Good evening and welcome to the Warren Committee. I'd like to thank everybody who's watching for their patience on our late start. This is an April vacation edition of the Warren Committee. So we're in a little smaller room, a little more intimate crowd.

We have some people on Zoom from the committee. Um, who are away with their families, but today we have the planning board to discuss 2 articles are going to be upcoming at our town meeting. 1 is our floodplain, which we discussed previously with them. And secondly, is the East Milton overlay.

So those are the two things we're gonna discuss with a focus on the overlay, and that's really what we're gonna do today. So thank you everybody for being here. Karen, could you call the roll?

Speaker 2 (01:41–01:57)

Sure. We have Tom Caldwell, Lori Connolly. On Zoom we have Jay Fundling, Allison Gagnon, Julie Joyce, Macy Lee is here, Brian McGuire is here, and on Zoom we have Aman Nagasi and Judy Steele. You have the floor.

Speaker 1 (01:57–03:00)

Thank you very much, Karen. So, as I mentioned very briefly, we discussed the floodplain with you on your previous trip here. We know that this is obviously a requirement, but this is more of a typical housekeeping for in terms of the establishment of overlay district pursuant to chapter 275 of the general bylaws for our zoning bylaws. So does anybody here present or online have any questions concerning the floodplain article four that the planning board is putting forward?

Okay, and those were forwarded to members of the warning committee. So there was some slight changes with some red lines, but, If no one has any questions, we can move on to the East Milton overlay. And we have Meredith Hall, the chair of our planning board, and member Jim Davis here to discuss with us. So all that being said, the floor is yours.

Speaker 3 (03:00–11:30)

Great, thank you so much. This is an article that has been many years in the making. This started with a tremendous amount of study to the East Milton neighborhood and what a mixed-use overlay zoning might look like. We did, I would say, the greatest part about this is it's really been a very proactive involvement of the neighborhoods, the East Milton neighborhood district, and the rest of the town.

This has been something East Milton has been wanting and asking for, But they wanted, they wanted it to be done in a thoughtful way that not only allows for mixed use a commercial with with multifamily housing, but they wanted it to be done in a very thoughtful way so surveys public forums. There's been a lot of public process that has led up to this. So we're pleased to present this. And for those who have not been able to watch it, there was a forum that was held that is online for anyone who would like to watch, which walks through the entire process and sort of the history of how we got to this point.

And it was very well received by the East Milton Neighborhood Association. So here we are this evening for an article to be presented for the June 16th town meeting. And just to begin, I think it's good to start with what the purpose is of this article. And it is Section 275-322 East Milton Square Mixed Use Overlay District.

This section's purpose is to allow high-quality mixed-use development that enhances East Milton Square. Successful mixed-use development shall strengthen the walkability and safe and convenient circulation for all travel in East Milton Square, proactively and intentionally guide commercial district investment, Enhance sense of place and district identity. Leverage private investments to add community amenities while reducing impacts. Encourage mixed use development and increase a variety of housing options.

Improve environmental sustainability and resilience in the district. Preserve and enhance the historic character of East Milton. The allowed uses in the area are mixed-use development. Mixed-use development is required with non-residential and residential uses.

So as you know, East Milton is currently a commercial district. So when we're talking about an overlay zoning, it's important to remember, for those who are watching and listening, that that underlying zoning always will exist. That's always going to be there if somebody wants to continue to maintain a funeral home, a gas station, certain things that would not be allowed under this new overlay zoning, they are absolutely entitled to remain as that existing 100% commercial building. It's only new development within this district that if they wanted to take advantage of the overlay that they would apply under this overlay zoning.

So it allows another level mixed use, residential that could be added to the commercial district. So non-residential uses, all businesses, all business uses otherwise permissible in the East Milton Square Business District shall be allowed by right with site plan review. except for drive-through, as I mentioned, drive-through food service facilities, filling stations, garages, sales rooms, and repair shops for motor vehicles, storage warehouses, and undertakers, which would be prohibited if they were taking advantage of this mixed use. Residential uses.

Residential use shall be allowed by right with site plan review in conjunction with one or more non-residential uses identified in section BB. The permissible residential uses shall be multifamily housing, which is defined as having more than one housing unit in a building or multiple buildings on a lot. A housing unit is defined as that portion of a building providing complete housekeeping and cooking facilities for one family as defined in section 275-11. This is important.

The ground floor use, at least 50% of the usable ground floor area of the building must be designed for and occupied by non-residential uses, identified in section BB. Where possible, this area should be designed to accommodate individual businesses of 1,500 square feet or less. As used in the section 275-322, the ground floor shall be shall be the story directly above the basement. If there is no basement, the story directly above the foundation, which generally coincides with the elevation of the adjacent sidewalk at the frontage of the building.

Under the dimensional requirements. This is where we have our setbacks side yard setbacks rear setbacks, and then going on to building height. You can read, you know, the front yard setbacks, the price we tried to really. align with what is currently existing.

So those setbacks would be the primary footage of new buildings and new additions to existing buildings shall be located no less than zero feet and no more than 10 feet from the lot line. So this blends in with the character of what is already there. Side yard setbacks, side yard setbacks are not required when the abutting use is an existing business or mixed use. When the abutting use is an existing residential use, the minimum side yard setback is 10 feet.

And then there's rear yard setbacks. The minimum rear yard setback is 12 feet when the abutting use is an existing business or mixed use. When the abutting use is an existing residential use only, the minimum rear yard setback is 20 feet. What was really important when we were putting out our survey and we were really listening to the residents of what people wanted, one of the things that most spoke out on is the height of the buildings.

They wanted it to be mixed use. They wanted to maintain a commercial base, bringing in new revitalization, but they really were concerned about the height. So we've taken the direction from the feedback that we received, the maximum height no building shall be erected or altered to exceed three stories or 45 feet in height. And then we go on to provide the definitions just to be clear for a developer or a builder what a story means.

And that's slightly technical, so I'll let you just sort of look through that piece. Ground story height. Yeah, if there's questions at any point, this might be a good place to. And I'll just say open space was also important because we wanted to allow for some common areas to allow for some setbacks so we could have maybe public benches, doing things that you would have tables, maybe outside if there was maybe food being served on the first floor.

But having really encouraging gathering places in a safe space just to, again, revitalize that area. open space was part of what we were asking. And I will just read that. All properties must provide a minimum of 10% open space.

Minimum open space may include hardscape pedestrian piazzas, extensions of the sidewalk, public realm, planting of trees, pocket parks, balconies, roof decks, or offsite improvements to existing open space amenities. So, we can pause at this point and see if there's any questions.

Speaker 1 (11:30–11:50)

Oh yeah, I just put it out to our friends at home online, if anyone has any questions. Just in regards to the first three pages, there's chair halls covered A, B, C, up to this point. Jay, this is Enda. Jay Fumling, question.

Speaker 4 (11:57–11:58)

Good evening.

Speaker 1 (12:09–12:24)

So while Jay will try to figure out the technical, I just have a very quick question. The 1500 square feet or less, is that Are we trying to encourage more smaller businesses?

Speaker 3 (12:24–12:53)

Yes, we're trying to keep it more of a village feel where you assemble a lot of small, we're hoping to guide sort of either startup businesses, unique businesses, not necessarily large commercial chain. stores coming in, so that was part of our, it's a suggestion that we would like to see that, some smaller businesses come in and support our small business community. So.

Speaker 1 (12:53–12:57)

That's great. That's great. Jay, you ready to ask a question?

Speaker 5 (12:58–13:40)

Yes. Okay, thank you. Yeah, sorry, technical problems. No worries.

My question was, with no surprise, a little bit of nitpicking on word. When you said that 50% of it must be, 50% of the ground floor must be designed for, and I'm trying to read the wording, designed for and occupied by non-residential uses. I just want to make sure that was the correct, I think we all know what that means, but obviously space can sit unoccupied. It can be designed for commercial, but they haven't found a renter yet, or they're between renters.

we all know what that means but is saying that it must be occupied by non-commercial space the right way to say it.

Speaker 3 (13:43–14:39)

Maybe what um it's d uh b big b small d yeah i'm sorry back here um yeah so this is um at least 50 percent of the usable ground floor area of the building must be designed for and occupied by non residential uses. So this is the purpose for this is, we don't want to lose our commercial base in East Milton, that's critical that we preserve it so and if somebody is building a new building. We don't want it to be all residential, all multifamily residential. We want to keep the commercial feel, and so a minimum of 50% on the first floor.

So you can have a residential, you can put a residential unit. It's become more profitable for developers to do residential than commercials become a little bit harder. So this is, yeah, does that?

Speaker 5 (14:40–14:59)

I think my question was even more nitpicky than that. I get that they're not apartments. They're commercial space. What I'm saying is it says they must be occupied.

What if they're sitting empty for some amount of time? I think the answer is that's fine, but should we not say that it has to be occupied?

Speaker 3 (14:59–15:16)

It's designed for an occupy. So once somebody moves in, it would need to be a non-residential use. The tenant, it can be designed for, it needs to not only be designed for commercial, but it needs to be a commercial occupant.

Speaker 6 (15:17–15:27)

I think the word buy after occupy satisfies that, the way I read it. Designed for and occupied by nonresidential uses.

Speaker 1 (15:27–15:34)

Jay, I think, are you talking tense here? Like, it shall be occupied? Like, is that what?

Speaker 5 (15:34–15:39)

Yeah, like, what if it's sitting empty? What if they haven't found someone to rent it yet? Then it's not occupied.

Speaker 7 (15:39–15:47)

So you don't like the word must? And you want shall? Could the area of the building shall be designed?

Speaker 1 (15:48–15:53)

I mean, that's the only thing. If we're looking to change. Jay, is that it?

Speaker 8 (15:53–15:55)

Yeah, what's the recommendation, Jay?

