Board: Milton School Committee
Date: 2024-07-16
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:54–02:47)
Good evening, everybody. And thanks for attending this evening's Milton School Committee meeting. We are meeting on Tuesday, July 16th, our first fully remote meeting in quite some time. It's great to see you all.
Thanks for making time to be here. We're gonna go ahead and call the meeting to order. We do have a quorum and we're expecting a couple more of our members to hopefully join shortly. So the first step for us this evening will just be to approve our agenda for tonight, July 16th, 2024.
Does anybody know of any changes to the agenda? All right. So seeing none, we can go ahead and approve that agenda and transition straight into our first agenda item, which as usual is citizen speak our public comment portion of the meeting. So during this part of the meeting, we set aside up to 15 minutes for members of the community to join us and share some comments, perspectives with us.
We welcome residents to speak for up to three minutes. At a time, we just ask people to introduce themselves and if you're approaching your three minute time limit, I will let you know. If you would like to speak during this citizen speak, can you please raise your hand electronically and we'll be able to go in the order that we see those hands raised.
Speaker 2 (02:48–02:53)
I'm promoting Michael McCarty.
Speaker 1 (02:53–03:04)
Okay, great. Thanks, Glenn. Michael, are you there?
Speaker 3 (03:04–03:05)
Oh, yes.
Speaker 1 (03:06–03:07)
Hey, thanks. Thanks for joining us.
Speaker 3 (03:08–06:29)
Thank you. So I just wanted to say hello, Michael McCarthy. I am a resident from 22 Hollis Street. I am a town meeting member, a Milton Townie, which seems to be a accolade that people throw in.
So I'll throw that in there. And I am a father of three. So I The reason I wanted to join today was really just to respectively urge this committee to make public your stance on the school building project and whether or not it should move forward on this November's ballot. As you probably know, there has been an effort.
There is a growing group of residents in Milton made up primarily of parents of young school children who have been trying to push this project forward. We've been intimately involved in this project, attending school building committee meetings, select board meetings, even school committee meetings. And we feel based on what we've been watching, based on what we've heard from, you know, folks in town who were around in the last school renovation project 20 something years ago, is that November is gonna give this project the best chance of moving forward. And so I'm asking this group, I know that you are leaders in this town, you're leaders clearly when it comes to education in Milton to make your stance known to the public, whether or not you support this moving forward as a debt exclusion on the November ballot.
We know that there's a daunting task ahead of you, right? There's likely a, An operational override coming next year, now this debt exclusion, it's a lot to bite off for any town. But this project's been going on for more than half a decade. I really feel the time is now and would like this body to really help us and let Milton vote on this.
Just let Milton vote on this. It's been held up for too long and let's see if the residents are behind this or not. And I can give you, you know, my promise and anyone I've really spoken to is fully behind helping with the operational override next year when that happens. But together, if these go in the fall, in the spring, it seems almost clear that they will fail.
Anyone who's been involved with this process now for over five years, folks who were involved in the process 20 years ago at the last school build are telling us, they're urging the town, they're urging the select board Going in the spring will almost certainly doom the operational, or sorry, the debt exclusion and push this back a year, maybe two, who knows how long. Interestingly, those who haven't been intimately involved in this process are now coming out with suggestions and saying that it should go in the spring. And even more curious are those who are publicly opposed to this project and have opposed it for several years are saying that the spring is the best option for passing this. So I just thank all of you and I ask you to please use your position as leaders in this town to help with this project so our children don't have to wait anymore.
Thank you, I appreciate it.
Speaker 2 (06:33–06:48)
Thank you. I'm promoting Peter Obersheimer. OK, thanks.
Speaker 1 (06:48–06:52)
Hi, Peter. Welcome, thanks.
Speaker 4 (06:52–06:54)
Thank you. Am I up?
Speaker 1 (06:55–06:56)
Go for it.
Speaker 4 (06:56–10:15)
Thanks, it boots you out and it lets you back in. Thank you, Chair Carroll, and good evening school committee. My name is Peter Obersheimer, 49 Rose Street. Similarly, I come here on the topic of the new school building.
In my capacity as a resident, as a town meeting member of Precinct 6, and most importantly as a parent. First off, I want to thank you all for your dedication and all that you do for this town through this committee or through your positions with the school. You're trusted leaders on the topic of school. For that reason that I asked you to speak out publicly, support the initiative to place the debt exclusion override in the November ballot so that the town can vote on whether to fund and build a new school.
My concern grows as a parent as I think about the project's timeline. You know as well as anyone, the School Building Committee was established in 2019 to address the overcrowding issues. That was before my son was born. He's now headed to kindergarten, what's going to be one of the largest enrollment classes in decades.
with really no foreseeable end in sight to the project. And frankly, what I am concerned about is risk of derailment. I know there are competing views, as Michael mentioned, around how to best posture this issue in the operational override. A few facts I asked you to consider as you think about how to navigate those two with regard to your own position on the issue.
One, because of the presidential election in November, it's my understanding voter turnout will be the highest at this time, which is a good thing for a school vote. Two, the project costs will only increase if we delay the vote, all while, as you know, the overcrowding issue perpetuates. In other words, November is our best shot within the next few years to get this passed. We always knew this solution would be complex.
And as others have said, of course, there's a motion involved. What concerns me is when we move away from structure and process that we've set up to succeed in this situation. We've had structure and process with the appointment of the school building committee. who the moderator established with professionals to address the issue and conducted the extraordinary diligence that they did to propose a solution that's before us.
We've had structured process around volunteers through parents and other individuals like myself, helping to spread awareness and advocate for this issue, particularly around elections. I've listened, I've not heard similar process or substance behind the suggestion that our children are better off. by putting the next phase on hold for some undefined period. I urge you to consider standing along beside us when we need you during this next crossroad.
It appears the select board is pointing to silence from this committee recently, just on the November issue, to imply you're not in favor of a November vote to support its own inaction. If that is not your position, either individually or collectively, I urge you to make it known as the select board takes this issue up later this month. Thank you for your time and for what you all do.
Speaker 1 (10:17–10:42)
Thank you. All right. There are no other hands raised. If anyone else in attendance would like to participate in citizen speak, can you please raise your hand at this time?
Okay, I don't see any other hands raised. Do you, Glenn?
Speaker 2 (10:46–10:47)
I do not.
Speaker 4 (10:47–10:48)
Okay.
Speaker 1 (10:48–12:03)
So thanks a lot to both of our speakers. And as everyone knows, we don't respond directly to comments shared in CitizenSpeak. However, obviously, the topic that both of our speakers joined to discuss with us are things that we'll be talking about shortly within the meeting when we discuss the school building project. So I will be able to, you know, perhaps respond to questions that they raised if that comes up in the course of our discussion.
before we transition to that, which is obviously the main agenda item for the meeting this evening. We are going to have a short superintendent's report and about a slightly different topic. And Peter, I'm not sure if you have any other updates that you need to share with us before we dive into the school building conversation. Thank you for joining from your important week with your colleagues, other superintendents across Massachusetts.
Thanks for making time to be here. I'll hand it over to you.
Speaker 5 (12:04–14:54)
Great, thank you everyone. So yeah, I am down in Falmouth at the superintendents conference and the summer is going by quickly. Just a short update on the central office, all of our new members, you see Regina and Katie here, so we have welcome them and FA as well onto the team. We met last week, had a great meeting, meeting again next week.
We're really kind of starting to gear up for the retreats that are coming. We have increased the number of retreat days this year from historically we had anywhere from one to two, and now we have five days of preparation, which we really need as we start to plan and really kind of move forward collectively. We're finishing We're still editing our implementation plan. We got a lot of feedback from all of our, uh, our leaders, the 30 CL that CLT group, um, on J 26, then we've taken all that feedback and are reworking that implementation plan.
So we're excited about kind of where that's headed too. Um, it's going quickly and, um, but, but things are, are feeling good. And I think we're starting to see. some of the work that happened over last year.
And as we look to be really intentional and moving forward this year, we see kind of, I can see the kind of the thread from the work we've done over the last year. So that feels good. It makes me feel like we're on track. The other thing just on the report tonight is polling.
And it's something that we're working on trying to get done before the next Election, you all, I think, remember we discussed once, Tucker as a polling place is pretty challenging, especially when school is in session. There are issues of security. There are issues of access for students. It's a small footprint and the voting takes up a large portion of the school.
If we can find if, you know, collectively as a town, if we can find a different location, that's better. So we are. I have, I've been working with Sue Galvin and with Nick. They are going, and I believe they went last week over to Concord Baptist to see if that would be a good location.
I believe it may have been used in the past. And there's, I think, strong support for it from both the organization and, and collectively from the community too. excited to hopefully report back soon with an outcome from that.
Speaker 1 (15:00–16:23)
Thanks, Peter. Um, that's great to hear that update. Thank you for working with Sue and her office around those conversations. I know, I think it may have actually been Parkway Methodist in the past that served as a polling location for those talk precincts um you know definitely understand it's challenging to make a change of that magnitude um but personally really thankful that we're looking into it because we have seen the negative impacts on that one school community in particular of um when there are elections taking place during school which will be the case on the Tuesday after Labor Day with the primary election, the next upcoming election.
