Board: Board of Appeals October 21st, 2014 Pt2

Date: Unknown


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:00–00:16)

Not less than six feet in height along each boundary of the premises that abuts a residential property. And you'd install an eight-foot stockade fence to buffer the mulch pile as shown on the site plan. That would be acceptable to you?

Speaker 2 (00:19–00:27)

We're coming off The six-foot fence going to an eight-foot and then coming down.

Speaker 1 (00:27–01:44)

It will be on uniform height, but you've also got different functions going on there. This is a big deal. We're going to hold you to this. Absolutely.

So that was one issue. The second issue is the mulch being continuously wet. And Mr. Gray has suggested that it also be kept wet both while being stored and while being offloaded.

So we found that to be acceptable. The third issue is the setback, which Jack, I forgot Jack's last name, I'm sorry. Mr. Carpenter has asked to be 20.

We've acknowledged that 20 is difficult given the geometry of that swing. Mr. Martinelli has now said that you might be able to get 20 on that first bin. I wonder if the, I wonder if we could do this by you, and you've suggested that that's really eight.

Speaker 2 (01:47–01:48)

Seven. Seven to eight.

Speaker 1 (01:49–02:05)

Yeah. So we have that as an outstanding matter. I don't know if the board has something they want to say about that. He's suggesting that it's a seven to eight foot setback, but that's not really a setback, right?

It's only here because he owns that.

Speaker 3 (02:09–03:07)

Yeah, I don't think 20 is doable, nor perhaps necessary when you have an 8-foot fence, 15 or 13 giant abovite. We know that Mr. Carpenter has really mulching area and and sort of a storage area in that in that direct area I think his main issue with the fire and the burning of the fence which I think we address and alleviate And by walking the property, we know that his yard and his children's play area is way beyond his real lot line going towards his residence. So I think 20 feet is onerous.

Speaker 1 (03:09–04:13)

OK. Yeah. Well, there should be something, because the idea was The permit requires you to pull the mulch back as far as possible. There ought to be a minimum, it seems to me.

I don't think that 20 will work on that first bin, Mr. Martinelli, because 1146 is the abutter. It's only those other two bins where Jack's the abutter. So you really don't have a setback on that first bin, which you could probably pull down further east, closer to Randolph Avenue.

But I don't know that it'll have any effect as applied. But the board could say that the setback should be no event less than seven feet, as shown on the plan. That will at least give some setback. And seems to me to be the intent.

I would like to have more, but I think your side is tight right there. We all know that, especially when That's a bit of a compromise, I know. What does the board say to that?

Speaker 3 (04:14–04:15)

I'm in agreement with that.

Speaker 1 (04:15–06:41)

Okay. I think the only issue is the amount of cubic yards of mulch that may be stored on the premises. Just for the record, so that I know that people are watching this at home, read it so that everybody understands what this says, because this is something that's never appeared in a special permit before. The way it was written now, and picking up on Mr.

Lumbaugh's comment from a couple of hearings ago, It reads that not more than 125 cubic yards of mulch may be stored at the premises during the months of April, May, and June. Not more than 50 yards of mulch may be stored on the premises during the months of July through October and March. And not more than 10 yards of mulch may be stored during the months of November through February. Now, that's a bit of a tortured paragraph, but I can assure you that all 12 months are addressed so that we know what the limits are for each 12, each of the months of the year.

Mr. Prodigal will have to have a calendar as to how many cubic yards of mulch are permitted during any one period. The applicant has asked that leftover I'm assuming particularly for the months of July and August where you've got you coming down be excluded from the 50-yard limitation. That's what you asked for it.

And one of the abutters, Mr. Martinelli, has suggested, oh, and you've also asked for the 125 to be 210. We also know that you've only got two deliveries of mulch during the week. And no single delivery in excess of eight yards of mulch.

So that means that not more than 160 yards of mulch may be brought to the premises during any week. And you can't bring the mulch to the property before 1030 or later than 4. So the real issue is, there's really two issues. One is, what's the total maximum number of cubic yards of mulch that can be at the property in April, May, and June?

And what's the total amount of mulch that can be at the property during the carryover months. So I don't know if the board has thoughts on that. And I think I've accurately summarized where we are. And this is the last issue.