Speaker 6 (15:56–16:01)

Sorry, I don't have a recommendation. Designed for and occupied by non-residential uses.

Speaker 8 (16:01–16:14)

Are you concerned that they'll build it and then they won't get a tenant and it'll be a year without… And then it'll be a violation of… And then are they violating the rules because that's not occupied?

Speaker 5 (16:14–16:18)

I mean, it's very nitpicky and I'll drop it after this go around. I just wanted to raise it.

Speaker 3 (16:18–16:23)

Yeah, I mean, we may be designed for a non-residential use and just take out.

Speaker 7 (16:23–16:46)

Can I have a suggestion? Jay, how would this work? So it says, at least 50% of the usable ground floor area of the building must be designed for and shall be occupied. Because you want to keep the 50% as mandatory.

And then the occupation somewhat discretionary, which is what shall implies. So you can split it to baby that way.

Speaker 1 (16:48–16:50)

Right, what do you think? I think the shall.

Speaker 3 (16:51–16:59)

Insert shall be occupied. Right. But keep the must because you want to keep that. Right, must be designed for.

You don't want that shall be occupied.

Speaker 1 (16:59–17:08)

So Jay, thank you. And I think that does make it clear. Now, as we've all seen before in front of the planning board, you're going to have to vote in that language.

Speaker 3 (17:08–17:17)

And then it's going to have to come back to us. So let's look at that. And we also like to run it by legal counsel too. Of course.

They might have, but I think that's good.

Speaker 1 (17:17–17:38)

We'll note that little shall in paragraph BD. I also had another scrivener on section C, residential uses. It says uses identified in section B and then you have the little b. You should put the little b in parens.

Oh, section C. That's in section BC. Residential uses. I don't know.

In parens.

Speaker 7 (17:38–17:46)

The only problem, that is the subsection is not in parens. The subsection is not in parens. So you do a dot, B dot. Yeah.

Speaker 1 (17:46–17:47)

OK. So strike that.

Speaker 5 (17:48–17:48)

OK.

Speaker 1 (17:49–17:50)

No, no. I appreciate it.

Speaker 5 (17:52–18:54)

Oh, can I ask another question? Less nitpicky. Sorry, I just realized this was this part of the document. So in VB, when you say here are things we won't allow, drive-through fast food, gas stations, car dealerships, I guess, a lot of these make sense to me.

The one that leaps out at me is where you say under tables. And that, when I read that, that concerned me, because my first thought was, is that fair? And I hope you take this in the right way. When I heard that, I was concerned that there are at least two undertaker businesses in the East Milton area.

And did those businesses' business interests playing into writing this so that they wouldn't get competition. I'm sorry if this is coming across the wrong way. I'm just saying that's what one might think when one reads this, and I want reassurance.

Speaker 3 (18:54–19:02)

No, that's definitely not at all. I can assure that. That's for sure.

Speaker 5 (19:02–19:06)

Yeah. So can you speak to why? I mean, I get why you're not allowing McDonald's.

Speaker 3 (19:06–19:34)

This was our consultant. This was a recommendation because this is when he's writing zoning for an area that is, that's going to be more of a mixed-use area. that these would be, these are typical businesses that you don't want to add more of because you want the new development to come in to be commercial but have a residential component. So.

Speaker 5 (19:36–19:59)

Yeah, it does make sense. I mean, I've never seen an undertaker business on the first floor of an apartment building. That would be weird. But yeah, when I saw, I guess it was a consultant doing the presentation, He specifically said, you know, we're going to eliminate some of these businesses.

You already have plenty of that in each note. And that got my spidey sense tingling. I was like, ooh, that doesn't sound good.

Speaker 3 (19:59–20:38)

yeah we we want to keep the businesses that we have obviously that um the wonderful you know obviously undertakers and gas stations that we rely on we just don't want it to all become all gas stations all undertake you know we don't we don't necessarily want more of of that and we've always had you know um You know, drive-through food services have always been sort of prohibited. But they're in some of the previous zoning is a much older underlying zoning. So some of these uses are allowed for. So this is just clarifying that under this, they wouldn't be allowed to have additional.

Speaker 5 (20:39–20:52)

Yeah. I guess if you could just have a reason as to why undertakers aren't allowed I think that would give reassurance to me and to the other people on town meeting.

Speaker 6 (20:52–21:25)

I think we're just trying to encourage residents to be able to walk around East Milton Square and go to a variety of different types of businesses. A funeral parlor is open during funerals and that's about it. And they would take up a lot of space. We're not trying to push them out.

We're just saying if that came in, it wouldn't be detrimental, but it just wouldn't be more welcoming. I mean, I think of like maybe another women's boutique or a men's clothing store or. I don't know.

Speaker 3 (21:25–21:36)

Amenities. I think we're looking to add amenities to the area. It's a very, it's a small area, a small district. So adding amenities, services for the community was our goal.

Speaker 1 (21:37–22:03)

I see these two, I see these very unique type of businesses that require like permitting and state approval and licensure. I see gas stations. food service facilities, garages, repair shops, a warehouse and undertakers have their own statutory requirements. So it's not like a men's clothes store or like a five and 10 or a sub shop.

It's a little more right. But I understand Jay and I appreciate you mentioning

Speaker 3 (22:03–22:31)

And walkability, I think, for amenities was definitely something that we heard loud and clear. People want safe pedestrian, but they want to be able to walk and do all their errands and not have to get into a car. So when you have other businesses that don't really, you can't really run your errands, you know, to a CVS, these would be really not considered necessary, although they're critical to a community, not the amenities in this particular location.

Speaker 5 (22:32–23:21)

If that makes sense. I hear what you're saying, but there are lots and lots of businesses that people don't want to walk in and walk into. I could hang out a shingle and be a for hire actuary, or someone could open a tax accounting firm. And that's not something you want to walk into.

And yet we're not forbidding that. We're specifically forbidding undertakers. Now what Tom said about this, the different types of regulations makes some sense. But When we're singling out specific ones and saying they can't be here, it gives me pause and makes me want to have a really good reason.

Again, we're not listing tax accountants as somebody who can't open a shop just because they're not fun places to visit.

Speaker 3 (23:21–23:29)

Well, I think you could walk to your taxes, like I would want to do my taxes if I could. Yeah, an insurance broker, you could walk in.

Speaker 1 (23:29–23:51)

We can get picked. With a funeral home, it's like, what is it, open from four to seven on every other Tuesday? I mean, that doesn't help the community. I mean, it does in a sense.

But I know what you're saying. You're saying businesses that people can walk to in a regular commerce type of situation buy something.

Speaker 9 (23:51–23:53)

You want to keep it more lively downtown.

Speaker 1 (23:54–23:57)

Right. Good one. Save that for town meeting.

Speaker 7 (23:59–25:00)

Can I have a… Sure. So just in response to Jay's comments, my understanding of this article is that the intent behind it is to have mixed residential business use. So meaning, I'm just making an example, I'm envisioning the South End, for example, right?

So you have a three-story building, you have two residential units on top and a business below. And a funeral home, as Jay just mentioned, is not really a place where you envision having a resident on top. Neither is a gas station, repair shop. So I think, and I may be inferring intent behind this article, is that going forward with this particular article, you're looking for mixed residential business use.

And so I think that the reason Undertakers, automobile showrooms on Route 1, those are not what we envision because you wouldn't have that as a mixed residential business use. Am I correct on that?

Speaker 10 (25:00–25:00)

Yes.

Speaker 7 (25:00–25:20)

Okay, so I think that, so with the exception of the two funeral homes that are already in East Milton Square, going forward you're looking for a mixed use and that's not what these businesses would you envision as a mixed use. It would be boutiques, hair salons, maybe a cafe where you could have two units above the building, right? Am I right?

Speaker 3 (25:20–25:22)

Right, that's exactly, that's what we're hoping to do.

Speaker 7 (25:22–25:42)

So Jade, so I'm just, like I said, in response to your comment, I think that that's why these particular businesses were mentioned behind this article because they're typically not the type of businesses that would be involved with a mixed residential and business use. Does that make sense? Okay, so anyway, that's how I read this particular article.

Speaker 3 (25:42–26:02)

And this is also, I should say, this is very similar to what we did. A lot of this language was language that was lifted and used when we did the lower mills, Milton Village overlay zoning. So a lot of this mirrors that. which were similar things that we addressed in there and design guidelines and standards.

Speaker 9 (26:03–26:04)

Makes sense.

Speaker 8 (26:04–26:20)

Do you think that there will be a push to force out the businesses that are on the second floor of some of those buildings with this overlay? Are we going to lose business now, potentially?

Speaker 3 (26:21–26:43)

And are we concerned? Yeah, I mean, it's the owner who will determine that. And a lot of those upper level, there's a lot of vacancies right now in some of those upper levels. I know a few that they're trying to rent out.

And it's nice to be able to offer that, but it would be up to the property owner to determine that.

Speaker 8 (26:44–26:47)

But could they have a business on the second floor if they wanted?

Speaker 3 (26:47–28:13)

Oh, yeah. Oh yeah, they can keep those businesses, yeah. Oh, all right. Well, if it currently exists, it can all stay, yes.

It can be all commercial. This is more incentive for new construction, new development. And where would that go? So, well, had we had this in place when 440 granted, when they were applying, this could have made that a different project where you would have had, not only commercial, but the height would have been limited.

If you look all along that corridor, whether something will happen with Citizens Bank at some point, they have a huge parking lot there. It's massive. They don't actually own, Citizens Bank doesn't own that site, it's actually they lease that property. So there's a few properties, and as you continue down towards the East Milton Fire Station, there's a few properties along there, and then some on Adams Street that we can see potential.

And then as you continue down, we're including the Food Center property with this. That was sort of a question on whether we should include that or not, but In the end, we decided that that should be as part of the map to include that for mixed use, to allow residential if ever there was a change.

