Board: Milton Conservation Commission

Date: 2024-06-11


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:50–01:40)

Ladies and gentlemen, welcome to the June 11, 2024 meeting of the Milton Conservation Commission. Commission members are appointed by the Select Board to implement the rules and regulations of the State Wetlands Protection Act and the Milton Town Bylaw governing wetlands. As such, we have, and this is a public meeting, so we have two orders of formality. First is we welcome everyone to join in to make comments, ask questions, and state an opinion.

But to do so, we do ask that you identify yourself with a record because we do keep a record of the meeting. We are being recorded this evening. The second formality is we introduce ourselves. My name is John Kiernan.

My commission member, and let me just read across the top of my screen. Steve, can you introduce yourself?

Speaker 2 (01:41–01:42)

Steve Ives, conservation agent.

Speaker 1 (01:43–01:56)

Tom Palmer. Tom Palmer, member. Phil Driscoll. Philip Driscoll, conservation clerk.

Thank you. Arthur Doyle. Arthur Doyle, member. Wendy Garpo.

Speaker 3 (01:57–02:00)

Hi, good evening. I'm Wendy Garpo, one of the commissioners.

Speaker 1 (02:01–02:38)

All right, thanks. Oh, Ingrid, welcome. You're here. That's great.

Can you unmute? You're still connecting to audio. We can stall a little bit. You can just wave.

Can you hear us? Wave if you can hear us. No, it doesn't look like she can hear us. Let's stall a little bit to see if she can connect.

Steve, is there anything you can do to get her in from the waiting room?

Speaker 2 (02:38–02:48)

She's connecting to audio, it says. That's what it says on my screen. Can you unmute, please?

Speaker 1 (02:52–02:57)

And see if it… I don't think she can hear or speak. Either way.

Speaker 4 (02:59–03:03)

Hey. I'm good, I think.

Speaker 1 (03:03–03:13)

Hey, you're good. Hey, welcome. Welcome. So now, as part of the formal introduction, can you introduce yourself, Ingrid?

Speaker 4 (03:13–03:16)

Yes, Ingrid Baby, Commissioner.

Speaker 1 (03:16–03:30)

All right, I think we're ready to go. So first on the agenda is the No. 1 School Building Committee. And Sean O'Rourke, as chairman of the SDC, welcome tonight.

And can you tell us what your presentation or what your wish is this evening?

Speaker 5 (03:31–04:14)

Yeah, thank you, Mr. Chair. For the record, Sean O'Rourke, Town Meeting Member, Precinct 8, and Chair of the School Building Committee. With me tonight is also Sean Burke of PMA Consultants, who's acting as our Owner's Project Manager.

What we bring before you tonight is a plan that we're looking along Guile Road for boring locations that basically are near or adjacent to the conservation land along Guile Road. For myself, I believe Mr. Burke is a little more well-versed on the technicalities that we're doing, so ask him to jump in and walk you through it.

Speaker 1 (04:16–06:04)

And just for the public's benefit, actually for Sean Burke's as well, this site goes back for a number of years and SBC, BSC, sorry, I get my initials backwards. BSC did an initial wetlands delineation, I think in really, 22? Yes. I believe so.

And at that time, we noted that they did not delineate the isolated wetlands on Guile Road. And I think Steve will be able to point out his general vicinity. And the isolated wetlands under the town bylaw is defined differently than the state wetlands. So it is a resource area for us.

And I know, Mr. Burke, that the reason they're here is to do some test sites, soil boards, which does have an exemption under 310 CMR 10 dash 0.02. But that's for the buffer zone. And what we lack is the delineation of the wetlands that Steve did for us for the Conservation Commission two years ago.

And there is an isolated wetland. What we can agree upon is that that isolated wetland, if we look at this map before us as north and south, that isolated area is south. And Tom Palmer, I know you all remember it, because we were standing there at a site walk, which was a joint meeting between the school committee, between and among the school committee, the school building committee, the conservation commission back, I think it was 22, it could have been early 20, no, it was 22.

Speaker 2 (06:05–06:06)

It was late 22, fall.

Speaker 1 (06:06–06:54)

And we were standing there at that area that was delineated. And we, as a commission, need to ensure that the test sites, which we see here marked as 1, 2, 3, and 4, are not in the resource area. So we had asked BSC to put on their overlay our town wetland by-law, isolated wetlands. And we couldn't find a map with it on there.

But Sean, I didn't mean to cut you off. That is Sean Burke. Go ahead. But I think what's important to us is to make sure that your test sites are actually not in a resource area, but rather in a buffer zone.

So can you tell us what the The plan is?

Speaker 6 (06:55–07:55)

Certainly. So the plan here is to perform some test borings in the location shown on this drawing, five test borings. And the purpose of them is to determine the geotechnical conditions of the subsurface soil underneath where the building is going to go. I did have some conversations with Steve yesterday.

I want to thank him for his time and walking me through this. And I believe that between the two of us, we determined the areas that were planning to do our boring-ins are outside of the area that he had identified as an isolated wetland. And now that being said, Steve, I put him in contact with BSC, the engineer, and he is setting up a meeting with their scientists to go walk this area. So both of them can look at it, investigate it, and determine if there is an isolated wetland there, where the limits of that are, and to finally put it on a drawing for us.

But the borings that we're planning on doing, as far as I know, are not within that area. So I'm not sure that we're at risk by doing these borings of disturbing any existing wetlands.

Speaker 2 (07:56–07:59)

And I would agree with that, Mr. Chairman.

Speaker 1 (08:00–08:06)

Steve, can you ballpark with the general vicinity of where you were a couple of years ago?

Speaker 2 (08:06–08:11)

It's right in here, I believe. And Tom, correct me if I'm wrong.

Speaker 7 (08:13–08:16)

Yeah, I would agree that it was on the south side there.

Speaker 2 (08:17–09:09)

South side, right approximately in here, maybe 75 to 100 feet long in this area. Okay, so I will be going out there with Matt Byrne as soon as he's able to. And we'll check it out, and we'll see. We'll see what's there, and it was directly, I can tell you that it was directly below the roadway itself, adjacent to the roadway, in a swale area adjacent to the roadway.

There are some large mature trees here. I don't know if you can see them right in here, but it was right along the street. And we just need to go back to the site and take a look.

Speaker 1 (09:10–09:41)

All right, so if you could delineate that and we can upload that onto the BSC survey plan, that would be great. But I think for our purposes here tonight, it's clear that the B4 would be the closest, and it's actually on the other side of the road from the resource area. So it would clearly be in the buffer and not in the resource area. And Sean, can you tell us a little bit about the borings?

I mean, are they, how, what's the diameter of the boring and how long do they stay open?

Speaker 6 (09:42–09:56)

So the diameter is about three and a half inches. They will take their soil samples and they will, you know, they'll rake and backfill the holes, but they'll naturally close up over time. There's no monitoring wells. We're not putting monitoring wells for groundwater in them at this time.

Speaker 1 (09:58–10:00)

All right. Any questions from commissioners?

Speaker 6 (10:02–11:00)

What is the dashed red line on the… So the architects for the school project are starting to lay out different building shapes. These will not be the final designs of the building, but the purpose here is to approximate a footprint of the building so that we can get a good sampling of the soil conditions throughout the entire site where the building will be built. So these are just overlays of some early thoughts of building shape and design to help us locate where it would be most appropriate to put borings for our subsurface investigations.

I know that all the moorings are on the existing road. Is that deliberate? They are next to the road, yes. It is deliberate so that we don't disturb or minimal disturbance to the surrounding site.

We don't want to be going through the forest or disturbing any trees or any work like that as part of this investigation. So it's to make it as minimally invasive as possible.

Speaker 7 (11:02–11:14)

I appreciate that. I think that's a good idea. I hope that is going to ultimately be how the work is performed without leaving the road.

Speaker 6 (11:17–11:22)

Correct. There should not be any disturbance to the road. If there is, it will be corrected by our project team.

Speaker 7 (11:25–11:32)

I think that those areas are sensitive. Yeah, I think we ought to know about it if there's going to be any equipment leaving the road.

Speaker 1 (11:38–11:41)

Well, the team can probably stay right in touch with Steve Ibis.

Speaker 2 (11:43–11:51)

Yes, and another question, Sean. The white dash, is that another possible building location?

Speaker 6 (11:51–12:31)

These are both possible locations. So these were early on drawings as part of the planning. And they were putting some different overlays of massing to try to figure out the building size. And then as we talked through where is most appropriate to put borings, we all determined that it would be best to do them right along the roadways to minimize any disturbance.

We didn't want to go into the woods. We didn't want to disturb any plants or trees in order to do this investigative work. The white line is just one option that they were considering early on, but that being said, we did put the boards along the roadways just to minimize any disturbance.

Speaker 2 (12:31–12:34)

Understood. Thank you.

Speaker 7 (12:35–12:55)

Go ahead, Tom. Could I mention that there was an article at town meeting that bears on this, right? Wasn't there an article that said, No work shall take place until the school is funded, something of that effect. Does anybody remember that exactly?

Speaker 1 (12:57–13:30)

No, I think the provision of Article 32 was that if the funding doesn't come through by 2028, then the land swap would revert to original owners. There wasn't another- That's not entirely true, because we weren't giving back Pope's bond. So it was actually a one-way reversion, not a two-way reversion. But Sean, you probably know that.

That is Sean O'Rourke. You probably know that better than I. Yeah, Mr. Chair.

Speaker 5 (13:31–14:03)

I raised my hand, too. I think what Commissioner Palmer is referencing, there was a friendly amendment on the floor when it was passed that was accepted. And I think that friendly amendment for that article uh, reference that this exact situation that we would not be driving into the site, uh, knocking trees down to do boring. So I believe that was the friendly amendment that was accepted.

So, you know, in concert with that, that's exactly why we're trying to stay along the road and not go deep into the site to disturb anything.

Speaker 1 (14:08–14:29)

All right. Any other questions or comments from commissioners? Steve, you'll have to help me, because I'm asking whether or not there are any abutters or members of the public that have a comment or would like to ask a question. And I'm asking for help, Steve, because I can't see everybody, as long as we're screen sharing, which I think we should be.

But can you spot anybody else that has a hand up?

Speaker 2 (14:30–14:41)

I can't see anybody else, but they should unmute themselves and say a little word.

Speaker 1 (14:43–15:22)

Wendy? I hear nothing. Is there a point that I? My understanding is it sounds like there's a consensus that there should be a negative determination on the RDA with the understanding that this will be mapped.

But the understanding is clearly that what we had previously thought of as the delineated, isolated wetlands under the town bylaw is not near where the, when I say near, I shouldn't say that. The drilling sites are not within that area because that area was south of Guile Road. So with that understanding, um, is there a motion to issue a negative determination on the RDA?

