Tonight, having the paperwork before us, having the record of the prior appeal and our discussion with Ms. Moore. I'm not sure there'd be any additional information that we would need.
Speaker 2 (00:10–01:11)
I wouldn't mind if we delayed it until January, just so that I could look into, I mean, it piques my interest, the two houses that were built around the same time, to see if they're actually on the sewer. If they were built at the same time by the same builder, why wasn't this one recorded? I guess my issue with this policy that we created is, and this appeals process is, at what stage do we actually give somebody a break if we do ever give them a break? Why did we create an appeals process if we're never ever going to allow somebody not to have to pay this bill?
Maybe we shouldn't have created this appeals process. I asked Mr. Blanchard the same thing and it was kind of like, well, we don't know. So every person that appeals this SOAR bill and they come in front of us, is it automatically a rejection, is my case, or in what circumstances would we grant some relief?
Speaker 1 (01:11–01:19)
It's not automatically. I think it's circumstances. And hardship would be one reason for granting relief.
Speaker 2 (01:20–01:23)
When you say hardship, do you mean that somebody just can't pay?
Speaker 1 (01:24–01:24)
Yes.
Speaker 3 (01:27–01:35)
Or somebody came in with proof that the connection was a newer connection than what we build it at? That would be another reason.
Speaker 2 (01:35–01:36)
I missed that, Tom?
Speaker 3 (01:37–01:50)
If somebody came in with proof that the connection occurred After the date that, you know, it was a newer connection than six years and we built it six years or a newer connection than four years.
Speaker 2 (01:50–01:55)
Right, but then it would be approved at Mr. Blanchard's level before it got to us.
Speaker 3 (01:56–01:57)
Probably, but.
Speaker 2 (01:57–02:12)
I'm saying if anybody comes in front of this board after getting rejected by Mr. Blanchard, Is there ever going to be a circumstance where we would approve it? Or is everybody an automatic rejection?
Speaker 1 (02:13–02:59)
There's no automatic rejection. Whether it's at this board or at the appeals officer level before Mr. Blanchard. If you look at the bottom of page five.
We have appointed the Assistant Time Administrator to make determinations on concerns, grievances, hardships, any dispute of facts. That goes to the point Tom raised. I had mentioned hardship raised by any aggrieved customer. The ability to pay, so there's different criteria in the policy for for determinations to be made.
And then we go through the whole process and what the appeals process has been, and Ms. Moore has been through this process. Yeah, I understand. So.
Speaker 3 (03:09–03:14)
Yeah, it pretty much is grievances, hardships, and disputed facts.
Speaker 1 (03:14–03:14)
Yes.
Speaker 2 (03:16–03:30)
But yeah, I know. I mean, I wish, to be honest, I wish I had read that better at the beginning. Because what if Miss Moore came in and said, I just can't pay it? What would happen then?
You know? Are we going to have everybody appealing now and saying, we just can't pay it?
Speaker 1 (03:31–03:59)
It's a hardship. I think the time ministry mentioned last week, we've had a number of letters already going out and there have been, this is the first appeal we've had. So, so this is the first time through this, which, you know, first time through anything is, is a challenge. Um, but we, um, those are, those would be some circumstances for granting relief if we were to make a finding that, There were some of these, one or more of these criteria were met.
Speaker 3 (04:04–04:07)
I mean, and a hardship is a high hurdle. Yes.
Speaker 1 (04:11–04:29)
A hardship goes to ability to pay. So my understanding, and correct me if I'm wrong, but I believe you said it last week, Mr. Cohen, that the house has been sold and the funds, the $5,500 are sitting in an escrow for this dispute to be resolved.
Speaker 4 (04:34–04:37)
Well, it had to sit in an escrow or the house of the sale wouldn't go through. Yes.
Speaker 1 (04:37–05:02)
Yes. And again, that's part of the policy that what we normally do under the policy is allow a period of several years for the payment to be made. It's a breakdown of how that's calculated. But obviously, when the house gets sold, then it's not something that you can bind the successor buyer to.
So that's why that gets triggered. When the house is sold, then the full payment needs to be paid out of the sale proceeds. So that's in the policy as well.
Speaker 3 (05:04–05:11)
Right, and no interest was charged, or penalties of interest are waived as long as the bill is paid.
Speaker 1 (05:12–05:26)
So Dennis has indicated he'd like to wait until January 6th. I'm not sure that additional information about other houses would be relevant. I guess I could be persuaded. I'm not sure why they would be relevant.
Speaker 2 (05:30–05:40)
Well, if the three houses were built at the same time, And you have two sewer systems that were on the register since day one, yet.
Speaker 3 (05:40–05:41)
Why wasn't the third one?
Speaker 2 (05:41–05:42)
Why wasn't the third one?
Speaker 3 (05:43–05:47)
I don't think we're ever going to be able to figure that out, though.
Speaker 2 (05:47–05:55)
Yes, but we can look at the old permits to build a house. Was there a water and sewer permit to put in the water and sewer?
Speaker 3 (05:56–06:35)
Well, we discussed that, too, when we went through that, that we weren't going to go there. Some of these well could have been if you want to call it the town's fault, in that either the records got lost or they were all paper records back then. There were no computers back 35 years ago, if that's when it happened, at least not at the town level. And these were all manual records.
And it could well be that the town lost it. It could well be that the contractor didn't submit it. I mean, there's just no way of knowing.
Speaker 1 (06:36–07:29)
And DPW's job has been to look into these and figure it out, to the extent they can, to see, you know, was there ever a connection? Was there a, I forget what Joe called them, he had some kind of a name for the paper cards, you know, to try to do some research into what the circumstances were, whether it was an error, a clerical error in the town, or whether it was the fault of a contractor, to the extent that they can determine that. But in either scenario, whether it's a mistake by the town, or a mistake by a contractor, or by a homeowner, or some other reason, whether it was a connection that was made that wasn't made known to the town. And again, that doesn't sound like that was the case here.
Regardless of which one it was, that because the homeowner still had the benefit of the service over a number of years, then we'd still have the six year look back period.
Speaker 3 (07:29–08:24)
The only thing I'd like to discuss maybe a little bit further is the sprinkler system. And I mean, we really can't determine at this point whether the phase knew that they were connected to sewerage or not. They didn't have a separate meter. I have a sprinkler system.
I'm connected to septic. I don't have a separate meter. There's no reason to because I don't pay sewerage anyways. The only reason you'd have one is if you were connected to Town Sewerage.
Had they had one, certainly this bill would have been cheaper because whatever water they were using to sprinkle wasn't going down the sewer system. Should we consider maybe some relief in that sense?
Speaker 2 (08:25–08:47)
I'm glad you said that, Tom, because I understand the appeals process better than anybody. I'm always in front of appeals boards. And it's usually not black and white. It's not like you get rejected or you get approved.
It's where can we negotiate? And I'm not sure if we put that in our policy.