Speaker 6 (28:13–28:29)

And the hope is that a developer looks at this and says, this is something that I can work with, and they won't go the 40B route. That's really one of the goals here. Because that was the threat with 440, and we were seeing that with Falcone, and we're trying to avoid those types of just massive developments.

Speaker 9 (28:31–28:31)

Preventive, okay.

Speaker 2 (28:32–28:33)

Preventive, yes.

Speaker 1 (28:35–28:39)

Okay, if anyone has any further questions on A, B, and C?

Speaker 8 (28:39–28:40)

I have one more.

Speaker 1 (28:40–28:41)

Oh, sure. Laurie?

Speaker 8 (28:41–28:43)

So the front yard setback.

Speaker 1 (28:44–28:45)

Oh, good question.

Speaker 8 (28:46–29:03)

The primary frontage of new buildings and new additions shall be located no less than zero feet and no more than 10 feet from the lot line. Is that like does that include the sidewalk so it can be like basically on the sidewalk from the sidewalk?

Speaker 3 (29:03–29:11)

So it would be so. Yes, it should be.

Speaker 6 (29:13–29:17)

Well, that allows you to build right up to the sidewalk, but we can't take over the sidewalk.

Speaker 8 (29:17–29:21)

Right, right, absolutely not, yes. But you could have a building with a wall at the sidewalk?

Speaker 6 (29:22–29:25)

Yes, most of them are like that right now. Oh, actually.

Speaker 3 (29:25–29:38)

We're trying to make it consistent with what's actually there. I see that, okay. So we didn't want it to be too, you know, we wanted it to have The same front. The same, yes, the same storefront appearance that would be somewhat consistent.

Speaker 8 (29:38–29:39)

Yeah, all right, that makes sense now.

Speaker 3 (29:39–29:54)

Yeah, I was envisioning which is different because we typically ask for more of a setback. You know, we want open space, but and when we get to the end, waivers can be granted to on this. So if it makes sense for the project, it can be looked at.

Speaker 1 (29:56–30:00)

Anybody have any further questions on A, B, or C?

Speaker 7 (30:00–30:08)

I have one more question. The open space, that includes open space in front like what I see for Starbucks, or it could be in the back?

Speaker 3 (30:09–30:57)

So that can be, it could, we're flexible on that. So hardscapes with pedestrians, it could be a little, you know, it could be like a little open, like Novara has a little courtyard area, outside seating area. It could be on the side, you know, certain. So it depends on where the property is, maybe in the back area, but it also could be along the front as well, if appropriate.

But extensions to the sidewalks, you know, we're thinking of, Again, a planting, we'd love to see planting beds done out front, you know, some green space added to it. Sometimes you see planters done out front in the property and things that would enhance the sort of the look and feel of the site.

Speaker 9 (31:00–31:05)

Would you know if the 10% of that Novirus, is that covered by the 10% level?

Speaker 3 (31:06–31:15)

So that was pre-existing, so that was a different, and that was a special permit all to itself. So I don't know that that was a requirement.

Speaker 9 (31:15–31:21)

It's probably not 10%. Like if a new person bought it, would they… fall into the grandfather piece?

Speaker 3 (31:21–31:31)

They would be grandfathered under what currently exists there. So this would be for new development or additions to properties and changes to new sites.

Speaker 6 (31:31–31:36)

All the existing zoning special permits, everything stays in place. This is an option for property owners.

Speaker 3 (31:36–31:53)

A new incentive for new commercial and residential revitalization, which hopefully translates into improved tax bases. New growth. And a smart new growth, yes.

Speaker 1 (31:53–32:03)

Okay, are we good on those first three sections? Okay, so now we have D and just starting off with historic preservation, one of the Warren Committee's favorite topics.

Speaker 3 (32:03–35:13)

So we did move to, yes, with historic preservation, it was really important to our members when we were looking at this. There's some beautiful historic buildings that front Granite Avenue that wrap around where Abbey Park and some really beautiful classic buildings that we wanted to protect. Some have been altered significantly. So we did say that buildings constructed in whole or substantial part before 1940 shall be preserved as part of an adaptive reuse mixed use redevelopment.

The purpose would be the preservation of buildings of historic significance and expansion of the economic options for historic properties in East Milton. So, say one day the post office was decided to sell. We wanted our historic buildings to have a purpose and to be able to maintain those buildings but find a new use. We went on with definitions, which you can look through, shall include preservation or restoration of buildings exterior, and may include renovation, rehab, restoration, or recreation of features or elements of the building.

The exterior elements of a building shall be historically compatible and appropriate to the preserved historic structure. And then we gave some guidance on what we would like for that to look like. Then it goes through. We do, if somebody wants to, if it's not found, if notwithstanding the foregoing a building constructed before 1940 need not be preserved if the planning board after seeking the advice of the historical commission determines that the building lacks substantial architectural significance and is not historically important or that the building is in an advanced stage of deterioration and not able to be preserved at a reasonable financial cost.

we would allow, you know, there are a lot of… The buildings are, many buildings are surveyed. Many have been altered significantly and now have aluminum siding or vinyl siding or just don't have any significance. That would not be maintained.

But if a building of significance and they wanted to do an improvement, we want to make sure that those buildings don't get torn down. We didn't want to be this, you know, We didn't want this article to become something that people just came in and we're just going to level everything in East Milton and rebuild all new. And it's unrecognizable. We wanted it to be recognizable and protect the village feel.

And so they can put additions on for some of the single story buildings. They can add on, but it has to be compatible with the existing. We would want it to be compatible with the existing building. So it's incentivizing.

additions, they can go up to three stories, but we're gonna try to hold on to the beautiful buildings that we have and not have just a demolition, incentive for demolition. So that was important.

Speaker 7 (35:14–35:16)

I think the post office is a great example.

Speaker 3 (35:16–35:54)

Yeah, those were, and even the Milton Arts Center, like people love the Milton Arts Center. Somebody could come in and, you know, And we even thought, you know, maybe somebody one day, if the post office was ever sold, which we hope it wouldn't be, but there's land behind it where they could even do new housing, maybe do townhomes behind that, or add some, you know, sort of mixed use on the property as well, or add an addition to the back and do some sort of residential mixed use in that, keep commercial in the front, residential maybe. So we wanted to offer… It'd be a cute restaurant.

Speaker 7 (35:54–35:54)

The post office?

Speaker 3 (35:54–35:55)

Yeah.

Speaker 7 (35:55–36:02)

It'd be amazing. It'd be a big restaurant. It'd be like that Masonic Lodge. Masonic Lodge in Quincy.

With that beautiful mural.

Speaker 3 (36:02–36:55)

Yeah. And even the East Milton Fire Station. What is the potential of what that could be? I don't know, but we can't sell it.

Right. Right. We must. Keep it.

Yeah. And we can. Right. And we can do some interest.

I think there's potential to do some interesting things. So and maintaining the building, which which folks love. So if deemed historically important, this is part of the approval project. Approval may require the restoration, rehab, renovation, repair, adaptive, reuse or addition to historic structures.

in the district. In order to grant project approval, the proposed restoration, rehab, renovation, repair, adaptive reuse, or addition shall preserve to the maximum extent feasible the historic and architectural features of the building or structure element.

Speaker 9 (36:55–36:59)

So this will, I'm sorry, just to clarify, this will protect the fire station for now, right?

Speaker 3 (37:00–37:07)

Well, the fire station is actually a town-owned building, so the municipal buildings are not necessarily.

Speaker 9 (37:07–37:09)

They're not covered by this?

Speaker 3 (37:09–37:25)

Unless they, if they sold it and demolished it. I believe that municipal buildings would be exempt unless they sold to a new owner.

Speaker 9 (37:25–37:28)

But once they sold it, it would be covered by this.

Speaker 3 (37:28–37:32)

Yes, yes, correct. That is correct. If they were selling it.

Speaker 9 (37:33–37:35)

If, well that's, it won't get sold.

Speaker 3 (37:35–37:44)

So yeah, the Milton Arts Center, the same, you know, but if it changed hands with a new, and they wanted to change that use.

Speaker 1 (37:45–37:59)

Could I ask you a question? It's just about the approval. And I think we all know it kind of when we see it, but if deemed historically important, would that be, would you, as the planning board, suggest the Historical Commission to look at it?

Speaker 3 (37:59–38:01)

We would send it to the Historical Commission for their comment.

Speaker 1 (38:01–38:02)

Okay.

Speaker 3 (38:02–38:27)

And that would sort of be the determination, yay or nay on that. And then waivers at the discretion of the planning board through site plan review, relief from the dimensional, as we mentioned, or parking requirements may be granted for good cause to accommodate the preservation of a historic structure and property. So that would be something that would be allowed.

Speaker 1 (38:28–38:30)

What would be a good cause?

Speaker 3 (38:30–39:15)

I'm just kind of thinking what would, just like, if you were… So say the fire station, I was just gonna use that because there's really no area for parking on that site. Three spots. Three spots.

But if there was a great use that they could justify either, maybe they would be leasing a parking lot from Citizens Bank Or so they would say, we don't have parking here, but we're going to rent parking. Or maybe the hours of operation would be conducive to street parking that would be allowed for minimum hours. So we would have to look at that very carefully with East Milton, because parking is an issue.

Speaker 1 (39:15–39:21)

No, I appreciate it. It's a good idea, I think, given some of the structures. So thank you.

Speaker 3 (39:21–41:43)

And we're trying to encourage Properties that have large parking areas that maybe they find shared uses, so for Abbey Park, Novara, that they don't have adequate parking, maybe they go in with one of the banks or a funeral home, and they have a shared lease where they're able to keep their business running but find alternative uses that may need parking at different times of the day. So that's creative alternatives for parking. Perfect, thank you. So just continue with the E design standards.

