Board: School Committee: Finance Subcommittee
Date: 2026-09-23
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:19–00:22)
So we'll call the meeting to order at 8.02.
Speaker 2 (00:25–01:43)
Okay, maybe the first thing we'll get out of the way is meeting schedule. now to folks. We have a school committee meeting on October 7th, and our intention is to alternate when the finance committee meets with when the school committee meets. And what we're going to talk about in our next finance committee meeting are contingent and non-contingent budget models for FY 2020.
So we could meet in a week, You know, let's just think about the next three weeks. And I think between, um, when you all feel like you'll have work complete that you're ready to discuss with the committee. Um, I think we should build around that, but probably plan on having this conversation no later than the 14th and ideally probably earlier.
Speaker 3 (01:45–02:39)
Do you all have an opinion on that? I do, actually. And I'll let James let us know where he is with it. So James is completing his first FY26 report to DESE in the states, which comes right up to the 30th, which has been the majority that in all the federal grants that all have similar cycles.
That work is actively being completed. at no later than the 14th, which may be the date or the date before the 7th is next week, which is the 30th, correct?
Speaker 2 (02:40–02:52)
Yeah, or we can meet on the 7th. I know it's a little out of order, but it's, you know, not the end of the world if we're trying to accommodate, right? Yeah, just accommodate a kind of a fluke.
Speaker 3 (02:54–03:08)
James, what is your thinking about that high level? We should talk about what that high level number looks like and what it's made up of to make sure that we're getting the right takeaway from the group. Do you mind if I pause and talk about that for a minute?
Speaker 4 (03:08–03:09)
No, go ahead.
Speaker 3 (03:10–04:00)
So James and I have looked at what the projected salary is for this year, looked at when we put in the roll that number over. He did give us a set of projections last year. I always forget what the second C is for. Coordination committee.
Speaker 4 (04:12–04:19)
assuming that number will be around a 5% to 6% increase, because that's the average that we all talked about last year.
Speaker 3 (04:20–04:36)
And then we'll have to get a what is each percent cost number. So every 1% equals $800,000 as an example. And then start to have the conversation from there. Does that sound like that's how people want to proceed?
Speaker 2 (04:37–05:08)
Yeah, that's my understanding of what we're trying to achieve in this. a better case scenario but i don't think that's realistic to just you know so last year i think it was 5.2 so we can just kind of work our way down there by 4.21 and see what that looks like and then the initial um conversation that comes forth and this is where the
Speaker 3 (05:21–05:31)
nuance between that. Can we do less non-salary? Can we make assumptions differently about fees? There's all this smaller tweaks that go around that.
Speaker 2 (05:51–06:23)
So are we saying in three weeks in this meeting to have that conversation? So that'd be the 14th. Okay. Well, that's what I'm asking.
I think by the 14th, we will be ready. So the 30th, I have to get these grants completed. And so that would give me a couple of weeks to work on the contingent non-contingent. So I think that would be.
So we'll plan on our next finance committee meeting.
Speaker 3 (06:23–06:45)
Unless there's anything in between that, that would be helpful to kind of do in parallel. Like, I mean, so to me, that is the biggest elephant in the room. Taking care of that work is important. Keeping up in FY27 is important.
And then continuing this discussion about how do we make sure that all of our other ducks are in policy.
Speaker 2 (06:46–07:03)
Well, then let's see how today goes and if we want to meet again next week, if that works for people, we can just continue this conversation, I imagine. One other question would be the Q1 report. Correct. And when the expectation is for that.
Speaker 3 (07:04–07:07)
Typically, I think that would be the first meeting in October or the
Speaker 2 (07:13–09:14)
Yeah, it's the Q1 report that's informing your budget. Correct. So maybe having a Q1 report before we, or maybe we can do a simultaneous. Yeah, I think if we, I think we want to have the stay on our budget schedule, we want to have the I think we want to have that so we know when we hear that, okay, here's the starting point for that budget, whatever contingent budget it is.
So, maybe we could try to do both in one meeting. I think what happens if you do both, then you're spending less time on it. If you do one and then the other, then we can focus on it and spend time on it. So it keeps on going.
