Board: Board of Appeals September 30th, 2014 Pt 1

Date: Unknown


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:05–04:49)

development at 131 Elliott Street in the town of Milton. The date of the application was July 2, 2014, and we opened the public hearing on the evening of July 24, 2014. And at that time we, by agreement, continued the hearing until this evening, September 30, 2014. At the last public hearing, we listed the materials that we had available to us at the time that constituted the then record for the application.

And since that time, we've received some significant additional materials. And I'd like just for the record to recite the materials that we've received since that last public hearing. As those who we hear the last time will recall and those who may have seen it on public television, one of the things that we accomplished at the last public hearing was to reach agreement that we would engage a peer review consultant to look at many of the issues that had been raised both during the public hearing process as well as in correspondence that had been in the file directed to the site suitability process by Mass Housing Finance Agency. and we decided to continue the hearing to allow the Horsley-Whitten group an opportunity in conjunction with their traffic peer review consultant Connolly Associates to review a number of issues.

Horsley-Whitten and Connolly Associates both submitted to the board a written analysis, each dated September 2, 2014, in which they addressed many of the issues that had been raised during the public hearing process, as well as in prior correspondence. Alan and Major, on behalf of the applicants, reviewed the peer review and submitted a fairly detailed report dated September 23, 2014, with a number of specific attachments to that report. I have not had an opportunity to read, but I know that we received this evening a further peer review analysis by Horsley and Whitten Group, presumably in response to the points raised in the Allen and Major materials of September 23, 2014. So that's sort of where we stand this evening in terms of the materials that have been submitted since the last public hearing.

It was my thought tonight, and I defer, of course, to Mr. David on my right and Frank O'Brien on my left, the other members of the board, but it was my thinking that sort of a logical way to go about this tonight was to have The Horsley-Whitton group, as well as Connolly Associates, present for the board in oral form their findings and recommendations with respect to the proposal, as well as the response that's dated September 30th in response to the Allen and Major report. My one objective tonight I think for both the board and the members of the public and the applicants is to come to some at least preliminary understanding of what issues we've sort of addressed and eliminated and what issues remain. And so my thought is I would have the folks come in and testify or offer their their thoughts on those issues.

And then when Horsley-Whitten group was completed with its analysis, as well as Connelly Associates, then we'd invite a representative of Allen and Major, basically, to do the same. And there can be some interplay between the two groups, at which point I would then invite members of the board and members of the public who are here to sort of weigh in and ask some specific questions with respect to the consultants. Since we have them here tonight, I'm not sure whether they'll be here again. I think we should take advantage of the opportunity to get the benefit of their thinking and experience and wisdom on these issues.

because the board frankly doesn't have that experience in some particular areas such as stormwater management and the like. So, for Frank, does that seem like a logical way to go? Yes. Ted, is that okay with you?

Yes, Mr. Chairman. Peter, are there any issues that you want to raise before we proceed?

Speaker 2 (04:49–05:03)

No, we concur. There were a few attachments, I think, subsumed within the Allen and Majors. Yes, there were. There's quite a number.

There's a stormwater report, architectural plans. Parking analysis that you would ask for. So I'm sure those will come up in the discussion. So no, we concur.

I think that makes sense. Thank you.

Speaker 1 (05:03–05:05)

So without further ado, Janet.

Speaker 3 (05:08–10:24)

Hello, how are you? My name is Janet Bernardo. I'm a professional engineer with the Horsley-Whitten Group. I was hired by the Town and Mountain Do you want me to sit here?

To review the stormwater management, basically of this development, the existing site is, as you are aware, basically entirely covered with impervious either buildings or pavement. Because of the location to the Neponset River, and they are within that water resource area, they will be required to meet the mass stormwater standards. So my initial letter that was dated August 29th, 2014, went step-by-step through the 10 standards that they were required to meet and how they either met them or if I thought that additional information was required for that. As far as standard one is concerned, What we had originally the requirement for standard one is that you do not cause any erosion to Waters of the Commonwealth and So the you're not supposed to have a new conveyance.

That's not treated or caused excessive erosion so my question to them was How, where does this ultimately discharge to? They are tying into the municipal stormwater system in Central Avenue, but I didn't know where it was going from that point. They replied that basically it goes to the Neponset River. And what I wanted to know from that point, because it looks to me from just looking at it, that it's a direct run from basically where they tie into Central Avenue to the Neponset River that's not very far away.

But I didn't ever see a pipe or a discharge point for that. And so that's what I'm looking for, someone to say there's no erosion right now at the outfall to the Neponset River, and they're not showing any increase in velocity, they're not showing any increase in flow rate, however, I just want a confirmation that there's no erosion at this moment and that they are not, the likelihood is they're not going to cause more. But if there's any erosion now, it should be dealt with before they're adding more to it. And so I was never quite clear where exactly the discharge point is in the Deponset River.

So I'm sure that's something that Alan Major knows and they can reply to it. Standard 2 basically says that post-development runoff cannot exceed pre-development runoff. Because it's an impervious site, it's relatively easy to maintain that. It's also considered a redevelopment project.

So all of the standards, they pretty much need to meet to the maximum extent practicable. But they are not increasing the runoff. And so our recommendation, we had a few questions. about the abutting property that's also part of the building.

It was, I understand that the town owns one of those parcels and that that building is being taken down. The town has received approval to take the building down, but I wasn't really sure if it was part of the same project, if the town is taking it down separately, if it's going to be a joint venture. But basically, I wanted to make sure that that there's ample capacity in the municipal system for any flow that's going there. The idea is that the existing flow already goes to Central Avenue in the municipal system, but the roof runoff is unclear because they couldn't go into the building to know exactly where that roof runoff is coming from.

