Board: Milton School Building Committee
Date: 2024-06-24
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:50–00:52)
All right, let's get rolling.
Speaker 2 (00:53–01:20)
So it is June 24th. I'm going to call the meeting of the Milton School Building Committee to order at 7.09 p.m. As we typically do, just doing a roll call of how I see people on the checkerboard in front of me. John Cohane.
Is it? Yep, you're on mute. You're good. Yes.
All right, perfect. Carrie Hurley?
Speaker 3 (01:21–01:21)
Here.
Speaker 2 (01:23–01:28)
Scott Tereshek? Present. All right. Ken Lombard?
Speaker 4 (01:30–01:32)
Present.
Speaker 2 (01:32–01:44)
And Eamon Lombard? Present. Perfect. Mark Loring?
Present. And Selina Miranda?
Speaker 5 (01:45–01:45)
Present.
Speaker 2 (01:47–03:00)
Akua Bang? present. And Shawna were present. All right.
Um, second thing on the agenda first, I think it's the first time we ever got that right. Second thing, uh, is citizen speak. Uh, we reserved the first 15 minutes of our meetings, uh, for any citizen that wishes to speak. Um, we ask that you just, uh, raise your hand and when called upon, uh, we'll unmute you and then, uh, just please state your name and address for the record.
So we'll open it up and see if we get any hands raised. I'm not seeing any. All right. We'll move on.
If somebody does raise their hand, we'll stop. So item three on the agenda is approval of past meeting minutes. Last Monday, obviously, we had our last meeting on June 17th. I know they were distributed in our packets from Seamus from PMA earlier today.
So just want to see if there's any questions, comments, discussion that people need. And hearing none, we'll just wait for a motion.
Speaker 3 (03:07–03:09)
I'll make a motion to approve the meeting minutes.
Speaker 2 (03:13–03:22)
All right. Is there a second? Any discussion? Seeing none.
Second.
Speaker 5 (03:22–03:24)
Oh, somebody did.
Speaker 2 (03:24–03:58)
Yeah, Scott beat you to it, John. Sorry. So what we'll do is run back to a roll call vote. And if you weren't here last week, obviously just abstain.
So John Kohan? All right. Terry Hurley? Yes.
Tim Lombard? Yes. Scott Tereshak? Yes.
Mark Loring? Yes. Selena Miranda?
Speaker 1 (03:59–03:59)
Abstain.
Speaker 2 (04:01–05:19)
Okay, Aquarabon. Abstain. Yep, and Shawna Warwick, yes. All right, item 4a, which is old business discussion update, architect update, and the first item is discussion of site diagrams.
So as everyone knows, you know, we were working the past couple weeks on layouts for what the architects had proposed for the middle school and preschool. You know, essentially we narrowed it down to two, which is a singular building that houses everything under one roof, which we called option one. And then we also had option two, which were essentially two segregated buildings. So for some of you that weren't here last week, the architect Spacey took option one and option two, dug into them a little deeper.
Uh, and presented some stuff. Uh, so what we want to do is kind of re go over some of that stuff tonight. Uh, I know last week too, that, um, you know, uh, Dr. Burroughs, you wanted to have, you know, some of the faculty and staff weigh in on, on the options too.
So, um, hopefully you got the chance last week to kind of work with the architects to see that. Um, so, you know, with that, you know, Andrew, I'll turn it over to you.
Speaker 6 (05:22–10:32)
Great, thank you. Let me so what I did is I took the content from last week's presentation and just summarized it down so that we can just briefly review. The 2 options so. And I'm going to preface this with apologizing.
I can't do the full presentation screen on my laptop. It doesn't work for some reason. So it's going to be a little, you're going to see all my Bluebeam stuff around it. So apologies.
I'm just going to skip. So Andrew, feel free to jump in any time. So two weeks ago, we had presented four options for the site studies. And based on that presentation, option one and option two were deemed the most interesting and viable that you wanted us to pursue.
So what we did is we took those site studies and started to Lay them out a little bit more specifically in terms of adjacencies and entry points and really starting to dive in to how it fits on the site. There was some feedback from that June 10th meeting that we incorporated about parking as you can see. on the right-hand side, which is option two. There was a preference for the parking on option one, which we then integrated into option two.
So I'll start just going back and describing the two options. So option one is the one building option where the preschool takes over the first and second floor of this academic wing, and it has its own separate entry here to the south. The middle school has their entry coming off of the drop-off right here to the north. And the admin area is sort of the knuckle of those two entry points, so they can oversee both entries as the different students are entering and exiting the building.
