Board: Community Preservation Committee

Date: 2025-06-24


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:22–00:23)

All right, why don't we get started.

Speaker 2 (00:23–00:39)

704. My name is Tom Callahan. Call the meeting to order the 11th meeting of FY 25 for the Community Preservation Committee. Welcome, everyone.

Let me just take the role.

Speaker 3 (00:43–00:50)

Rob. Rob Liebesch, member, Parks Commissioner. Cheryl.

Speaker 4 (00:51–00:54)

Carol Tagayas, representative from the planning board.

Speaker 5 (00:56–01:00)

Pete. Pete Jackson, at-large member.

Speaker 6 (01:01–01:05)

Jenny. Jenny Russell, vice chair and also at-large.

Speaker 7 (01:05–01:13)

Yeah. There she is. Good evening. I'm Wendy Garpo, representative of the Conservation Commission.

Speaker 2 (01:13–01:19)

Thanks, Wendy. I didn't see you there. OK, there you go. And anybody else?

Speaker 8 (01:19–01:25)

Kathleen O'Donnell, newly reappointed citizen member. There you go. Congratulations. I sworn in.

Speaker 2 (01:27–01:33)

So Kathleen, we forgot to have the cake for you. You know, you get a cake every time you're reappointed. Just just kidding.

Speaker 8 (01:33–01:34)

Oh, really?

Speaker 2 (01:34–01:39)

No, no, no. Being a little silly, that's all.

Speaker 8 (01:40–01:43)

I apologize for being late, but we had a meeting at the same time.

Speaker 2 (01:45–01:45)

Fair enough.

Speaker 9 (01:47–01:51)

All right.

Speaker 2 (01:53–01:55)

I'm sorry, what?

Speaker 9 (01:57–01:58)

Linda's here on Zoom.

Speaker 2 (01:58–02:04)

Oh, yeah, I just saw Linda. OK, great. Linda, do you want to introduce yourself?

Speaker 10 (02:07–02:09)

Linda Weld, Historic Commission.

Speaker 2 (02:10–02:56)

Okay, we have everybody, our current committee of eight, size is eight right now since I don't believe we have a housing authority appointee. So we have everybody. So thank you everybody for both in attendance and also our committee members for being in the room and online. Let's get right into it.

Administrative items, just a reminder, the upcoming meetings that we set at the last meeting are July 14th. and July 22nd. I believe I have that correct. Somebody should correct me if I'm wrong, but I think those are the two next meeting times that we established.

Okay, good. July 14th at 7 p.m., July 22nd. at 7 p.m. I think, right?

We didn't.

Speaker 11 (02:56–02:58)

Yeah.

Speaker 2 (02:58–03:12)

Okay. We didn't switch the times. Okay. And Julia has prepared the minutes for the last meeting, the June 11th, 2025 meeting.

Do I hear a motion?

Speaker 5 (03:14–03:17)

There were a couple edits. Okay.

Speaker 4 (03:18–03:41)

There was one other that I didn't see that one today. There was at the very end, it says that I refused at nine oh five, and then it says the meeting adjourned at nine oh five. And so I think the meeting adjourned later than nine oh five. It definitely did.

It definitely did.

Speaker 10 (03:43–03:51)

I also was not present, and I think I was counted as present on the meeting minutes, but I was not there.

Speaker 5 (03:52–03:57)

I move that minutes be accepted as amended.

Speaker 2 (03:58–04:02)

Okay, those are the two amendments. Second.

Speaker 5 (04:03–04:05)

Cheryl's time and that window wasn't there.

Speaker 2 (04:05–04:08)

Okay. All right. So we have a motion from Pete.

Speaker 6 (04:09–04:12)

Yeah, second.

Speaker 2 (04:13–04:17)

So we have a motion from Pete, a second from Rob, maybe also a second from Jenny.

Speaker 12 (04:17–04:18)

Thank you.

Speaker 2 (04:20–04:30)

PB, Harmon Zuckerman. PB, Harmon Zuckerman. PB, Harmon Zuckerman.

Speaker 8 (04:31–04:34)

PB, Harmon Zuckerman.

Speaker 2 (04:35–05:00)

PB, Harmon Zuckerman. All right, so we have approved minutes of the June 11th meeting. All right, let's get into the review of the eligibility applications. I think the first up is Arthur Doyle in the DePonce Estuary.

Arthur, welcome.

Speaker 13 (05:02–06:43)

Good evening, everyone. I'm Arthur Doyle from the Conservation Commission. It's a pleasure to be here with John Cannon, the Conservation Commission Chair. We would like to extend to the CPC, on behalf of the entire Conservation Commission, your investment in the Milford Miller Pond Suburban Regulatory Project.

You've received our report, and you've received, for your consideration, a follow-up application an actionable recommendation from the study project. We have with us this evening two of our contracted partners from APEX companies and its environmental partners group that conducted the survey engineering work and developed with the compound the study's recommendations. They are Eric Kelly, principal at APEX Engineering, and Jamie Gillette, also an engineer, and their project manager for the estuary study. We would like to walk you through the work accomplished and the initiatives proposed, employing our presentation materials.

You've already had the written materials. And also we welcome your questions and advice at any time during the course of this evening's presentation and discussion. So at this point, I'd like to ask Eric and Jamie Join us, introduce yourselves, and Jamie will put up the first screen.

Speaker 14 (06:46–06:53)

Sorry, I just want to make sure everybody can see the slide that I'm screen sharing.

Speaker 2 (06:54–06:57)

Yes. Online we can, yes.

Speaker 14 (06:59–06:59)

And in person.

Speaker 2 (06:59–07:00)

Yes.

Speaker 8 (07:00–07:01)

Yeah, in the room we can.

Speaker 14 (07:02–07:29)

Great, thank you. With that, my name is Jamie Blutt. I'm a project manager at Apex Companies, and I've been working with my colleague, Eric Kelly, to design the conceptual design for the Napata River Estuary Trail. Eric, do you want to introduce yourself?

Speaker 15 (07:29–08:18)

Sure. Thanks, Jamie. Thank you, Arthur, for the introduction. So we're here tonight to kind of walk through the conceptual planning study that Jamie led as part of our team working with Arthur and staff from Public Works and Town Hall and the Conservation Commission to kind of develop several plans for improving public access and education about the town lands off Granite Ave and on the south side of the Neponset River.

So Jamie is going to step through the scope of work that we completed to date, the concepts were developed, and the sequencing of how design permitting and future construction have been considered. Jamie.

Speaker 14 (08:20–08:44)

Thanks, Eric. So as Eric mentioned, this conceptual study, it's a multi-year initiative. And it aims to preserve the estuary as a natural resource, also rehabilitate the land for passive recreational opportunities, and enhance public access to the riverfront.

Speaker 13 (08:48–09:15)

I would also like to add to that that your application notes not only open space and recreation, but also historic preservation, Because as we've worked during the course of this past year, we found out that this area is a very historically rich part of the town of Millington.

Speaker 11 (09:15–09:16)

Thank you.

Speaker 14 (09:17–10:21)

Jamie? So with that, I just want to give you a little bit of background overview of the study area. So the area includes 4 parcels off Granite Ave behind the Cortland Circle and Riverside Ave residential neighborhoods. The town owned land is outlined by the green boundary, yellow and blue.

And then while the orange boundary represents a portion of the privately owned land in Quincy, and this black dashed line represents the Quincy Milton town line. And just to note, the orange boundary is owned by Blue Cross Blue Shield. So overall, the lands includes marsh and riverfront access, including two existing trails, one out to Black Rock and the other to Mount Hope Canal, which is shown by the red dashed lines.

Speaker 13 (10:23–12:37)

Well, Jamie has his frame up going back to that notation of history. I just mentioned where you see Mount Hope Canal, but that was incorporated in 1842. by the Massachusetts State Senator for the purpose of building a canal in the north. It's a well-known entity, for those of you who have not seen it.

And it is believed that it was part of a business proposition with Granite Gorge in Quincy, which among other cemetery in Boston. On the far right-hand side, where you have what is now called Black Rock, that was where the first ferry across the river to Georgia was established under the permission of Israel Stoughton, one of the community's founders, and the father of Governor Stoughton, and by the name of Glover, who was one of the incorporators at the moment of Junalda several generations apart. There was a device that connected to the other side, which had a place known as Slink Point, and it was believed that materials were sent across the river by way of a rope sling. And so, when Wicklow was given the permission by Stoughton to have a penny ferry going from that point, which is now, interestingly enough, in Quincy over to New Brunswick.

The line that Jamie has demarcated here between Milton and Quincy was not the original Quincy-Milton boundary. That was much further to your right down to Sagamore Creek and Croxbury area in Quincy. And in 1885, the two towns agreed to petition the general court to reestablish the boundary to where it is now.

Speaker 6 (12:39–12:42)

Was there an actual wharf that was built on Mel-Ho?

Speaker 13 (12:42–14:54)

That is Faulkner's wharf that is at Black Rock. And Faulkner actually ran a flower enterprise. He had major greenhouses on Granite Avenue. He and William, this is James Faulkner, and he and William Faulkner were the petitioners to reestablish the boundary line.

Granite Avenue was maintained by Quincy and Pott, and Hancock Street was maintained by Milton and Pott, so they decided to do a trade-off and separate the areas. A number of the petitioners, interestingly enough, appear to have been East Milton, now East Milton residents. The application before you concerns of this map, which is from the 1885 history of Milton by Thiel. And if you look sort of above center right, you will see the granite bridge of the Old Colony Railway.

That was a successor to, was succeeded by the New York, New Haven, and Hafen Railway, which ran until the 1950s. line that went from the Poncet. Look at the train coming this way from the Poncet. Actually, that old colony line was begun in South Boston in about 1844 and was finished in Plymouth in 18 months.

See if we can do that today. And they, in 1871, built this spur or branch coming from the Poncet crossing over Granite Avenue, connecting onto the first railway in the United States, which carried Granite from the Buckeye Aquarium down to the front of the construction of the Buckeye Mine. And the train went up that original rail line into East Wilshire Square, and on into Wisconsin.

Speaker 4 (14:55–14:59)

I see the town landing is up here, rather than where it is today.

Speaker 13 (14:59–15:03)

The original town landing is still on this landing. That's right.

Speaker 8 (15:03–15:05)

Yeah, I thought that was really interesting to see that.

Speaker 13 (15:05–15:14)

So that's just scratching the historical surface of this area. That's right.

Speaker 14 (15:15–17:21)

There was a great historical background on the area. So with that, one of the first steps of this study was to do a desktop analysis, as well as go out into the field to establish baseline site conditions in order for us to develop the initial concept plan. So with that, we worked with a surveyor who was able to establish the property, some of the property lines, and then from record information. And then we went out to the property to take a walk through the area and and see where some of potential property encroachments exist today and where the the town line boundary is and we were able to even install some wooden stakes along the town line boundary so this image that you see up on the screen.

The red dots demarcate the existing bounds and monuments that are out there today. And then the green dots were where we installed wooden stakes and as well as the red dots with a yellow circle. One thing to point out here is that you can see this orange line represents this image, the Milton Quincy line. So as you're headed out to Black Rock, there is wooden stakes out there designating that crossing over from Milton to Quincy.

where the end of the trail and Black Rock is within the Quincy boundary.

Speaker 5 (17:21–17:28)

Excuse me, did you have any coordination with Quincy at all as you were talking about this?

Speaker 13 (17:28–17:48)

Yes, in fact, we have. Yes, we do. Jamie, Eric, John, we've been involved with the engineering of the city of Quincy. a member of Quincy's planning staff, a member of Quincy's conservation commission, and a naturalist for the city of Quincy.

Speaker 14 (17:52–18:26)

We held a visioning workshop during the portion of when we were starting to initially draft a concepts plan in order to engage feedback from some key stakeholders like the City of Quincy and the Neponset River Watershed Association. There was an individual there from the association, as well as some other key players from Quincy from the planning side, as well as Conservation Commission.

Speaker 6 (18:28–18:29)

What about Blue Cross Blue Shield?

Speaker 14 (18:30–19:57)

Blue Cross Blue Shield, we started to coordinate earlier because we had to coordinate property access into their portion of their own parcel over the Quincy line. So we initiated coordination with Blue Cross Blue Shield prior to the surveyors work and Then moving into the visioning workshop, since there was still coordination to be done between Milton and Quincy, they were not in attendance in that visioning workshop, so that we could form a plan as a team in order you know, as next steps to contact them in order to start having a discussion on what, you know, what, what this project entails, what it's going to look like and how they could support, you know, the town and Quincy, the further developing the, the trail out to Black Rock. So that is, that is part of next steps of this study. or part of the design.

Rob has his hand raised. What was that?

Speaker 2 (19:58–20:05)

Rob has his hand raised. Yeah, Rob has. I was sorry. I was on mute, Rob.

I was calling on Rob, but I was on mute. Thank you, Julia.

Speaker 3 (20:07–21:24)

Sorry, I just have a few questions. One question is the public accessibility to this project. I understand this as a, you know, this is a neighborhood. And I'm always on the Neponset trail.

So I understand where the Neponset trail is, but you know, what, what is the opportunities here to connect to, you know, the park, I believe there's the, the, the Neponset park, which is just like North of this site in Dorchester, um, as well as the Neponset as well as the Neponset trail. So I guess I have three questions that one is public accessibility, right. To get here. Another one.

Yeah, just connectivity to any existing any existing past. And then the third one is have you thought through any with in regards to the public accessibility. if there is anything like parking or something, like if the public is to come out here, like how would they be encouraged to come out here? Because this is an existing neighborhood and I could just see that as could be a potential problem.

So is there like wayfinding or something and to be able to connect it to the Nepanza Trail, which is only if you go down Granite, there is like a little parking lot there, like a pocket parking lot. So I'm just wondering if you guys thought through any of that.

