Board: School Building Committee

Date: 2026-07-06


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:19–00:20)

Let's get started.

Speaker 2 (00:21–00:38)

So good evening. Uh, it is July 6th, 2026. I'll call to order, uh, the meeting of the Milton school building committee, uh, as we do with every, uh, uh, meeting and you do a roll call attendance. So there's column, uh, for people online carry early.

Speaker 3 (00:40–00:40)

Yes.

Speaker 2 (00:40–01:44)

Yes. Nathan present. Uh, Bob, may you present. Thank you.

In the room, we have Glenn Hoffman, Peter Obersheimer, and Sean Warke. So we do have a quorum. The second thing on our agenda is citizen speak. We reserve the first 15 minutes of every meeting for any citizen that would like to speak.

We ask that when you do speak, please state your name and address for the record. So take a minute and see if anyone, just raise your hand if you're online. Not seeing anyone, so we will move on. Agenda item number 3 under new business.

Yep. 3A is Lab Array. We wanted to introduce our architect to the DLR group who's with us tonight with John and Shanali. Take the floor and give yourself an introduction.

Sure. Welcome back.

Speaker 4 (01:45–02:03)

Thank you. Hi, everyone. I'm Shanali Rajani. I'm with DLR Group, and this is my colleague, Jana Sillsby.

And we're just going to do a quick introduction to our firm and sort of what our goals and schedule are for this test fit project. So you need to unlock that.

Speaker 5 (02:03–02:11)

Yeah, just going to… Reclaim host. There we go. Right.

One more time. I just had to reclaim host.

Speaker 6 (02:12–02:20)

Still showing it's not turned on.

Speaker 5 (02:20–02:41)

Okay, let me try one more time. Ah, look at that.

Speaker 6 (02:48–05:31)

All right, there we go. So we're just going to do just a quick introduction. Here's our agenda overview, schedule, review of the site walk that we did, and a summary of the meeting we had this morning and next steps. And so just a little bit about who we are.

DLR group has been in business doing educational design since for 60 years now. So 1966, we do everything from master planning, early childhood centers, elementary, middle, high school, as well as all the way up to CTE programming that, you know, to what would be called 16, grade 16, so community colleges and things of that nature. And, you know, this is our primary focus, we do more than just about anybody else in the United States. And we have a local office of about 50 people, even though in the local office, the K-12 team is small and growing.

Shanali here is one of our very first hires to build that team. But I have been with DLR Group now for six and a half years. Before we had a local office, I was a fully remote employee and have My entire career has been here in the Massachusetts area. In fact, I worked on the Milton Hospital Project back in the day.

So our ethos is empowering learners through a forward-looking research-informed design focus that delivers transformational opportunity and fulfillment for all. And we really focus on engagement, well-being, community, and joy. But not having fun, then we shouldn't be doing it. So I'm a client leader and principal within the firm, and Shonali is the senior project manager with me in that, like I said, the Boston studio.

Also in the Boston studio, we have a local interior designer, that's Alyssa Albers. But the other person who will be participating in the project is Dr. Meredith Dennison. She's actually a former educator.

She made a career change about seven years ago. She went from being assistant superintendent who had opened several campuses to working for DLR Group to be that liaison between actual pedagogy and education with the design team. And so she already has helped support Shanara and I with precedent programs and other things like that from around the country. But she'll be, I don't know if you'll ever see her, but definitely she's in the background.

So would you like to start?

Speaker 4 (05:31–09:54)

So we have a very tight schedule. Looking to get you guys to an August 3rd meeting to present to the select board. So, we've already completed the site walk through where you're going to see some photos. I'm going to talk about what we saw, but we are starting to review all of our initial findings.

We are communicating with FBRA, who's the structural engineer, to start for them to start putting together their initial structural assessment. That first column you see that is marking today's date, which we had a meeting this morning with your superintendent and Bernadette Butler, the director of early childhood, to start understanding a little bit more deeply what they want and need for this space. And so we will be Continuing to put together our initial findings, we'll issue a draft report on the 20th. We'll also be issuing that draft report to PMC so they can start doing an estimate.

And we'll be turning over our full report with the estimate during the week of July 27th. So the next time that you see us will be at your next meeting of July 20th. Where we're going to go over our draft report, and then we will incorporate your comments and then issue it the following week. Sure, so we walk the site with and a couple of other people from the town.

What you're going to see on the next few slides are some of the initial photographs marking some of the things that we observed during our site walk. So obviously we have what we've been calling building A, this older, not on the historic register, but historic nature building attached to what we are calling building B. So the interior slides from left to right, 2 on the left is 1 of the corridor of building B. and again, another connecting space in building B, the middle photograph is what the quarter connects between building B and building a, and then just showing some of the nature of building a, and I want you to notice in the 4th photograph that there is a door on the landing their steps.

I wish we could zoom the photograph. I should have made this one bigger. But there's a lot of floor transitions in that space. So that is one of the things that we'll have to navigate and understand is how are we going to manage all of the different floor levels.

Here are some of the connecting spaces and understanding a little bit about the side turn of building B and then the inner view. But it's just showing that there are these lot of corners, a lot of connections, understanding how are the volumes going to speak together? How are the children going to move from space to space? I think what we're seeing outside, there's a lot of outdoor perimeter that we have to think about when we are working on this.

And then moving into building C, The two photographs, the one on the top right and bottom left, are showing a corridor that expands to that corridor. They're really long. And so how do we break up that space and look at that space to make it learning and collaborative for children of this age and appropriate? The other photograph on the bottom left is the entry, understanding the ceiling height, the glazing, what the entry condition is.

And then you're seeing a typical classroom. So how do we make that classroom sized appropriately, scaled appropriately for these kids? What needs to happen on the interior of the classroom to make it the best learning space for this age group? And then the furthest right bottom photograph, again, shows the transition between the levels.

You're seeing stairs, you're seeing a lift. How do we navigate those floors? Especially for kids, if they're staying in their classroom, Do they transition to other spaces for other programs? How do they navigate the stairs?

How does kids who have mobility issues move around the school as well? So these are all things that we're going to take into consideration as we're looking at it.

Speaker 6 (09:54–21:31)

Is there anything else you want to add? The only thing other thing that I will say that came out of the meeting this morning was that definitely there's. My understanding is we've probably all discussed this, maybe even previously, to focus on what we're calling Building C, which is the building in the middle of the upper picture, the building on the left. It is a newer building that has better floor-to-floor heights, and it also does have an elevator that was added in 2013.

It is currently technically accessible, even though the entrance from the front road side is not accessible. That building is from the back, and there are ways that we can make it accessible from both directions. That we're not concerned about. In talking about that, then, we also just discussed, well, are we just going to, for the purposes of this test, probably just to not try to put anybody as far as classrooms in the building A.

It could be used for administration. And we did go back and check photographs. What is considered the first floor of that historic building and the first floor of building B are contiguous. So you could get through that portion of the building, but it still may not be appropriate to put kids in, like, say, Building B, and so we're going to focus first on what can we fit in Building C.

And then if we're, like, really close to making the program without an addition, then we may look at adding, you know, some students into Building B, but they would then have the differential at that linkway that you see there on the bottom right between those two buildings. But that may be okay if, like, the preschool's over in one side and the There might be ways that that would be appropriate, but we're going to first focus just on building C. Oh, the only other thing I will mention is the reason why we were very much encouraged to have a structural engineer, as we did want them, if there was any potential hiccups, something that's really, really tough to fix, it would be around the structure. So that's why we did ask for the structural engineer to go through and just check it out.

