Board: Community Preservation Committee
Date: 2025-11-20
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:18–00:19)
Yeah. All right.
Speaker 2 (00:21–00:39)
We're going to call this meeting of the Community Preservation Committee to order. Thank you for your patience. All those online and in the room. My name is Tom Callahan.
I'm the chair of the Community Preservation Committee and representing the Affordable Housing Trust on the committee.
Speaker 3 (00:40–00:46)
I'm Kathleen O'Donnell, a citizen member. I'm Wendy Garfield, representing the Conservation Commission.
Speaker 4 (00:46–00:48)
I'm Peter Jackson, citizen member.
Speaker 5 (00:49–00:54)
Jenny Russell, vice chair and citizen member. Gerald Tigay, spending board representative.
Speaker 4 (00:55–00:59)
Steve O'Donnell, historical commission. Robert Powers, from the housing authority.
Speaker 6 (01:00–01:03)
Great. And Rob? And Rob Leibash from the parks.
Speaker 7 (01:05–01:05)
Great.
Speaker 2 (01:06–01:23)
All right, we have a full house. All nine members are here. Thank you, everyone. I wanted to welcome our newest member.
For the second meeting in a row, we have a new member, Steve O'Donnell from the Historic Commission. Welcome, Steve, to the Community Preservation Committee, and we're very glad.
Speaker 8 (01:24–01:25)
Just for the record, we're not related.
Speaker 2 (01:26–01:56)
Oh, we have two O'Donnells. Yeah. So, okay, so it's legit, you're not related. All right, all right, meeting minutes of November 5th.
Were they distributed? Did I distribute them? Did everybody see them? Nobody saw them, so we're gonna postpone that.
You didn't? Okay, all right, so let's take a vote.
Speaker 9 (01:58–01:59)
Right.
Speaker 2 (02:00–03:04)
All right, so if people haven't seen them, we can just, we can easily postpone it to the next meeting then. It doesn't sound like enough people have read them and we have a few new members, obviously they can't vote on it. So we'll just defer that. We'll defer that to the next meeting.
All right. We have two projects we want to talk about tonight. The bicycle wayfinding signage. Jesse Gordon is here.
You're first up. So come on up and introduce yourself. Usually we allocate like 10 minutes, a few minutes for you to present your project and then leaving a few minutes. If you don't, you can go to randolphgreenway.com and they're there.
Okay, I think I can do that. So why don't you start talking? Randolphgreenway.com. Okay.
I'm Jesse Gordon.
Speaker 7 (03:04–09:48)
I'm a Randolph town councilor and I did a project very similar to this on the Randolph side of the Blue Hills. I'm proposing that we put up wayfinding signs on the Milton side of the Blue Hills to lead people directly on a safe and direct bicycle or pedestrian route between Blue Hills and the Deposit Green Bank, which are the two nicest recreational resources in Milf. What I did in Randolph was put up signs at a few different locations right next to the Blue Hills property, actually on the Randolph side so we didn't have to ask for the MTC permission and all that, in order to direct people how we can walk from residential areas to recreational amenities, in particular to Pond and beyond. When I did that in Randolph, people, even long-term residents, said, wow, I never knew I could walk from my home to these resources because there's really very bad signage saying that.
The same thing applies in Milton, that there's these two lovely amenities, which I use in my daily bicycle commute to work. The Nepenthe Greenway is a beautiful trail that goes straight to Boston, and the Blue Hills go straight to Randolph. In between them is the Blue Hills Parkway, which is a very safe and direct bicycle route between those two. And, you know, in the warmer months, I do use that actual route in my commute, and it's wonderful.
And the thing I wonder is, why don't people know about it? And the answer is because of those signs that say, In particular, when you're in the Blue Hills, it doesn't say, Hey, you can get from here to the Greenway. And when you're on the Greenway, there's nothing that says, Hey, if you go south here, you can get directly to the Blue Hills. Uh, you want to click on the, uh, the link, the PowerPoint later phase, the second link there.
No, no, no CPC presentation. Go back on. So this is, I took some photos of the relevant areas and so on. You can skip the text part.
That's what I just said, basically. The first map, a couple of them, is about what you would see at the Blue Hill side. That's the bigger map first. I guess I can talk about that first, sure.
The bigger map would be on the Neponset Greenway side. Perhaps one right at the Boston border. I talked about that at the Conservation Commission. There's a little pocket park right on the Boston border, on the Neponset River.
where it crosses the Greenway, then maybe another at the exit from the New Plymouth Greenway to the Blue Hills Parkway, then perhaps another somewhere in Blue Hills, maybe near the Eaglin Skating Rink, which is where sort of the Blue Hills starts, and maybe another in Blue Hills proper, where the Chickasaw Park road goes through. And then one more, a fifth one, at the, what's called Exit 3 on Interstate 93, that's actually the Milton Randolph border, There's a little parking area there and a sign there now. The signs that DCR puts up are very not pedestrian and bicycle friendly. They show the entirety of the Blue Hills Park, which is nice to get an overview, but if you want to actually go somewhere on there, you got to squint your eyes and say, what do I do to get from here at exit 3?
to, say, Pond to Boat Pond, or to Golf Course, or the exits in Randolph. There's no real way to know that. So what I did on the science of Randolph, and what I propose here, is you put a big red line that says, here's the safe and direct route from one Kennedy to the other. This is the big picture from the Greenway.
So the red line on top, on the north side there, includes the length of the Greenway in question. It doesn't include the whole Greenway because it's another half, which maybe I propose next year, that goes to the west side of Milton. There is more of the Nepenthe Greenway there. I'm not focusing on that this year.
This year is only about the Nepenthe Greenway from the Boston border to Mattapan Square and then south along the Blue Hills Parkway to the Blue Hills. That's the one safe and direct route which is a nice route and safe for bicycles and pedestrians along its entire route. So those are the five locations that I just described. I did present this to the Conservation Commission in September and talked about how one would place the signs.
took pictures of little slivers of KonKon land at each proposed location. The KonKon pointed out that they have jurisdictional issues, jurisdiction anyway. It doesn't matter if it's a pocket park. The one at the Boston border, for example, is owned by the storage company that has the border property there.
in the pocket part that is under the jurisdiction of the ComCom, so it's not a big deal to place a sign there. The reason I did it on the Randolph side of the border was to avoid jurisdiction issues with the DCR. In other words, I put it at the Dunedin School, which is a Randolph public school, on the school property side instead of on the DCR side, where I imagine the line to be, so I'm not exactly sure where the lines are. But that's the idea, is that the CONCOMM has jurisdiction, as long as it's on the Milton side.
And what we do on the DCR side is ask DCR, and so on. My proposal at the Exit 3 was the one descending vote on the CONCOMM, who said, well, if you put a sign there, it's going to encourage people to expand parking there, which there is a project proposed by DCR to do exactly that. He was opposed to that project because it does interfere, I guess, with the water passage. He was right.
It does interfere with the water passage extending the parking there. I went and looked after we had that discussion. He's right, but that's not my department. My department is getting people wayfinding between the areas, not about how you protect the waterways.
The waterway there, by the way, is the Blue Hills River, and that serves as the border between Milton and Randolph. I didn't know there was a Blue Hills River. There is a Blue Hills River. It eventually drains into the, not the deposit, it drains to the next one, the next river down, the one that goes to Weymouth, the Grand Train.
Speaker 5 (09:48–09:49)
And there was water?
Speaker 7 (09:50–18:26)
Yeah, well, it flows between the northbound and the southbound lanes of the highway, so it's a little hard to check, but yes, I think it's on this line. It actually used to feed what's now the Braintree-Randolph Reservoir. So they diverted it in order to keep the control of the water in the reservoir. So I believe it's always flowing, if she counts a swamp as flowing.
Next, now let's zoom in. This would be the Blue Hills map. This is more or less what I put on the locations in Randolph. And you can see those locations in Randolph.
They're marked six and seven. Six ends at the, you know, right over there. That's the Donovan School, one of the Randolph Elementary Schools. And it's a lovely path that you can walk in about a 20-minute walk or half an hour if you're a kid.
directly from the school to the pocketbook pond. And where it crosses the pocketbook pond is the AMC cabins, that's a public amenity where swimming is allowed. That whole area, the whole of the pocketbook pond section is under a proposal from DCR to improve the access in general. In particular, at the very southern tip, where that little kink is, that's called Fisherman's Cove.
That's the name of the project, the Fisherman's Cove Improvement Project, where they're proposing to spend millions of dollars to make better parking there. The Friends of the Blue Hills focuses on better parking at all of the locations around Pachipok Pond, which This address, we would put onto the wayfinding signs, yes, there's official parking here, such as at location seven, which is a little baseball field at the town of Randolph Ranch from DCR. There is parking there, but nobody thinks it's legal. It's legal to park at the Dunnison School on the weekends, too, and take your horses in, which is what all the horse farms around do.
They go in right where my sign is. And those two signs say it is legal to park here, as opposed to making it a mystery whether it is or not. On the other side, on the campus side, which is the golf course, that's on the very west side over there, route 138 on that map. I park there to go hiking around the Ponca Poca Pond and I have no idea if it's legal or not to park at the golf course.
I think I'd like to put on the side a P if it's legal parking and not a P if it's not legal parking. I've done it for years and I know that everybody who hikes around Ponca Poca Pond does exactly that. Whether it's legal is an open question. In other words, whether it's allowed by the golf course or just tolerated, I don't know the answer to that.
The other component of the Fishman's Cove project is to make improvements at Agent 3, to add parking there, that's what the CONCOMM member objected to, to add a picnic table and perhaps a portable party, and of course, the signage that I'm proposing as well would be in that same area. A few pictures of what I propose as the details. This map, I presented this idea much earlier this year, like in about February, to the Neponset Greenway group. There's another project, if you go up that trail there, which is my commute route to work, you eventually get to the Rainbow gas tanks.
There's a new project that opened on July 4th, after I took this picture, which has a pedestrian-bicycle boardwalk, I guess you'd call it, through the swamp, so you don't have to go on Morrissey Boulevard for about two miles, and that two miles was absolutely the worst part of every bicyclist's commute there. They really did fix it. When I heard that that was coming and saw the construction, I went to the Greenway group, that's the guys who were in the parking lot next to the golf course, and said, well, why don't we capitalize on this and put up signage? That was the result of my discussion with them.
So they stuck up the sign on the DCR kiosks. There's a dozen kiosks along the Nepanza Greenway. They're mostly empty or filled with graffiti at best. This was, you know, one improvement that the Nepanza Greenway group said, we'd like to put up these little signs, which are nice, but, you know, you have these kiosks, it would be better to have a full-size sign.