Speaker 7 (15:23–15:30)

I would, I would like to see a plan with a boring locations and a well hands, which we don't have yet.

Speaker 1 (15:32–16:09)

Well, we've got the wetlands. We've got plans with the wetlands that are down by Pine Tree Brook. And we've got plans with the wetlands down near Blue Hills Parkway, which would be west, I guess, of this site, to the left of this diagram. But those are several hundreds of feet away from this area.

The only concern that we had was the isolated wetland under the town bylaw. And we don't have it mapped, but we all agree, and since Steve was the one that did the delineation, it's south of Guile Road.

Speaker 7 (16:10–17:02)

There's also a wetland we can't see on the screen right now because we're not seeing the top of the image, but that highest site in the bushes just north of there, there's a stormwater feature. Can't quite see it here, but it's quite close. And there's like a channel that goes up toward the road from there. And I know you mentioned other mapping of other wetlands, but in this application, we don't have a plan that shows the wetlands within, say, 200 feet and the boring locations.

We don't have that right now. We're just like, what's in the package?

Speaker 1 (17:03–18:00)

I understand what you're saying. But when you say the wetlands may be within 200 feet, that's true. But the concern that we have tonight is whether or not these test borings are in the wetlands, not in the buffer zone. And the IDA itself quotes the exemption under 10.02, subsection 2, subsection B.

that allows borings within the buffer zone. My concern and the reason for the RDA was that we want to make sure that the wells weren't going into the resource area itself. So if there are, and I suspect there may be within 200 feet wetlands, that would trigger the exemption that's been cited in the RDA. And I think Sean Burke was the first to point out that exemption.

But it's actually part of the RDA.

Speaker 7 (18:02–18:21)

I hear you, but just as a matter of process, it's appropriate to have a site plan showing work area and wetlands. I mean, you're suggesting we don't need that plan because

Speaker 1 (18:25–18:38)

Why don't we then add a condition of the negative determination that the plan, when made, and Steve, do you have a time when you're gonna go out there with Matt Byrne?

Speaker 2 (18:39–18:39)

Not yet.

Speaker 1 (18:41–18:44)

But it will be within a week? I'm asking, can it be within a week?

Speaker 2 (18:45–18:48)

Yes, absolutely, I just haven't, we haven't connected yet.

Speaker 1 (18:49–19:11)

All right, but this is not a, you know, kick-the-can-down-the-road situation. This is going to be done in the near future. So why don't we make a condition of the negative determination that we receive a copy of the plan with the isolated wetlands delineated and the other wetlands that have already been identified on the original BSC plan?

Speaker 7 (19:11–19:40)

Would that be appropriate, Tom? Well, not only having the wetlands on, but having the boring locations. I mean, they both have to be there. Yeah, no, I agree.

All right. Well, yeah, I don't, I'm not comfortable going forward without having that plan because, you know, we're just looking at pixels and electrons. I would like there to be a plan that records what's going to happen.

Speaker 1 (19:43–20:00)

Okay. Well, we've certainly done this before. Um, is there a motion to, um, issue a negative determination with the condition that in the, say within, can we say two weeks, Steve, would that be sufficient?

Speaker 2 (20:01–20:48)

Yes, but one caveat, I didn't call this a particular wetland, a jurisdictional wetland in Milton because I didn't do what I call can complete Wetland delineation. Okay. I have it's it's an indication to me so far. That's all I'm going to say I didn't do a lot of soils here.

Okay, so Please everyone be aware that this may not turn out to be even an isolated wetland Okay, we're just giving you that overall caveat Okay, it indicates what I saw indicated a wetland, but I didn't call it a wetland, all right? That's all. I'm just trying to be very specific.

Speaker 7 (20:49–21:21)

I would like to mention that I haven't seen a plan that shows the wetland I just mentioned. Namely, the detention basin that's in this scrub at the top of the image, and also, Yeah, and also there's a stream channel, or you might call it a swale, that goes upslope from that small pond, and that ought to be on the plan also, I think.

Speaker 2 (21:21–21:44)

Are you talking about, Tom, are you talking about from the, on the other side of the roadway? Yes. Right at the corner where there's a, a culvert that takes water out of the basin next to the field. I think it's a baseball field.

Is that correct?

Speaker 7 (21:46–22:10)

Yeah, that's the wetland I'm talking about, but I'm not talking about that culvert. There's a stream channel that enters that wetland from the north. No, excuse me, from the south, coming toward this image. So I'm just saying that if we don't see that on the plan, that will be a defect.

Speaker 6 (22:10–22:33)

Mr. Chair? Yes. I do.

It's Sean Burke. I overlaid this on a plan, and we will get, for this conversation, we'll get BSC to add the boring locations. But I did add this to a plan, and I reviewed it with Mr. Ivis yesterday.

And I apologize if I was supposed to include this, but we did look at that wetland delineation, and I'm happy to share what I have if it would help.

Speaker 1 (22:33–22:50)

That would be great if you could do that, because we've actually all seen those plans because we were involved in the Lower Guile Road artificial turf field. And we had wetlands delineations at that time. So we know where they are.

Speaker 6 (22:50–22:54)

I'll just need the host to allow me to share, if that's OK. Steve, can you take care of that?

Speaker 2 (22:54–22:55)

I'm making you a co-host.

Speaker 6 (22:55–22:56)

Great. Thank you, Steve.

Speaker 2 (22:57–23:00)

One moment. You should have it now.

Speaker 6 (23:07–23:58)

Can you see that? There it is. OK. So I took the boring locations.

This yellow line is the delineated wetland 100 foot buffer that was shown on the BSC drawing. So I highlighted that in yellow to make it just easy to read. And then these are the locations of the borings that we show on the other plan. So up here.

This would be 5, 1, 2, 3, and 4. And 4 is the one that is closest to that suspect area that is going to be further investigated within the next week or two. And this concrete invert, I believe, is what you're talking about, maybe. This is the stream coming here.

It shows a concrete invert.

Speaker 7 (23:59–24:08)

Right there. Yes, that's right. That's indeed what I was referring to. Do you see the basin as well on there?

Speaker 6 (24:08–24:14)

I don't. I see something that looks like a stream here from their drawings.

Speaker 7 (24:14–24:56)

Yes, and then at the upper left, you see the contours even out and form a kind of ellipse. If you go down, keep going down, I think that is the basin in the upper left corner. So yeah. I think you're on the right track here.

But on the other hand, is that channel that goes from the culvert to the basin, is that an intermittent stream? Closed with water sometimes. I have been in there and looked at it. I wonder if that should be mapped as a stream.

Speaker 1 (24:58–25:04)

Well, Tom, even if it is an intermittent stream, even if it's a perennial stream,

Speaker 2 (25:05–25:06)

It's too far.

Speaker 1 (25:06–25:10)

It's the difference between a resource area and a buffer zone. Well, I'm.

Speaker 7 (25:13–25:49)

It's too far. All I'm saying is, if we have a plan, if we have a plan, it should show what's there. And we don't have a plan right now. We have a plan of where the boardings should be.

But to me, I'm not really. I'm looking at this plan. It doesn't really look like a plan to me. I mean, it's.

It's hard for me to read it. I can't see where the resource areas are and what they are. So I just find it not a very useful plan as something to describe the reality.

Speaker 2 (25:52–25:56)

Yeah. Tom, the symbology on this plan is very difficult to read. I will agree with you.

Speaker 7 (25:58–26:18)

Yeah. You know, a legible plan is what I'm asking for. And, uh, a plan that has the wetlands and the boring locations. I think we need to be careful about approving a plan if we're not confident that it shows everything that's there.

Speaker 1 (26:20–26:30)

Well, I think what we're approving is the locus for the individual boring sites. And I think we do have a plan that shows it's not in a resource area.

Speaker 7 (26:31–27:42)

I agree. I think we're sort of on two sides of the fence here because I think you are okay with a plan that is what it is as far as the resource areas go. But, you know, I don't really find it very readable. And if you're approving work on a plan, you want that plan to show the wetlands that are in the vicinity.

It's not really enough simply to say, well, the borings aren't in the wetlands. you want to know where the wetlands are and what they are. Don't you? Is that what you're looking at right now?

I can't read that, I guess. I just don't, you know, it doesn't say where the wetlands are and what wetlands they are. I mean, maybe it does if you are more used to this kind of plan, but I don't think it's that much to ask to have a plan that is white instead of gray and that has all the wetlands clearly indicated on it? Because they're not on here, unless you are good at reading this.

Speaker 1 (27:45–28:35)

Well, understanding that, I think the commission's in a position to take what I will call judicial notice. And that is a technical term, a judicial notice that we, as the commission, have looked at these plans a number of times during all of the land swap discussions from 22 and 23, 2022 and 2023. And this map that we're looking at right here, whether it's the traditional white background or not, is based upon that. That yellow line is consistent with what we saw previously.

So my suggestion is, that we could condition the vote on this with the addition to our record of those plans. I mean, they exist. We've seen them.

Speaker 7 (28:35–28:37)

Yeah, so it shouldn't be difficult then, right?

Speaker 1 (28:38–28:43)

It should be easy if they're already done. That's correct. And that's what I'm saying.

Speaker 7 (28:43–28:56)

Go ahead. We're looking at something on a screen. But I'm talking about a plan that you're going to hold in your hand. And when you go there, you can…

Did you see this?

Speaker 1 (28:57–28:59)

Yeah, you know that… It is in my hand.

Speaker 7 (29:00–29:26)

Yeah, well, that's not the type of plans that we get when we go on visits. All right. We don't get like printouts from screens, we get signed and stamped plans. And those exist, right?

So I can't… Yeah, I can't… Those plans be taken and the boys put on them and printed at the usual size, we get them so that we can look at them.

Speaker 1 (29:28–30:15)

They can be. Yeah, that's what I would like to have. And the rest of the commission knows that we oftentimes will take a vote conditioned upon the submission of plans for record-keeping purposes. It's very common.

And my suggestion is that we do that tonight. Since we've all seen the plans, we know they exist, and the overlay has been done here and should be done with the final plan to support the vote. So my motion is to issue a negative determination with the condition that those plans be included and submitted to us within, let's see, three weeks, is that better?

Speaker 2 (30:15–30:16)

Yes, that'll be fine.

Speaker 1 (30:16–30:30)

Three weeks time, and that would be the condition that that which we already know will become part of the official and formal record. That's my motion. Is there a second to that motion?

Speaker 7 (30:34–30:34)

I'll second it.

Speaker 1 (30:37–30:39)

Fair enough, Tom. Thank you. Is there any discussion among commissioners?

Speaker 7 (30:41–30:54)

I would, I would like to see those plans as soon as they're available because my memory of what was mapped there is foggy. So I just want to see it again in the way we've been talking about.