We really wanted, the goal was to, in incentivizing development, we wanted to really protect the character. So each building and site shall be designed to positively contribute to the legacy and character of East Milton Square while enhancing livability for surrounding residents. The building design and site layout shall define street frontage by occupying Street edges with an active ground floor and filling gaps between existing buildings. The building design and site layout shall configure the building layout and building massing to shape outdoor spaces by placing buildings at the edges of the outdoor space and located active ground floor uses.

The transparent ground floor facades at these locations, and transparent ground floor facades at these locations. The building design and site layout shall also be used to define street edges, corners, and intersections. Site layouts shall consolidate and share off-street parking efficiently across lot lines, improve streetscapes and walkability by minimizing curb cuts, and continue to and contribute to livability through the creation of pocket parks, additional outdoor spaces, and new outdoor amenities. The architectural design shall be composed to be visually attractive and compatible with the context of the East Milton Square Business District and nearby buildings.

So, and then it just comes with some context sensitive.

Speaker 8 (41:43–41:46)

Yeah. Yeah. What's a pocket park?

Speaker 3 (41:47–42:52)

It's a small, it would be a small little, they can be different size pocket parks. So you might call, Is it Cranefield? It's a pocket park. Is that Belcher's Circle?

Belcher's Circle, yes. That would be considered a pocket park. But you could have smaller pocket parks, where it could be like a little garden sitting out area. Almost Navarra could be considered that, be a little outdoor space that you can have.

And it could be a little play area. Maybe somebody might design something that might be active for children to activate, to use. But there tend to be little small parks. Spalding Garden is a pocket park, if you know Fletcher's Deal.

It's just a little, within a residential neighborhood. I guess the best pocket parks I can think of are in the South End. or Bay Village. Yes, exactly.

So in the south end where you find, where you don't even know that they're there and you walk through the building and then you walk outdoor in the back and they might have a little park out back.

Speaker 8 (42:53–42:54)

Gotcha, okay.

Speaker 3 (42:54–43:05)

Would be a great, a great use where you could sit out and yeah, have for the residents as well as the businesses, so. Thank you. Yeah, quick question, Jim.

Speaker 1 (43:07–43:23)

The second sentence, the building design and site layout shall define street frontage by occupying street edges. Street edges. And what does that mean? What does that like phrase mean there?

Speaker 3 (43:23–44:25)

So that might be, you might be doing things that define your street edges. So that might be brick, it might be like a down in Central Ave. I understand that, okay. You do like a brick, just a thin, narrow brick strip that sets your sidewalks and gives them character, you know, sometimes.

Sometimes people brick over the whole sidewalks, but sometimes they just do an edging in Central Avenue. That's an example along Elliott where that was done. It's a nice detail. Yes.

Along with, you know, the street trees. Sometimes they frame the trees with brick edges, but just gives maybe granite curbing that obviously, you know, something that would enhance that. We're encouraging utilities to be put underground when possible. So for 40 granite, we're hoping that they can work with the town and utility companies and sink those.

It would make a tremendous amount of difference when you drive in and you don't have telephone pole after telephone pole. So sort of improving the streetscape there that way.

Speaker 1 (44:26–44:31)

I miss, I'll be honest, I miss, I thought it was a schematic. Brick is lovely.

Speaker 3 (44:32–44:32)

Yeah.

Speaker 6 (44:33–44:42)

Just want to break up that massive concrete.

Speaker 3 (44:44–45:18)

Yeah, and so people could do, you know, there could be different things like a granite bench. So, you know, if you think about, again, down on Central Avenue, there were some nice granite stone markings and benches and bollards that you can do. There's a lot of things that you can do to enhance that streetscape. So that's, we're really encouraging that in East Milton to really warm that up and make a welcoming, inviting center.

Okay, I'm interested in context, these are all.

Speaker 1 (45:19–45:34)

Is there any, Washington, any questions just as to historical D&E? If there are no questions, please, Meredith and Jimmy can move on.

Speaker 3 (45:34–48:42)

I know. Yeah, we'll go through these and you can read through these and if there's any questions on these to reach out. Again, this is mostly a lot of the same language that we have in the overlay zoning from Milton Village. Changes to design, impact parking, you know, again, just good, thoughtful design features.

Sign approval, sign approval, that will go through the sign review process that the town has. So that's provided in 275-33. We, you know, have the opportunity to make some recommendations on what type of signage will go in, avoiding internally lit signs, for example. Like Santander like we will, we will be able to through site plan review, make recommendations, but ultimately it'll go through the sign review committee.

This is something I think that's important to point out affordable housing units in the East Milton square mixed use overlay. It'll be 12% of the total housing units for a project with less than 25 units or 15% of the total housing units for a project with 25 units or more, computed to the nearest whole number, shall be affordable housing units subject to perpetual deed restrictions and if applicable, a regulatory agreement ensuring permanent affordability. And so I think that will be something that will help us, again, with our affordable housing units. And it goes into more detail of calculation.

You know, should the calculation result in a remainder of .5 or above, an additional on-site unit shall be required. Should the remainder be below .5, a contribution to the affordable housing trust shall be required in an amount to be determined by the planning board. These units shall be affordable to households whose annual income shall not exceed 80% than the current area medium. income AMI for the Boston Cambridge Quincy Mass Metro FMR area as determined by the U.S.

Department of Housing. And then all affordable units shall be integrated with and distributed throughout the development and shall be comparable in size and design, floor area, number of bedrooms, appearance, construction and quality materials with market rate units. and to the maximum extent possible. Preference shall be given to Milton residents and employees of the Town of Milton in the rental or purchase of affordable units.

A site plan approval issued under this section shall state that final occupancy permits shall not be issued until the affordable housing restrictions And if applicable, the regulatory agreements have been agreed to with the registry of deeds and copies of the recorded documents have been provided to the planning board and the building commissioner. So that was, we felt was really important to include in that. Any questions?

Speaker 9 (48:42–48:50)

Yeah, I don't remember that. Sorry, I'll just jump in, but how do you manage that? The preference should be given to Milton residents and employees in the town of Milton.

Speaker 3 (48:51–49:22)

So they have to go through, there's a lottery process when any of the developments, like Hendry's was the most recent, they run it through and I think they typically, they contract that out to an agency who does that. And so Hendry's didn't actually do the lottery themselves, another agency did, and they have the list of Milton residents who apply.

Speaker 9 (49:22–49:23)

I did not know that.

Speaker 3 (49:23–49:25)

And to give preference.

Speaker 9 (49:25–49:26)

That's great.

Speaker 8 (49:27–49:34)

How would you determine the amount that a developer would have to contribute to the Affordable Housing Trust?

Speaker 3 (49:35–50:00)

So that would probably be calculated on their market rate rents. We would have to get advice probably from the Affordable Housing Trust on what would be an appropriate amount on that. Because obviously, it would have to be a reasonable amount. But sometimes they do do, in lieu of a unit, they will agree to a certain amount.

Speaker 1 (50:01–50:03)

And you say you're gonna be looking at the market rate

Speaker 3 (50:04–50:19)

Market rate, it will be, yeah, usually, typically there's a market rate, a certain percentage. But we would probably consult with the Affordable Housing Trust too on that. But sometimes, and sometimes it's negotiated back, you know.

Speaker 1 (50:19–50:21)

It's part of the permitting.

Speaker 3 (50:21–50:30)

Right, right. To come to some sort of agreement on that. I just want to make sure we get enough. Yeah, yeah, right.

No, it's all very good.

Speaker 6 (50:30–50:33)

Don't want to get too much though, so at least all the projects. Happy to meet you.

Speaker 3 (50:33–54:31)

Well, that's true. Good stuff. Right. Not that I'm not all for it.

Yeah. Parking. So this is very important in East Milton. Business parking in the East Milton Square mixed-use overlay district.

Minimum parking requirements for businesses uses follow parking requirements in business districts 275 dash 11.3 provided that upon a determination that a greater or lesser number of parking spaces would be reasonably necessary so as to be adequate for the business use in a particular project. The planning board may increase or decrease the number of business parking spaces required for the project. This is, again, this sort of ties back to things you've seen before. In the event of a restaurant use, at least one parking space shall be provided for each four patron seats, provided that upon an applicant showing that a lesser number of spaces would be adequate for the restaurant use, the planning board may reduce the number, the required amount of parking.

Resident parking for the residential units, there should be a minimum of one parking space for each residential unit. Off-street parking, safe and convenient parking may be provided off-site within or adjacent to the East Milton Square Business District for the parking required to support business uses at other properties. This is what I was talking about, that maybe they rent from Citizens Bank during the evening if they need additional parking. or other properties in East Milton Square Business District.

Off-site spaces used to fulfill parking requirements shall be associated with a parking agreement between the applicant and the owner of the property where the off-site spaces are proposed to be located. The parking agreement shall be submitted as part of the application. Shared parking reductions, again, this is just ways to be creative if there's a site that we would need to address this. Off-street parking requirements may be reduced if they collectively serve different uses within the same mixed use development or collectively serve multiple uses across multiple sites where such collective use of the parking facilities is based on a written agreement that assures the continued and collective use states the number of parking spaces allocated to each participating use and anticipated peak parking demand days and times for such uses.

And that it assures access to and maintenance of the common parking facility counted towards the minimum required parking spaces approved by the planning board. Other reductions, a reduction in the calculated parking requirement may be allowed as deemed appropriate by the planning board through a special permit upon demonstration of the features of the project that reduces automobile dependence for the development. These features may include the provision of on-site dedicated parking space, For car share vehicles, for example, increased bicycle parking and amenities beyond the requirements of 275-1112. On-demand shuttle services or other transportation demand management techniques and shall be appropriately scaled to the scale of the development and requested reduction in parking.

Bicycle parking applies to residential components of projects. Projects involving businesses shall also provide adequate exterior parking of bicycles for customers and employees. And then additional requirements. Oh, this goes on to the additional requirements.