The numbers, I don't think there's one down there yet. This is the last data point. Mark, you had a question? I just agree.
I mean, I agree splitting might be good, but if we're going to split them, then I would say we could do one on the 28th and push that down. I agree with your point, the timeline of keeping this budget is more important than that. I think Q1 doesn't form the budget, so we might have less questions, but it's probably one of the times for us to get in front of that, to get feedback, and to start having a sense of that. Yeah, I assume if there's anything within the Q1 that is of concern, I should inform you.
Speaker 3 (09:14–11:05)
Right. Yeah, we'll let you know. Okay. Yeah, that'd be awesome.
Is that okay with you time-wise? Absolutely. And just to highlight something for the rollover. you know, the back burner a little bit is what number of dollars are we gonna use out of the revolving account, the new stabilization account, which is going to be decided on what may have to, you have to acknowledge when do you think you're gonna go for your next override.
If there's five million in there, if you're gonna have the next override in two fiscal years, then it's gonna be split in half. The end of that, wait three years for that, then you're gonna split it. So like this, some good moving parts that I think we have a good, healthy discussion to have here and then have Amy and Nick in as well. So we've been meeting with them.
Those are his big things that he's thinking about, how to organize and what this might work, how they weigh in on the market. conversation needs to happen at the town level with what we are input.
Speaker 4 (11:06–11:14)
Or it will happen while we're doing it, right? So if we really experience that this is going to be a real big hit to the town, we've got to do more of it.
Speaker 3 (11:14–11:16)
But just to say that a lot of time.
Speaker 2 (11:16–11:51)
If you coordinate the FY26, we didn't use any of the funding for the general fund. You said $100,000. Oh, we did. Yeah, which is the annual.
Right, Mark? Yeah, they used $700,000 for this year, and they put in $2 million, something like that. So they put in more than they took out of it. But yeah, so it's not clear what the next year's going to look like.
Speaker 4 (11:54–12:21)
I think it's projections. So it's very same thing about the calendar. in terms of looking at last year and what we're aiming for now for timing. So we're talking about having a discussion here mid-October.
And the goal is still at the end of October to be connecting select board about the implications after we get these projections for November.
Speaker 2 (12:22–12:33)
And the goal is to have a draft 1.0 budget by the beginning.
Speaker 4 (12:34–12:47)
And to have their input on the decision, the implications of the how much is coming out determines what the conversation needs to be about reductions then.
Speaker 3 (12:47–13:26)
Yeah, it's like before the winter holidays. Correct. Yes, so we're conversation late November.
Speaker 2 (13:30–13:38)
Okay, I think we're good for the next month in terms of schedule. Should go on to capital requests.
Speaker 4 (13:58–14:04)
Bob and I and Bob Mayhew and James met two weeks ago to talk about capital.
Speaker 3 (14:05–14:45)
And Bob has, we've also performed that we're adapting this work to that Amy sent over as well, to go over what our needs are from the school-based perspective. I've asked Bob to present this information about what we're requesting for the next five years as per Amy Dexter's request. But I also want to always keep in mind what has not been funded over time, so we can get a look at the concerns that we continue to move over and move over, so that, you know, essentially, some time will be needed for folks to understand what's been being pushed down the road a little bit. So, broadly, everybody has this packet internally.
Speaker 2 (14:46–14:53)
I believe, Charmaine… We have the spreadsheet in the folder.
Speaker 5 (15:00–20:01)
I thank you for asking me to fill you in on this. So the past few years, I've actually been pretty fortunate in the capital request area. I've done quite well. I believe people seem to understand the issues that we're facing.
And when we don't get something, It doesn't just, it's not the same amount the next year it compounds. So the biggest item is the end user devices that just every year we try to have a 20% replacement policy and that's just based on the operating systems and It's a big number, and when we don't get the devices, that compounds every year, and it becomes a problem. So every year I've been asking for the end user devices, and every year we also have the discussion, and Richard Wells has brought it up many times, talked about it, that this is really an operational expense. They're not capital items.
nobody really has the stomach to add $400,000 to the operational budget every year. That's a tough one. So that's why it ends up in capital every year. And last year with replacing the smart boards, we got them all in before school started.
