Board: Board of Appeals

Date: 2026-06-18


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:19–00:45)

I will call the hearing into session on the application number 2908 for a sign at special permit and a variance for signage at 675 Blue Hill Avenue, the Gardner School. Tonight on the panel, we have myself as chair, Kathleen O'Donnell, and gentlemen, want to introduce yourselves?

Speaker 2 (00:46–00:49)

Michael Brown. Chris Harder.

Speaker 1 (00:49–03:21)

Excellent. And we have our clerk, Bill Donnelly. And so we have on the joining us today, we have Heather Duco from the Sign Company and Chris Fessenden from the Gardner School. Is that right about that?

So, just to briefly point out, we have a request for a special permit under our new sign by law, because we have a new sign that's in that accessory to a non residential use in a residential neighborhood. So we have this new Gardner school, which has been approved by the planning board with site plan approval. But they, unfortunately, under our bylaw, they need to have a special permit for the signs. And they also need a variance.

They've asked for a variance for the setback on the so-called monument sign, which is the sign sort of on the highway, on Blueville Avenue that would introduce you to the school site. And that is proposed to be 6.2 feet instead of 15 feet from the side of the roadway. As part of the file, we have the application that was filed on May 21st of 2026. And we have also attached to that, we have the site plan approval that was done by the planning board dated March 31st of 2025.

We have the site development plan dated August 28 of 2024. We have staff findings done by our planning staff. We have objections, comment letters from a neighbor named Tim Kiernan. In addition to that, we have the letter to the board from the signed review committee dated June 5th, 2026.

And we have a response from Chris, I believe, to the staff comments made by our planning department that were dated June 16th, 2026. And I believe that that's the contents of our materials for this application. Let me, anybody know if I've missed anything, but I think that's it. And so who would like to speak 1st?

I'll start. Okay.

Speaker 3 (03:21–05:45)

Okay. For the record, my name is Heather 27 old meeting house road and Auburn mass. I'm a sign permit consultant that works with National Sign, who's the sign installer for the school. And we are before the board tonight, as the chair pointed out, for a special permit for the use for the signs, because it's a business use in a residential area, and then a variance for the setback of the sign.

So I could just kind of generally go through the sign proposal description that was presented to sign review. and recommended for approval. It's simply a wall sign on the front elevation, a logo and lettering, the Gardner School. They're painted letters, non-illuminated.

The Gardner School lettering is approximately 29.67 square foot with a 16 inch letter height. And the logo is about seven square foot, 32 inch height. The diameter is about seven square feet. And then the monument sign is proposed as externally illuminated, 76 inches wide by 77 inches tall.

It does have the logo on it. Acrylic mount, pin mounted letters that read the Gardner school and preschool serving ages six weeks to five years. It's proposed on a brick base and the brick matches the components of the building. And we are asking for the setback to be 6.2 foot.

I believe, and Chris can probably have a little more information on this, but there is some site topography that does not allow the sign to meet the 15 foot setback. So that's why it's placed where it is. And that's really the, the, the, correct of the sign proposal. It's a very simple, we think simple, clear, concise, not overdone.

It's in keeping with the building architecture and complements the building in the area.

Speaker 1 (05:50–05:57)

Great. Chris or Michael, do you have any questions for Heather on the sign itself?

Speaker 2 (06:00–06:15)

I don't have any questions. I haven't seen a photo of it, but I did pull up the, I know there are locations nearby, for example, one in Dedham, and I assume the sign is going to look substantially similar to that sign.

Speaker 4 (06:18–06:37)

Yeah, that actually might be. For record, Chris fastened in with the Gardner school. That might be the exact match denim is the other school that had the natural stone veneer in lieu of the brick finish. So it should actually be identical to that.

Thank you.

Speaker 1 (06:37–06:42)

Well, that's good to know. Actually, I drive by that every week to go to rehearsal. So, yeah, I've seen it.

Speaker 5 (06:43–06:56)

I. I have a question in terms of the, the, the setback issue, just because that that involves the variance and you mentioned the topography. What exactly is the topography issue?

Speaker 3 (06:56–06:59)

I think Chris can address that.

Speaker 4 (07:00–07:46)

Yeah, so the issue is actually. Topography, but it's driven by drainage. So. Immediately to the plan left of the monument sign location is a large.

culvert. So there is a sunken inlet and then a culvert to allow water to pass underneath our access point. I believe it's sunken down three or four feet, heavily rip rap for erosion protection. One of the items that was discussed in the site plan process with neighbors and planning board was issues and concerns with drainage.

So what we've done is sort of oversized this system in hopes of improving drainage, both at our site and downstream. So, all the water of our site, we lost them.

Speaker 1 (07:49–08:02)

Okay, awesome. Well, I'm sure he'll send back on, but but that's that's helpful for us to have established the reasons for why you need the variance. Um.

Speaker 4 (08:04–08:44)

Yeah, if if you have the site plan, even the site line diagram with the line, there's a. A rock hatch in a square box indicating kind of that's that drainage graded low area that. kind of forcing our hand on the dimension. Our preference, that sightline diagram was developed because our preference would be to set it back a little bit further.