What we were very encouraged is that it does seem appear, especially building C, is a steel structure. And so there's beams that are spanning between columns. And so it doesn't look like we're going to run into a lot of difficulty taking walls out and reconfiguring. There are obviously some walls like stairwells and other things like that need to stay, but for the most part, it's not like it's a masonry bearing wall system or anything like that.

That would be cost prohibitive to do full renovation to get this sizes of spaces that you need for a preschool classroom or kindergarten classrooms. So, we did this this morning, we talked about a document was shared with us about the number of classrooms and this is the count that was shared with us. So there's 7 pre K classrooms that are being asked for and 3 of those are full day classroom 1 for general education and 2 for some separate. So, the number of students that can fit in those is different depending on if it's a substantially separate.

special education classrooms versus the general ed. And then there's four classrooms for half day preschool. And we're also gonna look at the potential, like if we went to all day preschool, what would that look like? It may be like a dashed line, like you might need to expand here or something like that.

But we are gonna look at it both ways, because you never know the future. And when we asked this morning, like, if you do this project, are we talking, temporary or 20, 30 years, 60 years. And it was like, no, it's a forever solution. So we do need to look far into the future and make sure that we have adaptability in case populations change or in case the pedagogy like going from half a day to full day changes.

In the next line is there's 16 classrooms of kindergarten plus one for potential increase in enrollment and one for substantially separate. So there's a total of 18 Kindergarten classrooms that are being planned and then some half classrooms that will serve as intervention as well as conference rooms, staff rooms and then a motor room. And the motor room is interesting because there's, there's the need for physical therapy and occupational therapy, but there's also the need for that a room that is like a multi purpose room. That's more for like, physical education as well as then just.

if the, you know, more than one class wanted to get together or even a parent event and that sort of thing. So we talked about, you know, what would that mean and what would that look like? Then there's a room space for specialists like art, music, as well as potentially library, even though they may not all be what you would see in a typical elementary, the ability to have those kinds of classes. And then, you know, some office space for the preschool and the specialist that would serve the preschool, as well as the nurse and main office.

One of the things that's not on this list, but we are going to be looking at it a couple different ways, is how the kids would have food service. So how would they be served lunch? Because the full-day kindergartners would need some sort of way to have lunch. We actually have in-house food service professionals within our office.

So we're going to ask them to give us a program that would be both like a warming kitchen if you did it somewhere else, as well as then if you did a full kitchen where you would be producing fresh meals on site, because those will be two very different numbers. And that will be part of what we look at for the next meeting and just show you the differences that would make. We also talked about, well, then where would kids Sit and eat and how would that work? And we actually showed some precedent images and talked a lot about, like, do kids go to services, like, lunch library, or does those kinds of things come to them?

We actually went through an exercise notice. Educational visioning condensed into an hour and 15 minutes. But we just talked through these different topics of learning, teaching, what kind of spaces would be appropriate, furniture tools and safety. And we had conversations around each of these, but we probably focused the most on the learning and definitely the two that were really interesting to both John Phelan as well as Bernadette Butler, I almost forgot her last name, was the visible learning as well as inclusive learning.

And then, you know, working in small groups, applied learning, hands-on learning, and things of that nature. And then the types of spaces that would support that, like, you know, Potential unique storage means as well as like small group and collaboration spaces, as well as even then talking about, well, what does it look like to have a library? How does the library maybe get distributed to different pods of spaces? The other thing we talked a lot about is what does safety mean and what is perimeter zoning within both the building as well as the site mean?

And we got some really good feedback about that and how we could you know, work the lines of there's the property and then there's the building and then there's within the building, keeping everybody safe and compartmentalized in a way that makes sense for the different, you know, the preschool and the kindergarten, but yet not having a lot of delineation and lines that those two programs can work together. And there doesn't need to be like a separate section completely for preschool. They can kind of have it to like a same floor, that type of thing. So, then 1 of the slides that we showed in some of the precedents was this slide and.

This was particularly interesting because there was this idea of going from an operation centric. Model or way of thinking and making sure we were doing a student centric way of thinking where you were centering the students and what they needed and making sure we weren't necessarily doing it just for the convenience of operations, but actually doing it for what was fast for teaching and learning. And we looked at some different spaces. These different images here were all things that were flagged as being interesting or things that they would look for.

In the upper top, it is left is an image of a space between different classrooms that were creating a pod and a place where there could be some pullouts, but it also could be that each pod has some sort of identity. The school that this came from actually happened to be a former big box store, but it was really important. Then it was huge. It had six different pods.

Well, how do we get identity that each of those, you know, groupings of like six classrooms, you know, where you are in the building because of that, the nature of it. And one of the ways they did that was each area had a theme. Then in the next picture over the center, right above where it says next steps, this idea of having companies that were not in the room that actually allowed the room to be more focused on the learning spaces. Like, you see in the far right top far right image where you create different stations and allows the companies and things like that.

The storage for the students coats and backpacks and. Snacks to be outside of the room so that they would have every inch of square footage within the room that could be for, you know, the actual teaching and learning activities. And then the bottom left is an image of some spaces that are used for physical therapy as well as there. We talked about sensory.

Learning and sensory spaces for the special education as well as then just. having potentially areas where there might be within the classroom places for deregulation, where kids can calm down and find a place. And then over on the bottom right is actually the little nook that you see there in the background is actually a distributed library. This school has a main area for a media center or a library where it actually has a professional that takes care of the kids the books and the curation of the books, but then they are distributed to the various pods, again, so that it's right there at people's fingertips and that you don't spend a lot of transition time walking and going somewhere unless it, you know, sometimes you do want those kind of events, but sometimes you want to be able to, especially when it's the kids that are on the half day, want them to have access to those kind of resources without having to To walk through, so those were just some of the images that we, you know, people spoke about and we're drawn to, and that is all that we have.

Speaker 4 (21:32–22:36)

So, I think 1 of the things that I wanted to go back to is why is this important? This this meeting and it's really for us to understand. Get a deeper understanding of the enrollment numbers where they're coming from how we expect to see them play out over the next couple of years. How many classrooms and how are they going to be used?

How do we start to think about the type of teaching and learning that's happening? You know, the cubbies is a great example, because it changes the way we start doing the test fit. You know, like, you've asked us to do a test, but look at an existing space and see what we can squeeze in there. But.

How do we break these spaces down in a way that if this project does go forward. It works for you and so I know that we presented a lot of precedent images and talk to a lot of detail, but this detail is really relevant to us to make sure that we understand that this space will provide what you need and that it's all integrated. It's not we're not trying to jump ahead. This is a part of it's 1 step in this multi step process.

Speaker 6 (22:36–24:07)

And we felt very good about the information that we were gathered this morning. Again, we feel like now we can go through and we will be doing at least two very different options. But we'll also inevitably have some variations on those themes. Like the kitchen is one of those variations on a theme.

And even just then, to have a dedicated library somewhere in the building versus a distributed model. and then how the pods work. If you looked at the 18 classrooms for kindergarten, that works out to be divided by six, three pods of kindergarten. And then there might be one pod of preschool that may work with the plan.