I just like to take this opportunity to also thank John Flakes, who's a town meeting member and Tucker parent, who's really helped lead advocacy around this particular concern and raising it to our attention. And just thanks to our colleagues in the town clerk's office who can hopefully help us investigate that new option. Mark, you want to add something?
Speaker 6 (16:24–17:07)
Yeah, no, I appreciate you shouting out John Flakes, just to mention that as well. And I know, again, from my own personal experience being a school administrator with a polling site, it's just really challenging. So, you know, I appreciate that Milton Public Schools, you know, all the schools, I believe, are polling places where the high school is and obviously Cunningham is, Tucker is. And so, you know, I think we do what we can to work with the town to provide those spaces, but Tucker, For all the reasons that are mentioned, I think, and that John Flakes raised in his communication, I think it's great that we are working collaboratively to try and address this and provide them a little breathing room, given how difficult it can become to operate both the things at once.
Speaker 1 (17:16–17:40)
Anyone else have questions or comments around that topic of the polling places? Okay, so will you just keep us updated? Hopefully as we can make progress around those plans, that would be great. Thank you very much.
And is there anything else under your report tonight, Peter?
Speaker 5 (17:40–17:52)
I think I'll wait on the, we've also been working on your end I was going to share a quick update on that, but I think I'll wait until the FY 26 agenda item.
Speaker 1 (17:53–19:06)
That sounds great, thanks. OK, so in that case, we're able to move right into the chair's report and we have one definitely important item to talk about this evening. Thanks, I see Sean O'Rourke is being elevated to join us as a panelist. Really wanna thank you, Sean, for making the time to be here with us this evening to bring us some updates from the School Building Committee.
I'd love to just give you the floor, let you kind of bring us up to speed because it has been at this point several weeks since we've had a formal update, let you share that with us and then Selena and Mark, you know, if, and Peter, of course, if you'd like to like chime in and share anything else from the various meetings that you all have been part of over these past weeks, that would be great. And then that will give us all a good base of information to have the discussion. So Sean, hi, thanks for being here. Is it okay if I hand it over to you?
Speaker 7 (19:07–19:25)
Yeah, that's fine. So just for the record, Shawna Rourke, town meeting member of precinct 8 and chair of the school building committee. Chair Carroll, I have a presentation. I figure the graphics are probably easier to walk through.
So if you don't mind, I'll share my screen.
Speaker 1 (19:25–19:29)
That'd be great. Yes, are you able to do that? Or do we need to change anything?
Speaker 7 (19:31–19:33)
Yeah, I believe so. We'll find out in a second.
Speaker 1 (19:33–19:38)
OK. Great. Thanks. And just let me know.
Speaker 7 (19:38–38:28)
Okay. Yep. And then, you know, as I progress through, if people have questions, feel free to stop and go back. Whatever's needed.
You don't need to wait until the end or anything like that. So, essentially, the way this presentation's broken down, what I wanted to do is kind of walk through the work we've been doing for about the past seven months, you know, as far as creating teams and stuff like that. and let people know the work that's been done that's kind of fed into the design. So what happens is there are essentially visioning sessions that were done.
It was a weird term that started out. I'll talk a little bit about that, show how all that kind of fed into the design of the overall building, which you'll see kind of floor plans and isometrics of. And then, essentially, the design is now feeding into the cost estimation. We'll talk about that.
And then, at the end, obviously, wrap it up with how it aligns with schedule. You know, just for everybody's understanding, you know, there's the makeup school building committee. The five of us at the top were appointed by the town moderator. At the bottom left, there are two representatives of your committee, Dr.
Miranda and Mark Loring. Mark's also vice chair of the committee. The select board, John Cohane has joined us in, I believe he's appointed May 28th. So we appreciate his input.
He's a hers writer. So he does envelope writing of buildings and residential construction. So his inputs can be very valuable. This is one I bring up almost at every meeting.
So this is our enrollment. with the horizontal line in yellow indicating the capacity of the elementary schools. And as you can see, we've been operating essentially a full grade level above the capacity of the buildings for about seven years now. The other thing that plays into this too is, you know, when we mentioned earlier, you know, I've talked about it multiple times, the incoming preschool right now is roughly on the numbers that was provided by Dr.
Burrows is about 369 students right now, and possibly maybe a couple more as we come into the fall, because it's always stragglers. The highest number we had was 372, so only three off from that highest number. The other thing to note, too, at 372, you know, when we had that large class there, that also corresponds to the largest peak that we had in here. I don't think we're going to get back up there, but my concern is With these size of classes, they increase every year.
This year went down because of COVID, but when you look at the year before, 356, as it went up to the next year into first grade, more enrollment happened to 377. It's kind of a continuing trend. So when we see these large numbers at kindergarten, they're equating to these class sizes or strand sizes of all 400 kids that we're starting to see now in the middle school. When I enunciate that concern there, and mainly when we had these bigger classes coming in before we had space to deal with them, there's not a lot of space left over in schools now.
So, you know, more for people's, you know, recap kind of where we're at. This is the existing grade configurations of the schools. Yeah, with the proposal for what we're doing is we're regrading the elementary schools and just kindergarten to 4th grade, bringing up space and in those elementary schools without having to redistrict. Similar for the Pierce, we're taking 3 grade levels in there, reducing it to and then creating this new upper middle school with the pre K that will talk about.
So, you know, kind of quick timeline since last fall. We worked through the fall and the winter, basically developing the team that's been working on this with PMA Consultants as our project manager and Arrow Street Consulting as our design with a number of sub-consultants underneath them. As we wrapped up the contracts with them, executed everything by, you know, kind of mid to late February, we led directly into this visioning, and I'll talk about that a little bit later. As we went through the visioning process that was there, there's some overlap with visioning and design.
And, you know, we've been working on this design now for about four months, really fine tuning everything, getting input and stuff like that. And, you know, as you can see on the timeline, here we are tonight. Another recap here for people, you know, the proposed locations that Kyle Road. Two years ago, we went through and passed the land swap to secure a parcel of land there.
That land swap right now is in its third reading at the statehouse and is, you know, from what we're seeing is on track to get passed by the end of the month. So, you know, all good news that we've got, it's gone through the Senate, a number of committees there. And now it's in the House, kind of on its third reading. After the third reading, it would go back to the Senate for a roll call vote, back to the House for a roll call vote, and then to the governor for signatures.
So that's kind of the process that's going on with that. With the land swap and the parcel that we had, you know, we work with the architect to basically develop what the building layout is going to look like. So using that parcel of land, how are we going to site a building, the parking, and everything on there? One of the components that came up when we reviewed this, we looked at multiple options, but it basically grouped itself into two, and I presented that earlier when we selected the architect.
They had what they called a consolidated strategy, which was a singular building that housed the middle school and preschool together, or a campus strategy where they had two separate buildings. So over that course of the design, we've looked at a number of options. We liked what we saw here as two buildings. And the reason for it, we just felt they gave a little more latitude for the design of the preschool, allowed us to do something differently.
And then potentially sometime in the future, a full day preschool became an option that we wanted to explore. We'd have the opportunity to do it. Whereas if it was integrated into the lower level of the building, to expand it later on was almost impossible. So some additional work that people, um, you know, we've kind of been doing is, you know, for this building, we've been doing subsurface, uh, borings to get, uh, conditions that are going on under the ground, uh, Long Island road.
We poked four holes in the ground to a coring samples. Uh, we coordinated that with the conservation commission, attended a couple of meetings with them to get the approval. And then in addition to those boring analysis that we did there, we also did a soil analysis for any hazardous materials, which we found none. So everything in regards to the boring, the hazmat, was in good shape.
The other one that came up is originally way back when we were doing the land swap. Long Isle Road was a patch of wetland that the Conservation Commission agency by this considered wetlands. We work with BSE Engineering. We did soil sampling with them.
You see the pictures out there. And basically went through the analysis that was there. It's kind of interesting for me to determine they are not wetlands. Even though it's wet soil, it doesn't meet the definition of what a wetland is.
So we're working on a final determination of that with ComComm that's forthcoming. So the visioning sessions, you know, for me, it was, I was trying to think of the best way to describe these, but essentially what you see here is what it was, you know. We got the district leadership team together, put everybody in the room. We had a lot of ideas or pictures of what schools could be.
What is your vision for what you see in this new facility? So it started with, you know, the design team touring the schools, and then we went on a bunch of existing new schools as tours to get an idea on them. The designers also had an initial listening session where they brought the district leadership team together, listened to everybody, what they were saying, and then basically started working these visioning workshops after that. After the visioning workshops, we started going into programmatic workshops where we're taking the parts and pieces, putting them together.
And then basically we wrapped it up with a kind of overall review, and this is what fed into the design. As you can see from the district leadership team, we had everybody there. You know, superintendent was there, principals, early childhood education director, a number of teachers, over 20, special ed, middle school librarian, IT department, and curriculum leaders. So it was a deep roster of individuals from the district that we had.
The other one, as a side-by-side component, as I alluded to, we went on site visits of newly constructed schools. Two middle schools, two preschools. And what you see here is actually the library at the Douglas Gates Preschool. It's very nice.