The town engineer appears to have confirmed that it is adequate, but I kind of restated it to make sure that the town engineer is, if in fact that roof runoff does not go to underground into the system, and it sheet flows off towards the railroad tractor somewhere else, we want to make sure that the capacity in that line is adequate. Anything that's happening to the town parcel I guess is eliminated from this project, but because they were so intertwined I was kind of confused of what was going to happen to that parcel if it's going to be impervious Or if it's going to be vegetated it seems like it's all together So I kind of have asked that question a number of times trying to understand from the town's point of view. What is the happening to the town, the building on the town parcel. I understand it's going away, but what's going to be there afterwards?

Is it going to be a grass? Is it going to be another building? Is it going to be a parking lot? Because it's kind of an all-in-one watershed area.

Speaker 1 (10:25–10:38)

Before you move to number three, can I just ask you a question? At the beginning you said that they had to meet the 10 criteria for Massachusetts stormwater standards. Do they have to get a permit of some sort?

Speaker 3 (10:38–10:44)

They'll have to go to the Conservation Commission with a notice of intent and get a permit from an order of conditions from the Conservation Commission.

Speaker 1 (10:44–10:46)

That will address the stormwater issue.

Speaker 3 (10:47–10:47)

Yes.

Speaker 1 (10:48–10:52)

So that would really be, I mean, their jurisdiction. That's a state issue, really.

Speaker 3 (10:52–11:00)

Yes. It's not a local issue. It's a state issue, yes. It's a state permit that the local Conservation Commission issues.

Speaker 1 (11:00–11:09)

I mean, we could if we chose to condition any decision to include those issues. But at the end of the day, that is within the jurisdiction of the Conservation Commission to determine.

Speaker 3 (11:09–11:30)

yes yes totally and and it's not even going into um a low like some communities have local bylaws but i was purely looking at the state bylaws for the state standards for this project because melvin doesn't have local because as um accommodates a permit they only have to fall under the state requirements

Speaker 1 (11:30–11:32)

Okay, I'm sorry to interrupt you.

Speaker 3 (11:32–14:16)

No, that's fine. Jump in. You may have heard it before, and if I'm going too fast, just slow me down. I know stormwater is always a highlight.

I think it's terrific. The requirement, so some of the things, the other thing for standard two, and because it's a redevelopment, they're required to improve existing conditions in some way. Redevelopment happened to be standard seven, but it falls back on all of the other ones. What they have proposed is something that is called a focal point.

Basically, we've been doing a lot of, everybody's encouraging infiltration, recharge of runoff. Because the entire site is impervious and they really have building on the entire footprint, there's not a lot of room for them to do any recharge. However, what they are proposing is something called this focal point, which is a new product. There's a lot of proprietary products out there that seem to be working well.

This one does not have a lot of testing behind it, but there are similar ones. Filtera, which is a tree that has a soil median, and a lot of times you put it on a curb, and it's a very similar idea to their focal point, the Filtera tree is something that has been studied and used in urban settings quite a bit. This focal point is larger, it's more like a rain garden in a box, is kind of where we summed it up as. It's a small vault and it has plants in the top and it has the soil meeting in it with the idea that the stormwater will flow through this box and have some water quality which is removing any sediments and pollutants that may have accumulated from the roof runoff or from the pavement area, not the roof runoff at all, sorry.

Roof runoff is clean. It's going separately. This is many of the pavement areas or the landscaped areas that which is not that much of Will go through this two of these proposed so in essence their their task was to improve existing conditions and by putting these systems in, that's an improvement over the existing for water quality purposes. They also, at the driveway entrances, they have trench drains that have A filter net, is that what you called it?

Speaker 4 (14:16–14:19)

It's a mesh screen that surrounds the outlet pipe.

Speaker 3 (14:20–20:46)

And has an absorbent boom, an oil boom, inside this mesh screen. So it's a trench drain that you've all driven over many times. It's maybe 12 inches wide on the top with a grate. And it goes all the way across the driveway and inside it is a mesh screen that is capturing or preventing the sediments and the leaves and the debris from flowing through the trench and just clogging up a pipe downstream.

So that is another way that they are improving the water quality conditions over existing conditions. There wasn't a lot of options for them. They seem to have gone through a lot of – from our telephone conversation, they seem to have gone through a lot of alternatives. For documentation purposes, I've asked them in my September 30th letter to provide some documentation of exactly what they have.

thought about. I mean there are, there's porous pavement, there's green roofs, there's you know just bioretention and rain gardens. There's a lot of options and alternatives. However, I can maybe appreciate why they didn't do some of them.

I talked to them about porous pavement and there's some brick walkway areas. I understand now that they want to match the brick of the sidewalk that the town likes, and so that would not be porous, and then the walkway into the main entrance will likely match that. It wasn't clear on the drawings, and so that was one of my questions, is why isn't that porous? It could be, and it could be one more way to make it, improve it.

So I've asked them to kind of give you some documentation so that in theory they can prove that they did do it to the maximum extent practicable. So that was, so standard three basically requires some type of recharge that they do not, so that post-development basically is similar to pre-development. I've asked, they've stated, what did I say? They're basically saying that it didn't apply.

I told them because of redevelopment, it does apply. They proposed this focal point. The focal point is solving the issues that I brought up in my first letter. By bringing in the focal point device as well as the trend strain, they have answered many of my questions.

So that falls along as improving existing conditions. Again, I'm asking for them to document the various low-impact development alternatives that they have considered. Standard 4 has to do with removing total suspended solids. They needed to remove, that's basically just the sediment that's coming off the roadway, any debris that falls into the water stream when it rains and it picks up sediment.

The idea is to remove 80% of that before it gets into the the drain pipes and then just deposits into the wetlands, which is the Neponset River. They are proposing the trench drain and the filter net on that. They needed to give me a detail, so that was my comment for September 30th letter, is that they didn't add the detail on the drawings, they included it in the report. So I've just asked for all the details on all of the Elevations and dimensions are clearly shown on the plan so that any contractor could put that in.

Standard five happens to not be applicable to this project because it falls under land use of higher potential pollutant loads, so it's not applicable. Standard six also is not applicable because it has to do with zone twos. Standard seven is all about redevelopment. and making sure that they are meeting it to the maximum extent practical because it's a total impervious site.

