Board: Milton School Building Committee
Date: 2024-09-30
Transcript
Auto-generated; may contain errors.
Speaker 1 (02:45–02:47)
But there we go.
Speaker 2 (02:47–03:17)
There we go. That must work. Yep. So we're running through right now, just doing a roll call vote for attendance.
Uh, so when through, so in the room tonight, uh, Aqua, uh, Selena, Miranda, Mark, Lauren, myself, uh, and then online, uh, John Kohane, uh, Scott Tereshack present. You there, Tim?
Speaker 3 (03:18–03:20)
Yes, I'm present. I didn't hear you say my name. Sorry.
Speaker 2 (03:21–04:25)
That's fine. Sorry. Just double checking audio too. Uh, so second thing on the agenda is citizen speak.
Uh, we reserved the first 15 minutes of the meeting, uh, for any citizen that would like to speak. Uh, we ask that you hold your comments to three minutes and please state your name and address. There's nobody in the room with us tonight. Um, so just look online and see if anybody raises their hand.
And not seeing a hand raise, so we'll move on. So item three on the agenda, let's pull it up, take a look. We have the band practicing next to us, so you may hear some background music, so enjoy. Item three is approval of our past meeting minutes, Monday, September 9th, 2024.
So in your meeting packets that PMA sent along this week, or last week, we should have copies of the minutes. See if anybody has ads, edits, or revisions that you may have.
Speaker 4 (04:30–04:35)
I'll make a motion to approve the meeting minutes for September 9th, 2024.
Speaker 2 (04:35–05:09)
Okay. Second by Dr. Miranda. Any further discussion?
Seeing none online, all right, so we'll do a roll call vote. These were remote. Aqua? I'll abstain.
Okay. Dr. Miranda? I'll abstain.
Mark Loring? Yes. John Cohane? Yes.
Scott Tereshak? I'll abstain. I was not present. And Tim Lombard?
Speaker 3 (05:10–05:14)
I'll abstain, although I did watch the whole thing after, but I was not present.
Speaker 2 (05:15–05:37)
Okay. And myself? Yes. Sorry, so move on.
Item, sorry about that. Item four, old business. So item 4A is a schematic design update for our friends at Arrow Street. So at this point, I'll turn it over to Shanali and Larry and Andrew.
Speaker 5 (05:38–05:57)
So quick update, we met with the working group last week where Jade from Terry, our landscape architect, was there to present the latest iteration of what the exterior of the middle school, the school would look like.
Speaker 6 (05:59–06:05)
Shamus, you can share your screen. And then you can get co-hosted by him.
Speaker 7 (06:05–06:05)
OK.
Speaker 2 (06:08–06:14)
Sorry. Give us one second while Shamus becomes a co-host and shares the screen.
Speaker 1 (06:16–06:38)
Yep, you're live. That's all good.
Speaker 8 (06:46–06:48)
Full screen looks fine.
Speaker 6 (06:48–07:01)
Yeah. It's trying to be a second screen for you.
Speaker 9 (07:02–07:09)
And everyone see it online? Yes. Okay. Yes.
So I'll let Eric just talk.
Speaker 5 (07:09–12:38)
Okay, great. Thanks. So part of the process of working with the landscape architect is going back and forth with them as well as the civil engineer. to navigate the different ground elevations.
The site has somewhat of a slope. And the way we oriented the building was to minimize any of the disruption to the landscape. But we still have to talk about the accessibility where the play area is and how to navigate around the building. So I'm going to walk through the landscape plans, and then I'll hand it over to Andrew to talk about how the architecture has responded to some of these things.
And I'm going to actually stand up next to the screen. So we can see where the multiple has been cited, and then the pre-K. And as you can see here, this is the drive coming through into the parking lot of the pre-K area. That drive actually is intended to continue for the fire access road.
but we want to make it much nicer so that it when it's not in use that's an opportunity for exterior play area connection between the middle school and the community. So the idea is that this sort of outdoor plaza fun zone starts here and then becomes an enclosed area for the community to meet their outdoor play needs. and then behind the middle school. There's a lot of different opportunities, but it could be a step seating zone, an outdoor patio area with chairs, some sort of exterior learning space that we're developing.
We got feedback from the working group on how to develop that. And as you can see from the photos, Jade and her team have put together some existing projects that show how the look and feel of that outdoor area can be. So one thing to realize is the ground floor, and I'm going to be a little technical, so if you have some questions, please ask. So the ground floor is set at an elevation of 55.
But the field over here is at an elevation of 70. That means there's a 15-foot change in grade between where we are here and there's basically a hill behind the building. So what that does is, if we see here, there's a wall that the game is trying to figure out, how do we keep the dirt up, basically? How do we keep it from spilling into that thing?
That makes it a really tall wall. And so the challenge for us has been to figure out, how do we navigate that and make it feel nice without being an exterior play space in the shadow? It is not simple. So if we go to the game.
So this is Jane's first work, and you can see how the architecture is slightly adjusted. She's put a set seating zone here, and it's wall, and so this area is at plus 70. One of the plans is the entry into the cafeteria, right? So you have a straight, glassy view.
It's going to look amazing, but it's still a tall, high wall. Sorry, can you go back to the previous slide? Specifically, what Jade's suggesting is that some zones of that could be vertical play area, right? You know, this could, we could take the wall and engage it in some way so that it's occupiable, it's active, and take advantage of the fact that we have this height.
So, one of the options that we're looking for. And so, At the end of the architectural part, we'll talk about how we're navigating this a little bit more, but I'm just going to put some of the key places we haven't announced here. So the idea is to have this open play area with a variety of structures, some murals, things to make it vibrant and fun. She's also gone in a canopy area for shaded play.
So shaded play, if you've been reading The Globe and The New York Times, has become a really important part of the conversation in play areas, a lot of play areas. have been asphalted over and then they paint stripes and things to make it fun, but what people are realizing is you need more landscape and shaded area to make it comfortable for everybody. So this is one of the gestures that they put in to make it more comfortable and fun for the kids. And all of this is acceptable.
So this meets the ADA requirements and it's navigating these existing scopes. There's more examples of that vertical plate area. different place for little kids, for older kids. So we talked to a working group about what was acceptable and we'll start featuring a little bit more of those options.
But in the next slide I'm going to hand it over to Andrew because he's going to talk about how this impacts architecture and what we've done to sort of make it more interesting from the building side. Before I hand it over though, are there any questions about play area. They want to do it very quickly.
Speaker 2 (12:38–12:45)
So the tags on the plan for C and D, those correspond to where she's anticipating some of this stuff.
Speaker 5 (12:45–13:49)
Yeah, so each of these pictures are, so the Cs are the slopes of play areas. The Ds are the fitness interactives, so from right here. So that would be for the older kids and the Cs are for the younger kids. And if we go back, So the walls and the messaging would be also over here.
And that's actually a really good point, because as you're driving through here, you can see Welcome to Milton, or Milton Middle School and Preschool, or some logo, or some fun thing to activate that. And then B is the seating options here, which would be in this zone right there. So basically it's a multi-use box, right? This part is primarily for the pre-K, but this area up here can be mixed.
You could have a younger one, the older kids, but there would be direct connection from the inside of the building directly out.