And it was a big task this summer. And people are ecstatic about them because of the functionality of them, and just they're completely, they can be completely independent of the computer. They're fully integrated with Google, and they have everything. They're basically a big cell phone, and people have been very excited with them, and they're doing some really great stuff with them.
So we just, we want to continue that at Pierce next year, and then the fall, and Collipot Cunningham to finish it out, because the boards that we have, especially Pearson, Collicott, Cunningham. They are some of the first generation boards and they are failing at an alarming rate and the projectors as well. And the lamps on the projectors, when they fail, they're $300, $400 each. Luckily, we've been able to, with the boards that we replaced at the high school and at even the spares are struggling and the teachers get very frustrated when they're trying to write on the smart board and it's not aligned properly.
And even if we aligned it five minutes ago, it's been an issue. So that's a big priority is just finishing that off. And then the last item for this year or next year, camera servers. These servers, we have one server in each building that does the recording for all the security cameras, and there's hundreds of cameras.
And we've added cameras over the years, and by adding cameras, and they're better quality, so that puts more video onto the servers, which reduces their retention time and They are just, the operating system is not supported anymore. The hardware, it's bailing. The service contract that we have on all of the security systems, it's not inexpensive, but it's the most worthwhile because that's the most common service call I make is to the people servicing the cameras and the servers. And the servers are just, And they need to be replaced.
And I actually just got the price yesterday. And it's that 383 on there, the first page. And they only hold their quotes for two weeks now because of the increase in cost. Because of the tariffs, the data centers are buying up all the servers.
Everything is outrageously expensive.
Speaker 2 (20:08–20:20)
Yeah, it's pretty crazy. Just a basic question that you're making me think of with this. Do you have like a quote from our current vendor on replacement systems, but is this something that you have to go out to?
Speaker 5 (20:20–23:55)
I really try to deal with state contract vendors. Okay. Yeah, you can ask James. He's learned pretty quickly that I am very by the book with all of the purchasing requirements, and I just avoid problems by dealing with state contract vendors.
And some of the things… And that basically means they've been kind of vetted. Yes. And they also, for the network hardware pieces, I file federal funding requests through E-rate.
I don't know if you know what E-rate is, but on your phone bill, you see FCC charge on every phone bill. That's all put into a big pot and schools and libraries can apply for that funding. And based on your level of free and reduced lunch, you get discounted. You get reimbursed from the federal government for internet networking, So each year, the network hardware is one of them that we actually got last year.
And I had, we got the funds for peers. And based on the level of funding from E-rate and the change in hardware, I was able to Get called by Cunningham as well, which is a project that we just started now. But, yeah, I deal with state contract pretty much exclusively, but my point with the E-rate, that's all, it's basically a federal request for proposal. So, when we put that out there, it's public to the whole country, and I do get responses from around the country.
And we have to do a matrix to decide which vendor we choose. Thank you. Sure. Also, in the future years, for the end user devices, in the past, I've tried to keep the number fairly consistent.
But with the prices going up so much, I've increased 5% on the future years. The Wi-Fi. request. I bumped that up.
That was further out. But again, those devices are older. The Wi-Fi technology is changing on the end user devices, which make the access points become a logjam, a point of congestion. And so the newer devices can handle more traffic.
And everything we're doing is more resource intense with more video and just internet. Those prices are based on just the hardware alone, because the last time we did a refresh, I did all the work. I did all the programming and replaced them. We did it ourselves.
So we did save a significant amount of money by us doing the work, which we also, we do that with all the smart board replacement. we end up assembling the carts ourselves. And I think we were able to get 18 to 20 more boards by us doing the labor.
Speaker 3 (24:08–24:37)
I know that Bob's team has been fairly stable for a period of time, and I think you may I want to say thank you when the summer is Bob's busiest time, Christine.
Speaker 4 (24:38–24:42)
And then when the teachers come back, they think it's the busiest times, the teachers do so.
Speaker 3 (24:42–24:47)
And now the team has to respond to the needs of the folks in the Arizona.
