Board: Community Preservation Committee
Date: 2026-07-06
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:19–00:20)
So let's call the meeting to order.
Speaker 2 (00:20–00:34)
It's 7.01 on July 6. Our developing community preservation committee is called to order. My name is Tom Callahan. I'm the chair of the committee.
And let's go around for introductions. Jenny Russell, vice chair.
Speaker 3 (00:35–00:39)
Dean Jackson, at large. Steve O'Donnell, historical commission.
Speaker 4 (00:39–00:41)
Kathleen O'Donnell, at large.
Speaker 2 (00:42–00:43)
And Robbie.
Speaker 5 (00:45–00:47)
Robbie Powers for the housing authority.
Speaker 2 (00:48–01:18)
And Hal. Hal Munger for Planning Board. Great. Thank you, everybody.
And we will get going with the first agenda item is the reorganization discussion. We need a vote on a new chair, vice chair, and financial liaison for the coming year. So I'm going to open that up, open the floor for discussion. Nominations.
Speaker 4 (01:19–01:26)
Are the current officers willing to serve again? That would be the question. Yes.
Speaker 3 (01:27–01:33)
That would have been my question. If you have a good thing, why change it?
Speaker 2 (01:34–01:40)
Exactly. Yes, I agree. And yes, I think the answer is yes for all three.
Speaker 4 (01:40–01:44)
So you would not be pulling a Calvin Kluge. Just checking.
Speaker 2 (01:45–01:50)
But the floor is open for any nominations.
Speaker 4 (01:50–01:59)
Alan, Rob. Whoa, whoa.
Speaker 5 (01:59–02:01)
I nominate Tom Callahan as chair.
Speaker 2 (02:03–02:21)
I second that. That has been one nomination for Tom Callahan as chair. And a second. I would nominate Jenny as vice chair.
Sorry. What's your preference to take them all at once? I was going to do it as a slate.
Speaker 4 (02:21–02:23)
Do it all at once. All at once.
Speaker 2 (02:24–02:25)
So you want to add to that?
Speaker 4 (02:25–02:32)
Add to the slate, I would add, opposed to add Jenny Russell as vice chair and Pete Jackson as our financial liaison.
Speaker 2 (02:34–02:38)
I second. And Robbie, would you consider that a friendly amendment?
Speaker 5 (02:38–02:39)
Yes.
Speaker 2 (02:40–03:04)
OK. So we have a motion to nominate Tom Callahan as chair, Jenny Russell as vice chair, Pete Jackson as financial liaison. And it's been seconded. Any other nominations?
Hearing none, I'll take a roll call. Kathleen?
Speaker 4 (03:05–03:06)
I would vote in favor, gladly.
Speaker 3 (03:07–03:09)
Steve? In favor. Robbie?
Speaker 1 (03:13–03:17)
Yes. Hal. Yes.
Speaker 2 (03:18–03:25)
Pete. Yes. Jenny. Yes.
Tom. Yes. You're stuck with us for another year.
Speaker 4 (03:25–03:27)
Thank you. Thank you. Thank you.
Speaker 2 (03:27–03:46)
Always the painful part of the meeting. One of these years, one of these years, it's not going to be so easy. Is that a reorganization or not? Yes.
Officially reorganized. Yes. So the next thing on the agenda is approval.
Speaker 4 (03:46–03:48)
With thanks from Grateful Nation.
Speaker 2 (03:48–04:27)
By the way, thank you for your confidence. We will endeavor to uphold that confidence over the year. Approval of the June 22, 2026 minutes, which again, Jenny beautifully prepared. I would move to approve the minutes.
Second. All right. Um, so, um, motion in a second, um, any comments, any additions, edits, um, hearing none, all in favor. I mean, I have to roll call.
Um, Jenny? Yes. Pete? Yes.
Steve? Yes. Kathleen? Yes.
Adam? Yes. Robby?
Speaker 5 (04:28–04:28)
Yes.
Speaker 2 (04:29–05:20)
And Tom votes yes as well. All right. We can bring our first presentation to the, um, to the, uh, well, first, Nick, why don't you go first? Because the first three or three and a half discussion items, what's not on the agenda, but I do want Nick to speak to is also some of the timing of the Tucker project that we discussed last week.
Obviously we met with, was it last week? Last, not last week, two weeks ago. Did we say the word first? When did we meet with you?
One of the last two meetings, we met with the Tucker PTO folks. So Nick, however you want to start, but between the Tucker project, the Atherton Street Fire Station, the Milton Lockup, and the monuments and historic markers are all you. We're all you.
Speaker 6 (05:21–07:29)
We're part you. Why don't I go in reverse order then, and then Beth do that, and Tucker kind of a little bit together. That's fine. Yeah.
So on the monuments and historic markers, we actually, the inspiration for this came really from looking at what the cemetery was doing, what their brewery stones and monuments were, that the CPC funded last year, and that will be commencing, I think, very soon this summer. It just spurred us to think about our own inventory of historic markers and monuments and really lack thereof, and lack of kind of thinking about proper maintenance for long-term care of those. So our office between the new system town administrator, Cody Case, and myself reached out to Steve and others to just make sure we were not missing any on the list. So we provided a full list of those that we're seeing right now that are in materials.
We're a little vague on cost right now because we're really trying to get to a place where we understand what our needs are. We have one vendor who will be coming into town Um, next week to look at the ones we'll put on the list and suggest a maintenance plan and inventory plan. But I think broadly, the concept is similar to what the cemetery is undertaking where they're documenting the quality and condition of all the. maintenance and long-term care, and then documenting them from there.
So that is what we are posing as the concept of the plan, seeking CDC feedback on eligibility as we work to kind of finalize what that scope might look like more specifically. There are a few that are in worse condition than others from our very unprofessional eye, but that's kind of what we're looking for for assistance on is to just validate in terms of the markers that are around town. that are kind of just there and not necessarily being maintained by any specific entity to categorize documents, record them, and then if necessary, invest in care and improvements.
Speaker 7 (07:30–07:35)
So at this point, would you be just doing the inventory and that kind of a plan?
Speaker 6 (07:35–08:05)
What we think is really that kind of initial inventory and evaluation. But we'll defer to the vendors if they see one that's more In a more dire need, maybe we'll bring forward a proposal that would improve one or two of them. But I think our concept is really inventory and evaluation as we work towards better maintenance moving forward. I should say better maintenance.
A maintenance game plan moving forward.
Speaker 5 (08:05–08:12)
So do you expect to know a budget by the end of August and the 9th of September?
Speaker 6 (08:13–08:24)
That's what we're working towards. We've been reaching out to a few different vendors that work in this field, and one's been responsive so far. So we're hoping to get something more concrete after engaging with them.
Speaker 5 (08:24–08:34)
And in terms of priority, how do you define priority? Is it condition, or is it danger, or is it historical value, or what?
Speaker 6 (08:34–09:01)
And that's, again, just because we're really trying to keep this in a phased approach in getting that inventory. to be in a place to evaluate what kind of needs to happen or what doesn't need to happen. So I don't think I have a good answer there. I think we are trying to maintain the markers we have.
If those are falling into disrepair or starting to in need of attention, then we would prioritize those and then just have a game plan for the balance from there.
Speaker 7 (09:04–09:17)
It would seem to me that condition is a big thing and then maybe significance we have something really historically significant like these monuments out here, maybe they go to a higher priority.
Speaker 6 (09:18–09:19)
Yeah, I wouldn't agree with that.
Speaker 3 (09:19–09:24)
But that's something you'll have to think about. I mean, there's such a variety. Yes. They're all so different.
Speaker 6 (09:24–09:25)
Yes.
Speaker 3 (09:25–09:50)
And if you're interested in doing the tricentenary ones, two are missing entirely. The 350th, I don't know if it's only the poles that are broken or the signs themselves, those would be relatively easier. The two centenary ones, we have photos of them, there are photos of them, but they're missing entirely.
Speaker 7 (09:53–09:57)
So the consultant will help you come up with that criteria or whatever.
Speaker 2 (09:58–11:26)
So you just raised the issue I have is, so it's very clear CPA can fund a study and analysis with this. It's also very clear to me that CPA can fund restoration of a historic marker that is in need of it. It's not clear to me that CPA could do a new historic marker. Even if it's replacing something that was lost to age or whatever.
I don't know, Kathleen, if you encountered that. I seem to remember some discussion on the state line level on this, that it's potentially, you know, it could be, you know, like a lot of the things we've discussed, if it was part of a larger project, you know, you can put up a sign at the softball field if it's part of a larger capital improvements project, but not, independent of a larger improvement project or something. So I'm not ready to say one way or the other, but that is something to look into. And also probably in consideration to whoever you probably have to do the plan, okay, what's the funding strategy beyond CPA for needs that might not be CPA?
But maybe I'm wrong.
Speaker 4 (11:26–12:05)
No, I mean, I sort of looked, because I was kind of curious about that, because they're not really like, you know, I always make the point that it's a dirt law, you know, we have to have some dirt involved. And so, but there have been on the, I'm just looking on the website now, lots of examples of using CPA money. Certainly for gravestones, it's certainly not an issue, but there are several projects that have been done over the years to fund the restoration. Right.
Yeah. Of, you know, or, you know, replacement of, existing ones. I said we wouldn't be able probably to do new ones.
Speaker 3 (12:05–12:08)
A recreation or restoration.
Speaker 4 (12:08–12:28)
Restoration or if you said or you knew that you had one and it's you know now it's like got hit by a truck or something you know that's a replacement of an existing. What we probably couldn't fund is new monuments. New monument like somebody wanted to build a statue to something. Okay but he says there were
Speaker 7 (12:28–12:38)
two monuments that used to be in the field and they're no longer, can we recreate that? That's the issue that I'm gonna solve tonight, Laura.
Speaker 2 (12:38–12:57)
Yeah. And it also goes to the other project, Joe Mondagnon's project, yeah, a proposal where he proposed historic markers on Louisville Parkway, which I believe, Joe's on call, so we're gonna hear from him in a few minutes, but I believe those are not,
Speaker 4 (12:57–13:09)
There, he was just, well, yeah, I mean, in Hanson in 2020, they did purchase and placement of historical markers throughout the town. Okay. So, you know, I'm thinking, you know, we need to do our research.
Speaker 6 (13:10–13:27)
And I don't know that we're necessarily at the stage where we would be asking for that. I think that's what we're trying to get to a place to understand better what. Reasonable budget would be for kind of an initial overview of everything and evaluation of everything to then move forward. It's a restoration and potentially maybe replace.
Speaker 4 (13:28–13:41)
Yeah, I'm just trying to see. So it was $4,000 for Hingham to do an inventory of its markers and that sort of thing. But that was some years ago.
Speaker 7 (13:41–13:43)
And that's just an inventory.
Speaker 4 (13:43–14:00)
Yeah, it was the inventory and evaluation. preservation of the markers and that was 2008. So add another percent to that. But that, yeah.
Right.
Speaker 7 (14:01–14:03)
Well, you look into that, let us know.
Speaker 6 (14:03–15:54)
Yes, we intend to have a proposal for September with these questions answered, but they're helpful in the meantime for us to start formulating that. Thank you. So I know this committee is aware of that project generally, more specifically the window replacement. I think in the application it said June start date, but they are mobilizing for the starting on Monday, the 13th of July to do the window replacement, which we had treated as a sort of phase one.
Phase two was building envelope and roof evaluation and improvements. So we intend again to bring forward our funding requests but that will be affected in a couple of different ways. First is the window project portion is $85,000, and the appropriation is upwards of a couple of hundred thousand. So there may be money available in what has been previously appropriated for this work.
So it could be, you know, depending on what the budget is, there may be money there that will be turned back to CQC after this project is complete. And having at least one vendor out there, they think there might be more of an opportunity to do repairs rather than a total roof replacement, which I think had been the initial conception. So, again, we're in the process of working with the contractor to do the window project, which has been delayed, and we appreciate the committee's patience on that one as we finally got that out to bid and contracted. But we intend to submit a funding application for the next phase for the fall.
Scope is a little bit kind of still wishy-washy just in terms of what is actually needed down there. But we'll be sure to have that teed up by the fall.
Speaker 7 (15:54–16:08)
The initial project was both the windows and masonry repair. and the masonry repair wasn't done. So do you intend to go ahead with a separate masonry repair project with the initial funding that you were given?
Speaker 6 (16:08–16:48)
Yeah, we pulled, so we had a bid set that had both in there and then talking to contractors that really felt that it would be two different kinds of people that would want to do the work. So we separated the work. Our intention was to have all of it done by the fall. I think our goal is to have a masonry under contracts and have a better sense of the route.
But again, we don't, that's still something we're working through. So the delays on the windows still trickling to further impacts on completion of all of phase one. Our hopes are to be in a better position by the fall to request the next aspect of it, but from an eligibility perspective.
Speaker 7 (16:48–16:53)
You're intending to do a separate masonry project to finish up phase one?
Speaker 6 (16:53–16:53)
Correct.
Speaker 7 (16:53–16:54)
Okay.
Speaker 5 (16:55–16:56)
Is the roof leak?
Speaker 6 (16:57–17:16)
The leaks that we've had received complaints about are really around, there's a skylight in there. So it's been, the complaints that I've been made aware of have been more or less limited to in that vicinity, which we're hopeful that means maybe a total replacement isn't necessary. But again, that's something I'm still trying to map out.
Speaker 3 (17:17–17:59)
Is the study of the roof was part of the first money. It was do the windows, do the masonry, and study the roof to find out what is needed. Can the slate be reused or not? Or can some of it be reused?
Possibly, if you couldn't reuse all of it, maybe only new on the front half and the used on the back half. The money for that was built into the $220,000. you're discussing is the money to actually do a roof, depending, you know, whatever it is that is determined to be needed.
Speaker 7 (18:01–18:11)
So if that's the case, then he could use some of the phase one money that's not needed for the masonry, if there's anything left over, to get an evaluation.
Speaker 3 (18:11–18:20)
The evaluation of the roof was built into the first 220. So it's within the scope of the, this is the money to actually do the room.