So that's a new section. So question on parking.

Speaker 7 (54:32–54:53)

I have a question, Meredith. Are residents allowed to apply for on-street parking, such as on Elliott Street? So let's just say a unit requires more than one parking spot. There are two people or two cars.

Will they be able to seek a street parking permit, like the cars that I see on Elliott Street?

Speaker 3 (54:54–55:22)

Currently, I don't believe that It goes through the police department, the hardship parking, so that we would not regulate that. There's been a lot of concern about how easily it's become to get overnight parking passes in some areas. Some areas it's appropriate, but again, when we're bringing in more residential, that would go through the police department.

Speaker 7 (55:22–55:27)

So there won't be any designated resident parking spaces in East Milton Square?

Speaker 3 (55:27–55:32)

No. Okay. No, Milton still does not allow overnight parking.

Speaker 7 (55:32–55:44)

I see some cars on Elliott Street with the red sticker. This is Milton permit parking. They have given some. I've seen them.

I actually walked down there last night, and I saw several cars on the street with the red sticker.

Speaker 3 (55:44–55:53)

There's a few, two families in that area, and one has a driveway, but most don't have a lot of driveways.

Speaker 1 (55:53–55:55)

Those are the ones that are closest to.

Speaker 3 (55:55–55:56)

that East Milton, right?

Speaker 7 (55:56–56:05)

Yeah, the ones that further going towards… Yeah, to the right of Milton Hill House. Yeah, yeah, okay. All right, so you don't envision that happening in East Milton?

Speaker 3 (56:06–56:15)

I don't. We really do hope that most provide on-site parking on there, and it would encourage them to do so.

Speaker 7 (56:15–56:27)

Because I think the existing residences, the residents who live there are concerned with parking on their streets and blocking their driveways. Absolutely. And using the businesses in East Milton.

Speaker 3 (56:27–56:29)

Right, for sure.

Speaker 9 (56:30–56:40)

Just can I ask on that same question? I actually think that if they're a Milton resident, I think they have to let them talk overnight.

Speaker 7 (56:40–56:41)

I think so. I don't know.

Speaker 9 (56:41–56:43)

I could be wrong about that.

Speaker 7 (56:43–56:44)

I don't know.

Speaker 9 (56:44–57:00)

I've heard that, but it's anecdotal. Why don't they put, like that's the biggest issue I have with this. Like why, you know, they say the average apartment in Boston area has 1.5 cars per unit. Why don't we just force that?

Why don't we?

Speaker 3 (57:00–57:01)

The 1.5.

Speaker 9 (57:01–57:11)

Yeah, because like with the Falcone, for example, there's 45 cars based on that math that aren't gonna have a home. Like why can't we force that?

Speaker 3 (57:12–58:21)

We definitely used to be more stringent with that. In this case, we were trying to find a balance between revitalizing an area, preserving the existing structures, and trying to find alternative solutions for parking. So most developers to make their apartments or condos marketable need to provide ample parking. And so we've almost seen a reverse by developers who have, for example, in South Boston, a lot of developers were not putting in enough parking and their condos weren't selling.

So we've almost seen developers saying, you know what? I'm gonna spend all this money building this if I don't have enough parking for my residence and can't guarantee a parking spot. And I know that the buyers and the renters in Milton are going to want, they're going to want parking to be included. If you're downsizing from your house, you're going to, you're going to a condo, you're going to want parking.

So it almost will somewhat self-regulate, but I hear your point. But they can park on the street, is the issue. Yeah, I know.

Speaker 9 (58:22–58:36)

So there's an alternative, like I think it's going to be, I think it's going to become like Dorchester or the South End where you're going to have residential parking and get a sticker and you can never find a parking spot. I think that's the future.

Speaker 3 (58:36–58:40)

Well, yeah, we want to monitor that and yeah.

Speaker 9 (58:40–58:53)

And for businesses, I don't, I think like, I get it for businesses like Brugge's doesn't need packing, I suppose. You know, there's so much people walking from the neighborhood going to a restaurant. So, you know, but for residents, I would think you need it.

Speaker 3 (58:53–58:53)

Right.

Speaker 9 (58:54–58:54)

That piece.

Speaker 3 (58:54–59:24)

Yeah, I know. It's something we discussed. And yeah, ended up with at least one. But again, we would, you know, one and a half.

I think there was concern with if we required too much parking, it affects sometimes whether a development will happen or not. So this was the goal was to incentivize revitalization. But it's a balance. So I definitely hear you.

Speaker 10 (59:25–59:25)

Yeah.

Speaker 6 (59:26–59:41)

And it was presented to us as the younger generations aren't buying cars. So people in their 20s and 30s. Whether I agree with it or not, this is just an argument that was made. By the consultant?

By the consultant.

Speaker 8 (59:42–59:44)

He's consulting in the city, then.

Speaker 7 (59:44–59:53)

Yeah, it's true. Cambridge, Somerville, Boston, but not here. It can be something that, yeah, we can… Not in Quincy, no.

Yeah, but there's no… Rochester.

Speaker 9 (59:53–59:57)

MBTA in East Midland, so you have to handle this.

Speaker 7 (59:58–01:00:02)

Right. Unless you're teleworking all the time, right?

Speaker 1 (01:00:02–01:00:07)

When you look outside your window and there's a highway right there, you're going to want to drive on it.

Speaker 10 (01:00:07–01:00:07)

Right.

Speaker 1 (01:00:08–01:00:12)

Just like the other underground lab, when people wake up, they see the highway, they're going to want to drive on it.

Speaker 8 (01:00:12–01:00:21)

You're going to get on in the car and get on North Quincy and take it. You're not walking to Butler, right? Right.

Speaker 3 (01:00:22–01:06:12)

So then it goes on for the application requirements, which again, this just clarifies for anyone who's applying what they would need to do, shall include a plan meeting the requirements of the site plan specified in 275-12.4 and such other requirements as may be specified by the planning board. The plan shall be contained in various sheets, all of which after approval shall contain the written approval of the planning board and shall be recorded with Norfolk County Deeds. So this, you all have become familiar with the site plan approval process and approval. Any relevant special permits shall also be recorded with the plan at the applicant's expense.

The recorded plan shall be part of the site plan approval. The plan shall show the development in all material detail. Any amendments or modifications to the plan shall be approved by the planning board and recorded or filed with the registry at the applicant's expense. The applicant shall promptly provide the planning board evidence of recording of each approved plan amendment modification.

The applicant shall promptly provide a copy of all recorded or filed documents. to the planning board showing the book and page and document number. If applicable, the application involving a property on which there is a building constructed in or before 1940 shall be referred to the Milton Historical Commission for consideration of its historical and architectural significance and the desirability and feasibility of its preservation, rehabilitation, or restoration on a proposed development. After consideration, the Milton Historical Commission may issue a report, which may include comments and suggestions to the planning board on these matters and any associated matters pertinent to the commissioner's responsibility, and the planning board shall consider any such report in its evaluation of the application.

If applicable, an application involving a property on which there is a building constructed before 1940 shall include a narrative description compliance with the Secretary of the Interior Standards with the application materials. The application shall include a narrative prepared by the project architect describing the project relative to the historic context of East Milton Square, including a statement of the positive contributions of the project that make the character of East Milton Square Business District by preserving its history and strengthening its streetscape and vitality. The applications shall include professional studies calculating the impact of the development on the town services, on the parking of the East Milton Square Business District and adjacent neighborhood streets, on traffic in the district and surrounding areas of the town, on existing nearby businesses, and on future business development. If there's no material adverse project impact projected, mitigating strategies shall If there is material adverse impact, I'm sorry, mitigating strategies shall be proposed.

The applicant shall include a narrative describing the parking, ride sharing, bicycle storage, and other similar transportation infrastructure elements integrated with the project in the event of restaurant use, at least one parking space shall be provided for each. I'm sorry, let's go back to that page. Sorry, for the project. The narrative shall include discussion of offsite transportation impacts including a district parking impact analysis and traffic impact analysis for the proposed project.

The narrative shall describe potential district mitigation that may be proposed to address the impacts identified. The applicant shall include a narrative describing compliance with the design standards. The application shall include architectural renderings, building elevations, an existing conditions survey with structures retaining walls, parking areas, trees, topography, existing condition photos and site and adjacent properties, proposed site plan with structures retaining walls, parking areas, topography, landscape plan and details, site plan sections with accurate topographic depiction, building materials, specification, and other pertinent details regarding the project, architecture, and site plan. And then again, the review fees, this is all sort of just standard for that application process.

And that is… and notice and procedural requirements set out in 275-13, 13.2 and 275-3 and the standard to be used in rendering a decision, which these are all for site plan review for mixed use development under this section. So this also has its own site plan under, because that was probably a question. So this is like the AD, if you can think about it like the ADU, this is its own world, it's its own site plan process.

So the site plan that it's accountable is. what is in this document only. So most of it is what exists in the new document, but it's with what is contained in here that are the only requirements for this overlay zoning. Specific, yeah.

Speaker 1 (01:06:12–01:06:27)

Just something specific and stuff. I'm just on section C of Application requirements, section IC. What are the Secretary of the Interior's standards?

Speaker 3 (01:06:27–01:07:36)

So it's a commonly used term for historic preservation projects. So when Walcott Woods was being built on Upper Canton Avenue, a lot of those were historic structures. So there's certain standards that they want you to adhere to. It does not necessarily mean you can't replace windows, but it needs to be a certain level that is appropriate for a historic site.

So it's very specific. language that's laid out. And most… But not like hyper, not like a hyperized version of it, but it's just like…

No, it's a certain standards of quality and consistency with materials and with things that exist. And again, waivers can always be granted. For example, Walcott Woods, they came to us on certain things and wanted a slate roof to be changed to an asphalt roof for certain reasons. And you know, we don't have any slate roofs, we don't have anything to that level, but really for mostly facades, that window alterations would be consistent with if they're changing out windows, that they would be consistent with the existing windows.

