Transcript
Auto-generated; may contain errors.
Speaker 1 (00:50–00:51)
Good evening.
Speaker 2 (00:52–01:18)
Call the meeting to order the Milton school building committee. It's December 16, 2024 at 7. Oh, 4 PM. As we start each meeting, we'll start with a roll call of attendance.
John Cohen here. Mark Loring here. Scott Tereshack here. And then online, we have Tim Lombard about to be in person too.
Correct. Present. Thank you. Carrie Hurley.
Speaker 3 (01:19–01:20)
Present.
Speaker 2 (01:20–01:21)
Selena Miranda.
Speaker 3 (01:21–01:22)
Present.
Speaker 2 (01:23–01:49)
And Akra Abom. Present. Perfect, thank you. So second thing on the agenda as we do each week is citizen speak.
We reserve the first 15 minutes of the meeting for any citizens that would like to speak. We ask that you limit your commentary to three minutes and please state your name and address. And the first one we have up is Ada Rose Marin. Ada, you're recognized.
Speaker 4 (01:53–01:54)
Hi, can you hear me?
Speaker 2 (01:55–01:58)
Yep, we can hear you. Just name and address, too, Ada.
Speaker 4 (01:58–03:12)
Ada Rosemarin, yep, Ada Rosemarin, 32 Columbine Road. Hello, everyone. I just came to say congratulations and thank you. Congratulations on the invitation into the MSBA funding program for school buildings.
Fifth time was a charm. Thank you for your persistence in making the case about the need to address severe overcrowding in the Milton Public Schools. Your ability to stay on multiple tracks to pursue different options that became available over your years of work together has paid off. There are bound to be more forks in the road before this school is finally built, but your team has the needed skill set, is focused on addressing challenges, and you have strong leadership with Chair Shawna Rourke and Vice Chair Mark Loring.
Milton is in good hands with you all. Thank you for your hard work over these past six years. We appreciate all you've done to reach this moment and recognize the work you have ahead. Milton will be a better place with your efforts and our kids will be the beneficiaries.
Thanks again and keep up the good work.
Speaker 2 (03:14–03:48)
Thank you, Ada. Nobody in person. Let's see if anybody else raised their hand. Give them a minute.
All right, moving forward. Agenda item number three is approval of past meeting minutes. Our last meeting was last week, Monday, December 9th, 2024. It was in everybody's packets, so just pause and see if anybody has any edits or comments to last week's meeting minutes.
Speaker 4 (03:48–03:53)
Yeah, the camera's off. Do you see there's a check here that…
Speaker 5 (04:09–04:13)
Make a motion to approve meeting minutes for Monday, December 9th, 2024.
Speaker 6 (04:13–04:14)
Second.
Speaker 2 (04:15–04:26)
Second by Kerry. Any discussion? Hearing none, roll call vote. John Cohen?
Yes. Mark Loring? Yes. Scott Karaschak?
Yes. Kerry Hurley?
Speaker 3 (04:27–04:27)
Yes.
Speaker 2 (04:28–04:29)
Selena Miranda?
Speaker 3 (04:29–04:30)
Yes.
Speaker 2 (04:31–05:05)
Tim Lombard? Abstain. Akbar Bal? Yes.
And yes, all right, I don't for a msba updates we got a couple of things under there 1st is to review and discuss the msba board meeting so I'm sure everybody's aware at this point. We had a formal invitation to the eligibility period for MSBA that was extended to us last Friday. Superintendent Burroughs attended that meeting. I wasn't able to attend.
Speaker 7 (05:05–06:16)
Yeah, it was great. We had the opportunity to just thank the board and everyone at MSBA for allowing us into the eligibility period. There were a number of other districts present too. each superintendent or sometimes the mayor of the city that was coming into MSBA shared just a brief thank you and since that time we've been communicating back and forth with MSBA trying to understand a little bit more based on where we are and the work that we've already done, how does that situate us and I think as you all know, it's fairly lockstep in some ways, but it seems like the capacity we've built over the years is going to be huge in going through this process.
It's been exciting just to learn more and figure out what we'll be doing. The eligibility period begins May 1st. There's some work that we can do before May 1st, but there's some that we also have to follow the MSBA timeline and I think there'll be a lot of learning that we do in the next couple of weeks related to that.
Speaker 2 (06:17–07:18)
Any questions just on the meeting overall from anybody? Exciting. It is exciting. All right, so leading into that, now that we've been invited in, as we discussed last week's meeting, there's a number of things that are going to be coming up.
So in preparation for the invitation that's on May 1st, we'll essentially enter into what's called module one from SBA, which is their eligibility. Yeah, eligibility and feasibility is the next one. So with that, essentially, do you want to, do you guys have anything else on? I can pull it up just to kind of walk you through it.