But another way of looking at that is dividing it by five instead and having more pods that are smaller. And so we're going to be looking at it and seeing which Makes the most efficient use of space within the building and makes the most sense to break down the scale. We didn't talk a lot about. It's a lot of kids, you know, it's like 400 and something kids almost 500 when you take the 350 plus the 120 preschool and how to make sure that everybody has a sense of belonging and feels good about it.

And those. breaking the scale down and finding a plan that makes it the most efficient use of space, but also is manageable for little children is one of the things that we're going to try to do with the test bed.

Speaker 4 (24:07–24:54)

And I think the other thing was, you know, we touched on future-proofing, like where does the future go? Like where does it set off site? But also how do you future-proof it internally? Do we design the spaces in such a way that there's like one pod can straddle between pre-K and K?

Like if you get You know, bubble bubble year, right? Like, or, you know, something happens so that the design can accommodate that and that the separation of the 2 age groups isn't so far apart that you can't accommodate it. Like, so these are all the things that we're thinking about, like, the, the, the entry, the flow through the, how does how does students transition through the spaces? Like, and how did the spaces flex in a way?

10 years now, 10 years from now, like, something changes, like, can can the building adapt?

Speaker 7 (24:56–25:35)

Are we asking questions, Sean? Yeah, absolutely. I have no doubt that you guys can design very nice, spacious classrooms for kids. I have more pragmatic concerns.

My own experience when dealing with pre-K, plumbing is always a huge cost. We're going to have to have a bathroom in each classroom. When you mentioned pods, that's the first thing I thought of. It was, oh, if there are any, we can design the pods to incorporate the bathroom so that we have that toilet room function Sorry, to the classroom, I'm just wondering, have you thought about that for this project?

Yes. What are you thinking as far as that with an existing building?

Speaker 6 (25:35–27:28)

So a couple of things, because of the nature of the classrooms that are over there, there's actually quite a bit of plumbing already. And the other thing is, one of the reasons why I was excited to see the type of structure, is it's also a type of structure that is not, I mean, obviously it's never easy to add pipes and core through, Um, the structure, but relatively speaking, it's not difficult. Um, the other thing is, is that in looking at the configuration of the classrooms and the way that they work together, they were at a minimum in pairs. And so, like, 2 classrooms, instead of each classroom having 1 bathroom, we have 2 bathrooms that serve the 2.

And that gives you just more flexibility that if one's busy, there is an option. Um, we will be looking at even potentially, is there a way that we could you know, combine more classrooms and, you know, limiting the number of locations. But there's actually existing shaftways that are in the building now that we're going to try to take advantage of wherever we can. Some of them aren't currently being used for plumbing, but because they already go through the building, they could be used for plumbing.

And so we're going to be looking at that as well. You know, being very mindful of how, you know, How can we make the services? But then also, one of the things that we look at is thinking about what we call the 50-year walls. Those are the things that you typically don't want to have to change at the time.

Plumbing chases are a classic example of what we would consider a 50-year wall versus, say, maybe a 20-year wall versus a five-year wall or even something that's daily able to be adjusted and moved. And that's one of the ways that we will approach the test fit. is looking at like, okay, if we do it this way, this means this is pretty permanent versus what things can then change over time. And that's just the general approach of how we would go about this.

Speaker 2 (27:30–27:47)

One of the things too, Glenn, is the basement of this space is basically a big crawl space. It's not a slab on grade. So any of the horizontal plumbing that has to go in down there, it's wide open. It's probably about five feet clear when you're down there.

Speaker 7 (27:48–27:56)

Sean was able to walk through.

Speaker 6 (27:57–28:09)

Is it actually their cross space or more like just a short basement? It's a short basement. It's finished floors, finished concrete, work tables.

Speaker 7 (28:10–28:23)

Yeah, people are down there. You mentioned the MAAD issues. Do you foresee us going after some variances for this project, or are we just going to try to bring it up?

Speaker 6 (28:24–29:39)

I think that if, so first of all, the way the buildings have been previously built, you can consider each piece of it a separate building. And so if we don't do alterations, like if you just say the historic portion of it is going to stay, and yes, people can go in and, you know, if somebody wants an office in the first floor of that building, Great, but you're not moving walls and you're not create doing alterations. It's all grandfathered in and so you would not have to do, you know, any major upgrades. The, and again, the B building right now.

It doesn't there's not. wall or not doors at every single opening that separates it from the other building. But you could put them and you could say this is the side that students are on and that's the side that students are not on. This is public.

This is private. And even if you chose to use the B building, you wouldn't necessarily have to bring up the A building because it is a separate building. It is structurally separated and definitely from a, you know, fire protection and everything has been, you know, separated. or we would make sure that in the design that it would be separated.

So I don't I don't think we would have to.

Speaker 7 (29:39–29:52)

It's more time and money. Right. Right. Right.

It takes time to apply for. And all the MAP is typically faster than other government agencies. That's why I was going for a variance that still takes a month or two.

Speaker 6 (29:53–30:51)

For the main areas where we would be putting students, we would from what I've seen, again, I haven't done a full test fit and everything, I don't think we would be asking for any variances. And there is enough space to even make the entrance that are currently the building C, there's the steps that go up. There's plenty of room there right now that you could make that if that stayed an entry, but that may not even be the entry. It may be that you were building something in front of that and creating a new entry.

We did talk about, though, entering at the middle, and then you go down and you go up, which those steps lead to the middle floor in that Building C. Again, you got little kids. Takes a long time for kids to go up and down stairs. And so the idea is by entering in the middle, you're only going up a floor or you're going down a floor.

So, yeah, there's plenty of space to make it so that you would not have any issues with MAAB.

Speaker 2 (30:52–30:55)

NAB is accessibility.

Speaker 7 (30:56–31:08)

Yes, as opposed to the ADA, which the way the law is more stringent than when you have to follow. Typically, as you know, MAP is more stringent than ADA. That's fine.

Speaker 2 (31:09–31:16)

Just, yeah, for other people that are online that know, that's why I was mentioning it. Any questions?

Speaker 8 (31:16–34:04)

First, just great, great initial presentation. Really sure what experience I expected from our architect, but the school experience is fantastic. So thank you. I mean, I have a number of questions.

I'll work them in as others do, too. But you're part about sort of mentioning trying to surface any hiccups now. You talked about the structural. Part of my thinking about this, and you mentioned to it, sort of thinking about what hiccups or surprises are we able to cover, like structural, between now and the end of July?

And are there any known items we don't have the opportunity to explore that we need to just sort of manage our own expectations about that's for a later date? It's sort of a process question. of what's left to do after that. Maybe, you know, it'd be great if this process surfaces the key hiccups now, even though we know it's sort of a test fit initially.

But I mean, structural is a big one I was going to ask about. I don't necessarily have anything in mind, but I'll give you an example to react to and see if anything else comes to mind, or just something I'll kind of keep asking about in later meetings, too. I forgot if it was in your as structural engineers, but the issue of at this phase being, you know, whether it's a non-destructive, you know, examination of the property, does that mean, and so keep in mind, not an engineer, not a construction, not an architect, so that's the lens in which my questions are coming from. Is there sort of a later time, you know, maybe post-acquisition, if we equate it, that there will be, you know, whether that's property viability for a school or just major costs, additional phases to kind of examine like what we might uncover with the property.

I mean, you can kind of take that 30,000 and take it in nuance. I'm just kind of thinking, trying to manage my expectations. Like what are we able to sort of vet in this phase and what is for later?