Their responses to my original questions I found to be acceptable. So what I've asked is that to make sure that they are improving existing conditions and because this focal point does not have a lot of testing and a lot of definite that it will work. It sounds reasonable as it's being proposed, but possibly the town engineer knows of some deficiencies that's in Central Avenue, in that intersection, that if there's catch basins there that do not have deep sumps, That's a standard improvement that many developers will do, so that it's a matter of if they have the deep sumps, then they have them. But if they don't, it's one of those things that they can put deep sump catch basins in that catches more sediment as the rain's going through the pipes and the sand and the leaves and everything get caught in the four-foot deep sump that's typically in a catch basin.

You with me? The other night I realized that people didn't know what a catch basin is. Do we know what a catch basin is? In the ground, it's a grate on the street and you're driving over it.

It makes a big difference if you don't have any idea what I'm talking about. It's really a bummer. Standard 8 and something that they do need to meet has to do with requiring a plan that shows erosion sedimentation controls. They have provided that information.

I had a few questions. because there were some mislabels and I'm still trying to understand about the building being removed and that there should be erosion controls around the down gradient side of the town parcel. So that's, I guess, not part of their application, but somebody should make sure that there's erosion controls on the other side of the town's parcel. Who is taking down that building?

Speaker 5 (20:46–21:10)

I don't think they hired a contractor.

Speaker 2 (21:10–21:22)

If I'm not mistaken, you're trying to not necessarily do it at the same physical time or same contractor, but moving together on the planning stage. For example, we are at the Conservation Commission for the approval for that demolition. For the demolition as well.

Speaker 5 (21:22–21:26)

It's going to be a joint takedown, simultaneous takedown of the buildings.

Speaker 1 (21:27–21:35)

And do you have any idea, because I don't, what's proposed to replace the town building? I don't know. Does anybody know? No.

Speaker 3 (21:35–25:29)

Okay, so Rosie controls needless to say should be put around the downgrading side and and somebody I'm sure is paying attention to that the town engineer maybe Billy inspector I One of my recommendations for standard number eight is that if you decide to approve this and one of your conditions is to reference the Conservation Commission's order of conditions for their project, because they do need to meet that. There was some minor plan edits that needed to happen. So standard nine has to do with having an operation and maintenance plan involved for their stormwater system. It's my understanding that it is going to be part of the building maintenance system, and so it was a matter of making sure that those stormwater systems that they have in place are being maintained annually as part of their ongoing maintenance of the building.

And so they provided that documentation to me. 10 has to do with the owner signing a illicit discharge compliance statement, basically. What MassDEP is looking for is that the owner is signing off saying that they know that they're not dumping any sewage or any pollutants into the storm drain system. It's more to make sure that the owners are aware, because the engineers know they're not supposed to do it, but it's to make sure the owners are also aware that they have signed off on something saying that they're not going to discharge anything else besides stormwater into the drain lines.

I had a few additional comments that had to do with parking spaces and how they were measured. There still are a few discrepancies on some of the architectural drawings because the parking spaces, they're just compact parking spaces, which is acceptable to have, but they were not dimensioned correctly. And the ones that are on the top landing, They didn't have dimensions and they they all seem to be slightly different sizes lengths particularly So they should just have dimensions shown on them And then the seven parking spaces that are on Elliot Street I think they should be also shown on the drawings because they seem to be You know, we've discussed them regularly and that they should be striped and As part of this project, those parking spaces should be striped on Elliott Street because they're going to reduce one of them anyway. I'm sure the striping will be gone during the construction project, and they should stripe them again.

The landscaping, we had a few comments about the landscaping not being native. The LMAJR gave me a new plan. We found that to be acceptable. They have a number of three waiver requests that we are really deferring to either the ZBA or the traffic consultants.

And another thing, the parking spaces were not numbered correctly. It's just a typographical error. But that was basically my concerns in general for stormwater. I look to make sure that their design is appropriate, that their calculations are accurate, and that their methodologies seem realistic.

So that was my intent, and I'm comfortable with their design as it stands with a few little edits.

Speaker 1 (25:30–25:39)

So other than a few modest and minor revisions or changes, it sounds like you don't have any substantive issues with your stormwater plan.

Speaker 3 (25:39–26:19)

No, not at this time. I feel like there's a few minor details to be added to the drawings. But there are things that I see as can be conditioned. They would have to be shown on the Conservation Commission's drawings.

They will become final. When the Conservation Commission approves something, they approve the final design. prior to it would go into construction. So they like to see it with every invert accurate and you know sometimes the zoning boards and the planning boards can have it not quite final but conservation is very insistent that it you know every last detail so that it gets built exactly as it gets permitted.

Speaker 1 (26:23–26:29)

Why don't we turn to Alan and Major? Do you want to speak to just to these issues for the time being?

Speaker 4 (26:30–27:48)

Sure. For the record, Phil Cordero from Alan and Major Associates. You know, I'll be very brief. You know, we worked closely with Janet on providing the response to her initial peer review comments and the applicant said, you know, let's address them to the best we can to make sure that we meet the standards in their entirety.

And I think we've done that, and I think the letter certifies to that. Just a handful of quick questions that I think popped up, and forgive me if I skipped any. You know, you had asked some questions about the outfall location into the Neponset River, and I'll just point to it on the plan. if I can, there we go, is the Centoav drainage system that was reconfigured a couple of years ago by the town drains in this direction.

There's a junction manhole approximately here that splits. One goes westerly to an outlet headwall here, and the other goes easterly to an outlet headwall here. So your assumption was absolutely correct that it's pretty close to a direct discharge to the river, but it is a stabilized system there now on both sides that would seek to tie into. Okay.

And we agree with you that we need to continue to work closely with the town engineer for the connection into the central app system and maintaining the stabilization that exists out there today for the river.

Speaker 6 (27:48–27:50)

What's the stabilization?

