of gone.

Speaker 1 (02:04:24–02:05:18)

So I appreciate the superintendent trying to put it on people's radar. I think we'll get a lot more engagement in the fall. And if this board decides to move forward with a kind of impairment and that occurs, I think it gives us really good opportunities sessions with families to say, like, what do you and your family and your child really love about the pre-K experience? What's missing?

Like, what are the things you want to get out of those, you know, past positive and learnings that we've had that we can take within the design and like actually open more design, more details. Great job. There are lots of ways in which that kind of design will be tweaked and adjusted based on that. Sean and then John.

Go ahead, Sean.

Speaker 13 (02:05:21–02:07:04)

Thanks. And just in response to Mr. Obersheimer's comment, you know, about, you know, enthusiasm for this, you know, I got to admit, you know, having the potential of having full-day preschool as a component of this project, I think, is a big win for any parent that's experienced half-day preschool. You know what I mean?

Dropping off and picking up really quick is never really that much fun. I think if we can offer that as part of this project, I think it's a really big win. But, you know, the idea of the students coming together at an early age, I think is a very good thing. But similarly, you know, just to contrast that at Gow Road, the intention of that was to create an educational campus for, you know, seventh and eighth graders along with high schoolers.

So, you know, that feeling of community, I understand it for the younger generation that would be there, but you also get that as part of the other project. And then, you know, the last thing that was kind of alluded to, too, is, you know, for this facility, it will probably take two to three years before it opens, or we can construct it and, you know, open it. And the majority of the parents that would be able to experience this may not be living in the town right now, and the students that are part of this wouldn't be able to. Whereas Gal Road, two to three years out, students that are in the elementary schools wouldn't be able to experience it.

With this entire effort, I appreciate everyone's help and assistance on this. And we're just excited to do something, you know what I mean? So thank you for your time tonight.

Speaker 12 (02:07:06–02:07:13)

I'd like to thank the School Building Committee for switching gears and doing such a great job.

Speaker 1 (02:07:14–02:07:16)

John, I think I hear you closer to your microphone.

Speaker 12 (02:07:18–02:07:54)

Hello, can you hear me now? Yep. I just want to thank the School Building Committee for switching gears and getting this thing where it is now. I really appreciate it.

Mr. O'Rourke and his group have been at this for a lot of years. And believe me, I wasn't one of the believers, but all you have to do is drive down H.O. Road on Saturday and Sunday and see all the mothers and fathers and all the young kids in the carriages, knowing we're going to need these.

And I appreciate you working so hard. I appreciate it very much. Thank you.

Speaker 1 (02:07:58–02:09:46)

On the program piece, piece that Sean spoke of, can you, like Mike mentioned, is obviously very far out of reach, Can you break down the difference in, are we currently offering full-day pre-K and kindergarten? And do we intend to offer full-day pre-K and kindergarten at the new site? The intention is not to have full-day pre-K for all students at that site. We're doing it for room for that.

That would be doubly the size. It would be that some of our half-day program would be adjourned to full-day program. It would be wise, and that might be But just to be clear to the public, we do already have the nation around us. We're not screeching.

That's right. So just to remind folks, preschool is a legal mandate for students who have reached the age of three who have been diagnosed with a disability that needs to be serviced by a public school. And some of those classrooms are full-day classrooms given to needs for children. And some of those programs, service deliveries, are half-day.

In some of those half-day programs, we invite students that are not on IEPs to join them in order to create a classroom that's robust in their learning environment and just has a lot of different learning styles. That's where our preschool support comes in for the public that can get into that and have their child at least have a half-day experience. We have one full-day preschool class at the Tucker that was created probably about 15 years ago that's not really part of the That's just for the community to use as one built-in option. That we would love to expand if we had space, but we don't have a lot.

We don't want to get that much space to be assembled. That's what we want students to have. So there's a little bit of a difference.

Speaker 6 (02:09:50–02:09:53)

Any other questions or comments?

Speaker 7 (02:09:53–02:10:44)

Can I just make one? Thank you for all of the work on this. It's tremendous. One of the things that I've been hearing from the community is kind of about the trade-offs, right?

Like nothing's a perfect solution. And, you know, thinking about the schools as being really the gem of our town. And I think what I'm hearing from folks is they want us to make sure we're thinking about not just a fast solution, right, but something that you know, is long-term and sustainable and it would be great to see, and it sounds like, you know, through these kind of different levels, right, that we could come up with something that would serve us well, right, to immediate, you know, to more readily help with overcrowding, but also to have, to be more of a long-term solution.

Speaker 1 (02:10:44–02:13:21)

I would like to think that this is a pretty, both scenarios should apply. I think the 17 would larger and make differences at every location. So, you know, keep that very sure. Sean and his team have done a great job of making sure that they're checking all of those boxes in a very long-term view.

So that's so much easier. The question becomes, this is a unique opportunity. So we take something that's just a little less than in terms of capacity that provides a unique opportunity and take advantage of it. The savings of the money, whether it's $10 million or $30 million, Is this good for children?

Is it good for the families? Is it good for the time? Is it good for the longer term, longer term? And I think it's a good option to explore more deeply.

And I think that the programming that we just once said with our design team, they've come up with a really unique way of engaging young learners. For example, we don't want students to go up and down three floors. The cafeteria will be down every floor in a very unique way. The libraries will be down there.

because we don't want to collect stored up and down free flow, so we'll put certain things. So we can be really creative with that space to address the needs of our customers. And I think it would be, either program will be short on time. Thank you, appreciate that.

Just a timeline question. This might be for Sean, Mr. O'Rourke, and Nick, I'm not sure. So it's sort of an MSBA.

Any views on, my instinct is, you know, MSBA related decisions might drive our timeline a little bit around further evaluation of this scenario. In other words, I think there may, there's gotta be, is there a time, you know, in the coming months where the town will need to decide sort of if labor aid is required, are we pursuing school there through the MSBA program or not, which inevitably will sort of, to me, that seems like kind of a final decision time. You know, how long can that go on? We're like, we're not excited on that.

You know, is there a view on sort of when we should really have that figured out?

Speaker 11 (02:13:22–02:15:06)

So right now the town, through the MSBA process and through that project can study a K-5 for 495 students or a 3-7-8 building for 670 students that operate today. That is included as part of the MSBA program. You can look at as many sites or as few sites as you want. We have an OPM on board that are preparing the designer's procurement process.

The designer will be selecting the contracts by the end of October. So that work related to K-5, grade 7, 8, you could start looking at Laborets right away by then. To look at Laborets and 3KK with MSBA partnership, that is an indeterminate timeline because The initial conversations we've had is they've said, if you acquire the site, and you're still interested in pre-KK, come talk to us after you've acquired the site, and if that's true. So now we're looking at at least a couple of months before we can engage in those conversations.

And we don't really know where they're going to say go back to. Are they going to say go back to the beginning of the eligibility period, and we're forming this new building committee again, and doing other initial stuff? Or will they let us move more quickly to less preliminary? The exact timeline is, it's hard to tell what we can have a final decision on what we do to take care of MSP partnership.

It would be a delay. It's not clear. And I don't know when we have a better answer from them on as to how long of a delay that might be.