Speaker 8 (07:19–07:26)
Actually, I don't see anything else. I thought that, right.
Speaker 2 (07:27–10:52)
Yep. So yeah, so within module one, there are a number of marks that we have to hit along the way. So the first one is the initial compliance certification due 30 days out. Essentially, it's a form that MSBA offers that basically requires three signatures.
So that one should be hit on the first 30 days. 30 days later, or 60 days from when we started, we have the formal school building committee. So, as we discussed at last week's meeting, there are certain roster positions that MSBA requires that I think Mark talked himself right. There are certain MSBA roles that we have to fill.
The previous formation of the school building committee was a warrant article that was offered by the school committee in February 2019. So we will not be offering that as an article because it was previously authored by the school committee. We're going to have the school committee author the article to augment this committee. So, essentially, the role of it is to keep this committee as is, and then just augmented with additional staff members to fill out.
So, you, if you watch school committee meeting on Wednesday night, you'll, you'll see the draft of what they're proposing for that and do that. And then, you know, as as we walk through, there are additional things in there that is going to require input from the district education profile questionnaire online enrollment projections. So. The enrollment that we were using previously, this is a keynote.
You know, we determined what the enrollment was when we were doing the feasibility study with our street. We told them sites in school for the site sites, preschool for the size. MSBA will walk through and do an enrollment on their own, and that will be the baseline for what we're going to use as we get through eligibility into feasibility design. The maintenance and capital planning information is, that only takes a while.
There's a lot that goes into that. We're going to lean on Tom McCarthy a lot for some of that. And basically what they want to see are what your assets are, how you maintain them, so they know that the future money that they're going to put in there isn't going to be well taken care of. The second to last one that's there is local vote authorization for essentially a feasibility study.
And we're going to talk about the warrant article that we'll be proposing for funding of that feasibility study. So that one, even though they give you 270 days, we're going to hope to get ahead of that by next February and have it completed and done. So, while module 1 gives you a 270-day window for the overall project, I think we're going to be progressing through it fairly quickly. My understanding of the May 1 invitation from MSBA is they do that to align it with the town meetings that the town has.
So, we have our annual town meeting typically in May. So, they look to have the invitation on May 1st. So, it's a lot of me talking. Open it up, see if anybody has questions or anything like that in regards to, you know, module 1.
1, 2.
Speaker 9 (10:59–11:05)
Like, when you would be sworn back in then. Because there would be technically the formation of the committee.
Speaker 2 (11:06–11:21)
Yeah, for. So, no, I don't think so. You're talking sworn in by the town clerk, like we were originally? Correct.
I think the original members would be fine. I think the new members would have to be sworn in. If they want to do it all again, fine with that too.
Speaker 8 (11:23–11:27)
Yeah. It wouldn't be like the last time we did it and they were assigned by the moderator?
Speaker 2 (11:28–11:31)
So, I think, I don't know yet.
Speaker 5 (11:31–11:48)
It depends on the way we construct the warrant. adding on to the existing school building committee. It's not reforming the existing school building committee. So it's reforming, it's editing the existing one versus creating a new school building committee.
Speaker 2 (11:49–12:03)
Yeah, and like I said, I don't have the details of the specifics on it right now. It's all, the school committee is working on that right now. They're going to be talking about that Wednesday night when they meet in anticipation. They're going to take a vote on it too.
Speaker 8 (12:03–12:06)
Reading initially, they're pretty rigid about their,
Speaker 2 (12:06–12:08)
Oh, yeah. MSBA. Yeah.
Speaker 8 (12:08–12:09)
Yeah.
Speaker 2 (12:09–12:09)
Yeah.
Speaker 7 (12:09–12:16)
So that certain people are required. Yes. Yeah. Yeah.
So I'll be on it. Nick will be on it. Yeah.
Speaker 8 (12:16–12:21)
They even mention local rules and regulations and following them and such.
Speaker 2 (12:22–12:25)
Yeah. Aqua, you get your hand up. You're recognized, sir.
Speaker 10 (12:27–12:50)
Thank you. It seems like we've worked on this for five years. Is there anything we can pull from our previous work that could help facilitate or move the process any faster? I know you're already talking about the committees and all that.
Has that been identified or is that something we will discuss later on?
Speaker 2 (12:51–14:23)
So that will be some of the discussions we're going to have with MSBA as we start engaging with them. We were just invited on Friday, so we're trying not to overwhelm them too much right now. But I think internally within the town right now, we're working to kind of align everything so we hit the ground running. I mean, most communities don't already have a school building committee formed, right?
They don't have the work we've already done. So I think some of the work we've already done, it will get redone again, which will be good because it will essentially provide a pressure test that I think some citizens were looking for, for that. And then, yeah, we have to go back and there'll be some redundant things that we have to do. So we have to form a team again.