Speaker 6 (34:06–38:01)

Right. So we, The reason why we went into the structural engineers, because definitely we wanted to make sure that we understood how the buildings work and whether or not it'd be difficult for us to make changes. They would, though, want to go and do a deeper dive and more investigation on that structure if the project went ahead. The good news is that down in that basement, that low basement, you could see it.

It looks like in really good shape. And typically, when things fail, the bottom fails first. And it looked really good. Now, on the flip side, the portion that did not look as good was the historic building.

That's an old rubble foundation. But again, depending on if we are avoiding that building and we're just saying it is what it is, then, you know, it's stood for however many hundreds of years. probably continue to stand. And if you're, as long as you're not going in there and making a lot of changes, it's probably fine.

But there are definitely some things that they would, if they were, we were doing a project, they would want to go and check out. And there's already a little bit of, there was an addition, and there's some issues with the way the deck is attached and things like that. So there would be some things there. But again, that's not unknowns.

Those would just be things that we would need to deal with. But if we were to do any major intervention in the historic building, there would want to be some testing. And they could not see the roof structure, what are the sizes of the rafters. They were not able to see up in there.

Whereas in the other building, they could just pop a ceiling tile, look up. In the B building, it's open web steel joists, and there's some columns in there. In the C building, it's steel beams. But in the A building, they could not see what the full structure is.

We know based on when it was built, it's Would, but we don't know if it's undersized just because we couldn't see it. The other thing that's always the number 1 thing is if we start adding additions, which. Chances are, we're going to recommend that you add an addition because of the gross motor rooms and other spaces like that. We don't know what the soils are like.

We also don't know, is there ledge? Is the reason why the building was built the way it was is because of the nature of the soils as the rocks, you know, what is the geotechnical profile of those soils? That is with any project until you actually go out and spend the money to do borings and things like that. We don't know.

And then, of course, the other thing is just honestly, what are the neighbors going to think? And traffic, that kind of thing. Until you do those, there's a big tree that has been saved. I know the superintendent was talking about, like, I don't want to be around if anybody says they're suggesting to take down that tree because there's a big tree right at the end of the one building.

Those are the kinds of things that are, you know, issues that the neighbors may bring up or that sort of thing. We will be looking at those kind of things and trying to mitigate it. It isn't, you know, it's a currently it's a business use as a college. it would become an educational use as a preschool and pre-K or kindergarten.

So I have not yet checked out the zoning for Milton, whether or not Milton has specific zoning for educational uses, but educational uses are protected by the Dover Amendment. So it's not like people could say you are not allowed to build an educational use, but there may already be some zoning in place that would regulate how like say setbacks and things like that. And we just, we will take a peek at that.

Speaker 7 (38:01–38:07)

But those are the kinds of things that- The JCCC default bond should alleviate any issues, I would think.

Speaker 6 (38:08–38:09)

One would think. One would think.

Speaker 7 (38:09–38:12)

We're still going through the process.

Speaker 6 (38:12–40:09)

Right, right. One would think. But those are the kinds of things that I can see. We are assuming that if this become, it's a major renovation.

the rooms and the walls are going to have to be reconfigured. The existing spaces are too small. They're like 700, 750 square foot are the existing spaces. And a preschool, pre-K, kindergarten age group is somewhere in the 1,100 to 1,300 square foot based on the MSBA standards and what we discussed today that we would be targeting.

So walls are going to have to, it's going to be a major alteration Not a minor, not a repair. We're thinking all new systems, you know, this soon going into this new, so we don't see that as like. A worry or something that we, because we're going to be assuming in the pricing, but it's new age, you know, heating, ventilating, air conditioning. new, potentially new service for electrical, all of those kinds of things will be built into the project.

The envelope will be, you know, upgraded and done according to the new energy code because it will be a alteration and the amount of change would require all of those things to be brought. We're going to be over the 50% threshold. Again, which is why then we're saying building A is a separate building. Building B is a separate building, and Building C is a separate building, so that each one of those could be addressed separately if needed.

Like, we may just not do anything to Building A. Fix anything that might be broken, but not do any alteration, not do anything other than repair. It will be a lot of new walls and reconfiguring.

Speaker 5 (40:13–40:16)

Let's see if anybody online has questions.

Speaker 2 (40:16–40:32)

I haven't seen more. Yeah, I got a couple, too. So I'm not seeing any members raise their hand, so I'll jump in with a couple of mine. So with the 18 classrooms we're talking about for kindergarten, what's the class size that we're looking at for that?

Speaker 6 (40:33–40:49)

So they said that 22 was the class size, and then it was 15 for the Preschool 16 for the half day preschool and then 9 for the substantially separate special education.

Speaker 2 (40:49–40:53)

And then overall numbers for the pre K was like 120. Yeah.

Speaker 6 (40:54–40:55)

Yeah.

Speaker 2 (40:55–41:03)

And then the. The kindergarten will be 352.

Speaker 6 (41:04–41:09)

What is that, 472, is my math okay?

Speaker 2 (41:10–41:13)

That's 396. 18 times 22 is 396.

Speaker 4 (41:13–41:21)

Yeah, because he had built in an extra classroom.

Speaker 5 (41:21–41:23)

Okay. Or was it two?

Speaker 6 (41:24–41:27)

He did build one for the extra and then one for substantially separate. Correct.

Speaker 4 (41:28–41:28)

Right.

Speaker 6 (41:28–41:55)

And one of the questions we did not ask, so what's interesting about substantially separate is in some districts, even though they're in a substantially separate classroom, there's still a seat for them in a regular classroom. And we did not ask that question today, whether or not the additional 9 were being counted as in addition to the 352, or if it was in, you know, part of that. So we do need to ask that question and get clarity on that.

Speaker 2 (41:55–43:29)

Because like right now, just from what I've seen for enrollments, there are 15 classrooms, I think. One of the things I would ask is just confirm with Bridget and John, And if so, that's fine for programming, but I think for the school committee, I think it's important to make sure that we're getting exactly what we have today. And if so, that's fine for programming. You know, and we're at today is we're at full capacity.

We're at 20, our average kindergarten classroom size is 21 kids. So there's no, there's no expansions possible there. Um, so, and that's, I didn't want to ask it today because I didn't want to derail the meeting that we're doing because you guys were making tons of progress and I didn't want to upset that. Um, but I think 1 of the things for some people to understand is, you know, what are we using today?

what are we getting with this project and then looking historically at like enrollment trends because it might be low this year or is higher in previous years and if we have that when that happens in the spaces that we have now we we have space because we're in bigger buildings once we build this and we're constrained by that we're not going to show you know right rent trailers for a year or something like that so how do we address that um so

Speaker 6 (43:30–45:28)

That I don't know if you remember, but that was also where I was talking about. I'm going to determine based on what I received with regard to the number of classrooms and the number of students per classroom. But I'm also going to reverse engineer it and say, okay, what you optimally want is you want about an 85% to a 90% utilization within our own. And the reason why you don't want it to be a hundred is because you always want if that kid shows up, there has to be some space for, for that growth.

So, you know, If you say, okay, what we're actually going to be doing is we're going to take the enrollment and then we're going to divide by 20 kids per class. Instead of 22, because that is more like bringing down the utilization to what something that is more reasonable. That gives you 2 things. 1 tells you you have a little bit of fluff, but then we also can say, all right, what does it look like?

