Board: Milton Conservation Commission
Date: 2024-04-09
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:51–01:23)
Good evening and welcome to the Milton Conservation Commission meeting for Tuesday, April 9th, 2024. We have two matters of formality that we bring up. First one is we invite everybody to speak and ask questions and make comments, but we do ask for record-keeping purposes that you identify yourself. And then you're welcome to ask the questions and make comments that you deem appropriate.
The second issue of formality is we introduce ourselves. My name is John Kiernan, and let me just read across my screen as I see it. Steve?
Speaker 2 (01:24–01:26)
Steve, I'm his conservation agent.
Speaker 1 (01:27–01:35)
Philip? Philip Risco, conservation clerk. Tom Palmer? Tom Palmer, member.
Ingrid?
Speaker 3 (01:36–01:38)
Ingrid Beatty, commissioner.
Speaker 1 (01:38–01:39)
And Arthur.
Speaker 4 (01:40–01:41)
Arthur Doyle, commission member.
Speaker 1 (01:41–01:52)
Great. So we have our quorum. We're ready to go. First on the agenda is Turner's Pond Pathway.
This is informational only. And Pete Jackson, I think you are our presenter tonight.
Speaker 5 (01:52–05:49)
Yep, happy to. As any of you who have been out there and looked at the condition of the new path around Turner's Pond, we continue to have drainage problems. It's been a very challenging year. Usually when we construct in July and August, we expect fairly dry weather and easy going, but we had continuous, very intense rainstorms.
So we fought drainage throughout the construction project. It was very difficult for the contractor, but we hung in there and we thought we had the path pretty well completed. And then we've had some very large storms in November and January and again this March that flooded the area tremendously. And there's been some significant ruts and things that have opened up in the path.
Material has washed, you know, from the edge of the path toward the pond. There's a couple places where a little bit's gotten into the pond, but for the most part, it's been stopped by the erosion control, although the erosion control hasn't been maintained since most of the completion of the path. last November. So there are places kids go fishing down there and they pick up the waddles to get catched worms underneath and they move it so they can get their bikes and things.
So the erosion control is not in great shape now. But the path, the biggest thing is the path continues to rut. Board of Park Commissioners invested in some additional drainage beyond what was on the original plan. And at times it seems to have worked, but when we get these really big floods, there have been a couple times that the water from the pond elevation actually was a foot over the elevation of the path, which we've never seen in, you know, as long as I've been around town.
There have been some problems at the outlet from the pond going into Pine Street Brook. So it's not in great shape. Most of the path is good, but there's still rutting that happens. The contractor, the last time in March, just about three weeks ago, the contractor came out and did repairs again to the places where it was rutting and put some drainage pipes under the path.
to try to prevent that, and then it was March 24th, we had a huge storm again, and it just washed everything out again. So he thinks he's done, that these are acts of God that he doesn't have any control over. The contractor's been very cooperative throughout the whole process, but he's thrown his hands up, and I really don't know It's hard to know whether the weather conditions are the new normal or whether it was just that we've had an unusual year. I fear it may be the new normal, in which case maybe, you know, the elevation of the path and trying to put in a soft surface path really isn't appropriate.
So I've come basically to report to you the conditions and the challenges that are going on out there. The contractor would love to get permission to remove the erosion control and do some kind of minor cleanups and stuff there and call it a day. But I feel that the commission should have a chance to see the condition out there and talk about what we expect to have done out there before that we can get an acceptance of the project.
Speaker 1 (05:51–06:11)
Pete, last year, in the late summer, early fall, I think you came before us and we approved some revisions to the original plan that related to new drainage under the pathway. Yes. Near the, I don't know what northeast side it would be, maybe northeast, but near Glover.
Speaker 5 (06:11–06:59)
The Glover school land. And that's worked well, that there hasn't been any continued erosion up in there and that's been stabilized quite well. But there's a couple of problem areas. The main one is right where the second flood storage basin is.
When we constructed that, we designed it as per the plans. But when we got down to the base elevation, there was a lot of clay down there. So although we were able to construct the storage capacity required, the basin does not drain through the subsoil. So the water kind of stays there.
Speaker 3 (07:01–07:18)
So, you know, and it's at the- So Pete, let me just ask you a question. There are a couple of those basins. There's, I think, one, at least one on the north side and definitely one on the south side. Are there more of those basins?
Speaker 5 (07:18–07:57)
There are three basins. The first one is if you're coming from the Central Avenue parking lot going toward Glover School, on the left, there's a basin that's adjacent to the wetland replacement that we did last time we did the path 12, 13 years ago. It's adjacent to that wetland. And then if you continue along that way about another 150 feet, there's another basin in there, and that's the one that's got a clay bottom, so although it has storage capacity, it doesn't drain.
Speaker 3 (07:57–07:58)
I see.
Speaker 5 (07:58–08:04)
And then there's a third one as you go across the western side of the pond. There's a third one.
Speaker 3 (08:04–08:07)
Yeah, sorry, the northwestern side, and that one seems perfect as well.
Speaker 5 (08:07–08:08)
Near the big beach.
Speaker 3 (08:08–08:09)
Yes?
Speaker 5 (08:10–08:11)
That seems to be working, yes.
Speaker 3 (08:12–08:15)
Okay, all right. Yeah, okay, so I got it. Okay, thank you.
Speaker 4 (08:16–08:35)
The storage area toward Glover School, the second one? Yes. The elevation for that, do I recall, is higher than the first one on the left coming from the parking lot?
Speaker 5 (08:35–08:59)
The base elevation is about the same. Because it doesn't drain very well, we ended up building up and putting a berm between the basin and the pond so that it wouldn't overthrow over top the path whenever it drained. But the base elevation is pretty much the same.
Speaker 4 (09:00–09:01)
OK, thank you.
Speaker 1 (09:03–09:10)
Pete, is this CPA money? Community Preservation Act money?
Speaker 5 (09:11–09:26)
Half of the project was paid by CPA and the other half through town funds. And then there's been some extra work orders. So it's probably 40% is CPA and 60% is town funds.
Speaker 1 (09:29–09:31)
What's the overall cost?
Speaker 5 (09:32–09:42)
It's approaching $200,000 now. The original bid price was $165,000. And then with extra work that we're done, we're approaching $200,000.
Speaker 1 (09:42–09:49)
All right. And who is the contractor?
Speaker 5 (09:49–10:14)
It's Ramco Survey Stakes is the name. They've done a good bit of work in town. They did the demolition at the ice house project, and they've done a couple other things around town. I'm sorry, what did they do with the ice house?
They did demolition work for the buildings that were there and some site excavation. I don't know about excavation, but demolition.
Speaker 1 (10:15–10:43)
Okay. All right, because the ice houses had some recent work done there to improve their erosion controls, and it appears to be working and it appears to be well done. That's the most recent effort, and I didn't know who did it. I know Charlie Bosworth is the developer, but as far as I know, and Arthur, you may have more recent knowledge, or Tom Palmer, you might, as to whether or not it's working.
It appears to be working.
Speaker 5 (10:46–11:38)
A problem at Turner's is that the land around it is so low, particularly as you go from the parking lot toward the school on the left there. That's all wetlands in there. So when rain builds up there, you know, it just flows toward toward the pond and the When the school was redone and they built, they removed some woodlands there in order to build their soccer field and things like that. That's causing a high point and the water comes off there.
There's almost no grass on that field anymore. So the water just, you know, comes off the school grounds, which are higher than the pond. And a lot of water is coming off of there and going toward the pond. You had to put in extra drainage to try to pick up some of that water.
Speaker 4 (11:39–11:48)
And that's what was behind my question about the elevation. When I've been down there a couple of times, that area has been exceedingly wet. Very wet.
Speaker 5 (11:49–12:14)
And I don't know if it's the new normal. And if it's the new normal, then I don't know that we can maintain the soft surface path at that elevation if we're going to get that kind of water. We've been struggling. Pine Tree Brook has been high.
The Nepenthe River is still very high. It's down about a foot and a half from where it was, you know, six weeks ago, but it's still very high. And it's all… I ran it.
Speaker 3 (12:14–12:15)
I ran it.
Speaker 5 (12:15–12:17)
It was terrible. It's all related, yeah?
Speaker 3 (12:18–12:18)
Yeah.
Speaker 5 (12:19–12:28)
They had that king tide that flooded the yacht club and flooded the greenway down in the estuary.
Speaker 4 (12:28–12:47)
Marcy Boulevard and Pete, I think you're right in citing the new normal, only that we haven't gotten there yet. The predictions of sea level and other water increases for the next 20 years or so are going to be considerable.
Speaker 1 (12:49–13:09)
Well, given that comment, and I'll switch it to Pete, but do you think that there should be some design changes that is to add some under path culverts, drainage pipes? I don't mean major culverts, but just some mechanism for getting under the path instead of over the path.
Speaker 5 (13:09–13:45)
There's a couple of pipes that have been put in there and things eroded away again. It's possible there may be some more. But with the water elevations that it's been, where it's actually overtopped the path elevation, it's not just water coming down from there. But if you go out there and walk it now, you see what almost looks like a rack line on the beach of things coming in from the pond from high elevations and depositing material along the path.
