Board: School Building Committee
Date: 2024-12-09
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:49–00:50)
Good evening.
Speaker 2 (00:51–01:11)
It's called the meeting of the Milton School Building Committee to order. It is now 7.09 p.m. on December 9th, 2024. With us in the room, typically due to his attendance, Ms.
Cohen. Oh, yes. Dr. Miranda.
Yeah. Online with us is Kerry Hurley.
Speaker 3 (01:12–01:12)
Here.
Speaker 2 (01:13–02:36)
Akua Vong. Here. Mark Loring. There, thanks and Sean will work.
I think I know Tim Lombard won't be making it Glenn Hoffman and Scott. Possibilities, but yeah, since the time we'll get going. So, 2nd, thing on our agenda tonight is a citizen speak. So, we ask any citizen that wants to speak, please raise your hand.
You'll be recognized. We ask that you limit your commentary to three minutes and also provide your name and address. So, we'll give it a couple minutes and see if anybody raises their hand or shows up in person. Oh, almost quiet.
We're in citizen speak. You made me some of the things. All right, the thing that move on. Agenda item number 3 is approval of our past meeting minutes from Monday, November 26, 2024.
So, these were afforded out to everybody in their packets. So. See if there's any edits or comments to the minutes.
Speaker 3 (02:44–02:51)
I'll make a motion to approve the meeting minutes from November 26, 2024. Seconded by Dr. Anda.
Speaker 2 (02:51–03:02)
Any discussion? Hearing none, so roll call vote. Dr. O'Neill?
Yes. Dr. Miranda? Yes.
Carrie Hurley?
Speaker 3 (03:03–03:03)
Yes.
Speaker 2 (03:04–05:04)
Yes. Yes. Yes. Yes.
Yes. So, all business, we have an item for a number one is review and discuss select board questions. So, as you guys are aware, we've got a number of select board. Uh, questions in regards to the overall project that was there before.
You know, 1 of the things more of a bigger thing is item for B, which is the update. So, I think. Diving into some of the questions that are there, you know, we're waiting the update on Friday. So, I think it may be prudent to just kind of hold on some of those select board questions right now, just to see if things changes on Friday.
So, everyone's okay with that. Double check. No objections. Alright, so item moving on item for B, which is update kind of what I was just alluding to.
So, as we're aware, we've got our statement of interest in the, we've essentially been through. a site visit with MSBA to come on site. Essentially it's filtered down. The final decision from MSBA is going to be made at the board meeting this Friday, December 13th.
So essentially at that meeting we'll be made aware formally whether we've been invited and approved by the board by MSBA. So with with kind of that overall thing, you know, generalization of where we're at with MSVI.
Speaker 4 (05:04–05:31)
I'll just open it up to see if anybody has any questions. We'll see on that one. Hopefully that's lucky for Melvin. Yeah.
I met my wife on Friday the 13th, so it's a lucky day. There you go. You all right?
Speaker 5 (05:31–05:43)
Yeah, definitely. So Sean, if we would hear formally, or we would know formally, I guess, on Friday. Right. And from there, what's the path forward with them?
Speaker 2 (05:44–07:44)
Yeah, good question. So I think that plays into the kind of next agenda items. So I'll just roll it into agenda item 4C, which is revised warrant articles based on MSBA board meetings. I think the main thing, you know, for us to look at tonight is, you know, we're coming to a path.
We've gone down a parallel paths for the past year of submitting with MSBA. And awaiting their decision, but at the same time progressing the design that we have. So, based on that meeting, we're either going to be. walking forward with the articles that we've already voted on for full funding for $173 million and progressing towards building a school without MSBA funding.
If we are accepted to MSBA and the board approves it on Friday, I'm assuming we'll be going down that path. So going down that path essentially would require us to revise some of our warrant articles that are there. For example, we don't need to ask for $173 million because we'd be restarting this whole process again and up to some other number that's going to be there. A couple of the things, if we do go with MSBA, that this sounds like going back in the time warp, right?