If you did then need an extra classroom and even some of the flexibility. Like, we might say, all right, there is an art room in a portion of the building, but that art room, if we did more of a push-in model and designed it so that it could accommodate a push-in model for art, that art room could also be a way that in the future you could have flexibility. And then, like I mentioned earlier, the half to full day, dotting in and saying, okay, if you made the decision when you actually do this project to go all full day preschool, This is how much space you would actually need, like, if you stuck with a half day, this is what it would look like. But if you went to the full day, this is what it would look like.

And that's where, like, the different options or variations on an option, you know. that's the way we would present some of it to you so that you would then have a choice and could see. And you wouldn't even have to make the decision now. It's more just, okay, I can see how we could grow into this and what that would look like and the difference in cost in looking at it the one way versus the other way.

Speaker 2 (45:30–45:35)

So by doing that, and I was trying to follow that earlier too, would that equate to basing more classrooms?

Speaker 6 (45:35–46:12)

It would. So right now he's got the 352 at 16. So add another 22 because he has the potential increase for enrollment. So that's 374.

Now, divide 374 by 20 instead of 22. And that would be then the number of classrooms that we might propose so that you would not be thinking of it as designing for max capacity, but designing for optimal capacity, which is usually, like I said, It's somewhere between 85 and 90% utilization.

Speaker 2 (46:12–46:36)

Got it. Um, just 1 other 1, 2, so I know there were options. I actually appreciate the discussion on fully pre K. You know, having an outline of that, that's going to be there in, like, the full kitchen versus the warming kitchen for what goes to the cost estimator.

Is that something that we're going to make a decision and they'll. Or are they going to cost both of those?

Speaker 6 (46:37–47:05)

So, his, his cost estimating at this point is going to be so high level. He's going to do a cost per square foot based on what he thinks the renovation is going to cost. And he's going to do a cost per square foot based on what the new construction. And again, the unknowns are the soils and things like that.

And we will have contingencies built in. So, the difference between say, adding full day versus half day is just more square footage. He can just. We can give you those.

Speaker 2 (47:05–47:06)

That's fine.

Speaker 6 (47:07–47:08)

Yeah.

Speaker 2 (47:08–47:10)

But essentially we can extrapolate that addition.

Speaker 6 (47:11–47:25)

Yes. So you'll be able to see it. It'll be like in a table formula format and it'll be, you know, there's option one, there might be option one, A and B. Yep.

And we'll, it'll, the square footages, we'll just be able to go with those. So you'll have, you know, be able to look at that.

Speaker 8 (47:28–48:17)

Okay. Follow that. I was going to ask, and I think you've already answered sort of just, deliverable and just, I was going to use the, just, just given the, I think there's a few variables we're talking about here. Um, for example, you kind of just answered it around some AB options that might come out, whether we do addition or not.

Trying to think what other, you know, swing variables we talked about, but I mean, are we talking about like a, a narrative Kind of detailing different steps along the way, that's just, you know, final cost estimates, basically a few options. I'm trying to kind of keep it simple for myself, but just, Eddie, if you needed to say a couple lines on the deliverables. Sure.

Speaker 6 (48:19–48:58)

We will definitely have a portion that talks about the process. You know, did the site visits, went with the structural engineer, that type of thing. And then we will talk about, like, the process of You know, meeting with the educators and determining what their space needs are and even how we arrived at, like, classroom sizes and things like that. That is all more narrative.

And then we will have the options. And like I said, there might be, you know, option, there's definitely an option 1 and an option 2, but there might be variations, slight variations within that. And then there will be a table that goes with that that shows the cost estimates. So you will,

Speaker 4 (48:58–50:07)

Yeah, I think also usually what I've done in the past is for the options, I usually have a list or a narrative that goes along with the description of the options. Being a little bit more explicit about the square footage, what is renovation, what's new. And in each option, we're going to repeat ourselves, like, in each options, because we overlap, but it's going to be like, all new systems sprinklers, like, you know, like, those things are going to be identified. So the cost estimator will know.

But when you look at the options, you're going to be like, yes, both options are going to have new. mechanical systems. They're going to both be upgraded sprinklers no matter what, but the square footages and maybe like the location of where the addition goes may be different. Like, we haven't quite, you know, gotten into the options, so I don't know I'm not trying to be vague, but it's like we don't know, but there are going to be differentials.

And we will give that class estimator this list so that he understands that we understand all the components that go into this high-level estimate.

Speaker 8 (50:08–50:30)

Right. And you guys made a few comments about, you know, well, I think you made it in different ways at different points, but whether this is a, like, by 10 provider projects. I was wondering if you could just expand on that, or if that's input that you're looking for from the town or the atmosphere.

Speaker 6 (50:30–52:01)

That was the question I asked today. So for instance, we're actually doing a project over in Cambridge right now. The project is to fix a building to keep people safe, warm and dry for literally 10 to 15 years. So the decisions that we're making are based on that timeframe.

And even the kinds of things, the kinds of investments you would make for such a short window is different than the kinds of investments you would make. It's like, no, this is, if we do this project, it's like a forever kind of project in that it will be a school and it, you know, you're not intending to move the kids out in 10 years and put them somewhere else. That this is a permanent place where a school population would be means that we're going to make different decisions. We're going to invest in things to make sure it works optimally and gives you a forward-looking educational experience, not just we're putting a band-aid on something for the short term.

And so the types of decisions we make with regards to Where do we build an addition? What are the building portions that you might build as an addition? Do we create a new entry? All of those kinds of things have to do with this is a long-term project, not just a band-aid project for the short term.

Again, do you understand what I mean? So that is the type of questions we asked it this morning.

Speaker 4 (52:01–52:06)

And the feedback was, this is a long, this is, this is the solution.

Speaker 8 (52:06–52:12)

I can't imagine it being any other answer than that. Yeah. Yeah.

Speaker 4 (52:12–52:13)

Yeah. Yeah. Yeah.

Speaker 8 (52:13–52:16)

Yeah. Yeah. Yeah.

Speaker 7 (52:17–52:17)

Sorry.

Speaker 6 (52:20–53:14)

Yeah, and honestly, even just the way that we the types of say, things that we would it's all a narrative. So when I say proposed, and it's still be a narrative, but even the kinds of like systems, a long term system solution is very different than a short term system solution. You know, making an investment in operational costs that are going to save money and energy year after year after year ease of maintenance. That type of thing is different than if you're just trying to put a bandaid on something and make something work for 10 years.

So those are the kinds of things that we would be looking at and making sure that it was for the long haul and trying to make it as easy to maintain. Operationally works in the best way possible, both from maintenance as well as, you know, from an educational perspective. Those are that is what will go into the narrative and sort of like, help determine the costs.

Speaker 2 (53:15–53:20)

Right? Yeah, so just some roles. So, Bob, that you see up there is the maintenance guy for all the buildings.

Speaker 6 (53:20–53:23)

So he's loving when you just I'm all about.

Speaker 2 (53:23–53:38)

Hey, and just for clarity to. Hi, everyone. This is a great conversation.

Speaker 9 (53:38–55:16)

Sorry. I can't be there in person. Like, Sean said, I'm a representative from the school committee. I wanted to make sure that I understand how.

2 parts of the discussion are coming together. I think I, I think I follow what you said, but I just want to confirm. So, we're, we're talking about 2, 2, different things. 1 was.

Someone mentioned that we'll have to understand that there's an assumption that we will need to do an addition onto this building to meet our program goals. And, but we're not sure exactly what the constraints of any addition might be. And then 2nd, there was this discussion of, we'll look at a couple of models of. Program size, like, maybe the 1.