Parents exiting, leaving, we need to be assured that they can see out the driveway. So we're doing the best we can to shift it as close to those rocks as we can, knowing that our parents are going to need to see out that driveway, hence the reason for the sightline diagram in the first place.

Speaker 1 (08:47–09:12)

Um, Chris says he's having connection issues. So I'm wondering, um, if I turn on my, um, and on your phone, um, it's trying.

Speaker 6 (09:15–09:19)

Hmm. We'll look for him to let him back in.

Speaker 7 (09:20–09:20)

Yeah.

Speaker 1 (09:35–09:36)

Well, that's unfortunate.

Speaker 7 (09:58–10:15)

Well.

Speaker 1 (10:18–10:23)

This will take an informal break while we wait to see whether we can get Chris back.

Speaker 6 (10:24–10:26)

I think I see someone.

Speaker 1 (10:28–10:36)

Is that you Chris? He's muted. Can you hear me? Yes.

Speaker 8 (10:42–10:43)

Back on mute though.

Speaker 1 (10:44–10:45)

But you backed on mute.

Speaker 8 (10:48–10:54)

Okay. How about now? Great. Okay.

Geez. All right. I'm really sorry about that folks.

Speaker 1 (10:55–11:03)

Um, no, I'm glad you called in because otherwise we don't have a quorum. Thank you for calling back.

Speaker 4 (11:03–11:05)

Yes, I was thinking. Oh, my God.

Speaker 1 (11:05–11:15)

Um, so Chris was filling us in on the reason for the, the reason for the location, which requires the variance. And did you hear that part?

Speaker 8 (11:17–11:19)

That's when I cut out, he was just answering my question.

Speaker 1 (11:20–11:22)

Yeah. So Chris, you want to repeat that answer?

Speaker 4 (11:22–12:15)

Yeah, certainly. Um, So, the main driving factor is drainage. There's a large depressed area, 3, 4 feet depressed with an inlet at the bottom that drains to a culvert. That's directing about 3 or 4 acres worth of runoff from kind of.

What would it be north kind of the high side of our site, right? We have a 6 acre site where we've only developed a couple acres. So there's a lot of runoff coming from above us. In our planning process, neighbors had shown up with pictures of some poorly drained areas, some flooding during large events.

So it was a focus to make sure that these things were adequately sized. And so we're just extra cautious with that area. And that rock is kind of pushing that sign a little closer to the right of way. I had mentioned that it's also our preference for that sign to be further back when it can be just for sightline visibility, which is why that sightline diagram had been prepared in the 1st place just to confirm.

Speaker 1 (12:18–12:48)

And I will point out that those materials that Chris has referenced, the site line plan and everything is on the record. It's available to anybody who cares on our website, on the town website. So if you go under the Board of Appeals, you see active appeals, all of the information that I listed in the beginning and the plan that Chris just mentioned are on the website. For everybody's help any other questions.

Speaker 2 (12:49–13:15)

With respect to that, I mean, I have. Questions just because I'm kind of a lay person and unable to read the site plan maybe as well as you can Chris, but I'm looking at it now and I see where the sign is. Can you explain what that, I mean, it looks like a pile of rocks to the left of the sign. I assume that's what it is, but what does it look like in real life?

Speaker 4 (13:16–13:26)

Yeah. I was going to say I could pull up a picture, but I don't think we quite have that area complete yet today. Is it okay if I share my screen?

Speaker 1 (13:26–13:27)

Yeah, that'd be great.

Speaker 4 (13:28–14:21)

Let's see here. Okay, so you're seeing the PDF. Okay, so here's the sign is not shown on this plan, but you can see here. We have a large swale.

That's what this area is here collecting water at the top of the retaining wall. They've got about 3 to 3 feet of depressed area where that water will collect. It'll drain through an inlet run through this pipe and into a swale that then runs down the blue Hill have adjacent to the right of way all the way through. And then that sign has landed somewhere in this rough vicinity.

So, it's sort of a gently sloped kind of detention pond area that you would see in other projects and areas.

Speaker 2 (14:22–14:32)

And is it in just for the record, are you unable to put the sign in the drainage area or is it just aesthetically unpleasing or what's the. It's the issue.

Speaker 4 (14:34–14:55)

It would just be, it's, it's this area is ripped wrapped with average diameter, 6 inch rock. It's a slope of of 15 to 25%. Just placing the signage there would would pose a challenge even in terms of foundations exposed. You know, facade and things like that much easier to place it on a 2 or 3% slope.

Speaker 8 (15:01–15:23)

Okay. Thanks. Can I just follow up on that just because, just because of the, and the reason I'm asking this is because of the, the way the statute is written on variances. When you say much easier, I mean, can you describe, is it, would it be just much more expensive?

Is it doable? Would it take a lot more time? Can you just describe those details a little bit more?

Speaker 4 (15:25–18:14)

I can make the case, I don't want to say it's not doable because everything is doable right that in order to do it, you'd be looking at significantly revising. Drainage plans that could trickle into to a number of revisions going all the way back to planning board and site plan changes, right? There's. Guard, there's guardrails, there's this drainage system.

There's other storm inlets training, catching other portions of the site. It's it's 1 of those where if I had to get the sign where it needs to be, I may be may need to go somewhere else for a variance on a different element. It's just a tight area. You can see we actually had the monument sign in a different location previously.