So the first set of ones that we did was Chapman Middle School, which was in Weymouth. A large middle school that actually won a couple awards for how nice it came out. Very big, very Modern, very nice space. Similarly, we went to the Lester Gates Middle School in Situate, a little bit older in construction, but basically the same, very wide open, very modern, very nice.
The Newton Early Childhood Education Center was the unique one. This was a renovation of an existing elementary school. So they had a building that was empty that they could use and they renovated the entire thing into an early childhood education center housing preschool. The amazing thing with this was the amount of space that they had in there.
Like when you compare and contrast where Milton is right now as opposed to what they have right now too. And then finally, you know, as I mentioned, Douglas Gates preschool. This was similar to the type of building that we're going to be constructing. However, this one was an elementary school with a preschool wing on it, where for us, we're doing the middle school with a separate preschool, but on the campus, so The one I asked you know everybody to go through is I'll forward this link on to everybody.
This is the before video, the walkthrough, the tour of the school that they wanted to get rid of to replace. What you see on the bottom is an image of that tour and at the top is what they ended up with. The image at the bottom is eerily similar to everything we're experiencing in Milton right now. For those of you who are familiar with the interiors of the buildings, that's what it looks like and to see them go from that to what they have today was astounding.
So All this stuff, the visioning tour, the site visits, all this stuff fit into what you're going to see now as far as the design. So there were multiple iterations to this design. So as you're aware, when we first identified the site, we had DRA do an initial study for, hey, can you put a building here housing this many kids? There wasn't a lot of input.
from the district, mainly because we didn't have the funding to have them do as detailed analysis as Arrow Street has done. And when they did that, they had a building of about 120,000 square feet. If you take an SBA and plug the numbers in that we have for a middle school right now, they're at about 111,000 square feet. But it doesn't include some of the things that we have in Milton, namely the world languages and some other exploratories.
And also it doesn't reflect a four-team configuration. So we got into the visioning. The visioning is, again, like I said, throw everything at the wall, see what you like, see what sticks, right? So we did all that, and we came up to a very large building, about 200,000 square feet, 168,000 for the middle school, 33,000 for the pre-K.
And again, this is aspirational. So, you know, we took that as our starting point, knowing we had to refine it. For example, the preschool component here was considering full day preschool. That's why I was at 34,000 square feet at 32,000 So what we did is we worked with the district leadership team and did a revision to that and started looking at right-sizing some of the spaces.
So for classroom sizes, we looked at what the existing middle school has now, made it a little bit bigger, and that basically took the visioning size down to an acceptable size there. There are other refinements that we did there too, but you know, You know, we kind of went through it all. And then finally, we did one last revision. We work with again with the district leadership team to reduce down to 17 from 18.
So we'd have either eighth grade have four or three grade strands, and vice versa on the other end. We also reduce the world languages down. And what we're doing here is right side of this just further refinements for what we're doing. Now, when we looked at that, we wanted to compare it to make sure, you know, we're not, you know, I don't want to use the term stripping it down, but reducing it, that it's not workable.
Because obviously our key thing here is making a building that works in the future, educationally as well as functionally. So what we did is we looked at other MSBA projects that are out there, and they're square foot assignment per student based on enrollment. And as you can see, we're right in line with those. So it gave us back a comfort level that we didn't strip too much down.
Before, we thought we were a little bit high or over. So looking at the middle school now and focusing on that, what you see on the left is a stacked version. It's almost like an exploded view of the building. of all the classrooms and all the spaces, and essentially they're all color-coded.
So we've got a four-level building, and I'll walk us through it. So what you see here is the first floor. It's roughly 58,000 square feet. It consists of the gymnasium, the auditorium, admin, exploratory, STEM tech, and cafeteria.
It lays out quite nicely on the site. We tried to move it as far away from our neighbors north as we possibly could. The second floor that's here is basically where we started introducing classrooms in the media center or library, along with special education. I believe special education is kind of spread out throughout the building, not zoned anywhere.
And then the third and fourth floor are pretty similar at, you know, roughly 22,000 square feet. Again, laying out the teams as it goes up through there. The key thing that I became learning about is when we're hearing of these teams, what it is, it consists of three regular classrooms and a science classroom. It's larger with the prep space on there.
Part of the layouts that we've done here, too, is the classrooms have small group rooms and then shared learning commons that are broken out on here, too. I didn't want to get into that much detail tonight. But essentially, what you're going to have is side-by-side classrooms, a small group room that they can work in, and outside of that, a learnings commons for each team too. So the program space, as we look at it from the middle school, like I said, is about 127,000 square feet.
There are seven teams. One of the main things that came up, too, from the DRA concept that we looked at, which was about 120,000 square feet, it didn't have an auditorium. And right away, that became a key thing for us, knowing that the existing middle school would have an auditorium, and then kids would come to this building and not have an auditorium. We felt it was important to create an auditorium, have that space in there for them.
So we'll jump into the preschool. And preschool is a little bit easier. We've got a two-level structure here, special ed on the first floor with admin in two classrooms. The green hatch that you see right here is basically what's considered a big room or a playroom.
And then on the upper floors, we have some special ed along with more classrooms. Again, it's about 25,000 square feet, and it houses exactly what we have for the preschools right now. So what happened is, you know, all this design fed into, uh, what we, the school building committee went through last night, uh, as far as the feasibility study. And that consisted essentially of a project narrative, you know, describing everything that we're doing there.
Uh, some of the floor plans, some of the stuff that you've seen, uh, that we just presented, um, the borings presented the geotechnical reports. So we can make sure we're designing adequate foundations. Uh, we have narratives for all the architectural MEP structural We have a geotechnical report, again, summarizing all the findings that we had, and then an initial draft traffic report. So all this is feeding into our cost estimator right now, who's working on this currently as we speak.
You know, there's been comments about total project costs. I know that people have concerns with that, and, you know, our goal has always been to be transparent. The total project cost on this is going to be whatever that construction cost comes up with. It's approximately a 30% adder on there for a soft cost, so we can pay the architects, engineers, and OPM, along with FF&E and other essentially design contingency.
You know, expanding on that on a timeline or schedule that we're looking at, you know, we're coming up at the end of July. There's a meeting that I understand will be presenting at Select Board next Tuesday night. Our goal with that is to have this line up for a presidential election in November. And to do that, the Select Board will need to have the ballot question sent to the Secretary of State that I believe we'll have to get certified by the town clerk first.
And then once that's there, we would then work towards a special town meeting, followed by that exclusion there. And then essentially with that, I'll open up to see if there's any questions. And if we could, too, I believe the architect and the OPM are probably in the audience, too, if we could promote them, too, just in case questions come up. It would be Sean Burke and Shanali.
I can't pronounce Shanali's last name.
Speaker 8 (38:29–38:42)
She's going to kill me. Thanks so much, Sean.
Speaker 1 (38:43–38:59)
I do see Sean Burke there, if we can promote him. Before we open up to questions and conversation, Mark or Selena, do you have anything to add?
Speaker 9 (39:05–40:51)
Yeah, I mean, I think one of the things I would say, I would thank Sean or again, for just the ongoing work on this. It's been quite the road. In the team, we've been fortunate to have put together quite a robust team that's been able to go through all the steps of visioning, et cetera, to get us to the feasibility study, which they'll feed to the cost estimates. And I think that's something that It's important to sort of understand and know that all these different steps needed to happen prior to a cost estimate.
We couldn't come up with that out of thin air. We needed to know sort of what the design was going to be. So there's been a lot of work and a lot of thought given to that. And, you know, thinking obviously administration and teachers and principals and everyone involved in the process.
I think we're at a crucial moment right now where we do need to sort of look at this tight schedule that we're in. And, you know, thank you, Sean, for going to the select board and speaking on our behalf of the committee to bring where we are in the process and knowing that, you know, we do sort of need their support. to be able to keep moving forward so that we can maximize all the work and leverage the work that we've done so that we can contain cost as much as possible. The more longer we delay this, the more expensive this project becomes.
And our kids can't continue to wait. So we have to continue with the pace that we're doing. And I just hope that folks, you know, not only the select board, but also our residents in town understand that this has been an involved process to get to a cost estimate. But thank you again for the leadership and I'll turn it to Mark in case he has anything else to say.
Speaker 6 (40:53–42:30)
Very little, because you said many of the things I wanted to say. I'll say for myself, again, also, thank you to Sean. Also, thank you to just all the other committee members, because there's a lot of talent in that group. I really appreciate it.
And the newest member, John Cohane, still getting up to speed fully on everything, but already contributing. And I appreciate him for that. I think the other thing I'd just say as a reminder of folks where we've come here is when we were kind of not this past May time meeting, but the one before when we did the land swap, right, we were looking at a five to seven year kind of construction timeline. And so the team has really put a lot of urgency into this work of getting the funding last fall town meeting in December, bringing on these great professionals like Sean Burke and narrow street and others.
And, you know, we have We are now kind of within a short 16-month window here at a point where we have a project fleshed out enough. And we know in the next week or two that we will have a number with that project. We expect to have the land in hand in the very short term. All of those things that were kind of unknown and up in the air very short while ago we have been able to nail down, and we're now in a place where we can move forward with a vote this fall in order to push along this very urgent process.
So I'm really excited about that. I really appreciate all the time that goes in. The committee's been meeting weekly, essentially, for a few months there, and just appreciate all the volunteers.
