Welcome to a meeting of the Zoning Board of Appeals for the Town of Milton on case number 2883. It's an application filed regarding property address 184 Reidsdale Road. And this evening on the panel, we have me as the chair of the ZBA. Michael and Nick, do you wanna say hello and say your names?
Speaker 2 (00:46–00:49)
Good evening, Michael Brown. Evening, Nick Gray.
Speaker 1 (00:50–05:09)
And they constitute the panel for this evening. In the webinars, I mean, as lined up on Zoom so far, we have attorney John Barry, who's representing the applicant, who will be doing a presentation on behalf of that applicant, and James Bailey, who was the architect for the proposed second dwelling. To just talk about what we have before us is an application for a variance. that would allow the applicant Ilmanda Dami to divide an existing lot at 184 Reidsdale Road into two lots, both of which would be non-conforming because they don't have the required frontage on Reidsdale Road.
They would have the minimum lot size of 7,500 square feet. So the application had been they had applied for approval to the board of appeal to the building department and received a denial letter on June 25, 2020 and stating that the proposal to create the two non-conforming lots required the required frontage like the required frontage and that they would have to be applying to us for relief. The application itself, as I said, was dated July 20th, 2025, and filed by Attorney Barry on behalf of his client, and they're seeking a relief from zoning provisions article x 10 section 275-10.1.c on lot sizes and frontage because i guess the proposal is that this existing lot only has 61 feet instead of 75 on Reidsdale. The proposal would be to divide up the lots, but have an easement that would lead off of Reidsdale Road to access a new single-family dwelling on a second lot to be created in the rear.
Apparently, the lot width is okay, but the situation is that the required frontage isn't available. The application filed by John Barry, along with the application or set of plans showing the proposed dwelling, plot plan showing the two lots that would be created, and actually the existing two lots, and then the new ones that would be created as a result of any approval that we might give. There is a sort of plans of the house itself, plans of the existing house, the proposed driveway easement, and then the layout and design of the house itself. In addition to that information, we did receive, John Barry sent along two letters of support from the abutter at 180 Reidsdale and the second at 196 Reidsdale.
Unfortunately, I couldn't read the names of the people that signed the letter, but that's their addresses. We've also received opposition from neighbors on Center Street, which is the street behind Reidsdale. A video showing flooding on Central Street provided by Suzanne Bridges. Opposition letters from George and Mary Ellen Geary at 59 Center Lane and Penelope Hines-Riley and Bob Hines-Riley at 65 Center Street.
Let's see. We also got an edited GPS plan from our member, Nick Gray, showing the lot and adjacent lots. Thanks for that, Nick. I believe that that's the contents of the file.
At this point, I'd ask Mr. Barry to present his information to the board? Sure.
Speaker 3 (05:09–15:39)
Good evening, Madam Chair, members of the board. My name's John Barry. I have a law office located at 10 Forbes Road West, suite 210 in Braintree, Massachusetts, zip code 02184. The architect for this proposal is James Bailey.
He has a principal place of business at 128 Lincoln Street, unit 110 in Boston, Massachusetts, 02111. We've been hired to represent the Thame family that live at 184 Reedsdale Road in Milton, Mass., 02186. I think just in the sense of context or what was the brainchild behind this proposal. directly next door to this site is 190 and 196 Reedsdale Road.
Admittedly, they have more lot width and frontage, but essentially this plan is a very similar layout to what was done at these two sites in where ideally this idea, I think, sprang from a little bit. But essentially our proposal here is to take a very large site and underutilized site at 184 Reedsdale Road that is roughly a little under 16,000 square feet. And our hardship here is that economically the site is very unutilized. It's a huge lot.
due to the shape of the lot. The current structure sits very, very close to a major road, Reedsdale Road, that's very busy. And the rear yard is enormous and unutilized. And that is essentially the hardship that my clients are suffering and hoping to gain this variance from.
And I will address what I'm sure are maybe some of the questions or concerns the board has related with what is being proposed here as I go through our plans in our proposal. But essentially, that is the hardship. It's the shape of the site. It's what is referred to in the zoning world as a pork chop shape, a very large backyard.
The current single family sits very close to the front of the site and leaving the entire rear of the site underutilized or unutilized. The family went through a renovation of the existing single family that's towards the front. They essentially made the house, the width of the house as it faced Reedsdale Road, a little skinnier to allow for a larger driveway to access the rear. So, ultimately, it was initially 10 feet, it's now 14.
But just getting into the plan so the existing site has a lot with pre existing non conformance at this particular time, even without a proposal, it doesn't have the 75 feet to begin with that this proposal would trigger a need for a variance at that site, but. the 10 feet of the easement that we're asking the relief for in the whole plan here, there was still an issue with the width regardless of that. But essentially with what we're proposing here, there's enough square footage once the two lots are created with the subdivision. Each lot is going to be 7,500 square feet after that subdivision.