I don't know if we can maintain a soft surface path there anymore.
Speaker 4 (13:45–14:07)
Mr. Chairman, might this, going back to an earlier comment, warrant a site walk? And if so, is there a way in which we can do it in conjunction with a site review of the Glover School situation that could be contributing to the high water level at this particular point along the pond?
Speaker 1 (14:08–14:15)
The simple answer is yes, but I'm not sure how you're distinguishing the Glover School issue.
Speaker 4 (14:15–14:35)
Well, if we have sheet water coming off a Glover School property or insufficient storage tanks off the rooftop, et cetera, of Glover School, that may be something that we need to take a look at. Do you know, Pete, is that the source?
Speaker 1 (14:35–14:37)
I know the area where you're talking.
Speaker 5 (14:37–15:25)
Yeah. I think there's some that comes off of Glover School. We pulled out the Glover School drainage plans when that was done, and I don't know if there's been any maintenance of those. There's some storage basins in there.
People from Glover didn't even seem to know they were there. The engineering department did. So whether there's been any maintenance of those facilities. The other thing, like I mentioned, what was to be a play area there, the grass is pretty much all gone.
So there's nothing to absorb the water. So more of it runs off. So there's no doubt that that's a contributing element. I can't say that that's the only or the major part of the drainage, but it certainly is contributing to some of the drainage problems we're having out there.
Speaker 4 (15:26–15:41)
John, if I may just add, the last time I was down there, that section of the Glover School property was very, very wet. Pete, is that your observation as well?
Speaker 5 (15:41–15:51)
Yeah, it is. And it is higher than the path, so it tends to go that way. If it's not being absorbed, by vegetation and things that runs off.
Speaker 1 (15:53–16:21)
All right, well, I guess we've got long-term issues and short-term issues. On the short-term issue, is it your recommendation that the erosion controls stay in place? I understand the contractor wants to get out of there, but that's kind of a different issue. Because if erosion controls are appropriate, then maybe we have to shift the onus to Parks Department to maintain that.
at least in the near term. What is your recommendation about maintaining the erosion?
Speaker 5 (16:21–16:40)
I think in parts, the erosion control could be taken away. But in a lot of it, it's just going to allow more of the path surface material that is continuing to erode. It would allow more of it to reach either the banks or into the pond itself. So I think maintaining erosion control is not a bad idea.
Speaker 4 (16:42–16:43)
All right.
Speaker 5 (16:44–16:51)
And that's out there should be maintained. The erosion control that's out there, you know, it hasn't been maintained for a while.
Speaker 1 (16:52–17:01)
Understood. And are they, is the contractor claiming substantial completion? They want to do their punch list and close up shop?
Speaker 5 (17:01–18:18)
They said that they're done going out there and they've, two months ago they submitted for their retainage, but we haven't released any retainage. And we held a invoice for a couple of months, too, that they did the work, but we knew there was still stuff to do. So I think we can, you know, he knows that he owns taking the erosion control out if we think it's worth doing, but I don't know that it is. Maybe we can get him out there to do some cleanup of some of the path material that's eroded toward the pond.
So I don't think we can get a whole lot out of them. So I think a site walk with the park department there so we can get your commission's thoughts on the condition of the entire project at this point. And then whether it's come up with new ideas or there's maintenance that if the contractor won't do it, that the park department is required to do, I think that's a wise way to look at it.
Speaker 1 (18:21–18:53)
All right, well, I'm in favor, I think we're all in favor of doing a site walk. If we get to do it jointly with Parks, that would be even better. So I know that, you know, it'll be easy enough for us to select a date. As you know, we usually do these on Saturday mornings.
But then somehow we'll have to coordinate with Parks Department to make sure they can do it. And we have to do it fast enough to get out. Like if we were going to do it this Saturday, we'd have to get a public notice out tomorrow. just to make sure we have the 48 hour.
Speaker 5 (18:53–19:30)
I'm pretty sure. And if you, if you guys set a date, whether it's this Saturday or the next one, I will tomorrow morning, contact the parks department. And I'm pretty sure that Kevin will get out there. And I don't know if there's any chance that Chase Berkeley would get out there.
He's been out there with us a couple of times to look at it and to try to come up with ideas. The, um, the manufacturer, the supplier of the PATH surface material, Reed Custom Soils. Tony Will's been out there a couple of times, and he's ready to go out again and look at it, you know, trying to get all the input possible. It's a real conundrum.
Speaker 1 (19:32–19:35)
All right. How about this Saturday, members of the commission?
Speaker 3 (19:36–19:38)
I can't do it this Saturday. I can do the following.
Speaker 1 (19:40–19:57)
What's the date of the following Saturday? It'll be the 20th. Okay. Well, I can do the 20th.
How about Tom? Can you? I can't hear you, Tom.
Speaker 6 (20:00–20:02)
Yes, I can. Yes, I can.
Speaker 1 (20:02–20:03)
Arthur, can you?
Speaker 4 (20:05–20:05)
Yes.
Speaker 1 (20:07–20:27)
Why don't we do this at 8.30 Saturday morning? We'll meet at the Central Ave parking lot. And then, Pete, if you could just check with Kevin and see if POCS can make it at the same time. And once we get confirmation from POCS, then, Philip, you can provide the notice so that we have a public meeting, adequate notice.
Speaker 7 (20:27–20:28)
Absolutely.
Speaker 1 (20:29–20:46)
All right, good. So the target is Saturday, April 20th, 8.30 in the morning, Central Avenue. All right, now before we move on, are there any other members of the public that have a question or would like to make a comment?
Speaker 8 (20:47–21:11)
Yeah, hi, I'm Roy Chambers. Hi, Roy. How are you? I have a question for Steve.
I was at a border health meeting last week relative to a beaver issue, and I want to know what the status of that is. I understand that, Steve, you had withdrawn the application for removal.
Speaker 2 (21:11–21:29)
Yes, Roy. We thought that the beavers were presenting an imminent hazard, and that's not the case. So they can live there very happily if the outlet of the pond is kept open.
Speaker 8 (21:31–21:40)
Yeah, right. Well, as you know, the area they're in, they're not even close to any of the drainage. Exactly. Exactly.
Well, that's good news.
Speaker 2 (21:41–21:43)
Good. I'm glad to give good news.
Speaker 1 (21:45–22:03)
Pete, can you, apropos of the question from Roy, can you go back, at one point you said that there was some problems in terms of the drainage from the pond into Pine Tree Park. What's causing that?
Speaker 5 (22:04–22:55)
There was a grate on that outlet that was made with rebar. And the rebars were very close to one another. So there was just not adequate place for debris and stuff to get out. So it would back up there.
And it could build up so that the pond would be a foot or 18 inches higher than the outlet elevation. Going out and so I've been on the department for probably 15 years now to maintain that outlet. So finally, this summer we removed the great so that the the leaves and branches that are flowing out and go all the way out to pine tree brook and that doesn't allow that to be a barrier that builds up the elevation of the pond.
Speaker 1 (22:57–22:59)
Okay, so that's not a problem.
Speaker 5 (22:59–23:02)
That's not a problem at this point, no.
Speaker 1 (23:02–23:19)
That's good. More good news. All right, thank you. Anybody else from the public?
Hearing not, we'll continue this hearing until April 20th, 8.30 in the morning. It's a public meeting, folks, so all are welcome, and we'll meet in the Central Avenue parking lot. Thanks, all.
Speaker 5 (23:20–23:20)
Thank you.
Speaker 1 (23:21–23:28)
All right, next on the agenda is a request for determination of applicability MBTA right of way. And I know we have a number of presenters, I think.
Speaker 9 (23:30–23:44)
Yes, good evening. My name is Calvin Leighton. I'm a consultant for the MBTA in putting this plan together. And I think the other folks in MBTA are representing it could probably introduce themselves as well at this time.
Speaker 10 (23:47–23:49)
Good evening, Alicia Toms with MBTA.
Speaker 1 (23:52–23:54)
Good evening and welcome. Thank you.
Speaker 11 (23:56–24:00)
And I'm Amanda Smith with BFC Group, supporting that project as well.
Speaker 1 (24:02–24:07)
Welcome, Amanda. Thank you. So Calvin, anybody else?
Speaker 9 (24:07–26:35)
Or are you ready to present, Calvin? I think I'm ready to get into it. Good, thanks. If anybody else comes on that wants to speak, that would be fine.
Okay, this is a routine filing for us. We were here five years ago. This is in regards to the vegetation management plans from Mass Department of Ag Resources that was set up between MDAR and DEP, Department of Environmental Protection, back in the late 80s. And these plans are good for five years, and every five years they need to be redone and revisited with the local conservation commissions.
So the RDA is for the determination of the wetland boundaries. The good news here is that we hired BSC group to come through and do a complete new delineation of the wetlands on the line. So we have a good solid delineation and which again determines our sensitive areas and determines our no spray areas. We've provided the maps of those, and BSC is here to answer any questions that might come up.
So this is for routine vegetation maintenance on the line. MBTA takes the safety of the commuting public very seriously and need to provide a safe rail corridor. And a key part of that is managing vegetation, both on the rail bed and on the sides of the right-of-way to provide a safe corridor. So this vegetation management plan is good for five years and we will implement it and continue what we've done.
