I'll call the Town and Milton School Building Committee to order. It's now 7.05 PM on August 24th, 2026. As typical, we'll just do roll call attendance as I've done before. In the room is Scott Tereshek.

Here. Tim Lombard. Present. Peter Erbescheiner.

Here. Nathan Hutto. Here. Uh, and Seamus, uh, thank you.

Thank you. And then, uh, online, I see Carrie Hurley here, uh, Bob Mayhew. Yeah. Uh, Jonathan Redden.

Speaker 3 (01:02–01:03)

Yeah.

Speaker 2 (01:05–02:40)

Also with the consultants, everybody. Um, I think you have to share your screen about this. Yes. Others can see her.

So second thing on our agenda is public comment. So we reserved the first 15 minutes of the meeting for any members of the public that would like to speak. We ask that you limit your comments to three minutes, and then please say your name and address just for the record. So just take a minute and see if anybody's online.

There's nobody in the room. And there's nobody in the waiting room, so we'll move on. Third thing on the agenda is discussion approval and meeting minutes. June 15th, July 6th, July 20th, and August 3rd.

There was meeting minutes that I sent out prior to this, which are the June 15th and the June 8th ones. June 8th ones, I don't know if we approved those at the last meeting. We did, yes. We did.

Okay, I wasn't sure. Minutes that I sent out, and that was the one to review the contracts for the cost estimation, the structural engineering contract, PMA's contract, and then the designer selection committee designer, the OPM selection criteria. Sorry, a lot of stuff I'm not meaning to say.

Speaker 4 (02:43–02:46)

A motion to approve the June 15th minutes.

Speaker 2 (02:47–03:06)

Second. Second by Nathan. Any discussion, any comments? Not seeing any, so we're hybrid.

We'll do a roll call vote. In the room, Svetlana Tereshcheva? Yes. In number?

Epstein. Peter Orbesheimer? Yes. Nathan Hutto?

Yes. Carrie Hurley?

Speaker 5 (03:07–03:08)

Yes.

Speaker 2 (03:08–03:13)

And I see Aqua has joined us, so let me just move him up to a panelist and let him vote.

Speaker 6 (03:17–03:19)

Wait to see when he joins.

Speaker 7 (03:21–03:29)

Hey, Aqua. Hello? Can you hear me?

Speaker 2 (03:30–04:21)

I can hear you now, sir. Sorry, I know the audio takes a second when you first log on. Yeah. Thank you.

We have minutes from June 15th, so I didn't know if you had a chance to review them, or even if you were in attendance. I'll abstain because I'm not sure I was in attendance. That's fine. The other meeting minutes, we'll get to them at our next meeting.

Item 4A, which is the MSBA designer selection panel update. Right now, we're working towards onboarding an architectural team as part of our MSBA project that we're doing. Jamie, should I take it away? Yes.

Let me just make sure I'm sharing the right screen.

Speaker 1 (04:22–04:38)

Yep. Okay. Can everyone see this? Yep.

Speaker 8 (04:46–10:09)

Okay, so as Sean led off, we are going through the design selection process. Just a quick update. Last Tuesday, we had our designer pre-bid walkthrough. So that was last Tuesday at 10 a.m.

at the intersection of Guile Road and Goodwill Parkway, same place we did the OPM walkthrough. Myself, Sean Burke, and Sean O'Rourke attended on behalf of this project team. In total, we had 12 participants from 10 different architectural firms. I think nine of those were prime architects, and I think there was one from a sub-consultant, an engineer.

Overall, that went well. Just before I move on to the distribution list, currently, we have 47, so about 50 people have pulled the designer RFS. Of those breakdowns as you see on the screen, 25 of them have been prime architects, the ones that we would expect to see on the cover page of any submission. And then the rest are sub-consultants like landscape architects or MVP engineers.

And then also there's a couple of like advertisers and people who distribute it more widely. So overall, I think this is a pretty good landholder list. Following that designer walkthrough, we received a couple of questions. So the first designer RFS addendum should be going out tomorrow morning, just to wrap things up and put it in the right format, but then it'll go out to everyone.

I believe we have a timeline here, and I'll just talk about where we're at and where we'll be in the next couple of weeks. So we've had our briefing session. The question deadline is this Wednesday. So that's the deadline for when any firm that has questions about the RFS has to ask them by the end of the day on Wednesday.

