Board: Zoning Board of Appeals and Planning Board

Date: 2026-10-14


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:19–00:20)

So welcome, everybody.

Speaker 2 (00:20–01:11)

I'm Kathleen O'Donnell and I'm the chair of the Zoning Board of Appeals and I'm here with members of the planning board led by Meredith Hall as chair of the planning board. And with us is a joint meeting and not a meeting, but a seminar that's being presented by Kumpelman and Page, KP Law. our town council discussing the new changes to Chapter 40A affecting variances, special permits, nonconforming housing, all kinds of things that have been an enormous change, especially to the terms of variances. And so we're very, very grateful to KP Law, Carolyn, and Emily for coming here today to explain the new thinking that we have to consider when we're addressing the issues of variances.

And so, just to go briefly around the room, as I said, I'm Kathleen O'Donnell, Chair of the ZBA. Joining us, Michael Brown. Mary McHattrick.

Speaker 3 (01:12–01:15)

Frank O'Brien. Jeff Miller. Jay Bollier, Building Department.

Speaker 4 (01:16–01:19)

Carolyn Murray. Emilia Schell. Maggie Oldfield.

Speaker 2 (01:19–01:21)

Cheryl Tagayas. Meredith Hall.

Speaker 5 (01:21–01:22)

Ned Corcoran.

Speaker 2 (01:23–01:44)

and our loyal clerk, Bill Donnelly is in the house, as well as our town planner, Liz Manning. And so there are people joining us online. And so without further ado, I'd really like to say welcome again and thank you so much to Carolyn and Emily for coming out here to show us how to walk us through these new changes and the changes that may possibly come soon.

Speaker 6 (01:46–11:17)

Thank you. Thank you so much. I think Liz is going to help with the share screen for the presentation. And I think, Liz, is it available on the website, or has it been distributed to folks?

The planning board received it. OK. We can post it on our website. All right, so a couple of things.

So Kathleen did a great introduction there of some of the things that we'll cover tonight. I have a couple of caveats, though, first and foremost. One is these were all changes that were incorporated into the budget bill at the last moment, signed into law by the governor on July 9th. retroactively effective to July 1st.

It's a little unusual to have zoning changes via outside sections of a budget. Typically we get a little advance notice of these things or through the Mass Municipal Association we might get an email saying, Hey, do you guys want to weigh in on this, that, or the other thing? That did not happen with any of the provisions that we're going to talk about tonight. You will also see that I think there are certain themes that come through.

One is certainly the state continuing its theme of trying to promote more housing opportunities. maybe tear down some barriers to housing and trying to make things a little bit more accessible or I would even say more business friendly. So you'll see those as we go through them. But typically the presentation takes about an hour, a little bit more than an hour depending upon questions.

I encourage questions, so feel free to stop me along the way, because as I always say when I do things like this, if it was just about me sitting up here and reading the slides to you, well, heck, you could read that in the comfort of your own home. So please take advantage of both your collective wisdom and experiences, and as well as my being here to ask any further questions you might have. So I think with that, we can fast forward, if you don't mind, Liz. There we go.

So as I said, these changes all took effect as of July 1st. We're going to talk about, primarily we're going to hit notice requirement changes, pre-existing non-conforming uses, changes to zoning freezes, changes regarding abandonment, perhaps the biggest sea change here for our zoning board members, a brand spanking new variant standard. And we'll also talk later at the end about some other things that are some recent changes or things that are still pending. So if you wouldn't mind moving this.

Okay, so the notice changes. One thing I want to highlight here, as you all know, if you look at Chapter 48, Section 5, that governs the notice and hearing requirements for the planning board for zoning amendments. And then obviously Section 11 governs the posting and hearing requirements for, you know, special permits and all other types of proceedings. The asterisk there is it does not apply to variances.

When the legislature decided to repeal Section 10 and replace it, it did not incorporate these notice changes into that change. But as we go through this, I think you'll tend to agree with me, it doesn't really matter. And so if we go to the next slide, please, Liz. So the previous legislation, so as of up until June 30th of this year, As you know, the posting requirements were that you had to post at town hall in a conspicuous location, you had to publish in a newspaper, and you had to send notice by regular mail to your abutters and abutters to abutters, all your interested parties.

If we could go to the next slide, please. Now, the only real change is that in addition to posting at town hall and publishing in a newspaper, you can send notices by regular mail or by email. So I'm going to pause here for a moment because I think most people were expecting that if there was going to be a change with respect to notice, it was going to be a change with respect to publication. Because as we all know, our local newspapers are dwindling every single day or we have to advertise in the Boston Globe at a cost prohibitive amount.

So for some time now, there's been some discussion that maybe the legislature would finally change the publication, the newspaper requirement, and maybe we could post on the town's website or something like that. That was not the change we got. Instead, we got, well, you can send it by regular mail or you can send notices by electronic mail. But you're still sending those notices to the owners of record as of January 1st or the most recent tax list as compiled by the assessors.

So if we could go to the next slide, please, Liz. So here's our first practical difficulty with that. How on earth are we going to know anyone's email address? There is absolutely nothing in the assessor's records that has a field for the owner of records email address.

Even if there was something like that that was made available, as we all know, people change email addresses pretty frequently. It's one of these things that I say, thank you very much, the legislature, but I really don't think it's going to have any real impact because I just don't see that we're going to use email addresses. And since there's no way for the assessors to certify them. Maybe if you happen to know your neighbor's email address, you might send the notice by regular mail and also by email.

But I certainly don't want to be the person who is depending exclusively on an email address and oops, I'm sorry, I didn't realize it was gmail.net. I put gmail.com. You can see that that becomes sort of fraught with issues. So I think we're going to stick to the good old-fashioned mail for a little while.

If we could go to the next slide, please, Liz. Okay, so now we'll talk about the changes that have been made to Chapter 48, Section 6. So we could go to the next slide, please. So Chapter 48, Section 6 is probably one of my absolute least favorite statutes in the world.

And as much as I would love to see it amended, I'm not so sure this was how we wanted it to be amended. So we all know, or at least those of us on the zoning board who see this more often than not, if we have a preexisting nonconforming structure or use, it's allowed to continue. It's allowed to also be altered or extended. And that has typically just been done through a finding or a special permit from the zoning board that the proposed alteration or extension is not substantially more detrimental to the neighborhood than the existing structure or use.

We now have what is an attempt at a little bit more of a user-friendly approach. that if you have a pre-existing non-conforming structure or a residential use that does not conform to zoning with respect to lot size or shape, frontage, lot area, or floor area ratio, and provided the proposed alteration or extension is going to comply with height, stories, and setbacks, that extension or alteration can now be allowed by right. So no more having to go to the Zoning Board of Appeals for that particular qualifying alteration. But now that means our good friends in the building department are going to have to look at every application and say, OK, how is it nonconforming?

Is it only nonconforming as to block size, shape, frontage, floor area ratio? Check. Here. Is the proposed extension complying with height, stories, and setbacks?

Yes. Here you go. Here's your building permit. If they don't meet the criteria on either side, so maybe it's preexisting as to lot size, but it is going to encroach into a setback, they're still going to have to go to the Zoning Board of Appeals.

I think the rationale behind this was thinking of a lot of You say individual owners, you know, and maybe single family houses who just want to put, you know, a deck on the back of a house or some modest adjustments to their nonconforming house. And it can be intimidating and expensive to go to the Zoning Board of Appeals, that this is designed to try to provide some, you know, buy right relief for those types of uses.

Speaker 2 (11:18–11:36)

So if you had somebody that's putting a deck on the back of the house, and the original house already violates side yard setback by six feet instead of 10 feet or something, and the deck is just following that same sideline. then they wouldn't have to go to the ZBA.

Speaker 6 (11:36–12:08)

Well, technically, still will. So now you're talking about the whole, like, Gail versus Gloucester and the Dedrick versus Chatham situation that, OK, we have a 10-foot setback. You already encroached, say, two feet off the lot line, and we're just going to square off the house. That you still had to go get a finding from the ZBA to do that.

But if you've now got that same house that maybe is nonconforming, but the proposed alteration is not going to encroach into the setback?

Speaker 2 (12:10–12:13)

No, it would be the same line. It would be the same encroachment.

Speaker 6 (12:13–12:30)

I don't think that's going to apply to this situation because this requires that you would, that they meet the setback requirements. Not that you just bring it, not that you just be no more non-conforming than the existing structure, but that you actually comply with what the setbacks happen to be.

Speaker 5 (12:30–12:37)

So. So the intent is really to treat the new work as if it were already conforming?

Speaker 6 (12:38–12:42)

Well, it has to. Because the work will be done with,

Speaker 5 (12:42–12:48)

The area of the work being done is conforming to the existing zoning requirement?

Speaker 6 (12:48–13:24)

Only as to so. So, it's non conforming, at least as to lot size, you know, you have an undersized lot, or it's under, maybe it doesn't have the required frontage anymore or. maybe lot coverage or, you know, really it's aimed at, I think, smaller lots, to be honest. But the proposed addition has to comply with setbacks and height.

So it could be nonconforming in other ways, but that addition would have to comply with setbacks and height.

Speaker 5 (13:25–13:33)

complies with zoning requirements, although other factors associated with a lot make the render that a lot non-conforming.

Speaker 7 (13:33–13:59)

Correct. Yes. Yes. So a local bylaw could be more generous?

Yes. I think ours is. Slightly. So it's very puzzling the way this, you know, it's puzzling to me that, you know, the criteria that were chosen are these.

but not any of the dimensional ones. I don't know how it really helps.

Speaker 6 (13:59–14:51)

Anyway, it's interesting. And like I said, we've looked at the legislative history, and it's virtually nonexistent. So that wasn't really helpful in terms of any insight. If I look at this, I think we live in an older state, and particularly an older part of the state.

We have a lot of undersized lots. But if someone can put an addition on that satisfies setbacks and height, which I suppose some might argue are the most impactful dimensions to your neighbors, maybe that's the rationale, make it a little easier to be able to, you know, expand that kitchen or put, you know, an extra bedroom on the first floor. Or maybe this is also, you know, a little bit of the accessory dwelling unit. rationale that is leaking in here too.

Speaker 8 (14:52–15:00)

I'm not sure I understood the interaction. I'm not sure I understood Marion's question regarding the word generous. Does that mean less restrictive?

Speaker 7 (15:01–15:01)

Yes.

Speaker 8 (15:01–15:03)

Well, could it be more restrictive?

Speaker 7 (15:04–15:07)

I don't, no, wait a minute. I think it's the reverse.

Speaker 8 (15:07–15:07)

The reverse.

Speaker 7 (15:08–15:08)

Yeah.

Speaker 8 (15:08–15:14)

Right? So what is the interaction between, is this permissive or mandatory?

Speaker 7 (15:15–15:18)

This is mandatory. Yeah, this is down to the minimum.

Speaker 8 (15:19–15:32)

So it's an automatic amendment to the terms of the bylaw, depending upon what your bylaw reads. So, okay.

Speaker 7 (15:32–16:02)

Can I just say what I think the example is that I'm thinking of? Maybe I'm just confused. So in our bylaw, if you have a pre-existing non-conforming lot or structure, you can alter the lot, the structure, it's not the lot, providing that the alteration meets setback requirements. So it's broader, isn't it?

Because it doesn't say, we don't restrict it to only alterations.

Speaker 8 (16:02–16:09)

It's got to do with not exacerbating the nonconformity, but you still need a finding. And what says, says you don't need a finding. So you never get to the board.

Speaker 7 (16:10–16:10)

Yeah.

Speaker 8 (16:11–16:19)

And that's the distinction that I'm seeing. So we need to amend the bylaw.

Speaker 6 (16:21–16:32)

Yes. There's actually a slide at the end where I've flagged a couple of sections of the bylaw that I think the planning board and I will be having some discussions about not too long, too far down the road.