Speaker 1 (02:15:07–02:15:42)

I was going to ask perhaps you and Sean to work on a best shot at sort of a timeline of key dates, decision points over the coming months. I can't quite tell if that's a reasonable ask yet or if more information is needed, but it would seem helpful for upcoming discussions to sort of have a visual like that.

Speaker 11 (02:15:42–02:16:26)

kind of plug in what we'd expect in kind of a, not a worst case, but in kind of a longest duration for an MSBA project, that would be pretty kick-ass. So we can at least work on that and maybe there's a way to leverage a lot of the work that's already been done to skip some of the other stuff and try to move more effectively or efficiently with MSBA, but that's not really, that's going to be in there. Fourth, they have a very deliberate the methodical process that they want districts to adhere to, and the idea of a district coming to them after we've already signed an agreement saying we'll study certain things to come back, and that really throws their program out of sync, so they don't, they're just gonna be, I think they're gonna be.

Speaker 1 (02:16:28–02:16:41)

Yes. Sean. Sean, you got your hand up, but I also have a question. Yes.

share the difference in size between the two projects, what would be a lab array and what the 7-8 would be a tile?

Speaker 13 (02:16:45–02:17:09)

I'm presenting, feel free to correct me where I go wrong. So the project at lab array numbers is about 86,000 square feet. Uh, I believe it's, I will say 45,000 of new build and 41,000 of renovation of the existing building. And, you know, I'll pause to let John correctionally correct me if I went wrong there.

Speaker 14 (02:17:10–02:17:16)

Um, it's slightly more than that, but you're close. It's slightly more than that, but you're close. Yes. Very close.

Speaker 13 (02:17:17–02:18:47)

Working off top of my head and then cool. And I've got the constructing cost up for Guile Road when we did that. Guile Road square footage area for the middle school was 137,000 square feet, and the preschool was 24,000 square feet, so roughly 161,000 square feet. Keep in mind with the middle school, there are additional very large areas, auditorium, much larger gymnasium, full-size cafeteria, which drives some of that size up.

So when you're looking for it, just keep that in comparison. Thank you. The one thing, though, I just want to touch base on Mr. Obersheimer's question on the MSBA timeline and Mr.

Milano's comments, too. So the middle school option was 660 students, not 670. But, you know, the overall working with MSBA this past year and a half that we've been working with them, We've done our best to be ahead of them or go as quickly as we possibly can. For example, in module one, we had 270 days to submit all our documentation to them.

We submitted it in 90 days and it didn't do anything for us. So just from experience through this past year, I wouldn't anticipate them accommodating us wanting to move fast because they haven't done it already.

Speaker 1 (02:18:51–02:19:11)

Thank you. No other questions or comments from the members. This does not require a motion or an update for us as well as the community. Thank you all for joining us.

Much more to come. Thank you.

Speaker 14 (02:19:12–02:19:15)

Thank you.

Speaker 1 (02:19:27–02:19:37)

So we move to item eight, special approval of the special town meeting warrant for Smilano and Walker Street.

Speaker 11 (02:19:37–02:19:47)

Thank you, Mr. Chair. We went through these articles a bit in our last meeting, so I'll walk through where they stand.

Speaker 1 (02:19:51–02:19:57)

The first article on the agenda is an appropriation related

Speaker 11 (02:19:57–02:20:18)

water main system and seeking additional funding from the WRA to take on additional infrastructure improvement work. DPW Engineering has identified an additional $2.2 million in projects that they contemplate fitting and constructing over the next

Speaker 1 (02:20:28–02:20:35)

interest-free loan money that is billed to the town through the WRA system.

Speaker 11 (02:20:35–02:24:14)

So you can acquire money at 10 years, no interest, to improve the watering systems. And we have, through DW Engineering, recommendations to drive that home to $.2 million for additional watering projects. Any other questions? All right, the next article is to transfer surplus bond proceeds.

So surplus bond proceeds are when we borrow money for projects that we ultimately don't need the money for. So it's not only a town meeting authorization to borrow money, but we did bring the money in. So it is sitting in a bank account in those terms. And we cannot use it for the purpose for which we borrowed it for because the projects are complete and the funding is no longer needed.

In order to use that funding now, we need a town meeting vote to move it and apply it to a different capital project. The rules are that if the surplus proceeds are less than $50,000, we can apply it to the Tennessee Municipal Housing Authority. We had a vote several months ago where we applied surplus proceeds to existing dental service costs. If the surplus proceeds are greater than $50,000, we trigger that requirement for a town meeting vote.

The two projects that are complete and no longer need are $350,000 from a DPW Locker Room and Sanitary Garage project from a year, 10 years ago, and the other is for what had been expected improvements that were necessary for the Pine Tree Road flood control dam for $134,000. So we propose, the way we see this article up is not to approved by the town meeting, but not been paid for yet. So we have a replacement fire engine that we expect to arrive early winter, November, December of 2026. So we propose to apply these savings or the surplus contributions to that cost.

So that $1.1 million fire engine, we won't borrow $1.1 million, we'll borrow less $3.50, less $7.50. So we put this money to work on another capital project that's expected to be delivered this year. So we would close out these projects. All right, the next one is the adjustment to the reserve fund with the additional state aid approved for the fiscal 27 budget, that delta is about $363,000, and we recommend appropriating that into the reserve fund to be used for extraordinary or anticipated costs in fiscal 27.

I will note one anticipated potential cost may be operating costs to fund, elaborate the balance of this fiscal year if we take ownership, if we're, you know, constantly reach agreements and inquire and the town votes to inquire. We will have a cost to manage that facility for the rest of this fiscal year that we have not budgeted for, so there is a potential place where this money is going to be used for already, but we just recommend moving it so that it's not thought of and used if necessary to run for legal action. We include it in the packet and just for the members and for the public and we share this with our community too.

Speaker 1 (02:24:14–02:24:22)

It's just it's more of a kind of a template acquisition article just to get folks something to think about in terms of Lava Ray.

Speaker 11 (02:24:22–02:24:32)

So this is just a pretty standard MARA article that was drafted by KB Logs to acquire property. This has the specifics related to Lava Ray in it.

Speaker 1 (02:24:32–02:24:43)

Some points that we would need to fill in would be, you know, the purposes that we're requiring for general municipal purposes including that are not limited to business conversation, we would add student purposes to that.

Speaker 11 (02:24:44–02:25:19)

And that would be sufficient to cover it. And I'll note that it is, the recommendation is continued. So the language here, so the town shall vote to exclude the amounts of units we're paying in bonds and that's what we mean that a debt exclusion order would be required for this to proceed. But again, there's more blanks to fill in, but this is broadly what that will look like.

And I also included, again, just to give context of what the ballot question might look like if we had to put it on the ballot.

Speaker 1 (02:25:19–02:25:24)

What is different from debt exclusions to operating overrides is that the amount

Speaker 11 (02:25:24–02:25:55)

So we thought it doesn't provide a lot of context. This is the state mandated language. You're asking your voters to exempt from approximately half the cost of a blue box in terms of buying a lottery. That's the amount of things they're not going to get, which makes the information sharing the communications around it leading to the town meeting, because that's where the town meeting votes.

That's the limitations on how much money. The ballot question is much more general than specific.

Speaker 1 (02:25:59–02:26:22)

Is there anything we should discuss tonight about, I mean, just from a timing perspective, right? Like this would go to Warren Committee, Maybe I should just ask, what would the sequence be in terms of finalizing this potential article to get to one committee for the fall?