Speaker 1 (08:49–09:43)
Well, the policy says for hardship, for facts in dispute. I mean, the policy is something that we spent, I just want to point this out, this board spent a fair amount of time with Joe Lynch, with town council, with town administrator, and others working on this policy. And it does give certain criteria. We get to keep in mind the homes that were not built did receive a benefit.
Obviously, the terms vary depending on the home and when it was built and when the connection was made. But there is a benefit that homeowners have received that have not been paid for that other residents in the town have paid for during that particular period of time. So we did give a narrow category of why we would grant relief from the look back period. So I think the policy does have the criteria that we would apply.
Speaker 2 (09:43–10:11)
I mean, if we're talking about hardship, just in my opinion, I believe that there is some hardship here. It's not Mary Moore's house, it was her parents. They both died within a month of each other. She's left holding the bag here to pay all the bills.
She's faced with this $5,500 bill that she never expected. I think there should be some consideration for $1,000 or something.
Speaker 1 (10:12–10:18)
Well, I think Tom's point about the sewer is something that we could look into.
Speaker 4 (10:18–10:19)
The sprinkler system.
Speaker 1 (10:19–10:28)
The sprinkler system, excuse me. I guess we would need to ask DPW to look into that issue for us and see if they could run a calculation.
Speaker 3 (10:28–10:38)
Some kind of equitable split between sprinkler system and other water use. It would have to be an estimate. There's obviously no way to determine it.
Speaker 1 (10:38–10:45)
I think that's all it could be is an estimate. Yeah. And Ms. Moore, I believe you said that you're not sure when the sprinkler was hooked up.
Speaker 4 (10:46–11:00)
I honestly don't know. I think it's been quite some time that I'm aware of because my parents always had a very nice lawn. How big was the lawn?
Speaker 3 (11:01–11:02)
Approximately how big?
Speaker 4 (11:02–11:40)
It's not very big. I mean, it's got a backyard. I really don't even know how big it is. And it's got a front yard and this conservation over on the left of it.
She had it running, I don't know, like twice a day, every other day. I know the last bill that I got, because I had it on probably more than normal, was one of the higher ones, because it was a lot more than I thought it was going to be.
Speaker 3 (11:44–11:45)
What was the address of the house?
Speaker 4 (11:46–11:49)
329 Canton Ave.
Speaker 3 (12:04–12:07)
329. Canton. Canton F? Yeah.
Speaker 1 (12:09–12:47)
You're looking for the acreage? The size of the lot? Yeah, the size of the lot. It sounds like that's the consensus of the board to look into the sprinkler issue and how that might, how DPW would be able to estimate the difference between the sprinkler system and the home.
The charges, the water charges attributable to both, to the extent that they can. Is that the desire of the board to take this under advisement and to continue it until January 6th?
Speaker 3 (12:48–12:50)
Unless it's something we can determine tonight.
Speaker 1 (12:50–12:55)
Do we have a motion to continue the hearing until January 6th?
Speaker 2 (12:56–12:59)
I'll make that motion. So second.
Speaker 1 (12:59–13:00)
Any discussion on the motion?
Speaker 2 (13:00–13:01)
No.
Speaker 1 (13:01–13:10)
All in favor? Aye. Aye. OK, Ms.
Moore, we'll continue this until January 6. If you'd like to be here, you certainly can be. It's not a requirement.
Speaker 4 (13:10–13:11)
You'll just let me know then?
Speaker 1 (13:12–13:28)
Yes, but you're certainly welcome to be here. The meeting will be in this room. It's a Tuesday, January 6. At 7 o'clock would be our next meeting.
And what we'll do is contact you beforehand and let you know where on the agenda it will be so that we can give you an estimate on what time you can be here. I know you were waiting quite a while tonight, so we appreciate your waiting.
Speaker 4 (13:28–13:28)
OK.
Speaker 1 (13:29–13:40)
All right, thank you for being here. Michael, thank you for staying. We are on to the public works budget would be next. Do we want to take something else out of order?
Speaker 2 (13:42–13:42)
Engineering?
Speaker 1 (13:43–13:59)
I think that's also DPW. Dispatch? Yeah, let's go on to that number 11, the civilian dispatch applicant.
Speaker 2 (13:59–14:10)
I'll make a motion to approve. The appointment of Sean Casey, 585 Adams Street, to the position of civilian dispatcher in the Milton Police Department contingent upon approval by the personnel board.
Speaker 1 (14:10–14:11)
Second.
Speaker 2 (14:11–14:15)
And a successful psychological and medical screening. Second.
Speaker 1 (14:15–14:17)
Any discussion? All in favor? Aye.
Speaker 4 (14:18–14:18)
Aye.
Speaker 1 (14:21–14:24)
Why don't we go into number 14, the Wakefield Charitable Trust pilot payment.
Speaker 3 (14:25–14:37)
I'll make a motion to approve a payment in lieu of taxes, a pilot payment from the Mary M.B. Wakefield Charitable Trust in the amount of $16,000. Second.
Speaker 1 (14:38–14:38)
Discussion?
Speaker 3 (14:39–14:39)
All in favor?
Speaker 1 (14:40–14:40)
Aye.
Speaker 3 (14:41–14:47)
Very thankful for that generous donation. It is. It's not a big charitable trust.
Speaker 1 (14:48–15:14)
It's not. And it's a good significant sum for a charitable organization of that size. So we thank them for that donation. OK, DPW Director Joe Lynch is here.
So we will move on. Just letting the town administrator know we've covered items number 11 and 14. Good evening, Joe.
Speaker 5 (15:15–15:15)
Good evening.
Speaker 1 (15:17–15:29)
We have a few items for you tonight, including one. Shall we start with your budget? I thought your narrative report, Joe, was very good and very helpful.
Speaker 2 (15:30–15:31)
That was very helpful.
Speaker 5 (15:31–18:06)
It was late, and I apologize for that. And I hope it was clear enough to give you some good insight on it. It did. But I guess for the folks at home who haven't understood where we're at yet, everybody knows that the charge given to us was to produce three budgets.
One was the level dollar, same as last year, as you guys all know. And one is to come in with a 2% cut And that's complicated for me on how you get there. But in essence, it's to reduce your spending. And then lastly is those things that you need to do, ought to do, without being crazy, without being over-exuberant, to come in and tell the town what that is.
And we did that. We did exactly that. We did achieve our level dollar budget. And our level of service budget, coincidentally, is down close to the level dollar budget.
And as I go through, I can explain how we achieved that. We did a 2% cut as a way to demonstrate that if we did that, there would be some loss of services, and those services would be focused on an area that's really a new mandate, and you've heard me talk about it for years, and that's the NPDES, National Pollution Discharge Elimination System, stormwater system. So, given that charge, what we did is look at some of the direction given to us as far as the the way the funds are managed throughout the year. And part of that charge included that a separate budget be done for each department.