There are no changes in the way we manage the vegetation from the last time. I know the last time we were here, five years ago, there were some concerns about what we were doing. I believe we addressed those concerns. I have not heard of any issues in the last five years.
I think we did a great job of keeping the tea right away there and melted in good condition and followed through on what we promised you guys to do. So we're back again for a determination that will allow us to continue for the next five years.
Speaker 1 (26:37–26:49)
And according to your current plans, do you distinguish between the mechanical vegetation removal and the chemical vegetation removal?
Speaker 9 (26:49–28:12)
The VMP talks about both types of maintenance. So on the a simple way to explain it would be on on the rail bed itself. We do an herbicide application. All of our applications up till now have been by backpack sprayer, hand-held backpack sprayer by a crew of three to four people that go through.
They spot treat weeds that are coming up through the ballast. And they do that in the mid-June timeframe. And then later in the season, they will come back and they may be targeting woody vegetation on the side where it's appropriate. that might go into the T right away.
And then we also, at times, we'll do tree removals as necessary if it's something hazardous or something interfering with the overhead wires and infrastructure like signs, signals, things like that, where cutting has to be done. And then in the no-spray areas, we would do mechanical weed whacking, whatever, to control the vegetation there.
Speaker 1 (28:14–28:19)
And line of sight is part of that tree removal portion?
Speaker 9 (28:19–28:46)
Yes. It's critical around corners that the operator be able to see ahead and not have stuff coming into his line of sight. And then especially coming into stations, he needs to be able to see what's going on as coming into stations. It's a fairly accessible right-of-way.
People can get out there and the operator needs to be able to see down the rail.
Speaker 1 (28:48–33:21)
Calvin, very articulate and professional presentation, so I thank you. Now I'm going to give you some history, because some of us here on the commission have been around a long time. And in September of 2009, when we were considering the same, we did approve an order of conditions. Actually, we approved an RDA, a negative RDA, with certain conditions.
And it was a disaster. And Northern Tree was the same contractor that I guess you've got now. We had many hearings, many discussions, and we signed a consent order with the MBTA, in which they would give us $15,000 in cash and 40 hours of labor to replant the trees that they took down unnecessarily, that had nothing to do with a line of sight. In addition, there were shrubs and plantings that were required because, and I don't know how familiar you are with the area, most of us grew up here, so we know it pretty well, but on the Elliott Street side, right by the Adams Street Bridge, there's a sort of an angled portion between Elliott Street and the right-of-way.
And we, the Conservation Commission members, referred to that as the nuclear zone. And it was either a nuke or perhaps napalm, but every living thing, every creature, every bug, every blade of grass was demolished, removed, gone. There was nothing there. We had several site walks out there, and that led to the consent agreement with the MBTA, and they said, oops, we're sorry.
Now, we had approved, again, all of the EPA and DEP approved herbicides, and so I don't know if it was a change in the herbicides applied or if it was the the actual installation or implementation of that. We don't know what happened, but we know what the result was. And just as a side point, the gentleman from the MBTA was very bright, very articulate, a true gentleman, Andrew Brennan. And he basically apologized and said, you're right.
And that's why we've agreed to pay. Now, plus, they never did pay, which is a different issue. And it may come to a bonding issue before us tonight, because even though the MBTA said, yes, we owe you the money, we owe you the 40 labor hours to replant the trees. We never got it.
And Mr. Brennan was very good, and he said, listen, we're in a deficit funding situation. You've got to go to the legislature. We just don't have the funds.
So I'm looking to see whether or not we need, and this is a question. I'm not taking an editorial position, but I put it out there. Do we need a bond for this? Because we do not want to go through what we did.
And I admit, it's back in 2009 and 2019, you seem to, to stay within the conditions that we set. And some of those conditions were, by the way, we want to see the trees that you intend to take down so we can look at it before you let those trees loose because they're tree cutting and they're going to cut trees. So we'd like to have a pre-construction meeting where not just the agent, I'd like the commission to walk this line. So I don't know if you can do that.
And you heard we've got a site visit. We like to go to the sites. We can do it on April 20th, on Saturday, if you can tell us which trees you're trying to remove. And the last time we did it, we didn't walk the whole distance from Mattapan, but we walked Central Avenue to, I don't know, Butler or Cedar Street.
We went beyond Milton, by the way. And I'll acknowledge there's a little footnote to that consent decree, because it was actually that money and labor hours were for both Milton and Boston. But we were in pretty close touch with the folks in Boston, and they acknowledged that most of the harm was done on the Milton side. So we had agreed that we'd come to an amicable split of the funding.
which neither of us got. So that's by way of history, and there are some new commissions. I know, Ingrid, you were there. You saw the nuked area.
Tom, you weren't on the commission, but you may have seen it yourself. It was pretty stark.
Speaker 6 (33:22–33:27)
I don't know exactly where you mean, John. Could you say again where it was?
Speaker 1 (33:27–33:43)
It's right off of Elliott Street, between Adams Street, and you know where Steel and Rye is? There's like a hillside that drops on the railroad right-of-way, and it runs between Steele and Rye. Yeah, there's a retain wall. Yes.
Yes.
Speaker 6 (33:43–34:29)
Yes. Right at the way the street is. It's very hard to get the area off LA Street, because LA Street is so high above the railroad. So there is a steel fence there.
And then there's a fallaway area of vegetation. in that fall away area produces trees, namely Olanthus and white ash. And I don't know, I wouldn't know what to do if somebody told me to maintain it, because I would say, how can I do it? I can't get to it.
It's between the fence and the tracks. So maybe somebody could not get to it and decided, I can't get to it except if I douse everything.
Speaker 1 (34:31–34:39)
Well, they doused everything, every critter, every blade of grass, every dandelion, nothing.
Speaker 6 (34:39–35:22)
I just walked by there a couple of weeks ago and I was in the fall too. And it's an interesting illustration of Darwinian, uh, pressure on invasives because of, I saw an Atlantis tree with bittersweet climbing up it and porcelain berry was smothering the bittersweet. so it was that's I guess what you get if you do it you know a hundred percent disturbance you get the positive side there's now lots of milkweed growing along that fence as well that's good I also saw pretty wildflower yeah
Speaker 3 (35:23–35:34)
But with the period of time that we're talking about, it went from green to nothing, gray and brown and dead.
Speaker 6 (35:37–35:40)
Yeah, I guess that sounds like it was nukes, doesn't it?
Speaker 1 (35:41–36:07)
Yes. That's the term that we use. You're right. Calvin, I don't think that's onerous if we have A, a site walk, and B, ask you to designate the trees that you're going to cut so that we don't have a repeat.
Granted, it's 15 years ago. I got it. Right. But it's not something that you could do?
Speaker 9 (36:07–38:15)
Well, I think that you've got a very good point there. From what you've described to me, it sounds like it was way beyond even what a VMP would allow to be done. There are restrictions in there about the height of vegetation that can be treated and all kinds of things. I do think that, especially if we have to cut off right away, we're going to be getting permission from landowners for that.
And you should certainly be involved within the right away. If it's, you know, in your jurisdiction, then I don't have a problem with marking trees and letting you know what we're going to do for removal. It's just a courtesy, so I don't have a problem with that. I don't think right now we have any pending removals to do on that line.
Part of the VMP requires patrols and plans, because we have the five-year plan, then we have a yearly operational plan. So part of that yearly operational plan is to actually come up with a yearly plan. So we might not have anything this year, but we certainly might have something next year. And we could set it up so that way ahead of time in the winter when we can see in the woods, here's what we want to do and do some type of a site walk so you guys can see what we're doing.
You know, we don't, I have a famous statement and you're living proof of that is herbicides don't lie. If you put them in the wrong place, you will know you put them there. They just don't lie. So, you know, I think that when it's done right, it's fine, but when it's done wrong, you end up with a mess on your hands like you've described.
And I think that we've worked hard in the last five years to restore some credibility in the program. So I think that that's reasonable.
Speaker 1 (38:18–38:45)
Commissioners, questions, comments? Because part of it is what we see now. And I'm not sure, unless we know when you're going to do it, I don't know if it's worthwhile walking now. Because if we didn't see the trees coming down, what I'm trying to prevent is the taking down of trees that were clearly unnecessary.
And the tree agreed to it. They agreed. Yep.
Speaker 9 (38:46–39:54)
It's not a line of sight, so we're not talking safety. Right. No, and I agree with you as well, that if a tree doesn't need to come down, if it's healthy and growing well and it's not interfering, why are we spending the money to take it down? No, I agree with you on that.
There has to be a reason for it to come down. And I'm a certified arborist, so I stand behind what I say when it comes to the proper evaluation of trees. It needs to be done. And that obviously was a miss.
In terms of walking it now, I mean, that's possible to do. The problem that we face in the T, and maybe someone from the T could speak to this, is that anybody that goes on the tracks has to go through safety training. And we're more than willing to do that, but it's another requirement. And we're under the jurisdiction of state agencies for safety.
And everybody that goes on that track has to have that right away, training, clearance, whatever, to do. So that takes time. I understood and agreed to.
Speaker 1 (39:55–40:01)
I understood and agreed to. Okay, thank you. We've done it before. Okay, great.