Speaker 14 (21:26–21:47)

Yep, I appreciate all those questions. I think we're jumping ahead a little bit because we will be answering some of those as I present the conceptual design. So could we table those questions and then come back to them if I haven't answered them towards the end of the presentation after we go through the conceptual design?

Speaker 16 (21:47–21:47)

Sure.

Speaker 14 (21:49–22:42)

Great. Thanks, Rob. So I'm just right now touching on the initial baseline site conditions. And then, and then we'll jump into, you know, that pedestrian connectivity and designations and signage, because those those are definitely key elements to the design for this area.

Once we designated the property balance. Milton Conservation Commission went out and installed some signage within the town-owned parcels. So I'm gonna hand it off to Arthur to just touch base a little bit about this.

Speaker 13 (22:44–25:34)

Yes, thank you. We've had an initiative over the course of the past, I'd say five years, John, to sign most of the conservation owned properties. These are all town lands of the West, but they're under the care of custody and control of the Conservation Commission. And this lets the public know that that is the case.

Three signs were placed in this area. One at the end of the rail trail. This is at the intersection of Thistle and Granite Avenue. And if you look just to the left of the sign, You have a clear shot of where that old railroad line, that granite branch of the old colony, and then the New York-related, and how the railroad went.

There's another one at the end of this, and we'll have you at the beginning of the path to Mount Hope Canal. There's been a parking area there, and there's another one down on the river side. We hope that these signs are supportive of the neighborhood. We have, as well as the natural resources, we've had conversations that we'll get into in response to Rob's question with a number of the neighbors, but not all of them yet.

But we do have a plan to do that. And with respect to protection, the marshes are a very vulnerable area. It's extremely valuable. as a natural and ecological resource, but also as a climate resource because salt marshes absorb greenhouse gases 10 times faster than an acre of salt marsh will absorb greenhouse gases 10 times faster than an acre of mature forest.

The science is also hopefully going to help redirect people off the marshland It's being abused in some respects. The march suffers in a second way, and that is from the vapor dam. Ordinarily, this salt estuary would be replenished by silt coming down into the Ponson River. And as the tide would come in and be re-deposited upon the salt, As you'll see in most of our estuaries, up in the Ipswich area, down in Cape Cod, and so on and so on.

Because of the dam, we have lost two centuries of silt replenishing itself, which makes its preservation all the more important.

Speaker 5 (25:35–25:39)

Arthur, we've got a full agenda.

Speaker 17 (25:40–26:18)

And I think it's and we're going to be absolutely not a lot of that is one of your public access comment. We're again we're still in the concept stage at least in the number of different phases. But I can get that it's it's a big deal. As we've asked for plans that will show a pathway that's sufficient to sustain a wheelchair access and people appreciate this because that's the way the pathway surrounds turns on that's the plan for both on.

And we're trying to include that into this plan. So public access includes handicapped access. Fantastic.

Speaker 14 (26:18–28:13)

Fantastic. All right. I'm going to talk about what we've all eagerly been waiting for, the conceptual design. So the project study area was divided into the following three priority areas for phase planning and budgeting.

We have phase one is the rail trail delineated in the purple. Phase two is the black rock trail improvements delineated in the green. And phase three is the Mount Hope Canal trail and parking area. But today we're going to present to you phase one, because that's what we're looking at implementing first.

So with that, the rail trail will begin at Granite Avenue, following the former railway corridor adjacent to President's Golf Course. The new trail alignment will connect to the existing Black Rock Trail, which I'll show on the next screen, and also Riverside Access Drive. This segment of the trail is proposed to be about five five feet wide and a quarter of a mile long. It's about a half mile to Black Rock.

So this is halfway out to the Black Rock point. The trail extension terminates. I want to show. Terminates at the we have an option to show a trail extension as well to connect to the Quincy Trail as well.

But for phase one for budgeting right now, we're just looking at the rail trail from Granite Ave to the existing Black Rock Trail.

Speaker 2 (28:15–28:27)

So I think- Can you just explain the quarter mile versus half mile? You said it's half mile. If I understood that right, it's half mile to Black Rock, you're asking for funding for a quarter mile of trail?

Speaker 14 (28:28–28:43)

Phase one will be a quarter mile of trail to the existing paved access driveway off of Riverside Avenue. If you can see where my mouse is hovering over.

Speaker 2 (28:43–28:47)

That means it doesn't go out as far as Granite?

Speaker 11 (28:50–28:53)

It goes from Granite.

Speaker 13 (28:54–28:56)

That's where it's from.

Speaker 2 (28:56–29:02)

I'm just a little confused about the half mile, quarter mile thing. I'm not quite following that.

Speaker 5 (29:02–29:10)

Tom, it goes from Granite to where the trail goes out to Black Rock, where we walked that time we were out there. But it doesn't take the trail out to Black Rock.

Speaker 2 (29:11–29:27)

I get that. So I just want to know what the half. So is the quarter mile from Granite to the intersection of Black Rock? Okay.

All right. I'm good. I'm good. Thank you.

Sorry about that.

Speaker 8 (29:30–29:34)

What's the redesignated shared parking area.

Speaker 14 (29:35–31:12)

I'll get to that. So it was important to create a parking area that was away from the residential neighborhood so that we can direct the majority of the pedestrian activity along the rail trail and focus the connectivity out to Black Rock. And so we're proposing to redesignate a portion of the existing parking area across from Thistle Avenue and then connectivity would be through there right now there's a fence so we would install a pedestrian gate and then tie in the connectivity across the There's an existing crosswalk. And then the trailhead would start right at the corner of Thistle Avenue and Granite Ave, which would include signage to demarcate that this is the start of the trail.

Along the trail, the five foot wide trail, we show also resting areas which will promote further accessibility. as well as re-vegetating the area because this portion of the town will land along the rail trail. We've observed some property encroachments. There would be some enhancements there.

Speaker 9 (31:14–31:19)

Who owns the parking lot land? We do.

Speaker 13 (31:20–31:21)

The town does?

Speaker 16 (31:21–31:22)

It's a state.

Speaker 13 (31:23–31:38)

No, the parking lot across Granite Avenue is state. That's the parking lot. And there's a crosswalk from the intersection of Granite Avenue and Thistle across Granite Avenue for easy access to and from the parking lot.

Speaker 8 (31:40–31:42)

And we have rights to use that parking lot?

Speaker 13 (31:42–31:50)

It's wide open to the general public. We even find people from other countries to drive down and spend the night there.

Speaker 6 (31:51–32:05)

Now, when you say easy access, though, granted, that is a busy street, right? So crossing that. Yeah, OK, just just noting. Yeah.

Speaker 13 (32:07–32:34)

I'll just say that I tested it when we were putting the sign up at that location. I crossed it more times. And about 75% of the time, as soon as I entered the crosswalk, the traffic on Granite Avenue stopped. Very similar to the traffic pattern on the other side of the bridge in the Ponce del River, when people were coming down the bike trail and crossing over.

Speaker 5 (32:34–32:50)

The same behavior pattern. Well, except they better like me. I'm still here. Very good.

So the proposed budget, does that include engineering, permitting, and construction of this first phase?

Speaker 13 (32:52–32:56)

David, do you want to comment on that?

Speaker 14 (32:56–33:45)

Sure. So the budget does include engineering, services, and so design and permitting for the first phase of the rail trail. And it does include a 35% contingency because we are in the conceptual design phase. So the next phase to continue the design of the rail trail would be a preliminary design.

And then a final design where at that point, getting close to final design would look to permit the work in order to get to construction.

Speaker 3 (33:49–33:56)

What's the budget number? Sorry, I don't have it in front of me. 275. 275?

Yeah.

Speaker 6 (33:58–34:03)

Do you have any idea with phase 2 what the total would be?

Speaker 14 (34:05–34:15)

I don't have that available right now, but I will when we finalize the technical memo for for this project.

Speaker 3 (34:15–34:33)

So can you just quickly, so 275, what does that buy? Is that buying design? It's got a 35% contingency number in it. It's a path.

What exactly is the total outlook for that 275?

Speaker 15 (34:34–35:08)

Jamie, I can jump in. I'm sorry. The 275 is to design all elements of the project. It does not include permitting of phase 2 or phase 3 because those will be much more complicated by both the Wetlands Protection Act, Chapter 91, and potentially 401 water quality certificate programs.

But the 275 is covering the design to get to construction documents for the three phases. but would only include permitting for phase one, the rail trail.

Speaker 3 (35:09–35:14)

So this is just design fee 275 for this? Correct.

Speaker 5 (35:16–35:19)

It includes construction of phase one.

Speaker 3 (35:19–35:23)

Does it or does it not? No, he's saying it's just design fees.

Speaker 11 (35:25–35:28)

Correct, Eric?

Speaker 15 (35:28–35:34)

Jamie, bring up the table.

Speaker 3 (35:37–35:52)

So can I also, so just asking as a question, another piece, so as another piece of this, because it's a public project, it'll have to go out to bid, right?

Speaker 11 (35:52–35:53)

Correct.

Speaker 3 (35:55–36:18)

So you guys are obviously heavily involved in this, and I would imagine you'd be one contractor, one person that this would potentially go out to. But I guess just so for the board's sake, you'll have to realize that if this project is eventually approved for funding, it would have to go out to procurement.

Speaker 15 (36:18–36:24)

Just to be clear, we're a professional engineering services firm. We're not a construction firm.

Speaker 3 (36:24–36:31)

Well, so that's what I'm asking. Is this project for your 275, is it for design or is it for construction?

Speaker 15 (36:32–37:01)

This is for design of the three phase one of the rail trail. As you can see in the screen Jamie's sharing, the construction subtotal is 314 with an additional, so project subtotal is 524. This is for design and permitting to get you through phase one and design of the other options, but we'd be seeking construction funding through other mechanisms.

Speaker 3 (37:02–37:08)

Wait, so can you just review, so what's up on our screen right now? You said it's 274.

Speaker 15 (37:09–37:10)

Yes.

Speaker 3 (37:11–37:13)

Which is the design fee for all three?

Speaker 15 (37:13–37:45)

The full project would be designed and then it would be constructed and permitted in phases. because phase 2 and phase 3 include next steps would be coordinating with Blue Cross Blue Shield because no one has property access to do any development out there so you can't permit or construct phase 2. Phase 3 is subject to additional wetlands and waterways permitting so that would be that would be have to be handled after the design is taken care of.

Speaker 3 (37:46–37:53)

So get me to the 274 75 number with these numbers that you have? You have 100, 110?

Speaker 15 (37:53–38:16)

No, these numbers are just for, this is just to present phase one as to what those construction opinion of cost is. This is not a table for the 275. So these numbers do not add to 275. This is three options for, that was in the material that Arthur provided, separate with the Conservation Commission.

I don't have that table here in front of me.

Speaker 3 (38:18–38:22)

All right. I guess that's what's confusing.

Speaker 2 (38:25–38:42)

So we'll need some clarity between now and the final application on exactly where the 275 is going. I hear you. It's going for design of the three phases. But this chart adds up to 315, not 275.

Speaker 15 (38:42–38:49)

This is three, just to be clear, this is three different options for how to complete phase one. It is not options.

Speaker 3 (38:50–39:50)

It is not phase one, two, and three. But the challenge is, but in this subtotal, you have design and permitting, right? But they only add up to 210 or something, at least from the numbers that I see. And maybe you have a contingency there on top of that to get you to choose.

I have no idea. But I think it's hard to tell your numbers that you have up on the screen to what you're asking for, for CPC money. And to divide that out. So just for the board's sakes, it would be a lot easier just so that your numbers and math could add up so that we understand what it would be potentially funding.

Because right now it's difficult to understand. So, you know, because you have design in one hand and you have construction on the other, right? And so I think it would just be easy. you know, just for the board's sake too, what you're asking for, for this phase is just design for three phases of a project.

If that is what is, that's what you're.

Speaker 15 (39:50–39:55)

Yes. Design and permitting for phase one design of phases two and three.

Speaker 3 (39:56–39:57)

Gotcha. Okay. Thanks.

Speaker 15 (39:57–40:00)

Construction construction would be a separate request.

Speaker 3 (40:01–40:46)

Can I ask another question? So, so, um, one at two 75 for this board is a lot of money, right? So in a year. In a year, I will say, you know, we, we give out a million dollars.

Right. And so what I'm, what I'm wondering is, is there a way potentially to divide this project out where potentially, you know, you're going to phase this over time, but can you take small bites out of this? Let's say, you know, could this be funded over a phase one and you do a design, you know, break out your design fee for your, your phase one. and potentially go ask for the funding for that, and then phase this out over time.

So that's just a question back out to you guys. So could you kind of bring that down?

Speaker 15 (40:46–41:08)

I would yes in the simplest form of it yes in that table you just saw phase one design and permitting is a much lower number but I would defer to Arthur and John as the kind of proponents of the funding requests as to but yes it it easily can be sequenced both for design and construction into smaller tranches.

Speaker 13 (41:09–41:16)

That has been a comment about this extending over multiple years. This project will outlive many

Speaker 9 (41:16–41:20)

I'm not going to take that bet, Arthur.

Speaker 13 (41:20–41:22)

I'm not going to take that bet. I'm not going to take that bet, Arthur.

Speaker 2 (41:22–41:26)

I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur.

Speaker 13 (41:26–43:14)

I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur.

I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur.

I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur.

I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take that bet, Arthur. I'm not going to take fill up any negative comments received from anybody.

We've had contact with a number of residents in there as we've been doing our work. They have welcomed the notion of a neighborhood gathering to do what you were seeking earlier on. And before that, we would like to also consider having a previous part of that joint meeting of the CPC and the Conservation Commission with that entire neighborhood area for those who wish to attend. People are extremely, some of the people I've talked to have expressed great pleasure with what's going on because they were afraid that they was going to be building down in the marshland.

And they just are very, very happy that it's a preservation area. And there are some people who are very pleased to know that human traffic will be managed in the area that people will be able to enjoy the natural resource as much as those people who are about us do. And with respect to human traffic, it already exists. I'll send around this and get you an electronic copy of it.

