Board: Select Board

Date: 1997-09-05


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:00–02:28)

during the week that I was on vacation. And these addendums there, this is the third addendum, and of course none of the addendums would have been voted by the Board of Selectmen. I'm not sure that it's absolutely required that the Board vote to ratify. You're going to have the opportunity to award a We do specifications and bids, specification on your behalf all the time.

But it is a particular vote that happened during the vacation period and I put forth in this form of a suggestion that the board might want to ratify it. It was a, it was suggestions that came to the town council from Barbara Hansberry, the General Counsel of the Office of Inspector General, at his request, he had requested, the town council had requested on an August date that they review the the talent IRFP, and offer any suggestions or ways that it could be improved. And she wrote back saying that she suggested that we omit the, the talent omit the complicated numerical scoring system, which other people had commented on, and of course we're reviewing it, And when it came to be known, Hansberry said that it has been the IG's office policy not to use a numerical system. And that was not known to us.

So that scoring system was modified to that effect. to let John speak to this rather than my saying what happened while I was on vacation.

Speaker 2 (02:28–02:35)

You're doing fine so far. First of all, Mrs. Agostino, this is my partner, Kevin Feeley.

Speaker 3 (02:35–02:37)

It's a pleasure to meet you.

Speaker 2 (02:38–02:45)

And I'm not sure the rest of you are aware that as of August 21st, effective January 1, Kevin is a partner, and Murphy has him in my hands.

Speaker 3 (02:46–02:47)

Congratulations.

Speaker 2 (02:47–04:16)

Thank you. As John said, I requested review by the Inspector General. When I was away on vacation, Kevin had the RFP hand delivered to the Inspector General because we had received a lot of comments, both at meetings here from board members and from members of the public. And rather than address them piecemeal, it seemed to me to be the appropriate way to do it was, why don't we ask the agency that reviews these things, and let's get a concise answer one way or another, particularly where they had expressed an interest in the legislation.

They did that, and on August 28, their general counsel, Barbara Hansberry, responded with a letter to me and Kevin making recommendations that they felt would make it more compatible with the spirit of Chapter 30B. And essentially, they had five suggestions that I'll summarize briefly. John has already summarized one of them very well. But the first suggestion was that they asked us to definitively state that the town is interested in proposals to cap the landfill and develop the site for recreational purposes, including the construction and maintenance of two athletic fields in exchange for a long-term lease.

To be frank, I thought we'd already done that, but I didn't see any problem in restating it. So that's the first item in the addenda. Number one, item number one, addenda three that you received.

Speaker 4 (04:16–04:39)

Can you stop and just question on that? Sure. How has the wording changed here from what was in the RP? Does it give any closer tie that you could not submit a proposal to simply close and cap the landfill?

No. It clarifies it better, though. Yes. So you still have the option, but more clearly stated.

Speaker 2 (04:40–04:55)

Yes. Yeah, let me read it to you. The town is interested without limitation and proposes to cap the landfill and develop the site for recreational purposes in exchange for a long-term lease, including the construction and maintenance of two ball fields. That's why I felt it clarified what was already there, but.

Speaker 1 (04:57–04:58)

It was your suggestion?

Speaker 2 (04:58–11:09)

Yes. the suggestion of the attorney. The second suggestion was to specify the length of the lease. Again, I thought we had done that because we cited the statute, but we added, and I thought it was fine to clarify that, the legislation for the lease of the landfill.

I'm sorry, I'm reading from our agenda, item two. The legislation for the lease of a landfill property currently being considered by the legislature allows the town to enter into a lease agreement for 50 years. That's the maximum term. It also allows you to consider one less than 50 years.

But that's the open end. That's the maximum term. And I didn't see any problem with specifying that. The third suggestion was to specify that the proposed lease price would be a factor in selecting a proposal.

thereby letting the market determine how much Milton will receive for the lease. Again, it was intended to be in the cost proposal section, but it certainly was reasonable to clarify that. So item three in the agenda says, any rent or other consideration paid to or received by the town as part of a lease agreement will be a factor in the selection of a proposal. suggestion was to rewrite the experience criterion to require both capping experience and experience with post-use development.

That one, I thought, was an attempt to clarify what experience we required. And it seemed to dovetail with several comments, including comments made by the board. So what Bruce Haskell and I did was to consolidate some of the other wording to make it plain, number one, that the experience you want to see has to be from either the proposer or whoever the entity is that's going to be involved, whether it's a joint venture or a subcontractor, because we know there were lengthy discussions about that. And the highly advantageous criterion is someone who has experience in both, because that's what you said in the beginning.

The next highest criterion is someone that has experience in either one or the other. The next highest criterion, which is not advantageous, is someone who has experience in neither, but has experience in a related project. And the least advantageous or unacceptable criterion is someone who has experience neither in closing and capping nor in post-closure use, and has no related experience. So it seemed to clarify what you had already said, that you wanted an experienced proposer.

But fine to clarify. The last suggestion was to eliminate the numerical rating system. in cost review methodology. In the sentence, the letter says, price proposals can be evaluated by simply comparing the present values of the proposed lease prices.

So what the addendum does is delete all references to points. And you'll see in item four and item five, deleting two sections, 96, deleting the references to points. What it did not do is take out those criteria that were important to every member of the board, I think, including no traffic in Milton. Those kinds of things are still in here.

So if you get a proposal of whatever nature that's going to come down Pleasant Street, well, it's not acceptable. If it's going to come down Milton, it's less acceptable, but more less better than the other. If you get something that's not going to come in Milton at all, it's most acceptable with three. Those types of issues are still in the RFP.

It's just that the point system is out of it. And also, we basically put in the language that you're required to follow anyway under 30B, that each proposal shall be evaluated based solely on the criteria set forth in this request for proposals. And each evaluation, meaning each evaluation by the town, shall specify in writing for each evaluation criterion a rating of each proposal as highly advantageous, advantageous, not advantageous, or unacceptable, and the reasons for the rating, and a composite rating for each proposal, and the reasons for that rating. That basically tracks the statute to say what you should do anyway.

Now, the timing of this was such that it came up I believe it was on a Thursday, late in the day when I got it. Friday is when I addressed it. Apparently, the cat is before the horse in the sense that you, the board of selectmen, were not aware of that at that time. I guess I have to take part of the blame for that.

I mistakenly assumed that that was not the case. So to the extent that I contributed to that, I apologize. I discovered that on Tuesday, at the earliest, you found out about it. It seemed to me that given your timing on your proposal opening, and given the fact that this request came from the inspector general, I had some teeth in it, that number one, it really wasn't the type of thing you wanted to fight about.