The academic core is on this north wing, and it's also on the third and fourth floors of this southern academic wing as well, where the common spaces, the cafeteria, the gym, and the library are all flanked over here in this larger core. We did also revise the fire access lane, so we were able to cut that back and gain some more space over here and over here. And that's a high level summary of the option one. I have more drawings coming up that will show it.
the full massing and option two is where the preschool is separated. We pulled that, as everybody can remember, we pulled that south a little bit. Here we've indicated some sort of cross covering so that people who need to go from the preschool to the middle school will be covered and protected from the weather. But it's a similar idea of option one where we have a four-story academic core over here to the north.
And as you're going to see in the 3D in an exploded axon, the remaining academic core actually flanks over the common space. But the entry sequences are fairly similar to both options, and it lays out on the north side pretty similarly in both options. As we move into the massing, you can see here, I'm going to just zoom in, that the preschool is on the 1st and 2nd floor, and then there's the academic core for the 7th and 8th grade on the 3rd and 4th floors. And then over here, you can see that the preschool has been pulled apart a little bit.
And then the academic core, instead of going to the South, it looks like a little bit of a boomerang. And there are a lot of pros and cons to both options. A lot of what we heard was that people like the idea of the preschool having its own identity for the two-building option. And then for the one-building option, people liked the idea of the sufficient academic bar over here and the adjacency to some shared admin spaces.
You can go in so you can see these exploded axons. Anybody, please feel free to interrupt. I know I'm going pretty quickly. So we put some of the exploratories on the first floor, two 7th grade teams on the second, and then on the third, the remaining two 7th grade teams.
And then over here on the south side, we have the two pre-Ks and then the 8th grade teams on the third and fourth floor with the world languages on the fourth floor here. The central core is going to have a stair and elevator, and that will go through the admin media area and having a shared common space. Carrie?
Speaker 3 (10:33–11:09)
I just have a quick question about the location of the gym and auditorium. Sure. And I don't want to, I know that this is just very preliminary, but I'm just curious if it would be able to be set up on the Guile Street, Guile Road side of any of these to put the traffic for these types of space where it's going to be engaged more often away from some areas that have been areas of concern. I'm just curious if that's a thought.
Speaker 6 (11:10–11:15)
So you're suggesting these common public spaces move to the north or where?
Speaker 3 (11:15–11:40)
Right. Exactly. just kind of use the school as the buffer for those types of activities. I just know from the use of Pierce right now that the gym is used a lot.
And the auditorium, I think, would be engaged as well a lot. And I'm just a thought as I was looking at this over the past couple of days.
Speaker 6 (11:41–12:37)
Yeah, that's great. We did have an option. And anybody, please chime in and let me know if we should pivot. But we did have an option where we were showing academic space in that area where there was parking.
But there seemed to be a strong preference to have parking on Guile Road for the spillover for games from the high school field so that parking was easily accessible. It doesn't mean that we can't keep investigating to flip the academic and the parking, but we would not be able to do it before the feasibility study was delivered. We would have to focus on one of these two options and then during schematic do a different level of review to see if we could adjust the building footprint in some way.
Speaker 7 (12:39–12:50)
Hi, Carrie. This is Andrew. I just wanted to make sure I understood the question. What's the concern that when there's a lot of events, there's a lot of extra traffic?
Speaker 3 (12:50–13:26)
I'm trying to reduce the amount of traffic that comes behind the building towards the community that's been concerned about having the school located where it is. So what I'm trying to say is if we could use that parking lot on the Giles, the same parking lot that we're probably contemplating for overflow as the primary place where people would come in from whatever, if we could put, instead of having like the cafeteria on that side of the building, if we could put the gym and the auditorium on that side of the building.
Speaker 7 (13:26–14:22)
Oh, yeah. I see. Yeah, I mean, to be clear, I think the feeling has been that the parking that you see that's adjacent to Guile Road is intended to be the primary kind of lot for the events. Because the thought is that the entry point in both cases would be that maybe, Shanali, you can point to sort of that main entry point.
would be there, which would be a naturally to be parking off of Gile Road as opposed to coming around the back. And I think there's a question of how there's only so many spaces. So at some point, there could be overflow where people would end up going around to the backside. But the way it's set up is that you enter where Shonali's indicating, and that would be the main point to come in for after hours or weekend events.
Speaker 3 (14:25–15:03)
OK. I just know from my experience going to gyms all over Massachusetts that I like to park right near where the location is. And everybody tries to find that way in. Right, so you're talking about the gym or the auditorium, Carrie?
I'm talking about the gym more than the auditorium. OK, so maybe the gym comes up where the cafe is. Yeah, exactly. So it's on that side of the building.
the first thing you see, and then people don't have to go any further. And I don't really care if the answer is no. I just wanted to throw it out there that I spend a lot of time in gyms.
Speaker 6 (15:03–15:45)
Yeah. I think that's actually the kind of feedback we're looking for for the next couple of weeks is to get the adjacencies correctly. So thank you. I think that's really important for us to hear.