Speaker 11 (02:26:23–02:26:40)

The only edits to this version of the article, and the articles all could be voted through, some of it's final edits would be to add language later down the line. Generally, this one is included, but not limited to certain purposes. We would certainly want to add that now.

Speaker 1 (02:26:42–02:26:51)

And maybe I can save you, maybe I can simplify my question. Is there anything else that would be helpful for us to weigh in on for readiness for this one? It seems like not.

Speaker 11 (02:26:52–02:27:04)

No, and I would say the board will need a subsequent meeting between now and the end of September. I mean, the end of August, excuse me. If and when any such agreement is reached. Got it.

To finalize this.

Speaker 1 (02:27:04–02:27:07)

Okay. My question was not clear.

Speaker 11 (02:27:07–02:27:41)

Yeah. on the CPC language. So I, no, I am, sorry, yes, thank you. I have not drafted that article.

The CPC project appropriation that's contemplated is to, looking for assistance with Council on that one, is to appropriate $300,000 to the top of the year end budget. So we have draft language we're just working with Council on. So it's prepared to be approved for tomorrow in the subject of time.

Speaker 1 (02:27:41–02:27:45)

School building committee. which I would ask Sean to stay on call.

Speaker 11 (02:27:48–02:27:58)

So the question about MSBA and non-MSBA, this is a proposed appropriation by the School Building Committee to study and design a project at Waterloo.

Speaker 1 (02:27:59–02:28:11)

We have an existing appropriation of $1.5 million from the School Building Committee under the MSBA auspices to design a school project related to a K-5 or a 7-K.

Speaker 11 (02:28:15–02:28:40)

program in that type of a project. In order for the school building committee to study and design a non-MSBA project and then that is deemed to be in appropriation, we think about 1.2 million dollars to be sufficient to get it to a point where that project can then come back to the voters and to town meeting for full approval for the total budget a year or whatever that timeline is for now.

Speaker 1 (02:28:40–02:28:57)

So the question here to the board, and it says to them that the school committee has an opportunity to make a decision, is whether we would want to have a prior comment warrant to give the school committee an appropriation to commence work once their decisions are made, MSBA or not MSBA.

Speaker 11 (02:28:58–02:29:32)

Otherwise, they will need to wait until a future town meeting for a future appropriation to proceed. It would mean there are two appropriations out there for the school building committee to design two schools. We know they wouldn't do that, but I just do know that that might be a little funky, or just a little strange, but if the intention is to have them, once a decision related to MSBA is made, to just start working, it would be in the interest to have an appropriation available.

Speaker 6 (02:29:32–02:29:42)

So that's, I don't really have a lot of prior contact when I shared this, but that's kind of the decision that we have to make at this point, related to additional appropriations.

Speaker 1 (02:29:42–02:29:50)

So we'd have two appropriations for two sites, but that does not mean that both funds would be expensive.

Speaker 4 (02:29:50–02:29:50)

Right.

Speaker 7 (02:29:51–02:30:00)

Because one set of funds can't be spent on, it's not like you can't take Guile Road, the Guile Road appropriation and apply it to Lauderdale and vice versa.

Speaker 1 (02:30:01–02:32:20)

And I didn't put in language, but there could be additional language that says, provided that, you know, no funds shall be expended if the town is proceeding with the project of the MSBA or something, just to kind of clarify that. I didn't, I wasn't really rid of it or something like that, but that would be enough. I'm not even kind of building a section on that, but yes, there would be two separate appropriations. The school building committee wants to start using the MSBA one now, until we stop and go in some direction.

It seems like we need the appropriation. I'm sort of thinking about whether, but like the explanation or messaging would be really important for Tom meeting. And I think I mind where you do that, maybe that needs to happen. around some presentation or something and maybe not through the actual article language because that just seems like there's a couple things in flux to try to accomplish that in the article with my instinct.

Is that sort of where it all started? Where you landed and not trying to write yet? That's why I left it as just a regular appropriation. Yeah.

You wouldn't spend 2.7 million dollars designing I just, I mean, to get to, there's some nuance here in terms of the time you spend, I think, like if you just read it, it might suggest at any point this spending will occur. When in reality, I think it would be, we need the appropriation, but something might trigger that to happen. I don't know.

Speaker 7 (02:32:20–02:32:28)

I mean… My gut is leaning towards wordsmithing or something in here.

Speaker 11 (02:32:29–02:32:49)

I'm not sure if that's a good way to put it, but I think it's a good idea.

Speaker 1 (02:32:50–02:33:38)

Otherwise, it doesn't matter. I'm just sure. I just worry we get into a point where people are wanting to get up before it's midnight time, and just like that could take days. So what I could anticipate, right, or the question I would have to try to anticipate anybody would change it, restricting the expenditure of Gen Sky on the road, right?

Would it be questionable or not off the top of your head? Can you… Can you insert language in an article authorizing appropriation that also prohibits the actual… I'm getting tired, so I'm losing words.

Speaker 7 (02:33:39–02:33:47)

Can you, like, halt or preclude the incumbence of funds appropriated

Speaker 2 (02:33:47–02:33:53)

that have already been appropriated in another… Can you reference the other appropriations?

Speaker 1 (02:33:53–02:34:03)

Yeah, that's right. So the article… It might be a crazy… The article is for Glamorous, but we would reference the existing appropriation for the Gallaudet.

Speaker 2 (02:34:03–02:34:04)

Yeah.

Speaker 1 (02:34:04–02:34:13)

I think we're okay with that in the token that we don't confuse folks. Right. Because right now we're only talking about one. Right.

Speaker 11 (02:34:13–02:34:28)

Just the one that was… So the Gallaudet appropriation. had it provided that no money shall be expended until the town has been approved by the MSBA. Broadly language to that, so it could, I can work with Council.

Speaker 1 (02:34:28–02:34:37)

I should also note that it's just a draft motion, this is the Warren Committee's motion, so we can prepare and submit to them proposed language.

Speaker 11 (02:34:37–02:34:38)

We don't need that now.

Speaker 1 (02:34:38–02:34:46)

The article, which was the non-folded portion, was sufficient for submitting an article, and we can work with Council to propose language

Speaker 6 (02:34:51–02:34:55)

I'm not, he doesn't like it.

Speaker 11 (02:34:55–02:35:03)

I'll let the attorney handle it. All right, on our list would be the Appleton Fire Station.

Speaker 1 (02:35:03–02:35:19)

So as I noted in an email to the select board, the Fire Station Building Committee met last week. And just in terms of their overall progress on the design, it's not at a place where they would be prepared to have a cost estimate.

Speaker 11 (02:35:19–02:35:23)

in a well-prepared design for the town meeting's deliberation at the fall town meeting.

Speaker 1 (02:35:24–02:36:13)

I think we should have, I think we raised expectations a little bit higher than we perhaps should have, that they would have been able to turn around from, you know, approval in May to come back in the fall. It was a lot of work to be able to do that in a short amount of time, and we're just not there. So, where they landed was, that is a project that will require a ballot question, so, the timeline that they discussed, I guess, would be the second one's decision, but, you know, February, March, special town meeting to take up the appropriation for Atkinson, followed by including the Dalmish women in the town election to avoid special election costs. We would incur, you know, the expense in time related to the special town meeting.