Speaker 8 (16:33–16:37)

This is like half of the matters in front of the Board of Appeals, this slide.

Speaker 7 (16:37–16:38)

Yeah.

Speaker 8 (16:38–16:40)

Or in front of, in front of, Ginny. Ginny.

Speaker 7 (16:40–16:49)

Ginny. But most of the, many of the applications are about dimension, non-conforming dimensions, you know, going into the setbacks at least. That's what I see.

Speaker 9 (16:49–17:06)

I mean, the typical case is the deck goes in the lid. Yeah. Yeah. You know, there's a kitchen that juts out.

The deck goes in behind the kitchen. It's completely hidden and it's a prior non-conforming use. So the deck is going to be prior non-conforming as well. It doesn't.

Speaker 7 (17:06–17:09)

It doesn't help. Yeah, it doesn't change anything, I don't think.

Speaker 2 (17:11–17:17)

Except that we've gotten letters where it's just been, you've increased the volume of the non-conforming house. We've gotten those.

Speaker 8 (17:18–17:26)

That doesn't apply here. Yeah. Because here, the addition has to comply for this to be effective.

Speaker 2 (17:26–17:34)

Right. But as I said, I've seen ones where it's just, you know, it does comply with the dimensional requirements, but it has increased the volume of the house.

Speaker 6 (17:34–17:46)

Right. If you're just going up the intensity, so to speak. Yeah. So this would address that.

Right. It would avoid those types of applications having to come to the zoning board. Yeah.

Speaker 2 (17:46–17:47)

Because we've gotten those.

Speaker 6 (17:47–17:51)

Yeah. Liz, if we could go to the next slide, please.

Speaker 9 (17:52–17:53)

Someone has their hand up.

Speaker 6 (17:54–17:54)

Oh, I'm sorry.

Speaker 3 (17:58–18:01)

to somebody speaking. Yeah.

Speaker 2 (18:04–18:09)

We can hear you. How did you have a question or somebody else?

Speaker 5 (18:09–18:14)

I was letting Kenneth has his hand up and I just want to let you guys know in case you didn't see it.

Speaker 10 (18:15–18:15)

Yeah.

Speaker 11 (18:16–18:29)

Thank you. And if you're unmuted, if you want to, if you want to speak I can't read his name.

Speaker 6 (18:34–18:36)

Okay, I'll keep going.

Speaker 12 (18:36–19:47)

Can you hear me now? Yes. Yeah. Sorry about that.

Sorry. So my name is Kenneth Semino. I'm one of the local inspectors for the town of Milton. I was just recently hired about three months ago as one of the part-time local inspectors.

So on that previous slide, they had those four exemptions. Two of which are lot coverage and floor area ratio. I know in the bylaw that there is a lot coverage requirement in I think most of the residential districts of the town of Milton. So does this change allow for someone to put an addition on the house that increases the lot coverage, but does not say we have, say it's 40% lot coverage now under the existing house.

We're adding another 15%, bringing it up to 55% lot coverage. Since they're increasing the nonconformity, has to allow lot coverage. Is it allowed as a right or is it special permit?

Speaker 6 (19:49–20:31)

Well, you have to, so it meets the first criteria in that it's nonconforming as to lot coverage. And then we have to look at does that proposed addition comply with height, setbacks, stories, if you make a distinction between stories and height. If it complies with those three, it's allowed to be altered by right. So even though that addition, I mean, every addition is going to add gross floor area to the structure, as long as it still is within the setbacks and the height requirements, the answer is yes, that could be allowed by right.

Speaker 12 (20:33–21:31)

That's what I was kind of wondering about, Because, you know, the other two criteria, which is lot frontage and lot size, a lot of times those criteria, you know, they typically don't change when someone puts an addition on. But certainly, you know, when you increase the lot coverage of a building and it's nonconforming to begin with, um, then you create a more there. Uh, the overall de which can affect things l and other things. Um, th So I just wanted to make sure that that was the case, that for lot coverage and FAR, that if they increased the FAR and it was already non-conforming on FAR or increased on the lot coverage and it was already non-conforming on lot coverage, they did not need to go zoning board of appeals.

Speaker 6 (21:32–21:39)

Correct, now they might still need a stormwater. Yeah, they might still need something else, but yes.

Speaker 12 (21:39–21:43)

I just wanted to try, I just wanted to confirm that.

Speaker 6 (21:43–21:51)

No, we're all reading and trying to visualize how this is going to impact us. So yes, it's a good question.

Speaker 12 (21:51–21:59)

Thank you. Yeah, because that's definitely a change. in the typical interpretation of how things are done.

Speaker 6 (21:59–22:02)

Right. No, thank you. Thanks for the question.

Speaker 4 (22:03–22:45)

Can I ask this question? So the planning board has contemplated putting it on our list of looking at creating a new FAR. Bylaw because that's what we're seeing in town is all of you know all these houses are being blown up And so we go from our you know three bedroom one and a half bath starter homes Which our starter homes also are downsizing homes and now they're four bedroom two baths so now we're we're You know we're making houses unaffordable for people and So by limiting the FAR, we're kind of creating a situation where we're preserving some of these smaller houses. So is this sort of a waste of our time?

Speaker 6 (22:50–23:10)

Yeah. I don't know that I'd go so far as to say it is a waste of your time. But we are absolutely seeing the state chip away little by little at local zoning control. And the pendulum just kind of keeps pushing further and further in that direction.

Speaker 4 (23:11–23:18)

But then it's counterintuitive what's coming up on the ballot is the smaller homes initiative.

Speaker 6 (23:18–23:20)

Yeah, by citizen initiatives.

Speaker 4 (23:20–23:26)

So here we are trying to create smaller homes, but yet we're doing away with our smaller homes.

Speaker 6 (23:28–24:41)

Yes. And then don't forget, if you are a seasonal community that was designated, I know that didn't apply statewide, but if you had been designated as a seasonal community, they are being forced to change their zoning bylaws to allow these undersized lots and tiny homes on undersized lots. So I don't want to say that the state is doing a great balancing act of the two. But when you see some of the other things that are being contemplated again, when we look at accessory dwelling units.

And all of that's going to add floor area ratio. You know, the legislature will talk a little bit later on, but heck, let's go there now. You know, a duplex, ADUs everywhere. It doesn't have to be in a single family district anymore.

Duplexes everywhere. And by the way, they define duplex, well, if you have a principal dwelling with an ADU, you've got a duplex. So what is this further duplex supposed to be? you know, commercial conversions of property from commercial to residential use.

Speaker 8 (24:43–24:52)

It's all coming. Is there a limit on the definition and the interpretation of what extended or altered is?

Speaker 6 (24:52–26:58)

They have not changed that at all. So it is still kind of left to the local. Right. And that's actually, you raise a good point about a couple of things.

This will be even more and focus when we start talking about the variant standard. One thing that was woefully lacking in any of these changes were definitions. So, one thing I did want to highlight about this change though is that, you know, we typically have talked about 48 section 6 is referred to pre-existing nonconforming structures or uses. Now it is pre-existing nonconforming structures or residential uses.

And it's not entirely clear what is behind that change. Unless again, is this looking at things like, you know, one theory that I have is there was one case that kind of left open the question of whether or not your garage is considered a residential structure for purposes of being able to say that it's preexisting nonconforming and can be altered. I happen to think that this change was sort of addressed at those things because we all know what nonconforming structures are. Residential uses, well, their houses, their garages, maybe their driveway, sheds, pools, you know, what else are we talking about?

So it's curious that this term has been used here and not really well defined. to suggest that it isn't just the structure, but it is the residential use itself that can be expanded. Again, is this also the idea of increasing housing stock, the idea that we might start to see an ADU allowed everywhere? Not entirely clear, but certainly we're not just talking about the single family home anymore.

So Liz, if we could go to the next slide, please.

Speaker 8 (26:58–27:04)

I'm sorry. Sure. Does that mean that it has to be a residential use to take advantage of the structural benefit?

Speaker 6 (27:04–27:12)

No. Now, just any non-conforming structure, commercial or residential, or a residential use.

Speaker 8 (27:14–27:20)

Right. So if you have a non-conforming structure and a non-conforming use that's not residential, this wouldn't apply.

Speaker 6 (27:21–27:21)

Correct.

Speaker 8 (27:23–27:24)

That's pretty clear.

Speaker 6 (27:27–27:31)

Liz, I saw the low battery.

Speaker 11 (27:32–27:35)

Okay.

Speaker 6 (27:36–28:02)

Abandonment, this is also one of the provisions that I would say is a little bit more business friendly. As you know, abandonment has been for a number of years, it's been a two-year period of showing that a use has either been abandoned or it has been discontinued for a period of two years or not more. It has now been increased to four years. So there's one provision of your bylaw that will have to be updated.

Speaker 13 (28:02–28:37)

So I have a question and it's not necessarily related to two years to four years, but how is it determined like we have in Milton two families. that are pre-existing non-conforming. How is it determined that it becomes, is no longer a two-family in use? Does somebody come out to inspect it?

I don't know, Jay, if you know. But like this question came up because people I know said they thought they bought a two-family, and it's been determined that it's a single family. And they said, well, it was marketed to us as a two-family, and it was built as a two-family.

Speaker 3 (28:38–28:46)

And so I said, was it? You know, how long has it been listed as a two family. Was it ever a one family.

Speaker 13 (28:49–29:14)

It's anyways, it's just something beyond this topic that I think is worth a conversation, maybe with the CPA again on thinking about these because if we're trying to allow for two families, and we have two families, and maybe somebody's not using it for a year or two as a two-family, all of a sudden, for two years, or now four years, it's gone. Now they'll be able to have a duplex.

Speaker 10 (29:14–29:15)

Right.

Speaker 8 (29:15–29:21)

But this is optional. Right? The town doesn't have to do this.

Speaker 6 (29:21–29:25)

Well, currently you do regulate abandonment, and you use two years. Right.

Speaker 8 (29:26–29:28)

And we could continue to under this language.

Speaker 6 (29:28–29:30)

No, I think you would have to go up to four years.

Speaker 8 (29:31–29:32)

What's the word maybe?

Speaker 9 (29:34–29:35)

I see a may there.

Speaker 6 (29:35–29:48)

Yes, but you can be more permissive. And if you said that a non-conforming use would be deemed abandoned after two years, you're actually being more restrictive.

Speaker 2 (29:50–29:55)

So you could say six instead of four. You could. But not less.

Speaker 14 (30:01–30:07)

I would agree. Words matter. Two years is the minimum, but you could increase it.

Speaker 6 (30:10–30:14)

Well, you can. We'll see how it all gets tested in court.

Speaker 8 (30:15–30:22)

Or if the town does decide to go to four, then you don't have the issue, I guess. But it's got to be on the list. That's one of your points. That's on your last slide.

Speaker 6 (30:22–31:53)

It is. So if we go to the next one, Liz. Oops, zoning changes as we start to talk about this. So right now, or up until June 30th, OH48 section six was crafted.

If you had a project, it was protected from any subsequent zoning change. If the building permit or the special permit was issued before the planning board had its first legal advertisement of the proposed zoning change. So we always had that sort of awkward, period of time that planning board would advertise a zoning amendment. It could be months before town meeting actually votes to adopt that zoning amendment.

But if you got an application in, in that limbo period, so to speak, we acted as though that zoning change was in effect and applicants proceeded at their own risk. Now, the permit is protected from any subsequent zoning change if they have simply applied for a permit. They may never have any intent of actually constructing anything, but they have submitted some sort of application for a permit, or, and this is a term in the statute that they've added in a few locations, they've applied for a permit or other entitlement. We have no idea what an other entitlement happens to be.

Speaker 5 (31:54–31:55)

Order of conditions.

Speaker 6 (31:56–32:03)

Well, could be. So I think if we go to the next slide, I think that's more.