Speaker 6 (18:21–18:49)
And we hope to be in a position to have kind of a more specific ask for the budget and scope by September. It is possible that we are in that position, but we actually wanted to keep the project alive and try to keep it moving forward. But at the very least. the window replacement should be complete by the end of July, and then we're hopeful to keep the rest of the project kind of moving on those tracks, and then be prepared to really maybe ask the committee, but we're optimistic.
Speaker 3 (18:49–18:58)
Because to get numbers by the end of September, you need to do the study of the roof now in order to… Yeah.
Speaker 5 (18:58–19:11)
I mean, because that, again, that, you know… So it's both a timing issue and a budget issue. So it seems like 280 would be the upper limit. of what we're talking about, if you have potential reserves from the first year?
Speaker 6 (19:12–19:24)
Those numbers, yes. With the fund that those numbers are. Ideally, yes. But those numbers are older.
But maybe they're savings if the scope is reduced. But they are just a little bit older numbers.
Speaker 5 (19:25–19:29)
Has it been an RFP by Mason? TBD.
Speaker 6 (19:29–19:33)
No, we're trying to, I don't know where it sits with consolidated. I'll check in.
Speaker 3 (19:34–19:43)
I have an 8 o'clock with trauma minority contractor. I'm not sure. Yeah, I'll be there.
Speaker 2 (19:43–19:50)
All right, so let's move on to your Charles Atherton Street Fire Station or Tucker. Sure. Thank you.
Speaker 6 (19:50–22:43)
On Atherton. Chair Brian Walsh of the Fire Station Building Committee couldn't be here tonight. And we We don't have a lot present at this time. At this time, the architect and the OPM, the owner's project manager on the project are in design as we speak.
For the committee's knowledge, the town meeting did vote at the Maytown meeting to appropriate a million dollars to bring the design to a level where it could go up to bid. that design contemplates an addition and renovation of the existing structure, renovation of what you see, addition in terms of at least one additional bay built onto the structure, up to two more bays in total when the project is said and done, what those two additional bays, where they will be, whether they'll be attached or detached from the building, kind of to be determined for this committee's I would view those two additional bays most likely as going to be total new construction. The rest of the project really is about renovating and rehabilitating the existing structure from masonry improvements, building envelope improvements to interior renovations of the existing bays and the living quarters. In addition, if you're looking at the structure, the original concept design included an additional bay to the right of the two bays with an expansion over it to expand the crew quarters up above.
So we will be in a better position to describe that project in greater detail later in the summer. As the design team continues, they are marching towards a goal of having materials ready for our committee to review in August and September ahead of a fall town meeting, which we anticipate to be in October. It's a compact schedule. Things will have to move quickly.
So, really, I would be interested to know what this committee would be looking for to evaluate. Whether to fund it, how much to fund it, what the committee can and can't fund. What your perspective is on that so that we can start to pull that information together to be in place and then really what your timetable would be. I know Rob was talking about trying to meet again in a couple of weeks, so I'll tell you, you're looking for feedback from the designer and the project team.
that won't be ready by then. The warrant will need to go to print for a mid-October town meeting by like mid-September. So we'd be looking for final warrant articles, you know, completely done and complete by really early August. So this warrant committee can get to work and it's a tough timetable.
So really it will be helpful for us at this point is understanding how the committee is interested in learning more about specifically and how you see CPC finally being possibly used on this project or not.
Speaker 2 (22:45–23:08)
Can we just, before we get into that, just lay out the timeline again a little bit. So early August, Warren article, it was the printer, Warren would go to the printer in mid-September or mid-October town meeting in a November vote. So, I'll work back.
Speaker 6 (23:08–24:34)
Yes. So, yeah, we're valid question because the project will require about the question or that exclusion. So that will be either be on the state election ballot. Or require special election and in mid November or early December.
So, in that approximate timeframe, so, like, early November to mid December as a possibility for the ballot question town meeting to take place before that. Town meeting is supposed to fall on the fourth Monday in October. That clashes against early voting and everything else the town clerk's office is doing. So likely that will land a week earlier, October 19th, potentially.
So October 19th, special town meeting. Warrant needs to be printed with Warrant Committee recommendations and comments by the end of the second week in September. So now it's a question of how much, one way at a time, does the Warrant Committee have to consider articles? So that's where we say ideally today, you know, if we had to, we can let that slag a little bit, you know, they're well aware that an Appleton Street project article is coming.
So getting that specificity by early August, mid August is what we're shooting for. And for this committee meeting kind of a similar timeframe, because that article will have to say, how much money do we need from the voters in town meeting to appropriate how much money is CPC interested in and willing and recommending to commit to the project as well so that they can go to the town at the same time.
Speaker 2 (24:35–25:12)
You want to say a little bit more about, obviously, as you know, typically our process is to bring articles, CPC, CPA articles in front of the springtime meeting. This will be the first time. There's nothing wrong with doing that, but this will be the first time we're bringing it to a special time meeting in the fall. just talk, you know, for people listening and whatever, just talk us through why that would need to happen.
And, you know, those funds would have to be committed before a vote. Yeah.
Speaker 6 (25:13–26:15)
So the, um, one of the issues that with waiting for CPC money would be that the town would still need to have voted the full appropriation for the fire station project so that we can put it out to bid. You can sign a contractor that can start work in the spring of 2028. So if we waited until May, the project would have been fully designed, we would have had a contract in place. And so we would have had to fund the whole amount of the project with general fund money.
So, yeah, so the concept of putting the articles together so that they're approved at the same time meeting and there isn't a risk of the money being received as supplanting other monies, which CPC funds can't do. So the idea was to get to a total project budget amount from both the tax levy and the residents and from CPC. So the total project budget is appropriate to say it's $16 million, X million dollars from CPC or X hundred thousand dollars from CPC and the balance to come from the tax levy, subject to voter approval, of course.
Speaker 4 (26:16–26:28)
So I have a question. So are we looking to do this appropriation out of money for fiscal, this fiscal year, 2027, or are we looking to appropriate from 2028?
Speaker 6 (26:30–26:33)
It would be debt, so it wouldn't have an impact.
Speaker 4 (26:33–26:36)
Well, we have to factor in the debt service.
Speaker 6 (26:36–26:40)
The debt service wouldn't come until fiscal 28 at the earliest.
Speaker 4 (26:40–26:45)
Oh, OK. When the money is drawn. Yeah. So I just wanted to see.
Speaker 6 (26:45–26:56)
It could affect your other project appropriations because it would have to factor into the amount of money you have for fiscal, all of your fiscal funding. And we can get that, that figure will also depend on what the amount of money.
Speaker 4 (26:56–27:22)
Yeah, yeah, no, but I just, from my own thinking, I just wanted to make sure that I had factored in where it was coming from. Because when I represented Plymouth, it was not unusual at all for us to do October town meetings. that would have CPA articles that were for this, the current fiscal year. So fiscal 2027.
And so I just wanted to see which one- We've made all the recommendations for that fiscal year. Right.
Speaker 2 (27:23–27:56)
So I just was asked to see. Yeah, that's a good question. It's a good question. Okay, so you had asked us what we would need, and I think, I don't know why other folks speak to this better than me, but I think, you know, obviously we can only fund historic preservation portions of the project, which are generally, I think, defined as the exterior of the building.
So that's, I think, the breakdown we're going to need to see, but Steve and Pete and Jenny and Kathleen are in.
Speaker 7 (27:57–28:50)
I think we need an identification of what elements of the construction are considered to be eligible or you're applying for it to be used, CPA funds to use it. And I don't think it's exterior building. I think it's roof, siding, windows, you know, chimney, whatever. So I think we need a breakdown and what those individual items will cost.
I think, you know, that's a start. I do think we would need a projection of what the debt service would be on whatever amount we do. If it's a $3 million thing, I think we want to, before we vote, we want to know what we're going to be on an annual basis funding to pay that debt service.
Speaker 5 (28:54–29:00)
The $16 million, where did that figure come from? For starters.
Speaker 6 (29:00–30:25)
It's an early cost estimate. based on the onus project manager kind of taking a square footage cost and quantity and just doing rough math on that. So it's a very high level cost estimate without specific information related to Athens and percent. It does include, you know, it includes a placeholder for the additional days that we talked about, you know, the two additional days over the three that had been planned includes upwards of, if I remember right, I think it's like one and a half million dollars just for temporary quarters.
for moving the fire department out of there to a temporary location for the duration of construction to move back in. So the cost estimate is high level, but it's driven from their experience on similar projects. What will happen before town meeting is there'll be a cost estimate of the design documents at whatever stage they're at. So we'll have a more refined cost estimate based on the specific project with the design that the architects have worked on.
That's a high level, hopefully, the high water mark. They did this right. And we expect that number to hopefully come down. And that's a total project budget that includes the soft costs, such as the architectural fees, the partial management fees, and any other soft costs that are included.
Speaker 5 (30:25–30:32)
So I'm a little confused about the bays. So in here, it says up with three additional bays, but you said two additional bays. There's two, there's two bays now.
Speaker 6 (30:32–30:39)
Correct. Yeah. Sorry. Yeah.
There's two additional bays now. The design always included adding on a third full-size bay to the front of the building.
Speaker 5 (30:39–30:39)
So a total of three.
Speaker 6 (30:40–30:48)
For a total of three at least. And now the building committee over the past year has recommended that two more for a total of five be constructed.
Speaker 5 (30:49–30:52)
So does that mean there's five trucks that have to be followed?
Speaker 7 (30:52–30:56)
That's right. That's more than the headquarters. That's right. Yeah.
That's more than the headquarters.
Speaker 6 (30:56–32:07)
Yeah. The challenge of the existing bays is that they, don't barely fit the current operation. And they're over, there's an open floor below. So there is a logistical challenge with the size of apparatus these days fitting into those bays.
So a new station of two full-size bays may have accomplished some of the same goals as this does because full-size base is really the goal. There's plenty of equipment to be stored that we now kind of fit where possible. And it also would allow the department to retain apparatus after what we would typically move on from them to a service reserve apparatus when the other engines are out of service or broken down. And we've gone periods without a ladder in town because we don't have a backup ladder.
So it's trying to solve some of those problems. Again, what exactly that looks like, whether they're a part of the building or a standalone kind of separate building, is still what they're working on through the design phase.
Speaker 5 (32:07–32:11)
So does it also mean a bigger staff as well?
Speaker 6 (32:11–32:19)
No, the active use of the station would remain as a single engine station.
Speaker 7 (32:20–32:22)
So the rest is just storage space?
Speaker 6 (32:23–32:31)
Storage space for additional equipment that for both reserve equipment and future and additional equipment that they maintain currently.
Speaker 2 (32:31–32:39)
There are also some talk about equipment from Los Angeles State for the Blue Hill.
Speaker 6 (32:39–33:09)
Yeah, that's a good point. It's also trying to think about where should the department be 10, 15, 20 years from now. What we don't have is a large off-road brush tanker. We have a brush truck that has a few hundred gallons on it.
So the idea of having the ability in the space, if the tower acquire a tanker to be used for future brush fires, like that's, that's another ability to increase the overall storage space that happens.
Speaker 5 (33:10–33:11)
So can I keep going?
Speaker 6 (33:11–33:13)
Yes, please.
Speaker 5 (33:13–33:17)
So, um, what happens if the VODOS turn this down?
Speaker 6 (33:18–33:32)
Uh, the project would not be funded. So the project would need to be, reconsidered, brought back to the voters, brought back to town meeting after changes were not, it would just mean the project's not approved and it doesn't go forward until it can go, until it gets approved.
Speaker 5 (33:32–33:34)
So there's not a plan B right now in place?
Speaker 6 (33:36–33:41)
No, not at this point in terms of, no, I wouldn't say so.
Speaker 3 (33:41–34:18)
Plan B ought to be incorporated by the fire station building committee into the present plan. Well, people don't usually do that. You know, my history of municipal projects. But if you go out with this station with five bays, and the voters turn it down, then you have to back up and do it all over again, as opposed to presenting something that is going to appeal to the voters the first time.
And that's not your job. It's not our job. It's just an editorial comment.
Speaker 6 (34:19–34:24)
I would say generally a backup plan is something less expensive, something smaller. So I would say that.
Speaker 7 (34:25–34:39)
Could you segregate the rehab and the one new bay? Because you said it's going to operate as a one bay station and have a separate building for two new bays as a future project or something.
Speaker 6 (34:41–35:02)
It's a possibility. It's a possibility to share in terms of whether I don't know what the design will come back to say. But I would say that all of that has been discussed in terms of a single building that has all of this or two separate buildings and the separate building is really just storage. That requires much less in terms of mechanicals and everything.
Speaker 2 (35:02–35:21)
I just wanted to jump in where Jenny was in. One of the things I thought you were going with that is what happens to a barred boat. So maybe that's where you're going. That's a good question.
Our vote stands. So our vote will stand, even though the project's not going forward. Right. How do we get that money?
Speaker 4 (35:21–35:32)
We have to go back to town meeting and rescind the vote. It's a typical process. It happens with many senior city committees.
Speaker 3 (35:32–35:33)
I mean, you have said that before.
Speaker 4 (35:33–35:42)
They have to go back to town meeting. It's dedicated funds to that purpose. And it stays there until we go back to town meeting and vote to.
Speaker 6 (35:42–36:04)
And the town couldn't issue debt for that purpose, because there wouldn't be enough money to do anything with it. So it would sit as a outstanding debt authorization that's on our books. And we will bring back periodically. There will be articles of the law to say to resend certain amendment provisions.
So that would be added to their list of something that would be going to be submitted.
Speaker 5 (36:06–36:22)
Well, obviously there's a number of ifs with this one, so that's what makes it difficult, I think, for this committee to move forward on, because there's so many unknowns to it, and the timing of it is a little clunky. Sure. It's just fast, for sure.
Speaker 7 (36:22–37:58)
It's very difficult for us. This is just, I'm kind of stuck in my craw. Two years ago, When we said that we couldn't fund the headquarters building because it was already funded and we couldn't replace, it was discussed that there's no doubt that the committee would be coming back to us for Atherton street. So what was happening over two years that the building committee couldn't come to us and talk about what they're thinking about and what the costs are so that this didn't jump on us, you know, with a week to take action.