Like six years ago when we were formed, you know, when you were here with us, we were talking about the formation of the school building committee. So, MSBA has specific guidelines for the makeup of the school building committee, which is kind of different than our makeup right now. So, essentially, what we need to do is augment this committee to kind of fill some of those roles. So I can pull up, if you give me a minute, pull up what those are and kind of look through them a little bit.
Speaker 6 (07:44–08:12)
Sean, will you pull it up? I have a quick question. It might be an uneducated question, but I don't know. Is there no precedence with MSBA of not starting over, of actually using the work we've done?
I mean, it's, In my mind, it's an incentive for them to save money, to not have to start over, correct? I know, I know, I know MSBA, I've dealt with them before, but I don't know if there's any precedence for that.
Speaker 7 (08:12–08:36)
Maybe there isn't. There might be, but I think the best option is to wait and hear. Wait and hear, but get it. And then get it.
This is just, like, this is something that's been in my head for the past three meetings, I'm like, because we've been talking about it. I will say with the MSBA, you're probably not going to convince them to do anything outside of their wheelhouse. But if there is precedent, they will know about it. And they would likely put you in the same boat as someone else who has done this.
they're pretty fair across the board.
Speaker 6 (08:37–08:51)
But I think as far as state rules, as far as selecting an OPM for instance, first of all, being a, you know, we've done everything for Commonwealth of Massachusetts, general law.
Speaker 7 (08:52–09:14)
So, that wouldn't be an issue. They have an OPM panel. So you would, typically MSBA process, you interview OPMs, you bring your preferred OPM to the MSBA, they approve your selection. But designer selection goes through their designer selection board.
Almost like a DCAM designer selection panel. They have a board of, I want to say, 15 people. So that hasn't changed, too.
Speaker 8 (09:15–09:16)
It's the same.
Speaker 9 (09:16–09:18)
OK. Both the same people.
Speaker 7 (09:18–09:25)
But it is something that if you do get into the MSBA pipeline, it's certainly a conversation that we advise the district to have.
Speaker 6 (09:25–09:33)
Yeah, that's all I'm doing is throwing it out there. I know we can't really make any decision on that or talk about it. I guess it's worth checking out.
Speaker 7 (09:33–09:45)
occurred before. And it'd be worth it showing the work product that you have, showing them where you are in the design process, showing them where you are in the estimating process and all that, so that they have a full understanding of how, where you are, how you got there, and kind of go from there.
Speaker 6 (09:45–09:54)
And any information that helps us go in any number of directions. Right. Carrie, you had your hand up.
Speaker 3 (09:55–10:19)
Yes, I just quickly wanted to ask you to clarify, or maybe even ask John to clarify, Who makes the decision if we go with MSBA or if we were to consider bypassing MSBA and going it on our own? Is that a select board decision? Is that a school committee decision? I assume it's not our decision because it's got to do with a lot of money, but.
Speaker 2 (10:21–10:24)
Yeah. John, you can chime in if you want.
Speaker 4 (10:25–10:30)
Yeah. I mean, I think we're looking for direction from this board committee.
Speaker 2 (10:31–11:47)
Yeah, so I've said it multiple meetings. I think it's a collaborative effort between this committee school committee, you know, select board. I mean, those are the 3 entities that are really at play here for it. You know, we're doing our due diligence right now with PMA to look at.
Um, the cost of doing it on our own and essentially doing it faster at a cost there or hitting reset going with. And, you know, honestly, navigating as quickly as possible to reduce that overall escalation that we'd realize there. Um, but, you know, I mean, I, I think. You know, there's.
you know, certain, you know, boards of the town that, you know, we're all of us are appointed within this committee, and I would feel elected boards would definitely carry more weight for this decision. So, you know, we can give our recommendation for what we believe, uh, you know, and we'll know that come Friday. Um, but, you know, I think the overall decision would really rest with school committee and select board. With some input from us, not to say we're not important, but.
Speaker 3 (11:47–12:01)
No, I just, it made me think of it as we were talking about possibly having to restart and kind of forego all the work that's been done over the past at least year, nevermind. So just, that's all, but thank you. I think you've answered it.
Speaker 2 (12:02–12:04)
No, no, no. And just to touch on that too.