Speaker 4 (13:50–13:58)
Just the orange line, kind of preview of this being at the other meeting, but like that is the edge of the landscape designers
Speaker 5 (13:59–15:05)
scope in terms of what they're looking at right now for this um for this phase for this phase for this initial sort of conceptual where's the play area where is there are going to be retaining walls you know this is a big area of concern for retaining walls are expensive and we are working with our civil engineer to mitigate. Some of the options are to, one, is to have the retaining walls. Two is to feather them in and pull back a little bit more so we can reduce the amount. of the retaining walls.
It's also to not have one continuous height, but to have it set down a little bit so that we're not obstructing views. We're trying to be sensitive to the amount of trees on the site. How many are we taking down? How far is it going to feather down?
Can we increase the amount of play area? These are all the things that we're trying to do right now, so I don't necessarily have definitive answers, but these are the things that we're thinking about. How do we make this the most enjoyable space? but still safe for the kids without storming trees.
Speaker 4 (15:07–15:14)
But the parcel itself does have that little wing, whatever it is, that kind of loops around the corner.
Speaker 5 (15:15–15:36)
Yes. Which I'm not seeing here, but yes, it does. And so thinking of it, So we were thinking of that, if you were to feather it, it would come out in sort of a little bit of a bowl shape. And so right now, those drawings are with the Civil Engineering Institute.
Speaker 8 (15:37–15:46)
So what's the purpose of this presentation for us to select what we want it to look like? Are you sharing thoughts for us to ponder on?
Speaker 5 (15:47–16:27)
So we're just showing an update of where we are in the project. We have to go back and incorporate another working group commentary. But also when we start talking about the architecture, you're going to see bigger changes in how we responded to the landscape updates. and take it back to the civil engineer, take it back to the landscape and keep doing this collaborative back and forth process until we get something that works with mitigating the retaining walls, getting the appropriately sized play area and then getting the architecture of the inside of the building to work the way that you and the working group want.
Speaker 8 (16:27–16:30)
So this is informational. You don't have an ask.
Speaker 5 (16:30–16:33)
I don't have an ask, but opinions are welcome.
Speaker 4 (16:34–16:59)
I would put my perspective of the step is somehow they are way off base on what they're presenting or thinking about. That's very different. You were thinking the rest of us were thinking this would be a good time to tell them in a way off base. We need to pivot significantly.
Otherwise, it's not like, hey, I like the lower slide better than the timings. That's a lovely detail. That's not a nice way to put it.
Speaker 2 (16:59–17:37)
Yeah, and one other thing, too, is as we're going You know, the decisions will start coming once we get into more of the design development, those documents there at those times to, we're going to have numbers against a lot of this stuff. So, during that, obviously, as we're talking, if there's a lot of retaining walls, we may not be able to put a lot of play structures. But it's essentially going to be a balance of the design and the budget as we're moving forward too. So when we're getting to those times for decisions, we won't present it and say, make a decision immediately.
We'll thoroughly kind of go through it and dive into it. You touched upon it.
Speaker 8 (17:37–17:41)
I was going to ask what the numbers meant. It may look beautiful, but how much more?
Speaker 2 (17:41–17:42)
Correct.
Speaker 4 (17:44–18:00)
Yeah. I think to be clear though, there's some numbers within the number we already got, 173, that covers Well, I don't know exactly what we're talking about, but there were numbers within there that assumed we were doing some landscaping for land structures.
Speaker 5 (18:00–18:20)
Yeah, we had provided the cost estimator, Peter, with a sketch that outlined what we estimated to be the amount of retaining wall. Very conservative with that number to make sure we're going to get everything in. And now we know where we are and we're trying to figure out if we can have that brought in, basically.
Speaker 10 (18:20–18:48)
That's my initial reaction. It's a very creative way to approach the challenge with the site. And it does give a lot more play options for kids than they have right now in their current sites, especially for the little ones. And I think it looks great, just the possibility.
There are choices to be made, but I think there's just more opportunities there.
Speaker 2 (18:49–19:06)
Yeah, so one of the things I'd say, too, back on cost is when we met with the cost estimator, there were narratives for all the landscaping and stuff like that. So that's essentially where we developed some of those project narratives that we put in there to help them develop that overall budget.
Speaker 4 (19:06–19:16)
Can you remind me, what are the dimensions of the space next to the Pre-K building from essentially that size of that Pre-K play structure? That box? Yeah.
Speaker 8 (19:18–19:39)
So the other one, too, is in the corner with the shade structures.
Speaker 2 (19:39–19:57)
I just know from walking the site multiple times. The topography, like you were saying, the 15 feet is up at the Yeah, up at that corner. If you're on Gallo Road and you're there, you look at the field, you're 15 feet up. But as you walk across the site, you get to where the shade structure is.
Speaker 5 (19:57–20:18)
It's not getting a lot less. There's still a differential, but it's not. Sorry, I didn't mean that. The 15 feet is just where the field is, and then it tapers down.
So you're going to have a less substantial retaining wall, but you'll still need something, because it actually tapers down lower here, feeding the retaining wall the whole day.
Speaker 6 (20:27–20:39)
it's going from like four and a half feet up to nine feet, along the bottom there. So we definitely like to reduce that, you know, for all the different reasons you can imagine.
Speaker 8 (20:39–20:57)
Let's see if anybody online. Nope, nobody here has their hand up. But yeah, I'll be waiting.
Speaker 11 (20:59–21:00)
Okay, can everybody hear me?
Speaker 2 (21:01–21:04)
Yeah, let me just turn the audio off a little bit. Okay.
Speaker 11 (21:11–21:13)
Try that again. Okay, does it sound like it's loud enough?
Speaker 2 (21:14–21:15)
Much better. Yep.
Speaker 11 (21:16–22:24)
Great. Okay, so I'm going to walk us through some of the updates we've made, primarily focusing on the first and second floor and how the architecture and layout of the building is responding to the issues that Shanali just summarized. And then I will walk us through some updates to the other parts of the building as well after that. So what we'll do is we'll start on the first floor plan, which we've got here.
We'll quickly go up to the second floor to kind of talk about how these issues play out across those two floors and then we'll come back down to talk about some other just sort of plan updates that are not related to the landscape but are good to know. So the first thing is that as you know we're dialing in the the topography and how that where that falls exactly with respect to the building as Shonali was mentioning. we've realized that it may be a more efficient approach to let the building serve as the sort of retaining wall adjacent to the athletic fields. And I'm going to try this.
Is this showing up? This is supposed to be a vanishing pen. Is that?
Speaker 9 (22:25–22:26)
We saw that, yes. Yeah.
Speaker 11 (22:26–26:52)
All right. Um, so the area that's sort of shaded in this light gray here is, um, essentially in this, at this plan level below grade, which is to say there's no access from the first floor out outside here. And you may recall that in an earlier version of the plan, we were looking at, um, locating our cafeteria sort of on this corner. With the hope of kind of had developing an outdoor space on this side of things and we've come to realize that that's you know what that would require is more retaining wall than we think is desirable on the project and thought, hey, what if we let this edge of the building actually.
since we're building this foundation anyway, let that serve as the retaining wall. As such, what we've done is these gray rooms that you see in the plan here, we've started to relocate things like back of house, mechanical space, electrical space, storage, along this edge where you don't need to have windows and things like that where previously we were looking at some classroom spaces. This creates a nice relationship of putting things that don't need to have windows along that edge where it's going to be below grade and hard to get natural light in. What that's done is relocated the cafeteria a little bit.