Speaker 3 (06:46–10:10)

Any of my fellow board members have something they want to say about that? On the issue of the total cubic yards allowed during April, May, and June, I mean, I think there's been enough testimony from Jason, this board, to understand that the mulch is a very, very significant part of his business. And it's certainly not my intent here to drive Eagle Farm out of business. My view is that some of the proposals that Jason submitted with respect to fencing.

He's going to put six feet on the Martinelli lot line. There are 40-foot existing arborvitaes on the Martinelli lot line. He's pushing back his display plant line 20 feet, installing the two pear trees up against, I guess, They would then be behind the eight-foot fence. We know from walking the property that Mr.

Martinelli has, on his side of the incoming six-foot fence, he has very tall trees, 50-odd-foot trees, and a lot of them. We have the irrigation system going in. In my view, Jason has shown a lot of good faith to address the issue of trying to remediate Mr. Martinelli's issue with noise and dust.

I think Jason has made a good case that 125 won't do it for him, it will cause him harm. So I'm flexible on the 125. I'm willing to go where we need to go to get a good compromise and get this thing resolved, not to belittle or limit anything that Mr. Martinelli has testified to or brought to light to the board, but we do have significant testimony from other more direct abutters that the business is fantastic and they get along very well with Jason and he's very accommodating.

There's clearly a history here with the issues that Mr. Martinelli raises, and I'm not saying they're not legitimate. They are very legitimate, but I think that Jason has done a good job. It's taken us a while to get there, but I think he's done a good job to put forth proposals to alleviate Mr.

Martinelli's concerns as best as he can when weighed against what he needs to do to keep his business running. So having said all that, I'm flexible on the 125.

Speaker 4 (10:12–10:32)

I could be flexible on it. I don't know that 210 is the right number, but it seems 125 is not enough. There's a lot of screening between the two properties now. There will be.

So we just have to figure out what the right number is.

Speaker 1 (10:41–10:45)

You want a clear reading special permit, which is exactly what we're going to give to you.

Speaker 5 (10:48–10:48)

Right.

Speaker 1 (10:49–10:56)

When you come back here and ask for it to be clarified, we're going to remind you who's sitting here when we negotiate.

Speaker 5 (10:56–11:18)

Again, it is my opinion that the $1.5 is a reasonable number, and that could be indeed the factor. If you would demonstrate that that Number one, Mr. Mark, the noise and the dust have been brought under control.

Speaker 1 (11:27–11:28)

Hear from the applicant?

Speaker 6 (11:28–12:07)

I think the years of doing business for Jason has indicated the reality that 125 is insufficient during that one quarter of the year. And if you take a season away from him, how do we get those people back that have had to move on to go somewhere else? It's just contrary to the best business principles to be unable to satisfy the people that come to you year after year after year. And during April, May, and June, they come year after year after year for more than 125 yards.

I mean, maybe there's another number, whether it was 180 or 190, something that might be a compromise, but 125 clearly would make it impossible for him to continue his current operation.

Speaker 5 (12:09–12:46)

If I might, just a thought that comes into my mind as you say that. As we found in another case, it was difficult for a board to say, well, this particular business, you can sell to Jones Landscaping and but you can't sell to your own landscaping company. Is it possible that the mulch that Eagle Farms uses for their own landscaping jobs, is it possible to keep that mulch elsewhere and would that help to reduce the number that has to be stored on this site? Just a thought.

Speaker 2 (12:46–12:59)

Eagle Farms as a whole does not install a lot of mulch. I don't think it would be significant.

Speaker 4 (13:01–13:07)

What about 50 or 60 cubic yards? There's three bins, 150 to 180, somewhere in there.

Speaker 1 (13:07–13:08)

Yeah.

Speaker 4 (13:08–13:11)

I mean, I'm just throwing out a number.

Speaker 1 (13:11–13:18)

One number that I think actually is, I appreciate that. One number that isn't really thrown out is 160, because 160 is 2 times 80.

Speaker 6 (13:18–13:23)

2 times 80, but if there's leftover from prior, you're going to have a little bit of a difference.

Speaker 1 (13:23–14:32)

You're going to have to deal with leftover anyway. Yeah, yeah. You get the sense. Let me try this.