But if we're able to hit that kind of threshold and timeline, the project should be able to start.

Speaker 11 (02:36:14–02:36:47)

At around the same time, we would have started on the fall town meeting, so there isn't a significant delay around the project at all. But it does mean a revised timeline in order for it to be ready. The other benefit is, depending on when that town meeting would be called, they would be able to put their project up to bid, have the contract just bid, and say, this is what the cost would be. You know, the construction contract ready to be signed upon town meeting, and the bad additions.

So it would be a very clear specificity just is not ready from that point on.

Speaker 1 (02:36:48–02:37:00)

Is the readiness just, is that just design timing? Yeah, the design process didn't really kick off until… It was aggressive. It was an aggressive design timeline.

Speaker 11 (02:37:01–02:37:14)

You have contracts done, amendments approved, it's a work start. It just, it was a fast turnaround and we flushed the message out a little bit carefully, but so they are on.

Speaker 1 (02:37:18–02:37:45)

we'll revisit later throughout the expression time meeting. The next three on the agenda are short-term rentals and related articles. As was alluded to in public comment, the planning board feels more time is necessary to work on that article related to how short-term rentals would be regulated, what kind of level of effort that would require staff,

Speaker 11 (02:37:45–02:38:04)

in the various departments that would be responsible for implementation of that regulatory regime. So that is not necessarily zoning art, but it's kind of on the planning board, but they feel that more work is necessary to have that when we work into something.

Speaker 1 (02:38:04–02:39:02)

Can I ask a question on that one? That's a planning board, so we don't have any influence over that at all? For them to put it forward, So it's a non-zoning, it's not an amendment to the Zoning By-law, so it could come from anywhere. It could come from Citizens Petition, it could come from the Select Board, it could come from the Board of Health, so it could be submitted by any authority, but the Planning Board has taken the lead on trying to work on it and spend a decent amount of time on it to this point, but it doesn't necessarily have to end here.

I'm not saying we should do it. I'm just hearing about the process. I do think the reason that they've surfaced for and why they think it's not ready is a good reason for them to take it back. Because there are a lot of town departments that they need to have buy-in and input from for this to be effective.

Speaker 6 (02:39:02–02:39:37)

Well, so I think the two town departments are being called on to weigh in on this, and practically speaking, looking for their, some of the operational burden, being the inspection department and the Board of Health. It's pretty tricky in government getting, what concerns me is there's two separate departments with two separate leads,

Speaker 7 (02:39:38–02:40:08)

And it's like, who are we having mitigate and manage and ensure that something is going to get to us by the next time? Because I think it's, it's, it's fine. It's, it's, it makes sense that there, we have to think about implementation, but like, we can't, we can't

Speaker 1 (02:40:08–02:40:27)

We need to prioritize getting this done because people are concerned about it. And it also supports our goals for maintaining housing stock for residents and impacts affordability.

Speaker 7 (02:40:27–02:40:36)

I don't want this to turn into people not doing anything because it got complicated to get through implementation.

Speaker 1 (02:40:36–02:41:03)

And these two departments report to you. I think one element here is we're trying to get to a regulatory regime that authorizes these for owner occupants. So as a policy choice, there's a policy choice to just say, no, these are not permitted at all. And that would be a cleaner, easier to prepare bylaw.

Speaker 11 (02:41:03–02:41:32)

But if we are going to regulate, then it becomes a bit more challenging. But I guess my question to this point is, you want to just prohibit them, or are you more comfortable with a regulatory that should limit them and cut down on the number of them, and only allow them in certain circumstances, but the other alternative would be to say, as a policy option in the town, we actually don't want these in the town at all.

Speaker 1 (02:41:32–02:41:45)

I don't know that we really talked about that as an option, I don't know if the board's interested in that, but that would be an easier path Because what have other towns done in our position, right?

Speaker 6 (02:41:45–02:42:02)

Like we're not the only, I mean, it's definitely, it's potentially a revenue source for us. I mean, people are going to do it anyway, whether it's legal, but whether it's regulated or not.

Speaker 1 (02:42:02–02:42:15)

And, you know, these things have been around other municipalities in the state who have figured out how to do this.

Speaker 11 (02:42:16–02:42:28)

And they deal with requiring annual inspections, or alternatively they've passed a bylaw and you give them the regulatory authority to avoid health. It's like, we don't have a lot of regulations now, so it's

Speaker 1 (02:42:29–02:43:51)

doing kind of half the work and then getting a bylaw in place that authorizes regulations and then turns that to another board to do a future process about it. So we've looked at both versions. We've kind of slowed down that. It says some other board will write regulations once this bylaw is approved.

We're alternatively kind of putting more into the promise of the bylaw and less into future regulations. But that's been kind of mixed across the board in terms of across the different cities in terms of I did try to give you feedback to your question. My view, you know, I haven't studied what draft was kicking around like deeply. I was sort of waiting for it to come to us.

But my view and the view I've heard from residents would be to proceed under a regulated framework. And, you know, my instinct was the bylaw was pretty far along and seemed like, you know, Hale Munger did a fair amount of engagement on it too, which was nice to see. So, you know, just want to answer your question. I think it's, if that, you know, I think it's worth whatever efforts we're having to do here and try to like push that along.

Speaker 7 (02:43:54–02:44:01)

So what would be next steps to push it along? Is there still a way to try to keep this for fall?

Speaker 1 (02:44:02–02:44:44)

Could we meet with the planning board? How can we? I don't think fall. My understanding of the timeline is that the board committee needs in early September drafts of articles to hit, you know, Articles now, sorry, articles now are going to hit there to finish their review files.

They will need to submit as is, which they're not comfortable with. And I don't know if they have the partnership or buy-in or whatever input they need from the public health or the training department to make this work.

Speaker 6 (02:44:44–02:44:53)

Yeah. But… As long as… I just want to keep some attention on this back to Megan's point that we're going to just, like, keep this moving.

Speaker 1 (02:45:02–02:45:08)

we do want to as a board. Just say we don't want to restrict.

Speaker 6 (02:45:09–02:45:14)

Right. No, I think there's a lot of reasons to make the measure.

Speaker 1 (02:45:17–02:45:30)

Well, it's here. We already talked about the Milton Village Local Historic Districts, and the last article, which again talks about our finding,

Speaker 11 (02:45:33–02:45:42)

we amend the affordability from 10% to 15% now that we have an economic feasibility analysis that confirms that 15% number.

Speaker 1 (02:45:43–02:46:08)

So I get more of a housekeeping, more article to do that. We do have 1, 2, 3, 4, 5, 6, 7 articles, assuming that the two relates in a lot of way are needed. So the action from the board tonight would be to approve those articles.

Speaker 11 (02:46:08–02:46:12)

The submissions for our subjects are filed, and it's by the town council.

Speaker 1 (02:46:12–02:46:30)

Is there any more questions that I'll take as a motion? I was just seeing if I had the right tally of which one to go with.

Speaker 7 (02:46:30–02:46:34)

That's what I was trying to figure out. The math is a mad thing here.

Speaker 1 (02:46:34–02:46:50)

So A through F on the agenda and the additional article related to them. So A through F in L. A through F in L. L is not listed, sorry.

Speaker 6 (02:46:53–02:47:00)

But that's equal to Q, K, 4, 5. No.