It's pushed it to the left on the page. What you've got here in the orange is the cafeteria space. And what that means is that as you're kind of entering the building, this red arrow that's dashed is indicating the main entry on the first floor. There's this public sequence that we're setting up that brings you into this cafeteria space, which would have A glass wall on this edge, which is South facing and will give us lots of natural light and sort of, you know, we imagine developing sort of little outdoor court here for when the weather is nice.
There can be some outdoor seating in that area. So here's where we're going to go upstairs quickly. So when we come in, you'll see that the plan is sort of organized around this triangular shape. And this is really this ceremonial stair that connects the first and second floor and creates a kind of double height volume space.
And it becomes a kind of organizer of the plan that shows up on the different floors. And it's a nice moment in the building that lets lots of light in, orients the students, and becomes a sort of feature. And so when you come in, you will go up the stairs. And Seamus, if you could take us to the next slide.
You arrive on this landing here and now where we're at is actually the same level more or less as the athletic field, which is located over here. This is the edge of the athletic field. And what that allows us to do is to create an outdoor connection where we step out through this wall. onto some sort of a terrace, and it may have this shape which is currently following the building below, or it could be slightly different.
But then the green is the landscaped area that you're seeing here, and this is an abstraction and not as specific as the types of things you just saw from our landscape architect, Jade. But the idea is that because we are working with the grade instead of against it, you can come out here and then circulate either slowly down the slope towards Guile Road and eventually to the high school, which is up here. on this plan, or come down towards the pre-K in that direction. And so we thought that's sort of a nice way to connect, you know, down below you're kind of coming in, working your way up, and then you have the ability to kind of step outside.
And there's the potential for connections to this athletic field more or less directly, depending on what the high school thinks about that. And if nothing else, you can circulate around it to get up to the high school without having to go through the parking lot. Okay, so let me just pause there for a second. Are there any questions about that relationship between the first and second floor?
And then if not, we'll go back down and talk about some other layout adjustments.
Speaker 5 (26:53–27:39)
I just want to say that the landscape drawings and the architectural drawings are not 100% in sync, right? Because we're working hand-in-hand, and one of us is always going to be two steps behind or two steps ahead. But the idea is Jade is starting to share her upper, second-floor story. We're talking about this connection from the architecture outside, but what we're working on is As Andrew was pointing, if you came out and you turned right and headed towards the preschool, how do you get your grade back down?
Because it's still a pretty big drop. So we haven't quite gotten to the right answer, but Jade and the team are working on that. But if you look at the drawings really closely, they're not 100% in sync because they're still a work in progress. So you don't need to put that there.
Speaker 8 (27:39–27:51)
If we go to the first floor, we need to go back to the second floor. the classrooms in front of the gray area. Can you speak more to that? What grade is that?
Are there windows there?
Speaker 7 (27:53–28:02)
Yes, thanks. So these classrooms all get natural light along this side of the building.
Speaker 11 (28:03–28:42)
And thank you. Um, what we're currently imagining is that this is where the 4 world language classrooms are located along with some of the special education programs. And so they still operate as a kind of cluster and a sort of destination that when you're going to a world language class, you are coming to this part of the building. 1 of the things that we're working on is, is looking how we can create some breakout space somewhere along this corridor so that we can break up the kind of length of the corridor.
There can be a gathering space for the students along there.
Speaker 3 (28:45–29:05)
Scott, you get your hands up. Yeah, I was going to ask about just natural light along that wall. But it looks like it's all back of the house type rooms for the most part. So that's good to see.
That's all. You pretty much answered my question by zooming in here.
Speaker 11 (29:06–29:27)
Yeah, and one of the reasons that we were going in this direction here was that we were finding it was going to be difficult to get you know, natural light through this wall, if there were going to be classrooms, there was going to require a lot of earthwork and retaining wall work that we think that money could be better spent elsewhere in the project.
Speaker 5 (29:28–29:41)
But the quality of that light would not be great, right? Because you're looking out to a 15-foot wall. You're always going to be in shadow. You don't have a great view.
It's north-facing as well, isn't it?
Speaker 6 (29:41–29:45)
It's north-facing as well. You don't see north-facing.
Speaker 7 (29:46–29:47)
This is north here.
Speaker 5 (29:48–29:49)
Yeah. North is up, so yeah.
Speaker 6 (29:49–29:54)
Yeah. But it would have that nice light well feel to it. Yeah.
Speaker 2 (29:54–29:58)
Yeah. it's reflected in.
Speaker 5 (29:58–30:39)
So one of the things that makes it exciting, at least to us from the design team, is we've always talked about it being a campus, right? You have the high school, you have the middle school, you have playground fields, and the preschool. being able to exit at the second floor, you can still have that connection to the high school that's a lot easier as a pedestrian, as a student. If you have a brother and sister at the high school, you can go meet them, vice versa.
If you want to have high school students come to the middle school to do tutoring or some sort of like early education programs or whatever, that makes that connection a lot more viable.
Speaker 11 (30:45–35:39)
Yeah, if you go up to the second floor for a second, just to pick up on Shanali's comment, if you could zoom in a little bit on the center of the plan there. You know, this second floor is kind of an exciting setup programmatically because we've got the media space and the associated guidance. We've got arts, STEM, and tech. All of these sort of elements are sort of, you know, these lobes around that center space and accessible from from the outside and in.
So if, you know, one of the things that's becoming more common in education and the relationships between middle school and high school is sort of mentoring opportunities between the high school students and the middle school students. You could imagine the high school students coming in and sort of meeting, you know, in the library and it being a very natural and sort of welcome, you know, connection between the two schools. If there's not, why don't we go down to the first floor and I'll sort of continue walking everyone through the current organization. And then as questions come up, please just jump in.
So I think we touched base on this sort of northern wing a little bit. And Seamus, if you wouldn't mind zooming into the kind of middle zone, I'll walk us through that a bit. So I started to mention the entry and the public sequence into the cafeteria. The other thing that we've done here is made some nice improvements to the location of the auditorium and music spaces.
So this block located here, Consists of a 350 seat auditorium with the stage and drama and then adjacent to that are the ensemble and chorus rooms, which have the ability to function as a green room. Sort of during performances, there can be warm ups and people getting ready to perform. and there can be a connection between the two. Also, the location of the auditorium next to the cafeteria space allows the cafeteria to act as a lobby of sorts for gathering and people before and after performances.
But also, we think that there could be a nice moment as you're entering into this space. The exact shape of the curve that you're seeing here is really more of a placeholder, but it's an idea that There can be some shape here that's sort of a nice looking and sort of creates interest to the overall space that you're entering into. So you would be seeing the light out through the south-facing glass and the kind of volume of the auditorium here. And we think that the sort of block of music programs, music drama programs, are working well together there.
