Speaker 1 (00:00–11:13)

grade-level wall. The gray wall around here is the subterranean basement wall. So the parking is under that plinth area and so the access is here off of Elliott. There are some public and some management spaces and some storage and elevator spaces to go up to through the building.

This small rectangle here is kind of the landlocked parcel. No man's land. Yeah, no man's land. This is the town on parcel and again the edge of my title block here is basically the property line at Central Street.

So what we did since last time is before this east end of the building or the east wing as I call it and this wall was pretty snug to the property line. We've moved the east end of the building a little over five feet away from where it was previously. The entrance doors into the garage have not moved, but the edge of the building on either side of it did move towards Elliott. So we've created an alley there and a potential alley here, although it doesn't discharge anywhere.

There's a retaining wall the length of the railroad track. And over here, there's at some points, very significant grade change down to the railroad. So the proposal, or last time, one of the concerns we heard was, What does our building look like? How close can it be to the property line to build it?

Certainly, building code does allow to have a zero setback and there are ways to build and construct the party wall or a wall right on the property line. It's done all the time, certainly in even more urban conditions than this. However, we have moved away and we've created the alley and that's done a couple of things We can create a what we've created a proposed a walkway in the site plans along this side so that we can access storage and mechanical spaces and have moving and loading of people's contents of their apartments in and out of the building trash in and out of the building etc and So that's a pedestrian way out to Central Ave This is going up one story and again the entrance to the garage level is right in this area here. We moved the driveway onto the sort of transient parking area on the top.

further west and previously in the plan there was an extra unit here but as we mentioned last time we're still at 57 units but the unit that was previously on this floor is no longer. So the driveway comes up on there there's a formal entrance again core of the building shaft again the building has been moved back all the way along this line and maintains that alley and that setback the entire height of the building. So again, a little bit tighter to the building here, but not at the driveway. The rest of the footprint remains the same as we showed last time.

Um, there are, uh, some, there's going to be cooperation going on between the applicant and the town to demolish the building, the factory building that spans these property lines. Um, and we presume that, um, we will have a kind of a tight condition here to maintain our property and whatever happens here in the future. That proponent, the town, or whoever becomes the proponent of some future development there, whether it's one story or multi-story will have the same challenges that the building code provides us. We can build this wall five feet from the property line and rate it and our building is sprinkled and so forth, so the assembly here can be this close to the property line.

So we've made subtle changes. Again, this building is moved away from that property line on all levels. I'll come back to the roof and to that. So this is the And we're showing, sort of in section, there's the grade level wall.

the doors to the garage, and then it is slightly downhill to the garage where we have the trench drain from the sidewalk, but not very much. Then there's a retaining wall that holds back a planting area. Then you get to the stair up to the pedestrian entrance, a handicap ramp up to that doorway, and then here is the archway underneath the two units that goes up to the grade parking. This is the backside of the building, again, This line in grade is really following the top of a stone retaining wall that parallels the track right there and then there's an existing concrete wall there that is right on the property line.

So this building now has moved away from us towards Elliott, a little over five feet, and there is a condition where we can create a walkway back to service doors to have moving in and out. other deliveries, et cetera. And we've got, this is the fire state, does have some windows just for some daylighting. The end unit does have windows.

I think someone asked us last time, maybe it was a local resident, was concerned about what the appearance of that end of the building was as you came into Milton over the river bridge and over the railroad. So, very subtle changes, but again, we've moved away from the property line to create that alley. These plans also show, by the way, street lighting, and our plans do include all the lantern posts and wall mounted, and in the package we supplied cut sheets for all those materials. We reached out to the manufacturer that the town has used, in Central Square and in current projects that it's working on.

So we contacted the sales representative who was working on those contracts with the town and we certainly intend to match the specification that the town's been using. The other thing I wanted to point out while we're still in the elevations is We did add, at the committee's request, the appliances on the roof for heating and air conditioning. And if I go back a couple sheets. You can see that there's a fair number of these mechanical units that'll be mounted on the roof.

And what we're proposing are heat pump type units, so they're electric based, heating and cooling. And the products are highly efficient, also greatly reduce how much fossil fuel this project will use. So they're scattered throughout the building over core areas in the building where we can distribute electrical and piping services from these rooftop units to mechanical units in each dwelling. And then again, we have extra units on the roof that supply heating and cooling to the common areas, the corridors.