I mean, it just seems that they should have been talking to us about, you know, we intend in your next round to come forward with the project to fund the historic restoration elements. Here's what they are. What are your questions? To do it and expect us to make this kind of decision without any information, you know, within weeks or a month, I just think is totally unfair.
I mean, we have a responsibility, you know, to best use of the CPA funds and the process and the, you know, the precedent being set by if we are willing to move like this on one project, particularly a project, the largest one that we've ever done, to move it like that, then does that mean, you know, that's gonna be the way we operate in the future? are things that we really have to consider.
Speaker 4 (37:58–38:06)
Well, I mean, we've always known that the Atherton Street fire station was going to need CPA money. We've always had.
Speaker 7 (38:06–38:07)
Correct.
Speaker 4 (38:07–41:05)
And so obviously, there's no question about the eligibility of it, which is what this meeting is tonight to decide whether these projects are eligible. I don't think there's any issue with that. And so really, the only question we have is how much of the project would qualify under the standards for the Secretary of the Interior as rehabilitation and restoration. And we've always known it's a big number.
So it's not really a surprise. And so when we think about the Athens Street Fire Station, and the Secretary of the Interior, we have broader authority under these kind of recommendations. If there's a rehabilitation that It's got new construction as part of it and the restoration and all that sort of thing. Those are all fundable under the rehabilitation standards for the Secretary of Interior.
You just have to make sure that whatever you're doing as new construction is sort of sympathetic to the existing and all that sort of stuff. So it's not a hard, hard, hard, hard line on it. Um, as and so it's like, we can't just can just fix the masonry, but we can't do the windows. That's not true.
We can do the windows and we can do the masonry and we can do the roof and we can do the siding and all kinds of things that are part of the building. So I think the only question before us to go back to knit for that committee is to just sort of say what's when you go to the architect and you go to the designers and you say, okay, fine. How much of this $60 million is. $16 million, how much of that is something that could be reasonably covered as a historic reservation of the existing fire station?
Is it 20%? Is it 10%? That sort of thing. And then come up with sort of a reasonable number based upon the revenue that the CPA has.
I mean, you could say that it's 25%, but we don't have that kind of cash to pay for that. And so that's a, that's a decision that Nick and his team have to sort of say, okay, fine. What's available as a pot from our committee. Reasonably available from our, from our committee as a pot and how much of that can be used for restoration of that building.
And I don't think we're paying anywhere near close to what the costs are going to be coming out of this committee. Yeah. But they're going to be a lot higher than what we are going to be able to fund. And we're participating in this because people, we told people when we were trying to get this elected, you know, passed that it was going to be something that was going to be used for the fire stations.
So I think we have an obligation because we told people we were going to do that. And that's why we needed to pass the CDA is that funds would be available, but there's no way that we have enough money to pay for all of that restoration costs on that building.
Speaker 7 (41:05–41:10)
So we need to know. I mean, what are the restoration elements and what are their costs?
Speaker 2 (41:11–41:21)
That's the first thing. Yeah, you can drill in. It's, you know, maybe a million, but we need to know what's behind that three million.
Speaker 7 (41:21–41:26)
How much is the East Milton station costing?
Speaker 6 (41:26–41:54)
It is the total project budget. A lot of this design for all three of the stations were done at the beginning, so it's hard to say to pull back and say, okay, there was $500,000 in design work already done, but from design development to final bid docs to construction was an $11 million project. For a two-base station, new construction, we build on a clean site.
Speaker 2 (41:54–42:30)
All right, we need to move on because we have a long night here. I think you're right to remind us our job right now is just to determine eligibility. Um, we'll formally discuss and vote on that at our next meeting, but I think there's no question that this project is all right. I think Nick, you've heard, um, You've heard, you know, some of the challenges he has committee and the time timeframe, but, um, but you know, the committee and you will do the rest to get us information as soon as possible.
Speaker 6 (42:31–42:47)
And we have a coordination discussion, uh, scheduled for tomorrow, um, where you know, hard dates are going to try to put on a calendar. Is there, obviously we'll start to get you as much information ahead of the 20th. Is there a subsequent reading date already on the books for us?
Speaker 2 (42:47–43:04)
There is. We'll schedule them out for the full year. Okay. So I can get you, I don't have it.
I have that. Yeah, you can probably get there. Okay. All right.
So Tucker.
Speaker 6 (43:05–43:11)
Yes, so I will let them speak to the merits of the project on TechEarth. Well, they already have.
Speaker 2 (43:12–43:13)
We've done that. Check that box.
Speaker 6 (43:15–43:24)
So timing, again, this is where it gets a little tricky to do these projects that need to take place over the course of a summer after school is closed.
Speaker 2 (43:25–43:57)
For us, from a bidding- Before you even start, can I just ask you a question? If by chance your goal of getting on the state ballots for the fire station, slip to a later November, early December vote, would that also mean, no, Tucker doesn't have to go to the ballot. Okay, sorry. Sorry.
So there might be more money in the balance.
Speaker 4 (43:57–43:58)
My priest doesn't even know where Tucker is.
Speaker 2 (43:59–44:01)
I withdraw that line of questioning.
Speaker 7 (44:02–44:04)
Don't take the book across the street.
Speaker 6 (44:04–46:10)
For any of these projects that we try to do in thinking about of a summer project, really for our purposes, as most of you are aware, it's going out to bid and signing contracts so that a contractor is ready to show up and actually start when the field or the place is available for them to start. In the case of a playground project, that includes procurement of playground equipment, bidding for installation, for demolition, and having all of those contracts signed so that when we can give them a notice to proceed, that is worked out well in advance. So in a case like this for a school playground project, really any school playground project, or a field project, if we want that to happen in the spring-summer construction season, we need to be able to go out to bid and sign contracts several months in advance of that date. So the purpose that there would be a request to bring forward from a Maytown meeting would be to enable for a project to have its full funding available so that it can then proceed to put projects up to bid, to sign contracts, to coordinate that work, to commence right when that space is available for that to commence.
So if we're talking specifically, again, that includes trying to have all of the project appropriation tied up sooner so that those contracts and bids can be done and work and commence over the course of the summer. So that's kind of the broad rationale why any requests might come forward. We won't sign a contract until all the project money is in place. We could put projects out to bid with funding contingent upon funding.
applies and for a vendor to know that they might have to sit around and wait for a town meeting vote or to wait for a ballot question vote. So ideally, you're taking those steps once all the project funding is secured. So that is the general rationale for bringing some of that funding request forward. Not that the construction will start necessarily before the annual town meeting, but really it's about having the contracts in place.
Speaker 7 (46:11–46:48)
So I think what you're getting at, and maybe some of the committee should be thinking of, we might be better served with these projects as it's happened you know every project that needs construction that should start in April or May is that we got in that you know started we did our schedule so we tried to be ready for a fall special town meeting with our funding you know recommendations rather than waiting for and that way all the projects could be ready to start working in the spring when the weather is suitable so maybe that's something we think about kind of reorienting our schedule yeah or
Speaker 2 (46:49–47:26)
I think that's a reasonable suggestion for the future. And also, you know, I think… But that's not tonight, okay. That's a future project discussion.
Right. The other thing I've thought of and we have discussed as many of you over the years is the idea of two rounds. You know, just, you know, being more adaptable to project needs, basically, and having the ability or reserving… ability to bring them to a fall or spring time, which I assume some communities do.
Speaker 4 (47:27–47:28)
A lot of them do. Yeah.
Speaker 2 (47:28–47:32)
Yeah. So. All right. Questions about.
Speaker 4 (47:32–47:48)
But mostly that's driven not so much by these kinds of projects. Those are mostly driven by the fact that we've got purchase incentive. It's where it needs to be in the same fiscal year, because otherwise people don't want to wait that long. Not for the usual ones that we haven't had anything like that.
Speaker 7 (47:49–49:34)
Um, just from my role as fiscal person, um, I went and looked at our budget upcoming and what we're going to have available, um, for, um, this, this would be a open space and recreation and our reserve for open space and recreation next year would be 118,000. except that $60,000 is gonna be taken out of there for the wharf project. That's our first year bonding costs. And so approximately 60,000, which gives us $51,000 basically for recreation projects.
Now- For the minimum 10%. For the 10%. In the past, we've tried to have the undesignated preserves, try to split them relatively equal, Exactly, but relatively equal. So if we did that from the undesignated reserves, we'd have $260,000, which would give us a total of $311,850 for recreation projects this year.
For all of them. For all the applicants. This is a $300,000 request, which really means this would be the only project that we could likely fund this year. The other thing I think we need to discuss or look into, the 60,000 bonding costs, does that have to come out of the 10% reserve, or can it come out of the entire budget?
In which case it wouldn't be such a big hit on recreation.
Speaker 5 (49:34–49:41)
I thought we discussed it, and it did. It had to come out of what was allocated for open space and recreation.
Speaker 2 (49:41–49:42)
10% for open space?
Speaker 4 (49:42–49:43)
No, I don't think so.
Speaker 2 (49:44–49:47)
Well, it can come out of the 70% that's flexible, too.
Speaker 4 (49:48–49:52)
You just have to set aside 10%. It doesn't have to come from that. It doesn't have to come from that.
Speaker 7 (49:52–49:57)
So if we don't do that, then only twice a week.
Speaker 2 (49:57–51:40)
Your overall point, though, is valid. As we said, we have $6 million in the press. Obviously, we have the responding. So $3 million in the press in total, with only $1.1 million approximately to So that's, that's our challenge on all these projects, including the project of course.
But the difficulty is trying to make a decision ahead of time. You know, yeah, no, that is a challenge. So, I guess, I building off of that. I'm just, I'm not saying I'm saying this out loud, but I'm not saying this out loud because this will come to fruition but but And Marika is here.
Maybe you want to speak to this with Nick, but I know you have ambitious fundraising goals. You've made a lot, a lot of progress, which has been wildly impressive to me anyways, who hasn't been a nonprofit fundraiser for most of my career. And you're continuing to make that progress and a lot of good projects. What would happen to this project if you were awarded something from CPC in the fall?
Let's just speculate for a moment. But it was less than the $300,000. I'm not going to put a number on it because I don't want to. But is that the death knell of the project at this stage?
Or are you optimistic that enough balls are in the air that you could fill a potential gap if we can't possibly.
Speaker 8 (51:40–51:47)
I think the biggest problem is that we're coming up to a deadline, isn't it? So we want to have this all done in the summer, next summer.
Speaker 2 (51:47–51:52)
Marika, why don't you come up for this purpose so that the microphone can capture what you're saying.
Speaker 8 (51:52–52:36)
I think that the biggest problem is just getting, we have a deadline now of, I think it's probably January-ish to have all our funds in line. And so I think it becomes harder and harder to know that we're waiting on a president grant and have reached out to that list of other places that we've reached out to. And we'll keep going until our kids are, my daughter on the last day of school had a big injury and is still recovering from it. So I'm not willing to not keep, to stop, but it certainly would help us get the project to where we need it to be.
Speaker 5 (52:36–52:46)
Do you have any other updates, funding updates since we last talked? No, no. Go for it.
Speaker 6 (52:46–53:04)
You should probably connect, because I believe the CPC is undesignated in Brazoria. I'm remembering right, I feel like you brought in more money than budget in the past years. you haven't necessarily appropriated all of it, so there may be more.
Speaker 7 (53:05–53:47)
I think accounting included that in this article, and it wasn't that much this year that we were under. And you know, the other thing that we didn't spend the whole historic preservation reserve, but that we have to add into the historic preservation reserve, not do the undesignated. So I did You know, I reached out, Nick, I copied you reaching out to try to get, I've been trying with accounting to get updated budget figures, but you know, this is year-end and they're just totally swamped and they were hoping that maybe by the 20th, we might have some numbers, but it's very difficult.
Speaker 6 (53:48–53:52)
I could be, I thought you might have said more.
Speaker 2 (53:52–54:28)
My new role as a member of the board of assessors, I just signed, I think they call it a warrant or whatever, but in the CPA for the first six months and what was coming to the town is in excess of 500,000 just in local funds, which I thought was good. So that means over a million dollars and then whatever the city. So it's possible we'll get 1.2 this year and we should see.
Speaker 7 (54:28–54:31)
Yeah, 10,000 here, 10,000 there.
Speaker 2 (54:31–54:45)
It's not going to solve our biggest problem, but it's every little advance on CPA revenue picture is going to help. Okay.
Speaker 6 (54:45–54:52)
So we'll get that. I'll shoot that next week. We will get it to you before.
Speaker 7 (54:53–55:05)
Lisa doesn't want to answer my email anymore. I mean, I'm a big fan of this project. And I think we all are. And we want to see it move forward.
OK. We're good.
Speaker 8 (55:05–55:08)
Thank you. Thank you. Thank you. All right.
Speaker 2 (55:08–55:26)
We did that reasonably early. We're running late. But that's pretty good. We're pretty good.
Pretty good. All right. Joe Mondagno is online, I believe. And he is here to talk about the Blue Hill Parkway Historic Marker applications.
Joe.
Speaker 7 (55:26–55:29)
Switch over to attending.
Speaker 9 (55:35–55:36)
Unmute.
Speaker 2 (55:37–55:39)
There you go. We can hear you.
Speaker 9 (55:39–55:47)
Okay, so you can hear me. That's great. I was really nervous because I'm not used to using zoom anyway.
Speaker 2 (55:48–55:51)
Oh, well, thank you. Thank you for attending. Thank you.
Speaker 9 (55:51–01:03:52)
Yeah. Yeah. Thanks for considering my proposal and allowing me to present here. So briefly, I think it's pretty straightforward and kind of easy in a way, but my inspiration for this to give a little context quickly is I've been following the work of Mara Holland and Andres Ripley, who are working on a collaboration between the Metropolitan Area Planning Council and then the Ponset River Watershed Association.