And it just it's hard to find the spot where 1, we're, we're 15 feet back, which I think is the standard. We. Now we're up to 6 feet and I just can't get us any any better than that 6 foot number really without driving us into. Possible variances in other areas, whether that's pipe depth, whether that's cover over a pipe, kind of the same thing, you know, spacing from the right of way.

Those sorts of things. On that note, I don't think this is a 1st for you guys, you know, and sort of doing some of my research, looking over Tim's comments, trying to make sure that we weren't going too far above and beyond and what we're asking for. I did look at little sprouts and their sign. I believe their sign is set 5 feet back.

It's of a very similar size. The only difference would be theirs isn't illuminated from what I can tell. Just going down the road, there's a couple other Montessori's on Blue Hill Ave that also appear to have signage that may not be 15 feet from the property line either. From a precedent standpoint, I don't think what we're asking for is anything new.

To your point, I do think there's a hardship here where getting to that 15-foot mark or even the 50 percent, 7.5 feet, Isn't feasible in the areas where we can play something. What's the issue is putting it on the other side of the driveway. Same thing, you've got pipes, you've got slopes, we've got trees that have been protected. This doesn't show landscaping.

Landscaping was a big topic of conversation with planning board. I think we've got over 100 plantings, or I wanna say like 400 plantings, 100 trees and 300 shrubs that are getting planted for different things. You can see here, we're already gonna have to make some revisions in a couple of trees and shrubs, get them located elsewhere on the property just to make that sign fit in there. How deep down does the sign go into the ground?

Likely to frost, so probably 36 to 48 inches.

Speaker 2 (18:16–18:24)

And what is 36 to 48 inches under the ground that would prohibit you from either moving it or moving it across the driveway or whatever?

Speaker 4 (18:27–18:30)

In the proposed location?

Speaker 2 (18:30–18:33)

No, in the correct location.

Speaker 4 (18:36–18:43)

Uh, it would, it would simply be the storm. The storm system would be the easiest answer. That's in the below grade feature other than poor soils.

Speaker 2 (18:45–18:57)

Yeah, I just, I, what I mean is, like, are there pipes under the ground? I mean, why, why couldn't you. Like, what is it about the underground that is preventing you from keeping it 15 feet back?

Speaker 4 (18:59–19:05)

It's it's this pipe right here. If I were to draw you a dimension, I want to say that pipe is.

Speaker 2 (19:07–19:19)

12 to 15 feedback, but it could look, I'm just playing devil's advocate here, but I want to kind of understand this. So what about behind the pipe? Like, I'm not away from the road.

Speaker 4 (19:20–19:22)

Sure. You're saying set it at 25 feedback.

Speaker 2 (19:24–19:25)

Yeah, or whatever that measurement is.

Speaker 4 (19:26–19:30)

Oh, yeah. Yeah. At that point, just becomes a visibility thing.

Speaker 1 (19:31–19:37)

Is it, you know, we, at that point, you're wondering why you would have a sign if it's too far back and that's it.

Speaker 4 (19:37–20:00)

That's exactly right. Right. We have a, it's heavily lined with trees. There was a goal in doing so with with the site plan stages.

what we had put on the initial plan, again, is kind of a similar setback to what it was, and that's partially because of the visibility that you can't get from setting it 20 feet back, even 18 feet back.

Speaker 8 (20:04–20:33)

I'm sorry if I don't mean to interrupt anybody, I just can't see anybody, so forgive me. The, um, the, the letter from the, um, sign review committee said, if I remember correctly, that they have authority to allow for 50% of the distance. So I think seven and a half feet is what it was. Is there a reason that that wouldn't have been sufficient?

Would that run into the same problems?

Speaker 4 (20:35–20:48)

Yeah. So, it just pushes the foundation and the limit of the sign into a conflict with the storm underground storm and at grade storm structures and piping.

Speaker 2 (20:51–20:57)

Has there been any conversation about reducing the size of the sign or is it does it have to be that size?

Speaker 4 (21:00–21:29)

Um. There hasn't been conversation on it. We typically haven't needed to do it and haven't pursued that. It's a marketing thing from that standpoint, right?

It's a logo and branding thing. We like to keep our signage the same, familiar. You're a growing brand. You want everyone to notice and recognize it, especially in the Boston, Massachusetts market where we're opening schools for the first time.

Speaker 1 (21:39–23:03)

Great. As Chris had pointed out, for the members of the public, that the sign review committee does have the right to reduce that setback by 50%, the 15 feet setback. But this one, the request is 6.2, so that's why there's a variance request before this Board of Appeals. I would point out that the sign review committee has approved this sign.

I think that the issues that are before us, I said the signage on the building itself, I mean, those are not illuminated. The sign review committee was fine with those. The monument sign is a separate category. As I said, there were issues pointed out by a neighbor, about the illumination and whether the sign might be visible from his site and was hoping to have the lighting contained.

I would point out that the planning boards, the requirements are that these signs are compliant with dark sky. And then, so Heather, could you explain a little bit more about the illumination that's being provided on the monument sign?