Speaker 2 (02:47:00–02:47:03)

I just count 6. Am I wrong? Yeah.

Speaker 7 (02:47:03–02:47:23)

A, B, C, and then L. D. There it is. I got it.

I can do it. You want me to do it? Move to approve the following warrant articles for inclusion in the Special Town Meeting Warrant, A, B, C, D, E, F, and O.

Speaker 1 (02:47:23–02:48:40)

I'm curious on the answer. Motion made. Second. Motion seconded.

Mrs. Driscoll. Yes. Ms.

Rosha. Yes. Ms. Nolan.

Yes. Ms. Heider. Yes.

And myself, yes. I think we're skipping out of nine valid questions. We don't have any of those. Yes, now, item 10.

This is not much for us to discuss. idea of process. We have received the responses for the RFP tonight for the East Milton Fire Station RFP. Tonight we're not going to be having further discussions.

We're going to discuss the process of it. So we have a rubric that was sent around by Mr. Milano with the scoring system. We are all to take the RFP back, review, score the rubric for ourselves, submit it to Mr.

Milano, and then at our next meeting we will discuss those scores and also on our next steps, whether it's to award, whether we'd like to have more information, whatever the selector feels should happen at the Eastman Fire Station. It's not necessarily the last item on that, but it is the next step for us in the process.

Speaker 6 (02:48:40–02:48:43)

By when, Mr. Moore?

Speaker 1 (02:48:43–02:50:45)

As soon as possible, yes. Before the next meeting. Before the next meeting. A week before, at least a week before.

September 1st. The only other thing I would mention is that if the board was interested in conducting interviews with each of the proposers prior to doing evaluations, if yes, then we should schedule that to take place prior to conducting evaluations. So that is, we allow for it in the RFP, we do not require it, the board's not required to do it. You can then evaluate based on we can re-request interviews after the evaluation.

I will need to do that. If we did interviews now, that would require us to be in, depending on vacation time, a couple, some very limited spots before the next meeting. Why does it need to happen before next week? It just stays in the track.

Because it's going to be sharing our scores. Or you can push that side to the back. As long as we're accommodating interviews and stuff, we can push that side to the back. Do the members feel that we need interviews, or are we comfortable with reviewing the applications and scoring?

I don't want to go with someone on that side It's a manageable number, two. I can go either way. On the fence. John, how do you feel?

Three for interviews. So yes, can we still individually look at the applications.

Speaker 11 (02:50:46–02:50:50)

Just for anybody interested, all the proposals are provided on the town.

Speaker 1 (02:50:50–02:51:14)

It's on our bid page, which may be a bit tricky to find, so we'll send out a news announcement as to where they are. All three proposals are available online. Should we right now select a week where we feel that we can begin? I'm not sure there is one.

in August, but we can try.

Speaker 6 (02:51:14–02:51:24)

I can't do it in August. I can be, yeah. I know, right? As usual, right?

Speaker 7 (02:51:24–02:51:32)

I can do the week after September 1st. Or the week after September 1st.

Speaker 1 (02:51:32–02:51:37)

Can you do August, like August, Monday, August 31st?

Speaker 2 (02:51:37–02:51:39)

Oh yeah, I can do Monday, August 31st.

Speaker 1 (02:51:40–02:51:46)

So that last week of August, First week of September. Yeah, that was very unique.

Speaker 2 (02:51:46–02:51:46)

Yeah, yeah.

Speaker 1 (02:51:46–02:51:48)

All right.

Speaker 2 (02:51:48–02:51:53)

Yeah, just like the September, I mean August 24th, midnight period.

Speaker 1 (02:51:53–02:51:58)

All right, so we would need to have this open, the regular sign for me.

Speaker 6 (02:52:00–02:52:02)

So that'd be September 1st.

Speaker 1 (02:52:02–02:52:11)

Sure. Keep it since Tuesday night. September 1st, okay. Yeah.

John, is September 1st okay for you?

Speaker 12 (02:52:11–02:52:12)

Yes.

Speaker 1 (02:52:12–02:53:06)

for the first two of these. Okay, so we will reach out to them to schedule that. We'll give them 15 minutes for presentation and then we have 30 minutes for questions. For the questions, for us as a board, do we want to craft specific questions so that we are asking each candidate the same questions and not doing this that often?

We can draft some, but if any specific motion that members would like to include on the list of consideration, just shoot those to us. So we can also work on some of those questions. So we'll draft questions from the first meeting of these notification candidates forward and forward. Exciting.

Congratulations.

Speaker 11 (02:53:06–02:53:11)

Oh, sorry, good catch. That's, we can't do that night, sorry.

Speaker 1 (02:53:11–02:53:28)

What? September 1st is the state primary. Son of a… I mean, so you can do the night before or the night after, but it is a conflict that we shouldn't need that night.

We try to avoid doing that. August 31st? Yeah. John, August 31st?

Speaker 11 (02:53:29–02:53:30)

Yes.

Speaker 1 (02:53:30–02:54:14)

All right. Thank you, Glenn. Item 11, the quote to determine the maximum useful life of capital equipment approved by 2026. Any time you wish to move on.

Thank you, Mr. Chair. So for capital equipment, when we go to issue number four, the maximum useful life is five years useful life.

Speaker 11 (02:54:15–02:54:56)

We already do this process through the capital process where anytime we take capital requests and we request for departments to submit their useful life and then the capital committee makes recommendation of their useful life to the town meeting. So we're really looking for a ratification of essentially what the capital committee and town meeting have done to set the following useful life for the following capital equipment as displayed on the screen. So this is the bus. front end loaders, skid steers, network hardware, any kind of capital equipment item.

So this is the maximum length that we can issue debt for these with. And we do try to trim that down where possible.

Speaker 1 (02:54:57–02:55:08)

The idea is you don't want to borrow money for a front end loader for 20 years if it's only going to last you 10 years, and then you're paying debt on something that maybe doesn't last the full 20.

Speaker 11 (02:55:08–02:55:25)

In that case, a front end loader should last 20. But just an example, if you want to keep the last, so we try to keep it below what the actual use will be, so that again, we're not carrying them to the cost too long in the past.

Speaker 1 (02:55:27–02:55:41)

And these are in place until they get changed again? Correct. If there's no further questions, I'll take a motion.

Speaker 7 (02:55:46–02:56:07)

I would like to move that the select board determines the maximum useful life capital equipment approved at the 2026 annual town meetings shall be displayed on the chart in the column labeled useful life vote at town meeting.

Speaker 1 (02:56:07–02:56:08)

Motion made.

Speaker 7 (02:56:08–02:56:09)

Second.

Speaker 1 (02:56:09–02:56:29)

Motion seconded. John. Yes. Pete.

Yes. Megan. Yes. Yes.

All right. Item 12, committee reports. I feel like we heard from the school building committee, but Pete, is there anything? I think we've covered it.

All right. John, airplane noise.

Speaker 12 (02:56:32–02:57:07)

Yes, we met a week or two ago. It was very productive. people. They're looking for some instrument reading, right, Nick, that they need to try to put something together this year, the Massport FAA.

They said the devices have been around the town, so they're just looking for the readings on them. And they'd like to appoint another member, if you have anybody applying.

Speaker 1 (02:57:14–02:57:25)

Thank you, John. 13, special election warrant. I think we can skip this. No, this would be to approve the special election warrant.