Speaker 5 (25:10–25:38)
Yeah, they're great, and we're, I'm not gonna say we're in an excellent spot, but we manage pretty well six schools, but we only have four technicians. So at each, at some given time in the day, there is a school without support. So sometimes we're not able to respond instantly. And so there's a lot of prioritizing with problems we'd have to do.
Speaker 2 (25:40–25:55)
I think we did pretty well. On the end-user devices, in the last few years, have you, I just can't remember last year's capital budget, have you had your request build on end-user devices? Like, have you been able to turn over 20% of machines?
Speaker 5 (25:57–26:53)
Yes, and I… massive grant. That helped us out, and end user devices are somewhat vague on purpose so that it can be a Chromebook or a desktop computer for teachers. We are replacing desktops throughout the year because Windows 10 is no longer supported.
Not a lot, but a good number of our devices are still Windows 10. placing those and I have not spent that $391 yet this year. I was waiting until a little bit later in the year to see what the prices do for devices and… Can I ask a question?
Speaker 3 (26:53–26:59)
Do we remember last year what the capital allocation was from the dollar perspective? Did you get what you needed? Did you not get what you needed?
Speaker 5 (26:59–29:00)
Last year I got $391 for the unused devices. I got the $188 for the smart board replacement at the high school and I got the $362 for network hardware at Pierce. And that $362 for the network hardware, because of E-rate, I parlayed into getting a $574,000 project at Collicutt, Cunningham and Pierce. I got 40% off of that.
So for $362, I was able to Thank you. So, on the camera servers, I didn't know exactly what year I should put that in. I just threw it in next year because it is pretty important and if those devices fail and we anticipate needing to use the camera. The cameras are, they're very reactionary.
It's not a proactive thing. We don't have somebody sitting in a center like at the police station monitoring to see what's going on, but every school goes back and if there's any sort of incident, they need to go back and review footage. Sometimes we have to retrieve it for police situations and things like that. And they definitely are panicked when they cannot access that video.
Except the only ones that are monitored are the ones at the front door. When people are buzzing in, they look up and see who's there. That is a pretty big one.
Speaker 6 (29:02–29:02)
Lizzie?
Speaker 4 (29:15–32:10)
Most of the work typically happens starting in November, December, and then typically trying to approve the requests by late January for the town. But I think it's usually in that timeframe of December into January that department heads come in explain the requests, and there might be a couple of meetings, basically weekly meetings in order to approve requests ahead of the warrant being closed for May. So, and of course, when we're presenting, it's combined, obviously, technology and consolidated facilities together. And so I do think that's obviously a factor in the fake ticket request items.
Like, I know this is, I think it's always done phasing them to look at some sort of like consistency in the five year requests, whether you have like, you know, the phones this year and Brooksfield's different year, so they're not like on top of each other. That's typically how it has gone. I mean, Richard, it's not here anymore, so I don't know if this will change in terms of like the approach, but Amy is the charge, really. Yeah, identifying like capitalism.
Yeah, well, and just determining like the flow of the cycle. You're totally right on the end-user device piece. Like, that's an open discussion every year that it's not a capital item, but that that has been included, and I do believe it's been fairly well understood that that's necessary to keep. And in fact, to the point, if you remember that when we were in a mad spot a couple years ago, and, you know, we actually, desperately had to take this attempt to, like, access that money back to be repurposed.
And the capital committee declined to do that and said, you know, I'm grateful to the commitment, actually, that they could hold on to it. And it was just an extraordinary circumstance. We are no longer in that circumstance, so we don't have to mess around with that. But it has been a good commitment
Speaker 2 (32:10–32:53)
on behalf of the town to keep that in there. definition, if you're if you're spending 25,000 or over, it has multi year life. That's it.
Speaker 4 (32:54–34:47)
I do just, and we've not, there's been no like initiation of this from the Capitol side. Look, there's, you know, they haven't started, I think it's right now, it's just with the departments, this internal requesting for you to provide. And at a certain point, like the school committee, I don't know the exact timing. That's usually by November, but the school committee has to approve the department's request before it gets sent to capital as a final request.