Speaker 4 (27:50–28:23)

Well, that we don't cause any further erosion. That as we build this system and our system drains into Central Avenue, that that additional flow does not cause erosion either to the stone or the basin of the river through there. There's none there now. Like I said, it's stable as you go out there.

The vegetation has grown in. The riverbed bottom is in good standard condition. And we don't want to disturb that with this project. And that's the mandate of the stormwater standard, essentially, as Janet outlined it.

Speaker 1 (28:25–28:33)

So you need to get sign-off by the town engineer, obviously, to tie into the stormwater management system.

Speaker 4 (28:33–29:06)

There are two permits at play here. One is the Order of Conditions through the Conservation Commission. They regulate the discharge into the river, because that falls under the Wetlands Protection Act. So in the issuance of the Order of Conditions, that allows us to discharge into the Neponset River.

The physical connection to the municipal system is through the town engineer. And we met with him prior, several weeks ago, you know, to review this project with him and make sure that what we could do was feasible and that there was capacity in the system to allow that connection.

Speaker 1 (29:06–29:09)

Does he actually issue a permit, though, to do that?

Speaker 4 (29:09–31:50)

He has, I don't believe he actually issues a piece of paper that says you're allowed to connect into the municipal system. He has a number of other permits that he'll issue for this project, curb cuts, sidewalk permits, and so forth, but not one that'll specifically say, you know, drainage is allowed. Okay, sorry, please no no no problem at all I think Mr. Connolly addressed the status of the town building and how that was going to be coming down and how it relates to this project which is that it doesn't relate to it at all they do have to be treated it treated independently and Again, we're in concurrence, erosion measures need to be in place as that building comes down, but we don't have control over it in terms of implementing that.

There is a notice of intent applied for through the Conservation Commission on behalf of the town for that project and the erosion measures, I assume, would be contained within there. We talked a little bit, Janet pointed out these focal point systems and we agree that the best analogy for them is a rain garden in a box. A rain garden seems to be a term that most planning agencies now understand. It's a method of treating stormwater using soil media.

So the stormwater runoff goes through the soil media, and as it's filtering through, the media is actually removing the pollutants and the accumulated sediments. So the water coming out of the bottom of the system is inherently cleaner than the water going into the top of the system. Because we have limited footprint area to install structural stormwater controls, we opted for these relatively small footprint areas of the focal point to gain that treatment that would meet the stormwater standard. And in putting in these systems, we also get some stormwater infiltration, which helps to reduce the rates of runoff from the pre-development to the post-development condition.

So we're able to check off a handful of boxes with this focal point system. Admittedly, it's a fairly new technology. They are great in urban retrofit areas because it's direct discharge of stormwater to them for treatment. We try to anticipate questions as to what these systems are by including a lot of documentation from the manufacturer in our stormwater report.

So you will find that in the files that were provided to the zoning board and also to Jennifer, her review. We're happy to provide any additional documentation as necessary should the board feel warranted. Do you have a question?

Speaker 6 (31:50–32:29)

Go ahead. It seems to me, I'm not an engineer but I get to play one tonight, that you're putting a lot of focus on these focal points. And I guess I'd like to get a little interplay between the two engineers. How new is this technology?

Where is it being used? What's the experience been with it? And should the town or the board be worried about the newness of this technology?

Speaker 4 (32:30–32:41)

I'll jump in first, and if you want to supplement. The technology of using soil media to treat stormwater is not new. It's widely accepted.

Speaker 6 (32:41–32:47)

Let's dumb it down for us non-engineers. Soil media. We're talking dirt here, right?

Speaker 3 (32:47–32:49)

We're talking, we're talking the engineered dirt.

Speaker 4 (32:50–33:16)

Special dirt. Special dirt. It's, you know, like a special type of pine mark mulch will go into the system and then special hand selected soil will be underneath it. And it's selected so that way the water is forced to run through the pores of the soil and as it creates contact with the soil, it removes the pollutants.

The pollutants will stick to the soil and the water will be allowed to go through.

Speaker 6 (33:16–33:25)

So that's what's happening. Where does the water go through? So the soil in the other media essentially acts as a filter. Yes, correct.

So I could think of this as a coffee filter.

Speaker 4 (33:26–33:26)

Yes.

Speaker 6 (33:27–33:32)

So it goes through this coffee filter and then the clean water goes where?

Speaker 4 (33:33–33:56)

Two places. One, it's going to go straight down into the ground. So there'll be some stormwater recharge into the existing soil and water table below the site. Given that these focal points are not very large, that's not a large amount of water going back into the groundwater.

The remainder of the water will connect out to the municipal system in Elliott Street and Central Avenue, depending on which focal point you're looking at.

Speaker 6 (33:57–34:02)

How many of these focal points are you thinking about using, and where would they be located?

Speaker 4 (34:02–35:01)

We have two proposed on site. One is located right along the westerly driveway and it is intended to handle the runoff that comes from the westerly sideline of the green area and some offsite flow from the residential houses that flows in this direction. It would come down and go into the system which sits here. We have a trench drain across this driveway, and then those two systems will then be connected via closed drainage pipe running along Elliott Street, so via pipe.

and then it'll connect into a manhole right at about the intersection of Central Ave and Elliott Street. At the same time, we'll have a second system right here along the easterly side of the site at the corner that will pick up runoff coming through here and the lawn area and the sidewalk. We'll have another trench drain with this filter and the sock inside that we talked about. And again, that all connects up into the system and then goes towards the Neponset River.

Speaker 6 (35:01–35:03)

Are you comfortable the two is enough?

Speaker 3 (35:04–36:06)

They don't have a lot of space to put much of anything. So I'm comfortable that two is an improvement over existing. And if they, for whatever reason, don't work, they don't get maintained, they don't get cleaned, they will just the stormwater will just go through the municipal system as it currently does. So I'm not worried about the design or the system.