That's on that document that the superintendent put together another, you know, and I share Sean's question around. Expanding pre K, I worry about being locked into. Today's pre K enrollment numbers if this is a forever building. I think we should very strongly consider the possibility of significantly expanded pre-k in our future, either because we want to do that or because we have to do that.

So I wanted to understand, will those two things come together in your study? Will we simultaneously understand the space constraints of a couple of different models, including one that has more enrollment than we have today, and the constraints of an expansion, and be able to put those two parts of the equation together in the study?

Speaker 6 (55:18–57:09)

Yes. The short answer is yes. Just having done a quick back of the napkin looking at it before I even had it in a drawing program, Again, any of the ancillary spaces and support spaces like the gross motor room, OTPT, those kinds of things, you will not be able to fit within the building as it currently stands, especially given if we are avoiding the building A and things like that. What I just don't know yet is where on the site it's going to make the most sense to add an addition.

Inevitably, it probably wants to be towards that big tree. But we are definitely going to be looking at it in a way that how can we do this in a way that is clever, that can work the best on the site for the site as it appears. As far as the growth, I'm definitely going to do a look that just gives what we have on the page. I will want the input besides just obviously it's very easy to change half day to full day.

But if we were to add additional capacity, I will need feedback on what does that look like? Are we doubling it? And again, remember this is just paper. except for maybe perception outside of this room, there's no harm, no foul.

Like, it doesn't mean that that's what you're going to build. Like, you're just testing it. So you can say to me, I want you to double the preschool program to see what it would look like and how much spare footage that would take. That would be a reasonable request, and we can totally look at that.

But those numbers should come from you. I can speculate, but those numbers should come from you based on

Speaker 4 (57:09–57:29)

Um, you know, your historical data and, you know, what you're seeing, you know, somebody mentioned about, you know, the sales of houses are prediction of your growth. Like. We would have to do some sort of deep research where you may have access to it more readily and can provide that.

Speaker 7 (57:29–57:51)

So follow up to the last question. I don't know if I haven't been in the building really yet. Is it possible? I mean, we've mentioned building a, you can't do much with.

Is it not possible that we keep building A under a 50% renovation so that we can actually incorporate some of the program into that building where we not need an addition to somewhere out there?

Speaker 6 (57:51–01:00:20)

The big spaces, you don't have existing spaces that can be made into big spaces. So, like, these kids are going to need some gross motor, i.e. physical education type space. There's nothing that we can do to make the existing building work for that.

That, if we're going to have a small gym or even a large fitness room, you're going to be looking to then go to some sort of addition. Like I said, I can tell. Based on just the size, roughly speaking, you can get about two classrooms side by side on each side right now. And then maybe another fifth classroom at the end.

So you're getting roughly five classrooms plus a support space. And that's just me on the back of a napkin going, all right, this is where 1,200 square feet takes me for a classroom. And by the way, that 1,200 square feet does include the toilets then. are associated with those classrooms.

I can already tell you're only going to get like between two and three classrooms per side in that building. You got it times three floors. We're talking, we're already at 15 to 18. And we haven't even had them to preschool yet.

So inevitably, you're going to have addition for those big spaces. The reason why I'm saying, okay, we might not need to add more if you kept it at seven rooms for the preschool. That's why I said, well, what if we put the preschool classrooms in the other building or something like that? And again, we're doing universal classrooms.

So where you actually assign and how you split it up, that could be decided later, but just conceptually, where do we put those other seven classrooms? Possibly some of them could fit in building B. you're still looking at an addition. It's not the admin spaces that I'm worried about, like the office spaces and that sort of thing.

It's the bigger spaces. It's the kitchen. It's the, you know, even if it's a warming kitchen, it's the gross motor room. It's the OT, you know, occupational and physical therapy.

It's those kinds of spaces that we're gonna run out of room within the existing building to, you know, and we need to find, you know, where do those spaces go?

Speaker 2 (01:00:20–01:00:46)

And that was 1 of my notes to ask, but it seems like the progression of the design is like, fully utilize building. See, look what you can utilize building before. So, basically, whatever we're buying, we're trying to maximize what we're, what we're purchasing. And then the final layer is if we have to do an addition.

Yeah. Right. Exactly Nathan has a follow up. So Nathan, go ahead.

Speaker 9 (01:00:46–01:02:06)

Yeah, thank you. I just had a follow up on the on the pre K specific discussion. Um, you know, you, you, you, you just said, you know, you'll, you'll kind of take your cues from us. We'll, we'll give you the numbers and you'll run them through your model.

And I think on, um. On enrollment of our current education program, you know, we could probably create scenarios in which our enrollment goes up or goes down, you know, incrementally based on different factors. There is a step level change that I think is possible with pre K. Where whereby we have.

Universal full day pre K. Which would be some. Percentage of. Current kindergarten enrollment, but I don't know.

I don't know what it might be. I don't know. I don't know what that tends to look like. Just stepping away from from this specific project, I'm wondering if you all just what you're seeing.

Among your clients, or in the in this sector in general around how districts. are planning, doing space planning for an eventuality with pre-K in which there is higher enrollment, but where there's less predictability right now.

Speaker 6 (01:02:06–01:04:38)

You're not alone. Cambridge is wrestling. That's the client that we're working with right now that are wrestling with how do they do this? And they're also like the master plan that we did for them looked at different ways that they could also do a dedicated center.

It is, All the way across the country, people are wrestling with this. One of the biggest questions ever. One of the things that I am like the North Kansas City school district is doing is they've actually started taking over big box stores and putting preschool pre-Ks in those type of because the retail space has gone defunct. They're sitting empty.

They can get them for inexpensive. And yes, it makes for an unusual Layouts, but they found them to actually be really successful and really cost effective. Everybody's dealing with it. One of the things that is so difficult is.

There aren't enough spaces with the current enrollment. This isn't even talking about existing or like growth. It's not about growth in the district. It's about flipping on the switch and saying now everybody has access.

So that's the like, I think that at the very least. you should look at it and say, okay, if we flip the switch and everybody had access to universal pre-K or preschool, what would that look like? And what are those numbers? Because there's the crux of it.

Most communities, Massachusetts is losing population, but that doesn't necessarily mean that if you flip that switch, you still wouldn't have a significantly So, is that something that's in the future? Is that something that there's a thing for the other thing is remember projects take a while. Like, even if you buy the building in September. And you do a project, we're 3 years out.

You know, at a minimum, and what does that look like? 3 years out? What decisions do you think that, you know, 3 to 4 years out? Like, what does that look like?

And so those, you know, those are the things that we're looking for. I would always at this stage on paper plan for more because it's super easy to build the actually been designed for less. So, that number don't be shy and saying, we want to double what you've currently got in the program. It's just paper, it's just lines on paper.

Speaker 2 (01:04:38–01:05:24)

And that goes back to my kind of progression of the design building C to building B to some addition that we know we're going to have to build as part of this project if it comes. And then I think that full day preschool, like you were saying, the dash line would outline for something in the future that if you wanted to expand this project. If you remember what we did at the middle school, the intention there was we separated the preschool off of it. And we did it as a standalone for whatever loan it was today, but built it separately so that we could expand it.

So that will be the full day preschool option. Basically, you guys would need from the town an enrollment number to kind of plan that dash box.