The sense of the board could be that… You really don't want additional mulch coming there when you've got a lot left over. Say that, first of all. We wanted to tie the capacity so that we would begin to get a handle on how much absolute mulch is there, recognizing that you had your peak, your median, and your small season.

One way to do this would be to suggest 160. and then have something about the fact that that would not include any leftover, something like that. I'm concerned that that gets a little bit more difficult for you to enforce. And there's actually been people questioning whether you can even calculate how many yards were there at any one time, which is really why.

Speaker 5 (14:32–14:34)

I was capable of making reasonable estimates.

Speaker 1 (14:34–14:48)

OK, good. Good. Which is why you're the building commissioner and we're not. But that's good, because that was a question that we did get.

And Mrs. Martinelli had asked that, as to whether or not you had an ability to eyeball it and say, OK, that's 100 or so.

Speaker 5 (14:49–14:51)

I mean, and.

Speaker 1 (14:52–15:08)

It's not an easy calculation. It's times three and two, and there's a 27 in there, things like that. Do you want to try that? No.

What do you say to that?

Speaker 6 (15:08–15:18)

That makes sense, Mr. Chairman. The 160 is some understanding that it could be an overflow from a past delivery.

Speaker 1 (15:22–15:33)

Is that a reasonable compromise that we would limit it to 160 and we would permit a certain amount of overflow? I don't know exactly how to write that.

Speaker 4 (15:34–15:49)

That's the fudge. You know what I mean? That's going to be the area where it has the potential for, I don't want to say abuse, but… Yeah, I think whether it's 125 or 380, there's always going to be that difficulty writing that.

Speaker 1 (15:49–15:54)

There is a big difference, though, between 125 and 380, and I think we're hearing that from Mr. Martinelli.

Speaker 5 (15:54–16:02)

Right. No, I agree. I'm just saying that the language will be the best it can be, and we will work with it the best we can.

Speaker 1 (16:03–16:48)

So the proposal that I'll put out there is that you limit it to 160 cubic yards during April, May, and June, 50 yards during July through October and March, 10 yards during the months of November, December, January, and February, but that each of those might be increased to accommodate a certain amount of carryover from the previous delivery to be enforced by the building commission. a certain amount of, and, okay. What does the board say to that? I know that wasn't very accurate.

Small amount?

Speaker 5 (16:48–17:11)

I mean, I'm trying to put it in a. I think, you know, sure, there will be factors. I mean, if it's, If it's a particularly rainy season, maybe there's going to be more carryover because less is moving out, I suppose. But I think some of that is, I'm still able to judge that.

And I think we can at least begin to work with that.

Speaker 1 (17:11–20:24)

If we said minimal amounts, minimal amounts of melch may be in addition to accommodating the carryover during the changes in delivery. that working next like okay uh… so they also want to have anything to this uh… to this hearing okay i'm gonna call this hearing but to an end uh…

but i'm gonna request it uh… a motion on the adoption of an amended in recent let me let me have one more one more issue the last issue is that the uh… mister senator tell us is asked for extension And as the acting chair, I'm actually sympathetic to the request, but I don't think we can properly grant it in the way that this forum was designed. The forum was designed for, it's really an enforcement order under the 2008 special permit.

And I think it's unfair at this late time, after, and I know you asked it before, Mr. Barry, and I don't think I gave you a full answer, but I do think it's unfair and a little bit out of order, with all due respect, and I know that, I don't mean that negatively. to seek an extension at this time. The person who asked us to come here is the building inspector for the purpose of enforcing the 2008 order.

We've taken steps to clarify that the 2008 order is being amended and restated, but it's not being extended, probably because it wasn't asked to be extended. And that's not to say that I or any member of this board wouldn't entertain an application to extend the order at the appropriate time, we are requiring that you reapply to the board within a time period sufficient to extend the permit prior to its expiration so that we have, and knowing how long this took, we have enough time to consider it. And we're not requiring that you not come in front of us till 2017. So, I'll leave it to you as to decide whether or not you come back, but, and I'll, I'm more than happy to hear from the members of the board, but as the acting chair, I don't think we can consider that at this point.

I agree. I agree. Okay. Okay.