We've been focused on the site plan layouts to understand where the parking and the entry is. Once we get down to the one option, then we're going to want to meet with everybody again to talk about the importance of the spaces, where they go, what kind of adjacencies they are. And I think the suggestion of swapping the gym and the cafe makes perfect sense. And I think it's something that Andrew and I had talked about.
last week and we were like no no we got to focus on the site plans first and let's get to adjacency so thank you.
Speaker 3 (15:45–15:55)
I honestly have not paid attention to this piece until we were asked to review it again and that's when it popped out to me so I totally have been focused on that as well. I just thought I'd throw it out there since I saw it.
Speaker 6 (15:55–16:09)
No I think it's important for us to recognize that those things are really going to be important to the way the building ultimately functions for the community. So I think then we can take that comment and then also incorporate it here as well in some way.
Speaker 3 (16:09–16:14)
Thank you. I appreciate it.
Speaker 6 (16:14–16:21)
Yeah. So I. Oh, go ahead.
Speaker 5 (16:23–16:35)
My question was, and you might have. address this earlier, are these options roughly the same square footage classroom size is the same in each option? Yes.
Speaker 8 (16:35–16:36)
Yes, they are. Yes.
Speaker 5 (16:36–16:50)
And did we have a conversation earlier on about there were different size classrooms, one was a little more ideal than another? How did these meet that? What's the classroom size?
Speaker 7 (16:51–17:24)
So these all utilize the same classroom size, which was, we did have a conversation several meetings ago about a range of possible classroom sizes. And we landed on a classroom size of 825 square feet. And that's what both of these options are using. And that is larger than the, than the average Pierce classroom size as it stands today.
So that's sort of equivalent in both options here.
Speaker 5 (17:25–17:25)
Thank you.
Speaker 6 (17:34–20:05)
I can keep going and show larger plans. I don't know if this was enough of a recap for everybody, but I can just keep going. So these are the larger scale plans that you saw from the first slide, but with the spaces labeled. So you can see that we have STEM, tech, flex, classroom over here, music and arts.
We tried to get it as close to the auditorium so that they could have some sort of relationship, cafe, kitchen, the health and physical education spaces that support the gym. And then again, I had mentioned that shared admin space because in this version, the pre-K is embedded in the building. So again, this is the same massing. So you can see we tried to orient the academic wing, the short side, towards home ink to minimize the impact of a large mass facing them, whereas I'm going to skip ahead to the split building.
It's, again, the short end is facing home ink, but this time it's a two-story. So it'll be around the tree line height. If I go back to the one building option, I think we've reviewed the stacking pretty clearly. Again, there's a vertical circulation in here that connects to some of the core areas, the media, the admin, and some of the shared spaces.
With the two building option, similar layout, but I think in this, Option we have the auditorium embedded in the center because it doesn't really need any windows and then the gym. Off to the side, so carry to your point, you know, the gym could either have a separate entrance off of the road, or we could relocate it a little further north. So it has more connected access to the main entry. Like, those are some options we can explore as we get further.
What's nice in both options, the kitchen is on the exterior wall, so there'll be easy access for loading and unloading for deliveries. And again, for the auditorium as well, if there are large-scale props or anything that need to enter, you can easily access from the south side.
Speaker 7 (20:08–21:00)
I'll also add that a couple of things that were discussed on this option that people liked was that the ability for future expansion on the pre-K building, as we sort of dashed in one potential way that that could happen, is more easily done in the two-building approach. And it just sort of makes it a bit more flexible for how that could play out in the future. And also there was a nice sort of potential adjacency with the cafeteria and some outside space there to the east. And also its proximity to the pre-K that it was, you know, when there are meals being delivered to the pre-K that they're not traveling very far.
We were also talking about the idea of the cafe potentially spilling out into that green space area just outside there.
Speaker 6 (21:01–21:15)
Right. This could become like an outdoor classroom or an outdoor spillover space for when kids are done with their lunch, or it could be used by any of the teachers as needed. I think, Sean, you have your hand up.
Speaker 2 (21:15–21:30)
Yes, thanks, Shelly. So I know at our last meeting, I talked about seeing if the pre-K could be essentially rotated 90 degrees and pulled north on the planet. I just wanted to find out if you guys had a chance to look at that.
Speaker 7 (21:32–23:23)
Yeah, we did look at it at a high level. And I think the short answer is that it can be done, but it raises some more questions that I think need some more study in that it starts to impact the parking and arrival drop-off loop. And it also tends to place classrooms in the pre-K facing the middle school potentially. And so we would want to kind of look at, you know, not putting it so close to the middle school that those classrooms are basically looking out a window at the backside of another building.
So I think the answer is that we have some flexibility there, but there's some things that we kind of need to study to know if it's if the trade-offs are worthwhile. So that's sort of where we're at. But I think that my sense from last week was that it wasn't necessarily whether that could work or not wasn't necessarily differentiated between whether option two or option one should be the one that we proceed with. So if we do, in fact, continue with option two, I think, you know, we can we can dig into that a little more carefully to understand the implications.