Speaker 11 (02:57:25–02:57:32)

I'm sorry, it says special, it should say state election.

Speaker 1 (02:57:32–02:57:37)

State election, yes, sorry, excuse me. That would be the confusion. The state election warrant.

Speaker 2 (02:57:38–02:57:43)

So move to approve the state election warrant. dated Tuesday, September 1, 2006.

Speaker 1 (02:57:43–02:57:51)

Motion made. Second. Motion seconded. John.

Yes. Pete. Yes.

Speaker 7 (02:57:51–02:57:52)

Megan. Yes.

Speaker 1 (02:57:52–02:58:38)

Nate. Yes. And me, yes. All right.

Discussion approval of boards and committees. We will take these one by one. So. anything to discuss before I move to approve the Bicycle Advisory Committee.

Oh, wait, sorry, we haven't discussed the composition and charge, right? Are we ready to vote on this for Bicycle Committee? I believe so, this is only move number five, but we have the charge. I'll just give it a minute, and then I'll give the motion.

and people can read it. Just make that seven.

Speaker 6 (02:58:39–02:58:48)

It needs to be spelled.

Speaker 7 (02:58:49–02:58:56)

We have no existing bicycle advisory committee members at present, correct?

Speaker 1 (02:58:57–02:58:57)

Correct.

Speaker 11 (02:58:58–02:59:02)

We did receive an application in the last day or two.

Speaker 6 (02:59:08–02:59:24)

Okay, so we're approving the charge first, and then the three numbers? The three, okay.

Speaker 1 (02:59:24–03:00:37)

I'll take a motion to approve. Any questions? Do you want me to break this up? Move to approve the Bicycle Advisory Committee charge.

Motion being seconded. John. Yes. V.

Yes. Negative. Yes. Negative.

Yes. Myself, yes. Move to approve the Bicycle Advisory Committee. Move to appoint the following individuals for one-year terms.

Echo Berquist, Richard Bork, and Shelley Wolfe. Second. Seconded. John.

Yes. Yes. Thanks for doing the charge, Nick, and thanks for those members to get this relaunched. And we'll have two more applicants on the next meeting, so we'll see two more applications over the weekend.

John, you got your hand raised?

Speaker 12 (03:00:38–03:00:40)

No, I did that by mistake.

Speaker 1 (03:00:42–03:01:13)

All right. All right. So for the Conservation Commission appointment, you're only appointing one. So we will need to select one of the three candidates.

Is there anyone that's numbers would like to go forth and make the presentation? While we get organized on that, I just wanted to thank Dr. Ingrid for 19 years of service on this committee, which created this vacancy.

Speaker 6 (03:01:13–03:01:24)

Go ahead, John.

Speaker 12 (03:01:26–03:01:45)

I'd like to put forward George DeLee. She's worked very hard for the Fletcher Steel Garden. She's been on the Women's Club Flowers. She's a very nice lady, and I really support her in this role.

Speaker 6 (03:01:48–03:01:51)

Any questions from the audience?

Speaker 1 (03:01:52–03:04:12)

I mean, this is a competitive set of applicants here, impressive group, and I hope that we can find places and positions for all three of them because this is a tough one. So I was respectfully going to nominate and advocate for another candidate procedurally. Do we discuss John's motion first or do we discuss this all at once? It doesn't matter.

I think that, I mean, they're all very strong. I don't want to pronounce your last name, but I thought Mary Reif showed what jumped out at me among three very qualified candidates was what, you know, from the application, sort of a unique interest in this particular committee. including sort of, you know, meeting with prior members to, you know, make sure it was the right committee to sign up for. And, you know, that just was a one differentiated factor, I thought, between the three applications.

So that would be my vote. So there's a lot of guidance here that two candidates put forth, which is the best way for us to proceed. Procedural reference, I apologize to the board. You probably have to deal with it.

I would send John seeking a second for Mr. Driscoll's nomination first. Seconding. Seconding Mr.

Driscoll's nomination. So then we need a second for it, a second for Kennedy as well. I would say they left a motion on the floor, which is appointing John Kennedy. So motion to appoint John Kennedy.

Motion to make and seconded to appoint Georgia Lee, Sheridan? Georgia Lee. And we'll take it to a vote. John?

Speaker 8 (03:04:12–03:04:13)

Yes.

Speaker 1 (03:04:13–03:04:23)

Eden? Just because I was offering the other candidate, so I'll go no for this.

Speaker 6 (03:04:24–03:04:26)

Yes. No.

Speaker 1 (03:04:35–03:04:52)

And for myself, I will say yes, because Ms. Lee has applied, I think, a couple of times for this commission. So I'll put us at three to two, and four to 17.

Speaker 6 (03:04:52–03:04:57)

So George Lee will be appointed.

Speaker 1 (03:04:58–03:05:02)

That's great. You know, I mean, they all seem very strong, so.

Speaker 11 (03:05:02–03:05:21)

And I will, I think we'll reach out to both Mary and Tom and see if they're, Tom had expressed interest in several committees, and Pete and I had spoken to them, and we checked on traffic, so we reached out to them, and tonight's the design mess, and we can apply to Tom's.

Speaker 6 (03:05:21–03:05:23)

All right, thank you. We'll move to the next.

Speaker 1 (03:05:28–03:05:33)

These are reappointments for the capital planning committee.

Speaker 2 (03:05:33–03:05:43)

Move to appoint the list as written to the Conservation Commission for three years.

Speaker 1 (03:05:43–03:05:43)

Right?

Speaker 2 (03:05:44–03:05:46)

What happened to?

Speaker 1 (03:05:46–03:05:53)

Oh, I see.

Speaker 2 (03:05:53–03:06:08)

I got you. I see. I got yes. I'm just not.

I'm tired. Move to reappoint the following individuals to the Capital Improvement Planning Committee for a one-year term as written.

Speaker 1 (03:06:08–03:06:20)

Second. Second. Good job. Yes.

Yes. Yes. Yes. Move to the Fire Station Building Committee.

Speaker 11 (03:06:23–03:06:41)

We historically had a selector liaison to the Fire Station Building Committee. should flag this in the spring, be positive to that, but the board does not have to appoint a liaison, but could, and ask that member to resign by a position on the committee.

Speaker 1 (03:06:41–03:07:05)

Are there any members that would like to volunteer? What's the runway on that committee? So it will be through what, through the completion of the project? Correct.

They meet, they've been meeting monthly. They pretty much stick to a monthly schedule and they will meet monthly until Atherton is built and closed out.

Speaker 11 (03:07:05–03:07:24)

So that committee will last probably another two and a half to three years. And then right now they're, they're having some, like a working group planned around just some of the Atherton issues that might meet more often than the full committee, but the full committee meets monthly with additional meetings, kind of like case by case basis.

Speaker 1 (03:07:26–03:07:27)

John, I see your hand up.

Speaker 12 (03:07:30–03:07:33)

Pete wants this. He can have it. But if he doesn't want it, I'll take it.

Speaker 1 (03:07:36–03:08:05)

I was interested, but John, you should take it. I've got some busy committees on my plate. So by all means, John, thank you. So I guess, absent further discussion, I'll nominate John.

Second. Motion being seconded, we'll do it without Mr. Driscoll, right? Yes.

Megan?

Speaker 6 (03:08:05–03:08:05)

Yes.