So that would be like the first step for us. There is… First step is for you. Yeah, I might put that out of my way.
I don't see anything. So the one thing I am thinking about, which I don't, I think is probably going to come up more in regard to the consolidated facilities potentially than the technology piece. There has been this conversation about the library generator in terms of, you know, that was a request that was debated and approved at Capital One, a town meeting. And then there was this conversation about it's now been paused based on the relocating installation of the generator, caused concerns for some folks because it was right in front of the building.
And so I think I'm not, I'm anticipating somewhat more of like a, I just don't know what that's gonna mean as far as like a micro, managing that focus within capital to kind of understand the processes for how the money is going to be used.
Speaker 3 (34:47–35:32)
So I was flagging that that might be something we need to be ready to talk about. And one of my goals is whatever we are responsible for, I want to get in front of you all quick. Because sometimes at capitals, I thought in school committees, we'll say, well, geez, you know, when did Amy ask for that? When did you submit it?
Now it's February. than unpacking the consolidated facilities fund. I think it's going to be a lot more complicated. And I don't know where the school committee wants to sit with the same kind of meeting that we have with Bob Mayhew.
Do we have a collective meeting with Bob in town? Because his stuff is really involved communities across the whole town.
Speaker 4 (35:32–35:41)
And the schools do have specific needs. There are some parts of the capital request on his side
Speaker 3 (35:54–36:18)
because the buildings were all relatively done in the foyer area. So all your HVAC systems, all your major pieces will be coming to age. And so I mean, it looks like from this capital budget that the last few years, the capital committee has kind of taken a unique approach to proactive and providing chunks of money to make this live systems in order to not have a failure, which I think is a very good idea.
Speaker 4 (36:24–37:47)
shapes, but, um, yeah, Nick has been good on that. I mean, that's the same discussion about roads. It's like, they're trying to just put chunks towards that every, um, so I think that's been healthy, but it is always. I mean, the main thing for me, both on the tech, not as why it's helpful.
I actually like this new like format with the detail. for each request because, of course, and it's, you know, when, like, sometimes, you know, John, you'll get pulled in, or Katie would, like, or, you know, in some cases, even Bob or Bob might, you know, come in and present the request. But then what comes after that is the conversations where the committee members are sort of like, you know, not everyone's getting everything they want. So then it's important that I'm really understanding like the non, the top, top needs.
And then if it's going to come down to like how can I let defer something, which is the one thing that you could defer in real time in the discussion sometimes it just helps. and what's the main plan for them.
Speaker 3 (37:48–37:50)
So when you're going into that meeting in January.
Speaker 4 (37:50–38:04)
Yeah, that is in January. When things get put on the cutting room floor. Just making sure I know which are the things that must be.
Speaker 2 (38:13–38:47)
I appreciate this. I agree with your early point you made, John, of like, I think what would be helpful just to misdocument it, but I think it'd be helpful to have a document that over the last five years shows this is what we asked for and what the company was. This is what we got. Yes.
Just the prior five years so that we can make a track of what the projects are and so we can track, like, how does this dollar amount, 1.1 million, compare to past years? How likely is it that we're going to get that because of how much has been allocated historically? That's something I've been going in and trying to pull documents, but having that in a consolidated list.
Speaker 5 (38:47–38:55)
Yeah, I have it right here. I just highlight it each year, what the requests were. I can make copies of this for you.
Speaker 2 (38:55–39:36)
Yeah, that's FY27. Do you have FY26? Yeah, I have. I was able to pull it all on a document.
It's just pulling a bunch of documents together. So I think having that, I just think would be a standard report moving forward. But I think the 1.1, It seems to be somewhat in line with what we've gotten in the past. So that seems pretty good with all these things.
The question I have, because it just keeps coming up, is the Wi-Fi at Pierce, which I know, looking back, at one point it was under FY28. Last year you put it under FY29, so this is still a lot of that. I like the Wi-Fi issues, specifically in the auditorium and something, when they put kids in there, and that not being able to work.