The rear lot is going to be a little bit larger. It's going to sit at about 7,998 with the front lot being 7,500. James and I work together in going through the zoning code and trying to lay out that particular site in the rear to not trigger any side yard setback issues. I do know that in some of the notes that I received, there was a question about would the rear setback needing to be 30 feet be an issue.
My clients would be 100% willing if the approval for the structure was allowed to amend those plans if that was something that was going to be a deal breaker as far as the need for a 30 foot setback in the rear. Now, my understanding of the zoning code is that if it's a deck without a roof, That shouldn't trigger a point at which the setback begins. But I just want to bring that up that if it is an issue, we can address this and amend the plans to make sure that there's a 30 foot setback in the rear if that's going to be a deal breaker, even if some minor edits need to be made or the deck needs to be moved or made smaller. So with that being said, Essentially, just walking through the set of plans, the first cover sheet is ultimately just a rendition of what the rear structure would look like.
There's a zoning table that's listed. Essentially, there are no other variances that are needed here for this proposal to be approved other than the issue as far as the lack of lot frontage. Moving into page number 2, we have the existing site plan. Again, just reiterating it's a relatively smaller single, single family it's a total of 1500 square feet on a almost 16,000 square foot lot.
The rear of the site has roughly an 81 to, I think, 85 foot width. But because of the lot next to them cutting into a portion of it, that's what creates the 51 foot width at the front of the site where the site meets Reedsdale Road. Flipping to page 3, that is ultimately the proposal that was worked on with the Thame family, myself, and James. Essentially, the red footprint in the rear of the site is where the new structure would sit, and that would be the footprint of the site with a good-sized deck on the rear and front of the site.
You'd pull off of the easement that both owners would share. There would be a driveway for the front structure to keep cars not blocking the shared easement driveway. A little bit of a turn to get to then the rear structure with the two-car parking garage that is utilized by whoever's the owner of the rear structure. Moving to the third page, this is just was to orient the board to an aerial view, both from a map and from an aerial view of how the site currently looks right now.
And then just James laid out a little bit of a rough floor plan of the structure, moving to page number four, which is SD dot sorry dash 0.2. We have a little bit of a plot plan that James worked out showing the board that driveway that I've discussed the existing house and deck, the proposed parking for the front structure. the rear structure of those decks. We tried to create a border of green space around the entire site, trying to maintain as much green space on the site as possible.
One of the issues that came in in these letters of opposition was that they're concerned, I think from what I read out of the letters, was that their concern is that in excavating to dig for the foundation in the rear of the site, that that might trigger more issues related to the flooding. I just wanted to highlight, and we haven't hired any civil engineer just yet, but as this board knows, if this approval was approved, if this, sorry, if this proposal was approved, The state licensed civil engineer would take a look at the entire site. They would ultimately look at what is the grading and come up with a lot of. There's a lot of ways to deal with any of the site drainage if there is runoff.
There are ways that you could essentially either use, you know, some type of berms, put some kind of plantings or landscaping around the site to address if there is any runoff issues but I just wanted to highlight to the board that What their concerns are they might actually be relieved by a proposal like this being approved and that you would have a civil engineer that would look at and essentially have to come up with a plan to satisfy Milton's building department. It could be a call tech system, it could be, you know, ways to just recharge any runoff. and address any of these issues related to what's happening. I didn't see anything in what their concerns were related to the flooding that was coming from this particular site.
That said, I mean, there is some hard-packed gravel and dirt on this site, so I think anything happening in the rear would be a benefit and would address Any of the issues as far as runoff that are coming from this particular site moving forward to. Essentially, this is 1.1 is just a rough set of each floor of this particular structure in the rare again. We don't have any issues with. the height of the building, the size of the building, FAR, or any of the dimensional aspects of the building.
If the board would like us to walk through the floor plans, that's why James is here. But we're not looking for any relief related to this particular structure. SD 2.2 is related to just some renderings to show the board what ultimately at this point, what the design of the structure would look like if it was to be built. SD 3.1 is just a, It's just showing the board ultimately what is gonna be, where the parking would be located and how the height of each floor would look within the structure.
And that's essentially the set of plans. Pretty much gone through my presentation. I don't know that James really has anything to offer. So I think with that, if there's any questions or concerns from the board, I'd be happy to field them.
Speaker 1 (15:41–15:44)
Michael or Nick, do you have any questions for Mr. Barry?
Speaker 2 (15:44–15:56)
I mean, I think I have a lot of questions about this, but can you say more about how the large backyard poses a hardship to the property owner?
Speaker 3 (15:57–16:44)
Um, it's just they can't fully utilize the site being that if they were to build anything here they're going to trigger this this issue as far as the frontage in the width of the front of the site. So with how everything is currently situated. they would have either had to have had a financial hardship in ripping down the single family that they currently live in to build something in the rear and even to build off of it and do any addition to the house, they would have ultimately have run into this issue. Now, they've been living in the house.
They have two young children. They're not really in love with where this front house is situated so close to a busy street. It's very, very loud. And that's another hardship that they've brought up to me that I know that this isn't something that most zoning boards.
Speaker 2 (16:45–16:50)
But they're not proposing to move the existing house, correct? That's going to stay where it is?