So, I'd like to entertain a motion that the Board of Appeals adopt an amended and restated special permit substantially in the form as has been heard today, and that we will incorporate the findings made by the Board at the various hearings in the usual and customary way, and that this special permit would replace in totality every special permit that's been granted on the premises to date, and be a standalone document governing the use of the property at 1126-1146 Randolph Avenue to be enforced by the building commissioner in accordance with the town bylaw. Is there a second to that motion? I'll second that. All in favor?

Aye. OK. Thank you very much. Thank you.

Speaker 3 (20:24–20:25)

Thank you.

Speaker 1 (20:25–20:37)

And I want to thank all the members of the town for bearing with us during the five hearings that we've had and the site visit. Thank you very much. Thank you. Appreciate it.

Thank you, Mr. Prodak. Thank you very much.

Speaker 7 (21:00–21:07)

Tonight we have another one?

Speaker 2 (21:07–21:09)

Yes, wait, yes.

Speaker 7 (21:09–21:17)

So over the summer, you can figure out the team. Thank you.

Speaker 6 (21:18–21:20)

Thank you for your time.

Speaker 4 (21:20–21:26)

Tomorrow? You email me early in the morning for this. I don't think we do.

Speaker 7 (21:26–21:27)

I think we swapped off.

Speaker 8 (21:36–21:43)

I thought we were going home.

Speaker 7 (21:43–21:44)

Almost.

Speaker 4 (21:45–22:03)

Is this the fill? It's the fill. We thought 126 cubic yards was a lot of material.

Speaker 1 (22:06–22:11)

Okay, what? Oh, I see, I see, I see.

Speaker 7 (22:11–22:11)

Okay.

Speaker 4 (22:11–22:16)

This is close to where I grew up. Where did you grow up? 306.

Speaker 9 (22:17–22:22)

Oh, no kidding. That's very close. Very close. Is that Forbes Road?

Speaker 4 (22:22–22:30)

Yeah. Well, it's the road that the private driveway that goes up from across from Pont Pont. My brother's there now.

Speaker 9 (22:38–22:44)

that house. Is it the one that's got the . .

Speaker 4 (22:44–22:46)

. so you grew up in that house?

Speaker 9 (22:46–22:47)

Is that the house?

Speaker 4 (22:47–23:10)

I grew up at 306, and my grandparents and my great-grandparents were at 300. My brother is now at 300. Hopefully it's not a problem in this case, but I don't think we're abutting. No, I think I should know this area.

Speaker 9 (23:12–23:19)

If you go towards the other end, and you took your next right.

Speaker 4 (23:19–23:35)

It's the next driveway. The other driveway where the house burned down, the Mansard roof house burned down at the end of the street, at the end of the driveway, up that driveway. It goes up to the Beatrice Forbes' house. There's several houses on it.

Speaker 6 (23:36–23:39)

And you're on the right-hand side? No, it would be the left. You were on the left-hand side.

Speaker 9 (23:39–23:43)

Yeah, I know the one you're talking about. Yeah, you know the one I was thinking of. Yeah, yeah.

Speaker 4 (23:43–23:57)

But you were right across the street from it. We were across the street, yeah. Yeah, yeah. Until 1975.

I'm dating myself now. Are you three or four?

Speaker 10 (23:57–24:01)

Sixth grade. I graduated from high school.

Speaker 9 (24:05–24:18)

79 right here. OK, next subject. Where do you live now?

Speaker 4 (24:19–24:25)

Hinkley Road. Right next to the newly resurfaced Central Avenue.

Speaker 10 (24:27–24:31)

Much quieter at home.

Speaker 1 (24:31–26:38)

We're going to call to order our 8 o'clock hearing on the resurfacing of Central Avenue. Upon the application of Michael and Cynthia George, dated September 22, 2014, on file with the board for a special permit Under the provisions of Section 483, Earth Materials Removal and Deposit of Fill, the applicant's proposed to deposit approximately 3,200 cubic yards of clean fill onto their property located at 328 Adams Street, which is located in a residential A district. The purpose of the project is for the installation of a granite terrace, swimming pool, and other landscaping features. All is set forth in the application on plans on file with the board and open to public inspection.