The next one, next slide, please. There's that. This is one of the Can-Can signs. This is near Central Ave.
If I got that right, yeah, right next to the Central trolley stop. I think that's a little sliver of Can-Can-owned property, so they'd probably put their sign up. That would be a great place for a sign because it's already owned by the Can-Can. It's right on the trail.
That spot is where the 240 bus crosses the Bouncy Greenway, so it's a really hot spot, I guess you might call it, for bicyclists. Everybody would go by there and see their sign. I think it's a pretty good place for a sign. The next one is another CONCOM sign along the Blue Hills Parkway.
That's actually on a very large CONCOM property that goes back for hundreds of acres. But that part of the Blue Hills Parkway, if you are familiar with it, has dedicated bicycle lanes on both sides and a green strip down the middle so it feels kind of Parkway-like. And it's really, that is the safe route that I'm talking about. That road continues up Unquity Road directly into the Blue Hills to Chicagoland.
Unquity is not quite as safe, but it is in the Blue Hills. So, I mean, I like it and it feels relatively safe. The Blue Hills partway actually feels safer. Next one.
This is that little pocket park. That building there is 88 Worth Street. That's the big part of the complex with the Madre Osteria in it. And off to the right, on the very edge there, that's the pocket part.
That's the border of the storage company, whatever they call that, store and locker. That bridge is the border over the deposit river between Boston and Newark. That's Agent 3, so that, whatever you call that barrier theme, is the Randolph-Milton border. So there is an existing sign that has the big picture of the entirety of the Blue Hills Park, so it's a pretty big scale.
And that's what I'm proposing, is making a sign like that one, maybe somewhere near that, I don't know exactly where, that has more detail, basically. Oh, and that's what they're going to expand. If you look there, there's something like five or six parking spots there. That's what the project proposed by DCR is going to do.
When they do that is an open question. I mean, I participated in the discussions for that project, I don't know, three or four years ago. It could be a long time until they do it. If they do it, great.
There'll be more parking there and another opportunity to put in a better sign. I'm proposing something in the interim. One last sign perhaps. This is the signage that's actually in the Blue Hills near Chicatauqua Road and near the ski area.
If you read that sign, what it says is Blue Hills Ski Area and Trailside Museum. You know, those are things that people might drive to and that's the sort of signs that are all around the the Blue Hills is here's where you can drive to. It doesn't say where you can walk to. And actually from this spot, you can very easily walk across the highway.
That's a safe way to do it too. It's A3, you know, there's a little bridge there with sidewalks. You can walk directly to Houghton's Pond here and walk all the way around Houghton's Pond and come out right here. But there's no signs that say that, so people don't know that they can do it.
And that's the idea, is put a sign there that says, hey, here's where you can go by foot from here and not just by horse. Next slide. This is the MBTA property along the Milton Greenway. You know, I'd say a decade or two ago, they put up that lovely mural, and maybe in those days that was a lovely fence, but I think no more.
I'd love to put a sign right there on the MBTA property, but getting the MBTA to do something is a real challenge. Especially along this stretch, this is the middle Charlie, which has been controversial lately. And you can tell by the state of the mural that they have not really maintained it very much. Just up from there, about a mile north on the Ponds Greenway, there is another mural, which they do maintain because it's in Boston, and I guess they get along better with Bostoners.
This is a picture of while it was under construction. That's the, what I would call the boardwalk over the swamp. Just to the right of this picture is the rainbow gas tank. It really makes a lovely commute.
And I can tell you hundreds of people use it on a daily basis.
Speaker 2 (18:27–18:33)
I'm just trying to move it along because we want to leave some, have some questions.
Speaker 7 (18:33–19:17)
Yep. This is the project I described, the Fisherman's Cove Improvements. This is my existing science in Randolph, which was funded by your account of arts in Randolph, the Randolph CPA. The way they did it is exactly what I'm proposing here, which is I proposed five signs, I proposed some large number of signs, and they said, why don't you do five, we'll fund you to five, you can pick where the five go.
That's what I'm proposing here, is I'm starting with five here, and where they go is, I'm gonna leave that to the content, basically. And that's what the signs look like. The key is, it's zoomed in and it's got the red marks that say, this is where you go. And it has P for parking at the legal parking spots, which was the issue that the Friends of Blue Whales has always brought up as their key issue.
So thank you.
Speaker 2 (19:17–19:21)
That's it. Cool. Questions from members?
Speaker 8 (19:23–19:27)
Kathleen. So where would the funds go? Do we…
Speaker 7 (19:27–20:03)
Yes, I have a little budget included. Okay. I used some sign maker called Rufo Science. He's the official sign maker for the Tamar Randolph.
He charges the fee that's in here, which is something like a little under a thousand bucks for the construction of the map kiosk and the installation, which is, you know, some games on the ground. The Randolph Greenway, my group, would pay for the artwork, which is what we did in Randolph, too. So we split the cost. We paid for the artwork, which means you don't have to deal with the artist.
You only have to deal with the one company, which is the I guess he's the official account sign maker.
Speaker 8 (20:03–20:15)
I guess we'd have to find out whether or not that sign maker works for, I mean, whether procurement is for… In Randolph, who was the recipient of the funds?
Speaker 7 (20:16–20:17)
Rufo Signs.
Speaker 2 (20:17–20:18)
Rufo. Rufo Signs.
Speaker 7 (20:18–20:25)
Oh, yeah. Okay. Only. Yeah.
My group came directly from the artwork. So he was the only recipient of the funds.
Speaker 4 (20:25–20:36)
You're looking for us to give you a writer. You would hire Rufo. Or whoever the town of Milton hires. Okay.
What is the town of Milton doing?
Speaker 7 (20:36–20:53)
We're just granting you funds. Sure. For you to do it. The Rufo signs is who the town of Randolph has dealt with to do their town signs.
So they said, use him. So I said, okay. If the town of Milton says use someone else, I'd say fine. If you say Rufo's fine,
Speaker 2 (20:56–20:59)
Okay, Rob has a question online.
Speaker 6 (21:00–21:19)
Yeah, I guess my one question is, is this fall under like a signed review committee? I guess I'm just curious if we fund this, does that apply? Does these signs have to go before the signed review committee under the town of Milton? Good question.
Speaker 7 (21:20–22:09)
I have no idea the answer to that question. The same sort of question came up at Randolph a couple of years ago, and the conclusion was, use the standards that the DCR has defined, which is what we did. We used their symbology, their construction tenets, et cetera. So it wasn't quite a signed review in a formal sense, but that was the informal signed review.
It goes to the Randolph Intergenerational Community Center, which has a web page dedicated to that spot. And I have a different QR code on the different sites.
Speaker 5 (22:11–22:25)
And then just to follow up in terms of the location of these, Wendy, the question for you is like, how does this work? I mean, does the CONCOMM have to approve every sign that goes on CONCOMM property? Is that how it works?
Speaker 3 (22:27–22:49)
If it is within our jurisdiction, then you would need to go through the formal process of making sure that we sign off and permit it. then at that time we would have more opportunity for back and forth and address any concerns.
Speaker 5 (22:51–22:58)
So when you did the CONCOM signs, you told us up there in this presentation, were they reviewed by the sign review committee?
Speaker 3 (23:00–23:19)
In my knowledge, and I would have to double check with Arthur on that, I do recall him working with the select board But I don't remember any acknowledgment of the signs of the committee.
Speaker 8 (23:20–23:35)
I don't think it's, I'm looking at the bylaw. I'm not so sure that it applies because those are signs in business districts. Right. And this is on conservation land owned by the town.
So I'm not quite sure that we would have had the same process.
Speaker 2 (23:37–23:53)
And so the CONCOM voted in favor. So what was the vote? And you voted four to one or six to one. What was the vote?
Speaker 3 (23:53–23:58)
The vote was to support his application to the CDC.
Speaker 7 (23:58–23:58)
Okay.
Speaker 2 (23:59–24:02)
That's what I thought, but I just wanted to put that out there.
Speaker 7 (24:02–24:05)
More specifically, to a commitment to assist with the jurisdiction where she was going.
Speaker 2 (24:05–24:10)
Yes. Yeah. Which is obviously what you'll need. Yep.
Speaker 5 (24:10–24:50)
Well, as someone who doesn't commute, but does ride the parkway to get to the trail and up the trail, I do think the signage could be improved. And I do think interconnectivity across town on our bike lanes even is something that's in the bicycle pedestrian master plan is to improve the connection there to make it more understandable for people who want to get across Milton, but also to get to the adjacent town. So I think that this is, it seems a good idea. And I'm curious how, what's the feedback in Randolph and what you've put in there?
Speaker 7 (24:51–25:44)
And the first feedback was, who needs this? Well, everybody knows about that. But the real answer was, they don't. I mean, I took people out who live literally across the street from the Blue Hills.
You know, there's a big housing complex right on Camp Randolph, Oregon. There's a bunch of people who live there. And I met up with some of them to go on a hike. And they said, wait, wait, I can walk across the street from my home and get to this lake?
It's the biggest lake in the biggest park in the states. And they didn't know that it was there because it doesn't say that anywhere. So that was the real feedback. And I presented that to the Fisherman's Cove discussion, which was run by the DCR, and they caved in on that.
They said, yes, we're going to make the entrance to what's called Fisherman's Cove parking area better marks. Because people drive by it hundreds of times and don't realize it's an entrance because there's no sign at all.
Speaker 5 (25:44–25:57)
So have you talked to DCR because I know that they're working on a plan to make a better connection for people in Boston to get to the Blue Hills. And I thought part of that was down the parkway. So are you familiar with that?
Speaker 7 (25:57–26:03)
I heard vaguely about that. I think it was actually from the team.
Speaker 5 (26:04–26:33)
it is what i recall but uh where you where you take the parkway and then you get yeah that's the end of that right so yes you can get on the trolley yes and then the city's working on a plan for redoing um where they will be adding the whitening that should go forward, right? So they'll be able to get from this path down the parkway and continue going.
Speaker 7 (26:34–27:02)
My plan for next year, which is not part of this proposal, is to propose something similar to this for what's called the Milgram Park and Ride, which is right off of the Ponte Greenway and has no signs at all to get there, but it's a lovely place to park your car and bike to Boston, which I did this morning, for example. But that is, I think, part of their plan. I really don't know what exactly their plan is, but I'd love to participate.