Speaker 3 (16:50–17:10)
They're not. I mean, with the work and renovation that they did to that, it would financially be impossible for them to add on to it. So what they were hoping to do was sell the current house that they renovated and build this house in the rear. That would be the house that they were looking to live in the dream house with their children.
That would be offset from the street and not as loud.
Speaker 2 (17:11–17:23)
Right, but so you're saying that the current hardship that they have is that they can't subdivide their house and turn their backyard into a separate lot to build a house on it?
Speaker 3 (17:24–17:42)
They can't without this relief because of the frontage at the front. It's only 51 feet. So by literally proposing any kind of construction here, you're going to run into that issue. It's a pre-existing nonconformance that's going to get triggered.
I think that's the answer to your question.
Speaker 2 (17:43–17:53)
Okay, has there been with respect to the water issues? Has there have there been any studies done on the ground water issues or anything affecting the neighborhood?
Speaker 3 (17:53–19:40)
There hasn't now from we received these opposition letters this morning. Um, so we didn't have any notice of this issue, but from my understanding, there's, there's no issue as far as runoff from this particular site. Um, the board has before them to support letters from direct to butters. Um, both that I apologize.
I don't have this right off the top of my head, but I believe it's 196 wrote a letter of support and 184. so. The neighbor, if you're sitting looking at the front door to the left of them, and then the neighbor that this structure would essentially sit next to, that is the two sites, if you're looking at the front door to the east of this site, that are very similar in this kind of layout, that are two separate lots. They have more width to play with, so they were able to do a little bit of a direct cut in the middle of these two, where we don't have enough width at Reed Steel Road to try to accomplish something like that.
But they are in support of this proposal. They didn't state that they have any issues with flooding themselves. My suspicion is if there's flooding that's happening, it has nothing to do with this particular site or anything that we're planning to propose. But it's probably something related to just the grading of Center Lane in how during really vicious rainstorms, the water might be pooling But I brought that up just to say, if this proposal was approved, we could do things at the site to address any runoff and recharge it into our site that would at least alleviate some of the issue.
I still don't think that there's anything related to this site that's triggering anything with that flooding issue that was raised in the opposition letters.
Speaker 2 (19:42–19:43)
But there have been no studies done on it.
Speaker 3 (19:45–19:50)
They're having because we needed this approval in order to get started with anything like that for my clients to start investing that kind of money.
Speaker 2 (19:51–19:54)
I just mean when you say you think that this has nothing to do with it.
Speaker 3 (19:54–20:24)
I watched the particular site. There's no major grading issue from the front where Reedsdale Road is when you go to the rear. If there was like a significant grade where I could say, yeah, there's a huge grading issue and water is running from the site back towards center lane. I didn't observe that.
I can't tell you it's a perfectly flat site, but if an entire street is having flooding issues, as I'm sure the board is aware, that wouldn't just be one site that's triggering that.
Speaker 2 (20:25–20:27)
Okay, I don't have any other questions right now.
Speaker 4 (20:29–22:15)
So I've got a, I've got a couple that in looking at the map that I submitted to the board for the hearing, it contains. The 1 foot top of contour lines for the shape of the lot for all the all that the entire neighborhood. It's showing that that lot slopes at least five to six feet from the front to the back. It's sloping from Reedsdale Road towards Center Lane.
It's not level. The water runs off, according to the map, from the Reedsdale Road thing through their yard towards the houses behind them. That's what the contour lines show on the town's, G. I.
S. G. I. S.
map so. What can you tell me what percentage of the lot of the 7,000. 998 square foot lot is the house going and it's driveway. And sorry, the house and what percentage a lot is going to be covered.
Because that's a concern. If we're taking what's currently an open lot that allows water to, by common sense, to be absorbed into the soil, and we're covering it with a 3,000 square foot house plus some additional parking space, To a layman that suggests that there's going to be less square footage to absorb water. I mean, we all pay tax in Milton based off of what I call the rain tax, right? Just based off of the percentage.
So what percentage of a lot is going to be covered by this structure and the deck?
Speaker 3 (22:15–22:27)
Do you have that number handy? I know that you did a calculation. I know that we made sure that the house didn't trigger any issue as far as lot coverage in that, I believe. It's less than 30 percent?
Speaker 5 (22:27–22:32)
30 is the maximum and it's at 28.5. That's the zoning.
Speaker 4 (22:33–22:38)
Is that just the footprint of the house or is that including the space for the driveway?
Speaker 2 (22:40–22:43)
These are actually on the application.
Speaker 4 (22:44–22:46)
If they're on the plan, that's great. I just couldn't find it.
Speaker 2 (22:46–22:50)
It adds up to 5,147 square feet.
Speaker 5 (22:51–22:52)
It does not include the driveway.
Speaker 3 (22:53–24:15)
Yeah. All right, so now that being said, if I could just address your concern or thoughts that we've come up with with all of this, as everybody here knows, we could do some kind of impervious pavers for the driveway. So it doesn't need to be blacktop. That's just going to have water running down it.