This is a footpath out to Black Park on January 15th of this year, just to give you an idea. how well the traffic in that area is already.

Speaker 3 (43:16–43:24)

So, Arthur, one question. So this path, would this be like a new pedestrian crosswalk that goes over Granite Ave?

Speaker 8 (43:26–43:37)

I don't think we can go that far yet because that's a state, isn't that a state road, Granite? It's an existing crosswalk.

Speaker 7 (43:37–43:47)

Yeah. So he was asking if there is a crosswalk already from the end of itself to the parking lot.

Speaker 13 (43:47–43:57)

There is a crosswalk there. That's the one that I mentioned that I had taken on four occasions, crossing maybe eight crossings on four occasions.

Speaker 3 (43:58–44:12)

OK, so that exists today. Yes, it does. Okay, is there any like lights up or anything I'm just, you know, I'm very familiar with the one, the one down the road and the positive and there's a, you know, there's obviously a traffic signal and such.

Speaker 6 (44:14–44:21)

But, but that's down a ways right right yeah over the river. We can kind of move this.

Speaker 2 (44:21–44:39)

Yeah, we need to. Jamie, is there anything you need to present to us? Because we're running way behind time here. You will get a second chance at this in terms of the full application round.

Speaker 14 (44:39–44:45)

Like I said, thank you very much, everyone, for giving us the time to speak tonight.

Speaker 2 (44:45–44:56)

Thank you. Thank you all for taking the time. Arthur, John, Jamie, Eric, thank you very much. Take care, everyone.

Bye.

Speaker 17 (44:57–44:57)

Thank you all.

Speaker 2 (44:59–45:13)

All right. Let's call on Jeff Stone for the Brookwalk project. Jeff is in the room, right?

Speaker 9 (45:13–45:13)

Yes.

Speaker 2 (45:13–45:16)

Yeah. Okay, great. Welcome, Jeff.

Speaker 9 (45:17–45:20)

All right.

Speaker 18 (45:23–46:01)

Thank you. Thank you for inviting me to talk about the current request. For the Milton Brook Larkin, I'm Jeff Stone. I'm identified as the citizen advocate.

In the FRESH report, which less than two weeks ago, we finally got the feasibility study from BHQ. Have you folks seen it yet? Oh, Tom, you distributed this? It was included.

I didn't know that everybody got it. I'm really glad that you got it.

Speaker 5 (46:01–46:08)

I think Julia put it in our folder. So that is.

Speaker 18 (46:08–51:28)

Aligned with john john. So. So I wanted to call your attention before talking about our current request to the next steps, because if the current question is tied into the next request and, by the way, I want to mention that the best where we are. it's so good to.

see something else connected to the Nepocet River, something that town administrators can talk about also as connections. So we are really connecting to our surrounding bodies of water and natural opportunities here. So I made a few copies of these next steps, if anybody wants to have a handy copy. So where's the point now that we've got the feasibility study report that we can move ahead with the next steps that I certainly wanted to do as the resident advocate here.

One of the most important ones is to is to build a Friends of the Milton Brook Walk. There were several dozen people that at the time I submitted the original request for the feasibility grant that indicated they were very supportive of the idea of the Brook Walk and listed themselves in support of the feasibility study grant, which thank you very much again to CPC for awarding the project that grant. So, I can go back to those people and do a much further outreach and think of what I can do as a person who's not a professional in this field. I'm a great outdoors advocate, hiking advocate, backpacker on the Appalachian Trail, stuff like that.

But as far as being an architect or a construction and design person, that's for people who are like some of the members of this committee and VHP and other firms. So with the establishment of the Friends of the Milton Brookwalk, I'm hoping that some of the skills that I don't have, I have an MBA degree, I'm not in planning, but that some of the skills that would be very useful for an advocacy group in town will be included in the Friends of the Milton Brookwalk. So that's, to me, an important component to help drive the possibility of actually achieving and making this vision real. Other things that I can do are outreach to Milton boards and commissions, such as the Conservation Commission, which I'd love to meet with the ComCom soon.

I've already outreached in the past to the Milton Public Schools. When we had our initial meeting with the town administrator, the superintendent, Peter Streisand was here and very supportive. That component, if you don't know, is for the schools, public schools to be involved in designing assignments for the seasonal flora and fauna, as well as history that may be connected with the route of the, the tradeway of the trail. So, you know, I can do the outreach to people in the schools and the teachers, and also, of course, with the Friends of Brookwater, I'm hoping that we will have lots of people saying, I can do that, I can do that, I can do that.

NEPRA, I'm a member of NEPRA and the Prospect River Watershed Association, so I can reassociate with them. And then there was a meeting with somebody from NEPRA, I forget his name, and people from DCR, So that's some of the background. And some of the things I can do as a non-professional in this field, but as a passionate advocate for this project. So let's see.

If we move to, first of all, any questions right now about the findings, about the findings up there that I can answer? Having seen the previous presentation, see that it would be helpful to have VHB here to possibly deal with some of your technical questions. But do you have any questions about the different segments? Actually, can you put up?

Is that the first one?

Speaker 9 (51:29–51:31)

I actually have five.

Speaker 5 (51:33–52:14)

That's the first one. Jeff, I think my question would be, more specifically about what you're proposing to do with the funds from this grant. And also, are you seeing managing it yourself, continuing to manage this yourself rather than, you know, turn it over to a fund board or something? No.

Yourself, no. Myself, only none. No, but I mean, you are seeking the funds, or you're going to spend the funds with your consultants to do this, as you did with this phase. There's not, the funds aren't going to a town board or anything like that.

A town board.

Speaker 18 (52:14–52:38)

No. The funds will be coming to you. Right, whoever's going to perform the functions that are listed in possible next steps that we have. Right.

Can you go forward with the next slide? Go right to the last one. Not the last one now, but the, whatever the next one is.

Speaker 9 (52:38–52:50)

No, it's not a test. It's not, it's not always true. It's not always true. It's not always true.

It's not always true. It's not always true.

Speaker 18 (52:50–53:02)

It's not always true. It's not always true. It's not always true. It's not always true.

It's not always true. It's not always true. It's not always true. It's not always true.

It's not always true. It's not always true. It's not always true. It's not always true.

It's not always true. It's not always true. It's not always true. It's not always true.

It's not always true. It's not always true. It's not always true. It's not always true.

It's not always true.

Speaker 19 (53:02–53:02)

It's not always true.

Speaker 18 (53:02–53:04)

It's not always true. It's not always true. It's not always true. It's not always true.

Speaker 9 (53:04–53:15)

It's not always true. It's not always true. It's not always true. It's not always true.

Now that's on my side.

Speaker 4 (53:24–53:45)

While he's doing that, the application says the $30,000 would be applied, combined with other grants, towards The cost of progressing the product such as 15 to 25% design process for survey and trail and boardwalk, signage, crosswalks, traffic planning and design. There's a lot of things listed.

Speaker 5 (53:48–53:55)

More specifically, what does someone really go for? And there's no idea sort of what the overall cost might be.

Speaker 9 (53:56–53:57)

I think it's early for that.

Speaker 4 (53:58–54:08)

It's exciting to see it this far. Yeah. It was an idea in the master plan, do you remember that?

Speaker 5 (54:08–54:33)

Jeff's been pushing this for 20 years. I think VHB did a terrific job in its analysis, coming up and looking with concepts. It sounds like you had a lot of coordination. So I think, you know, rather than going through that information, I guess, you know, more specifically, how you would see the use of this next round of grants to advance things.

Speaker 18 (54:33–56:15)

Yeah, right. This is the route. This is approximately three miles from New Orleans State and way into the river. And the top segment is segment one at the top.

That's from Brookhill, is it called Brookhill Road? Yeah. whatever, to School Street, Glover to School Street. And actually from the segment, this apartment runs from School Street to Glover School.

And that is a Conservation Commission property. And we are proposing to probably build a, so we thought, and it was through the advice in our initial meeting with the town administrator, that it would be a good idea not to try to build the whole thing, but to build it segment by segment, to prioritize segments. So we're suggesting here, can you go to the next one there? The river seems to lead after this.

We're suggesting to hit this segment from Glover School to School Street, to do the work that is in… Next slide for that. Those are the different segments. Okay, and that's a overhead of the same segment.

And let's go to the last one, because I know you want to get out of here at some point.

Speaker 9 (56:20–56:22)

Well.

Speaker 18 (56:28–57:24)

Okay, so there are three options here. Okay, so this is what EHB basically did at my request for segment two between rubber school and school student. So they gave me three options. Now I have specified 30,000 in the eligibility application.

The question that I have, important question for you folks is Do we have to stick with that figure or can we possibly ask for more to do more here? You don't have to answer that yet. Okay, let me, unless you want to.

Speaker 5 (57:24–57:37)

So you're talking, you're talking this, the section from Glover School to School Street, that you're proposing a boardwalk. Yes. Yes. And you're thinking that might be the first phase?

Yes.

Speaker 18 (57:38–59:04)

And and accessible boardwalk. One component which doesn't really jump out very often in this report is I think it's very important that we create accessibility for people with limited mobility. And I have been in touch with several companies that manufacture or distribute these motorized wheelchairs with very large wheels that are made for people with limited mobility. And I would love to see that for our residents, anybody else perhaps who comes here, but our residents who have very limited mobility to be able to go all the way around Turnage Pond, because that's what this connects to, and around Lover, that's the next segment, but around Turnage Pond, around Lover, and all the way to School Street and back.

for people who have virtually no mobility or very limited mobility. So parts of the group walk are walking in groups, and some are smooth. So some could be improved. Some are difficult to improve.

But this, if we build this new section, on this Conservation Commission property with a boardwalk, it could be made very smooth and very navigable for people who need accessibility. So I would love to see that.

Speaker 8 (59:05–59:48)

Well, I think as a real estate attorney, it seems to me it's best to do your first project on property that the town already owns. Because a lot of the other stuff is private property. Not a lot of it, some of it. Yeah, but I mean, you should pick.

It seems to me, pick the one that you're not going to have the biggest fight with. Then that makes it a flagship program for people to see what it looks like and then make private property owners more amenable to it if they can see what it looks like. I applaud your selection of that segment because I think trying to do it on private land or something like that first would not be a good idea. Thank you.

Speaker 2 (59:49–59:50)

Rob has his hand up.

Speaker 3 (59:51–01:00:07)

Um, so just 1 question, um, you had asked about the. You know, increasing design budget is these are these numbers coming from your designer? Where are you getting the numbers?

Speaker 18 (01:00:07–01:00:10)

These are ballpark numbers from DHB.

Speaker 3 (01:00:10–01:01:10)

So, my, my, I think 1, 1, word of advice would be is. I would say, when you go back to the funding application is to. get a more hardline number for it. And I would always say, you know, build within that what you can.

So I would go back to them and ask them for a more hardline number for what it includes. And then secondly, one thing you may want to consider for at least for this board as you go through is a cost estimate. If you have a cost consultant or something give you a number to figure out what this project would cost. Any of these phases, that might be helpful.

And it might be only a few thousand dollars, but it would help. I think in future funding raises, if you come back for more money, it would help you and help the committee understand what the budget's going to be. And they could put a contingency in there and et cetera. But I think it's always helpful to understand the budget of the project.

Speaker 18 (01:01:12–01:01:52)

All right, so back to my question, could you go down to option three a little bit so you can see the big number at the bottom. So you see the first option is 30 to 50 second one is 50 to 200 and the third one is 400 to 700, and this is for. That one segment so. Are we limited in the final application, the full application due in September, to the 30 that I put, or can we ask for somewhat more, you know, and of course, we tend to justify it.

Speaker 2 (01:01:53–01:02:53)

I, I believe I, you know, I'd have to consult the historical record here I believe there are some eligibility applications that we certainly have had a little bit of applications change them out downward. Sometimes on our advice. But we've also, I believe, had some of the applications come in with a different number that is higher. So we don't necessarily encourage that, but I think it is allowed.

But yeah, obviously, we're going to evaluate the project on its merits. And as Rob said to the previous applicants, we have only a million dollars, and we're really trying to Stretch this budget as far as we can. So, um, I wouldn't, I wouldn't get dollar signs in your eyes. Um, but yeah, but I think it's allowed to, you know, to adjust it upwards.

Speaker 3 (01:02:54–01:03:58)

If, if, uh, if you felt like that and you wanted to, I think, I think Jeff to, to, to just couple that, what Tom said, um, it's nice to see some of these projects and this is another project that I think could be phased. I think. you know, you have a number of different options. Could you phase this over a, you know, amount of years or whatever to figure out how you, how you would make some of these investments?

I think that might be a good way to look at this project. And then, you know, with this, I think the number can change, Tom, you know, I think we have done that in the past, but just understanding our budget right on a yearly basis is tough. I mean, there's many applications. So if you had to, could you break this down into like a phase, PB, Harmon Zuckerman.

He's right of like, hey, maybe this is what we can bite off right now and then, you know, continue to, you know, you can continue to come back and see how, you know, what we can do over time. But I think some of these projects are just so big in nature, that that's what we're going to really, that's what you have to look at, I think, as you kind of go forward.

Speaker 4 (01:03:59–01:04:57)

One thing I would suggest is if there's a certain amount of this work that would help be a leverage to get other grant money, then it would be worthwhile to know how much you would need to spend, what level of work you would need to do to help leverage the grant money. Because this is obviously going to be, I mean, I love the idea. It's obviously multi-phase and very costly over time. So I actually even think a ballpark five phase of like this one doing a boardwalk The last one was any indication of the boardwalk was the most expensive thing so if there's an idea that some of these are less expensive just kind of a general idea of.

The whole project, how long might that take what kind of I know the budget is going to be very preliminary but.

Speaker 5 (01:04:57–01:05:09)

But they're talking about a construction cost of $4 to $5 million just for this boardwalk. That's way beyond what I could be thinking of investing in the next 20 years for a project like this.