Speaker 4 (27:02–27:29)
Gerald, the Greenway connection comes up Truman Parkway, and where it hits Neponset Valley Parkway, proposals to cross the parkway and develop, instead of going over Falls Bridge, develop a pedestrian and bicycle bridge upstream from Falls Bridge that makes its way over. There's still a question of whether it follows Brush Hill Road or goes on Neponset Valley to get to 138, which would make the
Speaker 2 (27:34–28:36)
I'm gonna unless there's any final questions I think I just say thank you very much this is thank you for taking the initiative on this and and coming to us and making this proposal. All right, next item on the agenda is Wharf Park. And I think there's a few people here. So Scott and team, why don't you just bring chairs up if you're all gonna be part of the conversation.
It'll just probably enhance that for everybody. And Scott, I don't know if you want to introduce your team or and get us started there.
Speaker 10 (28:37–28:51)
So we have a time when I come to just seeing my face, but then sometimes it stares back to me when I don't have the answers to some of the technical questions we brought up.
Speaker 2 (28:52–28:54)
No question goes unanswered tonight.
Speaker 10 (28:58–30:06)
Um, so Jeff Kramer is on the board of, uh, in New York and he's been part of our steering committee for about a year now. Um, Chris Salen is owner of the exchange, and he's also a board member of the market. Brian Pascual Antonio owns a landscaping business in town amongst other businesses that he's involved in. And he's been providing some of the technical ideas for helping us out on the technical side of it from a construction standpoint.
You guys know Bill Madden, he's our architect on this project. And J.D. Weil is a business owner in our neighborhood of Wharf Park. He and Dan Camerigan, who's owner of Steel and Rye, are involved in a project right on the corner across from the other partners as well.
So that's kind of the team that's here tonight to pitch and talk about different things and how this park is going to affect their businesses, the farmers market, also to answer some technical questions from the architectural side.
Speaker 2 (30:07–30:11)
And I think you have some updates based on the last time we saw you.
Speaker 10 (30:11–31:35)
Yeah, sure. And again, I apologize for you two who may not have been involved in the discussion. I'll just do a quick thousand foot look at this project. It's about a water park rehabilitation project.
It's at one of the farmers market in Durham near town. right across from the lockup that I'm sure you're aware of. And just based on a lot of discussion that's been going on with the landings, you know, map design implementation committee, there's been a lot of talk about revitalizing our access to the water, our only access to the water in Milton, and we think that Moore Park is right for contributing to that development. So we, oh by the way, Scott McKay, I'm a former park commissioner, a former county meeting member, and I'm also on the board of farmers market and also on the board of So this project started back in 22-23.
We applied for a $25,000 grant from you guys to conceptually design what the park could be. We spent about a year doing that and then came back to you and asked for help with the engineering side of the development.
Speaker 11 (31:36–31:39)
Sorry, Scott, we turned all of those meetings for $25,000?
Speaker 10 (31:41–32:45)
I actually, I went back through and there were 15 public meetings, some smaller and some larger, but there were 15 meetings that were held between the select board, planning board. We have two large public meetings as well. Yes, we did. We went ahead and put in an application, got another $73,500 from the town, from CPC, to help us engineer the project, get it to a construction phase.
That was out of a budget of $157,000, so we did some private fundraising and raised the remaining amount, and now we're back here for year three asking for funding for the construction of the project.
Speaker 11 (32:46–34:46)
Well, I guess just big picture-wise, we're talking to sort of like… you know, a thousand feet in the air. I have to say that the process that Bill Scott said that you led has been really amazing. I know there's some faces that I've seen in some of the meetings and all the different types of groups that we've met with, large groups, small groups, people that had very specific interests.
It's been a great process. So as a resident in Milton, it's been exciting. So just from a personal, it's been very, Fulfilling for me as a professional and then also as a resident. 1 of the things just fundamentally for this project that was important to us was.
Blurring or sort of layering the social ecology with the natural ecology of the site. And that was a huge driver in a lot of our decisions that we facilitated with different groups. There are some people that feel like the social side of it should drive all the answers, and some people think that the natural side should drive all the answers. And we, as a moderate sort of personality, I think that these things should come together, and typically it makes for an amazing site.
So, this project really was driven when we saw it the 1st time. I think Chris and Scott, we were there and did a little sidewalk. The thing that stuck out was the 88 accessibility for the site. And just the overall sort of walk ability of the green space.
And that was one of the drivers for us was like, okay, so how can we make this safe for the pedestrians and Milton and also a compliant in terms of the slopes and the services. So, that that drove a lot of the decision making for the park itself. And I apologize for you guys. We didn't really bring imagery to sort of share with you.
So hopefully you've seen some of this.
Speaker 2 (34:46–34:53)
We're getting them access. We had a little technical problem this morning, but to the shared folder, which has all of the materials.
Speaker 11 (34:55–35:36)
So, and we're, you know, we're thrilled with where we've where we've landed in terms of the design and working with Jeff. Brian and, you know, developing the documentation, the drawings has been, you know, very fruitful. We're really excited about where we've landed with that. And then having JD's voice as well and Kyle Harnish and Bob Balconi's voice in this process, too, in terms of what this could be from a business standpoint for the Town of Milton has been very exciting.
You know, that's sort of where we are right now. And I'm, you know, I'm interested to hear if there's any further questions.
Speaker 2 (35:39–35:47)
Yeah, I was just gonna, Scott, I did distribute the three documents you sent. Do you want to just briefly describe those? And then I think we can go right into questions.
Speaker 10 (35:47–37:59)
Some, some things that we just wanted to, some, some, We wanted to get some things in writing to help support the application. So we came up for a series of meetings. Kyle kind of pushed the idea of getting some resiliency in our community to help with saying this is an important step into starting some public and private partnerships and projects. So there are four folks that signed it, Brian Pasquantonio, Kyle Harnish, again, who was not able to make it tonight, J.D., and Bob Coney, basically stepped forward and said, we're interested in helping to support this project in whatever way we can to make that happen.
The second piece of information was an assessment done by Richard Hunt landscaping on the oak tree that is currently in the middle of the park. And again, it's been kind of the source of some discussion in terms of, you know, can the tree be saved based on its current state? And also, if from an ADA perspective, how would we accomplish creating an ADA space with this large tree and root system that's exposed on the property. There's an assessment that got distributed as well.
Third was the second letter from the select board. As you might recall, this property is select board property and we've set forward to usher this project forward, but really the decision-making process and what to do with this land allows you to select for it. So we wanted to make sure that throughout the process they were involved. This letter is a support letter that we actually got today, but we had a presentation a couple weeks ago with Select Ford.
That was the third time meeting with them to kind of update them on the process, and this is a
Speaker 2 (38:06–38:17)
Right, thank you. That's that's helpful. Um, as we talked about. Yeah, because there's a couple of new members of the select board.
That was important. Yeah, sure.
Speaker 10 (38:20–38:25)
We provided all the documentation that we have and what funding.
Speaker 5 (38:28–38:42)
And is there any discussion about any other source of funding besides CDC? Did they have any other thoughts?
Speaker 10 (38:42–38:50)
They didn't have any specific questions on that, but I think they're probably the best person to field that question, if you don't mind.
Speaker 12 (38:51–42:12)
Sure. Yeah, so one of the things we discussed, well, let me back up a little, if you don't mind. So I came to this conversation as a global business owner. I own Muscle & Fo, which is Virginia, but I'm not a multi-village.
I'm also a proprietor. I own some property down there in the village, and then I also actually live up in Milton Hill. This project touches home to me. It hits me in every facet of Milton life.
When this project first came across my plate, I became very excited because one of the things I've been very vocal about, about investing down in the village in Newark, is that I think the Milton village has an extraordinary economic potential for placemaking, for activation, to improve the quality of life for the Milton residents. When we started talking about using that space, There was a really honest conversation about no one even really knows that park exists because it is kind of no man's land right now. So, as we work through those conversations, we get into how businesses can help at a high level. One of the things that we explored as a team was Is there a way that we can introduce businesses to help fund this?
So we brought it to Nick Moana. And one of the problems we had is that because it is a town of land, it has to go through the public bidding process. So naturally, a large portion of the funding would have to go through that process. One of the discussions we had was, can we source the front end portion of the project with public funds, essentially prep the infrastructure, and then bring in private funds to help to finish this?
So essentially invest in the land itself, get into a workable site, and then partner with local businesses and families in town, people that want to contribute so that it can be kind of a community project. You know, one of the things I do want to stress, and again, part of the reason why I'm here tonight is, I don't want to look at this park in a vacuum. I think if you just look at it on a piece of paper, it is a piece of land with a larger glass perforated board. It's a very important piece of Milton Village and the businesses down there need growth.
They need things like this to help people stay in the village and consume goods and services. Right now, the village is very transactional. You go to the post office, you grab your meal, you go to the harvester, you grab another. Someone with young kids, my kids come ripping down that hill on their scooters, and we either take a left to steal a ride, or maybe go to a flat pack, but you're in and out.
There's really no engagement with the village. So I did Because one of the conversations that him and I had early on when I was trying to suggest that you partner over to Elliot was what's possible in the village and what it can become. And that was the early conversations about this park and it was very clear that. I want to make sure that this board knows that this part is a big part of that conversation.
I think all the residents would have a place where they can go get a coffee. Mothers can bring strollers. Kids can play. And I think as part of that conversation, the businesses are all excited to be a part of the conversation about how they can help as well.
So I don't know if that directly answers it, but you know.
Speaker 5 (42:12–42:40)
That brings me to the meeting that I participated in. with a few of you at Kyle's office where we talked about that, what you could do under the public bid and what you could do separately. Have you taken a look at your budget, your construction budget and separated that out? So like this is the number for public bid and this is the number that we can source other funding for.
Have you done that yet?
Speaker 10 (42:40–43:26)
So from that meeting, we did take a step back. We did take a look at that and were able to go through the 75% cost estimate, and that larger document breaks out certain scopes. And we went through that and highlighted, well, what is an infrastructure piece? What would be kind of an additional layer to the park?
And came up with a document, and I think I sent it over to Emanuelis. You were not physically at the last meeting, but we did circulate that.
Speaker 9 (43:27–43:39)
I think you're talking about something since September, right?
Speaker 10 (43:39–45:23)
So basically this is what we're talking about and I can share this with you guys or you can get it on the screen, but basically taking this document that says, you know, this is what direct site work costs are. This is the additional soft card size. So basically, CPA in a town would, that's the amount of money, 1.1 million. And this, again, this budget, we've talked about this before, the 75% documents come out at 1.5 million.