In receiving these opposition letters this morning about this, I had a discussion with the owners. James and I have discussed this. There's ways that we can design ways to capture any of the water during storms and make sure that this isn't an issue. If anything, what I would say is by denying this, it's going to continue on.
I wasn't aware of that map being provided to the zoning board. I wish I had a chance to review it in more detail, that there was that difference in grading. You know, that being said, The proposal, if it was to be approved, would actually remedy that issue more than it would cause more of a problem there in that we could identify it and address it with issues, like I said, by creating some kind of landscaping plan around the site to trap more of any runoff in, maybe create some kind of a berm system around where the landscaping would be around the site in order to, again, prevent any runoff from occurring, and then just deal with any of the grading issues during the construction of the site. Creating a whole tech system to recharge water back.
Speaker 4 (24:15–24:55)
You got a bigger problem than the water. I even even without the opposition letters. I'm about the about the flooding. You got a bigger concern in my view.
Okay. Okay. Which is that the house. What's the, the house that you're proposing to build has 0 frontage on, on, on regional road, right?
There is no frontage. Right? It would be the easement, but yes. There's the right does the easement count towards the frontage total for that lot?
It does not. Okay. So you're, you're asking us to grant 2 variances. I think 1 variance to the, the front lot.
For it's now nonconforming minimum.
Speaker 3 (24:56–24:57)
The pre existing, right?
Speaker 4 (24:57–25:09)
Right. We're looking for us to sort of bless that. And then secondly, you're looking to us to approve a variance for basically 0 frontage for a 2nd lot. Is that do I have that about right?
Speaker 3 (25:11–25:13)
That's what the variance request is.
Speaker 4 (25:13–26:34)
Yeah. So. And you're talking about the hardship issue, which I understand, but there's a 2nd test. In section 10 of 40 a right in the granting of the variants that is that we have to find that desirable relief can be granted without substantial detriment to the public good and without nullifying or substantially degrading from the intent or purpose of the bylaw.
Right? So, what this proposal is asking us to do is to take. a 15,000-ish square foot lot, cut it in half, make the person's backyard a separate buildable lot in perpetuity and with no frontage. Right now, I'm having a hard time understanding how that doesn't substantially degradate from the intent of the zoning bylaw.
Forget about the water and all of that, let's say that was solved. The second prong of our variance test to right now, I don't see how that's met. Possibly, I don't see it. So is there any way that that, how does this project not degregate substantially from the intent of the bylaw?
Speaker 3 (26:35–27:59)
That's what I'm struggling with. The intent of any zoning code is for there to be an option or for exceptions where there are unique situations. And that is what I identify when I look at this particular site. If you go around in the entire neighborhood, there is not one other lot that has this shape and this size.
So, the owners here are stuck with a 15,000 square foot lot and a 1,500 square foot home that exists on it. Now, there are ways around this. They could have created some kind of thoroughfare or breezeway to an additional structure, and that would have essentially I don't want to say done an end around on all of this, but it would have then not have been two different structures that would have triggered this issue. In doing that, the owners here then are stuck with ultimately building the house they want, but then being combined or living right within almost the same structure as somebody else.
And that look would be completely outside of what happens in Milton. So the idea here was to try to create a way that they don't suffer from having this huge yard that they're never going to be able to fully utilize and ultimately have the financial hardship of. We are only using, I think the coverage amount is 0.1. So there's an FAR of 0.1 of the existing house on this lot and never be able to utilize it for any financial gain and build the house here that they really would like.
Speaker 4 (27:59–28:41)
They're going to run into the lies that they can walk back there. It's not like it's cut off from them. They still have access to it. They still possess it.
They still own it. It's like, if we allow this to happen, what's to stop any other person in Milton. From cutting up their lot into 2 pieces with 0 frontage and coming to us and say, well, you granted a zoning. I have a hardship.
My lot is slightly weird. I just don't see how we could possibly grant that. I haven't talked to the board members about this obviously, but I don't, you know, I, it to me, it just it. I don't see any way to grant this without completely abrogating most zoning.
Speaker 3 (28:41–28:50)
Lots are not going to be of the size where they can cut their lot in half and still have 275 hundred square foot lots to utilize not in this neighborhood, but in other parts of town.
Speaker 4 (28:52–28:59)
Yeah, that's what I'm having trouble with. I just, I, I. Yeah, I.
Speaker 1 (29:01–30:53)
Well, I mean, you know, I think Nick has pointed out that in the provisions of 10A, there's three requirements we have defined. That there's special circumstances relating to the soil conditions and the shape and the topography, etc. that the literal enforcement would be some sort of a hardship, and that, as Nick pointed out, that the desired relief isn't, you know, without substantial detriment to the members of the public. And so those are the three things that we have to find, and I get the sense from the other two board members, and they probably should get the sense from me, is that I'm not finding grounds for the three provisions.