They're creating the Boston to Blue Hills Project, which I'm sure you've heard of by now. It's creating a walking, biking, and rolling connection from the Neponset River Greenway to the Blue Hills Reservation. And the Blue Hills Parkway is a key piece of this vision that they have. Some of you might have attended, actually, the meeting they held on January 17th, which was a well-attended neighborhood meeting.
where they offered a lot of visuals and proposals to reconfigure the Parkway bike lane, the Central Island, the northbound travel lanes to slow traffic and make the Parkway more friendly for walkers, bikers, and recreational activities. There is a detailed and nicely illustrated PDF flyer, by the way, from that meeting online. It can be downloaded. It's called Blue Hills Parkway Meeting overview.
And I have links, I can maybe send them to you. I can't post them, I guess, right? And there's a Boston to Blue Hills website too, which is excellent and also provides information on this proposed project. So it's kind of exciting what they want to do.
And I've seen all the proposals and most people are in agreement on, I think it's proposal number four. Anyway, today I got an email from Mara and I've got some good news regarding this. MAPC and NEPRA are in the process of finishing a study on Blue Hills Parkway to enhance mobility along the corridor. I'm kind of quoting right from her email.
After extensive public input over four years, the team has developed a strongly supported design for the Parkway. The final report should be publicly available later this summer, at which time the team will work with DCR to determine next steps for moving into a more detailed design phase. The state just approved $200 million for DCR parkways in the most recent Chapter 90 bill. Which we anticipate will be great will be a great opportunity to move forward with this project.
So. Andres and Mara both encouraged me to submit this application. I had discussed it with them up front. Because they really liked the idea of having some historical signage.
On the parkway. I think most of us realize that the Parkway is on the Register of Historic Places. I think it's since 2003. There's a write-up on Wikipedia that you can check out if you've never seen it.
I think Tom Palmer wrote that actually. It's interesting. But there's also a substantial and very interesting report available in the Milton Library. I think it's in the Historical Society Collections that was created and submitted in support of that application for the Register of Historic Places.
And it's pretty rich with local history, and I've drawn upon that a little bit for this presentation. And it's just full of material that could be used in a mock or on a mock or whatever. So the main reason for the historical status of the parkway rests, of course, in the fact that it was one of the first connecting parkways designed by famed landscape architect Charles Elliott and the Olmsted brothers. The land was acquired in 1896 and construction took place in 1898.
Elliott was an Olmsted apprentice and later associate. For this reason, the parkway can be viewed, in a way, as a disconnected piece of Boston's famed Emerald Necklace, which Eliot worked on. Charles Eliot significantly shaped Boston's landscape by pioneering the nation's first regional park network, moving beyond municipal city parks to preserve entire natural systems. Preserving or restoring, and even replicating, natural landscapes in an era of expanding urbanization in Boston, late 1800s, was a major ethos of the Olmsted landscape firm, and one that we're the lucky inheritors of today.
Nationally, Frederick Law Olmsted is revered and well-known, but the younger Charles Elliott was a gifted visionary himself and not as well-known. When he became a full partner in the Olmsted firm in 1893, the firm was renamed Olmsted, Olmsted & Elliott, which most people don't realize. It was Elliott who conceptualized transforming the tidal mudflats of Back Bay and the Charles River into a scenic and controlled river basin. So he laid the framework for the Charles River Esplanade.
It was Eliot, along with other conservation-minded reformers of the 1880s, who envisioned the large forested hills south of the city as a protected natural area set aside for Boston citizens for their recreation and relief from the growing urban sprawl of the period. This preservation of that natural setting is, of course, the Blue Hills Reservations. So I'd like to see Charles Elliott get his due as visionary and landscape architect and perceive the proposed historical markers would mainly acknowledge his contributions and his vision to the Parkway and Milton. It's also worth mentioning that before the parkway, the specific route the parkway would later follow was simply known as Mattapan Road, and the northern stretch was already Blue Hill Avenue, both rural roads running through sparsely populated farmland and countryside.
And along these roadways, the corridor of land south of Boston was also homeland to the Massachusetts people, of course. There are no confirmed ancient Native sites directly documented on the Parkway's narrow footprint, but there are 16 Native sites within a mile of the Parkway corridor. And it was the wetlands primarily, the Neponset River, Pine Tree Brook, Pope's Pond, and that kind of thing that made this favorable for Native American settlement and use long before Europeans arrived. Mattapan was the site of a native village in pre-colonial times.
And there is an existing native quarry site that few people know about, which is now protected by the city of Boston, literally a stone's throw from Mattapan Square. So I think there's a good reason, and there's plenty of interesting local history to include on maybe three markers, as I put in my proposal. And I think the timing couldn't be better with the Blue Hills project, which looks like it's going to happen. So that's kind of my thinking behind this.
Speaker 2 (01:03:53–01:05:06)
I don't know if you have questions. Thank you for bringing it forward, Joe. It's timely, like you said. I think the other investment in the parkway also makes it timely.
And there's no question of the historical significance of this. I think the only question, and you were listening in our earlier conversations, is I think we as a committee need to do a little research on the idea of can CPA fund new historical records, essentially. And that's an interesting question. That's really homework that we have to do.
I would wonder, You know, since you're working with Mara Holland and Andres Brickley, is whether you could ask them if they are aware, you know, MAPC or New Ponset River Watershed Association, whether there is any awareness of other CPA communities that might have funded similar types of projects. Obviously, they suggested CPA funds, so maybe they have some knowledge about similar projects that other communities might have.
Speaker 9 (01:05:07–01:05:11)
Yeah. That's a reasonable request. I think you're right. Yeah.
Speaker 2 (01:05:12–01:05:20)
And we'll do our homework as well and investigate this. Other questions for Joe?
Speaker 5 (01:05:20–01:05:28)
Yeah. I've got two. One, I was wondering, What do you think the recipient would be? Who would the recipient be?
Speaker 4 (01:05:28–01:05:33)
Who's going to design and install the signs? No.
Speaker 5 (01:05:33–01:05:35)
Who would receive the money?
Speaker 9 (01:05:37–01:05:57)
Well, that is a question we would have to discuss. I mean, I don't know the procedure on these markers in general in the town. I thought maybe the historical society would be in on this. you know, Mara and Andres would have some input.
I guess we'd have to figure that out, right?
Speaker 2 (01:05:58–01:06:13)
Well, it's also, it's a little complicated because, right, it's DCR land. Right. And, you know, like normally I'd say DPW would install the signs, but we're talking about the DCR parkway that they control.
Speaker 9 (01:06:14–01:06:22)
So do you think that you think there'd be a problem with them? You think they would allow us to do that if we had the funds available?
Speaker 4 (01:06:22–01:06:26)
Or I mean, I don't think there's a guarantee on that.
Speaker 2 (01:06:26–01:06:37)
I think you'd have to be talking to them. They just we just funded the project last round. That is bike signage. That was my second that included DCR.
Speaker 5 (01:06:38–01:06:45)
Right. It was the the Randolph Greenway. Right. fellow named Jesse Gordon.
I don't know if you've talked to him at all.
Speaker 2 (01:06:46–01:07:02)
No, no, I haven't. He worked extensively with the DCR both for sites in Randolph and now sites in Milton to get their approval for like wayfaring signage basically.
Speaker 9 (01:07:02–01:07:23)
I mean, it would seem like a reasonable collaboration and it's a pretty small project if we went forward with that. Maybe it wouldn't be too big of a deal. I mean, I'll be glad to talk to anybody, but I'll talk to Mari and Andres tomorrow and see what we can put our heads together and see what we can come up with maybe, I don't know.
Speaker 5 (01:07:24–01:07:26)
Well, yeah, I'd recommend you talk to Jesse Gordon as well.
Speaker 9 (01:07:27–01:07:28)
Okay, all right, I will.
Speaker 5 (01:07:28–01:07:31)
Joel, I can send you Jesse's contact information.
Speaker 9 (01:07:31–01:07:32)
Thank you, please do, yeah, please do.
Speaker 7 (01:07:33–01:07:55)
I think we're giving a grant to him, and in theory, he's… Well, it's the grant of Greenway Group. Yeah, right. And then they will oversee the design and construction.
In the interest of our agenda, I just want to make one comment. Charles Elliott was a resident of Brushdale Road in Velta.
Speaker 9 (01:07:55–01:08:04)
You know, I was going to say that, but I wasn't 100% sure when, when, when was he married when he was living there or something early on?
Speaker 7 (01:08:04–01:08:10)
He and his family lived there. I think it was just for a few years. He died very young. He was only 37 when he died.
Speaker 10 (01:08:10–01:08:11)
Right.
Speaker 7 (01:08:11–01:08:21)
And I don't know if he was living at that address at the time or, um, you know, or if it was earlier, but it was at least a few years. Yeah.
Speaker 9 (01:08:22–01:08:34)
Well, there's another nugget of information for a marker. It brings it closer to home, too. Yeah, yeah. So that's good.
Thanks for verifying that, Pete.
Speaker 2 (01:08:34–01:08:38)
All right. Thank you very much for bringing this forward, and we will be in touch.
Speaker 9 (01:08:38–01:08:39)
Sure. Thank you.
Speaker 2 (01:08:39–01:08:40)
OK.
Speaker 9 (01:08:40–01:08:40)
Good night.
Speaker 2 (01:08:40–01:09:15)
Good luck. Good night. All right. The next one on our agenda is Brooksfield LED lighting.
Let's see. Tom Garthie. So why don't we move on to the Forbes house? I think I saw.
All right, Lori and Heidi, you should be unmuted at this point and feel free to.
Speaker 11 (01:09:16–01:09:23)
Yes, hello everyone. Also, unmute Lori Conlin, assistant director at the museum.
Speaker 2 (01:09:25–01:09:25)
Great. Hi, Lori.
Speaker 11 (01:09:29–01:09:30)
Was she unmuted?
Speaker 1 (01:09:32–01:09:32)
She was.
Speaker 11 (01:09:32–01:09:34)
Or allowed to talk? OK.
Speaker 1 (01:09:38–01:09:40)
Try that again.
Speaker 11 (01:09:40–01:09:46)
So we prepared a slide presentation. Is there a way to share that with you?
Speaker 2 (01:09:48–01:09:55)
Yeah. Yeah, I can actually what I can do Heidi is it will you be running the slide or Lori?
Speaker 11 (01:09:56–01:09:58)
Lori. Yep.
Speaker 2 (01:09:58–01:10:29)
All right. I'm going to promote Lori to panelist. And she should get a prompt on her screen. Once she's a panelist, I can Sure, but you you should be.
Yeah, she should be able to. Yes, perfect. She figured out quicker than I could say. Alright, so she should be able to run the massage at her.
Speaker 11 (01:10:30–01:11:19)
Wonderful, so we are requesting funding for two outbuildings on the Forbes House property that in relation to the barn carriage house, which was fortunate to receive funding from the Community Preservation Fund of Milton, they create a courtyard space. So the two buildings are the Shed and the Plank House. And we've done some background historical work to learn a little bit more about their significance. So I will pass it on to Lori to talk about that.
All right.
Speaker 12 (01:11:23–01:15:24)
Now you're able to hear me now. Yes. Okay. Sorry.
I shared and did not unmute myself when I was allowed back in. Okay. Thank you all very much. Um, so as you can see from the slide, um, in 2019, so about seven years ago, we did do a conservation assessment, um, by an independent conservation consultant.
Um, and. Her conclusion on the two buildings is that there is definite significant architectural elements to both of those. The two buildings obviously served as outbuildings when the Forbes House property was a residential estate. The term shed for the 1 building on the left obviously denotes it's probable usage for the Forbes as a place for storage of tools.
And, uh, you know, other small implements. The plank house terminology likely didn't really have anything referring to its usage, but was more in reference to the upright verticality of the boards flanking the exterior of the building. The usage was likely for carriages or early vehicles. Mary Bowditch Forbes, who was the very last Forbes member to live on the property, did use these terminologies in her will.
So it's very likely that the Forbes family themselves called it both the shed and the plank house. They were likely constructed in the late 19th century. And while we don't have information on necessarily an architect, so it's likely that they were designed by a local builder, They are definitely significant, as Heidi mentioned, in their relational aspect to the Isaiah Rogers designed carriage house and the Peabody and Stearns designed barn. The carriage house was designed in 1833 to 1834 in the Greek revival style, while the 1880s barn extension was designed in shingle style, and then intriguingly, Both the Plank House and the Shed feature some Gothic revival elements.
If we go to the next slide here, we can see that both buildings feature what is called label or hood molding, which is an architecturally referential element to medieval England and, again, is an aspect of the Gothic revival movement. Additional Gothic references can be seen in the molding around the plank house's large entrance, which alludes to an extended round trefoil arch, which is another element of Gothic Revival architecture. So in this small courtyard with these three buildings, we have this incredible span of reference to very significant architectural styles. And the three of them together form this historic service plaza.
right here. And so you're able to see the relation between the three buildings. This is the carriage house and barn. This is the shed.
And then this would be the plank house. And again, they're all around this historic service plaza. And any exterior work that we do on the shed and the plank house is going to enhance the CPC funded work that's been being done on the carriage house and the barn. So, Heidi, did you want to walk through a little bit about what we are hoping to achieve?
Yes, you can see.
Speaker 11 (01:15:24–01:18:53)
This is a building in dire need of some attention. There's a tarp on the roof and the siding is very worn. There are rotten boards. The roof is leaking.
So the work that we need to address involves structural framing, replacing those rotten boards, a whole new wood shingle roof to replace the existing shingles, restoring the window sashes, painting and re-graining with the gravel apron that will help it coordinate into the paved area for the eventual courtyard. The cost, $116,394, and this is from plans created by Spencer Preservation Group, the architectural firm that we've been working with for the barn and carriage house. Next slide, the carriage or the plank house. Similarly, it has some rotten wood.
It has roof issues, not as severe, but it does need a new wood shingle roof. Window sashes need to be restored, needs to be painted, and again, regraded with a gravel apron. The cost is a little bit more. It's a larger building.
even though structurally it doesn't need as much work, but that totals 145,230. Once restored, we will be preventing further damage and greater expense to restore them the sooner we act. There will be additional space for the museum to serve the public with space for historic interpretation, and the other building safeguards our collections. We would be doing important work to preserve the historic landmark status of the entire property and really enhance the visitor experience with that new welcoming space.