So similar process of interviewing OPMs and selecting an OPM, we'll be doing that. Um, 3 of us, or there are 3 representatives that will sit on a 15 member board. On the designer selection committee that will. Again, here interviews for architects and engineers and, you know, weigh in on which 1 we want and that's essentially gets into model 2.
Um, but. as we get through that, there's no harm feeding in some of the work that we've already done, our concepts there, to help educate whoever we bring on the team to, you know, again, help them hit the ground running, too. I hope that answers what you're looking for.
Speaker 8 (14:24–14:58)
I did see, too, I looked up, and in 2023, in the invite stage, Needham itself had a were approved for feasibility in October. So and there was only two that did that. So that to give us an idea of what's an aggressive schedule, us being approved for feasibility by this October would be You know, I reached out to them, and I'm going to talk to somebody over there to see what they did. You know what I mean?
Because that was a quick turnaround.
Speaker 2 (14:58–15:02)
Those two. Yeah. So you're saying I reached out to those schools over there? Yeah.
Speaker 8 (15:02–15:03)
Yeah. Yeah. Yeah.
Speaker 2 (15:03–15:05)
Yeah. I mean, they could see what they did.
Speaker 8 (15:05–15:20)
Because like I said, they were the, of the 19, only two of them made it. And it was Needham and South Hadley. And Needham actually had the same date as us. They had a May 1 commencement date.
So they were exactly the same.
Speaker 2 (15:20–15:28)
And so, Aqua, does that answer your question? Just making sure. Yes, it does. Thank you very much.
Speaker 11 (15:29–15:31)
Yeah.
Speaker 2 (15:33–16:12)
Any other questions on feasibility studies or anything with Module 1? James, can you bring the agenda back up? Sorry about that. So the other one, you know, PMA was kind enough to kind of run through essentially a proposed schedule for us as we enter into MSBA, just to give everybody an overview of, you know, what this process, module by module, is going to look like for us.
Sean, do you mind if I turn it over to you to dive into it?
Speaker 6 (16:12–16:16)
Sure. Can I share a screen or do you need to?
Speaker 2 (16:16–16:19)
I'm going to make you a panelist.
Speaker 1 (16:19–16:22)
Um,
Speaker 12 (16:52–16:54)
It's going to be a little hard to lose if ever needed.
Speaker 6 (16:55–18:23)
Home might have a little easier time. So we just put together a schedule for the MSBA process. I have feasibility starting today. That's going to have to get pushed out until that May 1st date.
I put in the 270 days so that we can do better than that. I think the town should be able to not use all of that time. That's the limit, and I think most towns do it in a shorter time period. So maybe that September 8th, finishing that would be the correct time.
Through that process, you just have it on the screen, all the different things you're going to spell out, and then you're going to get into OPM selection. So assuming that you're going to start that in the fall, you'll do an OPM selection, you'll do designer selection, and then you'll start with their module, the feasibility module, which the first phase of that is the preliminary design program. And then we've spelled out the preliminary design program here, the preferred schematic report program, We have some items in here for permitting and some other items that we do early on in the process, finishing up with your schematic design, and then ultimately the project funding. So if you get in to the MSB and get them approved and start your OPM selection in September of 2025, we're looking at project funding sometime winter of 2028.
Speaker 2 (18:25–18:31)
And when you say project planning, you mean the full project planning, right?
Speaker 6 (18:33–18:54)
That's kind of a standard timeline with MSBA. Obviously, some of this will have to change because of MSBA board dates, depending on where you have to align it, because this far out, they haven't even set their board dates for that. Also, town meeting, if you're going to have one in April or May, do you target that or do you do a special in the winter or as soon as possible? So those are all down the road discussions that the committee is going to have.
Speaker 8 (18:56–19:05)
And they even stated in their letter that the project's open budget shall be no sooner than July 1, 2027. So that's right even in their letter.
Speaker 6 (19:07–19:40)
Right. So yeah, you're not going to be able to, well, you can actually go for town funding before that if you want. But typically, the project funding agreement will set your budget. And oftentimes, towns decide to forego the vote until the MSBA signs off on that project's open budget.
But it's a, you know, this is up on the shared drive friend and then wants to see it. I will update this as well and rerun it with the May 1st date just to show you kind of the accelerated and then a best case scenario.
Speaker 8 (19:40–19:42)
Oh, that's not May 1st.
Speaker 6 (19:42–20:06)
No, I have it as Friday. When they select you, I didn't realize they're going to make you, at the time when I was doing it today, I didn't realize they're going to make you wait five months. But I also do believe you can do it faster than 270 days. So we can kind of use this as an early schedule, use the other one as a later schedule.
And then as we have further discussions with the MSBA, try to figure out what's the best fit and where we think we can actually achieve.
