Board: Milton Planning Board

Date: 2024-04-24


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:49–01:07)

Good evening and welcome to the 30th meeting of fiscal year 2024 for the Milton Planning Board. At this time, I would like to now call the meeting to order and begin by introducing the members of the board and our staff. Jim, if you'd like to start.

Speaker 2 (01:07–01:08)

Jim Davis, member.

Speaker 3 (01:09–01:15)

Maggie. Maggie Oldfield, member. Cheryl. Cheryl Tagaya, secretary.

Speaker 1 (01:16–01:18)

And Sean.

Speaker 4 (01:18–01:19)

Sean Fahey, member.

Speaker 1 (01:20–01:28)

and myself, Merida Paul, serving as chair. And now tonight with us, we have Tim, if you'd like to introduce yourself.

Speaker 5 (01:28–01:30)

Tim Zerwinski, Director of Planning and Community Development.

Speaker 1 (01:32–01:56)

And Julia. Julia Getman-Clerk. Great, thank you all. We can begin with our first administrative items, approval of the minutes.

Cheryl has sent out today, I don't know if folks had a chance to review it yet, for March 14th, Folks had a chance to review those, not yet?

Speaker 6 (01:56–01:57)

I have not.

Speaker 1 (01:58–02:20)

Okay. So why don't we defer the March 14th minutes? And Julia, I know we had the executive session, but was there one other that we needed to approve? The 28th of March.

Is it the 20th or the 26th? Oh, I'm sorry, the 28th of March.

Speaker 7 (02:20–02:22)

26 was the executive session.

Speaker 1 (02:22–02:31)

That was the executive session. Okay. So has everyone had a chance to review the March 26th minutes? No.

Speaker 8 (02:31–02:35)

You mean the 28th? The 28th? No, I have not. 28th.

Speaker 2 (02:37–02:42)

I have not. I have. I'm okay with the 14th and the 28th, but yeah. But if you guys haven't.

Speaker 1 (02:42–02:56)

Cheryl needed to look at those. So, okay. Why don't we just plan to defer the March 14th and the 28th to our May 9th meeting? I can have a motion to defer the minutes.

Speaker 2 (02:57–02:59)

Make a motion to defer the minutes to May 9th.

Speaker 1 (03:01–03:06)

Great. Second? Second. Roll call.

Jim?

Speaker 4 (03:07–03:07)

Yes.

Speaker 1 (03:07–03:10)

Cheryl? Yes. Sean?

Speaker 4 (03:10–03:11)

Yes.

Speaker 1 (03:11–03:22)

Maggie? We lost Maggie. Oh, yes. Oh, sorry.

Hi. And myself. Yes. Great.

Thank you.

Speaker 2 (03:22–03:33)

I'm sorry, May 8th. I have on my calendar May 8th for some reason. Wednesday, did we, did we, am I confused there? Planning Board?

Speaker 5 (03:35–03:47)

I think we might have talked about May 8th because that would be the second week of the month, but also it's the first week of town meeting. So town meeting would be the six, seven and nine.

Speaker 1 (03:48–03:49)

That's right.

Speaker 3 (03:49–03:59)

Yeah. We have confirmation. Yeah. Wasn't there a conflict on the ninth at the high school?

So isn't it town meeting scheduled for six, seven and eight?

Speaker 5 (04:02–04:11)

You may very well be right. Let me. I'm going to shoot a text to the… Cheryl's got some documentation.

Speaker 8 (04:12–04:22)

Yeah, I have the warrants. And it does say the 7th and 8th, the 13th, 14th and 15th. And of course, the 6th is the start.

Speaker 5 (04:23–04:27)

Okay, so then we're in the clear for the 9th. Perfect. That's great.

Speaker 7 (04:28–04:35)

Okay, Lynn booked a room just in case you guys want to meet before town meeting. So if you want to meet, just let me know.

Speaker 5 (04:36–05:22)

Great, thank you, Julia. Yeah, that may be something. Because I know the select board is doing their annual kind of reorganization meeting right after the swearing in next week, so potentially we could have the same crew as today, potentially a new member. There's no, I don't think that there's any planning board business at town meeting.

But that may be an opportunity to just do the annual reorganization in advance of the 9th, or you can meet at the 9th. I think it's probably less pressing because there are no planning board articles at town meetings. But you can all think about that if you want.

Speaker 1 (05:23–05:36)

OK. Maybe a half an hour before. Okay, great, thank you. Nice to know we have that room held.

The next item, Tim, your update.

Speaker 5 (05:38–05:59)

That was basically it. I just wanted to make sure we were all ready for town meeting if you all wanted to decide to meet. I don't wanna say there's nothing going on. There's a ton going on, but nothing that you don't already know about.

So we can kind of move on. Okay, perfect, thank you.

Speaker 1 (06:00–06:14)

At this time, we can now open it up to citizen speak. If there's anyone from the public who would like to join us, please raise your hand and we can bring you in. Comments.

Speaker 5 (06:20–06:29)

Tim, do you see anyone? We had a hand and then, okay, we've got Frank Donovan. Frank, if you want to give us your name and address for the record.

Speaker 9 (06:30–06:33)

Yes. Hi, Frank Donovan, 16 Spafford Road.

Speaker 1 (06:34–06:36)

Welcome, Frank.

Speaker 9 (06:36–07:11)

Hi, everyone. Just if the vote is coming down tonight for the Highland Street property, I want to address this to Jim. Jim, as I understand it, you have family members in a facility of Northridge. Is that correct?

Yes. So I see that as a conflict. And I don't know how you've been looking at this. And I would think because of that, you should recuse yourself from voting.

If they are voting tonight or whenever they do vote. So I wanted to put that out there.

Speaker 2 (07:15–07:21)

Okay, I don't see it as a conflict personally, but unless the board feels otherwise,

Speaker 9 (07:23–07:27)

I mean, how would you not, I guess? I feel like you'd definitely be influenced by that.

Speaker 2 (07:32–07:34)

Because my father isn't in a memory clinic.

Speaker 9 (07:37–07:42)

Well, one of these ones that's coming before us. It's not just any memory clinic.

Speaker 5 (07:43–07:46)

Jim, I don't think we need to get into a back and forth here at citizens.

Speaker 9 (07:46–07:48)

Okay, so I didn't mean to get like that.

Speaker 5 (07:48–08:01)

I just know we can we can talk to town council and we can, you know, direct Jim to the state ethics commission for advice on that. So we don't need to go back and forth on this right now.

Speaker 9 (08:01–08:03)

Okay. All right. Great. Thanks.

Speaker 1 (08:04–08:20)

Terrific. Thank you. Um, any other hands up? Anyone else?

And there will be an opportunity to, of course, speak during the public hearing.

Speaker 5 (08:21–08:25)

Sorry, I don't see any other hands. Okay.

Speaker 1 (08:26–08:44)

Great, thank you. So at this time, we can now begin to reopen our public hearing for 111 Highland Street, special permit continued from April 16th. And welcome our team in. Was Ned able to get in now?

Speaker 5 (08:46–08:54)

Give me half a second to if folks that are that are on the Northbridge team could raise their hands just so you're at the top of the list.

Speaker 10 (09:19–11:40)

I have been making it in. Great. And thank you for the record, Ned Corcoran, on behalf of Northbridge Communities LLC, the applicant in this case. I thought maybe what we do is present some new information and materials that we had submitted over the last week since the last hearing.

We've done a lot to focus on key outstanding issues with the board and then hopefully turn to the a new draft of the special permit, which I've just submitted five minutes ago with most up-to-date proposals for terms and conditions of the permit. I think the most significant change that we have proposed is that we are proposing to change out the Ready Rock retaining wall walls to a conigliaro block, which is a Framingham manufacturer that manufactures precast concrete block with stone veneer. Last Friday, I delivered in pieces of stone that would be precast, cast into the precast that would be available. we would propose to use the veneer block for the drive all the way into the turnaround in front of the main entry and down to the left to the loading dock so that all of the visible wall from outside of the property would be this stone veneer.

It changes the way the top of the wall would operate. There would be a fence and wooden guardrail on each side of the roadway. And I can present, have, I think, Rebecca Dillon present an image of what that front entry would now look like with that change. And Rebecca, do you have the ability to do that?

Speaker 11 (11:43–11:44)

I do.

Speaker 5 (11:52–11:53)

You should be able to share screen.

Speaker 11 (12:02–12:11)

There can everyone see that? Yep, thank you. OK, Sashi, did you want to go over this? Sure.

Speaker 12 (12:12–14:01)

So big difference with this wall is that it's now the top of the wall along the entrance drive will be flush. So really, as you go up the wall, you'll see, or up the driveway, you'll see very little wall on your left, right. There's guardrail now on both sides, as well as a ornamental fence. The fence will tie right into the pillars that mark the driveway entrance along with the cobblestone strip.

And then the walls will continue out just around the radius of the entrance drive. So it really ties in nicely. The wall will still step as you go up the entrance drive, but again, it will be not nearly as visible as it was with the previous material that we were using. The stone is really nice we've selected.

I know you've seen samples of it, but what's shown in this rendering is pretty close actually to what the color pattern would be. This will also be similarly used on some of the building materials. I feel like it is a really nice element and it will highlight this entrance quite well. Visually, looking from the road as you go down the road towards the Bacardi property, and if you look right into this area, if you have views through the trees, through the vegetation that are open, you would see the stone wall and then the building above it.

So, yeah, that's about it.

Speaker 1 (14:03–14:07)

Questions from the board on this design?

Speaker 3 (14:11–14:47)

Is it only about the stone wall or is it about also my question is about the guardrail? How come that guardrail is necessary when you have a nicer black fence? I feel like this is a driveway. And the guardrail makes it more industrial looking and it seems a little odd to have sort of a double fence.

And that's one. And number two, what's the spacing between the guardrail posts?

Speaker 13 (14:53–15:25)

Um, I don't I don't know if that's been, uh, I can get the answer that off the detail in a second. It's on the drawings, but, you know, the guardrail we need for safety purposes. We had a parapet before and taking the parapet out. We just felt that the additional barrier, the condition was raised last meeting about, you know, neighborhood kids run bikes or something like that.

We have to have it on the sidewalk side by code. We've added it onto the non-sidewalk side just as an additional safety measure.

Speaker 3 (15:28–16:31)

My question about the spacing on the post was, I think the setback for the building, was in the special permit, it said it was 139 feet setback from the road. I'm thinking that 139 is possibly from the closest part of the building, which is the loading dock area. But then I saw, we talked about that the setback from the main building was 150 feet. I just wanted to understand this rendering as to, I feel like this rendering makes the driveway look much longer than it actually is because 150 feet is not that significant.

Like from the street that my business is off, my driveway is about 300 feet. So I'm just kind of wondering if this isn't kind of an accurate depiction.

Speaker 12 (16:31–16:44)

I believe the distance along the driveway is closer to 200 to 230 feet.

Speaker 13 (16:44–17:14)

The driveway distance is more than that. I'm excluding traveling around the roundabout, but if you just basically drove up the driveway from Highland Street and then at the traffic circle, you went straight to the front door, that distance is about 320 feet. Thank you.

Speaker 10 (17:15–17:35)

And you're right, the closest point of the building to Highland Street, which is actually not at the loading dock, but closer. That corner is 135 feet to the edge of Highland Street. That's the setback.

Speaker 1 (17:37–18:02)

OK. So I agree with Maggie. I think the reason why we had requested the guardrail was because there was just a stone, there was a stone wall there, a low stone wall, and we were concerned about that. I guess, I'm not sure why you took the stone wall out now, but now that you have the fence in its place, it looks sort of silly to have double fencing.

Speaker 10 (18:03–18:09)

Well, we took out the stone wall because it's a different wall system. completely.

Speaker 1 (18:12–18:15)

You still can't have a low stone wall?

Speaker 10 (18:15–18:28)

Well, it is a retaining wall that is a different material than what was originally proposed as ready rock.

Speaker 13 (18:28–18:48)

It's not a block wall anymore, so the parapet doesn't make sense. It's a completely different system. Okay, we had massive blocks before that would serve as a guardrail barrier. That is not the case with this system.

So we have to put the guardrail in.

Speaker 8 (18:49–19:25)

So you have here, these have served 2 different purposes. I understand from the code point of view that the vehicle is for the guardrail. So that's the closest to the street. And then the fencing is a fall protection because of the drop that you have from the top here down to the grade down below.

And typically, the fencing for fall protection isn't of the same strength And I believe that was the case at Walcott Woods as well.

Speaker 3 (19:28–19:47)

Yeah, I don't remember it up there. I just drove up there the other day and I don't remember it. And just as a side note, I drove also by Goddard School and it seems like they have since put in a second fence. So it kind of looks a little silly having these two fences.

So.

Speaker 13 (19:47–20:17)

So the guardrail, we need both fences on the sidewalk side by code. You have to have them. And we always did. On the non-sidewalk side, we absolutely have to have the guardrail.

The site fence, it is my understanding that's not necessarily required by code, but we felt it was a good idea. And further, it was raised as a safety concern comment during the last meeting, so we put it in.

Speaker 3 (20:18–20:19)

Yeah, which I understand.

Speaker 4 (20:19–21:52)

Yeah, I think, you know, I was, Paul, this is Sean, I was the one that initiated probably everything that you're talking about in this particular, on that particular side of the road. The concern that I had expressed last week is there was no guardrail, there was no black metal fence, and if kids happen to be riding up there, my recollection is that the retaining wall extended only a short dimension above grade. The attention you've given to that as a result of the questions that I was asking and the concern I was expressing for the safety of somebody that might be on that side of the road, and more than likely, kids exploring, wandering onto the site. Maggie, this is a result of some of the questions that I brought up, and I definitely understand you know, the difference between the performance of a guardrail and the performance of that metal fence, the metal fence will never perform to meet the requirements to withstand, you know, vehicular traffic.

But one question I have, and it might be helpful for us to see, last week there was a section, Paul, that you had that showed us a section, a cut through the roadway that showed us how the stone wall, or how the retaining wall was, would be assembled. Do you have something similar to show us so we can understand what you mean in regards to that?

Speaker 13 (21:52–21:59)

I was in the updated drawings that you should have received, but if you give me half a second here I can share screen and call it out.

Speaker 8 (22:00–22:19)

Before you switch images, I just want to point out that this light fixture is a change as well. The prior fixture had a kind of an arm on it, more like a street light. I mean this is a street light too, but it's that we talked about last week.

Speaker 10 (22:19–22:23)

And we provided a cut sheet with respect to that.

Speaker 13 (22:24–22:52)

So I can share screen, but, you know, if the board has to stop sharing so that you can share. Okay, if the board doesn't want the guardrail on the other side, I don't think we're required to have, it's not required by code, then we can take it out. Guardrail or fence? The fence.

We have to have the guardrail. If I said guardrail, that was incorrect. They mean the fence. Do you see my screen?

Speaker 14 (22:53–22:54)

Yes.

Speaker 13 (22:54–24:37)

Okay. This is the updated section. These walls, they're more like a VersaLock wall, it's a different type of block system. There's no batter.

These ones stack vertically, the other ones tapered, so it was like a 12 to one net tilt back as each one nested back slightly further than the one before it. This is now looking towards Highland Street. you know, the detail on the left is pretty much what we always had. We have the, you know, five foot concrete walk that is exclusive of the width of the curb, which we allowed six inches for.

And then we got the guardrail and the light poles fall in between the guardrail posts, which, by the way, are six, six on center. One side fencing on the wall and then the other side, looking at it on the right side, we need the two-foot setback from face of curb to face of guardrail. We allowed a foot width for the guardrail and then the base of the guardrail needs to be a foot and a half back from the back of the wall. The walls are two feet thick and you add it all up and we have a 38.5 foot wide cross-section here with the site fence fitting in between the guardrail and the top of the wall.

all flush, you know, there might be some, well, it's graphically and it's nominally flush, but the blocks are blocks. And so that what will happen is, is there will, they're about two feet tall so that there will be a variable reveal as it steps up or down, depending on which way you're going that, you know, the reveal would be next to zero and then up to about two feet. If you follow me.

Speaker 4 (24:42–24:51)

Well, on the right-hand side, as we look at this section, what is the grade surface where the guide rail is on the right-hand side?

Speaker 13 (24:52–25:03)

Well, it varies sloping uphill. Oh, what is the surface? Yeah, that would just be loam and seed grass.

Speaker 4 (25:03–25:04)

It's grass, yeah.

Speaker 13 (25:04–25:04)

Okay.

Speaker 2 (25:08–25:20)

Does that grass grow right over the block or do you cap the- This is the grass stock short of the block.

Speaker 13 (25:20–25:38)

Again, the block will stick up somewhat just because it's blocks. You can't construct it flush, it's like it'll step. As it goes up, once you get up to the top of the block, then you have to, in the next block, you add a course to the top of it.

Speaker 10 (25:41–25:49)

If we have a color for the guardrail, do we want it?

Speaker 13 (25:49–25:54)

Guardrails, well, it's just timber at the moment. We haven't talked about a color for it.

Speaker 2 (25:55–26:05)

OK. I'm sorry, Paul, getting back to the top of the block, is there a cap on it or is it because I was standing on one today at the Norwood Airport that.

Speaker 13 (26:07–26:15)

Yeah, there would probably be a cap on it. I mean, we're not showing that on the detail here. We just, you know, usually typically there is a capstone that goes on it.

Speaker 2 (26:17–26:47)

Yeah, the one that I was standing on today, and I don't want to go backwards with this comment, but I'm going to say it. It looked a lot like a ready rock. Not that I want a ready rock, but it looked like that. But the top course was actually grass to the end of the block.

So when I was standing looking at the airport, I was actually standing on the top of the Ready Rock block wall and it was grass all the way to the tip. And I was just wondering, it was just really neat to the block. The top course of block had a little lip and it was probably four inches of loam and grass that went right to the edge.

Speaker 13 (26:47–26:56)

That's what we have. You're talking about this detail here that we still have, because we still got the Ready Rock. Probably this is what you're looking at here.

Speaker 2 (26:57–26:58)

Yeah, hold on a second.

Speaker 13 (26:59–27:00)

Yeah, exactly.

Speaker 2 (27:00–27:04)

It just goes to a lip. Beautiful. That's going to be on both sides?

Speaker 13 (27:06–28:03)

No, because we still have the parapet here. This is the back entrance here going back to the rear parking lot. So this one We kept the parapet for a number of reasons, mostly to keep this wall section down in the crossing because the way this lines up, if we added a foot or so of width to this thing to put a guardrail in there, that the amount of wetlands impacts would be more than what I would call de minimis. That's what we did.

I don't know if we've got photos. Again, stop sharing my screen here. I can look. I suspect that if you look at the photos of the conical block wall systems that most of them include a cap.

I know VersaLock and those, there's always a capstone that goes on this thing. I should be surprised if they didn't have one. Okay. I haven't looked at it.

We're not showing it in the detail, but that's typically how they're done. All right.

Speaker 2 (28:04–28:06)

Thank you. Okay.

Speaker 4 (28:07–28:32)

Well, on that section, one last comment, it's just a small comment though, that the, the grass probably should start before you get to that metal fence is you'll never be able to attend to, you know, caring for it on the other side. So that little space, um, you know, somehow that detail ultimately when you're building, we'll probably get worked out to not be like that is my thinking, you know, whoever's, you know, it's a minor issue.

Speaker 15 (28:33–28:33)

Okay.

Speaker 13 (28:34–28:49)

I mean, you know, this site fence that you're seeing here, if not required by code, we can take it out, which would help with that. You'd be able to, you know, reach through the thing with a weed whacker or something like that and maintain it. Yeah.

Speaker 4 (28:49–29:01)

But if for some reason, you know, a young kid went over that guide rail, that's a pretty significant drop on the other side, right?

Speaker 13 (29:02–29:05)

That's why we put it in, that's why I put the site fence in.

Speaker 4 (29:05–29:11)

Yeah, I'm not going to encourage getting rid of that fence.

Speaker 2 (29:11–29:13)

Okay. How tall is that fence, Paul, on that side?

Speaker 13 (29:15–29:16)

It's actually, what did we have?

Speaker 12 (29:16–29:18)

42 inches.

Speaker 13 (29:19–29:25)

Okay. 42 inches as measured from the grounds, yeah, 42 inches from the ground surface.

Speaker 1 (29:28–29:30)

And what is the material of the site fence?

Speaker 13 (29:31–30:01)

It's like we're calling for like, you know, the black square, close aluminum fences. Yep. I've got pictures of a similar, of a project where we basically went with this detail. I mean, the wall system is different.

You know, if you want to come back, I can call up some pictures of that and share them here and kind of, I mean, it's a different wall system that won't be versed a lot, but. you know, how it lays out.

Speaker 1 (30:04–30:11)

And what are the dimensions of the stone pillars that you're gonna have and the height of the stone wall in the front?

Speaker 12 (30:13–30:35)

The pillars are four foot by two foot by two foot. And then the stone wall part, we were looking at two foot by two foot by two foot. So the pillars are only two feet? They're wide in depth and then four feet tall with a cap.

Speaker 1 (30:38–30:45)

So four feet tall. It's pretty small. I was expecting something a little bit larger that you would have done a little bit as an entry.

Speaker 12 (30:45–31:34)

For a residential? Yeah. And while we did the rendering, which I felt looked appropriate, and then it was confirmed by the rep from the conigliere said that that was very common for what they used, a four foot height and with a cap and a light. Yeah, four feet is too small.

And then it ties really nicely with the fence tied right into the. To the pillar. I thought it looked great as far as you know, not wanting it to be too large and out of scale for this little neighborhood, so I thought it was nice.

Speaker 1 (31:37–32:06)

What so what will the width of the front stone walls be? To say 2 feet? Two feet wide and two feet tall. Yeah.

So that doesn't really give a, I guess a reveal from the columns or the pillars. It just looks, I was thinking it would look a little bit more substantial and then the walls would come off of that.

Speaker 12 (32:07–32:11)

It gives two feet of reveal because the pillar is four feet.

Speaker 1 (32:12–32:16)

I know it's height, I'm talking about the depth.

Speaker 12 (32:18–32:46)

Oh, yeah. Well, these are the same block, so they're a block material that we're working with. Once we detail it out, there might be some ability to push it out an inch or so on either side, but getting into that at this point would be Yeah, I was just thinking, yeah.

Speaker 1 (32:46–32:47)

I don't know what others feel.

Speaker 16 (32:50–32:51)

Meredith, are you talking height?

Speaker 1 (32:53–33:14)

The four feet height is fine, but I just, the two by two width just seems really, Not typical of what you would see when you drive up Highland Street, some of the stone entrances are more substantial.

Speaker 16 (33:15–33:17)

Sasha, are you working in two-foot increments?

Speaker 12 (33:20–34:11)

I am, but there is the veneer in this. This portion of the wall will probably be, the veneer will be installed in place. And so there will be the ability to adjust the thickness of it and some portions of it. But we are working with that metric.