So all together, what does this cost? 261,625. What we're requesting from CPT would be to fund the restoration and painting of that shed and the painting of the plank house. We would raise the remainder for the restoration of the plank house, the structural work, et cetera, through grants that we are working on and possibly Mary Forbes's endowment, which does have funds available to address those buildings, which were an important part of the legacy she left behind in her will to safeguard that these important parts of the property would be cared for in perpetuity.
So thank you very much. And yeah, if you have any questions.
Speaker 4 (01:18:54–01:19:00)
Questions? Is the project on the carriage house finished?
Speaker 11 (01:19:02–01:19:55)
We are, we've run into some delays working with the federal government to save America's treasures. Most recently, they requested, well, as you know, the government was shut down for a while, so things were on hold. And then most recently, they requested shovel testing because there is some ground disturbance in addressing the drainage needs of the Carrotsopson barn. That was recently completed.
The report is going to the Mass Historical Commission. Then it goes to the San Francisco Treasurer's. Then we will proceed with the phase two, but all of the funding from CPC has been expended towards the intended work on those buildings.
Speaker 4 (01:19:55–01:20:03)
Great. Yeah, I mean, I didn't see the tour. I was just kind of curious. But thank you.
Speaker 2 (01:20:03–01:20:04)
Great. Any other questions?
Speaker 5 (01:20:05–01:20:23)
So is there a priority between the shed and the plank? It looks like you're presenting them together, as well as the work together. But if you were to consider them as independent projects, would you focus on the plank because of its leaking? Or what would be your priority?
Speaker 11 (01:20:23–01:21:09)
The shed is the one that is actively leaking. And really, you know, at one point we were ready to just have Mother Nature have her way with it. But it is protected by a preservation easement on the property. And it is an important part of the heritage of the site.
But right now you can't even walk in that building. It is very, very compromised. So the shed for restoration purposes is 100% our priority. Painting both is important for the exterior aesthetics of the courtyard, but the restoration of the plank house, we could hold off a while on.
It's not as emergent.
Speaker 12 (01:21:10–01:21:13)
Right.
Speaker 7 (01:21:13–01:21:29)
I think when you present an estimate in your final funding application, maybe if you divided those out in case we were only able to fund one rather than both of them, maybe if you present them as separate costs, just to give us a little more information.
Speaker 12 (01:21:31–01:21:32)
Okay, so that's great advice.
Speaker 11 (01:21:35–01:21:51)
And so at this point, we were only intending to ask for funding for the shed restoration and the painting for both, not knowing what is available and how many other and historic preservation projects are out there.
Speaker 2 (01:21:53–01:22:36)
Yeah, we did get a long list of applications, 21 applications, many in the historic preservation category. The request right now is about $3 million. And as we have said, we have approximately 1.1 available this year, 1.1 million to award. So we are going to have to make some creative and tough decisions as we go forward.
But we thank you for your work on this overall project, including the carriage house. And thank you for bringing this project to our attention.
Speaker 11 (01:22:38–01:22:40)
Thank you very much. Thank you. Yes.
Speaker 12 (01:22:40–01:22:41)
Thank you very much.
Speaker 11 (01:22:42–01:22:46)
Where we are without CPC funding. That is for sure.
Speaker 2 (01:22:46–01:22:47)
Thank you.
Speaker 11 (01:22:47–01:22:47)
Thank you.
Speaker 2 (01:22:48–01:22:56)
All right. Steve. Steve Novak. The Marcy Lane.
Speaker 13 (01:22:57–01:29:12)
Good evening. Many of you. So I am Steve Novak. I'm president of Milk American based off.
And we actually have been a fortunate recipient in the past of CPC funds. And I'm glad to say that it's gone very, very well. So we're very, very pleased with that. As our Parks and Recreation Department knows, we're always looking to try to continually improve the spaces that we utilize.
I think as a reminder to this group, we serve half the town of Milton, primarily from Randolph Avenue and East. And so that encompasses about 450 or so families on an annual basis ages typically 4 to 12 years old of our baseball program. So this particular project is addressing Mary C. Lane.
What this would do in particular is we want to actually extend and create the infield to be what we would call a convertible infield or a 50-70 infield. Now what that means it's an intermediate space and division which is growing far far more common not just in the state of Massachusetts but around the country. The traditional Little League dimensions are what we would call 4660. That refers to the base pass as well as the pitcher's mound.
So it's 46 feet at the pitcher's mound, 60 feet on the base pass. What we would do is we would have a pitcher's mound that is convertible, that could convert back to 50 feet, as well as base pass that can go out to 70 feet. That would require us to have a company come in and extend the entire apron of the infield further into the existing outfield. we would not be compromising the ability to keep the field as is.
You could play both dimensions on the same field. So that is quite common in terms of what that looks like. There's over a hundred such fields in Massachusetts. I think some on the table may be aware that the Parks and Recreation Department is also undergoing a master planning process.
And this was actually something that was identified by constituents as a need in the particular town. For our league, to kind of put this in greater context, this particularly impacts our older constituents. Now, older by our standards is our 11 and 12-year-olds. Okay, so most of them, if they're playing outside of town, are playing on these 50-70 fields.
They're doing so in club baseball, outside of Millwood, and that's a very common thing in terms of what we do. We are a Cal Ripken organization, we're part of Babe Ruth Baseball. It is a requirement for us when we play in our summer seasons to actually play at that dimension for our A baseball team. So we don't have a choice to do anything other than that.
At the 11 and 12-year-old. Yes. Not before then. Not before then.
So before then, it's still at 46, but we're required. So what we've been doing the last several years is we've been leasing space over at Houghton's Pond from DCR. DCR has been very challenging to work with over at Houghton's Pond. We are doing our best to make it work, but we've had to go out, including when we've actually had space, we have to go out to other communities and other towns to utilize their space to accommodate what we need to do in terms of game schedules.
We're also spending quite a bit of money to rent out Houghton's Pawn on an annual basis as well. There's not a lot of flexibility there in terms of how we schedule, so we actually probably take more time than we need. The reality is we wait until schedules are firm, or we don't account for rain outs, they don't give us space. And so it's a real challenge to go through that.
The other thing about this is there's two other components. One, I think from a player's safety standpoint, the, it actually improves the mechanics of players in terms of reducing injury risk, because it's actually, it's an incremental transition to what will eventually be the larger field. So that's what you would see the Red Sox playing high school baseball play on There's really very few sports or no other sports that I'm aware of where you actually have a potential 30% increase year over year in terms of the dimensions of the field that you play on. This allows for appropriate simulated gameplay in terms of base running, et cetera, as well as extending out gradually what the dimensions are going to apply to how far you need to throw and what that looks like.
So there's a player safety component to this as well as they grow and they mature. The other, the opposite end of that is You'll see this sometimes over the summer, if you watch the Little League World Series, sometimes you get a young man or woman who perhaps has hit puberty before everybody else and being so close also has its own dangers associated with that as well. So there's a combination effort here. The other piece that we put into the project would be additional fencing.
So there is, if you're aware of Mary C. Lane, there is a current asphalt path that comes from the parking lot, which is adjacent to Randolph Avenue and leads towards the playground area. What we'd be proposing is we'd have 11 and 12-year-olds play there more often. It's parallel to left field.
Exactly. So what we'd be proposing, because the dimensions of this field are a little bit shorter than the traditional 12-year-old field would be, we actually want to create a fence in front of that asphalt path to allow for particularly, especially non-baseball participants and fans who are passing through, not to be in danger of batted balls, et cetera. and extending that in left field, part of it is a permanent fence. We would then also incur the cost of a temporary fence to put up during the course of the season, not dissimilar to what you see over at softball at Geofield in terms of a fence that can come up and down to accommodate gameplay outside of, in this case, baseball during the off seasons.
So this is something that we've obviously talked to Parks Department about, and they're on board with supporting this project as well. And total cost, I know you have it in front of you, is going to be over $70,000 when we kind of take this into account. We're certainly in the position to try to fund a good portion of that with some of our own funding and support from our community and sponsors. And looking for CPC to help us get to that total number and continue to try to make that park available to all of our players so we don't have to go out of town and or to Houghton's Pond as well.
in simple form, where we are. I learned some things.
Speaker 2 (01:29:14–01:29:22)
I've always thought that that jump from 12-year-old to basically high school field is a big challenge.
Speaker 13 (01:29:22–01:29:31)
It's huge. It's a challenge. And one of the reasons we are, there's many reasons, but one of the reasons that we enjoy being part of the Calgary organization is that gradual transition.
Speaker 5 (01:29:32–01:29:32)
Yeah.
Speaker 13 (01:29:32–01:29:33)
That can happen.
Speaker 5 (01:29:34–01:29:40)
So I'm trying to visualize. So the infield, the dirt part then becomes wider?
Speaker 13 (01:29:40–01:31:14)
Yes. So the easiest way to put it, so your current grass of the infield portion, biomass is going to stay largely intact. Okay. So that grass part, the dirt parts that will now, that halo, if you will, that goes around, that will be extended further out.
And so then when you adjust, when you have to redo the white lines all the time? No, so the white lines and foul lines are the same regardless of the dimension of the field. It's a 90 degree angle regardless of what happens. So those foul lines never change.
The bases change, but what you do is you have anchors in each of the places that you could put, you basically put a fill in there so they're not dangerous. So that if you're not playing in that particular dimension, it just, it's in the ground. you would never even know it. You just play as normal.
And then if you need to switch the bases out to the different dimension, that base comes out of where it is. You put a different type of anchor in from a safety standpoint, and that base can now go to the prior place, depending on what dimension you're playing. So you'd actually have two different bases. Similarly, we would be responsible for purchasing what we would call a convertible mound.
And what that would mean is you have to essentially have two different, you know, we'd call them pitching rubbers, et cetera. at two different dimensions. There's different ways to do it. The most common way that is, you know, weather resistant is something that actually literally the mound itself can move from one area to the other in a very easy fashion.
So that would be, you know, something that we would be purchasing on behalf of North America as well for that space. You have to have two different pitching rubbers for that as well.
Speaker 2 (01:31:15–01:31:16)
You lost me.
Speaker 13 (01:31:16–01:31:45)
So that's an artificial mountain? It can be. It can be. You'll see in Massachusetts, Tom, you'll see that more often than not, because people have a hard time with the weather, maintaining both, particularly with the natural dirt, the different landing spaces that the two different dimensions would create.
We're open to either, you know, in terms of trying to work through different things. And, you know, we're not, we wouldn't look for CPC to fund any, if we did an artificial mountain, we wouldn't look for any of that funding to fund that in any particular way.
Speaker 7 (01:31:46–01:31:49)
What is the dimension of the rubber on the 70 foot?
Speaker 13 (01:31:51–01:32:12)
So that would be 50 feet instead of 46. Four feet does not sound like much until you watch the two differences of the game. To put it in some perspective, a major league mound, if you watch the Red Sox tonight, is 60 feet. So similarly, 10 feet doesn't sound like much, but But it's 10 feet.
Oh, yeah, there's no doubt.
Speaker 2 (01:32:13–01:32:32)
Exactly. It's huge. Yeah, exactly. You saw when they moved the pitching rubber from 40 feet to 43 feet.
And again, it was a big change for absolutely forever. Yeah.
Speaker 5 (01:32:34–01:32:37)
So how often would you change? Is this like every day you'd be changing, switching?
Speaker 13 (01:32:37–01:33:15)
Not necessarily. So the majority of our spring season, the majority of our kids would still utilize Mary-Selene primarily in the 46-60 dimension. It would be heavy use in terms of the 50-70 from, I would say, June through August. That's really our summer season where we have to go out of town more than we can play anywhere near Milton.
And we also prevented from actually ever practicing on those respective dimensions as well, which from a preparation standpoint and really helping the kids from that standpoint, it's a little bit of a challenge as well for the coaches that have to work with those respective teams. Yeah. Great.
Speaker 2 (01:33:15–01:33:27)
Other questions? Great. And also, congratulations on your election. Oh, thank you very much.
As we saw each other, it's a huge help. Thank you. You're a new member of the Parks and Rec.
Speaker 4 (01:33:27–01:33:27)
Oh, great.
Speaker 2 (01:33:27–01:33:30)
Yes. Congratulations. Thank you very much.
Speaker 4 (01:33:31–01:33:32)
Oh, that's nice.
Speaker 2 (01:33:33–01:33:33)
I did go.
Speaker 4 (01:33:35–01:33:43)
My supports are very limited to Stanley. So I didn't even know where the Mary St. Louis baseball field was.
Speaker 2 (01:33:43–01:33:45)
Hold it. Yes, you did, because we funded.
Speaker 4 (01:33:45–01:33:47)
No, I still didn't know.
Speaker 7 (01:33:48–01:33:52)
That was the year she took a hiatus.
Speaker 4 (01:33:52–01:33:55)
I had no idea. I just looked it up on Google Earth.
Speaker 5 (01:33:55–01:33:57)
I'm like, oh, there it is. Yes.
Speaker 2 (01:33:58–01:34:17)
Well, thank you all again. I appreciate it. Appreciate it, Steve. All right, Julie Creamer is here for the Affordable Housing Trust.
Julie, are you on mute?
Speaker 14 (01:34:18–01:34:28)
Great, hi there. Hi, can I show my, Tom, I don't know if you have my,
Speaker 2 (01:34:28–01:34:39)
I can call it up, because since you gave me a heads up, I was prepared here. So let me do that.
Speaker 14 (01:34:48–01:43:16)
Great. Thank you. So great. And you'll move it for me, Tom?
I guess I've never done this before. I'm always in control. There we go. Stage one.
So, hello everyone. I am Julie Kramer. I'm with the Milton Affordable Housing Trust. I'm the chair.
I've been in front of you before and I, you know, speaking for the for the trust, very much appreciate your support for the trust fund. We've done some great work, and I'll talk about that at the end of the slideshow, but I'm here to talk about our current eligibility application, which we submitted in June, was it, or May? Anyways, The goal of the Affordable Housing Trust is really to address affordable housing needs in Milton. We really work to support local control of some housing initiatives.