Speaker 12 (20:08–20:10)
of where we are today.
Speaker 6 (20:11–20:36)
So right now we're basically at the end of SD. So we would be submitting right now to the MSBA with our SD package, or we would have done that a month ago or when the SD package was ready back in October. And that submission right now is scheduled for mid-November, 2027.
Speaker 8 (20:41–20:44)
And as we've done so far, it greatly helps.
Speaker 6 (20:46–21:21)
Yeah, it should. I mean, it's not going to hurt you for sure. But as everyone has said, and I think we'll keep reiterating, the MSBA is a, it's a process you've gone through the website, you've seen everything. They're going to make you, in my understanding, is going to make you tick all the boxes.
So it would be good once we get rolling and once they kick off the project and you have conversation with them to ask if there's any way that we can If anybody knew what the information we already had, I suspect they're going to make you do your full submissions on the PDP and then the PSR and go through your site selections and show them the due diligence you've done, document that for the state level.
Speaker 8 (21:22–21:30)
Plus we're working with their new designer at that point, right? I mean, when assigned by them. one of their list.
Speaker 6 (21:30–22:45)
Yeah, so the way that designer selection process works, yeah, so it's technically you go through their designer selection panel. This committee will have three votes on that panel, and I believe we have about 15 others. 12. 12.
15 total. 15 total, okay. So they will, you'll go and you'll interview with the MSBA designers who you've shortlisted, and then you'll do an initial round of interviews, or an initial round of review of the submissions, and then you'll do a shortlist. You'll decide with the MSBA who you're going to shortlist, and then they'll have the actual interviews.
And you will be allowed to speak and tell them who you like, why you like them. And ultimately, it'll be the majority vote of that committee, of which is honor. In the past and historically, we've been able to kind of coach towns and to make sure they get who they want. And we've had a pretty good success in doing that.
I don't think we've ever had a town that of signs on the paper that wasn't their number one choice. It's been close in some votes, but I think the MSBA listens. And as long as you present to them why you want to go with the designer, they're usually pretty okay with voting in your way. But that's still a ways down the road.
So it's not to say you're going to have a new designer. You could have the same designer. You could have a new designer. It just depends at that point in time.
Speaker 8 (22:45–22:47)
So we could stay with Aerostreet?
Speaker 6 (22:47–23:01)
You could. You'd have to. My understanding is you would have to interview them. They'd have to go through the designer selection process, and they would have to be voted and approved by the designer selection panel.
But assuming that they do that, then yes, you could continue with the same design.
Speaker 5 (23:01–23:03)
I'll never select it. Yes.
Speaker 6 (23:03–23:50)
And they, well, the other thing too, if they have capacity to do the work as well, you know, things change over time and it depends on how busy they get. Um, and they're not going to keep a slot open for a year and a half while they wait. Um, but if the time comes and they have the ability to open at the time, if they're open at the time, I hope that they would pursue the project. Yup.
And that goes the same with EOPM. You're going to have to, my understanding is they're going to, you're gonna have to go through their process and which is less rigid than the design of selection panel. There is no OPM selection panel. You interview and you vote on who you want for an OPM and then that OPM goes in front of their MSBA board for approval.
But it's not a, at that point, you sit in front of them, you tell them, here's our capacity, here's what we're doing, here's why the town will explain why they'd like to.
Speaker 8 (23:50–24:01)
And they only ask about ours. So my understanding was you're on the list, but they're not on the list. like the approved list of designers for MSBA? No?
No, I think they've done it.
Speaker 9 (24:02–24:15)
Oh, yeah. Yeah, yeah. OK. I thought I saw it.
OK. I was under the impression that everyone who shortlisted was on the list, specifically for that reason that we were all, I mean, Sean, I think you said we were always pursuing dual track, right?
Speaker 2 (24:16–26:03)
Right. But so the process that we did for selection on our own, right, we mirrored MSBA for the language in the advertisements, the RFPs and stuff like that, the process, it just wasn't an open panel for MSPA to sit on. So this time, where before, so we're gonna go through that same exact process to onboard OPM, right? So there's gonna be a number of smittles, they're gonna come in and give presentations, there'll be Q&A, we'll go through that.
And similar to how we voted last time, I think we did a hierarchy of one, two, three, and whoever got the most one votes won. We'll then, so we're allowed to do that for the OPM. The designer end of it will only have three votes out of the 12. So, you know, we'll figure out who sits on that committee and then participate in there and see.
But the reality is there's going to be a whole other group of architects that are going to be interested in doing this. Arrow Street may or may not be one of them. If they are one of them, then, you know, give them an opportunity for us to do it. I still think they're going to have to come through, and again, because MSBA is so rigid, run through all the options, re-look at sites, re-look at augmenting schools, you know, and stuff like that.