Again, if I flash back to the elevation drawing, you can probably clearly see in the plans we submitted, but along the building, we've added those. We did stretch our parapet wall up a little bit from our previous submission to hide those, but I want to say that you can see them here in this 2D drawing, but certainly as a pedestrian, even from across the street, because they're set back in the center of the mass of the building, that they will be virtually impossible to see them invisible. And also because we're roof mounting all of these units, and they work similar to any pad mounted condenser unit that someone might have at their home. They might be slightly larger than the residential size.

But we've modeled in this project cubes that are 42 inches by 42 inches by 42 inches, which is a pretty standard size for multiple manufacturers for dwelling units of this size. So we were asked to show that, and we have. And these drawings Again, a little easier to read in the black and white package in the large set. But this is a sun study and a shadow study.

And we have one for winter and one for summer. Certainly the upper left-hand corner. And this is north at the top, and there's a compass centered on the parcel. And in kind of, again, hard to read in this projection in this light, but sunrise.

is you know over on the east side and the shadows are long okay by the time you get to that's sun study winter morning sun study spring morning you can see that once you get into the spring the shadows are much much lower again fall very similar and then the shadows are quite short in the morning on And what we're trying to show here is the majority of the year, the shadows don't cast very far. Also, because of this unique setting, that most of the shadows throughout the day, again, this shadow doesn't last very long over in this neighbor's backyard. And you can see that these are the other two houses that abut us to the west. Their shadows are also long.

This is only for an hour or two close to sunrise. And then it starts coming around. But because it's over the railroad track, it's a really unique setting. If we had other abutters back here, it certainly would be a concern.

But I think in this unique setting, it's not. So I know we're just a couple minutes away from 10. So maybe at this point, I'll see if you have any questions that I could answer about the building shifting. and the things we've added to the architectural plans.

Speaker 2 (11:15–11:22)

I do not. Frank or Ted, do you have any questions? No. I don't mean to crimp you.

If there's more you want to present, do it.

Speaker 1 (11:22–12:53)

I think that the plans are virtually unchanged other than moving the east end of the building a little bit closer to Elliott Street and a little nip-tuck on that end unit there and the core area. Still a generous amount of space in the corridor coming off the elevator at all levels. However, we did want to create that. five and a half foot minimum separation the whole height of the building away from the property line below.

What's the noise like in the roof units you talked about? Very similar to a residential air conditioning system. You certainly can hear when they come on. You mean like a window air conditioner or something?

Or like a? Probably even less so, but a grid mounted one, a pad mounted one that would be outside. We could get some cut sheets from different manufacturers. We don't know exactly which one we'll use.

It'll certainly be a bid situation when we go to build this. But we could get some decibel ratings again. Because we've put it behind a parapet wall, we've put it on a rooftop. Typically, if they're on a rooftop, they're on an isolation pad and mounted on vibration silencers.

And because they're, in this case, well over, like in this area, they're 50 feet from the curb, they're going to be virtually impossible to hear, and definitely you won't be able to see them as you pass by.

Speaker 2 (13:00–17:05)

I think it makes sense to suspend for the evening. I guess whatever date we ultimately decide on to continue it to, in the intervening period, what I'd like the traffic person to do is to consider the issues that we've talked about tonight. to revisit current data on existing traffic and whatever impact that has on your analysis. I'd also like you to sort of revisit or rethink the whole parking, required parking, and what's likely and reasonable in terms of the number of spaces that would actually be utilized by the residents.

I think those are really the two big issues that we need to really take a hard look at. And I'd ask you, when you prepare something, to just file it with the board, but also copy Jennifer Connelly so that she can review it and analyze it. And then we can take it up at the next hearing. Peter, it would be very handy if you could send me one of those springing agreements, if you have one that I could take a look at.

Because it sounds like that would address Mr. Whiteside's continuation of affordability concern, which is, I think, a very legitimate concern. that he articulated. And just before we try to set a date, just a couple of observations for the public and everyone who cares to listen.

We are not a planning entity. That's not our function. We are an adjudicatory body. We don't design the best plans.

That's not our job. That's not our expertise. What we do is we take in an application. We invite the applicant and everyone else in the world to submit what they think is relevant information that will inform us in making a decision.