Speaker 1 (03:08:06–03:08:08)

Megan? Yes. And myself, yes. John, congratulations.

Speaker 12 (03:08:10–03:08:10)

Thank you.

Speaker 1 (03:08:12–03:08:30)

All right, we move to the Affordable Housing Trust. I'll take a motion. Move to appoint LaVita Johnson to the trustees of the Affordable Housing Trust for a one-year term. Second.

Executive John. Yes. Yes. Yes.

Speaker 7 (03:08:30–03:08:31)

Yes.

Speaker 1 (03:08:31–03:09:16)

Yes. Yes. Congratulations, Mr. Johnson.

Our next is the Milton Housing Authority. This is also, we are to select one of the candidates I would like to put forth, Mary Kirby. The reason being, Ms. Kirby lives at the Miller Ave residence, which I believe Mr.

Driscoll spoke of getting some funding recently and I know there's going to be some work done at that address. I think a resident there would be a great value add to the affordable housing trust. So I'll put this merry curtain forward for your appointment. Mr.

Otterson. Seconded. John. Yes.

Yes.

Speaker 4 (03:09:17–03:09:17)

Yes.

Speaker 1 (03:09:18–03:09:56)

Myself, yes. All right, item 16. Discussion approval of our election officer appointments. How many of you would like to share?

Oh, sorry. We got rats. The slide board makes regular appointments confirming the election officers, the wardens and clerks. all of the other poll workers who do yeoman's works in managing and running and working all the elections.

Speaker 6 (03:09:56–03:10:09)

So we appreciate their efforts, and I'm sure Town Clerk will use more bodies if anybody else is interested in what this would be to appoint all of those individuals that she's identified as those election workers.

Speaker 1 (03:10:09–03:10:13)

All of our very hardworking election officers, I'll take a motion.

Speaker 6 (03:10:13–03:10:20)

I move to appoint and re-appoint the election officers maintained by the Town Clerk and on file in the Town Clerk's office.

Speaker 7 (03:10:20–03:10:22)

Second.

Speaker 1 (03:10:22–03:10:38)

Seconded. John? Yes. Lee?

Yes. Megan? Yes. Megan?

Yes. Myself, yes. Item 17, discussion approval of one-day liquor licenses. Who would like to read those?

Speaker 7 (03:10:41–03:10:49)

Move to approve the one-day liquor license to the Milton Chamber of Commerce, Milton Arts Center, Vance Walsh.

Speaker 1 (03:10:49–03:11:22)

I just wanted everyone to see. Oh, sorry. I'm gonna walk us through just kind of a site map. This is in addition to, I don't know if everyone remembers the time we had a discussion about the deer garden sort of setup.

That was passed, I believe it goes to identify. I don't know if I printed that out, is it marked out there? Maybe not, so we'll pass this one around. If members will recall, last year, there was a debate over adding…

Oh, it is, okay, good.

Speaker 11 (03:11:22–03:11:28)

So, there were a couple versions, so I apologize for confusion.

Speaker 1 (03:11:29–03:12:06)

Town Meeting voted to change the town's bylaws to allow for alcohol on town land with a number of requirements. The applicants have said, and have stated that they're working to complete all the requirements. They're aware of one related to insurance, which appears to be insurance at each of those levels. they'll either use a beer garden, or not.

So they'll set up a dedicated space for alcohol service, or they would be open to not having a more limited space and allowing it throughout the deck, but they're open to whatever the subculture preferences are on that.

Speaker 11 (03:12:06–03:12:42)

The bylaw does allow the subculture to demarcate a specific area where alcohol service can be allowed. related to insurance, related to TIFF certified servers, related to risk payouts, and the like. So the two questions are, big picture, do you want to issue an alcohol license for this event, the back to business event, for the chamber and this fountain at the deck? And if yes, what do you want to set as the location where alcohol service and consumption would be provided?

Speaker 6 (03:12:44–03:12:56)

I feel like I remember when we were discussing this bylaw, and then that we weren't going to sign this on board.

Speaker 7 (03:13:00–03:13:17)

Specifically, we weren't going to be drawing on maps, because we're not necessarily the experts in Did I not remember that correctly?

Speaker 2 (03:13:17–03:13:21)

I could not, I could have misremembered that, but.

Speaker 11 (03:13:21–03:13:27)

It specifically says, ultimately, it's up to the board to decide. They submitted a proposed location.

Speaker 1 (03:13:27–03:13:27)

Yeah.

Speaker 11 (03:13:27–03:13:36)

That said, which we would have locations on this map. The restricted access to your garden, that's on the bottom line, so not on the lower left-hand side.

Speaker 6 (03:13:36–03:13:44)

So we have police department, and fire department, and whoever else is

Speaker 1 (03:13:45–03:14:12)

not on the specific location in this case in terms of having restricted or not there have been previous events where obviously a prior one-day license is fully issued until the chief will sign off on but in this case it was the first so we were really I was thinking the court might have a strong preference so I'm seeking your

Speaker 11 (03:14:18–03:14:27)

Because, for example, you can limit it to a park, or you can use what they propose there.

Speaker 1 (03:14:30–03:15:01)

So we have the ability to say, either the space is bigger, or the space is larger, or we can move the area. But we are going to only allow it to be spread. where there's spins, where there are ball sales in the area of consumption on the street. So unless we have a really strong feeling about where it should be.

Speaker 2 (03:15:01–03:15:04)

I want to know if Chief King has a strong opinion of where it should be.

Speaker 1 (03:15:04–03:15:41)

No, I'm sorry. I went in the reverse order. OK. All right.

So I think what we can do is we can inform the applicants that generally the board is comfortable with this. And however, it's going to seek to employ the location of the public safety units. And we can see that on the floor of the select committee. Okay.

I don't think I would also abstain. I realize I had a strong opinion about it. It's a good process. It's a good process to start.

Okay, that's fine, yeah. With our first.

Speaker 7 (03:15:41–03:15:43)

Oh, we can still approve?

Speaker 1 (03:15:43–03:15:45)

I would hold it. We'll tell them.

Speaker 7 (03:15:45–03:15:46)

Okay.

Speaker 1 (03:15:46–03:16:03)

Where there's no No, no, we don't expect to not allow it, but we're going to put some additional details together and we'll let them know August 30th or so.

Speaker 4 (03:16:03–03:16:03)

Okay.

Speaker 1 (03:16:03–03:16:12)

It's good to hear, it's very good. So we can move to the second question. Yep, you can move on to the next one.

Speaker 7 (03:16:13–03:16:30)

Move to approve the one day liquor license to James Southfield, Break Rock Brewing, 534 Victory Road, Quincy, for the Whitetine Vintage Market, October 17th, 2026, 10 a.m. to 4 p.m. at Governor Hutchinson.

Speaker 1 (03:16:32–03:16:48)

Motion made. Second. Seconded. John?

Yes. Lee? Yes. Megan?

Yes. Megan? Yes. Lee, yes.

All right, moving to item 18, discussion approval of the meeting minutes, July 14th, 2026 and July 21st, 2026.

Speaker 7 (03:16:48–03:16:57)

I would like to move to approve the amended meeting minutes for July 14th, 2026 and July 21st, 2026. Second.

Speaker 1 (03:16:57–03:17:09)

Motion being seconded. John? Yes. Steve?