And then we'll work to respond to them probably by the end of the week. And then we'll send out our last addendum for the RFS early next week once we have all those questions answered. Marching ahead into the second week of September, the ninth is when we will receive designer submissions. So once we get those, they will be emailed to the PMA team and to the town.

And once we get those, we'll confirm that they were all received, do a quick check to make sure that the PDFs are openable and in the right format, and then we'll distribute them to the rest of the committee. From there, PMA will begin our own review where we just go through just some black and white things that they need to submit with the RFS or else it's invalid. If there's some stuff that's in the gray area, we can ask them to supplement it, correct their submission. Then we do a couple of requirements for the designer selection panel.

We do a bunch of background on what sub-consultants they're using, and then we perform reference checks for it. We'll be working on that. The materials will go to the selection subcommittee and to the MSBA. All that documentation is due to the MSBA by September 17th.

And then they'll have two weeks without all that material to review it. And same with the subcommittee before we go to the MSBA for the design of selection panel. The panel is currently October 6th for a short list where we'll review all of the submissions that we've received. talk about pros and cons of any firm, and then at that meeting, we'll narrow it down to two or three final applications, and we'll invite those to interview at the October 20th board meeting.

At that time, that's the 20th is when we rank all the firms, get a finalist, and then we vote to award them. For the design and selection process, I know this was kind of in the last meeting we had, but it's always a good reminder. The majority of the members on the design and selection panel are made up by the MSBA. So it's 13 members total, and then only three of them are Milton representatives.

The MSBA has some guidelines on who should be appointing these representatives. And that's kind of the next slide in our next agenda topic. But it can be whoever the town wants. I've seen make-ups of many different people, people on this committee.

I've seen it solely made up of people on the school building committee. I've seen it wholly made up by people on the school side, the district side, or the town side. It's really just whoever the SPC and everyone's comfortable with. So, if we want to start talking about the next agenda, agenda B.

Yeah.

Speaker 2 (10:09–10:21)

I just got a couple of questions. Yeah. So, the submittals that come in brief that you guys are reviewing. Yes.

Can you deny or reject that issue or send it down?

Speaker 8 (10:21–10:54)

Yes. Yes. If there are certain black and white things that are written out in the RFS that are like the signature, like the submission has to be signed. The submission has to have a cover page.

It has to be the right length. It has to acknowledge all of the addendum. If it doesn't, then it can be rejected. Just point blank.

There are some that technically we do have to, but we can ask the MSBA and ask this committee if it's acceptable to kind of omit certain kind of

Speaker 2 (10:54–11:02)

gray area items. So what are the timelines again? I'm just trying to think. So when we talk about next meetings and stuff like that.

Speaker 8 (11:02–11:39)

So the 9th, which is, I think, the Tuesday? Wednesday. So Wednesday, yes. So Wednesday the 9th is when submissions are due.

End of the day on the 9th, we'll get them. And then we have two weeks until the 17th. That is when we owe the submissions and some of the kind of preliminary reviews that we do, those are due to the MSBA. Then the MSBA has them for that two-week period for their own review before we all meet at the designer selection panel.

You go back a couple of slides.

Speaker 6 (11:39–11:42)

There was one that had all the dates on it.

Speaker 2 (11:42–11:47)

Yeah, it's up there. So it's on two weeks. Yeah. Yeah.

Speaker 8 (11:48–12:26)

Yeah, eight days. That is only when that's so that everyone is pointing. The 17th, that's when we just have to send them all the submissions that we've done. The first task, do they meet the requirement?

Exactly. That's the one that, hey, we're going to be considering these after the meeting. The 30th, typically, it's just references that take as long as the 30th. Well, it will be done with the designer, technical backup by the 17th.

Speaker 2 (12:28–12:33)

Should we have a meeting on the 14th? Do you need us to approve it?

Speaker 8 (12:36–12:48)

Typically we do have a meeting after they come in, either with the subcommittee that's going to be at the DSP or public committee. It's really up to you guys.

Speaker 2 (12:50–13:09)

And what are we doing in that meeting? I don't think I'm following. So, correct me if I'm wrong, process service. They submit everything on the night.

Yes. There could be some things that are missing that you could reject or you could go back and ask them. Yes. Do you need the power committee to approve that or?