As it stands now, the orientation of the pre-K building, you know, allows for sort of a greater sense of independence from the upper middle school. And it allows for all the classrooms to sort of have unobstructed views. One side would be seeing the parking. One side would be seeing the playground.
But I do think that it's possible. It's just understanding the implications. Thanks, Andrew.
Speaker 9 (23:28–24:30)
And we kind of come full circle in terms of our conversation last week. So I did follow up with staff, with leaders and others and kind of talk through what the building committee had talked about regarding options 1 and 2. And I think in looking at everything and really kind of sussing out some of the operational differences still lean towards option 2. the separation of the preschool.
It kind of, I think, for folks, it felt better. On the one hand, the design part of it felt better. And through the entry point of coming into the preschool and having a shared entrance and all the other factors involved that it would be cleaner to have a separate building as opposed to part of the same building. So that was the outcome of that conversation.
Speaker 6 (24:41–24:49)
Thanks, Peter. Does anybody else have any other questions or want to review or reflect on any of the slides? Because I'm happy to flip through.
Speaker 2 (24:52–25:02)
I think, Shanella, just for a couple of the folks that weren't present last week, if you could just kind of keep walking through and then we'll dive in and just check with each person.
Speaker 6 (25:03–28:09)
OK. So continue with option two. As I said, we can definitely take a look at what Carrie's comments were about the location of the gym and the auditorium to make it more accessible from the parking lot side so people aren't walking through the school In this option, we were able to maintain the 143 spaces. There's 60 over here by the preschool at 83.
What's nice about the parking in both, because they are similar, is that you have separate car drop-off loops that's separated from the bus drop-off, and that you were able to get six buses queued up for the middle school. And then we also have the separated pre-K area. And as Andrea mentioned earlier, we've been able to squeeze out some space for the middle school behind the cafe, that's a spillover, possibly outdoor classroom, and then some space over here by the gym so that there could possibly be some ancillary area for the gym over here that can support those activities. And then again, going to the massing, currently based on feedback that we've been hearing from the visioning and the workshops is that the world languages prefer to be grouped together.
And obviously, any other feedback about those locations We're happy to take it, but we've put all the world languages as like a separate team up on the fourth floor. So that gives an opportunity to students to inter-travel between floors, which we heard was something that the teachers wanted to encourage a little bit of that independence for the students to be able to get to classrooms in other areas outside of their teaming areas. So we've flanked it. with spaces on the fourth floor and then spaces on the first floor.
So it's controlled direction, I would call it. With the media in the center on the second floor that's over the public area, that can bleed out into the vertical circulation area that you see in the yellow here, which again is where a stair and an elevator would be located. But that can all open up and be kind of an open, engaged space. I'm not sure if much more to review.
We did bring the site plan so that there was additional context for people if they needed it. But yeah, that's kind of the summary of where we landed last week. And this week, we're just continuing with the adjacencies and are hoping after we discuss which site option about the next steps that we can take.
Speaker 2 (28:11–29:29)
Okay. So, Association Alley, what you guys from Arrow Street are looking for is essentially direction between option one and option two from our committee, correct? That's correct. That's right.
Okay. Yep. So, you know, in regards to committee members, You know, essentially, you know, we're working on, you know, getting to a cost estimate on this. And this is, I think, one of the kind of final pieces.
I think there's maybe one or two more that we're working on. So, you know, ideally, I know we were waiting last, we were hoping to have a vote last week. And the reason for doing this tonight is to get the input from Dr. Burroughs and, you know, leaders from the district.
You know, as Dr. Burroughs mentioned, you know, option two was their preference. So, you know, for others, let's do it this way. If you do not feel comfortable making a vote, you know, speak up now just so we're aware.
But if not, basically open it up for a motion for. someone to see which option they would like to vote on. And then, you know, we can vote it up or vote it down from that. And Akra, you have the hand raised.
You're recognized, sir.
Speaker 10 (29:30–29:36)
Thank you very much. Broadly speaking, are both options about the same price?
Speaker 7 (29:39–30:33)
At this stage, where we're at, we are treating them as sort of cost neutral in terms of, you know, there were questions about whether building a separate pre-K building would add cost. And where we're at is that while there might be a little bit more roof area, for example, that goes into the pre-K. We also could build it with a different system than the main middle school building. We're thinking about potentially doing it as a wood frame structure, for example.
And so there are offsets in that by separating the pre-K as its own building, we can have some more flexibility in how it's built to offset it. So for those reasons, we at this stage feel that the two approaches are essentially equivalent.
Speaker 10 (30:35–30:41)
Thank you.
Speaker 2 (30:41–30:43)
Any other questions from members?