And I use the word department in quotes. And maybe the narrative didn't clearly follow that. But in essence, we think of Public Works as Public Works. The public does.
I think of Public Works as nine departments. It's Public Works, it's Vehicle Maintenance, It's the collection of the trash, it's the transfer and disposal of the trash, it's recycling, hazardous waste material handling, landfill closure, water and sewer. This year, recognizing that there's this new federal permit out for public comment, we know we are ramping up, and I've been talking about this for years, ramping up towards that new permit and the expectations of that permit. I've talked to this board in recent history about The thought is that if the draft permit ends up passing and becoming the final permit, the impact to Milton is $1.2 to $1.3 million a year in stormwater spending.
Can you remind us what that permit is?
Speaker 2 (18:06–18:06)
Stormwater.
Speaker 5 (18:06–21:44)
That's a stormwater permit. That's a federal EPA permit under the system that's called National Pollution Discharge Elimination System. Our acronym, we refer to it as NPDES. Some people call it NITPIC, but we call it NIPTEES.
So we partnered up with other communities, the Regional Planning Agency, as well as NEPRA, if you remember. In fact, I think maybe it's for a future agenda, is to discuss partnering up with them again for another grant. But we got a Community Innovation Challenge grant. And part of that grant was for the group of communities to look at what this new permit meant, how would they best gear up to meet it.
More importantly, on a regional basis, what types of things can towns do as a group to minimize redundancy and effort and therefore make it more efficient and less costly and more cost effective, if you will. But part of that also was that two communities were singled out to be a pilot community to look specifically at what you're doing, how you're doing it, put it in the context of the new permit so you can better understand what that might cost. And that's where that $1.2 to $1.3 million estimate comes from is through that effort, that planned effort. It's not a wild guess.
It's very carefully planned maceration of looking at the permit compared to those things that we already do. And what came out of that, and And the talk in our realm has been stormwater, ramping up year to year to year. In November, Ann Marie, the town administrator, and Amy Dexter, the town accountant, and I went to a workshop sponsored by the MWRA, and there were couple hundred people in that room. And the topic was exactly that.
And the things that the town should be prepared for, it was more abstract, but we, of course, we knew what it meant in our own way. What came out of it, though, is the towns should be doing the stormwater work they've been doing, tracking what you're doing and the dollars that you're spending already. Those are monies you're already investing into that effort. And then lastly, Contemplate how you're going to pay for it in the future.
And we've talked in the past. There are tools available down the road, a couple of years, in fact, probably, before we look at, do we create a stormwater utility? Do we add this extra cost to the tax base? Do we just give a flat fee to per household basis, per taxpayer basis?
Do we do it on some sort of equity of impervious area? Sky's the limit further down the road. But what that allows us to do is allow me to look at this budget And I created, for the first time, a stormwater budget. Why?
Because we collect yard waste at a substantial cost. It's required on the permit. Put it in stormwater. We collect household hazardous waste, $12,000, $13,000 a year.
Put it in stormwater. We sweep streets, clean catch basins, clean drain lines, do inspections of drain lines. We administer the maps. We administer the permit.
All those things we're doing. I put in stormwater. So as this effort moves forward, we can demonstrate to EPA, these are the things we're doing, and this is what we're spending already. So you see a new department for the first time.
So I don't want you to think it's, you know, I'm just trying to slide something in. Tom asked three years ago, brilliant idea, is taking all of those departments and try to compare personnel's up and expenses are down and that.
Speaker 3 (21:44–21:46)
Yeah, pull them all back together.
Speaker 5 (21:46–22:24)
Put them into a summary budget, and I've done that. And that's actually the first sheet of the budget that you have. And you can see, by taking those things that are DPW, general, vehicle maintenance, solid waste, and storm water, those things known as DPW, pull them all together in an aggregate, you can see, in fact, I hit the level dollar budget by balancing between them. And the level of service also allows me to do that.
And I can do that for about the same money. So with that said, do you want me?
Speaker 2 (22:24–22:32)
I had one question. Sure, go ahead. So this stormwater, is this completely new from this year on or has it always been there? Some of it's been there.
Speaker 5 (22:32–23:07)
I think it's something new, right? Exactly. The new permit, So you were driving a high-performance car. Well, they just gave you a Formula One car.
We've been doing this thing, and we've been riding it now for eight years. And they've just now said, OK, you're doing really good. Boom. The entire United States.
Now you're doing these things. Some of the things we hadn't been doing a great job on, but they're going to. Absolutely come in and say, well, now you have to do those. And there's probably going to be a three, four, five year phase in before you fully implement all of the new permit.
Speaker 2 (23:07–23:14)
Who monitors all of this? So you're going to be cleaning streets and- Well, it's three people.
Speaker 5 (23:15–23:46)
Self-reporting, under pains of perjury every April. I do. And I have to report that to DEP and to the EPA. DEP and the EPA both monitor Milton.
DEP monitors the state as well. So we have to be in compliance with the state in answer to them. The state themselves have the overall permit, and EPA monitors them and us directly.
Speaker 2 (23:47–23:48)
If you're in violation, what happens?
Speaker 5 (23:48–23:55)
$25,000 a day per violation, every day being a separate violation. It's the penalty, maximum.
Speaker 2 (23:55–24:01)
Very quickly, how much extra to your budget this year is the stormwater utility budget?
Speaker 5 (24:01–24:27)
I was going to get into that in a little more detail. I think the round number is $150,000, and what I did is I took the liberty of recognizing that we, there was a Solid Waste Advisory Committee and this Board of Selectmen approved a contract to issue a new trash contract. We went through some growing pains of going from five-day collection to two-day collection, but the net result of that is we saved $150,000 this year over the last year's cost.
Speaker 2 (24:27–24:31)
On the garbage. On trash. On trash. Trash and recycling.
And that's going to go to the increase.
Speaker 5 (24:32–24:44)
And I took that money and put it into stormwater. OK. To achieve the net zero increase in level dollar fuel. I see.
Speaker 3 (24:44–24:57)
OK. Joe, just looking at, because it looks like in terms of getting your minus 2% of water that came out of stormwater, the reductions.
Speaker 5 (24:57–24:58)
Yeah.
Speaker 3 (24:58–25:00)
About $100,000 anyways came out of.
Speaker 5 (25:00–25:19)
Well, I was trying to not hit the services that we're providing on a regular basis, which, in my opinion, fall short of what we should be doing anyway. So recognizing these are new mandates, if the direction of the town is to, in fact, cut 2%, then my answer is going to be, I will tell EPA.
Speaker 3 (25:19–25:20)
We can't afford it.
Speaker 5 (25:20–25:52)
We can't afford it. We've tried. The town might have to answer, well, what do you do with the money you save? Towns have to balance budgets all the time, you know, across the entire country, not just in Milton.