Speaker 10 (40:01–40:31)
I was going to ask, when this was last year, I believe that a request was made to have someone from the environmental department represent to ensure any integrity with any promises. Had a drill last year that the commissioners went along the right of way alongside a representative from the environment department to ensure that everything was in agreement, or did that not happen?
Speaker 1 (40:33–40:35)
I'm sorry, you're talking about last year?
Speaker 10 (40:36–41:05)
Last go around, meaning, okay, I appreciate the concerns relative to the 2009 circumstance. We're trying to say, okay, things haven't been as disastrous as that. I believe there are measures put into place to ensure that reputation and integrity has been rebuilt over time. Forgive me for saying last year, I guess last go around, was that the requirement and was that part part of a successful means of approaching the same project?
Speaker 1 (41:06–41:39)
I don't believe that we did walk the line five years ago. The pushback at the time was that the T was suggesting that they were exempt. And we were one of the, I guess, 22 communities that said, no, you're not exempt. So we issued the order.
And I know that there was some talk about litigating that issue. I don't think it ever was. But we do not recognize an exemption for the T. But having said that, we did not walk the line in 2019.
Speaker 12 (41:40–43:04)
Hi, can I say a few words? I'm Janice Kerney from the Environmental Department at the MBTA. I work with Alicia. The first thing I wanted to talk about was the safety, the walking of the right-of-way.
So I know that you just agreed that, yes, you would take the training, but it's more than just taking the training. It's scheduling and taking the training, but it's also getting clearance now on the right-of-way. We have new FTA requirements and safety that are in place, and so it's not like it used to be for walking the right-of-way, even if you could walk it parallel. So if we could walk the area that you have issues with outside a fence line where we're not on the right-of-way, that's one thing.
But if we're on the right-of-way, we're going to have to get track time. And that could not happen. That may not happen. I shouldn't say it could not happen.
That may not happen for quite some time, like months. because of ongoing scheduling. So I just want to put that out there that it's not like it used to be. And to get to Alicia's point that she just made about this is the last round that we were here twice before, once for this subway and then once on the commuter rail side.
The commuter rail side actually still is an appeal. It's an appeal right now, along with 22 other communities. But that's still an appeal. But we're filing this VMP and going forward on the subway side.
Speaker 1 (43:07–43:19)
I understood. I understood everything you said. My firm has represented the MFRAC, at least in my experience, the last 35 years. So I know the rules and the regs.
And I know the training.
Speaker 6 (43:22–43:28)
Anything else? I have a question about the plans.
Speaker 9 (43:28–43:31)
Yes.
Speaker 6 (43:32–43:46)
I'm looking at a plan that shows the line itself overlaid with stretches that are blue or yellow. And I think they're labeled no spray zones and limited spray zones.
Speaker 9 (43:47–43:47)
That is correct.
Speaker 6 (43:47–43:52)
I'm just curious what those are. I don't know what they are.
Speaker 9 (43:52–45:19)
So within the sensitive site, which includes the 100-foot buffer, all sensitive areas are blue. And they're marked not only on maps for the guys that are doing the treatment, but we actually put blue tags on the rail when a sensitive area begins. In that sensitive area, we will get close to a wetland, and we will get within the area of a wetland where we can no longer spray herbicides, and then those zones are yellow. There are no spray zones.
We will then put a yellow tag on the rail, or we actually put posts in the side of the right-of-way with a yellow tag on it to show the zone that says, this is a wetland. We cannot spray in this area. So those are, in the sensitive areas, we can only spray. Once in a calendar year with, and we can do touch up, one touch up in a calendar year.
And we can only use materials that are listed on Mass Department of Ag Resources sensitive site list. So that we're restricted to the type of herbicide we can use, and we're restricted to when we can use it, and we're restricted to where we can use it in those zones. And as you notice, most of the Milton area is blue or yellow or whatever. I mean, there's a lot going on there.
Speaker 6 (45:21–45:32)
Thank you. Let me ask this. From a sort of functional or utilitarian point of view, which do you prefer to use, mechanical or herbicide?
Speaker 9 (45:33–48:08)
So on the ballast, herbicides are basically essential. Because the one thing an herbicide does that mechanical can't do is it destroys the root of the plant. And the root of the plant is what holds moisture and water in the ballast. And it creates a softening in the ballast.
So when the trains go over, you get lack of technical term, you get squishy rail. So you get a squishy roadbed. And that will lead to derailments and all kinds of issues. So the rail bed needs to be kept clean of weeds as best it can.
I know there are some areas we can't treat because we're close to a wetland. But the more we can, the better drainage we get out of a rail ballast. And the integrity of the rail is much better. Around switches and light poles and things herbicides will clear vegetation very well when mechanical.
It's pretty hard to use a weed worker on a rail switch. So we prefer that. When it comes to large vegetation, mechanical is definitely less expensive, less impactful, and works very well. With small woody vegetation, we can't treat anything over 12 foot in height.
We can only treat stuff under 12 feet. So when you have woody vegetation under 12 feet, we can treat, brush, But the goal of the plan is to, and I think we've achieved that there, is that where we've treated, we allow good plants to come back. Stuff that you would want to grow there come back. So we target a plant that shouldn't be there and allow other stuff to come back that can be there.
So lower growing vegetation beside a rail is fine. It doesn't block view. And if we have a well, Planted roadside road beds. I mean, roadside railside corridor.
It's going to prevent other woody vegetation from growing up in that area and reducing our herbicide use over time. So, so it's a combination of processes that result in a pretty low application rate. And I would like to say that I think our herbicide application rate is probably one of the lowest of any probably rail application you'll ever see. Because of our backpack applications, we're using minimal herbicide on the rail and achieving good results.
So I'm pretty happy.
Speaker 6 (48:09–49:07)
Well, I thank you. That was a very complete answer. I would just say that in terms of herbicides, I tend to prefer mechanical, but you make a good argument for the ballast. And I would just mention that when the Greenway was constructed from the area of Adams Street out to Granite Avenue and Dorchester, there was a problem with getting it cleared for public use because of the legacy of herbicides in the past.
Namely, the soils were all contaminated with arsenic. And those soils either had to be removed or capped. Now, I'm sure when an arsenic was being applied, nobody anticipated what would happen years down the road. But that's one reason I appreciate your efforts to limit your use.
Thank you.
Speaker 9 (49:08–49:10)
You're welcome. Thank you.
Speaker 1 (49:13–51:05)
Calvin, let me ask you this because, and this may fall to us. that when I say us, the Conservation Commission itself, because in our file, at least what was distributed, we have the letter from Northern Tree Service requesting that we consider a determination on your so-called exemptions. And we've been provided a copy of a report from MS. MCP, which I think is Municipal Conservation Professionals, to the DEP.
And they contest the exemption component of this, as do we and as we did in 2019. And I did hear what Attorney Kearney said about the Keolis part of that is still under appeal. So the position that we have taken previously, I can't speak for the commission, we haven't voted on anything, but the position that we did take and did vote on in formal session, that we did not recognize that exemption. And I suspect that it's probably going to be the same when and if we vote tonight.
But my My problem is I don't have your yearly operational plan. I don't know what chemicals you're using. And we have a scientist in our group here, and I personally always look to her to take a look at stuff. MSDS sheets for the chemicals and make sure some of the old EPA approved chemicals are no longer approved and have picked up some operational plans that have old chemicals on it.
I didn't have those chemicals and I don't know if they were submitted to us, but we just didn't receive them in our packets.
Speaker 9 (51:04–52:35)
Do you know if that was submitted? Well, the YLP notices went out, and the YLP is on the MBTA website. The notice went out. I will say this.
The yearly operational plan only specifies herbicides from the MDAR sensitive site list. The current list, the state approves. And that list is up to date and is accurate as to what's approved. We can only use materials that are on that list.
So we've made a choice on all of our treatments on the MBTA is to use materials on that list. Just because it makes sense to do that. I think that we're basically using the same materials we used last time. The core materials we use are still approved for use.
And those are the ones that we'd be using. So there's actually no change in that from last time. There may be changes in the particular registration number of the herbicide, so another version of one with a different registration number, but they've all been vetted by the state toxicologist working with Mass. Department of Ag.
Speaker 1 (52:35–52:49)
Resources. And maybe I'm over-listening, but you said the core materials are the same. The implication is that there are some other materials that are not core materials that might be different.
Speaker 9 (52:49–53:34)
Oh, OK. I misspoke there, meaning we have materials that are our go-to materials that we use because they're effective. And there's probably, I don't know, seven or eight materials on the list, but we only use probably three of those. And that's what I mean.
So when we do a newspaper posting, 48-hour newspaper posting before we begin treatment, and we list all the herbicides in that posting that we're gonna use, they'll be on the plan. And it's typically three or four materials.
Speaker 3 (53:36–53:42)
Can you send us a link to the full list and highlight the three of your most commonly used?
Speaker 9 (53:42–53:43)
Yes, I can do that.
Speaker 3 (53:44–53:46)
That would be great. I think that would be very helpful.
Speaker 1 (53:48–55:23)
Yeah, I think it would be a mistake. on our part to vote without a record. I understand what you said, these may be publicly available data, but that really doesn't help us on a vote. If we vote on a record and somebody comes back and says, why did you vote that way?