Speaker 4 (12:04–12:15)
And the one thing too is that basically we're waiting for Warrant articles from this committee, basically, which way we're going. That's my understanding.
Speaker 2 (12:15–13:46)
Yeah. So we've got our one set of warrant articles if we want to go on our own without MSBA. And then I think what we're going to discuss tonight is like the theoretical articles. If we are accepted on Friday, what do we need to do between now and town meeting to kind of set us up in that direction too.
So, you know, and to touch on it too, Carrie, I know I talk about it as like we're hitting a reset button and we're going back in time, but, you know, it's, I think we'll go back in time a bit, but we'll be able to fast forward through it as fast as we can. You know what I mean? Just through some of the work we've already done as far as identifying sites. You know, I think it's, if we get accepted to MSBA and we bring a consultant on and they start looking around the town, they're going to come to a quick conclusion as we did.
There's not a lot of sites available in the town, and we've already identified one that's secured it. So that will make that process a little bit easier. So it may, as they run through the options that they need to review, it might hone them in at a faster pace than if we were just kind of going at it from start. Okay, thank you.
So makeup of the committee, if I could, Share my screen. So, just let me know if you see this, Carrie, or Seamus, could you just share the, just so I can see what people are seeing.
Speaker 3 (13:46–13:47)
I can see it, yep.
Speaker 2 (13:48–16:00)
Okay. I think I need the, hang on one second. I was promoting you earlier. Yeah, there you go.
So essentially what happens is with MSBA, when you get accepted to MSBA, there's basically, these are the modules that we talked about before, module one, two, three, four, five, six, seven, eight, all the way through. And it walks through the whole process of what they have you do. So we're invited in, we'll get brought into what's called their eligibility period. And in their eligibility period, a nice thing on their website, they break it down to you.
So within that box for the eligibility period, they allow you up to 270 days to accomplish sub-modules that they have here. So there's a number of things that run through each one of them. One of them is the formation of a school building committee within the first 60 days. So the good thing is we've already got a school building committee created.
But like I said, we just need to augment that to align with them. So what they do is they give uh, essentially a template here that you can see online that gives, you know, the, the letter or the draft, the craft of how to form the school building committee. But the main thing that's here is these designations. And these are the kind of the boxes that we need to check.
Um, so as we go through these, you know, we want someone who's MCPPO certified, which is, uh, the lead for procurement. And, you know, we talked about that. You don't have that, right? No, but I'll get it if I have to.
Okay. Yeah. And if it's not you, we can have multiple other people. Maybe easier for me to get it because of the design background.
Well, I think there's some people in the town that already have it. Oh, we have.
Speaker 10 (16:01–16:06)
Yeah. I got to take one more class and then I have mine. I need it for my job.
Speaker 2 (16:06–16:07)
So yeah.
Speaker 10 (16:08–16:08)
All right.
Speaker 2 (16:08–18:33)
All right. That's good. But essentially, probably, you know, I think for a lot of this stuff, we have some of these already, you know, checked off. School committee member, we have two.
Local official responsible for building maintenance, so Tom McCarthy or somebody from facility facilities will want to bring in a school principal. So there's a list of these things here that we'll kind of need to craft a warrant article to take what was the formation of the School Building Committee in 2019 and again augment it. for one of our potential articles. And I'm assuming we'll probably want to do this early.
So maybe even next, so if we get selected Friday, I'm skipping the agenda item to the next meeting, but we'll probably want to meet next Monday. So at least to have some of these there to get in front of the select board, so it's ready for February. The good thing is we have a meeting, you know, kind of lined up perfectly for this. So in regards to components of the school building committee, and this is where a number of us will fit in, members of community with architecture, engineering, or construction experience, local budget official or a member of local finance committee, which will probably be someone from the Warren committee.
So I think what we'll want to do at our next meeting is dive into this a little bit more. uh craft how many positions you want to hold and you know figure out kind of where the gaps are based on our roster right now the other part of this too as you can see i'm just going to move the roster of people over is you know who's a voting member who's not a voting member so like right now the nine of us that are here are all voting members as we start augmenting it you know you might there might be some people that don't want a vote and things they just want to contribute and stuff like that um So, this is, I think, one of our warrant articles we're going to have to look at for developing. So, and I'll forward this out to everybody so they have it. It's on MSBA's website, stuff like that.