But that's how I did it. I did it deliberately, Tom, recognizing that, you know, I don't think there should be much of a tolerance of cutting the services we provide day to day. I also don't think we should be cutting those services and trying to meet this mandate, especially when we have the opportunity that we did of the trash savings. That's my opinion.
I mean, for what it's worth.
Speaker 3 (25:52–26:07)
So the 2% reduction in the stormwater would mean less, certainly a reduction in the amount of services provided in terms of stormwater mitigation.
Speaker 5 (26:07–26:22)
It would be a reduction? None of those things that we're already doing. I think I can still maintain those things. But the extra things that are going to ramp up on that new permit, those new things that they're going to be wanting in the early years, those are the ones that are going to be in peril.
We'll go first.
Speaker 3 (26:23–26:24)
Mm-hmm.
Speaker 5 (26:24–26:49)
OK. That's what I chose to do. Now, are there also some new positions in here? I know it's- Numerically, there is, just as a matter of clarity.
But in reality, there isn't. Reorganization just recently happened. I think just last week, it closed and became official. So in the FY16 budget, the one person who's been transferred from the central business office whose duties are water and sewer, her position has been moved to public.
Speaker 3 (26:49–26:50)
That's right, yeah.
Speaker 5 (26:50–26:52)
But she's fully allocated half water, half sewer.
Speaker 3 (26:52–26:53)
Yep, okay.
Speaker 5 (26:53–27:04)
So even though it's a net one increase, if you look at central business office, there's a net one loss of that position. I'm not sure what else is happening over there.
Speaker 3 (27:04–27:22)
Okay. It was a dollar-for-dollar transfer, so there's no increase. So in your DPW budget, forgetting about the enterprise funds, the change in the personnel line item is really just the raises?
Speaker 5 (27:22–27:39)
It's 100% attributed to contractually-balanced increases, you know, cost of living increases, any person who would be entitled to a step was included, and then the in-longevity payments, and anybody who gets stipends.
Speaker 3 (27:39–28:06)
The only other thing I noticed, and just in keeping with the way that the Warrant Committee wanted it, is the contractual The line item the contractual services are winding up on was the wrong line. The disposal contract, the collection wound up in general expense as opposed to contractual expense. And it probably should drop down. I think we should probably just make that change.
I mean, again, it really doesn't make any difference because we didn't.
Speaker 5 (28:08–28:41)
Yeah, on this Schedule E. There's three lines that that can happen on. It's the collection of refuse. Yep.
That's just a per, it's a per year fee, it's known. Yep. It's the collection of recycling and a per year fee, and it's collection of recycling. The disposal of trash is a unit cost that should stay up in expenses, because it's not known.
It's a unit cost. It's no different than what the cost of fuel is. Right. And the processing of recycling should stay up in expenses, because that's a per ton basis as well.
And the same with yard waste.
Speaker 3 (28:41–28:49)
Those should all stay up in expenses. I agree. I agree. But I think when I looked at it, I'm pretty sure they were all ones up top, I think.
Speaker 5 (28:50–28:50)
They were.
Speaker 3 (28:51–28:51)
Yeah.
Speaker 5 (28:51–28:51)
Yes, they were.
Speaker 3 (28:52–28:58)
So those ones that are contracts, I think, should just be moved down. That's all. And I don't think it doesn't impact anything, just.
Speaker 1 (29:01–29:47)
Joe, on DPW General, two things. I was glad to see you allocated some of the funds for trees, because we've been trying to make that something to restore. And we certainly get a lot of inquiries and requests about trees. The second point was you mentioned that the cost of utilities at Town Hall are all within your budget, that the expectation was that at some point they would go into consolidated facilities.
But they're still in your budget, and yet you don't have any management or control over use of utilities or conservation efforts. Do you work with consolidated facilities at all to try to coordinate efforts there, or are there conservation steps we can take even with the system?
Speaker 5 (29:47–30:34)
I think the Consolidated Facilities Department does a great job in coming up with ways to save money. They re-lamp the entire building with energy-efficient lighting. My point was more to the . .
. I mean, the reality is why not? If we know that I'm spending X number of dollars on town hall on an average basis, At some point in time, take that money, put it over there. Because what happens is as rates increase year to year, regardless of any energy savings, why is my department saddled with the increases?
At the expense of not planting trees, for example. So that's me maybe being It's a little too forthright, but it's a fact. It's not adversarial by any means. It's still in my budget and it's included this year, too.
Speaker 1 (30:34–30:55)
Maybe that's something we should look at for next year, trying to move that over to consolidated facilities. any way to reduce costs through bulk buying with the schools? I think we're doing that. If it's moving into his budget, does it give any savings there?
Does it matter whose budget it's in? I don't think so.
Speaker 3 (30:55–31:10)
I think it really does, other than the fact that when you try to deal with level dollar budgets, it's clearly unfair, but it's just as unfair to put it all in consolidated facilities if you're going to try and hold them to a level dollar budget. It's not their expense either.
Speaker 5 (31:10–31:15)
To Katie's point, the town is purchasing the commodity, the energy.
Speaker 1 (31:15–31:19)
So are you coordinating the buying efforts with consolidated facilities and DPW?
Speaker 5 (31:20–31:39)
Townwide. I'm not buying my own. We buy the gasoline and diesel fuel on behalf of the entire town. They and the school department buy the energy on behalf of the entire town.
Whichever facility it is, whether it's the library, police station, my buildings, this building, they're all paying a rate that was negotiated as a group.
Speaker 1 (31:39–31:39)
OK.
Speaker 2 (31:43–31:51)
Yeah, but I agree with you, Katie. We should really consider getting that out of his budget next year. Let's do it.
Speaker 1 (31:53–31:57)
All right. We have other comments or questions on Joe's budgets? Don't be on that now.
Speaker 2 (31:58–32:08)
Joe, there was just on your narrative on the second page, were these percentages supposed to add up to 100%? Yes.
Speaker 5 (32:09–32:14)
They're probably rounded. So there's a fractional.
Speaker 2 (32:15–32:18)
Well, it adds up to 90%. I'm just wondering what's the other 10%.
Speaker 5 (32:18–32:18)
90?
Speaker 2 (32:18–32:29)
Yeah. Where would the 10% be? And I should have called you earlier on it, not to put you on the spot here, but.
Speaker 5 (32:29–32:44)
You probably have the answer here. I can tell you the answer is probably sitting somewhere on my fingers who typed in a wrong number. Let's see what we had here. Allocation.
Speaker 3 (32:48–32:49)
Is that scenario number two?
Speaker 5 (33:04–33:06)
Actually, I'm looking at my spreadsheet, and the spreadsheet is 100.
Speaker 2 (33:09–33:10)
Maybe I'm embarrassing myself here.
Speaker 5 (33:11–33:12)
I didn't mean to do that.
Speaker 2 (33:12–33:13)
No, no.
Speaker 5 (33:16–33:18)
I was willing to admit it was a typo, but I think they are 100.