Speaker 11 (32:03–32:16)

I just had a question on that. Oh, sure. If the permit application was deficient, incomplete, denied, does that help me there? I get a lot of plans that are pretty incomplete.

Speaker 6 (32:19–33:08)

you know, the statute just says all they have to do is apply. So I would say that we might want to tighten up language about an application having to be reviewed and deemed complete because you could certainly see a situation where a permit is applied for and it looks like something that, you know, your 10-year-old child could have just completed and handed in. Is that really a bona fide application that should protect you from a zoning amendment. Personally, I don't think it should.

I think it should have to be something that shows an intent that you are going to actually act on that permit, not just beat the buzzer. But again, I think we're going to have to see how the courts interpret all of this.

Speaker 7 (33:08–33:15)

Yes? Shouldn't the language have said that the permit was eventually issued? I mean, shouldn't that have been added?

Speaker 6 (33:15–33:22)

But again, that's what the statute had said previously, that at least if you had a building or special permit that had been issued, you were protected.

Speaker 7 (33:22–33:41)

But the date by which you had to do it was much earlier in the earlier language. So I still think, I think this is more generous to applicants. And I think it's actually might be better. However, it's not better because now, as you said, it looks like all you have to do is file your application and walk away.

Right, right.

Speaker 5 (33:41–33:48)

Question with the applications. The zoning change. It doesn't matter. It doesn't matter.

Speaker 7 (33:49–33:55)

Well, yeah, but it's still, I don't know what the implications are, but it's a little strange.

Speaker 3 (33:56–34:15)

Applications online that are in the queue, they're going to expire. They're not just going to sit there. And I don't know what the, I don't know if it's six months or maybe it's actually less. ignore them.

Does that mean that they're still alive?

Speaker 7 (34:16–34:18)

No, it means it, but it, well.

Speaker 3 (34:20–34:24)

If they haven't acted on it, but you're saying they're just there.

Speaker 6 (34:24–35:35)

Right. And as we know, it could just be a building permit and you only have 30 days really to act on that. It could be someone has applied for special permit and we don't even open up the hearing. for two and a half months.

And the hearing could go on for many, many months and the permit could ultimately be denied. But now all you have to do is apply, which is a very, very low bar. I'm sorry, was this for any use? Well, it's still under Chapter 48, Section 6.

But, well, yes, but there's other things mixed in there, too. But it's simply saying that all you have to do now is apply for a permit. And if there is a zoning change that is either pending or then adopted, but you've got your application pending, You your application is evaluated under zoning as it was in effect, the date that you applied for. I'm sorry.

Right.

Speaker 2 (35:36–35:58)

Right. Yeah, I mean, I had a situation like that actually with a guy that had an ADU that he wanted to do before the town had voted its own special ADU bylaw. And they said he was out of luck because they had advertised the zoning change. Now he would be OK because he put in his application for the building permit before, you know.

Right.

Speaker 8 (35:59–36:13)

But this might be in Section 6, but it doesn't relate to the previous changes because those are already effective. Right? That's the way you have to read this. Right.

That's the law as of July 1. Right. So everybody's got the benefit of that regardless.

Speaker 6 (36:15–37:02)

Right. So if we could go back to the next slide, please, Liz. So we started to talk about, you know, another entitlement is, you know, we mentioned like an order of conditions. Could be.

It could be, you know, site plan approval. It could be, you know, a water sewer connection, who the heck knows, where it hasn't been defined. I don't think it should apply to what we typically call discretionary permits because it's not something you are entitled to. But again, I think this is either going to be something that the legislature is then going to have to give us a little bit of definition around.

or we're going to wind up fighting with someone eventually.

Speaker 8 (37:02–37:07)

We're just not going to touch this. They opened it once, then I couldn't do it again.

Speaker 6 (37:07–37:12)

I know. First time in like 50 some odd years, they finally touched the statute. But they don't do what we would like them to do.

Speaker 9 (37:12–37:20)

No, you're not going to see anything on this next year or the year after. They'll wait for the courts to sort it out. And after the courts screw it up.

Speaker 6 (37:21–37:25)

Then 40 years later, they'll get around to it again.

Speaker 9 (37:25–37:27)

That's just the way the legislature works.

Speaker 6 (37:27–37:40)

I mean, in the interim, I would say an entitlement should be taken sort of literally as something to which you are entitled, not something that would be discretionary. So not a variance, not a special permit.

Speaker 8 (37:41–37:49)

But a demolition permit. It can't live in 40A and have something to do with a water-sewer connection.

Speaker 6 (37:49–38:03)

I don't disagree with that, but I'm just throwing out there some discussions, some ideas. Because what else is it? A building permit is not really a creature of 40A.

Speaker 8 (38:03–38:30)

What is it is people chose the word entitlement to try to encapsulate everything that Boards of Appeal does without thinking about entitlement the way you ascribed the technical thing to it. So, I mean, boards probably would line up with where you are on it. But I doubt that it would extend to something that's beyond 40A. I think there's a, yep, I think there's…

There'd be an out-of-control Board of Appeals. It really could be, yes.

Speaker 6 (38:31–38:49)

So, as I say, you know, stay tuned. We're going to have to see how the court interprets this ultimately. I'm not laughing at you. I'm laughing because I can't tell you how many times I've been asked this.

Speaker 9 (38:49–39:14)

The reason why I ask is because in my professional life I do a lot of law or I used to do a lot of law here in Beacon Hill. So this stuff doesn't happen by accident. Right. So who was behind, what group, what organization was behind getting to the conference committee to get this stuff put into the conference committee report.

Speaker 6 (39:14–40:19)

There wasn't a lot of legislative history. I mean, there are a lot of groups, whether it's REBA or CHAPA or, you know, even EOHLC is weighing in on an awful lot of this. But we're not seeing Nowhere else. There's no hearing on it to see who's providing testimony.

I mean, I know I get a lot of our towns that will say, oh, you know, this piece of legislation is pending. We need you to submit comments as to, you know, either against it or as to why this is not workable or as to why they just truly don't understand how zoning works. And okay, you know, we'll submit that. I can't really answer, you know, why did they pluck these few and put them into the budget as opposed to the economic development bill, which still has a whole bunch of zoning issues related to it.

Why didn't they just pour it all over to a conference committee? I don't have a good answer for that.

Speaker 2 (40:21–40:24)

The real estate bar association does take some credit for this.

Speaker 8 (40:25–40:30)

That's why. And they don't like carrots. And that's it. So you just move on and get what you get.

Get over it, Frank.

Speaker 6 (40:37–40:41)

Kathleen, were you going to add something to that?

Speaker 2 (40:41–41:00)

No, I was just saying that Reba's taking a lot of credit for it. And our new lobbyist is Ben Fierro, who used to be with Home Builders Association. So he's totally dialed into what that organization wants. And so I would assume that some of the credit or discredit goes to that.

All right.

Speaker 6 (41:00–42:34)

Can we go to the next slide, please, Liz? So zoning freezes also found in 48 section six. So up until June 30th, if you had a building permit that had been issued for construction or for use, you were protected from any subsequent amendment to zoning for a period of 12 months after the permit was issued. As long as you actually started to take steps to exercise that permit.

Now, that's been extended to 24 months. And it isn't just 24 months from when the building permit is issued. It's 24 months after the issuance of the last permit necessary for construction. So now, as we all know, you could have a project that requires a variance from the zoning board, maybe a special permit from the planning board, an order of conditions from the Conservation Commission, And it could be going through the permitting process, heck, for three years.

That wouldn't be unheard of. Now we wait until the very last permit necessary for whatever the project happens to be issues. And you get the benefit of a zoning freeze for the entire time that your applications are pending. And then 24 months thereafter, after the building permit issues for that project.

Speaker 5 (42:35–42:39)

given the amount of money and time and effort that would have gone into collecting all of those permits?

Speaker 6 (42:40–43:09)

And this is one of those where, like I said, I think you see some of the special interests that this might have been designed to help. Because especially like with a variance, where it was only good for a year and you could only extend it for six months, well, if the variance was the first thing you got, because you needed to know whether or not you're going to be able to do any of the other things. By the time you get through with the Conservation Commission, your variance is expired.

Speaker 5 (43:09–43:20)

And your appeal may have been taken. Exactly. As a practitioner, I think that's a great change to the law, because I know in significant cases that I'm involved with, it takes three or four years to get through.

Speaker 6 (43:21–45:31)

And remind me to hold that thought later when we talk about clean energy, because I'll tell you where I think this came from. So if we could go to the next slide, please, Liz. So lot merger protection that you also find in 48 section 6. You may be familiar with the provision that protects lots for single and two-family residential use.

If they're not held in common ownership, but you have at least 50 feet of frontage and 5,000 square feet, or if they were held in common ownership, But they had at least 75 feet of frontage and 7,500 square feet of area. They were protected from having to merge with adjoining lots. The only change that has happened here is that the legislature has removed the lots for single and two-family residential use. So now any lot, even for commercial purposes or business purposes, would now be able to take advantage of this provision so you could, in theory, have a 5,000 square foot lot on which you could put some sort of commercial use.

Go to the next one, please, Liz. So variances, the reason everyone is here. You can just go ahead to the next one, please list. So, as I said, chapter 48 section 10 has been completely deleted and replaced.

So, for every zoning board of appeals member who is. Had it drilled into them. Shape, soil, and topography. You know, there has to be some sort of, you know, an issue with respect to the shape, soil, and topography of the lot that creates a hardship, that prevents compliance with the zoning bylaw.

You know, it was always a very strict standard, and the courts were always very clear to say these are a rarity. not so rare anymore. We're seeing a relaxation of that standard. And now we see that the new standard is whether strict enforcement of the bylaw would result in practical difficulty.

Speaker 7 (45:32–45:34)

Is that even less of a standard than for a special permit?

Speaker 6 (45:36–45:50)

Well, you know, with special permits, you typically are looking at, you know, specific findings. You're looking at traffic and sufficient parking and maybe lighting and site circulation or whatever. This is a little bit more fuzzy.

Speaker 7 (45:51–45:55)

It's so big that it eliminates it entirely, I think, the idea of a variance.

Speaker 6 (45:56–46:26)

Well, I will tell you that shortly after these changes were released, at least the I think the planners listserv, and I don't know whether Liz, you saw some of these emails, had just sort of immediately reached the conclusion, so everyone gets a variance. I don't know that it's everyone gets a variance, but certainly there has been a relaxation of the standards, so to speak. So if we go to the next slide, we'll go through what the components of the standard are now.

Speaker 5 (46:27–46:29)

Ken Cimino has his hand raised again.

Speaker 6 (46:29–46:29)

Oh, sorry.

Speaker 5 (46:29–46:30)

Maybe.

Speaker 2 (46:31–46:32)

No, I thought it didn't take it down.

Speaker 12 (46:34–46:43)

Maybe you didn't take it out. Can you hear me? Yes. Yeah.

Has practical difficulty been defined?

Speaker 6 (46:44–50:02)

We are now on that slide. But to answer your question quite literally, no, it hasn't been defined. It is the standard that you'll find if you're at all familiar with zoning in the city of Boston. And it's just sort of been imported here.

But the legislature didn't. they didn't define any of these terms. And even more so when we also went to take a look at, well, how does the city of Boston define practical difficulty? They don't define it either.

So it's another situation where you're sort of going through case law and trying to figure out what it really means. But the most guidance that the legislature has given us is that the permit granting authority now weighs the benefits to the petitioner or the applicant and to the public interest, including the interest of supporting housing. So, you know, there it comes. And you balance that with respect to detriments to the public health, safety, welfare of the neighborhood.

And you may also consider shape, soil, and topography, as you have in the past. You may consider whether strict enforcement imposes a financial hardship on the applicant. And you may consider whether the benefit that's sought by the applicant can be achieved by some other means. And you can consider whether the practical difficulty was self-created.