Speaker 8 (42:36–42:37)
Thanks, Mark.
Speaker 1 (42:37–43:10)
So let's just open this up to questions. This is our chance to sort of really make sure we understand where we are. I am happy to sort of share some updates from conversations I've been part of and my own opinion around this project, but I'd like to first just make sure everyone has a chance to ask questions.
Speaker 10 (43:16–43:46)
Anna, go ahead. Okay. Thank you all for this presentation. I've been kind of out of the loop, so it was nice to see all of it kind of come together.
It looks great. I did have a few questions. First of all, Sean, you mentioned that there might be possibility of expanding the pre-K program into a full day. Is that something that you would kind of add on to the building above?
Because I noticed there wasn't much space in the area that we're working with.
Speaker 7 (43:48–45:02)
Yeah, let me just pull it back up and show you kind of what the process looks like. So the building that you see here in yellow, the intent is, it's hard to see right here, but I can send it along separately, but boxing out this area here as future expansion. So the intent would be make it like an L-shaped building to expand it out. But, you know, part of it is that's not what we're pricing right now.
That's not what we're building. That's the better way of putting it. But what I, you know, similar to, you know, when I first came on to this project, you know, over five years ago, my whole thing was, you know, can we expand the existing buildings? You know, can we do, you know, is there a shadow space that we can do it?
And it wasn't there. So, you know, for me, as part of this project, knowing that after we do this, there's gonna be no more land in town. I know I keep saying that, but I'm just trying to make this work that in the future, you know, if the federal government subsidizes the universal pre-K and we decide to do it as a town, we can expand this building to accommodate it. That's one of the goals I've been working towards on it.
Speaker 10 (45:03–45:54)
Okay, that's great. Um, no, that's really good to know. So the other thing I wanted to know, I know you guys did a feasibility study. Is that something that's going to be available for you and see, especially like I know there's always concerns about traffic and construction and all that good stuff.
So I think that might be something worth putting out there if it's, you know, if it is if you've already collected that data. So might be worth putting that out sooner than later. The other question I had, I know we talked about. So if this goes through for the November ballot and gets passed, are we still looking at the the start date of September 2027?
Is that still our goal? Okay. Okay. Yes.
Okay.
Speaker 7 (45:54–46:45)
Yeah, I think you can elaborate on that a little bit. So, you know, we met with the cost estimator earlier to kind of review the feasibility study. One of the things he asked about is, you know, in his estimate, what the construction durations would look like of start times and stuff like that to lay out what would be escalation. So, you know, based on what we're looking, ideally, we'd like to start as soon as possible.
So, essentially, the initial first package would be a site package, realign Guile Road, clear the site to be ready for a building. So, we don't have to design the entire building to wait for that. And it's kind of like a staged deployment of construction in order to do this as efficiently and as quickly as possible. But, yeah, September 2027.
Assuming that we're still voted this November successfully, yes, that's our plan.
Speaker 4 (46:46–46:46)
Okay.
Speaker 10 (46:47–47:09)
And then lastly, I know Amanda has a question, so I will keep this brief. My other question is, I know we're trying to get costs kind of done in the next two weeks. And sometimes when we're trying to rush through stuff, you know, we might not have exact numbers. How are we kind of, you know, planning for any overages that happen once we get into construction?
Speaker 7 (47:10–47:47)
Yeah, so 1st is reassure everybody. We're not rushing. I mean, we, like, this, this project has been. you know, thoroughly thought out for a long time.
And I mean, we brought the professionals on. I'll let Sean touch upon, you know, we carry a design contingency as part of the estimate that's there. And that's basically used to cover. So essentially you have a large contingency at the beginning of the project.
As you start refining it, you pull into that contingency to make sure you don't go through any overages. And Sean, you can feel free to chime in some more on that one.
Speaker 11 (47:47–48:16)
Yeah, that's correct. We will have, not only will have design and construction contingencies, we'll also have escalation contingencies to deal with the rising cost of construction as the project timeline goes on. So that's all built into our estimate and our total project budget. So there are buffers in there to ensure that we stay within that, the budget, and we just continue to hold to a number.
Once we set a number, we set a budget for the project, the goal would be to stay under that budget and not go back for more money.
Speaker 10 (48:17–48:21)
Okay. And it will also include the 30% for self costs as well, right?
Speaker 11 (48:21–48:25)
Correct. They would be the entire project budget is what we would be approving.
Speaker 10 (48:25–48:26)
Okay, great. Thank you.
Speaker 7 (48:27–49:06)
Yep. And one of one of the nice things with that is having that project budget, you know, basically gives us guardrails for the design. You know, as I mentioned, the visioning session, there was no financial constraints on there, like throw everything there and see what comes out. That's where we had to kind of pull it back a little bit, knowing that we couldn't build the 200,000 square foot building.
And one of the nice things with this is once we have a published budget that's out there, we're held to that. So we'll be doing that. Your comment on the feasibility study, what we're waiting for is they have the cost estimate there with it. And then once the final cost estimate is done, we're going to package it all up and have it out there published so people can absorb it.
Speaker 8 (49:12–49:14)
Thank you. Thanks.
Speaker 12 (49:15–50:28)
All right, Amanda, go ahead. Thanks. I echo what Anna said. I think it's great how many stakeholders you guys had involved to really inform the project.
I think that obviously it was needed, but it's not always done. So I appreciate that. I have just a few questions. One is actually a follow up along a similar line of Anna.
So I know that there's talk about the way you were looking at the pre-K would be if it was extended day. I just am curious if there was any feedback. I don't know, do we have a waiting list for people to get into the preschool right now, currently? Because I know that there are peer students and then the typical kids and then other kids are going to other programs.
So do we find that it's a program that more people would want to subscribe to if they're enrolling, if there's the space right now? Do you know? I guess I'm just wondering if we're building it to the size that we have, are we missing an opportunity right now to address need that's there? But if it's not, then it's not.
Speaker 7 (50:30–50:34)
Yeah. Yeah, I was going to pass it to Peter or Glenn.
Speaker 5 (50:35–51:34)
I was just going to jump in here. Yeah, so we have both full day and half day. And we have programs that students are on and IEP are within those programs. So for the half day programming, we are at about the right place right now in terms of our size.
There was some concern when we were talking this past year about going over to Curry that we wouldn't be able to fill the half day slots. So the half day is not as much of a, it's not as desirous as a full day. We do have a full day program at Tucker that fills up quickly and there's a lottery to get into that. So if we built, if we decided to scale Pre-K, we could, we could certainly fill full day programming.
The question would be, how are we funding it?
Speaker 12 (51:37–51:52)
Okay. All right, that's helpful. Thank you. Could you give it, what's, how big is Pierce?
I'm just trying to get a sense comparatively, square footage.
Speaker 7 (51:53–52:05)
Yeah, so the existing pierce, that was one of the measuring sticks that we used as we were looking at 200,000 square feet during visioning. The existing pierce is roughly a little over 150,000 square feet.
Speaker 12 (52:06–52:39)
Okay. And then the final thing is, I know that in the past you had talked about doing something that was almost almost like a tax implication or a, you know, cost implication, residents may know that this differs if it's an override versus a debt exclusion. So are you guys looking at something along those lines to have as part of the presentation or to share with with people so that they know the impact?
Speaker 7 (52:41–55:00)
Yep. Yep. So, so part of the feeder, so the visioning feeds into the design, the design feeds into the cost estimates process. When we get that number is going to feed into that next phase.
So, along that timeline, you know, our hope is we would be lined up for the November ballot and basically use the time between now in November. to educate people on everything that's going on. The first part of that would be cost and the tax implications on the residential tax impact for people. I know member Musto for the select board was asking that it be broken down by $100,000 blocks, not at median home price and let somebody figure out that way.
So that's our plan. There is legislation that's in the state right now outside of the land swap that's there that is also going to play into that tax impact. Um, it allows you for bonding to spread it over. Typically right now it's a 30 year duration.
Uh, this would allow municipalities to spread it over a 40 year duration and basically lower that impact too. Um, it, it, it wouldn't stop us if it's not there. For example, if it passed next year, uh, we can reissue that debt. Uh, if it was tied right now to a 30, we could reissue it almost like a rewriting your mortgage to a 40 year one.
Um, The other thing that plays into, too, is the tax impact when you talk about it. The difference between a debt exclusion for a capital improvement project and a operational override are two totally different things. And it's important for people to pay attention to them. An operational override, and we talked about that in the spring, is immediate.
So once it's passed, your taxes go up. A debt exclusion vote that would happen there The tax impact of that is spread out as we issue the debt as construction goes on. So it's something that once it is, if we pass it in November, our taxes are not going to go up in December, not until we start issuing the debt later on during construction, that building school. that you'd start seeing the tax impacts of those.
So essentially, they would ramp up over time. But when we do those tax impacts for it, it would just give that flat number or the ceiling number, your highest level that you would see at some later point down the road. Hope that helps.
Speaker 12 (55:01–55:01)
Yeah, thanks.
Speaker 6 (55:05–55:47)
Just to quickly jump in on the question Amanda asked, I know from a tax calculator standpoint, that was something that the Assistant Town Administrator, Nick Connors, was working on. I don't know, Sean, if you've heard anything more from. from him or not, but again, as I brought this and updated to a previous school committee meeting, I know the town finance team and the town team is aware of that desire for folks at the tax calculator. And that is something that they are working on.