Speaker 3 (23:04–23:30)

So it's a two, on each side of the sign, it's like a loose neck. It's an LED flood lighting, but it's attached to the top of the sign, and it directs down just to light on the sign face only. So there's no spillage on the outside of the sign. The flood lights are targeted right to the faces of the sign.

Speaker 2 (23:32–23:58)

I saw something in the papers about, I don't know if it was the planning board that required that the sign, and I don't know, do we have jurisdiction over the lighting, the timing of the lighting? But there was, did I read that there was a requirement that the lighting, the lights only be on an hour before business opens and an hour after business opens? Did I misread that?

Speaker 1 (23:58–25:05)

No, that's in the, there are two conditions in the site plan. Number four, which is on the lighting, which says exterior lighting is on one hour before opening and one hour after closing. But then there is a second condition on number nine on signage. And so the question gets to be sort of a hair splitting situation about whether the language on exterior lighting refers to the lighting on signs, as opposed to the lighting on the building or the lighting in the parking lot or lighting to help people get in and out of the building.

And so in a condition on the signage, they say it just has to comply with our sign bylaws. And it doesn't mention anything about the timing on the signs. So I think that Chris had responded to that comment with an email back to us. Didn't you, Chris, on June 16th?

Speaker 4 (25:06–26:46)

Yeah, so to explain that a little bit, Again, commercial daycare use in a residential neighborhood, residential zoning district, there was concerns about lighting. There always is. We typically would say we'll go, we need one hour before for when it's dark in the mornings, and we need one hour after when it's dark at night for teachers and staff and parents to leave. The question that came up was safety and security.

They asked us if we could go to a motion sensor that would trigger at 30% or 50% At all times, just in case someone wanted to pull into our parking lot for whatever reason. So, so that's what we're working on in doing. So we found it very difficult to get this motion sensor system to tie into the overall building system. A lot of inverters, a lot of different things to get lights to work on 1 timer, but then a motion and 30% dimmable at another.

So, the discussion with the sign review committee was. I understand your guys's concern, but my ask would be, can we just set some hours of timing on on the monuments time instead? It's just going to take out a complexity and a possible. Repair and maintenance nightmare going forward to try to get this monument sign to also follow a dimmable schedule.

Now, there's then the aspect of, okay, well, why not just one hour after and one hour before it'll be lit up for those dark periods and that's it. And that's where my email came into play of like, it's a wayfinding measure. It's a marketing measure as well. It identifies, hey, we're here, but it also says, hey, there's a driveway approaching, hey, traffic may be turning in and out.

So that's where I think some additional hours on the evening end would make sense.

Speaker 1 (26:47–26:51)

So what time does the school normally close?

Speaker 4 (26:51–27:05)

We're open, Challenging me 7 a.m. to 6 p.m. Monday through Friday. So the hours would be 6 a.m.

to 7 p.m. for, for lighting. Obviously.

Speaker 8 (27:07–27:22)

No, you're fine. Go ahead. I apologize. Um, is that the wayfinding issue is, um, I appreciate the marketing for the point of it, but the wayfinding issue is that.

Is that a safety issue?

Speaker 4 (27:26–27:55)

That's the approach and the reason for me mentioning it is, I had said marketing in the past, and Tim, who I've met, we've had conversations about this project in the past, had brought up that's not a strong enough argument. I wanted to share other reasons why we light our signage, especially on a road like this. I do think that there's an aspect of illuminating the sign that helps warn people of a commercial access they're approaching.

Speaker 2 (27:58–28:10)

But we're talking about after hours, right? I mean, nobody's going to be, there shouldn't be a safety issue an hour after the business closes, right?

Speaker 4 (28:12–28:14)

Uh, not on a regular basis.

Speaker 1 (28:18–28:18)

Yeah.

Speaker 2 (28:18–28:26)

And you don't have, it's no longer a commercial op. It's no longer a commercial operation after a certain hour of the day. Right.

Speaker 4 (28:29–28:53)

Again, not on a regular basis. That's not to say that we don't take a late trash pickup or an early trash pickup or a delivery for kitchens or oftentimes an open house when we're first opening on a Saturday, something like that. Right. Those are special circumstances.

But it's still doing, it's still acting that way.

Speaker 1 (28:57–29:14)

Yeah, I didn't see a recommendation at all from the sign review committee on the timing. I mean, other than it says that the applicant wishes to keep the monument sign illuminated from six to 10, but they don't, they didn't say whether they thought that was a good idea or a bad idea.

Speaker 8 (29:16–29:41)

Um, yeah, I, I wasn't, I mean, I don't know if this is a now conversation, but I, but, um, I wasn't even sure to what extent we were. This was a decision before us that this is already made. This goes back to the exterior lighting point you were making, Kathleen. I'm also, this also isn't really a variance issue, right?

The lighting, it's a…

Speaker 1 (29:41–31:22)

No, I think that's a special permit for lighting in a, you know, for signage in a non-residential use in a residential district. So, and I think in that situation, I mean, we're certainly relying heavily on the recommendations of the Sign Review Committee. And so, As I said, they point out that information that come in after they had their hearing to say, oh, well, there's a provision in the site plan approval that restricts the lights to no more than one hour prior and one hour after. But as I said, I think my reading of it is that applies to the exterior lighting, not necessarily the monument sign.