My name is Jeffrey Mullen. I'm the acting chairman. Tonight to my immediate left is Nicholas Gray, board member, and to my immediate right is Stephen Lumbo, a member of the Board of Appeals. I have in front of me the application.

submitted by Attorney Edward Corcoran on behalf of Michael and Cynthia George. I've got a letter from Mr. Prondack, the Milton Building Commissioner, to Mr. Corcoran calling to Mr.

Corcoran's attention the need for approval of the Board of Appeals. I've got a number of exhibits to the application setting forth with the requested relief along with the reasoning articulated by Mr. Corcoran. And I've got a set of drawings that come in four sheets, including a certified plot plan, existing conditions plan, a drainage plan, a soil prep plan, and a master plan for the premises laying out the work to be done.

I believe that's the entirety of the file of the board. I see Mr. Corcoran is here with Mr. George.

Welcome to the Board of Appeals.

Speaker 10 (26:38–31:24)

How can we help you? I appreciate your time. I am joined by Michael George, who is the owner of the property at 328 Adams Street. He purchased it just over a year ago.

I have some photos that I think will be helpful to the board, including the aerial photo of the property. 328 Adams Street is part of the The 328 was built by Ralph Emerson Fultz, who was the grandson of Ralph Waldo Emerson. And it was built in 1903. It was a large, ancient-style house on a five-acre bustling venue.

And for a long period of time, it was owned and maintained by Ralph Emerson. And from that timeline, the property has really been sort of allowed to disintegrate, if you will. It became overgrown outside of the area and really around, as you can see from the aerial, around the top of the house itself. The Georgias have moved in and are restoring the mansion to its former grandeur, doing a beautiful job.

And they propose to add some outdoor living area that, if you look at the aerial photo, it's sort of this area back here. So the area on the plan, And in this area, in the rear of the property, they propose to install an outdoor living area, swimming pool, an outdoor patio, and amenities like that. It requires a fairly significant amount of fill because the property drops off pretty significantly from the foundation of the house. So the plan is to bring some film back in, restore some of the ground around it, and then fill up.

There are a series of permits that are necessary. The second photograph, the next set of photographs show the area in question. This first one is from the back side of the property, looking back at the area in question. that will become a part of a retaining wall system that will be installed from this pool.

The swimming pool and all the work will go on the other side of that. The plan is to raise it fairly significantly, at least up and above the top level of that wall. In addition, so most of the area is in what's being proposed, a series of retaining walls. There's a 48 by 20 foot pool, an outdoor fireplace, a spa, and some other things.

It's sort of a really nice area, in fact. And then, in the front, as you come in the driveway, there's a lawn, there's a wall, sort of slopes down towards the front of the property and plans to level that with that retaining wall and have it sort of as a children's play yard where they can sit on a flat level, a level part of the property where they can play their sports games, perhaps up a skating rink or something like that. I know you wouldn't want, you know, problems with having a skating rink, flexing open while in the skating rink. But to do that really requires a significant amount of bill.

And so it's an interesting bylaw that the board administers that we bring in more than $200,000, if you will, more than $200,000. It requires a permit. I've got a couple of questions, Attorney Corcoran.

Speaker 3 (31:25–31:50)

under 4A-4, list out a couple of the issues we need to sort of talk about I think. On these bill cases, we have questions about mode of transportation, how many truck loads, how often. I know that's a tough turn going up and down Adams coming out of that driveway.

Speaker 10 (31:51–32:14)

It's actually not a very difficult turn. That driveway is fairly wide and it is perpendicular to Adams Sturt. turn off to the left as you come into the property. So this is a fairly wide driveway, and it's fairly flat as you come into the end of the jamb.

Speaker 3 (32:15–32:32)

I'm thinking in terms of, do we know, we're talking, what's the number here? 3,200 cubic yards. an average dump truck.

Speaker 10 (32:32–32:38)

This is Tom Grant. He's overseeing the installation of all the work that's been done.

Speaker 11 (32:39–34:21)

Good evening. We anticipate bringing triaxial trucks to bring as much in as possible. We're trying to get as much material in as quickly as possible during optimal times, usually between the hours of 9 and 3. We're probably going to have about 70 trucks, 70 loads coming in.