Deficiency in lot frontage is unfortunately not a circumstance that's supposedly related to the soil conditions or the shape or the topography of the lot, just because it doesn't have frontage that's not related to that first requirement. I don't think that you've already got one house on there. I don't think that, and I think there's case law that says that there's no hardship based upon somebody's desire to build a second house. You know, that's not a hardship.
There's already a house there. So, you know, so I have, you know, as I think maybe the other two board members do too, is that I'm finding it a hard argument to come up with the reasons for the variance, because I don't think those three provisions have been satisfied. But you know, that's I don't know what their other opinion is, but that's the difficulty I'm having with. With the variance is the fact that we've got to make these findings and we've got to support those findings and we can't just recite statute.
We have to come up with reasons and I don't. I don't so far here any.
Speaker 3 (30:56–32:12)
I don't know how to respond I mean I've given you reasons it sounds like you disagree with me on them I don't want to just repeat them and waste everyone's time right now. You know, I do think it's unique, I think there is something special as to this particular site in that there's a, there's, it's the way that initially when whoever did the estate plan here divided all the lots up. That it is a very unique shape and that it literally goes from 80 feet at the back to 50 feet at the front, had they had the 80 feet at the back of the very two neighboring lots did something very, very similar to this and this zoning board must have at some point approved that. And in doing that, you know, essentially that created this particular lot here.
So, you know, I don't want to get into this like, well, someone else created this problem, kind of an argument with the three. I'm just saying my client was left with what they were given. They have a 15,000 square foot lot. I understand Mr.
Gray's argument. And I hear this all the time in making zoning presentations that, well, everybody is going to follow this thereafter. No, I disagree with that argument here on this particular site in this particular neighborhood, because this is the only site that has that shape in the rear of the, Um, in the actual site, the property itself to be able to divide it in half and still have 7500 square feet for each lot to ultimately utilize.
Speaker 4 (32:13–32:24)
At the frontage say that again, you don't have the frontage if we don't and that's the variant that we're seeking way that you could make that subdivision and you have the frontage.
Speaker 3 (32:24–32:41)
Yeah, no, I understand what you're saying. But what you're saying is, if we had the frontage, we wouldn't need a variance at all. This would be an as-of-right project. You wouldn't.
You could do it as-of-right. Yeah. So that's why we're here. That's what I'm saying.
Like, it's a bit circular, me making that argument, in that if we had this, we wouldn't need this. We wouldn't be here. We'd just be doing an as-of-right project.
Speaker 4 (32:41–32:58)
Just need something more to hang my hat on with respect to that last element about how this doesn't abrogate, substantially degradate from the intent of the bylaw. And I haven't heard anything yet that I can, we could write a decision and point to as a reason how that doesn't happen.
Speaker 3 (32:58–36:52)
That's my understanding of the bylaws is that as long as it's staying with the harmony, the aesthetic in the feel and fabric of a particular neighborhood. Okay. What my client is was looking to propose here was some kind of a plan to do this. I was at the, and this is not a knock on anyone.
I was at the planning board. I was at the building department trying to figure out where to get started with this brainchild. And I spent four months being sent to go and get, I think it's an ANR. So I was first told to go and get a subdivision first.
I looked into that. That costs, I think, roughly $7,500 just to have them look at it. And I said, well, why are we going to start with the subdivision here when we know that we need a variance? We were then sent back to the building department and then this was the violation that happened at no point has anyone from the building department met with us to discuss this particular issue of this house is big or that it's going to be detrimental to the particular community.
I am by no means are my clients said on at the house has to be of this size or this design. But what they're struggling with is that they have this huge piece of property, Milton has high taxes, they could bring in another tax paying member of the community to this particular neighborhood. If you look at the aerial view of this particular neighborhood. Other than this stretch of reads deal road, almost all of the other lots are around.
I want I didn't do an exact measurement but are the size of what these two when split would ultimately result as so it's not as if it's all 15,000 square foot lots in this neighborhood and by subdividing this you're going to end up with two very small. You know what we call like. shoebox sites. It is unique in that you would have a driveway going to a house that's in the rear.
However, I would like you to look at the two sites that are to the east of this particular site. One, and I'm just doing this off of like the eye test, one only has a frontage of Maybe 30 feet. It's not as if they're both 40 or 50 feet and they got variances for that one, which not, I think it's 196. The frontage there is very very small it's just it's it's a little bit of space and then the driveway that winds to that rare house.
That rear house sits behind the house that's in front of it at 190. So it's not as if that house sits and has frontage onto Reedsdale Road. That house is behind the other structure. It is different.
I'm not going to sit here and tell you that they're both oranges. It is a little bit of an apple and an orange situation. but it would be similar in what the intent of the design here is, which is, I'm guessing both of ultimately what was two lots, they were allowed to split it in half and make it into three. And my clients looked at that and said, well, we could do something similar here, but for this zoning issue.
And that is the uniqueness of this particular site. I don't think that this would be detrimental to the community in that my clients have already shown that they renovated the existing front structure of this house. They have two children that live with them at this site. They're a family and a member of the community in Milton.