But I'm also sensitive to the fact that, you know, People have pointed out that other signs on Blue Hill Avenue do not have illuminated signs after dark and certainly not as late as 10 o'clock. So I think that we would approve, if we decide to approve it, we'd be giving the special permit for the signs, and then we would probably throw in or not some discussion about the timing on the lights. But as I said, that's separate from the variance on the distance from the road. I mean, setback from the highway and property line.

Speaker 4 (31:24–31:51)

Right. OK. This is Badger Montessori just down the road. This is their monument sign, not too far off the roadway.

They have an external light shooting up. I can't speak to the hours I've been turning on. So again, other signage on this same road, same use with that external illumination as well.

Speaker 1 (31:51–32:25)

Thank you. Is there any other information Heather and Chris that you'd like to provide the board and then if if not, we will probably just we'll discuss. In the, in the recommendations that I got the last time I went to a planning session was don't close the hearing then and then talk about it because the. the applicants might want to say something, and they can't if we've closed the hearing.

So the newest practice is that we will discuss this, and then you can still speak. If we close the hearing, you can't.

Speaker 3 (32:25–32:25)

Right.

Speaker 1 (32:26–33:25)

That's right. Yeah. If there were some conditions or something like that that come up in the course of the discussion, you would have the opportunity to weigh in on them, which you won't if we close the hearing. So gentlemen.

As I said, we have this letter from the sign bylaw review committee that has approved all the exterior signs, including the monument sign. And then, as I said, there's a question before us about whether we want to grant the variance for the location of the monument sign and secondly, approve the external signs with the lighting and the question on the timing. And whether we want to impose a restriction on the length of time that the light these lights could be on on these on these on this building. So, your thoughts gentlemen.

Speaker 2 (33:25–34:19)

I mean. On the lighting issue, I'm really just in favor of restricting it to one hour prior and one hour post. I just, I don't see there being a continuing need to have the lights on until 10 o'clock at night in a school for young children. And I'm also sensitive to the neighbor's concerns about having lights on At night, and I kind of agree with you, Kathleen, that there are the other schools and businesses on Blue Hill have don't have lights on that late at night.

And so, in keeping with, you know, in the interest of uniformity, those would be the restrictions I'd be in favor of. Are we discussing the variance issue as well?

Speaker 1 (34:20–34:20)

Yes.

Speaker 2 (34:22–35:32)

As far as the variance, I mean, the law on the variance is so strict. And I just don't see that this application meets the standards. I mean, there are topographical issues with this, but they're not topographical issues that are inherent with the land. They're inherent with the development project.

They were kind of created as part of this project. And I'm not convinced that that's what the variance standard Addresses and I'm also kind of mindful of the fact that I think there could be a sign that complies with the 15 foot setback. It just might be complicated to achieve that. And then I also don't think there's a substantial hardship for the same reason.

I mean, the hardship has to relate to the land and marketing, advertising, that kind of thing does not qualify as a substantial hardship. So I don't know. I mean, I wanted to go first because that's kind of where I'm coming out on this. I'll let you guys try to convince me otherwise, but that's kind of the way I'm feeling right now.

Speaker 8 (35:36–37:06)

Yeah, I'm happy to go unless you want to first, Kathleen. I agree on the lighting. I heard for the reasons that Michael stated. On the setback, I'm a little bit more conflicted, although I think that I come out this way, the same way that Michael does.

I take, I take the applicant and his word about the, I think the sense of hardship. The problem is that I feel with the papers, at least I'm a little bit at sea in terms of evaluating that. And I haven't really heard enough in this hearing to make me think that the standard under the statute has been met in this case. And it's given some of the, Possibilities here in particular, the fact that.

this might've been a little bit easier if this were seven and a half feet as opposed to 6.2 feet or whatever it is. And I'm not entirely sure that that's not in fact the possibility, for example. I guess I come out the same way that Michael does, not because I don't appreciate the difficulties that the applicant might be facing. It's just I haven't heard enough or seen enough that makes me think the standard's been met.

Speaker 1 (37:10–37:55)

Well, as I said, I've read the sign review bylaw a couple of times, and I'm sort of mindful of the fact that it's sort of a variance from the sign review. The sign bylaw doesn't seem to me to rise to the same level as if I was looking for a variance for the actual zoning. Um, and, um, so, so while I appreciate the fact that, you know, case law would support the fact that we need to find, you know, serious hardship and all that sort of stuff. I'm thinking that the slam bylaw is sort of a lighter standard, you know, for variances.

Um, that's just sort of my thing.

Speaker 8 (37:55–38:08)

Can I, can I, can I, can I, if you can indulge me, um, just cause I think that's important and because I wasn't able to find the, I am going off the statute. The lesser, what is, what exactly then is the standard that we're dealing with?