This element here that sits between the administration and the auditorium consists of restrooms and the piano lab. And one of the things we've been thinking about and talking about with you all is how we and sort of make the plan very efficient for after hours use and nights and weekends if there's sporting events or performances. And we imagine that there might be a way to close off, for example, a portion of the building so that you are kind of concentrating folks in this area. And it's nice to have the restrooms located for those events there.
And then one other comment about the music before I move on. In earlier iterations of the plan, we had some of the backup house spaces located here. Those have sort of jumped over to this side of the plan. And these music rooms are now in a kind of very nice location for getting south and west light, which is a really nice exposure to have for those programs.
We've been developing the gym and locker rooms, still in progress, but starting to show more detail there. And the idea here that the locker rooms are abutting each other and the gym so that you can, when going to gym class, move straight through the locker to the gym and then reverse on the way out, which is an improvement over what's currently the setup at Pierce.
Speaker 2 (35:39–36:03)
Quick question, Andrew, sorry. So one of the things that pops in my mind is like logistics for trash removal deliveries to the kitchen and stuff like that. You know, I mean, with the trash and kind of storage or receiving on that corner, are you guys thinking about how to access that for that stuff?
Speaker 11 (36:04–37:17)
Yeah, we are. That's sort of one of our next things to dig a little bit deeper into. It's sort of this push and pull where I think previously we might have had the trash that might have been what was on this corner or it was somewhere back here, which has the benefit of it being easily accessible from this road. It got moved over here because the things we've been talking about, about the grading and we're we're thinking through, yeah, how does that best work so that, you know, if there's an outdoor enclosure or something that needs to be located next to this, or do these things actually need to push this way again?
That's something that we're looking at. So I think we touched on that in the working group meeting, and we're still working through it. Okay. Thank you.
Yeah. So why don't we go up to the second level? So it wasn't just me last time. It seems to load slowly for everybody.
Speaker 2 (37:19–37:24)
Andrew, if we could hold for one minute. I see John has his hand up. OK. Yeah.
He has a question. Go ahead, John.
Speaker 12 (37:24–37:35)
Hi. I just had a question about the cafeteria seating, the amount. I've seen cafeterias seem to be an issue.
Speaker 11 (37:41–38:03)
So this is seating that's sized for three seatings, which I think we, through discussions with the district and the school, they felt was an appropriate number. And so that's what you're seeing in terms of the total number of tables that are located in here.
Speaker 1 (38:07–38:09)
Sure.
Speaker 6 (38:09–38:43)
What we haven't done yet is started figuring out what types of tables they're going to use, whether they're the long, thin ones or the round ones, a little bit of what works best for the middle school. We did want to point out, sorry, if you can go back one, Janice, the thinking about having, if you can zoom in right there, having a quiet zone where could be enclosed and some of the students could eat in a more quiet setting, which can be helpful for some of the students.
Speaker 5 (38:44–38:51)
Right, and you can close it off. Then it also serves as a secondary conference room after hours if there are events.
Speaker 11 (39:04–41:47)
Okay, so we spent a little time on this floor already just to sort of review. We've got this central stair and double height space that's connecting the first floor to the second floor. We've got the media. and library space and then the orange piece that you're seeing here is the guidance programs.
One of the things that we learned is that it's quite desirable to have this co-located with the media as opposed to down at the main office. We're looking at ways to have this have you arrive to the library and have the ability to go off into the guidance area where there would be the opportunity for some overlook to the cafeteria below. Maybe you could zoom in a little bit closer on that, Shamus. There's some conference space that's here that you could imagine being useful for guidance or for other uses because it's adjacent to the media and a certain number of offices there.
You know, aware of and sensitive to sound traveling. So one of the things that we're thinking about is that, you know, there might be a visual connection between media and looking kind of over to the cafeteria, but perhaps not, you know, sort of a open air connection because it might be might be distracting. We also, on this level, have sort of co-located arts and the STEM and flex room and the tech room on this other side. And we imagine that there's opportunity here for either exhibition or media related.
There could be that there's a book kiosk or something that's done. You know, just in the main media space when we had conversations with the school about strategies for media, we talked about this range of possibilities being, you know, either that it's all in the library in the traditional sense where it's the destination. Some schools have done things where it's completely distributed throughout. And this is closer to where everyone seemed to feel comfortable, where they were interested with some amount of the distributed media, but more on the end of actually there being a destination.
So this allows a both-and approach, where there is a destination media space, but there also might be an element of this that's a little bit separate, that's a little bit more of an informal way of interacting with the materials.
Speaker 2 (41:48–42:01)
So, Andrew, the ceiling or ceiling space of the cafeteria is going to be two heights. So, a lower one above would be the meteor and then on the left here would be a much higher ceiling open up.
Speaker 11 (42:01–42:33)
That's right. So this area here is the cafeteria below. But the cafeteria, a portion of it is underneath this portion here. And that's part of what we were looking at downstairs, where a portion of that could be set up as this quiet lunch space, where there's visual connection, but it's not the full on.
uh, sound that you would be getting from a typical cafeteria.
Speaker 2 (42:34–42:37)
James, could you go back to the first one?
Speaker 11 (42:40–42:45)
So I can kind of, this, this zone would be below the media.
Speaker 2 (42:46–42:52)
Yeah. Yeah. It's basically everything adjacent to the auditorium.
Speaker 11 (42:54–42:58)
This part. So the double height space would be this whole part.
Speaker 2 (43:02–43:11)
There we go. Chair coming in and out. No, that's good.
Speaker 13 (43:11–43:11)
They're coming in like sleds.
Speaker 2 (43:12–43:22)
Yeah. Look at these. More rear-end chairs. OK.
Thanks, Andrew.
Speaker 11 (43:22–44:11)
Sure. So then if we pan up a little bit, page north a little bit, just to get the rest of the floor plan in there. So here you'll see our sort of typical team structure that we've seen before and will occur on the upper levels when we go to those, but this is the sort of. three core classrooms plus a science room and the related small group rooms, a teacher planning space and the science prep room organized around a learning common space.
So that's sort of one of the building blocks. This chunk is sort of one of the building blocks of the building up above that we'll see when we go upstairs. Let's go, yeah.
Speaker 7 (44:15–44:20)
Great, thanks.
Speaker 11 (44:20–46:40)
So here we see on the ends of the bar, we have that same block sort of repeating. And then in the middle of the bar, we've done some work to sort of regularize the size of the classrooms. from the last iteration, you'll see here that there's this kind of triangular shape showing up again, which is related to the stair space below. And so what we imagine is that this can begin to sort of stack up through the building and take advantage of this wall letting in southern light.
which would filter in and then down through into the building. And it really will help when you're in the corridor for it not to feel like it just goes on forever because the corridor is broken up by the Learning Commons here anchoring that end, another Learning Commons associated with the central, the team that's in the middle of the plan here. And the natural light that's coming in, this kind of breaks up the overall floor plan. And then we have this third learning commons here.
And in between the teams in these pink colors are elements of the special education programs. And just to orient you, we've got restrooms in these gray blocks. And I think maybe new from last time is that we've separated out after consulting more closely with our code consultant. We've elected for the time being to include a third egress stair.
I think previously we were thinking that perhaps the stair that went from the first to second floor could continue to kind of wind its way up in this area. It has to do with the occupancy quantity that's on the third and fourth floors. And we're sort of on the cusp of possibly needing this. And so we've decided to, for now, include it and make sure it works with that.