Speaker 11 (30:49–31:17)
I had the same concern as Aqua. I think that's great. You know, that's a fair response. Like if I'm voting on these as cost neutral and I have Dr.
Burrow's input, like I feel like I can make a vote on this. I'm just, I remain, I guess, concerned or skeptical that they will be cost neutral, but I'm gonna vote on them as if they are for the purposes of this exercise.
Speaker 2 (31:21–32:26)
Yeah, the, the 1 thing, you know, for me, and just repeat what I said last week, again, for the, for the members that weren't here, um, you know, having the ability to have the separate preschool, they're trying to give us options that Andrew was referencing earlier, you know, for, for the layouts and everything that we're doing. Um, you know, I think for. Sensitivity, you know, that, that area of the site is probably our most sensitive. So having.
the opportunity to kind of adjust some of the stuff there and kind of not lock into a singular building that's kind of fixed with things stacked on top of it. And coupled that we may be able to come up with a way to expand it later if universal preschool becomes, you know, a true thing, nationally recognized and funded through that, and we could expand it, that'd be great. But, you know, that's, for me, that's where, you know, my preference has always been option two. So essentially, again, you know, Mark.
Speaker 8 (32:26–33:01)
Sorry, just to throw my two cents in. I agree with you, Sean. I think my preference is option two. I feel comfortable based upon, again, any input that Dr.
Burroughs can share based on the conversation he's had with his internal team, unless they have a preference that is different than kind of what, where I'm leaning, I think the, the option to use the best flexibility is, and especially working during this is being caught neutral. I think option two is the best path forward based on all the things that have been shared previously. So I'm prepared to vote tonight.
Speaker 2 (33:09–33:16)
If you're prepared to vote, Mark, I think the only thing we'd be waiting on is the motion. If you'd like option two and welcome that motion.
Speaker 8 (33:18–33:25)
I'll make a motion to direct Air Street to move forward with option two, as they presented it here today.
Speaker 1 (33:27–33:28)
I second.
Speaker 2 (33:30–33:42)
Second by Selena. Any further discussion for anyone? Not hearing any. All right.
Perfect.
Speaker 5 (33:43–33:59)
One quick, sorry, one quick one. Oh, yeah. Yeah. Yes, sir.
Don't don't need to take your time. Sorry, sharing Tim's comment too. Will we ever know the difference in cost between the two? Are we moving forward with one and only that one for the cost?
Speaker 2 (34:01–34:53)
I believe it would only be one that we'd be doing a cost estimate on. So that's essentially what we're trying to fine-tune on. I mean, to the point that you made earlier about square footage being the same, what we're looking at here is the cost estimate that we'll be doing is mainly based on square footage. They're not getting down into the granular level that we're going to get down into.
As the project progresses, but this is more of just a dollar per square foot cost that they're looking at right now. But what this does now is allows and correctly off the rails. Some of the MEP teams that are going to feed into this cost estimate are developing narratives, so they'll be writing up separate systems for these, and those systems will be priced, so we'll be able to see those.
Speaker 6 (34:53–35:25)
Then it'll be the same for structural when they write their narrative, that they'll be writing a system for the middle school and then a more compact system For the preschool, you know, going off of what Andrew had said earlier about having good framing, but also being a smaller school and a smaller footprint means that we can also have a shorter floor to floor because our ductwork won't be as deep. So there's other opportunities for savings to keep it cost neutral. But those are the things narratives are going to address.
Speaker 2 (35:26–35:51)
One thing I may suggest, and I think this is kind of where John is coming from, too, is when they do do that cost analysis, could they break out what the preschool cost is compared to the other building? that's there just to get a dollar per square foot, you know, understanding there to see that it actually may be cheaper than if we were just to include it lumped into the overall building.
Speaker 6 (35:51–36:06)
Sorry, let me just clarify. So you're asking if they, in the option, if we went with option two, the preschool square footage as a separate cost from the overall campus square footage?
Speaker 2 (36:07–36:08)
Right.
Speaker 6 (36:10–36:20)
I don't see why not. We can talk to the cost estimator and see how he approaches that.
Speaker 8 (36:22–36:33)
Okay. I agree with that. I think that'd be very helpful to be able to kind of see those two buildings just cut out in some way. I think it'd be helpful for the assessment.
Speaker 12 (36:33–36:42)
I would imagine from a square footage estimate perspective, they would have to break it out just to show you it's two different building type constructions. So they're not going to be able to work together.
Speaker 2 (36:44–37:16)
Yeah, and as I was thinking through it, Sean, that's exactly what I was thinking is, you know, he's going to have a heavier pen on the bigger building because it's a different style of construction for that and different systems within it. Like we've been talking about, the estimate for the preschool would be lighter, if you want to call it that, specifically if it's a wood frame building. You know, happy to jump on a call with the cost estimator when it comes up, just so I can explain a little more, too.