Speaker 1 (30:54–31:02)

That's perfectly reasonable. Any other discussion?

Speaker 6 (31:03–31:19)

This is a- I will talk to BSC tomorrow and I'll ask them to clean it up. I'm not a CAD expert, so these are based on a viewer that I have, but I'll ask them to clean it up and get you exactly what you're asking for. I believe I understand what the request is and I'll make sure it's fulfilled in short order.

Speaker 2 (31:20–31:24)

And Sean, if you have any questions, you're welcome to give me a call.

Speaker 6 (31:24–31:33)

Thanks. I appreciate that, Steve. I appreciate all your support and helping me, kind of walking me through this whole process. You've been extremely helpful and giving of your time.

Speaker 1 (31:34–32:07)

Certainly. Any further discussion among commissioners? All right, there's been a motion to issue a negative determination with the condition that those plans with the overlay for the borings be submitted to the commission within three weeks, which will demonstrate that the borings are all outside of the resource area. Arthur Doyle, how do you vote?

Yes. Tom Palmer, how do you vote? Yes. Wendy, how do you vote?

Yes. Ingrid, how do you vote?

Speaker 6 (32:07–32:07)

Aye.

Speaker 1 (32:08–32:20)

And I, John Kiernan, vote aye as well. So that's unanimous. Sean, thank you very much. And if you could speed the process, I would be very grateful in terms of getting those plans submitted.

Speaker 6 (32:20–32:21)

Certainly, we'll do that.

Speaker 1 (32:21–32:26)

Thank you very much. All right. Thank you very much. Have a good night.

Thank you. Thank you, Sean.

Speaker 2 (32:26–32:27)

Thank you, Sean.

Speaker 1 (32:27–32:41)

All right. Next on the agenda is change in the order of conditions at 485 to 487 Blue Hills Parkway. That's known as the Ice House. And Charlie Bosworth, I think you're with us.

Yes.

Speaker 8 (32:43–32:45)

Good evening. Thank you for taking the time to meet with us.

Speaker 1 (32:49–32:56)

Can you tell us what the revisions are, and if you need to screen share, then, Steve, I think you can facilitate that.

Speaker 8 (32:57–33:06)

Yeah, I think I sent the drawings to Steve earlier today, and I believe he tested them out, so he's going to be sharing the screen, I believe. Great, thank you. Yes.

Speaker 2 (33:09–33:10)

Give me a little bit of time here.

Speaker 8 (33:11–33:14)

I'll give a brief background, Steve, while you pull it up. Please do.

Speaker 9 (33:15–33:16)

Yeah, please do.

Speaker 8 (33:16–34:42)

Board recalls we had a couple of heavy rainstorms back in December and January that caused some significant flooding on the north side of the site to the point where it inundated the erosion control and was flowing into the resource area. So after several of these events and our mitigation processes, we determined that we may want to tweak the design a little bit. And what we're proposing now is the tweaking of that design to mitigate the amount of water that's flowing to that specific area. If the board would like, I can walk through the drawings.

Steve, if you could blow them up, I can explain what we're looking at and the reason for two different colors. We have two different colors on these plans. One is red on the drainage, and that was the originally first and approved drainage design. The black line type is the proposed drain improvements that we're seeking the board's approval on.

Speaker 2 (34:44–34:52)

OK. Anybody know how to blow it up? Here we go. I found the button.

The button was hidden. Here we go.

Speaker 8 (34:55–36:28)

All right. So Steve, if we could start on the east side of the building. because that's kind of where the catalyst of the problem started. So if you drag at the bottom of the sheet, yeah, yeah.

All right, so at the… You want northeast or southeast? That's perfect. Good.

So what we're looking at here is the parking lot for the ice house. And the original design is that we were sheet flowing the water runoff from south to north and then west. And what we found with the rough grading is that the water was just getting to the north side of the site too quickly. And our proposal starts with picking that parking lot up on the north side of the parking lot about four feet to slow down the sheet flow to the driveway and directing the flow to this catch basin right there, which Steve's got highlighted.

And we're adding a wall off the building about 25 feet long at the highest point, right at the corner of the building, Steve. Nope, a little bit more west.

Speaker 2 (36:28–36:30)

More west. Yeah, right here.

Speaker 8 (36:31–38:48)

Exactly. So we're adding a retaining wall there in order to pick that grade up. And that will allow us to flow the water more east and direct it towards the catch basin. Now, the original catch basin flowed under where that proposed wall is.

We need to move it away from where the wall is. Bring it to a new drainage hole. Yep, that's where Steve has that. It's flowing in the exact same direction as the old drainage.

But what we did was, on the right-hand side, which is the north side of the driveway, we added a gutter inlet to get the water before it inundated the low point on the site. Now, Steve, if you could move west again for me. Keep going. Yep, that's good.

So the red line type that you see, we're eliminating that, replacing it with the black line type, changing the invert elevations a couple of tenths. to accommodate the flow. That gutter inlet that we spoke about will tie into Drain Manhole 202. And we added another gutter inlet opposite of Drain Manhole 202.

So we're now picking up more surface runoff with gutter inlets. From Drain Manhole 202, The drain line flows in the very same vicinity as the originally proposed and approved line to the sediment forebay area just before the pond. And we bring it in about two feet deeper into the sediment forebay area. And then the outlet that comes out of the pond is a double barrel outlet, which was the original proposal.

And it goes to a outlet structure with a level spreader. That hasn't changed. And that basically encompasses the proposal and relief we're seeking.

Speaker 2 (38:54–38:57)

Makes sense to me, John, and everyone.

Speaker 1 (38:58–39:12)

Is the increase in the amount of water that you expected, if that's the right terminology, is that due to an increase in sheet flow, or was it a mistake in groundwater elevation?

Speaker 8 (39:12–40:21)

No, it's actually from what we've seen on the site. The surface area has already been the same. What we're seeing is that the water is getting to the north side quicker under the previous design because of the steepness of the slope, the original slope. Now we're flattening that slope, capturing the water earlier on so it doesn't sheet float and inundate that north side where we added the gutter inlet.

We didn't have a gutter inlet there before. So the water was reaching that point, and it would slow down because of the grades. And when it would slow down, it would build up an overtop, which will be a curve in the future. So now we're going to pick it up at that low point, or that slow point, we should call it.

It's not a low point. It's really a slow point. Pick the water up and get it underground to the sediment forebay area quicker than allowing the sheet flow to make it.

Speaker 1 (40:23–40:30)

How much fill is going to be required to make the elevation changes that you're proposing?

Speaker 8 (40:30–40:51)

Maybe under 100 yards, John. Because we're adding pipe length and we're adding structure, so that soil will be heavy.

Speaker 6 (40:51–40:51)

OK.

Speaker 1 (40:54–40:57)

Steve, from your perspective, does this make sense?

Speaker 2 (40:58–41:16)

It makes very good sense. It's the only solution to what was a difficult condition in our heavier range.

Speaker 1 (41:17–41:26)

But what's the difficult condition? What does it go back to? Just that excess or unanticipated sheet flow to the northwest area?

Speaker 2 (41:27–41:28)

Exactly.

Speaker 8 (41:30–41:37)

And the speed at which the water flows, it's not slowed down enough.

Speaker 1 (41:37–41:54)

But that's what I was asking. Why was it unanticipated? Just a miscalculation in how much water would be there, or is it maybe an increase in the amount of rainfall, or is it, as I said, a change in the groundwater elevation?

Speaker 8 (41:54–42:32)

I think those two events that we had, and I believe you and I spoke during both of those, was an incredible amount of rain on both of those occasions. It was probably the maximum test that we would be put under. So I don't know if it was just an incredible rain event on those two instances, because since we changed the in-situ grading, we haven't had any issues. And the in-situ grading is essentially mirroring what we're proposing here, but we're at those catch bases.

Speaker 1 (42:33–42:36)

Any questions from commissioners?

Speaker 10 (42:38–43:04)

Mr. Chairman, I have a question but a comment just to reinforce what was just said by the applicant. I was on the site for both of the rainfalls and the mitigation at the time of the second rainfall was very significant. So I would endorse what Ojibwe was proposing.

Speaker 1 (43:07–43:11)

All right, thank you. Any questions?

Speaker 7 (43:12–43:19)

Yes. Randy, Tom? Is the basin that's at the top of the drawing, is that now in place?

Speaker 8 (43:19–43:33)

It has been excavated. It is not in the completed design. It has not been topsoil. It has not been planted.

But it has been excavated.

Speaker 7 (43:33–43:38)

Thank you. Is the final design, is it going to be fenced or not?

Speaker 8 (43:40–43:50)

The original design is not fenced. There hasn't been a way to fence it.

Speaker 7 (43:50–44:08)

I guess I wasn't around for some of the early permitting, but I'm wondering, is there a plan that shows access to Pope's Pond from this corner for people who are living in the development? Is that sort of built into the plan, a connection?

Speaker 8 (44:10–45:18)

If you review the original approved site plans, we have, I believe it is six parking spaces allocated at that northwest corner of the project where the Pope's Pond path enters our property and where the water easement flows from our property out to Pope's Pond. So there will be a parking provided. Matter of fact, I think Steve, on this plan, It's not called out because this is not a parking plan, but just east of the pond, there is a rectangle. If you come a little bit more east, Steve, so a little bit where the double barrel drain line is.

Yeah, so to your left, to your left, there's a rectangle. If you see that rectangle, That's it, that you're outlining it now. That's a parking for six vehicles that will have access to the Pope's Pond walking path.

Speaker 7 (45:18–45:49)

Good, and you know, I expect to be using that myself and I won't be driving there. I like that you'll be able to go to the pond and then walk through here to the parkway or come from the parkway through here to the pond on your two legs. I think it would be a bad outcome if for some reason this connection was not part of the project.

Speaker 1 (45:49–46:01)

Tom, you're 100% correct. That was an issue, and I think it was an issue both before the Planning Board and before the Conservation Commission. But you had mentioned it as access for the residents. It's actually public.

Yes.

Speaker 11 (46:02–46:05)

For everybody. Yeah.

Speaker 1 (46:05–47:03)

Right. OK. Thank you. All right, any other thoughts, comments, questions from commissioners?

And again, I can't see the full scope of people attending tonight, but are there any hands raised, or would anybody like to speak who is an abutter or any member of the public? Hearing none and seeing none, I suggest that this requires two votes. The first one is whether or not it's a significant or an insignificant or a minor or a major revision. If it's minor, then we can have a second vote to vote to approve the revision.

If it's a major revision, then it would require a filing of another notice of intent. So based on this, is there a motion that this would be considered a minor revision to the existing order of conditions?

Speaker 10 (47:05–47:11)

I would move that it's a minor revision, mitigation revision.