Say, well, look at the record. We don't have it. So I find it insufficient that if the applicant says you can look for it elsewhere, and you would be the first person to do that. We often get an application that's before another board, either the ZBA or the planning board, and people will say, oh, it's available over there.
Go look. Well, we have a burden of proof here. Your other applicant is an RDA. And I think we need a full record from you, including the yearly operational plan with the chemicals.
And I heard what you said, and I accept what you said, that MDR approved, EPA or DEP approved. But that's a moving target. And we've had a lot just within this last year. We've had a lot of chemicals questioned on the basis that EPA is now saying, I'll give you an example, PFAS.
The hazard level is changing as we speak or as I speak. And so I think we need to have a record of what it is that you're going to be using. I don't know. Others?
I don't know. Tom, Ingrid, Arthur?
Speaker 6 (55:23–55:26)
I agree with you right there, John, for sure.
Speaker 4 (55:27–55:31)
All right. I don't think we can vote, John, until we have that information.
Speaker 1 (55:33–55:35)
I agree. Amanda, you with your hand up.
Speaker 11 (55:35–56:19)
I was just curious. On the permit, we're simply requesting confirmation of the delineation as being accurate. That's the request, not for permission for work, necessarily. Some of this seems like additional pieces that maybe we could have that written in as provided that we get you all of this material, like copies, that you are provided with copies of the yearly operational reports.
But we weren't requesting a project specifically. We were requesting confirmation of the resource areas. and buffer zones.
Speaker 1 (56:21–56:30)
That's what the letter says. March 25, 2024, it says that you're looking for a VMP. It's been developed for 2024 to 28.
Speaker 11 (56:30–56:55)
That's part of the VMP process with the Massachusetts Agricultural Department. They need to receive confirmation of where the resource areas are. I think some of these pieces might be like tree removal, cutting things might be a slightly different consideration as opposed to what was being requested tonight.
Speaker 1 (56:56–57:39)
Well, that's what I'm referring to. I'm referring, what I'm reading in my hand here is the letter from Northern Tree, and it says MBTA's vegetation management plan, VMP, expired on 31 December 2023. A new VMP has been developed for 24 to 28 in accordance with the Wildlife Protection Act. Determination of applicability issued for work conforming to 33 CMI 11 are in effect and must be renewed with a new VMP.
Accordingly, I have enclosed an RDA to renew the wetlands delineation along MTAs. But what happens to the VMP? I don't think you can segregate out the delineation. I know what you're saying.
Speaker 12 (57:40–58:00)
But the VMP is issued by MassDAI. This is part of the process. That's what Amanda was getting to. We're requesting that the wetlands be verified.
That's what MassDAR is looking for, that we've come before the Conservation Commission and we've verified that the delineations are accurate.
Speaker 1 (58:01–58:07)
And then you're coming back for an RDA for the VMP?
Speaker 12 (58:09–58:32)
No, this is the RDA for the VMP. Right. That's my point. But that's the point of the regulations as well.
The RDA, you're verifying this is the crux of the issue. You're verifying the wetlands, the delineation, and DAR issues the VMP. They had their public comment period last Friday.
Speaker 1 (58:33–58:42)
Not for us. You're not exempt. You have to go through the RDA process with us. You are not exempt.
And that's our position, and we're sticking to it.
Speaker 12 (58:43–58:50)
But that's this position. So the RDA is not for the VMP. The RDA is for the delineation of the wetlands.
Speaker 1 (58:51–59:52)
And I said, are you coming back with an RDA for the VMP? And you said, this is it. This is it. You just said it again.
So why are you asking us to segregate one component of the delineation? And by the way, in my 32 years of doing this, I have never approved the delineation without seeing it ever. No exceptions. So other commissioners may want to weigh in on this, but my recommendation is we do not split the components of approving a delineation versus approving the VOP and the application of chemicals and what they are.
and the components of that, which would require pre-marking, which is exactly what we did in 2019, pre-construction meeting to pre-mark those trees coming down. So I'm unwilling to segregate and separate different components of an RDA. But please speak up. I mean, Arthur, Tom, Ingrid, you're not shy.
Speaker 3 (59:52–59:59)
I agree.
Speaker 4 (01:00:00–01:00:02)
Yeah, I think it should be the total package.
Speaker 12 (01:00:05–01:00:09)
So what would be the total package just right now to point the additional herbicides?
Speaker 1 (01:00:11–01:00:45)
The herbicides that are being applied? The VOP. The VMP. Well, both, actually.
What I said, V, I'm sorry. I'm talking about the yearly operational plan, the YOP. And I did say V, I'm sorry. But it's yes, the whole plan for the VMP, V for Victor MP, and the yearly operational plan.
We don't have that. We've got the maps, but we don't have the yearly operational plan.
Speaker 11 (01:00:46–01:01:27)
So section 10.03 of the general provision of the Wetland Protection Act explicitly says that any application of herbicides within the buffer zone shall be presumed not to alter an area subject to protection under MGL 130.140 only if the work is performed in accordance with such plans as required by the Department of Food and Agriculture pursuant to 333 CMR 11 right-of-way management, this presumption shall apply only if the person has obtained a determination of the boundaries of buffer zones and resource areas. And it has been submitted as part of the plan.
Speaker 1 (01:01:27–01:02:08)
Yes, and 22 communities disagree with you. And we are one of those that disagree with you. Okay. So next step, I think, is to continue this until such time as we receive the VMP, because we don't have it.
And we also receive the YOP. I don't want to use the wrong ones, the yearly operational plan and the vegetation management plan. And in addition, I assume that that would include the MSDS. But if it does not, I'd want the MSDS for those chemicals.
Speaker 9 (01:02:10–01:02:28)
Correct. So the YLP only gives links to those, but I can provide the sheets, the STS sheets. That's not a problem. Perfect.
That would be very helpful. And I can have that all sent over to Phil Driscoll tomorrow. Perfect.
Speaker 1 (01:02:28–01:02:38)
Thank you. Amanda, can I go back to you? Is it possible for us, meaning the Conservation Commission, to approve the delineation without going on the right-of-way?
Speaker 11 (01:02:41–01:02:44)
I don't know why you wouldn't be able to.
Speaker 1 (01:02:46–01:02:58)
Well, I don't know. I've got the maps here, but I don't know if we could look at where you're marking, where the resource area stops and where it starts. Can we see it? Have you flagged it?
Speaker 11 (01:02:59–01:03:14)
Yes, it was flagged by our field crews. And also… I'm sorry, by whom? by our field staff for the delineation.
We have certified people who can go on the rails in the right-of-way. So, yes.
Speaker 1 (01:03:14–01:03:17)
They did not go on the right-of-way?
Speaker 11 (01:03:17–01:03:22)
No, they did. They have gone through all the trainings and are certified to do that work. Okay.
Speaker 1 (01:03:22–01:03:33)
So, my question is, can we, the Conservation Commission, right now, without the requisite training, can we see those flags up to approve the delineation?
Speaker 11 (01:03:35–01:03:47)
I'm not sure what visibility is like between where the wetlands are and access points that are not within the right of way.
Speaker 6 (01:03:47–01:05:41)
I could speak to that, John. I just happen to know the area, and I would say there's no place where the wetlands and the tracks are the same place. The tracks are always on a berm or embankment, and that embankment has always got a double fence row on either side, keeping you off the tracks. Now, I don't know of anywhere where there are wetlands inside those fences, but as I look at the map, I see there's a big isolated wetland in the area near the harvest bridge, but downstream in that large wooded area that We could walk too easily without going on the tracks.
This is on the second page of maps, but it's also on the first. It's that area indicated by a white line of dots. And as you go further downstream along the tracks, you see two more areas where the white line intrudes onto the tracks. Those are areas where surface channels go under the tracks for stormwater.
And you can see the part that matters from outside the fence on the riverside. So I would just say if we were to walk that particular area, we would have looked at all the wetlands that are actually bordering wetlands instead of wetlands that are rivers or wetlands that are defined by a distance from a high water mark. So that was just my read of where I would want to see any flags. I think that's a pretty limited area.
Speaker 1 (01:05:44–01:06:02)
OK. I know you're familiar with the area, in fact, the entire area. I'm just trying to see if we can do what I consider to be our duty without getting out of the right of way. And it sounds like we can.
Speaker 6 (01:06:04–01:06:05)
I would say yes.
Speaker 1 (01:06:05–01:06:21)
Yes, OK. And what about It's probably just top of bank in the area that I was talking about that is between Elliot Street and Adam Street.
Speaker 6 (01:06:22–01:06:52)
And in that- Yeah, that's way up above the retain wall. There's not gonna be anything wet up there. You know, that retain wall must be 15 or 20 feet high. So imagine if you're behind this steel fence on Elliot Street and trying to maintain that.
There's just no way to get at it. What you need is a train car that has a big crane on it. where you can strap a guy in with his chainsaw. It's really a difficult spot.
Speaker 1 (01:06:55–01:07:23)
Got you. All right. Do you want to, because we don't have this, if Calvin can get us the data and we can do a site walk in this area on the 20th, which we're already scheduled for, And you're talking, are you talking about all the way up towards the, are you talking about the area around Cabin Street?