Speaker 6 (37:16–37:35)
Yeah, absolutely. Let's, now, once we figure out which option tonight, I'm certainly going to be reaching out to all the consultants to confirm so that they can move forward with their narrative, talking to Peter about the best way to approach the cost estimate. So, yeah, we could definitely jump on a call.
Speaker 7 (37:36–38:53)
And then back to you. Sorry, just to add one comment to that discussion. I think that, to Sean Burke's point, that they likely will have to be separating out the cost for the preschool if it's a separate building. But I just want to caution everybody that what's more difficult will be to take that information and somehow reverse engineer what the one building option would have been.
I think we'll be able to understand the cost of the preschool relative to the middle school and the two building option from the cost estimate. But the extent to which we can take that knowledge and then figure out what the preschool would have cost if it was option one, um, is limited. It's not, it's not like a, I just want to make sure, I don't know if that's what people hope to be able to do, but I think that it's, that's a little bit more of a complicated thing to do because, um, you know, you, you would be pricing systems that include the preschool, um, in the option one, whereas in the option two, the systems are going to be somewhat independent. So, um, I just want to kind of caution caution everyone on that.
Speaker 12 (38:55–38:55)
Yep.
Speaker 5 (38:56–39:19)
My comment, if I may, would be just that we're on a square footage basis at this point. Yes. Is that correct? Yes.
I mean, it should be. It's not going to be perfect, but it should be reasonably easy to just take square footages and based on square footage cost, figure it out, roughly.
Speaker 2 (39:22–40:18)
Yeah, and I think where Andrew is going with it, too, is on those square footage costs, you know, for specifically when we do a separate building like this, you know, the plumbing, lead outs, the utility feeds up to that separate building would be included in kind of the overall building. But I think what you were looking to do, John, is to see that there would be some cost savings and then understand their site cost and basically build that back up to get it to cost neutral. Thank you. Just checking, John, because that all precipitated from your question.
For us, just to go back to it, the intent was to just get to one cost estimate for one option and not have the ability to do both cost estimates for both of them.
Speaker 5 (40:18–40:19)
I don't want to upset that.
Speaker 2 (40:21–40:38)
All right. I was just trying to figure a way that we might be able to, you know, get to where your question was going to, but using that singular cost, that's been able to break them apart. That's all. Thank you.
No problem. And Carrie, you have your hand up.
Speaker 3 (40:38–40:49)
I was just curious, and you could have already answered this, and I apologize if you have, but how are we pricing this as net zero, as lead, gold, silver? Just curious.
Speaker 2 (40:51–40:58)
That's going to be one of our, I think, our next questions that we're going to have to get to an understanding on.
Speaker 3 (40:58–40:58)
OK.
Speaker 2 (40:58–41:01)
All right. You know what I mean? Yeah, no, there are options for it.
Speaker 3 (41:01–41:14)
I just, as we're talking about cost per square foot, that's going to be drastically different. And I know that there's just a lot of things coming out that it's kind of forcing folks to go net zero. So I just was curious.
Speaker 7 (41:16–42:28)
Yeah. So I think that Andrew. Well, I was going to say, Carrie, well, I think it was maybe two meetings ago we had our director of sustainability present sustainability options for the project. And one of the decisions that we're going to be looking to this group to make is you know, which there were four potential types of systems that we talked about and we wanted to kind of get feedback about which one the group wants to proceed with.
And that's going to be an important choice that will impact cost. And similarly, you know, whether we're looking to Um, I don't think that we're going to be able to. Simply meet the current energy code that the town of Milton has elected to abide by or sort of do something beyond that. And so, um.
Absolutely Those choices will, you know, have have an impact on cost. And I think once we've made the decision about option one versus two, that's sort of the next topic. I don't know that that's on the agenda this evening. Um Sean, but it is
Speaker 3 (42:29–42:31)
Oops, let me take my hand down, sorry.
Speaker 2 (42:32–42:54)
No problem. We'll just see if there are any other questions or comments. And honestly, very good discussions. I appreciate them all.
And if none, I think Mr. Loring is about to start a motion.
Speaker 8 (43:00–43:01)
Did I already make a motion?
Speaker 4 (43:03–43:03)
Yeah.
Speaker 2 (43:04–43:06)
Okay, you did.
Speaker 4 (43:06–43:09)
I think we made it and seconded it. I think we're in discussion.
Speaker 2 (43:10–43:35)
Yep, you're right. Apologies about that. I got too deep into the discussion. All right, so seeing no further discussion, we'll go to a roll call vote.
So this is the recommendation of option two. So we'll start with Mr. Cohan. Yes.
All right. Carrie Hurley.
Speaker 3 (43:35–43:36)
Yes.
Speaker 2 (43:38–43:47)
Scott Tereshek. Yes. Akua Ba. Yes.
Selena Miranda.
Speaker 1 (43:48–43:48)
Yes.