Speaker 1 (47:12–47:22)

All right, I think we had two proponents, so we can, Tom was, I think, first to say, and he's so moved, and Arthur, I'll give you the second. Is that okay?

Speaker 10 (47:22–47:23)

That's fine.

Speaker 1 (47:23–47:42)

All right. Is there any discussion on this first vote that this would be a minor revision to the existing order of conditions? Hearing none, I'll take a voice, individual vote. Arthur Doyle, how do you vote?

Yes. Tom, how do you vote? Yes. Wendy, how do you vote?

Yes. Ingrid, any vote?

Speaker 4 (47:43–47:44)

Yes.

Speaker 1 (47:44–47:57)

And I, John Kiernan, vote yes as well. So that's unanimous. The next motion will be whether or not to adopt this revision so as to revise the existing order of conditions. Is there such a motion?

Speaker 11 (47:58–47:59)

So moved.

Speaker 1 (47:59–48:01)

All right, thanks, Tom. Is there a second?

Speaker 11 (48:02–48:03)

Second.

Speaker 1 (48:03–48:18)

All right, thanks. I heard Ingrid first. Any discussion among commissioners? Hearing none, Arthur, how do you vote?

Yes. Tom, how do you vote? Yes. Wendy, how do you vote?

Yes. Ingrid, how do you vote?

Speaker 4 (48:19–48:19)

Yes.

Speaker 1 (48:20–48:33)

And I, John Kiernan, vote yes as well. So that's unanimous. So it's a minor revision, and the order of conditions is hereby amended in accordance with these plans. Charlie, thank you very much.

Any comments, questions, or anything else?

Speaker 8 (48:33–48:35)

I'd like to thank the board for their time this evening.

Speaker 1 (48:36–48:38)

All right, thank you, Charlie. Thanks, Charlie.

Speaker 8 (48:39–48:40)

Have a good night. Thank you, Steve.

Speaker 1 (48:42–48:50)

Next on the agenda is number three. This is a request for determination of applicability. This is VHB on a DCR project.

Speaker 2 (48:54–48:54)

Yes.

Speaker 1 (48:55–48:55)

Good.

Speaker 12 (48:56–49:01)

So do we have a presenter for this? Yes, Steve, are you going to pull this up?

Speaker 2 (49:02–49:05)

Yes. Would you like me to go all the way to the back?

Speaker 12 (49:06–49:12)

Yes, I think it's probably, yeah, sheet 21 of the package has the proposed plan there.

Speaker 2 (49:13–49:13)

Something like that.

Speaker 12 (49:15–49:18)

We don't see anything. Not seeing it right yet.

Speaker 2 (49:18–49:43)

Oh, I'm sorry. Yeah, yeah. Hang on. Let's see.

I've got to get to that little place that says share screen. One moment. There we go. That should do it.

How's that?

Speaker 12 (49:45–51:47)

There it is. Thank you. All right, so good evening, everyone. I'm Dan Cannata.

I'm an environmental scientist with VHB here on behalf of the MassDCR regarding this project. I have with me Rob Cahoon, who is one of the project engineers as well, if we have any other questions to bring up there. Some of you may remember back in 2022, DCR came in front of this commission here for proposed geotechnical boring and also archeological test pits that are being used to finalize the design and layout of the proposed future pedestrian bridge across the Nepassett River from Milton providing connection over to Osceola Street in Austin. This is right across Brush Hill Road or Truman Parkway across from the intersections with Concord Avenue and Sheever Street.

This is again pretty pretty straightforward has can be allowed as exempt work for exploratory activity within riverfront area. There's one test pit, which is called out with the yellow square there. Steve, I don't know if you can zoom in a little bit. It's showing the approximate limits of the actual test hole.

It's really looking like about a 100-square-foot area for access, excavation of the 10-foot-deep hole, and stockpiling of materials. No works proposed within the river itself. The delineated line you can see is down below. And this really should only take the excavation contractor one day on site.

They will have additional work to go in Boston on the opposite side, but that is going to be dealt with on a separate day and through their conservation commission. So yeah, again, pretty straightforward. No tree clearing proposed as part of this and everything will be restored to grade upon completion. So with that, if there's any questions, we're happy to field them.

Speaker 1 (51:49–52:17)

My question actually was in reaction to the depth of the hole. How wide or what's the, if it's round, if it's circumference, so what are the dimensions of the hole? 10 feet is pretty deep. I'm thinking public safety purposes.

What I'm really interested in is how do you cover it up? How do you protect the public? Or how do you prevent the size of the hole itself from collapsing?

Speaker 12 (52:19–52:49)

Yeah, so this is pretty standard practice for excavation contractors and geotechnical exploratory projects like this. Rob, would you be able to speak to a little more of the depth there? I think in terms of public safety, this is going to be done in a really expeditious manner within one day, so I think that is… is kind of a benefit to the project here.

Not a long duration, nothing being left open overnight, and also a little offset from typical public access to the area.

Speaker 13 (52:51–53:38)

Sure, Dan. And so as Dan mentioned, it's off the path for pedestrian access. So the excavator would go off the road a little bit. estimate you were anticipating it would be about a five foot by five foot square pit to go down to that depth of 10 feet and the purpose is to determine what the conditions are at lower levels for that bridge foundation you know so you know, the pit would be excavated in one day and backfilled the same day, so it would not be left open to the public when the crew is no longer there.

Speaker 7 (53:42–53:47)

Do you have confidence that there's no riprap where you want to dig?

Speaker 13 (53:49–54:06)

Um, we do not believe that there is any, um, in that location, but that's part of the reason that, uh, they're, they're digging, um, below the, um, below the soils to, to figure out what those conditions are. Um, and if that footing, uh, has to move from, from where we're proposing to put it.

Speaker 7 (54:08–54:35)

Yeah, I, I think this bank was rebuilt in the sixties and generally below the high water mark, there is a, grade that is faced with heavy stone. And in some places that stone is covered with dirt and other places not. And, uh, I don't know myself how high of the back it comes. So yeah, I think you could run into some boulders down there.

Just don't know.

Speaker 1 (54:38–55:03)

Right. What about, and I know it's DCR behind this, and I know you're familiar with OSHA regs, but in usual trench work, I forget what the OSHA regs are when sheathing is required, but it's certainly anything over six feet. So do you have sheathing for this, or are you in and out so fast that OSHA doesn't control it? I don't know.

Do you?

Speaker 13 (55:05–55:37)

So I personally don't have that information. We have an excavator, a subcontractor that will be coming in to do the work. This is geotechnical work that they do on a regular basis and they do follow all OSHA standards. So it's possible that they'll go down five feet, find what they are looking for, but we're anticipating that they'll have to go up to 10 feet for that.

to determine what those conditions are.

Speaker 1 (55:40–55:49)

All right, again, I'm concerned with the overnight aspect, if it's left open. And I don't know the trigger for sheathing.

Speaker 13 (55:49–55:50)

Yeah.

Speaker 1 (55:50–55:52)

But it's less than 10 feet, I know that.

Speaker 13 (55:52–56:07)

Right, and they would not be leaving it open overnight. They would be closing it up the same day. So they'd put the pile of soil that's excavated next to it, the pit, and backfill it on that same day.

Speaker 1 (56:08–56:22)

All right. Does it require reseeding, or I'm not sure what's there right now, but when you return it to its normal state, does that require any kind of wildflower seed or anything of that nature?

Speaker 13 (56:22–56:57)

Yeah, I think, Steve, if you zoom out a little bit, I think we had some pictures on the side of this graphic that kind of show what the existing conditions are. So, you know, you'd want to, yes, you'd want to just kind of reseed it to get back to what's there. And I think the one up top is a little bit more information. There we go.

So those are the general conditions where we're going to excavate.

Speaker 7 (56:59–56:59)

Understood.

Speaker 1 (57:01–57:09)

I'll defer to Wendy, Ingrid. What do you think about just return to normalcy? Does it require reseeding?

Speaker 4 (57:15–57:18)

I'm not sure what's there either at this moment.

Speaker 1 (57:19–57:21)

Say again. I didn't hear it all.

Speaker 4 (57:22–57:28)

I can't tell, so I can't say right now what's there from these pictures.

Speaker 2 (57:29–57:32)

It's mostly invasives, Ingrid.

Speaker 4 (57:33–57:36)

Oh, good. No big surprises.

Speaker 2 (57:36–57:37)

Right, exactly.

Speaker 4 (57:38–57:39)

What kind of invasives?

Speaker 2 (57:41–57:49)

Let me think. I think there's Greenbrier, which is not an invasive, but I'm sorry, I just don't remember what's there.

Speaker 4 (57:51–57:58)

I mean, if that's the case, then reseeding with a wildlife mix would be a distinct improvement.

Speaker 2 (57:59–58:03)

Yes. Yes. Wildlife mix would be fine.

Speaker 1 (58:07–58:12)

All right, good. So any other comments, questions? Wendy?

Speaker 7 (58:12–58:21)

Is this bridge going to be level, or is it going to go downhill from Milton to Mattapan?

Speaker 13 (58:22–58:51)

I believe it goes down a bit from Milton to Mattapan to get to the grade on the opposite side of the river. I think there's a profile at the top of the page. Steve, if you want to pan up. This kind of gives a general indication of the grade that would be required to meet Osceola Street.

So if you slide to the left a little bit,

Speaker 2 (58:51–58:55)

Yeah, slide sliding to the left.

Speaker 13 (58:56–59:05)

Yeah. So it's about a two and a half percent grade downgrade from Milton side down to the Boston side to meet Osceola street.

Speaker 7 (59:07–59:33)

Yeah. Um, it's obviously if you stand on the back of the Milton side, you're up higher. So, uh, I guess if you have a bridge that has a grade to it, you don't have to dig down so deep into the Milton Bank, which, I don't know, I think that's appropriate here. I would rather have a graded bridge than a big excavation.

Speaker 4 (59:37–01:00:00)

I have one more question. Rob and Steve, can you tell me what is the nature of exposure at that site in terms of how much sunlight? Because those wildlife mixes really, I believe, they require a whole lot of sunlight.

Speaker 2 (01:00:00–01:00:14)

There's a lot of sunlight. There will be a lot of sunlight from the east. And depending on which trees come down, there'll be even some sunlight from the west, Ingrid. I see.

Speaker 4 (01:00:14–01:00:15)

OK. All right.

Speaker 2 (01:00:15–01:00:24)

There's a couple of large, I believe they're oaks, along the bank. And I'm not sure. where this is in relation to the big trees.

Speaker 12 (01:00:25–01:00:31)

Yeah, those aren't proposed to be removed as part of this work. There's no tree removal proposed for the excavation.

Speaker 2 (01:00:32–01:00:39)

OK. OK. So there'll be exposure from the east.