Speaker 1 (33:21–33:22)
Any other questions or comments for Joe?
Speaker 5 (33:23–33:24)
I'm sorry to ask.
Speaker 1 (33:24–33:37)
No, I still get it. Joe, the town administrator passed me a note. Always a good suggestion. We've got two holiday weeks coming up.
Could you remind the viewers about the trash collection schedule for the next two weeks?
Speaker 5 (33:37–34:28)
Great opportunity. Keeping it simple, we are lucky that the holidays fall, meaning Christmas and New Year's both fall on Thursdays this year, just as Thanksgiving did, which means on those days, the entire town will be collected on Wednesday. Christmas Eve and New Year's Eve, the entire town. So regardless of where you live or what your day used to be last week or the month before, Wednesday of next week and Wednesday of the following week for the entire town.
The week after that, we're going to go right back to our Wednesday-Thursday schedule, which is what's been happening since July. And the only thing I do want to point out is we have our Martin Luther King holiday coming up in mid-January. Regardless of a Monday holiday, there is no delay ever. It's always going to be a Wednesday or a Thursday, regardless of what holiday week.
Speaker 2 (34:28–34:29)
Three times.
Speaker 1 (34:30–34:54)
And speaking of the solid waste contract savings, you had a good point in this narrative that I think we're going to need to emphasize to the Warren Committee and going forward that this contract, when it expires, we might be facing a pretty significant increase because the circumstances under which we got the two-day-a-week collection.
Speaker 3 (34:55–34:57)
Just because you had a contract with capacity
Speaker 1 (34:57–35:11)
Right. It's because the Sunrise Scavenger had a contract for the other three days and happened to have the two days free. So we're benefiting it in these, is it three years or five years? I think it's five years.
Five years. So at some point, we're going to potentially face a substantial increase.
Speaker 5 (35:11–35:51)
And we'll take credit for $750,000 worth of savings when recognizing the day of reckoning might be in 2020 when the new contract goes into place. Joe, what was the savings again? Well, it's $150,000 per year on average. So the life of the contract, it's $750,000.
3 quarters of a million dollars is not bad in a five-year contract. No, very good. As a committee, and there's two other members sitting at this table here, we were blessed with a very, very unique opportunity. And as many of us were wringing our hands saying, oh my god, people hate change in this town, we felt really the two-day shift was well worth it.
And so far, I believe it is.
Speaker 1 (35:51–36:08)
Yeah. That's something we'll just have to keep in mind, especially as we get into years three and four, that there could be a big increase at some point. We'll see what the circumstances are at that point. Any other questions or comments on the various DPW budgets?
I don't.
Speaker 2 (36:09–36:09)
I'm good.
Speaker 5 (36:10–36:45)
OK. Joe, anything else you want to add? I do want to point out that Water and Sewer, just for the public, you people know that they're enterprise. For the first time, they're purely enterprise.
There are some other numbers that I've submitted the budget as it is. There are three pretty big elements that are hanging out there. That's short-term borrowing. That's long-term debt service, especially given the fact we just authorized $5.4 million in borrowing and water.
And the MWRA assessment. Those are all pretty big numbers. We're waiting for those numbers in the indirect cost allocation, meaning all the other departments, how they get assigned.
Speaker 3 (36:45–36:47)
I don't think that's going to change dramatically, though, right?
Speaker 5 (36:47–38:05)
The allocation, probably not. It's hot off the press, and if you don't mind, I'd like to share some great news. This is something that my department should be very proud of. When I say hot off the press, I mean literally this morning.
My narrative, in fact, which I finished up putting the polish on last night, even speaks to that they don't issue preliminary numbers until sometime shortly after the new year. Got them today. These are not assessments. This is, if you understand how our Two big factors that affect our assessment is flow share on water.
How much water do you use as compared to the entire district? How much sewerage do you contribute to the system as compared to the entire district? Our water flow share, meaning what we used as compared to other districts, has gone down 2.9%. in what's going to be used for this year's assessment.
That reverberates through to, comparatively, we'll be paying, in fact, it is the second best savings in water flow share across all of the 29 wholly served communities. What do you attribute that to?
Speaker 3 (38:05–38:06)
Flushing the toilet flush.
Speaker 2 (38:06–38:17)
It's leaks, it's maintenance, it's the change in metering. Didn't we have a faulty meter one time?
Speaker 5 (38:17–39:46)
We challenged them on that. We fought that battle for a good year and a half, and in the end, what we finally have is I think for the first time in maybe a decade, we have far more accurate metering. And it took that first year of phasing in, of getting that new meter, and now it's really showing consistency year to year. And so that's, I think it's very, very good benefit to us.
So that's not, I'll be very careful, that's not a 2.9% reduction in our assessment. That's not a 2.9% reduction in rates. That means simply that when the MWRA completes their final budget, our share of it is going to simply be that much less than everybody else's, which is great news. water side of it, the sewer side of things.
I keep saying sewer and then side, but on the other side of the equation, you've got more complicated, based on a three-year average, peak flows. What it all boils down to in the end is our flow share there has reduced by, actually, 2.7% as compared to the entire MWRA system. Out of 43 sewered communities, we have the third best reduction in flow share. So we are really measuring up very, very well in finding financial benefit because of that.
Speaker 3 (39:46–39:47)
Yeah, it's very good news.
Speaker 1 (39:47–39:48)
It is good news.
Speaker 5 (39:49–40:04)
So still sometime in the end of December or that first week in January, we will get what those mean in dollars as a preliminary assessment. Sometime in June, well after town meeting, we'll get the final assessment, which is what we build our rates on when we come in.
Speaker 1 (40:07–40:14)
How is it going with the prorated multifamily properties? How is that working administratively in your office?
Speaker 5 (40:15–41:31)
It's difficult. We had actually, I can't tell a story out of school in front of the TV. We did have one challenge from one of those customers. The result of that challenge, They invited us in to look at the situation, their configuration.
One of those things we were concerned about, the metering and multiple meters, how we're not in control of the plumbing. Through that process, we discovered, in fact, that there was two new meters added, one of which we knew about, second of which we had no record of. It's been in existence for a long time. We're going to have to back-bill them.
They did it on their own with no permits. And in fact, their multi-tier savings and their questioning of how it was done brought us in to discover that. So I think it's working pretty well in the long run. Similarly, we're making headway week to week, certainly month to month on the SOAR investigations as well.
And we've returned an awful lot of people to the SOAR roles. We've put people on payment plans. We've had people who've paid them outright. So that's working pretty well.
I think that's working very well. To my knowledge, I think there's There hasn't been more than one or two appeals.
Speaker 3 (41:31–41:36)
At some point in time, can you come in with just a report to the selectmen? Yeah, in a future date.
Speaker 1 (41:36–41:36)
Sure.
Speaker 3 (41:36–41:38)
I wasn't prepared to do that, but I did.