So that's not something that the school building committee itself would create, but the town office would. And again, Sean, if you have an update on that, great. Otherwise I can reach back out and try and get that for that committee.
Speaker 7 (55:47–56:16)
Yeah, no real update as far as what the tax impact would be, but I know they're waiting our number to kind of feed that in and for the operational override. So I think the hope would be if you were voting on this in November, you would understand what the tax impact would be for the debt exclusion, along with what potentially is coming in the spring for that. So that when voters are asked to make that decision, they would have both impacts there for them to review.
Speaker 1 (56:23–56:28)
Bow, since you haven't gotten to ask questions yet, we'll let you go ahead and then back to Anna.
Speaker 13 (56:29–57:28)
Thank you. I have a couple of questions. The first one is, how many students can we fit into the upper middle school? Like with the student projection that we have right now, because we already have the students in our school systems, and imagining everyone's going to go up within our Milton public school system, then how many students are going to be able to fit within this building?
Is the cafeteria and auditorium that you mentioned in the plan going to fit all the students and the staff and teachers? Because that's usually a problem with buildings is that we project it into a lower number and then once those buildings finish building and everybody trying to come into the town and there will be increasing numbers of enrollment and the auditorium and cafeterias usually have a problem with hosting all the students at once. So I'm just curious to know if this is already taken into consideration.
Speaker 7 (57:29–59:24)
Yeah, so the short answer it is. So again, going back like five years, you know, when I started on this part of the question was, you know, similar what you're saying, you're building these new schools, did you build them enough to have the expansion to absorb, you know, people want to come? One of the nice things for us is the town doing this project outside of MSBA's guidelines. It gives us the opportunity to build that in right now.
So if we were to go with MSBA, they would tell us what that enrollment number is, and then we'd have to design to that. And if we wanted to expand on that, we wouldn't be reimbursed for it and essentially would dilute the reimbursement. Um, so the answer to your question is, you know, we did, um, the, the, the enrollment number is 670 that we're planning on for the upper middle school. Um, we believe in Sean, correct me if I'm wrong, because I know you were deep in the numbers on that, but it was like 30 or 40 kids over what we have now, or was it more than that?
Yep. So what happens is, you know, we, we did that to allow it to expand to that point. And then what we also did is looked at. utilization of the classrooms.
That's part of the fine tuning that we did there for average class sizes that we're going to have. And even at that 670 number average class sizes were smaller. So essentially, if we looked at it, if the class sizes were to increase, I forget exactly what the class, again, Sean was deeper in those discussions than me, you know, we could accommodate it. So And also we did similar on the pre-K.
So the pre-K, we currently have eight classrooms. We put nine in there right now. So the ninth is kind of a flex room that they have that potentially they could utilize or expand. But the key for us was making sure that we had that ability to expand if we needed.
And it looks like Violet's redoing her audio.
Speaker 8 (59:24–59:37)
So if you need me to repeat that, Violet, just let me know. All right. Oh, are you all set? Or did you have other questions?
Speaker 1 (59:39–59:39)
Or comments?
Speaker 13 (59:41–01:00:01)
I have one more question is that, how is how is this to new building going to affect the staffing? Maybe we definitely going to have need to hire more custodians, lunch a, and perhaps teachers as well. So how is that going to affect our budget for staffing in the future years?
Speaker 7 (01:00:04–01:00:11)
And for that one, I'd kind of ask Dr. Burrows to kind of weigh in a little bit. That did come up during our visioning sessions.
Speaker 5 (01:00:14–01:02:38)
Yeah, so we believe, you know, we don't have a total number, so I don't want to quote a total cost impact because there are decisions that we're going to need to make with peer staff and looking at other programming across the district to determine For example, a teacher right now, a 1.0 teacher at Pierce teaching three grades, does that become, do you split that up exactly, that 1.0 into a 0.66 and then add 0.3? Do you keep some at 1.0 for two grades versus three grades? So there's work that we don't want to do outside of working with staff on some of those decisions. We have talked about, and we know that we need a principal, we need an assistant principal, we're gonna need custodians, we're gonna need an admin assistant or two.
So we expect there to be a staffing increase. I know from talking with other superintendents on building projects locally that going through a similar process and everybody said, you know, there's gonna be no staffing. impacts and then when they got to that point they had all sorts of work that they had to do to essentially move staff around from other buildings to be able to to open that school. So I think we do we do want to recognize that we will need more staff but we will also look to for efficiencies as we make the the shift and look to to share staff across buildings too.
So there's there's definitely some staff would be shared across Pierce and the upper middle school. And then some staff would potentially, there may be one or two that, you know, would work better at one building as opposed to trying to get a point two. And then, you know, you've got all the kind of the pieces of staff which can be challenging to fill. So hopefully that's helpful.
When we get to the point where we need to share a final number, we will kind of go ahead and kind of give a hard and fast number, but we do want to, like I said, engage staff in that conversation too, so it doesn't come out of the blue.
Speaker 13 (01:02:39–01:02:47)
I really appreciate all the answers. Thank you so much for all the hard work that you guys put in the school building committee.
Speaker 8 (01:02:51–01:02:54)
Go ahead, Dana.
Speaker 10 (01:02:54–01:04:15)
I actually, I did have a question, because what you mentioned, Peter, really does, will probably impact our operational override, you know, as we think about what that number ends up being, especially if it's something that we're planning a few years out. And then the other question I had was for Sean, I know you mentioned the difference between the debt exclusion override and a standard operational override. I know you mentioned it, you know, it's not going to hit right away, but it will over the next 30 or 40 years, how many years we expand the debt over. But I think having that, like, what would that number be in year one, and then at the highest point, and then year 30 is really helpful because we also have to factor in multiple operational overrides during that 30 to 40 year time frame.
So just so that people kind of have an idea of what that's going to be just to, you know, just as we are being transparent, I think that's going to be really helpful for people to understand. I think you guys have done a phenomenal job. It's really great to see how thorough you have been in this process. I know it's not easy and it's been a lot of work.
Thank you all for all the work you've put into this. This is really, really good.
Speaker 7 (01:04:17–01:05:15)
Thanks. As a taxpayer too, I'm very interested to see what this is going to cost. For me, I'm excited because The project, as you can see, between what we had last year when we looked at this stuff to where we are right now, it's a tremendous jump. There's been a lot of work done, like I said, the past six months.
And I'm excited. We're actually starting to see it a little bit more. It's gone from just basically a 2D plane of the hand sketch that we had on there to much more. We're going to get into massing, renderings, exteriors, and stuff like that.
But understanding what that overall cost is, we're going to get it pretty soon. Then once we get it, it will be public for everybody to discuss. Then once we have that, the tax impacts, we'll work with the town, PMA, and have those for everybody.
Speaker 8 (01:05:15–01:05:22)
There's no intent of trying to hide any of that. Thank you.
Speaker 1 (01:05:24–01:08:46)
So on that note, I guess one question that I have is just, I mean, thank you for the really great informative presentation, all the work that is behind that, as everyone else has said. And I'd like to sort of, if it's okay to talk through a little bit where we're heading these next couple of weeks in terms of the coordination of this sort of final push. This presentation tonight was so informative. I really appreciate the detail.
It's obviously been so great to have the thoughtful and really comprehensive input of MPS leadership and staff. So we, as a school committee, I mean, what has typically been our cadence, you know, in pertaining to recommendations from the school building committee is that we take them up for a vote here at the school committee, which is not a binding recommendation necessarily, but which is important. As a couple of our residents who spoke at CitizenSpeak also mentioned, you know, symbolically, but also just in the meaningful way that we on school committee are very close to the actual impacts of this problem we're trying to solve through this project. And it's important for us to be able to speak to that.
Practically speaking, so you're going back to select board next week, is my understanding to provide the updates that you've been able to share with us tonight, the cost, It sounds from the presentation and the discussion so far, we know we are still waiting for that cost. And obviously that is the final important piece of information for our elected bodies to be able to take a formal vote on this. That includes us at the school committee being able to make a formal recommendation slash request to our colleagues on the school building, sorry, on the select board, before they need to take a final vote prior to August 6, 7. So, Sean, is there a way for you to lay that out?
I'm reading between the lines and I'm expecting that it will be important for us to reconvene. Well, first of all, to really ask our colleagues on Select Board to kind of hang in here with this process the understanding that it is taking time and it is not being rushed, but it is a process of identifying that cost to make sure we have all the information available to make an informed decision. So that's what's happening. If that's not something that will be ready for the next Tuesday, the 23rd meeting, If that won't be part of that presentation, or what are you hoping for?
I guess so that we can also plan accordingly here.
Speaker 7 (01:08:47–01:11:04)
Yeah, so today, as I mentioned, we had a call with the cost estimator what he has promises the deadline to us. is an initial cost estimate next Monday, the 22nd. What that's going to be is, he's been working on this. He's part of that visionary design series.
The architects have been keeping abreast of what's been going on. He's got the final report. He's working through that now to put a cost estimate to it. I was surprised because I thought it was the 26th, and he said, no, I can get you one on the 22nd.