So number two, you really should do it. Number three, you didn't have a lot of time to do it. And anyway, that's why it happened when it did. I guess it's on the agenda tonight to ask that you ratify the fact that it was done, since you are the awarding authority.

And we appreciate their input. They did take the time. They don't have to do this, but in response to our request, they reviewed a lengthy document and gave us some assistance on how to clarify it.

Speaker 5 (11:10–11:25)

I do think we appreciate their suggestions. an extra function of their agency to not only watch over these things, but actually make suggestions to towns to do it for the best results.

Speaker 2 (11:26–11:28)

And to help share potential proposals.

Speaker 5 (11:29–11:29)

Right.

Speaker 2 (11:29–11:31)

And everyone is a clearer and better.

Speaker 5 (11:31–11:50)

We have clearer language. And I think, as you said, these items were covered. But the language is now much more specific and much more to the point, and I think it's probably helpful to the proposers, and certainly as I review it, I agree that it was all there, but the wording on this is very specific and clear.

Speaker 1 (11:52–12:23)

But there's really nothing that bidders or potential bidders are affected by in this of the intent for ranking them by those things that are considered to be highly desirable. So that remains. I mean, it really isn't a substantive change from the bidder's point of view. I don't see it.

It's all the changes that are in general for the town, who would have liked to make me a lawyer.

Speaker 5 (12:24–12:28)

We still will have to rank them, even though it's not going to be by our point system.

Speaker 6 (12:31–13:25)

Well, I think the timing, frankly, could have been better. I mean, they had this thing on August 8th, and it'll take as long as they did to do this thing. I don't think it's helpful. At the same time, I also would comment that in our own packets that we received last night, if you look at this magazine we received, it talks about exactly the opposite.

Best value calls for a ranking proposal based on a weighted average of scores on all criteria stated in any solicitation. So… That's it. That's it.

This is from the municipal government. This is the The time-wanted method of awarding contracts is getting renewed scrutiny as local governments look at new methods. And the new method is to rank. So we get the material last night that in the same packet contradicts what her advice is.

So I agree basically with what the Chairman is saying. At the same time, it seems to me it's fairly late in the process and contradictory to the practice of ranking proposals, whether you be in any enterprise.

Speaker 2 (13:27–13:46)

I guess you have to choose your spots to fight, and this may not have been the right one. In other contexts, maybe we would have been on the cutting edge of the industry, but apparently not in the view of this agency and this particular item. So we weren't left with a lot of options yet.

Speaker 5 (13:46–14:23)

And I think that certainly rather than discuss this or postpone the addendum going out until we were able to meet this week, I think you acted knowing that there are certain time constraints. And there was an article in the Ledger last night saying that the award that may give the material to Corey Hills may be within the next two weeks. And we don't have a lot of time to play around with. We really have to keep this process moving because it's the central lottery that's setting the time schedule, not the Board of Selectmen and Milton.

Speaker 4 (14:28–18:29)

Well, I have many comments regarding this process and as the member of the board is probably being viewed all the time as being the most, you know, cautious from readily agreeing with everything that's done with regards to this RFP. I do have concerns and John, you brought them up immediately in your first introduction regarding this issue. You said you don't believe You're not sure if an addendum needs to be voted by the board. And my concern in this process that we see before us, as John has admitted to us, the addendum number three clearly reads at the beginning, has requested by the Inspector General's Office, which I completely thank the Inspector General's Office for their assistance in helping to clarify some of the concerns that have been raised in the public.

But it follows by saying the Board of Selectmen is providing the following clarification to the RFP. And this was sent out August 29th and yet, as we've heard, the Board of Selectmen had no knowledge of it at that time until yesterday. And I disagree with the wording clarification. I feel that these are amendments.

It removes the point system. It's not clarifying something. It's an actual amendment. I also know when you're deleting section 2.4, it raises a major question in my mind.

I mean, I'm happy to see it deleted, that 50 points in the ranking process would go with regards to the $7.2 million cost. But I have questions as to, it's not even a question. It's more or less, we have not even discussed what your discussions might have been with regards to deleting the $7.2 million. And that was a question I asked Camp Dresser McGee just a week ago.

In the past, you've received documents saying per acre would cost X dollars. And I have asked for those. And I once again asked for it last week of Camp Dresser McGee and was told it would take a day or two. And that was one week ago.

And yet, during that time, we have two full pages before us, or three, two full pages before us of changes to the addendum. So my main concern is if someone in the bidding process, I mean, we do have a lot of people taking out this bid. If someone in the bidding process says once we award this bid to someone that, you know, that this was inappropriate, that our board should have had approval of this addendum and we had not because ratifying something after it's done is not discussing it and finding out the background workings of why we're doing all these things. And I don't want to see the town opening themselves into a case where if we were cautious today, we wouldn't have to worry that somebody may hold up the whole thing tomorrow.

And I want someone here to explain to me. Needless to say, I was outraged when I saw it. I accept your apology. Yet timing isn't everything.

If we need an emergency meeting, we can call an emergency meeting. This is very important to the town. I don't think there's anyone here who in any way has tried to hold anything up for the sake of holding anything up to nitpick, as some have said. That's never been the intent.

But I need some clarification that, as John said at the beginning, it would not complicate things should some individual who puts in a proposal, not win the proposal, and say, wait a minute, I'm going after the town of Milton. I know in the past RFPs are reviewed by the Inspector General's office, and I don't know how much time, how many extra legal hours we're paying to get this update now, if only we maybe had accepted their help in the beginning, when certainly the questions kept getting raised.

Speaker 7 (18:30–18:39)

We asked for their help, and we did accept their help. That's why this was issued. August 7th. Yeah.

Speaker 1 (18:39–18:45)

Even before that, we met with them. We met with the Inspector General himself.

Speaker 4 (18:45–18:48)

Who's we? What date?

Speaker 2 (18:48–19:04)

These are the things that- We already required them to. The most recent meeting was Thursday, There were two meetings that I attended, and they both were the subject of discussions here. The first one was, I'm sorry, the most recent one was Thursday, August 21st.

Speaker 4 (19:05–19:15)

John, you weren't at our meeting August 21st. I was told at this meeting, and I guess we can look at the minutes, the outfit was not mentioned. No. The discussion was on the lease.

Speaker 2 (19:15–19:52)

It was, except to this extent. I was not at the meeting, but Mr. Neely was. And I watched part of it on the TV.

But what I can tell you, because I was there, I asked about the RFP, which I had submitted on August 8th. The general counsel told me she had not finished reviewing it, was not prepared to discuss it, would give us an answer by the following Wednesday, which was the 27th. In fact, we got the answer on the 28th. What I meant by that was we sought the assistance of the inspector general.