Speaker 4 (01:05:09–01:06:02)

So that's why it brings me back to the grant funding. Because we know, I think it was the Eustis estate that was able to leverage, and maybe it was even up at the observatory, they were able to leverage this funding to get grant funding. And sometimes it's a match. And sometimes, you know, it can be a piece of a whole, if there's a friends, you know, group that forms, maybe the friends can help fundraise, maybe someone can be a grant writer.

But even, you know, if there's kind of that call, what you would need in the friends, I would think a grant writer is a big one, as far as, and then some of the others may be more technical. But my main point is to think about how much you need to do in order to leverage getting other funding.

Speaker 6 (01:06:03–01:06:05)

Yeah. And the more tangible, the better.

Speaker 4 (01:06:06–01:06:46)

But I mean, I look at this and weapons flagging and soil test borings, you can't really do a proper cost estimating without that information. So that to me is seeing a field survey. So those seem like things that you should put in. at this point, and I don't know if that puts you closer to 200 or closer to 50, but that's the sort of thing.

If you've got those estimates and itemize them, so like what's included in 30 to 50, what's included in 50 to 200, if you can kind of break it down a little bit more, because that way it would give us a little bit better idea of how much we could help with and how far that would get you.

Speaker 3 (01:06:47–01:07:25)

Yeah, I think I think Jeff to just just to go back to that point, I think you are probably in you're probably in the 50 to whatever your option to. But to the point, if you get a cost estimator on board for this for the long term, like, plan, then then it would be easier to, like, figure out a phase plan and such to figure out, like, what what the long term planning is for it. because right now they're just kind of ballpark numbers, right? And then at least the cost estimator will come in and say, okay, here's the contingency over so many years, et cetera.

And then maybe there's gotta be some other funding possibilities through this, like Cheryl was saying.

Speaker 5 (01:07:27–01:09:03)

I love it. Cost estimator, I think this is just very conceptual at this point. I had a very different idea. John has got, $40,000 to study the feasibility of accessibility around Pope's Pond.

I don't know where that project is or whatever, but I don't know if you have a consultant on board or where you are with that. But my thought was to make a real difference someplace at this phase to take the plan from Canton Avenue to Blue Hills Parkway and combine work, BHB's work or whatever, which John's doing, and not only get the feasibility, but design for the pathway around Pope's Pond. He's got money for a pedestrian bridge. We're going to be putting a playground there and Beverly Park right by there.

And so to me, if you concentrated to get a first phase of this thing done and work in this quarter around Pope's Pond, So to really see an improvement, you know, that won't be a real high cost improvement, you know, not $4 million. You know, I think that could be, personally, I think that that could be a feasible project that could get off the ground and, you know, coordinating with the playground at Pevernick Park and the work that John's doing at Pope's Fund, and we could get a piece of something done.

Speaker 4 (01:09:04–01:09:37)

So to your point, Pete, I walk I'm looking at the segments, segments 5, 6, and 7 frequently. So it's along the brook, around Pope's Pond over to Canton Ave and where Pebbly Park would be. Some of that I know will be improved, but I do think that even the portion along the brook there wouldn't require as much construction work. So it would be interesting to get an idea

Speaker 5 (01:09:38–01:09:55)

Combining with the money that John's got, and maybe you could get a design of that path for that whole grade. And I think that would have a reasonable construction cost that could conceivably be funded.

Speaker 18 (01:09:55–01:10:14)

Right, I can see you have a signage there, so people get a glimpse of what this can be. across town, you know, you could talk about the yellow warblers that are in the bushes near the.

Speaker 5 (01:10:14–01:10:25)

But taking on the most capital intensive part of the project at a first phase, I think, is pretty difficult. Yeah, I didn't realize it was the most capital intensive.

Speaker 4 (01:10:25–01:10:44)

So the other interesting thing is, I think DCR is doing a link on the on the parkway to get folks to. The blue bills, so this idea they're going to.

Speaker 9 (01:10:44–01:10:48)

go down now. silver. Okay.

Speaker 4 (01:10:49–01:11:10)

Because the bike path it's on the. I mentioned it because I also ride that bike path to get down to the Ponset Trail. And also, in segment five, there's that crossing behind the high school at the lower field there. And that's attractive already for a lot of students, right?

So there will be students who come from West Milton.

Speaker 18 (01:11:10–01:11:23)

I think we know which side of the group we want to go on. The more traveled side is where the houses are in the neighborhood. That's much more traveled by the people. you can also want to know the scientific work.

Right.

Speaker 2 (01:11:24–01:11:48)

So I'm going to try to bring us to a close. And I think you've heard a number of good suggestions, ideas. It's ultimately your project. We look forward to seeing, assuming we vote on eligibility, which I assume we will.

But we'll look forward to seeing a full application in the fall.

Speaker 20 (01:11:49–01:11:54)

You've got some good feedback here.

Speaker 11 (01:11:55–01:11:57)

All right.

Speaker 4 (01:11:57–01:12:07)

Tom, before you start, I'm going to recuse myself on the next one. Can someone, I'm going down there. Don't let me down there too long, okay? Okay.

Speaker 2 (01:12:07–01:12:09)

All right. Thank you, Cheryl.

Speaker 5 (01:12:09–01:12:11)

Where will we find you downstairs?

Speaker 9 (01:12:11–01:12:16)

Just in the- I'll have my phone on me. Okay. Somebody can message me. Thank you.

Speaker 2 (01:12:17–01:12:45)

So the 648 Canton have affordable housing or 40 B project proposal, Joseph and Lou are here. So why don't you feel free to give a short presentation or, but yeah, welcome and thank you. And why don't you describe what you're proposing?

Speaker 19 (01:12:46–01:12:52)

Sure. Well, thank you very much committee members, uh, for hearing us tonight. Um, can everyone hear me? All right.

Speaker 12 (01:12:53–01:12:54)

Yes.

Speaker 19 (01:12:55–01:13:21)

Perfect. Great. Well, once again, thank you. Um, and we will be mindful of time.

We'll try to keep, uh, our presentation pretty short here. So I will just, uh, share my screen and pull up, uh, some slides that we prepared, um, and we'll run through them pretty quickly. Okay, can everyone see that.

Speaker 11 (01:13:22–01:13:23)

Yeah.

Speaker 19 (01:13:25–01:16:26)

Okay, great. So, this is a for a 40 B project at 648 to 652 Canton Avenue to project that was approved by the Milton zoning board back in 2023. It's a total of 116 rental units of which 25% of the units are affordable to households earning 80% or less of the area median income, which equates to 29 of the 116 units. So, on this title page here, you can see the site plan.

It's a mix of townhouses and flat style apartments located on the 7.7 acre site. So just for a little bit of neighborhood context. So the site here consists of two properties that are currently holding single family homes, as I mentioned, it's a total of about 7.7 acres. And you can see it's located really in the heart of Milton.

It's walking distance to Milton High School. directly abuts the Winter Valley Residences, which is another affordable multifamily project. It's close to Town Hall, the Milton Police Department, the hospital, and the public library as well. So as I mentioned, there's a variety of uses in building typologies in the immediate neighborhood.

For this particular project, as we mentioned, it's permitted under Chapter 40B, so 25% of the units are required to be affordable. Where we're seeking the CPA funding is, it's our goal to try to set aside some of those units at deeper affordability levels. which we've proposed to set aside some units at 50% AMI, which are significantly more affordable than 80% AMI units. And I'll pull up a rent matrix on the next slide to show just kind of what that difference is.

So understanding that the committee does have limited funds, we've requested $500,000. which does not partially fill the gap that's created by moving down to that 50% AMI limit. But we believe that we can fill the rest of that gap through developer equity and other sources. So just in the total context, this is going to be over a $60 million project.

So the request of $500,000, while we understand it's large relative to the annual funding of the committee. It is a very small percentage of the overall project costs. Particularly given the magnitude of creating 116 units, all of which will count towards Milton subsidized housing inventory. We think it's a good use of funds and something that will really benefit the community of Milton.

Speaker 20 (01:16:27–01:16:43)

And this really, just as Joe's going to get into, this is specifically to bring that deeper affordability levels to the project. It's aside from the overall construction budget, that's a function of just an increased need for cash flow from an equity and debt standpoint.

Speaker 19 (01:16:46–01:19:39)

So on my screen here, you can see what that difference looks like. So essentially, if the project were to move forward without CPA funding, just with The statutorily required 25% of units at 80% of area median income. You can see where my cursor is here, what the monthly rents are for one, two, and three bedroom units. So even an affordable rental unit in Milton, the monthly rent for a one bedroom is almost $2,500 a month.

For a two bedroom, it's almost $3,000 a month. And for a three bedroom, it's almost 3,400. and the corresponding income limits are to the side there, 99,000 for a one and a half person household, 119,000 for a three person household and 137,000 for a four and a half person household. So what I've highlighted on the chart to the right of this is the income limits and the rents for those 50% AMI units.

And again, this is what that $500,000 of CPA funding would be helping to subsidize. And so, as you can see, the rents are significantly more affordable. You know, one bedroom is $1,550 a month versus the $2,500, a two bedrooms, $1,861. versus the almost $3,000, and then a three-bedroom is $21.50 a month versus the $34.40 at 80% AMI.

And likewise, the income limits, so those are the incomes to which this rent is affordable, are much deeper. So we think that we're able to target a much broader section of incomes and households, bringing in more diversity into the project and bringing in, you know, the ability for people who otherwise couldn't even afford the 80% AMI income rents to have the opportunity to live in this project and live in the town of Milton. So that's really, really the key for why we're seeking the CPA funding. And getting back to that gap that we were talking about, that's simply a function of what our cap rate is on the project.

So basically, you know, by earning $900 less per month on the one bedroom units, 1100 less per month on the two bed units, and 1300 a month less on the three bed units that reduces the amount of permanent debt that the projects can support, which is what creates that $930,000 funding gap, which we're proposing to partially fill via CPA funding. And I know I've just spit out a lot of information quickly. So certainly feel free to stop me at any time if you have questions or want to dig into any of that further.

Speaker 6 (01:19:39–01:19:57)

So just a quick question of clarification. So this is over what period of time, if you figure the six units divided by the $500,000, that would be seven and a half years. Seven and a half years of savings. Is that correct?

Speaker 8 (01:19:57–01:20:27)

No, no, no. But the restrictions, they would record a restriction on the project as they are required to do. Full disclosure, Kathleen O'Donnell, I'm the chair of the Board of Appeals. which issued the permit for this, but I did not sit on this panel.

So I did not participate in the decision-making on this. But the permits require an affordable housing restriction. And so the restriction will be in place perpetually. But the CPC request is just for seven and a half years.

Speaker 6 (01:20:27–01:20:28)

Is that correct?

Speaker 8 (01:20:28–01:20:54)

No, it's one year to get the money now. It's not seven and a half years. It's a $5,000 request to us to pay them one time. So they then recorded affordable housing restriction that restricts those units to 50% as opposed to 80% of their median income.

So it's not an ongoing request, it's a one time as part of the financing for this project.

Speaker 19 (01:20:54–01:21:19)

That is correct, Kathleen. And the reason that that works out that way is because our debt is amortizing over time. So essentially, you know, lower rents in one year, throughout the life of the loan, the reduced rent would be made up by that one-time grant of CPA funding. It's not an ongoing request.

Speaker 11 (01:21:20–01:21:21)

Yeah.

Speaker 19 (01:21:21–01:21:21)

Okay, thank you.

Speaker 3 (01:21:22–01:22:59)

Rob? Yeah, so I know we spoke about this at the last meeting, but, you know, I appreciate I appreciate this project. However, in the past, the CPC has funded the Affordable Housing Trust in Milton. And so often, because it's almost just second nature to us, because it's not in the CPC's best interest to usually make that assumption, that I don't know what the board's going to feel.

I know we spoke a little bit about it last time, Tom, but I think Um, and I don't know, I don't know what, you know, where we go from here, but I know, you know, for instance, Joe, the, the, the winter Valley across the street did something similar where they were looking to get some, some funding for more affordability within their project. And what the CPC did was say, Hey, um, you know, yes, of course this, this committee supports that, but. You know, the affordable housing trust in Milton is better at. Addressing the issue.

So, I think, you know, in time, you can correct me if I'm wrong and see how the board feels about that, but I think typically that's what we would do would say, hey, you know, we appreciate your application, but this this committee. typically gives a third of our money, right, to the Affordable Housing Trust, and they continue to build up on it. And then the Affordable Housing Trust is usually in a better position than we are to make a decision on funding such applications.

Speaker 19 (01:23:00–01:23:03)

Okay, yeah, no, that's helpful context, Rob.

Speaker 2 (01:23:03–01:24:46)

Yeah, and we, we did have that discussion and you know, we wanted to hear you out because, you know, it's helpful for us as we deliberate about that. And we basically make these decisions at the end of having seen all all the projects in front of us, so that we can fairly evaluate but that that is a precedent we sent set. At the winter valley project, uh, most recently, um, when they went to Valley came to us initially independently, and then we encourage the conversation between the affordable housing trust and winter valley in that. ultimately resulted in the Affordable Housing Trust funding a $400,000 project at Winter Valley, or a $400,000 subsidy for this larger 36-unit project at Winter Valley.

So they are the experts. Full disclosure, I serve on the Affordable Housing Trust. Well, I'm the designee. But that has been the pattern.

of recent decisions, at least, that this committee has made. So we may ask you to do that. That could be a very plausible outcome from our conversation. But it is helpful to hear this, at least for ourselves, too.

One question, and Rob, I'll turn it back to you. No worries. One question, have you had experience doing this at other 40B projects? I'm assuming you've developed other projects.

Have you had experience from a marketing point of view? What has been your experience if you've done this elsewhere?