If we later learn that we can do without it, then we can have that discussion. But this stair here would actually, if you go down to the second floor, so back one page, Seamus.
Speaker 9 (46:42–46:42)
Go back.
Speaker 11 (46:42–46:44)
Yeah, go back to page six, please.
Speaker 7 (46:46–46:46)
Thanks.
Speaker 4 (46:55–47:03)
That stair will, when it shows up, will be here.
Speaker 11 (47:03–48:08)
And the idea is that when you're taking that stair, you then exit the stair onto this large landing area. and can either egress out of the building or then continue down the main stair. That's the point I just wanted to make. And then why don't we go back up again in the stack?
So page seven, yep. And then page eight, which is the fourth floor, you'll see is very similar to the third floor. Why don't we go ahead and do that one? So here you're seeing nearly an identical floor plan with the teams on the two ends anchoring it, and then this central team.
The main difference here is that there's just a couple of different special education programs, but in the same similar locations to the floors below. So that's sort of the update on the floor plans.
Speaker 10 (48:08–48:13)
Happy to… Where is the elevator?
Speaker 11 (48:14–48:18)
The elevator is located here.
Speaker 2 (48:26–48:40)
Andrew, on a similar note for egress calculations and occupant counts, are you guys doing that for toilets, bathrooms? Correct. That's right.
Speaker 5 (48:42–50:26)
So hopefully the next iteration, you'll start seeing those populated. We've gone back and forth with Code Red quite a bit about the occupancy. As you know, it's two different calculations. And what we've been focusing on primarily is the emergency egress population.
And as Andrew was saying, that we've added this third stair sort of like on the cusp of that threshold. So that threshold is 500 people and we have calculated 498. So we've added the third stair. The second we move a room or we switch a room or you add another person, two people into the special education rooms, we're gonna be over that threshold.
And I just don't foresee us getting approved to not have those there, so we're being really cautious. And if for whatever reason things change and we're able to eliminate, that's great, but right now I'd rather err on that conservative side. So we do have two restroom banks stacked on each side of the floor, which will carry the number of pictures. I don't remember the count off the top of my head, but we work with Code Red to get those counts.
I think we're slightly over the first floor because we have the locker room fixtures, plus we have restrooms over by the world languages, plus the additional restrooms that are in that center next to the piano lab, but we're leaving that because if you have a full auditorium or a full game, you're going to need those extra public restrooms. People are less likely to use the locker room. So at the moment, that's our perspective on it.
Speaker 2 (50:37–50:51)
Any other questions? I don't see anybody. Andrew, anything else you need to update or weigh in on?
Speaker 11 (50:52–50:53)
No, I think that's it for tonight.
Speaker 2 (50:54–51:01)
Okay, everything looks great. No other questions? We'll get moving. Yeah, feel free.
Speaker 4 (51:01–52:18)
I can just make a comment. I like the changes you made. The idea of again, having that kind of Essentially, what I'm having in my head, based on how you're describing it, it's like this kind of glass column, kind of right there in the middle of the building, right along that curved spine, to bring the light into that, what otherwise is a pretty dark hallway. It's great.
It should look really well. And yeah, I think the media center as well, I've been kind of concerned about being too open in terms of, I know, talking about the other reading, just with all the sound coming from the lower level, given how open that would be. But we're doing that. A lot of glassings were right into the cafeteria and out back.
We're having a lot of like, I'm sure similar concerns about just what you're receiving, especially if we're trying to have outdoor seating areas over there, like how you can bring trucks back there every single day receiving them is a concern of mine as well. I think that bottom floor logistics is still a little bit empty, but otherwise, it looks great, continues to look really good.
Speaker 2 (52:18–52:19)
John, you get your hand raised?
Speaker 12 (52:21–52:29)
Yes, thank you. I was wondering too, again, could I get a copy of that presentation? I know they tend to come out at the last minute and I didn't see it in the package.
Speaker 4 (52:31–52:34)
They usually send them after the fact. It wasn't in the bank.
Speaker 9 (52:34–52:41)
Oh, OK. OK. Thank you. It's the one that happened to me.
Speaker 8 (52:41–52:49)
In the current picture we're looking at, the awful crime, there are two orange lines. What are those?
Speaker 5 (52:50–54:56)
Those are the orange ones for administration. So I can't read it, but one of them is a co-chair planning and another is an office. So it's for the administrative people. We've tried to distribute those types of spaces evenly throughout the building so that you have adults beyond just teachers on every level, which actually worked out really well for us.
when we made this shift on the second floor because you have that whole cluster of guidance counselors right on that second floor right near the entry so that there's a little bit of control adult supervision on the inside outside during the school day of that entry which was noted by the working group as well. Just to do a quick summary for our next steps, we got feedback from the working group on the distribution of the special ed rooms. So we're going to switch those up a little bit. They're same as pink, but the names in the rooms are getting switched a little bit.
They want to redistribute which ones are on which floor. And then we're going to continue working on this connection of the inside and outside. Tomorrow we're meeting with the traffic engineer to talk about refining the parking layout and the entry sequence since we have so much information from the civil engineer and the landscape architect. on how things are developing.
And so we're going to look to them to help us push the parking layouts a little bit further. And as we've discussed, we're going to keep working on the loading dock and service area, try to resolve that and try to get the fire access lane resolved. Code Red is reaching out to the Middleton Fire Department to set up a meeting. It has not been scheduled yet.
I'll keep you all posted, whoever wants to attend, just to talk about the fire access lane and how we're approaching it. So I just want to be clear, we are following code completely, but we're just running it by them to make sure that they're comfortable. OK.
Speaker 2 (54:57–54:59)
Yeah, could you send that to me? Yes.
Speaker 5 (54:59–55:43)
Yeah. Yeah, absolutely. Yeah, so I think things are, as Larry noted about the furniture, we're just putting the furniture in for scale, just so that you can understand how it's populated. We did get the benches in, I think that was a concern, in the gym, so the gym has been populated.
Oh, the bleachers, yeah. The bleachers. And then we're working on some of the egress from the gym. outside.
So the gym has to have three means of egress. And as we know that we just discussed that there's a drop off in the grade. So we're going to work with the civil engineer and the landscape architect of how to egress out of the gym. So those are the major things that we're working on as we're heading towards the design.
Speaker 2 (55:47–56:13)
Any other anything else from any of the members? All right, seeing none, thank you guys. So moving on our agenda, item 4B, which is the MSBA update. So most of you are aware MSBA did a site visit to the district on, I think it was Tuesday, two weeks ago, or was it Wednesday?
Speaker 8 (56:14–56:15)
I think it was Tuesday.
Speaker 2 (56:15–58:56)
Yeah, I think it was a Tuesday. Apologies, the days are flying by. So at the meeting, It was well represented by the town. I believe there were probably 11 people from the town, including members of the select board, Mr.
Cocaine, members of the school committee, Mr. Loring, the superintendent. We were guided by the principles of Collie Cunningham. I want to thank John Rennan and Holly Concanon for putting that together and doing it.