But most of that meeting concerned the legislation as I believe the board was told.

Speaker 6 (19:52–20:05)

It's in the RP. And let me just add, there's two quotes I said that night. And I stand by the quotes that I heard in that room. And this woman stated, there was no fundamental disagreement of what we propose.

Number two, she thinks it's a worthy project and working on a few details.

Speaker 4 (20:05–20:07)

That's not the concern.

Speaker 6 (20:07–20:16)

She said that was, I said, where do we stand on this proposal and project? And that's the quotes I used that night. And that's when I understood where she was in this whole thing.

Speaker 4 (20:17–20:47)

I'll review the tape, but the discussion when we turned to the fact that you had attended another meeting, which also brings the point up, it wasn't that we had authorized any negotiations with regards to the RFP to be going on, nor with the lease, and yet you, John Flanagan and John Cronin have met with them. Has it only been two times? It was never stated on August 21 that there were possible changes coming for the RFP.

Speaker 2 (20:47–21:01)

If it had been, I didn't know that. She told me she wasn't ready to talk about it. I asked the question, where do we stand with the RFP? She said, I don't know.

I haven't finished reviewing it. I said, when can you give us an answer? She said, the following Wednesday.

Speaker 1 (21:01–21:08)

But she gave you the general characterizations, which Rick reported at the meeting. And you want to repeat those, Rick?

Speaker 4 (21:08–21:14)

Well, he made the two statements, but that's not the gist of it. that there were some changes.

Speaker 6 (21:14–21:37)

The first thing is we were discussing technical amendments to clarify the passage of the legislation. The lease. The legislation for the lease. Secondly, I said there was no fundamental disagreement what we were proposing.

She was thumbing through the actual proposal and said, I haven't finished this, but there's no fundamental disagreement. The third thing she said was, I think it's a worthy project and we're working on a few details. But she said, I haven't finished going through the document.

Speaker 4 (21:38–22:57)

Nowhere in there do you mention that the RFP was being reviewed. Your discussion centered on the legislation that there were a few minor changes and now tonight we also have a document in front of us with changes to that. The fact of the matter is the RFP as we put it out was not in compliance with Chapter 30. That's why we have two pages before us to put it in compliance with Chapter 30 by the Inspector General's Office.

And I'm concerned, my concern, what I'm proposing is that to cover ourselves, that some extension be put on the submission of the bids. I also have repeatedly asked for when this was ever submitted to the DOJ report. It finally made the DOJ report on August 26th, and in it it still stated the bid is due August 29th. So I'm just pointing out that should a bidder find fault, should someone who has a proposal find fault with the process, it'll put you back years, not days.

I think Mr. Farhad has an answer to our need to be the ones approving. I don't know if you get that from the attorney general's office or the district attorney, but.

Speaker 2 (22:57–23:07)

Well, you get it from me. I'm the one that asks that you put it on the agenda. Because you're already wanting it, Charlie. You're asking us to ratify something that's already been done?

Yes. Yes. Absolutely. That's what ratification is.

Speaker 4 (23:08–23:15)

Except? As you stated previously, we never authorized you to put this out.

Speaker 2 (23:15–23:19)

That's why I'm asking you tonight to ratify it. That's what ratification is.

Speaker 4 (23:20–23:46)

Well, I have serious problems with doing that after the fact, since I didn't have the time to discuss any of these changes. Although, as I said, I appreciate the Inspector General's changes. And these are clearly amendments. They're amendments to bring us into compliance with Chapter 30, not clarification.

So I have strong concerns about that word. and about the fact that if they are amendments to bring us into compliance, that there'd be the need to extend the bid process.

Speaker 6 (23:47–23:53)

Which items are you stating bring us into compliance with Chapter 30B?

Speaker 4 (23:53–24:00)

Removing the any, what was the term, ambiguity in the RFP.

Speaker 6 (24:01–24:02)

That's not a violation.

Speaker 4 (24:03–24:51)

Well, it's not clearly, I've had Chapter 30, I didn't bring it with me, but if there's any concern that someone putting in a bid might feel that by the point system stating the 7.2 million and the 50 points, that if their proposal was not going to include a post-closure use or just acceptance of that close recapping, I think you can mainly look at the amendment has the concern over the 7.2 million dollar figure. has only, you know, one of the ones that I know of. But not having been involved in any of these discussions, you know, you read two sentences there, but didn't give any background. That was why we've got two pages before us, is it not, John?

Are you saying that it was in compliance with Chapter 30B and we have two changes of amendments for nothing?

Speaker 2 (24:52–25:23)

No. I can tell you this, that you will find nowhere in 30B something that says these items are required. But when you have the inspector general recommending that you make these changes, you have two choices. What do you do?

Go to court and fight them? Do you negotiate for weeks? Or do you do it? They are very simple changes to make.

That's why it was done this way. And if you have the state's reviewing agency now comfortable with your RFP, you've eliminated a potential problem.

Speaker 4 (25:23–25:33)

I'm not arguing with the changes. I agree with the changes. But they're not simple, you used the word, changes. And in an addendum, these are amendments, not clarifications.

Speaker 2 (25:33–27:16)

No, I disagree. I think they're fairly fundamental. The major change in this, in my opinion, is not for a potential bidder. It's for how you, the town, as a watering authority, react to it when you get it.

If you take the time to study this, you will see that most of this work should already be done. The Inspector General asked us to eliminate the cost proposal review methodology, not because they had a question about any of the particular dollar items, because the Inspector General favors, and I stress favor, not because 30B requires it, favors rather than a cost review methodology based on a specific list of prices or something that you let the market dictate it. If it's a cost item, what's the least costly to Milton? Or if it's a consideration to get back, what is the most beneficial?

It makes sense to me, but to say that 30B requires, you know, but that is not something that is a substantial change for a prospective bidder. If you think it requires more time, then certainly as a warding authority, you have the discretion to do that. But to answer your question, why 2.4 came out, because the inspector general suggested eliminate the cost review methodology. When I asked her about it, her answer was, the inspector general's office does not favor this type of approach.

She did not express a particular concern about any of this particular item, such as the $7.2 million, the 4% interest rate, any of that. It wasn't a question as to the validity of the figures. It was a problem with the methodology.

Speaker 4 (27:16–27:57)

But the market. Yes. And that's something that I argued. repeatedly, that you do when you put something out to bid, especially like this.

I've heard from several developers that are in this business, and they said for $8 million, are you closing the cafe in the town of Milton? I'm very concerned because my argument is not so much what you're trying to say, take them to court and fight the Inspector General's office. I'm appreciative of what has transpired here. And yet, I don't want to see us in a position, because of the introduction and the term clarification, not amendment, in a position we're opening the town up to tying us up in court.