Now… Is this part of the statute? This is right out of the statute, yes. Now, some of my more cynical folks in the planning world have said, when isn't the hardship self-created?

Great question. Just because you want to go right up to the property line or you want to exceed the height limit doesn't mean you should be allowed to. But this is a really cumbersome, standard. I don't think it provides a lot of guidance to zoning board.

A couple of the City of Boston cases, and what's kind of interesting about this is most of the cases that they cite to are from like the 1930s. You know, then it's sort of like trailed off. So maybe everyone's just kind of figured out, at least from the City of Boston, what they think a practical difficulty is. One thing the case law is pretty clear on is It is not financial hardship alone.

Some of the cases have looked at things where, you know, has the neighborhood changed? Maybe this parcel was zoned a particular type of business use, but the neighborhood has undergone a transformation around it where there are other types of businesses that maybe have more lenient zoning restrictions. that might be one basis for granting, say, a dimensional variance.

Speaker 13 (50:03–50:13)

But-. I have a question. So, in the example I gave earlier of the two-family, could someone come in and say now, I'd like a use variance to go back to a two-family?

Speaker 6 (50:13–50:14)

Yes.

Speaker 13 (50:15–50:15)

Yes.

Speaker 6 (50:15–51:38)

So, stay tuned for that. Next slide coming up. Yes. So, if we could go to the next slide, please, Liz.

Okay, so we've already talked about this. The practical difficulty has not been defined. And I said, well, I'm sure there's gonna be some litigation around this. If we could go to the next one, Liz.

So here's the answer to your question, Cheryl. Use variances. So previously, a bylaw had to explicitly allow a zoning board to grant a use variance. And if you didn't explicitly allow it, use variances could not be given out.

Now, if you have a use variance bylaw, such as Milton does, probably there will be no effective change. But for those communities that did not previously allow use variances, they are now allowed to grant a use variance for residential uses. So I think your two-family example, if the two-family was no longer a use allowed in that zoning district and someone wanted to reestablish, a H2 family and putting aside the fact that Milton does allow a use variance, yes, someone could now seek a use variance just for that residential purpose.

Speaker 13 (51:38–51:46)

And under these new standards, the ZPA could think about that under the residential.

Speaker 2 (51:46–51:51)

Practical difficulty standard, yes. And weighing the public benefits.

Speaker 5 (51:59–53:09)

practitioner looking at a particular piece of property is, okay, what's the end use? What are we trying to accomplish? And what I'm trying to accomplish is plan A. Plan B sits in the background as chapter 40B, which blows away everything into its own.

Is this some sort of an effort to soften the variant standards to make plan A possible, which is a better alternative to plan B? I mean, I've got three. big 40 cities in this town that started as plan A and were blown out of the water before they really got understood. And if you look back now, you'd say, why didn't we build this or this or this?

How did six stories happen in East Milton? That was four stories. I'm just wondering if maybe that's some of the thinking behind why softening variance standards is appropriate, because now it becomes more of a negotiation between the town, neighbors, developer, property owner.

Speaker 2 (53:10–53:11)

That's an interesting point.

Speaker 13 (53:12–53:18)

Which is the way Boston has done things for a long time, is most of them are negotiated. Right?

Speaker 6 (53:19–53:51)

I think it's a really valid point. And I think what's also behind it, again, is we've been hearing from the state for years now, there's a housing crisis. We need to increase our housing stock. We need to increase opportunities for housing.

So I think relaxation of the use variance standard, or even just the variance standard in general, I think they're hoping to spur more housing production. Yes, heavy sighs.

Speaker 4 (53:52–54:35)

When will they decide we're not in a housing crisis? Because if you watch the market, There's a lot, you know, especially when there are not a lot of international students coming to Boston. You know, look in Savan Hill, Mission Hill, there's a lot of apartments that are available. Look in Quincy.

A lot of available. So when will it be determined? And then the other thing is, what happens to those people who, you know, might have spent a lot of money on their houses? Do they really want to see a decrease in the value of their home?

Most of us, you know, our greatest asset is our properties.

Speaker 6 (54:36–54:36)

Absolutely.

Speaker 4 (54:37–54:41)

And so do we really want to see the market crash?

Speaker 6 (54:42–56:09)

Well, to answer to your first question, I have no idea when the housing crisis will be in the rearview mirror, if I'll even live to see that be the case. To answer to your other question, one of the things that we were asked to weigh in on with respect to some of the pending legislation is, you know, a duplex for everyone. And one of the, we were, my colleague and I got an email from the Mass Municipal Poll Association, their legislative liaison, who literally said, I've got 30 minutes before we go back into, you know, some sort of a meeting. Can you provide me with your initial comments on You know, how do you feel about a duplex for everyone?

I said, well, first of all, we're going to hear about, you know, there goes the neighborhood, because, you know, you're going to have this, you know, urbanization of communities that are very protective of their properties and wanted to perhaps get away from living in a, you know, and I mean, I've lived in Somerville and Cambridge, so I mean, absolutely no disrespect, but I go to a lot of hearings where people say, you're turning us into Somerville. Well, it feels like that to some communities. So, um,

Speaker 4 (56:10–56:17)

And isn't Cambridge rethinking? They passed a very aggressive zoning. And they're rethinking.

Speaker 2 (56:17–56:20)

Well, that's under attack right now. Yep, it's on litigation.

Speaker 4 (56:20–56:51)

Yes, yeah. But it's even recently on the news. And even, what was it, Lexington dialed back their MBTA zoning because they overzoned and they didn't realize everyone was going to take advantage of it. And then also on, will it ever become easier to get a variance than a special permit for property owners?

Speaker 6 (56:51–56:58)

There might be some right now who feel that it now is easier. And I think it sort of goes to the earlier question.

Speaker 2 (56:58–57:00)

I mean, as a property owner with a business, I feel like it's easier.

Speaker 6 (57:00–57:01)

I think it's a very similar analysis.

Speaker 2 (57:01–57:57)

Yeah. I think it's just more, you have to take more care with drafting your opinions. A friend of mine who's a litigator did a panel the other day, I watched, and she said that in her sense, in the olden days, like in May, if you had an appeal of a variance nine times out of 10, the town would win. Yes.

99% of the time. And so you would be advising your client, don't even bother wasting your time, because the variance is going to be upheld. Now, with this change, we have to be much more careful, I think, about how we are drafting our decisions to show that we did weigh all the factors that we are supposed to be weighing, and not just the three things, the soil. And the financial hardship used to say substantial financial hardship, but now it's just financial hardship.

It doesn't have to be substantial anymore. So I think you have to have much more discussion in your decisions about why you reached the conclusion you did.

Speaker 13 (57:58–59:34)

And I think it's going to be harder to defend them. You know, in situations like Boston, where the zoning was often just a baseline and things are negotiated, it meant that the price that people were paying for a piece of property was speculative based on what they thought they could get approved. And they oftentimes go into the community and say, well, this is what I need in order to make this project work. Well, yes, because this is what you offered to pay for the property.

So I would hope that this isn't the sort of thing that's set up here where, you know, that kind of financial factor is what you have to consider. Because to me, the whole point is your zoning kind of sets your use, which sets the value, right? So it shouldn't be so speculative. But in this case, it looks like it can be speculative because the variance may allow for it to be.

I'm talking about maybe heights or, you know, maybe units in a multifamily district, because now we have multifamily districts, we have overlay districts anyway. So, you know, some, I've often wondered why haven't we received an application under the is someone going to come in now and say, well, you know, that doesn't really work. I need a variance to make it work. And now, what are your standards for deciding that when we have a whole bunch of work that went into that overlay?

So, I don't know. It just, to me, seems like that financial piece could easily be, you know, Malleable, I guess, is the way I'd say it.

Speaker 8 (59:34–59:49)

I think that's the significance of the self-created language, actually, and probably the best example. But I think you could read that to be much more extensive, like, you know, you created this problem because, you know, you never did get out of your mess.

Speaker 2 (59:49–59:53)

Well, there's one example that somebody was using where the guy cars up the lot.

Speaker 8 (59:53–59:56)

That's a good example, but I think yours is a good example.

Speaker 2 (59:56–01:00:02)

Carves up a lot and then says, oh, I need a variance for this. And it's like, Bozo, you did this. Right, you did this.

Speaker 9 (01:00:02–01:02:26)

Well, I mean, we as a board have seen cases through the years where someone has come and, without checking the zoning requirements, has bought a massive prefabricated home and is stuck now with that home. And we've denied the relief that they required to site that home. Well, to me, you created that issue. We've had other cases where people have done things, they've gone ahead and put on a non-conforming structure or made a non-conforming change to the property and have now come and We don't want to be in a position as a board to reward bad behavior, particularly if it's bad behavior that results in something that is detrimental to the zoning bylaw.

That's where it's helpful. Yeah, that's where it's helpful. To your point concerning the financial impact of it, Financial impact, it's always there. I mean, it's always lurking in the background, and to suggest that it isn't is just not living in the real world.

We have to deal with that. Looking at this from a builder's point of view, I see this language as really an attempt to prevent cities and towns, from a developer's point of view, from moving the goal line. So that's why I see a lot of the freezes and the extensions. A lot of this stuff probably comes from real-world experiences.

And whoever was arguing for it was able to bring a particular case to whomever. And this is the type of stuff that we want to work against. To your point, Kathleen, we're going to have to craft the decisions. much more carefully.

It kind of reminds me of how we would have to craft the ADU decisions under the old ADU bylaw, where you'd have to go through each one of the requirements and lay out chapter verse how it met or did not meet the specific requirements. So the decisions are going to be longer and perhaps more nuanced.

Speaker 6 (01:02:26–01:03:32)

And I think what we might also start to see with variance decisions that are lacking some of that analysis, that just kind of reaches a conclusion, you know, variance, whether it's approved or denied. You know, we've seen a number of cases with respect to special permits where a bylaw might outline, you know, half a dozen findings or considerations, criteria that the board is supposed to apply. And for one reason or another, the board maybe considers one or maybe just kind of give some sort of like garbled explanation and then just reaches a decision and he gets appealed and you go to court and the court's like Well, how exactly did the board apply the bylaw? Like how am I supposed to make sense out of this?

And often the court will say, look, I'm remanding this back to the board and you're going to tell your board to go through all six criteria of your bylaw and we want them to make findings and issue a new decision. I could see that happening with the new variance standard as well.

Speaker 2 (01:03:33–01:03:45)

Yeah. I mean, that's happening under the old variance standard, but yes. That's what I told the planners on Friday. They have to talk to their boards and make sure that they're including in there.

Speaker 9 (01:03:45–01:04:14)

Right. That's a good point that sweeping the judiciary, the Supreme Court's case in Volpe, decision in Volpe right, kind of sets that up in terms of the judiciary not deferring to administrative agencies interpreting statutes in a way that prevents or alleging that they're interpreting statutes in a way that alleges the court from reinterpreting the statute.

Speaker 6 (01:04:17–01:04:34)

Of course, here with local zoning, there's always great deference that's given to the local board, who is supposed to be uniquely qualified to understand you know, the characteristics of their neighborhood or how- It's supposed to be. That's right, you are. Right here.

Speaker 2 (01:04:34–01:04:47)

We always say in our decisions that we are familiar with the neighborhood. Yes, you are familiar with the neighborhood, yes. It's a standard line. Can we go to the next one, please, Liz?

Speaker 8 (01:04:47–01:04:54)

Marion, I took out the word generally in the 39, Brothingham. I said we are familiar with the neighborhood.

Speaker 6 (01:04:55–01:07:45)

One other aftermath of the legislature revising Section 10 is previously there was very explicit language that said that the Zoning Board could impose conditions. on variances. That's been completely deleted. So again, the folks on the planners listserv, we can't condition variances anymore.