We engage in real estate activities. Most recently, we've worked with the lottery agents for the homeownership lotteries in town, reading through lips applications and the lottery materials. One of the, I think, more important things that we do is we are able to make timely decisions because the funds are with the trust and so we can take in requests really on a rolling application, and I think that's helpful to move projects along and get the support that these projects need pretty quickly in order to meet funding applications and deadlines and such. We also collect dollars from various sources, mostly from CPA, but there are some times that we get funding from, rather than inclusionary units, it's funding in lieu of.
And we, you know, manage these funds and try to do the best with what we have. You can go to the next one. So most recently, we funded an application from the Milton Housing Authority. I think you folks saw this application as well because it came into the CPC directly.
And we have now met with them and are now in a position to award funds for their project at 65 Miller Ave. which is 39 units of elderly and disabled housing, you know, with the average annual income of folks who are living there of about $19,000. So these are some of the more needy residents of Milton. The buildings, you know, they actually don't show their age all that much because the Housing Authority has done just an amazing job.
with little money to keep the property in great condition and keep the residents safe. But they are 40 years old, so they're near the end of their useful life, as we like to say. If you can go to the next slide. You know, the state housing authorities are currently in a little bit of a tough spot, right?
And there's few opportunities for extensive rehabilitation of some of these housing units. You know, some have actually chose to increase density at their sites and work with a partner and get funding sources made available for all kinds of other projects. But for good reason, Milton Housing Authority is really focused on preserving these assets, not adding more units, keeping the project the size and also, you know, serving the resident profile that they've done for the past 40 years. So, one of the programs is this high leverage asset preservation program, and the state will match 2.5 times of the local contribution.
So, Milton Affordable Housing Trust with primarily CPA funds awarded Milton Housing Authority $600,000. And that will be matched with about 1.5 in state high leverage asset preservation program funds. The scope is pretty for, you know, building of this vintage, you know, window replacement, sliding door replacement, siding replacement with improved insulation, HVAC upgrades to some of the common areas and offices. There is an allowance for some of the second floor porch repairs, which, you know, may present themselves as a problem once the siding is replaced and connections are more brought out to the open.
So the total development cost is estimated to be 2.2. So with our funds and the matching funds, they're really close to what they need for this very important preservation project. So we have, you know, we have We've asked you for $600,000. We know there's a lot of demands on these funds with some great projects.
I heard a few of them today and a few of the last meetings. But it's really important that we show a continued and steady funding for the Milton Affordable Housing Trust. Um, you know, with some of our funds, we've funded the shared housing services office annual cost. Um, we've contributed to the cost, uh, of the update to the five year housing, uh, production plan.
We are really looking for opportunities to deepen affordability for new housing projects that are really pegged at 80% AMI. We'd like to see if there's a way to bring those closer to a 60 or 50% AMI. And funding the Affordable Housing Trust and allowing us the opportunity to have a seat at the table. looking, as I said, about affordability levels and long-term restrictions, you know, making sure these restrictions don't burn off and that they're always available to, you know, residents that can't, that are priced out of Milton.
If you want to go to the next slide, just One more update. This was a prior funding award that we gave to Winter Valley Residence Building 6, which is under construction. If you want to go to the next slide, just a few more pictures. We funded $470,000.
This was a Long, drawn-out process. I'm so happy to see that they finally broke ground. For folks who might remember, it's 36 units of new construction, some community space. Project construction closing was in February of this year, and it's expected to be completed summer of 2027.
And we were able to get our CPA Funds at Work sign up on their I think you just photoshopped that in there.
Speaker 2 (01:43:18–01:43:19)
No, I've been on site.
Speaker 14 (01:43:19–01:43:25)
It's there. It's there. I didn't AI it, right? I didn't.
Speaker 2 (01:43:26–01:44:57)
Right, right, right. Fantastic. Julie, thank you. That's great.
And I have to say the Winter Valley, not the Winter Valley, both the Winter Valley and the Miller Ave projects, I think, are sort of as we designed this, right? As we have decided four or five years ago to fund the trust instead of us trying to grapple with the complexities of housing development. And also, as you said earlier in your presentation, without the, the flexibility of timing, you know, that the CPC has had, the once a year funding round. That Miller Ave project got funded, you know, in short order, which was, you know, allows, and obviously, you know, Earl has done a great job to position that project to go forward and get that state match and, and obviously some of the most lowest income residents in Lincoln.
So, you know, I know I'm a member of the Board of Housing Trusts and representing the trust on the CBC, but I do think the trust deserves some credit for, and your leadership, Julie, for acting so swiftly on the housing proposal request.
Speaker 14 (01:44:57–01:45:11)
Thank you. Yeah, Earl came prepared and had us do a site visit. you know, really sort of drove home the fact that, you know, this match is literally the only way these units can truly be preserved.
Speaker 2 (01:45:13–01:45:14)
Kathleen and Janet.
Speaker 4 (01:45:14–01:45:23)
I just have a question. I don't think it's for Julie, but we have on our list another $200,000 request for Miller Ave. Is that in addition to the $600,000?
Speaker 2 (01:45:24–01:45:51)
We met with Earl at the very first meeting, and we indicated to him that You know, as we've done with all of you, as we did with Valley a couple of years ago, we encourage them to meet with the trust. I think by the time Earl had come here, he had already made the initial presentation to the trust. So we don't have this anymore? Yeah, they have withdrawn.
Speaker 5 (01:45:51–01:45:51)
OK.
Speaker 2 (01:45:51–01:45:54)
Thank you. That was my question.
Speaker 5 (01:45:55–01:46:07)
So two questions, Shirley. Thank you, and congrats on getting the other funding So will the rehab require any dislocation of any of the resonance? And if so, how do you figure that out?
Speaker 14 (01:46:08–01:46:58)
Um, he doesn't think so. And you know, in my professional life, I've done some of this work. And, you know, it's, it's really important to get the right contractor involved, right. And they've got a, you know, the windows can go, you know, from the outside in, and then you finish up trim work, you know, you usually residents have to be out of their units for a little while while that stuff's going on, but it can be done.
Um, it really depends on um, you know, your staffing levels to, you know, that there's someone always there to open up the door and close the door for the, you know, for the general contractor. And it's, it's a nuanced, um, approach, but it can be done. I don't think he's expecting it. It's not in the budget currently that I have.
It's really just, those are all like hard costs in the budget.
Speaker 5 (01:47:00–01:47:17)
Yeah. Okay. And then my second question, actually, the first slide, you had a building with the solar panels. So I was wondering to what extent, so this project and other projects, is that a requirement that you have or a heavy suggestion or what's the history behind it?
Speaker 14 (01:47:18–01:47:51)
I would say it's a heavy suggestion. I would say that we really, you know, want our the projects we fund to do the best they can to support energy efficiency. And, you know, solar was always something we pushed because there were other credits and other ways to fund them. That is slowly eroding.
But, you know, we still hope for the highest energy a project can afford to do.
Speaker 5 (01:47:51–01:47:54)
Not on this one, I guess.
Speaker 14 (01:47:57–01:48:15)
I don't think Miller has plans for solar. But, you know, residents for the elderly is built to passive house standards.
Speaker 4 (01:48:18–01:48:27)
Are we allowed to ask how much is in the trust funds at this point? the Affordable Housing Trust Fund at this point? Sure.
Speaker 14 (01:48:28–01:49:20)
Yeah, we're getting dangerously low. With these two funds, we're about at a million dollars, which, you know, my goal would always be to be a little bit higher than that. As you know, you know, two projects you know, get rid of the million dollars, right? Or one project can, but I think it's really more important to just show some steady money coming in because, you know, these deals don't happen overnight.
And so if a project has to wait a second round or has to wait till our funds come in, you know, so be it. But, you know, right now, because we haven't funded either one of those, the trust looks pretty healthy, but both of those are committed, you know, over.
Speaker 4 (01:49:20–01:49:24)
No, no, I was, I was asking, you know, sort of net.
Speaker 2 (01:49:25–01:49:48)
Net of those is fine. Okay, thank you. Which, and of course, the Tom Farram project is solved for now and, you know, it's been withdrawn, you know, so there's still, you know, some of us have some hope that that will get kickstarted again and some, some development can happen on Tom Farram and that's going to meet you know, some CBA or trustee.
Speaker 7 (01:49:48–01:49:56)
So I didn't know. The composer of that, there was one left, because he withdrew on his proposal.
Speaker 2 (01:49:56–01:50:32)
The select board slash governor starting trustees withdrew. Withdrew them, all right. So they took positive action, but they took action to say, like, rethink it. Cancel it.
Yeah. Yeah. So, you know, that was unfortunate, I think, from a affordable housing point of view, certainly. So, yeah, I think the town or the governor's trustees hopefully will be sort of thinking about a new, you know, a new idea, a new proposal.
Speaker 7 (01:50:33–01:50:36)
And they said they'd have a public meeting at some time, so people can get involved.
Speaker 2 (01:50:36–01:50:43)
I think I can't speak for them, but I would. I agree. So.
Speaker 4 (01:50:43–01:50:52)
So, yeah. It was pretty stale. I mean, you know, the numbers. That RFP went out so long ago.
The response was so long ago.
Speaker 2 (01:50:52–01:51:52)
Well, I think the respondents was interested and engaged and had several meetings with the Governor's General Trustees. I think that the issue is the Governor's General Trustees were looking to the applicant to pay for the infrastructure improvements to go into Stonehenge. And that just makes the deal not viable. Affordable housing can't, I mean, affordable housing needs subsidy.
They can't be subsidizing the town's infrastructure. And those infrastructure demands are not unreasonable by residents that go into Stonehenge Lane. So whether a smaller development, I don't know what the right answer is, but, back to ground zero. We're back to, yeah, I hate to say square one.
I don't think Julie and I have been involved since square one. So we're back to some place that's behind where we were a few months ago or six months ago.
Speaker 14 (01:51:53–01:51:56)
Yeah, unfortunately.
Speaker 2 (01:51:56–01:52:21)
But I think it goes to Julie's point about keeping the trust as healthy as possible. Yeah, yeah. I know that applicant asked for half a million dollars. I know in informal discussions, we were expecting that request to be raised from half a million to a million.
So I think, as Julie said, a million can go quickly.
Speaker 4 (01:52:22–01:52:26)
Yeah, most of mine in other towns, it's a million.
Speaker 2 (01:52:27–01:52:27)
Yeah.
Speaker 14 (01:52:27–01:52:33)
Yeah. Yeah. It's between a half a million and a million in most towns.
Speaker 7 (01:52:34–01:52:50)
But the two projects funded have been our significant projects. And so it's a great thing for CPA and the committee to have supported them. It's a good thing for the trust. And I think the continued support at the committee is probably there.
Speaker 14 (01:52:52–01:52:58)
And it's nice to have two projects now sort of under our belt.
Speaker 2 (01:52:59–01:53:12)
Absolutely. All right, any other questions for Julie? Thanks, Julie. Julie, thank you very much for your leadership, and thank you for coming tonight.
Speaker 14 (01:53:12–01:53:12)
Go USA.
Speaker 2 (01:53:14–01:53:14)
Yeah.
Speaker 14 (01:53:14–01:53:15)
Yeah.
Speaker 2 (01:53:15–01:53:19)
Is there any sport? Is there any sport? You're down one?
Speaker 1 (01:53:20–01:53:20)
Yeah.
Speaker 2 (01:53:21–01:54:21)
Sorry. OK. All right. Thanks again.
Thank you. All right. The next item on our agenda is, where are we? Winter Valley Solar Lighting.
And Sarah, I don't think it's here for that project. I don't see anybody that, that would be Sarah Thorn from Umberdal. I don't see her. And so the Milton Landon photographs is 94.
Boy, we got, so I have an 850 and it's 854. We were running all sorts of behind. It brought up to your time. Right.
Speaker 15 (01:54:22–01:58:31)
Hi, everyone. My name is Madison, and I'm on the board of the Nacassette Rowing Club. I think this is the one. So those who aren't familiar with us, we are a small nonprofit base in Milton, and we grow out of the Milton Landing down by 88 Ward.
And our mission is to share the joy and the working for Many of our student athletes be life-changing benefits of rowing with the communities along the Neponset River. And we run junior programs, which are high school programs. Those are, that's really the bulk of our programming, but we also do middle school learn to row and we have adult rowing programs, which is actually how I originally got involved. I was never a rower and I saw a flyer and Yes, I got sucked into rowing.
We are now a club. We used to be Milton Peru and we converted to a club a few years ago. That is sort of the trend in U.S. national rowing and the Northeast is kind of the last area that is kind of migrating over to club programs.
So by having a club program, our program could be open to athletes from all different schools, which was always the case in the fall. But in the spring, under the MIAA rules, it was only Milton High. So by opening a program up, it's still a majority of our athletes are Milton High, but we have athletes from Milton County, we've had athletes from Fontbonne, we've got an athlete from Denham High, we've had athletes from BC High, even though they have a program, sometimes it's just convenience of location. Our programs are open to all.
So one of the great things about rowing is a lot of times we either get student athletes who have either can't continue on their sport because they don't make varsity for whatever sport they make or we have student athletes who didn't think they were going to be an athlete. They weren't playing any sport, they try out for rowing, and they end up being a great rower. And then, obviously, our adult programs are really open to all. And we also have a policy of a no questions asked scholarship.
So if we do have a family who feels they have a need, they can't make, our fees are expensive because running is an expensive sport. We issue scholarships to those students. So I think this year we had six students on either partial or full scholarships. And what's the total number of students?
It varies. Usually our goal is about 45 students a season. So it varies. Sometimes it's a little more, sometimes it's a little less.
I think this past spring, it was a little less. I think it was like 38 or 39. So right now, what we kicked off in November is a boat host campaign. I'm sure you have all seen Dexter Southfield also is sharing the landing with us.
The dock, we used to row off the Yacht Club dock, which is not a dock made for rowing. It's quite dangerous for rowers, actually. When Dexter Southfield moved in, they brought a beautiful low-profile dock. and they let us use it, and they let, you know, kayakers use it.
It's good for kayakers. It's wonderful, actually. Oh, yes.
Speaker 2 (01:58:31–01:58:33)
And that's further down the river.