Speaker 1 (27:57–28:09)

Well, an addendum is, in fact, an amendment to the old RFP. So, I mean, it's not, I might be getting into semantics here. It is an amendment.

Speaker 2 (28:09–28:59)

Isn't that correct? That's what an addendum is, when you say that. We could have said addendum. We could have said, I mean, we could have said amendment one, amendment two, amendment three.

Camp Dresser's terminology is addendum. It's clear to any bidder or proposer that there's a change. Believe me, the word clarification is not a problem here. I would stress, look more at the substance.

You have achieved a change you wanted, but as I said earlier, there were many changes requested both by individual members of this board and by members of the public. And rather than address them piecemeal, I thought with the consent of the board, I was submitting the whole package to the Inspector General asking for review of the entire thing. The result is that one of the changes you wanted has been recommended, and we've done it. So I think that's a good result.

And I'm not sure what the problem is, frankly.

Speaker 6 (28:59–30:34)

I mean, I guess I look at this thing, and I look at 1.3 of the proposal. 1.3 reads, if the proposed, this is the original RFP, if the proposer and the town execute a lease, the length of the lease shall be limited to 50 years for the requirements of the Milton Town Meeting and the Homeowner Petition, which the town expects to be passed by the legislature. So now we've issued a clarification on number two. The legislation to lease the landfill property currently being considered by the legislature allows the town to enter into a lease agreement for 50 years.

Why is that necessary? And if someone read 1.3 of the proposal, it's pretty clear to me. Point one is also expressed in the doctrine. She wrote in her letter a reference to three choices.

I would say there are the two choices. The two choices, one was to cap the landfill, or the other was to cap the landfill and develop the landfill. I don't know where she got three. There's only two if you read through the proposal.

So I'm not sure, frankly, where some of these requirements were put in. Because it's clear, if I read the proposal, it says 50 years on this document. It's clear that we asked for either capping the landfill… So you're saying you don't want to ratify this?

I said they were unnecessary. I think John is trying to make a practical viewpoint. John is advising as his legal counsel that it's not worth going into court and contesting this or opposing this thing. He's saying that these are changes that do not impact on the quality of the overall process and that we'll be ready next week to open the proposals.

And I think his key point is that the changes under items 4 and 5 affect our review and not the documents submitted by the developer.

Speaker 4 (30:35–31:07)

You continue to stress the concern with fighting the Inspector General's Office. You're saying, fine, we're all in agreement with the changes, and maybe they're just clarifying some warning. But there are actual amendments that do change the evaluation process. There's, especially under 2.9, now a composite rating for each proposal.

And the reason for that proposal is added. That's true. Excuse me. Go ahead.

I'm sorry. Is that what you say is required under Chapter 35? It wasn't there?

Speaker 2 (31:07–31:10)

The statute requires it anyway.

Speaker 4 (31:10–31:11)

But we didn't have it in before?

Speaker 2 (31:11–31:37)

Well, there's a lot of stuff in the statute we don't have in there. You don't have to put the statute in there. See, I disagree with that, but it's in there because it doesn't occur. I think I understand your point.

It's a valid question. Your concern is, will this affect the validity opportunity to participate this process here or should you give more time?

Speaker 4 (31:38–31:55)

I think you have to give more time for us not to in the end suffer the consequences should we not have should anyone contest the whole process. I thank you for your time and today's

Speaker 1 (31:55–32:54)

This is a letter that came in this afternoon after 4 o'clock, and it's from Barbara Ansboury, and it was a copy to me. It says to Mr. Flynn that she has reviewed the RFP, that it incorporates the suggested changes. And she's pleased that it complies with legal requirements for fair and open compensation.

So it's a blessing over the addendum number three. The last sentence says that she suggests that Tom might want to consider extending the date, which is a point that you made, Mrs. Agostino.

Speaker 4 (32:55–32:58)

So that's the… When I was asking the question, you'd already seen this?

Speaker 2 (33:00–33:11)

I thought you were questioning the substance when I finally figured out you were asking about this. That was next item. Yes, I've seen it. She sent it to me.

I thought you were questioning the merits of the changes.

Speaker 4 (33:11–33:17)

I began that with my concern that we not get tied up with anyone once the update is accepted.

Speaker 2 (33:17–33:28)

That's why I asked the question again once I figured out what… I thought you were talking about the validity of the… Yeah, no, once I figured out you were talking about the timing, and that's what's next to talk about this.

Speaker 4 (33:28–33:41)

She says right here exactly what my argument to you were, that these are substantive and procedural potential pros that should be committed at additional time. And that was, I think, my first state of concern.

Speaker 2 (33:41–34:40)

So what I said to her was, I called her up and I said, you know, argued with her. She wouldn't change her mind. I said, well, look. She said to me, it is my recommendation if the board chooses not to follow it, there is no legal recourse.

So I said to her, can I at least quote you to tell the board that it is your recommendation and if in their good judgment, they decide not to follow it, then there is no legal action to be taken by the inspector general. She said yes. That is her opinion. It is also her opinion to make the changes which we did.

So the choice you have to make as a warding authority is number one, you've been told by the Inspector General that the amendments, changes, whatever you choose to call them, addenda three, comply with 30B in the sense that they provide for open and fair competition. So that's why I asked you if your concern is, Diane, yes. You have the inspector general suggesting that you allow more time. And that's where you are tonight.

I'm only here for you to ratify the thing.

Speaker 5 (34:40–34:45)

Could you clarify? Did she clarify what she means by sufficiently extended?

Speaker 2 (34:46–34:53)

Did she? Is that a time? Excuse me. I'm sorry.

I interrupted you.

Speaker 5 (34:53–34:55)

Did you talk to her? No.

Speaker 4 (34:55–35:00)

I'm just assuming sufficiently extended must be 30. We always keep doing 30 days.

Speaker 2 (35:00–35:04)

I called her up and asked her that question, and she said 10 days.

Speaker 4 (35:06–35:20)

She said 10 days was sufficient time. My concern is what I pointed out about the Dodge report. Can you imagine a developer for the first time seeing this August 26, and still hasn't been notified that the August 29 is the middle date?

Speaker 1 (35:20–35:54)

That's an interesting question. We did not, the town did not, did advertise in other newspapers. as required by the law, and in the central register. And I showed you a very early confirmation document from the drudge report.

It was a dark matrix thing. It was a confirmation to Canvass and McKee. And you say it never appeared until the 26th. I've never seen a copy.