Speaker 2 (43:50–45:56)
Tim Lombard. Yes. Mark Lorin. Yes.
And Sean O'Rourke. Yes. All right, um, next thing on our agenda is essentially just, uh, shame is for the topic of, uh, just new business. Um, so essentially it seemed pretty open ended.
Um, so. I sent around, so the town was notified last week from the Executive Office of Energy and Environmental Affairs that they did their review on the proposed legislation or the land swap for ecological value. They came back with a positive recommendation, so that came through last Friday. So, I sent that around for everybody, so I hope everybody got a copy of that.
So, we know from, you know, the time that Senator Timothy's Chief of Staff came to our meeting, that was one of the Things that they were waiting on, uh, the other, so the bill is in committee. Uh, for scheduled for a third reading that committee from what I've seen today has reported it out of that committee as of today. So our hope is, uh, it will be read for a third time and voted on through the Senate and then, you know, migrate its way through the house. I've already gotten in contact with Senator Representative Luka Oakley, who's a co-sponsor on the bill.
And, you know, she's going to do her best to usher it through to try to, you know, get us to that deadline before the end of the session. So the practice would be that the bill would come out of the Senate into the House. It would be read three times, then engrossed. And then engrossed, I think, in both the Senate and the House.
And then basically we go to the governor for signature, and there'd be, you know, finalized. So just with that, I'll open up, see if anybody has any questions or comments, you know, just, you know, in regards to that update.
Speaker 10 (46:03–46:29)
Yeah, Aqua. Thanks, Sean, and thank you for the positive update. Given the state where we are now, what can we do to help you move forward And more specifically, what can we do or what information do we need to share with our constituents? Many of my constituents are willing to help wherever necessary.
What do I tell them?
Speaker 2 (46:32–47:09)
Yeah, for me it would be contact your legislature. I'm hoping it gets voted on soon, but right now we're still in Senator Timothy's hands. you know, based on the Chief of Staff and, you know, comments they received, he's pushing this as best he can. You know, the next part is, you know, once it gets to the House, contacting our House representatives, which is Representative Brandy Fluker-Oakley and Representative Bill Driscoll.
So those would be the two, as far as the land swap, to kind of, you know, push that over the goal line.
Speaker 13 (47:12–47:12)
Thank you.
Speaker 2 (47:19–47:25)
All right, any other, oh, Mr. Cohan, start with that.
Speaker 5 (47:25–47:33)
Do we, just plain devil's advocate, do we know what the schedule would be if they don't approve it by July?
Speaker 2 (47:35–47:42)
So there's a couple of things. So as Aaron Bradley mentioned,
Speaker 5 (47:58–47:59)
I can't hear you.
Speaker 2 (48:03–48:04)
There we go.
Speaker 5 (48:04–48:07)
Can you hear me now? There you are. I didn't hear any of that. Sorry.
Speaker 2 (48:08–50:02)
No, no, no. Sorry about that. For some reason, I hit mute on my computer. I'm using my phone for audio.
I thought I hit mute on that. So apologies. You said Aaron Bradley. Yeah.
So if it did not happen by the 31st, You know, Aaron Bradley referenced that one select board meeting. There's still the opportunity to do it by the end of the year. While it's not commonplace, it's still an opportunity to do that. If it did not happen by the end of the year, then they essentially would have to refile it with, you know, whoever would be our new senator at that time.
But, you know, for us, you know, From everything we've heard, it's essentially was waiting for EEA to weigh in. So that's why getting that positive recommendation last week was, you know, for us, a big checkmark to go. I know Senator Timothy provided a 15-step process at his meeting when he was here, and that we're on step 11. So I think once we get done with this, we'll be on step 12.
So hopefully making a move as quickly as we can. Any other questions? So I think we'll move on to agenda item number six, which is future meeting dates. So for our next school building committee meeting, I'll look to, you know, Chinale, Andrew, you know, that question that comes up on essentially the HVAC system that Kate presented and stuff like that.
You know, essentially, when are you looking for input for that?
Speaker 6 (50:02–52:17)
So, thank you. I was just looking at the schedule. So, we are looking to get The site plan that we just saw today and the narratives to Peter Bradley. By July 12th, because he needs 2 weeks to.
Do a cost estimate. So. That leaves us either July 1st or July 8th to meet next. And if we met July 8th, I don't think that would give GGD enough time to incorporate it into their narratives.
So I'm hoping that the week of July 1st that we could meet to discuss further, you know, what the options are. And I'm not sure exactly what kind of information we can talk offline about how we can help you get to the right answer. I'm happy to invite Kate back or somebody from GGD to talk through the different systems. I think it's a two-part conversation.
One is, what's the right system for the school of the four options? And then also, cost. And they are obviously linked in a myriad of ways. So the goal is for Andrew and myself and the team at Arrow Street is to talk to, we've been trying to talk to GGD about these options and they're doing research to get back to us.