Speaker 4 (01:00:39–01:00:51)

OK. Well, I guess it's worth a try. But I do recall that those mixtures tend to be really need a lot of sunlight to do well. Yes.

Take and to do well.

Speaker 1 (01:00:54–01:01:39)

Any other thoughts, comments, or can we move on to a vote? And it seems like this would be a negative determination of the RDA with the conditions that the hole not be left open overnight, that OSHA regulations are complied with during the excavation process, and that there be, after backfilling, that there be a wildflower seed mix placed on the surface. Anything else? Hearing none, is there such a motion?

So moved. All right. Thanks, Ingrid. I heard you first.

Tom, is that will make yours a second? Is that okay?

Speaker 7 (01:01:40–01:01:40)

Yes.

Speaker 1 (01:01:41–01:01:54)

All right. Any discussion among commission members? Hearing none, Arthur Doyle, how do you vote? I can't see you, Arthur.

You might be on mute.

Speaker 10 (01:01:55–01:01:56)

I was. Thank you. Yes.

Speaker 1 (01:01:57–01:01:59)

OK. Tom Palmer, you vote?

Speaker 10 (01:01:59–01:01:59)

Yes.

Speaker 1 (01:02:00–01:04:26)

I vote yes. Wendy, how do you vote? Yes. Ingrid, how do you vote?

Yes. And I, John Cannon, vote yes as well. So that's the annulments negative RDA with those conditions. Thank you very much.

Thank you. Thank you. All right. And I think that brings us on the agenda to new business number four.

Oh, actually, I should just put this on the public record that maybe I did it before we started. But number 24 Wentworth Farm Road, there is an existing E enforcement order. I was going to say EO. And that's one in which we sent out a request for proposal for a consultant to come in to give us some advice in terms of the viability of the septic system that was installed.

in light of the fact that it didn't conform to the original approved plan. So we did get a response back, and the town has approved a contract with Deb Keller as our consultant from Merrill Engineering. There was a bit of a slowdown because of just getting the approval for the contract to be signed. And by the way, this contract, it's at the cost to the, I say applicant, but the person who is the subject of the enforcement order.

The contract, I think, is in the amount of $2,100. And in any event, that was approved. Nick Milano signed off on it. It's gone to Deb.

But she's just received that approval. She has the information. She's got access to the file. Tom Palmer, took, I don't know, 51 photographs when we were out there at a site visit.

I forwarded those to Deb Keller. So she's up and running, but was not able to have anything ready for tonight. So as a consequence, I talked to Ned Corcoran, who was counsel for the homeowner, and we agreed that this would be kicked to next July. However, in the interim, I think Ned and Steve Ives and Deb Keller are going to meet on site this coming Friday.

So they should be able to make some progress, and we should hopefully be able to resolve this by the July meeting. That's just an update as to where that is. Steve?

Speaker 7 (01:04:27–01:04:41)

Yep, yes? Is it the case that the main difference between the plan and the work Was it they used the boulders for the retaining wall rather than building the retaining wall? Is that correct?

Speaker 1 (01:04:42–01:05:54)

That's part of it, yes. The other part was that we've got some photographs from September of a filter fabric being used at the site. And a filter fabric, now as I understand it, and that's why we have Deb Geller, a filter fabric, if it's used, requires a different sized chamber. So we don't know if it's properly sized vis-a-vis the chamber, if the filter fabric was used.

And it appears it was used because of the photos we have. And the concern is that it was not inspected before it was backfilled. I believe we have a sign off for the health department, but that was not done until January. And the original approving engineer was Jeff Kane.

His services were terminated somewhere around September. So there's kind of a gap there. So we want to make sure that it's not just the wall, which is one component of the design that changed, but the other component was the use of the filter fabric and whether or not that necessitates a size change in the chamber.

Speaker 7 (01:05:55–01:05:58)

Thank you, John. I had forgotten that other aspect.

Speaker 1 (01:05:59–01:06:13)

Okay. All right, so that's off until we'll have Steve and Attorney Cochran and Steve Ives meet on this coming Friday.

Speaker 2 (01:06:14–01:06:15)

Friday at 11 o'clock.

Speaker 1 (01:06:16–01:06:22)

All right. Any other new business from anybody, Steve or anyone?

Speaker 2 (01:06:22–01:06:23)

No, sir.

Speaker 1 (01:06:24–01:06:29)

Wow, so what's the date of our next meeting official meeting in July.

Speaker 2 (01:06:29–01:06:32)

July 9 July 9.

Speaker 1 (01:06:32–01:06:44)

Perfect. All right. Well, hearing nothing else, and am I missing are there any hands raised if there are members of the public? I can't see them.

Steve, can you spot anybody that has a comment?

Speaker 2 (01:06:45–01:06:47)

I don't see any other hands.

Speaker 1 (01:06:47–01:06:49)

All right, then how about a motion to adjourn?

Speaker 10 (01:06:49–01:06:56)

John, before we do that, do you want to give an update on the additional signs discussion?

Speaker 1 (01:06:57–01:08:14)

Yeah, that's a good piece of new business. We had taken a vote a couple of months ago to approve up to $10,000 for additional signs. And I think that there… between Arthur and Chase Berkeley and others.

Somebody, I guess Chase went back to the sign company that made the first 10 signs and the bid came in at 12.5. So it looks, and the turnaround time is terrible. It's between four and six months to have these things manufactured. I have no explanation as to why it takes that long.

But Chase, as a consequence, is looking for an alternative manufacturer. But because of the price differential, we only authorized 10,000. So the number of science dropped to eight instead of 10. But they're the same design as the first 10 that we installed really under the guidance of Arthur in terms of locating and making sure that the DPW got them in place.

So first year was a success. The second year looks like we've been slowed down a little bit. So that's the status of that. We're waiting to see whether or not Chase can find a speedier supplier.

I guess four to six months is quite a delay.

Speaker 10 (01:08:14–01:09:17)

Mr. Chairman, I would offer just the additional information that it's two years since the first purchase. So the increase in price would reflect the inflationary and labor costs changes over a two plus year period. year period.

So I wanted to ask, recognizing that Chase is looking for alternatives, that if satisfactory alternatives are not found, and albeit there would be a time delay which gives us, by the way, some time to determine the additional site locations and have our motions in place where there are possibly in wetland areas to go to the number of eight rather than 10 that was initially planned for, again, assuming that the director of the DPW cannot get an alternate supplier. of quality science.

Speaker 1 (01:09:19–01:09:24)

I'm sorry, your suggestion is then is to locate eight sites?

Speaker 10 (01:09:24–01:09:28)

The suggestion would be to reduce the order from 10 to eight.

Speaker 1 (01:09:32–01:09:51)

If Chase cannot get- Well, right, yes, because the only authority that we've approved is $10,000. So that he would have to do that. I don't think we need another vote. because that's all the money that we've got, at least so far allocated for this particular decision.

Speaker 10 (01:09:51–01:09:58)

I just wanted to be clear that we could follow that type of approach and that everybody understood it was an agreement.

Speaker 1 (01:10:00–01:10:04)

Yeah, what you just said makes perfect common sense.

Speaker 11 (01:10:06–01:10:09)

Tell my wife this is common sense.

Speaker 1 (01:10:12–01:13:03)

All right, good. And the other thing is that I don't know if we can do it tonight, or if I think we probably should. I think there's going to be general consensus on where do we place the signs that Chase Berkeley, again, was good enough to order for us. And he said the turnaround time for these no parking signs is about a week.

So that's not an issue. We're talking about 10 signs, so the cost is much, much different. The green conservation signs cost about $1,000 a piece. The no parking signs are pretty cheap.

So he can turn that around quickly. He's already ordered signs that say no parking, wetland resource area. and at Arthur's suggestion, they're going to be white background with dark green paint as opposed to black paint. And I did check, and Chase Berkeley indicated that there is no difference, there's no enforcement regulation that requires that they be black paint on white background.

He said they're equally enforceable as green paint, and that would be more consistent with the resource areas that we're trying to protect. Now these signs are to go at the lower Guile Road field area. I wish Hans were here because he's got sight in his mind. And we've got, I think just for planning purposes, we've got about 10 signs.

Some can go at the end of Elm Street and perhaps the end of Gulliver Street to prevent parking there, maybe as far as Wendell Park, because people are parking in that area adjacent, very, very close to the brook actually. Some of the overhead. plans actually show cars parked there from Google Earth. And then the other sides will go, as we were initially focused on, is actually, is Deb Milbauer on?

I don't see her. She said she couldn't make it, but somebody from the Pine Tree Brook Association might be able to attend our meeting tonight. But the idea was to get everybody together, and the everybody includes the school department, because they own some of the land, and the Parks Department, and they own some of the land. So I reached out to Lizzie Carroll, who was chairman of the school committee, and Kevin Chisholm, who is director of Parks and Recreation.

And they said, no, they're all in favor of these signs. They want them to be put up. So they were invited to participate in locating the signs. Steve, I don't know if you've got those in a screen shareable view.

Yeah, that's the old man that Han sent to us.

Speaker 2 (01:13:04–01:13:10)

No, I have nothing. I don't think I've seen what Han sent.

Speaker 1 (01:13:10–01:14:46)

Okay, I thought I sent them I sent them around to chase and to Lizzie Carol and to Kevin chrism. But anyway, I don't think there's any magic to it. I would defer really to chase in terms of locating the science and I think he's an agreement that 10 would be sufficient. Now, in addition to the area low down near to the pedestrian bridge that goes from Dial Road over to Parkway Crescent, I think everybody agrees there's a need for up the hill to have some signs.

Because once again, the overhead photographs actually show cars parked there. And they're right adjacent to the wetland. I mean, they're within just a few feet of the wetlands. So I will endeavor to send those around so that everybody's looking at the same overhead projections.

And everybody should kind of weigh in and say, I think they should go. you know, as far as this. The spread of where the signposts actually go, I think, is going to be up to Chase Berkeley. But they're ready, willing, and able to do it.

They're waiting for everybody's agreement, which they already have. Now it's just a question of, you know, where do we think they should go? So please weigh in. I'll send the photographs, the overhead projections, around to everybody so everybody's looking at the same documents.

Was that… Go ahead, Wendy.

Speaker 3 (01:14:47–01:15:19)

Thank you, Steve. I'm wondering if it would make sense for us to utilize the same signage, like at the end of those dead-end streets off of Audubon that go practically right up to the brook, where we've often seen on our site walks and when I've just been walking around the neighborhood, you know, cars will park right at the end of those dead-end streets. I mean, just beat from the brook.

Speaker 1 (01:15:20–01:15:30)

Now, is that because the neighbors are using it as parking spaces as opposed to the sports families that are using the fields?

Speaker 3 (01:15:30–01:15:34)

I honestly don't know who the cars belong to.