I think I have seen similar products that have a similar concept that have been working fine for many, many years in all around Massachusetts. This is just a new manufacturer with a new product, kind of, you know, he's making a new box. So if it doesn't work, no harm, no foul kind of thing. It will just go into the drain line that it's already going into.

But if it does work, it will provide some quality cleaning of the stormwater, which is great.

Speaker 6 (36:06–36:07)

Thank you, Mr. Chairman.

Speaker 7 (36:07–36:15)

I apologize if you've already said this, but what is the size of these boxes, height, width?

Speaker 4 (36:16–36:53)

It's about 20 by 20 area, so it's about 400 square feet. Now that's below grade. What you see is a typical catch base in the Janet referred to, or a yard drain that'll sit inside a landscape bed. 20 square feet.

Excuse me, 20 square feet each. Excuse me. 20 square feet each. It's going to go, again, surface water will run down along the green area to an inlet right in this location.

And then through the inlet, it goes through that filter media. So it's 20 square feet each in terms of area. That's about 5 by 4 in terms of width. Excuse me for that.

Speaker 7 (36:54–36:55)

And what's the depth?

Speaker 4 (36:55–41:15)

The depth I believe is about 36 inches in terms of the media. That was one of the details that Janet asked us to add to the plans, so we'll confirm that specification with the manufacturer and make sure that that's on the plan. Yeah, it's really a box, as a simplistic term, with the mulch and the soil inside that box. It percolates through, and then it recharges to the ground.

The bottom of the box is an open honeycomb, like a milk crate, for lack of a better term, where, again, that water gives it the open area to pond and recharge back into the ground. Thank you. Certainly. Certainly.

I think the last thing that I'd want to touch upon is, you know, she made mention that we have to meet the standards to the maximum extent practical. And we made a selection in terms of using this media as a way to improve the water quantity and the water quality. We feel it'll do that. I believe Horsley Whitten is in concurrence with that.

We looked at other options, some of which we had to exclude because we didn't have the land area available on site to use them, like the porous pavers that Janet had made mention of for the sidewalks and the walkways leading up to the door. You know, that wouldn't result in the cohesive product with the central corridor with the brick edging that's out there now. So we wanted to have, you know, an integrated product out there as opposed to many dissimilar materials like the porous pavement. We looked at tree filter boxes, which again is the same idea that the stormwater runs into a tree well.

And it's filtered through the media, through the soil and the root system below the trees, and that's what holds on to the pollutants. We don't have tree wells along the Elliott Street corridor. There's not a whole lot of area there. There are some tree wells right at the Central Avenue site, but those are controlled by the town, and we would not be able to use them for, you know, stormwater management.

You know, it's technically public property, and we need to deal with it in our own way, and that's why these focal points came into use. Rain gardens, infiltration trenches, there's a laundry list of other stormwater controls that could be used. For regulatory reasons, we can't use stone trenches because they're too close to the building. A rain garden requires a much larger footprint and we don't have it between the face of the building and the public right of way for either Elliott Street or Central Avenue.

So, we did go through quite a list of them. We didn't document them in the way that Janet has requested. I mean, we can certainly do it if the board is entertaining it, you know, to have a list of things that we touched upon but then elected not to use for various reasons. We think at the end of the day, in terms of stormwater, we do meet the standards.

We find that the Conservation Commission will be in agreement with that. Again, not to speak for Janet, but I think she's in concurrence with it. And that's what we're required to do here for the project. Last comment was some details to be added to the plans.

We'll certainly get to that. She had also looked at maybe some betterment in the central ave area if there's existing catch basins that need deeper sumps. The town went through and rebuilt the central ave corridor not too many years ago. So there's not much of an opportunity to do anything with the town to improve any of the offsite systems.

So we have to cross that off the list as a potential option. And then last thing was erosion measures. We'll certainly do them. The Conservation Commission requires that we have them.

They're shown on the plans. Erosion measures being silt fence barriers, straw bale barriers. As the site is being constructed, we don't want stormwater leaving the property in any direction that is unclean, that has somehow picked up debris and sediments from the construction activity. So we'll need to make sure that those are in place.

They get inspected at the time of installation by the Conservation Commission. And then the engineer, the contractor, the owner, we're all part of the team to make sure that they stay in place and maintained throughout. So we'll certainly be part of that.

Speaker 1 (41:19–41:21)

Anything you wanted to add to that, Janet?

Speaker 3 (41:22–41:48)

No, I am comfortable with the system. I think there's some documentation and the Conservation Commission will chime in on their end for the order of conditions if they approve the project, as well as the town engineer to confirm. Are there two systems in Central Ave with, you said the Conservation Commission controls one and the engineer controls the other?

Speaker 4 (41:48–42:38)

No, there's one drainage system. that everything through the intersection flows down Central Avenue and discharges into the Neponset River. Technically speaking, by letter of the regulation, a connection into the river is under the Wetlands Protection Act, which is governed by the Conservation Commission, which requires the order of condition. But the physical connection into the drainage system, the town engineer is going to have to approve it.

So you know it's the Conservation Commission would be the master authority without their approval nothing happens And then once we get their approval the town engineers to say okay. We agree with your connection You know the pipe into this particular manhole this particular structure is acceptable to us, and there's no There's I from just looking at it.

Speaker 3 (42:38–42:48)

There's nobody down gradient that could be impacted by at all because it's the next thing. It's the railroad tracks and then it's the river.

Speaker 4 (42:48–43:01)

Right into the river. So there are no additional systems here. There are no additional discharge points. It does not come out onto the railroad tracks at all.

So we don't have an opportunity to cause any down gradient problems. That's good.

Speaker 1 (43:04–43:20)

I'm comfortable. All right, let me turn it then to members of the public who are here this evening to ask if there's any questions or comments about anything that you've heard so far this evening as it relates to stormwater management. Yes, sir.

Speaker 8 (43:30–43:39)

materials be changed as directed by the manufacturer, that the operator would have that obligation.