We try to get, I would say, maybe eight trucks a day, eight truckloads a day. What we plan to do is have one of our laborers at the corner of Adams, where you turn into that private drive. There is a lot of activity on Adams. We understand that.

So we just want to make sure that the truck can come in and leave without disturbing the residents. I anticipate bringing the fill in no more than seven working days We would not be doing on the weekends. It'd be Monday through Friday Within the Not around rush hour. It just really wouldn't make sense So we would be Staggering those those trucks

Speaker 12 (34:22–34:24)

Are you coming in from the north?

Speaker 11 (34:24–34:31)

We're coming in from the south. Well, we're coming off of 93 North.

Speaker 1 (34:32–34:33)

From the south.

Speaker 4 (34:39–34:40)

Through East Milton, by the new bank.

Speaker 8 (34:45–34:46)

But you're coming up there.

Speaker 11 (34:47–34:47)

Right.

Speaker 8 (34:48–34:48)

More questions?

Speaker 3 (34:49–34:50)

Not at this moment.

Speaker 4 (34:51–35:19)

I was just staggered by the amount, that's all. That's the main concern. I mean, it's a short amount. I mean, I guess, can we hear a little bit more about why so much is necessary?

I mean, not that, I don't know if that's our thing, but I mean, obviously, the bylaw, it triggers our involvement at 200, and we're talking, I don't want to do the math, but, you know, significant increases.

Speaker 10 (35:19–35:21)

Yeah.

Speaker 9 (35:22–35:28)

It's a five-acre property, it's not an insignificant property.

Speaker 10 (35:32–35:42)

They're filling sort of a quadrant, well off of the talking lines, the setbacks are pretty significant off of each side.

Speaker 4 (35:42–36:00)

So if I were to draw a line on the certified plot plan where the fill was going, it's just, because I'm not, I see where this proposed retaining wall is with the curb and the pool. So it's in sort of that area.

Speaker 10 (36:01–36:16)

Oh, you've got it there. Yeah. Oh, there it is.

Speaker 4 (36:18–36:25)

Where it's going.

Speaker 10 (36:25–36:36)

You can see, for example, as you come up, the pool towards the east.

Speaker 7 (36:36–36:48)

No, it steps down. to go into sort of a natural state before we go into the property of the device.

Speaker 4 (36:48–37:11)

In fact, the property of the device is owned by the Open Land Conservation Trust. I mean, I guess that's just, it's the drainage, right? I mean, have we, have we heard anything about the runoff from that?

Speaker 10 (37:11–37:27)

There's a, potentially, there's a drainage plan. Yep. Site-prepping soil erosion plan. Okay.

So that the line of hay bale stack. All right, all right, I get it.

Speaker 8 (37:27–37:29)

Yep. While eroding.

Speaker 10 (37:30–37:40)

All work is being done outside of any wetland area. There is wetland, wetland buffer that's on the property that abuts to the northwest.

Speaker 4 (37:40–37:49)

Yep, yeah, I know. Forks, woods. Yeah, I've walked around in there a lot, so I think I've got the, I think I've got that part. All right, that's all I have.

Speaker 1 (37:49–37:50)

How many trees are coming down?

Speaker 9 (37:52–38:04)

You know, at this point, you know, we've taken some trees down already, but I don't think there's much of anything left to be done in that regard.

Speaker 1 (38:04–38:14)

Would you be willing to accept a condition that would prohibit, not prohibit, but express a desire to remove as few trees as possible?

Speaker 9 (38:16–38:26)

From here forward, we're going to probably end up planting some trees, just so you know. Yeah, I think that would be reasonable.

Speaker 1 (38:26–38:27)

Where is the fill coming from?

Speaker 11 (38:31–38:46)

It's coming from the South Shore. It's Right now, I think we've narrowed down to a company called PA Landers. They do quite a bit of … I know they are.

Okay.

Speaker 3 (38:46–38:50)

Yeah. Do a lot of asphalt work, don't they?

Speaker 1 (38:50–38:57)

Yeah, and back in business. What's the nature of the fill?

Speaker 11 (38:57–39:41)

How would you describe it? We've actually went through a pretty long process of There's really not a lot of sand around this area. And we're looking for something that will both act well, but also be able to percolate. So it's a gravelly sand mix.