Speaker 1 (38:08–41:48)

Well, no, I mean, it's still the same language. But as I said, we're looking for a variance for the signed bylaw, which is part of the zoning code, yes. And so it should be he keeping the same standards as any other kind of we look a variance for a site setback for a building. But as I said, I'm sort of taking kind of a looser notion.

because it's just signs and not an actual structure or an actual use. And the other situation that I have is that I did spend time on the planning board. And so I'm also sensitive to the fact that this went through site plan review with the planning board, which when I was on it, was on occasion a pretty painful process. And so the…

If they have to go back to the planning board to get the site plan corrected to show the location of the sign in the stormwater or the landscaping, I think that's going to be a problem. uh you know um a pretty serious one and and you know because I because I know from the you know listening to the discussions of the current members of the planning board is that you know the landscaping is is a huge issue for them. And so if there are going to be, you know, sort of trees and things like that, that have to be bushes that have to be taken down and relocated because we won't give a variance on the, on the, on the setback. That's that's going to be a problem.

I can see the planning board saying, no, they won't let that happen. And so I'm sensitive to the conflict between our way of thinking and what the planning board has gotten on the site plan review decision. And I also, I mean, because of my background too, is that I'm not excited about the fact that there would be footings for a sign sitting in my stormwater system. I think that compromises functionality of the stormwater, having looked at those over the years, I don't think that's helpful.

But, you know, that's unfortunately, that's, you know, my experience. I mean, it's hard enough to make sure that you can get people that clean those drainage systems, let alone have a stick assigned 36 inches down into it. I don't think that's helpful. So as you can tell, I'm sort of in support for the grant of the variance for those reasons.

I'd like to protect the landscaping that was approved by the planning board, and I'd like to protect the stone water system that's been installed by the applicant. I agree on the lighting. I don't see any reason to have a light on that road at 10 o'clock at night. I don't know who you'd be marketing it to.

Somebody driving with a toddler in the backseat at 10 p.m. is going to suddenly go, oh yeah, I'm so glad the sign is up here. I just don't see the purpose of that. And as I said, I know there's many other signs on that road that are not lit that late.

I think that condition on the timing is fine to keep it with what the planning board has. But as I said, I don't think it's as simple a matter as one would hope to move the sign to a different location.

Speaker 2 (41:50–42:32)

Yeah, I mean, I'm I'm also sensitive to the same things Kathleen, you know, I want this business to be able to. Finish its development and get up and running and I know that this is probably 1 of the last. Things that they're looking for, I just, you know, the, the sign. Setback is in the bylaw and the law as it stands is kind of like, preventing me from taking that step and.

Without guidance or without more information, as Chris mentioned, it's hard for me to just kind of ignore the law on variances just for practical purposes, right? And so that's kind of what's sticking in my craw right now.

Speaker 8 (42:35–43:28)

I think, I mean, I want to be persuaded that we can read the standard differently given, Stephanie, what you were saying about this is a sign, it's not a structure. And so, you know, sort of getting me to the red zone. In terms of getting to the end zone, I wonder if we could actually get some more information about the hardship component of this. that could at least make me and maybe Michael feel more comfortable that we're actually meeting the standard.

So I think either way I think I could get there, but that might be helpful.

Speaker 2 (43:31–43:44)

So, I agree, and I would just add that, you know, maybe some kind of discussion of. Alternatives and why alternatives might not work or create additional hardships might be. Helpful part of that.

Speaker 1 (43:47–44:36)

So here's what I would propose rather than, I mean, we could take a vote and they would be denied and they'd be having to put their sign where they're supposed to put it. I mean, we could vote and leave it at the 15 foot requirement. My thought on it instead is to sort of ask the applicants whether they'd be considering a continuation of this hearing and to see if we can get better information from the sign review bylaw committee as to what they reviewed. I mean, did they just review the appearance of the sign?

Or did they go into the weeds about the location? I mean, was there information provided to them in more detail than has been given to us on the actual reason for the location? Would that, does that sound

Speaker 3 (44:38–44:54)

Can I just say one thing? Yes. We did have the discussion at sign review about the placement and there was no, Chris can maybe back me up on this, but there did not seem to be any opposition to the location at the 6-2.

Speaker 4 (44:56–45:25)

Yeah, I think that's shown that shown in their notes, right? Yeah, I think 7 and a half mark, they're comfortable, but we're asking for more than that. So, you guys, we had the conversation with the chair of the sign review committee on the stormwater. This is the issues that were presented there.

So, I think that they're. On board with the location, they're understanding why they're in support of it. It's now getting that extra foot in a couple inches from you guys that is putting us here.

Speaker 1 (45:25–46:17)

Yeah, well, so I think that that, um, it would be my recommendation to you would be to agree to a continuation continuance of this hearing. You know, or, I mean, or not, I mean, we could say, fine, we could take a, we could take a vote and discuss what we, what we would. You know, what we would consider, I mean, at this point, I think what you would be hearing from us and gentlemen, please jump in if I've gotten this wrong is that. We would approve the special permit for all the signage on the site.

We would limit the lighting to one hour before you open and one hour after you close. And that we would deny the variance for the setback. And that you'd have to figure out how to put it in at 15 feet.

Speaker 4 (46:18–46:20)

15 feet or seven and a half feet.

Speaker 1 (46:20–46:27)

Well, you go back to this and go back to the sign review committee and say, I'm going to do, we're going to do it at 7.2 and then you don't have to come to us.

Speaker 4 (46:28–46:42)

Right. I just was clarifying. Okay. Um, I, I'm comfortable asking for the continuation, but I'd like to ask a couple more questions on what you guys discussed so I can understand what I would be coming back with.