Speaker 6 (01:07:25–01:07:36)
Yeah, everything I mentioned is between Cabin Street and Central Ave. So if we walked that portion, we could see everything I mentioned.
Speaker 1 (01:07:36–01:07:52)
All right, and can we walk that? I think we can, but, because I know we've done it before. without intruding onto the right-of-way? What I'm trying to do is stay out of the rail line right-of-way.
Speaker 6 (01:07:52–01:08:00)
Yeah, I would say if we were on the right-of-way, we couldn't see the wetlands I'm talking about because we would be separated by the fence.
Speaker 1 (01:08:01–01:08:08)
Okay, so if we started at Central Avenue and walked towards Valley Road or Capon Street?
Speaker 6 (01:08:09–01:08:15)
Yeah, either way, or cape in the other way, but always on the north side of the tracks.
Speaker 1 (01:08:22–01:08:53)
Okay, and you can do that without getting into the right-of-way. I think you can, because we've done it before. Yes. But you have to bushwhack.
All right. And Amanda, are those flags visible? I don't know if you've got the map in front of you. I happen to be looking at it right now.
So I have an advantage over you. But I'm looking at essentially the area where Tom is indicated between Central Avenue and Capen Street. Are those flags there visible for us?
Speaker 11 (01:08:54–01:09:03)
I have not been out there. Calvin, have you? Were you able to see the flags? You said you had been out there for some of the delineations?
Speaker 9 (01:09:03–01:09:18)
Yes. And yes, you can see the flags if they're still there, if they haven't been picked off by birds and whatnot. When were they placed? They would have been done last summer.
OK.
Speaker 1 (01:09:20–01:09:23)
Yeah, I assume they're still there.
Speaker 2 (01:09:23–01:09:28)
Next question, Amanda or Calvin, what color are they? What colors did you use?
Speaker 11 (01:09:30–01:09:32)
Blue is for bank and pink is for weapons.
Speaker 2 (01:09:33–01:09:34)
Thank you.
Speaker 9 (01:09:36–01:09:58)
And I would also say that given the maps that they've done, and those are all GPS locations, I think it's, I was out there when they did some of the marking on those wetlands. And yes, it was done from outside the fence. And it's really obvious where the wetlands are there. It's not a, it's not a, it's not hard.
Speaker 2 (01:10:00–01:10:04)
Were they doing GPS locations concurrently with the flagging?
Speaker 9 (01:10:04–01:10:05)
Yes.
Speaker 2 (01:10:06–01:10:06)
Good. Thank you.
Speaker 1 (01:10:09–01:10:17)
We've got these overhead pictures, but are there plans for us that we could see with the numbers, so we can match the numbers to where we are?
Speaker 11 (01:10:18–01:10:20)
Like wetland flag numbers?
Speaker 1 (01:10:21–01:10:29)
Yes. Yes, but plans that are located on the plans, because all the commissions that are provided are overhead photographs.
Speaker 11 (01:10:30–01:10:41)
Yeah, that's the typical for the VMP process. That's what I've usually seen it done. But we do have all that data, and we should be able to put it onto plan so that you can see the labels.
Speaker 1 (01:10:42–01:10:45)
All right, so we know where we are. We can say, oh, yeah, here's flag 14.
Speaker 11 (01:10:45–01:10:46)
Yes.
Speaker 1 (01:10:46–01:10:47)
Could you do that by the 20th?
Speaker 11 (01:10:48–01:10:50)
Yeah, I think we could do that.
Speaker 1 (01:10:51–01:10:59)
All right, commission members willing to just add this on to our site visit? Tom? Yes. Tom, Arthur?
Speaker 6 (01:10:59–01:11:07)
Yes. Yes, I appreciate your comment, John, that we always look at them.
Speaker 1 (01:11:07–01:11:09)
We do.
Speaker 4 (01:11:09–01:11:39)
Arthur, you good? Yes, and Mr. Chairman, I just wanted to suggest that we do an overlay or just check what we have here with the EPA work on the Long Island and Ponsett River with respect to the identification of wetlands that I shared with you about a month ago following the EPA's presentation with the Ponsett River Watershed Association.
Speaker 1 (01:11:41–01:11:55)
Yes. I mean, I don't know if they flagged. I didn't look at it in detail. I know exactly what you're talking about, but I don't know whether or not these areas were the same as they were flagged by the BSC group.
Speaker 4 (01:11:56–01:12:01)
That's why I was suggesting we might revisit it. Perfect. All right. That's a good question.
Speaker 3 (01:12:02–01:12:08)
John, on the 20th, when do you think we might be done? I've got something in the afternoon.
Speaker 1 (01:12:10–01:12:30)
Oh, I don't think we'll be too long a turn in this pond. No, I agree. That's going to be like 20, 25 minutes or so. So if we start at 8.30, we could be here by quarter after 9.
So I've been there before myself. So I think we can get through there in an hour.
Speaker 3 (01:12:31–01:12:36)
OK. All right. So we could be done by 11, you think, for sure?
Speaker 1 (01:12:36–01:13:05)
Yes. Yes. All right, is that good? So Amanda, can we meet you or our designee or Calvin, whoever?
And I'm just trying to think. At the Capon Street, I think we've parked here before. Remember when the EPA was removing the arsenic soils? We did a site walk in the same area.
And I think we all parked on Capon Street. Tom, do you remember that?
Speaker 6 (01:13:05–01:13:24)
Yes, you can do that. If you go over the track. Right. There's on-street parking on the right side, and there's a little spur road on that right that leads down to Aluminum Gate, DCR Gate.
There's a footpath. That's an easy way to get in from that end.
Speaker 1 (01:13:25–01:14:14)
Oh, good. That's good. So why don't we meet at the end of Capon Street at about 9.15 on Saturday morning, April 20th? Is that good with everybody?
Sounds like the commission members are okay. Calvin, Amanda? Alicia, we can figure that out on our end. Okay, all right, fair enough.
All right, and then you'll get us the other data, Calvin? Correct, right. Perfect, that's good. Then we'll continue the public meeting until the 20th.
All right, and that's a public meeting, so we can vote if appropriate. Okay, that works for me. All right, good. All right, anything else?
Any members of the public, about us or otherwise? Comments? Hearing none, Bowser, I see a hand raised.
Speaker 4 (01:14:15–01:14:17)
I'll take it down, I spoke.
Speaker 1 (01:14:17–01:14:23)
Okay, all right, good. All right, good, so we'll continue this until the 20th. Thanks all. All right, thank you.
Speaker 3 (01:14:24–01:14:24)
Thank you.
Speaker 1 (01:14:31–01:14:50)
Next on the agenda is Enforcement Order 24 Wentworth Farm. The applicant, through its representative, Attorney Ned Corcoran, has requested that this be continued until the May meeting. Arthur, I mean, sorry, Steve, what's the date in May?
Speaker 7 (01:14:52–01:14:57)
The date of the meeting is May 19th.
Speaker 4 (01:14:58–01:15:05)
May 16th or something like that. 14th? I have it, John. May 14th.
Speaker 2 (01:15:06–01:15:08)
I'm sorry. That's incorrect.
Speaker 4 (01:15:08–01:15:08)
May 14th.
Speaker 2 (01:15:09–01:15:15)
I'm reading on the 2023 list. May 14th.
Speaker 1 (01:15:18–01:18:27)
Is that what you got, Dartha? Yes. OK. Yes.
May 14th. Now, in the interim, just so that everybody knows, Hang on just a second. We are still in the process of finding, this is, there are two parts to this, number 24 that's being continued until May for any substantive discussion, but just procedurally, we're asking Deb Keller from Merrill Associates, Mary Hall from GCA, George Collins from, I don't know, Collins Engineering. Collins Engineering, right.
Okay, thanks. To do, you know, it's a request for a proposal. And in terms of a scope of work, the scope of work is as follows. To review, number one, to review the terms and conditions of our approved order of conditions for 24 Wentworth Farm with a focus on the septic system design.
Number two, to assess the efficacy of the septic system as a result of not following the approved design specifications. Number three, to assess the structural integrity of the current boulder wall, I didn't know what else to call it, as opposed to the approved concrete block wall, including but not limited to A, its capacity to withstand the lateral pressure from the septic system, including the leaching field. B, its capacity to prevent a blowout potentially resulting from a large rainfall, including the water coming from upstream on Wentworth Farm Road. C, its capacity to prevent erosion in between the non-contiguous boulders, as opposed to a concrete-slash-block wall in the approved design.
And four, to determine whether an as-built plan for a septic system can be completed without an inspection of the system prior to its being backfilled, and whether in this case the as-built plan submitted to the Board of Health was completed with or without an inspection of the system prior to it being backfilled. So that's the scope of work, and it's going out to those three engineering entities, the first of which Merrill was actually suggested by the homeowner. So that's just to get you up to speed. That's on the septic system wall component of it, on the surface area issues that we all saw when we were at the site inspection.
I can't even think of the date that we were there just a couple of weeks ago. And there was obvious signs of erosion and sedimentation going into the adjoining wetlands. Steve, I know you've gone up there and we've sort of approved administratively some immediate action to prevent further erosion and sedimentation. And Steve, you've probably got the latest update on that.