Speaker 19 (01:24:47–01:25:35)

Correct, yes, so we have quite a bit of experience in affordable housing and we also have experience in affordable housing developments that have different income bands. So, for example, right now we have a project that just finished lease up in Concord, New Hampshire. That has income bands at 30% 50% and 60% of area median income so we work closely with an affordable housing property manager who has a full compliance department and expertise in. qualifying incomes, obtaining income certifications, making sure that the tenants who are put into particular units meet all the requirements that we have relative to our affordability restrictions.

Speaker 6 (01:25:37–01:25:43)

Rob, did you have a follow up? Yeah, I guess. I'm sorry.

Speaker 2 (01:25:44–01:25:45)

I'm sorry. I can't see that. OK.

Speaker 7 (01:25:46–01:26:10)

Tom, my apologies for interrupting, but it's been brought to my attention that there may be a point of order that needs to be discussed regarding current legislation, excuse me, current litigation. And John Kiernan would like to, would be willing to speak on behalf of that if you'll have it.

Speaker 2 (01:26:11–01:26:16)

a point of order regarding current litigation, you said, or legislation?

Speaker 3 (01:26:18–01:26:18)

Litigation. Litigation.

Speaker 2 (01:26:19–01:26:30)

Okay. Sure. I don't know exactly how to respond to that, but if John has information that he'd like to share, I guess that's fine.

Speaker 17 (01:26:34–01:27:56)

Certainly. Thank you very much, Mr. Chairman. This is not a comment on the merits of this application, and it really is not a comment on affordable housing.

I recognize that it's a social goal. I recognize that a certain percentage of CBA money is destined for affordable housing. But separate and different from that is that just Friday at about 4.30, the town of Milton filed its appeal with the OADR, that's the Office of Alternative Dispute Resolution, because we appealed the DEP permit. So we are currently, as of last Friday, and we've got our scheduling order out.

I don't know when the hearing is. We're in the process of preparing a pre-filed litigation as the applicant, Ms. Beth D'Ambrosio. So this is active litigation.

So the Conservation Commission originally denied the permit for lack of We claim lack of information as the impact, the hypological impact in this area. The neighborhood opposition group has also appealed. So there are actually two appellants. This is an act that puts the town in kind of an awkward position if we're appealing a permit and at the same time funding.

Speaker 8 (01:27:57–01:28:49)

Well, of course, the timing is always something, but the fact is that you could potentially have an application before us for funding for CPC, but the project wouldn't ever meet the qualifications. It has to get a permit. It has a comprehensive permit, but it doesn't have everything else. It could be one of those situations.

I've done them in other towns. I've had community preservation projects go to affordable housing projects, that never got built. And after three years, we vote the funds, but they never get used. And so after three years, we rescind the vote, and the money comes back.

It's not as contentional. Well, we haven't given the money to them. It's set aside, but it's not going anyplace until certain things are happening.

Speaker 17 (01:28:50–01:28:56)

I think that's why I started by saying, I'm not coming. All right.

Speaker 2 (01:28:56–01:29:19)

This is just fun for me. It's helpful to know. And I think Kathleen's right. Obviously, if it got to that phase, either with us or with the Affordable Housing Trust, a project grant agreement could speak to some of that.

Yeah. Yeah. OK. Is there anything else, Joseph or Lou, that you want to present?

Speaker 19 (01:29:19–01:31:10)

No, I had a few more slides. Actually, I was going to speak a little bit about the litigation on the next slide, but I think we've covered that already. I think just the last side again, whether it comes through the CPC or the Affordable Housing Trust, we really do want to emphasize the public benefits of this project. So, not only does it meet the community preservation act criteria for funding, affordable housing units, low and moderate, moderate income housing.

It also meets their criteria, giving preference towards redevelopment rather than just blank new construction. And then finally, it'll also help the town of Milton achieve its housing production plan goals as well as the obligation to achieve 10% subsidized housing inventory in accordance with state law. As of the most recent subsidized housing, Milton was still under that 10%. So having this project go through and actually be built and have those units created We'll put them on to the subsidized housing inventory.

They were on the subsidized housing Tory originally. Once the project was approved but given the appeal that now, I believe moved off the subsidized housing until that appeal gets resolved. Lastly, the project will support construction jobs. It'll support permanent property management jobs in the town of Milton.

It will support local spending and also increase local property tax revenues. We are strong proponents of this project. We're very excited to see it built, understanding that it does still have to resolve some of the appeals. We're strong believers in this project and that it's going to be a great project for the town.

Speaker 2 (01:31:11–01:31:38)

All right, thank you very much for coming and explaining that. And we will be back in touch. And I know Julie Kramer, the chair of the Affordable Housing Trust, is aware of this application, partly because the Affordable Housing Trust met last night and this came up. So stay tuned, and we'll be back in touch with both of you.

Great. Thank you very much. Thank you, guys.

Speaker 11 (01:31:38–01:31:39)

Thank you.

Speaker 2 (01:31:40–01:31:52)

All right. The next one is, I guess, the next several boat ramp bocce court town center basketball courts.

Speaker 9 (01:31:53–01:31:53)

Everything.

Speaker 2 (01:31:54–01:31:55)

Greenway.

Speaker 9 (01:31:55–01:32:08)

I just sent a text to show the sheriff in his office.

Speaker 2 (01:32:12–01:32:14)

Okay, so Nick Milano or Nick Connors is around.

Speaker 3 (01:32:14–01:32:40)

I have a quick question, Tom, for Kathleen. So with the last applicant, like regardless, if that's funded, is that, let's say that property changes hands, they're developers and they sell that project to someone else. Does that restriction go on to the next owner or whatever? I think it does, but I would defer to

Speaker 8 (01:32:41–01:32:59)

Yes, it's a requirement of the comprehensive department that there's a perpetual restriction. And usually they're later. There's one to the one to the Commonwealth and then one to the town. But but yeah, that's perpetual restriction.

Speaker 3 (01:32:59–01:33:01)

OK, I thought so. I was just making sure.

Speaker 9 (01:33:01–01:34:23)

Yeah. It's all films. Yeah, yeah, yeah. $50,000 to keep them going.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry. I'm sorry. I'm sorry.

I'm sorry. I'm sorry And so, you know, it's a lot of money to tie up.

Speaker 8 (01:34:23–01:34:29)

It is tied up. It's set aside, it passes to me.

Speaker 9 (01:34:30–01:34:35)

And so you can have a grand jury.

Speaker 2 (01:34:37–01:34:47)

Okay, all right, so he might be a bit he might be a while.

Speaker 9 (01:34:48–01:34:54)

So should we just discuss standard. So, without Nick in the room.

Speaker 3 (01:34:54–01:34:58)

I mean, you should you should wait for Nick.

Speaker 2 (01:34:58–01:35:00)

Yeah, I think we should wait.

Speaker 5 (01:35:00–01:35:06)

I don't know if he's an hour. OK, can he get moved to another meeting?

Speaker 2 (01:35:07–01:35:23)

Yeah, we could. We could also bump it to the next meeting. All right. So I can't tell.

I know there's a lot of conversations. I can't quite tell.

Speaker 4 (01:35:23–01:35:26)

He's a, he's texting. So go ahead, Tom.

Speaker 2 (01:35:27–01:37:25)

Okay. Um, so 1 thing I want while we're, um, um, potentially waiting for Nick or we'll, we'll see what his, um, schedule allows for tonight. Um, I wanted to raise, uh, 1 issue, um, that, uh, I've talked to a couple of people about, but, um, so I wanted to just inform the committee that I've been touched with the proponents of the wharf park, um, project, uh, as you remember, we funded that project, um, It is their intention to apply for bonding funds from the CPC for the build out of that park by the September 26 deadline. There was a bit of confusion about whether they needed to submit an eligibility proposal since that project hasn't changed at all and it was deemed eligible last year.

You know that's definitely something we should clarify as a committee going forward, but I encourage them to submit an application by the September 26 deadline for bonding funds. It doesn't impact our funding available in FY 26 because. If we decide to bond for the project interest payments. That service essentially on the bond wouldn't be wouldn't be paid for another full year.

Um, so I just wanted to raise that, um, get any feedback, uh, from. From committee members, um. But we don't have a formal eligibility application from them. But I do believe they're eligible, in my personal opinion.

But I wanted to open that up for discussion. Rob and Pete, I see the hands so far. So Rob, why don't you start and then Pete, you can go second.

Speaker 3 (01:37:26–01:38:19)

Yeah, I think I would support this application. because it was previously in the queue and I know, you know, they reached out to us. So I think, you know, Scott reached out to us. So I think it's, I do think we need to clarify in the future though, you know, that I think most applications just at least to check in with us before, like when the eligibility comes out.

I think it would be good, but it's kind of a gray area because they did just submit last year. And then I don't think the projects changed anything, but they're looking for funding, right? It's completely eligible. So I would agree with you, Tom, that they wouldn't need to do that.

But I think in the future, we would just want to make sure that maybe there's a check-in or something that- Yeah, it's a little, yeah.

Speaker 2 (01:38:20–01:38:32)

No, I agree. We need to clarify that because, you know, we just saw Jeff Stone, right? It's the second phase. It's clearly the next phase of that project as opposed to the same project, right?

But anyways, go ahead, Pete.

Speaker 5 (01:38:32–01:38:40)

Yeah. We don't have this discussion on the agenda. Should we put it on the agenda for discussion? Yeah.

Speaker 2 (01:38:40–01:38:44)

That's probably a good idea. That's a very good point.

Speaker 5 (01:38:44–01:38:56)

I think it's much more complicated than this. Okay. We just turned down the Ford's house because their application was a little late and they had been Yeah, it's been deemed eligible for a couple of times.

Speaker 2 (01:38:57–01:39:01)

Well, but remember, that's a completely different project, Pete.

Speaker 5 (01:39:01–01:39:07)

Yeah, but I, but I hear the discussion for next time. I don't think it's as simple as that.

Speaker 2 (01:39:07–01:39:24)

Yeah, no, that's a very good point. I always forget that. And so we'll, we'll, we'll put this on the agenda for the, for the July 14th meeting and have a full discussion on it. Thank you.

Okay, speaking.

Speaker 4 (01:39:25–01:39:30)

Yeah, onto that one. Do we have a status report of where they are with the project?

Speaker 2 (01:39:31–01:39:34)

Yes, we do.

Speaker 3 (01:39:34–01:39:34)

Okay.

Speaker 2 (01:39:34–01:39:40)

So I can share that so that people have that in front of them before the 14th.

Speaker 3 (01:39:40–01:39:50)

Could we even, Tom, have Scott reach back out to him? If you make an agenda point, would he be available to the committee to give us an update?

Speaker 2 (01:39:51–01:40:16)

I think, yeah, I mean, I don't know his schedule, obviously, but I would think he would be inclined to do that. I think, I guess it's a question to the committee of if we're gonna have a conversation. I mean, obviously our deliberations are public, but do you wanna have it with Scott in the room or would you rather have it without him in the room, frankly? So.

Speaker 4 (01:40:17–01:40:30)

I think initially without. PB, David Ensign — Henderson, he-he-he PB, David Ensign — He-he-he I think we do have to be.

Speaker 2 (01:40:32–01:41:08)

To me, there's very different circumstances because that was a porch project of something we have not funded there just because it's the same applicant. I'm not saying the applicants are automatically eligible. I'm talking about project and Forbes came to us with a very new project. Yeah, a brand new project.

So anyways, let's defer all of this. It's a healthy and good and needed discussion we need to have and let's defer it to the July 14th meeting.

Speaker 6 (01:41:08–01:41:18)

But we have not received from the town either the bonding information that we requested some months ago. Is that correct? I have not.

Speaker 2 (01:41:18–01:41:20)

I have not. Yeah, that's a good point.

Speaker 6 (01:41:20–01:41:23)

How can we pursue that? What's the best way to pursue that?

Speaker 8 (01:41:24–01:41:26)

What were we asking the town for?

Speaker 2 (01:41:26–01:41:43)

It was sort of like a spreadsheet to determine how much of a bond we could do and what impact it would have in terms of… Yeah, I can reach out to Joanna McCarthy, who's the town treasurer, who I think would be the person there.

Speaker 8 (01:41:46–01:41:52)

She was probably doing tax bills. I think they just came out, right?

Speaker 5 (01:41:53–01:41:56)

I think they just came out. I haven't seen mine yet.

Speaker 3 (01:41:56–01:41:59)

PB, David Ensign — He's holding my breath.

Speaker 5 (01:41:59–01:42:02)

Don't look, Pete. I'll just tell you what I did last year.

Speaker 2 (01:42:06–01:43:03)

All right. I'm cognizant of the hour, so I want to just go through the rest of the agenda. Do we have an update on Nick's availability, or is it looking like — He said he'd be back in a few minutes. Oh, okay.

Okay, good. All right, while we're waiting, let's go through, I don't know if we have, a lot of these things were on the agenda last time. I don't know if we have additional updates, but let's go through them to see if we do. Discussion of CPC public outreach.

I think that was related to websites, social media, and other types of public outreach, including a conversation with David Ensign, PB – He, Him, His): I'm blanking on the name of the David Ensign, PB – He, Him, His. : Jack rabbit. Yep. So do we.

Is there any updates from anybody on on any of this. David Ensign, PB – He, Him, His. : I thought we David Ensign, PB – He, Him, His.

Speaker 3 (01:43:03–01:43:06)

: I thought we came to a resolution last last meeting.

Speaker 6 (01:43:06–01:43:17)

No. Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen Hollweg, OSBT-Karen

Speaker 10 (01:43:17–01:44:02)

Well, I don't know that I have suggestions so much as questions. I would just like to know what other towns with CPA funding have done in this area. I wouldn't want to be quizzed about how much money we're spending without any background in terms of what other towns do. I don't know what other Towns have done in terms of social media or public outreach, and I think it's a good idea.

I just don't want to blindly approve a dollar amount without some more information and background.

Speaker 5 (01:44:05–01:44:08)

Yep. I think somebody's got to make a proposal to the committee.