Speaker 6 (01:05:24–01:06:15)

Right. And one of the things that's interesting, you know, we talked about today, we actually talked about, well, the kitchen would be like in one location, distributed dining, not having the kids go to a central dining. And again, for two reasons, one transition time, little kids take a long time to walk from point A to point B. But also, that means that it's a module that, as you expand, it doesn't matter.

You haven't undersized your cafeteria. You would just, if you added another pod or 2 pods or whatever, you would be adding the dining along with it because it would be decentralized and would be in association with the pod. Same way, even honestly, with things like the distributed library, you know, and circulation of books, things like that.

Speaker 4 (01:06:15–01:06:23)

It's proportionally and it's modular, right? Like, because of the distribution, the warming kitchen itself doesn't get bigger.

Speaker 5 (01:06:23–01:06:24)

Yeah.

Speaker 4 (01:06:24–01:06:33)

Except the kitchen, except the food, except the library, except all the additional spaces. So the module just keeps going.

Speaker 2 (01:06:33–01:06:38)

Could you guys also talk about the travel time that slide you had about the increased learning? Oh, sure.

Speaker 6 (01:06:39–01:06:48)

Um, I included that slide. That's okay. I have it on my, my, um. Do you want, I can pull it up.

Do you want me to pull up the, from earlier?

Speaker 2 (01:06:48–01:07:11)

If you could share it. I mean, that was, that was one that struck me when I was seeing it earlier. That was, I think it plays in a lot of like how the best way to utilize the spaces are. Cause I think like for people that don't do the design, like you guys do daily, it might be missed, but it was for me, it was really striking.

Speaker 6 (01:07:11–01:07:46)

So. Um, 1 of our projects, in fact, it's the same project where they have the aspiration to go from. Now, I've got a little bit of like, there we go. Um.

From operationally, um. Design from an operational point of view where you're centering operations and the. Staff versus centering the students, the same project. Say, where.

Man, there's a lag. It's not liking this. There we go.

Speaker 1 (01:07:52–01:07:56)

OK, I'm good now. Now I'll see if I can share.

Speaker 2 (01:07:56–01:08:02)

Somebody is a co-host, so you should be good.

Speaker 6 (01:08:02–01:13:04)

Yeah, I'm just trying to find and making sure I'm sharing this the right one. There, I think. Let's see if this works. So, this right here, we did observations of this.

This was an existing kindergarten facility and we did observations and. The day in the life of student and teachers. And what you will see here on the bottom are the transition. So they came in the morning and they had breakfast at the facility and then they transitioned to class there between each 1.

they went to like, special instruction. There's another 7 minutes there and another 7 minutes coming back and then they had class and then they eat again. And there's another 5 minutes there. Then they had 3 minutes of transition to go out and play research, recess, and then they had another.

30 to get back to class, and then they did five minutes of transition to go to art, and then another five minutes back to class. And you can just see all of these different transitions versus then the design that we actually proposed where they had, they brought, the art actually came to them, the distributed dining came to them. So they created these pods that had six classrooms, They add small group rooms and other kinds of support spaces, like teacher planning. So the teachers also have a space where they could do work collaboratively and look at collective curriculum issues and things like that.

When they put everything back into the pod and they reduce those transitions, they actually saved 30 minutes a day in learning. So it went from little kids walking from lining up and walking from point A to point B back to an additional 30 minutes a day of actual learning time. That's super important when you have the half day kindergarten, preschool, that kind of thing. I guess it's in this case, it's preschool.

That was for a full day program, but still the same would apply for the half day programs. ended up being that it was a 48% reduction in transition time, which equated to three additional weeks of learning across the school year. That's a lot of learning time. And that is just one of the things that by having this, instead of saying like you would in a normal elementary school, oh, we've got that cafeteria and all the kids are going down there.

No, we actually designed different, I don't know, I think actually if I go forward by one, It said it will actually go forward. I don't know if it's just that slow. There we go. So these are the pods.

And this was a brand new building. But within each of those pods, the green is like where they eat. The yellow is where they do, the light yellow is where they do projects, as well as like pullout space for specialists. and then the classrooms and it becomes this area.

This was a two-story building, and so there was a total of four pods, and they even then had two gyms, or they were small gross motor rooms. It wasn't the size of a 6,000-square-foot gymnasium that a normal elementary school would have. They were much smaller, but to keep those travel distances down, they actually built two of them, one at the end of each pod. So there were stacks.

So you see two here. There was another floor above. The gross motor rooms were double height. But what it meant is that you were drastically cutting down on the travel times for the kids because those programs and those specialists and the eating time and all of that was coming to them.

And it was the whole concept of the school and the way that it was designed and planned. These are just some of the images from that project. And we built different types of spaces so that there would be places for respite for the kids that don't want to be out in the middle of everything all the time. So we created different places that people could retreat and observe, including within the classroom.

We have a little puppy that we created for kids to have a place to get away. But this is out in that space where the specialists get together. And you can see through the glass, that's the classrooms. A lot of connection between that.

It's not like the kids were just roaming out in this space. They were with specialists, they were with, you know, but there might be another teacher on the inside of the classroom doing a different type of lesson, but these kids were pulled out then and they had a focused exercise. And then here it is where they're having their lunch. And then this is the gross motor room.

and it's connection out. So.

Speaker 2 (01:13:04–01:13:20)

So with kind of a set up question for the next question. OK. Sorry. So with the three level space that we have, do you see that as being an important thing, like reducing that amount of travel time?

Speaker 6 (01:13:20–01:13:59)

Absolutely. Again, it's bad enough to have to go down corridors. It's even worse when you have to go up and down stairs, which is why even like the way that we distribute We're going to have to really look at where do we put the gross motor room. The gross motor room may not want to be down on the lowest level.

It may want to be up at that middle level. So again, students are only going up one or down one flight of stairs as opposed to two levels. That takes little kids, little legs, and it'll reduce the travel time if we locate those things that are accessible to that middle level.

Speaker 2 (01:13:59–01:14:50)

So the follow up and that was a setup. So I apologize. So with this project right now, like we're in the MSVA program, right? And our preschool K option that we're discussing now is not part of what we're doing with MSVA.

So I think for like all of us, not really focused on you guys, but At some point, we have to have a kind of deeper discussion of, are we going to just go this on our own, forego MSVA, and just kind of push along and do this? Or are we going to say, we want to go back to MSVA, hit reset, re-get our options for enrollment done, and do it? So the question going, because you mentioned it earlier, is like, for the type of layouts we're doing, they probably won't be MSVA, quote, unquote, compliant.

Speaker 6 (01:14:51–01:15:30)

We can do them. The sizes of classrooms that they were, the expectation right now is that there's an 1,100 square foot classroom, because that's what you have existing. So that's what we are going to use as our module when we're laying out a classroom. So I actually don't think I, well, I'll tell you in two weeks, I don't anticipate there that there would be anything that would like, Raise eyebrows and and honestly, the fact that it's.

Looking to reuse a building is. A good thing.

Speaker 4 (01:15:30–01:16:11)

Yeah. Yeah, from there wasn't anticipating us being. Stepping far away from the SBA at all. I think.

Part of the reasoning is that, again, we're future-proofing the building. Those are standards that are set across the state. It makes your teaching spaces equivalent to what's happening across the state. We don't want to deviate too far.

We don't want Arnoldton to be 10% behind on the space allocation. Parents look at these things when they're choosing where to live, where to send their kids. We want to make sure that your leader is not followers.