These decisions aren't easy. These are not things that we do every day in life. And so the information that we receive from whatever sources is vitally important to us. When we engage a peer review engineer, it's just that.

We don't engage them to do sort of an advocacy piece for us. We don't have a position going into these public hearings. I haven't been, and I don't think that the other members of the board have been invested in this process before coming to these hearings. I don't know what the history of this site is.

I don't know what development plans have been considered over time. All we can do is act on what the information that's provided. Citizens are certainly welcome to provide technical and expert information if they choose to. That often happens at 40B hearings, in my experience.

Towns can do the same. We can only act on what we receive, and it's important to keep that in mind. We're not a planning agency. We'll take it in.

We'll operate within the constraints of the statute and the DHCD regulations, the implementing regulations that govern appropriate considerations for a board in our position, and we'll try to do that faithfully. So what I invite in the intervening period is if you have information that you think would be helpful to us, that would inform us in making what could be a difficult decision, please bring it to our attention. We're delighted to receive information, expert and otherwise, from whatever source it may come from. So I just think it's very important to keep our function and our role in mind here as we continue on in this process.

So, with that having been said, it seems to me that we probably need approximately 30 days, Peter, more or less, to settle upon for the next public hearing, which would bring us out to roughly November 1st, Mary. Is there, is that, I have a calendar with me, so is that, what are the days of the week that we're talking about here?

Speaker 3 (17:07–17:17)

November 3rd is the start of November workweek. Fourth is election day, I think, right? Is it? Yeah, true.

Speaker 2 (17:17–17:33)

So maybe, what's open for you? Is Thursday? Fifth is not available? No, the 6th, looks like it is, is John Cornyn.

Okay, the 6th. November 6th, is that okay with you guys?

Speaker 3 (17:33–17:47)

It's probably available. The only thing is, if there's dates, maybe, you know, it's still about a month, the last week of October, I don't know if there's any dates available. And it goes dependent on Jack and your peer review in terms of the further follow-up. Fall town meeting.

Speaker 2 (17:47–17:51)

Yeah, we have the fall town meeting in town that week, which really complicates things.

Speaker 3 (17:51–17:53)

The 6th, is that okay?

Speaker 2 (17:53–19:50)

Does that work for everybody else? And the quicker you get your information to Jennifer, the quicker she can issue a report to us and inform us, hopefully, before the hearing. The other point that came up, Mr. Mullen, I think, raised it during the meeting, and that's the availability of information.

Obviously, all the information that's in the file and that has been submitted is available for review in the town hall. And I appreciate that that's not always a convenient way to review information. We certainly can't put on the website everything that's in this file. But there may be things we can put on the website.

I mean, it seems to me what's emerging, obviously, from this process is that really the bellwether issue here is traffic and parking. I mean, I don't mean to denigrate other issues, but stormwater management, it's interesting, and we can impose conditions that relate to it. But at the end of the day, it's the Conservation Commission's issue. It's really not our issue.

I'm not an expert and I don't want to be an expert in stormwater, other than as it affects my house. You came close, perilously close. But it seems to me if we could put some of the key traffic memoranda from both sides on the site, I think that would be a start. So without overburdening systems.

If we could put, if we could do that, if we could at least put the traffic information on the website, I think that'd be great. No plans, just the reports on traffic that people can sort of use as a parking and traffic that people can use as a baseline. I think that would be helpful, Mary, if we can do that. So we'll do that as a cautious first step.

Yes? Can I put that on there for her? You can do anything you want, yes.

Speaker 3 (19:51–19:54)

I need to put something on our website the other day. No, we actually have a page for it.

Speaker 2 (19:55–20:03)

However it gets there is fine. I think if people have public access to the information, I think it's helpful to all. Yes, sir?

Speaker 4 (20:03–20:12)

With regard to the traffic studies, if they could put the page from the ITE that they're using as a source, that would be helpful.

Speaker 5 (20:12–20:19)

Sure. That was on figure three. It did have the volume. It had the page.

I will continue to do that.

Speaker 2 (20:19–20:31)

Okay, that'd be great. Okay, without further ado then, we'll continue this public hearing until November 6th at 7.30 and in this room and I look forward to seeing you all then.

Speaker 3 (20:31–20:33)

Thank you very much. Thanks. Thank you.