So that's trying to keep a consistency within the site. But from what I looked at along the street, this looked very comparable to the others that were within the neighborhoods surrounding this site. Going too large feels like, you know, it just gets a little bit too much.

Speaker 16 (34:12–34:16)

But Sasha, are you saying that that pier dimension is two foot by two foot?

Speaker 12 (34:18–34:51)

The pillar, it's four feet tall, and then the width of it is two feet by two feet. And then you have the veneer on top of it. So there's a little bit of width there that is going to, you know, it's not going to be, it's not, this rock has got different depths to it. So it has texture, it has, you know, form to it.

So it's not going to be a straight, straight wall. It'll have that texture of a natural stone material.

Speaker 1 (34:53–35:09)

So you could not do a three by three on those pillars? Just to give a little bit of a bump out on them from the wall?

Speaker 12 (35:09–35:59)

I mean, honestly, I feel like this looks like a good fit. I feel like once they install, we can work with inches, but I don't know if we can work with six inches on either side. They will have a cap on them, which will be a little bit wider than the wall itself. So that will give it some width as well.

you know, we do have, you know, part of a drop off on one side. So, you know, expanding the footprint of it isn't really desired as well, making it more complicated than it probably needs to be perhaps.

Speaker 3 (36:00–37:05)

Yeah, so that's what I sort of was thinking, you know, Highland Street is a historic way and a scenic way with lots of historic homes. So in my mind, I sort of pictured a solid granite, like old hitching post type without a veneer. And even on the walls, because it's a scenic way, you know, I just happen to like a dry, you know, a dry stacked mortarless wall, like you see, you know, on my street and other historic streets. So to me, that's, it seems, I mean, it's a, you know, it looks pretty and I understand the walls, we build these walls all the time, but I think because it's a historic street, I think it should be in keeping with the with the rest of the street and the rest of our scenic ways, which is just a dry stacked wall and just straight granite posts.

Speaker 10 (37:05–37:15)

Meredith, I think we need to move on. This is a significant change. Change for the better. We need to move on.

Speaker 12 (37:16–37:57)

One consideration is that the wall on the right is retaining soil. So a dry stacked wall in that condition just would not be effective. We would end up having two walls to accomplish what this one wall can do. So minimizing disturbance, I think is the key factor.

And by looking down the street, I see some of these walls, and they're six inches tall or one foot tall, and the pillars are quite small. So I mean, the reality is that this is going to be a significant, really beautiful addition to the neighborhood.

Speaker 1 (37:57–38:02)

Yeah. OK. And there will be lanterns on top, too, which will be nice.

Speaker 10 (38:03–38:07)

Yeah. Right. OK.

Speaker 15 (38:08–38:08)

OK.

Speaker 10 (38:09–38:55)

Let's move on. The other thing that we delivered into the planning office was samples of vinyl, which I know went over like a lead balloon. And we have worked hard to come up with an alternative. We are proposing a fiber cement finish for the exterior of the building.

of a, at this point, of an unnamed type with the proposing that the planning board would have the ability to review and approve the aesthetic appearance of the final product. And we would present that back to the planning board at a later date.

Speaker 1 (38:58–39:00)

Does that sound reasonable to the board?

Speaker 2 (39:03–39:22)

Yeah, I don't have a problem with that. As long as Ned, you include, I mean, are you gonna do PVC trim boards? Or it's gonna be the hardy plank on the, let's say clapboard or shingle or some kind of- It'll be either clapboard or shingle or combination.

Speaker 10 (39:23–39:32)

We'll present samples to the planning board at a later time so that you can review and approve it for aesthetic purposes.

Speaker 2 (39:32–39:40)

Yeah, I got that part. Will you also add a couple pieces of the trim that you're going to use? Trim will be a cement as well. Fiber cement.

Speaker 10 (39:40–39:46)

Like the casing around the windows will be a fiber cement? The casing around the window will be part of the window, I think, Rebecca. Is that right?

Speaker 11 (39:48–40:13)

Well, because the windows are recessed in here, let me pull up this updated Because the windows are recessed in, we're going to have to case them out with either PVC or another product like that. They won't be able to come integral.

Speaker 2 (40:15–40:23)

Yeah, that's fine. As long as you just show us a sample of that trim so we can hold it up against the platform and see what they vote for. That's all I'm asking for.

Speaker 10 (40:23–40:42)

Yeah, that's fine. There is a provision, a new provision in the draft of the special permit that reflects the obligation to come back to the planning board for review and approval for aesthetic purposes. Great.

Speaker 1 (40:42–40:52)

That's great. So you'll provide both a shingle and a cladboard option that we can look at. And some color options as well?

Speaker 10 (40:52–40:56)

I think yes.

Speaker 11 (40:57–41:07)

Okay. That would be great. Right now the building is just shown with all cladboards. You're talking the roof shingles?

Speaker 1 (41:09–41:29)

No, just like the vinyl, you had given some samples of a style of shingle style. We just approved a building recently with hardy plank shingle style. And that can also be quite nice. I just thought it would be nice just to see the different options.

Speaker 11 (41:30–41:31)

Gotcha, OK.

Speaker 10 (41:36–41:42)

All right. Other questions about the window and the window details and the signing?

Speaker 8 (41:44–41:50)

Just thank you for preparing this drawing. I think it's helpful and will be helpful for the record. So thank you, Rebecca.

Speaker 11 (41:51–41:52)

Sure, you're welcome.

Speaker 10 (41:52–44:26)

There's one other significant thing that we took a look at. I know that Sean had asked us to look at, and that was whether or not we could go with porous pavement in the rear parking area. We took a pretty close look at it. Paul can jump in for me as well, but there are two significant issues why we would not be able to provide porous pavement.

The first is that the parking areas have to be developed initially with a binder payment because that's going to be the lay down area for all the construction equipment. And that has to be, it can't be any possibility that. oils and other fluids would come off of the equipment and into the ground. So that's important.

We'd have to remove that, obviously, and replace it. The other thing about porous pavement, it is a a stormwater measure, and we would have to bring in a significant amount of fill in order to achieve separation between the bottom of the pavement and seasonal high groundwater. There's a four-foot separation that's generally required under stormwater standards. That would be an enormous amount of fill, additional fill coming to the site.

And I think that the impact of that far outweighs the benefit that would come from The porous pavement. So for those two reasons we really took a look, you know, having looked at it. We don't think it's really appropriate in this case. With that, those are the major modifications obviously the transfer over to this conigliaro block with the with the uh with the stone veneer is a fairly significant change really from a from a structural perspective but in an aesthetic perspective because what you'll now be looking at will look more like the stone bridge the bridge over that carries the stone bridge lane over that is a looks like a very similar type of look to what's being proposed here.

With that, I'm happy to pause for questions or comments from others, but we can move into the significant other issues that we've addressed in the draft of the special permit and which we obviously prepared to walk through.

Speaker 1 (44:28–44:39)

How would members would members like to have any questions that they would like to ask before we walk through the special permit? Or do you want to save your comments as we get to that aspect of the permit?

Speaker 4 (44:43–45:08)

Meredith, I'll look to you for guidance. Two topics I want to address, and I'll address them whenever you say is appropriate. One is hospital business traffic. This is a topic I've spoke of in the past.

And the other is some measure of water mitigation for the residents. So whenever those are appropriate to discuss, I'm happy to discuss them. I'll wait for you to signal.

Speaker 1 (45:09–45:29)

OK. All right. That's great, I'll take a note of that. All right, why don't we start walking through where we are on the permit?

And I'm sure questions will arise as we get to certain sections. So walking through page one, was there any, did anyone have any questions?

Speaker 10 (45:29–45:32)

I think it would, maybe it's helpful if Tim could share a screen and.

Speaker 1 (45:32–45:37)

That would be great, particularly since you have some, yeah, added revisions, that would be great.

Speaker 5 (45:37–45:41)

I'll bring that up momentarily.

Speaker 10 (45:48–45:58)

And I attempt to address two of the two issues that Sean raised in the body of that, of the special permit, but obviously we need to look at it carefully.

Speaker 1 (46:00–46:15)

Okay, great. All right. Any questions from the board on page one or any comments? I don't think there were any changes to that first page.

Speaker 10 (46:16–46:45)

You only changed the first page as we added some revision dates to the plans. Is this the one I just sent over to you, Tim? Yes, it is. Okay.

So I added some revision dates. Is this a separate question whether you would want a conformed set of plans with a final date or whether you're happy with plans dated April 2 revised as specifically indicated?

Speaker 8 (46:46–46:57)

I prefer to have a set of conformed plans, just I think it's easier for all parties down the road. Great.

Speaker 1 (47:00–47:34)

And I had asked him, I just had a question. I believe Sean Reardon was given the updated, the revised April 19th site layout plan, grading and drainage plan. I think there were a few other site details, just a few things that were revised on April 19th. But we have not, do we know if Sean has reviewed those or if he had any comments on those, Tim?

Speaker 5 (47:37–47:41)

I believe Sean is here with us. Okay.

Speaker 1 (47:41–47:51)

So Sean, if you want to- And I'm not even sure exactly what those revisions were, I just thought, it would be good for him to sign off on those.

Speaker 17 (47:51–48:08)

Yep, I'm here. Good evening, everybody. I did look at all the revised plans. I obviously didn't sort of, they were all modest changes.

I didn't sort of scrub through the entire submittal, but I did get a healthy look at everything that had been submitted and didn't generate any new comments for me.

Speaker 1 (48:09–48:35)

Okay, great. Thank you, I appreciate that. OK. All right.

So moving to the second page, Tim, if you can scroll down. There was a highlighted section here. I just wanted to make sure everyone had a chance to see that.

Speaker 8 (48:37–49:17)

Here, I still see that just before the highlight begins, that the default is considered a minor change and there's no sort of verbiage as to what constitutes a significant change. At the last meeting I suggested that it come back to us in the event of any change and that the board be asked to decide whether the board considers it minor or significant. So Ned, can you explain your thoughts on this?

Speaker 10 (49:18–49:32)

I drew a blank on that one, I think. OK. I didn't intentionally not address it. I just, as I was looking at all the other things that I was addressing, I think I missed that one.

Speaker 8 (49:33–49:34)

OK.

Speaker 10 (49:36–49:40)

I don't have any issue with the board determining whether or not. Okay.

Speaker 8 (49:41–49:45)

I think that's a change I would like to see.

Speaker 5 (49:49–49:51)

How do you want to phrase that?

Speaker 6 (49:52–49:53)

Okay. Let's see.

Speaker 8 (50:01–50:19)

Then you could put period after final site plan. And then you could say a copy of which shall be provided to the board to be reviewed as to whether the board considers it a minor or significant change.

Speaker 10 (50:25–50:29)

I would put a semicolon, not a period. OK.

Speaker 1 (50:35–50:37)

Yeah, I agree with that. That's just cleaner and.

Speaker 8 (51:07–51:29)

Great, thank you. Do we need the rest of that though? We go back.

Speaker 5 (51:30–51:50)

Let me change substantial to significant so it matches. Okay, great. I mean, I think the distinction here is if it's a minor change, you just approve it. And then if it's a significant change, then the review is a little bit more substantial.

Speaker 10 (51:56–51:58)

OK, great. Are you saving this as a new version?

Speaker 5 (51:59–52:10)

Yeah, I'm going to put it on my machine. Sorry, gang.

Speaker 1 (52:10–52:16)

No, take your time. That's great, that's.

Speaker 5 (52:32–52:33)

Keep going.

Speaker 1 (52:35–52:53)

Yep. I think that's good for H2, did anyone have? Those all seem to stay the same, yep.

Speaker 10 (52:56–53:37)

This is where I dealt with exterior siding and trim. Windows, I don't know what the recess, whether it was two inches or three inches wide as a blank. And then we would provide a sample and a specification sheet for the cement that would be available to the director of planning and the parent shall be approved by the planning board. And then I added language that Cheryl suggested about the solar readiness for the roof with the definition therein.

Speaker 8 (53:38–53:55)

The one thing I would say is, if you want flexibility in the material of the windows, this would be a question for Rebecca. I don't think you'd have to include vinyl here. And I think, again, Rebecca, was it three inches that it was set back or three and a half inches from the exterior face?

Speaker 11 (53:56–54:02)

It was, yeah, three inches. And I agree that makes sense too.

Speaker 1 (54:02–54:10)

I yeah I got the vinyl yeah okay do you know what the window you used up on new report.

Speaker 10 (54:11–54:12)

I think it's gel one.

Speaker 5 (54:14–54:20)

yeah that's a good good name do we do we want to put three inches here, yes.

Speaker 2 (54:24–54:34)

And then will we be able to take a look at like the grill pattern on the windows to see if they're simulated divided light or just like a grill in between the glass?

Speaker 8 (54:37–54:39)

I think that was in that drawing that they had.

Speaker 2 (54:40–54:49)

It wasn't. I mean, I assume from the first drawing, it was between the glass. From the second drawing, it looked like it was a simulated divided light, but it didn't specify it anywhere.

Speaker 11 (54:51–55:07)

Yes, we didn't specify it, but when we come back with all of the exterior finishes, we can also get a window sample. Yeah, that would be great to get a window sample.

Speaker 10 (55:07–55:23)

Yeah. Yeah. Appreciate that. We want to add siding after the word siding and put siding trim and window samples will be made available to the director of planning.

That would be great. Right below the number three, Tim.

Speaker 6 (55:23–55:24)

OK.

Speaker 10 (55:25–55:26)

Siding comma.

Speaker 6 (55:26–55:27)

That would be great.

Speaker 10 (55:28–55:30)

Trim and window.

Speaker 5 (55:34–55:45)

Sample and specification sheet for the fiber spent siding trim and windows. I'll be made available to the director of planning.

Speaker 1 (55:45–55:50)

Yeah. And Tim will let us know when it's in, right?

Speaker 5 (55:51–55:59)

You'll be the 2nd to know after after me. The Goddard school. We don't. Yeah, yeah.

Meredith, you don't have to keep reminding me.

Speaker 4 (56:01–56:32)

So, Meredith, I have a question on this and I guess like Charles inputs and she's an architect. Does this preclude the use of a trim material that's PVC? It seems to me it's really common to have PVC trim and a cementitious siding material.

Speaker 10 (56:34–56:37)

That's a good catch, Sean.

Speaker 4 (56:37–56:45)

I honestly don't know. And Jim, you might see some of this, but I don't see that. I don't see trim material as being cementitious.

Speaker 8 (56:47–56:57)

There's a product by Boral. But I don't think we have to hold to that as the trim material here either.

Speaker 10 (56:58–57:02)

So since we just take out exterior sodding shall be shall consist of.

Speaker 8 (57:03–57:04)

Yeah, that's fine.

Speaker 10 (57:05–57:06)

So take out and trim.

Speaker 2 (57:11–57:22)

Yes, exactly. I mean, because you can do way more with the AZEC or PVC trim as far as cornices and back bands and things that you can't do with that boral.

Speaker 8 (57:23–57:32)

Well, and I think you could make the word materials just material now. But that's a minor thing.

Speaker 11 (57:34–57:40)

Our preference would be to use PVC, but if you keep it general, then we can look at options.

Speaker 4 (57:46–57:51)

It's going to be a better look in building if you have the latitude to use PVC trim.

Speaker 8 (58:08–58:16)

I think in the event that could be changed to should, So after solar ready.

Speaker 5 (58:21–58:21)

Wait, where are we?

Speaker 8 (58:23–58:48)

Oh, the roof will be constructed in such a manner as to be solar ready should actually well, maybe it shouldn't be just the roof, because there's reference here to other things than just the roof. So maybe it should be the building will be constructed in such a manner as to be solar ready should the opportunity to install solar panels presents itself in the future.

Speaker 4 (58:48–58:53)

I totally agree with you, Cheryl. That's a better way to capture this.

Speaker 10 (58:54–58:56)

Buildings should be capitalized.

Speaker 3 (59:19–59:58)

Okay. So if you stop for a minute, if you go back to number six, so under site plan design, there's a statement that says, The site layout takes into account the existing terrain and significant landscape features. Is that an accurate statement?

Speaker 6 (59:59–01:00:00)

Absolutely.

Speaker 3 (01:00:01–01:00:11)

Because by bringing in 20,000 cubic yards of fill doesn't mean you're using the existing terrain.

Speaker 10 (01:00:11–01:00:21)

It means we're preserving the existing terrain to the extent possible by bringing in fill with retaining walls and narrowing the area that is actually subject to development.

Speaker 8 (01:00:22–01:00:43)

So to your point, Maggie, it could say to the extent possible or something like that at the end. Or to the extent. Feasible.

Speaker 3 (01:00:45–01:01:19)

Following the use of cuts and fills have been minimized to that necessary to fit the building into the terrain. It's just going back. Has it really been minimized? Has cut and fill really been minimized?

It goes back to it's just a lot of cut and filling going on, and it's disrupting the natural topography. It's just making sure the statements are accurate.

Speaker 8 (01:01:20–01:02:04)

Again, to the second sentence I think you're referring to, you could add, and to be in compliance with stormwater standards. I think it's really what's triggering stormwater and zoning, stormwater standards and zoning requirements, because it's the height at the abutting property to the south that triggers some of it. And it's the stormwater requirements that are triggering other parts of it. So if you want to be more specific, to that, I think I agree with you.

So it would be after the abutting properties words.

Speaker 10 (01:02:07–01:02:15)

I'd recommend the term wetland protection. Okay. Stonewater standards. Okay, Stan.

So my standards are part of weapons protection.

Speaker 5 (01:02:16–01:02:20)

What do you want me to write here after abutting properties?

Speaker 8 (01:02:23–01:02:28)

And conform to What did you say, Ned, again, wetlands?

Speaker 10 (01:02:29–01:02:37)

Provide wetland protection and conform to zoning requirements and provide wetland, maximize provision of wetland protections.

Speaker 8 (01:02:53–01:02:55)

You could say in order to instead of and.

Speaker 13 (01:02:57–01:02:57)

Sure.

Speaker 6 (01:03:14–01:03:15)

OK, great.

Speaker 1 (01:03:25–01:04:29)

Can we just have a quick talk about the sidewalks? I know you all had originally, the applicant had put in asphalt and then we requested, you know, we talked about concrete. You know, I did take a drive up to Walcott Woods again to look at a granite curbing with the asphalt. And aesthetically, it really, it just, it disappears.

It looks really nice. It's a very clean look and it doesn't draw your attention. My biggest concern for this project is, you know, is really having it blend in and not jump out at you when you drive down the street. And I think that might be a nice way to have sort of a compromise of having, you know, certainly a safe, ADA accessible walkway, but allow for that to be possibly asphalt.

And I just wanted to see what others felt on that.

Speaker 8 (01:04:30–01:05:53)

So I took a walk, might take a number of walks, but I took a walk today in particular to look at sidewalks. I walked where asphalt is in horrible condition. I walked where asphalt was in good condition and decent condition. And I walked where concrete was in good condition everywhere.

The state roadways, like Reedsdale, are concrete. And the towns are more commonly asphalt. Anywhere where they're making accessibility improvements at crosswalks or at intersections, they're concrete. The long term durability of concrete is just far superior than asphalt.

And to maintain it as an accessible way, I still think concrete's the best. And from an aesthetic point of view, I looked at the color today too. It seemed to me like the color of concrete on Reedsdale matches the color of the asphalt as they've aged together. When asphalt is new and the concrete in the area, the asphalt sidewalk and the asphalt street are new, their coloration sort of matches up too.

So I would say that my preference would still be to have the concrete, but that's me, one person.

Speaker 1 (01:05:53–01:06:10)

Yeah. And you should walk through my neighborhood because the concrete is a mess. But now I recognize that. And they do have to keep it, they're required to keep it maintained.

whatever, whether either concrete or asphalt.

Speaker 10 (01:06:11–01:06:23)

The plan currently shows concrete in the front area and asphalt to the rear. But again, we're ambivalent based on what the board's preference is. Sorry, Maggie.

Speaker 3 (01:06:24–01:06:26)

Yeah, no, I was just saying, what about a stamp concrete?

Speaker 8 (01:06:30–01:07:04)

I think you could ask for pigment in the concrete if you're concerned about the color. But the stamping, you have to be concerned about the accessibility of how deep the patterning would be. And really, in terms of maintenance, if you get snow and ice kind of gathered in those, it is a slope. And so if you have the snow and ice gathering in those depressions in the stamping, It could present a little bit more of a maintenance or safety concern.

Speaker 3 (01:07:05–01:07:26)

I keep going back that it's still a driveway and not a road. And it should look like it fits in with the neighborhood. So if your preference is concrete for maintenance, then I would want to see a pigment, a dyed concrete, a darker color so it does disappear.

Speaker 10 (01:07:30–01:07:37)

I think the sidewalk across Highland Street is asphalt, if that makes a difference.

Speaker 8 (01:07:37–01:07:44)

Just like if you look at the sidewalk at the library, next to the library, next to the stone wall, that's concrete, for example.

Speaker 2 (01:07:46–01:08:25)

Yeah, it varies throughout town. I mean, I got to agree with Cheryl. I think the concrete is a much better product long term. I think it's really a Cadillac job as opposed to asphalt.

And my wife and I walk also, and we do see a lot of, not that there's going to be any large trees here, but roots and asphalt is just more susceptible to frost heating, it seems, and breaks apart quicker. I mean, I do like the functionality and the look of the concrete, personally. I mean, I could go either way on this one, but I would lean towards concrete if we, you know, if we had a choice.

Speaker 4 (01:08:31–01:09:05)

Meredith, it's not uncommon for some towns to have a standard where the concrete material on the public sidewalks are required to be a certain color. I think the concern that you've had is the contrast between the lightness of the color of a concrete sidewalk and the darkness of the color of the paved roadway. Am I right?

Speaker 1 (01:09:06–01:09:18)

Yes, exactly. It'll look much more commercial rather than residential. If you look at ball cut woods, it just feels like you're going up to a residence.

Speaker 4 (01:09:18–01:10:46)

Yeah. In terms of the quality differences, as someone who's spent the years that I have in construction, it is definitely a superior surface, the concrete. I wonder if it's possible to find a balance between the aesthetic concern that you have and also the value of a sidewalk that'll probably last forever. If we could have a you know, have a, and I'm suggesting a mix-in solution to it.

I know in Watertown, for example, they mix in fly ash into the ready-mix concrete, and that gives them a, you know, a darker color sidewalk. Um, so there's, it's not unusual to, to do something like that and I'm sure you can achieve it. Um, you know, stamping as, as we talked to, um, some make sure I'll mention it earlier. It creates another host of problems, you know, with a surface that's not smooth.

And if people are walking on this, I don't think we want to create chances and opportunities for people to trip and fall. And it would be hard for the applicant to maintain that certainly in the winter time too. But, um, maybe concrete with a color that might take away some of the whiteness that might make it look a little closer to the pavement.