I don't subscribe to that point of view. I can certainly see that there might be a situation out there where a condition is imposed and the variance gets you know, the decision gets challenged and we'll see, again, how does the court look at this. But there's certainly, you know, those of us who look at some of the case law that talks about, look, if you have the authority to issue a permit, you also have the authority to impose reasonable conditions with that permit. And I will give you an example.

Very early in July, right after the new law took effect. I happen to be the zoning board. Hearing and I was there for a 40 be but they had a variance on for that evening. And they saw me standing in the back of the room, Carolyn, come on up to the table, tell us about this new standard.

Great, I think it was July 10th. I'm literally reading the statute as the hearing is going on. And the whole purpose behind the variance, they were looking for a variance to create an undersized lot, because they were going to subdivide a larger lot. And the lot already had a single family house on it.

And the zoning board said, well, we understand we can't condition the variance anymore. But we do want to condition the variance on the fact that it is conditioned upon the applicant subdividing the lot because otherwise they could wind up with, you know, two principal uses on one lot, which is not allowed under their zoning. And that's not what the variance was for. And I flat out said, you know what, under that circumstance, I think it's a defensible decision that you can impose that condition.

The applicant, of course, was completely amenable to that condition because… What else are you going to do? What else are you going to do? Exactly.

This is what you have represented you are going to do. And all we're saying is, sure, we'll give you the relief you've requested, provided you do what you say you've represented. There was no appeal, obviously, in that situation. But I suppose the appeal will come at some point in time.

But I'm not telling zoning boards not to impose conditions.

Speaker 7 (01:07:46–01:07:57)

Can it be framed as the application itself? The variance is based on the application. The application proposes X, Y, and Z, including, and that can be. Right.

Speaker 6 (01:07:57–01:08:36)

So that was one of the things that internally we talked about as maybe one of the ways around it is when you're making your findings, the applicant has applied for, the applicant has represented that the intent of this is. And that we're sort of tying our conditions but into the findings section of the decision. And then ultimately, you know, granting the variance subject to the findings contained herein. You know, again, I'm not going to say don't do that.

The day will come and we'll see how the court wants to interpret that.

Speaker 9 (01:08:36–01:08:39)

So not only are we familiar with the neighborhoods.

Speaker 6 (01:08:39–01:08:41)

You are very familiar with the neighborhoods.

Speaker 9 (01:08:41–01:09:05)

We've always included in our decisions that, as part of the conditions section, that the relief is predicated upon the plans, drawings, basically the materials presented at the hearing. Are we taking a risk by continuing to include that standard condition? It doesn't sound like we are.

Speaker 6 (01:09:06–01:09:36)

I don't think it is. I really don't. Because of course your decision is based on the plan submitted. You know, we aren't sitting there, you know, close your eyes and imagine a world where this lot might have a structure built on it that might, you know, encroach this way.

No. You're looking at the plans and you're saying, okay, so you need a front yard setback variance. You need a frontage variance. Whatever it is.

And we always tie those decisions back to the plans.

Speaker 9 (01:09:36–01:09:40)

That's the reason why we list the plans.

Speaker 6 (01:09:43–01:10:35)

In my opinion, that isn't… conditioning the variance. That is the application, quite frankly. And it might be amended in the process, but that's still fine.

I think the conditioning of the variance is more like things like, and lights shall go out, you know, one half hour after the business closes and can't be on one half hour, any earlier than a half hour before, you know, the business opens or something like that, conditions like that. But I would still say, go ahead and do it. Or if you can get the applicant to say, the applicant has agreed that they will shut their lights off between these hours, then great. Put it into the findings.

And then we are granting this decision based on everything that we have reiterated herein.

Speaker 7 (01:10:37–01:10:49)

And that's actually the way it usually works. Right. Those things get worked out in the course before you get to the actual decision of the board's final decision. Right.

Planning board.

Speaker 5 (01:10:49–01:10:56)

Right. An applicant ought not to expect anything other than the ability to do what they represented they were going to do.

Speaker 6 (01:10:57–01:10:57)

Exactly.

Speaker 5 (01:10:57–01:10:59)

Why would they be allowed to do something different?

Speaker 6 (01:10:59–01:11:00)

Exactly.

Speaker 5 (01:11:01–01:11:03)

Or they've created a self-inflicted funeral.

Speaker 9 (01:11:03–01:11:04)

There you go.

Speaker 6 (01:11:04–01:11:06)

Self-created hardship.

Speaker 2 (01:11:08–01:11:09)

Practical difficulties.

Speaker 6 (01:11:09–01:12:26)

All right. Can we go to the next one, please, Liz? So I talked a little bit about this earlier. So variance used to be in effect for a period of one year, and you could extend it once for six months.

Now a variance is good for two years. And that two years excludes the time necessary to pursue other permits and entitlements. And it excludes the time to await the determination of an appeal. And the zoning board can also extend variances for two years because if the appeal period or the time to get all of your other permits isn't enough time for you, you can now extend it for another two years.

That's fair. I think that was pretty straightforward, so I think we could go to the next one, Liz. So these, as we were talking about earlier, these are just a couple of sections of the bylaw that, as I went through it with these changes in mind, I think we're going to have to take a look at the language and consider some adjustments for the Springtown meeting. But we don't have to go into any detail this evening.

Speaker 8 (01:12:26–01:13:00)

On this, I think this, I know you wanted to move on, but I have a thought on this. The issue of these non-conformities comes up all the time. It lives in three different places of the bylaw. It'd be nice to live in one.

And it's always like a little bit differently stated. So we've taken, it comes up so often with the board. We've got this pretty much standard language now, which is good. But it would just be really, if we're going to get into this, Article 4, it would be helpful to fix that.

Speaker 6 (01:13:00–01:14:34)

I was going to say, so as a little side quest here, so the planning board has charged me with going through the zoning bylaw and putting a diagnostic report together, identifying Some areas of improvement, and I would agree with you that those are things that should absolutely be sort of consolidated because, you know, especially since we're still new, relatively new to Milton that every time I get a question, you know, mostly from, say, the building department. I go to your zoning bylaw and I'll do a search, you know, and, and I forget, I think we were talking about parking and how many cars are allowed to be parked, you know, in a single family residential district at one point. So do a search for park, parking, cars, vehicles, nothing's coming up. And eventually, you know, the next day, I think we found it embedded somewhere, but It should be easier.

You should be able to say, all right, well, if I've got this use, how many parking spaces do I need to provide? And I know you were talking about nonconformities. It's the same thing. Why is it in?

three or four different locations. And why is it just a little bit different? And I think the reality is it's the beauty of how the sausage is made. You know, everything was adopted at different times or drafted by different people.

And, you know, no criticism meant that is just the way it is. It evolves.

Speaker 2 (01:14:37–01:14:50)

It's now a beautiful, lengthy, I think what,

Speaker 6 (01:14:50–01:14:54)

10-page sign bylaw.

Speaker 8 (01:14:54–01:15:00)

I wouldn't comment on it other than if we're looking at it, let's fix it. That's all.

Speaker 6 (01:15:00–01:15:15)

Yes. Yes. Absolutely agree. This was just the specific areas that 48 is definitely impacting now.

So we'll have to revisit those in particular. But if we could go to the next slide, please.

Speaker 11 (01:15:16–01:15:23)

There's language about pre-existing non-conforming signs in the new sound bylaw.

Speaker 6 (01:15:23–01:18:47)

Yes, yes. So one of the things I was asked to talk about too is just some of the things, not just the changes to 40A that were adopted as part of the budget. but some other things that are on the horizon. And as I was putting those other slides in, I said, well, I'm gonna take advantage of this to also talk about something that is already in effect.

That is this new consolidated local permitting for small clean energy facilities. So the legislature, this is part of a 2024 Climate Act. But as of October 1st of 2026, municipalities were now required to accept these applications. It's been analogized to a comprehensive permit under 40B, and it sort of is, but sort of isn't a perfect comparison.

I will say one thing that is similar to both is You know, when 40B came in, it clearly changed the whole permitting process for multifamily housing and affordable housing. But cities and towns did not rush out to adopt a 40B bylaw. We just recognized, oh, when one comes in, we're going to have to reach out to refresh ourselves as to what does statute or the regulations apply and how do we, you know, what are the deadlines, how is this all different from you know, conventional zoning, so to speak. If you think about it in that same way, consolidated local permitting is sort of the same in that we don't have to adopt any zoning changes to comply with the new permitting process, but you need to be aware that there is a new permitting process.

So right now, small clean energy facilities are identified by the legislature's wind, solar, battery energy storage systems, and aerobic digestion facilities. But they also leave open the possibility of other technologies that might become available. There are thresholds. So it depends on whether you're a generation facility, a transmission distribution facility, or you're a storage facility.

So I've included what those thresholds are. And if you are considered a small facility, meaning you meet these megawatt hours or storage capacity thresholds, those smaller facilities can still be permitted at the local level. Anything above those thresholds, however, will now be permitted by the Energy Facility Siting Board. So what's the local government representative?

So the local government representative is defined as your chief administrative officer or designee. So it's the town administrator or whoever the town administrator chooses to designate. And the way this process now works is

Speaker 5 (01:18:49–01:18:51)

It'll be Liz.

Speaker 6 (01:18:51–01:25:38)

It'll be Liz. And sadly. I successfully dodged it today. Sadly, in most communities, it is kind of defaulting to Liz and planning directors or similar titles.

So right now, if you've got an application for a solar project or a wind project or whatever, if you have an existing solar or wind bylaw, the applicant has the choice Do they want to come in and apply under your local bylaw and go through the normal process? I'll call it the conventional process. Or do they now want to invoke the consolidated local permitting process? If they choose the consolidated local permitting process, There is a Department of Energy has developed an online application for this.

There is a process for pre-application municipal meetings where a developer has to come in and meet with all of your local stakeholders. So your zoning board representative, planning board, conservation, police, fire, whoever you can think of, and they're supposed to identify what are all the possible permits that might be required to put in, say, this battery energy storage system installation. Could be a variance, could be an order of conditions, could be site plan approval, there could be an earth removal permit, could be a stormwater permit, a land alteration permit, you know, there could be a lot of permits that get identified. Through this consolidated local permitting, they submit one application.

It is supposed to contain all of the components that the individual permits would require. The local government representative is the lucky person who gets to review that application. They have to make sure that the applicant has completed all of the pre-application prerequisites. and have to certify that a complete application has been submitted.

And from the moment that application is deemed complete, everyone has 12 months to issue their individual permits. no extensions can be granted. So really when you get down to it, you should be banking on something more like 11 and a half months from when that application is deemed complete because we all know it snows in New England or we you know, things happen where you don't want to be in a position where if at 12 months, if that date comes, there are no, there's no room for extensions. So if we have not issued the consolidated local permit within that 12-month period, it is deemed approved.

And it is deemed approved subject to common conditions that the Department of Energy Resources has been very busy developing. Um… I've done probably three different presentations in conjunction with DOER on this process in the last eight or nine months. I could do a presentation that would last at least an hour just talking about this and I've condensed it all to like one slide.

Really all I wanted to hit upon here was be aware, just be aware. One of the things, if the applicant chooses the consolidated local permitting process, If there is an appeal, that appeal goes to the EFSB. There is no longer an appeal to court or to DEP. So even though the Conservation Commission is still going to issue its own permit, and even though ZBA and Planning Board might issue their own permits, and we're all used to having that standard language at the bottom of our decisions that advises an applicant of the appeal process, That's got to be removed because what you're now going to do is you're going to forward your individual permits to the local government representative who basically is going to slap what I call like a cover sheet on it and submit that.

That becomes the consolidated local permit. A copy of that also goes into EFSB. There's a lot more to this in terms what they call a site suitability score for certain types of projects. And an applicant has to literally sort of like using DOER's guidance grade their project.