And essentially what they did, which was great, We created a tour, essentially, through the schools, and they went through this tour with an agenda that listed what rooms they were visiting, what the original purpose of the rooms were, and then what the rooms are actually being used for today, so we could walk MSBA through and let them understand, you know, this was a, you know, a guidance room before, and now it's turned into a classroom or something like that. It was a long list, a lot of spaces, a lot of rooms. And essentially what we did, that many people we had to split into. So MSBA, the superintendent, Dr.
Carroll, chair of the school committee, went off on one group, Mark, myself, John, and Mr. Wills, chair of the select board, went off on our own other. And essentially we split up, we did Cunningham and then passed over to Collicott, went down to Collicott. We all regrouped after with MSBA and gave a short presentation to them and essentially, you know, had those slides there for talking points so those questions came up.
For them, they also brought their consultants with them from STV, which are professionals that augment some of their staff and dive through some of the statements of interest they received. They developed some questions for us regarding enrollment. They were asking about projects coming up in town, future developments for 4DBs, the MBTA community zoning. So it was, excuse me, it was a pretty good site visit.
The one thing we got out of them that was unique or that was informative The decision for if we get selected to MSBA will be coming most likely the end of November from what they've been telling us. Their board meeting formally announces it, but they'll start letting us know by the end of November if we're in, which was pleasing, you know, sooner or better, we can figure this out. So that's kind of a recap, but I'll open it up if anybody has questions or anything and, you know, feel free to jump in. I'll do my best to answer whatever I can.
Speaker 10 (58:58–59:01)
Well, after the visit, do they require any additional information?
Speaker 2 (59:02–01:00:19)
The only things they asked for was a number of units that are developed that are on the horizon for developments through the town. So Nick Milano had developed that list of items there. And they also asked for a copy of the presentation that had some of the graphics and graphs in it. So yeah, Nick sent the numbers of housing units over.
It was shocking. I'll, I'll share it with everybody, um, probably at our next meeting. Um, but, you know, for the, for the number of units that are coming on board. That are already permitted under construction or are coming on board next year or 2.
it was a lot. So, you know, there's some data that I'm looking at for that, just trying to figure out student yield from it and using the data that the consultant for the planning board did for two-bedroom, three-bedroom units, one-bedroom units, how many typical children they yield, and then using that to kind of estimate how many children to kind of expect from that. I've got some of those numbers already started, but I want to have the town administrator, planning director kind of look at that before I go too. Yeah, John?
Speaker 12 (01:00:22–01:00:40)
Yeah, I had heard too that they have like a standard formula, like they just need bedroom counts. And then they have a standard formula that they take off of the bedroom counts. And they were also asking for the DESE enrollment data. if we have, when that was available, I remember them saying.
Speaker 2 (01:00:41–01:01:08)
Yep. Yep. And that was, I believe that was one that Peter was providing for them. So yeah, the, the bedroom counts that were there, uh, the, the impact study that was done for the planning board, they listed out on one of the slides there.
Uh, so it was just using that public data and what they use, uh, to kind of calculate it once it's, checked and confirmed all that. I'll list it to everybody, but we're not there yet. Mark?
Speaker 4 (01:01:09–01:04:15)
Just a couple things. The, yeah, DESE enrollment is set as of, it's reported during October, and it's set based on October 1st. So, that wouldn't be ready yet. I mean, again, we can share what our current enrollment is.
similar to what I did the last meeting here, but that will be done by the district in the next few weeks. Another couple of things I got out of the presentation just to share was that they said there are currently 28 communities in this current phase of the MSBA process. They said, again, it varies exactly how many communities get in each year based upon what their budget is, how many communities apply, and cost of the projects, like tech schools and high schools are more expensive than middle schools and elementary schools. But generally, the average over the last three years was about 14 communities by my math, the numbers.
That essentially means it's like a 50-50. Yes. One year was like 11, one year was 17, one year was 15. So, you know, about 14 per year.
And again, that's not exact, but that's if there's 28 communities in 14 per year, that's about a 50-50. Again, with no other data, obviously, that other things, you know, factor into that. The other thing that they reiterated with the process, which I thought was helpful, although disappointing, is it would be a five to seven year timeline. That's the number they used to go forward with MSBA.
So seven years is a long time. They also reiterated the reimbursement rates. They said our rate for the current year, which does not mean that is what our rate would be because it could go up, it could go down next year. But the current year rate for Milton is 45.32% of the eligible costs.
So the reimbursement certainly would not be 45.32, it would be a little bit less than that, because not everything is eligible. But anyways, that was a helpful framing number. And then the other thing I just think we all need to be clear on like message that to folks is because I've heard this last year when we didn't get in or the year before is this statement around. If we're not in, if we don't get accepted into the MSBA, that is the MSBA saying that the project is not needed, that there is not an issue.
And that is clearly not the case. If we don't get into MSBA, all it's saying is that MSBA does not have enough funding to address all of the needs within the state. And they are triaging and addressing what they can, but it is not MSBA coming and saying, this is not a need within the town. I think that to me was personally clear kind of within the conversation and back and forth with them.
So, those are things I want to share.
Speaker 2 (01:04:15–01:04:39)
Yeah. So, 1, 1, question I have. Well, our ethics here to do is, you know, the, the, the spaces that we have, we know how our program will align with the textbook and SBA 1, like, for example, the classrooms are going to get larger. Right.
Any other kind of off the top things you guys have and if you don't, you know. We probably have that somewhere.
Speaker 5 (01:04:39–01:05:03)
Yeah, I can go back and sort of update it to what today is. But you do have quite a number of spaces that would not be reimbursed, right? Your auditorium, the world language classrooms. There's some other classrooms that you have that I can't remember off the top of my head.
Speaker 2 (01:05:04–01:05:07)
Yeah, it's just off the top of your head. You might want to dive into that deeper.
Speaker 5 (01:05:07–01:05:37)
Yeah, so we do have a workbook spreadsheet. I can update it with the current program, but you do have spaces that are not eligible, but those, from what we understand, are really important to the educational vision of Milton, and so those are the things that you'll have to talk about moving forward. Like the Piano Lab is a special space, like that's really important to everybody, but MSBA doesn't even have a category for it, right? So,
Speaker 6 (01:05:38–01:05:46)
Usually they'll let you put in those kind of spaces, as we were alluding to, they just won't reimburse you for those spaces.
Speaker 5 (01:05:46–01:06:02)
Which is why the reimbursement number that Mark is talking about only applies to eligible spaces. So your ineligible spaces reduces your overall reimbursement number.
Speaker 10 (01:06:04–01:06:26)
I think to your point, Sean, it seems like it would be worth spending the next few weeks looking and comparing sort of what the impact would be of dealing with MSBA just so that we're ready or we have the information that we need should we reach that point of decision.
Speaker 4 (01:06:28–01:06:36)
Do we have enough? Be mindful of budget for them because I know we're running out. Is that something we need to lean more on? Or OPMs for?
Speaker 6 (01:06:36–01:07:13)
I think a little more money over this side so you can ask. The one thing with the MSPs, we're not going to know 100% what they're going to pay for and what they're not. We can certainly make some educated assumptions and tell you, okay, this is how many square feet you have. This is what you'd expect you to do.
be eligible we can make assumptions on the cost per square foot cap is going to be at that point but until it goes through the MSA process you really just don't know they're going to go through their board and they might surprise you or they might not we'll just do based on past experience what we've seen the best information at the time and spell it out the way it would go.