Speaker 8 (13:09–13:36)

It depends on, it really depends on what the kind of technicality that they're missing is. Often, it's just, it could be an email. Yeah. They forgot to sign it.

Yeah, that's fine. And then we'll just notify the MSBA, hey, these guys forgot to sign up. We're going to let them send a revised page with all that backup. OK.

Speaker 6 (13:43–13:49)

If you need an opinion, from this group that doesn't need to be anything.

Speaker 2 (13:50–13:58)

Yeah, we're not reviewing any of that stuff. So let's probably leave it to the next one.

Speaker 8 (13:58–15:34)

Yes, the decision makers for the talent side are the three members of that subcommittee of the DSP members, the three that we'll talk about next. They're the ones who will sit at the meeting with the MSBA And they'll be the ones that we'll want to meet with before the design selection panel, just to make sure we all have our thoughts all on the same road. We'll talk about strategies for the design selection panel at those meetings beforehand. Because in our experience, we do find that it's important that the district or town has a united front when they go into those meetings.

Because the MSBA, there's 10 of them. They all have their own opinions. If the town lets them kind of take over and kind of lead the conversation, especially if the town is kind of divided, where one person likes this one more, so the MSBA can kind of take over and take it away. Good thing about the designer selection panel process is typically at the end of the discussions, the last three people who speak are the three people from the town.

So if there is a discussion point that you say, hey, we thought this was a big plus, but it wasn't really discussed in the overall thing, you kind of get the last say to say, hey, please consider this. When we reviewed our submissions, we thought this was a plus for Milton, and it really made this designer really stand out. And it can sway some of the members' kind of rankings for at least the shortest.

Speaker 9 (15:34–16:01)

Yeah, Seamus, this is Mitch from PMA. Hey, everybody. So it's just good to keep in mind that the designer selection is a lot different from the OPM selection. So the MSBA, as Seamus said, has 13 members on there, and they all get to rank everybody with a score of 3-2-1.

So when it comes around to the last three from the town, it's good to be on the same page, like Seamus was saying, because those scores could easily sway one way or the other for a designer when they all get tallied up.

Speaker 2 (16:03–16:11)

Yeah, just one clarification Mitch. So you said there's 13 MSBA when you were saying 13 total I'll say I might have had it.

Speaker 8 (16:11–16:16)

I you might have it right there might be 16 total 13 msba. That's fine. Oh, yes.

Speaker 2 (16:16–16:19)

Yeah, because I had it wrong earlier. I thought it was 15 3 8 12.

Speaker 6 (16:19–16:23)

So Do the town representatives also score?

Speaker 9 (16:24–16:27)

So it's a total of 16 16 16 total.

Speaker 8 (16:27–17:14)

Yeah All right. Got it. So I think the way that we typically like to uh These are all virtual. They've been doing virtual only since COVID.

And I don't think that they're planning to go back to in-person anytime soon. But we like to, as the PMA, just have all sit at a place in-person and have the meeting where the three members and PMA are here. And then we'll, as discussion goes on, we'll take notes and we'll keep tallies. To make sure if anything's going the wrong way, and we need to live adjust any of our rankings, if we want to.

There is ways to do that, to try to work it out. We've done that in the past. Yeah.

Speaker 9 (17:19–17:23)

Yeah, I think some of those details, Seamus, are on slides coming up too.

Speaker 6 (17:25–17:33)

Yes. So from this committee, What do we need on each of those dates?

Speaker 8 (17:33–18:54)

For this committee, I don't think that the members, I don't think we have, we don't need to take any of the votes we can. Of course, we'll have a meeting after we receive the submissions and before the design section panel. I think we should anyway, just to go over all the submissions that we received. The architects often, they'll have very napkin math layouts of how they foresee projects, and it can raise ideas up just from their initial heady ideas, and it can help.

feedback from this committee can help inform the DSP subcommittee on helping them when they do their reviews. Yeah, and this is the topic that Mitch was mentioning. What we do, it is fairly prescribed and organized for the MSBA, you know, they don't want to hear anyone come in and be like, oh, when we met, this was our first ranked. They will love to talk about how we talk because the MSBA doesn't want to hear the ranked piece before the meeting.

So you'll have to use language like most advantageous, most challenging, stuff like that.

Speaker 2 (18:55–19:07)

But we'll talk about that. But on the scoring and similar to the town having the last Discussion point is the town the last three days. Yes.