Speaker 1 (01:10:48–01:10:50)

That would be great if that's something that's possible to do.

Speaker 4 (01:10:52–01:11:06)

I think you want an opportunity to make sure that you are satisfied with the color. Maybe it's a matter of having an opportunity to see a sample of what that would be before it's at some point in time.

Speaker 1 (01:11:09–01:11:13)

Ned, can you ask your team if that's possible?

Speaker 10 (01:11:15–01:11:42)

My assumption is that it is. Mike's phone is not lighting up at the minute, so that probably means it's OK. In fact, the answer is yes, possible. So maybe a sentence that says that the will present for review and approval of the planning board final treatment for sidewalks, including coloration.

Speaker 1 (01:11:43–01:11:45)

All right, should we add that now in here?

Speaker 5 (01:11:46–01:11:49)

Do you want to put that under the condition?

Speaker 10 (01:11:49–01:11:54)

Yeah, put it in the condition.

Speaker 5 (01:11:56–01:11:59)

All right, say that again.

Speaker 10 (01:11:59–01:13:41)

The applicant shall present materials and coloration for final sidewalk treatments for review and approval by the board, by the planning board. This is the provision in the retaining walls that deals with the change over to the conigliaro rock with field stone blends round veneer. And then provision that we may foot and highlighting the fact that the veneer would be on the portion of the wall leading from Highland Street to the traffic circle and down to the loading dock. And then the remainder of the walls would be precast blocks, either conigliaro, ready rock, or equal without veneer.

The front entry of the site, we spent a fair amount of detail. We spent some time on earlier, but this deals with the notion that there will be, again, the precast conical arrow block with the veneer, pillars to have solar-powered lanterns on top, and a cobblestone apron across the entry, as shown on the site plan.

Speaker 8 (01:13:42–01:13:46)

So I didn't see any dimensions on the site plan for that cobblestone apron?

Speaker 10 (01:13:46–01:13:47)

They're on the landscape plan.

Speaker 8 (01:13:48–01:13:49)

And the dimension was added?

Speaker 10 (01:13:49–01:13:52)

Yeah. And it's referenced in the site plan.

Speaker 8 (01:13:53–01:14:10)

OK. What's that dimension? Does Sasha recall? It's 5 feet wide.

Thank you. Thanks.

Speaker 5 (01:14:14–01:14:16)

We done here with the retaining walls.

Speaker 1 (01:14:19–01:14:37)

I think so. Yeah. I had a question on the lighting. I know we talked about 14 feet tall, but I don't recall having…

Meredith, I'm sorry.

Speaker 8 (01:14:37–01:15:02)

Before we get to lighting, may I make a comment or question on number 12 on the parking? Or maybe it's a different numberation now. It's the last sentence. Visitors to the site are prohibited from parking on public ways of the town.

I just wonder, is that… enforceable or how is it enforceable?

Speaker 10 (01:15:09–01:15:21)

I think the concern would be visitors parking on the ladder streets and walking down and across the street.

Speaker 8 (01:15:24–01:15:34)

I guess, I'm just wondering if there's a better way to sort of ensure this rather than just making a statement like that.

Speaker 10 (01:15:35–01:15:43)

I suppose we could adopt a provision that's, well, we would have to work with visitors.

Speaker 8 (01:15:52–01:16:18)

So there could be something where a parking I'm just thinking it's a document that could be provided to all residents and their visitors, which states what the parking arrangements are on holidays and special events, something like that, so that they know what the policy is coming in.

Speaker 10 (01:16:20–01:16:23)

Yeah, we could develop a document like that.

Speaker 8 (01:16:26–01:16:38)

In that policy document, when residents families bring them here that they'll be provided with that policy, and that policy would include this statement.

Speaker 10 (01:16:43–01:17:13)

Yes. Maybe the thing to do is strike that sentence here and put something into where we deal with traffic. Okay. Because we do say in the traffic section that we encourage visitors to follow the same rules about accessing the site and egressing the site.

Speaker 8 (01:17:13–01:17:15)

OK, that seems like a better place for it.

Speaker 3 (01:17:15–01:17:22)

OK. And were we provided a copy of Exhibit F?

Speaker 10 (01:17:24–01:17:29)

I'm sorry, a copy of what? Exhibit F. No, still being developed.

Speaker 8 (01:17:44–01:17:51)

So I interrupted you, Meredith, when you were talking about the light pole height. So that's a train of thought there. All right.

Speaker 1 (01:17:52–01:18:00)

I just I only thought we were talking about 14 foot tall lights. I was not aware that there were any 18 foot.

Speaker 8 (01:18:00–01:18:05)

I'm in agreement on that, Meredith, on the 14 feet.

Speaker 12 (01:18:06–01:18:57)

Those were the two light poles in the rear parking lot that have always been 18 feet. The lighting rep was really pressing to keep them that way because we were getting the coverage that was needed. The lights are going to be shut off at 1130 and he was just concerned that We needed that 18 feet to get the light levels that are required for safety back there. And considering that they weren't going to be visible from pretty much anyone that didn't go down that road in parking those lots.

So that's why we kept those. Everything else on site is 14 feet. So anyone visiting and parking in the upper area will only see a 14 foot residential scale light pole.

Speaker 8 (01:18:58–01:19:11)

But the taller they are, particularly in winter, the more potential for visibility further away they are. So I think, would it mean adding a fixture up there instead of two that you would need three?

Speaker 10 (01:19:11–01:19:13)

Might need four.

Speaker 12 (01:19:15–01:19:32)

Hopefully four, since there are two different parking opposite sides of the entrance road. I mean, this is the area where we have a good 50 feet of woods on the back and then buffered of woodland all around it.

Speaker 8 (01:19:33–01:21:12)

Except that when we don't have the woods, I mean, I see Milton Hospital lighting, I see Winter Valley's parking lot lighting, and You see they're much more visible in the months when you don't have foliage on the trees. So you will look straight up the street or straight up the driveway here to that parking lot. It's not as if it's in the back or in a different part. It's the front of the parking lot.

It's not fully that way. But I mean, I don't think we should dismiss Winter Valley. You know, people think of this site as being the back, but there is a property to the back and that property is winter valley and there will be a parking lot there as well with 14 foot tall lights. The idea here that you were going to have this be shut off at 1130, but I had suggested these dim down to 30% at dusk.

So if we put here that these dimmed down to 30% at dusk, so whatever, if it's 4 o'clock in the winter and 8 o'clock or 9 o'clock in the summer, then maybe that's not such a concern to keep it at 18 feet. But otherwise, I still am concerned.

Speaker 10 (01:21:13–01:21:16)

The 30% capacity is in the condition?

Speaker 8 (01:21:17–01:21:23)

Yeah. But it doesn't say at dusk. So let's put at dusk.

Speaker 10 (01:21:23–01:21:25)

We can add at dusk.

Speaker 1 (01:21:25–01:21:33)

And didn't we also talk about motion detectors on these so that they only get triggered when there is a vehicle?

Speaker 10 (01:21:36–01:21:49)

One of the issues I think you might be concerned about with motion detectors is there's a lot of critters that move around back there. And they may be going on and off constantly.

Speaker 8 (01:21:50–01:22:19)

I would actually like all of the site lighting to be dimmed at 30% at 1130. There shouldn't be visitors coming and going then. You're not going to have staff coming and going then. except maybe the very front entrance, if you need it there, and security that can be occupancy center off of the building, not on the roadway.

But there's no reason to light up this driveway and parking lot past 1130.

Speaker 10 (01:22:20–01:22:21)

We can do that.

Speaker 8 (01:22:22–01:22:24)

Any parking lot, not just the rear parking lot.

Speaker 10 (01:22:24–01:22:30)

Yeah. Any of the so-called street lights can be dimmed.

Speaker 8 (01:22:31–01:22:59)

And I had asked, I think, at the bollards as well, because there's a lot of them around the perimeter. Those, again, will be visible from neighboring properties, particularly winter months. So the lights, do we need to be more specific about the lights will be dimmed to 30% capacity at dusk?

Speaker 10 (01:23:00–01:23:13)

But if you say the lights, including lighting and driveway, including driveway, parking area, lighting, and bollards.

Speaker 8 (01:23:14–01:23:16)

You could say service area as well.

Speaker 10 (01:23:16–01:23:19)

Service areas, parking and service areas.

Speaker 12 (01:23:27–01:23:29)

Bowl and bollard would cover them all.

Speaker 8 (01:23:33–01:23:34)

True. Paul and Bollingwood.

Speaker 2 (01:23:36–01:23:40)

So how would that work if an employee doesn't feel safe?

Speaker 8 (01:23:42–01:23:51)

Well, that's where I said the ones around the building. But at 1130 at night until dawn.

Speaker 2 (01:23:51–01:24:10)

I'm thinking more like six or seven at night in the winter. I just don't want to limit them. And so, I mean, it would be nice to have a provision that says something to the effect of if an employee or if a visitor doesn't feel safe walking to their car, you know, this could be adjusted.

Speaker 8 (01:24:11–01:24:29)

So maybe we could do an occupancy sensor. Sorry, Jim. Occupancy sensor that's activated between the hours of dusk and 1130. So that way it would cover that time, but not animals during the middle of the night.

Speaker 2 (01:24:32–01:24:35)

What's the difference between occupancy sensor and motion?

Speaker 8 (01:24:35–01:24:42)

I'm sorry, motion, same thing.

Speaker 2 (01:24:42–01:24:46)

Yeah, I guess, yeah. OK, if you want to include motions in there.

Speaker 8 (01:24:49–01:25:09)

That word says, except as necessary to provide safe access and egress for evening visitors and shift changes, you could say, except allowing motion sensors as necessary.

Speaker 2 (01:25:18–01:25:25)

That's great, thank you. I'm just concerned about safety and protection and we live in a very safe town, but you never know.

Speaker 3 (01:25:29–01:25:33)

There may not be as many critters because we're disturbing their habitat.

Speaker 2 (01:25:41–01:25:42)

They'll be back.

Speaker 8 (01:25:43–01:26:05)

Oh, and then one other thing is with it, it says in this under conditions and ABCC shall be compliant with the principles of the International Dark Sky Association. I think you just say shall be certified by the International Dark Sky. So the fixtures are actually certified.

Speaker 5 (01:27:15–01:27:16)

Anything here?

Speaker 8 (01:27:25–01:27:26)

Not for me.

Speaker 4 (01:27:30–01:27:43)

Meredith, is this the appropriate area to address what I've been speaking about with regard to possible business traffic?

Speaker 10 (01:27:43–01:27:46)

That's coming in the draft, Sean. OK.

Speaker 8 (01:27:47–01:27:52)

But this is the section, Ed, where you thought we would put the parking policy?

Speaker 10 (01:27:58–01:28:41)

Perhaps if you keep going, there's some additional conditions. Right. So the third line in that next page says, in addition, all reasonable efforts shall be pursued to encourage visitors to comply with this requirement. Perhaps there you could put in language that deals with establishing materials to provide to visitors and families and guests relative to access and parking.

Speaker 8 (01:28:43–01:28:44)

That makes sense.

Speaker 10 (01:28:49–01:29:41)

Maybe after it says this requirement, add in before the word copies, Tim, the applicant shall develop and provide guidance materials to guests and other visitors relative to this traffic requirement and the requirement that, and guidance relative to parking, including the provision that parking is prohibited on the abutting streets, including, you know, Upper Highland and the Ladder Streets.

Speaker 5 (01:29:44–01:29:46)

Give me the last part again.

Speaker 10 (01:29:47–01:30:03)

Let me just read it. The applicant shall develop and provide guidance materials to guests and other visitors relative to traffic and parking requirements, including the prohibition against parking on Upper Highland and the Ladder Streets. Or Highland and the Ladder Streets.

Speaker 5 (01:30:07–01:30:08)

Do we define Ladder Streets?

Speaker 6 (01:30:09–01:30:09)

Yes.

Speaker 10 (01:30:16–01:31:24)

might want to then make this a new condition relative to surveillance materials and penalty. The next condition deals with the payment into the traffic infrastructure fund after the last hearing, I actually called Chase Berkeley to get an estimate on the cost to re-sequence the signals. And he said, oh, funny you should ask. We did that a month ago.

The town got a grant from MassDOT to resequence those signals, and it's been done. So we took the full, what we estimated as $5,000 per, and we just went and said, proposal, we pay the max under the policy or under the bylaw. This next condition, Sean, is the one that gets at the issue of the hospital.

Speaker 4 (01:31:26–01:31:40)

There's an email from Rich that came around eight o'clock. Have you seen that in your email? I have not, but I will take a look. Am I copying it?

I think so.

Speaker 6 (01:32:04–01:32:27)

That makes sense.

Speaker 2 (01:32:27–01:32:32)

Could you say vendors and employees?

Speaker 10 (01:32:34–01:32:52)

I think from what I understand the hospital's concern, the employee issue is a difficult one. Employees now are parking at St. Elizabeth's Church under a separate license agreement between the hospital and St. Elizabeth's because parking is so tight on the site.

Speaker 2 (01:32:57–01:33:01)

Yeah, but that can't be all employees.

Speaker 10 (01:33:02–01:33:29)

That's not all. It's not. But as we have understood, I'm not saying it's the only issue, but we have understood that the real issue here is the air gas truck, the linen trucks, the ambulances using a lot of things.

Speaker 2 (01:33:29–01:33:39)

Yeah, they're the most obvious, but I'm sure there are employees. It'd be nice to try to, I mean, I'm sure there are employees going down the ladder streets. It'd be nice to get them to use the Reedsdale Road entrance as well.

Speaker 10 (01:33:40–01:33:42)

Yeah, I hear you.

Speaker 3 (01:33:46–01:34:14)

Well, maybe that contribution of 13-5 to the traffic could be used for the ladder streets protection instead of, to me, it seems like the money is going into a general fund and the impact from this development is on the neighborhood.

Speaker 8 (01:34:14–01:34:26)

Maggie, my recollection about that fund is that it is specifically required to go to the neighborhood that's affected by the project.

Speaker 3 (01:34:26–01:34:42)

Okay, so then if the neighbors on Stafford or Buckingham, if they wanted to put in speed humps, maybe they would get priority from DPW because they have money to install them.

Speaker 8 (01:34:43–01:35:17)

They might want to look at some traffic analysis of what would happen if there was any other change. Um, to traffic patterns also, I mean, so, for example, if there was a one way proposed somewhere that the traffic study could take a look at that, but. Those that my recollection of that fund is that that's a requirement. So, how that gets used, I believe it's planning board that.

And or select board that would make that decision both right? Okay.

Speaker 4 (01:35:20–01:36:14)

I guess we would want that opportunity to influence how the funds are used. I did have a conversation with Rich Fernandez today. And the language that's written here is a result of the conversation that he then had with Ned. So he's committed to this.

which I'm grateful for, but I think making sure that the monies are available, because some of the success of keeping vendor traffic off the Lattice Streets might be to introduce signs at the end, the retail end of each of those streets, you know, to identify or, you know, I guess… Perhaps go back up to the…

Speaker 10 (01:36:15–01:36:26)

condition about paying into the Traffic and Safety Infrastructure Fund, we could add a provision that says that with the funds to be used to address traffic issues in this neighborhood.

Speaker 8 (01:36:29–01:36:43)

But you have to look at the language of that, that established that fund to start with, I think, Ned. You could say to the extent as allowed in that, you know, the language of that fund.

Speaker 10 (01:36:43–01:36:59)

I'm just pulling that language out now to see if I can.

Speaker 2 (01:36:59–01:37:13)

So are we not going to require the applicant to adjust the lights anymore at Canton and Highland? Or is that part of this 13-5? That's already been done.

Speaker 10 (01:37:14–01:37:55)

OK, so we don't have to do that anymore, correct? That's why I adjusted this to. You know, grateful payment. OK, good.

So one of the things that says money paid by a specific applicant for a special permit under this section shall only be spent in mitigation measures related to said development and specified as conditions in the special permit. I think you can condition the expenditure on the provision of traffic mitigation measures in this neighborhood as determined by the select board and the planning board, perhaps in consultation with the traffic commission.

Speaker 8 (01:37:59–01:38:00)

That makes sense, I think.

Speaker 3 (01:38:06–01:38:07)

Maybe with the neighborhood,

Speaker 10 (01:38:10–01:38:34)

I would expect that they would be part of the discussion. But yeah, you could certainly add that. I mean, that would be that this is outside of us. It's a separate action that would be undertaken by the planning board and the select board relative to what measures you want to introduce.

Just know that there's a fund available to pay for them.

Speaker 4 (01:38:36–01:39:26)

There's a letter provided to us late today by the neighbors. And one of the measures that they identify in the letter that they would, I think they're advocating for, is speed bumps. And they happen to say five speed bumps on Spafford. So, you know, hopefully these funds, and I'm not sure how that all comes to life, you know, and who's involved in it, but I would hope that 13-5 is for potentially signage at the end of the traffic roads to identify that they're not for hospital vendors and possibly for speed bumps on Sparford for traffic calming measures.

Speaker 10 (01:39:28–01:39:48)

The traffic commission would have to approve the number and location of the speed humps. I think as part of the hospital's plan, the hospital would be encouraged to post signs.

Speaker 8 (01:39:49–01:40:06)

So what if we require that this be paid in at the issuance of the building permit so that whatever mitigation measures are done could be done by the time of the certificate of occupancy?

Speaker 10 (01:40:07–01:40:53)

I think that's fine. If you change certificate of occupancy to issuance of building permit. And I would add then, Tim, a next sentence that says funds shall be expended as directed by the select board and the planning board. Let's just find that language again.

on mitigation measures related to the development and as specified by both boards.

Speaker 8 (01:40:54–01:40:56)

Shouldn't we reference the section of the zoning?

Speaker 5 (01:40:57–01:41:02)

Yeah. I would just reference the zoning itself rather than try to restate.

Speaker 10 (01:41:03–01:41:16)

No. Well, it's section 275-20.2. Yes, it's 2.75-20 is the traffic impact bylaw.

Speaker 5 (01:41:16–01:41:20)

Section 275-20.

Speaker 10 (01:41:23–01:41:30)

And the specific reference to the mitigation payments is .6.

Speaker 4 (01:42:01–01:42:58)

No, I have one question on this, Ned, and I see the note written here, the applicant in the hospital will present the plan to the Traffic Commission and the hospital will agree to be bound by any reasonable provisions that may be imposed by the Traffic Commission therein and completely respect the technical ability of the Traffic Commission, but I really would like the planning board to understand what the plan is. I don't think the planning board has more technical ability than the traffic commission, but we're the one that's initiating this. And I don't know, with the way this is written, I feel like it's going to be, if this project were to be approved and move forward, How do we remain, you know, we don't want to do the traffic commission's job. I'm sure the other members feel the same way.

But I'd like to make sure that what happens here, you know, there's a benefit for the neighbors.

Speaker 10 (01:42:59–01:43:05)

How about if you say it's imposed by the traffic commission consultation with the planning board?

Speaker 4 (01:43:10–01:43:11)

Okay. I think that's fine.

Speaker 15 (01:43:12–01:43:12)

Okay.

Speaker 8 (01:43:16–01:43:57)

So here, are we moving now to the construction? I still have problems with 7 AM conflicting with the school.

Speaker 10 (01:43:58–01:44:14)

Yeah, my thought on that was adding the provision that there would be police details would be specifically required and that would mitigate the impacts.

Speaker 8 (01:44:15–01:44:21)

Well, it says to address safety concerns, so I would say It would have to be every day that there's truck delivery then.

Speaker 10 (01:44:22–01:44:28)

Or as required by the Director of the Department of Public Works.

Speaker 8 (01:44:28–01:44:37)

But he or she may not put that requirement on when neighbors think it should be required in terms of?

Speaker 10 (01:44:38–01:44:48)

The issue, I think, is more about the volume of trucks coming on Canton Avenue and up Highland Street. They're prohibited from the neighborhood.

Speaker 8 (01:44:50–01:45:42)

Yeah, we heard concerns from neighbors about students walking to Pierce and to the high school down Highland, and they would have to have crossing points. I actually think the intersection at Canton and Highland and Thatcher for all these trucks is a problematic intersection anyway. And you send all the trucks through that intersection, it's going to be that much more challenging, because that's where they all have to cross to get to the high school or to Pierce. So I still think that that's the worst timing on Canton Ave is in the morning at 7 AM.

I was walking down Canton Ave at 7.15 this morning and it was backed up. I still don't like the 7 a.m. time frame.

Speaker 10 (01:45:45–01:45:58)

Well, as Shawn knows, this is a tough one to resolve. I don't know how to resolve it other than to respond to suggestions.

Speaker 8 (01:45:59–01:46:00)

I'd suggest 8 a.m.

Speaker 4 (01:46:05–01:46:55)

Well, maybe there's an opportunity here. I'll go back to the police detail for a moment. Typically, the police detail is going to be located at the entrance to the site. And the challenge we have is that the traffic to and from the school is not just at the entrance to the site.

So the detail isn't really going to resolve. the concern with the kids walking and the traffic. But what if we considered this, that truck traffic to the site has to be before seven or after eight, but not between seven and eight. So that would allow the builder, if he needed something for the seven o'clock hour, to have the opportunity to arrive there before seven.

But between seven and eight, Cheryl, there's no truck traffic.

Speaker 8 (01:46:55–01:47:18)

I just think it's early start for residential neighborhoods. Now you're talking about trucks rolling in at 6 or 6.30 when we don't normally allow construction to start before 7 on a site. What if they arrive at 6.45? Are they going to idle in the street on Highland or on one of the latter streets?

I just think 8 AM.

Speaker 4 (01:47:22–01:47:22)

Yeah. OK.

Speaker 10 (01:47:23–01:47:38)

How about if the detail is posted at the, so I'm getting a suggestion for how about 730 and detail posted.

Speaker 8 (01:47:38–01:48:06)

Yeah, 730 won't address the school time frame. I would say, what is it, 745 at the high school is the, I don't remember if that's exact start time, but it's definitely around then. So I don't think that's going to help.

Speaker 2 (01:48:06–01:48:22)

I mean, I got to say, if I lived next door to this, I would want it done as quick as possible. That means I have to hear noise at 7. Personally, I would be willing to do that if it means it shaves two or three months off the duration of the project.

Speaker 4 (01:48:22–01:48:35)

I don't think it'll do that though, Jim. I don't think it's going to save time. It's just going to change the workday. That's my opinion.

Speaker 3 (01:48:35–01:48:40)

We want to ask the neighbors what they would prefer instead of us guessing.

Speaker 2 (01:48:46–01:49:06)

One of the thing I was thinking of is if you're going to do a late start date, What about school vacations in the summertime when there is no school? Would you let them go back to seven o'clock those days, long weekends? Actually, they're not working Memorial Day, but yeah, so school vacations in summertime, but they have a seven o'clock start.