Speaker 1 (01:07:37–01:08:05)

And I just have one more question. This goes to the end of the document, so I'm kind of skipping. I'm just skipping to the J, section J, application review fees. And it was just, The planning board may require that an applicant pay a review fee, reasonable costs for employment of consultants.

Is there any examples you can give of that, that you would think it would be applicable if this is passed? Like, just an example.

Speaker 3 (01:08:05–01:08:43)

So the typical review fees are engineering. So an engineer would have to evaluate a site for drainage systems, for example. Traffic would be another example that we would ask. I don't, we've never asked for an architectural review of a property.

It's typically been civil engineering, which are the fees to make sure that it's site can, and sometimes a consultant's brought in for construction management to set up, but more it's for civil engineering.

Speaker 1 (01:08:43–01:08:49)

And just a follow-up, when does that become, I don't know, I'm kind of looking at them.

Speaker 3 (01:08:49–01:10:11)

Very early, like once they come to us, and what usually triggers it is not only just through the planning department, but when it goes through the building department, it will get triggered by the engineering department, it will get kicked to the engineering department, so there's multiple people looking at this, so often, the engineer peer review, or whether it's conservation commission, whatever, they will ask for a civil engineering, a drainage report. And so because we're not engineers, that will be Marina Fernandez, Marina will be in her department, the engineering department, will actually review that. They'll write a comment letter, and they may go back to, following that peer review, they'll go back and say that, to the peer reviewer, they need more information. They need something else.

So the applicant will be required to provide another level of some sort of engineering study. So that, at that point, it tends to go back and forth between the town engineer, and then we will get a final letter of recommendation saying that it has met all the requirements. But sometimes it's, so sometimes it's, it's asked by the conservation commission, sometimes it's asked by Marina, and then sometimes it's asked by the planning board for those reviews.

Speaker 6 (01:10:12–01:10:24)

And the memory clinic comes to mind. It was a very, very wet site. There was a ton of engineering and hydrology and just report after report. And I think it was Sean Reardon was our peer reviewer, and the guy was super helpful.

Speaker 1 (01:10:25–01:10:38)

So like in a project like that size, when did the cost become unreasonable? So like, where on the hook? So like, just say hypothetically that this traffic study cost a million dollars. How about that?

Speaker 3 (01:10:39–01:11:30)

A lot of times there's an existing traffic study, which is often utilized for an existing traffic study in East Milton that is referred to. They'll have to do sometimes an additional traffic count to update that at certain times of the day. Maybe they have to look at, you know, working with the town on signalization, for example. If it's at a, I'm just thinking of East Milton Square.

You know, they have to have the signal set to, you know, to allow the traffic to flow. So sometimes a traffic engineer will look at that. But it doesn't tend to be anything excessive. I think most developers, depending on the scale of the, It could be a small project, but if it's something larger and more significant, like 440 granite, they know they have to have those studies done.

Speaker 1 (01:11:30–01:11:33)

Yeah, so it's like, these are par for the course.

Speaker 3 (01:11:33–01:11:34)

I was just trying to think of a… They're very standard.

Speaker 1 (01:11:35–01:11:55)

Yeah, I was just trying to think of a circumstance where the… developer might be like, yeah, okay, like, we can do 75% of that. But like, we've never had to do that in any place in the world before. So can can you pay for some of this planning board?

Like, I know that I'm just trying to think of a situation where we'd be right. So think about anticipated question.

Speaker 6 (01:11:56–01:12:10)

Well, I think they're responsible for bringing the reports forward, and then we just review them. Okay, so I would imagine it's not, I can't say for certain, but I don't think would cost would escalate, because we're just reviewing their work. At least that's the way it was with the memory clinic.

Speaker 1 (01:12:11–01:13:04)

Yeah, well, that's one project that I would think, given the location of it, that there would be some pretty intense studies, just in terms of the geography of the land. So I guess that answers my question. I guess it really isn't. I can't foresee a project much larger than that in Milton, frankly.

Yeah, and not as complicated as that one. OK, so thanks. I appreciate it. Does anybody I kind of monopolize there's anybody else have any questions in regards to the second half of the of this article or the document as a whole?

And that would include any comments anybody may have, especially those who are watching online may have on this article. There was also a very lengthy piece in the Melton Times about this, I can recall, a couple of months ago.

Speaker 3 (01:13:04–01:14:02)

That was following the forum, and Josh Fiola from MAPC is our consultant, and he did a wonderful job. I think some of the Warrant Committee members were there and heard the presentation. There was a link sent to you, so I think if the Warrant Committee members would like to watch that, it really sort of walks through the history and all of the work that's been done to get into this. And it really was embraced by the East Middleton Neighborhood Association, which for us was really important that they felt, because this is a big change.

And change is not easy, as we all know. But this gave enough protection. So I think the residents who have been wanting to see something, this feels like that it's changed, but with protections. And I think it's finding that balance that we're looking for development opportunities, but we're protecting the neighborhood at the same time.

Speaker 9 (01:14:03–01:14:34)

I'll speak a little bit because I'm an East Milton resident. I've been to most of the meetings. And I know that the first iteration that MAPC came up with, nobody was happy with. And I think people really, I think people throw the planning board a lot of bombs at you.

They get a lot of bombs thrown at you. But I think that everybody was very appreciative of the planning board for stepping up for the neighborhood and the community and making the changes that they did, because I think it's a great improvement over that. So I appreciate that.

Speaker 3 (01:14:34–01:14:35)

That's good that we heard that feedback.

Speaker 9 (01:14:35–01:14:38)

Yeah, most people, I did too. And I heard that, and I feel that too.

Speaker 3 (01:14:38–01:14:38)

That was good.

Speaker 9 (01:14:38–01:14:40)

So I'm really happy with it. Thank you.

Speaker 3 (01:14:40–01:14:41)

That's good.

Speaker 9 (01:14:41–01:14:41)

Kudos.

Speaker 6 (01:14:43–01:15:11)

And the last two pages are all And one thing that we heard was that residents wanted to see, you know, with 440, they didn't know what they were getting until the end. This allows a developer to come in and read this and say, okay, this is potentially what I can do. So everyone knows what to expect. So I think it's gonna be super helpful from that angle also.

Not just limiting the height from five stories to three, but having a process that people can understand, developers understand.

Speaker 9 (01:15:11–01:15:15)

You can't retro this to 440 though, right? Unfortunately not.

Speaker 11 (01:15:15–01:15:15)

I know.

Speaker 6 (01:15:15–01:15:30)

You know 440 will be alright because it's got road on two sides and then it's got the citizens parking lot. If there's a place for a monstrosity.

Speaker 3 (01:15:31–01:15:33)

And hopefully it will be some good commercial space.

Speaker 8 (01:15:34–01:15:40)

Yeah but that didn't have a lot of space for commercial. Yeah, not as much as getting off the expressway.

Speaker 9 (01:15:40–01:15:53)

You know, when you think of New England, you know, a New England town, like Milton's still a town, which I think people live here because it's a town and they like that, not a city. So I like that we're preserving that. But like when I think of a New England town, I think you see a church steeple.

Speaker 11 (01:15:54–01:15:54)

Yes.

Speaker 9 (01:15:54–01:16:03)

You know what I mean? And on my street, in my streets, like 440 is now blocking that church steeple that we used to be able to see for a lot of people.

Speaker 11 (01:16:03–01:16:03)

Wow.

Speaker 9 (01:16:04–01:16:05)

Yeah. It wills, which is sad.

Speaker 11 (01:16:06–01:16:06)

Yeah.

Speaker 6 (01:16:08–01:16:24)

So we got to get to 10% affordable because the threat was 40B. Everything we approved, even with the memory clinic, everything backs up to, well, I'm going to go 40B if you don't let me do this. At some point, you push the developer too far until we get that 10% safe harbor.

Speaker 8 (01:16:25–01:16:35)

But the minute you get the 10%, you add more. We'll be chasing it for the rest of our lives.

Speaker 3 (01:16:36–01:16:38)

It'd be a challenge to get ahead.

Speaker 9 (01:16:39–01:16:42)

ADUs considered, can they be considered affordable? No.

Speaker 6 (01:16:42–01:16:55)

There's no affordable, unless you're the noble gentleman who builds an ADU and just, you know… And it actually screws you because the mix, it probably goes the other way, right? Yeah, because ADUs… It adds to our housing stock, our overall housing.

Speaker 9 (01:16:55–01:16:55)

Oh, right.

Speaker 7 (01:16:56–01:17:02)

But that's up to the discretion of the owner, whatever they want to set. Yeah, exactly. So it doesn't have to be affordable.

Speaker 3 (01:17:04–01:17:10)

So this is terrific. Any questions that we can answer, please feel free to email if anything comes up.

Speaker 8 (01:17:10–01:17:20)

Can I just ask one other question? So the Fruit Center lot is a residential, is a residential zone right now.

Speaker 3 (01:17:20–01:17:33)

That, it's actually, the parking lot itself is more on the commercial side. It's sort of, it's a split in the building where the actual structure, that's residential.

Speaker 8 (01:17:33–01:17:36)

So the first parking lot is commercial.

Speaker 3 (01:17:36–01:17:39)

Oh, and then up top, are you talking about the upper levels?

Speaker 8 (01:17:39–01:17:45)

The up top is commercial. And then the parking lot down below where the building is, is that?

Speaker 3 (01:17:45–01:17:54)

That's commercial. That lot, part of that lot is commercial. Oh, really?

Speaker 8 (01:17:54–01:17:57)

But the backside that abuts to Franklin is?

Speaker 3 (01:17:58–01:17:59)

That's residential.