And, you know, if they come to the same conclusion, or we look at different options throughout of it, I mean, that's essentially why the schedule gets so long, is we're going to go back and kind of review all this stuff all over again. And basically, by doing that, like I said, it's repressure testing the work we've already done. In the hopes of that too, not only is it good that we're getting funding from MSBA. It will alleviate probably hopefully some of the concerns of people thinking that we've been on the wrong road a couple of times on our own.
So it will be good.
Speaker 6 (26:03–27:07)
Those early conversations with the MSBA are very important to frame the project as well, to let them know why you're building. It's not that the buildings are past the usual life. It's overcrowding. And then really be honest about what you want to investigate as a program.
Because once they fill out that feasibility agreement, and they do the enrollment study and all that, you are required to study everything that they put in that, because that's what you told them you wanted to. So oftentimes, the district will go in and put a whole bunch of different options, multiple different sites, multiple different grade configurations, which is great. So you're open. But then when you get to the PDP, you have to study 25 different options.
You have to have costs. associated with those options, you have to explain them and do narratives and things like that. So it becomes a lot more work where if you have a more narrow view on what you want, talking through that with the MSP, and then they may be able to guide you to how to make it maybe a little bit more open, but because you don't want to be too rigid to your point, you want to stay open and have some flexibility, but you do not want to you have to do 25 or 30 different options in a PDP submission.
Speaker 8 (27:07–27:17)
I did see from the feasibility study reports that come out when they're invited in that towns had options. They showed that they still had options. You could see that.
Speaker 2 (27:17–27:44)
Yeah. Yeah. I mean, the big thing for me is on the invitation letter when we got it. That's still being a development from them.
We know you've done some work already. We want you to kind of keep going with that and look at it as one of your options, but still look at how to be open to other things. And they've enunciated that on multiple calls, which is good.
Speaker 6 (27:45–28:04)
Yes, as part of submission, just based on that, they want to see probably an ad reno of one of the existing sites. If it can support it or if it can't, they're going to want to share how it can support it. And then also they're going to want to see an elementary school on the new site and a middle school on the new site. And then any enrollment, different enrollment options you have, they'll want to see that on each of the sites that you've chosen.
Speaker 8 (28:04–28:30)
And I should ask this too, because this is in the invitation letter. I'm still digesting it. The invitation for the Cunningham Elementary School is for a continued co-location with the Collicott Elementary School, four grades, pre-K through five, and is for the continued co-location. expecting pre-k through five to stay at Cunningham?
You know what I mean?
Speaker 2 (28:30–28:37)
But if you need that, you know. If you do a true black and white legal language. I just, just saying, you know. No, no, yeah.
Speaker 5 (28:37–28:43)
See, I was just saying that either an additional elementary school, the feasibility study to examine an additional school.
Speaker 8 (28:43–28:57)
Granted, but the invitation is for the continued co-location with Collier College Elementary School of Grades. Those grades got to stay there. We can add new ones. But when we're done, grades three through five is still a cutting edge.
Speaker 6 (28:57–29:31)
You can change, it's a whole process, but you can change enrollments, you can change grades. I think the assumption is that that school isn't being knocked down or that school is not. This will be part of those early conversations in that 270-day period between the school department and the MSBA about talking about, okay, what's the plan here? What's your plan for your existing schools?
who's in your existing schools, and they're going to look at all the enrollment data and look at growth and all that, and then come up with the different enrollment numbers and different enrollment options.
Speaker 7 (29:32–30:03)
I know the letter stated that if you move too quickly and if you don't follow our guidance, the funding won't be there, essentially, which is like a… So I guess I'm wondering in terms of you were mentioning shortening the eligibility period. Do you have to check with MSBA at every little piece here to see like am I on track or not, or how, how will that work in terms of the MSBA kind of communicating you guys look like you're on track or.
Speaker 6 (30:04–30:37)
know, how did you end up there? Yeah, and they'll be in this process that you're going to now is usually before OPMs get involved because, you know, we know tangentially how it works because we know what the output is, but it's constant communication between the school district and the MSBA. You'll have a project manager, they'll be assigned, you'll talk about, you know, different options, and then you'll lay out a schedule. They'll walk you through it, they'll hold your hand, they'll make sure you hit all the dates, they'll make sure you They don't want this to fail.
They want you to go through the process. They want you to check all the boxes and they want you to move to the next step and they'll help you do that.
Speaker 12 (30:37–31:01)
Okay. What about the comments? What's your experience with that? Just the comment about invitation to the project scope and budget no sooner than July 1st of 2027.
Say we were ready in September of 2026. Does that mean we're just sitting in a waiting pattern? Does that have to do with how they provide their funding, or?