Speaker 1 (41:38–41:47)
You just heard an appeal earlier tonight. OK, anything else on this budget? I'm good, so. And do we have a motion?
Move.
Speaker 3 (41:48–42:33)
I'll move to approve and forward to the Warrant Committee of the Department of Public Works FY16 budget as follows, DPW General, vehicle maintenance, solid waste, stormwater, $4,348,974 level service, $4,348,697 level dollar, Water, $5,177,532 level service. $4,457,581 level dollar. Sewer, $7,371,064 level dollar. Second.
Speaker 5 (42:34–42:58)
Any further discussion? Before you take the vote, be careful on the water and the soil. Those are not final numbers. We still have some pretty big numbers that have to come in.
I would say if you vote that, fully recognize before we go to the Warren Committee, when the numbers work out with our consultant, with Amy, they will be higher. They will absolutely be higher.
Speaker 1 (42:58–43:14)
We can submit a revised budget in January. OK, then, all in favor? Aye. Aye.
Aye. OK, unanimous. Thank you. Joe, we have two other items for you.
One is the approval of an engineering intern. Liam Charette Fahey.
Speaker 3 (43:15–43:24)
I move to approve the temporary seasonal appointment of Liam Charette Fahey, 182 Thatcher Street, in the engineering department, beginning January 1, 2015.
Speaker 2 (43:24–43:30)
Second. Any discussion? What is he going to be doing?
Speaker 5 (43:32–44:08)
We always have two interns in the engineering department, and they are typically working on our water projects, our soil projects, our drain projects, doing the plans and specs, putting them together. I mean, they're not doing hardcore engineering, but they're working on the tutelage of. Is it a paid internship? Oh, it's a paid internship.
Yes, it is. Yes, it is. We're fortunate this year. We typically get them out of, mostly out of Wentworth.
University, we get them out of Northeastern. This particular student is a first year or second year student at Wentworth and happens to live in Milton. It's a great situation.
Speaker 1 (44:09–44:19)
If no other discussion, then all in favor. Aye. Aye. And also, Joe, we have an acceptance of a gift from Sullivan and Company.
Maybe you could just speak a little to this before we make a motion.
Speaker 5 (44:20–45:37)
Sure. Milton Hill House, if you recall, actually, you should recall, it's a beautiful facility. Just built that new apartment building up on Elliott Street across from Steel and Rye, across from the tracks from Steel and Rye. Part of that planning board approval required the developer to make certain improvements in front of their building, street lighting, sidewalks, and the sorts, street furnishings.
It was made in good decision in the context and in the vacuum of the project that was before them. What they didn't realize is we had simultaneously had pending a MassWorks grant to do these very similar items along the same stretch of street. We got that grant. We are working on that grant.
We've awarded the contract. If you remember, D'Alessandro, you guys voted a couple of meetings ago. We had a kickoff meeting last week. They're prepared to start next week.
The situation is why should we spend the money? Why should they not spend the money? So as part of the planning board's decision, allow them to contribute what would have been their value. of doing those things.
But we took our Unicross pricing and simply assigned it to that project, came up with that dollar, which is the gift amount. They're going to gift it to the town for that specific purpose, which augments or supplements our MassWorks funds.
Speaker 2 (45:38–45:53)
That makes sense. I like that. They do this in Boston as well. Yeah, we're not trying to be too innovative.
No, I understand. But it's a great idea, I thought. You build a project that big, you've got to subscribe to the town.
Speaker 5 (45:53–46:10)
It's got a complete harmonious look out there for all the way from the Central Avenue Business District to the Milton Hill Business District and everything now in between. It's going to give it a really unified look and it's going to be nice. Nicer than it already is.
Speaker 3 (46:11–46:26)
I'll move to accept a gift in the amount of $148,523 from Sullivan & Company, Inc. to cover the cost of installing new period lighting, granite curbing, and other sidewalk improvements along the front of 36-50 Elliot Street. Second that.
Speaker 1 (46:27–46:29)
Any discussion? All in favor?
Speaker 3 (46:30–46:32)
Aye. Thank you very much.
Speaker 1 (46:32–47:29)
Thanks, Joe. Anything else? I don't think we had anything else for you, Joe, tonight. Thank you.
Thanks for waiting around. You're welcome. We appreciate it. We know you're getting to later than we thought we would.
But thanks very much. Good night. OK. We've covered the dispatch applicant.
We are on to the town meeting articles. And I believe the planning director is going to join us for that. OK, so when we meet next on January 6, that's the night we'll be closing the warrant. And so we should discuss tonight articles that we want to submit.
I also have an update from the Government Study Committee on articles that they will be submitting. I spoke with one of the, Bill, are you here for a particular article?
Speaker 6 (47:30–48:10)
Articles I know that we need to add in one of them is an updated zoning map and the other is The reuse of the old landfill access road Although we took at the October town meeting and changed the use of the Land to the left of the access road as you go up from Randolph have We didn't do is change the use of the road from landfill purposes to municipal purposes. So I'll do that with Mr. Flynn and get it in the right order and submit it by before the 5th.
Speaker 1 (48:10–48:15)
Okay. Zoning map is a planning board article that they will be submitting, correct?
Speaker 6 (48:15–49:40)
The zoning board article, the zoning map article, yes. It's actually a It's the planning department being done with Alan Bishop because our map is, we found a few mistakes in the plan itself. It was last adopted by town meeting in 1995. There was a map amendment that was added in in 2002, but there's no, we didn't implement what we passed that town meeting.
We created a plan, but we never added in the overlay districts. So what we did is we took a 1995 map that was based on a hand-drawn map, and we did it in AutoCAD in 2002. And it's not the same. So we're trying to go back.
fix the mistakes that happen between one software package and the handwritten package. Now we do it parcel by parcel. We can identify all of those. So it's a bit of a process that we have to identify where the holes are when we do it parcel by parcel.
So the list will be fairly long identifying what parcels are. So it's more the planning department than the planning board that'll be submitting it. I'll do it any way you want.
Speaker 1 (49:41–49:50)
I was asking because I didn't know whether you were asking us to submit it or I just assumed it was a planning board article. Is it one that we as a board would be submitting? Because I think that's what we want to discuss tonight.
Speaker 6 (49:50–49:57)
I think it actually is going to wind up. It would be the planning board that would have to submit it because it is their zoning.
Speaker 1 (49:58–50:08)
That makes sense. All right, and the landfill access road, that's one that you will connect. Yes, but you're going to work with the town council on that one. OK.
Speaker 6 (50:09–50:10)
That's it for my articles.
Speaker 1 (50:11–52:34)
OK, great. All right. Thank you, Bill. Thank you, Bill.
Bye. Good night. OK, so we should talk about articles we want to submit. And also, I had a conversation with Rick Neely, and he gave me an update on what the town government study committee will be submitting.