Speaker 8 (01:17:59–01:18:06)

Including the row of parking spaces along Franklin, is that residential?

Speaker 3 (01:18:06–01:18:16)

The, where you go to that, where that upper lot is, the upper unit of town. No, I'm just, I'm behind. Where the loading docks are. Oh, where the loading docks are back.

That's residential, I believe, too.

Speaker 8 (01:18:16–01:18:19)

Okay. And so it's what's closer to Granite Ave?

Speaker 3 (01:18:19–01:18:21)

You're right. The Granite Ave side is.

Speaker 8 (01:18:21–01:18:38)

Okay, okay. So that area will stay residential. What's residential is residential. And this overlay.

Yes. would allow that somebody, whether if he sold it or anybody else, to add a story. They could go up to three stories.

Speaker 3 (01:18:39–01:18:45)

They could go up to add a story and do retail on the first floor and residential up above.

Speaker 10 (01:18:47–01:18:47)

OK.

Speaker 3 (01:18:48–01:18:50)

Yeah. So.

Speaker 1 (01:18:51–01:18:52)

Okay.

Speaker 3 (01:18:52–01:18:53)

Anybody else?

Speaker 1 (01:18:53–01:18:54)

Yeah.

Speaker 3 (01:18:54–01:19:23)

No, just thank you. And did you all receive the map? Because with all every time we do an overlay zoning, there's a map and I'll make sure you all get it because it's basically mechanic street all the way up to the funeral home. But then it does cross over where I'm at, which to include.

which includes the bank. Citizens? No, across.

Speaker 6 (01:19:23–01:19:26)

The Justin Building there? I call it the Justin Building.

Speaker 3 (01:19:26–01:19:45)

Yes, where Heart Dental, Rockwood Trust. Oh, yes, yes, yes. That's also included. We included that.

We didn't go too far out. We kept it a pretty tight boundary, mostly along Granite Street and then up to Franklin. So it's a pretty tight map, but I'll make sure you all see the map, too.

Speaker 7 (01:19:45–01:19:49)

So it's- It's anything beyond the church, right? Even before the church, it's not part of the OVA.

Speaker 3 (01:19:49–01:20:04)

It's not part of it. Before the church. Yeah. And even if a lot was split half, because it's interesting, a lot of lots, even like residential homes, sit half commercial, half residential.

So we kept those residential for the most part.

Speaker 8 (01:20:04–01:20:07)

So is the post office? That's included in this.

Speaker 6 (01:20:07–01:20:12)

Post Office, Juvenile Building, Helium Physical Therapy, and I think it stops right there.

Speaker 1 (01:20:12–01:20:29)

And then across the street it's… Those used to be all single-family homes. The Sheldon Building, the Dr. McDonald, those were all…

A lot of history with the building of the Expressway, why those zoning areas were formed, how they were formed, and why.

Speaker 2 (01:20:29–01:20:31)

That's right, there's that big white house.

Speaker 1 (01:20:31–01:20:41)

How they have to be owner-occupied. Also, they still have to be owner-occupied. supposed to be, with the exception of the Sheldon, now Jeshen building.

Speaker 3 (01:20:43–01:20:43)

It's interesting.

Speaker 1 (01:20:43–01:20:50)

It's really interesting how that all formed in that area. Right. Well, the train used to run by there.

Speaker 3 (01:20:50–01:20:54)

That was the train depot, right? I know, which would have been nice to have a little train there.

Speaker 1 (01:20:55–01:21:01)

There was just one thing. I just wanted to just reiterate Jay's point from the very early on just about the shall.

Speaker 3 (01:21:02–01:21:02)

Yes.

Speaker 1 (01:21:02–01:21:03)

And the masa head.

Speaker 3 (01:21:03–01:21:07)

So we'll address that.

Speaker 1 (01:21:07–01:21:18)

Yeah, that was just the one thing I just wanted to add. And I just noted there was just a couple of typos.

Speaker 11 (01:21:19–01:21:20)

Mm-hmm. OK.

Speaker 1 (01:21:20–01:21:32)

There was one on page 8, paragraph E. Parking restriction is just a space issue with on-site in the hyphen.

Speaker 6 (01:21:35–01:21:35)

I'm sorry.

Speaker 1 (01:21:35–01:21:36)

Paragraph E?

Speaker 9 (01:21:36–01:21:45)

Yeah. Just the middle of it. These features may include the provision of an on-site.

Speaker 1 (01:21:46–01:21:49)

I'm not seeing an E. Yeah, I'm not either.

Speaker 9 (01:21:49–01:21:53)

E? It is H-E. Oh, H-9.

Speaker 1 (01:21:54–01:21:55)

Oh, I'm sorry.

Speaker 3 (01:21:55–01:22:02)

That's H-9, yeah. Sorry. So under E, other parking restrictions.

Speaker 1 (01:22:02–01:22:16)

Yeah, it's just the word on-site with the space and then… I'm sorry, could you repeat that? It's the fourth line down, or the fifth line down. Other parking reductions.

Fourth one.

Speaker 6 (01:22:16–01:22:22)

These features may include the provision of on-site dedicated parking space.

Speaker 8 (01:22:22–01:22:27)

Yeah, it says on hyphen space site.

Speaker 6 (01:22:27–01:22:27)

But we don't have that on ours.

Speaker 3 (01:22:29–01:22:45)

Yeah, on-site dedicated parking. You don't? You might have had it, because we did correct a few typos that maybe you got a. And you probably already shared.

So on-site, so we have the provision of on-site dedicated parking space.

Speaker 8 (01:22:46–01:22:48)

And on-site has no space.

Speaker 6 (01:22:49–01:22:52)

It should be for site. Okay. But on-site is hyphenated in ours also.

Speaker 10 (01:22:53–01:22:53)

Okay.

Speaker 1 (01:22:53–01:23:03)

And then I had one other very small one. You probably corrected us. It's in the following page, page 9 under IB.

Speaker 6 (01:23:05–01:23:14)

So we're now on page 10. IB is on page 10.

Speaker 8 (01:23:15–01:23:15)

What happened?

Speaker 1 (01:23:15–01:23:42)

Okay, so, it's the paragraph that starts, well, they all start, if applicable. This is the 1940 paragraph. Refer to the Milton Historical Commission for consideration of its historical artificial significance. A few more lines down, you have the word planning board, you have an extra space in there.

And that's probably been corrected already. It's one, two, three, it's four lines from the bottom.

Speaker 3 (01:23:42–01:23:59)

After consideration, the Milton Historical Commission may issue a report which may include comments and suggestions to the planning board on these matters and any associated matters pertinent to the commissioner's responsibility and the planning board shall consider any such report in its evaluation.

Speaker 6 (01:23:59–01:24:06)

So on ours, that first reference to planning board, it's planning on one line and then board on the other, so the extra space doesn't show up?

Speaker 1 (01:24:06–01:24:08)

Yeah, so it's been corrected.

Speaker 10 (01:24:08–01:24:09)

Okay.

Speaker 1 (01:24:09–01:24:10)

That was all, just two very little.

Speaker 7 (01:24:10–01:24:23)

The second planning board have the same space left? It's justified, the margins. It's the, it makes it, yeah. Yeah, when it's justified, the margins are justified, you're gonna end up having extra spaces, which I think that's the reason.

I think that's what's happening. Because it's justified margin.

Speaker 6 (01:24:24–01:24:25)

That's weird you guys have a different.

Speaker 1 (01:24:25–01:24:29)

Yeah, because there's a lot of, there's a lot of extra spaces throughout the document.

Speaker 8 (01:24:30–01:24:31)

Oh, that's. It's the justified.

Speaker 3 (01:24:31–01:24:49)

It's justified margin, which is what I use. So maybe, because it's in, it was pulled from our, It could have been an old document. So I'll make sure that you just have a fresh copy. And the Warren has the fresh copy, more importantly.

Yeah.

Speaker 9 (01:24:50–01:24:52)

Should you read the whole thing again to be sure it's right?

Speaker 3 (01:24:52–01:24:56)

We can do that. Yeah, exactly. Because we read pretty soon.

Speaker 1 (01:24:56–01:24:59)

The filibuster, the Warren committee? Yeah, but you might go some of the.

Speaker 3 (01:25:00–01:25:18)

Yeah, but I think it's something that the neighbors. And the other thing to mention, Josh, it are the consultant is going to be presenting a town meeting. So he'll walk through it and he is the one who helped us draft this language. So if there's any confusion, he's very good at clarifying.

Speaker 1 (01:25:18–01:25:39)

Okay, thank you. Thank you very much. See any hands raised. So thank you very much.

We will vote on this. I think on a future meeting, probably next week. So once you get us that final clean copy for our review, we'll vote. We'll have a vote on it.

And we'll also, okay.

Speaker 3 (01:25:39–01:25:45)

And we'll make sure you have that map too, because that's. Great. Thank you so much.

Speaker 1 (01:25:45–01:25:47)

Thank you so much for coming.

Speaker 9 (01:25:47–01:25:50)

It was a pleasure. Thank you.

Speaker 1 (01:26:00–01:26:17)

A lot of work they've put into this in several years now. We've been hearing a lot about it. And it is a dense document. There's a lot in here, a lot of good things in here.

We'd like to have maybe a brief discussion about this, members at home.

Speaker 7 (01:26:18–01:26:18)

That's well done.

Speaker 1 (01:26:19–01:26:30)

Anybody have anything they'd like to discuss that's contained? And I include the floodplain too, but really the overlay.

Speaker 8 (01:26:31–01:26:43)

I think it's awesome. I think it's great work by everybody. It's well done. And the fact that the neighbors are all in support is a miracle of miracles.

Speaker 1 (01:26:45–01:26:50)

Meredith, can I stop you before you walk out? This was a unanimous decision by the planning board.

Speaker 3 (01:26:50–01:26:51)

Yes, definitely.