My anticipation of that is we'll probably have some comments could be our 1st time seeing it, but it will put us essentially in a ballpark. So, with that on the on the 23rd for select board, I should have a quote unquote ballpark estimate that we will have. I'm assuming minor comment on some of the stuff that he will have on there. And then his goal is on the 26th to have that finalized cost estimate.
So, you know, the goal would be to attend the select board meeting, give a similar presentation to what you saw tonight, along with an initial cost estimate that we have there. And, you know, for any committee to see the amount of work that's been done Uh, you know, understand it, work through it, you know, I, I truly feel you need one meeting to kind of dive into a lot of this detail. Some of these questions that come up. Give it a week to take in all that information, maybe come up with additional questions and come back ideally a week later.
So, um, you know, I, I've been stating out loud that, you know, I'd like to have this first meeting on the 23rd. to give kind of what you saw tonight, maybe even a little more in-depth if needed, and then have that estimated cost estimate there for that meeting, and then follow on ideally a week later, which would be the 30th, for another meeting to see if there would be a formal vote taken at that point. I just don't think that a select board would take a formal vote hearing all this information very first and including the cost estimate.
Speaker 1 (01:11:04–01:11:20)
Thanks. So let me just Um, see, let me just throw something out there and see if this would make sense. Um, so the you will be discussing the cost estimate at school building committee on Monday next week, the 22nd.
Speaker 7 (01:11:22–01:11:30)
No, no school building. Yeah, our school building next school building committee meeting is the 29th.
Speaker 1 (01:11:30–01:13:14)
so we'll get the cost estimate it'll be a draft one i'll disseminate it to school building committee members via email and it will be discussed in the following weeks and so it will be unveiled so to speak when you're able to present it at select board on the tuesday correct so in that sense it would be most helpful for the school committee to reconvene i'm hoping this would be something we could do uh you know pretty quickly, given that we're having this discussion now, we've taken in a lot of the information from the rest of the update this evening. What would be the ideal timing for us to have a next opportunity for the school committee to kind of receive that final number, that's our final puzzle piece, that will then allow us to kind of go on the record individually as school committee members around, you know, what we are hoping to see from our select board around the timeframe and putting this on the November ballot. So, and I'm sorry for people watching, what you see, these are our meetings, these are open meetings, and this is like when we can actually do. logistics at times like these.
So Sean, if we met as a school committee, and I can follow up offline just around our scheduling, but I just want to make sure I'm understanding, given the moving parts, we would be looking to meet sometime following July 23, but before when?
Speaker 7 (01:13:15–01:13:41)
So the ideal time, or not the ideal time, but after school building committee on the 29th and before the select board on the 30th. So essentially, you know, if we had an afternoon meeting at this time, um, that would allow us for you guys to be on record for the 30th. And I preface all that, that that's assuming the select board would allow us to have another meeting on the 30th.
Speaker 1 (01:13:42–01:14:29)
Okay, well, I mean, I'm happy to go on record myself right now as a single member to just ask that they would do that. Because, you know, I think we've, as Dr. Moreto was saying, like we've come this far, we've put this much effort into it, we've, you know, it's really important to see this through, I think with the due diligence that it deserves. So I will follow up offline about whether we have a quorum available to meet, it sounds like the morning of July 30th.
might be our best bet. So colleagues, I'll follow up to confirm if that's going to be possible or not. And Mark, were you going to?
Speaker 6 (01:14:30–01:14:41)
We also could do, I think as Sean was suggesting, the select board doesn't meet until 7 o'clock. So we could do the same 5.30 time slot if somehow this works for folks on Tuesdays.
Speaker 1 (01:14:44–01:14:45)
Oh, gotcha.
Speaker 7 (01:14:47–01:15:06)
And the other way to check out is, you know, for for school building committee, you know, we can move our meeting earlier to on Monday. So if you want to do Monday night, I can work with you on scheduling that and we can move school building committee kind of earlier in the day Monday, it doesn't have to be at 17.
Speaker 1 (01:15:10–01:22:05)
That all sounds good. I mean, um, you know, as As you all know, I'm speaking to my fellow school committee members, because I've been keeping you apprised individually of conversations, which have also, of course, now been alluded to in select board meeting of late June, June 25th, I believe. As you all know, I've participated in several meetings with various combinations of people, with Peter, Glenn, a meeting with Sean, together with Chair Wells and Nick Milano and various colleagues on the town hall side. So we have been sort of having conversations and You know, it's been mentioned tonight, but of course, somewhat, well, an important factor of those discussions has been the relationship between the need to push forward the school project, which is so obviously, desperately, indisputably needed, overdue, to solve our overcrowding.
We're pushing that forward at the same time as we're preparing for an operational override, which we also all know is overdue and has been postponed to the point that we can no longer postpone it without drastic cuts to services that would include laying off teachers next year. So we're, as a school committee, we are positioned in between Um, these really important pieces. I just want to say, um, for the record that, you know, I have been consistent in my conversations that I, I see the, um, the urgency and the need, um, and the reasons to do this in November. Um, the reasons have been rehashed here tonight.
Um, and you know, I, I do appreciate the, residents who take time to share their perspectives. I think the question of whether it would be in November on its own or in November alongside the operational override as two questions on one ballot, like to me, that remains a sort of an open question that we can be considering. I think there are different views on the pros and cons of those approaches depending on where you're coming from. So I'm happy to kind of stay in that conversation, obviously, but I do just want to make that clear because, you know, that has been what I have represented in my conversations.
And I also just wanted to share one more thing about a phrase that, you know, Chair Wells used in the conversation, which was this idea of needing to be in lockstep. And I don't disagree with that as something we should be aspiring to as leaders of this town. But I think it is important for me to say what I interpret as lockstep meaning. That means we're in a sort of transparent, good faith, sort of partnership where we are doing our best to work together respectfully as people who are striving to meet the best interests of our town.
And obviously on school committee, where I sit, where we sit, we are focused primarily on the needs of our students and families of Milton Public Schools who are among the residents of our town, obviously. And so, You know, I'm looking forward to staying in this conversation. It's not easy and that's for sure. And the school building project, we need to get done.
We need to let the town have the opportunity to vote on that. I think that is just a fact. And at the same time, we are in the conversation about the operational override as well. And that is something that we will work closely with the select board to move forward.
Um, and we need to do both. Uh, that is just the bottom line. Um, we need to have the opportunity to help the town, the residents of the town understand why both of these pieces are so critically important and needed. Um, and so that's what I'm continuing to work towards.
Um, and you know, it's not. Nobody's trying to pretend it's easy. The conditions may not be ideal. Would we have liked more time before this deadline?
Maybe, yes. But this is the deadline, and the work has been happening. And we just have to lean into what our responsibility is, which is to lead, as I heard Chair Wells say in the last meeting. That's, that's just a little update from me, just to make sure that I'm clear with you all, you know, what I am continuing to try to do as I participate in these conversations we actually haven't met in since before that last board meeting.
And I'm not quite sure when our next meeting might be sort of with the town administrator, superintendent, and chairs of the boards. But Amanda and Mark, I see your hands. If you have questions for me, of course, I'm happy to try to clarify anything or just understand kind of where you all are. I do intend to, one way or another, join the select board meeting on the 23rd.
um, just to sort of, uh, weigh in, not, not in a way to formally represent, um, our position as a, as a body. Um, but just to provide sort of updates from this conversation and where we're, where we're at, um, including the request that we see this through and really take the time to, um, consider everything, including the cost. So, um, I'll stop there, Amanda.
Speaker 12 (01:22:09–01:25:23)
Thanks. So I guess just from a clarity standpoint, and I know when we get back together, and I know there it's, it's, um, we talked about voting, sort of a, it's a vote of not a, I guess, not a binding vote, but it's a vote of, um, intent or not intent? I guess my question is, there, it sounds like a couple things are being discussed. So it's talking about, you know, Sean was talking about coming back with a budget.
So it sounds like there's one, is it support of the school building project and the budget? And then is there a secondary conversation about the desire or the the need or the desire to get this on the, get this on the, get it on the ballot in November. Do you know what I mean? So it sounds like, because once we started- I don't see those as separate things necessarily.
But I, okay, I guess I do a little bit. I don't know, it's, And maybe I'm just thinking about it differently because it feels sort of like a theory in a way it's not a theoretical discussion but there's, we need, you know, there's, it seems to be people believe we need a new school, they've gone down this path we're getting the costs. the November piece sort of feels like regardless, I'm not saying the cost doesn't matter, that's not what this means, but it's regardless of the cost, do we want it to be, is it better needed to have it on the budget and have it on the ballot in November versus the spring? Do you know what I mean?
So that's why it feels like, it feels like a different discussion. Is it, am I making sense? Do you know what I mean? Because it's not necessarily about, I mean, it is about the project and the budget, but it's also seems like a bigger discussion around when this would be, should we, this be put before the voters and if so, when in order for there to be, for it to be success.
So I know, I know that they're all intertwined, but it does feel like two different discussions. and maybe I'm just looking at it differently, but they, you could, theoretically, you could still say, if you believe in this project, you saw some of the costs earlier that were on the screen for Sean, some of the other ones, so you kind of have in your head, it's not gonna be 10X any of those, you have that in your head, knowing that those costs are coming down the line, could you not still discuss the importance of having it on the November versus spring? I guess that's where my head is. Is there any benefit having that conversation, or is it just more beneficial to have it all at once?