The 50% documents were 1.9 million. When we get to 100%, we're looking at trying to get this project down to about $1.2 million. So $750,000 would come from CPC funding, $250,000 from the capital committee, and then the remaining $200,000, $250,000, whatever that turns out to be, would be public-private. So essentially, foundational work would cover certain things like retaining wall, handrails, that type of stuff.
But the infrastructure pieces, which would be existing conditions, the earthwork, paving, the walkway, plantings would be something that the private end would be able to pick up and the utilities that the site would require would also be part of the town. So it's essentially the nuts and bolts of creating an accessible space and then all the amenities added after that would be covered by private folks.
Speaker 5 (45:24–46:06)
So when you're looking at getting that 300,000-ish out, I look at this, what you're looking at, at direct site work of 825. 300 is a pretty large percentage of that. And I look at where those numbers lie, the big chunk in the earthwork, and I'm wondering if you've thought about if there's a way to reduce that earthwork number to help you get there. So rather than the finishes, which are the things that people see, or something that's less durable.
You know, is there something that should be adjusted?
Speaker 11 (46:07–46:30)
Possibly. So we've stopped at 75% so we could have this conversation. Because we didn't want to blow through our fee and then there's no money left and now we have to start making changes. So I'm not going to say yes, because there is significant cut to make the site relatively level for compliance in terms of slopes.
But possibly, yeah.
Speaker 4 (46:34–47:05)
I was at the first public meeting and showed a variety of things and the one that the public reacted to the most I think was the third proposal which shows roughly a circle up where you've got it and some of that but it specifically identified preserving the tree as part of that project. Then, I wasn't able, I was out of town at the next meeting, so I didn't see that. And those were the only two public meetings.
Speaker 11 (47:05–48:13)
For the first meeting, just to back up, for the first meeting, we showed three options. Right. So I'm one of the shade trees for the town. So like, I love trees and I want to preserve them as much as possible.
And so I knew in my head, I'm like, you know, Middleton loves its trees. So I was concerned. So I said, let's just go. Chop a vanilla and strawberry and let's show, let's clean the site and we're going to make it a level green space.
Let's see how everyone responds to that. And then this second scheme was keeping the beech tree at sort of the lower end of the slope, removing the oak tree, which is the problem, really one of the issues for the market. And then the third scheme was keeping both of them. So we, and then we even talked about sort of the education of different ways that we could herestate the tree to sort of evaluate where its roots are growing.
And at the end of that, the first meeting that we had, there was the direction that was given to us was the group was very interested in scheme two, which was the removal of the oak tree and the preservation of the tree.
Speaker 4 (48:13–48:52)
That was amazing. My concern is, I think, did you look at an option where you set your base elevation at the elevation of the oak tree rather than the beech tree and create, in essence, the same plan you've got now? but basically two or two and a half feet higher, which would reduce or eliminate a lot of that wall work. It would eliminate the bulk of the expensive earthwork and reduce the stairs.
That could be a half a million dollars right there.
Speaker 11 (48:52–50:17)
So we didn't look at a scheme to keep the oak tree, because the oak tree is problematic for the site. But we wanted to keep one tree. And so that was the decision we had to make. So do we keep the beech tree, which is much healthier?
And we walked the site with Doug prior for him to give us an assessment. He said that his recommendation is to prune the tree that he grew up yesterday. We met with him. His recommendation was to prune the beech tree in terms of livability.
The big thing in my mind is if Milton's going to invest a significant amount of money on this site, we want to think about this in terms of a 100-year window. To design a park that's based on a tree that's clearly in decline, And I would prefer to preserve the tree that's healthier versus the tree that's, let's say, we can even say it's not in decline, but it's past its prime for sure. And so we're setting grades that are at that elevation, and then we're gonna have steeper slopes down to the parking lot beyond. It just didn't seem that that was the most beneficial in gaining the maximum space that we could get for the park.
Speaker 4 (50:17–52:53)
So I'm not a professional in the area. Um, I just moved to Middleton, uh, five years ago from Boston. And one of the things that drew my husband and I to Middleton was the community. And I live in 88 Wharf.
So I look right up at Wharf street and I see the park and people come down that street all the time. Not only on scooters, but they can come down that street all the time. And the park is invisible. No one stops there.
There's no reason to stop there because it's not very inviting. It doesn't welcome people in. With respect to the farmers market, which a lot of folks in my building love, There's a couple of older folks there and have trouble walking around there because of that tree in the root system that's there, so they can't participate in that. I'm a little embarrassed to say that I was walking in there a couple of weeks ago and tripped myself, and I've lived there for five years.
As part of the Board of Trustees for Milton Landing, we have a very local group of residents who are very much interested in keeping greenery, making sure that we have nature outside of our window. I apologize, I was at that first meeting and I recall that the plan that folks were most interested in include the oak tree because it does kind of cut up that whole space. So no one wants to lose the tree, but it seems like that's a big impediment to making that the space residents want it to be so that kids can play there or older folks can play there. Or, well, they should play too.
The other thing I'll mention about the trees, I've had a few experiences myself where I sat on that one sad lonely bench. And from June to August, the number of carpenter ants that have fallen on me from that tree, it just makes it a place you don't want to spend any time. And so I think that, again, I'm not a money person, but I live there, I love the village, I love what's there, and I see this park as a way to revitalize that part of Milton that brought so many of us to living in the first place.
Speaker 2 (52:53–52:58)
Well, Rob had his hand up, and then we'll go back to Pete and Jenny. Yep, Rob.
Speaker 6 (52:58–54:17)
Yeah, sure. So first of all, I just want to thank Scott and his team for coming out. And I appreciate the three letters that we received today, the one from the select board, which we've been asking about with the new select board support. I appreciate that, as well as the letter from the arborist.
So thank you. And thanks to Scott and his team for putting this project forward. Just a few things that I guess I have a question for Bill and Scott is, you know, I was out to the site probably, you know, two weeks ago or so to look at this with Pete and one question is, is it possible, you know, It seems like there's a lot of earth that's getting removed from the site with this project And is there an opportunity here to save some money by lifting up? uh by bringing up that uh The earth up a little bit And so that's just a question for you guys to see if if is there an opportunity here to to not make such a big A big change in in the plane of the project and and remove that much earth And so I just want to want to know a little bit more detail around that and if there's opportunities for some savings and not such a big cut to the elevation.
Speaker 11 (54:20–54:50)
Thanks, Rob. I can't remember the slopes right off the top of my head, but I know that there's a couple of things that we're thinking about. One is on the residential side, we always think we don't want to have a table where you can see the wine glass and tipping. It's similar with the market.
We want to have a relatively flat space pitching enough. Can you see me?
Speaker 6 (54:51–54:53)
Yeah. So we've graded it.
Speaker 11 (54:53–55:41)
So I believe it's in, it should be in degrees of tapping. Um, and it's, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, it's a, So your question, Cheryl's question, they're great. And I can't answer if we can minimize some of the cutting. But there might be, I guess, Cheryl, I didn't want to say yes, because I need to look at the drawing and study it more.
But that's to save some money. We've been trying to save money. for the last four months in different methods. So, this is a question we will look at a little closer.
Speaker 10 (55:41–56:05)
So, I have a question for you. I've seen cutting down the right fork on the drop chain tire, the flattening of the road. If we didn't do that and we were to change the grade, we'd still have to add some sort of a retaining wall on the east side, correct? Because there is such a slope difference.
So, in the end, I'm not sure it's going to really get us any different in terms of cost.
Speaker 5 (56:05–56:14)
You wouldn't have, if you did raise that, your cut, you would have less law, you'd have lesser removal.
Speaker 6 (56:14–56:17)
But you have to- Less steps, right? Less steps.
Speaker 5 (56:17–58:39)
Yeah, we were all design professionals, others were all making these comments, right? And we've looked at and worked on grading plans and these kinds of things. And I always, when I have a budget problem, I always look at my biggest ticket item and say, what's driving my budget? problem here and it's not the little things that you're going to chip away at and it's usually like you know this big project.
the landscape is the last thing to go in. And that's where the cuts get made. And so it's, you know, if you can find a way, I always look for things that are not the things that the user is going to see. So it's this sort of thing that is driving some cost here that the user won't see.
So as a design professional, I think it's just we're giving you some suggestions about the budget and it doesn't change the design concept. It doesn't affect the tree. It's just a question of how you're implementing it in the end product. And so that's hopefully something where, you know, I'm concerned, you know, whether you're going to get that kind of money out.
And I know you have that goal, but having looked through the budget, I am concerned about that. And, you know, it is a good project. I mean, I, you know, started working on the master plan implementation committee over 10 years ago. We started with planning work at the land.
You know, and we developed a report that got passed on to the Select Board, and the Select Board said in the letter that they're working on that implementation. So it's great to see progress and see things that we've worked on some years ago, you know, having some progress. And so I do want to see progress there. So, and I, you know, I agree with Jake, we passed zoning, I worked on zoning too.
and the town passed it five years ago and not one project has done it yet. And I keep saying, why not? If we have to change a building, we should do that again. Because it is an amazing part of Millicent and JD is making some progress and the family needs to do its part too.
And hopefully the other property owners will too. So I hope you're taking my comments in that vein.
Speaker 2 (58:39–58:44)
That's great. Yeah, thank you for the feedback. And Pete and then Jenny.
Speaker 4 (58:44–01:00:50)
I think the difference is if you use a higher elevation for your circle and the change in grade instead of happening between the sidewalk and going down there, the bigger change of grade happens from your circle area going down to the lower. So there'll be a slope that goes down to the beach tree area. Correct. big piece of your work, a big piece of your wall and stair construction, and you can have the circle, you know, you have to figure it out, and the circle might get a little smaller.
You'd have to work at that. But I just think it makes sense. And regardless of what happens with the tree tonight, have to review the arborist report and things like that. But I've been watching that tree for a long time.
And there are actually three beautiful, healthy trees that are being removed in this project. It's not just the old oak tree. We've got a beautiful pin oak over there. The driveway that goes back to the MB&T parking lot.
We've got a beautiful, young sugar maple out there by the wall. But yeah, those trees, if they have to be removed, you know, should be transplanted. One of the other things, while we're throwing out suggestions here, you're putting in a lot of impervious surfaces that aren't there now. So I would suggest that your plan improves an infiltration basin, you know, like a rain garden or something so that you can handle all this impervious surface.
But I appreciate the hard work, Scott. I know how hard you've been working on this for years. I just wish there were more opportunities for input. Has anybody from the town done a detailed engineering and design review?