Speaker 4 (43:41–44:14)

If I could speak to that, the media, there's a specific operation and maintenance plan, and it was required that we include it. So in the stormwater report, we have that maintenance program which says how often the media needs to be changed, how often it needs to be inspected, and so forth. So that is immediately today already part of your record, part of the plan submittal. It would carry forth with the Conservation Commission in whatever order of conditions they issue.

So that would be, and it's as specified by the manufacturer.

Speaker 1 (44:15–44:20)

Okay. Anything else? Yes, sir. Could you just give your name and address, please?

Speaker 9 (44:21–44:37)

Just a quick question for the women who've given the kind of synopsis of the report. Just one question. Did you guys go out to the site? I did.

Speaker 7 (44:38–44:40)

Okay.

Speaker 1 (44:41–45:33)

I'm told that people need to come up to the table, I guess, to speak because the sound, you will not be picked up, you won't be able to hear it. So if there are any other comments or questions, please. Where would they come to, Mary? Okay, they would sit right there.

Any other questions or comments on this limited issue of stormwater? OK. To some extent, the stormwater issue is really an engineering issue. And as Frank indicated, none of us here on the board are engineers, although over time I've, through some sort of osmosis, picked some of it up because of all the land use litigation that I do.

It's because you have the correct media.

Speaker 4 (45:34–45:38)

I do have the correct media. If I call it dirt, everybody gets offended.

Speaker 1 (45:38–46:18)

But I think from a public perspective, the next topic is probably a more immediate interest, and that's the subject of traffic and parking in this neighborhood as a consequence of this project. And with that in mind, I would turn to my friends from Connelly Associates to address the traffic and parking issues. And again, you've submitted to the board a written peer review analysis of traffic. There's been a response to that from the major people.

But why don't you just take us through the beginning and explain your analysis and your findings.

Speaker 10 (46:18–47:24)

Certainly. My name is Jennifer Conley, and we conducted the peer review of the Gill and Associates Traffic Access and Impact Memorandum. Taking a look at it, I'd followed the standard steps of a traffic analysis, which is to take a look at existing, what the baseline condition is expected to be, and look at then what the impact of the project is expected to be on top of that. What they used for their base peak hour traffic volumes, instead of using the existing condition, because there had been a traffic study that was on file for the apartments at the Milton Hill House, they used the traffic volumes for that build condition from that traffic study.

And what they did is they backed out the the traffic that was assigned to this site under a previous proposal. So we double-checked their steps in doing that and found that the volumes that they used for this baseline 2017 condition were correct, based on that source, and verified that they did remove the trip generation that was previously assumed for the subject site tonight.

Speaker 1 (47:24–47:42)

Can I just stop you for one second, Jennifer? When you do that analysis, you take existing traffic, you build in the no-build condition, there's a certain amount of traffic that would be anticipated to be added over a period of time without the development.

Speaker 10 (47:42–47:43)

Correct.

Speaker 1 (47:43–48:08)

And then you, on top of that, and you'll get to this in a moment, on top of that then you add the anticipated trip generation from the project, And for that, I'm sure you're going to tell me in a moment, you use the ITE trip generation manual. So then you know existing plus reasonably anticipated additional traffic unrelated to the project plus the project equals traffic in the future.

Speaker 10 (48:08–49:25)

Those are definitely the standard steps. You heard the spiel before. I've heard the spiel before. But in this case, what the proponent did was they took the study that was already completed, as I said, for that other development, which had already included a background growth, which had already looked at a future condition, and already included the traffic from that project.

So instead of starting from analyzing just an existing condition and doing those steps, they relied on a study that had already been submitted to the town and included those steps already. So using that 2017 condition, they already had built in background growth, you know, other projects including that subject project from that traffic study. Then, as you said, they took a look at what the proposed building program at 131 Elliott Street was expected to generate. And looking at that, we verified using the ITE standard and verified the numbers that were contained in the Gillen report.

And that was they anticipated it would generate 32 trips during the a.m. peak hour, 49 trips during the p.m. peak hour, and 43 trips during the Saturday midday peak hour. And as I said, we looked at that standard and verified for the proposed number of units, 57 units of apartment, that those estimates were correct.

Speaker 1 (49:25–49:27)

And those are trips in and out.

Speaker 10 (49:27–55:04)

Correct. That's a mix of ins and outs. For example, say on the Saturday peak hour it was 23 trips in and 20 trips out for a total of 43 vehicle trips. Then they took a look at how those trips would be distributed through the network.

And I know that is very important because there is a lot of concern about this adjacent intersection. And they based it on the existing patterns. So they took a look at a cordon kind of around the whole area. What is the traffic doing that's coming into this area?

Where are trips that are currently traveling, say on that Saturday peak hour, where are they going? And they distributed the traffic from this project following those existing traffic patterns. Then they added those trips to that baseline condition that we already spoke about to come up with what their build condition volumes were. And again, we just verified that their math, that their methodology was completed correctly to develop their build condition 2017 traffic volumes.

Then Gillian Associates conducted an operational analysis of three different intersections. Let me step back. Originally, of course, there were also three driveways, but one was on Central Avenue. The most recent information, again, because we received the historical information, but the most recent filing, only included driveways on Elliott Street and no access provided on to Central Avenue, which I think was something that came from feedback from the town.

And they analyzed the unsignalized four-way stop location at Central and Elliott. They analyzed how that intersection was operating and they analyzed how the site driveway intersections were operating. At first, the analysis was not included with the submittal, but once we requested it, they did provide it to us so that we could just review that all of the inputs were put into the analysis correctly and that everything that was presented in the report was correct. As I said, the next thing that I do discuss in the memo is that site access because we did receive also a lot of the comments and a lot of the the town correspondents about the access, and I know there was a lot of concern about that Central Avenue access, so in the most recent analysis, that was removed.

In addition, they also commented on the site distance, and based on our field visit and based on the information provided by Gill and Associates, there are adequate sight lines for the site driveway locations on Elliott Street. especially when you take into account that folks will be leaving the four-way stop intersection and really, you know, just be getting up to speed as they're passing by those side driveways in that direction. The other comments, I just provided a little bit of, I pulled some of the traffic comments from the Board of Selectmen, the Police Chief, DPW. I know on-street parking was a concern.