Speaker 5 (39:36–41:16)
So there's only two access points in there. It was, I think it was, it might have been during COVID when they put a lot of kids in this auditorium. When these were, the Wi-Fi was kind of rolled out in stages, and we put a couple of access points in each auditorium just to give some signal in there. We ended up putting more in this auditorium.
I had to have Bender come in and run the cables, and we bought more access points, more licenses, because they kept having more kids in the auditorium for actual classes. I'm sorry, are you saying at the high school or at Pierce? The high school, yeah. There's still only two at Pierce, and I only recently heard that There was an issue in peers auditorium I didn't realize they were bringing a lot of kids in there to.
To have some sort of class so. That would be. Requiring running more cables and. Yeah, sure.
Yeah, that's not something that has been, it's been mentioned. Yeah, yeah. Like not as a pressing issue. So I certainly have not had it on my list, but I can get it up there.
Speaker 2 (41:17–41:54)
That sounds great. My only thought from a strategy perspective is potentially moving one of those Wi-Fi things over just because it's such a small dollar amount. And so to Lizzie's point, as you, or straight, to lack of a better word, like figure out exactly what's your point. I don't know if there's an ability to get one of those.
Also, just looking at FY29, it's a little bit lower than the other year. So we pull something over and assume we need to kick over the camera server as an example. We're not going to get that this year. That has to be pushed in FY29.
There's something else we can fit into FY28 to just reduce FY29 further so that we're balancing those things.
Speaker 5 (41:54–42:26)
That's just the strategy in my mind around. I can follow up just to get the auditorium. The devices themselves are probably $800. Because I just bought the exact same ones for the library at Collicut Cunningham.
It would be those exact same devices. And then it would be just a few thousand dollars for a vendor to run the cable to the locations necessary.
Speaker 2 (42:27–42:57)
Yeah. I was thinking, in addition to the auditorium issue, but just generally pulling over a small dollar amount of pay from that $1.29. Because I'm worried that we're not going to get all four of these things in FY28, like we didn't get all four of the things last year. And so, is there something that we could pull over to help relieve the pressure that they're like, oh, 65,000 is not that.
That's just a strategy. I defer to the department of which I'll, you know, want to prioritize our list or do it all.
Speaker 5 (43:00–43:38)
saying it out loud, but I think for the end user devices next year, I just I think with what I have now for devices, and with the money that I have yet to spend this year, I'm going to be in pretty good shape with devices, but I don't like to, you know, say, Oh, I don't need it next year. But if that's, if that's something that needs to It just so happens this year because of that grant I got a few years ago.
Speaker 4 (43:38–43:57)
Yeah, it's definitely good to be able to show that that's that level of analysis is being done and we're not asking for more than we need and prioritizing what we do need. So this is good. I think this is okay.
Speaker 3 (43:58–44:36)
So we'll work on the statement around the strategy of that. we would probably go back to our 4.10 or 4.10 plus inflation in future years just to not give up the gains of what we have right now, which is really importantly a 20% replacement number. And then just from a pure strategic point of view, if in fact this wide buy appears thing or anything else unless you want to move over to March point, when they look at these things in chunks and they don't have a smaller bite,
Speaker 5 (44:39–44:50)
I'm perfectly willing to move the Pierce Wi-Fi to next year and the cameras to the year after. I will keep them both on.
Speaker 3 (44:50–44:52)
Okay. Oh, okay.
Speaker 5 (44:52–44:59)
Oh, and I'm sorry, can I just take a minute? I didn't mention the fault system really.
Speaker 4 (45:00–45:05)
Yeah, that has been something we've heard about.
Speaker 5 (45:05–46:58)
Yes, because it's been several years now that NEC no longer makes phone systems. So they don't support it at all. And my vendor that we bought it all from and they installed it, they really don't support it either. And the hardware is extremely difficult to get if there's a problem.
So there is a There's a control box at each school that runs the system in each school. They're all connected. And there's another device at high school that does the entire voicemail system. Last year, last spring it was.
the system at Tucker failed. There was a card in it that failed. And especially with all the safety concerns, it's a big deal when parents can't call in and we can't really call out. So that was a massive problem.