Speaker 3 (01:44:09–01:44:38)

Well, I think that the way we could potentially go about it is just seek Seek a proposal from an outfit like a jackrabbit, maybe get some others, and then come back to the committee with what that dollar amount is and see if we have an appetite to it. I just, during our last meeting, I don't know where we ended up landing on it, but I think maybe it was just waiting to discuss it with you, Linda.

Speaker 2 (01:44:39–01:44:52)

And I may have said I would reach out to Stuart, and I haven't yet, just to see if there's examples, to Linda's point, examples of towns that have retained a firm like that.

Speaker 10 (01:44:53–01:45:39)

Well, I'm less interested in other towns having a dollar amount or retained public relations firms, just as a background to what other towns have done. I wouldn't want to propose that we spend X amount of money or entertain a proposal for any kind of outreach without knowing the context of other social media that has been done. It's just literally, I would like to know what else has been done to give us a context for evaluating a proposal.

Speaker 8 (01:45:39–01:46:57)

And I just speak to that a little bit is that in my experience that it has been towns have gotten PR assistance when they have been facing a vote to override or to end Community Preservation Act. And so it's dealing with sort of election issues and challenges to the CPC in a local town. I do not know of very many towns who use an ongoing without a challenge. I mean, it's really, it's usually hiring a PR firm or that sort of thing.

You're using social media when you're trying to protect the Community Preservation Act in a particular town. Not for public relations in general. People tend to, in committees in my experience, they use the town website, make sure that that's up to date. They also make sure that there's signage at places that have been helped with CPC funding.

There is one at the Forbes Museum, for example. Peter and I saw that on Sunday. So that's really the sort of major outreach that people have done. And I've only really seen significant money being spent when there's been, committee, you know, communities seeking to overturn CBs.

Speaker 10 (01:46:58–01:47:36)

And that's not. That's exactly the kind of background that that I was hoping we could get. And it's a real benefit to have Kathleen's experience to inform our ideas. I think it's a good idea, but I don't want to put us in a position of allocating funds and having somebody criticize us because they would say that the funds should be spent in a different way.

So I, Kathleen, I appreciate that background. That's exactly the kind of thing that I was trying to understand.

Speaker 6 (01:47:37–01:48:32)

One other thing that might be helpful from the community preservation coalition website is a list of social media, things that have been done by other towns. So, for instance, the town of Easton organized a CPA workshop at a local library. The city of Beverly used social media to invite the public. CPC chair participated in local podcasts.

The town of Tisbury ran newspaper ads. The town of Hanson printed a full-color brochure. Orleans created a detailed informational brochure. The town of Arlington sent out media alerts to place announcements about upcoming public hearings.

Newton held a happy birthday CPA celebration in an open house. Dale and Springfield both issue a press release every year advertising their public hearing. Blah, blah, blah. And it goes on.

There's about 20 different examples of mostly encouraging people to attend something or to hear about it.

Speaker 5 (01:48:33–01:48:35)

Public education. Yeah.

Speaker 2 (01:48:36–01:48:39)

Yeah. And probably most of those pretty low budget, if no budget.

Speaker 10 (01:48:40–01:49:17)

Fantastic. Yeah. That's exactly the kind of information that I was looking for. And I think we did do one outreach just recently, didn't we?

And that might be a good start. Plus, I believe Julia said she can put images up on the town website. So it's a good start. And then we might pursue the idea some more.

But my concern was that we have some idea of the context in which we were operating, that we weren't going to go into this so enthusiastically and spend money that really was probably better spent somewhere else.

Speaker 2 (01:49:19–01:49:44)

Sounds good. All right. Nick is back in the room. Thank you, Nick.

And the floor is yours for the multiple projects that you're a sponsor. Thank you. Sorry. No apologies needed.

Speaker 21 (01:49:46–01:50:49)

Thanks for the time. I guess I'll just quickly describe the three applications we put in, I can take any questions in whichever order. So the first one is the Tom Keller one. And I know the community has an application for the town center court and Bakshi court rolled into one, but also has an application for the Bakshi court in St.

Louis. I think I had asked Christine to apply first alone, and then we had a meeting with the neighborhood and said, I would apply together. So there are two applications. Here would be one project.

So the idea, I'm sure you've seen everything, is just to wrap up the work on the basketball court next door, which we did get $40,000 for, but working through a few different contractors in New York, we were able to get the scope of work under that dollar amount. And then Christine Stanton and her team at the COA has been thinking about a botching court, so I won't go too deep into that. I think you've heard about it already. I can take any questions on that.

Speaker 2 (01:50:51–01:51:01)

Nick, just on that, you're anticipating that in the final funding round, there would be one application in front of us.

Speaker 21 (01:51:01–01:51:19)

That is our plan. That is our plan. I just want to make sure we're in touch with both the neighborhood and with the scene, but there will be coordination. between the single application or if it does decide to become two projects.

Speaker 5 (01:51:19–01:51:29)

Funding would probably go to the town, to the DPW or something to put out a contract or something. Yeah, that would be how we would like to look at it. That would be a good way to do it.

Speaker 2 (01:51:29–01:51:39)

I mean, I know there's a lot of moving parts to this, but I think our brief discussion last time, the committee would encourage a one application. Correct. Yeah, if that's.

Speaker 21 (01:51:39–01:51:45)

No, that's helpful feedback. We'll look at it that way. Okay.

Speaker 6 (01:51:45–01:51:58)

I know that there's sort of the drawing of this and just sort of looking out at where the box would go, would it mean that those beautiful trees would have to go? Have you gotten down to that level of detail?

Speaker 21 (01:51:58–01:52:21)

The landscape architect is a member of our shade tree advisory committee, so it would shock me if he didn't. And I know that I would not expect that. Yeah, we lost him from the fire station. Yes.

Second, I'll just talk.

Speaker 6 (01:52:21–01:52:26)

Oh, wait, I'm sorry. I have a couple other questions about that. Was there going to be lighting? There was no mention of lighting.

Speaker 21 (01:52:28–01:52:39)

And that has been something that. I think some of the conversation with the neighborhood was not necessary and not being requested.

Speaker 6 (01:52:39–01:52:45)

Not encouraged, probably. Right. Yeah. Okay.

And DPW would take care of the maintenance?

Speaker 21 (01:52:46–01:52:56)

Yeah, right now that is managed under the town departments for maintenance. Right.

Speaker 6 (01:52:56–01:52:59)

And would you have to go out for other bids at this point?

Speaker 21 (01:53:00–01:53:10)

So for design, no, those services are not required to, but for construction, it would be, you know, a package for construction.

Speaker 6 (01:53:10–01:53:16)

Yeah, there's two involved in this. Would you vote for one?

Speaker 21 (01:53:16–01:54:48)

We, I mean, ideally we'd like to have one localization and one contract. Yeah. Okay. Thank you.

Okay. Secondly is yellow. We submitted for additional environmental permitting work related to the Milton-Landes Boat Ramp. And I know this was in front of CPC last year.

We essentially copied and pasted last year's application. We have not done any further engagement with Travis Visionary, which is the firm that we have been in touch with and has been doing work with us related to that boat ramp. and the landing committee will need to weigh in. Between now and a funding application, I think we have some homework.

I know some of the comments from last year, and I had a conversation with Pete as well, in terms of recreational access. You know, I think everybody can agree it would be great, but when you're coming down to, you know, somebody being able to launch a boat for a day, especially if it's where they start on their truck with their trailer or their vehicle with their trailer, and down there there isn't, Even if there wasn't any gold storage down there being taken up permanently, there isn't a lot of work at the end of the day, especially now. So it's a, it's something, there's a restriction, a limitation that we're aware of, but it's something that we'll seek to speak to more directly in the funding presentation.

Speaker 4 (01:54:48–01:57:16)

So can I just talk a little bit about the landing? I've heard from a couple of people about the, the Dexter, Southfield, Keeney, Struxness, and Vaughan people taking trees down. So I went to pay a visit last weekend. And having the master plan implementation committee doing the early planning work for the north to follow up on the plan's recommendations to improve access to the waterfront.

I feel like that it's gone the opposite direction and looking at it, it's less attractive to someone feeling like they're welcome there because it's got this narrow entrance next to that big structure. And it doesn't feel like people are invited into that end of the wharf. And then you've got the cradles on the front portion. It just really feels less attractive to residents than it did before.

And I'm really disappointed about that. And I think everybody who worked on that planning and participated in those meetings would be disappointed too. And someone said to me, you know, how do Milton students feel coming to Ducru when they see this big, it looks like private wealthy school coming in and taking their waterfront? And this was just said to me at a social event over the weekend.

And so I'm going to ask Dick Burke, who's a representative from the landing committee, to speak to the ambiguity of our next meeting. But I didn't want to share that with you, because it is a unique asset. And we're seeing these wonderful projects proposed for the waterfront. And I'd love to see a wonderful project proposed here that actually makes it inviting for residents.

Even if you're not on a boat, because there's The water is beautiful when you're there. And most people don't even realize that outside of 88 Wharf, that's public right there. That's Chapter 91, right? That pathway.

So there should even be like signage. And if there's a way, I know there's a bunch of kayaks out there, but do people, I mean, can you even come in a kayak and get a parking space and take your kayak? Much less a big boat. I always joke.

But it's not that you, have you seen what it looks like?

Speaker 8 (01:57:16–01:57:40)

There's very little parking there now for that. Yeah, I was in, no, I mean, I haven't done it yet this season. And given the sailing schedule, might not. It's just a lot different than it was then.

Yeah, I went to Boston and I parked and I took the trolley just because you should. And so I parked there and I did sort of notice that boat jet. Yeah.

Speaker 4 (01:57:40–01:58:07)

Yeah. So I took my bike and I went back all the way into the corner. And at the time that we did that study, again, there was this idea that back in the corner, there were things happening like after hours that maybe shouldn't be. And that was even more of a dead corner or dead section back there behind that.

So I just, I don't know, like the person who was speaking to me was someone who lives at 88 Orphan. They were interested in the lease and the lease allowed for that and the length of their lease.

Speaker 21 (01:58:07–01:59:20)

Yeah, so it's a temporary structure. It's meant to be temporary, it's meant to be able to be taken down with a few days notice. I think those comments aren't, haven't gotten unnoticed, and it's not something we disagree with. I think the, what we, Sometimes we think they're a little bit different when they're in concept and in a plan, you see in the plan, so I would agree in terms of how it's situated that appears to kind of restrict access.

Obviously that's not the intention and some of the conversations we had is doesn't make sense because an opposite rowing that supports Milton crew and others is located in the. section adjacent to the Dexter section, so it would have made more sense to have them flipped, to have that set back more against that rear corner. So those are things that, you know, Dexter has been a good partner. They've been open to any kind of feedback and concern to make sure that they're not infringing on anything.

They installed, designed, and built the local file doc that is there, that is available for kayakers. It's available for communities. It's open to the public.

Speaker 4 (01:59:21–01:59:33)

At all, although someone did tell me that they tried to get off there and there was like a rope on the edge. So you to get off your kayak there, you have to step over the rope on the edge. So, yeah.

Speaker 8 (01:59:33–01:59:43)

Yeah, it's there, but it's it's you just lift it up. I mean, you know, it's it's sort of there is a safety feature.

Speaker 21 (01:59:43–01:59:58)

And I'll double check that in terms of the intention of it was to be used for. to support their efforts. But if there is, if folks feel, it's more important if they feel like it's not open to them, we will correct that.

Speaker 5 (01:59:58–02:00:13)

I think a design review on the fabric structure, you know, could have gotten something lower profile and that didn't blaze Dexter Southfield as if they only got, you know, things like that.

Speaker 21 (02:00:13–02:00:40)

That's easier to review that and see that they will be open to hearing and think about us or they have it's a five year lease there in year two, they very much want to have all of their three renewal options extended. So there is mechanisms to make adjustments as as we see fit to not have that impression to not have those fans.

Speaker 4 (02:00:40–02:01:31)

So one, and I don't know if I've been involved in that, or maybe again I can ask Nick about this, but one of the ideas initially was to have some, like Childhood Recreation, which I think is now called something else, but they host like, with NEPRA, I think like a free event on the park that's on the Neponset Trail, and anybody can come and go out on a kayak. You know, that's a way to introduce people who might not be on the water, like, you know, residents who might not, you know, be aware of it. So if there were even just once a year, an event there that was widely publicized that could bring people up for free out on the water, if that could be written into one of their rules or even… Well, they don't have the right kind of boats, Dexter Southville.

Speaker 8 (02:01:31–02:01:35)

You wouldn't be having people going out in a crew. You wouldn't do that.

Speaker 4 (02:01:36–02:01:39)

Well, somebody, whether it's Dexter or somebody else.

Speaker 8 (02:01:39–02:01:55)

You just say that could be something that the town does. We just, we don't have to have Dexter do that. We should do that. Yeah.

Yeah. I mean, that's, that's not something you'd be looking at Dexter Southville to do. That'd be something you'd be saying, you know, the town could get better.

Speaker 21 (02:01:55–02:02:32)

And I can imagine they would be open to partnering and supporting initiatives along those lines. And the other thing is they are, They are, as well as the other tenants down there, contributing to a rental revolving fund that is meant to help make investments down there. And it pretty much has to do with the program, but it can go to landscape improvements, science improvements. So those are the kinds of things that the lease revenue, we can tap into to invest in.

And these ideas are, you know, they're thoughtful, they're good suggestions, they're good things that we can put in the land development documents.

Speaker 7 (02:02:33–02:02:41)

I think it's perpendicular to the river. Is that public property?

Speaker 21 (02:02:41–02:02:46)

It's posted for two hours, I think, but they're public property.

Speaker 7 (02:02:46–02:02:49)

I lived here for 18 years and I did not know.

Speaker 4 (02:02:49–02:02:54)

It used to be posted as service zone, I think, and now it's posted, I think, for two hours.