This isn't an out-of-town developer looking to come in and just make money off of the town. They could work with the town work with the professionals and the designers of this particular town to come up with something that is not, you know, is what the town would like to see both from an aesthetic and from an architectural perspective. I just think they're ultimately left with 50 feet that no matter how you cut it. You're then going to just have these really odd shaped front yards with two houses in the back that are then going to have all kinds of setback issues with houses that aren't even facing the street that have to knock down their single family in order to do that.
And without that, then they're left with, say, roughly a 14,000 square foot yard and a 1,000 square foot or 750 square foot envelope of their existing single family.
Speaker 1 (36:55–37:03)
Well, thank you. Thank you, Mr Barry. Let me just ask Bill. Is there somebody anybody in the in the waiting room audience with a hand up that would like to speak?
Speaker 2 (37:04–37:09)
I do see only identified as iPhone. I'm allowing them to talk.
Speaker 6 (37:11–39:23)
Hi, apologies. I think I'm the person listed as iPhone. Hi, my name is Suzanne Bridges. Thank you for taking my call, Zoning Board of Appeals.
I live at 71 Center Lane. I'm one of the abutters of this project. I have a letter that I want to read, but I just first wanted to make a few points from listening to Attorney Barry's presentation. So first, when he was saying there was support from 196 and 184 Reedsdale, I understand why they would support.
Reedsdale does not get water in the front. The water runs from Reedsdale to the back of Center Lane, which is why Center Lane is the The issue at hand, I would say we on center lane get all of the water and not just from say said project. We get it all the time. I'm the person you spoke about earlier who sent the video from Thursday, August 14th.
We couldn't even have cars come down the street during that during that flooding. I also sent some pictures. So I just wanted to make point of that. That's why they would support it because they don't get water.
And also another point where you said 190 and 196 Reedsdale have similar structures to this proposed project from what I believe having been here over 10 years those were existing structures there was a small ranch. there that was knocked down to build one nice home. There are two homes 190 and 196 obviously, but if you're looking at this property to the right, there was a really small ranch there. And then a larger home was built so just wanted to make note there was already two existing structures.
And my other note I wanted to make wanted to make is just saying that a hardship is having a large backyard. I would never call that a hardship that's it's, you know, they have, they have a nice backyard that they. would have if they actually took care of it, which I'm going to make point in my letter that I wrote. So those are my points that I wanted to make to Attorney Barry.
Is it OK if I speak a little further on the letter that I wrote?
Speaker 1 (39:23–39:24)
Yes, please.
Speaker 6 (39:24–41:27)
OK, great. OK, so thank you, Board of Appeals, for taking my call during this. My name is Suzanne Bridges. I currently live at 71 Center Lane.
I'm speaking to formally express my strong opposition to the proposed 3,900 square foot construction project at 184 Reidsdale. As a property owner directly abutting this site, I have serious concerns about the potential negative impact this development will have on my property and the surrounding properties in my neighborhood. Currently, my property, along with others in the area, already face significant challenges with water runoff, including frequent basement floodings and excessive pooling of water in my yard after a rainstorm. Given the proximity of the proposed construction to my land, I am worried that the new development will significantly add to these drainage issues.
further overwhelming and already inadequate stormwater management system. This poses a real risk of increased flooding, not only to my property, but also my neighbors who I've spoken with. As I said earlier, I sent some pictures and video from the August 14th storm that caused cars to not be able to return to their home. And additionally, I wanted to point out that the current homeowners at the site have shown a lack of responsibility in maintaining their property.
The lot is consistently overgrown and unsightly, creating further concerns about how the land is being managed and raising questions about the developer's commitment to upkeeping the property, both during and after construction. A lack of maintenance on this scale does not inspire confidence that the development will be properly managed. Given these factors, I respectfully urge the board to deny approval of this construction project. I'd like to thank you for your attention to this matter, and I trust that you will consider the serious implications this development may have on our neighborhood and make a decision that reflects the best interest of our current residents.
And again, thank you for listening to me tonight.
Speaker 1 (41:28–41:37)
Thank you very much for attending and we appreciate the input and the videos. Thank you. Is there anyone else that wishes to speak on this matter?
Speaker 2 (41:38–41:43)
Rachel Hsu. Rachel, you can speak now.
Speaker 7 (41:44–43:07)
Hi, can you hear me? Yep. So I don't have anything prepared as well as Sue did. This is Rachel Hsu.
I live at 53 Central Lane, but I've been listening and I just kind of wanted to chime in. I apologize. I sent a letter just now, so you don't have it. I was away this weekend, and I did include some photographs as Sue did.
But I just also wanted to chime in. We're at 53 Center Lane. We are, I believe, three doors down from Sue, closer to Center Street. And just from the flooding point of view, just to kind of emphasize how severe it is, our home, we have two sump pumps.
We have an extensive French drain system. We have a dry well. And we personally, since we moved in, and 18 have spent tens of thousands of dollars on mitigation in our backyard with re, grading, landscaping plantings. And you will see in the photographs that I shared from recent storms, the volume of water that we deal with when we have rains.
including the fact that we came within inches of losing a car on Center Lane in the storms that Sue referenced. You will see from the photographs how the water nearly came as high as the engine on our car. So I just wanted to share that the flooding is severe in this neighborhood and that I just feel that that's something that really does need to be factored in. Thank you.