Yes. Vangie? Yes. Vangie?

Yes. And myself, yes. Moving on to move 19, the time to administer this report. Thank you, Mr.

Chair.

Speaker 11 (03:17:09–03:17:17)

I'll just do quickly two parks updates first. Everly Park on Summit Street is coming together on the playgrounds.

Speaker 1 (03:17:17–03:18:37)

equipment is fully installed and preparing to install the new rubber surface, so that project is coming on quickly there. And then in terms of the lower guile turf fields, peels on that project would be nasty to use a glue guile for projects by the end of the day. we'll be able to proceed under the prior approval from the Lexington Conservation Commission, and that's the piece that's been on really for several years, but we'll be working with the landscape architect, the CTO of the projects, and just helping with the construction schedule, if that makes sense, likely sometime next month. That's good news on that.

This would be in future agenda items, but we should, I expect to speak with Clarks. I know they have their master plan that we can just learn more about, but also with Clarks for how we move forward with this project four years later. All right. John, do you have your hands raised?

Speaker 12 (03:18:37–03:18:40)

Yes, for the members report?

Speaker 1 (03:18:40–03:19:26)

No, not yet. I thought you put your hand up for the Clarks, the mission report. I'm sorry, I'll go quickly through the chair's report. Not much here and it's already late.

I would just like to congratulate J.D. and Dan Kerrigan on opening of Two Pence. If you have not been, you should. It's a great little market and I think it will become even better over time.

Any time I've been in there, it's been packed, so traffic has been great. With the discussion we've had today about Milton Village and also the the creation of new businesses and new amenities and new resources for our residents. It is a great place to visit, a great place to finally have open, so congratulations to everyone. Members, reports, anyone?

John?

Speaker 12 (03:19:27–03:20:52)

Yes, thank you. I want to apologize if I have to leave, so people will let me. I just wanted the town people to know that I'm a culprit of this. I was on the capital committee, A year ago, we voted for a generator for this library.

Well, four weeks ago, I found out about the generators going in front of the library. They're going in front of the building. And to this day, it's still got me infuriated that they even voted for this. I'm a culprit of this.

If I only knew that it was going to go in front of the building, I would have voted no. Then the library's on the hospital neighborhood. And they don't let the hospital stay out of electricity very long. So this generator is costing $380,000 and going in front of the building.

So you come down the driveway, it's right there. They need the transformer. But they didn't want to spend another $280,000 to put it behind the building, off to the side. So they're piping.

And this is a scenic roadway. It's a scenic roadway, and I don't think the drainage should be in front of this building. I just want to bring that to all the townspeople's attention that that's coming to the front of that building. Thank you.

Speaker 6 (03:20:53–03:20:56)

Thank you, John.

Speaker 1 (03:20:56–03:23:10)

All right, public comment response. shared a little bit from Mrs. Felton's view on short-term rentals. We had an update there and we'll continue to work on that to get it ready for spring.

For the 138 and MassDOT relationship, I think that is more to come. We have been in communication with MassDOT, perhaps we've not been as specific about researching the overflow to 138 in Cannab, but that is something that we feel ways forward. Can we talk just one or two comments on that? First, I think Nick's been doing a great job to try to convey to MassDOT the views and information provided from Mr.

Corey and other residents. The part about the comments that I'm beyond that, that caught my attention, is, is there anything the select board can do to be helpful there? Because it does seem to me like, you know, if we're going to secure any kind of help from SCOT there, like strike while the iron's hot, you know, in the wake of their presentation in May. Um, so either now or soon, you know, I'd be interested in like, yeah.

So, so his suggestion was invite them back. I don't know what the right sort of move could be there to kind of show our interest. I'm sure you're conveying that, whether it's like one of us like joining colleges to like reinforce the views or something like that. But, you know, I'm open to trying to make the most of this, you know, post window right here, which, you know, I think if it's two years after, probably don't have a lot of momentum.

I can, um, we can reach out to the team again.

Speaker 11 (03:23:10–03:23:26)

They've obviously been very responsive and helpful throughout this process. Um, and this kind of outstanding item, I can reach out and say to some of those, you know, ask them to give me an update for me to go to the next meeting and get a response to that.

Speaker 6 (03:23:26–03:23:34)

And if that doesn't get a response to what I'm looking for, then maybe we can take that next step as you mentioned.

Speaker 4 (03:23:34–03:23:34)

Okay.

Speaker 7 (03:23:34–03:23:39)

And I don't think that they have good data on the Upper Canton piece, right?

Speaker 6 (03:23:39–03:23:52)

It's all from, shoot, I don't know what to talk about now, but not in the Upper Canton piece. And I think, you know, right, they measured from Unkwiti, right?

Speaker 7 (03:23:52–03:24:03)

They measured from Unkwiti, but I don't think they captured, I'd like to see them capture that as they live there. I hear Mr. McClory's point about people are,

Speaker 1 (03:24:04–03:24:07)

There's a lot more traffic there. What is the data?

Speaker 11 (03:24:07–03:24:16)

Yeah, and we are doing some homework to try to pull any counts in the data that we have, but everything that we have is all calculated from this one meeting.

Speaker 1 (03:24:16–03:24:33)

So it's pretty old at this point, but we are pulling that to share as well. So I can follow up on that. And as I mentioned, just reach out to us at the center with the request to find out if there's any stuff that we're going to ask you to do. Thank you.

Are any of the accounts our purviews versus NASDAQ or Big Game?

Speaker 11 (03:24:35–03:25:03)

Yes, we, the town, can have, yes. It's not 138 yet. If we're talking, yes, that would be our street that we could grab council on with our internal equipment. The challenge would be, that would be the present condition.

We just don't, we miss the opportunity to do it. But we could at least see what the road is carrying in terms of capacity and volume.

Speaker 7 (03:25:03–03:25:21)

It used to be the 2018 accounts, right? Well, that doesn't capture like the, that's like pre-building, but we're also kind of, I think, I mean, I'm not an engineer, but I think the 2018 accounts may be.

Speaker 1 (03:25:21–03:27:04)

Okay. And those are often, what's more, I'm not in the discussion room. Because of something to do with it, right? Yeah.

So it's actually probably kind of now three years ago. Someone may, yeah, argue. But it's also where the math's worst of both worlds. Future meeting schedule, we just had September 1st.

August 31st. August 31st. August 31st, September 8th, and still September 22nd. All right, future agenda items, anyone?

With that, I will move to enter executive session to consider the purchase, exchange, lease, or value of real property. Elaborate college, real estate, Adam Street. Based on my belief that discussion of this matter in open session may have a detrimental effect on the negotiating position of the select board. The select board will return to open session.

I also move to to enter into executive session to discuss strategy with respect to collective bargaining, Milton Clerking Unit on the Southeastern Public Employees Association, Milton Professional Management Association, Milton Public Employee Association, Milton Firefighters Local 1116, Milton Police Association, Milton Superior Officers, Milton Library Association. Based on my brief discussion of this matter, an open session may have a detrimental effect on the bargaining position of the select board. The select board will not return to open session. Second.

Seconded, John. Yes. Yes.

Speaker 7 (03:27:05–03:27:06)

Yes. Yes.

Speaker 1 (03:27:06–03:27:22)

Yes. Yes. Yes. Yes.

Yes. Yes. Yes. Yes.