But I'm not sure that that's necessary.

Speaker 5 (35:55–36:01)

Do you think that would be sufficient grounds for a bid protest? that it wasn't the Dodge reports? That's your question, isn't it?

Speaker 4 (36:02–36:17)

No, the main question would be the voting of the addendum, which I don't know. Because John's opening words were, I'm not sure if the addendum needed to be voted by the board. And I want whatever lies.

Speaker 1 (36:18–36:21)

Actually, I've said addendum one was not voted by the board.

Speaker 4 (36:21–36:21)

That's right.

Speaker 1 (36:21–36:39)

Addendum two was not voted by the board. And addendum three was not voted by the board. But anyway, with John's suggestion that I bring it to the board, because you were away. I was away, so there was not a dialogue or discussion as there had been on some of the other things.

Speaker 4 (36:39–36:56)

Because the awarding authority, I can't understand how we would not vote addendums. I mean, we did, you know, vote the entire RFP, so I don't… When we… You voted to authorize me to review it and then to approve it.

Speaker 5 (36:56–37:04)

and you did not ask them to come back to be… We did not offer addendum. We were aware that there would be addendums issued.

Speaker 1 (37:04–37:49)

We do contracts all the time and the board never reviews the specs. I mean, you seek the appropriation, you authorize the project when you go to award the contract. Now in this case, you were all intimately involved in the… formulation of the original RFP and it was very helpful to all the staff and the department heads and everything to have the input from the selectmen.

But that's not a common thing that the Board of Selectmen gets involved in. specifications. Your power is when the bids come in, you can reject all the bids or you can award to the one that you feel is the best fit for the town. I thought your question was on the time.

Speaker 4 (37:50–37:56)

I have two questions. I want to be sure that you have the answers to both questions. One was the time.

Speaker 6 (37:57–38:00)

I thought you just said to Joan that your main question was on extension.

Speaker 4 (38:01–38:35)

But my first question followed up on my concern. I 100% feel the Board of Selectmen put this RFP together. Although our conversation was for the preliminary review over on vacation, any addendums should have been reviewed by us. I actually discussed that, Kathy, with regards to a minor addendum of the extension of time, I think it was, because we got a copy and I asked if we needed to review it.

And that question hasn't been answered. on if we have to vote on addendums. I feel we should be voting on addendums. We're the awarding authority.

This isn't a science-scale contract.

Speaker 1 (38:36–38:54)

One of the reasons that Kevin was invited was his experience with Chapter 30 being a journal. So I think you've raised a couple of very good questions and maybe he would have some comments to make on those.

Speaker 3 (38:54–40:03)

Just a couple of very general ones. This is, you know, this is not an uncommon problem because in a number of towns, obviously the boards of selectmen meet once a week or once every other week during the summer and it is certainly not a violation of Chapter 30B. for someone else to issue an addendum to an RFP. It's a routine municipal business practice.

You know, by the same token, if tonight if the board said we disagree with the addenda, you would certainly have the authority to vote tonight to retract it. You know, that's where, you know, John said the power still lies with this board and you have the authority. Again, there's nothing in 30B that says, you know, the awarding authority has to approve or vote on every addendum. every agenda or amendment that is issued.

But you certainly have the authority now, as the awarding authority, if you so choose, to modify the agenda that went out in any way you see fit, or to vote, as the agenda item says tonight, to ratify the agenda.

Speaker 4 (40:03–40:33)

I don't think I'm necessarily looking at Chapter 30B with regards to this question. It's more a matter of the open meeting law, the deliberation of these two pages of changes because this has received widespread public review. And so if tomorrow, in fact, I did find out, I don't know how you two found out about it, but a resident who I guess originally received the RFP in their mail on Tuesday got this and so called to ask, when did your board meet to do this? I don't know, how did you find out?

Speaker 6 (40:33–41:30)

The key point is the board is not required to vote addendums or amendments or any of this. I mean, again, what John has stated is what's unusual in this process is the board has participated in the RFP. If you look at the sewage projects or the water projects, we haven't reviewed the water project that was awarded to Brockton Contracting. We reviewed the contract proposal, we reviewed the budget.

so that we review the streets that are going to have water work going on. We reviewed the contract for Brockton Excavating after looking at the bids. So we were approving the actual contracts and the awards based upon the dollars and based on the streets that were approved at town meeting. We haven't gone ahead and looked at the RFP that DPW did for that water work.

We haven't looked at the RFP on the sewerage. What we do is we make sure that in the sewer work, an RFP is going out that takes care of what town meeting voted, and then on the back end of it, we're reviewing to make sure that it's a low bidder. and all the other precautions.

Speaker 4 (41:30–41:53)

This is totally different though, it's completely different the way this whole process for the landfill has been working and I feel we have to be very cautious and… Those statements aren't exclusive? Well yes they are because you've already said that you feel there's no need for us to vote on the addendum and I feel that I want… So it's not legally required?

Under 30B. Correct, it's not legally required. What about under the open meeting law?

Speaker 1 (41:54–42:00)

because the 10,000 people we've dealt with. That's a good question. Hit Kevin fairly with that.

Speaker 3 (42:00–42:25)

Obviously the Open Meeting Law certainly is another area that any municipal board would be very concerned with. The Open Meeting Law only applies to meetings of public boards. In this case, there was no public meeting. maybe that gets to the root of your issue.

But there was no public meeting. And because there was no public meeting of a governmental board, there could not de facto be any violation of the open meeting law.

Speaker 4 (42:26–42:39)

The governmental body can also be a subcommittee. So my next question to you would be then, Mr. Neely, Mr. Cronin, Mr.

Flynn, were there anyone else at those meetings besides the Secretary General's office?

Speaker 2 (42:40–42:44)

Who's that? Bruce Haskell was at one. I was at one. Kevin Taylor was at one.

Speaker 4 (42:44–43:02)

Now, any governmental body, I mean, making, Representative Joyce, this is a governmental body, this is a, by some it will be viewed as a subcommittee, that was in fact discussing changes.

Speaker 3 (43:02–43:28)

And that is, and that's another issue again, which would be defined by the statute, by the open meeting law, and that defines public board, governmental board, and it would be my opinion that certainly that group of people meeting would not be covered by the Open Meeting Law. Typically, it's for a subcommittee to be covered. You're right, subcommittees can be covered. It has to be a subcommittee that's appointed by a board which is covered by the Open Meeting Law.

Speaker 4 (43:29–43:36)

My next question then is, this group that met, how were they authorized?