Speaker 8 (01:49:10–01:49:17)

Certainly summertime makes sense. I think traffic's lesser anyway in the summer, particularly around the school time.

Speaker 10 (01:49:17–01:49:32)

What if we said 8 to 2, Monday through Friday, except during summer recess? Or 8 to 2.30?

Speaker 3 (01:49:35–01:49:40)

Or 8 to 3? If you're starting an hour later, you get to go an hour later.

Speaker 2 (01:49:40–01:49:44)

One hour later would be 4, right?

Speaker 3 (01:49:46–01:49:48)

Well, this says 8 to 2, 7.

Speaker 2 (01:49:48–01:49:48)

Yeah.

Speaker 3 (01:49:49–01:49:51)

It says 8, what does it say, 8 to 2?

Speaker 10 (01:49:52–01:49:54)

It's a six-hour workday. 7 to 2.

Speaker 3 (01:49:54–01:49:56)

7 to 2.

Speaker 10 (01:49:56–01:50:02)

We said 8 to 3, Monday through Friday, excluding summer.

Speaker 8 (01:50:04–01:50:07)

It's not the workday, Jim, though. It's certain deliveries.

Speaker 4 (01:50:07–01:50:10)

It's graphic, Jim, right? So the workday can go longer.

Speaker 10 (01:50:12–01:50:15)

This is just, yeah, this is materials coming and going.

Speaker 8 (01:50:15–01:50:26)

I mean, they can plan for deliveries and materials they need for tomorrow and the hours the day before. I mean, it's just how it's managed. Well, I'm not the manager, Sean, but it seems to me you ought to be able to do that.

Speaker 10 (01:50:27–01:50:57)

One of the things that we provide below, further down, is the two-week look-ahead schedule, which includes schedule of deliveries. Part of the notion that, you know, if there were police details, it would be a look ahead to DPW, alerting them to volumes and times of deliveries and when details would be necessary.

Speaker 8 (01:51:03–01:51:23)

Well, I think the, to Maggie's point, we can get neighbor feedback, but I think the eight to two with the exception of summer vacation, is a good revision.

Speaker 4 (01:51:23–01:51:30)

They can make 8-2 work. Okay. That's a 6-hour window. That's plenty of time to make it work.

Speaker 3 (01:51:35–01:51:48)

And then just as a follow-up, if for some reason the trucks are coming outside of that schedule, what's the penalty?

Speaker 8 (01:51:51–01:51:56)

That fine of $250, that's on the upper, I mean, just before this, right?

Speaker 3 (01:51:56–01:51:58)

Yeah, OK, yeah.

Speaker 4 (01:52:23–01:52:29)

You might want to add that to this, though, that language, because that 250 is really for the facility once it's in operation.

Speaker 10 (01:52:30–01:52:42)

OK. It's actually, there is a separate 250 provision for violation of the direction of traffic rules for workers and trucks coming to and from the site.

Speaker 4 (01:52:43–01:52:48)

OK.

Speaker 8 (01:52:48–01:52:50)

Yeah, because this is under construction management.

Speaker 10 (01:52:52–01:52:54)

That exists in both places. Okay, good.

Speaker 2 (01:52:57–01:53:03)

And then where it says except in the summer, you want to have that say summer break for students or summer recess for public.

Speaker 10 (01:53:05–01:53:08)

During except during summer school vacation.

Speaker 8 (01:53:08–01:53:08)

Yeah.

Speaker 4 (01:53:35–01:53:42)

And do we need to define what the hours are at that point in time? Or have we already defined that?

Speaker 8 (01:53:45–01:53:47)

I think that's a good point, Sean.

Speaker 10 (01:53:48–01:53:53)

When hours shall be 7 to 3.

Speaker 8 (01:54:12–01:54:20)

And would the safety concerns just be the DPW, or would it be our public safety officials, such as police and fire?

Speaker 10 (01:54:20–01:54:32)

I would expect that that would be coordinated by DPW, but I don't know.

Speaker 3 (01:54:40–01:54:54)

Does the DPW really want to get involved in this though? Are we putting more work on them? Are they usually involved in this type of thing?

Speaker 8 (01:54:59–01:55:08)

For details like for the paving on Canton Ave today, whether a police detail, who is responsible for that? Is it DPW?

Speaker 10 (01:55:10–01:55:13)

Yeah, the DPW has charge of the roadways.

Speaker 8 (01:55:14–01:55:17)

Yeah. So I guess they have to, Maggie.

Speaker 2 (01:55:39–01:56:05)

So safety concerns brought up by who? Residents or? The applicant shall provide, oh, where'd it go? The applicant shall provide police details to address safety concerns.

Who determines what a safety concern is? Is that a resident's complaint or is that like trucks blocking traffic? Like when do you call in the police detail, every day?

Speaker 8 (01:56:21–01:56:39)

So maybe that there should be a pre-construction meeting where this is worked out with the DPW in advance. Sean, what have you normally seen for something like this?

Speaker 4 (01:56:50–01:56:58)

I don't know. There's a lot of variety.

Speaker 2 (01:57:06–01:57:18)

So this kind of reads like the DPW identifies a safety concern and then we get a police detail to address it. So I guess what a complaint would go to the DPW?

Speaker 3 (01:57:21–01:57:53)

In the real world, if there's something that's a concern, the police always get the phone call and then they respond. So, and I don't think if they were just, if they were regular, you know, material coming in, you know, I would assume you don't need a police detail every day.

Speaker 2 (01:57:53–01:57:56)

Yeah, I don't either. I'm with you.

Speaker 10 (01:57:56–01:58:28)

Well, it's one of the reasons why I put the provision with respect to the two-week lookaheads, that the lookaheads would include projection of truck volumes. timing and volumes of trucks so that there would be some advanced notification to DPW and whoever else in the town should be. The two-week look-aheads, I think, go to the building commissioner, the DPW, and to a representative of the neighborhood.

Speaker 8 (01:58:30–01:58:48)

Couldn't it be here that there's a provision for the neighbors to be able to make this request and in those two-week lookaheads? So rather than just relying upon whether the DPW decides to do it or not?

Speaker 10 (01:58:48–01:58:49)

That's fine.

Speaker 4 (01:58:49–01:59:24)

Yeah, dragging the DPW into this would be wrong. Somehow I think maybe between the building department and the police department, the issue really is when there's significant activities that bring a lot of traffic. So the earthwork phase, large concrete placements, significant deliveries of framing materials, it's those things. I think that's where the traffic is going to be most problematic.

Speaker 10 (01:59:26–01:59:29)

Maybe it's not notice to DPW, it's notice to the building commissioner.

Speaker 3 (01:59:32–01:59:39)

Or just say the applicant shall provide police details to address safety concerns that arise.

Speaker 4 (01:59:41–02:00:15)

Yeah, what often happens is this falls to the builder. And the builder might not be the best party to decide that it's safe or not safe. It'd probably be better to have the police, you know. How do we write this?

It's… Okay.

Speaker 1 (02:00:15–02:00:17)

Can you call Elliot Dentz?

Speaker 3 (02:00:17–02:00:23)

Was there something that was written in Walcott Woods? Wasn't there? No?

Speaker 10 (02:00:24–02:00:28)

I don't think so. I don't remember dealing with this issue at Walcott Woods.

Speaker 8 (02:00:31–02:00:36)

And they're not as close to the schools and quite the congested intersection there.

Speaker 4 (02:00:36–02:00:43)

So I think we should take out the Department of Public Works. It shouldn't be theirs.

Speaker 8 (02:00:44–02:00:58)

How about having a pre-construction or a two-week basically coordination with the building commissioner? And then that's part of the who enforces the construction management plan, the building commissioner, right?

Speaker 6 (02:00:58–02:00:58)

Right.

Speaker 8 (02:00:58–02:01:12)

So I think the building commissioner and then the neighbors get a chance to weigh in at that two week look ahead time, like, if they're concerned that the certain level of truck activity, it's it's unsafe.

Speaker 4 (02:01:12–02:01:48)

sure well maybe maybe ahead of that you said something that triggered a thought um you know there should be i think maybe what we could do is establish that reconstruction meeting with the building commissioner and the police um to determine uh you know when police details will be provided and let the police, and at that point in time, there'll be a sequence of work, there'll be a schedule, it'll be better understood, and I think we'll make better decisions at that point, and give the two people that would be best positioned, the commissioner and the police department, to decide how it's handled.

Speaker 8 (02:01:49–02:01:55)

And then I also think the neighbors should have a chance to provide their comment to it.

Speaker 4 (02:01:55–02:02:15)

Sure. The neighbors should be a part of that pre-construction meeting. But I think to try to sort out what the police details would be right now, there's not enough information at that point in time that would be. And all three parties would be part of the decision making.

Speaker 1 (02:02:19–02:02:21)

So we would be striking that.

Speaker 8 (02:02:21–02:02:43)

So I would say leave it in until you get to in accordance. You could say the applicant shall provide police details to address safety concerns in accordance with a plan to be developed at a pre-construction meeting with the contractor, building commissioner, police department, and neighbors.

Speaker 10 (02:02:44–02:02:45)

Representative of the neighborhood.

Speaker 8 (02:02:45–02:02:47)

Representative of the neighborhood, yeah.

Speaker 10 (02:02:47–02:02:48)

Yeah, exactly.

Speaker 5 (02:02:49–02:02:51)

Repeat the composition of that.

Speaker 8 (02:02:55–02:03:16)

A representative of the neighborhood. In preconstruction, meaning with the contractor, building commissioner, police department, and a representative from the neighborhood, I think.

Speaker 2 (02:03:30–02:03:31)

Okay.

Speaker 1 (02:03:31–02:03:43)

That's great. And Nadine Hanna actually has her hand up. So she might want to comment on these specific issues. Tim, can you let Nadine in?

Speaker 18 (02:03:46–02:06:05)

Hi, Meredith. Hi, Meredith. Thank you so much. Nadine Hanna, 11 Spackard Road.

I'm sure there'll be more commentary later, but going back, please, to the start times. the neighborhood chat is on fire right now. We appreciate the push for the 8 a.m. start throughout the year, and we ask you guys to extend that, please, into the summer.

The summer hours, if you have school-age children, are the only hours you get a little bit of a break in the morning to not have to get them up and out the door before the summer, you know, sport clinics and camps and so on start up. I think we don't have as much opposition To the 3 PM in the summer for like extending the hour into 3 PM in the summer. Because we don't have the buses running at that time, but the school bus on Stafford and ladder streets. during the school year is, it comes in around 7.30.

In addition to the high school starting early, the elementary school bus for Colley Cotton Cunningham, which a lot of our kids go to, that's a 7.30 start. And it comes back right around three. So three is not a safe time in the afternoon during the school year for our kids. And 8 a.m.

sounds kind of like another punishment to the neighborhood for having to put up with a construction that we don't want to begin with. And in regards to the police detail, And this is a little less specific, but if any and all construction, even the landscaping recently that's happening on Highland at the corner of Highland and Martin, there's police detail there. That road is narrow. It's historic.

That's well established. It turns into less than a one lane. It's almost less than a one lane. There's no curb.

The police actually have to help us when we're walking. I go for walks in with the carriage, et cetera. And I've had neighbors who I was chatting with pull me off the road. They felt I was getting too close to the road.

They know that there were some fatalities or large incidents and accidents, people getting hurt. on Highland due to those traffic concerns. So I would say that whatever the most stringent wording you could put in place for that is what the neighborhood would request. Maybe we'll talk again later, but I'm going to put a kid to bed.

Thank you.

Speaker 1 (02:06:06–02:06:13)

All right. Thank you. Thank you. So it sounds like the neighbors are asking for 8 a.m.

Speaker 10 (02:06:14–02:06:48)

This issue is dealing with delivery. Right? The construction hours are 7 to… I'm not sure what the town's construction hours are, but they are what they are.

I think 8 to 2 during the school year is appropriate. I do think that 7 to 3 during the summer is reasonable. Leave it at that.

Speaker 3 (02:06:49–02:06:55)

So I understand that construction hours in town are what they are, but special permits.

Speaker 10 (02:06:56–02:07:02)

No, we're not going to agree to anything other than the standard construction hours from work on site.

Speaker 4 (02:07:06–02:07:21)

I think it's a small ask from the neighbor who just called in to ask for the 8 a.m. to carry through the summer. I think it's a small ask.

Speaker 10 (02:07:22–02:07:24)

I think for the deliveries, that's fine.

Speaker 2 (02:07:24–02:07:28)

Yeah. Yeah, I'm sorry. I brought it up earlier. I think 8 a.m.

is just fine.

Speaker 10 (02:07:28–02:07:31)

8 to 3 for the deliveries is fine.

Speaker 1 (02:07:36–02:07:38)

Okay, so we'll change that.

Speaker 10 (02:07:41–02:07:53)

Summer, Tim would go eight to three. Eight to two, Monday to Friday, except during the summer?

Speaker 2 (02:07:55–02:08:01)

Yeah, summer is, I heard summer was eight to three, but even if you go eight to two in the summer, I'm fine with that.

Speaker 5 (02:08:01–02:08:04)

I thought we weren't doing different summer hours.

Speaker 8 (02:08:04–02:08:18)

We're doing eight. It took three in the summer, eight to two the rest of the year. Right. So just undo your corrections and just change the seven to an eight.

Speaker 10 (02:08:24–02:08:24)

Great.

Speaker 3 (02:08:25–02:08:28)

On Saturdays, they can receive materials?

Speaker 10 (02:08:29–02:08:31)

No. Monday through Friday.

Speaker 6 (02:08:37–02:08:41)

Uh-huh.

Speaker 10 (02:08:52–02:09:06)

The next condition, we're ready to move on, is taken from the order of conditions, which deals with cleaning of trucks before they leave the site.

Speaker 2 (02:09:19–02:09:56)

The only thing I'd say here is, what happens if the street does get all muddy? I mean, the way this is written, it's not going to. But if it does, we have street sweepers every once in a while on big construction sites. I don't know if that's even realistic or necessary.

But I was just thinking, what would be the measure if this doesn't get done? With the amount of trucking that's going to come in and out of there, the street gets covered in just mud, gravel mud.

Speaker 10 (02:09:58–02:10:16)

We could add a provision that say that on a periodic basis, and on what the right period would be, that the applicant will sweep the street, maintain its cleanliness. Yeah.

Speaker 2 (02:10:16–02:10:16)

I like the sound of that.

Speaker 5 (02:10:19–02:10:20)

So how do we want to do that?

Speaker 10 (02:10:23–02:10:50)

On a biweekly basis, the applicant will sweep the street to assure cleanliness. Is that okay?

Speaker 4 (02:10:50–02:11:04)

Yeah. I think instead of bi-weekly, I think I would just say on a consistent basis. Because if the tracking mechanism isn't working, we don't want to wait for the next bi-weekly interval, right?

Speaker 8 (02:11:06–02:11:10)

Okay. Do we also want to be more specific about street, Highland Street, Stafford?

Speaker 10 (02:11:11–02:11:20)

It's Highland Street. Yeah. Directed to take a left. You shouldn't be using SPAP.

You shouldn't be using SPAP.

Speaker 8 (02:11:20–02:11:27)

Yeah, but if you're doing it bi-weekly, other vehicles can be driving down the street, picking it up and taking it down.

Speaker 4 (02:11:28–02:11:47)

Yeah, I think we want to say on a consistent basis. Maybe the contractor will do a much better job making sure that the tires of the trucks are free of dirt if he knows he has to clean the street.

Speaker 10 (02:11:48–02:11:52)

That's fine, whatever the right mechanism is you want.

Speaker 6 (02:11:53–02:12:16)

Yeah.

Speaker 10 (02:12:19–02:12:35)

I added this one provision that deals with resurfacing Highland Street in accordance with the requirements of the DPW.

Speaker 1 (02:12:38–02:12:41)

Can we also say in Spafford, Spafford Road?

Speaker 10 (02:12:42–02:13:01)

Yes, Spafford Road. Because that's where the tie-in is. Good catch.

Speaker 1 (02:13:10–02:13:34)

Um, I had something under this number 17, the condition, the applicant shall provide for and fund third party inspection of stormwater management system and earthwork installation. I was going to ask Sean, how often would you recommend that inspections, those inspections be held?

Speaker 16 (02:13:36–02:13:38)

I'm sorry.

Speaker 1 (02:13:38–02:13:40)

I was going to.

Speaker 10 (02:13:41–02:13:45)

Oh, I'm sorry. Both Sean's actually. This language came from Sean Reardon. Sorry.

Speaker 1 (02:13:45–02:13:55)

That's right. Yeah. Sorry. Sean Reardon.

And then you may want to add to Sean. Is Sean Reardon still with us, Tim?

Speaker 10 (02:13:58–02:13:59)

His name.

Speaker 5 (02:14:07–02:14:10)

Yeah, he's here. Okay. He's away from his computer right now.

Speaker 1 (02:14:13–02:14:27)

All right, Sean, why don't you start first then on your recommendation on how, because it seems like we should have some sort of frequency of these inspections, something structured.

Speaker 4 (02:14:28–02:15:18)

Yeah, the stormwater management system is going to start and it's going to continue until it's complete. I think it should be through the entirety of the installation of the system. It's not going to be a long period of time. So it's really hard to say that you have two inspections or three inspections.

An inspector is going to arrive and see that particular two or three hours worth of work, and that's it. And we'll have not seen what happened the day before or what would happen the day after. It's really difficult for someone to ascertain that it's been built properly if it is just a spot inspection process.

Speaker 1 (02:15:19–02:15:31)

Right. So is that a biweekly, you know, or how quickly will that system? be installed or constructed?

Speaker 4 (02:15:32–02:16:23)

It could be a couple of weeks. It would be really hard for me to speculate how long it would be. I mean, there's some work involved in it. And it may not be that the stormwater management system is installed all at one time.

There's going to be a progression through the site. So I don't think it's a real financial burden. I think it's probably in the best interest of the applicant that they have an independent inspector assuring them that the contractor and the site work contractor are installing the system properly, especially given all the attention this project is getting with regard to stormwater management. If I were the applicant, I'd be monitoring every day of it.

Speaker 8 (02:16:25–02:17:13)

One thing I think you could say here, though, is if the independent inspector identified that they wanted to see something done differently or wanted to be notified when something was going to be done that they wanted to see, they could be a little bit more in control. For example, 333 Brush Hill Road, when an issue arose there and we had a peer review civil engineer empowered basically to go to the site on behalf of the planning board and to monitor the construction, he determined his schedule. So I think here, maybe we could add some language at an interval as recommended by the third party inspector.

Speaker 1 (02:17:15–02:17:22)

Yep. I like that. That's to be determined by the third party.

Speaker 5 (02:17:27–02:17:30)

So where are we putting this?

Speaker 8 (02:17:33–02:17:50)

All right, so go scroll back up just a little bit. So the applicant shall provide for and fund third-party inspection of stormwater management system and earthwork installation. And you could say the next sentence is at a minimum.

Speaker 2 (02:17:53–02:17:54)

But not limited to?

Speaker 8 (02:17:54–02:18:10)

You could say where it says periodic inspection as determined by the third-party inspector. Because that way, it's the professional who's deciding how frequently they need to go. So right there.

Speaker 1 (02:18:10–02:18:14)

In coordination with the developer.

Speaker 5 (02:18:16–02:18:18)

How do we want to phrase this again? I'm sorry.

Speaker 8 (02:18:22–02:18:36)

I would say it's a pretty active, to be for an inspection, either at the discretion of or at an interval determined by, I guess, at an interval determined by the third party inspector.

Speaker 1 (02:19:01–02:19:02)

Okay, are we good with that?

Speaker 3 (02:19:03–02:19:15)

Yeah, I just wanted to have some sort of… And do they go to other reports going to DPW or the town engineer?

Speaker 8 (02:19:15–02:19:22)

It says in the next sentence, Maggie, that it goes to the DPW and building commissioner.

Speaker 3 (02:19:22–02:19:25)

Is the DPW the correct place or should it be the town engineer?

Speaker 5 (02:19:27–02:19:30)

Town engineer works under the DPW director.

Speaker 1 (02:19:39–02:19:45)

Should we just add that DPW, town engineer, and building commissioner? Just to be clear.

Speaker 19 (02:19:55–02:19:55)

Good.

Speaker 10 (02:20:09–02:20:13)

And add town engineer to the last sentence in that next paragraph.

Speaker 6 (02:20:19–02:20:19)

Yeah, yeah.

Speaker 8 (02:21:15–02:21:21)

So this last condition, just above number 18, this is a new condition, Ned?

Speaker 10 (02:21:22–02:22:37)

This is a new condition. Conversation with Sean. And the premise would be that we would establish to address what we think are unfounded concerns, but concerns nonetheless about stormwater impacts to basements within the neighborhood, among other things, that we would provide a settlement fund, $100,000 to be divided among those who would want to take advantage of it. Absolute condition of the provision of that settlement fund would be the immediate withdrawal of the appeals to DEP and to the Superior Court.

a signing of releases assuring no other appeals of this permit or any other permit. So it's a settlement fund. It's not something we would have ever offered, but we're certainly open to providing it and listening carefully to the issues and concerns that have been raised. I have a draft of language that's not included but would be included as an Exhibit H.

Speaker 1 (02:22:39–02:22:47)

Ned, is that something that would need to be in this permit or is that something that could be an agreement? Because I think obviously the neighbors will need to discuss this option.

Speaker 10 (02:22:47–02:23:31)

I don't think it needs to be in the permit. I think it needs to be, certainly the neighbors have to, they would have to really think about it because it would require all of them to agree that there'll be no further appeals and that the existing appeals will be withdrawn. And there are multiple parties, there are multiple lawyers involved representing different interests here. So they would really have to think about it on their end as to whether or not and to what extent they'd be willing and able to take advantage of it.

But we are responding to what we've heard and this is what we can do.

Speaker 1 (02:23:33–02:23:36)

So yeah, go ahead.

Speaker 4 (02:23:36–02:25:15)

So I had a conversation with that about this and I asked him to speak with the applicant to to assemble this. And I recognize this is a challenge. I recognize the applicant is looking for something in exchange. And we have a civil engineer who has said his design will not make conditions worse.

We have our own town consultant, Sean, who has said, you know, this design and this improvement to the site, development to the site, I should say, won't make conditions worse, and the DEP is going to have to also, you know, accept the stormwater management system. So this, and I, you know, I had said to Ned, all parties are going to have to agree the civil engineer already does, our Sean Redden already does, and the DEP will have to agree. And at this point, these funds are still going to be made available by the applicant, you know, so that if somebody feels that their property is potentially harmed, it's, I think it's, you know, I had said to Ned, it would be, you know, a strong gesture by the applicant to do this. How this gets, you know, how it all works, I don't have an answer for it, but I wanted to have something there for the neighbors.