Speaker 8 (19:07–19:31)

Yes, and then that's where you're talking Yeah, so we'll have we'll have a sample of this and we'll go through and we'll just have an Excel sheet You're adding it up. So if we know that like, oh if you actually want to interview this person But the votes aren't going that way switch your votes to this. Yeah, you'll get around to it You might be able to sway it that way Just like that

Speaker 4 (19:32–19:39)

October 20th date conflicts at their town meeting, depending when? These are all in the morning. These are all during the day.

Speaker 8 (19:39–20:01)

Yeah. These are not at night. I think there depends when they do interviews and typically interviews are after they do a shortlist. It might change, but it's like nine and then like 11 is in weeks.

Speaker 2 (20:01–20:15)

Okay. I think the thing for us is, so we can't assign anybody to the designer selection panel. I think that's going to come from select boards. I'm not sure.

Speaker 8 (20:15–22:06)

Yes, they can suggest people. But technically, the MSBA is going to, we're going to have to fill out a form. And they're going to have to, each member is going to have to sign something and say, oh, yes, I was appointed by these three bodies. And they're all prescribed.

So the MSBA requires someone to be designated by a school committee. Sometimes that's just a member of the SBC has to be a member of the school committee. Sometimes it's just them. Sometimes it's anyone that the school committee might be like, oh, I kind of want to do it, or I'm already familiar with the process.

I did it before. Or they could name anyone else they could feel comfortable with. Superintendent, sometimes the superintendent does it themselves. If they're busy, I've seen them nominate their assistant superintendent or the director of business and support services.

And then chief executive or town administrator, they can, again, themselves, anyone they're comfortable with. Yeah, so it's basically any of those three categories of other appointees. Yes. And I think when we talked with Nick about The chief executive officer, it basically breaks down from school committee, superintendent, and the select board.

Because they are the chief executive officers. And we don't need to know the exact names of all these people until the 30th of the end of September. But it is time. It's just a decision coming up.

Does each of these require a public vote? No, not always. Well, not really. The superintendent, certainly not.

Chief Executive Officer, it could be just something in their notes to say, oh, yeah, you're going to be it for, and then they just note it.

Speaker 4 (22:06–22:22)

I was thinking, in order for our committees to essentially designate someone, usually that happens by, like for other committees, it happens by, I don't know how else the committee would act to designate someone by vote, whether it's required.

Speaker 8 (22:22–22:34)

We do have time for this, but I figured if one of these two does require a vote, To get it in kind of everyone's head early, so that we're not scrambling in mid-September.

Speaker 4 (22:35–22:53)

I mean, what could make sense, I don't want to go off track of your slides, but to go back to those committees with you know, some suggestions from this committee, for example, like it would help for me. So whether we get into that tonight or soon, that would be helpful.

Speaker 2 (22:53–23:30)

Yeah, I think so. The only one I know that's not here tonight is Mark. So Mark Lawrence, we have a forum committee right now talking about a different subject, which we'll talk about in a future agenda item. But tonight, the good thing is we have everybody here.

So I think the key thing would be is if you have interest to participate in the design of selection. Basically, I'll go around and ask each person if you're addressed or not. If you are, then basically you're in a pool that could be designated by one of these committees. I think that's the best way of doing it.

So if everybody's fine with that, set up a spot.

Speaker 4 (23:30–23:59)

I don't think I'm happy for Select Board to designate someone else from this committee that's not me, just from an expertise perspective. I'm happy to spend the time if we decide we want to be for some reason. But I thought our OPM subcommittee, the way we set that up made a lot of sense from an expertise perspective. So we totally don't want something like that.

But we'll see who's interested.

Speaker 2 (24:01–24:12)

Any other discussion for walk around and call on each person? Just kind of put it out there just for discussion. I'll keep an eye on people online just in case somebody raises their hand.

Speaker 6 (24:12–24:47)

I mean, I certainly think that among the members of the school building committee, there are people that meet these requirements well. And actually, I was hoping that you would say, I'm in. Because that checks our box to cover you know, select board and school building committee representation. But I understand what you're saying about, like, others with specific expertise in architectural planning.

But I think there's a bunch of good candidates amongst our committee.

Speaker 2 (24:48–25:47)

Yeah, I think that the key thing is, as Pete was saying, I think what we're trying to do is get a list of names. That, for example, nobody in the select board wants to participate in, and they're looking through their designee, here are our roster for school building. But if they're looking to us as the first tier, on that roster. So I think that's what I'm looking for of, you know, within our committee, who may want to do this.