Speaker 7 (02:02:54–02:02:57)

I have always felt like I'm a trespasser.

Speaker 4 (02:02:57–02:03:05)

That's because the cradles used to be stored there and you always thought you're interrupting the yacht club. Now you feel like you're interrupting Dexter.

Speaker 8 (02:03:06–02:03:39)

Well, no, I've been kayaking down there for years and definitely have had that situation with the old yacht club. You know, you would be pulling in and taking out the kayak and all that sort of stuff. People like me, you know, of course, I'm a member of four. Yeah.

So seriously, you know how to deal with one. I've had it. It's it's it's it's been up. But, you know, that that new doc is wonderful as opposed to stepping in the mud.

So, yeah.

Speaker 2 (02:03:39–02:03:44)

I'm sorry. I'm not trying to interrupt anybody by just Rob.

Speaker 12 (02:03:44–02:03:46)

No, no, no. Go ahead.

Speaker 3 (02:03:46–02:04:48)

No, I will say as a past collegiate rower that I support the rowing programs along the Neponset and the river. That being said, it's news to me that the private school is set up kind of shop in town. So I think, Nick, I do know the Neponset Rowing Club. It's not an inexpensive sport.

And the shells and everything else that costs to do the sport is quite expensive. So I think any, any opportunity here that can help the other clubs, like the Neponsa rowing and Milton crew and such that is more home-based would be an opportunity for, for this other school to help kind of build the community around this. And then I liked the suggestion that Cheryl had because there's been, there's many community boathouses, right. That can get more people involved in the sport and such.

So I absolutely, think there's some opportunity here to leverage the school.

Speaker 21 (02:04:51–02:05:42)

Yeah, we agree. And that is, I mean, that's where that low-profile doc came from. And it was done with an intention to be available for an apostate growing and building proof of that. We do quarterly checkings or seasonal checkings, both in the spring and fall.

With all the tenants as a group, they're all talking to each other. They're all working together. The collaboration between the three groups that are down there, between the Ponce O'Connell and Dexter, and the alumni club is good. The relationships are growing stronger, I think, and having everybody kind of working together is a better place than we've been.

We aren't saying everything here is perfect, and we appreciate the candid feedback, and we'll take that and bring some of those concerns full to Dexter, but also to the landing committee in terms of how to address this moving forward.

Speaker 6 (02:05:43–02:05:55)

So the request that you're asking, getting back to this, is that for internal exploration, or would you actually be firing outside?

Speaker 21 (02:05:55–02:07:47)

So the concept is to contract with child's engineering. So if you go down to the landing, there's a big boat. There's two boat ramps. There's a boat ramp.

If you're looking at the water on the far side, that's much smaller. There's a boat ramp on the left that is tied to an old pulley system, rail car system. So the idea is to, in theory, replace that old car system, rail car system, with a new true ramp, which would involve excavating what's there, dredging some of the landing area. Problems with that include contamination in the landing road.

There's an extensive type of study that shows the extent of that contamination on the solar side. That is not going to be addressed by the Nepenthe River Superfund Projects. So there are a number of environmental steps to go through. One of the key ones being based on what has to come out of there.

Where does that have to go? How is it going to be disposed of? What is the permitting process for that? So ideally, we'll come out of this with a very clear pathway on permitting and get the ball rolling on permitting.

We have a design for the ramp already done by Childs, so this is more just to kind of keep moving towards ideas around construction. When we try to get round number estimates on what it might cost, contracts that we reached out were reluctance to give us any numbers because of the uncertainty around disposal of contaminated soils. So getting clarity on that will help us be able to come back with a true cost estimate to actually do the project, if that's the direction we decide to go in. So it's very much an initial kind of overview of environments and property.

Speaker 6 (02:07:49–02:07:55)

Would there be a response where you would say, stop, no, no more? It's like, it's not worth it, we can't do it?

Speaker 21 (02:07:56–02:08:35)

Yeah, I think that's what we're trying to get to in terms of Can we nail down a price tag that says what price is it worth it for the town to take this task on and what point is it worth? You know, I think the Yacht Club, they have the system. They all know how to use it. It works for their purposes.

However, it's not the safest in the world. Not everybody can use it. You know, recreational boater really can't launch from there. So it does have those limitations.

We all know it's a cost-benefit analysis at the end of the day. So that's what we're trying to get so we have a better understanding of the cost so that it's flushed out.

Speaker 6 (02:08:35–02:08:43)

And would that include, as was mentioned earlier, the parking of ramps and all that kind of stuff and trailers and all that?

Speaker 21 (02:08:43–02:09:18)

There's no good answer for that. So that's going to have to be part of what we find in the fall for a funding application, part of the narrative around how we expect it to be used. I will note that one of the bond bills approved by the legislature has in it an airmark for $750,000 for program construction. And part of our problem is those bond bills, the funding doesn't always get released.

Some does, so maybe it's not fully accessible for any city, it's not really. But we also can't say with certainty what that $750,000 will fix.

Speaker 8 (02:09:22–02:09:30)

Was that railway installed by the yacht club at some point, or was it predating the yacht?

Speaker 5 (02:09:31–02:09:31)

It's a good question.

Speaker 8 (02:09:32–02:09:34)

It looks to me like it might.

Speaker 5 (02:09:35–02:09:36)

It might predate.

Speaker 8 (02:09:36–02:09:37)

Yeah.

Speaker 5 (02:09:37–02:09:40)

It very well could. I mean, because there were big boats built.

Speaker 8 (02:09:40–02:09:42)

Oh, no, a friend of mine's grandfather built ships.

Speaker 5 (02:09:42–02:09:47)

That's why I said it very well.

Speaker 21 (02:09:47–02:09:48)

I've never asked that question.

Speaker 4 (02:09:49–02:10:08)

I will do that. When we were doing that study, I went down and I watched them taking boats. I think it was out of the water. And I took a video.

It was a long video. It's time consuming. Yeah, because that's the whole wooden. You know cradle thing.

Speaker 8 (02:10:08–02:10:32)

Yeah, yeah, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no PB, David Ensign — Her.

Speaker 2 (02:10:32–02:10:43)

He. PB, David Ensign — Her. He. PB, David Ensign — Her.

He. PB, David Ensign — Her.

Speaker 21 (02:10:43–02:13:49)

He. PB, David Ensign — Her. He. PB, David Ensign — Her.

He. In the Pedestrian and Bike Master Plan that the town completed a couple of years ago, one of the key recommendations was trying to build out and expand upon what's referred to as the Milton Greenway, which is trying to get a safe bike and pedestrian connection from more or less the Smiling Grand Rap, across over to the end of Brook Road and Doritos Parkway. So anybody who's driven down Brook Road knows that For some portions of it, it's very wide. It does have on-street bicycle lanes today.

A lot of it has sidewalks already. So when we were looking at it as we approached needing to do some work on growth from a paving perspective, we had a little bit of a discussion about if it made sense to try to make a true shared-use path off-street. So think of something more like a greenway or a rail trail in another community, a 10, 12 foot wide shared use path, the length of a road, and so bike lanes would come off the street, actually, and sidewalk, a sidewalk would be enlarged to be a true shared use path. You know, there's a lot of questions that come with that in terms of what are the impacts, what are the sacrifices, is there space?

And then, and we were aware of all that, so I think where we want to first get a sense, and I was looking around and it appeared that CPCs in other cities and towns do fund rail trails. I don't think I found a true, like a shared use path, something like this. So I was looking for guidance from CPC in terms of eligibility, and then if it's eligible, we'll think about it more deeply and come back with a more kind of roundabout proposal. looking for right now would be for essentially a traffic engineer to come in and say, zoom out on Brook Road, where are there places where, is this feasible at all?

If it is, where is it feasible, where are the restrictions, where are some impacts, where are the harder decisions have to be made? So it would be a really high level kind of concept plan that really just is a set um, tree impacts, um, parking impacts, um, and, and, you know, engage the public. So, um, true, just like a, a first step concept plan, if it's eligible, if the select board is supportive of, of further study here. Um, and we flagged it because again, Brooke is in places very wide.

There are, you know, great issues as you get closer to these, nothing that might make it feasible. So we are aware of restriction going in, but, um, That was the concept. And before we spent a lot of time on it, we just wanted to make sure it might float to the, get past the eligibility test first, before we get to dedicate too much time in MDR.

Speaker 2 (02:13:50–02:14:39)

That's a good question. I think you're right, Nick. Rail trails have been funded with CPA money. That's quite clear.

Multi-use paths or shared use paths, I think it's, I know there's been some stories of towns essentially just applying for a sidewalk, which is definitely not eligible. But this multi-use or shared use path is this hybrid. We can seek some advice from the statewide CPC and see what examples might be out there for us to help us. Determine, you know, just from a statute point of view, Kathleen, I don't know if you have.

Speaker 8 (02:14:40–02:15:25)

Yes, there's actually a case on it. It was in Norwell about the sidewalks using sidewalk CBA money and the argument that it was a recreational use when really they were just, you know, putting in sidewalks. And so it was, you know, it's challenged, obviously, and the and the town lost. because it wasn't a recreation.

It was a road project. It was a sidewalk. This is something different. You could, I think, possibly use it, but especially if it was connecting to other paths.

Well, this. That supports it. The Norwell one was seriously a road project and they were just trying to figure out some way to make it.

Speaker 4 (02:15:26–02:16:04)

What I like about this too, it could potentially lead to the Brook Walk and to the Stuart or Marjory. Pull it all together nicely so you can get somewhere without having to drive and park. And really getting from east to west, you know, I'm sure some of you, like I have, have ridden on the Neponset Trail and you decide you're going to come back by Granite Ave. Well, that's not that attractive way to come back.

and the ground, but if people, there's a whole section of Milton that does not very well connected to the deposit trail, which is a lovely asset. So this, you know, would really provide that opportunity. I like it.

Speaker 6 (02:16:04–02:16:11)

What about the question about, you said that Brick Road is up for improvement anyway, correct?

Speaker 21 (02:16:11–02:16:31)

Yes, it's starting to reach the point where it's a project. So what's the timing of that? not in this paving cycle, potentially maybe next year in portions, a portion of it, but you know, we're several months, we're probably nine months away from making a decision on that.

Speaker 5 (02:16:31–02:16:35)

But you're just talking basically paving as opposed to re-paving.

Speaker 6 (02:16:35–02:16:37)

But that's where it would go in.

Speaker 5 (02:16:37–02:16:57)

Well, they put in the bike paths to narrow the road to slow down traffic, you know, and make it, because it was always, people didn't know if it was a one lane or two lanes because they're so wide. And so if you're really going to take the bicycle use off of that and put it there and be nice in there on the road, then it becomes a whole different project. Correct.

Speaker 21 (02:16:57–02:17:53)

Yeah. And if we're, you know, we wouldn't necessarily save money on this project if the road were all of a sudden a little bit better. If, you know, we don't have the four-foot bicycle in there anymore, because the cost associated with removing that. But 15 years down the road, now it's not as much maintenance or repair.

So yeah, you'd want to try to see these on, but the concept again would be one large shared use path, ideally inside of the street, the duration, the bike lanes would now come off of the street, the street would then be narrower. You know, the Holy Grail of the bike project is non-impact drivers, non-impact door parking. and not impacts the trees, that'd be great. I don't feel like that's possible in this case, but it's what we want to explore and understand, you know, what are the impacts and where are those impacts and, you know, are there places where they can be built.

Speaker 4 (02:17:53–02:18:41)

So one thing I'll also mention is on like wider paved streets, some communities are integrating trees into these new paths, you know, because you can get some shading on it and it's cut down a little on the heat island effect. So if there's enough to do the sidewalk and the separated bike path and have trees, that would help quite a bit. Because you know, you get out there on a bike and it's really sun beating down on you on those paths. It's a lot of pavement reflecting back up on you.

So it could be also integrate some seating along the way. So if there were, you're thinking of it as recreational, that people could stop and take a break under a shade tree or a shade structure or something. And then you get the water fountain. Well, you've got Turner Spa, maybe you can just peel off there and sit there, which is really nice.

Speaker 2 (02:18:43–02:18:56)

OK. Any other questions for Nick? Thank you, Nick. This is great.

These are great ideas for the town. Thank you.

Speaker 21 (02:18:56–02:19:10)

And I know, Tom, we chatted briefly about it, but I did not submit an eligibility application for Warped Park, but please fully expect a funding application for Warped Park. I mean, we had already spoken about that. I just wanted to mention that.

Speaker 2 (02:19:10–02:19:19)

Yeah, yeah. And we're going to have a full discussion of that at the next agenda, because we didn't put it on the agenda for tonight. But yeah. Thank you.

Speaker 21 (02:19:20–02:19:24)

Thank you. I appreciate your time. If you need anything else, let me know.

Speaker 16 (02:19:24–02:19:25)

Thank you.

Speaker 2 (02:19:25–02:19:48)

Thank you. All right. I'm inclined, unless there's anything urgent about items five through nine to defer those given the hour. Unless we have a quick update on any of those.

Speaker 5 (02:19:50–02:19:52)

Julia, you ordered more construction signs, right?

Speaker 4 (02:19:52–02:19:57)

Yeah, I picked up 20 new signs this week. That's great.

Speaker 2 (02:19:57–02:20:00)

You already picked them up. Okay, great.

Speaker 6 (02:20:00–02:20:04)

It was just the permanent signs that we need to update.

Speaker 7 (02:20:05–02:20:06)

Do they live in your office?

Speaker 3 (02:20:07–02:20:13)

Tom, to be fair, Kevin's Chris is on the, on the line.

Speaker 2 (02:20:14–02:20:17)

Oh, okay. Oh, did he want to present too?

Speaker 3 (02:20:19–02:20:40)

I mean, I know he just was just here to support both of his applications. So that's why he was here. Okay. I know.

I know. I know. I gave a little bit of feedback on the, on the softball one. but I just want to give him the opportunity since he's been on for the last two and a half hours and he texted me.