Speaker 10 (02:25:17–02:25:53)

Yeah, as I said, you know, the applicant dug deep on this one. Um, you know, this is a, this is, this is cashed out of pocket. It would be available and be upon the issuance of the building permit. Um, and as I said, all neighbors would have to buy into the notion of accepting this.

Um, and there's, there would be, I can understand that there'll be some angst perhaps within the neighborhood, but, um, it's a condition that we're willing to, to, uh, to live with.

Speaker 3 (02:25:54–02:26:09)

My question is if in the future there is a problem, if they accept this and then in the future there is a direct problem, do they not have the ability to

Speaker 10 (02:26:11–02:26:49)

If there's a direct problem in the future, they would certainly have the right to seek recourse associated with the specific cause of that problem. It could be extremely difficult to establish that the problem came from this property. But if they can, then they certainly would have the right to file lawsuits to seek recovery. But they would have to prove that the problem was caused by this property, whoever that might be.

Speaker 1 (02:26:53–02:26:54)

And we know today.

Speaker 10 (02:26:54–02:26:55)

Yeah. Go ahead.

Speaker 1 (02:26:55–02:27:07)

I'm sorry. Now that there has been the appeal, which has now been filed with the DEP, the site plan, how does that affect that process?

Speaker 10 (02:27:08–02:27:52)

Once they're in the midst of their- If they withdrew The appeal, we would presumably have to go back to the Conservation Commission for a modification to the order of conditions approving the modification to the site plan. There may be no challenge to that, because that would be an issue of violating the agreement not to appeal. But we would have to assume we take the latest version of the site plan and take what we filed with DEP and file it with the CONCOM and have a hearing approving an amendment to the order of conditions.

Speaker 3 (02:27:53–02:28:23)

So I feel like this isn't like under our jurisdiction. This is like a discussion kind of offline. This has nothing to do with the planning board and part of a special permit. So I don't think that this is really, I understand what was trying to be accomplished, but I just don't think, I'm uncomfortable with this, I'm uncomfortable.

With the Senate, I don't think we should be discussing it. I just don't think it concerns us.

Speaker 1 (02:28:27–02:28:47)

I agree, I I thank you, Sean, you know, for bringing this forth as a suggestion just to give. Just give the neighborhood as many options and opportunities. We do have Bard had his hand up. I don't know if it's still up.

Speaker 3 (02:28:47–02:28:52)

It's making me uncomfortable because it feels like you're trying to buy off someone.

Speaker 10 (02:28:52–02:28:53)

I'm not trying to buy anybody.

Speaker 3 (02:28:54–02:28:55)

No, I know that.

Speaker 10 (02:28:55–02:28:58)

I'm trying to respond to what was a reasonable request.

Speaker 1 (02:28:58–02:29:16)

I'm feeling uncomfortable about it. Maggie, this would not be part of the permit. This language is here for But this would be something certainly between the neighborhood. Bard has his hand up and so does Dan Hill.

So why don't we let them, yeah, Bard, if you wanna, you had your hand up first.

Speaker 20 (02:29:19–02:29:27)

Introduce yourself. Hi, Bard, Harry Reza, 11 Spafford Road. Actually, if you don't mind, Meredith, maybe I'd ask Dan Hill to chime in first.

Speaker 1 (02:29:28–02:29:28)

Okay.

Speaker 20 (02:29:29–02:29:29)

Thank you.

Speaker 14 (02:29:30–02:29:35)

Great, yeah. Good evening, can you hear me?

Speaker 1 (02:29:36–02:29:37)

Yes, welcome.

Speaker 14 (02:29:37–02:30:43)

Great, just for the record, Dan Hill, I'm attorney representing neighbors on Speckford Road. And I can maybe revert my questions and comments into public comment, but I just had a question on this condition and it is shown as a condition and what Ned just described was a condition that all of the neighbors would have to agree to, but who are all the neighbors? It feels very undefined. I mean, it could be like 50 or a hundred neighbors.

I mean, where do you draw that line? and ask me for a release from neighbors to not appeal further permits. We all know the devil's in the details when it comes to release documents. So this just seems like a hollow promise to me.

and we appreciate some of the improvements that have been made in the plans, definitely moving in the right direction, but this project still should not be approved for a lot of reasons that I described in my last letter, but I'll reserve those comments until the end. Will we have an opportunity, Madam Chair, to?

Speaker 1 (02:30:43–02:30:45)

Yes, yes, absolutely, yeah.

Speaker 14 (02:30:45–02:30:46)

Thank you.

Speaker 4 (02:30:47–02:32:54)

Yeah, Meredith, for everybody that's listening, this was initiated only by me. When I initiated this thought, I had simply said to Ned, there are 22 homes on Spafford, and is it possible to consider offering each of those 22 homes on Spafford an amount of money so that in the future, if they did have to do some form of mitigation, they would have some funds to do it. When I presented it to Ned, it was there were, no ties as I presented it to Ned. And I had said, hey, a general idea, maybe $5,000 a household.

Now at that time, I had not already considered the other residents that we have on Highland. I was focused mostly on Spafford. So Ned has had conversations with the applicant and it has evolved to the applicant. asking for something in return.

My intention, for all the neighbors that are listening, was not for anybody to lose any of their rights or to give up their rights. It was to help with something that may come to be an issue for them. How does any of that become proven in the future? I have no idea.

I wasn't even suggesting that we even try to identify condition now, pre-development, identify conditions later post. It'd be too complicated. really hard to, probably hard to prove anything. So the thought I had was, you know, the neighbors have consistently talked about water and traffic, water and traffic, water and traffic.

I feel like we've tried to do something on traffic and I was simply trying to do something with regard to water.

Speaker 1 (02:32:56–02:33:08)

Great, thank you. So we are going to, let's just take this out for now. And I think this would be something that

Speaker 10 (02:33:10–02:33:13)

It sounds like a lot of reasons. It's unwieldy.

Speaker 1 (02:33:14–02:33:17)

Yeah. And it needs to be defined. And Dan is absolutely right.

Speaker 10 (02:33:17–02:33:18)

I would recommend taking it out.

Speaker 1 (02:33:19–02:33:34)

OK. Great. Can we delete this, Tim?

Speaker 5 (02:33:36–02:33:37)

Working on it.

Speaker 1 (02:33:37–02:33:38)

Oh, sorry. Thanks.

Speaker 8 (02:33:46–02:35:47)

So I have something to propose to add to the next two paragraphs. Right. You want to go first? Sure.

Let's see. I guess it's the third sentence that begins with the board also understands. After the word that, I'd like to suggest the words The board also understands that the screening of retaining walls, parking lots, and structures from adjacent properties and roadways is a significant feature of the final site plan, period. And then the applicant can continue on.

So I'll read that again, Tim. The screening of retaining walls, parking lots, and structures from adjacent properties and roadways is a significant feature of the final site plan, period. Capitalized final site plan. And then in the next paragraph, In the sentence that begins, in addition, the landscape architect shall be present during placement of trees.

I'd like to add the words and shrubs. And then strike the words available to. And then at the end of that, after the word construction, add the words in order to maximize the screening.

Speaker 15 (02:35:47–02:35:48)

Great.

Speaker 8 (02:36:02–02:36:24)

That's great. This is just to ensure that the screening that we've been described by Sashi, the landscape architect, will actually be fulfilled, basically. Add some more assurance here.

Speaker 1 (02:36:29–02:36:46)

I agree, and I had mentioned that before, to know that, you know, having the opportunity to replant in places, you know, during the end of construction towards the end as we start to see areas that are still sparse and need protection.

Speaker 8 (02:36:50–02:37:07)

This is good. Well, where we talked about that there's a significant tree budget, and we were interested in it going to this area, it should go to the screening. So that's, I think this is pretty explicit that that's what we're looking for it to go to.

Speaker 1 (02:37:07–02:37:28)

So should we tie that into involving the planning board in that? Because we're leaving it up to, you know, the landscape architect. And the neighbors, and maybe we even, we want to include a representative, a representative from the neighborhood.

Speaker 10 (02:37:31–02:37:45)

I'm not sure about the mechanics of that. In consultation? They're planting. She's out there.

If she sees an opportunity to add plantings, they're going to go for it.

Speaker 1 (02:37:45–02:37:48)

In consultation? In consultation.

Speaker 3 (02:37:48–02:38:27)

One of the best views to ensure proper screening is from the upstairs window of the neighbors. If you look across the street to the house on the corner of Stafford and Highland, they should be on their second floor looking over, and that's where the best placement of trees are. Usually, that's what I tell my clients, is stand upstairs and look out your window, and that's where you place it.

Speaker 8 (02:38:27–02:38:41)

But Maggie, we also have to be concerned about the neighbors to the south and to the west. So I'm thinking that it's all of them here. That's not just from the Highland Street side. I know.

Speaker 3 (02:38:41–02:38:44)

So it can get complicated a little bit.

Speaker 8 (02:38:45–02:38:58)

I do think we could say, if you'd like, the planning department or director of planning and community development and representative of the planning board. Maybe we don't need the full planning board.

Speaker 10 (02:38:59–02:39:06)

If you have a full planning board, you're calling for a public meeting, you got to post it.

Speaker 8 (02:39:08–02:39:10)

I would say the planning director.

Speaker 10 (02:39:10–02:39:13)

The planning director and the conservation agent.

Speaker 5 (02:39:20–02:39:22)

Where do I put that?

Speaker 1 (02:39:24–02:39:32)

Maybe after landscape architect in consultation with the planning director of planning and conservation agent.

Speaker 3 (02:39:58–02:40:37)

Okay. So I do feel like this condition, well, number 18 is really two separate things. One is the landscaping plan and one is a tree preservation plan. Right.

And we have a tree, first we have a tree preservation plan. And so we shall, the trees and groves shall be maintained with the tree protection. But then the landscaping plan is different, right?

Speaker 10 (02:40:38–02:40:52)

Landscape plan deals with what we propose to plant, where the tree preservation plan deals with the preservation of those trees that are capable of being protected during the construction.

Speaker 8 (02:40:54–02:41:19)

So it's the infill also in those areas, right? It's the buffer zones that we're mostly talking about. I'm not really here making reference to the plantings that are, let's say, in the courtyard areas or in the entry circle. I'm really talking about the buffer.

So if we need to make that distinction, we can do that.

Speaker 10 (02:41:22–02:41:49)

I think anytime there's an opportunity to plant a tree here, that we should take advantage of it. And those opportunities will present themselves in different areas on the site. Some of it may be within wetland setbacks, particularly within the 25 foot. That would require participation, presumably, of the conservation agent to make sure that the planting was appropriate.

Speaker 8 (02:41:52–02:42:14)

I think the fact that there's a lot of trees that have to be removed that are in Conservation Commission jurisdiction. And you said there's a robust or significant tree budget. And there's been an interest in that budget be applied to this site. I think, as you said, we need to look at all opportunities for where it can go.

Speaker 10 (02:42:14–02:42:31)

Agreed. No question about that. And I think that was the purpose of this language was to provide for ongoing review and opportunity to keep planting where it's appropriate.

Speaker 8 (02:42:31–02:42:41)

In my mind, even if it's the area by the rear parking lot so that you're not looking at two parking lots next to one another. Exactly. The fuller.

Speaker 10 (02:42:42–02:42:45)

The whole property is really in place for that.

Speaker 8 (02:42:45–02:42:46)

Right. OK.

Speaker 3 (02:42:47–02:42:54)

And would any of those trees be available to be planted along Stafford? Yes.

Speaker 10 (02:42:54–02:43:23)

What we would propose is that there's going to be a significant payment into the Conservation Commission's tree fund. And that the Conservation Commission and the Shade Tree Advisory Committee should develop a plan for installation of trees off site, and that the town should take that money and provide for the planting of those trees.

Speaker 8 (02:43:23–02:43:28)

But that should only be after it's exhausted on this site, in my opinion.

Speaker 10 (02:43:30–02:43:58)

I don't think it's going to be exhausted on this site, but I may be wrong. But be that as it may, we're happy to plant trees on the site, and we're happy to provide allow the fund, you know, well, the funding will go to the Conservation Commission and they'll spend it in accordance with their requirements. So generally, I think in consultation with the Shade Tree Advisory Committee.

Speaker 3 (02:43:58–02:44:50)

Yeah, so that was my only concern is if the spending of the funds is left up to CONCOM. do they know that there are properties on Spafford who don't have any street trees? The town street tree is usually less than six feet. I would think that if the opportunity arises for some larger trees of which the neighborhood might have a certain preference to, they should, Be able to, you know, get that size instead of a six foot tree.

Maybe they get a 15 or 20 foot tree. I just wouldn't want the neighbors to be limited or shut off from that discussion.

Speaker 10 (02:44:52–02:46:32)

I don't disagree. I don't know mechanically how to make that happen, but And that is tree funding a predetermined set amount based on The there's a survey that has to be done of every tree that will be removed within the con coms jurisdiction. So that's everything with 100 feet of the edge of wetland that is three and a half inches or greater in caliber. And there's a calculus.

I don't have it in front of me. It calculates the replacement cost. So if you have a 30-inch tree, then it's 10 times 3-inch tree, whatever the value of a 3-inch tree is. That's the contribution that's made.

So it's based on the total of the caliper wrenches that are removed after the survey is done, after removal. And then that calculus sets the total amount. We get credit for every tree that gets replaced based on the per caliper replacement. And then whatever is left is available to fund other tree replacement in the town.

And our understanding is that the delta between the removal and the replacement is significant. All right. We've been calculated all the way out, but it's a big number. Yeah.

And it'll pay for a lot of trees.

Speaker 2 (02:46:34–02:46:48)

So is what you just explained documented in this? It's in the order of conditions. In the CONCOMM order of conditions? Yes.

OK. All right.

Speaker 1 (02:46:49–02:46:59)

We also have Carla Moynihan. The attorney for the Bacardi's has her hand up, Tim, if we could invite Carla to come and speak with us.

Speaker 5 (02:47:08–02:47:10)

I just allowed her to speak. She's got it on mute.

Speaker 21 (02:47:10–02:47:11)

Can I speak now?

Speaker 1 (02:47:12–02:47:13)

Yes, Carla, welcome.

Speaker 21 (02:47:13–02:47:56)

Wonderful, so sorry. I know that we'll have an opportunity to speak later as part of public comment, but I just wanted to speak on this issue, not agreeing necessarily with any approval, but if we were so inclined to go down this road, I just want to point out for Section 18 that should we not make a specific reference to the Planning Board's rules and regulations under Section 5, 4, 2, 3, 9? Chairperson on the measures to be taken to ensure survival of existing newly established trees, not just make this a, you know, we're going to pay X, Y, and Z amount, but rather tie it back to the standards under the International Society of Arboriculture.

Speaker 1 (02:47:56–02:48:04)

Ned, would you be okay with tying that in?

Speaker 10 (02:48:04–02:48:07)

I'm not sure what the reference is being made to.

Speaker 21 (02:48:08–02:48:26)

I'm making reference to Milton's own rules and regulations for the planning board, 5.4.2. Under subdivision regulations? There are measures to be taken for the survival of existing or newly established trees.

Speaker 10 (02:48:28–02:48:54)

Whatever those measures are on-site, we're responsible for making sure that the trees survive on-site. There's a provision for that in the order of conditions. If it's off-site and the town's gonna go plant them, the town will pursue the survival as the town would do that. I don't have any concerns about tying the survival here to trees that are planted on-site.

Speaker 21 (02:49:03–02:49:16)

Okay, so I'm simply asking whether or not. From my perspective, the order of conditions only deals with the wetlands, Ned, not all the clear-cutting on the property.

Speaker 10 (02:49:16–02:49:23)

We're not going beyond what the Conservation Commission is requiring for the dollar fund.

Speaker 21 (02:49:24–02:49:37)

I'm not asking for the dollar fund. I'm asking for inclusion of the rules, of the policies associated with the International Society of Agriculture. as part of the planning board's own rules and regs.

Speaker 10 (02:49:37–02:49:45)

I have no qualms with accepting those provisions as it relates to the survival of trees that we plant on site.

Speaker 21 (02:49:50–02:50:16)

Bottom line, I feel like I'm coming in late in the game here. CONCOM's jurisdiction stops at the buffer zone. The rest of the site is up to the planning board. And I'm simply pointing out that in this instance, again, I don't want the project to succeed.

I don't want the project to be approved tonight. But if the board is inclined to do this, I would like to simply add in appropriate conditions.

Speaker 10 (02:50:17–02:50:26)

That's fine. Conditions that require survival of trees that we plant on the site, wherever they're planted on the site is fine.

Speaker 1 (02:50:27–02:50:42)

So we could say, Ned, if we say in consultation with the director of planning, per and then put in this section, per section, 5.4.2.

Speaker 10 (02:50:43–02:51:21)

We can say the trees that there'll be, all trees planted shall be required to survive two plantings, whatever the appropriate length is, Maggie, two years, two planting seasons, whatever, and will be replaced. There's a condition in the order of conditions that requires replacement of trees that don't survive after two years. That's fine. We replace the tree.

On-site, whatever the appropriate survival condition should be, will comply with. I don't know what they are, I don't know how to draft it here, so.

Speaker 3 (02:51:22–02:51:54)

Yeah, so I know, like for me, if in my special permit, where I've agreed to plant trees along my buffer, I've owned those trees for life. So whenever a tree dies, then I have to replace it. So the same would, I would assume, be here. So if a tree gets planted that's not in CONCOM's jurisdiction and it's part of the special permit as part of their landscape plan, then that tree will have to be there forever.

Speaker 10 (02:51:54–02:52:00)

There's a maintenance plan that's included in the landscape plan.

Speaker 12 (02:52:02–02:53:23)

I would question some of that due to planting. I mean, we're planting like a woodland, which. in parts of the site, we're planting like a woodland. So, you know, where large trees are going to die, young trees are going to come up and fill in their places.

We're really encouraging an ecological system. So a one-to-one replacement whenever a tree dies in some of these areas just doesn't seem like it's going to be beneficial for the site or the plant material that's there. You know, if any of the, you know, the trees within all of the, you know, typical landscaped areas, you know, Aveda wants their site to look as good as anybody else. We're not going to, you know, they're not going to want dead trees to be standing in their center circle.

You know, they want this site to look good. And the intent is to plant these things so that they grow up and they survive. But in some of the areas where we're minimizing our disturbance in the woodland, we're trying to encourage this ecological system to thrive. I think, you know, we have to be a little concerned about some of the language in those areas.

Speaker 3 (02:53:29–02:54:09)

Yeah, but the plants that are being planted, you know, to minimize the effect of the wall, the 19-foot concrete block wall, if a hemlock dies in front of that, I do think that that needs to be replaced. I understand if a little bayberry or serviceberry doesn't make it, but an evergreen or a thick row of plants that is being planted to specifically minimize the impact of this concrete block wall, I do think that that should need to be replaced.

Speaker 12 (02:54:11–02:55:10)

I mean, I would, I think your language was talking about for the life of, you know, for forever, that's something very different in this woodland. I see it, you know, we're fully expecting to replant if something dies within the first few years, where it's a situation where, you know, there was an issue with the planted tree, but once things get established and you're really working with a, an ecosystem, you're really not wanting to go in there and mess with it. Abita wants the walls to be screened. They're going to go in and fill in where it needs to take place.

That's just what they're going to do. I just would be hesitant to have language for, you know, forever. If a tree dies on this property, it needs to be replaced. That seems that it could lead to some problems.

That's all.

Speaker 8 (02:55:10–02:55:40)

What if we provide a provision that requires the landscape architect to do an annual inspection for the first two years and review any plant materials that haven't survived in these buffer zones around the property and require the landscape architect to make a recommendation for any replacement.

Speaker 12 (02:55:42–02:55:47)

Yeah, I think that sounds very reasonable and that would be expected.

Speaker 1 (02:55:54–02:55:56)

I think that sounds appropriate.

Speaker 8 (02:55:56–02:56:10)

So we should think that would go out in that second condition or in that condition under number under paragraph 18. Or maybe it's a separate condition.

Speaker 10 (02:56:11–02:56:15)

That's what I'm wondering if it may be easy to call out as a separate condition.

Speaker 1 (02:56:16–02:56:16)

Yeah.

Speaker 15 (02:56:16–02:56:16)

Okay.

Speaker 8 (02:56:28–02:57:27)

I would say, Tim, the landscape architect shall make an inspection in year one and two following the issuance of the certificate of occupancy. and determine whether any plant materials have not survived or thrived, and make a recommendation for any replanting within the buffer zones on the east, south, and west

Speaker 5 (02:57:28–02:57:32)

portions of the property after replanting when we.

Speaker 8 (02:57:36–02:57:41)

Within the buffer zones within the buffer zones on the east, south and west portions of the property.

Speaker 3 (02:57:47–02:57:59)

Would you put also something like all plantings shall be maintained in good condition and planting shall be replaced if disease dying or otherwise not in good condition?

Speaker 1 (02:58:07–02:58:09)

Can you say that again, Maggie?

Speaker 3 (02:58:10–02:58:26)

All plantings shall be maintained in good condition. And plantings shall be replaced if diseased dying or otherwise not in good condition.

Speaker 12 (02:58:27–02:58:29)

Isn't that what was just in there.

Speaker 3 (02:58:30–02:58:37)

Yes, I went to I wasn't looking at this, I was looking at another condition on another permit.

Speaker 1 (02:58:43–02:58:55)

And I had wanted to add something, which I do think should be a separate condition, that no trees shall be removed prior to the issuance of the building permit.

Speaker 5 (02:58:56–02:58:58)

Are we doing Maggie's language?

Speaker 1 (02:58:59–02:59:00)

Oh, sorry, Maggie, were you?

Speaker 3 (02:59:00–02:59:03)

Mine could be repetitive. I was just looking at the language of another permit.

Speaker 10 (02:59:05–02:59:13)

Yeah. Meredith, you can add that if you want, but I guarantee that no one's going to touch this site until the building permit's been issued.

Speaker 1 (02:59:14–02:59:21)

It would just be great to ensure that. If for some reason the building permit did not get issued.

Speaker 10 (02:59:22–02:59:37)

If the building, well, put it this way, the building permit doesn't get issued to the site, something else is going to happen to the site and who knows what, but the trees won't be touched unless the hospital sends somebody out to do it.

Speaker 1 (02:59:37–02:59:40)

Exactly. I just want to make sure that, yeah.

Speaker 8 (02:59:40–02:59:55)

I just wanted to add to the condition that I drafted there or suggested there that the applicant shall implement the Landscape Architects recommendations or something to that effect. That's fine.

Speaker 3 (02:59:56–03:00:13)

Well, sorry. When I re-read this Cheryl's condition, make an inspection in year 1 and 2. What happens in year 3 if the plant material is not in good condition?

Speaker 8 (03:00:15–03:00:32)

Well, I go back to Sashi in terms of the time frame that it is anticipated for these plant materials to become established. I think that's what she said, two years. But maybe she could clarify that. Yeah.