Speaker 2 (01:07:14–01:07:38)
So, question on that. So, for cost per square foot, do they cap that at some point, even for eligible spaces? So, even if they're we've got 1,000 square feet and it's coming in at 1,000. Spaces that are costing us $1,000 a square foot, but they're only reimbursing us for $600 a square foot.
That's somewhere in 650, right? So they just upped it.
Speaker 6 (01:07:39–01:07:41)
And give you very round numbers.
Speaker 2 (01:07:41–01:07:51)
Yeah, but again, just for everybody, just, you know what I mean? So that's $400 extra per square foot that we'd be paying that kind of reduces that down. Correct.
Speaker 6 (01:07:51–01:08:04)
I believe also design costs and OPM costs on that extra space they're now cutting that out of the reimbursement as well. Yes. And then if there are ineligible spaces that they will not pay for the percentage of the design fee based on the total square footage as well.
Speaker 2 (01:08:04–01:08:28)
So there's a lot that goes into these calculations. Yep. So currently if I remember from the cost estimate we're at like 870 square foot. So roughly even just 173 that we're talking about there's already, probably 20% of it that's ineligible just on the square footage cost.
And then we're adding even more on there too. Preschool wasn't covered.
Speaker 6 (01:08:30–01:09:23)
We have them, they pay for pre-school employee spaces, but they'd be a separate building, it brings into question, but I think we've done projects that they've covered pre-school. They usually lump any of the extra, like, nursing place or admin in together in your total admin space, so they might ding you on some of that stuff. Pre-K coordinator might just be admin, and they might not pay for that because your total admin's over that category. But the classroom space, we've had them reimburse that space.
Okay. The one we get to be careful of is with a reimbursement number, the quick math is to take the total cost multiplied by the percentage and then say, hey, this is what the state's going to give us. We should go forward with this. That is not the way it works.
So it's much more complicated calculation than that. And the more you can say that early on, the better off you are, because I've read newspaper articles that have that metric on there, and it's just, it's incorrect.
Speaker 2 (01:09:24–01:10:56)
Well, that's, you know, Anybody get a calculator? What's 173 times 0.05? I mean, it's roughly more than 50 cents. I just don't want the narrative for this.
All right, so 77 million. So, I think we can all agree right now, we're not getting 77 million as a reimbursement number. It's gonna be something much below that, which is again, gets to that effective rate. So, as we dive into this and start looking at it, you know, trying to look at, you know, really what that reimbursement number is going to be, and then work on how much longer it's going to delay us and elevate the cost and escalate the cost.
Elevate the cost by adding square footages in, doing additional things that we're not planning for right now, and then build in whatever escalation that's part of that. And that's where we got to make the tough decision when we look at that. So, but all that stuff needs a plan. And I agree with you, Selina, I think the next couple of meetings, you know, now that we've got, you know, a bunch of really good work, appreciate it.
I love the connection to the field. Thank you. I think, you know, diving into that in preparation for A decision coming in November, you know, we should. Focus on that from the next couple of meetings or a month if we're doing.
Any other questions on updates or anything like that online.
Speaker 4 (01:11:01–01:11:03)
Thank you for all you did.
Speaker 2 (01:11:04–01:11:30)
You wrote the. All right. All right, moving on. Item 4C, here's the fun ones, review and approve project invoices.
So our friends at Arrow Street submitted their invoice for schematic design. It's their first, you know, they finished feasibility study. So basically a third of it right now. So this was in the packets for everybody.
Speaker 4 (01:11:33–01:11:42)
I'll make a motion to approve Arrow Street's invoice for July 27 to August 30, 2024. Second.
Speaker 2 (01:11:46–01:11:55)
Second by Dr. Miranda. Any discussion? Seeing none, I will do a roll call vote.
Dockland?
Speaker 8 (01:11:55–01:11:56)
Yes.
Speaker 2 (01:11:57–01:12:09)
Dockland? Yes. Dr. Miranda?
Yes. Mark Loring? Yes. John Cohen?
Yes. Scott Tereshak? Yes. Tim Lombard?
Speaker 7 (01:12:09–01:12:09)
Yes.
Speaker 2 (01:12:10–01:12:36)
And Sean O'Rourke? Yes. All right. Item five on the agenda is new business.
As of right now, we've got no new business. So we've got our motions that we put forward last time. I'm waiting to hear, essentially, from the select board for dates and times for an upcoming fall town meeting. So we're just kind of in a waiting and holding period for that right now.
Speaker 4 (01:12:36–01:12:58)
Mark? Just a question on that. I watched the last board meeting. It was not discussed.
I assume, again, that was somewhat talked about that in the last meeting, not to go into it. And I know Nick also, I think, was at that meeting. And so maybe that's why. Is the next select board meeting tomorrow?
Or are we on the next select board agenda? Maybe that's more of a question for John.
Speaker 2 (01:13:03–01:13:06)
John, do you happen to have an update on that by chance?
Speaker 12 (01:13:06–01:13:08)
See that again? I'm sorry, I didn't hear.
Speaker 4 (01:13:09–01:13:26)
I was just wondering if items related to the school building committee, some of the stuff we talked about at the last meeting and the meeting before were on the agenda for the next select board meeting for you all to discuss as a group. What are the questions and the direction you all are asking from this committee?
Speaker 12 (01:13:28–01:13:48)
The only thing I can say is for sure, I mean, I can bring them up. I still don't have the actual documents for those two articles we talked about the last time. That's what you want, right? Funding articles?
Speaker 4 (01:13:49–01:14:54)
I mean, I wasn't specifically referencing the funding articles, although, yes, that's that is something else that we sent over, I guess, as a committee to the select board to ask to be considered for a meeting. But I was more just the general discussion of the project and looping back to, I think, the request we had made related to. you know, what are the items, what are the questions that remain from the select board given the select board's votes not to put this out for a public vote in November and within that conversation, right, you know, certain concerns or questions that came up and wanted to answer and we had responded from that asking for you to go back to select board to collect those items so that you could bring it to us and we could have some direction to move forward in terms of what are the things we need to work to address to answer questions or again address the select board's concerns related to kind of taking this out to the public.
Speaker 12 (01:14:54–01:15:09)
I have to say, I think part of the delay a little bit this time is Nick's out. His wife just had a baby, and he's been kind of running this question pot. Remember, he sent out the email afterwards. I'll follow up.
I'll see what I can find out.
Speaker 2 (01:15:10–01:15:27)
Yeah, the one other two, John, was the original email I sent to is like dates for the town meeting. Because we've got our kind of warrant articles ready to go. It's just a matter of timing for everything else. So that's the big one we're waiting on.
Speaker 12 (01:15:28–01:15:53)
Right now, what I'm hearing is that the town meeting is not going to be until January or February. And the reason for that is the operational override. We need to deal with the operational override. And some of those answers won't come in from the state until January.
So I'm just relaying what I'm hearing as what those dates are probably going to be.
Speaker 2 (01:15:53–01:15:54)
OK.
Speaker 1 (01:15:54–01:15:55)
Thank you.