Has the town engineer reviewed the project at all? Or any of that?
Speaker 10 (01:00:51–01:03:39)
I don't think it's replied to the project, so I haven't been I will say that this process has been going on since 2022 and to have these types of questions coming up now is a little frustrating because I just don't know where this project is going to go from here. I'll share that as my own personal feelings on it. You know, there was a lot of opportunity throughout this process for relevant input. Whether you decided to show or not or what…
There were three names at the conceptual design meetings. Okay. I just think that this town is begging for development in this particular neighborhood. This community here is a funding decision mechanism for the town.
It's not the planning board. It's not your Mostly making funding decisions, not decisions on the technical nature of a project. I don't want to tell you how to do your job, but for someone who's invested a lot of time and money in this project, and to have it at the last minute potentially not be funded is extremely frustrating. This has been, with our committee, all volunteer.
We're the only people who have stepped forward to make a difference down there at this park. I just don't see… If you guys are asking us to go back to the drawing board and re-engineer this, The private side of this funding is not going to withstand an additional round of this. That is something that you guys are going to need to make the decision on whether you want to go back to the drawing board and re-engineer the project.
That's your choice. I don't see on this project, listening to the community, listening to folks. And we redesigned this project how many ever times to get it to a point where we tried to hit 90% to 95% of the requests that came in. And we spent a lot of time getting it to where it is now.
And again, kind of a last minute, change is difficult to hear. That's probably where I'm at right now. But I guess I'll stop. But I think that's always good.
Speaker 2 (01:03:40–01:03:46)
So let me give a couple of other members who haven't spoken yet. Rob, I'm going to call on you in a minute, but Jenny has been waiting patiently. So Jenny.
Speaker 5 (01:03:47–01:03:59)
you know, Mr. Hunt's letter involving a replacement tree. So I was just wondering where you got that from.
Speaker 4 (01:04:00–01:04:04)
Did you have an idea for litigation that there would be a replacement for it?
Speaker 2 (01:04:04–01:04:16)
And it wasn't clear to me whether that was replacement on elsewhere on the sites or. You know, planting another tree in other words, that's happening.
Speaker 11 (01:04:17–01:04:35)
Um, so. You know, we can caliber and I mean, maybe we get close to the Cal branch, but I mean, again, that's budget development. But there's significant planting that's being proposed for this. I don't know where he got that.
Speaker 5 (01:04:39–01:05:05)
My second question is, the circle, when I look at it, I see heat. It just seems hot, super hot. And some of the images have a shade awning, but it's not in the budget. So I didn't know what the plan, how difficult that is, or I'm not sure what your thought is about shade.
Speaker 11 (01:05:05–01:06:32)
I mean, so, you know, you always start with sort of big visions of what these things could be. So we talked about, I don't know if there's anybody in here, but we were talking about more canopy trees in space. And that was really more, actually it was a group that we met with that was more farmer market centric. Wasn't she talking, I feel like there's a woman talking about providing shape.
But yeah, that was something that was considered for sure. But in terms of the state, the circle really was driven from the planning board. We had a great sort of design meeting on site. And so we reoriented the entire park from where it was originally designed.
And I think this is where Scott's going in terms of like getting, trying to get input from all different groups. The park has been reoriented now, so it orients itself to the river, so you can sit along the seawall. The circle was born from the concept of connecting it to the lower part that's in the board. About 25.
About 25, so there's a series of circles that make that up. The planning board was very interested in making this feel like more of a precinct, so everything was cohesive. So those were the shapes and orientation. In terms of the shade, it's a great point.
We're really trying to maximize space for usage for the market.
Speaker 13 (01:06:33–01:07:22)
I'll speak a little bit on the market as far as designing that circle. Not only being on the board, but being a vendor down there, the 1st thing that we do when we get set up is 1st. Clean up every branch that has fallen off that oak tree. And in fact, 2 years ago, we used to have 2 picnic tables down there and a very large lane that was probably the size of a car.
fell off that tree and smashed that down. So when we first talked, three of us, it was a safety issue. We wanted people to come to the market, to get their goods, hang out, be active, go up to JD's place, stuff like that. We lost a lot of choppers there.
Our majority of the shoppers have not come there.
Speaker 2 (01:07:22–01:07:29)
You haven't lost them. Otherwise, I mean, this is being reported.
Speaker 13 (01:07:33–01:08:22)
Because of the access there, I have seen with my own eyes, somebody come up, drop a gentleman off and he says, can you go down there, give me two ears of corn, give me two cookies and I'm going to stand right there. how he wants to show up in the market. That's not how we want to sell the market. We used to have the Council of Aging come down in their van, drop off a whole group of folks.
Even if they bought nothing, it was something for them to do. That has gone by the wayside because of this parlor. I mean, I've been down there for probably five, six years now and nothing has happened That's where we kind of circle is getting more people around there, get access so everyone can walk around and talk to them better and find out what we're all about.
Speaker 2 (01:08:25–01:08:28)
Danny, did you have additional questions? Okay, Rob.
Speaker 6 (01:08:29–01:09:37)
Yeah, I just want to take a step back and answer, Scott. Basically, you know, this isn't this isn't a small lift for this committee, just so that everyone understands this. This is a big this is a big amount of money that we're going to be going from this committee to town meeting to try to get a two thirds vote. So, funding is a big issue on this one.
So, I hope, you know, I think the design professionals who are on this call, we're just looking at this, you know, it's one thing to look at plans as we all know. It's another thing to go out there and look at it. And so, if there is ways to save some money on this project, I would hope that would be taken seriously because we know as this committee, as we continue to go on year and year, It's going to be a big lift for this committee, you know, to continue to spend funds wisely. So, I don't think we're looking at making major changes to any designs here.
I think we're just looking at ways that potentially could save some money in the long run because this is going to be a 20-year type project that needs to get bonded.
Speaker 2 (01:09:39–01:11:41)
Yeah, that's a good summary, Rob, of what we have in front of us. We are a funding committee with a lot of really great experts on this committee. Not me, but people like Cheryl and Pete and, you know, We all have different expertises, but Rob and Cheryl and Pete particularly in this area. So that's our challenge.
It is, as I think you know, Scott and I have talked about this. I think everybody in the room knows that this would necessitate us bonding for the first time, CPC communities. The vast majority of them have bonded. We're still a fairly young committee.
This is only our fourth, would be our fourth year of submitting an article to town meeting. So that would be a first for us. So that's a new challenge for us. And obviously, any bonding article needs, as Rob just referred to, a two-thirds majority of town meeting, which is a higher hurdle now.
I will say we have passed the previous three articles with 99% support, usually one or two or three people vote against it. But yeah, I think this year we only got one negative vote, but whatever. The town meeting in specific, the town in general passing CPA with 63% of the vote back in 2020, and then town meeting specifically has been very supportive of our decisions in the past. So we would hope they would do that again.
So let me just ask again for any additional questions for anybody that hasn't been able to ask questions. Yeah, Steve.
Speaker 14 (01:11:42–01:11:55)
We're looking for $750,000 from us. $250,000 from the capital committee. Has anybody discussed that with the capital committee?
Speaker 10 (01:11:56–01:11:59)
They haven't gone through their interview or presentation process.
Speaker 14 (01:11:59–01:12:03)
OK. And the balance, whatever the balance is, will be private.
Speaker 12 (01:12:03–01:13:55)
Right. I can't understate the significance of this park and what it has for potential for the village. So as Jeff mentioned, as a resident of Morphe, Madre is probably one of the first successful restaurants that has existed down there. Again, it's kind of no man's land.
People don't even know it's down there. This park is the connection between Adams Street and Madre. So again, people go to Monterey, they either eat dinner and leave. This allows for traffic to travel to folks.
It's going to be an extraordinary opportunity for that business down there. The farmer's market, as a resident of the town, I personally don't use it a ton because I often find the terrain and the topography and the setup a little difficult to navigate. What this is going to present is not only to have a more robust market, but also pretty robust programming. One of the things that Bill and I have discussed is, as a gym, we're happy to donate community-free yoga classes.
I would love to help coordinate as a business, Shakespeare in the Park, SPUN activities for kids. So as we talk through this, there's no question this is a huge undertaking for this board. I understand it's not a small amount of money we're asking for. I also think it's an extraordinary opportunity for this town.
As far as I've been involved in the planning, business, these conversations, it's rare that we're presented with this type of opportunity where a park can have such a substantive impact on an ecosystem and kind of a community. So I don't want to understate how extraordinary the opportunity is for the town of Milton, for the residents, for families, for the village, for the businesses. I don't want to do better because that part exists, because right now, like Jeff said, it's really, I mean, most people don't even know it exists. It's just a kind of absent vacant piece of land.
So this will be an extraordinary asset for the town.
Speaker 8 (01:13:58–01:14:02)
Is it appropriate for me to make a motion on this or not?
Speaker 2 (01:14:03–01:15:25)
So we did set another, that's a meeting you weren't at, we set another meeting in December that was in part not wanting to anticipate an outcome of, what was it, December 18th, did we set? 16th. We could take a vote tonight. We voted on every other proposal, except for the Randolph proposal, so we absolutely could.
We did set another meeting in case the committee wanted to deliberate more and think about it. But I thought it was a reasonably, you know, full agenda. So, bringing Joanna McCarthy in, you know, I thought it was a reasonably, you know, full agenda. So, bringing Joanna McCarthy in, you know, I thought it was a reasonably, you know, full agenda.
So, bringing Joanna McCarthy in, you know, I thought it was a reasonably, you know, full agenda. Thank you, Robert, was to sort of talk a little more details about the mechanism of bonding and the actual, we have some estimates of what it would cost in terms of debt service per year, but to have her give us the latest and greatest on that.
Speaker 8 (01:15:25–01:15:47)
I think that's a separate, I mean, I think that's a separate question. I mean, it seems to me that I'd like to see this committee, this group, get some evidence of support from this committee. And so if it was a modification of the vote that we would say that we're in support, you know, subject to us, you know, understanding the consequences of the bonding.
Speaker 5 (01:15:49–01:16:00)
Yeah. To understand the consequences of the bonding financially, what that means for how much is available How much is committed for the next 20 years or 15 years? I think that's what we needed to understand.
Speaker 2 (01:16:00–01:16:15)
Yes. Yeah. But what I'm saying is that we do have an estimate, by the way, it's about 85,000, 90,000 per year and then declines. And that's it was based on a 15 year bond, not a 20 year bond, a 15 year bond.
So, so.