Speaker 6 (31:01–31:33)
I think that's exactly right. They're making the funding available for July 1st of 2027. I think it's a grant program, so they're trying to make sure that they have enough money to continue to fund the grant. So I believe that's why they put these time limits.
We need to go faster for the next year and a half. Yeah. I mean, the one thing is you can ask them. They're open, and they'll have conversations with you, but that's what Without a change of that and without some, we should probably take director level approval.
I would assume that that's the earliest that they would enter you to private scope and budget.
Speaker 12 (31:35–31:38)
You could always ask for partial funding to get going.
Speaker 6 (31:38–31:56)
Well, you may be able to get going. It's just they won't fund you until the private scope and budget. So there may be some opportunities. You may be able to do it at risk without, and then with the risk is that if they don't grant you the project funding agreement or something happens, then you're going to be out, whatever.
you put in prior to that happening. Yeah.
Speaker 2 (31:56–32:17)
And that ties in to a question I had is, you know, previously when we were kind of going on the other path, we were looking at almost two design packages, the roadway site package first and then the building package after. I'm assuming with MSBA that they wouldn't allow that type of procurement right up front, or would they just have to do everything at once?
Speaker 6 (32:18–32:27)
Meaning after the project planning agreement or prior to that? After. No, we've done it on multiple MSBA projects, no problem.
Speaker 8 (32:27–32:28)
After what date?
Speaker 6 (32:29–33:00)
So once the project funding agreement is in place, the methodology of construction and how you bid it, strategies, things like that, they've been supportive. You just let them know what you're doing, how you plan to do it. Budget funding is this July date? Yes.
So that sets your total project budget. You can increase the budget if you need to later on, but the MSBA will likely never give more money than the grant that they tell you you're going to give at that date. That's when they set their funding for the year, and that's making sure they have enough money to fund all the projects that are entering at that time.
Speaker 7 (33:02–33:21)
What is their margin of error for towns that, I mean, they're setting aside a certain amount of money, inviting a certain number of districts in, probably there's some assumption they make that 80% of these are going to get funded or I know like some go through this process and then don't get funded.
Speaker 6 (33:21–33:35)
I think they're for their budget and they're assuming that they're all going to, they have to assume that they're all going to pass. Okay. And then whatever money doesn't get spent either gets rolled into, it'll just get rolled into the next. Okay.
The next chunk and they'll give it out to the next community that comes asking for it.
Speaker 12 (33:35–33:44)
Or less. Even though if they go over then that next round of approvals probably is less. That's why it varies.
Speaker 6 (33:44–34:27)
They don't let in X amount every year. It changes year by year based on tax collections and what they have available. But that's at that time for project funding agreement, that's where they're going to lock in your reimbursement rate, that's going to lock in your grant. Typically, that's when you go and get the vote from the town.
Sometimes you do it early, usually if there's a presidential election, right before. Towns have done that because it's more than welcome to the ballot, but that's more of a strategy from the committee. If it's a non-presidential year, which it doesn't seem to be, it would likely be you get the private funding agreement and then you put something to the town for a vote.
Speaker 8 (34:28–34:35)
November 27th. November election would be the soonest after the July 1st date.
Speaker 6 (34:36–34:43)
We got to go to town meeting first right to get it approved to go on the ballot is that correct.
Speaker 8 (34:43–34:52)
So you might have to have a special Thomas, because we're talking like we're doing up. Yeah, you know.
Speaker 2 (34:54–36:31)
I mean, the good thing is, you know, I mean, it's good news, honestly, for everybody in the town. And I mean, it's you know, I know there was heartache or concern with the overall project budget. We had posted 173 million. I was one of them.
And I mean, it was, it was a lot of money. I think everybody was kind of shocked by what that was. But essentially, that's what instructions of The good thing now is we can lessen some of that through getting this reimbursement for eligible costs. So it's not a 45% reimbursement on the total project.
45% of eligible costs and I keep saying that so people understand it's going to get diluted down. Um, but, you know, it's an additional funding source. It provides a level of oversight that I think some people want to see on this project and stuff like that from a state agency. So it's a good thing there.
And then for me, this is a big step forward for us. We've been together. We're coming up on six years. And we've got land for it now.
We've got a program that we think's right that we're going to run through again. And now, essentially, we have partial funding from the state agency. So we're moving ahead. So I'm excited.
Speaker 11 (36:34–36:37)
It's going to be a lot of work, Peter.
Speaker 7 (36:37–36:44)
I'm feeling it, in a good way. It's nice to see a pathway. Yeah, that's exciting.
Speaker 8 (36:45–37:02)
reminds me of when I would land a contract and I'd go home and my wife would say, why aren't you ecstatic? Now I got to do it. The salesman's hat was off and now the contractor's hat was on, you know? And that's what we are.
I mean, great news, but.