So, any questions regarding that?
Speaker 11 (18:35–18:56)
that in the future. From the selection to getting to the first module, how long do we have to get ourselves geared up to get to the final thing? Or do we just, it's like you get accepted and it's all right, go.
Speaker 7 (18:57–19:05)
We have 270 days to finish, to basically form the team. but hopefully you can do it faster.
Speaker 4 (19:06–19:33)
I did hear that there's a tiered entry, like there'll be a group of schools that'll be approved to enter in January, February, and I heard that we were on the end towards May, so we're But by my understanding, we're on hold until like May, until they take us, you know, they don't take all these schools in together. They take them in pieces.
Speaker 2 (19:33–19:36)
And that's assuming we're accepted.
Speaker 4 (19:36–19:44)
Assuming we're accepted, yeah, obviously, that's where we are right now, right? Assuming we're accepted, that's what I heard. We'll have to clarify.
Speaker 7 (19:44–20:02)
You'll know more on Friday. I think if they accept you at the meeting on Friday, I don't know that it would accept you with a hold to say you don't start until May. I think once you're accepted from their board, that's when your acceptance is. But you're right.
They do oftentimes have a selection, then another selection.
Speaker 4 (20:02–20:12)
But if you're- It's not like it's another selection. You're in a line for them to process in module one. You know what I mean? Like, that was what I had heard.
Speaker 7 (20:12–20:19)
Normally, we get involved in module 2 or 3. So, we're usually behind the eight ball.
Speaker 4 (20:19–20:21)
You do typically.
Speaker 7 (20:21–20:34)
We get hired after you've gone through all the upfront things. The MSBA is going to want to meet with you. They're going to do enrollment studies. They're going to ask you a lot of questions about what is the project?
hire an OPM. So that's their standard process.
Speaker 9 (20:34–20:51)
And they do sometimes put you in the tranche for like design submissions, where like your SD set needs to go in front of the board, but they only take a certain number of projects that will be there, because the board meeting is so long. If you kind of miss that list, you're pushed off to the next meeting two months later.
Speaker 7 (20:51–20:58)
But I don't know what invitation. I haven't heard about a tiered invitation, but it could certainly be true. But I think you wait until Friday, and they will let you know.
Speaker 4 (20:58–21:00)
Yeah. I was just looking online at stuff.
Speaker 2 (21:01–23:09)
Yeah, so what you can see here, you know, it's, there's the ICC, which is their first step, which is the doing things that way. Zoom is the initial compliance certification, which is basically this document here that I think, you know, Nick and you guys at Selectboard would kind of run through. That would be the first portion. The next portion, that's almost like a paperwork thing within the first month.
Again, the first 60 days is formation of school building committee. I think we're good on that. Educational profile, up to 90 days, so another 30 days. So essentially within the first three months.
And you don't have to wait 90 days. It's up to, so we can go as fast as we want. I'd like to get started on if we get heard of early is the maintenance documents and enrollment certification. So really get some of the documentation on that sub with Tom and engage with him to kind of go through there.
And then local authorization of funding, submit votes for feasibility study. So I think this local authorization of funding, knowing that we're going to get a town meeting coming up in February too, for our feasibility study, I think it would be advantageous to, again, as a second article, have something on there so that the funding is set up. If we don't get to this one until, say, June, we're not waiting until the town meeting in December and causes that lag. I think trying to get an allocation that's there, that's appropriate to do a feasibility study again, So that way we have that and ready to go.
So I think that's going to be another warrant article that we're going to have there. So that's essentially the path that we're going to have, the two that you described. Mark, I see you have your hand up.
Speaker 10 (23:11–24:28)
Yeah, I guess my question is, Sean, Sean B, is this something that y'all can help with in terms of identifying what the number is? Because we obviously had some numbers from Arrow Street for their current design. But if we are accepting Tim SBA and moving more in that direction, I don't know if that number You know, I don't know if we know exactly what the feasibility number is, or if we have to actually would need to go through the process with MSBA over a few months before we'd actually kind of know what that is. I'm just wondering, given the tight turnaround between obviously us potentially finding out, well, finding out one way or another on Friday, and then whenever we have to submit warrant articles to, the select board to vote on to then have get to the warrant committee to then be published, you know, all those timelines are really tight at this point, especially given the break.