Speaker 1 (43:08–43:18)
Thank you very much. And we'll make a note to include your letter in the materials on file with the board. So thank you. Anyone else?
Speaker 2 (43:22–43:23)
I don't see anybody else.
Speaker 1 (43:26–43:42)
So Mr. Barry, I think we would probably, you know, I think if you wanted to have any sort of last sort of wrap up to before we consider the application, on whether there were any sort of last thoughts you wanted to add or Mr. Bailey.
Speaker 3 (43:43–46:54)
Just to reiterate, I understand the neighbor's opposition related to the flooding issue. I think by stopping a proposal like this, it's just going to persist. I think in developing a site, the benefit would be what I just described, which is creating ways to try to mitigate these issues and recharge more of the runoff into this particular site and try to remedy as much of that as possible. I, you know, I think I address all of the other concerns or questions that were raised.
You know, I understand some of the opinions that, you know, having a large yard is is not a hardship. That's true, although I also think just the cost of living in Massachusetts is extremely high, and we have an issue right now with a lack of housing. So just like the house that, if I made a mistake in that it wasn't subdivided by one developer to do the whole project, at some point, somebody must have done that with the idea of taking a lot that was odd-shaped and putting two houses on it right next door. One of them was a small ranch, and someone made a decision to knock that down and build a larger house there.
So, you know, for all those reasons, I think that is ultimately my client is trying to do something similar here because of the uniqueness of the way that these four lots at 180, 190, and 196, the way that they're cut up compared with The remainder of the existing block, they are very unique and different from the planning that was done as far as each site looking very, very similar to each other other than these three lots in the location where they are. you know, one last thing as far as the current state of the site, there was a construction project renovating the existing house at 184 Reedsdale Road. So, if while that was going on, the maintenance of the yard wasn't perfect, you know, I'm not trying to make excuses, but there were there were things going on at the site that the family and the owners were, you know, spending their time on and most concerned with, but I would say that if this proposal was approved, there would be a landscaping plan and the entire site would be redesigned and relandscaped that would address or do away with that issue as far as what. I believe was Miss Bridges had related to the upkeep at the particular site.
There would also be a new owner at this particular site. So if they had concerns about this developer and how they would maintain their site, well, there would be a new member of the community as well with them. And they would be sharing the easement of the driveway and the responsibility of maintaining both sites. I think this is a good proposal.
I think this is a good option for Milton to add some housing. I understand that there are some issues related to the variance that needs to be granted, but I think in how it's fleshed out, it wouldn't be detrimental to the community. In fact, for what we've discussed regarding the flooding and some of the other issues, those will be remedied by a development here.
Speaker 1 (46:55–47:02)
Somebody needs to mute themselves.
Speaker 7 (47:02–47:04)
Thank you.
Speaker 3 (47:06–47:11)
But otherwise, thank you all the members of this board for giving us the time and the chance to make this proposal.
Speaker 1 (47:13–47:16)
I would entertain a motion to close the public hearing.
Speaker 2 (47:19–47:19)
So moved.
Speaker 1 (47:22–47:38)
Thank you. So up for discussion, gentlemen. I sort of did my little kind of outline of what I think we need to find for the variants. I'd be interested in your thoughts.
Speaker 2 (47:39–48:21)
I mean, I think for the reasons we all have just discussed, I would vote against allowing the variants. I don't think we meet two of the three hurdles that we're required to find. I'm not convinced that there's a substantial hardship This is the kind of, um, the kind of thing that the zoning law just would not permit. Um, I think as, as Nick put it, it would abrogate the purpose of the zoning law.
Um, and I, I just don't see how we meet, um, the second and third requirements. Um, so I would vote, uh, vote no.
Speaker 4 (48:22–50:17)
I agree. I agree with Michael. You're done. I'm sorry.
Um, I, I agree with that. Um, as I said before, even, even for the sake of argument, not considering the flooding issue, right? Which I think is real. I think I agree.
I know it's real. We've got, we've, we've got evidence in front of us. And, and, but even if let's just say hypothetically, that wasn't part of one of the issues that we had testimonial, right. And we're just merely talking about dividing this lot in the manner.
And for the reason stated, um, I, I still don't think it meets the, the tests, the 2 of the 3 tests that we need to make findings on and I don't. I don't doubt that it's, I mean, I get the, I get the reason why this is a good project from the point of view of the, of the applicant, because it, you know, they renovated the front house it if they're able to do this subdivision. They're able to take the capital from selling the 1st place and turn it into building the dream house. I mean, I get it.
It may it's it and from that point of view, it's an exciting project for them. I, and I certainly understand why they've, they've spent the money hiring council and developing a plan to do it. But. I just, I don't see how we can.