And there's one of them that both our board and their committee are interested in. So I just wanted to mention the ones that he went over with me. And the one that both boards would consider co-sponsoring Article for a Stronger Town Administrator form of government. So we've asked town council to draft something.
We have not received a draft yet, but the Government Study Committee is also looking at this and intended to submit an article. So I mentioned to Rick that I'd bring a discussion of it tonight to see whether we'd want to co-sponsor it. with the Government Study Committee and that way they and we together would be able to look at the draft once we get it. I think they're meeting on the 5th and we'd be meeting next on the 6th so we could hopefully have the article language well enough in advance that it would be an opportunity for them to review it and comment on it on the 5th and us on the 6th.
And then the idea would be that the I'm talking with the Town Administrator and Town Council. The idea would be that the article itself would be fairly short and simple, and that the job description of the Town Administrator would really be something we'd work out in the next, say, six weeks. With the idea of giving that to the Warrant Committee, presenting that to the Warrant Committee, In the form of either a proposed recommendation or something that we would request that they consider for their recommendation So the recommendation will be more detailed have the duties of the town administrator That we and the government study committee and the town administrator and town council and maybe others Come up with together jointly, but the article itself would be short and the detail and not have detailed the detail would be in the recommendation that we'd ask the Warren committee to put forward and which I'm sure would mean going in and having some meetings with the Warren Committee after we agree on this ourselves. How does that sound?
It makes sense to me, yeah. OK. The Town Government Study Committee is putting forward articles for an audit committee. Is it an article for a quorum article?
Speaker 3 (52:34–53:47)
Yeah, the quorum article sounded fine. I had some problems with the audit committee. Well, there were some language problems. calling things generally accepted accounting principles when they should have been generally accepted auditing standards and things like that I sent off to Rick.
They were just clearly wrong language. The other thing I did mention to him and shot along an article on what constitutes a full audit committee at a municipal level. And it goes far, far beyond what that article would call for. Now, and as I put it to Rick, I don't know if you consider this an intended to be what I called a weaker audit committee because its duties would be limited.
On the other hand, a full-blown audit committee could be a pretty onerous task that you might have a lot of difficulty finding people to fill the role.
Speaker 1 (53:48–53:50)
So you're talking with Rick about this?
Speaker 3 (53:50–53:54)
I emailed him tonight or this afternoon.
Speaker 1 (53:54–55:17)
They may take it up at their next meeting then. They're also going to be putting forward an article for a bylaw review committee. an article to create the OPEB trust, which was discussed in the DOR report. They will be submitting an article to reconstitute or reappoint the IT committee, information technology.
And they had a vote at one of their previous meetings on the issue of the five versus three member board of selectmen. They voted, I believe it was a five to four vote, not to recommend a five member board of selectmen. Rick indicated to me that that was based on their preliminary research, that they had it on their agenda for their most recent meeting, which I think was this week. and that they did not get to it because they had a pretty full agenda, but they expect to take it up again on the 5th.
So he indicated that there may be another vote taken on that because they've got some additional research results. So I did say to him that maybe that would be something that we, I don't know whether you want to talk about that tonight or give them any feedback on our thoughts on the three-member versus five-member or not discuss and just wait and see where the research that they're doing, what the results are. But I thought I'd bring it up because it's likely that there could, I shouldn't say it's likely, it's possible that there could be an article to that effect. They won't know until the 5th.
Speaker 3 (55:17–56:15)
I guess, yeah, I haven't changed on it really. I can see I can see an advantage to it as the board moves towards more of a policy-setting board and a stronger town administrator, town manager kind of role. when it's strictly policy setting or more policy setting, the five-member board might make more sense in that you can break into subcommittees and consider policies where it makes it, it's kind of difficult to do that as a three-member board. And beyond that, I'm not sure it makes an awful lot of difference.
I can see that The way we're constituted now with not a strong town administrator is probably better than having five members because it just gets unwieldy. Drive the town administrator crazy.
Speaker 1 (56:16–56:19)
That's my big concern about a five-member board is the impact it will have on the town administrator.
Speaker 3 (56:20–56:29)
Until you move to the bulk of the responsibility for running town government falls with the town administrator as opposed to the selectmen, yeah.
Speaker 1 (56:29–56:59)
I agree, but although I still think five members, even with a stronger town administrator, still means more communication that the town administrators do because it's maybe not, it's maybe informing the board of things that are going on rather than consulting with the board or asking the board members' views or arranging different items for the agenda, because there will be presumably less things on the agenda and more detail or more time spent possibly on certain items. But I still think it will have some kind of a burden on the town administrator.
Speaker 3 (57:00–57:08)
I don't know what their discussion is. I think there are probably more five-member boards than there are three-member boards now, but I'm not positive about that.
Speaker 1 (57:08–57:22)
It does seem to be the case. Yeah, I mean, I'm still of the same view that I was when Rick Neely was here last summer, which is that the most important thing to do is going to the Stronger Town Administrator, because I think that could work well whether it's 3 or 5.
Speaker 3 (57:23–57:28)
And then you can revisit the 3-5 question down the road, sure.
Speaker 1 (57:28–57:42)
But it will be interesting to see what the results are of their research. I think they have one person doing research now. They have a couple of people doing research, contacting more towns, doing more interviews. So it would be interesting to see what their results are.
Speaker 3 (57:42–57:42)
Yeah, would be.
Speaker 1 (57:44–57:56)
Do we have any… Well, so it may be premature for us to take any vote on anything, but do we have any further thoughts we want to offer to them? I could always make them directly, but… Yeah, I'll make them directly.
I did mention to Rick I'd at least bring it up tonight.
Speaker 2 (57:56–57:56)
I've spoken to a couple of them.
Speaker 1 (57:58–58:41)
OK, so those are the articles the Government Study Committee will be bringing up. Now, we've already voted to submit an article for an appropriation from, we've identified free cash as the source, but to use one-time money for the Affordable Housing Trust. So I haven't seen the draft yet. I know town council has that on his list to draft.
I'm sure that's a simple, to see what sum of money the town will appropriate to. But should we be submitting a requested amount? then I think, because, you know, we do want to also probably talk about some of the one-time money requests, because other boards are submitting one-time money requests, and whether it's the capital committee or this committee, other boards that might report to us.
Speaker 3 (58:41–58:53)
I mean, I'll send the article through to see what some, the town, will. Yes. But yeah, I think we need something to go with what we would like to see, sure.
Speaker 1 (58:53–59:20)
Well, I think we need to give the Warrant Committee a request earlier rather than later, because they're already starting the budget process. Tonight they were meeting with the School Committee, so I'm sure they'll have some of our departments scheduled for early January. So I had mentioned at the last meeting that we recommended that we consider seeking $500,000 for the Affordable Housing Trust, because it's a big number, and it's But it's an important group.
Speaker 3 (59:20–59:24)
If we really want to do something serious about affordable housing in the town, yeah.