Speaker 2 (01:16:13–01:17:05)

Yeah, because if we could have it, that it is, you know, with MSBA, because essentially, if it just asks us just for everybody's kind of understanding, if we're going with a separate option that might have been smaller, and it obviously would weigh into a less expensive one, because again, from the high level estimate that we're doing, we're just doing dollars But I think if we all agree and kind of look to everybody around the room that we want to run with an MSBA model, just in case we do want to go back for it. Because at some point, you know, the town has to make a decision. Do we want to go forward? We're trying to compare at some point this project to the overall guide road project.

So that's, I just want to check on that.

Speaker 6 (01:17:05–01:19:02)

I mean, one of the things that is interesting though, is that when you look at the MSBA space summary template, there isn't technically an early childhood mark. And I mean, they don't usually jump up and down and deem people for like, like I said, we were not intending to put a 6,000 square foot gymnasium. We were planning on sizing it based on our experience of working and having done multiple early childhood centers all over the place. And it probably will end up being more in the 4,000 square foot or maybe even 3,000, 3,500 square foot size for that.

That technically, there's no place in the MSBA space summary template that you're going to find a space like that. But I would think that they would still be supportive because it is a very different population. that you're building for here than, like I said, an elementary or something like that. And as long as we would be able to prove from an industry standard perspective that it is appropriate for this age group, I don't think that they would ding you for it and suddenly come back and say, no, you've got to build a 6,000 square foot gymnasium instead.

The other thing is they don't have a standard for preschool. But what I would recommend, and this is what my intent was, is to compare it was to put as if everybody was in kindergarten and see what it spits out as far as like, you know, how many classrooms would they expect? Because the way that summary puts it, you know, you put it in is you put it in according to grade and it will come back. I could imagine though, that you might need a little bit more of the support spaces.

Little kids tend to need a little bit more support space, but still, I think that we can look at that. And those are the kinds of things that Almost every community deviates around how many offices and all of that.

Speaker 5 (01:19:02–01:19:04)

Cool.

Speaker 2 (01:19:07–01:19:37)

Any other questions? Anybody online with any follow-up or any other questions? Seeing none, all right, so I think that covered the gender items A and B. I think our C item is kind of next steps for you guys.

So, you know, as you laid out, our next meeting is in two weeks. So there'll be a draft that comes in at that point. We'll have a similar round table of this.

Speaker 6 (01:19:39–01:19:49)

Yeah, and we will be sharing options. So we will have the options, and you'll be able to comment on the options. And there will be time to revise, even if there was something there. We're excited.

Speaker 5 (01:19:50–01:19:58)

Yeah. Any questions on next steps or anything? I just appreciate that presentation. It's impressive.

Speaker 2 (01:20:00–01:20:01)

Thank you.

Speaker 6 (01:20:01–01:20:04)

We're excited. Yeah, this is fun.

Speaker 2 (01:20:04–01:20:07)

Yeah, this is the fun end of it.

Speaker 6 (01:20:07–01:20:09)

Yeah, it's totally the fun end of it.

Speaker 2 (01:20:09–01:22:36)

So, we're just going to move on. You guys are welcome to hang out and stuff like that. So, we'll move on to agenda item number four, old business, which is module two, onus project manager OPM selection update. So, I believe.

You don't have to. Yeah, that's what I'm saying. It's totally up to you guys. So, we have received, I believe, from the MSBA that we're on for July's Confirmation of PMA as our as our OPM.

So I just wanted to kind of relay that to everybody. I forget the exact date. July 13th is our update. So that's actually next week.

So that is at 245. So if anybody wants to attend, they can forward the invite. short presentation and then MSBA, I believe, would just certify them afterwards. I haven't been through the process, so I can't really speak to it.

Any questions or updates or any discussion? I'm seeing none. All right. Uh, item 4 B is discussion the enrollment analysis part 2 and 3, which are the citizens enrollment projections that were provided.

So, you know, at 1 of our previous meetings, we had. Formed a subcommittee, so I believe was carry myself and Tim. So, you know, at some point. Over the next couple of weeks, we'll have to meet as a subcommittee to kind of dive into this and to provide.

A response to the overall reports that were there. I started looking at them initially. Just to get my, my comments and stuff like that. So.

You know, just looking at, you know, carry and I'll touch base with Tim after. But, you know, for you guys, you know, over the next couple of weeks, if you want to. Schedule a meeting and just kind of dive into this a little bit. So just see if you guys have any questions or comments or anything like that.

Speaker 3 (01:22:39–01:22:43)

The only thing I'm going to comment on is that I'm on vacation for the next 2 weeks.

Speaker 5 (01:22:44–01:22:49)

We, we, but when you get back, yes, of course.

Speaker 3 (01:22:50–01:22:55)

Yep, I just I hate to delay, but. I need a vacation.

Speaker 2 (01:22:56–01:23:03)

No, it's that time of year. So the week of, sometime the week of the 27th? Yes.

Speaker 5 (01:23:04–01:23:23)

Okay, can you hear me? Yes, sir. I will be available. We just need, I need to know what options and dates.

Okay.

Speaker 2 (01:23:23–01:23:47)

Yeah, I'll, I'll reach out and we'll, we'll, we'll discuss, you know, a date and time because I believe we have a meeting on the 27th, um, for school building committee, just kind of go over that final report or sometime that week. So we can get it to the select board in the following week. Uh, but the subcommittee, yeah, I'll touch base with yourself and Carrie and line something up.

Speaker 5 (01:23:49–01:23:49)

Thank you.

Speaker 2 (01:23:50–01:25:01)

No problem. Thank you. All right agenda item number 5 is the special approval meeting minutes. So, obviously, with the past weekend for the holiday same carry, I needed a vacation.

So I took a vacation this past week. So, I didn't get a chance to kind of wrap up those minutes. I'll get them at our next meeting. So, we're just going to table that.

Future meeting dates, agenda item number six. I think we discussed it two weeks from tonight. The architects are going to have their draft plans for us. So, Kerry, you'll be on vacation, but for everybody else, if you could pencil in the 20th and I believe the 27th.

Um, and, you know, that's kind of the rush to get it. So Pete can get it to you guys before that 1st week of August. But then the 1 thing I was mentioning to the architects too, is that if there are a number of changes. We might want to give them to the 31st, so give you guys kind of that weekend to kind of absorb it.

Or if you need it on the 27th, just let me know.

Speaker 8 (01:25:03–01:25:16)

We'll do. I mean, it's all evolving, time running. So I think anything we can get along the way is good. But as far as the final development goal, I know we're doing our best.

Speaker 2 (01:25:17–01:25:33)

OK. Appreciate that. Any questions or comments on future meetings? Hearing none.

Item 7 is adjournment. So I will entertain any motion to adjourn.

Speaker 9 (01:25:37–01:25:38)

I'll make a motion to adjourn.

Speaker 2 (01:25:39–01:26:02)

Okay. Right. And no discussion. So we'll do a roll call vote because we're a hybrid, uh, Carrie Hurley.

Yes. Yes. Thank you. Uh, Nathan Hutto.

Yes. Uh, Glenn Hoffman. Yes. Peter Obersheimer.

Yes. And Sean O'Rourke. Yes. Thank you guys very much.

Have a great night.

Speaker 1 (01:26:02–01:26:04)

Thank you. All right. Thanks all.