It's not like recycled asphalt. It's not a processed gravel. Basically, it's a natural byproduct of the work that they do. So it's a, I would say, a gravelly sand.

Speaker 1 (39:42–39:43)

Can we classify it as clean, Phil?

Speaker 11 (39:44–39:44)

Absolutely.

Speaker 1 (39:45–40:36)

All right, so what I'd like to, this is where I'm going with this, you know, I don't think anyone in the town wants this to become a dumping ground for some three-decker in, you know, even if it's from the South Shore. Sure. So I just make that suggestion, some type of, you know, the language would be a gravelly sand mix of clean-filled materials. regardless of its source, we just have an idea of what we're getting, or what Mr.

and Mrs. George are getting. You do specify clean fill? You do, in the application?

Okay. Could we also, you would also make a representation to us and we would require that there be no resulting drainage of any surface water or runoff onto any abutting property?

Speaker 9 (40:38–40:39)

Yeah, I think that'd be fine.

Speaker 1 (40:40–40:45)

There's no CONCOM jurisdiction here at all? No. They didn't have anything to say about this? They have no jurisdiction.

Speaker 10 (40:45–40:55)

We have a separate action pending with the preservation of the store with the stone wall back in the corner of the property because a portion of the stone wall

Speaker 9 (40:58–41:03)

That failed. You know that area? Yeah, the wall failed.

Speaker 10 (41:03–41:32)

So we're going to try to reconstitute it. So he's restoring, and he's restored to a point where he's gotten to the 100-foot buffer. I see. And we have reached out specifically.

I've talked to Jim Comeau, DCR. DCR plans to land at a Butts, at the Corp of Woods. And we were due to be on Thursday night before the Conservation Commission, but for reasons that aren't quite clear, on Thursday it's been rescheduled. But we will be taking order of conditions.

Speaker 1 (41:34–41:56)

So you say it's 3,190.94 cubic yards. That's the net volume. That suggests that there's some cutting here, right? So you're taking some soil off, too?

Otherwise, I wonder why we have a net number. No, I see the calculation. I just can't figure out what's actually happening.

Speaker 11 (41:56–42:05)

Well, I think that net number is there's some loom on the site that we strip off.

Speaker 1 (42:05–42:06)

OK.

Speaker 11 (42:06–42:09)

And then we will amend it with some organics.

Speaker 1 (42:10–42:37)

That's probably what that net comes from. All right. So it's not like you're taking a whole lot of bad soil off and bringing in a whole lot of new soil. There's not a larger gross amount coming in.

Because if there's 70 loads, eight trucks a day, you said seven days, but it's The math isn't perfect.

Speaker 11 (42:37–42:50)

Right. There's always going to be a little bit of variable on each day of how many trucks. It could be one truck, two trucks. It will vary depending on the traffic.

Speaker 8 (42:50–42:52)

And how big are these trucks?

Speaker 11 (42:53–43:03)

They're triaxles. What cubic yards? They can probably carry about 20 ton. which is approximately 26 yards.

Speaker 1 (43:03–43:07)

Yeah, 26 or 27. No mulch, right? No mulch in this?

Speaker 3 (43:08–43:16)

No. Please. No, it's sprinkling in there. OK.

So 26 yards. Yeah.

Speaker 1 (43:17–43:23)

You're basically building up the yard so that you can enjoy it. Yeah. You could have said that at the start.

Speaker 9 (43:23–43:24)

It's not particularly usable.

Speaker 1 (43:25–43:46)

Right. It's up here and it slopes down. You want your kids to be able to play on the grass and you want to be able to have a swim pool when you're back down. I don't have any further questions.

No. You know the area better than all of us. Yeah. Okay.

Is there anybody here who would like to speak in favor of the application? I just had a… Oh, nobody?

Speaker 3 (43:46–43:51)

I'm sorry, what are we, 3,600? 3,200.

Speaker 10 (43:52–44:00)

There's a growth, yeah, there's 3,600 coming in and 400 going out. So there's a net of 3,190 rounded to 3,200.

Speaker 3 (44:01–44:20)

Well, coming in, if there's, you said about 26 yards per truckload? Yes. Let's give us 123 loads. Approximately.