Speaker 14 (01:15:55–01:16:01)
John, a quick question for you. Is the next meeting October 8th? October 8th? No.
Speaker 1 (01:16:02–01:16:04)
It's next Tuesday. Next Tuesday.
Speaker 14 (01:16:04–01:16:05)
Got it.
Speaker 4 (01:16:05–01:16:24)
Yeah. So just to be clear, John, October 8th, maybe there's, I guess there's some time for adjusting the agenda, but maybe not. But you're saying you're still waiting for, from the warrant perspective, the language of those two warrants?
Speaker 12 (01:16:24–01:16:35)
There were two last time it was presented on the screen, but I never got the actual documents. You know what I mean? For the two funding articles.
Speaker 4 (01:16:35–01:16:41)
Yep. OK. So do we have that to share with Nick and John?
Speaker 12 (01:16:42–01:16:42)
Yeah.
Speaker 4 (01:16:43–01:16:44)
And then I'll follow up.
Speaker 12 (01:16:44–01:17:11)
I'll follow up on the questions. I mean, it went out to everybody, and I haven't heard. I'll see what I, you know, this whole open meeting. I don't know how many to talk to, but I'll see what I can do ahead of the meeting.
Because a lot of times, I don't find out what's going on because I'm not involved in the agenda development. That happens like on Thursday morning. So I'll have to see who I can talk to. Usually, it's Nick, and Nick's kind of out of the loop right now.
So I'll do my best.
Speaker 4 (01:17:12–01:17:46)
Yeah. That's fine. I think previously you shared the document that kind of listed the items that we were still, that we had previously discussed about. Can you re-share that?
And again, John, I guess I just say, given that it's not till next Tuesday, the 8th, right? We're more than 48 hours in advance. That's something I'm not sure if Nick's back or not, but obviously Richard, you know, and the assistant town administrator, Nick, I assume we'll have to put it out at some point this week, if I can just be.
Speaker 12 (01:17:46–01:18:01)
I'll reach back out to everybody with that email that went out to, I'll have to do it through Nick, but he can do that even this week and reach back out to him. Cause he did ask everybody for their questions, but nobody's responded. So we I'll give them another prod.
Speaker 2 (01:18:03–01:18:12)
Okay. Thanks, John. I appreciate it. All right.
At the new business of new business, by the way.
Speaker 4 (01:18:13–01:19:27)
I just want to share with this committee because it's something that we talked about at the last school committee. To be clear, school committee has not taken any action, but there was a initial discussion of the programmatic elements for this building. It was specifically discussing the pre-K and, you know, should we consider removing the pre-K out of the design of this building in order to reduce costs, reduce square footage. And again, discussing from the school committee perspective, the programmatic element of that in terms of, you know, our ability to still meet the needs of the staff and the students within the district with that reduced space.
So, just that was talked about last Wednesday, two Wednesdays ago, whatever it was. As an initial conversation, there was no vote taken. I'm not sure if that will be. I assume we'll discuss it at the next meeting.
I don't know if we'll take a vote on it at that point. But that was part of the discussion kind of coming out of talking about some of the Warren articles that this committee passed, because that is a discussion of whether or not the school committee as a whole will vote to support that as we're passing along to select board.
Speaker 8 (01:19:31–01:19:43)
Questions? I have this question. Yeah. Just for my clarity, would the proof pay for charging the fee with revenue generated?
Speaker 2 (01:19:44–01:20:49)
It is not revenue generated. Yeah. So just going back, I'm speaking from my experience at preschool. So preschool, there is a cost for a parent to send their child to preschool.
If they're on an IEP, there is no cost to it. So essentially what happens is there is some type of tuition. I don't know what it covers or anything like that, but there's some cost to parents. It's not a revenue generator.
If anything, I would assume it's like a break even. So by making a bigger preschool, we're not going to pay for everything there. If that's where it's going. Yeah.
The other one I'm hoping, as I alluded to earlier, the new units that are coming on board through 40B developments or other developments throughout the town are going to start introducing kids at some point over the next couple of years. So as we're making this decision, that's one of the ones I'm trying to dig into all this data to feed into them. John?
Speaker 12 (01:20:51–01:21:04)
I just didn't understand what Mark had said. Mark, did you say the school committee is looking at not doing a separate building for pre-K? I'm not sure. OK, I didn't know what I was hearing.
That's why I'm asking.
Speaker 4 (01:21:06–01:21:26)
Yeah, the last school committee meeting began a discussion of removing pre-K from the new school building project. So yes, no separate building, no classes incorporated within the overall building. We're moving that.
Speaker 2 (01:21:26–01:22:55)
So just for clarity. Please. Yeah. So what they were talking about, John, was the current project right now that we're looking at for $173 million is to build an upper middle school housing grade 7 and 8 and a separate preschool doing the preschool components.
By doing that, the elementary schools would pull out fifth grade and pull out preschool. So basically, you know, taking the top part of the enrollment, the bottom part of the enrollment out, making it up in there that equates out to the 26 classrooms that we needed. If we only do the middle school component of this project and not build a preschool, we will not satisfy the 26 classrooms that we know we need. So that decision, you know, the school committee looking at, you know, as something, you know, could they survive with less than 26 classrooms?
And I think that's where their decision will come in. So programmatically, the school building committee doesn't have authority to say we have to do this. We've provided these as options. But for us, our charge is to, you know, build the building and deferred to the school committee for programmatic elements of what goes on in that building.
So that decision, whether it's decided to not build the free school, would come from the school committee, not the school building committee.
Speaker 12 (01:22:57–01:23:03)
Correct. And that's what I was asking, because I thought he was just talking as school committee.
Speaker 14 (01:23:03–01:23:06)
No, John, I think what he was saying was that the conversation happened.
Speaker 12 (01:23:07–01:23:07)
OK.
Speaker 14 (01:23:08–01:23:09)
There was no recommendation.
Speaker 12 (01:23:09–01:23:14)
Okay, that's the point I'm trying to get to. Thank you. Yep, cool.
Speaker 2 (01:23:15–01:23:43)
Any other questions? Just double checking people online. All right, any other new business? All right, seeing none, we'll move on and…
All right, future meetings. So Shamus put a couple of placeholders on October 7th, which is next week, which I don't think we need to do, or two weeks from now, October 14th, if that works for everybody. October 14th is a holiday.
Speaker 4 (01:23:45–01:23:48)
You can skip it and get back on a regular schedule on the 21st.
Speaker 2 (01:23:48–01:24:16)
I'm fine with that. That worked for everybody online. So October 21st will be our next meeting, three weeks from tonight. Everybody a little pause, get ready for Halloween, decorating, all that fun stuff.
Yeah. I think that's good. All right. All right.
That sounds good. OK. So I think our last thing on the agenda is adjournment. Yep.
So entertain any motion to adjourn.
Speaker 5 (01:24:17–01:24:18)
So moved.
Speaker 2 (01:24:18–01:24:37)
All right. And roll call vote. Akua Obama? Yes.
Dr. Miranda? Yes. Mark Loring?
Yes. John Cohane? Yes. Tereshack?
Yes. Tim Lombard? Yes. Sean O'Rourke?
Yes. Thank you very much, and we'll see you in a couple of weeks.