And so I'm just my reading of the MSBA languages, right, we have to provide the town the ability to vote for sufficient funding for the feasibility study in order to kind of check that box. And I just don't know if we can put any number there or if there's like a specific number they're going to look for.
Speaker 7 (24:29–25:02)
Yeah, I would say that based on historical data from the MSBA, we can come up with a pretty, a fair budget that you should hold. And with the hope that if the MSBA allows you to continue with your OPM and architect if you so choose, that number, we probably wouldn't spend all of that. I think we could do it much more efficiently than that, but I would advise that, you know, you vote for the full budget, which you would need for any feasibility study as if you were starting from scratch, because the reality is the MSBA may make you start from scratch. That is your question.
Speaker 10 (25:03–25:05)
Yeah, that's great. I think getting that number.
Speaker 7 (25:06–25:35)
John and I have had some conversations offline above or online offline about what that number should be already. And kind of the same conversations will, as we get closer and get some more efficient MSB, we'll be able to decide. But we know basically what other schools are caring for that number of the MSB. It will also advise you to care for that number as part of your advertisement.
So it's not an unknown entity. It's pretty available public information that with just the bulk of schools have been done in the past. You know, historically, you can put your finger on it pretty quickly.
Speaker 2 (25:36–25:55)
Yeah, and on MSBA's website, Mark, and the kind of large spreadsheets I've sent around before, they give the cost breakdown of all the projects going back like 15 years. And feasibility study is one of the line items there. I can pull it up if you want to see it too.
Speaker 10 (25:55–26:20)
Yeah, no, that's fine. I just, I've been looking at the language, the vote language that MSBA provides, right? They provide kind of standard vote language under module one. But obviously that that number is the one blank there that we need to kind of fill in there other than town of Milton, if we get to that point.
So that's helpful to know that it shouldn't be hard to turn around that number quickly if we need to move that direction.
Speaker 2 (26:21–26:56)
Yeah, let me just take a look. I'll see what the Yeah, I get the spreadsheet. I'm just looking to see. Yep.
Get to the more recent one.
Speaker 8 (26:56–27:05)
Share the screen.
Speaker 2 (27:05–28:19)
So on the MSBA's website, Mark, they give, you know, history data that's here. It goes back. pretty far, but if you go to the last page, it brings you to kind of the more current schools for soon start of construction when they improved it by the board. It gives all the metrics of the overall project.
The first line item they list here is for feasibility study. It highlights everything. So if you go across that, you'll see the numbers that are here. So what I've been doing working with Sean is looking at similar programs that are here, similar square footages, you know, for the base program that we've looked at.
And then from there, we can back into what we think would be an allocation. Um, or, you know, the overall project costs, or at least to fill in that, that blank number that you were talking about there. And I can again with the, um. With the school building committee roster, I can forward this link around to if people want it.
So you can kind of dive in and see a similar thing. But of all the middle schools, it's roughly 1% of the overall cost. That help?
Speaker 10 (28:21–28:38)
Yeah, that helps. Yeah, I know the ratio of one percentage is I'm not sure. I mean, I guess we we know what we were into what we are currently anticipating our design for the upper middle school being so using that as the rough estimate, I guess, makes.
Speaker 2 (28:38–31:03)
Yeah, yeah, it's kind of weird to work backwards from the work that we've already done to kind of back into that number. So it's good. So I think, you know, on our end, you know, the main work between now and next Monday is, you know, for us to kind of, you know, look at, become familiar with, like, the roles with the MSBA School Building Committee, or kind of what we have to do. And then, you know, for us to get familiar, too, with kind of the anticipated costs that we'll be comfortable with as a board.
or as a committee, sorry, not a board, and basically be ready next Monday, similar to what you were saying, Mark, to react quickly so we can get this in front of town meeting in February. Any other questions in regards to MSBA or process if you're going through stuff like this? I mean, as of right now, everything's theoretical. I mean, and then we'll, you know, if we get selected, you know, transition into reality.