So that's just.
Speaker 1 (01:25:24–01:25:27)
And I think we're sort of having that conversation now, right?
Speaker 12 (01:25:28–01:25:31)
Yeah, I just didn't know if we were having that conversation.
Speaker 1 (01:25:31–01:25:50)
Yeah. But I'll let, no, I appreciate what you're raising. You're just, you're teasing out the nuances of this, the implications, and that's good. And Mark or Sean, like if you have things you were gonna respond to, please go ahead and we can.
Speaker 7 (01:25:55–01:27:18)
Sean. I think Mark referred to me. Good point, Amanda. So yeah, the nuances to it, you know, for the cost that's there, for the ballot question that we're talking about, or we're asking the select board to put out there right now, it's a ballot question to authorize the town to issue debt, right?
And essentially what we've done at school building committee is we voted on a recommendation to the select board that they put this on the November ballot. And what will happen is, And Glenn might correct me if I go wrong here, too, is essentially the ballot question that goes there doesn't have a dollar value associated with it in the language of the ballot, right? And essentially what it does is it authorizes town to issue debt. The debt number that we'd be issuing is a separate warrant article that would go in front of town meeting to get approved.
So essentially, we'd be using the time between August and whatever that town meeting is to advertise what that number is, what the tax impacts would be, and allow people to understand what that overall impact is. So essentially, when they go for the ballot question, even though there's no number on there, they'll have the number from what was passed at that meeting prior to that. And Ms. Pavlicek, feel free to correct me if I'm wrong.
Speaker 12 (01:27:25–01:27:58)
So can I just clarify? So the order would be, So it would be a special town meeting prior to the election. So it would be determination that it's a ballot question, special town meeting to vote on the number ballot vote in November, correct? Or did I have that wrong?
Speaker 7 (01:27:58–01:29:21)
Correct, it doesn't need to be, and this is why I know Glenn was fun to jump in. So the typical way these have been passed is town meeting goes first, develops the number, and then it goes to a ballot question following. But there's no, you can switch them around, but I think it would be more harder knowing that the ballot question doesn't have a number associated with it, even though it would be public by that time. I think people would feel much more comfortable doing a special town meeting first, knowing that town meeting asks whatever that number is, and then when it goes to the town-wide ballot.
The key thing for us, the ask of the select board isn't to approve the budget, isn't to approve the dollar value. It's allowing people to vote on this, whatever the dollar number comes to that. And if it's too expensive, people will vote it down. But all we're asking is that people get a chance to vote on it in November.
November election is 85% turnout, where a typical town election is about 25. So we're talking about, when you look at the numbers, it's about 13,000 extra voters that are there. And, you know, for me, I see it as an opportunity to, you know, get these passed, you know, having that high of a turnout. If we're targeting a time when there's less turnout, that doesn't make sense to me, specifically for something this critical.
Speaker 8 (01:29:21–01:29:27)
Thanks. Mark.
Speaker 6 (01:29:29–01:31:13)
Yeah, I just want to say, I mean, I think you're, you were, you were making sense. Like there's an event diagram here. There's a lot of overlap between those two things, but they are somewhat slightly separate things. And I think I, I, in my mind, the first ask is I appreciate if there's consensus on this with the board have Lizzie joined the slide board meeting to essentially the first ask is like, And we ask them to make sure they are making time to hold another special meeting in order to make sure they have time to vote on this before the first deadline, which is that August 7th deadline.
And that deadline is when we have to get the stuff to the state in order to make sure we can have the fall election. So that's the first deadline we need to hit in order to have everything else happen. And so as Sean said, we don't need them to approve the project or approve the number. We just need them to say, yes, we're going to hold space in the fall meeting for that.
I think a lot of people, obviously, we are getting closer to it. We still have three months, a little bit more, three and a half months. But it seems like we will have a number. here on Monday, which will be fantastic.
They'll have some sense of the number if it's not the exact down to the penny number that we'll vote on in the fall, it will be pretty darn close, I'd assume. But yeah, I think the first question is we want to make sure this light board is on board with making the extra time, making this priority similar to what they've done with having special meetings for MBTA or for lawsuits or for any of the other things that have come up over the course of time, as happens with being in a whiteboard.
Speaker 1 (01:31:18–01:33:03)
And Amanda, just to circle back, I mean, yes, this has been a helpful conversation. And I didn't mean to dismiss what you were teasing out as the differences. And they are there as differences. I think I was stuck in my own.
just thinking around what makes the most sense to have us do as a collective in terms of asking us to make a formal vote, you know, which we're not obviously doing tonight, but we have a lot more information right now than we did at the beginning of this meeting. And I'm really, I'm glad that, you know, I think we should definitely be able to, do another meeting in order to have that final piece of the information, just even if we don't technically need to know the cost in order to make a recommendation, I'm recognizing that that is, it is an important piece for us to be able to know, even if it wouldn't necessarily make a difference to some of us, right? Maybe we would vote to recommend that the project move to a vote in November, whether we know how much it's gonna cost or not. I mean, and that's fine, but I'm glad that we will have that opportunity to be able to do that.
So I'll look to coordinate that. And that will be our next chance to pick this up. But Anna, go ahead.
Speaker 10 (01:33:04–01:34:21)
Um, I just want to say I really appreciate the school building committee, you know, working really hard to get those costs, I know it doesn't necessarily need to. We need to have that cost to decide whether to put it on the ballot and it's it's slightly separate as Amanda mentioned. But I do think I think it's important for us as elected officials to kind of just do our due diligence and kind of understand what's going out there. You know, I know it doesn't affect it, but I think that's why we were elected to represent the community.
And I think, you know, us knowing that making good decisions in terms of also how it's presented out to the community is also really important. You know, like, hey, what is our message out to the community on how this, the school project is presented, you know, like what is, what is the tax implications? I know there are a lot of families here that it might be hard on, but hopefully, you know, the majority support it and it does pass, you know, so I really hope that it's very positive and I really, really appreciate, you know, Sean and the work that your team has put into this. I know it's a lot of hard work and it's not easy and you guys have stuck with it for so many years and your dedication to this project is just really appreciated.
Thank you.
Speaker 8 (01:34:27–01:34:28)
Thanks, Anna. Amanda?
Speaker 12 (01:34:29–01:35:10)
Yeah, so I just want to just because I want to make sure that I was clear and it doesn't come across as I'm saying that the cost of this project doesn't matter. That was not my intent at all. I just wanted to understand that there are sort of two tracks of conversation. One has to do with the vote and the other has to do with the project as a whole.
So I just wanted to make sure that I understood are we. how we were looking at it and sort of where the discussion was. So I fully appreciate that we'll have the numbers and it's important to have the number, but also recognizing that the idea of the vote or the ballot question was separate. So I just wanted to make sure that I understood the nuances of that.
So I appreciate you guys working through that with me.
Speaker 1 (01:35:15–01:35:27)
Thank you for bringing it up. It's an important point. Any other comments on this topic? Yes, Selena.
Speaker 9 (01:35:29–01:37:28)
Yes, I just would like to, you know, go on the record to say that, you know, there is an urgency of now that we're looking at. in terms of timing, the fall is very important. And I think also that recognizing that there is a need for an operational override, and then there's a need for the debt exclusion for the school project, like that is those that we're holding on to both of those. And I just hope and I encourage us as elected officials and I'm talking for the town, not just, you know, the school committee, but all of us to continue to hold on to that urgency and realize that we have to act on both.
And we can't hold one hostage over the other because, you know, we're, I don't know, deliberating, you know, the timing. It's really, we have to do this, and we're gonna have to do it in the fall, and we're gonna have to do it in the spring, or do it all in the fall, you know, but we have to. And the reality is that the need is there, On in so much is writing in as a school committee member. I mean, I hold sort of, you know what, what we were elected to make sure that we're representing, and that is the well being of our kids right we want to make sure our kids get the best education.
If we're looking at cuts coming because we don't do the operational override, the kids are going to suffer. If we hold on to this project and delay it longer, the kids are going to suffer. So I really want to bring it back to that and for us to hold on to that and really think that, you know, the cost of course matters. And it's important for us and we're going to do we're doing all the due diligence and everything we need to do to make sure we're transparent.
We get the cost, you know, as as exact as we can, obviously, to begin to continue this conversation. But really, I would implore that all of us sort of show up for the town and do what we need to do on both on both accounts, because it's urgent.
Speaker 8 (01:37:28–01:37:39)
We need to act. Thanks, Selena.
Speaker 1 (01:37:41–01:39:11)
I think that's a good note to end that conversation on. And you all can look for a follow-up from me about scheduling the next piece of this. Thanks again, Sean. And Sean O'Rourke and Sean Burke, thank you very much for being here tonight, for giving us this information.
As everyone has said, really appreciate your dedication. It's very exciting. That shouldn't get lost in the shuffle of the mix. School looks beautiful, looks awesome.
I think we could all be really proud to be a town that can build a school like that for our kids. So to be continued, and thanks again. And we're gonna transition quickly. I know this meeting has gone maybe a little longer than we thought.