And for example, like reuse of a brownfield site is more advantageous than I'm going to cut down 16 acres of forest as we just saw happen in Petersham. Yeah. They come up with a number. That number is related to the minimization and mitigation conditions that the state has also decided to set up as a framework.

So we're not going to get quite as much, you know, we were talking earlier about the city of Boston sort of being able to negotiate your way to a permit. You can still do that, but going to be a lot of state oversight with respect to it. If any one individual board denies their individual permit, the consolidated local permit is deemed denied. That doesn't mean, for example, if the zoning board is the first to issue a denial on the variance, that doesn't mean that everybody else, you know, put your pens down and don't worry.

you should still complete the permitting process to the end, because more likely than not, it's going to be appealed to the EFSB. And, again, if we're analogizing this process to 4EB, we all know how well municipalities fare at the Housing Appeals Committee. I don't expect the Energy Facilities Siting Board to Be sympathetic to municipalities in all instances. So you want to make sure that if there were things that, you know, conditions that your board would have wanted to impose upon the permit, you want to make sure that those are all documented in the record and not just cast aside.

Speaker 5 (01:25:40–01:26:00)

Did I have a question? Sure. Go ahead, Doug. So just a quick question.

Under the 40B process, wetlands is out of it, right? There's an appeal that goes to DEP. Right, right. In this case, if there were order of conditions or were denied an order of conditions, the appeal goes to the EFSB.

Speaker 6 (01:26:00–01:26:14)

Correct. Correct. Right. They're going to take everything, even a stormwater permit or anything you could think of.

except for curb cuts or more ministerial permits as they call them.

Speaker 8 (01:26:14–01:27:09)

So the local government representative in the small example is more like a quarterback and the adjudicatory bodies are still going to have the hearings that Eversource is going to have to present or whomever. Exactly. I think a real threat to the town that probably deserves conversation is the grant of location process. Because I think Eversource is probably thinking that that's also a permit, but it's really not a permit, because it's dealt with in a different statute.

I could see that being a big deal in this town and a real threat. I don't know how many they're planning that come through Milton, but that just brings in a whole bunch of other things that these facilities aren't in Milton, they're going through Milton. And they're using Milton's rights away, so they could supersede that process. That could be a big deal.

Sorry. I don't want to get you all nervous.

Speaker 14 (01:27:10–01:27:16)

We have this on our list. Don't we, Liz, for drafting some zoning around this?

Speaker 8 (01:27:16–01:27:43)

We've added this. The grant of locations I think could be a big deal here. So there's not a lot you can be able to do with that because of the way the state law is set up and there's going to be a real bias. to the energy companies, kind of like housing, because basically it's the same argument.

We need more energy, because everything's going to be electric. And they're out there in force. Right. So this is going to take up a lot of oxygen.

Speaker 6 (01:27:43–01:27:44)

Yes, it absolutely is.

Speaker 13 (01:27:46–01:28:08)

So this is a protected use, like a Dover Amendment use, in terms of where it can go? I'm just thinking like a solar field or a battery storage. I mean, those are structures, right? It's not something that's a underground or et cetera.

I mean, we're talking about something that's cited on a piece of property. Right, right. And those are grant, I mean, those are protected uses, right? So they can go anywhere?

Speaker 6 (01:28:09–01:29:02)

Solar and, and I know that there are certain attorneys in the field who would like to tell you, yes, they are absolutely protected under the Dover Amendment. They're in 40A section three, but they are not given the same level of protection. as a church or an educational use. If you want to call it Dover with a lowercase d.

I can point to a particular attorney in a particular law firm that would walk in here and tell you, oh, yeah, they're absolutely protected. But anyhow, this is just to sort of put on your radar as something to be aware of in the event that an application comes in. I don't want you to be caught completely off guard.

Speaker 13 (01:29:02–01:29:16)

But to that point, just not to belabor this, but a bylaw which establishes some setbacks, for example, is something we should work on. Because if an application comes in and we have nothing in place, then what is it being judged against?

Speaker 6 (01:29:16–01:30:28)

So I spent a lot of time on Monday drafting the portions of the diagnostic report about solar battery energy storage systems and clean energy facilities, saying exactly that you should be you still get to govern. what zoning districts these locations should be in, if there should be a minimum lot size, certainly setbacks. You know, people want larger setbacks for these things, so screening, fencing, decommissioning, surety bonds, battery energy storage systems. A lot of people complain about noise.

Solar, we've got thermal raceway. We probably want to make sure that they're not using PFAS and their fire suppression systems. You probably want greater setbacks from any public water supply. These are all things that, yes, this we can still do, because regardless of whether or not an applicant comes in under this consolidated permitting process, you still want to have your underlying solar or battery energy storage system bylaw for someone who might come in and say, I want to do it conventionally.

Speaker 8 (01:30:29–01:31:23)

It's less random than you think, right? I think it probably would help to have some smart people in the planning department thinking about this, because where these people want to be, they want to be close to the grid. And they want to be on big sites where they don't bother people too. So it's less random than it looks like on the slide.

And you could probably target your activity in those areas where they would most likely want to be. because they're not going to randomly put an energy facility in a place where they can't tie into the grid easily. And then, I don't know, there's a big one in Dorchester going on right now, which is enormous. I just don't have any sense of the extent to which they're looking to either site in Milton or use Milton for these facilities.

But it's a big deal and it's worthy. It's great that you brought it up because I think it's a good thing to raise awareness about.

Speaker 6 (01:31:23–01:34:56)

And so earlier when we were talking about the extension of the period of time that a variance is in effect, and I said, wait till we get to small clean energy. So I've had multiple conversations with the folks at DOER over the last year about what this really means to us. And as they were drafting regulations and, you know, we were given the opportunity to weigh in and say, this doesn't work. on a local level.

Some of our suggestions they took to heart. Some, you know, they didn't, you know, but at least, you know, we felt like we were heard in some way. And one of the issues that we raised was, okay, you only have 12 months to complete the process. I said, but back up for a moment.

I said, a variance is only good for a year. you know, site plan review might be good, you know, two, three years. An order of conditions is good for three years. So, what happens, you know, you could very easily get to the end of this 12-month period.

Your variance is likely going to be the first thing that gets granted just because it's a shorter timeframe. You've only got 100 days from when you, you know, to issue that decision. So, it's going to be the earlier one versus, you know, CONCOM. or a special permit might drag out for a while, but you could easily see yourself getting to the end of that 12 months, and maybe you've only got four months remaining on that variance.

And you still have to, you know, you still can't stick a shovel in the ground or whatever. I said, your variance is going to then expire, and they're going to have to come back for new variance. And I said, so answer this question for me. Are they then going to come back to renew that variance through the consolidated local permitting process, or do they now go to the Zoning Board of Appeals independently and apply for a variance?

The answer I was given, no, they should just go to the ZBA and ask for a variance. I said, okay, so now continue with me for a moment. You've got the consolidated local permit process here, and it's been appealed by somebody to the Energy Facilities Siting Board. The variance, meanwhile, has expired, so they go back to the ZBA, and now they separately under 40A get their new variance, and now that's appealable under 40A-17.

I said, you are creating this mess. I think that's one of the reasons why we see the changes to the time frame for variance and also adding in that language that it's told for the amount of time it takes to get all of the permits necessary. I'm not going to say I take responsibility for that, but I think I could see my comments when I read that and said, well, I guess that's one way to fix it, isn't it? So something else that's also, as you all know, for those of you who maybe have done early mail-in voting or have heard some of this coming up in November 3rd's ballot, Is ballot question number seven, you know, citizens initiative that would make it statewide that if you've got a lot that has 50 feet of frontage and a 5,000 square foot lot area, and provided it is accessible to public water and sewer, that it could automatically be used for construction of a single family house.

Speaker 2 (01:34:57–01:35:22)

Yeah, so that's an interesting question because I'm seeing in the last one that the town may still regulate height setbacks and parking in open space and whether you can use it as a short-term rental. So how does that, if you can automatically get you know, you're supposed to automatically be able to construct a house. How are you, how's the town then going to be able to condition that?

Speaker 7 (01:35:22–01:35:32)

I think it works that way now with pre-existing. Right, with like the ones that… The town can still say, yeah, you can build a house in the lot, but you'd have to meet this at that point.

Speaker 2 (01:35:32–01:35:37)

But you're still going to, so this assumes that every town is going to pass zoning that…

Speaker 6 (01:35:37–01:35:54)

It's still going to be a 5,000-square-foot lot in a residentially zoned district, so whether it's Residence A, B, whatever, and you've got your dimensional requirements associated with each of those zoning districts now, those are still going to apply.

Speaker 2 (01:35:55–01:35:59)

Right, but I don't think we have anything that prohibits short-term rental.

Speaker 6 (01:36:00–01:36:06)

That would be something you would have to add in if you wanted to do that. I'm just saying, you should add that to the list.

Speaker 2 (01:36:06–01:36:07)

Right.

Speaker 5 (01:36:07–01:36:08)

We don't allow B&B.

Speaker 2 (01:36:10–01:36:12)

Well, we have Air B&Bs all over town.

Speaker 4 (01:36:13–01:36:14)

We don't not allow it.

Speaker 3 (01:36:14–01:36:17)

We don't allow them, but it's not written.

Speaker 7 (01:36:17–01:36:20)

We didn't write a permit process for them.

Speaker 13 (01:36:20–01:36:30)

So I have a question on the second house. This isn't where you're subdividing the property or it is? Can you build two houses on one parcel based on this?

Speaker 6 (01:36:31–01:36:32)

Yeah.

Speaker 13 (01:36:32–01:36:33)

So you're subdividing the parcel.

Speaker 4 (01:36:34–01:36:34)

Okay.

Speaker 2 (01:36:35–01:36:44)

Or it exists, and maybe has been rendered non-buildable under your zoning bylaw. I mean, my lot's 50 feet of frontage and 5,000 square feet, my house.

Speaker 7 (01:36:44–01:36:52)

And these could be created lots, couldn't they? That's the real threat. The threat isn't the existing lots, it's the created lots.

Speaker 5 (01:36:52–01:36:55)

You have 11,000 square feet.

Speaker 6 (01:36:55–01:36:57)

And now you can get two lots out of it.

Speaker 4 (01:36:58–01:37:23)

Or have like up in my neighborhood, we have 150 foot frontage. Oh, yeah, it's very good 40 40,000. So but we are on septic, however, so it costs about $50,000 to do a new septic. So if all the neighbors got together and then brought sewer down the street, then we would then be able to

Speaker 6 (01:37:23–01:37:24)

Right.

Speaker 4 (01:37:25–01:37:40)

That's the town doing it, not the neighborhood. Right, the town. Yeah, but the town would charge the neighborhood. But it would be, you know, if there's 100 houses and each neighbor is already spending $50,000.

Speaker 7 (01:37:41–01:37:47)

It becomes much more affordable. It becomes, yeah. But that's why those sewers lines haven't been extended so far.

Speaker 4 (01:37:48–01:37:48)

Yeah.

Speaker 6 (01:37:49–01:38:15)

Maybe they will. So we shall see. So the next slide is just hitting some of the highlights from the economic development bill. if we could go to that.

I won't go through all of this, but essentially we had a House version, we had a Senate version, now it's been referred to a conference committee. If we could go to the next slide, please.

Speaker 2 (01:38:16–01:38:37)

It's my understanding that the reason it's been sitting in conference is not over the zoning provisions, but over the liquor licenses. I have heard that as well. There hasn't been any discussion that I've seen anywhere where the issue before the general court in the conference session is the zoning. Everybody's signed off on that.

Speaker 9 (01:38:38–01:39:45)

Every single office committee is sitting. The typical end of the session on the old rules was July 31st, and there were multiple conference committees appointed. Nothing has been done to any of the conference committees. Nothing is likely to be done to any of the conference committees until after the election.