Speaker 15 (01:58:33–02:02:42)
It's further down the river. And we've always, you know, that's where we've always put our launches in. So that was a game changer for us. First of all, just for safety.
It's just a safer way to row. And so, and then they put up their, we have always talked about having a shelter for our boats. You know, for a long time, they were only kept up by the trees, by where the farmer's market is. And then when the town plotted up the land and we started leasing our plot, then we store our boats there, but we have no cover.
And we've had incidents of vandalism, cars backing into them. We've had some damage. We've had some bullet holes that were in them. After Dexfield, Southfield put up their structure, I think for a long time we were thinking, I don't know if you've ever seen what CRI has in the Charles River.
They have a beautiful structure. And then when Dexfield, Southfield put up their town, we realized there's other options. Because to put up a full building is a lot. So we also decided we would love to have something similar.
as a place to store the boats and also to have changing rooms for the athletes because right now there really isn't a space if they come down from school or for them to change if they come down early in the morning before they go back up to school. And for, I would say the past five winters, we've been, we bring our boats down to a place in New Bedford that very kindly lets us store our boats with them. They have a rowing program down there. For a while there, we were storing them in Hyde Park in a warehouse.
So not ideal, because all that movement of the boats isn't good for them. How many boats are we talking about? We have a fleet of about 20 boats. Oh, that's a lot of eights.
Some are about four and eights. Most of the fundraising we have done has gone into buying new boats, upkeeping the fleet. So the high schoolers, they use the better, more expensive boats. The adults use the older, heavier, slower boats, which is fine.
So out of our whole fleet, there's a good eight to 10 of them that are really, really good. boats and the rest of them are in different stages of aging. So we had a gala in November to kick off the campaign for the boathouse. We had it at Adams Inn, which was nice because it was right on an eponset.
And we raised $38,000. The estimated total cost for the structure that we're looking at, Dexter Southfield structure is sort of the deluxe model Um, it costs them 550,000 to 600,000. Um, when we met with the vendor, um, that builds these structures, we, you know, we were pretty new. We were not going to aim for that.
We just, it's. It's because we're such a small nonprofit. Our fundraising is. We don't have deep pocket donors, so it's a lot of, you know, we do workathons and we do lots of piecing together the fundraising.
So we are aiming for the sort of their bare bones structure. We're not getting the fancy floor, we're not getting fancy doors. We're getting sort of a safe, tented structure to store our boats with two sectioned off areas for changing rooms. And that's sort of a rendering.
that we did, so you could kind of have an idea of how this is our plot here. So that's your, and then Dexter's behind us? Yeah, Dexter's behind us, yeah.
Speaker 2 (02:02:43–02:02:45)
And then you'd be further away from 88 War.
Speaker 15 (02:02:46–02:02:50)
Yeah, so down closer. Yes, this is like the end.
Speaker 4 (02:02:50–02:02:54)
You're where the original ramp is first.
Speaker 15 (02:02:54–02:03:31)
Yes. Yes, yeah. And we have the, right now we have a container there and a quarter potty. It looks like the same size.
It's a little bit smaller. Our footprint of our lot is a little bit smaller, so this probably isn't accurate how it looks. Their tent is actually a little bit bigger than ours. I think I have in here, it is a 40 by 70.
14 feet high, can store up to 20 shelves. So those are the steps.
Speaker 2 (02:03:31–02:03:38)
Some of the differences that you're saying is in the interior finishes and you mentioned the floors.
Speaker 15 (02:03:38–02:03:47)
We're not going to have a floor. Ours will be folded into the asphalt. They have like a whole floor, you know, that fits.
Speaker 10 (02:03:47–02:03:47)
Yeah.
Speaker 15 (02:03:47–02:04:39)
So it's nice. We, we've always been a scrappy organization and so we are just to have the covering and we feel, you know, of course we, this takes time involvement because we would need the permit and and if we allowed to keep it up, we would need a variance to keep it up all year, but we do, we're trying to We want to be a partner with the town, continuing to make this space accessible, like, you know, it's a waterfront that people should be down and using. And I know there's been other talk about, you know, the area between 88 Wharf, like the park area and redoing that. And, you know, there's a lot of space here that could be look nicer, you know, and so we've talked about that too.
Speaker 4 (02:04:39–02:04:42)
Well, hasn't there, I mean, hasn't the YACLA been using that area?
Speaker 15 (02:04:42–02:04:51)
Yeah, so now they have like a lot, they also have a lot that they pay the town for and they have the brick, the old brick.
Speaker 4 (02:04:51–02:04:51)
Right, yeah.
Speaker 15 (02:04:51–02:04:52)
Yeah.
Speaker 4 (02:04:52–02:05:01)
Yeah. Has there ever been any discussion with either one of your groups about using the YACLA facilities for, is it a quarter potting for friends?
Speaker 15 (02:05:02–02:05:16)
Yeah, it's better, it's better for our athlete, it's such a different, and they're not always there when we're rowing, like we're kind of there earlier in the spring than they are, and then.
Speaker 7 (02:05:18–02:05:18)
Earlier in the morning.
Speaker 15 (02:05:19–02:06:24)
Yeah, we're there early in the morning. We're there earlier in the morning, they tend to like be there more in the evening after work, and so, yeah, yeah, so. So do you have to pay the town for? Yeah, so we pay the rent, I can't remember, It might be around 7,000 to 8,000 a month, possibly.
I feel like, yeah. Yeah. So before we were just, you know, we were just kind of spotters on it. You know, and then we would go and use the yacht club thing and we paid for, um, I think we now part of this, what we pay for is, you know, the electricity and the water.
Cause there's hoses down there that we used to rinse off things. So. before we actually have a lease, that's what we're paying for. So we did raise our 38,000.
I asked in this application for 200,000, which is the rest of the, which is a big, big ask. But first, I guess if you have any questions. Yeah.
Speaker 5 (02:06:25–02:06:34)
So this doesn't allow for any growth. Right. So any more of them turn boats?
Speaker 15 (02:06:35–02:07:16)
Yeah, we have 20 boats. I think that with a program, I think that we have sort of an optimum size of how we wouldn't want to get too much bigger, actually, realistically with just how many, the coaches you need and the launches you need, but for all the safety things that you need to make sure you're having the reality of our program is it really will always kind of need to stay around. I think 45 to 50 athletes. I know they'd love to grow the adult program more, but I don't in the immediate future see us all of a sudden getting much bigger.
Speaker 5 (02:07:17–02:07:21)
So you said that indicated that the 10,000 would come down in the winter?
Speaker 15 (02:07:22–02:07:50)
Well, it depends on the permit you get from the town. So I know that Dexter Southfield got a variance so they can keep it up. They are made for snow, so they're snow bearing tents. And they also have to be a particular hurricane wind proofed tent as well.
So they can, ideally for us, it would be great to keep it up in the winter because then we don't have to move the boats to another area. Yeah.
Speaker 7 (02:07:50–02:07:54)
Taxpayers wearing tear on the rent every time on the 10th and 10th.
Speaker 15 (02:07:54–02:08:13)
Yes, yeah, yes, exactly. Every time we put our ticket down, yeah. And then like there's sometimes like a vendor showed us like with the clear windows that you can see in and but though that we found out those take a lot more wear and tear so it's actually better just to have solid.
Speaker 2 (02:08:16–02:08:29)
Liz, what's the town's awareness of your your goals, your plan. I mean, obviously they're aware of you, you've paid rent in town. But, you know, Nick Milano, the administrator and the select board, have you met with the select board?
Speaker 15 (02:08:29–02:08:56)
Not yet, no. But I know that, I think, I don't know if it was our chair or if it was probably Peggy has already spoken with Nick Milano, somebody who's going to be judge and start talking to them about this. So I think at first we made the assumption because Dexter Southville was allowed to have one that the town allowed us as well. But then we realized we should never make assumptions.
Speaker 2 (02:08:56–02:09:03)
I mean, it's not unreasonable to think that. Yes.
Speaker 15 (02:09:04–02:09:30)
We've tried to be good stewards of our plot and the area around it. And we try to make sure our student athletes are always well-behaved. you know, good citizens when they're down there. And for the most part, they are.
They're wonderful kids. But yeah, that would be a piece of it. It's worth it.
Speaker 3 (02:09:30–02:09:34)
You said Decker Southfield had to get a variance to leave this up all year?
Speaker 15 (02:09:34–02:09:53)
Yes, because it's something about a temporary structure. And then there's a permanent structure one. So there's like a variance. And I don't know the details of all of that.
But I believe that they did. Did it come down? I don't, I mean, I don't, I don't think it's come down.
Speaker 4 (02:09:53–02:09:58)
Yeah. Well, I'm surprised that there would have been a variance.
Speaker 7 (02:09:58–02:10:00)
It would have had to go through you, right?
Speaker 15 (02:10:00–02:10:06)
Yeah. Temporary structure can only be up for 180 days.
Speaker 4 (02:10:06–02:10:07)
Yeah.
Speaker 2 (02:10:08–02:10:28)
I mean, one, I don't have a question. I think that would be sort of in between now and the final application. I think that's those are the types of things you would be looking for. What if we talked about communication, even support letters from various town bodies that might be have an interest in this.
Speaker 7 (02:10:29–02:10:32)
That's a good idea. And residents as well.
Speaker 15 (02:10:32–02:10:33)
Okay.
Speaker 7 (02:10:33–02:10:34)
And residents.
Speaker 2 (02:10:35–02:10:37)
Yeah, yeah, exactly.
Speaker 15 (02:10:37–02:10:39)
Particularly maybe 88 Wharf.
Speaker 2 (02:10:39–02:10:46)
88 Wharf as a neighbor is always, you know, would be, would be. And Southfield-Dexter.
Speaker 15 (02:10:46–02:10:48)
Yes. Yes.
Speaker 7 (02:10:49–02:10:59)
I wonder whether you could approach the town and suggest a tax abatement until this was paid off. And, you know, that's a little tricky.
Speaker 15 (02:10:59–02:11:02)
No, we don't pay taxes on top of it.
Speaker 7 (02:11:02–02:11:12)
You know, they pay rent. Yeah, oh, like. Rental abatement, you know, until you pay this off or something. Because, you know, it serves the town.
Speaker 3 (02:11:12–02:11:18)
And I don't know, I have no idea. But it's a competitive bidding situation, too.
Speaker 15 (02:11:19–02:11:19)
Yeah, right.
Speaker 3 (02:11:19–02:11:24)
They have further. Well, they put up. Oh, they put on now around the space.
Speaker 15 (02:11:25–02:11:28)
Yeah. Yeah. Yeah.
Speaker 2 (02:11:28–02:11:31)
Yeah. Yeah.
Speaker 4 (02:11:31–02:11:32)
Yeah. Yeah.
Speaker 15 (02:11:32–02:11:34)
Yeah. Yeah.
Speaker 4 (02:11:35–02:12:14)
Well, I'm concerned about actually is the is the nature of the structure is that we need to be getting more detailed about how how permanent it is because We've had issues before with eligibility requests for things like a temporary stage in the land. That's not fundable by CPC. And so if it's a temporary kind of tent thing, I don't think that's going to be something that we can pay for. So if you can give us sort of more details about the structure that you've decided on and the fact that it's anchored into the tarmac and all that kind of stuff, that would support the nature of the fact that it's a 12.3.
Speaker 15 (02:12:15–02:12:28)
So I think if we, if the town agreed to let it be a permanent structure, not something we take off. Yeah. Right. Because that's really ideally what we want.
Because the point is that in the winter we have storage.
Speaker 10 (02:12:28–02:12:30)
We have a place. Right.
Speaker 4 (02:12:30–02:12:38)
We wouldn't be able to, as I said, I don't think we could fund something that was something that you took down in Hurricane season or whatever. Okay. That's good to know. Okay.
Speaker 7 (02:12:38–02:12:40)
Is your lease a five-year lease?
Speaker 15 (02:12:43–02:12:48)
I was involved in this, and I should know. I can't remember what we did.
Speaker 7 (02:12:48–02:12:54)
I do think it was like a- If you put that up, I think it's going to be permanent, and next time around, you don't win the lease.
Speaker 15 (02:12:55–02:13:02)
I feel like it's a 10-year. I feel like they were longer. Yeah. I feel like it was a 10-year lease.
Speaker 7 (02:13:02–02:13:03)
How long is your lease?
Speaker 15 (02:13:04–02:13:12)
Yeah, I think it's 10. I think they were 10-year leases. But we're a few years into it now, so I can find that out.
Speaker 3 (02:13:13–02:13:16)
Mr that goes back to you. Yeah.
Speaker 4 (02:13:16–02:13:37)
So, well, let me, you know, docs or something that come out, and we end docs get funded by CES. Docs and ramps and those come out, you know, so I think it just needs to, the nature of the structure seems has to be something a little bit more than, you know, couple of attachments. Yes.
Speaker 2 (02:13:37–02:13:39)
And your lease is relevant.
Speaker 4 (02:13:40–02:13:40)
Right.
Speaker 2 (02:13:40–02:13:42)
Again, the full application.
Speaker 5 (02:13:42–02:13:43)
Yeah. Yeah.
Speaker 2 (02:13:43–02:13:45)
Yeah. No, I think that's a good point.
Speaker 5 (02:13:47–02:13:50)
What's the cost for a student to participate?
Speaker 15 (02:13:51–02:14:37)
We are at nine hundred and fifty a season. So we fall in spring. So, yeah, nine hundred and fifty. And is the high school or any of those going to pick up some of that?
No, they never did, actually, even while we were melting through. So that covers the coaches, obviously, and the regatta fees tend to be expensive. So we built that into the pricing so that then when they're racing, we're not also, you know, we changed the model of how we were pricing. And it also pays for buses, transportation, getting them to and from the races.
Speaker 2 (02:14:38–02:14:45)
And when we talked before, did you say you had some scholarships, too?
Speaker 15 (02:14:46–02:15:01)
Yeah, so we've been having a lot of discussion about this, actually. But right now, we have no questions asked. So if someone approaches the director and says they can't pay or they can only pay for half, then we fund their, yeah.
Speaker 2 (02:15:02–02:15:04)
So we don't turn people away.