So moving on, we've got item five, which is new business, which is kind of a line item we hold. So just For it out there, if anybody has any new business, anything new they need to discuss. Look online, see if anybody raises their hand. Seeing none, hearing none.
Alright, so I think. 2nd, the last thing on our agenda is future meeting dates. to be determined. But, you know, for everybody that's here tonight, you can check in with Scott and Tim after.
I just want to confirm if next Monday will be available for everybody, mainly just so we can react to stuff. John, you guys are meeting on the 17th, right?
Speaker 4 (31:03–31:04)
Yeah, the next day.
Speaker 2 (31:05–31:05)
Yep.
Speaker 6 (31:09–31:26)
That works for me.
Speaker 12 (31:26–31:28)
I'll probably have to join online as well.
Speaker 2 (31:29–31:34)
No, online online is totally fine. I appreciate it. And Mark, I assume Sampy is good.
Speaker 10 (31:35–31:37)
Yeah, I can, I can make it in person next week.
Speaker 2 (31:38–31:45)
Just run a job next Monday. Appreciate it. All right. So, yeah, with that, I think.
Speaker 7 (31:46–33:01)
You want to go over the. I'm happy to go over and I just want to note for members of the committee last meeting. We had a discussion about, um, we, we. We've done a comparison of our cost now versus our cost over the next six years and we did not escalate the MSBA cost.
So there's a request of the committee to look at that. So we've done that and we've escalated the MSBA cost over the past It looks like almost 15 years. They have increased at an average of 4.65% over that time. So we have provided a summary that shows that cost increasing.
So as our costs increase, the MSBA costs also increase. And we publish that on our shared website. It's under the budget planning and estimating folder. It's labeled 2024-1208 3011 MSBA draft estimate comparison.
And if you want to go in there, you can see every scenario with every year. It shows you that how an increasing MSBA reimbursement affects our total reimbursement. And based on our numbers, it turns out that in year six is where it flip-flops where it's more advantageous to go without the MSBA, where I think years before it was five. It was year five.
Speaker 2 (33:01–33:20)
So Aqua, this goes to your comments from the previous meeting, you know, when you were talking about the MSBA reimbursement being flat and not escalated and similar to the construction escalation. So, you know, if you don't have access to the folder, let us know, we can get that to you.
Speaker 7 (33:21–33:26)
Everyone should have access, yeah. If you need me to send it to you, Aqua, you can just send me an email and I'll send you the file directly.
Speaker 12 (33:27–33:36)
Thank you for doing the work. I will spend some time on it. And the mere fact that you looked at it makes me really happy. Thank you.
Speaker 7 (33:37–33:44)
Any questions on it, just let me know. Reach out to Sean, or send me an email, copy Sean on it, and I'm happy to answer any questions you have.
Speaker 2 (33:44–33:49)
So the simple fact is… Go ahead, Agbo. Will do. Thank you.
Speaker 4 (33:50–33:56)
So the simple thing… When does escalation stop?
Speaker 2 (33:56–33:56)
Never.
Speaker 4 (33:58–34:10)
No, but I mean, when we award a contract for construction, we have allowing them to escalate after that. So once we sign the contract, escalation stops.
Speaker 2 (34:10–34:21)
So that's actually a good point. point because it plays into how Peter did the estimate too, because remember he estimated it to the bid award date and assumed contractors would carry that.
Speaker 7 (34:21–35:30)
That's correct. Estimators have different theories of how they do estimations. Some, even the MSBA template says estimate to midpoint of construction. PM&C does not do that.
They estimate to bid time because what they figure is at bid times, that contractor is assuming some sort of escalation with their own contract, but when they bid it, they're locking in their price at the beginning on day one. So once you bid your contract, that's where your escalation costs. And it's also an interesting point to remember that with the MSBA, your grant is locked in when you sign your project scope and budget agreement. which is right around that SD day.