I think that we will see a very busy December. Now, the other thing with the conference committee report you have to realize is that just because something is in conference doesn't mean it's going to come out of conference. So there's a possibility that they can hold certain provisions in conference and they'll never see the light of day. Because a conference committee report is not amendable on the floor.

It's straight up and down low. And I've been doing stuff on Beacon Hill for over 25 years. I've never seen a conference committee report rejected.

Speaker 13 (01:39:45–01:39:50)

So from reading this, there's some significant differences between the House and the Senate versions, right?

Speaker 9 (01:39:51–01:39:57)

Yes. That's called Tuesday. There are always significant differences.

Speaker 13 (01:39:57–01:40:07)

Okay, so then based on your experience, will these survive? The differences all get pulled in together? Yours is as good as mine.

Speaker 9 (01:40:08–01:40:16)

Conference committee proceedings are behind closed doors. You only know what people want you to know.

Speaker 6 (01:40:16–01:41:46)

Yeah. But to that point, we did include a couple of slides just sort of highlighting some of the differences between the two. The House is including a further Permit Extension Act. You may recall some months back, folks were talking about yes to God in my backyard, allowing religious institutions to convert surplus property and multifamily housing.

I can tell you that that is one of the draft pieces of legislation that a colleague and I looked at and just said, God, there was so, I'm sorry, I shouldn't say God. There was so much wrong with it, you know, that the goals were commendable, you know, increased affordability. They never once mentioned that any of these units would actually count towards the subsidized housing inventory. So why on earth would we want to agree to something like this?

I think God in Your Backyard did not make it into the Senate version of the bill. Some of those voices, you know, that surround the conference committee that whisper to us have indicated that God in My Backyard is not something we are going to see, but probably something we will see in the future when they can finally tweak it so that it makes some sense. And the house.

Speaker 2 (01:41:46–01:41:56)

I mean, we already have the example of doing that in the city of Boston. I represented the archdiocese office of housing. And so there is an existing zoning ways for that to happen. You don't need to have this.

Speaker 6 (01:41:56–01:46:24)

You certainly don't. And actually, we did a we did a 40 B for another, like rectory. Yeah, I've done three of them. So yeah.

The house bill also includes mandatory training for special permit granting authorities. And what I've been told is it is similar to the open meeting law training, you know, here's your piece of paper. Here's the summary of the law. Now, please go take, you know, your You know, are you just supposed to sign off that you've received it?

Or is it going to be like the ethics commission training where you can just sit there and just say, A, oh, that wasn't right. B, oh, that wasn't right. C, oh, that, oh, D, I went, you know, just do that for 15 minutes. It's not really clear what will come of that.

If we can go to the next slide, please, Liz. In the Senate, you know, the permanent option on hybrid meetings, I think that's something we are likely going to see happen as long as there's still sort of an in-person option because there are still a number of communities mostly out in the western part of the state where they just don't have good, reliable broadband and it really is a problem for them. Requiring hearings to be open within 30 days of the application and closed within 60 days. I think that is incredibly optimistic on the Senate's part, but that's in their bill.

The next one, removing ADUs from being limited just to single family districts and basically being allowed an ADU can go in any district. I think that is something we are going to see. you know, adult entertainment districts making it clear that they have to be within 500 square feet, or they cannot be within 500 square feet of an academic research or medical facility. I think that should be 500 feet now that you actually, after I read it out loud, yeah, 500 square feet, that makes no sense.

And you know, we, a lot of communities have a similar requirement now. that there be some further setbacks from especially from schools. And then duplexes in every district is something that is being discussed. If we can go to the next slide, please, Liz.

So this is a common for conditions that are in both the House and the Senate version. Statewide site plan review. I'm not going to read that whole slide to you just to let you know that these are, you know, some of the things that is, I think this is likely to come out of the conference if they ever do submit a conference report. You obviously have a site plan review bylaw.

There are still a number of communities that do not, and so this would standardize site plan review for them. It says at the top that for municipalities that have site plan review, this would not take effect until one year after. You'd have like a one-year grace period. That seems to suggest to me that the idea being, well, I'll give you time to bring your site plan review bylaws in line with what the state decides should be the parameters, but we'll wait and see is all we can really do with this to see what this ultimately looks like.

If we could go to the next slide, I think this is pretty much it. Commercial conversion, I mentioned this a little bit earlier. One of the provisions that's common to both the House and Senate version would be to allow commercial properties to be reused for multifamily or mixed-use, you know, residential, again, to increase residential options. And coming up with a streamlined process to allow this to happen.

Speaker 13 (01:46:24–01:46:25)

No matter the zoning district?

Speaker 6 (01:46:26–01:46:28)

Correct. Correct.

Speaker 9 (01:46:29–01:46:32)

Is there a place of all on the Boise side, including conservation?

Speaker 6 (01:46:32–01:47:03)

That's, again, they're proposing a process similar to the 40B process to allow that. So yes, the zoning board. But not the state. Right.

I would imagine that's exactly how it would operate. Yep. If that's the way it gets reported out. And I think, do we have one more, Liz?

Maybe? That's it? Nope, that is it.

Speaker 5 (01:47:03–01:47:05)

So those are…

Speaker 6 (01:47:05–01:47:15)

So the longer the shorter it is, there's going to be a lot of litigation in the next couple of years. And we'll let you know how this all settles out.

Speaker 5 (01:47:15–01:47:49)

A couple of quick questions related to our process. And Jay, maybe this is helpful. One is, do we need denial letters in order to appeal for variance for a special permit to the Board of Appeals? council and council knows what the requirements are, should you be able to file your application for variance without going through the process of having the building department issue a…

Denial letter.

Speaker 6 (01:47:49–01:47:51)

A denial letter to get you there.

Speaker 5 (01:47:52–01:48:07)

In the past, we did file directly. Directly with the board. And it became a new standard that requires, and I've got four, that are pending that you guys don't have time to get to.

Speaker 7 (01:48:07–01:48:12)

It's not even a regulation, it's a local practice, right? I think it could be.

Speaker 6 (01:48:12–01:48:14)

I think to be honest you could do either.

Speaker 5 (01:48:14–01:48:44)

I understand the reason if it's pro se, someone comes in as an application like 350 Blue Hill Avenue and They don't know what they need, right? They don't know what they need, and so they get denied. But if I'm representing somebody and I know, maybe the court could ask you to confirm the relief that I determined is necessary, but do that in the interim of the hearing.

Speaker 6 (01:48:46–01:49:03)

So unless you lay out the process in the bylaw, which you don't need to do. I think someone can apply directly to the zoning board or directly to the planning board if they know what permits they have.

Speaker 5 (01:49:03–01:49:21)

There is no review by the building department with respect to site plan approval or special permits that are authorized under specific zoning provisions, you know, overlay, just file and go right to the planning board. Right.

Speaker 6 (01:49:21–01:50:14)

The only caution I would say, you know, if somebody clearly needs a variance, they're applying for special permit, yes, they don't need to go to the building department first for someone to confirm, yes, you need to go get this relief from that board. The only thing I will say is that every once in a while, someone will just apply directly to the board for, and I'll just use a variance for an example. You know, they're applying for a variance from they think it's a, you know, a setback variance. And when you look at it, they didn't quite identify all of the relief they needed.

And if there had been somebody with a little bit more of a trained eye to look at it and say, well, you actually need a variance from, you know, three provisions. Thank you.

Speaker 9 (01:50:14–01:50:20)

We've come up with situations even with a trained eye where

Speaker 8 (01:50:22–01:50:26)

Well, not exactly.

Speaker 9 (01:50:26–01:51:02)

It's just not that specific. Yes, it may not. Where, okay, you applied for a variance, but after looking at the application board, reviewing it, we decided that it's not really a variance that is required. It's a special permit, or vice versa.

And then there's always debate about whether appropriate notice has been given. Right. So that's always a little bit of a concern and sometimes it can complicate the hearing or may even require that the hearing be re-noticed. Right.

Speaker 7 (01:51:02–01:51:07)

But the notice is the Board of Appeals. It's not the building department.

Speaker 2 (01:51:07–01:51:19)

Right, right. No, but if you had that sort of situation and you're sitting there and hearing like Frank is saying, all of a sudden you realize this person didn't ask for everything they needed. They needed a special permit.

Speaker 6 (01:51:19–01:51:22)

Not a variance. The advertisement was for variance.

Speaker 9 (01:51:22–01:51:26)

And they asked for the wrong thing.

Speaker 3 (01:51:26–01:51:29)

Can we say variance slash special permit?

Speaker 6 (01:51:29–01:54:08)

So there are some communities not far from here that I can tell you they advertise everything as an application for a variant special permit finding or any other zoning relief that may be necessary. And then they go on to describe to put a 500 square foot addition on to blah, blah, blah. Is it perfect? No.

I mean, if we, I haven't quite seen any cases that say, that knock something out because you didn't necessarily identify all of the sections of the zoning by-law under which, you know, the zoning relief is necessary. You know, if you put enough out there to let folks know an addition is being put on at this particular address, and this is roughly a good description of it, I think you're going to be okay. One of the thoughts I also had is that, and this is just my own personal pet peeve, people come in and say, it's pre-existing non-conforming. to which I would always say, so says you.

Prove it to me. Where is the history that shows me that this existed and then a bylaw change was created and then rendered it nonconforming? Just because something has been there for 25 or 30 years doesn't mean it's preexisting nonconforming. or folks don't necessarily understand if something was originally granted by a variance.

They'll say it's pre-existing non-conforming. No, it's not. It's lawfully existing. It's pre-existing non-conforming, so now I need a special permit to be able to alter it.

No, you can't alter something granted by a variance. via a special permit. So a lot of folks are not going to understand if they go directly to the planning board or the zoning board, they're not going to get some of those nuances. And I'm not saying that every homeowner, for example, has to go out and hire the local land use council to represent them.

But, so maybe it's, maybe it's. It makes life easier. It really does when somebody actually says, no, this is how it works in Milton. But it happens.

Speaker 7 (01:54:08–01:55:04)

So that's, that's just a, that's one narrow example. that Ned provided, that you don't want to wait so long. You're really very sure what really is required, and I think the answer you've given us is go ahead and apply. I mean, you know, I guess you could say it's at your risk.

It's also at your risk when you get a denial letter, especially, I mean, if you're an attorney representing somebody, you need to look at all of those things that you just described, whether or not the denial letter lists them, because Theoretically, in reality, the Board of Appeals can then say at the hearing, this should have been a variance, not a special permit or whatever. It doesn't matter what the denial letter says. That doesn't protect you. But I did like that answer because I think there are some instances where it really makes sense to go ahead and just file.

And there are also certain factual circumstances that really call for doing it that way anyway. And I know I've done it a few times, so I've always checked with the building.

Speaker 5 (01:55:04–01:55:16)

I would also agree with what that other town does, which is to be as broad as possible with respect to the notice, because the purpose of the notice is simply notice. It's a notice that there's something happening next door.

Speaker 2 (01:55:16–01:55:27)

And if you care, show up Tuesday night at 7 o'clock. Well, it's like when you draft warrants for town meetings. Same thing. You're drafting the notice that something's going to happen.

Something's happening.

Speaker 6 (01:55:27–01:55:42)

It might be this, or it might morph a little bit along the way. I've made a note. I see a hand raised. Yeah, I don't know if Ken.

Ken, do you have a question or is the hand just still raised from before?

Speaker 12 (01:55:43–01:57:29)

No, I actually, I just wanted to comment. I don't know if you, if anybody knows, my background, I was the building commissioner in the town of Dedham for 19 years before I retired back in the end of 2025. And in Dedham, We didn't issue denial letters. We would do a review sometimes.