Speaker 8 (01:16:15–01:16:25)
But what I'm saying is that I sort of feel with these people in front of us that I'd like to have a motion to sort of indicate that- You can certainly make them.
Speaker 2 (01:16:25–01:16:26)
I'd like to make that motion. Make the motion.
Speaker 8 (01:16:27–01:17:44)
I agree with JD. I was at an event for the library on Monday at Steel and Rye, and I was so struck by the fact we sold 194 tickets for people to come out to raise money for the library. And the fact people had a place to go and a place to congregate, this town does not have those. It doesn't have that opportunity, hardly ever.
And to get that amazing turnout. It's dealing right on a Monday. As I said, the place was packed. We as the friends of the library, we do programming in that park and it's tough.
It's not comfortable for little kids to sit and have Sarah read to them. We're there all the time for the kids and it's just not a really great spot for that. We would get much better participation if people could actually roll a stroller, which they can't right now. And I just think that it's so important to have places and gathering places in this town, which we don't have, and we lose them all the time.
And so I'd like to let these people know, I'd like to have a motion to sort of say, yes, we're generally in support of their project, and that it's subject to our understanding the financial consequences, and that would be my motion.
Speaker 2 (01:17:46–01:17:49)
Okay, so we have a motion on the floor. Do we have a second?
Speaker 8 (01:17:50–01:18:24)
We're supporting the $750,000 subject to our understanding of the coast cost of it through the bonding mechanism because we have no funds to support it at 750 if we do not buy. Yes, but so so you're making a motion to go forward with bonding subject to without having no no no to say that you are in support of this project. And that's the next opportunity we will be discussing what the financial cost of it is before we vote for it. Yes.
Speaker 2 (01:18:24–01:18:29)
So this is different than the votes we've taken up to now.
Speaker 8 (01:18:29–01:18:31)
Yes, we're approving this application. That's not my motion.
Speaker 2 (01:18:32–01:18:34)
So it's a motion of support, general support.
Speaker 8 (01:18:34–01:18:52)
I just did, but okay. I'd like to have a motion to indicate this committee's support of the Wharf Park project, subject to our getting cost estimates for what the bonding would be.
Speaker 2 (01:18:53–01:19:14)
So I need a second. Do I have a second? Second. All right.
Then now discussion. I'm not always a stickler for Robert's rules. So we have a motion and a second and more discussion and questions. Jenny.
Speaker 5 (01:19:14–01:19:29)
The last meeting was in addition to not understanding the complete bonding, but was also to fully understand the potential of other bonding requests this committee may receive in the future. Just to understand that.
Speaker 2 (01:19:30–01:20:52)
Yeah, the fire station particularly, the Atherton Street fire station, yeah. Yeah, I mean, you know, that's We can we can attempt to do that. That is going to be I'm going to say it's going to be challenging. Right.
Every time for the last two years, I've seen Brian Walsh on the street says we need to talk to the CPC. But for two years, they haven't come before the CPC. So no, no, I understand. And Brian's done an extraordinary job.
Don't get me wrong. But I don't think they know exactly what they need and what direction they're going to go. Yeah, no, right. I mean, but it just feels like to me, I'm not, you know, whatever, we can do our best to extract what information the fire station building committee has at their disposal right now to factor into that discussion.
But I don't know if we're going to have certainty is, I guess, that's all I'm saying. I'm pretty sure we're not going to have certainty by the time we have to make a recommendation at town meeting. All right, so other discussion on the motion? Yep.
Speaker 14 (01:20:52–01:21:02)
I'm a little bit wondering about subject to understanding the bond.
Speaker 8 (01:21:03–01:21:41)
I'm not sure what that- Well, I've said I'm just concerned about the fact that we have all these people here and they have spent an amazing amount of time. As Scott said, you know, to come here at the last minute in their idea, that, you know, come before us and people are like, well, you know, I'd like you to, you know, have it be pink, not blue. And I'd like to have this and not that, you know, is, I just would like to send a message to the team that is here today, that in general, I'd like to find out whether the committee is in generally in favor of going ahead with this.
Speaker 5 (01:21:41–01:22:31)
So one of the things I would say is the funding request is important for us to understand what the long-term consequences of that dollar value is. Because some applicants have come forward with requests and they don't get recommended for the full request that they've asked for because they're not sufficient funds. And so I want to be sure that we fully understand that this will be something that is decided for the future committees for the next 15 years, that there's an additional cost that comes with bonding. I think Rob spoke about that before.
So it's not a $1.2 million project. Just on the bonding alone, the costs are going to go up for the cost of the borrowing, right?
Speaker 8 (01:22:32–01:22:37)
No, you do the bond. You buy the bond. The cost of the bond stays.
Speaker 5 (01:22:37–01:23:24)
But the project costs go up because the cost of the money goes up. So the question I think that we asked tonight is, can the cost of the project go down? So that helps the overall request that comes to us. Maybe the request will still be 750, but if their project costs go down, we can consider whether the recommendation that we make is for the full 750 or whether the recommendation is for 500 or 600 or some other number as we think about the impact that it has on, let's just say it's 85 to 90, and we have about a million dollars a year, so we're talking about nearly 10% of it is committed every year.
And I don't know, maybe it's gonna be a little bit more than a million some years and a little bit less than a million some years.
Speaker 8 (01:23:24–01:23:29)
No, no, no, the bonding cost stays the same. I understand what you're saying. Yeah.
Speaker 2 (01:23:30–01:23:43)
Yeah, if we have a million dollars to spend every year, which is approximately what we have currently, yeah, I think that's what she's saying. 90,000 is, yeah, 9%.
Speaker 8 (01:23:43–01:24:45)
I mean, as Thomas pointed out any number of times, and as I know from borrowing a bunch of money from the town of Plymouth, most towns do. And this is a special project. This isn't coming in and fixing my wall or taking care of a grove of trees. I mean, you get different kinds of projects.
And every town gets faced with a significant capital project for the CPC. and it's either a fire station, or it's the town hall, or it's a massive redo of a recreational facility, or the construction of a new park. So every town gets faced with those. So Pebbly Park has been trying to be the playground for the last three or four years too, right?
But they didn't ask, okay? So we only can act on the applications we get, and they didn't ask for And in the end, what we have gotten, what they have gotten along the way is a pretty significant amount of money over three years.
Speaker 2 (01:24:46–01:24:50)
Today, they're the largest project.
Speaker 8 (01:24:50–01:25:21)
We have that same situation with Forbes, is that they were working on the barn, they came in for a chunk for this, they said they're going to come back for a chunk. We've been told Eustis Estate would come back for other things. We have, in fact, gotten repeat customers. These folks have worked on a pretty major project.
They know it's going to be costing a bunch of money on town land. And so their request is the 750. I don't think we can go around and say, well, you know, rather you did X, Y, and Z. That's not the application on premise.
Speaker 9 (01:25:24–01:25:26)
Well, yeah.
Speaker 4 (01:25:26–01:28:04)
First, I'd like to say how much I appreciate how much I support and appreciate all the hard work that is put into this a lot of time and effort. And so I agree with everybody here that that can be a very important site in upgrading the site. is a high priority and can have a great impact on the waterfront and the business area. So I'm supportive of all of that.
I understand the problem with the roots of the trees. That can be dealt with. Whether the tree goes or stays, the root problem can be dealt with, and we can have a usable site there, even with the tree there. I don't know how to say this delicately, I don't believe there has been a sufficient public community positive involving public meetings.
There have been a lot of little meetings. You've met with everybody twice, you know, you've met with a lot of people, but Scott, you say that this is coming up at the last minute. We've never, I've never had a chance to see a professional for 48 years. never had a chance to see, you know, what the grading plan was and how this, how the concept plan responded once the survey came in, because all the concepts we saw, there wasn't any survey, so you didn't know the elevations, you didn't know that.
You could walk out there and look at it, but there's never been a chance to review that. There's never been a chance to review the playground. I saw the playground and tried to look it up on the site of the manufacturer and can't find anything related to what that playground is. The community's not had a chance.
to talk about what the playground is, what the surface is, and how that affects the surface, each tree and things like that. And some of that is, you know, beyond here. I am very supportive of a project down there, you know, that project could be something that I could support financially without you know, I can't support the project as designed now. And if the team is not willing to take the less than a week it takes to look at if we raise the elevation, you know, to more reflect this, you know, what's the impact of all that to be done?
I think that's not a good feeling. No one said that. No, he didn't.
Speaker 11 (01:28:04–01:29:34)
No, he didn't. No, so what I was saying, we just got the feedback about that, and that's where I just can't answer Cheryl's question right now. We need to look at that. And so, you know, whether or not My feeling is that there's a lot of technical connections that we're making in terms of the existing roads, the sidewalks, the trees.
My gut feeling is that we might be able to raise it slightly. And as you know, Pete, when you have a public space that's 80, you can't have cross slopes or path to travel slopes that are greater than 2%. So the grades are very difficult. And we have had that engineered by Jim Burke.
We've worked with him arm and arm in terms of that. So I don't take any of your feedback in terms of the design personally. I've been told a fountain I designed in Little Rock, it was a private urinal. So I've been through it.
I don't have an ego anymore. But in terms of just so you know, there's been engineers that have looked at the designs There's been landscape architects that have been looking at designs and then we've had also professionals that have been looking at the plans as well. But in terms of like the interest, we support the interest of reducing the cost. So I'm happy to hear the comment about the earthwork.
And I just can't give the answer now, but we will look at that for sure.
Speaker 4 (01:29:34–01:29:43)
And it was not my role, but I'd be happy to be able to show you. Yeah, yeah.
Speaker 11 (01:29:43–01:30:24)
At the end of the day, taking my landscape architecture side, JD is so eloquent in the way that he's talking about this, we want this park as a Milton resident to happen. And so if we can reduce costs in any way, whether or not that's raising the grades of foot, well, in the meantime, deleting all the code compliances that we need to have, then we will do that. There's no intent to have the price high. So any feedback that you guys give us, we are happy to look at that.
And so we appreciate that feedback.
Speaker 2 (01:30:25–01:31:06)
All right. What I'm going to suggest, what I'm going to ask is for Kathleen to withdraw her motion. if you're willing. Obviously, you don't have to.
We have a December 16th meeting on the books, a chance to bring in Joanna McCarthy or possibly the fire station building committee and just hear from them because we have talked about that. A chance that's what I know there's a holiday in between and it's three weeks. Any additional insight you can give to answering Cheryl's question would be appreciated if it's not possible before then.
Speaker 5 (01:31:07–01:31:10)
What's up?