Speaker 12 (03:00:33–03:00:43)

Yeah. I mean, that's pretty typical is once it's gone, established in two years and it's pretty good that it's going.

Speaker 21 (03:00:43–03:00:48)

I will say for Ned's sake, he's right. This is from the subdivision laws.

Speaker 1 (03:00:52–03:00:56)

What was that? I just, I was saying yes, thank you.

Speaker 2 (03:01:00–03:01:02)

Will you finish what you were saying, Sashi?

Speaker 12 (03:01:03–03:02:31)

Yeah. The two years is pretty typical. It's what we see across the board as far as longevity. Usually, it's one year making sure that everything survived.

That's the contractor's responsibility. Two years, I think is generous and right for this property. The idea that in perpetuity, we would be replacing trees that died. That's just where I have a problem with it because I feel like, you know, we are doing a lot of these plantings as an ecosystem and that's not a way an ecosystem does not work that way.

So we're really you know, some plants will be dying and some will be regenerating. So that's the idea of the long-term maintenance of this, the woodland areas on the site. You know, everything along the parking lots and along the, within the building areas, you know, those are all going to be, if something dies in those areas, they're going to be replaced because they're ones that are out of the woodland. They're part of this Aveda landscape.

You know, the owner is going to do those. You're not going to let your site come into, you know, disrepair. So that's, That's my understanding of how it would should work.

Speaker 3 (03:02:32–03:03:54)

And I get that. I get that. That's what they would do. But our concern is really from the passer by or the people driving by every day.

and the people living there every day, we're trying to hide the site from the outside. So I understand if some lavenders die in the courtyard, of course, you're going to be planting that. But that doesn't affect the neighbors. It's more like if the buffer planting in front of the walls start dying, and especially the evergreens, and if only Um, you know, what remains are all.

you know, scrubby woodland plantings, which I appreciate all natives, but they grow not very dense, they grow straggly looking, and they don't have any leaves on them in the winter to hide the wall, which, you know, is not that far away from Highland Street. So that's just my concern, is I do think that, some plants need to be replaced that if they die in front of the wall. I think they need to be maintained.

Speaker 8 (03:03:56–03:05:04)

What if we add year three to address your concerns, Maggie? I understand what Sasha is saying about long-term. Then lastly, I wanted to make a suggestion too that these landscape architect, submit a report to the director of planning and community development just so that the town has a record of it actually having happened, that these inspections actually have happened. Okay, so I guess what I would say is the applicant shall submit the landscape.

Architects annual report to the director of planning and community development and shall implement the landscape architects recommendations.

Speaker 3 (03:05:12–03:05:43)

So like in the future, if, you know, a tree dies in front of the wall and a neighbor calls up the building inspector to complain about the tree, you know, trees dying, the building inspector would go up and probably would enforce the replanting of the tree because it's on the landscape plan, which is part of the special permit. Isn't that the normal process? of enforcement?

Speaker 8 (03:05:49–03:05:58)

Well, for the forever, that goes back to the question of the forever, right? Like if it got planted and it survived for two years.

Speaker 3 (03:05:59–03:06:42)

So I'm just saying the neighbors, actually, even if we might not like the forever, it's written in the special permit. And the special permit is forever. or at least as long as the building's there and the facility is in operation. So just for the neighbors, in year three, four, five, you could go and complain to the cone enforcement officer and he would go and look at it and say, yes, these trees are part of the special permit and they need to be replaced.

So, I guess maybe my concern isn't it doesn't need to be written because it's a given.

Speaker 8 (03:06:45–03:06:54)

Tim, they need to submit that annual report to the director of planning and community development. So, after the word report.

Speaker 2 (03:07:02–03:08:14)

I mean, Maggie, I think your point is a good one, because a lot of this stuff is going to be planted sort of half on a dry bed and half in wetlands almost. So I don't know how long it takes a tree to slowly die in wetlands, but I mean, I don't know if you could, I mean, I like Cheryl's year one, two, and three idea, but it would be nice to somehow regulate especially plantings against the wall, because that's one of my biggest concerns as you drive by. From Highland, you look and you see the wall, and granted the wall's a lot nicer than it was, but I just don't think a lot is gonna survive in that 20 feet or 10 feet of dry area before you hit the wetlands at the wall. And so, if what you just read is true, is that in perpetuity, I know I'm kind of going backwards here with my thought, but if, you know, five years from now, is that enforceable?

I guess I wouldn't ask anybody.

Speaker 3 (03:08:14–03:08:14)

I would think it is.

Speaker 12 (03:08:15–03:08:16)

I would think it is.

Speaker 2 (03:08:17–03:08:18)

Okay.

Speaker 12 (03:08:18–03:09:52)

I mean, we have no problem with item H, the way it's written in the special permit. No problem with that as far as, you know, landscaping installed and maintained in a manner that will enhance and screen views. But if one tree is not there anymore and another one has grown larger in its place, then that's the process that is developing in these woodland areas. I don't think there's any problem with maintaining the site so that there's screening, but it might not be the exact vegetation that's in the plan right now because it's grown and it's developed.

Fifteen years from now, some of these trees that are out there right now that are still there and won't be disturbed, well, they're probably not going to be there anymore. because they've reached their lifespan. So new trees will come up and things will drop seeds and new shrubs will come up with this not being disturbed for quite a long time. And we won't be going in and clearing the understory, which a lot of the neighbors seem to do.

We won't be clearing that part out of our woodland. We're gonna leave it all natural. We're going to remove the invasives and let everything native grow up. There's going to be a lot more screening than anybody else in this neighborhood has.

Speaker 2 (03:09:52–03:10:08)

I believe that. All right. Thanks.

Speaker 10 (03:10:08–03:10:12)

Presumably, Sasha, your annual inspection report will document that.

Speaker 6 (03:10:14–03:10:15)

Yes, yes.

Speaker 2 (03:10:20–03:10:29)

So do we bother adding year three to the first sentence of that condition? What does the board think?

Speaker 3 (03:10:36–03:10:44)

So I'm fine with wanting to because I still think if the neighbors have a complaint of a tree dying in year five, it still has to get replaced.

Speaker 8 (03:11:45–03:11:57)

So Ned, this provision, if the next available bed must be an affordable bed, what determines that it must be an affordable bed?

Speaker 10 (03:11:57–03:12:00)

The affordability plan.

Speaker 8 (03:12:00–03:12:00)

OK.

Speaker 10 (03:12:02–03:12:37)

That was specifically addressed. One of the issues, so the way the affordables will work is that there will be four affordable beds they'll start out presumably within the two bed units. But if one of the affordables drops away, for whatever reason, the next available bed becomes available to that affordable on the list, whether it's a single or a duplex room.

Speaker 8 (03:12:39–03:12:46)

I know that the affordability requirements have been reviewed by the Affordable Housing Trust previously. Has this condition also been run by them?

Speaker 10 (03:12:48–03:13:04)

This is taken roughly from the Affordable Housing Trust, the affordability plan. Okay. There is a preference for Milton residents in the affordable plan.

Speaker 8 (03:13:04–03:13:25)

Thanks. When do you anticipate having the exhibits submitted?

Speaker 10 (03:13:28–03:13:48)

They're already, they exist. Some of them I sort of copied and pasted into the exhibits. If we scroll down, some of them are just taken. Oh, I see.

So once we scroll past here, you'll see what's in the exhibits.

Speaker 8 (03:13:48–03:13:49)

OK.

Speaker 10 (03:13:50–03:14:07)

So the construction management plan, for example, is the Erland plan that was dated August 23. That would have to just be attached physically. I copied and pasted the affordability plan into the exhibit dealing with affordability.

Speaker 4 (03:14:11–03:14:42)

I'd like to go back to number 20 for a minute. Sure. Thanks, Tim. So this condition is written to provide a preference for Milton residents.

Am I right? Yes. And it reads, the applicant shall maintain a waiting list and the next available bid shall be made available to the next eligible Milton resident. Can we reference the waiting list as a Milton resident waiting list?

Speaker 10 (03:14:43–03:14:57)

The waiting list that they, well, they could, they could have two waiting lists. There is a waiting list that they will have for affordable. That takes priority, but there could be a separate waiting list for Milton residents.

Speaker 4 (03:14:58–03:15:02)

So affordability aside, does a Milton resident have preference?

Speaker 10 (03:15:04–03:15:05)

According to this, it does.

Speaker 4 (03:15:05–03:15:09)

Okay. That's the way I read it. So you mentioned affordability, but you know.

Speaker 10 (03:15:10–03:15:28)

Yeah. The issue of affordable Trump's the issue of, of, of, uh, Milton resident, because there's a requirement in the zoning that there'd be 5% of the beds would be available for affordable. Yep. That's the only Trump.

Speaker 6 (03:15:29–03:15:29)

Mm.

Speaker 1 (03:15:38–03:15:39)

Okay. Okay. Thank you.

Speaker 8 (03:16:00–03:16:03)

Can you scroll to the exhibits, Tim, please?

Speaker 5 (03:16:06–03:16:21)

I have a question about 21. OK. From the date when these permits become final, is that. That's after appeals are exhausted, is that kind of encompassed in there?

Speaker 10 (03:16:22–03:16:22)

Yes.

Speaker 5 (03:16:23–03:16:25)

OK. That's all.

Speaker 10 (03:16:32–03:16:51)

So you can take out right here and take out exhibit G. This is the same as the same as the listing of the site of the plans and part of the site plan.

Speaker 5 (03:16:52–03:17:29)

And these all have the same date, we'll have a conforming date. I'm going to go back and. I think this is the same language as is up top, which we amended relative to minor versus substantial amendment. We can either take it out and rely on the language within the body of the permit.

Speaker 10 (03:17:41–03:19:26)

So what I did here was I copied and pasted language from the transportation assessment dealing with the access and egress plan into the next page. And I have the employee and delivery person acknowledgment form as the next page. And then the last two pages are actually would be, they're not here, but they would be cut. They're the delivery plan and the employee schedule that are separate documents.

We just attach those. The same is true of the CMP that would be attached. And exhibit D, the same is true. Exhibit D is the tree protection preservation plan that is submitted as a separate exhibit to the application.

That'd be cut and pasted in. And then the affordability plan, I actually, on the next page, I think I copied and pasted what was in that exhibit. So if you go past this page, Tim, Yeah, this is copied and pasted right from the affordability plan. You can take out exhibit G.

Speaker 5 (03:19:40–03:19:41)

That's all she wrote.

Speaker 2 (03:19:46–03:20:01)

Okay. Just shoot back up to page 13, the last sentence. It's just a typo. It must be snow windrows within site triangle.

So something to do with snow storage.

Speaker 10 (03:20:03–03:20:15)

It's a technical term. Windrose? Yeah. I'm not sure what it is, but I.

Educate me. It's not hard to do. Scott Thornton's not here, unfortunately.

Speaker 2 (03:20:16–03:20:20)

All right. But that's not a mistake. No.

Speaker 17 (03:20:21–03:20:27)

Yeah, it's piling by plow.

Speaker 16 (03:20:27–03:20:32)

All right.

Speaker 1 (03:20:35–03:20:48)

All right. So Ned, we're waiting on the policy document regarding the visitor parking. Exhibit F, is that?

Speaker 10 (03:20:49–03:21:00)

No. Exhibit F is the parking license with the hospital.

Speaker 1 (03:21:00–03:21:01)

Gotcha.

Speaker 10 (03:21:01–03:21:01)

It's still in progress.

Speaker 1 (03:21:03–03:21:03)

All right.

Speaker 10 (03:21:07–03:21:26)

Basically, the purpose is to show you what it is, but the issue is that it's a perpetual license to park up to 30 vehicles at the hospital. And it was offered up by the hospital.

Speaker 1 (03:21:27–03:21:41)

Yeah, that's great. OK. Any other questions or comments from the board? And then I'll just open it up to the public and neighbors to speak.

Speaker 8 (03:21:48–03:21:51)

All set for now.

Speaker 4 (03:21:51–03:21:52)

I have no further comments.

Speaker 8 (03:21:55–03:21:55)

Good.

Speaker 2 (03:21:56–03:21:56)

I'm good.

Speaker 1 (03:21:57–03:22:16)

OK. All right, then let's allow to see if anyone would like to speak at this time. Who's with us? I have a hand up.

Dan Hill would like to speak. Let him in. Okay. Welcome, Dan.

Speaker 14 (03:22:16–03:30:23)

Thank you again. So I'm assuming this is the last public hearing for this application and we just wanted to essentially summarize our outstanding concerns with the project and make one last pitch for the board to issue a denial of this application. We have commented on a variety of the project design issues over the course of the hearing. We've submitted technical comments from civil engineer and psychologist Scott Horsley.

Only marginal design changes have been offered by the applicant, in our view, have really failed to address the substantive concerns that we've raised relating to drainage, hydrology, access, off-site traffic impacts. There are ways to mitigate these adverse impacts, most obviously to shrink the project, which I proposed two meetings ago. But it's not actually the board's place to redesign the project, right? You have to vote on what's been presented in front of you.

The applicant has refused to make any substantive changes to the design of the project. So I had sent to you on April 16th to propose findings to make in support of a denial decision. And I just wanted to briefly address the performance standards and how we view this application's compliance with those performance standards under your bylaw. And then specifically, the main performance standard here is that the planning board cannot issue a special permit without making a finding that the development will serve the public good and provide significant public benefit without significant unmitigated detrimental impacts.

The bylaw does place a cap on the size of these projects to no more than 70 units and 78 beds, but it doesn't preclude the applicant from proposing a project with fewer units or fewer beds. Likewise, the bylaw does contain maximum dimensional standards, but does not preclude smaller projects. The bylaw requires that the project have a safe and convenient driveway system designed to meet foreseeable needs, and it mandates that the project comply with certain stormwater requirements, including the DEP stormwater standards and the Town and Milton Stormwater Bylaw. Under design standards, the bylaw requires the project that existing significant trees and groves of trees and other natural features be preserved.

That driveway layout shall take into account existing terrain and landscape features and avoid extreme or ill-designed cuts and fills. The planning board may require the submission of a stormwater plan and drainage calculations, a traffic impact study, and importantly in that point, the planning board shall determine the scope of that study and the planning board shall determine what mitigation measures may be required to address impacts. The planning board may also require a fire equipment and delivery truck access plan and approve it. Mr.

Horsley has testified in this proceeding that the stormwater infiltration system will cause breakout, will rise above the ground surface. That has been corroborated in part by the applicant's own analysis. We've given you our analysis from a civil engineer that the project doesn't comply with the state stormwater standards, particularly the subsurface infiltration system that is being used for rate control, which is not allowed per DEP. The latest plans show a large section of the first floor of the building to be submerged in groundwater.

That fact alone is a sign that this site is not an appropriate location for this project. With respect to the driveways and fire lanes, we provided you with facts and evidence that this project doesn't comply with several of the requirements, dimensional requirements in the state fire prevention code. I acknowledge that there's some debate over the applicability of those provisions. Sean Reardon provided an opinion a few weeks ago that the regulations say that the regs don't apply in towns that accepted the subdivision control law, which is most of the towns in the state except for the city of Boston.

I actually called the Fire Prevention Board last week and I spoke to the General Counsel and asked him directly, is the intent of that provision that these requirements don't apply in any town that has subdivision control? And he indicated that that probably was not the intent. The intent was if the town regulates these specific issues such as the maximum distance away from a fire access road to a building, or the fact that you can't drive a fire truck into the opposing lane of travel, if the town has a regulation that deals with those issues, then that regulation would trump, not that any town that has subdivision control, that these regulations don't apply. So, I think everyone acknowledges this ambiguity in the regulation.

Whether these apply or not, the fact is that these are standards that exist that the planning board can consider. And the fact is the project doesn't comply with them. So that is a relevant factor, whether or not the fire prevention code strictly applies or not. And then finally, with respect to off-site traffic impacts, The applicant's traffic study should have included a study of the roadway network for this entire neighborhood, Reedsdale Road, Highland Street, and the latter streets.

And it should have developed a master plan for managing traffic flow through these intersections. In general, projects like this should be preceded by planning. The applicant did not provide such a study and has offered instead piecemeal mitigation, including simply payments in lieu. There's actually a lot of payments in lieu.

It sort of feels like the developer is just buying off a permit by making payments for a tree fund and for a stormwater fund and making a settlement payment. This isn't how process should work in zoning. I don't think this is a process that Milton would normally accept. There should have been a traffic study.

There should have been thoughtful consideration over turning restrictions on the ladder streets, not some amorphous condition or requirement that some money get paid into a fund, and maybe that money will be spent on the neighborhood streets. But that's really out of our control and out of the Planning Board's control. These conditions, they are extensive. And some of them are well thought through, but they're not enough.

The project just simply does not pass muster. It does not meet the performance standards under the bylaw. And there could be a different project that does meet these standards, and the board should insist upon that smaller project coming before it and not just simply accept what's been put in front of it. Thank you.

Speaker 1 (03:30:23–03:30:34)

Thank you. Next, Bard has his hand up, and then Scott Horsley would be next. Welcome, Bard.

Speaker 20 (03:30:36–03:30:40)

Hello, everyone. Thank you very much. This is Bard Hairezai from Spafford Road. Can you hear me?

Speaker 1 (03:30:41–03:30:42)

Yes, we can. Thank you.

Speaker 20 (03:30:42–03:41:40)

Thank you so much for the time and for all of your really thoughtful consideration throughout. I'll start off just by kind of going back two years remembering well the night that we debated in town meeting about this zoning article. And when some of the concerns were raised by neighbors and people such as myself, this threat was raised. Well, if you don't like this, then it's a 40B.

And two weeks ago, we heard that again from the applicant, from BID Milton. If you vote against this, you're voting for a 40B. That doesn't make this a good project. It doesn't excuse all of the special exemptions that they're asking for.

We know from their SWEF path analysis, just one violation is something that would be felt every single day, is that every truck turning in and out will have to cross that double yellow line, and traffic passing by will have to stop, otherwise they get into an accident. Often that traffic will go off-road and there are pedestrians there. It's a serious public safety risk to put something like this, given the wetlands restrictions that every reasonable suggestion for mitigation almost has been met with, well, we can't do that because of the wetlands. Well, because of the wetlands, we have a compromise project.

We have a project plan here that is not what Northbridge has built anywhere else, as some of our research has shown. You know, all their other locations are on wide roads with wide shoulders, many of them state roads. There's much safer access. There are much fewer wetlands constraints if, you know, most of them have none at all.

You know, so we are dealing with a unique site here in that all of the kind of going back and forth and trying to figure out ways to make it better, we just end up hitting a brick wall because we can't do that. And it's the wetlands, the wetlands. So I'd like you to keep that in mind. We shouldn't just be voting on something because we think some hypothetical alternative is worse.

And it really is not a sign of a good neighbor, not a current neighbor, a future neighbor to sit here and say, well, if you don't like it, this is what we're going to shove down your throat instead. So take what we're shoving down your throat right now because it won't be as bad as this other thing. That's not trying to be a good neighbor. I mean, I think there's been some really thoughtful discussion over ways to mitigate construction impacts, construction management plan.

But I think for those of you who walked in the area, very familiar with the area, I'm still not quite sure if you understand how much of the town actually drives through these streets. Closing down a lane, having police detail regularly there. what will happen is there's thousands of cars that use Highland every day. And a lot of them, whenever we've seen this, they just start darting down the side streets because they don't want to wait two minutes because there's a police detail, or there's an obstruction, or there's something happening on Highland.

So there's just a lot of impacts that it's hard to foresee. That's during construction. We're talking about, as you know, 300 trees coming down, 600 trucks of fill, dozens of trucks of retaining wall rock blocks. It goes on and on.

All the lumber, the framing, there's going to be deliveries for months and months and months on end. that will cause massive disruption to the town. It's already hard for our neighbors in East Milton, where most of the population is, to get to the high school, to get to points in the western side of town. We're creating this bottleneck where we can't get around.

We've gone through some of that. I'd also like to come back to the whole public benefit versus detrimental impacts. And, you know, I would respectfully, you know, submit that based on what we've learned, that the public benefit, you know, although on paper and, you know, obviously we all support, you know, helping our elderly, particularly those afflicted with these types of conditions, that on paper, the benefit to Milton residents is actually pretty limited. Because in reality, as we've learned, you know, or maybe a little bit more than half of the resident population is made up of people from the local area, which can include any number of towns.

So the likelihood that Milton residents make up the majority of who would live here is actually pretty small, given some of the data. And they aren't giving preference to most of the rooms. Most of the rooms are not affordable. A Vita of Needham room started $13,900 a month and go up.

If you include other packages, transportation packages, So this is really only a select few who would have access and would benefit here. The rest of the town, the environment, we're left dealing with the impacts that are largely unmitigated to this point. I'm not sure if everyone heard, but those of us sitting in the back of the room last week in the hearing, we heard the CEO of Northbridge say that what they can do is give preference to Milton residents who are in there, if and when they run out of funds. I guess it hadn't even occurred to me the length of duration and how commonplace it is for people who move into these expensive types of facilities that after a year or two, they may run out of their retirement savings or other savings.

And then what happens to them? So this is a business that is a lucrative business model with high profit margins, with deep investor backing. It's the reason why it took seven years to get approval in Marblehead before building, and they have no wetlands, and they're on a main state road. So they have time.

This deadline that's been put forth is really artificial, as was admitted a couple of weeks ago, and there's still a lot of outstanding issues. So please give that all consideration. I mean, in terms of traffic, One of the things in the letter that I sent, it sounds like Sean Fahey, you read, which I really appreciate, but obviously it was kind of last minute. But some of these kind of piecemeal suggestions, on the face of it, they sound like they'll be beneficial, like the left turn only.

It certainly will help some of the traffic from the project avoid the latter streets, but it doesn't deal with traffic getting to the site. Getting to the site, you are fed up Spafford Road from almost every direction by the GPS apps, which is something that was not discussed in their traffic report. But even, let's say, you're able to manage some of that by sending people left down the hill, that's just contributing to that bottleneck on Canton Ave between Thatcher and Highland and Retail Road. what people are trying to avoid.

So by sending more traffic that way, you're almost encouraging more cut-through traffic. So you have not just the impacts of the net new traffic that you're generating, but because you're contributing to a bottleneck, you're potentially making cut-through worse, encouraging people to cut up and down when they see that those lights backing up even more than they already do, then it just gives them more license or more encouragement to speed up in these narrow residential sized streets. So I think that's all part and parcel of why we think a more comprehensive traffic study for the whole neighborhood is necessary. And physical barriers, things like the speed humps, and I had included in there, which I think, Sean, you referenced, MassGov says it costs about $2,000 a speed hump.