And I could not get the hardware. I actually, I ordered it through the regular channels and it was back ordered probably two to three months. So I actually found a used one on eBay and I bought it myself. and you got it done that way.
So that's a potential problem at every building at all times. I did find a new vendor who is very good and they're responsive and they've helped with subsequent phone problems. They say they can get some hardware, which is great, but that could change at any minute too. And I'm talking about the not the phones themselves.
A couple of years ago when they were going out of business, I bought a couple dozen phones, so I have some phones. But the servers are definitely a problem. And that's a massive project because we have probably 450 phones.
Speaker 4 (46:58–47:30)
Right. But just like the camera servers, that is easy for people to, whether it's a capital or town meeting, Like we need our kids, the safety issues are first and foremost. You know, I think the smart board type stuff becomes a little harder sometimes for people to grasp, like what's the difference? You explained it well, but did you think that that's, oh, people, all people remember when that happened and don't want that happening.
Speaker 2 (47:31–47:33)
Is the phone system something that has to happen in one year?
Speaker 5 (47:34–47:45)
Well, yes, because they all work together. If we did it in multiple years, we wouldn't be connected. It would be like two completely separate systems.
Speaker 2 (47:45–48:02)
Yeah, that really wouldn't work.
Speaker 3 (48:04–48:10)
We had a few days of phones not working at Clubbird. Was that connected to this?
Speaker 5 (48:11–51:22)
That was actually Verizon. So throughout the district, we have the old Centrex phone lines. That's why we dial 9 when we get out because they're just the old, old business lines. They're copper.
And when all the buildings were built, they ran new 50 pair or 100 pair cable into the building. for the copper. And whenever it rains, that copper gets wet and the pairs become crackly, staggy. And I have to call Verizon and they come out and they swap the line to a different pair that's not having problems.
Believe it or not, they're the nicest people on the phone that I call. They're very responsive. They're good. But at Glover, so what happened at Glover, it was the main line, 4288.
So when that just rings and rings and rings, the phone lines are in a hunt group. So if 4288 is busy, it bounces to the next one and then the next one. But because the 4288 just rang and rang and rang, it never bounced to the second, third, fourth. So it appeared that Everything was down.
It was just that one phone line. So Verizon fixed that. It took a couple of days. They had to come back because they needed crews in multiple locations on the street and the poles and the boxes and found another problem.
And so my other vendor, they were very responsive. They came out to a wire. which I don't know why, but a wire between where it comes into the building for Verizon, and then it connects to our phone system, that wire had failed for whatever reason. So they retraced that, fixed it, and that was it.
That was- Are you looking to move to a VoIP system? So, okay, so there's the problem. All right, we don't have it. So all of the, is this a conflict of interest?
Are you going to sell us something? Verizon wants to move us all to fiber optic phone lines coming into the buildings, which is great. And they, over the past couple of years, they've run the big fiber cable into each building and there's a terminal for fiber in each building. But they've only moved a handful of lines, such as like fax lines and lines that have been added after the fact, because they're not Syntrex.
Apparently. Verizon's central offices, the local one in Quincy, I guess that all of our stuff goes to, they can match lines yet on the fiber. So that's why we're still stuck with this problem of funky phone lines. And this has been two years now that they've been telling me, because we've got notices.
Oh, you guys probably haven't seen them, but Verizon will send notices if you don't convert over to the fiber. your phone lines are going to be disconnected. Well, hey, I can't. So my hands are tied with that.
Speaker 3 (51:24–52:37)
I brought up the glove. I want to just say that our parents did experience frustration trying to get a hold of her in the first three or four days of school. The timing was awful. And then we had a couple of bus challenges.
So now you combine that to be, I mean, it's all about the end user, right? Our families were frustrated. something and couldn't get in contact with the staff and the staff were working hard to make sure that that was happening. So the reason putting it on the table was these things matter.
They matter around safety, they matter around end user satisfaction, which is our parents, families and I mean, there's a lot of behind the scenes things. I'm pretty sure that people realize when we talk capital, there's a lot of work that goes on behind the scenes that our families don't see. But when they don't work and they fail, they've experienced that. And so this is where those discussions are so important.