I don't think we have enough. Evidence to meet all of the tests that were required under section 10 to grant a variance to allow that 2nd lot to have 0 frontage. It just that's that's the frontage requirement is kind of there to prevent this exact thing from happening. Right?
I mean, so but for whatever reason, I just, I, I, I can't see my way to. voting for it, and then defending a decision that's appealed. I just, I don't, so that's where I am.
Speaker 1 (50:18–52:03)
Yeah. Well, I agree with both of you, unfortunately, is that I just don't see, you know, having looked at the case laws on, you know, case law and stuff on variances, looking at the test, I just don't think that we have enough grounds in here to justify in a decision the issuance of a variance. You know, hardship, you know, I said it's not really a hardship to say I can't have a second house on my land. And there's cases that have come down on that.
And then, as you say, we have two non-conforming lots and one which has no frontage at all. And that's a problem as well. And I don't see how, you know, there's a discussion about the fact that it's an oddly shaped lot. It's not that out of shape.
I mean, it's not like a serious pork chop. But I can see the other houses, you know, that happened because they had the required frontage. And this one doesn't. But as I said, I just can't see drafting the decision.
I would have a hard time putting enough meat into it to have a variance granted, have that hold up in court if it got challenged. I just don't think I've got enough there, as they say. Anyone else, Mike or Nick? Anything else?
Well, so I guess we should take a vote on this application and on whether or not we would be in favor of granting would be in favor of granting the license of the variance that's been requested by the applicant. And my vote would be no.
Speaker 2 (52:03–52:06)
No, my vote would be no.
Speaker 1 (52:08–52:10)
I'm sorry to say that Mr. Barry.
Speaker 3 (52:10–52:23)
That's okay. You already did. You all already said no in your discussion. So, you know, if I could just respond to one thing that you said, I understand that building two houses isn't a hardship.
That's not what I argued or represented.
Speaker 1 (52:23–52:26)
Oh, no, no, no. I didn't say you did. I didn't say you did.
Speaker 3 (52:27–53:18)
I just wanted to put that on the record. That's all. I didn't say that was the hardship. The hardship is related to the shape of the site.
There isn't enough frontage for 75 feet as it exists now. So that is the struggle of this particular site in trying to subdivide it with how shallow and deep it is. I disagree with you that it's not pork chop shaped. It's 50 at the front and 80 at the back.
So the front is almost literally half of what it is at the rear, but I get that it's not 20 and then 80. But it is not as if it's 65 in the back. It's not a triangular shaped lot. You know, the one thing I would say is even with this decision, if You know, my client might be interested in coming and meeting with some of the town professionals.
We literally got no guidance at all.
Speaker 1 (53:19–53:34)
Well, I apologize for that. And that's true. And that's because we didn't have any planners and we had interim building commissioners. We now have an actual building commissioner.
And starting on October 1st, we will actually have a town planner.
Speaker 3 (53:34–54:57)
And again, if somebody had mentioned that to us and I didn't waste five months and my clients time and money, trying to figure out how to do this. We might have waited because we waited five months to get the zoning board date. Yeah. And then we just got a letter saying you have a hearing in three weeks no we have a commissioner coming to meet with us.
I've worked with a lot of towns all over the state of Massachusetts, and I was. I'm not this is not intended to berate it. I was just kind of shocked at the lack of assistance at all from the, from the Milton planning department with assisting and or having a conversation about was it was because I actually went down to see what was going on 60 days after I filed this, and all that I got was yep you're building permits going to be approved if you go and get an A&R. and all I was looking to do was file it so that I could get in front of some of the examiners and or the building commissioner and or some of the planners to be like this is what we're thinking before my client spends a lot of money in putting this forward and a thousand dollars to put notice out is there somebody we can speak to about it and all I got was here's your notice for your ZBA hearing and here's a violation of the zoning code so With that, we now have this information.
My clients have spent some money that they've lost, but I think they have a decision to whether they want to proceed forward and come in and have some more discussions about this or not.
Speaker 1 (54:57–55:33)
Thank you for everyone's time. I understand that totally. We are also getting new town council and that's happened too. The disarray in the planning department has been very sad for all of us and especially for our Bill Donnelly in our apartment because people wandered on the hall and he's like the only person around.
And so I do apologize on behalf of the town for the trouble that you have gone through and the lack of direction that has been, you know, your experience at Town Hall. Hopefully that will be better.
Speaker 3 (55:33–55:36)
Yeah, that's okay. It's fine.
Speaker 1 (55:37–55:38)
Well, thank you very much.
Speaker 3 (55:38–55:39)
Thank you. Have a nice evening.
Speaker 1 (55:39–56:24)
And take a motion to adjourn. Oh, we have to draft a decision. Does anybody have a desire to do that? I'll do it.
in between the other, I have a hearing tomorrow too. But anyway, so thank you very much for all the people that attended, the people that sent in information and to Mr. Barry and to Mr. Bailey, we appreciate the time and effort you spent on this and hopefully you can come up with a clever solution for the situation.
I take a motion to adjourn. Thank you gentlemen, as always. And we are adjourned.