Peter had to jump off because he had to participate in a meeting at the superintendent's conference. So we can still, I think, have the brief finance report, if that's okay, because it shouldn't take long. I know we need to approve some vendor warrants, Mark. And then the the budget process should just be kind of a brief update, hopefully.
So Mark, I'll hand it to you now. Thanks.
Speaker 6 (01:39:13–01:40:35)
Great. I think I failed and I apologize because I've been kind of out. But I have two vendor warrants, the 52nd and 53rd. I don't think I've sent to y'all.
So I think both of those I owe you to forward it over. I didn't look at them and sign a return. I think I've sent the other three overs, but if that's not the case, and I'll double check my sent email when I hang up here just to see which vendor warrants I have sent you or not. But we have five vendor warrants that we need to vote on as a committee.
And unless anybody has any questions, I can go ahead and start making the motions. Hearing none, I'll make a motion to approve vendor warrant number 49 in the amount of $373,544.24, to approve vendor warrant 50 in the amount of $469,893.17, vendor warrant 51 in the amount of $806,999.73, Vendor Warrant 52 in the amount of $1,331,613.12, and Vendor Warrant Number 53 in the amount of $50,795.25. I second that motion.
Speaker 1 (01:40:47–01:40:49)
So we'll need a roll call vote for this.
Speaker 6 (01:40:53–01:40:58)
Great. I will conduct the roll call vote in order of my screen. Chair Carroll?
Speaker 1 (01:40:59–01:40:59)
Yes.
Speaker 6 (01:41:00–01:41:01)
Dr. Miranda?
Speaker 13 (01:41:02–01:41:02)
Yes.
Speaker 6 (01:41:03–01:41:04)
Member Varghese?
Speaker 13 (01:41:04–01:41:05)
Yes.
Speaker 6 (01:41:05–01:41:06)
Member Chiu?
Speaker 13 (01:41:07–01:41:07)
Yes.
Speaker 6 (01:41:08–01:41:09)
Member Seria?
Speaker 13 (01:41:09–01:41:09)
Yes.
Speaker 6 (01:41:10–01:41:12)
And I'm yes. Thank you.
Speaker 1 (01:41:18–01:42:06)
Thanks. So, um, at this time, in terms of FY 26, um, budget process quick update. We have Dr. Pavlicek here.
We have Ms. Blake. And this is in the context of, again, we've mentioned it already tonight, but just knowing that it's sort of out there, a conversation about the pending need for the operational override as we look ahead. Don't expect a drawn out discussion here.
We'll have plenty of time for that later. Dr. Pavlicek, am I handing it over to you, Mark, or?
Speaker 6 (01:42:06–01:42:15)
I mean, I have opinions on this, but I'm not prepared to talk. I think, Glenn, you had a presentation from Peter.
Speaker 2 (01:42:17–01:45:16)
Oh, I just wanted to say that we are still in the process of closing out fiscal 24. As you know, we had mentioned it quarterly reports at Springtown meeting. This was a very challenging year, especially for a couple of factors. You know, we've said it many times that since the fiscal 24 budget was put together back actually in the fall of 22, because it was voted in the spring of 23 and put together the fall of 22, there was, for instance, that 16% increase in out-of-district special education tuitions that was approved by the state.
We talked a bit about this in the spring. That's why our budget for fiscal 25 that we presented for town meeting was significantly higher than the fiscal 24 budget because we had so many unfunded pieces to fiscal 24. So fiscal 24 was a difficult year because we had to absorb all those costs. Luckily we had built up some reserves in our circuit breaker account and our Medicaid funding and some other sources that were able to close the gap.
It is closed. We are going to close out on budget or, you know, to a zero total. There is one piece that remains. There is a certain amount of unspent ARPA funds that we're going to spend off to finish the year, but that's going to require a change in the allocation of them and a vote by the select board on next Tuesday night.
That's just because everything seems to be happening on the 23rd. So actually, Peter and I will also be at the select board meeting on the 23rd to talk about this because they need to do one final vote to reallocate some unused ARPA funds that were going to go away owing to the sunsetting of those funds. and that will be the final piece that closes out our books for this year. So we will end the year, you know, not with a surplus, not with a deficit, but on zero, but it will have cost us much of our reserves that we've built up over the years, particularly in special education, which sort of emphasizes the need going forward to build a stronger budget and the operating override that we're talking about for next spring.
You know, we talk about having crept through the last few years. We have, but it's the ability to creep is rapidly diminished. So I think it just further emphasizes the need for an operational override next spring. So that's the three-minute version of the closeout of fiscal 24, and I can write it up as a final quarterly report as we're going on, but we're just at the process of closing out now.
Speaker 6 (01:45:16–01:45:22)
And I can share some information on the FY26 process a little bit, but Anna, question?
Speaker 10 (01:45:22–01:45:39)
I just had a question on that, on the operational override that you mentioned, Glenn, is that something that we could get numbers before if there's like talk of maybe combining both overrides into one for November, or is that something that would have to wait till the spring to do the operational?
Speaker 6 (01:45:40–01:47:50)
I can jump in on that a little bit is that, you know, we have luckily Katie has joined us and is taking over kind of the finances. We're extremely happy to have her. She and I still need to meet and kind of have a launch conversation. Belinda and I talked a little bit about that exact question to Anna a couple weeks ago.
Just before we actually even thought of the fall override, it was about a month ago, we were just talking about the budget process for FY26 and how do we make sure we get to a strong budget number and plenty of time for the committee to review. Katie and I need to sit down and have a similar conversation and then we share that with Selena and Amanda as part of the finance committee so we can all kind of be on the same page. Certainly the idea of a fall override vote is going to be tricky because unlike the school building project where we've been working on this since December and before, this is going to be very tight to try and get all the process that normally would take us into January to have that wrapped up by, I'm not 100% sure when, if it would need to be the same town meeting or if we'd have a special town meeting after the Well, so the timeline and those things, I think, are things that are still somewhat up in the air and under the control of the select board. But we definitely, if the select board decides we have to do this and get that together in the fall, that's what we're going to have to do.
And so that's going to mean a lot more meetings for the Finance Committee. So Celina and Amanda can get excited and certainly a lot more reporting back to you all to to get your feedback on. And that's going to be a lot of work for the school staff, as Katie is working with Peter and working with school leaders to get input and make sure we are planning appropriately. Because it's not even just last year, it took us to January.
And that was a one-year budget planning process. And so we need to do the one we need to do five years. So it's a lot of work and a lot less time. So I have concerns about it.
you know, we will make miracles if we need to, because we got good people.
Speaker 10 (01:47:50–01:48:24)
Well, and the reason I asked only was because, you know, this this amount just came up, you know, once once we figured out what those special and additional costs were. So and then just concerned when Glenn said zero, it's it's always a bit scary. So I, you know, and I look forward to I hope we can continue to make the finance meetings cross-posted so that, you know, those of us that want to attend can, because I think it was really helpful last year to be involved in the process. So thank you so much for all the work you guys are doing.
Speaker 6 (01:48:25–01:48:41)
Yeah, we'll definitely make sure to do that. We've not had any finance committee meetings, again, just thus far. So Katie and I will put our heads together, and then hopefully I'll reach out to Amanda and Selena, and we can schedule those and certainly cross-post them and let the whole committee know when those happen.
Speaker 8 (01:48:42–01:48:51)
Thank you. Okay, thank you very much.
Speaker 1 (01:48:51–01:49:16)
So this will be another topic we obviously continue to discuss, but good to kind of open the conversation. So the only other thing on our agenda for this evening is just a quick approval of minutes for June 5th. Did anybody have any edits to the minutes?
Speaker 6 (01:49:23–01:49:28)
I make a motion to approve the school committee meeting minutes for June 5th, 2024.
Speaker 9 (01:49:31–01:49:32)
Second.
Speaker 1 (01:49:33–01:49:52)
Thank you. So member Chu? Yes. Member Serrio?
Yes. Dr. Miranda? Yes.
Member Varghese? Yes. Member Loring?
Speaker 6 (01:49:53–01:49:53)
Yes.
Speaker 1 (01:49:54–01:50:39)
And I'm a yes as well. So for our next meeting, we will follow up on that. That will be the follow up on the school building committee recommendation in order that we get to weigh in on that. And Um, following that, of course, we are anticipating our summer retreat.
Uh, which will be our opportunity to begin discussing and setting our goals for next year. Um, so those will be our next two meetings and if there's nothing else, uh, we'll just. Anyone have anything else? Otherwise I'll make a motion to adjourn.
Speaker 6 (01:50:40–01:50:40)
I'll second.
Speaker 1 (01:50:42–01:50:49)
Okay. Member Varghese? Yes. Member Chu?
Yes. Member Loring?
Speaker 6 (01:50:49–01:50:50)
Yes.
Speaker 1 (01:50:51–01:51:08)
Member Serrio? Yes. Dr. Miranda?
Yes. And I'm a yes. Thank you so much to everybody for being here, especially Dr. Watts, Ms.
Blake, Dr. Palachuk, and great to see you all. I'll see you again soon. Thanks.
Speaker 8 (01:51:08–01:51:10)
Thank you all. Thank you.
Speaker 4 (01:51:10–01:51:11)
Bye.