And then, you know, if it's all nine of us, cool. If it's six of us, five of us, whatever, then when select board wants to make an appointee and they want to go to that roster, they have a pre-filled roster that they can choose from. Does that make sense? Mm-hmm.

Okay. Any questions online or anything like that? Not seeing any hands. So just quickly, Scott, any interest?

You were on the OPM. I was on the OPM.

Speaker 6 (25:47–25:58)

But I think on this one, I would be happy to defer to the people on that designated groups on that list.

Speaker 2 (25:58–26:12)

But if they don't want to do it, for now, you're not interested. I would like to nominate you. Yeah, so we'll take that.

Speaker 6 (26:12–26:44)

We'll go through. I feel very much the same as Scott, but if you need me to do it, I'm happy to. I've been involved in architectural procurement many times. I think that you would be an excellent person to do it.

I think that Glenn has been a person who has Put together these sorts of proposals, I think that we would be an excellent person to assess the quality of other people's proposals. But yeah, if you need me to, or I will, but I think there are others, that would be great.

Speaker 2 (26:44–26:58)

Yeah, what I would ask is just keep it to yourself right now. Like, if you're interested in a goal, if somebody else is, you know, they'll say if they already have. That's just how I'm trying to do it. Pete, you've already talked, so.

Speaker 4 (27:00–27:12)

I'm going to keep my name. I'll say yes just to keep my name on the poll, and I can communicate. We'll see who signs up. Yeah.

Speaker 6 (27:14–27:17)

Nathan? Yeah.

Speaker 2 (27:18–27:21)

Welcome. Online, Gary?

Speaker 5 (27:25–27:33)

I would say that I'm not the best person, but I would be more than willing to if you needed me to, I would do it.

Speaker 10 (27:38–27:55)

Dr. Redden. I think I agree with what Kerry just said. I think if needed, but especially as a resident, I would definitely need to lean on someone a little bit more experienced here.

Speaker 2 (27:56–28:11)

I'll take that as a no, because Kerry was saying yes, only as nobody else. Sorry, I thought, yeah, so yes, I was going to ask one. Just trying to get people to be definitive so it makes the roster easier.

Speaker 11 (28:14–28:29)

Bob? I have to respectfully decline. I'd have to say no. I'm crazy busy with a lot of other stuff and probably couldn't give it the time it needs.

Speaker 2 (28:30–28:37)

Yeah, I appreciate that. And yeah, I know you get a lot on your hands. So. All right, Aqua.

Speaker 7 (28:39–28:50)

I would really want to be on the committee, but I have quite a number of things. And at this time would not be able to serve at my best. Therefore, I'll decline.

Speaker 2 (28:51–28:57)

Understood. And Glenn, last comment.

Speaker 1 (28:57–28:59)

Forgive me. What's the time commitment, John?

Speaker 6 (29:02–29:04)

I'm interested, but I'm not sure what the time commitment is.

Speaker 8 (29:05–29:22)

So it'll be just you on your own time just reviewing the submissions just to see which ones stand out at you. Just kind of notes on your own time. for what you see as positive and negative, and then- Yeah, no, I can help with that. Okay.

Forgive me, I'm double dip.

Speaker 6 (29:22–29:26)

I'll admit it, I've been double dip, and I'm also a BSA member. I don't know if that helps.

Speaker 2 (29:29–31:43)

All right. Yeah, I can help out with that. All right. All right.

Then obviously with myself, I'm interested in good volunteer for it. But one thing that didn't come up, just letting you guys know too. The firm I work for is now the largest engineering firm in the world. We have multiple subgroups within our company.

And a specialty structures group that we have was approached by one of the architects. And so there was a question of conflict of interest. If I was on the designer selection panel, could I participate if they were one of the sub consultants? The good answer is, Yes, but it's just additional disclosures that we'd have to do because with a company as large as mine, we have different sectors, if you want to call it that.

So I'm in a transportation sector. This isn't a totally building sector. In my transportation sector, I'm only doing electrical and involved in that portion of it. This is a totally different sector in structure.

across anything between them. So I did talk to Tom Conso to go through him today. So what it would be is if I'm appointed by one of the committees, I would have to file a disclosure for it and then enunciate that to the committee, have that committee take a vote to make sure they're still confident that I could act independently based on that disclosure. And if they're still confident and take that vote, then I would.