Speaker 3 (43:37–44:12)

Again, it would be typical in the operation of any situation involving a request proposal that certain, whether it be department heads or other town officials, would typically try to work out issues, whether it be the Attorney General, the Inspector General, whoever it might be that have concerns would be typical. that those issues would try to be resolved not by the Board of Selectmen tracing in at 3 o'clock in the afternoon to the Inspector General's office, but by those officials that you entrust with carrying out those types of things.

Speaker 4 (44:12–44:46)

Well, you can see my concern that since there were so many questions on the RFP, not being aware that those questions had continued to such a state that we would end up with two pages of changes that I would have been one who would have preferred to have been known or even officially established a subcommittee for the review process. And I trust you can see my concern in that when I get phone calls from residents saying, how did these changes come about? You know, when did you meet? Who did it?

It doesn't seem as up front as I reported to business.

Speaker 2 (44:46–45:54)

I can partially answer that. There were two meetings that I'm aware of. One of them was called by Representative Joyce because of his concern with the reaction of the Inspector General. I went there because I was asked to by him.

The July meeting? Yes. So that was just you? No, I was there, Representative Joyce, Rick Neely, John Cronin, Chris Haspel.

But we were asked to be there by Representative Joyce. There was no issue of any subcommittee at that meeting. When a state representative who filed legislation on behalf of the town of Milton asked me to go to a meeting, I go. This had to do with the legislation, not with the RFP.

The legislation concerned the lease. I assume that's why Mr. Neely was there, because he negotiated for the lease. I honestly don't know who asked the other people to be there.

The second meeting, I called for, and I called the people who attended. I called Kevin Feely, because he works for me. That was the August 21st. It was a Thursday afternoon.

Speaker 4 (45:54–45:54)

No.

Speaker 2 (45:55–45:56)

No, that's when we met.

Speaker 1 (45:56–45:58)

It was the day of the last one of the meetings.

Speaker 4 (45:58–45:59)

Oh, after.

Speaker 2 (45:59–46:04)

Those are the two meetings I'm aware of. Neither one of them was a subcommittee appointed by anyone.

Speaker 4 (46:04–46:19)

I wanted to follow it through systematically though, you know you go on to the 28th, I still don't understand the 7th. The 7th is actually the 8th, the 8th is the day that we hand delivered the RFP.

Speaker 2 (46:19–47:31)

August 8th is the day we hand-delivered the RFP to Barbara Hansberry, General Counsel for the Inspector General. I was on vacation. Kevin, on my behalf, sent her with a couple of letters saying, please review this and provide us with your comments. August 28th is the date I received those comments and a letter from them.

That has nothing to do with the legislation. That has to do with the RFP. Neither of the meetings concerned the RFP except to this extent. In the second meeting, the August 21st meeting, I asked Barbara Hansberry, where do we stand with the RFP?

Because we had submitted it to her on the 8th. She said, I haven't finished reviewing it yet. And I asked her, when will we have your comments? And she said the following Wednesday, meaning the 27th, it turned out we got them on the 28th.

So the meetings did not concern the RFP, nor were they called for the RFP. They were called because of the legislative process and their comments, if you will, to the legislation. They were kind enough to meet with us to tell us, and I think it was reported to the board, that they had some concerns with it and they were looking to find a remedy, which they hopefully have done.

Speaker 4 (47:32–47:40)

And it was simply your concern about the questions about the RFP that led to this August 7th submission of the RFP.

Speaker 2 (47:40–48:04)

I thought I told the Board of Selective Intermediate that I would send it to the Inspector General. I don't remember when I was asked to. I think I was asked by the Board of Selective, but whether I originated or you did, I walked out of here with the understanding that I should submit it to the Inspector General, and I thought it was I don't recall whether you asked or I asked, but I thought the Board of Selectmen told me to, or at least approved it.

Speaker 1 (48:04–48:12)

It was that same night that you all took it for your own review, and were to give Kathy any reactions on it before it was released?

Speaker 5 (48:12–48:19)

No, I think it was early, because it was released the 20th. It was released in July. It was released in July. It was released in July.

Speaker 1 (48:19–48:20)

It still could have been.

Speaker 2 (48:20–49:03)

I can tell you this, my office got the bound copy, and by that I mean this, on August 8th. I was away on vacation, that's the day it was delivered. So you can call it what you want, but I submitted it to them because each of you had asked questions about it and I thought you authorized me to send it. But neither one of those, just so I don't confuse it, neither one of those meetings with the Inspector General concerned the RFP.

They both concerned the legislation. So if your concern is what meetings have been held on this, none. I've had a lot of phone conversations, whether it was since the letter came in, but… With the IG?

Speaker 4 (49:03–49:04)

Yes. Okay.

Speaker 2 (49:04–49:10)

But no meetings. I did bring up the question of one of them, but I was told we're not ready to talk about it.

Speaker 4 (49:10–49:22)

And you can see my concern that if these changes hadn't been made, and if a bidder was concerned about the process, I mean, they might have had the IG's office right behind them saying it's not in compliance with 30B.

Speaker 2 (49:23–50:57)

But what can I tell you? When I submitted on the 8th, to be perfectly honest, I hoped I would have an answer from the Board of Selectment well before the 28th. Particularly what the original document said right in it, because it's going to be open on the 29th. But what am I going to do?

Call them up and ring them up? Because, I mean, you can't bite the hand that feeds you. You have to use a little bit of discretion. And they don't have to do anything.

They're not required by statute to do that at all. They did us a favor, if you will, by reviewing it. Yes, they had some concerns, but that was the whole point of sending it to them. Let's see what, I mean, when I have comments coming from several different people As I said earlier, rather than address them piecemeal, it doesn't seem to be a good idea to come to the Board of Selectmen every week and ask for changes because A, B, and C, maybe they're all valid.

This is the agency that reviews that stuff. Let's have them put it all together. Let's see what they synthesize out of it. That's the result, and I think the result is good.

If you object to the process, I'm part of the process, so I guess I'm here to listen to that. But to answer your question about whether the Board of Selectmen should, I don't think we'd ever get a clear answer on that. But you are the awarding authority. I felt it made sense, given the unusual circumstances here, to ask the Board of Selectmen to approve the action today that's already been taken.

I think under the circumstances, if we're ever challenged, any judge would understand fully what happened and why it happened.

Speaker 4 (50:57–50:59)

I just don't want to see us challenged.

Speaker 2 (51:00–51:06)

But what would the challenge be? You have a change, whatever you choose to call it, that complies with 30B.

Speaker 4 (51:06–51:11)

Also, do you feel that if we extend the time, then there'd be less likelihood of a challenge?