Speaker 1 (01:15:35–01:15:38)

OK. But I would guess. I think that's a great point, Wendy.

Speaker 3 (01:15:39–01:15:48)

I would guess it's a mix of both. OK. And it would be nice to have signage that was consistent.

Speaker 11 (01:15:49–01:15:50)

Yes.

Speaker 3 (01:15:50–01:16:02)

And if our parking policy is also consistent. If we don't want people parking by the field next to the brook, then we don't want them parking anywhere next to the brook.

Speaker 7 (01:16:04–01:16:24)

It's hard, though, I think, to put up a no parking sign on a public street. I mean, those streets are, those dead end streets are streets. So I think you might get in the way of those residents having guests and visitors if you put up signs on their streets.

Speaker 1 (01:16:27–01:17:27)

Well, in terms of consistency, Wendy, and apropos of Tom's point, the overhead that the pictures that I'm going to send to everybody show at the end of Wendell Park and Elm Street, you can see some cars from the satellite photograph. They parked on the grass. And it's the grassed area that is next to the brook. It's not the street itself.

It's off-street parking. And that's really the same problem we've got with Guile Road. And Guile Road is pretty narrow at that point. So what's happening is people are driving down, but then pulling onto the dirt or the grass, which happens to be resource areas, or at least buffer zone areas.

So those are the areas that the signs are going, not to prevent street parking, but to prevent, essentially, grass parking. Now, so my question then goes back to you, Wendy. Are you aware of people parking on the grass off of the Meccanum?

Speaker 3 (01:17:29–01:18:01)

I would have to double check, but I do seem to recall that on one of our site visits a couple of years ago that there was a particular street where the pavement ended and there was then hard packed dirt that was from the end of the road, between the end of the road and the brook, and that there were cars that were parked in that dirt area.

Speaker 1 (01:18:03–01:18:41)

You know what you might want to do is, and we can ask Alan Bishop or Chase Berkeley to get us additional satellite photos of those areas that you've identified. And with those, you might go to Deborah Milbauer, because she's, I think her title is president of the Pine Tree Brook Neighborhood Association. And she was the impetus behind this No Parking signs on the other side of the brook. So she'd be the perfect person to talk about it, to talk with.

So if I can get you those photos in addition to the ones I'll send to everybody, maybe you could reach out to her and get her input on that.

Speaker 3 (01:18:42–01:19:09)

Okay, I seem to recall, and Steve, you may remember, I think that you and I were discussing it at the site walk, but it wasn't entirely clear if the dirt area where there were cars, if it was private property or if it was public property, and Is this ringing a bell at all, Steve?

Speaker 2 (01:19:09–01:19:20)

Yes, it sure is. And we didn't have a final conclusion as to what was what when we were out there. So you're absolutely correct.

Speaker 3 (01:19:22–01:19:34)

Regardless, my understanding is that we can't park anywhere in town on the street overnight without express permission from the police department.

Speaker 7 (01:19:37–01:19:38)

That's true in my neighborhood, I think.

Speaker 3 (01:19:40–01:19:47)

And I know that sometimes it seems like random selectiveness that certain neighborhoods get ticketed.

Speaker 2 (01:19:51–01:19:55)

Having been ticketed in my own town, I know all about that. Yeah.

Speaker 1 (01:19:56–01:20:34)

All right, well, let's take the first step first and identify the areas. And then we can figure out how this will fit with the, and I think you're correct, there is an overnight parking ban throughout the town, I thought. Enforcement, I don't know. But we might be able to draw a distinction between wetlands protecting resource areas or buffer zone areas as opposed to paved streets.

Maybe taking the first step first is let's protect the resource areas.

Speaker 10 (01:20:35–01:21:46)

I agree, Mr. Chairman, if I may, there are several locations in town where this is an issue beyond the point that we're discussing. And maybe we need something more than signage at some point in time that can inform the public. For example, we were down in the city of Wendell Park not too long ago visiting and There were automobiles there that were parked not parallel and on the pavement, but vertically and up toward the water, the brook.

We would never allow any equipment to be stored there overnight, but you can see very clearly from the soil and the grasses that these are used for perpetual parking, and they were on both sides of Wendell. So as we drove in one side and home on the other side, so we might take a look at situations like that once we get beyond the situation that we're discussing at the end.

Speaker 1 (01:21:47–01:21:53)

Hathi, you will see those cars in the satellite photo at the end of Wendell Park.

Speaker 3 (01:21:54–01:21:54)

Wow.

Speaker 10 (01:21:54–01:22:04)

They're not on the road. They're not on the road. These were not at the end of Wendell Park, Mr. Chairman.

They were along Wendell Park. Oh, okay.

Speaker 2 (01:22:04–01:22:07)

I have seen them as well, Arthur. Absolutely.

Speaker 1 (01:22:10–01:22:14)

Mm-hmm. Wow. Along the center strip there between us?

Speaker 10 (01:22:14–01:22:15)

Yes. Exactly.

Speaker 1 (01:22:15–01:22:15)

Yes.

Speaker 10 (01:22:16–01:22:19)

Mm-hmm. In fact, vertical to the stream.

Speaker 1 (01:22:20–01:22:27)

Well, that's not good. All right. So, Wendy, your idea is expanding.

Speaker 3 (01:22:27–01:22:29)

It's a big problem, it seems. Yeah.

Speaker 1 (01:22:30–01:23:43)

All right. Well, let's get the pictures out first, coordinate with Pine Tree Brook Association, the Neighborhood Association, and then check with it. We may have to involve Chief John Keogh of the police department and find out about the enforceability of this. Because you're right, they shouldn't be parking next to the brook.

It's just like, remember, we had the issue with Eversource down by Fontainebleau Academy. And it's fine for emergency purposes, but they wanted to store the trucks there. Permanently. And some of the trucks were actually so big that part of the truck was extended out over the water.

Over the water. So that didn't seem like a good idea. And they were good enough. They said, OK, we won't park there.

They just asked for permission in emergency circumstances. And of course, public safety emergencies are important to all of us. But these are issues, so let's take the first step first, and I'll get the overhead photos up to everybody tomorrow.

Speaker 3 (01:23:44–01:26:34)

John, there's something else that I'd like to bring up if we could take a few more minutes. Sure. And it's actually, again, involving Pine Freebrook and Deborah Milbauer and the others from the Pine Tree Brook Association, but it seems that there's some overlap in our CPC application that the commission submitted and an application that the Pine Tree Brook Neighborhood Association submitted. Both of the applications are looking at sort of a a ecological summary of data that's available.

I believe ours was a much larger geographic area of most of the conservation properties in town. The Pine Tree Brook was proposing something that was very specific just to their neighborhood. and the 10 acres of conservation land in that vicinity. The challenges though, at the last week CPC meeting, Kathleen O'Donnell explained that both of the applications may not be eligible.

because they really are not closely aligned with the legislation. And that Kathleen spoke about the importance of there being like a very tangible a tangible project that would be in keeping with the real estate aspect of the legislation. So what I'm wondering is if there might be, since we're still at the early stages of this fiscal year's funding application cycle, if there might be a possibility for us to collaborate with the Pine Tree Brook to maybe revise the application, our two applications, to propose something that might be more in keeping and consistent with the legislation so that it would be more fundable by the committee?

Speaker 1 (01:26:36–01:30:00)

Simple answer, absolutely yes. Not only is there overlap, and I have not read or seen the Pine Tree Brook Association, but I do know there's also overlap with the Climate Action Planning Committee. They submitted a much larger one plan. Ours was a little bit different to the extent that The focus was on the educational part of it, to get the schools involved.

And I, without any authority, I kind of used the superintendent's name in vain. He should be the lead on providing an academic leader for a project that involves both experts, scientists and students, both at the collegiate level and at the secondary school level in the environmental sciences. And the whole, our whole purpose was to do a benchmark. It offers the inspiration that came from Arthur and his inspiration came from Professor Primack at BU, the book globally, Walden Warming.

And the whole idea is to benchmark both wildlife and wildlife habitat in order to come up with a plan to preserve the open space. So that might be an indirect way of getting, how do we get this into the open space? The whole idea is how do we save it? How do we save the forests?

And in our application that I submitted to the committee, the idea was to use what we already have by way of comparison. Now, people may have forgotten, but within the last, what, six years, we've actually funded two migratory bird studies, maybe more than six years, maybe it's eight years. But we've funded two migratory bird studies as to what's happening, because I know Judith Darrell Kemp was very interested. Why is the bird population plummeting?

And it is, nationally. It's just It's gone off a cliff, and people don't know why. So that's why we funded it. And then we did one forestration study to see how we're doing with the rest of the state.

And that actually came out of our pocketbook. So we actually have those three benchmark studies to compare the forest appearance, to see how the forest is doing and how the migratory birds are doing. So we actually do have a benchmark to compare it to. But we just need to see whether we're going up or down and how best to proceed.

But to answer your question, collaboration, yes. And we're not trying to reinvent the wheel here. And I think Ron Israel, is that, I think that's his name, Arthur, am I correct? I think he's the chairman of the Climate Action Planning Committee.

He's been one for about 75,000. And I recognize that some of that was overlapping. I didn't even know about the BioDream program. But my purpose was to include the schools to get some academic component to bring in scientists and educators and get the kids involved.

High school kids in the environmental science classes. And Arthur, I think that's part of the curriculum now, isn't it?

Speaker 10 (01:30:00–01:30:23)

Well, we have, I think Milton High has two environmental science courses, one which is honors and one which is non-honors. But I don't believe they have that. My last check is advanced placement in environmental science. That's the university level course that's taught at the secondary school level.

Speaker 1 (01:30:25–01:30:42)

Who submitted it for the Planetary Brook Association? Do you know? Deborah? I'll call her and we'll compare notes and see, and then we'll bring back a proposal to this committee.

Do we have a timeline on that, Wendy?

Speaker 3 (01:30:44–01:31:43)

Yes. Well, the initial deadline for the The first-level review has already passed, and the committee is meeting actually tonight. They met last week, and they're meeting next week to review those initial applications just to look at how, if they meet the first-level criteria of the letter of the law, so to speak. And while nobody was disputing the importance and the value the CONCOM's proposal.

Unfortunately, based on Kathleen's review of it, she didn't think that ours was eligible. And she had some questions about Pine Tree Brooks as well.

Speaker 1 (01:31:44–01:31:50)

Do you have the same questions about the Climate Action Planning Committee?

Speaker 3 (01:31:50–01:31:52)

Yes. Yes.

Speaker 1 (01:31:52–01:34:11)

Well, let me be in politic and say this because I need input from the commission members here. But last year, one of our applications, we had three applications last year. Two years ago, we had the pedestrian bridge. Last year, we had both the completion of the pathway around the pond, and we had the study for the handicapped accessible pathway around this pond.