Speaker 15 (02:15:04–02:16:12)
We don't turn anyone away. I mean, our main thing we've been really trying to, I think rowing sometimes has this real elite. Uh, stigma to it, I guess you could say, um, we've really, um, like right before COVID happened, I was in talks with athletic director of the Boston public school system, because we really kind of wanted to expand into the the Boston schools that are closer, they need to be close to the landing, because getting there is a thing. But then COVID happened and it was getting too complicated.
But we're really trying to diversify the program. We have rowers that end up rowing at college, and it was never on their radar that that was a possibility. So we have rowers at Bates and Temple. So that's been great to see.
We feel any student who wants opportunity should have it. But when you're a small nonprofit, that's not always fiscally, sometimes where we've had this rush. Yeah, no, there's a limit. But so far, we've been able to do it.
So yeah.
Speaker 2 (02:16:12–02:16:20)
Yeah, good for you. All right. I think that's some of the, I think Kathleen's advice on that.
Speaker 15 (02:16:20–02:16:21)
Yeah, I think.
Speaker 2 (02:16:21–02:16:29)
I'm talking about how the leap, the long-term lease, permanent C or whatever structure would be helpful.
Speaker 15 (02:16:30–02:16:38)
And have some conversations with the tenant and where, yeah, right, right, okay. And support letters. And support letters, yes.
Speaker 2 (02:16:39–02:16:40)
Yes, thank you very much.
Speaker 15 (02:16:40–02:16:44)
Yeah, thank you so much. Thank you, nice to meet you. Nice to meet you.
Speaker 2 (02:16:45–02:17:28)
All right, the last thing, last two, I just put on there, they have really looked it on, but I just, you know, in case they changed their mind and showed up, I put them on as an agenda. And then two didn't show. There's a Brookfield LED lighting, which is a project from Carthy and the consolidated facilities department, I believe, in town. And then the solar lighting, I wasn't sure if it's eligible.
Speaker 5 (02:17:29–02:17:30)
Is it a maintenance?
Speaker 2 (02:17:30–02:17:49)
It's under local housing. It's solar lighting in the pathways, in the driveways. It doesn't really include that. So I'm not sure if it's eligible.
Speaker 7 (02:17:49–02:17:55)
Although they could probably go to the trust and ask for money.
Speaker 4 (02:17:56–02:18:27)
They have to fund it from their other money, not from the CPA money. That was in the first meeting and he was So I've watched that. I wasn't sent to them, but that's, yeah, a playground one staff that doesn't know where.
Speaker 2 (02:18:27–02:20:00)
Yeah. So we've heard from everyone except, well, one has withdrawn or two have withdrawn essentially, you know, obviously before it wasn't just in his favor by funding the Winter Valley project. So that isn't, we don't expect would advance to the eligible, to the full allocation stage. Houston Avenue Bioswales sent me an email saying, they intend to withdraw.
And solar lighting might not be available. So that brings us down to 19 projects. So let me just stick with the agenda. Updates on interviews, that's a quick update.
But I expect either tonight or early tomorrow morning, the formal offer will be made by the Pound's director of HR to our preferred candidates. So this in the past week, recommendations were, references rather, were requested and reference checks were done by the, again, the Pound's HR director. There are glowing references. So that was a thumbs up.
So Carla, Phoebe, informing me tonight or this afternoon that either the formal offer letter will go out tonight or first thing tomorrow.
Speaker 7 (02:20:00–02:20:02)
So progress on Chinese.
Speaker 10 (02:20:02–02:20:03)
Yay.
Speaker 7 (02:20:03–02:20:13)
And the candidate was ready and willing to start as soon as she could. So Jenny might get some relief before long. Yes. Yes.
Speaker 2 (02:20:15–02:22:34)
Next week. So this brings us to the next meeting. I just put on there in case we wanted to discuss this a little more, but discussion regarding committee recommendation process and vote on July 20th. So obviously this is the eligibility phase.
The reason I put it on there is obviously the complicating factor of our two of the projects requesting us to speed up our timeline and bring a recommendation to the fall time meeting. Um, so obviously we can have a full and should have a full discussion on the 20th. That's really what the meeting on the 20th is for, um, to, to discuss that since we, we have a deadline, we, yes, we have a deadline and we have no more projects, uh, other than potentially hearing from the LED, um, lighting at Brooksfield, uh, project, um, I think we're going to have some tough decisions. I guess I put it on there to say we're going to have some tough decisions.
Obviously, not so much at the eligibility phase, but going in, I think whatever we determine is eligible, we need to write one of those letters that we've done in the past, asking people to sharpen their pencils and rethink their dollar requests because Again, we'll have some decisions to make. Do we fully fund some projects and then really have to say no to a significant number of projects or partially fund a lot of projects? But realizing that a partial funding might not be enough to get some projects across the finish line. So that's the dilemma that we're going to have and we can obviously debates on the 20th when we meet again.
But I want to just open it up now just for other comments about how we structure that discussion on the 20th or any other comments people want to talk about leading into that meeting. And we still have Al and then Robbie on the phone.
Speaker 7 (02:22:35–02:23:15)
So I think we need to determine for sure whether the bond costs we have go against a particular, you know, set aside or that it's just general to our funding, because that's an important, you know, that if we bond more, that will continue to be an issue. So I think we should look into that and talk about that. get an answer on that before. And Nick did say that he was going to try to get some better figures for us so that the next time we talk, maybe we'll have a better handle on what our total budget.
Speaker 4 (02:23:15–02:23:27)
Well, I gave him that cheat sheet on the Secretary of the Interior's guidelines. So that could help him with his thinking about how to divide up the overall.
Speaker 7 (02:23:27–02:23:31)
But I mean, overall, so much money we're going to have to give.
Speaker 8 (02:23:31–02:23:32)
Right. Oh, yeah. Yeah.
Speaker 7 (02:23:34–02:23:55)
It's probably not going to be a whole lot different than the 189. And we can discuss whether we want to continue to set aside $50,000 for admin, or do we want to cut that back? It's good to have some, in case we have a real estate issue, or even appraisal, or whatever. But we haven't come close to spending the $50,000.
No.
Speaker 4 (02:23:55–02:24:02)
Well, yeah. But I mean, considering the gap we have. Oh, yeah. These are all nickels and dimes.
Speaker 5 (02:24:03–02:24:19)
Yeah. So I think in the past when we've done this, it was pretty much a yes, now is it eligible? We've gone through that very quickly. The discussion was really about how much do we guide them in terms of the funding request?
Speaker 2 (02:24:20–02:24:35)
And I think that's where the discussion will… Yeah, and some of that's the constructing of the letter and reminding them. Yeah, I think we did this in some cases verbally, you know, at these meetings would be helpful.
Speaker 7 (02:24:35–02:24:41)
And typically when we write our letters, we do bring out the things, you know, we did committees, I should look more further.
Speaker 2 (02:24:41–02:25:02)
And so we can take some time to say, okay, some of that, the notation on the letter needs to emphasize community support or public accessibility or, you know, for various things. So yeah, we should definitely do that for the 20th.
Speaker 4 (02:25:02–02:25:11)
So for the 20th, so we would have the list. I think, you know, we talked about most of those projects are eligible. I don't think we have anything.
Speaker 2 (02:25:11–02:25:16)
I think the only one I'm questioning at this stage is the solar panel.
Speaker 7 (02:25:17–02:25:19)
Yeah, I don't think. And the Brooksfield lighting.
Speaker 2 (02:25:21–02:25:24)
Brooksfield lighting is the same project we funded for GRD.
Speaker 4 (02:25:24–02:25:27)
We funded it, we did it before. It's a recreation.
Speaker 2 (02:25:27–02:25:39)
Oh, recreational lighting. Right, yeah. So it's, I think that is eligible. Whether it's a priority is another question, but that's a question for the fall.
Speaker 4 (02:25:39–02:26:09)
So I think, I mean, yeah, so I think part of this is that we should be, on the 20th, we would sort of go through the list. I think most of the things are eligible, but so just a question about how we would frame the letter back to the people to say, OK, fine, we're not questioning the eligibility, but A, we don't have enough cash, so what can you do if we give you less? And B, what else can you tell us that would support your argument for?
Speaker 2 (02:26:09–02:27:58)
And then I think I agree. And I think then the other obviously big discussion is how do we deal with the time? Yeah, I'm less concerned about the fire station. I'm concerned about the timing and everything coming together.
But that's really out of our hands. Either we're going to have the information or we're not. And that's really on the fire station building committee and the town administrator. And we can only do what we can do there.
And they have a lot more deadlines than we're imposing to meet the ballot by the fall. But that's on that. The, I think the tougher issue for us is the Tucker request, because it's one that's not dependent on Bella, as we've determined. And it's, you know, I think they've made a pretty strong case that that project has to be done in the summer.
And because it's such a big project, it has to be bid out in the winter and spring to be ready for summer construction. But an award of any size takes money out of our spring bucket, if you will. And do we want to do that? As Pete said earlier, it's precedent-setting, which may not be a bad thing, but it is precedent-setting.
And it definitely restricts how much, you know, it will reduce the amount of pool we have for the scrimming time, meaning.
Speaker 7 (02:28:00–02:28:34)
So… One thought I have, and maybe you'll discuss this a lot more, there are plenty of them. Leading up to now, every year, we've funded studies and reports and things like that. And I really personally like the idea of supporting getting some of these things implemented that we did the studies for, you know, and for me I'd give priority to continuing to fund their finishing up a project rather than bringing on a whole new project.
So I think that's a discussion we'll have.
Speaker 2 (02:28:34–02:28:43)
Yeah, and it's not, you know, it's neat John Kiernan saying the bridge is going to be done this fall, which is great.
Speaker 7 (02:28:43–02:28:56)
It's funny he talks about the bridge a lot, but he's got He's got two other projects that have been funded worth $115,000 and haven't started either.
Speaker 2 (02:28:56–02:29:51)
I agree with you. I think we're getting there. It's been a little slower. Got a field dugout, so off and running.
Petaluma Park is under construction. Petaluma Park is under construction. But it's an exciting time for Subcade because I think we'll begin to have all these tangible reminders of the benefits of CPA all around town, but it has taken, you know, a little bit of time to get there. So, all right.
If people have other thoughts in between meetings, obviously email me and I'll make sure the agenda speaks to what we need to discuss, but we'll do the eligibility determinations inform letters with our comments and then have a specific discussion about the fall requests.
Speaker 5 (02:29:52–02:29:59)
And then can we also add a review of the final application? Because I think we can tweak that a little bit.
Speaker 2 (02:30:00–02:30:05)
Okay. We can definitely add that.
Speaker 5 (02:30:06–02:30:22)
So, I mean, just as an example, it would be useful to have on there, have you been funded before? You know, how much, just so that we're like, it seems like every question is like, how much do you think? All right. I don't let you wear it.
Speaker 2 (02:30:22–02:30:27)
Yeah. Okay. I'll definitely put that on there and we can, we can.
Speaker 7 (02:30:29–02:30:52)
And I get these updates from accounting all the time and I send them to the committee, but the status of every project. And I'm hoping by the 20th, we will have an update of this that goes through the end of to the end of the last fiscal year. The problem is, like I said to Nick, counting doesn't want to hear from me anymore, because it's the end of the fiscal year, and I'm nuts.
Speaker 2 (02:30:54–02:30:58)
OK. I will put that on there, too, just in case we do have an update of that statute.
Speaker 7 (02:30:58–02:31:09)
That'd be great. We can take a look at it. And I'm happy to take on contacting these people to find out the status and things like that, so we can.
Speaker 5 (02:31:09–02:31:20)
So if this person was offered And if she accepts, would you take responsibility then for onboarding her? Well, definitely inviting her, but doing an onboarding.
Speaker 2 (02:31:20–02:32:26)
I think we should. Yes, but I think we should share that since you've been doing some of the dance. Definitely. But yeah, so yeah, I mean, this past year has been a great sort of reminder of what you know, our staff person did, you know, obviously the minute taking we've been doing, the letters, and also just the scheduling, right?
The scheduling was one, I did all of that in the absence of a staff person. So it's, yes, I think Pete, you and I should probably sit with her as she, once she's on officially and, And since we do the bulk of the staff-like work, administrative work, we should talk about that with her. So yeah, I would try to, while she's on board, schedule a meeting for the four of us.
Speaker 7 (02:32:26–02:32:44)
Yeah. The grant agreements for this year's projects, I don't even know how many there needed to be, I mean, they work for the ones that we are, that we voted. That we voted at start, money's available to pay. Is that start now?
Yeah.
Speaker 4 (02:32:45–02:32:51)
I haven't done any, and nobody's asked me to do any of them, so I should probably tweak that out.
Speaker 7 (02:32:51–02:32:58)
Try to identify what projects require one, to sum down. Right, okay.
Speaker 2 (02:32:58–02:33:19)
Maybe we'll lighten it to me. That's something a staff person could help with. And not in terms of a legal side, but just in terms of communication with the application applicants of like, okay, and that being the two of you, whatever, just making sure the ball is moving forward.
Speaker 7 (02:33:19–02:33:27)
Or that they respond, they don't get a draft from you and you don't hear from them for two months.
Speaker 4 (02:33:27–02:33:29)
Yeah, that's usually what happens.
Speaker 7 (02:33:30–02:33:35)
Yeah, so a staff person could. And your willingness to continue to do this on behalf of the committee.
Speaker 4 (02:33:35–02:33:36)
As I'm retiring.
Speaker 7 (02:33:37–02:33:38)
Really?
Speaker 4 (02:33:38–02:33:39)
Yeah.
Speaker 7 (02:33:39–02:33:40)
So you're disabling them all?
Speaker 4 (02:33:41–02:33:47)
Yes. And there are clients that have been happy to say, thank you very much for working with me all these years, but I'm done.
Speaker 2 (02:33:48–02:34:16)
All right. I am looking for a motion to adjourn. So moved. Second.
All right. I'll. Yes. Yes.
Yes. Yes. Yes. Yes.
Yes. Yes. Yes. Yes.
Yes. Yes. Yes. We'll see you on July 20th.
Speaker 1 (02:34:18–02:34:18)
Thank you.