So now, if we did five on Spafford, that would be $10,000 for Spafford. But I would imagine Buckingham and the other streets would be interested in them too. So now you're looking at, and again, we understand it wouldn't be up to us solely how many on the street would get put in. Obviously, we'd want expert input from those in the town who know these things.

You might be looking at $20,000, $30,000, $40,000 to do it for all the latter streets, which very well may be appropriate. We do appreciate the gesture of $13,500 rather than the $5,000, but it still really doesn't get us very far. And just a smaller point on the signals, you know, that was one thing that was actually suggested to us that traffic commission said, you know, we got to make Spafford not the fastest way to go. So let's make that light shorter so people have to wait longer.

So it stays green for much less time at the police station there by Highland and Canton. So, you know, people will have to wait longer there and they'll say, you know what, it's better for me to stay on Reedsdale. And so that's why the concern was, well, if now they adjust it the other way, then it kind of undoes some of the benefit we've actually gotten from that change. So that's why I think some of you have pointed out, and others in the past, and the Traffic Commission have pointed out that more holistic solutions are required.

Um, so, so yeah, take, taking all that together, you know, and what we've learned, I think the costs do outweigh the benefits to the town. I mean, just today, you know, I'm looking at my emails about making up a soccer game that was rained out for third grade boys travel. And, you know, Milton soccer is telling us that you need to talk to your opposing team about rescheduling games in their town, because we do not have fields in Milton for these games and we're playing baseball. in Hyde Park and Quincy exclusively because we do not have fields in this town.

Our neighborhood has turned over. Now we have hundreds of kids. Since the master plan was written in 2015, as much as we need to do things for our seniors, we need to be doing things for our kids. And right now, I think a lot of us would agree that there are other use cases.

There are other things as well that we need in this town. And this should not all be profit-driven that benefit the out-of-town applicant and benefit the BID Milton, where for them, the recurring revenue stream every time somebody falls, which I know happened to my dad a lot, we had to bring him in for various scans and checkups. It's a solid revenue stream for them. It benefits their business, no doubt.

doesn't outweigh the cost to the town. So thank you so much for all your consideration. We urge you to vote no or abstain if you don't feel like you have all the information you need and you're being forced by this artificial deadline. So thank you very much.

Speaker 3 (03:41:56–03:41:57)

Meredith, you're on mute.

Speaker 1 (03:42:00–03:42:03)

Sorry, next we have Scott Horsley. Scott, you should be able to speak now.

Speaker 15 (03:42:06–03:42:07)

Wonderful. Can you hear me now, Madam Chair?

Speaker 1 (03:42:08–03:42:09)

Yes.

Speaker 15 (03:42:09–03:48:04)

Wonderful, thank you. Again, for the record, Scott Horsley, and I've been retained by the law firm of Sharon and Logdon. I also have done work for Hill Law. Dan Hill spoke a little bit earlier, representing two different citizens groups.

I've submitted a number of letters to both the Planning Board and the Conservation Commission on stormwater, wetlands, and water resources issues in general. I guess the first thing I'd want to point out here is, as I stated in my letter, is general comment here. There's a huge increase in impervious surfaces on a very tight site. I think everybody would agree this is highly constrained.

The applicant's working hard to make this work by bringing a lot of fill, retaining walls, as well as substantial stormwater systems. The second point I would make relative to that is when you add a significant amount of impervious surface, you are going to generate an increase in stormwater volume. That's a fact. There's no way around it.

There's going to be more stormwater generated in this site, significantly more, and I've articulated that in terms of numbers in my letters compared to existing conditions. So that stormwater has to go somewhere. As Chairman Kiernan of the CONCOM always asks, where does the stormwater go? And that's a great question.

And in this case, what's happening is to comply with the MassDEP stormwater standards, the applicant has designed a number of facilities that, frankly, I think will work well in controlling what we call peak surface runoff rates. In those cases, we're matching pre and post. However, as I said, because we have a lot more stormwater volume to deal with, the extra stormwater has to go somewhere. And the proposal here is to put it in the ground using infiltration systems.

Again, I think the applicant's done a good job engineering facilities that will, in fact, infiltrate a huge amount of stormwater into the ground, much more than is going now. However, the consequence of that is water levels are going to rise and there's going to be more water flowing through the site, notably into the Vernal Pool. And it's going to be reaching the Vernal Pool at different times. In the field of hydrology, we call that hydroperiods.

Wetlands and Vernal Pools are very sensitive to not only how much water is getting there, but when it's getting there. Both of those things are going to change dramatically in this project. I had suggested a while back that the applicants submit a hydrologic budget analysis for the vernal pool that has was declined. I don't believe you ever got that.

I would strongly argue that that would be required. The third point I want to make is there seems to be some confusion here about meeting the mass DEP stormwater standards and whether that's good enough for the planning board and I want to refer specifically to your zoning bylaw and I'm looking at 275.3.22 subsection 9 entitled utility stormwater management. And what it says is the stormwater management system shall meet all applicable provisions of DEP's stormwater management guidelines and regulations. But it doesn't stop there.

It also says, and the town of Milton's stormwater bylaw. Well, as it turns out, the stormwater bylaw and its regulations that are adopted under the stormwater bylaw are different. than the MassDEP stormwater standards. I believe that the applicant has really been focusing on complying with the MassDEP stormwater standards, and they should because they're going to have to go to the CONCOM.

However, they also have to meet the stormwater bylaw. And I want to refer to, again, a very specific section of your bylaw and regulations that's on your town website, and I'll read it again. Stormwater management systems must ensure that the rate and volume of runoff discharge to wetlands and waterways approximates pre-development hydrology. What that means is they have to somehow equalize what's going into the wetlands and the vernal pool today versus post development.

And I would argue that they're not even close. That is not a standard with the DEP stormwater standards. So that's different. That's unique.

I would suggest you need to make a finding. that they've done that, that they've met, that they've done some studies to show that the volumes and rates and hydro period, as your bylaw requires, match pre and post development. I don't know that that exists anywhere. It's in your regulations.

Your zoning bylaw says that your board's issued a special permit must demonstrate that those regulations get met. So I think that's a really important outstanding item. And I would just conclude with, again, as Mr. Hill mentioned earlier, I think there are some issues with some of the specific facilities.

As I mentioned, the attempt here is to put a lot of stormwater in the ground. And for the most part, I think that's being accomplished. But the end result of that means, again, water levels are going to rise. They're going to rise beneath the systems.

They're going to rise up against retaining walls. And they're going to rise in the wetlands. And I'm not sure that even that meets the DEP stormwater standards, but what I can say with certain is it does not meet your stormwater bylaw and regulation standard that I just met to you, because there is going to be an increase, significant increase, and I provided you those numbers in prior letters in terms of how much of an increase, and I provide it seasonally, because hydro period is important. in wetlands and vernal pools.

And again, that's a standard that's in your town bylaw, not specifically in the state DEP stormwater standards. And I will stop there and be happy to answer any questions you might have. Thank you for your attention.

Speaker 1 (03:48:07–03:48:09)

Any questions from the board on that?

Speaker 8 (03:48:12–03:48:56)

I did have a question for Sean Reardon with respect to what Mr. Horsley said. Is Sean still with us? I am.

Sean, you've provided us with our peer review consultant opinion for all of the stormwater and traffic application materials, right? So on this, the town stormwater bylaw, can you refresh our memories on What you've provided us with an opinion about whether the application meets the town stormwater bylaw.

Speaker 17 (03:48:57–03:49:20)

I don't recall doing that specifically because in my opinion that they're fundamentally the same. Scott references approximating the volume of runoff, which the project does by meeting the other stormwater standards. So I don't, my familiarity with the stormwater bylaw lends me to believe that they're fundamentally the same.

Speaker 10 (03:49:20–03:50:05)

Cheryl, I would add, sorry, that there's a specific provision in the stormwater bylaw that says that to the extent that a project is required to obtain approval from the Conservation Commission, the provisions of this bylaw do not apply. So the stormwater provisions apply to all stormwater applications that don't implicate wetland protection. When when wetland protection comes into play the conservation commission takes over and the and the specifics of this but by law don't apply. And that's that section.

225 dash three a of the stormwater by law.

Speaker 17 (03:50:08–03:50:23)

And that's pretty typical too, Cheryl. We see that quite often that there's a, in local stormwater bylaws, there's a catch-all that basically is there to make sure that the standards get applied even if the Wetlands Protection Act doesn't.

Speaker 8 (03:50:26–03:50:27)

Thank you.

Speaker 1 (03:50:33–03:50:38)

Any other questions? Scott Horsley has his hand up.

Speaker 15 (03:50:38–03:52:35)

Did you want to respond to that, Scott, or is that from- Oh, actually, frankly, I forgot to take my hand down, but I would like to respond to that. I guess my response is that doesn't make any sense to me, because the provision that I read you, I have to respectfully disagree with Sean, that is not in the state's similar language, but not that language. That language talks about balancing the flows and volumes to wetlands, which would include the vernal pool. The way that the mass DEP standards read is you have to equal or more recharge.

Under the state standards, you can add more. And I've always, as you may know, Sean, on other projects, I've always raised this question. What happens if it's too much? What if it changes the hydrology of the receiving well?

And in this case, the town bylaw talks about that. So if Ned's correct here that it doesn't count because they have to go to the CONCOM, then that's quite a shame because that really, to me, defeats the purpose of the bylaw. It doesn't make any sense to me. And regardless of that, this site has a vernal pool at the downstream end of it.

I'm not sure anybody here would suggest that's not important. And I would hope that, I'm not sure everybody's here familiar with the hydro period. If you read the MassDEP Hydrology Handbook for Conservation Commission, there's a lot of discussion about it. So this impact that I'm talking about is an important one.

It's well documented. And if the bylaw is exempt because they're before the CONCOM, frankly, that just doesn't make any sense to me. I'll take a look at it. I'm not a lawyer, but I'll provide my regulatory opinion as opposed to my legal opinion later.

It doesn't make any sense, Madam Chairman.

Speaker 17 (03:52:35–03:53:03)

Madam Chair, it makes perfect sense. The Conservation Commission is empowered specifically with administering the wetlands protection. So it belongs in their purview predominantly. So it makes perfect sense that you wouldn't ask another bylaw to double the same process that's required under the Wetlands Protection Act.

So it makes perfect sense. And the Conservation Commission is fully capable of making those determinations.

Speaker 1 (03:53:06–03:53:19)

Thank you, Sean. OK, next we have Nadine Hanna. Nadine, if you'd like to join us, go ahead and speak.

Speaker 18 (03:53:19–03:53:52)

Hi, everyone. Nadine Hanna, 11 Stafford Road. Thank you again. Thank you for allowing that change earlier on the delivery hours.

Before I go on, I just had two questions, if I could ask, please. The first one is, if you could remind me, what are the construction hours associated with the build? And the second one being, what are the town's allowed receiving hours for business functioning after post-construction.

Speaker 10 (03:53:56–03:54:04)

Ned, do you want to address the construction? I think the general construction hours are set aside.

Speaker 18 (03:54:07–03:54:09)

And the commercial receiving hours for the town?

Speaker 10 (03:54:10–03:54:14)

I don't know where we are receiving hours from between 10 and 2.

Speaker 18 (03:54:16–04:01:25)

Thank you for that. Given that this is a special permit, Madam Chair, the neighbors are asking if you are able to restrict construction hours. And before anyone else jumps in, I am directing this question to the board alone. Is that something?

And I don't want to undo, because by the way, and of course, I agree with everything Attorney Hill said, I agree with everything. Bard said, I agree with everything. Scott Horsley said, we don't want the project. We don't feel it's appropriate.

Outside of that, given that you are putting restrictions into something that will be voted on, are you able to restrict those construction hours significantly? And I would dare to say to the 8 AM to 2 PM, because let's not forget when we discuss the heavy duty traffic coming in, You bring a truck in, right? They make, they lumber through onto the site. There's the bed gets raised up.

There's the clanging of the door when it opens. It's the dumping of anything that's on it. It's the heavy duty vehicles that are backing up back and forth from whatever's been poured out, whether that was within the delivery time or not. The construction is going to be picking things up now if it starts at 7 that have been left there the day before.

And you're talking about constant, consistent, persistent noise pollution within a residential neighborhood. You know, we have a major renovation going on in the street, a renovation that is quite significant on Spafford Road. It needed to be done. We welcome the change to the neighborhood.

given that we hope it'll bring great neighbors in and save a beautiful old home that was in jeopardy of sinking into the ground. But that's a home renovation, and it is highly disruptive to the neighborhood. Even though we support it, it's not a complaint to get it against it. It's just reality.

You're living with truck after truck after truck coming through the street, staying on the street, getting stuck in a neighbor's tree. Believe it or not, I think the video might have been included in some prior photo submissions. And then the consistency, again, of those vehicles on the site, on the property. So if that's something the board can do, I would, on behalf of the neighbors, really ask you to consider significantly restricting the construction hours on this site, given that it's not just It's not just a commercial entity, a commercial site that's being developed.

It's a commercial site being developed within, completely buffered by residential neighborhoods. So that's my first thing. The second one being, I do want you all to think back to the trucks, the tanker truck, the air gas, all of those things, no matter how much the developer, the applicant, the attorneys say that the hospital type traffic is not their type traffic or that it won't impact Stafford Road. We know that not to be true.

We know it's going to build upon a pre-existing extreme problem that the neighbors are facing every day. We have not heard anything that really feels significant towards mitigating the traffic. Stafford Road should be a no-truck road and a no-truck road more than Highland, which is currently a no-truck road, which has trucks being planned to come through it to make this site develop. This needs to be more firmly established for the residents, for the kids.

It is not a safe situation for any of us. On the water, with as much respect as I can muster, I don't think a generalized engineer is capable of countering a certified hydrologist who has spent his career researching water and the rules and applications and has helped to write some of them at DEP. Everything that Scott Horsley said should be taken as seriously and with as much education and experience behind it as possible. Not taking into what he has said into serious thought and research and time, take that at ease, would really be doing the town a disservice.

Because we, the neighbors, have paid the specialist or have contributed towards research, right? Just to make sure it's not just our opinions that we don't want it, it's that there is real factual evidence that this is detrimental, that this site, that the changing and the impervious, you know, space that they're going to make will actually harm the town of Milton. And again, you know, the more people in life I have found that the more that they dismiss concerns instead of embracing and wanting to work with you, the more likely it is that they're hiding the general problem of that they know that they can't actually mitigate. And I think that this developer has shown a complete unwillingness to work with the neighbors, to work with the residents.

And that as they said, they said no to so many changes because they want to put in what they want to put in, how they want to do it, to the size and scope that they want to do it. forgetting any of the town rules, forgetting, you know, let's get a pass on wetlands, let's get a pass on the fire safety for the entrance, you know, on and on it goes. Even to offer, what are you going to offer? Six foot tree?

Take a six foot tree as a trade off for deforestation up the street. A six foot tree. If you put a tree in your home, do you go to Home Depot? Or do you go to the local nursery and get something significant?

You know, that's just an opinion. I'm going to put it to the side. But I know that I don't go to Home Depot. I know that if I'm being serious about wanting to make an impact on my property or in my neighborhood, that I'm looking for something more significant than that.

And also the last thing being said, and the neighbors have not spoken, so I'll say this one just for myself. We don't, hush money is not a thing that I as a person with my ethics and morals would ever want to consider. We stood up for a reason. We have been present for a reason.

Our kids have, you know, had to float in the background of these meetings and, you know, be made to have limited time with their parents, you know, night after night after night. We believe that this is not appropriate and it does not fall on here. Once again, thank you for everything you said. I urge you to vote no.

I know the neighbors all agree on that at least. And have a great night.

Speaker 1 (04:01:25–04:02:14)

Thank you. Next, we have Diane DiTulio Agostino. You can unmute yourself, Diane. You're still muted.

Let's see if she can get off. Diane is still muted. Why don't we go to Carla while Diane, if she can try to get unmuted. But Carla, why don't you go ahead?

Okay. Am I unmuted? You're unmuted now, yes.

Speaker 21 (04:02:15–04:05:12)

Fantastic. Thank you. Brief, because I think a number of the comments are already said by Nadine, Dan, Bard and Scott. And as it set forth in our letter from last week, April 20, I'm sorry, 16th, Madam Chairman.

Basically, it comes down to the planning board still must consider the impacts on the neighbors and mitigating the negative impacts with respect to the stormwater under their bylaw where plainly that's not just concom jurisdiction, which is limited to wetlands. You can't cure that when there's been no study whatsoever done with respect to the existing conditions. We really, really need the planning board to understand and take into consideration the fact that not only does the memory care bylaw allow, but it requires the planning board to take the broader community detrimental impact into consideration. The proponent has been so focused on mitigating the stormwater impact on the because that's what the con comments required.

But the planning board is required as a result, stormwater mitigation must channel that water elsewhere. Therefore, it goes to where the doesn't want it to go. Perfect, but it still has to go somewhere as our own consultant for both Dan hill and our own firm on behalf of the neighbors respectively has asked where does the water go? goes to the property of the neighbors, Bacardi, Spafford Road, et cetera.

This whole argument, and I can ask Scott to speak to it specifically again, with respect to topography, surface versus ground, and the fact that Spafford here, if you just look at the topography, is different. It's not all about where's downhill, where's uphill, et cetera. It's much more complicated than that. Could possibly articulate to the board, but you've heard the experts with respect to this, the hydrologist with respect to this, and I ask you to really think about that in connection with, as you.

Similarly, there's no ability for the planning board to assess compliance or apply conditions to mitigate these circumstances without understanding and thoroughly seeing the results from these studies. I feel like this whole process has been rushed to Nadine's point and others. There's this artificial deadline that's been set for decision. I really wish that we would just sit back, take a step back, and ask the applicant to either reconsider the project or at least do the studies necessary to allow the planning board to have a full deliberation in front of the public in connection with this.

So, at this stage, I would respectfully ask that you vote no. Thank you.

Speaker 1 (04:05:16–04:05:47)

Thank you, Carla. And now let's see if Diane can try to, Diane was next, but is still muted. Diane, if you can unmute yourself. She seems to be having issue.

Okay, now we have Teresa O'Brien, you're unmuted. If you wanna go ahead, Okay. Thank you.

Speaker 22 (04:05:47–04:07:42)

Okay. Teresa O'Brien, 42 Spafford Road. This is just one last plea that, you know, this is just such a large project. It's going to affect the neighborhood and everyone in town that cuts through and goes to the high school and to Pierce.

It's a two-year construction project. So no matter what time you have those trucks come in, it's just going to be a tough project. Then I'm listening to two to three years for the trees to grow in. That land over there, it's going to probably be five years listening to even the architect landscape.

In the zoning as well, let's go back to trees for a second. It was 20-foot trees. I think on the recent plan, there was seven 20-foot trees listed. It would be great if Northbridge would make this smaller, push it back a little so it's not on top of the street, so you could plant more trees and plant a better buffer for the neighborhood and again for everyone.

Because we keep seeing images of the driveway, but we haven't really seen many images of what it will look like from the stop sign on Highland, where everyone in town kind of drives up and they have to stop. So I think at one point, someone even asked for a image just to see what it would look like from there. It'd be great if we could actually see that. And just to see how big this project is compared to all the houses around here, it's just too big.

It just sticks out so much. It's 55,000 square feet. It's what the size of the fruit center and the new fire station combined in a small neighborhood. Please, again, I just urge you to vote no and please have them make it smaller.

Thank you.

Speaker 1 (04:07:42–04:08:14)

Great. Thank you, Teresa. And now, Diane and Tosha. Let's see.

I have Diane on here twice. One is unmuted and one is not. Let's see.

Speaker 23 (04:08:14–04:18:01)

Hello. Hello. All right. Yes, there you are.

Let me turn the phone off. It's going to cause echo. Yeah, I live. Uh-oh.

Do not want to call the emergency number. The phone. Oh, hold on. Only me.

Thank you very much. Diane DiTullio Agostino, Precinct 9 town meeting member, former select man, because that's what I was sworn in as, former Warrant Committee member, current chair of the Commission on Disability, and I am presenting to you tonight something that I have, very few people know that I have a history of, and I have not brought much of this to your attention. However, I am concerned some neighbors that I only recently met had no idea what the signs referring to a 60,000 square foot building in their neighborhood meant. And when I expressed that this had been going on for some time, this proposal through a town meeting, they were surprised.

And I believe that should this go forward without some mitigation as presented by the brilliant attorneys that the neighbors have spent a lot of funding and the brilliant hydrologist, et cetera, et cetera, I do believe this could become an issue far greater than a 40 B because I do not believe, and I have spoken to developers, I do not believe this site could support. And I think some of the planning board members, you know, have actually fought against some 40 Bs in the town, but a site with this much wetlands and so limited space. you know financially for a 40 meter successful I find that a threat that is blatantly obvious to scare the planning board so what I would ask is to keep in mind that should this and the neighborhood, you know, people think, oh, Highlands, it's a rich neighborhood. I did bring this point up before, but this property is in an environmental justice community.

Winter Valley abuts this property. Winter Valley has a lot of residents who create this as an environmental justice community. And some of the items that the attorneys would be looking at should they want you know i don't know if this board's considering voting tonight but should the board vote before they have some of the samples of these new suggested bricks and new suggested products for the neighbors to even see some of the items that would come up is that When the article came to town meeting, the then chair of the planning board presented to town meeting, and this is saved on tape, you know, everything these days is saved, not like in the old days, that This residence, and I'm glad that we all understand it's not a facility, it's nothing more than a residence, like an apartment complex. This residence that's certified under Mass General Law Chapter 19D is, in fact, an assisted living residence.

And the former chair of the planning board is on tape that they promised the neighbors, on tape at town meeting, they promised the neighbors they would not allow an assisted living residence to be built there. the minutes of the planning board during that time period preceding that town meeting will state the town council, either he suggested, I forget the word, I don't have the document in front of me, but the attorney Hill's comment about fire is what reminded me of all of this, that they could change the word assisted living residents to memory care unit. Well, the law only certifies, in the state of Massachusetts, assisted living residences, and there's only two types. The two types are the traditional and the secured resident unit ones, under which would come something.

The memory care unit's a very nice marketing term. And the reason I'm bringing that up is because, unfortunately, in January of 2013, I'm proud of my unknown history. I unexpectedly had to get involved in what was happening in this industry, in some of the places. And I met with Representative Timothy at the time.

And this also speaks to what Attorney Hill said. Representative Timothy said Massachusetts has the worst assisted living resident laws in the country. And that's what I began for the next 18 months. And I have continued through all these years to work to improve the assisted living residence laws to protect, to protect and make sure that the residents, the most vulnerable residents in these places, those who have dementia, those that if there was a fire, they cannot find their own way out.

And the industry has a term that they use, heads in the bed. And heads in the beds is money in the developers' pockets. And there were plenty, I'm not saying one way or the other, a thing about Northbridge. I know something about Northbridge, but not everything.