As of the time when I wrote the memorandum, we had not read, we had not received anything from the Associates. We have since then, and I will comment on that briefly. There also was concern from the Police Chief in a request for investigation of signalization at the location of Central and Elliott. Because information was not provided specifically to address that from Gillen.

We just did a quick peak hour analysis and one of the peak hours Borderline met the warrant. I mean just was right on the line and for the other peak hour it didn't meet it so my guess is that it is not a candidate for signalization and My guess is is Gillen associates could speak to that more because they had more I was just looking at the traffic volume peak hour and data, they may have a little bit additional data and might be able to speak to that a little further. But it certainly doesn't seem a likely place for signalization just based on the fact that the operations at the four-way stop are fair. One of the approaches during each of the peak hours does experience, you know, longer delays in queues.

But overall, the intersection is operating at acceptable levels. So, I don't think that it's a candidate for signalization, but again, I did not do a full analysis of that. I was just supposed to be reviewing what was provided, and since nothing was really provided on that topic, I just touched on it just so that you would know what, you know, what in a cursory view I was able to find. Overall, the traffic study followed the standard steps.

The analysis was done correctly. I didn't have any concern with the methodology. The item that was at that time still remaining as an issue was that question of the on-street parking, which again, there has been a subsequent submittal from Gill and Associates where they did observe the parking during the weekday and during the Saturday peak, the Saturday over the course of the entire day. As is no surprise, and a little bit of the comments reflect this, There are a couple of areas where the parking, which were pretty parked most of the time, Zone C and Zone F, if you take a look at that document.

But in general, during most of the times of the day, both on the weekday and on the Saturday, within a walking distance, there certainly is parking available. So even with the elimination of the parking on the site, those vehicles will be able to find parking elsewhere. It may not be immediately in front of the business that they're hoping to go to. But certainly within walking distance, there were parking spaces available.

And again, I did not complete that study. That's just my review of it. And again, I received that after I had prepared my memorandum.

Speaker 1 (55:08–55:14)

So just so I understand, the Central Avenue intersection, you did a level of service analysis with respect to that?

Speaker 10 (55:14–55:15)

Yes, Mr. McGillen did, yes.

Speaker 1 (55:15–55:23)

And you reviewed that? Yes. And what was the level of service impact, if any, attributable to the project?

Speaker 10 (55:23–56:37)

Very slight, hold on, I can tell you exactly, because it was very minor. The number of trips that are going through that intersection, you know, as a percent of what's already there was very minor. the levels of service, depending on which approach, the delay increased by less than a second per vehicle. And basically, that's the impact of, again, over the course of the hour, if you think of it this way, the number of vehicles that are going through that intersection, if I go back to that trip generation, from this project are going to be, on the one approach, coming, say, coming from the site and heading towards the intersection would be 23 during the morning peak hour, as everyone is, say, heading off to work.

Over the course of the hour, 23 vehicles, that's one every three minutes. So, the average person pulls up to that intersection and gets through it, say, waits 30 seconds, 40 seconds, waiting. They may or may not encounter that extra vehicle. That vehicle may or may not add to their delay.

So, over the course of the hour, the average vehicle will experience less than an increase of one second.

Speaker 1 (56:39–56:46)

Now, if one were to conduct a warrant for traffic signal here, what does that entail? I know you didn't do it.

Speaker 10 (56:47–58:11)

I just looked really quite simply. There are a number of traffic signal warrants. Typically what it involves is collecting traffic data over the course of the day. And most of the warrants that you typically will install a traffic signal for are the eight-hour warrants, which means for a period of at least eight hours over a given day, there is a traffic meets certain thresholds.

That means there is a sustained traffic issue at this intersection, if you meet those thresholds, what that means. There are other warrants for four hours, there are other warrants for things like correctable accidents, for pedestrians, for school crossing, for a number of different reasons. But I just very quickly looked at using the billed condition peak hour volumes. I just compared that against what's called the peak hour warrant.

It's very rare that you would, just based on a single peak hour warrant, put in a traffic signal. Because again, what you're doing is you're causing everyone 24 hours a day to stop at a traffic signal that's only warranted one hour a day. which is why you typically don't do it just for that peak hour warrant. But given the limited data that I had to look at, I just quickly looked at that.

And that tells me it's borderline even for that one hour, I'm guessing that it wouldn't warrant it over the eight hours. But again, it was not part of my scope to go out and collect additional data and conduct that analysis.

Speaker 1 (58:11–58:15)

It's simply a matter of collecting data for a day-long period.

Speaker 10 (58:15–58:15)

Yes.

Speaker 1 (58:16–58:19)

And then applying that data to some standards.

Speaker 10 (58:19–58:19)

To standards.

Speaker 1 (58:19–58:22)

That would tell you whether or not a signalization was warranted.

Speaker 10 (58:22–58:22)

Correct.

Speaker 1 (58:23–58:37)

And so given the police chief's concern about this, it wouldn't be that big a deal to do that kind of study. True. OK. I just wanted people to understand that.

Anything else you wanted to say, at least at this point about traffic?

Speaker 10 (58:37–58:40)

No, I think that summarizes our findings. Fine.

Speaker 1 (58:40–58:45)

Well, why don't I turn then to the Gillen people and see what they have to say on traffic.

Speaker 11 (58:47–59:43)

Thank you, Chair Gillen, Gillen Associates. The two things that I can elaborate on here is I'm not going to repeat myself, but the question was about the traffic signal warrant. We did look at the eight-hour warrant based on the volumes that we had taken for the previous study back in 2011. And based on those volumes, it did not meet the eight-hour warrant because even Mass Start doesn't accept the one-hour.