Speaker 1 (01:26:51–01:26:55)

I just wanted to get that on the record for us. Yeah. So thank you very much.

Speaker 3 (01:26:55–01:27:03)

Thank you. And all the information, the survey, everything is online, is on the Planning Board website.

Speaker 2 (01:27:04–01:27:06)

Thank you for all your work. Thanks. Have a good night.

Speaker 8 (01:27:07–01:27:18)

Sorry, Lori. Oh, no. Yeah, no, I think that's good. I think that it's great that I remember going to one of the very early meetings thinking, oh, this is going to be terrible.

Speaker 2 (01:27:19–01:27:19)

I remember.

Speaker 8 (01:27:19–01:27:21)

Yeah. So I think that's great.

Speaker 9 (01:27:21–01:27:40)

Yeah. I've been to a number of meetings, and I would say people are happy with the evolution of it. And they felt like they listened to what the neighbors' concerns were, which doesn't always happen. But I shouldn't say that.

But I think it did. People were pleased with the outcome on it. And I think it enhances the downtown.

Speaker 1 (01:27:40–01:27:57)

So Brian, I watched a bunch of them too. When people were just giving the overlay props, it was EMA, but were these also individual people who were at the hearing, who were just coming forward being like, this is great, or was it EMA, or was it a combination of the two?

Speaker 9 (01:27:57–01:28:03)

No, it was just neighbors. OK. It was just the neighbors. Oh, that's good.

Yeah. That's good.

Speaker 1 (01:28:04–01:28:36)

That's really good. Anybody have anything at home? Julie? I'm going to revisit this when they get us a clean copy back, which will be next week.

And we can have a vote on it at that time. But as a chair, I'm not seeing any problems with this document from any member at this point.

Speaker 2 (01:28:37–01:28:37)

That's great.

Speaker 10 (01:28:37–01:29:01)

I think it's great. OK. Tom, can you hear me? I can hear you, Judy.

Oh, thank you. Good. So this is for the June meeting. Correct.

Do you anticipate anything else being presented for the June town meeting?

Speaker 1 (01:29:01–01:29:02)

MBTA.

Speaker 10 (01:29:03–01:29:04)

OK.

Speaker 1 (01:29:04–01:29:17)

And maybe a historical bylaw. OK. But I received an email, they're trying to keep it as light as possible for the June meeting.

Speaker 10 (01:29:18–01:29:19)

Yeah, a one night affair.

Speaker 1 (01:29:20–01:29:28)

Yes, but we will be seeing the lighting bylaw in May. So we still have that one other article that we have to deal with.

Speaker 10 (01:29:29–01:29:51)

Do you, not, I kind of am looking at the, Bottom of my computer and it says 423 and we know that the town meeting is. You know, the 1st week of May, do you know when we might see the lighting bylaw?

Speaker 1 (01:29:52–01:30:33)

Their language is being revised as we speak. I have been unable to secure a speaker, both an expert to opine on lumens, I actually reached out to two people, two people have not responded to me. And this was over two weeks ago. In addition to that, we will not have any member of the select board at this time to come down and present the article to us.

So I'm hoping to get to speak to our town administrator and get some more information maybe through town council. But I'm not going to have no one from the select board I think at this point is going to be presenting to us.

Speaker 10 (01:30:35–01:30:49)

Is it, I think it's my understanding and I probably need to be corrected. that the article itself came from the select board?

Speaker 1 (01:30:50–01:30:50)

Yes.

Speaker 10 (01:30:52–01:31:04)

So I guess that goes to the question. It seems odd that they would not come and clue us in, if you will.

Speaker 1 (01:31:07–01:31:51)

Yeah, it's helpful, Judy, as you know, you've been on here for three years, just having someone coming down and talking about it and giving you know, their thought process, their analysis, the origins, you know, those types of things, I think, are very important when we're advising time reading. And I think really stepping inside the head of the author or the individual who is really creating the product is very helpful to us. And it's actually, you know, disappointing, to a degree when we don't have that guidance as a unelected appointed board. But I'll do my best, Judy, and see what I can do to educate.

Speaker 10 (01:31:51–01:31:55)

All right. Thank you. Tom?

Speaker 9 (01:31:55–01:32:06)

Can I ask a question? Sure. Did the select board vote for the lighting? It's just been like, they never voted on it?

And they don't need to? They don't.

Speaker 2 (01:32:07–01:32:12)

Oh, I thought they had to in order to propose. They vote to put it on.

Speaker 1 (01:32:12–01:32:33)

To put it on. They don't vote. They don't necessarily have to vote for approval. Frequent times in the Florida town meeting, they've been asked to vote on things, to give their recommendations.

So at that point, they're kind of forced to make a recommendation. But like Lori said, their vote was just to put it on the warrant.

Speaker 9 (01:32:33–01:33:12)

Yeah. Probably sound like a broken record on this, but it seems like the last town meeting that we had, when people put forth articles that weren't vetted, like we had the thing with the taking away the legal fees, and we had the thing- Citizens petitions. Citizens petitions. We couldn't get anybody to, in the lighting, same thing, we couldn't get anybody to discuss it, so we never delved into it, and then it just floundered at the town meeting and wasted a lot of people's time, and then it got changed or taken out completely.

Speaker 7 (01:33:12–01:33:17)

I thought it was withdrawn. Wasn't it withdrawn? It was withdrawn. Initially withdrawn, and now it's alive again?

Speaker 1 (01:33:17–01:33:42)

Yeah, it's going to be coming back to us. The Select Board still has to do a little work on this, but I am now going outside my guardrails on that agenda. OK. We're discussing the thing.

So I appreciate it. And Judy, I appreciate what you said. And I obviously ran with it, but it's not something we can talk about. But I know what you're saying.

Yeah, well.

Speaker 5 (01:33:42–01:34:39)

Tom, can I add to the choir? I don't want to beat a dead horse, but maybe this will help you in your endeavors. I'm reading the Town and Milton bylaws, as I enjoy doing. And it says, it shall be the duty of the Warrant Committee to inform themselves concerning those affairs in the interest of the town, blah, blah, blah.

And then it says, the officers of the town shall, upon their request, meaning us, shall, upon the warrant committee's request, furnish them with facts, figures, and other information pertaining to their several departments. Now, you know, is the select board officers of the town? I don't know. Is anyone going to arrest the select board if they don't want to talk to us?

No. But it's just one more thing we can point to that says, hey, the bylaws of the town say people are supposed to talk to us. And I know I'm preaching to the choir, and I know you're doing your best, so.

Speaker 1 (01:34:39–01:34:58)

No, Jay, I prefer. You are doing your best. Yeah, and I appreciate you mentioning that, Jay. And I don't think the information we're looking at is going to be injurious to the town or its citizens.

In fact, it's going to be helpful when we're really going after people's pocketbooks here.

Speaker 5 (01:34:59–01:35:03)

Do you have the bylaws memorized?

Speaker 1 (01:35:04–01:35:07)

Yeah, Jay, you're talking about a bylaw committee veteran.

Speaker 5 (01:35:08–01:35:09)

All right, all right.

Speaker 1 (01:35:10–01:36:42)

But that's the thing, Jay, and like I said, I appreciate you bringing it up at the meeting in that language because that's why it's just kind of difficult and it's disappointing. Because we got to give the best information to town meeting. And when we start at zero, it's kind of hard, especially given the time crunch we're in. But we will persevere.

I know we will. And I appreciate you bringing that up. OK. Okay, so I know the future meetings have always been a question.

I've been working with Meredith for MBTA. I was looking to really kind of push them to come in next week. They most likely will not be available next week to do this. And then we have town meeting starts on Tuesday.

So then we have the, excuse me, on the 5th. So then we have, So they may have meetings during the night, but town meeting and we can't meet. So we're gonna have to figure that out. We're gonna need to have meetings next week.

at least as to the lighting bylaw. We got to have a meeting next week about it, and we have to vote on it. So just keep your eyes out on the calendar, Monday, Tuesday, maybe Thursday, depending on when a speaker, if I can get one is available, or somebody.

Speaker 7 (01:36:43–01:36:50)

Are we going to still, I'm sorry to interrupt, are we going to still meet even though we're unable to get a speaker to come in?

Speaker 1 (01:36:50–01:36:56)

We need to meet and vote on it because we need the green sheet. We need the comment and the green sheet to be submitted.

Speaker 8 (01:36:57–01:37:01)

Don't we need the article if they're making changes? And we also need the article, too.

Speaker 1 (01:37:01–01:37:09)

And they're changing it again. So again, my frustration on the last correspondence is that everybody, like I didn't have anything to even look at.

Speaker 7 (01:37:09–01:37:11)

And they want this on May 5th, not in June.

Speaker 1 (01:37:12–01:37:43)

Yes, this is on May 5th. And it was originally, as I said, A couple of months ago, Jay, you can correct me. This was on the June agenda. And then it slid over to May.

So it's what the select board wants. So we have to deal with it. So we just need to vote so we can craft a good comment the best we can and get it to Nick Milano. I don't see any hands raised.

It's 9 o'clock. This could be a Warren Committee record.

Speaker 7 (01:37:43–01:37:44)

Motion.

Speaker 1 (01:37:45–01:38:10)

Second. To adjourn. Okay. We have a motion for Macy to adjourn.

Before I ask for a second, which I may have already gotten, does anybody have any questions, concerns or anything regarding the planning board articles that we've looked at tonight? I don't see any hands raised. No member here. So we have a motion to adjourn by Macy.

Do I hear a second?

Speaker 8 (01:38:10–01:38:11)

Oh, I'll second that. Second.

Speaker 1 (01:38:13–01:38:18)

Thank you, everybody. Second, the meeting is adjourned. Thank you, Warren.

Speaker 12 (01:38:18–01:38:19)

Thank you, Milton.