Speaker 6 (37:02–37:11)
Now it's time to work. Well, not quite yet. May 1st. There's something you can do in advance of that for sure.
Getting yourself ready for that process.
Speaker 2 (37:11–37:27)
Yeah, just get it and start on and that's that's, you know, I think everybody's on board to do that. So, you know, I mean, the 270 day mark, we're not waiting for that, you know, 269 day running around trying to get all the paperwork and we're gonna be way ahead of that. So.
Speaker 8 (37:28–37:47)
Just like right now, I think, you know, we form the school building committee, and they can be doing all these things. Granted, they say no, what do they say? You can't pre-submit, but you can have everything lined up. Yeah.
Speaker 2 (37:47–39:56)
Yeah. Any other questions or comments on that agenda item? Okay. That's the end point of the agenda.
All right, now I can share my screen. So the agenda item 4B is review revised warrant articles based on MSBA 4B. So as we talked about at our last meeting, as I mentioned earlier, we're gonna have two warrant articles from school building committee, one augmenting the roster of us to align with MSBA. School committee has now taken that on, so they'll be talking about that and going through it on Wednesday night.
So if you're interested, tune in. Um, the other 1 that we have is, uh, we've talked about, uh, funding for feasibility studies. So again, for the 270 days, that 1 had a 270 day mark on it. We can get that done fairly quickly.
So we work with PMA, looked at what we thought would be a reasonable amount of money for a feasibility study. So I'll pull up the article. Nick sent it to me this afternoon. I forwarded it to everybody kind of later today.
We'll see and see. But it's similar to the other funding articles that we've had. So give me one second. So for this, what it does is it basically utilizes the language, similar to what we're going to find with MSBA.
Any of these articles that you have to do, they give you draft language. They give the draft language with fill in the blank here, program, address, town, stuff like that. And then amount. So we worked with PMA, you know, the anticipation of $1.5 million for the feasibility study, we think it's fair.
That will basically go to funding the project team once we get them formed in module 2. So leave it open to see if anybody has any questions or comments. We've got to get started.
Speaker 9 (40:03–40:06)
How is the dollar amount derived at?
Speaker 2 (40:07–40:41)
So what we did is, so at our last meeting I showed everybody the spreadsheet that MSBA has and we went through that and looked at similar programs that were there and dollar values. Right. Yeah. Yeah.
So if you go to MSB's website, they have their data from all the way back, like, 10, 15 years. Obviously, not using the funding. They used the basis of 15 years ago, because we would be in trouble. So working with Sean and Seamus, we've looked at it.
And basically, their recommendation was what they wrote down. OK. Thank you.
Speaker 12 (40:41–40:50)
And that's the potential feasibility studies. So that takes us through module 1, 2, and 3. I believe so.
Speaker 6 (40:51–40:57)
They bring it up to be a project funding agreement.
Speaker 8 (40:57–41:02)
Reach the feasibility study. So this is the money for that feasibility study at that stage.
Speaker 6 (41:03–41:05)
Yeah, bring it up to the town vote.
Speaker 2 (41:06–41:15)
Yes. So it goes to a feasibility study, then the schematic is out after the town vote. No, the schematic is out before the town vote.
Speaker 5 (41:15–41:23)
This will bring it up to the town vote. I'm not sure if funding the project after is going to be one.
Speaker 12 (41:23–41:31)
Yes. Yeah, that's Marginal 5.
Speaker 8 (41:31–41:37)
Isn't this funding that feasibility stage, that third Marginal?
Speaker 6 (41:38–41:40)
Feasibility and Schematic.
Speaker 8 (41:41–41:42)
Okay.
Speaker 2 (41:42–41:44)
For the 1.5 million?
Speaker 5 (41:44–41:44)
Yeah.
Speaker 2 (41:44–42:08)
So part of the language that we have in this, too, is obviously we want town council to look at it. I mean, this is our initial draft. As with anything, we recommend it up to the select board. It goes to the select board, and town council reviews it and basically makes sure we're covered for certain things there.
So if we have to include schematic sign as part of that for there, we can include that.
Speaker 8 (42:09–42:18)
Again, following their eyes and crossing the T's, they said that exact same thing, run it by legal counsel. You know, Tom, legal counsel.
Speaker 6 (42:19–42:21)
They do that with a lot of stuff. They do that with a lot of stuff.
Speaker 8 (42:21–42:27)
Oh, yeah, they do. It's a fantastic site.
Speaker 12 (42:27–42:38)
Is that what they call it, feasibility study? Yeah.
Speaker 5 (42:38–43:15)
So the total contract amount for AeroStream. I just, I was worried that this is not, but for the schematic design and the study of the AeroStream, it was about half a million dollars. Yeah. So not on top of that, the OPM fee as well.