They like to know that there's a real need for a signal before you put a signal in because If you put a signal in, a lot of time the crash rate, the accidents go up because someone will stop at a yellow light and somebody else coming, even perhaps down the hill, Eldia Street, where you have a little bit of an incline, they don't anticipate the bridge is going to stop and you'll have a little rear end there. So a lot of cross collisions, a lot of major intersect, but you do have minor property damage a lot of times when you do put signals in where they're not warranted. So we can take a look at that for you.

Speaker 1 (59:43–59:48)

I'm not sure I understood what you said initially. Did you say you have the data?

Speaker 11 (59:48–59:57)

We have the data. I don't have it with me tonight. We have it based on 2011 for the 8-hour warrant and it did not meet the 8-hour warrant.

Speaker 1 (59:57–01:00:03)

So they did it for the Elliott Street apartment building? They did a signalization warrant?

Speaker 11 (01:00:03–01:00:14)

We did. We did. Actually, we did the traffic volumes, the train movement volumes back in 2011, but I think it was this project back in the day.

Speaker 1 (01:00:14–01:00:19)

Okay, okay. What would it take to do it again for 2014?

Speaker 11 (01:00:19–01:00:24)

It would just be putting a couple of machines out, one on each.

Speaker 1 (01:00:24–01:00:24)

Just counters?

Speaker 11 (01:00:25–01:00:32)

Yeah. And then doing an analysis, summarizing and comparing it with the criteria.

Speaker 1 (01:00:33–01:01:10)

I mean, traffic is a matter of some concern to people in the town, understandably, who live and drive through that intersection. And they're not, perhaps, conversant with all the fine details of traffic analysis. But they do know that there's the apartment complex there, and there's a steel and rye, which during certain periods of time, it's probably not peak hours, but certainly during certain periods of time generate, visually you can see it, just get down there on a Saturday or a Sunday morning for the brunch and it generates a lot of traffic. It's a wonderful place.

But it wouldn't be a big deal for you guys to do an eight hour warrant at this point.

Speaker 11 (01:01:10–01:01:36)

That's correct, but I think that I'd be remiss if I didn't mention that the incremental difference of what we are contributing isn't an awful lot, and further, that the design detail may be a tiny bit complicated where traffic would queue back on each leg. Obviously, whoever has a green light, they're moving, but when they have the red, the queues are getting longer on both Elliott and on Central Ave at some point.

Speaker 1 (01:01:38–01:01:55)

Don't misunderstand me. I don't have an opinion one way or the other as to whether a signal is a good idea. But since it's been raised as an issue, if there's some easy way to obviate the issue, I think I'd like to see it done. That's my only point.

But I'm sorry to interrupt you. Please continue.

Speaker 11 (01:01:55–01:02:19)

No, you're fine. Just one of the things you'd look at is obviously the queuing on Central Avenue, because that's where a lot of vehicles come from. In the evening peak hour, you'd be concerned about the tracks. But I understand your first question is are they warranted or not.

OK. I did do the parking survey, and I could elaborate on that a little bit if you'd like.

Speaker 1 (01:02:19–01:02:23)

It's also an issue of interest, I think, to many people.

Speaker 11 (01:02:25–01:02:27)

Jack, I have that electronically.

Speaker 8 (01:02:27–01:02:28)

You have it electronically?

Speaker 7 (01:02:28–01:02:30)

Excellent. All the way, almost to the bottom.

Speaker 1 (01:02:34–01:02:39)

Guys, jump in at any time. Don't leave too many for later.

Speaker 7 (01:02:39–01:02:41)

There you go.

Speaker 3 (01:02:42–01:02:42)

Here.

Speaker 11 (01:02:44–01:06:57)

Well, we'll make the best of it. What we did is we did the parking survey in two days. One was a weekday, and I believe that was September the 4th, and we did it on a Saturday, and I believe that was the 13th. The way we did the survey was we used a clipboard.

I'm sure some of the people have seen me. We go back and record the license plate, the last three digits of the license plate on the vehicles that are there. The weekday was conducted from 7 a.m. until 4 p.m.

and the Saturday was actually conducted from 9 a.m. until 6 p.m. because we wanted to see what the steel and rye packing was like more towards the supper hours. We looked at it in different zones.

You can see this over on this side here, this is Elliott Street. Here's our property over right in this corner here. So this is Elliott Street between Central Avenue and the westly end of our property. That's zone A.

Zone B was down on Central Avenue between Elliott Street and down past 36 Central Avenue. Zone C was actually in the parking lot of 36 Central Avenue because there were eight parking spaces that are reserved for customers and shops at 36. D is up here on Central Avenue between Elliott Street and the bridge, so those on-street parking spaces up there. E is on Elliott Street.

from Central Avenue up to about the Millbrook House. That section from here to about here is 600 feet long, 613 or something like that. And the reason that we went that far, or not further, or not less, is that Walker Design Group, they do an awful lot of parking analysis, they had indicated that people will walk up to 600 feet maximum. for where they'll park and go to different stores and retail places, so that's why we looked at that.

E, that was E, F is this little area right here in Brook, and there's a lot of all-day parking on there, very, very long-term parking, and that's pretty much a service zone, and a lot of people that do work in the area do use it as a survey zone, even though maybe not everybody has has a permit on their car. And the other is over here on the site, zone G, there are people that are parking in that. And it's not so much that we're going to accommodate them in the future, because that's not going to be the case. But we had to displace these vehicles when you build a building, and they have to go somewhere.

So we have to be sure that there'd be plenty of parking to accommodate those vehicles as well. So what we did is we looked at how many of those spaces were occupied during all of those hours, and the total occupied, and then compare it to the zone, the zone capacity, not including the parking spaces on site, because those spaces are not going to be available. was 120 spaces altogether. And the percent occupied did not go over 60% during the weekday peak hour.

And there were a lot of spaces available. There was never less than 48 spaces available. That was on the weekday. And then on the Saturday, we did it in the afternoon.

And you can see the Elliott Street area ended up being more occupied than during the weekday, but there were other areas that were not occupied as much.