Speaker 5 (51:11–52:19)

I'd like to make two points first of all I'm look at Kevin Feeley's cover letter for that RFP of August 8th and it says to Barbara Hansberry the general counsel for the inspector general as I believe you know for a number of reasons time isn't the essence in this matter please feel free to contact me if you have any questions. So the issue of the timing, the fact that you were requesting at least questions coming back to you as soon as possible so that the dialogue would continue and that if there were any, you know, substantive concerns that they be identified immediately. There wasn't a delay. Right.

Time is of the essence. I think that's one very important issue. that we need to bring up. It's unfortunate that I'm sure the Inspector General's office is busy, but that they were not able to get to this earlier.

Because I do think that time is of the essence. On the other hand, we welcome their comments.

Speaker 2 (52:20–52:51)

I don't know how to answer that question. If a bidder contacted you with a problem, I would say definitely. But you three have to make the judgment. changes, addenda, whatever, you know, impede the ability of a bidder, a proposer, to submit a bid to you by September 8th.

I'm not sure that they do, but I'm not the awarding authority. To me, my reaction to all of this, it's more an issue of how you evaluate it. But if you disagree with me, then by all means give them more time.

Speaker 5 (52:51–53:47)

I think we have to be aware that in any circumstances a bid may be challenged. We can't control what a contractor who doesn't receive the award may do. Certainly know that bid protests are fairly common. I read the reports of the MWI Board of Directors and I've talked to some people in there.

I know bid protests from Some of the large Boston contractors are fairly common, especially when a low bidder is a relatively new entity. I'm aware of that. If you look at item 5A, they're talking about awarding some contracts. And I know that those contracts, there were bid protests from Boston contractors that it was a matter of routine.

So if any of these contractors are considering bidding on the Milton Project, I think we would expect that they might, if they don't get the award, Or if any one of them doesn't get the award for Quarry Hills and thinks that our project is tied in with Quarry Hills, there may well be a big protest.

Speaker 4 (53:47–53:52)

And I think we should be prepared for that and not alarmed by it. I don't think we have to hand them an opportunity, though.

Speaker 5 (53:52–54:31)

I don't think we are handing them an opportunity. So how many days do you feel comfortable with extending? I think the Quincy City Council has some reason to believe that the Quarry Hills may get their award within the next two weeks, if I read the ledger correctly. I don't know if we have any better information than that.

But I am concerned that if this process is delayed, Quarry Hills is not the only contender, but it's the bird in the hand at the moment, we hope. And I wouldn't want to see them lose an opportunity to get the big dig material for the benefit of the city of Quincy, the MDC, and the town of Milton if that's an option. So I'm concerned about a delay.

Speaker 4 (54:32–54:36)

Could you answer the question of how many days delay are you stating?

Speaker 5 (54:37–54:45)

I don't know what the Central Lottery schedule is, but the City of Quincy, Kansas seems to think it's within two weeks. That's the best guess I have at the moment.

Speaker 4 (54:45–54:49)

I'm talking about our opening of what, Monday?

Speaker 7 (54:49–54:50)

Monday.

Speaker 4 (54:50–54:53)

Today's almost Friday.

Speaker 5 (54:53–55:04)

I asked Mr. Cronin to get in touch with Bruce Haskell. Has he had any requests from any potential bidders for a further extension?

Speaker 1 (55:05–55:12)

No. He has heard from not only the bidders, but potential bidders.

Speaker 6 (55:14–55:19)

Well, I think the issue is, she told you it was only 10 days? Yes. That was her estimate?

Speaker 2 (55:19–55:40)

But I called her up because I expected that he would ask me, what's the sufficient time? Or actually, it was suggested to me that it might be good to find that out by someone a little more alert than I am. That was her answer, 10 days. I mean, there's no cutting stone, but she said 10 days.

So I said, well, it's good enough for her. It's good enough for me to tell my client a little more to start with.

Speaker 6 (55:41–55:58)

Well, I'd be willing to consider 10 days, frankly, because we've been playing by their game, frankly, which isn't necessarily the rules that are necessarily outlined in the law, but we'll play by their rules, since with all due respect to the legal profession, there seems to be many interpretations of it.

Speaker 4 (55:58–56:01)

But this does protect us somewhat, playing by her game, right?

Speaker 6 (56:01–56:11)

That's right, that's right. So I would be willing to consider 10 business days, which would put it, excuse me, 10 calendar days, which would put it to that Thursday, the 18th, I believe.

Speaker 4 (56:11–56:14)

That normal calendar days versus business days?

Speaker 6 (56:14–56:29)

Yes. So I'd be willing to say that if that's what this attorney would like, That's something I don't think is unreasonable at this point to do. And obviously, we're having just seen this as you handed in the meeting here.

Speaker 2 (56:29–57:09)

By the way, I should say in answer to your question that They did give us a quick turnaround on this, because I asked today for a letter. And a lot of agencies would tell you where to go with these people. So they were, you might disagree on their results, but they were attempting to be responsive and cooperative. And they do perceive that they're working toward a solution that will help.

They were good in that sense. I mean, I, there were a lot of people who were just been busy or in confidence, so. So there was a, there was a motion, I think, that never got seconded. Well, yeah.

Speaker 1 (57:09–57:14)

Now, you'll amend the motion to say, and to issue addendum number four.

Speaker 6 (57:14–58:02)

I'll do that. I guess I would first comment that I wasn't aware of these amendments two and three, and I can't remember amendment one at this point, frankly. I will tell you that we do delegate to the town managers the authority to do these amendments and extensions. So the fact that you know, these, the extension was first branded by whatever number of days it was, from the 29th to the 8th, was something that, you know, we delegate to the people who have the most direct contact with the people requesting the information, such as the, you know, Bruce and John talked about.

Right, so I mean, I wasn't aware of that, and we delegate, again, on a regular basis on all the RFPs, the authority to do that, so I don't think there's any, the board doesn't usually get into approving the RFPs or the amendments to the RFPs, it's delegation authority.

Speaker 4 (58:02–58:31)

In this circumstance though, concerns and questions came to us as a board. Maybe the residents don't normally come to CitizenSpeak for some of these other RFPs and that's why I feel we have an obligation. to this RFP process here and I thank you for adding the 10 days and I would second that motion. But could you clarify the wording?

Are we skipping over this request for a ratification? Are we jumping right to a today?

Speaker 6 (58:32–58:55)

Are you combining it? I would move to ratify the town council's action on August 29th in the issue of addendum number 3 and add 10 days to the date presently contained in addendum number 2.

Speaker 5 (58:55–58:58)

So that would be by addition. By addition of 10 days.

Speaker 6 (58:59–59:05)

Addendum number 4. I was going to. Alright, so I would make a date.