Yeah, 1.5. I was worried 1.5 wasn't enough. Yeah. I just want to make sure we're not cutting it too close that we're going to need to go back to Tom before we go back to Tom a third time.
Yeah.
Speaker 8 (43:15–43:19)
If you do even more recent, if you look at the existing accounts, it's similar, right?
Speaker 5 (43:19–43:29)
Yeah. I know at Arrow Street, we talked about the price that we were trying to get from that schematic was It's going to be tight because our budget was tight.
Speaker 2 (43:29–43:48)
It shows you the discount that Arrow Street kind of gave to us, too, for a lot of this work with the hope of being able to recapture some of that on the other one. So, Scott, if you go to the website here for feasibility votes, this is basically the language in the bulletin that they give.
Speaker 12 (43:50–44:09)
Actually, that's the bulletin. I apologize. That was a sample from MSBA.
Speaker 2 (44:19–44:23)
So this is basically the, this is what I was saying, insert stuff here.
Speaker 12 (44:24–44:30)
So basically this is an example that we use from SBA to come up with it, so.
Speaker 2 (44:30–44:39)
Yeah, I mean, that's part of the good thing. I mean, it's a framework that we're entered into and we just kind of follow them.
Speaker 12 (44:39–44:45)
So leave it open for everyone to just kind of review and take a look at it.
Speaker 3 (45:07–45:10)
Are you looking for a motion to approve this?
Speaker 2 (45:10–45:18)
I would entertain one.
Speaker 3 (45:19–45:42)
I'll make a motion to approve the warrant article 20 as stated. Second. to see if the town will vote to appropriate borrower transfer from available funds and amount of money to be expended under the direction of the school building committee for a feasibility study of a middle school or elementary school project.
Speaker 2 (45:46–45:50)
Good. I'll second. Motion's been made and seconded. Any further discussion?
Speaker 8 (45:52–46:02)
Can I just ask? Yes, sir. Which committee? There's under the direction of the School Building Committee, we have two of them now, right?
No. No?
Speaker 9 (46:02–46:02)
Could it just be one?
Speaker 8 (46:02–46:06)
What's the one for the MSBA?
Speaker 9 (46:07–46:10)
No, it's just for automating the existing committee.
Speaker 8 (46:10–46:17)
Oh, I see. Okay. I didn't understand it.
Speaker 2 (46:17–46:19)
Any other questions, comments?
Speaker 12 (46:20–46:27)
Okay. I'll stop sharing. And we'll go to a roll call vote. So John Boehme?
Speaker 8 (46:27–46:27)
Yes.
Speaker 2 (46:28–46:34)
Mark Warren? Yes. Ken Lombard? Yes.
Scott Bereshek? Yes. Carrie Hurley?
Speaker 3 (46:34–46:35)
Yes.
Speaker 2 (46:36–46:36)
Selina Miranda?
Speaker 3 (46:37–46:37)
Yes.
Speaker 2 (46:38–46:46)
Like I said, I think Aqua's dropped off, so he was on earlier. And then myself, yes, unanimous. Congratulations.
Speaker 12 (46:50–46:54)
Did you pull the agenda back up? Sorry.
Speaker 2 (46:58–47:46)
I think we're good for this year. I don't believe that any. Actions more committee or anything like that between now and the end of the year. Um, so we want.
Scheduled date sometime in January. That works for people if you want to leave a TV for now, and kind of coordinate as it comes up, but it might make sense. Just. going on the calendar.
Speaker 8 (47:46–47:52)
You might say tentative, because don't you have the next board meeting, I think, is January 13th.
Speaker 5 (47:52–47:57)
You might want to meet before that. You might want to meet before that. The next slide board meeting? Yeah.
On the 14th.
Speaker 8 (47:57–47:59)
13th or 14th. Is the 14th the 13th?
Speaker 5 (47:59–47:59)
Yeah.
Speaker 8 (47:59–48:01)
That's the next one.
Speaker 2 (48:01–48:46)
I don't know. I'm just saying, whatever. It'd probably be good. Who knows what'll happen.
To Peter's point, to just put something on the calendar. So we're on the night before. Whatever. I'm fine with that.
So yeah, if you put January 13th. January 13th. 2025. And so last agenda item is item 7 in German.
So entertain any motion to adjourn. So moved. No discussion. Roll call vote.
John, go ahead.
Speaker 12 (48:46–48:46)
Yes.
Speaker 2 (48:47–48:53)
Mark Warren. Yes. Tim Lombard. Yes.
Scott Parishak. Yes. Carrie Hurley.
Speaker 3 (48:53–48:54)
Yes.
Speaker 2 (48:54–48:57)
Selena Miranda. Yes. And Sean O'Rourke.
Speaker 1 (48:57–48:59)
Yes. Thank you. Have a good year.