Speaker 2 (01:31:10–01:31:25)
He's agreeing with me? Absolutely, good, good. So we would appreciate anything you could provide as a response to the grade issue, the cost issue.
Speaker 11 (01:31:26–01:31:57)
The cost issue, we owned two cost estimates. and we've used them. So we can make a, based on their unit costs, we can come up with a number. Again, it's not a certified price, but it would be a order of magnitude that maybe it saves us 10, 15, $20,000 in terms of adjusting the rate.
So we can look at that and provide some additional feedback. Okay.
Speaker 2 (01:31:57–01:33:28)
Okay. Then I think we would then, I would suggest we would be prepared to vote on these final two projects, the Randolph Wayfinding signage and the Wharf Park project on December 16th, after getting that feedback, after hearing back from you folks and after having a discussion here at this table. Instead of having a… What I'm viewing is essentially a non-binding vote.
I will say for me personally, as one member of this committee, I am in full support of this project. I think when Scott first approached me three years ago, I used the word signature. This is a signature project for this town. I think that I agree with everything that's been said by the team, that this is an underutilized and kind of a space that I think we all agree on can be revitalized, can be a real signature for the town.
And I like what I see, but we have to be, we have a perfect record at town meeting, I want to keep that. And I want this to have the support of as many people as possible in town meeting. So, if it goes that far. So, but that's my personal opinion.
Speaker 9 (01:33:29–01:33:30)
So I'll throw my motion.
Speaker 2 (01:33:30–01:33:39)
Okay. All right. Thank you. And any other comments from you folks?
Speaker 5 (01:33:40–01:34:03)
Any from members? And I hope you take my comments as a challenge and not as a challenge. of this life of the project or a non-supportive project versus as a challenge.
Speaker 11 (01:34:03–01:34:24)
Sure, I look at it as a collaboration. I think that's the thing with this town that we need to collaborate more versus like I'm telling you to do these things. I think the spirit of collaboration is important and I think that's why this project, in my mind, has been so successful because we've been hearing a lot of different voices. So I appreciate the feedback, for sure.
Speaker 5 (01:34:26–01:34:36)
I just want to open it up, because we don't have any sense about the capital. So I'm just wondering, is there any way to get any sense about that?
Speaker 2 (01:34:38–01:34:41)
The capital budget, or capital improvement? What is it called? The capital?
Speaker 8 (01:34:41–01:34:50)
I don't think we can consider it. I mean, that's a different committee. That's sort of not.
Speaker 2 (01:34:50–01:34:55)
Do you know their timeline, Scott? I don't. I don't.
Speaker 4 (01:34:57–01:35:22)
I think the departments have been told not to request. You know, there's some that will get things. Police will get a cruiser and fire department will get something. That's not us.
You don't know.
Speaker 8 (01:35:22–01:35:25)
That's not us. And then, you know, sort of the project is the project.
Speaker 2 (01:35:25–01:35:32)
I just wanted to clarify. So you, Scott, you alluded to the planning board earlier. Obviously, we have a select board letter.
Speaker 10 (01:35:32–01:36:00)
The planning board has voted to… This was at the very beginning of the project in a presentation over Zoom looking for a support letter. I don't think that individual members or the board was able to But we did an extensive site walk. There was a formal vote to support it.
Speaker 2 (01:36:00–01:36:03)
Do you know which members wrote letters?
Speaker 5 (01:36:04–01:37:44)
I participated in that site walk as a member of the Planning Board and there was discussion about considering the park as part of a broader context. So thinking of the other park, but also thinking of the connection to the Greenway, the path, the trail that we talked about, you know, that just crossed to the, even to the trolley, which I spoke about making sure there's handicapped accessibility and a clear path there because, I have come off with a bike path over to the wharf and you know gone through the park or next to the park for that and I think it's one of the things that we hope there'll be better signage too so that people on the path know that they they could get off. I mean our waterfronts are kind of a little hidden gem and residents have it right but it's this park is a part of that sort of larger open space network that we talked about. And so I think that's what the planning board feedback was making this make you feel like it's more connected.
And I think there were varying opinions about how formal it should be or not formal it should be, whether, you know. What kind of plant material? Not everybody can get into the same level of detail, but that sort of broader concept, I think, was that connection was important. And so you took those comments and addressed it in your design.
But I agree, I don't think there's a problem with the general support, you know, for improving the park, part of the Milton Village.
Speaker 13 (01:37:45–01:37:51)
Yeah. Okay. All right. That's helpful.
Is the conservation committee waiting on us at all? It's not conservation land.
Speaker 2 (01:37:51–01:38:02)
It's not within 200 feet of the water. I think it is. I'm sure, yeah, probably is, but at least part of the park. Do you weigh in on everything within 200 feet?
Speaker 4 (01:38:02–01:38:10)
Yeah, I think that I have concerns about the terrain.
Speaker 3 (01:38:10–01:40:00)
I don't think it is within our jurisdiction. Certainly we do have an interest. And I have a question. Yes, yeah.
I'm a huge supporter of this project. I was a former participant in the farmer's market and loved that area when my girls were babies and very excited about this proposal, especially the fact that you're saving the beach street. But I've also lived in town long enough to know that they don't last forever. And every time one of these legacy trees dies, I feel like a little part of my soul dies with them.
And I mean, including the one right around the corner from where we are now on the corner of Fairbanks that just came down a couple of weeks ago. So I'm curious and I'm wondering, I'm asking this question because I think that there may be other people at town meeting that have this question as well. And that is, what would happen to the vision of this space if that beech tree was not to live another 100 years? It may, but the design is sort of using that as a focal point.
Speaker 11 (01:40:00–01:41:42)
Well, it's not necessarily a focal point. It's just a constraint. Because we want to keep it. And so we're using its roots as our constraint for how we create the site.
And we have decided to remove the oak tree because of its condition and the challenges that come out of youth. And so we want to preserve the beach tree. So we're sort of like saying, OK, guys, let's make a decision which direction we want to lean, and we're leaning towards saving the beach tree. If the beach tree dies and declines, I think then that's just sort of the nature of urban parks.
I mean, it sort of happens all the time. The design, I think, has a lot of flexibility because we have this space that's being created for public gatherings. That is essentially the oak trees, more or less in the center of that space. And then there's this sort of, we call this sort of the garden or wild space that's sort of closer to the parking lot.
And so if that tree passes on, there's other species of trees that were shrubs and trees that are being planted down there. And so it'll just turn into more of a gardens type space. But yeah, the evolution of parks is an interesting concept and it's been discussed by landscape architects for many years. But taking that into consideration in the design, I think this park has the flexibility to do that.
Speaker 2 (01:41:46–01:42:53)
All right, any other comments, questions? So, thank you. Thank you for coming tonight. And Scott, thank you for assembling a rich and…
We're already there. Well, no, we appreciate it. Thank you. All right, so I think we have our agenda for the 16th.
I have the date, right, Jenny, right, the 16th? The 16th. Tuesday, December 16th, yep, at 7 p.m. Probably back at our normal meeting room, I would think.
Well, we can ask for it. Do people like this room? All right, let's ask for this. Let's make this our normal meeting room.
I like it. I like it. Yeah, I do like this room as well. Yes, yes.
Yeah, no, definitely. As long as we figure out the echo.
Speaker 4 (01:42:53–01:42:58)
Well, yeah. So will you remember next time?
Speaker 7 (01:42:59–01:42:59)
No.
Speaker 2 (01:43:00–01:43:55)
I can almost guarantee that. So yeah, I'm getting to, so we'll, so seven o'clock, hopefully here, but I'll confirm that on December 16th. Pete, I think was just about to ask about the walk, site walk, and that's my fault. My schedule kind of changed.
So I have not, I initially sent an email to Marita and I didn't hear. I didn't hear back, I don't think, I don't know if I, but whatever. She's lined up for Saturday? I didn't know that.
It's not posted, so it's too late. It would have been posted by today. I'm sorry, I didn't,
Speaker 5 (01:43:56–01:44:05)
to discuss it, right, Kathleen? If there's no discussion, and if there's somebody pointing it out, what's there?
Speaker 14 (01:44:05–01:44:08)
That's my understanding of it. I mean, you can't talk to anybody.
Speaker 2 (01:44:08–01:44:15)
You can't talk to anybody. But we already, I mean, it's actually, it lines up for that because we've already made the recommendation. There's nothing to discuss, right?
Speaker 5 (01:44:15–01:44:16)
There's nothing to vote on.
Speaker 2 (01:44:16–01:44:24)
We voted on recommending that project, so. Yeah, what time? Okay.
Speaker 8 (01:44:24–01:44:27)
Oh, I didn't, yeah, I didn't see that, so. I'd love to do that.
Speaker 2 (01:44:28–01:44:37)
All right, so it's on. So this Saturday at 10 a.m.? 10 o'clock at Winter Valley at 10 a.m.
Speaker 4 (01:44:39–01:44:45)
Okay. And we'll meet by the community building right next to the gardening and living offices.
Speaker 2 (01:44:45–01:45:00)
Okay, okay. And we will not debate anything there. All right, Rob, thank you for weighing in from Pittsburgh or wherever you are.
Speaker 6 (01:45:01–01:45:04)
New York right now. New York. Be home tomorrow, yeah.
Speaker 2 (01:45:04–01:45:13)
All right. All right. Safe travels. I was going to get a motion to adjourn, but Pete, did you have something else?
Speaker 4 (01:45:13–01:45:23)
Well, we had an item on the agenda. that supported project, but I guess we're going to hold that for the 16th.
Speaker 2 (01:45:23–01:45:25)
Yeah, for the 16th, I think.
Speaker 8 (01:45:25–01:45:34)
Yeah, I'm a little troubled about saying that, you know, we'd have the fire station committee in because they don't have an application.
Speaker 2 (01:45:35–01:46:01)
I think people, the members had to express, I think, just a desire to hear their current thinking. You're right, we don't have an application. We can, I don't know if it's appropriate to have them in. I can attempt to have a more detailed conversation with Brian and to see what their, and then relay that to hear.
That might be more appropriate, frankly.
Speaker 8 (01:46:01–01:46:16)
I understand about that. standing up in science. So we had a long chat about the fire station. And it clearly is the intention to preserve most of it.
And given the history of the building.
Speaker 2 (01:46:17–01:46:35)
I think everybody knows this, but there's only a small, well, I don't want to say small, but there's only a portion of that work that we can. So basically anything interior, we can't support. It is. Exterior.
Speaker 5 (01:46:35–01:46:43)
Yeah, yeah, no, I'm. You know that they were allocated to do 3 stations and they've spent 1, 2. Yep.