Speaker 2 (59:25–59:26)
It's an important group you said?
Speaker 1 (59:26–01:00:16)
It's an important group of, it's not a committee. I was almost going to say committee. It's an important entity. It's a trust and the trustees are all people with some expertise in housing and we know we have a real need for affordable housing.
in Milton and for a long time we've been, and we'll see where this all goes at the DHCD, but we've had the 40B kind of hanging over our heads as something, because we hadn't met our 10%, that that was really something developers could use to override zoning and whatnot. And we've been responding, I think, to affordable housing in that context of the 40B context. So assuming if we get the 1.5% certified by the DHCD, that doesn't mean we don't want to do affordable housing. We want to do affordable housing because it's the right thing to do for Milton for a variety of reasons.
Right.
Speaker 3 (01:00:16–01:00:18)
And we still 5 or 10%.
Speaker 1 (01:00:18–01:00:54)
Yeah. And we need some resources in order to do it. We don't have the Community Preservation Act. We don't have other funding set aside just for this purpose.
So the trust is brand new. We have a good group of trustees. It would be nice to get them off and running. You're one of the trustees, Tom.
So it would be nice to get your group off and running with some money to either make loans or potentially purchase maybe a single family home or a two family home to get the ball rolling. So I think we should take some kind of a vote tonight to let the Warrant Committee know what we'll be seeking so that they can put together their list of one-time requests.
Speaker 3 (01:00:56–01:01:13)
Yeah, I know we had thrown around the $500,000 number. I mean, I can throw that out as a motion move to request of the Warrant Committee that we seek $500,000 from one-time money for transfer to the Affordable Housing Trust.
Speaker 1 (01:01:16–01:01:30)
We have a second? I'll second that. Okay, so for discussion, any discussion on requesting that? We'll see where the Warren Committee process goes, but I think we'll have to go down and really advocate for that because together with the planning board, we've really tried to make this a priority.
Speaker 2 (01:01:33–01:01:40)
By putting $500,000 into this account, are we leaving, are we going to be leaving other departments short?
Speaker 3 (01:01:42–01:02:10)
Well, I've got $2.9 million of one-time money. I mean, this is a lot of hands out, really. It's one-time money. It shouldn't really be used for operating budgets.
Unless you can prove that that expenditure is just a one-time expenditure and it has future improvements to the department by doing it. But otherwise, I wouldn't want to see one-time money go to
Speaker 2 (01:02:11–01:02:12)
to the operating.
Speaker 3 (01:02:12–01:02:14)
To plug operating budgets, it's just.
Speaker 2 (01:02:14–01:02:19)
But if it would mean delaying an override by one more year.
Speaker 3 (01:02:20–01:02:36)
But it not only, it really doesn't delay it because it makes it bigger. What you need that next year to balance because that money goes away. unless you… Yeah, it doubles it.
Yeah, it just, it makes it that much worse.
Speaker 1 (01:02:36–01:04:01)
Because, you know, if you take, we just use a round number, if you take a million dollars out of free cash to put it into recurring operating expenses in FY16, then once you hit FY17… It's not there anymore. It's not there, so you gotta replace that million, and then you roll the money forward, it's really two million that you're talking about. So…
But there's other departments, including under boards that don't, separately independent elected or appointed boards that are submitting requests. So the school committee's submitting requests for one-time money. I think there's other requests we're going to have that we should talk about, too, whether it's the fire stations, which you'll probably address, Tom, through the capital committee, or other work. But by putting this in, it's just a request.
And the Warren committee's just going to go through what they did last year and what they do every year and tabulate them all. And then they'll do the balancing act and figure out what they want to recommend but it'll be our job to go down and advocate for this and probably bring the planning board into it and ask them to join us in making the request because we work together on the housing production plan. I think it would be good if two elected boards stood up and went down to the Warren Committee and said this is a priority funding source for us and we've got great people on this housing trust. We want them to make some progress and really help move us forward in this area.
Regardless of what happens on the 4DBs, we want to go forward on affordable housing on our terms and on what we want, and this would help us get there.
Speaker 3 (01:04:01–01:04:04)
Absolutely.
Speaker 2 (01:04:04–01:04:18)
I mean, I hear what you're saying and I am an advocate for affordable housing, but $500,000 to me is just a lot of money to put into some trust that is not even set up yet. It is.
Speaker 3 (01:04:19–01:04:20)
The trust is established.
Speaker 2 (01:04:20–01:04:22)
It is established? The account is established?
Speaker 3 (01:04:22–01:04:25)
Well, there's no money in it, so there's no count.
Speaker 1 (01:04:26–01:04:33)
But Tom Eating approved a trust a few years ago. And unfortunately, we're a few years. I know we're nothing. But we appointed the trustees well over a year ago.
Speaker 2 (01:04:34–01:04:44)
I just don't want to do it at the expense of the departments, you know, of other departments. I mean, do we have people calling Town Hall today looking for help in buying houses?
Speaker 1 (01:04:53–01:04:54)
Right.
Speaker 3 (01:04:58–01:05:36)
But again, it's not necessarily helping, well, I mean, it could be that, but more what it is is, again, just. taking control of how you move towards your goal of making affordability in the town. And if you don't do it, then somebody else is going to do it for you. And usually that answer is, well, and we know what the answers have been.
40 Bs. 40 Bs. And sometimes they're good, sometimes they're not. You just don't know.
It's catch as catch can.
Speaker 2 (01:05:37–01:05:41)
But is this something you'd want to fund every year going forward then? No, not necessarily.
Speaker 1 (01:05:41–01:06:51)
No, I mean, right now we have, because there are some years we have negative free cash or very little free cash, so we currently have $2.9 million in free cash. And it's possible that the Warren, you know, I think the Warren committee will look at that and look at what the sources of it were and maybe they'll revise their revenue projections a little bit, but probably most of it wouldn't be used for operating, it would only be used for one-time funds. various boards are all going to submit requests and then the Warren Committee is going to have to go through the process of deciding what are the priorities. So we'll have to advocate what the priorities are.
But the housing plan, some of our goals included things like tax title properties that the treasurer might acquire. And once the treasurer acquires a property, then maybe that's where the housing trust comes in and can work with attracting developers, or bring in Habitat for Humanity, or some other organization that would help. And that way, they've got a source of funding to do educational outreach maybe first, and then make loans, or help facilitate purchases. Maybe they become a joint venture.
And I think the housing authority then becomes another resource to the trust. And the housing authority might even be managing properties.
Speaker 3 (01:06:51–01:06:54)
Yeah, administer some of the things that you do.
Speaker 2 (01:06:54–01:07:13)
I'm not sure what the right amount or the wrong amount to put into this account is. It just seems to me that $500,000 is a lot. You know, when you open up an account, in my opinion, I say you put $50,000 into it. Let it sit there and then see if we can raise money from developments that are going on in town.
Speaker 1 (01:07:15–01:07:17)