So for some of the other, I should have said this before, it just kind of came to me now too, that if you are selected to there, and for whatever reason, whether your company is a firm, does it happen to get pulled in as a sub or something like that, that's essentially the process you want to go through, if you have that much experience of self-management. So, but, you know, definitely interested in it, and I think it's going to be a good thing. So, yeah, we'll kind of see what comes out of those committees. You know, we basically put this roster together, board to have thought of it from there.

Speaker 6 (31:43–31:52)

And we can put it on the agenda for a vote at school committee in a week or in two Wednesdays from today.

Speaker 4 (31:52–32:02)

Yeah. I don't know. Maybe through Nick or be in touch so we don't delegate, designate the same person.

Speaker 8 (32:10–32:14)

OK. And that is it for my update.

Speaker 2 (32:15–33:53)

All right, for new business. All right. And we'll just see, make sure nobody online, any other questions or anything on that subject. And we'll just see if any hands get raised.

Do not see any. All right. So we'll keep moving. Our next agenda item for old business is item 5A, which is a library update.

And so I put this on the agenda. Again, the town, I think, as everyone's aware, has submitted an offer to purchase Labyrinth. That offer is still pending. unknown at this time, because it hasn't been disclosed, which is totally fine.

But the offer went in, I think, a couple of weeks ago. I'm not sure if you can say whether the offer went in or not. But for us right now, we're kind of in a waiting pattern to see if the offer is accepted. And then if the offer is accepted, then it basically you know, on that parallel path that we've been operating on with MSBA, now levering that other path, you know, certain decisions that we'll have to look at for there.

So, you know, like I said, part of this, I kept it as a placeholder in case there was an announcement to make or we're aware of something beforehand. And again, we have to post these agendas last Thursday for tonight. So just being careful with that. That's basically what I have for an update.

Speaker 4 (33:53–37:37)

Pete, I don't know if you have anything you want to share or elaborate or… Nothing additional on the offer component, but just a few other thoughts for the committee. I mean, one thing I'm trying to do is keep the select board apprised what this committee is doing and vice versa as best I can. And I just wanted to acknowledge that the work of this committee and of our architects kind of working at DLR was really sort of commended by a number of committees over the last few weeks.

That included, and I'm actually going to, just in case for those watching, if they want to see the presentations at the other meetings, I'll just include, because I have it here, sort of the timestamps of those presentations. So that included at the Select Board on August 4th, there was a presentation by DLR and Sean at hour 30 into that meeting. Warrant Committee on August 10th, around the 30-minute mark and again at that hour 40 mark at the school committee on August 19th at the hour 15 mark, each culminating in sort of appreciation of this committee for sort of the dual tracking of this summer. From the perspective of that presentation at the select board meeting, you know, in addition Um, and next steps will in part be dictated by if we do, in fact, acquire the property, but just some observations from that meeting of.

and diligence and focus. Some feedback from the select board, and this isn't all necessarily for a school building committee, but it's just to kind of keep you guys apprised of what I was seeing over there. Some encouragement to keep working the, you know, operating cost comparison between, you know, having a school at Labre versus Guile Road. And that came up in the discussion in terms of initially with busing options, but then later with staff.

In that meeting, I encouraged thinking about community engagement and strategy and plan, which I think will have to be turned to pretty quickly if the acquisition happens. Sean was sort of touching on this a minute ago, I also think a deliverable around fall sort of decision points vis-a-vis the MSBA if we acquire the property will be important. So I think there's going to have to be a lot of additional work here triggered by the acquisitions. Those are just some key takeaways I think.

As well, tonight is a Warren Committee meeting that our school committee chair and select board chair are there to answer questions about, you know, about Labor Day. Sean was there on behalf of the school building committee to do the same on August 10th. So that's where we are from my perspective. You know, if there's anything not addressing, have been answering questions the best I can, But so it's evolving.

Speaker 2 (37:39–37:45)

And just one comment to the operating bus analysis that you were talking about.

Speaker 4 (37:45–38:12)

That would be something the school committee is doing, because we don't do buses. I wouldn't expect that to come from the select board. It was enough of a theme from the school building committee to bring it up, because there's enough of a theme from the conversation. Yeah.