And then the third one was to get money to purchase a conservation easement for open space. And I identified the space, I met with a prospective purchaser, and the money was somewhere around $2 million. And I sought $100,000 to kind of sweeten the pot for the buyer, because the buyer agreed to sign a conservation restriction that would preserve 6.8 acres on Blue Hill Avenue. And the committee denied it.

And the comment at the committee meeting was, wouldn't this be a great space for affordable housing? And I said, I think appropriately, that that's a great social goal, just as preserving open space is a great social goal. And I think we can do both. But the problem was, we were denied.

And that application was rejected. And that was for the pure purpose in compliance with the legislative goal to buy open space. Now, not buy it in fee simple, but buy it at conservation restriction to prevent development. And the prospective purchaser was willing to do that.

If we added our 100,000 to her 2 million, I think it was sold. The last time I saw any of the traffic, the townwide traffic, I think it's now the proposal for a preschool, a nursery, pre-nursery school.

Speaker 2 (01:34:11–01:34:12)

Yes, that's correct.

Speaker 1 (01:34:13–01:34:16)

Yeah, so.

Speaker 3 (01:34:16–01:35:20)

You know, John, I would like to go back and look at the notes from that particular meeting as to why specifically that proposal was denied. But I'm guessing it was not because it didn't meet the criteria of the legislation. It's, you know, unfortunately the committee doesn't, we just don't have enough money to fund all the good projects that would be so beneficial to the town. And unfortunately this year is even more difficult when it comes to prioritizing and deciding amongst the applications because there's, we, only have about $1.2 million that we're expecting to have to give.

And we have over $4 million of really great proposals before us.

Speaker 1 (01:35:21–01:35:58)

So, you know, which is- But my only, my point, I understand all that. And I understand the role of prioritization. But if pure compliance with legislative priorities, preserving open space, we don't have the money to buy that. You don't have the money to buy land.

But we do have the money to buy conservation resources. And that's why I was surprised that it was rejected out of hand. Now, it might have been just a matter of priorities, because they did support the Pope's Pond pathway. So I applaud that.

Speaker 3 (01:35:58–01:40:14)

Correct. And that is something that Kathleen suggested that we might want to consider, that the Community Preservation Act does support feasibility studies and that sort of administrative work. if those studies are leading to something that's very tangible. And in the case of the Handicap Access Feasibility Study, it is in fact leading to this enhancement of this wonderful path around the pond.

So maybe what would, And we can check with Kathleen to see if something like this might be more in alignment. Maybe we focused the environmental studies that we proposed from a bigger perspective, maybe focus it on around Pope's Pond and along Pine Tree Brook. And it would, another thought would be to join forces with Yet another CPC proposal that I believe Arthur and John, you guys were at some of the meetings where this proposal was talked about, where a gentleman who's a town meeting member from Precinct One, he's also one of the leaders of the Pope's Pond Neighborhood Association. Jeffrey Stone, I think is his name.

He's proposing a three mile long, calling it the Milton Brook Walk, which basically is overlapping a lot of the work that we're doing in around Pope's Pond, connecting it with Turner's Pond, a longtown brook, and then working its way out to the Neponset River pathway. So he'd like to make that connective fence. It's about three miles long. Just make it more formalized and ideally handicapped accessible as well.

But he's also at the feasibility stage of doing this kind of thing. And that project was funded by the CPC last year. And part of that study, that feasibility study, which is being done by BHP, I believe, was to look at the environmental resources at a high level, kind of what existing information is already available, but compiling it into one nice package that would be more accessible for everybody. So it seems like, I guess what is a little bit concerning but also really exciting is that there's all of these projects that are going on by the different groups, right around Pokes Pond and Pine Creek Brook.

and it's being very much supported by the Community Preservation Committee. But I just wanna make sure that where there's overlap, that we're all collaborating and taking advantage of economies of scale wherever we can and utilizing all the information that the different consultants are providing and what's already available at our town and just making sure that we're doing it as efficiently as possible.

Speaker 10 (01:40:14–01:40:58)

John, a follow-up question for Wendy. Wendy, May 31 was a deadline date for the preliminary applications. My tongue is getting wrapped around my teeth at this hour of the night, and it's only 9.10. Will the chair, on behalf of the CPD, when responding the making suggestions like you just mentioned, such as bridging and being more concrete in identifying tangibles, or will there be denial without further

Speaker 3 (01:41:04–01:41:08)

I'm sorry, Arthur. I don't think I'm following you. I don't understand your question.

Speaker 10 (01:41:08–01:41:55)

Well, the first pass of the applications was due on May 31st. Right. Those are the preliminary or the initial applications. Now that the committee is doing its work, will the committee's chair on behalf of the committee possibly be sending out a communication to some of the applicants, like the one from the ComCom, Instead of denying it today, we have a couple of related proposals.

We suggest that you meet with the applicants of these proposals. You find a joint proposal, be more tangible with respect to the outcomes, and come back to us on phase two for further review by the CPC.

Speaker 3 (01:41:57–01:43:29)

Yes, historically that has been how the CPC has worked. We have collaborated very closely with the applicants to revise and sort of craft a proposal that we thought was more fundable, and that is Also, in keeping with the discussion that the committee had last week about the CONCOM's proposal. So I think I wish that I had reached out to Deborah to perhaps have her as part of this discussion as well. I don't know if it would make more sense for us to set up a smaller meeting with the Pine Tree Brook people and perhaps also with Jeffrey Stone, and the work that they're doing with their feasibility study.

Because $3,000 of that funding is supposed to be going towards the environmental study of those areas.

Speaker 1 (01:43:31–01:43:31)

Sure.

Speaker 10 (01:43:32–01:43:33)

Very helpful. Thank you, Wendy.

Speaker 1 (01:43:34–01:43:39)

Can you send me a copy of the Pine Tree Brook Association application?

Speaker 9 (01:43:40–01:43:41)

Yeah.

Speaker 1 (01:43:42–01:43:58)

That'd be good. And maybe when you talk to Deborah about parking signs along Pine Tree Brook, you can try to set up a meeting. I'm certainly available at your convenience to talk with you and Debbie at the same time.

Speaker 3 (01:43:59–01:43:59)

OK.

Speaker 1 (01:44:00–01:44:02)

And Ron Israel and Jeff Snow.

Speaker 3 (01:44:04–01:44:24)

Yeah. I'm wondering if it makes sense to I don't know. I would just, I would love it if it was, if there was an easier way that we could be having these conversations with all the different groups, you know, rather than.

Speaker 1 (01:44:24–01:44:52)

Well, the public meeting would be pretty complicated because everybody would have to be there and announce. So, a subcommittee might be the way to do it. you know, an appointee from each group to get together and get the committee work done and then report back to the larger committees. And then in some way, that joint meeting would be appropriate.

But I think it would be like herding cats to get everybody together at the initial meeting.

Speaker 3 (01:44:52–01:45:19)

Yeah, exactly. And who would be the one to organize and facilitate all that? You. That's easy.

Speaking of which, John, would you be willing to give us a brief update on what's going on with the bridge and the feasibility study?

Speaker 1 (01:45:22–01:45:34)

Yes. Somebody called and asked for that, and I wrote a brief report. Now I can't remember who I sent it to, but somebody had asked that. Oh, probably Julia.

Speaker 3 (01:45:34–01:45:43)

Julia, the CPC administrator. I was asking as a member of the CONCOM, not as the CPC.

Speaker 1 (01:45:43–01:49:36)

No, that's right. So I guess, you know, going back in time, Probably December, when Jake Berkley, director of DPW, and I met with Dan Jablonski, professor of engineering at Northeast. And his student lead, I think that's the correct term, who would be the lead student engineer on this project. And we walked the site.

And the purpose was to locate the narrowest crossing for Pine Tree Brook. The bridge is not going over the pond. It's going over the brook. We're trying to figure out where is the easiest place with the shortest span.

And so Chase worked with And we had a number of plans with us. So we saw that some of the property lines are not even along Parkway. towards the pond or towards the brook, actually. And what it does is it pinches the public land if you were trying to walk all the way to Canton Avenue.

So that's the point that we logged in. It happened to be, serendipitously, it happened to be the shortest span over the brook. So it worked out. And so I sent a report to this committee.

back in December or January, saying what we had done, what we had accomplished. And it showed that it was, I think it was at flag number 60 is the shortest distance. So that went to Dan Dulasky and his crew. And then about six weeks ago, nothing was happening.

So I reached out to Steve, I think I contacted, and I know I ended up writing to Chase and to Dan and said, what's going on? And Chase Berkley and Dan have met a couple of times since then. And they have now put the survey of the weather flags. They've located the bridge, and they've now set it back for the shortest spin out.

Part of this process is to figure out how long the bridge is, which translates into how heavy is the bridge, which translates into how many sauna tubes do you need to support the bridge. So I think they can do it with I don't want to say four, but we were struggling with eight of these tubes, because you have to get away from the brook to drop the tubes in the land. So I think they've got the smallest number of sonic tubes to suspend the bridge. And now they're in the specification, so we know the exact length of the bridge.

You know, it was like a it's a 25 foot crossing, but you have to expand beyond that to find solid land to put the you know the extension on the bridge down into the ground. So they're trying to keep it as short as possible. We've got a We had an earlier specification submitted for bids, and they came in at about 64. The best bid was like 64,000.

That was a 60-foot span. We think we can do it for shorter than that, but we know the price is going up, because that bid is probably four years old now. So we're right now waiting, and I would hope to get in the month of June, the specifications for the bridge with the number of sonotubes. They're actually called helical piles.

They're not called sonotubes. But the helical piles, I think we've got down to four to suspend the bridge. And so I would expect before the 1st of July to have some kind of a specification suitable for bid.

Speaker 3 (01:49:39–01:49:54)

Very exciting. Okay. And what about the feasibility study? Has there been any action on that?

Speaker 1 (01:49:54–01:50:12)

No, there's been no action on the feasibility study other than my talking to Pete Jackson. And we actually talked about it when we were on the site walk at Turner's Pond. And we've got some issues there that we, I don't think, were you there on the site walk?

Speaker 3 (01:50:13–01:50:15)

No, sadly, I missed that one.

Speaker 1 (01:50:15–01:51:48)

All right, because we've got some design problems there. And one of the problems is, how do you handle the drainage underneath the stone dust pathway? I say stone dust. I know there's another product.

So we were kind of comparing notes at that point. Because Martha, you all recall this. I think you were the one that asked for respects on whatever product they were using. they had to use and whether or not there's a better product.

Because the one at Turner's Pond is washed out. That's not a happy ending, at least right now. I think that's got to go back to the government to figure out how to fix that one. So we were talking about using that information for the Pope's Pond study.