You said about 70 loads.

Speaker 11 (44:23–44:57)

Well, that was just doing some quick math. That number, that 3,200, that's a very high number. I don't think we're going to be up that high. It's probably not going to be that many cubic yards.

So when I looked at the plan as well, we're using material on site too. So that value is going to be dropped out.

Speaker 1 (44:58–45:22)

We will do something like this. We say a maximum of 3,200 cubic yards. You'd be delivered only Monday through Friday, not during commuter hours, either in the AM or the PM. That you take steps to manage the traffic on Adams Street, as you said.

And I don't know that we . .

Speaker 3 (45:22–45:22)

.

Speaker 1 (45:22–45:26)

Are you suggesting a maximum number of loads per day? Is that what you're thinking?

Speaker 3 (45:26–45:55)

My only thought is, you know, it's Adams Street. It's a busy street. Farnborn Academy is right there, or close by. I'm just looking at it from a safety point of view.

somewhere between 70 and 120-odd truckloads coming in over a course of a week is upwards of a dozen a day or so, potentially. We've just got to be careful, that's all.

Speaker 9 (45:55–46:01)

Yeah, it won't be going by Tampon, as you know. We fall short of it by a couple hundred yards. If you're coming up.

Speaker 4 (46:01–46:02)

Coming up. That's what he said.

Speaker 1 (46:03–46:10)

Could we say that the permit only permits you to come from the south? That will matter.

Speaker 11 (46:12–46:29)

Otherwise, you go through Milton Hill and deal with those folks. Right. They wouldn't allow the trailers to go down that way anyway. Yeah, they want to jump right off the Southeast Expressway and come right on to- Come right through East Milton where there's no traffic at all.

Speaker 10 (46:31–46:34)

probably reasonable to suggest that it would be between 9 and 3.

Speaker 11 (46:35–46:35)

Yes.

Speaker 10 (46:36–46:45)

And so that's really the time of day when school is in session. It would be less likely that you would have students.

Speaker 3 (46:45–47:18)

Yeah, there after 3. Any earlier than 9, that corner of Adams and Central. There's a lot more, I'm thinking. You know, it's a crosswalk there for the kids going to St.

Agatha's. Not down here. Squanam? Crossing, got it, the Squanam Street.

I think he'd be coming off of Squanam, wouldn't he? He's coming 93. He'd be taking a right. So I think we should keep it to well after 9 AM.

Speaker 8 (47:21–47:23)

Can you do after 9?

Speaker 11 (47:23–47:32)

That'd be fine. 10? 9 would be a little better. we get it done quicker, it'd be less days to be on the road.

Speaker 1 (47:32–47:35)

So nine to three, Monday through Friday.

Speaker 11 (47:35–47:35)

Okay.

Speaker 1 (47:36–48:46)

But I don't know that you wanna limit it, the absolute number of trucks. No, I'm not saying that. Let's say the police department can deal with that if they believe it to be a nuisance. I think I'd like to suggest that we make certain that it's clean, Phil, that we prohibit any drainage onto adjacent properties.

We limit it to 9 to 3, Monday through Friday. We require that you manage the traffic with your personnel at Adams, as you said. I really think those are the conditions that we've heard. Oh, and then you take steps to minimize trees, tree removals.

And maybe put a, let me say this, let me make a motion of supporting that and asking the board if they would, if there's a second, is there a second to that motion? Second. And all in favor, granting a special permit to the George family?

Speaker 4 (48:47–48:47)

Aye.

Speaker 1 (48:48–48:59)

Okay, we've got you a special permit. Gentlemen, thank you. A little while for us to put this together. I'm sensing that you might be under, you're out there now, doing work now.

Correct. When would you place the fill?

Speaker 11 (49:00–49:03)

As soon as possible, as soon as we have that permit in hand.

Speaker 1 (49:05–49:22)

Okay. We'll do our best to get it out and you can deal with Mrs. Fitzgerald on the details of how to get it reported. fully executed.

Speaker 10 (49:22–49:50)

Thank you very much.

Speaker 8 (49:52–50:00)

So, um… Are we off now?

Speaker 7 (50:00–50:07)