I'm not gonna get into the specifics, but I do wanna say that, The one of the speakers pointed out, I think was Bard, that the article gave a maximum number. It didn't make it that the planning board must approve that number of heads in the beds because these residences do not have doctors. Many people, they think they have doctors. They do not have nurses.

allowed to even change a Band-Aid. And this is all documented by the laws. I have volumes and volumes of information on this. Therefore, there are no CNAs.

You'll often hear, oh, there's CNAs. So Because you don't have doctors, you don't have nurses, you don't have CNAs, who are the people at night who would be in there, God forbid, that there was a fire? And what is this planning board putting in the special permit? that is going to safeguard to the highest degree the ability for people to get out of that, to be guided out of that building.

California has the best laws. In fact, I too have spoken to many of the, I started with the fire chief in Milton back in 2014, and then I went all the way up to the fire marshal, and they were shocked. They were shocked to learn how vulnerable, once these residences are built, that there is so little that they can do to improve fire safety in them. Planning board's responsibility is not just to give a special permit to build a building.

It's to protect those disabled residents that would be residing in this building. The number of employees, several years ago, there wasn't even a mandatory amount of employees. So I would know that there were 60 people with dementia in a building, and there were two young aides. not certified nurse assistants, just two college age 18, 19 year old individuals responsible for the safety of those 60 people, God forbid.

And it really brings into focus how many exits and how much safety is a back way exit. You know, and seconds count in a fire. You all must know that I'm an insurance broker and fire safety. My husband worked for years working on the new firehouses.

So it's wonderful that we have new firehouses. But what we need here is to know, and I don't even believe that there's ever been any discussion. If you put 70, 78, I think those were the numbers you were saying, heads in the beds, What does the law require for the number of people? And it's not in your jurisdiction to control the number of individuals in that building at night to be sure that those 70, 78 people could get out in a fire, but it is within your jurisdiction to make sure that you have explored all options.

And I could actually give you, there's another town that took months and months to permit an assisted living residence with a memory care unit, and they, specifically to address what Attorney Hill mentioned included additional fire safety. And it doesn't have to be written in the law, but it does have to be something that we as responsible residents and the planning board has responsible individuals writing the permit. Don't just take it for granted that what you're being told, well, this will work. You know, the fire truck will go on the other side of the road, it'll still make it in there.

Speaker 1 (04:18:01–04:18:06)

You know, we have a couple more people to speak. I hate to.

Speaker 23 (04:18:06–04:19:20)

OK, I thought I might have been the last. But now there's I'll get to the point. Tosha still has her hand up. And I can't see that.

But that's OK. So the point is, you know, how many nighttime AIDS seconds count in a fire and. Consider the fact that these neighbors have very, very good legal arguments, very, very good DEP arguments. The Con Com pretty much whitewashed this saying that it's for the good of the town.

And yet there's no guarantee that Milton residents will be getting beds here. I get calls all the time is, do you know anyone at the hospice center across from St. E's to help get my family member in? There is no guarantee that the money that Milton Hospital is going to get will be used to benefit anything at Milton Hospital because they are owned by Beth Israel Deaconess Boston.

So I implore you to please consider the fact that if it's a good plan and if it's a good permit, we have plenty of time to make sure it's done right and there's no deadline to do this tonight. And I greatly appreciate the amount of hours you just put into this tonight. Thank you. Thank you.

Speaker 1 (04:19:20–04:19:30)

Teresa, I don't know if you have your hand up, but I'm going to let Tosha speak next because she has not had a chance. We can let Tosha and Wells. Yes.

Speaker 5 (04:19:37–04:19:52)

Tosha, okay. Sorry, Meredith, hands are going up and down. And every time I click on allow to talk, someone else moves up in the list. So I am carefully going to press the button now.

Here we go.

Speaker 24 (04:19:55–04:20:28)

Hi. Can you hear me? Yes, we can. Welcome.

Okay. Antonina Wells, 179 Highland Street. I know it's late. I just want to make one comment.

I'd like the board to consider that installation of gauging equipment be part of the special permit so that hydrometeorological data can be recorded for accountability purposes in the near and beyond future. Mr. Horsley might have a specific recommendation as to what gauging equipment or well monitoring system would be most effective in the area. But just for that to be considered, thanks for your time and consideration.

Speaker 1 (04:20:29–04:20:38)

Yep, thank you very much. All right, next we have Gene Irwin.

Speaker 25 (04:20:43–04:34:01)

Hi everybody, can you hear me? Yes. It's Gene Irwin, 120 Highland Street. I have several points I'd like to make quickly if I may.

Under the rules and regulations of the planning board in regards to flooding, 14.4 section B, Within the floodway, no new construction, substantial improvement or other land development shall be permitted unless it is demonstrated to the building commissioner that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood level at any point within the town. So I believe the applicant should have contacted the building inspector because we know there's gonna be a new development at Winter Valley. We know there's potential 40B over on Canton Ave. We know Marine Road is going in as we speak.

And to me, the neighbors down here have all felt the effects of the Marine Road development on our water table and our basement flooding. So again, I don't believe that the building inspector has been contacted and has done a combined or anticipated development research on any surface water level in town. I think the people down by Gulliver Road are all gonna flood as all these things come in. Also, Scott Horsley I don't think was in on the meeting several meetings ago when it was discussed that on the back of the memory clinic towards Karen Bacardi's house, there was gonna be a pipe placed 10 feet below ground to help stop the flooding of the basement of the memory clinic.

And my worry there was that if you lower the water table between the memory clinic and Karen Bacardi's house, is that the drought that will ensue will kill all the existing trees that are 60, 80, 100 feet tall. In our Rules and Regulations of the Planning Board, PDF, under 5.4.2.3.9, it says, measures to be taken to ensure the survival of existing are newly established trees. I'm mostly concerned about the existing trees. When you go into Karen Bacardi's property, there are these giant, beautiful trees, probably 80 feet tall.

And now you're going to lower the water level, the groundwater level, 10 feet. I believe those trees are all going to die of drought. This rule asks what measures are to be taken to ensure the survival of the existing trees. And again, it says you need a letter of compliance issued by the International Society of Arboriculture or an equivalent guideline.

And then it also says under 5.4.2.3, describe the permanent methods to be used to control erosion and sedimentation and protection of the trees to be preserved. Again, I don't believe the applicant or the landscape architect has done either of these things. So that's just on that. Also, in front of the memory clinic out on Highland Street, there's supposed to be a crosswalk.

We haven't discussed the crosswalk signals. Are there going to be any? If so, what type? Is there going to be a red and yellow light, you know, green light over them?

and the effect of having a stop sign less than 100 feet away. People come from, say, the town hall end of the street, headed towards the memory clinic, and they see a green light, and they're racing to get through the green light, but they don't realize they have a stop sign 100 feet beyond the green light. So I think that's a problem. Also, In front of the memory clinic, you have a drop-off zone.

And they said, the truck drivers are going to check in with the people at their front desk about making a delivery. Well, this drop-off zone is directly on top of a crosswalk. Again, I don't think the ADA would like that. Also, as you go up the sidewalk towards Highland Street, they said it's about a 300 and some odd foot run to get to Highland Street.

And again, I pointed out weeks ago that when you go into Winter Valley, who meets the code, they have sidewalks on both sides of the driveway. and the code says every 200 feet you have to have a separate additional five foot square bump out. At Winter Valley they put a little bench so the people who have less stamina can take a break and sit down for a minute or something or at least get out of the way of the bicycle traffic. So that's another consideration.

And again, I go back to the ADA rules that say you have to have equivalent facilitation regarding the parking. And Mr. Corcoran and the applicants talked about doing underground parking, which I believe would be equivalent or better facilitation, which the code requires. However, now they're talking about some sort of dirty parking spaces over at Milton Hospital.

Again, this is rushed. We haven't seen any plans. There's no handicap ramps to accommodate people now going in that direction. There's no staircases.

It's supposed to be the quickest, most unobstructed path to get there if it was ever allowed because, again, the new code says cost is not a defense on putting the underground parking. Mr. Corcoran said it would cost $4 million, and he said it again after he was already told that the code says cost is no defense. Just bear with me a couple seconds longer.

Also, Quantcom, in their haste to call a vote, which I believe the vote wasn't legal because I don't feel they had a quorum, at the beginning of the whole project, the neighbors, we hired Tom Palmer. as a consultant for us. And eventually Tom got named to the Conservation Commission. And he said at the time when he joined, he said, I have a conflict of interest because I work for the neighbors.

And he said, I will participate, but I will not vote. And when they voted for the order of conditions, there was only four members in attendance and Tom Palmer was one of them and he voted. And I don't believe the order of conditions is valid because I don't believe there was a valid quorum. That's just another one of the problems.

And then as you look at the area over in front of the barn that exists now, the applicant wants to tear down the barn, tear down the stable, dredge where the driveway is, and put another sort of retention pond there. And when we talk about all this potential neighbor flooding, no one has considered the yellow house at 95 Island Street, which is owned by the MRE, about their basement flooding. This new retention pond in the area where the barn is, the border, the house is only 20 feet over the border. And it's an old-fashioned granite foundation.

And those people, I believe, were on septic. And I believe this added groundwater level down there will wipe out their septic systems and flood their basements. And those people haven't been adequately talked about, or no attention's been paid to them. And then we go back to the threats that the hospital has set about 40 bees.

And personally, I'm not concerned about the 40 bees going across the street whatsoever, because I've maintained all along that the applicant doesn't have the proper infrastructure to even be able to build over there. And I've already cited that the fire department can't really get in the driveway. And as I look at this new proposal tonight showing the guide rails, if you go down to the, if you can pull up, Tim, for the audience, the two schematics showing the new stone walls, the bottom one says that the new road is only 10 feet on center. So now the driveway going in has gone from 22 feet down to 20 feet wide.

And I don't believe we have a proper swept path analysis of this new narrow street. And again, the planning board's number one priority is public safety. It should trump everything. And I don't believe public safety is achieved.

Diane Agostino, I thought, did a good job talking about if there was ever a fire at night and you only have a few employees to get 78 heads out of bed, I thought was a good point, but it's not just fire. You know, you can have an oxygen leak. You can have a gas leak. You can have other stuff.

And again, seconds matter. And there's no rendezvous point. Where do you put these people? If you take them down to the back parking lot near Winter Valley, there's no escape gates.

There's nothing. There's no question a fire engine or any vehicle could block the entrance. And then to me, all hope is lost. And I'll just finish up.

Going back to the sewer in the street, I defy anyone because I've researched the town codes over and over. I've gone into the DPW's website and it says that the town and the state bylaws match up perfectly. And it says a public sewer shall mean a sewer in which all owners of abutting properties have equal rights and is controlled by a government agency or a public entity. And the owners of abutting properties, Northbridge does not abut Spafford Road.

I can say it till I'm blue on the face. Under the town's definitions, shell is mandatory. And again, public sewer shall mean a sewer in which all owners of abutting properties have equal rights. Now this new sewer, if it goes in, I'm told it's gonna be a two inch ejector system.

And that's gonna go from the memory clinic to the connection on Spafford Road. And that's, I'm guessing, about 600 feet away. And our bylaws are clear. It's supposed to be a gravity system.

And when it's not available, when sewer is not available on Highland Street, they're supposed to have leaching field and septic systems. Now, in addition to that, abutting properties are supposed to have equal access or equal rights to this sewer main. I abut Highland Street and my neighbors between my house and the hospital, the Burdicks, We both have grandfathered double lots, and we cannot tie into this two-inch sewer. These ejector systems, the law is you can't connect into someone else's ejector system.

So now we have basically a private sewer in a public way. Again, it's splat zoning. You can't do it. The splat zoning says, you know, of a financial benefit to just one person.

Speaker 1 (04:34:03–04:34:20)

Gene, I'm so sorry, we're at 11.35 right now and we just need to allow the board time. So I just appreciate your coming on and speaking, but I think we now need to move to the board.

Speaker 25 (04:34:20–04:34:36)

And I just wanna say before you make a final decision, please, In all these years, we've never had one meeting on this sewer system. And I'll leave it at that. And again, I think this process is being rushed arbitrarily. Thank you so much all for your time.

I know it's late.

Speaker 1 (04:34:37–04:35:39)

Thank you. OK. So, Nadine, you have your hand up, but we really do need to be able to discuss before midnight. We have to end.

All right. All right, she's done. Okay. All right.

So now to the board, we are at a late hour. We have a couple of options here. We can decide to continue the public hearing, but we would have to continue it probably till Monday. If we wanted to meet, discuss, we can close the public hearing and then post a meeting, I guess we would We would be able to post a meeting for Monday if we wished.

And I guess I'll open it up to the board if you want to discuss tonight and close the public hearing.

Speaker 10 (04:35:41–04:35:50)

So if I just make quick remarks, you can only continue with the consent of the applicant. Correct.

Speaker 1 (04:35:54–04:35:57)

So what would be the request of the board?

Speaker 3 (04:36:01–04:36:05)

Well, it's really what's the request of the applicant?

Speaker 10 (04:36:05–04:36:44)

I think the applicant is ready for a vote. I think very briefly, this is the town invited this development. We went through a lengthy zoning process. The project complies with zoning.

More than mitigating the impacts that are ours, we're contributing to assisting mitigating other existing conditions. And we think we're ready for a vote. We think that the special permit as currently written is properly conditioned to protect the town and authorize the project to go forward. Thank you.

Speaker 1 (04:36:46–04:36:47)

Cheryl, you have your hand up.

Speaker 8 (04:36:50–04:37:37)

Given the hour, I'd like to request that the applicant consider a continuation to Monday. I'd like to be able to give the decision another final review. We made a lot of changes tonight on the screen and we've heard a few other comments. I'd like to just give some thought to whether we've covered the conditions as thoroughly as we possibly can.

And honestly, at 1140, I don't think I'm in a position to look at those conditions again further tonight, but I would like an opportunity to do that. And I think with the applicant's patience that we could do that.

Speaker 10 (04:37:38–04:37:40)

I appreciate that. I've just put out a text.

Speaker 4 (04:37:41–04:38:08)

I agree with Cheryl. You know, I think we're almost five hours into a meeting and it's been fairly intense. And through the meeting and reworking language, I think it would be reckless, you know, to vote on this tonight. I agree with Cheryl.

I would hope that we could move this to Monday.

Speaker 10 (04:38:11–04:38:27)

I hear you. I don't disagree with you. I guess I'm stalling for a little bit of time. I think it's not inappropriate.

Speaker 1 (04:38:27–04:38:48)

I would agree as well if that's possible to move it. If it would be helpful, I think we could Would the board feel comfortable voting to close the public hearing and move to vote on Monday? Is that possible?

Speaker 8 (04:38:48–04:39:02)

So the question would be whether we want to make any other language changes to the conditions and if we need to keep the public hearing open for that. Yeah, that's true.

Speaker 1 (04:39:02–04:39:03)

Yeah.

Speaker 10 (04:39:03–04:39:17)

Yeah, that would be my concern as well if there was something that came up. OK. And your considerations that needed to be discussed, we'd want to have the ability to do it. We wouldn't be able to do it if the hearing were closed.

Speaker 4 (04:39:17–04:39:28)

Yeah, I think we need that opportunity, Ned, and to the other members. It's too much to try to reach a conclusion. Yeah.

Speaker 10 (04:39:36–04:39:53)

No, listen, I, as you know, I've been in front of this board and many other boards in town, and I certainly appreciate the attention, the detail, the time that you've given. to this process.

Speaker 8 (04:39:53–04:40:13)

One other thing I'll say, Ned, is that some of these conditions we saw for the first time on the screen tonight. So I appreciate that you also have been working with your client and trying to work on these. But I think we would all benefit from a fresh set of eyes on all of these conditions.

Speaker 1 (04:40:17–04:40:26)

Yeah. Yes. And that way, we could look at a final draft. Clearly clear minded.

Speaker 10 (04:40:26–04:40:42)

Okay. They're watching Monday. They're watching. So I assume that they're taking it under serious advisement.

Speaker 8 (04:40:58–04:41:42)

So, Meredith, there's an agenda item or several agenda items related to the MAPC contract and then a few related to the MBTA communities. I think if we could consider the contracts in particular for Monday as well. Yeah, I think we should be able to get that on if everyone agrees. Yeah, perhaps the survey questions.

But I mean, at a minimum, the two contract pieces, just so that consultants can be engaged.

Speaker 1 (04:41:48–04:41:56)

And maybe we will have heard from someone else also on the RFP responses.

Speaker 10 (04:42:08–04:42:11)

I'm going to mute for a moment.

Speaker 1 (04:42:11–04:42:18)

OK. Great. Tim, is there anything else that you would want to comment on or add at this point?

Speaker 5 (04:42:23–04:42:24)

No. No.

Speaker 15 (04:42:24–04:42:24)

OK.

Speaker 1 (04:42:29–04:42:34)

Are you anticipating any other RFP responses coming in?

Speaker 5 (04:42:36–04:42:59)

this week? I honestly don't think so. I'll shake the tree one more time. But we did get a note from MAPC.

They just don't have the bandwidth right now. Same thing with Judy Barrett. She's having a little bit of staff turnover. She's kind of shuffling around projects.

OK. OK.

Speaker 10 (04:42:59–04:43:10)

That's good to know. OK. The envelope says continue to Monday.

Speaker 7 (04:43:11–04:43:11)

OK.

Speaker 10 (04:43:12–04:43:31)

Obviously, through final review of the draft of special permit and close the hearing and call for a vote. And I certainly look at it. I just made a very strong recommendation that the client agree with that, and they've accepted that.

Speaker 6 (04:43:32–04:43:32)

Thank you.

Speaker 10 (04:43:32–04:43:43)

I very much appreciate, particularly the last two hearings, the amount of time and effort, and really focused on all of the details here. Great.

Speaker 1 (04:43:43–04:43:44)

Thank you.

Speaker 10 (04:43:44–04:43:45)

I'm exhausted, and I know you are.

Speaker 1 (04:43:46–04:44:08)

So if I could have a motion to continue the hearing for 111 Highland Street to 705 Monday, Monday is the 29th. I'm moved. All right. Is there a second?

Speaker 4 (04:44:09–04:44:09)

Second.

Speaker 1 (04:44:10–04:44:13)

OK, roll call. Cheryl? Yes. Jim?

Speaker 6 (04:44:14–04:44:14)

Yes.

Speaker 1 (04:44:15–04:44:30)

Maggie? Yep. Sean? Yes.

And myself, yes. Great. Okay, so we will move that public hearing. And with that, could I have a motion to adjourn?

Speaker 8 (04:44:30–04:44:47)

So before we do that, Meredith, do we need to defer the other items on the agenda? I think it's good for the public to know that we haven't just disregarded the full agenda.

Speaker 1 (04:44:47–04:45:07)

Some people… No, I think we did decide, yeah, we wanted to go over On the MBTAs, we had the review and the vote on the technical assistance RFP responses. We have the guiding principles, which I think we could maybe go over those.

Speaker 3 (04:45:09–04:46:42)

But again, I don't know. I don't want to set an unrealistic expectation. We have met extra times to be accommodated. You know, I think we all put in a lot of time and we put a lot of effort in and, um, this project is a really important project that's been on our desk for a long time.

And I think it deserves all the, um, all of our, um, um, attention. I know MBTA is extremely important and I know on social media people have been critical of us, which I'm not really liking too much. I think it's unfair of the residents to be critical of us at this point in time. Um, so I, I, you know, miss my climate action committee meeting.

Um, so if there's just a lot of things going on and I just, um. I don't want to over, um. commit to things. It's a lot of work.

This whole memory care, we have not received the information in a timely manner. As was stated, we just got a bunch of information today.

Speaker 1 (04:46:42–04:47:18)

All right, Maggie, I hear what you're saying. I have a suggestion. Why don't we Because I think we will want to spend more time on the guiding principles, just going through that for the public. What I would suggest is that we just vote on the amendment to the MAPC contract, which is just a very easy date change.

And then we could just review, if we want, the RFP, possibly, and just put those two items on. We might not get to both, but at least we could get the MAPC contract.

Speaker 8 (04:47:18–04:48:35)

What I would like to suggest, too, is we defer then the next to the guiding principles and the survey to the May 9th meeting. And I think it's, you know, when we have agenda items that we don't get to in a meeting and we leave it open ended as to when those agenda items are going to be gotten to, you know, I don't think it's The public that's interested in those agenda items doesn't know what happens to them. They just vanish. I think when we have something on the agenda, we should defer it to a particular meeting just so the expectations for people who may have tuned in were there.

With that, I would suggest that we defer the new business of the East Milton zoning contract discussion and vote to April 29th meeting and also the review and vote on the technical assistance RFP responses to the April 29th meeting and that the other two under MBTA communities get deferred to the May 9th meeting. That would be the discussion of the guiding principles and the survey questions. And if you'd like, I'll make that a motion.

Speaker 1 (04:48:37–04:48:41)

Go ahead, make that a motion. That's the motion. All right, is there a second to that?

Speaker 4 (04:48:43–04:48:45)

Did you say April 29?

Speaker 8 (04:48:47–04:49:03)

Just for the East Smilton contract amendment and the technical assistance RFP response. And the other two. Monday. Yeah, that's Monday, yeah.

Speaker 1 (04:49:04–04:49:06)

That's when we just moved the public hearing to.

Speaker 6 (04:49:07–04:49:07)

Okay, yep.

Speaker 8 (04:49:09–04:49:14)

And that the other two be deferred to the May 9th meeting.

Speaker 4 (04:49:16–04:49:17)

I confused my Mondays, thank you.

Speaker 1 (04:49:20–04:49:21)

All right, is there a second?

Speaker 4 (04:49:22–04:49:23)

I'll second.

Speaker 1 (04:49:24–04:49:37)

Okay, roll call, all in favor? Sean? Aye. Jim?

Yes. Maggie? Yes. Cheryl?

Yes. And myself, yes.

Speaker 24 (04:49:39–04:49:40)

Okay.

Speaker 7 (04:49:40–04:49:46)

Thank you all. And a motion to adjourn. Sorry, one quick question. Jim, did you say yes?

Speaker 2 (04:49:46–04:49:50)

Yeah, I said yes.

Speaker 1 (04:49:50–04:49:56)

Oh, okay. Thanks. Oh, I thought that was part of our motion to adjourn. So separate motion.

Speaker 2 (04:49:57–04:49:58)

Second.

Speaker 1 (04:49:58–04:50:10)

Second. Sorry. Jim made the motion. Is there a second?

I'll second it. OK, roll call. Cheryl? Yes.

Jim?

Speaker 4 (04:50:11–04:50:11)

Yes.

Speaker 1 (04:50:12–04:50:15)

Maggie? Yes. Sean?

Speaker 19 (04:50:15–04:50:16)

Yes.

Speaker 1 (04:50:16–04:50:19)

And myself, yes. Good night, all.

Speaker 19 (04:50:19–04:50:20)