What have you seen and what's happened?
Speaker 2 (01:18:27–01:19:49)
Well, I saw something very strange I've never seen in any other site. There appears to be two cultecs on the lowest level adjacent to the residence. And they are supposed to be taking water from the roof and from a small drain that's in the driveway. And a linear drain in the driveway.
Well, at those locations in the backyard, it seems to be the Caltech facilities that are discharging water to the surface. Never seen it before. And then there's little streams or little gullies from those two Caltechs toward the wetlands on the surface of the ground that eventually be stabilized. So the question is whether those cultex are working as designed because they shouldn't be discharging to the surface at all.
The water should be going down below the cultex. So that's another question that we should probably add in the scope. It may be too late. Is that scope out already?
Speaker 1 (01:19:49–01:20:00)
No, they're in my hand. OK. I haven't hit the send button yet. OK.
So number five would be what? Whether or not the Caltex has a blender. Caltex.
Speaker 2 (01:20:01–01:20:08)
OK. Are functioning as designed. That's the simple question.
Speaker 4 (01:20:08–01:20:10)
Did you take a photo?
Speaker 2 (01:20:10–01:20:10)
Yes.
Speaker 4 (01:20:11–01:20:13)
Could you share that with us after the meeting, please?
Speaker 2 (01:20:14–01:20:14)
Sure.
Speaker 4 (01:20:15–01:20:19)
Thanks. And you have the photos that I took from up there.
Speaker 2 (01:20:19–01:20:20)
Yes.
Speaker 4 (01:20:21–01:20:23)
During the rain the day after our site work.
Speaker 2 (01:20:24–01:20:24)
Right.
Speaker 1 (01:20:27–01:21:14)
Okay. I'll add that as a fifth component of the scope of work and send those out in the morning. All right. Okay.
We'll have that data hopefully by the May 14th meeting. All right, thank you. Any other thoughts or questions on that that we continue? Seeing none, enforcement order at 20 Wentworth Farm, which is actually the next lot up and it's adjacent to the detention basin, which is an issue, I guess, for the homeowners association.
But do we have a presenter? Ah, there you are. Hi, good evening.
Speaker 13 (01:21:14–01:21:15)
Good evening.
Speaker 1 (01:21:16–01:21:45)
Can you tell us what's going on with the Homeowners Association? Because your enforcement order is related to sedimentation going into the basin, and the basin is clearly clogged and creating a problem. And it appears to me, to us, that that is a problem for the Homeowners Association. Jeff, have you made any progress in getting people together to talk to one another?
Speaker 13 (01:21:45–01:21:56)
No, I haven't been able to get anywhere with them. But I've been maintaining the drainage. So we haven't had a clog since.
Speaker 1 (01:21:59–01:22:02)
I'm sorry, you're maintaining the drainage, you mean in the detention basin?
Speaker 13 (01:22:03–01:22:13)
Yeah, anytime there's debris, I'm just clearing it out. I'm there daily, most of the time. So anytime there's debris, I'm just making sure that it doesn't get clogged.
Speaker 1 (01:22:14–01:22:14)
All right.
Speaker 6 (01:22:14–01:22:17)
Do you have to wait to do that?
Speaker 13 (01:22:17–01:22:19)
What's that?
Speaker 6 (01:22:19–01:22:20)
Do you have to wait to do that?
Speaker 13 (01:22:21–01:22:28)
No, I have a nice piece of three-quarter inch strapping. I just kind of clean it off from the edge.
Speaker 2 (01:22:30–01:22:40)
And I was there as recently as yesterday, and it was looking very good. The basin was looking clear. The water in the basin was clear. And I was surprised at that.
Speaker 13 (01:22:41–01:23:14)
Yeah, something definitely needs to be done to redo it. That's certainly obvious, but it's working the way as intended now. I don't know what the solution is for that cap. I think it's something similar to what was going on in the What you guys are talking about whether the lake was like rising too high because of the rebar, you know, it's just clogs up similar situation.
Speaker 2 (01:23:15–01:23:23)
Right. Yeah, the debris will clog the beehive, you know, that's why it has to be maintained continually. Yeah.
Speaker 1 (01:23:24–01:23:33)
Between you and Dr. Strom, I was hoping that you'd be able to put enough pressure on your neighbors.
Speaker 13 (01:23:34–01:23:39)
My wife is the one that should be handling that.
Speaker 14 (01:23:39–01:24:00)
We all haven't been in communication thus far on the homeowners association, just because people are in varying degrees of moved in. So I can reach out to Todd Hamilton and his representation to get contact information for everybody. I don't have that at this point.
Speaker 1 (01:24:02–01:24:11)
Yeah, we have- I'm just wondering what we should be, well, let me back up to go right to your property. It appears if the water is clean in the basin, that your erosion controls are working.
Speaker 2 (01:24:13–01:24:13)
Yeah.
Speaker 1 (01:24:14–01:24:14)
Is that correct, Steve?
Speaker 2 (01:24:15–01:24:16)
Yes, absolutely.
Speaker 1 (01:24:17–01:24:31)
Okay, good. Well, that's good news. So I'm just trying to figure out a way to put some pressure on the Home Owners Association, because inertia will sometimes define action, and nothing's gonna happen.
Speaker 13 (01:24:31–01:24:39)
And so I'm not sure how- I'm surprised that the 24 lot hasn't gotten them going, to be honest with you.
Speaker 1 (01:24:39–01:24:43)
Well, me too, because there's a lot of erosion that's coming from the road.
Speaker 13 (01:24:43–01:25:00)
Right. Yeah, because I think they have a case of some of the wetland problems they're having seems like it might be a homeowners association issue from that erosion. Yes. We'll see where that goes.
Speaker 1 (01:25:01–01:25:19)
All right, well, and I can certainly reach out to Ned Cochran, who's the attorney for Dr. Strom. And I don't mean to be a blight and leave his wife off in mentioning that, but I don't know her last name, if she uses the same or a different name. Do you know?
Speaker 14 (01:25:20–01:25:21)
No, we haven't met them.
Speaker 1 (01:25:22–01:26:06)
All right, well, there's got to be a way that we can kind of motivate some action. And I think eventually, we've got enough data in front of us, including Arthur's pictures. I've got pictures, Tom, you've got pictures. It's a mess on his property.
So I suppose we could eventually issue an enforcement order to clean the basin. But maybe the first step would be to simply write a letter to all the residents and say, it's your obligation under the homeowners agreement that that be maintained. Please come into our meeting and tell us what you're gonna do. Like an invitation as opposed to an enforcement order.
Speaker 4 (01:26:06–01:26:29)
I think that's only fair, John, if I may comment. That way we help to serve as a catalyst for getting the homeowners association on top of the situation, rather than putting the responsibility on one of the homeowners in the entire development area. Maybe we can talk to Todd about this as well.
Speaker 13 (01:26:30–01:26:37)
Yeah, it sounds like a good starting point to get everyone together. Then I'm sure the group seems capable of figuring it out.
Speaker 1 (01:26:38–01:26:59)
OK, well, at least it seems from your perspective that you've stopped the erosion of the street in the basin. So that's good news. So why don't we continue this until May 9th? I'm sorry, May 14th.
And then at the same time, reach out to all parties and see if we can get a letter out and everybody gather and join. Yes.
Speaker 2 (01:27:00–01:27:19)
Also, they had a request to be able to start some work on the waterline. Is that correct, Jeff? Yes. Once they have the erosion controls in, and they're in and working just fine, so I think it's time to allow that activity to happen.
Speaker 1 (01:27:20–01:28:50)
I agree. Does everybody know what that reference is to? Because when the erosion was still continuing off the property, there was a plan to bring in a trench digger to put in a water line, and we stopped that. So we added a cease and desist until the erosion controls were up and running.
They're up and running. They seem to be effective. So from an administrative point of view, I recommend that we remove that cease and desist and let you get back into operation. Is there any, I don't think we, well maybe we do need a vote for that.
So I would move that we remove the cease and desist order on the basis that the erosion controls are working and allow the trenching to go forward and to complete the house project. Somebody second that? I'll second. Thanks Arthur.
Any discussion? Is there anybody, you know, a neighbor that wants to ask a question or anything? I don't see any, so I'll go through a roll call vote. Arthur, how do you vote?
Yes. Ingrid, how do you vote? Fine. Tom Palmer, I can't see you.
Can you hear me? Uh-oh. Tom. I'm back, Tom.
Hello, Tom Palmer. You may have stepped away, so I'll vote yay. So you've got the votes, and I don't expect when Tom comes back that he'll have an issue with this. So you're good to go.
Okay, great.
Speaker 14 (01:28:50–01:29:01)
Thank you. And just to clarify, if I reach out to all the people in the Homeowners Association, should I suggest that they appoint a representative to attend your next meeting?
Speaker 1 (01:29:01–01:29:12)
That makes sense because otherwise it's like trying to herd cats and trying to get everybody there at the same time. That's probably not going to work. I think a representative would be an appropriate approach.
Speaker 14 (01:29:12–01:29:21)
Okay. Then you will give us guidance on what the appropriate solution is to remedy the situation at that meeting?