Right before you go for the full budget. So you lock that price in, the MSBA locks in their reimbursement rate. And if it takes you, usually it's about 16, 18 months of design before you get, designing, bidding, all that stuff before you get a contractor locked in. If it takes you longer than that, you're dealing with escalation and you're not getting any more money from the MSBA.
So it is kind of a balance of when that gets locked in and when you lock in the MSBA reimbursement grant to when you lock in your contractor pricing. So obviously the closer to the time that is, typically the better off it is for you.
Speaker 4 (35:30–35:35)
But our escalation timeline would be to contract on it, basically.
Speaker 7 (35:35–35:49)
Yes, to award a contract. And that's the way Peter Bradley, PM&C, that company does it, because they figure, for that reason, if they're looking at data at bid time, then it's at bid time. When you bid it, that number is going to be good at that point.
Speaker 2 (35:50–36:06)
Yes, that is correct. It reminds me of a funny story. I had an electrical contractor one time whose big question, so you know when you get bids, and it's a whole list of questions. And the question was, Due to the fluctuating marketing of copper, will you allow us to adjust our bid in the future if prices go up?
I said, what if prices go down?
Speaker 8 (36:06–36:10)
That's what we don't do.
Speaker 6 (36:11–36:23)
During construction, they said, this will escalate it. I'll do, can you help us out here? That's where we bring the lawyers.
Speaker 7 (36:24–36:55)
I will say that if you go GC, which is 149 hard bid, your bid is locked in. If you go CM at risk, you're not locking in your pricing until the CM, typically until they buy out those contracts. Certain items could escalate like paving or landscaping. If you have a long project, they don't fit it out until later on because the landscaper may not hold this price for three years, which is fair.
That may escalate, so you may have to keep this price. But the majority of it- If it's a traditional 149 hard bid on A1, when you sign that contract, they are locking in their price to the project.
Speaker 2 (36:55–37:10)
Yeah. Again, with the framework of the project that we have now with the site, owning it, stuff like that, going CM at risk. probably would need to do this. It's not complex phasing.
It's basically giving them the whole site to run with it.
Speaker 7 (37:10–37:13)
So a design bid bill, $149, would be more probable.
Speaker 9 (37:14–37:14)
Yes.
Speaker 7 (37:14–37:32)
I mean, we will investigate. MSP will require us. The township requires us to investigate all options. But normally, when you're on a new build site that is in complete control of the town, and you're not doing an ad reno, or it's not a complicated project, then $149 is typically the most cost-effective solution.
Speaker 2 (37:37–37:50)
So the point I was going to make too is like, so six years, essentially that's our timeline for a town to say, let's get this done within six years or we're going to stop this. Yeah, we're looking at it if we were to go right now.
Speaker 7 (37:51–38:33)
The six years we're looking at is like, yeah, six year delay, which means that we don't start construction in 2026. We start construction in 2032. So that's what we're looking at. Right now, our estimate is for starting in July of 2026.
If you do get acceptance in this VA program, that is going to, you're not going to be able to start building in 2026 more than likely, unless they super fast track to and they say, yep, not likely. So you'll probably be, you will be a little bit delayed, but the math still works out that you'll have additional savings at the time based on the grant. Any other questions?
Speaker 2 (38:35–38:51)
So next meeting date that we had on there will be next Monday night, which was the 16th, I believe, so. Actually, correction, I will not be here. My son's right there.
Speaker 6 (38:51–38:58)
You already said you'd be here, so. If I'm here, I'll meet up places.
Speaker 8 (38:58–39:04)
All right, so yeah.
Speaker 2 (39:04–39:22)
Outside of that, I think we're on our last agenda item, so adjournment. So entertain a motion to adjourn? Motion to adjourn. Seconded.
All right, made by Glenn, seconded by APPA. Roll call vote. John Cohan? Yes.
Dr. Miranda? Yes. Glenn Hoffman?
Yes. Carrie Hurley?
Speaker 3 (39:23–39:23)
Yes.
Speaker 2 (39:25–39:31)
Akua Bang? Yes. Mark Loring? Yes.
Sean O'Rourke? Yes. Thank you.
Speaker 1 (39:32–39:33)
See you guys next week.