Speaker 1 (46:44–47:17)

Well, I think you've heard from us that, you know, the members of the board have, when you issue a variance, there are standards set up by law that require the finding of substantial hardship. And so I think that what, when gentlemen speak up, you know, but I think what we're hearing is that the case hasn't been made. that this is an impossible situation and that the only place that you can put this is 6.2 feet from the property line. Am I right about that, gentlemen?

Yes.

Speaker 4 (47:18–48:23)

If I may, the hardships I presented of landscaping planning board stormwater are substantial and significant. As you mentioned, you were on the planning board. I don't know if you know our background, but we had a completely different site plan, single story building on top of an 18 foot wall. We had to start all over after our 3rd planning board meeting.

We went through 7 planning board meetings with the planning board work through everything from the block on the, on the retaining wall, being a natural stone, the number of trees, what species of trees we went through it all. It was a process. So, in terms of of. Picking your battles and choosing your path to approvals.

Signage is the lesser of a lot of evils. And so that's where this is coming from. And I feel like you're starting to hear that. So Mr.

Brown, you mentioned other info. Are you just looking for us to present in a more formal way what the hardship is? Do you just need more documentation of that is what we've presented?

Speaker 2 (48:23–49:18)

Here's an example of what I'm talking. So we talked about the sign in debt. You want to put the exact same sign up there on this project. But that sign isn't going to work because it violates the setback.

Could you use a smaller sign? Could you use a different sign? A sign that's supported in a different way? A sign that's in a different location?

You know, any of those things I think would get me over the finish line, to use Chris's analogy. But we haven't heard that case, right? All we've heard is that you have a sign that your business likes to use on all its projects, and that's what you need to put here for some reason. I haven't heard anything stated that would, that actually goes to why this is a hardship, other than it's gonna make your project uh, longer to get approved.

And that's not what the law requires.

Speaker 4 (49:22–49:31)

Okay. Yeah. And an alternative sign size placement understood. That's, that's an alternative that wasn't evaluated.

Speaker 1 (49:36–50:11)

Yeah. I mean, as, as, you know, as, as the members have pointed out, um, you know, we're served, we're bound by the law. on variances and that we have to meet a certain standard to have those variances granted. And we've got some information, but probably not enough information.

And so if there's a way, as I said, to address the questions that Michael has raised and that Chris has raised, I think we'd get to a better understanding of whether or not there's an actual hardship here.

Speaker 4 (50:12–50:25)

Understood. Would you consider. And this is going back to sign signage versus zoning variances. Is signage visibility considered a hardship?

Speaker 1 (50:27–51:31)

Um. Well, I'm sorry, so I'm looking at the I'm looking at the bylaw and so it's so it says under variances assign requiring a dimensional variance from the zoning board of appeals shall be governed by chapter 48 section 10, which like everything else is and they those applications should be accompanied by a recommendation from the sign review committee, which they were. And so. You know, so if you had, if you'd gone to the, if you'd gone to the design review committee and said, you know, we can put this at seven something feet instead of 6.2, the design review committee has the right to do that.

So there's an option. I mean, that's another way around is that you, we continue this, you go back to the sign review committee and see if they can give you the 50% and put it and see if you can get it at seven, seven point, whatever that was instead of 6.2, 7.6.

Speaker 4 (51:32–52:01)

Mr. Brown's point. If, if I reduced my sign size, I can get there without the variance needed from you guys. So exactly.

It's obviously not. company's preference, brand, marketing's perspective, the best choice because it's not the sign that's most visible from the roadway. But if the way this board is going to view it, you know, we have to evaluate it that way.

Speaker 1 (52:02–52:39)

I mean, that, you know, that's as a practical matter. I mean, as that's would be my recommendation is that you avoid coming to us for you still get a special permit from us. And I think you've heard that we are perfect. We're, we're okay with giving a special permit with the hours that we had said 1 hour before and 1 hour after closing.

And then if you go back to the sign review committee, which would be simpler. And say, we just want to alter our application to ask for 7.2 feet or a smaller sign or something that doesn't require being at 6. And so at 7.6, 7.6, they'll give you that.

Speaker 4 (52:44–52:54)

Okay, so then. I, I like, I'd like to consider that. I want to think it through. I want to look at the size of what you need to talk to.

Speaker 1 (52:54–53:09)

You need to talk to Heather. You need to talk to your company and that that, but that would be, you know, we give you the continuance and you have time to talk about that. Okay, but because otherwise, if we say, no, you're not back here for 2 years, right?

Speaker 3 (53:09–53:10)

You can't come back.

Speaker 4 (53:10–53:19)

Right, right. And that's what I'm in my head thinking. I still need to come to you for the special permit of the 7 and a half feet, but it comes from as a recommendation.

Speaker 1 (53:19–54:07)

No, no, no, no, you don't have the planning. We just do a special permit that says, yes, you can have lighting and you can have signs on a building in a, on a commercial use in a non risk and a residential area. Right. So there's two requests.

One, the special permit for having signs of any kind on the building, on the sidewalk, on the parking lot. That's a special permit that you need from us. And I think you've heard, I think that I could speak for the other two of us that I think that's fine. We would do that.