It's been great.

Speaker 16 (02:20:40–02:21:01)

I'll be very brief. Thanks for having me. I think in your last meeting, Rob talked about the softball batting cage project that we have at Milton High School that we want to do.

Speaker 12 (02:21:01–02:21:05)

Mine doesn't, the Gaia field.

Speaker 16 (02:21:05–02:21:11)

Which will really help with the softball program, Sarah Milton. Can you hear me?

Speaker 9 (02:21:11–02:21:12)

Yes.

Speaker 16 (02:21:12–02:21:53)

Okay. And then the second project we have is renovating the Andrews Field soccer slash lacrosse slash gala football field. The field, I don't know the last time, we do work every year to it, but It really needs to be completely renovated. And it's way overused, like all our fields.

But talking with Milton Youth Soccer, they think this is the next field that should be in line to have addressed. So those are the two projects that we have out there.

Speaker 2 (02:21:54–02:21:58)

OK. Questions for Kevin?

Speaker 6 (02:22:00–02:22:03)

This is a grass field, right?

Speaker 11 (02:22:04–02:22:04)

Yes.

Speaker 6 (02:22:04–02:22:07)

Grass field. It will remain so.

Speaker 16 (02:22:07–02:22:08)

Is that right?

Speaker 6 (02:22:08–02:22:11)

Excuse me? It will remain so. Yes.

Speaker 16 (02:22:12–02:22:13)

It's a grass field.

Speaker 9 (02:22:13–02:22:28)

It's not maintenance. The dirt catches. This is a rebuild?

Speaker 3 (02:22:29–02:22:31)

This is a rebuild. It's a rebuild Cheryl.

Speaker 8 (02:22:32–02:22:34)

Okay.

Speaker 3 (02:22:35–02:22:38)

And complete substrate, everything else that's needed for it.

Speaker 8 (02:22:39–02:22:40)

It's a complete rehab.

Speaker 3 (02:22:40–02:22:41)

Yeah.

Speaker 8 (02:22:43–02:22:45)

Okay. Thanks.

Speaker 3 (02:22:45–02:22:54)

Yeah. Yeah. For that price. I think it's a, it's not a filling in holes or seating and such.

No.

Speaker 2 (02:22:55–02:23:22)

And I know there was a couple of brief exchanges last week, Rob, we had about the softball batting cage thing. I think you probably answered those, but does anybody have any specific questions for Kevin on the softball batting cage? I think we established where it was. It's on the first base side.

Yeah, I'll road field.

Speaker 3 (02:23:22–02:23:40)

And it's let me, I'm going to just share my screen for one quick second. I'll show you what that I just brought it up on my for those who don't know. Hold on one second. Oh, Lord.

Now, now the zoom link is in my way. Hold on one second.

Speaker 6 (02:23:41–02:23:51)

Kevin, where was the difference of the rest of the money would come from where? The 185 and 300?

Speaker 3 (02:23:52–02:24:08)

Kevin, did you hear that question? No, I did not. I'm sorry. Was the money for which project, Jenny?

Speaker 6 (02:24:08–02:24:14)

Andrews Park. I was just wondering where the difference would come from. The 185.

Speaker 16 (02:24:15–02:24:29)

So 185 from CPA. And then five from parks, five from youth soccer, five from lacrosse. And then we're going to go for capital money as well, $100,000.

Speaker 1 (02:24:29–02:24:34)

Got it.

Speaker 6 (02:24:34–02:24:35)

From the town.

Speaker 4 (02:24:36–02:24:48)

I have a question. What's the lifetime of the work that you would do here? How long do you expect it to last with the tenants that you get?

Speaker 16 (02:24:50–02:24:55)

Hopefully, hopefully, 12 to 15 years.

Speaker 4 (02:24:56–02:25:00)

All right. That's good. Longer than I would have thought. Thank you.

Speaker 5 (02:25:01–02:25:06)

It all depends on maintenance. You've got to get a couple of new guys to make that.

Speaker 16 (02:25:07–02:25:13)

Yeah. You're 100% right, Pete. And how much use? Andrews Park is so overused.

Speaker 3 (02:25:15–02:27:16)

So you guys can see my screen. You'll see anybody who you see these two batting cages today are used by baseball. And the rules are, according to the baseball, is if this is always given to baseball and if baseball is there, they use a second one. So softball is always kind of the second, second fiddle if we get to use this second batting cage.

And so, so what I would say, so you, you look at the, the geo field, And this is the space that we're talking about. So you can even see in this picture that, you know, Milton softball was supposed to maintain this. You can see that it's overgrown and here's the two pitching rubbers to the plates. And Kevin can attest to this, that even the pitching rubbers are up now and they're not even, they're not even situated in here.

So the idea is, is to make this a, a netted structure and can, and can basically serve dual purposes. It can be used for pitching during a game or it can be used for batting at alternative times. And then the challenge really to this site is when you're over here is there's a lot of topo, there's a lot of hill space over here. So what we need to do is build a wall in here to widen this up a little bit.

And it also will help with drainage because Kevin, you know, this gets overrun with with water and such too. Right? And there's a, there's a catch base in over a year. That we can divert the water to around this.

So that's the reason why this project is is is the price it is because typically we can get a, we could get it like a cage or such for like, 15 or 20000 dollars, which we just. Did at Cunningham, but that's the reason why we, we need the money is because there's, it's the retaining wall that we need to put in here. It's not going to go up too high, but it's going to go up enough just to kind of solve for the retaining.

Speaker 22 (02:27:18–02:27:20)

And what's the surface of the cage?

Speaker 3 (02:27:20–02:27:33)

Once it's complete, we're, we're thinking about, we're just going to do stone, like, uh, like stone dust. you've probably seen it, right? So yeah, no artificial anything. It would be all stone dust for that reason.

Speaker 2 (02:27:33–02:27:35)

But it's also not grass, which is weird.

Speaker 3 (02:27:35–02:27:37)

It's also not grass because we just don't want it to grow.

Speaker 2 (02:27:37–02:27:38)

Hard to maintain.

Speaker 3 (02:27:38–02:27:48)

Yeah. So similarly, we would have like a substrate in here to push it down a little bit. And then we would put stone dust on this. So just the maintenance wouldn't be a big issue going forward.

Yeah.

Speaker 2 (02:27:48–02:28:06)

Right. Right. Yeah. OK.

That's helpful, Rob and Kevin. Thank you. Yeah. Thanks.

Any other questions? All right. All right. Thank you.

Thank you.

Speaker 16 (02:28:07–02:28:09)

Thank you. Thanks very much. Thank you.

Speaker 2 (02:28:10–02:28:12)

Gotten through a lot tonight.

Speaker 4 (02:28:15–02:28:15)

Yeah.

Speaker 6 (02:28:15–02:28:31)

Sorry. I'm sorry. Go ahead. Well, I'm just noticing that we've actually heard from everybody.

If I'm going through the affordable housing trust. Affordable housing trust. Bicycle wayfaring signage and affordable housing trust. Those are the only two.

Speaker 22 (02:28:32–02:28:34)

Which, I'm sorry, what's the other one?

Speaker 6 (02:28:35–02:28:37)

The bicycle wayfaring signage.

Speaker 5 (02:28:37–02:28:39)

Okay, yep.

Speaker 6 (02:28:41–02:28:45)

Yeah, so we may not need the second meeting, potentially.

Speaker 9 (02:28:46–02:28:47)

Right, right.

Speaker 8 (02:28:49–02:28:53)

Great, because I'd be coming in from Scotland. Oh, nice. We had midnight.

Speaker 4 (02:28:53–02:29:02)

So if we can do those two. I can't do the 14th, and you can't do the 22nd. Well, I could, but I'll be in Scotland. I have an MP.

Speaker 5 (02:29:02–02:29:09)

We've got to hear from the remaining projects, but then we have to have our debate discussion.

Speaker 2 (02:29:09–02:29:11)

We do have to have deliberations.

Speaker 4 (02:29:13–02:29:46)

So I just wanted to make a comment. I'm looking at the spreadsheet and how they're categorized as historical open space. I think some people thought that it could be both open space and historic, for example, at that Winter Valley, there's the gardens. So I think maybe we should think about having another column or something which can get at that, that there's truly not just the Flux House porch under historic.

Speaker 2 (02:29:46–02:30:10)

No, that's a good point. I think a lot of times in the statewide CPC, we have hybrid projects or something. I think that's an important point in terms of characterizing them because if the project ticks both boxes or two of the three boxes, we should acknowledge that in how we account for that money.

Speaker 4 (02:30:11–02:30:25)

And then it wasn't clear to me, I heard Cronin say that that garden was open to the public. I was on Zoom, so it was a little hard to hear everything.

Speaker 2 (02:30:25–02:30:47)

She did, yeah. I mean, I think the issue is accessibility right now or attractiveness. And maybe a member of the public wouldn't want to walk down there. But I think it is open to the public.

I believe she indicated that it was open to the public and could be a more public resource with the improvements.

Speaker 5 (02:30:49–02:31:10)

Just a little update on that one. Yeah, Marita and I and Georgia Lee have been talking, because there are historically escape plans for the Whitney escapes state and Georgia has some of those plans. We've been in touch with the homestead historic site and the Library of Congress to try to find those plans.

Speaker 12 (02:31:11–02:31:11)

Wow.

Speaker 5 (02:31:11–02:31:22)

And so, I think I think by the time she comes in for funding application might be a very different project.

Speaker 4 (02:31:22–02:31:24)

But I think it's historic is what my point.

Speaker 5 (02:31:24–02:31:27)

Oh, no. Yeah, it's historic more than it is recreation.

Speaker 4 (02:31:27–02:31:32)

Yeah, so that would give us something in that category. Yeah.

Speaker 10 (02:31:35–02:31:52)

With that, I would like to ask Pete if there are so few or no historic preservation projects, what happens to the 10% funds that supposedly go to that category?

Speaker 2 (02:31:52–02:32:25)

Yeah, we talked about that last time, Linda, and and it was, you know, our our obligation is just to reserve 10 percent for each category, not to spend it necessarily. There's obviously we can spend it, but our only obligation based on the statute is to reserve 10 percent in each category. So we would certainly do that if we didn't have enough project applications to fund 10 percent.

Speaker 10 (02:32:26–02:32:31)

So when you say reserve, does that money then go into a bank account somewhere?

Speaker 2 (02:32:31–02:32:49)

It stays in our town's bank account and it essentially carries over into next year and then increases the pot of money available for historic preservation. Yeah, it adds to the 10% available next year.

Speaker 10 (02:32:50–02:32:50)

All right.

Speaker 2 (02:32:50–02:32:53)

It doesn't get lost. Definitely not.

Speaker 10 (02:32:55–02:33:02)

But it does carry over and does not disappear into other projects.

Speaker 2 (02:33:03–02:33:04)

100% correct.

Speaker 10 (02:33:05–02:33:06)

All right. Great. Thank you.

Speaker 8 (02:33:07–02:33:29)

Lots of times, Linda, people, you know, towns decide that they're not going to spend the historic preservation money in a given year to sort of build up the reserve when they know that a big project is coming along. So you vote it, but it doesn't go anyplace, and it just waits until you've got this, you know, major project that you need the historic funds for.

Speaker 4 (02:33:29–02:33:36)

So another question I have, then, is if the planning part,

Speaker 9 (02:33:36–02:33:38)

Forget the name of it.

Speaker 4 (02:33:38–02:33:46)

Thank you. It's looking for bonding. Do we need a line item for bonding in these categories?

Speaker 2 (02:33:47–02:33:50)

Well, eventually, if we do bond, we'll need a debt service line item.

Speaker 4 (02:33:51–02:33:53)

Yeah, something like that.

Speaker 8 (02:33:53–02:34:04)

Yeah. And and it's a it's a borrowing on the vote so that it makes it two thirds vote. Um, sometimes there's a town meeting, you mean? Yeah.

Speaker 4 (02:34:04–02:34:06)

So that does that have to be a separate article then?

Speaker 6 (02:34:06–02:34:15)

No. So depending upon what the bond is used for, would that be attributed to the category that it's in? Yes.

Speaker 2 (02:34:15–02:34:40)

Okay. Yep. Yep. Yep.

Yep. Good stuff. All right. So I'm now the hours even later, I will remove me a turn.

I yeah, I would entertain a motion to adjourn and we'll defer some of the other items if needed to the next meeting.

Speaker 8 (02:34:40–02:34:47)

And not only would he entertain it positively encouraged.

Speaker 2 (02:34:47–02:34:54)

Well, entertain could, you know, Could imply encouragement, I think.

Speaker 4 (02:34:54–02:34:56)

All right.

Speaker 2 (02:34:57–02:35:04)

I heard a motion. I heard a second. I guess I have to do the roll here. Cheryl?

Speaker 4 (02:35:05–02:35:06)

Yes.

Speaker 2 (02:35:06–02:35:14)

Kathleen? Yes. Jenny? Yes.

Pete? Yes. Wendy?

Speaker 7 (02:35:15–02:35:15)

Yes, Lee.

Speaker 2 (02:35:18–02:35:22)

Rob? Rob's gone. Is Rob gone?

Speaker 12 (02:35:23–02:35:25)

Linda? Yes.

Speaker 2 (02:35:25–02:35:28)

Yes. And have I forgotten anybody?

Speaker 10 (02:35:29–02:35:32)

You yourself, yourself, Linda, myself.

Speaker 2 (02:35:33–02:35:34)

I think I said Linda. Okay.

Speaker 10 (02:35:34–02:35:37)

Yes, you did. And I agree.

Speaker 2 (02:35:37–02:35:51)

Okay. And Tom votes. Yes. Thank you very much.

I apologize for doing this remotely. But thank you for your cooperation. And And we will, it worked, it worked.

Speaker 4 (02:35:52–02:36:08)

So I will, we'll see everybody on July 14th.