Someone came in, we would review it, we would go over what we thought would be the relief required. But we always left it as it was the burden of the applicant to apply for whatever relief needed. uh, to the board. And we that, you know, if they'r relief is needed, um, tha know, counsel or other o Um, because again, from t at least in Denham, where I came from, you know, we always left it on the applicant to meet those priorities to the board and to seek that relief.

I think, you know, the promise tonight kind of alleviates that to some degree. It's good to have the building department you know, review it, but also, you know, it may be equally, you know, beneficial, especially with all the changes that are being made now under the Zoning Act, that, you know, that the applicant, you know, be more responsible for, you know, filing an accurate application with the appropriate brief, whether that's prepared by a legal counselor or by themselves.

Speaker 2 (01:57:31–01:57:33)

That's all I wanted to say.

Speaker 5 (01:57:34–01:57:45)

Great. Thank you. I'm going to call Michael tomorrow and tell him to ignore the three things that I just uploaded.

Speaker 3 (01:57:46–01:57:52)

I mean, I guess my question is, is council going to catch it all? I don't, you know.

Speaker 2 (01:57:53–01:57:54)

But that's their problem.

Speaker 5 (01:57:54–01:57:55)

That's our issue.

Speaker 3 (01:57:55–01:58:04)

That's not the town's. So when it comes back to us, we're going to review it and say, well, you missed this or you missed that.

Speaker 5 (01:58:06–01:58:08)

I suppose. No, I mean.

Speaker 7 (01:58:09–01:59:09)

I mean, well, if there's zoning relief grant, we get the zoning relief. That's it. But if you find a different issue that really. That's what I mean.

Yeah, sure. But in general, the problem we're having and have always had it really is it just takes too long. You know, it takes too long to file that preliminary application and get the decision. In some cases, it just doesn't seem necessary.

depending on what the case is all about. So that's an interesting answer and thought, and everybody should just talk about it in the building department. It's always possible that you get a denial letter that says, or you get a response that says you don't need zoning relief, and this has happened a couple of times. You start doing your building And then you're told, you do need zoning relief.

I mean, all kinds of things can happen. And then you have to go back to the Board of Appeals if that's the decision by the building department. So I just, I think I would say, try to think of ways that we can make the process more efficient, because it's a horribly burdensome.

Speaker 3 (01:59:09–01:59:12)

But we're always going to be reviewing the zoning.

Speaker 7 (01:59:13–01:59:15)

Yeah, you will. For every project.

Speaker 3 (01:59:15–01:59:15)

You have to.

Speaker 7 (01:59:16–01:59:26)

You will. But when you've already had a Board of Appeals decision, and all of these things have been explained in detail. Yeah, I mean, it's like you said right there, hopefully.

Speaker 2 (01:59:26–01:59:44)

Well, it's like when Liz does those checklists for the review of the comprehensive permits. I mean, they didn't get a denial letter from you. They filed for a comprehensive permit directly. So it's the same sort of process, just sort of not as involved, clearly.

But the same idea. And it would save a bucket load of time.

Speaker 7 (01:59:44–02:00:10)

So I think people do go to the building department with their plans. They have to talk to you at the desk and you look at them in a preliminary fashion and you might say. It certainly looks to me like you're going to need some zoning relief. And now the next step is they find somebody or they do it themselves.

They file the preliminary permit online. They have to wait. And it can be quite a wait, 30 days or more. Everything goes into a queue.

That's where it's getting kind of gummed up. And I'm not blaming anybody for it.

Speaker 5 (02:00:10–02:01:18)

No, no. I mean, that's the process. And part of it is there isn't anybody in any seat other than you. that's been here for more than a year and a half in every department.

So getting anything through a queue that has any complexity and I've got clients that are clamoring at me, why, why, why, why, why, why? This is pretty simple. Why can't we, well, it's, you know, so and so. So would you present it to us, Ned, first before you?

I would be happy to present it to you, but at the same time, I would be preparing to file. Right, I have a I have my brief, I'd have. I mean, it's not just here's the plan. Here's the zoning table.

What do you think, which is what I'm already filing. It would be the justification for the variance and everything and it would be ready to file and go.

Speaker 3 (02:01:18–02:01:20)

So where does our interpretation come into this?

Speaker 5 (02:01:21–02:01:33)

The interpretation is that for a period of time that the denial letter is the ticket to entry to the variance process.

Speaker 10 (02:01:33–02:01:33)

Correct.

Speaker 5 (02:01:33–02:02:24)

And I don't think that ticket is needed. I got not to have to go. It's there for someone who doesn't understand the process. Mary and I know it.

We look at it. I've worked with the engineer and the designer. We go through the plans. We spend a lot of time with them reiterating plans, making sure they've accounted for.

all the things that are needed so that when we're filing, we're pretty confident that we've got a complete application. It gets amended if possible during the process, but having to file those plans and then wait the process for Michael to issue a denial letter which can take six weeks, eight weeks, 10 weeks.

Speaker 3 (02:02:24–02:02:51)

It just… I mean, I think to defend our department, an application will be put in, but we don't get all the information. And would it be any different with you? I don't know.

Yes. I think so. We're waiting for plans. We're waiting for a survey plot plan.

What's the average grade? What's the height of the finished first floor? Et cetera, et cetera.

Speaker 5 (02:02:51–02:03:21)

If you get a building permit application, and you are reviewing that to determine whether or not you can issue a building permit, you need all that information. And when you get it, if you've determined that you need, well, you need a variance because the first floor elevation is 4.3 feet, and that makes the basement a story, so now it's three and a half stories, now two and a half stories, now you need a variance, understood.

Speaker 2 (02:03:23–02:03:33)

But you don't need a formal letter to say that. You've seen it and you've said, OK, fine, I've looked at this and it needs some input.

Speaker 5 (02:03:33–02:03:54)

I've got something that's ready and I've got OK, I've got three that I filed and permit eyes, which I think I've already filed drafts of denial with them. I mean, I could come in. Tuesday morning and. walk right through each of those things in five minutes, you could tell me whether you agree or not.

And then I know that I can file.

Speaker 6 (02:03:55–02:04:57)

So I have two thoughts, you know, that you can do with what you will. One is you asked, well, when do you then, or when does your department then get to weigh in on the relief requested? You can always do a staff report, you know, to the zoning board, you know, look at the application. I agree.

I disagree. I've identified something else that perhaps was was missing. Or some communities do have a pre-application meeting requirement, where it wouldn't just be, say, the building department, but it might be building, planning, zoning administrator, somebody like that, and they would look and kind of troubleshoot and identify, oh, well, don't forget about this. You're going to need this as well.

That might, nothing's going to be foolproof, unfortunately, but it might help to identify for folks who are representing themselves a permit that maybe they haven't thought about.

Speaker 3 (02:05:01–02:05:06)

Like many of them, we have architects who are aware.

Speaker 5 (02:05:06–02:05:34)

My thought, bottom line, is make it more efficient and easier for you guys. Keep moving, keep moving. Everything else. You get everything else.

ADUs. ADUs and memory care and you know, you get all of that and you get a simple variance application where someone who's representing somebody knows it.

Speaker 3 (02:05:34–02:05:36)

I agree, you know, it's a simple setback.

Speaker 5 (02:05:37–02:05:46)

Yeah, and you just want to get it filed because, you know. Exactly. You build a garage and you have to, you want the garage to be built before the snow flies.

Speaker 4 (02:05:48–02:06:25)

And it would make your life a little easier for all the other regular people who just go in. For instance, my husband went in today for a roof permit. He got it? He's like, I didn't get it.

They want me to have a contract. And it was his mother. And his mother died in May. And he's like, now I have to go.

He goes, what am I going to do? And he's like, it's just a simple garage roof. So I'm like, I defended your department. I said they're so busy, give them a break.

Speaker 3 (02:06:25–02:06:28)

You're looking at circumstances, your circumstances.

Speaker 4 (02:06:28–02:06:39)

And then he said, oh, it's going to be a three week. And they told me that I can't jump the line because everybody else is ahead of them. And he goes, I just want to do a roof. I just need a building permit.

Speaker 3 (02:06:40–02:06:49)

You're talking to the people out front. Yeah, that's who he was talking to. And I think, yes, he needs a contract. That's what they're going to say.

Speaker 13 (02:06:49–02:07:12)

So one of the things I want to hopefully make you aware of, if you're not already, because Carolyn mentioned it earlier, this codification. I have been absolutely adamant about getting done. I've been trying to advocate for it for years, because it will save you time, too. It will save them time.

It will save us time. It will save her time. It will save everyone time.

Speaker 3 (02:07:12–02:07:16)

Will it, will all these parties be able to review it before it goes in?

Speaker 7 (02:07:16–02:07:23)

What do you mean? Yes, that's the plan. Well, I mean, we already have a. No, they're going to recognize.

I understand. You mean improvements and edits to the.

Speaker 13 (02:07:24–02:07:31)

Yes. Yes. Having dimension of standard chart, you know, like a table of uses. We're not changing.

Speaker 7 (02:07:31–02:07:45)

Definitions that are consistent instead of one section and one section. I just thought, you know, we do have a, we have a code now, but it's the old bylaw. Yeah, and it's a mess. And it's only made it clearer why it's so difficult to deal with.

Speaker 10 (02:07:46–02:07:50)

I know it's a full employment thing for you two guys, but it drives me nuts.

Speaker 7 (02:07:50–02:07:55)

I can't find it. And half of those drafts were to make it more difficult, not easier.

Speaker 5 (02:07:55–02:08:01)

Every time you take one and add five pages, Alex decided you need to get to seven pages. Then the next one had to get to 10 pages.

Speaker 7 (02:08:01–02:08:16)

There are different things going on during different eras. Yes, zoning is often written to be protective and whatever. That's why it's hard to go back and make it work well.

Speaker 14 (02:08:16–02:09:17)

That's their charge. That's great. I'm glad you're looking at it. This has been great.

This has been such a good conversation to have. One of the things I would like for everyone to put on the radar and maybe have a future discussion via Liz and Carolyn in the building department is in our enforcement. What we hear a lot is we create all these zonings, zoning bylaws, regulations, but they're not enforced. So there was an example of someone who paved over their entire backyard with a full parking lot striped lights.

And it was a previous someone in the building department said, Oh, that's fine for right now because when the development project next to you, which was taking up a lot of parking is finished, then you can just tear it out. And I'm not sure how if everybody knows about it. It was reported to the building department. They were doing work inside without any building permits.

Speaker 3 (02:09:18–02:09:26)

And all of that was corrected. Okay, the real lot realize still If you only park, I believe it was five cars back there.

Speaker 14 (02:09:27–02:09:35)

That was it. You can pave your backyard. Right. But there's only supposed to be five parking spots.

Correct.

Speaker 3 (02:09:35–02:09:40)

They went ahead and did it without a sanction from us or zoning.

Speaker 14 (02:09:41–02:09:45)

What was it, the lot coverage? Wouldn't that have prevented them? It's a single family home.

Speaker 3 (02:09:45–02:09:52)

The lot coverage does not come into play unless there's an accessory structure on the lot. That's the way we interpret it.

Speaker 14 (02:09:53–02:09:54)

And that's just one example that I'm.

Speaker 4 (02:09:54–02:10:05)

Yeah, there's the trees at 7-Eleven in El Favre. Taken down right up. I was just there on Sunday at the. Yeah, but we're not having a meeting.

Speaker 14 (02:10:05–02:10:21)

It's not a meeting. I do want, if we could discuss enforcement officers and things that were, you know, we learned when we were doing our assigned review bylaw that were prohibited that we're still happening. We need to let people go home.

Speaker 2 (02:10:22–02:10:45)

Agreed. We'd like to say thank you very, very much. Thank you. Thank you very much for the slides.

It was very, very helpful. And I hope that people watching from home. But thanks very much.

Speaker 1 (02:10:45–02:10:47)

Thank you, folks.