But right now, that does need to be pushed. I guess that's up to me to get back to Pete Jackson and figure out what he and originally Charlie Gamer did by way of the plan for Turner's Pond. Now that goes back to 2010 or 11 when the first one went in. And then they did another study in conjunction with the Parks and Recreation and DPW for the recent upgrade.

So they've got the plans and specs for that one. Do you think they were happy with the contractor or not happy with the contractor? Or is that a design issue?

Speaker 10 (01:51:48–01:53:04)

I don't think they disclosed it. I had the impression that the contractor had done more than the contractor was originally contracted to do. But they had to go over budget, the contractor did more, the plant department did more. But I think that and the discussion that we had with the ice health space was something that we might put on a future agenda.

And that is in terms of looking at projects, Do those projects anticipate what increased water is going to be so that the projects, even during their construction phase, as rainwater, stormwater increases, are going to be built according to a plan that accommodates changes due to climate change? I mean, it's not something that's coming. It's something that's been with us for a while. And it's getting more severe.

Speaker 11 (01:53:04–01:53:05)

Yeah.

Speaker 3 (01:53:07–01:53:52)

Yeah, I mean, last summer was the second wettest summer that's been on record. And they're expecting this continuous Easter famine cycle of drought. and they lose. And that is one of the concerns that I have with the accessibility plans that we have for Pope's Pond, because if we're planning for that based on current rainfalls, then it's going to be, it's not going to be good enough.

I think by the time everything is built up and put in the ground.

Speaker 10 (01:53:54–01:54:11)

And forecasting data is available from several sources. So we might be taking a look at it ourselves and suggesting that applicants be apprised of this information as part of what they're doing and coming before us.

Speaker 1 (01:54:12–01:54:28)

Well, Arthur, won't some of that data become available through the Marsh Lands grant? Because I know that's primarily tide, but rainfall is going to be a significant component of the flooding that's anticipated on Riverside Drive.

Speaker 10 (01:54:28–01:54:55)

I think several of the state agencies and the inter-agency work that is underway, work that is being done by the Once the Watershed Association and several other parties come together, we'll provide a great deal amount of data. But the state has increasing amounts of information and projections that we could use as resources both internally and could be used externally.

Speaker 1 (01:54:58–01:55:20)

we should keep some kind of an inventory, and we're gonna put this in the lap of Philip, but we should be collecting this data and putting it into like a conservation commission repository, so that, you know, like a research bank or a library, so that we could access it, because it is becoming more and more relevant.

Speaker 10 (01:55:22–01:56:03)

Yeah, even homeowners, for example, two years ago, so, We put on this house, which is built in 39, newly sized gutters in downspouts because of the impact of the increasing rainwater on the house itself. And the change that those increased drainage capabilities has made on the property has been phenomenal. Phenomenally positive. people doing that, the contractor said, are you busy doing this stuff these days?

Speaker 3 (01:56:04–01:56:23)

Oh yeah. Well, gosh, I mean, look at the Ice House. They had to redo their drainage. I just want to make sure that whatever projects that we, the CONCOMM, are doing, that we're that we don't have to redo them.

Speaker 10 (01:56:23–01:56:32)

It would be very helpful and responsible to all of these people by having such information ourselves and making it available to other parties.

Speaker 1 (01:56:34–01:57:08)

And not to single out the Conservation Commission application to the CPC, but that benchmarking, that's part of the benchmark. Right. Because it was not wildlife, but not just wildlife, it was wildlife habitat. And that's one of the data points that's significant in the collection.

So I think there are takeaways, maybe to take issue with Kathleen O'Donnell, that I think there are some takeaways that are consistent with and compliant with the legislative goals of how do you preserve or enhance open space?

Speaker 10 (01:57:10–01:57:20)

Right. And I was thinking about whether or not, what's the definition of tangibles? Are they traditional definitions or are they contemporary or futuristic definitions?

Speaker 3 (01:57:26–01:57:31)

You mean what sort of tangible things is a committee looking to fund?

Speaker 10 (01:57:32–01:57:33)

That's correct.

Speaker 3 (01:57:33–01:59:11)

Yeah. You know, I think a good rule of thumb is is that the committee is looking for things that ideally we could put a. a restriction on, so a conservation restriction or a historic restriction, you know, something that can be protected in perpetuity, something that we could put a wooden sign on in front of, you know, this project's funded by the CPC, your taxpayer dollars, you know, whatever, so that people, tangible in that way. So it's tricky because these feasibility studies, they're a critical part.

And the legislation does acknowledge that in that the act specifically says that 5% of the funds can be used for administrative purposes. So Kathy suggested that our proposal, for example, the Conservation Commission's proposal would fit under the administration category, but that's only 5% of the budget. And there was several proposals that definitely exceeded that 5% that we have each year.

Speaker 10 (01:59:11–01:59:38)

Yeah, the four to one ratio. that you discussed is very, very tight. But we do need information yielded that is going to be allowing us to do tangible things that we won't be able to do without that information.

Speaker 3 (01:59:43–02:00:01)

It may be worth maybe inviting Kathleen to come to one of our meetings when we're discussing what we want to propose for next time.

Speaker 10 (02:00:01–02:00:03)

Well, maybe Kathleen and the chair.

Speaker 3 (02:00:05–02:00:17)

The chair of the CPC? CPC, yes. Yeah. I know.

Speaker 10 (02:00:18–02:00:19)

That's a good idea.

Speaker 3 (02:00:20–02:00:48)

Yeah. You know, just so we could brainstorm with Kathleen, because, you know, she's certainly in alignment with what our goals are. So I imagine that and she also in her professional life, she provides a lot of of support to other CPCs in the Commonwealth. So she's seen a lot.

Speaker 10 (02:00:49–02:00:53)

And she's a recognized expert in the state.

Speaker 3 (02:00:53–02:00:56)

Yes. Yes, she is. Definitely.

Speaker 1 (02:00:56–02:01:01)

Do we have a takeaway, Sam?

Speaker 3 (02:01:03–02:01:20)

So if I understand correctly, you'd like me to reach out to Deborah. and set up a meeting with Deborah, myself, and you, John?

Speaker 1 (02:01:21–02:01:30)

At least, but what about Jeff Stone? What about Ron Israel? There's overlap in all of us.

Speaker 3 (02:01:30–02:01:45)

Yeah, there is. Well, with Jeff Stone, with the other two, those are They are not proposing anything before the CPC this year.

Speaker 1 (02:01:45–02:01:55)

Oh, I'm sorry, I thought he was. I thought you had that Brook Walk.

Speaker 3 (02:01:55–02:02:20)

No, the Brook Walk was already funded last year. $30,000 was given for the Brook Walk feasibility study. And of that, $3,000 was specified for the environmental study component.

Speaker 1 (02:02:22–02:02:37)

OK. Well, I think it should include Ron Israel from the Climate Action Planning Committee. OK. Don't you, Arthur?

Speaker 10 (02:02:37–02:02:38)

Makes sense.

Speaker 1 (02:02:44–02:02:55)

And maybe that initial meeting should include Arthur, too, because he's not designated to the Climate Action Planning Committee. Arthur?

Speaker 10 (02:02:55–02:02:59)

Whatever you wish, Mr. Chairman.

Speaker 1 (02:02:59–02:03:00)

Not formal, sir.

Speaker 10 (02:03:00–02:03:05)

Not formal. All right, that makes sense.

Speaker 1 (02:03:05–02:03:06)

All right, so that's on your plate.

Speaker 10 (02:03:06–02:03:28)

It's worth it, the human investment, to help as much as possible. This is very important, not only for this round, but for future rounds, because we're going to be seeing much more of this type of interest and need.

Speaker 3 (02:03:28–02:03:33)

I wonder if we should invite Kathleen to that meeting as well.

Speaker 10 (02:03:37–02:03:41)

I think that's a good idea, John.

Speaker 3 (02:03:42–02:03:49)

I don't want to Let anyone think that I'm by any means an expert on the legislation.

Speaker 2 (02:03:52–02:03:53)

Wendy, Kathleen, who?

Speaker 3 (02:03:54–02:03:56)

Kathleen O'Donnell.

Speaker 2 (02:03:57–02:03:57)

Thank you.

Speaker 1 (02:03:58–02:04:06)

All right. So you're going to herd the cats. Wendy, okay?

Speaker 3 (02:04:06–02:04:07)

I do like cats.

Speaker 1 (02:04:08–02:04:20)

I know you do, that's why I said it. All right, see if you can put that meeting together, that would be great. Okay. And I'll get the information, the overviews for the no parking signs out to everybody right away.

Speaker 3 (02:04:22–02:04:24)

Okay. And I do have one other very quick thing.

Speaker 1 (02:04:24–02:04:25)

Okay.

Speaker 3 (02:04:25–02:04:46)

Okay, and it is coincidentally about around Pope's Pond, and I promise I love all parts of town, but I just so happened to be walking around Pope's Pond last week, and I noticed that there were some very, very like

Speaker 1 (02:04:47–02:06:02)

Yeah, that was responded to within hours. Hans was the first person to report it. The police were on site. The story is that a deaf couple got lost, drove in there, and they have an app on their phone that they can actually sign to people that then talk to the police.

The police responded. The police called a tow truck. The tow truck got stuck. Everybody was stuck.

So the tow truck had to get towed. And it made those deep things. Hans, he was all over that. So I reached out to the police chief.

I called Chase Berkley. Chase put it all together. He got the police report. And I've got it.

I can forward it to you. The tow company, they were good and everybody did the right thing. The police gave the deaf couple a ride back to wherever they lived. And Chase said, I will commit to having TPW guys get down there and fix those hiatrax.

A lot of people have called that in. But Hans was the first, because he was walking his dog there. He was all over it. He was there.

He was on me the next morning. But Chase responded immediately.

Speaker 4 (02:06:03–02:06:04)

Excellent.

Speaker 1 (02:06:04–02:06:37)

So I wrote a report for it, and it kind of lays it all out there as to who did what, when, and why. But I think the time responded very quickly and appropriately. I don't know if it's been done, because I know Deborah Milbauer called me on it, and I gave her a report that I just gave to you. Yeah, everybody was concerned with that.

But it does show how wet that area is and how drainage is gonna be an issue for any kind of a handicapped accessible pathway in that area.

Speaker 3 (02:06:39–02:06:41)

Isn't it great that there's so many eyes on the street?

Speaker 1 (02:06:41–02:07:15)

Oh gosh, there sure are. I got a lot of calls on that one. All right, anything else for new business? All right.

We'll wait to hear from you. A motion to adjourn? Ingrid, you just seconded that one. All in favor?

Aye. We're good to go. Thank you at 9-3-3. Thanks all.

We'll stay in touch by email, right? Good night, everybody.

Speaker 11 (02:07:15–02:07:17)

Good night. Good night. Good night, all.