Speaker 2 (52:37–53:24)
Yeah, the first year I see this as coming up was back in FY, during 2022, right? As this came up as an FY26 projected expense. And so this is something that has been on the books for a while. Yeah, I've tried to help.
I understand. I mean, I think we can only, Prioritize what y'all think you need to prioritize. If you're saying this is not a priority for next year, then it's not a priority for next year. If it is a priority for next year, let us know.
And obviously, that's what we need to document in the presentation you say. But yeah, it does sound like a challenge. I totally agree. It's a big issue.
We did a VoIP transition over to Zoom, which will be great. So we're going to participate a little bit in Zoom. On the scale, it's It's scary. It's scary.
It affects a lot of people.
Speaker 3 (53:26–53:33)
Thank you, Rob, for all your work. If there's any time that we think we want to have Barbara come back to us, maybe in December or January, when we get close to that.
Speaker 2 (53:58–54:21)
later in the fiscal year. Looking at the clock, would people have time to meet again next week on the 30th, the morning of the 30th to continue? Because I need to wrap up in just a minute.
Speaker 3 (54:22–54:41)
At 8 o'clock, we're going to do a virtual I have a CDM and mock meeting at 8 a.m. Okay. If you want to do that virtually, I usually have that meeting here.
Speaker 4 (54:41–54:55)
I could call in. I'm probably camping on Zoom, but that would need to be about discussing these
Speaker 2 (55:01–55:49)
I mean, I could do a different day that week, really, but we wanted to stick with that one. How about this? How about I send a note just for the sake of time? Yeah.
But next week, the week of the 28th, I could do basically… Well, I actually don't know.
Speaker 3 (55:49–56:28)
I'll send the next paper. Okay. So in that, so the, just to chunk out our work again, the big picture work is the rollover for FY28. Q1 for FY28.
And then we really want to engage in, we've met with Martha's in the fall, we would like to propose a three-year plan for fees increasing each year with some assumptions made and have it be a three-year period so it can be re-evaluated on a regular basis as opposed to just setting something indefinitely so she can reassess in the positive or negative, whatever the experience is.
Speaker 4 (56:29–56:31)
We would also like to talk about
Speaker 3 (56:31–57:39)
doing something similar with small incremental increases for transportation and athletics in order to, you know, not put something on our families that is overburdensome. And if we do it with a three-year window, we can always, always evaluate and know when it's going to come to the end and have that conversation we need to, so parents can say, we need to stop doing that or we need more. It's a three-year period, so we're going to use a framework for that. The other one that we might want to discuss, but I'm not sure if we want to take it on this year, is just the rental fees.
It's a huge conversation. It's so complex and involved. This is just selfishly, I'm pausing that conversation because I think that we really tackled, started to break it last year. Does that make sense?
Speaker 2 (57:40–58:03)
Yeah, I'm personally open to that. I think every year we have to go up the cycle just a little haphazardly. I would love to get back on the cycle. are doing this.
It's their way to say, we're going to do these five this year, these five next year, the next year, and have that count.
Speaker 3 (58:03–58:38)
But I think we put it in policy that we have to address it, right? So we have to create a framework that we all have to respond to, no matter who's sitting in anybody's chair. This goes from fiscal 27 to fiscal 30, this goes from 28. Because the rest of them are, as soon as you fall unique animal within themselves, they all deserve a different kind of discussion because they serve different purposes.
Speaker 2 (58:39–59:03)
I think we'll work on that. Yeah, I'll send a note out to the group with some dates that I'm available for sort of maybe a one-off meeting on accounts and fees. We'll see if we can make that happen in the next few weeks, not the 30th. And then Lizzie and Mark, did you have a chance to look at the meeting minutes from last time?
Yep. Any comments?
Speaker 4 (59:05–59:10)
I'll make a motion to approve the minutes from September 9th, 2026.
Speaker 2 (59:11–59:20)
Second. All in favor? Okay, great. And then can I have a motion to adjourn?
Speaker 1 (59:21–59:23)
So moved. Second. All in favor?