But the variance part is the location of the monument sign. Everything else, is not the variance requirement.

Speaker 4 (54:08–54:14)

But it still comes back to you for the issuance of that special permit, which is why we need to continue. So I can come back.

Speaker 1 (54:14–54:21)

Well, I'm trying to think whether we could vote the special permit and continue the hearing on the variance.

Speaker 4 (54:23–54:27)

Could you approve it or deny the variance and approve the special permit?

Speaker 1 (54:28–54:35)

If we deny the variance, you can't come back to say we want something else.

Speaker 4 (54:35–54:36)

I don't think we want to do that.

Speaker 1 (54:38–54:40)

I don't think that's a good idea for you.

Speaker 4 (54:40–54:54)

All right. Well, then let's just continue it under all these circumstances. We'll find out how to get to 7 and a half feet work with signer view committee. Or, or, you know, hopefully, if.

Speaker 1 (54:55–55:10)

For some reason, or you can have your engineers or something, you have your engineer, you have your lawyer who was beating his brains out trying to get the site plan from the planning board. Any number of things that to come back and make a better case for the hardship.

Speaker 8 (55:11–56:21)

Yeah, understood. Yeah. Can I Kathleen, if you wouldn't mind, if I could, on that last point, I would say, yeah, what I would say on that, and this is going to echo, I think, um, both Kathleen's helpful, uh, synthesis, as well as the comments Michael was saying earlier. Um, if you can't get to, for whatever reason, the seven and a half feet that the, um, sign review committee would approve.

Um, then I think the coming back with more is really just to meet the threshold of the statute and more is. Uh, the way I would put it, um, and, and I, and I, and I mean this just in terms of what I think I need to evaluate as a member of this committee is, is more than just what you, what you are saying here without backup. I would need some, I would, I feel like I would need to review something. I would need to have some.

something I can look at, something I can read, something so I can actually understand the basis for the hardship argument that you're making. So if it comes to that point, just so you know sort of at least where I'm coming from and where I think Michael's also coming from.

Speaker 4 (56:22–56:35)

Yes, yeah, if we get to that point, I can certainly I'll go as far as looking how we can move storm pipes and identifying what the. Planning board amendment process would be to show the significance of those locations.

Speaker 1 (56:41–57:20)

Any further comments gentlemen. Nope, so I would entertain. Yeah, I would entertain a motion for a continuance of this hearing, um, to a date, to be determined by looking at, uh, respective calendars of the participants on this panel, um, and to give, um, Chris in time to, you know, talk to the signing review committee. If he so chooses all in favor of that.

Speaker 5 (57:20–57:20)

Aye.

Speaker 1 (57:21–57:36)

Uh, thank you, um, you know, Heather and, um, and Chris for coming before us. And I hope that this discussion was helpful to sort of hit you to a successful direction. Okay.

Speaker 4 (57:36–57:38)

Thank you. I appreciate it. Thank you.

Speaker 1 (57:39–58:23)

Okay. And we'll, um, we'll, we'll said, I mean, I, we haven't, um, normally we'd be meeting on the 2nd, Tuesday of the month. Um, uh, we had scheduled this 1, a 2nd, so there is a day of the month. And so that would be, um.

July 9th. But I have a serious conflict on July 9th, unless we did it at a different time than 7 p.m. So I would at this point look to probably doing it, we have to talk to Michael and Chris and I have to talk about what schedule, you know, dates would work. And so we'll have to get back to you on an actual date, but.

Speaker 3 (58:25–58:25)

Okay.

Speaker 2 (58:25–58:38)

I think we can try to work towards, even if it's not on one of the prescribed dates, we'll try to get this scheduled so we can get you guys moving.

Speaker 1 (58:38–58:54)

Yeah. I mean, I just said the week of July 6th, except for Tuesday, the 7th, I've got dress rehearsals for a concert on the 11th. Mandatory appearance.

Speaker 4 (58:56–59:03)

Get it. I don't want to hear the Alto part that I'm in dress rehearsal for dance recitals right now.

Speaker 3 (59:03–59:09)

I get it. We can narrow down the state later. Yep. Yeah.

Narrow that down later.

Speaker 1 (59:09–59:18)

Yes. Okay. So, so yeah. So discuss what you, what steps you think you want to take and we'll go from there.

Speaker 3 (59:19–59:22)

I understand the directive. So yeah, I get it.

Speaker 1 (59:22–59:23)

Well, thank you very much.

Speaker 3 (59:23–59:26)

All right. Thank you so much. All right. Good night.

Good night.

Speaker 1 (59:26–59:28)

So can I have a vote to adjourn gentlemen?

Speaker 2 (59:28–59:30)

I think so.

Speaker 1 (59:31–59:32)

All in favor.

Speaker 2 (59:32–59:34)

Aye.

Speaker 1 (59:34–59:40)

Aye. And I'm just confirming that we all in favor of the continuation. I think we did that too.

Speaker 8 (59:41–59:44)

Just making sure, but I'm, I'm, I'm, I'm still in favor.

Speaker 1 (59:45–59:48)

Okay. Okay. Anyway, thank you very much.

Speaker 7 (59:49–59:50)

All right. Good night.