But we need to sort of nail down some sort of like comparative analysis. between the four systems and present it to you on Monday. But I don't know if you need more further technical details on the way the systems operate so I can invite the right people to be in the room. So I think those are the two things that we need to review.
And then I think too, I believe it was Carrie who was asking about some of the sustainability metrics that goes hand in hand with the selection of the systems. So I think that needs to be part of the conversation as well.
Speaker 2 (52:19–52:48)
Yeah, I think, you know, from my end, Shanali, it's like, you know, having the cost up front on these, specifically the upfront costs, because I know with, you know, as Kate mentioned for geothermal heat pump, there's a lot of rebates and stuff that kind of offset the upfront, you know, capital expenditure. However, that basically adds into a bottom line that we have to make a larger ask at the beginning, even though we'll recoup that money later on through tax incentives.
Speaker 13 (52:48–52:48)
Yeah.
Speaker 2 (52:49–53:08)
So having those kind of upfront raw numbers of what they'll be that will add into that overall bottom line would be important to know. So basically costs in one column. Potential rebates in the next column and then the net cost in the third.
Speaker 6 (53:08–53:43)
So I just want to caution everybody on costs, because it's not going to be the cost for this building, right? It's going to be comparative costs, meaning this system is going to be 10 to 15% more than this other system. Until Peter gets his hands on what system we selected, we're not going to have actual Numbers, so I just want to caution everybody, like, whatever numbers we talk about on Monday, it's not going to be. The actual numbers for this building, it's just going to be comparative.
Speaker 9 (53:45–53:50)
If that makes sense, you're talking about the other Peter, right?
Speaker 6 (53:52–53:59)
Peter Bradley, sorry, Peter Bradley on cost estimator. I know you're good at what you do, but I don't know.
Speaker 9 (53:59–54:09)
I was like, wait, what do I need? What do I need to do? Peter B. I should start saying PMC.
Speaker 6 (54:09–54:10)
Apologies.
Speaker 2 (54:10–54:12)
Another thing we'll add to your list, Peter.
Speaker 6 (54:12–54:19)
And ironically, he has the same initials, so I can't say PB either, so.
Speaker 9 (54:19–54:19)
It's OK.
Speaker 10 (54:24–54:44)
Yeah, Aqua. For the rebates, knowing that we're a town, would we be qualified for the set rebates? Are those just for private, if they're tax benefits, does the town of Milton pay taxes? How do we get that back?
Speaker 2 (54:45–55:14)
I don't know, but I think we'll have to take that up at our next meeting. We can look into that, but I think that's kind of the type of things for questions like Shonali was asking for, what do we need to make that decision, if that's one of them. But I'm pretty sure any of the tax rebates that Ada's referencing has come from other schools that are public entities. So I don't think she's doing it for private.
Speaker 6 (55:14–55:29)
No, these were all for schools. So the rebates, I'm going to get Kate to explain it again more clearly on Monday, but the rebates are applicable to a public school because we've used them before on other schools.
Speaker 2 (55:31–56:30)
Thank you. So for our next meeting, does next Monday work for everybody? At the same time, we'll keep it as a Zoom meeting. Actually, I'll be down in Cape.
But, you know, if that works for everybody, let me know. Or if it doesn't work, let me know. All right, three thumbs up. Those are all good.
All right, so let's plan on that. As I mentioned probably a couple of months ago, these meetings are getting intense, you know, as we're getting to, you know, these decisions. So I appreciate everybody jumping on. We have a full house tonight.
Glenn Hoffman jumped on after his baseball game, I think, for his son. So good with all hands on deck. So yeah, so Seamus, if you could work with Lynn and just get the same link credentials and stuff like that for next Monday.
Speaker 7 (56:30–56:38)
Yep, will do. So it'll be a Zoom link, similar to this one. Awesome. Yep.
Speaker 2 (56:38–56:47)
All right. All right. Last item on the agenda, item seven of the adjournment. So entertain a motion to adjourn.
Speaker 8 (56:48–56:49)
Make a motion to adjourn.
Speaker 2 (56:51–57:04)
Second. Tim, you can have it. Thank you. All right, there we go.
So roll call vote. Mr. Cohen? Yes.
Carrie Early?
Speaker 3 (57:05–57:05)
Yes.
Speaker 2 (57:06–57:18)
Mr. Tereshek? Yes. Mr.
Abong? Yes. Mr. Loring?
Yes. Dr. Miranda?
Speaker 1 (57:19–57:19)
Yes.
Speaker 2 (57:21–57:38)
Mr. Lombard? Yes. Mr.
Hoffman? Yes. And myself, yes. All right.
Thank you very much. And see you next week. And hope you enjoy game seven tonight for all you watching this. Bye-bye.
Speaker 1 (57:39–57:40)
Thanks, everyone.