Speaker 2 (01:46:44–01:46:45)
Yep.
Speaker 5 (01:46:45–01:47:16)
Yep. But just there's no funding. And so, you know, if we're thinking about, we're going to the town will be looking at that service override for that. The CPC, you know, that's one of the reasons, or one of the things that was part of the pitch to the residents was, you know, to help the fire station.
So I do think it's worth seeing if they plan to apply in the next round. and if they've done a budget that shows what the preservation portion is?
Speaker 2 (01:47:16–01:48:40)
Yeah, I can attempt to get as much information as possible on that. I think the other variable, and I agree with everything Cheryl said, as many of you know, I was part of that campaign and fire stations were front and center of every brochure that we mailed out and that type of stuff, specifically Atherton. Well, we thought we were going to do something. Yeah.
Right. We took a picture of that building, the building that's still… We took a picture of this building. No, the auxiliary building.
The chemical building. The chemical building. Thank you. Thank you.
No, what was I going to say? Sorry, it just blanked and says, oh, well, the other, you just mentioned the other variable, which is gonna be really hard to predict is regardless of this committee's inclination to fund Atherton, they're gonna need a debt service override that's gonna require a vote of the town. So that doesn't mean we don't support it and don't fund it, there's a lot of variables before they get to, you know, when's the right time for them to bring that? You know, when are they planning on doing that?
Does that pass?
Speaker 8 (01:48:41–01:49:38)
So, all I'm saying is kind of I'm in your camp of… You can have projects like this one, for example, where, you know, we vote the 750, town meeting votes it, and nothing happens. What happens to happen then is you have to go back to town meeting and rescind the earlier vote. That definitely happens with the borrowing.
We can vote to do it and the town could vote to the borrower. Then they don't get the capital money or they don't get this, they don't start. And so we'd have to go back, we just have to go back and rescind that vote because otherwise that money sits there in our debt, I mean our cap of what we have. So we have to go back and, you know, at Plymouth we used to do it every, every couple of years.
We'd have to go back and rescind, you know, six votes because nothing, you know, the project never happened.
Speaker 5 (01:49:38–01:50:24)
I want to just be clear about the My concern about their budget is I reviewed their budget and I met with them and I think it's going to be hard to get to 1.2 without any changes to the design. There's just only so much you can do with the materials that you change and so forth. And so I said it's a challenge. Well, I do think it's a challenge.
Unless they plan to get more and more out of the public bid, the cost will drop. Just the same scope will drop if it's out of the public bid and they get that done through the private. But there's a certain limit to how much can be pulled out. I don't know if they can do that.
Yeah, they can do like the landscape, right?
Speaker 14 (01:50:24–01:50:42)
Like plant materials, doesn't have to be public bid. $60,000 worth of shrubs and trees. 900, that's not enough. That's not enough.
$950 for a lava viding.
Speaker 4 (01:50:42–01:50:52)
That's ridiculous. There's a lie in that thing. I mean, there's almost no contingency. And you're not making any money.
Speaker 5 (01:50:52–01:51:21)
They're removing trees along a property line on a wall the town doesn't own and the roots are probably under it. You need a contingency just for the wall. My point is that the funding, as Kathleen said, if they don't get all of their funding, and I really think they're looking at a larger project, where does that leave us?
Speaker 8 (01:51:21–01:51:43)
Well, I mean, as I said, we vote. This happens all the time. You vote it. It's the authorization is there.
The money doesn't go anyplace. And after a couple of years, when it's nothing's happening, we have to go back to town meeting and listen to find it. Does it go out to get funded when you voted? No, no, not till you need it.
It's just the authorization.
Speaker 5 (01:51:44–01:51:52)
Not the action. But then you still have to hold that money aside each year then? No, you don't.
Speaker 8 (01:51:52–01:52:14)
But it affects the treasurer in terms of when you report to DOR about what your debt limit is. And so we have this authorization, which we've never exercised. but it sort of affects what the borrowing, the rest of the town can do for borrowing is because there's the potential to borrow this.
Speaker 5 (01:52:14–01:52:24)
So let's say like they don't raise money for two years. Let's say it takes two years to raise the money. Yeah. And that means like next year, do we have to hold the 90,000 or whatever?
Speaker 4 (01:52:24–01:52:30)
No, no, we don't. We don't. it's taken off the town's ability, the town every year.
Speaker 8 (01:52:30–01:52:54)
Your rating, your bond rating is X. You know, your bond rating is X and you've used some of that rating cap for potential. So it affects our bond rating to have all that stuff sit out there as a potential borrower. It's like you, when you have a HELOC, but you haven't drawn on, you've taken the debt.
We haven't used it and you're not paying anything on it, but it's affecting your, your credit.
Speaker 5 (01:52:54–01:53:07)
So, would they start this project without it being fully funded? I don't know. I mean, that's going to be a question. I think they.
On a public, public portion of it now.
Speaker 2 (01:53:07–01:54:01)
Yeah, I. I mean, we will have this debate. I, I have confidence in this team. If we, if we vote 700, if town meeting votes 750,000 for this project, this project is going to happen.
I have confidence in the team. It's that's a huge commitment. They're going to make it happen. He's assembled some of the heavyweights in town.
And Scott, himself has invested three or four years of his life on this. And I can't see it not happening. It might happen with some of the changes and cost shaving that that you're recommending even. But I, I can't see.
You know, I can't see. It's got too much support in town.
Speaker 14 (01:54:01–01:54:06)
It's wild. It's the whole village. Yeah. Yeah.
Just like he just bought the associates.
Speaker 4 (01:54:07–01:54:10)
Oh, he did. Which one?
Speaker 14 (01:54:10–01:54:24)
I thought the Mississippians. The big, the big brick. Oh, the big one? You're kidding.
Wow. He owns the Bank of America building. He owns the Millacross Street. He owns most of the block on the opposite side of Paris.
Speaker 8 (01:54:25–01:54:25)
Wow.
Speaker 2 (01:54:25–01:54:25)
Right.
Speaker 8 (01:54:25–01:54:26)
What, he bought that?
Speaker 2 (01:54:26–01:54:43)
Yeah, his his his presence tonight was significant in my mind in terms of he didn't sign the support letter that we got. No, no. That was just a logistical thing. But he he yes, this guy had said, no, J.D.
's signature is not on it, but he's signing it actually literally tonight.
Speaker 8 (01:54:44–01:54:52)
So so that's and I didn't know. Yeah, that's amazing. You just bought that within the last month. Yeah.
I mean, I know that Bank of America project.
Speaker 4 (01:54:52–01:55:20)
So do you want this with that? I mean, he might as well go right up the street. Can I ask you a question? Last time I talked to Brian about the station, he said the committee was considering demolishing that station, building a whole new building and property behind it.
Has everybody heard that?
Speaker 2 (01:55:20–01:55:22)
Yes, I heard that. I heard the same thing.
Speaker 14 (01:55:23–01:57:04)
the flood station building committee a month or so ago, and that was one of the things that was floated. What was floated was building there in equivalent to the East Mountain Station on land behind the existing building. There is enough land to do it. Alan Hanselaw, who's on the Historical Commission and the Five Station Building Committee, said the issue with that is the land slopes down steeply, and it would make it difficult for the trucks to get going up the hill.
The other wrench that gets thrown in is MassDOT. wants to discontinue Bradley Road behind the station, loop across the connection with Avedon Street. So it's a four-way intersection. Oh, wow.
Five. And that virtual public hearing conflicted with this meeting. So, I mean, and they floated this idea a couple of years ago. And the vital problem is there.
Well, wait a minute, you're going to take our land away. We're going to give you the piece that's on Bradley Road. Well, we were going to build something there, says the chief, and this is a couple of years ago. And I'm watching, you know, but how is he going to build?
Well, apparently in the back of the mine is… build a new station, a bigger station, you know, we can't get along with one bag, we need two, because maybe we need a brush truck, or maybe a tanker truck.
Speaker 5 (01:57:06–01:57:20)
So I have, Ellen messaged me on Tuesday, we had a meeting on Tuesday, and I asked her if Demo African was still on the table, and she said no, as of Tuesday. So, okay, that's good to hear.
Speaker 14 (01:57:21–01:57:23)
Now, what do you mean by on the table for changing this?
Speaker 2 (01:57:23–01:57:25)
Are they still considering?
Speaker 8 (01:57:25–01:57:33)
Yeah, I mean, Brian had told me that a month ago that there was no way they were going to tear it down.
Speaker 2 (01:57:33–01:57:40)
He, I think, recognizes that there's a lot of support in town for saving the structure.
Speaker 8 (01:57:40–01:57:49)
Well, he was telling me the whole history of it. That got funded by the Salton Shoals after they lost a child, a three-year-old in a fire.
Speaker 14 (01:57:50–01:58:45)
They lost a three-year-old child in 1901. And the town report for 1901 lists all the fires. And on this particular one, there's a little notation that a three-year-old girl was badly burned and died three or four days later. In the 1902 Town Report, there's a notation that there is now a house and equipment of Aberdeen Street and Bluefield Avenue, making Milton right up to date with the best fire service of all the towns.
Because they donated the land? There is a plaque in front of the station facing the station, not reading from the Hill Avenue, but facing the station, indicating exactly that, that they had provided the funds because it took too long for the equipment to get there.
Speaker 9 (01:58:47–01:58:48)
Right. Yes.
Speaker 5 (01:58:48–01:58:58)
Any update on staffing or anything? Can we discuss that now or not? No, we can't discuss it.
Speaker 2 (01:58:58–01:59:16)
No, we can't discuss it. Possibly. Okay. Yeah.
Speaker 8 (01:59:17–01:59:20)
So we invited Johanna yet for the 16th?
Speaker 2 (01:59:20–01:59:23)
No, but I will.
Speaker 6 (01:59:24–01:59:25)
Did we have a motion to adjourn?
Speaker 1 (01:59:26–01:59:26)
Not yet.
Speaker 2 (01:59:26–01:59:48)
No. Can you make one? Yes, please. So the motion, we now have to take a roll call.
Rob? Yes. Cheryl? Yes.
Steve? Yes. Robert? Yes.
Wendy? Yeah, Wendy. Let's skip Kathleen. Kathleen?
Yes. Wendy?
Speaker 4 (01:59:48–01:59:48)
Yes.
Speaker 2 (01:59:49–01:59:56)
Pete? Jenny? Yes. Tom?
Yes. We're adjourned. Thank you very much. Thank you.
See you Saturday. See you Saturday.