I would almost think without signing anyone off that would come from district leadership, but I'm actually not, I'm not sure. And that's not suggesting it's. Yeah. Yeah.

Speaker 2 (38:13–39:43)

So the, the one other thing, you know, this committee, just be aware of, of, you know, there's the, there's two articles in regards to letter it, I'll be coming up. So there's the acquisition article that was there. And then we have a follow-on for us, a funding article that's there. Because if you recall, the funding article that we have right now that's paying PMA, the future architect that we're doing with MSBA, was a $1.5 million allocation that was given to us at the February town meeting, maybe two years ago, or last year, or whatever.

But if you recall, there was an amendment to that article that said, It's only for MSBA projects. So one of those decision points is if we purchase Laboret and the town would like to go without using MSBA, kind of on that faster path, this article provides us that funding that we hit the ground and we start running. So if the town purchases its Laboret and decides to go back to MSBA to incorporate Pre-KK as an option under there, We had the funding already set up, and then this allocation we did, we would just never execute it, basically. So I'm just making you guys aware of the other article you may hear about that's coming up for a town meeting.

So I'll pause there, see if anybody has any questions on that.

Speaker 6 (39:45–39:56)

Presumably, if the author is not accepted, let me know about it prior to town meeting, those two articles both get full. It's a good question.

Speaker 4 (39:56–40:18)

You know, the article does include, you know, broader acquisition, rights, and purchase, including eminent domain. But I'm not hearing comments on anything like that. But I'm not sure. I think it would have to be further considered.

Speaker 2 (40:18–43:12)

Yeah, I think that would be the decision point I was just talking about. There's one before that that we're not even talking about that. Yes, if it's not acquired, what is the town's procedure? What is their intent after that?

well beyond us that will fall to the select board in one of their meetings to figure out what they want to do. So again, pause there and just see if, you know, in regards to Labouray, if anybody has any other questions or comments in regards to that. And like I said, for right now, we're kind of in a holding pattern. to be accepted or denied.

Seeing none. All right. So the other item under old business item 5B is the enrollment analysis that was presented as part three and part four from citizen. So I've been talking with our subcommittee, just trying to get a date scheduled.

So essentially, one month from tonight, the 24th of September, we'll meet with the citizen, review the analysis they provided to us, we've already started going through it, doing our own internal analysis to it, and then hopefully have some type of resolution after that meeting. I want to make everybody aware of the intent for us to sit down and meet with the citizen. Have, obviously, a conversation about what their findings were, what our findings were, see what type of resolution we came to. And just for everyone's reminder, that subcommittee was made up of Kerry Early, myself, Tim Lombard, Aqua.

Uh, you know, again, that agenda item was here just to give everybody update of kind of what we're doing and see if anybody overall committee had any questions or comments. All right. Yeah. All right.

So I believe coming. Rounding out towards the end of the meeting, so our future meeting dates. Um, as I said before, I think we're on, like, every, as I mentioned previous meetings around, like, every 3 weeks, I think is what we're doing. And when I mentioned that earlier, um.

Realize it, but that September 14th would align and would have.

Speaker 8 (43:12–43:20)

we'd have suspicions, we can put together a high-level review of them, and then we can show where we're at with our review on preferences and everything.

Speaker 2 (43:21–43:42)

Yeah, and my guess is, by that date, we may have some answer on LabArray, too, that we may want to meet at that point, too, not just for the designer stuff, but for potentially other things that may be possible. So if that works for everybody, if you could just pencil September 14th on for our next meeting,

Speaker 5 (43:43–43:47)

Sean, I can tell you right now, I won't be there. I'm in D.C. on business.

Speaker 2 (43:48–44:36)

That's fine. I'm just trying to put it out there right now. And then essentially our last thing on the agenda is adjournment. So I will entertain any motion to adjourn.

Make a motion to adjourn. Nathan. Second. Second by Scott.

Any discussion? Hearing none, then we'll do a roll call vote. Scott Farrishev? Yes.

Tim Lombard? Yes. Peter Erbesheimer? Yes.

Nathan Hutto? Yes. Kerry Early? Yes.

Glenn Hoffman? Yes. Akua Bong?

Speaker 7 (44:37–44:37)

Yes.

Speaker 2 (44:38–44:45)

And myself. Yes. Thank you guys very much and see you in three weeks. Have a good night.