Speaker 1 (01:29:21–01:29:54)
The simple answer is yes, but somewhere I believe that there is an operations manual that would have been, I believe, part of the original order of conditions that we issued, not for the houses. Because there were two phases. One was when the infrastructure went in, the utilities and the roadway. That had an order of conditions, and that included the installation of the detention base.
And I think there is an O&M plan, the operation and maintenance plan, that goes along with that.
Speaker 13 (01:29:54–01:29:59)
Is that something like, so we just should ask Todd what he did originally and just mimic? Yes.
Speaker 1 (01:30:00–01:30:25)
And if you don't have any luck there, we should have it. So, Philip, could you just check on that border conditions? It would be the Wentworth farm, not a single lot, but rather the whole street. Oh, I think I've seen the file for the whole lot, so I'll look at it.
Perfect. All right. So Jeff, if you can stay in touch with Philip at the DPW and, or if you can get it from Todd, that'd be great.
Speaker 13 (01:30:25–01:30:25)
Okay.
Speaker 1 (01:30:26–01:30:40)
All right. But that's the key to what the remedy is. If you look at that, cause I'm certain it has some kind of, you know, clean it out, you know, keep it free and clear so it doesn't get clogged up component to it.
Speaker 2 (01:30:40–01:30:44)
And look at it every couple of months or whatever, whatever it's necessary.
Speaker 1 (01:30:45–01:30:56)
Very good. All right, good. All right, thanks all. We'll see you on the 14th.
Take care. Thank you. That takes us to additional business. Anything?
Speaker 2 (01:31:00–01:31:04)
You wanted to talk about the ice house, I think, John.
Speaker 1 (01:31:05–01:31:25)
Yes. I just want to make sure that it's working. I mean, I thought that the additional erosion controls looked pretty good. But that's just my untutored eye, and I don't know whether or not…
I know Hans sees it pretty regularly, because he walks his dog in that area.
Speaker 2 (01:31:26–01:31:42)
And I stopped by last week sometime. It was working great. They built a huge hole, and all the volume of the rain is in the huge hole, rather than flowing out to the north and northwest.
Speaker 1 (01:31:44–01:31:54)
That's good news. And that huge hole that you're describing is what, south of what I call the border where they put the crushed stone?
Speaker 2 (01:31:54–01:32:02)
Yes, exactly. And it's parallel to the fence line at the rear of the property. So it would be parallel to Pine Tree Brook.
Speaker 1 (01:32:03–01:32:06)
Got it. OK. So it's doing what it's supposed to do.
Speaker 2 (01:32:06–01:32:08)
Yes, it sure is. And I was very happy to see it.
Speaker 1 (01:32:09–01:36:12)
OK. Anything else on Ice House? The only other additional business everybody should be aware of is that yesterday, Stephen and Philip and I met with Peter Mello on the Highland Avenue project, and that's the Highland Street project, rather. That's the memory care facility.
That's been appealed, both the DEP and to the Superior Court, Norfolk Superior Court, which is the correct mechanism for appealing a bylaw order. And we issued both. We did one order for the DEP, the Wilderness Protection Act. We did another for the town bylaw.
So it was appropriate that we meet. The issue that came up is whether or not there will be a stay in those proceedings. And right now, we don't know, but there may be a stay. The reason for the stay of the judicial proceedings is that the same project is before the planning board tonight.
That's one of the reasons why Ned could not be here because he's before the planning board on the memory care facility. As we all know, they came back to us last fall and said there have been some revisions imposed by the planning board, but those revisions seem to be pretty good to us because they reduced the footprint, They pulled back, and that allowed them to pull the driveway away from the 25-foot non-disturbance zone. Because you all recall that when we issued the order of conditions, we had to have a separate vote because there was an intrusion into the 25-foot. And I think they lost about 900, or we lost from the non-disturbance zone about 900 square feet.
But they made up for that. They created an area of about 4,400 square feet of replication land or remedial land, so to speak. But now they've pulled it back, so that's a good revision. There are some other things I talked to Meredith Hall from the planning board.
We just want to make sure we stay coordinated. There may be some other revisions and the issue, and I don't have a good answer for it, I thought they would have to come back to us automatically if it was a revised plan. But it would be, I think, a minor revision if they're improving the wetlands protection by reducing the footprint of the building and pulling any intrusion of the driveway out of the 25 foot. And just as a footnote, you remember that the intrusion into the 25-foot zone was at the request of the fire chief.
We needed additional turning room for the fire trucks. That's why we did it. But now that's not necessary, so that's all good news from the environmental side. There may be some other revisions, I'm not sure.
So because it's already before DEP, the planning board plans may go directly to DEP before they come to us? I don't know the answer to that question. But at some point, we're going to see revised plans. And that's all the things that I've mentioned are the reason that all the attorneys may want to ask the court to stay the proceedings and ask the DEP to stay the proceedings until they have the final revised plan approved by the planning board.
That's the update. All right, I think they're gonna close the hearing tonight, which means they have, I don't know, 30 days, 45 days, I'm not sure. They have to issue an opinion within X number of days from the date that the hearing is closed. So if they close it tonight, I expect to see some kind of a plan within the next 30 days.
All right, any other thoughts or questions on that? And I don't have any other additional business, I don't think.
Speaker 4 (01:36:13–01:37:51)
Anybody? Arthur? Mr. Chairman, just one topic of possible interest.
As you may recall, I'm the commission's appointee to the Climate Action Planning Committee. And some committee on which I'm serving is focused on waste management, The environmental coordinator, Jack Turner, for the town, and I, and Chase Berkeley have had a meeting on this. One of the things that has surfaced, mostly through anecdotal information, is how some people manage some of the waste through the stormwater drain system. And there are communities that have markers now at critical locations for stormwater drains in the communities.
I think the city of Boston is one. I've seen a couple in different locations over by Fenway Park, et cetera. Now you know where I live. A good place.
And I was thinking about doing a little bit of homework on this between the two committees, but I didn't want to start doing so without first touching bases with the Conservation Commission. It may lead to something that we might be able to do through future CPC funding or in conjunction with other parties.
Speaker 3 (01:37:52–01:37:53)
Are these the bronze plaques?
Speaker 4 (01:37:54–01:38:07)
Yes, that you see in the bronze that are on the sidewalk or on the street. Usually at major intersections and things of that nature. Yes, exactly. They'll have a fissure on it.
Speaker 3 (01:38:08–01:38:11)
Yep, that's exactly what I remember.
Speaker 2 (01:38:11–01:38:14)
Drains to a river or ocean or whatever, yes.
Speaker 3 (01:38:14–01:38:17)
Yeah, exactly.
Speaker 1 (01:38:18–01:38:23)
But what's the purpose of it? Is it public education? Yes, it reminds people.
Speaker 3 (01:38:23–01:38:26)
And it's a deterrent. It reminds people.
Speaker 1 (01:38:26–01:38:28)
To what?
Speaker 3 (01:38:28–01:38:34)
To dumping toxic, corrosive materials down the storm drain.
Speaker 2 (01:38:34–01:38:42)
Exactly. Oil, you know, changing oil of vehicles and things like that, which I used to do when I was a kid.
Speaker 1 (01:38:45–01:38:49)
It's a statute of limitations run, Steve. I hope so.
Speaker 3 (01:38:49–01:38:53)
All right.
Speaker 1 (01:38:53–01:38:56)
No, that's a great idea, Arthur. I think that's the one.
Speaker 3 (01:38:56–01:39:14)
A couple of municipalities have those either plaques or or spray painted. I think the plaques are nicer and no doubt more expensive, but I think they capture one's attention more and they'll last forever.
Speaker 2 (01:39:15–01:39:31)
And I've seen the new words on greats as well, the stormwater greats themselves. They've been affixed to the greats. So I think it's a good idea, very good idea. That's good.
Speaker 3 (01:39:31–01:39:34)
Yeah. I think it's a great idea, Arthur.
Speaker 1 (01:39:34–01:39:39)
And are they bronze in Boston? I think they are.
Speaker 4 (01:39:40–01:39:50)
Yeah. I think for the coloration, they may have been bronze when they were cast. Wow. Yes.
Adorable. They're meant to last a lifetime. That's pretty good.
Speaker 1 (01:39:51–01:39:53)
Yeah. Brooklyn is probably gold, right?
Speaker 3 (01:39:55–01:40:02)
Other cities have got sort of spray-painted stencils, but then, of course, they get eroded and don't last very long.
Speaker 2 (01:40:03–01:40:04)
Right.
Speaker 4 (01:40:04–01:40:25)
Some of the solvents that are being disposed in the culverts, you can get caught on those as well. That's true. Unfortunately. I'm trying to get a couple of photographs and so on down the line and do a little bit of homework on this and bring it back to the commission if that's acceptable.
Acceptable. It's perfect. That's great. Thank you.
Speaker 1 (01:40:27–01:40:37)
All right, anything else? I think we're good. We lost Tom, so how about a motion to adjourn? I move.
Anybody second?
Speaker 7 (01:40:38–01:40:39)
Second.
Speaker 1 (01:40:39–01:40:45)
Thanks, Ingrid. All in favor? Thanks, all. Good night.
Thank you for having me. Good night, all.
Speaker 7 (01:40:45–01:40:46)
Good night. Thank you.