Speaker 2 (59:05–59:35)

Hold on a second. I'd like to issue addendum number 4 which is meant for the time from the process to September 8th. Could I suggest an alternative wording please? Okay.

Don't do this as intended. That the latter part of that motion be to authorize Camp Terrestrial McKee to issue addendum number 4 which would extend the time for opening the requests for proposals to Thursday, September 18, 1997?

Speaker 5 (59:35–59:43)

Would we make that early in the day so that by the end of the day, by our meeting, we would have some knowledge of how many proposals would come in?

Speaker 8 (59:43–59:48)

11 apply.

Speaker 4 (59:48–01:00:07)

Should that addendum number four, John, Since we're voting to ratify addendum number three, make note of it, that the board officially ratified addendum number three? Or do you want to get back to us with an answer as to your concern about us ratifying addendum?

Speaker 1 (01:00:07–01:00:12)

I don't think it would be without precedent. How did you need to do that?

Speaker 2 (01:00:12–01:00:16)

So we're being asked? It's enough if it's in the minutes, in my opinion.

Speaker 8 (01:00:18–01:00:18)

All right.

Speaker 6 (01:00:21–01:00:47)

All right, so the motion is to ratify the town council's action on August 20, of August 29, in issuing addendum number 3, and to issue addendum number 4 to extend the deadline, excuse me, and to authorize the addresses B to issue addendum number 4, to extend the opening of the bids from September 8th to September 18th at 11 AM.

Speaker 4 (01:00:48–01:00:51)

September 18th?

Speaker 6 (01:00:51–01:01:01)

Yes.

Speaker 4 (01:01:01–01:01:03)

Which is our next meeting?

Speaker 5 (01:01:03–01:01:08)

We're back on every week. The calendar we received.

Speaker 1 (01:01:10–01:01:16)

I'm off, but I kind of assume we keep going back now to every week.

Speaker 6 (01:01:17–01:01:20)

Yeah, the calendar actually did have the 11th off, but it seems to me there's enough business.

Speaker 4 (01:01:20–01:01:24)

I think there's enough business. I thought you were extending the plenum.

Speaker 6 (01:01:24–01:01:25)

I'd like to.

Speaker 5 (01:01:25–01:01:26)

We would all.

Speaker 2 (01:01:28–01:01:32)

Mr. A, can you read that once more, please? The amendment? Yeah, the motion.

Speaker 6 (01:01:32–01:02:01)

Okay, I move to ratify the town council's action of August 29th in issuing addendum number 3 and to authorize Kim Dressen McKee to issue addendum number 4 to extend the opening of the RFP from the 8th of September. Proposals, excuse me, opening proposals from September 8th to September 18th at 11 a.m.

Speaker 4 (01:02:03–01:02:18)

I will second that and vote for it, but I'd just like to give my reason that it's because the Inspector General's office has certainly provided us service that I think we'll come to appreciate.

Speaker 5 (01:02:25–01:02:27)

Are we ready for vote?

Speaker 1 (01:02:28–01:02:58)

Please say aye. Aye. Unanimous. It was distributed with that legislation.

It's actually not a license, it's just a change of a manager. John? Yes.

Speaker 8 (01:03:01–01:03:02)

What's that number?

Speaker 1 (01:03:03–01:03:07)

Fourteen.

Speaker 8 (01:03:10–01:03:11)

Fourteen? It's nice to meet you. Bye-bye.

Speaker 4 (01:03:12–01:03:34)

Can I ask one question? Are we going to discuss this? The change to the house amendment, I don't know if Kevin was involved in that. Okay, I just wanted to be sure.

Because it isn't numbered next. Congratulations again. Thank you. So your name moves over on the station.

Speaker 2 (01:03:34–01:03:53)

More responsibility. More money. Did you want me to address the liquor license?

Speaker 1 (01:03:53–01:03:58)

Yes, please.

Speaker 5 (01:03:59–01:04:02)

Do you have questions about the legislation?

Speaker 4 (01:04:05–01:04:17)

We just got this one tonight. in the process.

Speaker 1 (01:04:17–01:04:24)

Yes, yes. This goes back to the meeting of the 21st. Yes.

Speaker 2 (01:04:28–01:09:02)

The Inspector General raised some additional questions about the legislation and expressed some concerns with public bidding statutes other than 30B which frankly I do not understand to be an issue when we left the July meeting. Since they shared them with us, we… They suggested remedies. Yes, they suggested remedies and sent some draft language to Brian Joyce that we've worked on over a couple of weeks now.

Essentially, their questions were, To the extent you're talking about closing and capping the landfill, it isn't clear from the language of the governor file that you're complying with the applicable statutes. And that was a surprise to me, frankly, because the whole tenor of that first meeting in July was all about 30B. But notwithstanding, that's why they're there. They said there are ways to address that.

And the ways to address that are to put amendment language to the House bill filed by the governor that would authorize a couple of things. Number one, would authorize the Milton Board of Selectmen to act on behalf of the town, rather than, for example, a chief procurement officer. That seemed eminently reasonable in this case, I mean, perfectly, honestly, I'm more comfortable with the Board of Selectmen doing it because you have the elected authorities. That was number one, their point.

Number two, they said, it should be clear that you can utilize the provisions of Chapter 30B rather than other public, other construction statutes. including particularly Chapter 30, Section 39M. If you were building a road, for example, or building a bridge, 3039M, the Inspector General raised the specter that there's at least a possibility, if not a probability, if you're closing and capping a landfill, normally that's under Chapter 30, Section 39M. The third issue that they said should be raised since we feel you need this authority, you need to somehow address the fact that it would be effective retroactively.

The language that they have agreed to after several discussions back and forth between me and their office, a woman named Fran Brown, is the language that you see in front of you here. I'll try to summarize it. What that would add to the governor's bill is, number one, It would say that the town of Milton is authorized to do this project acting through its Board of Selectmen. Number two, it would say, to be precise, you can issue the RFP for closure and post-closure use of the landfill.

You, the Board of Selectmen. That you can do that utilizing competitive sealed proposals. that you can make the decision which proposals provide the best offer, that the action you've taken to date is okay, that it's validated, ratified, and confirmed. That language is accomplished in two methods.

Number one, The sentence you see, the action of said board in issuing a request for proposal to their board and giving public notice is hereby ratified, validated, and confirmed. That language is requested by the Office of House Counsel. The second way it's accomplished is the language. This act shall take effect on July 1, 1997, which is the language requested by the Inspector General's office.

If the legislation passes with that amendment, then the Town of Milton is authorized to go through this 30B procedure with this RFP to seek proposals for our closing and capping of the landfill and post-close use of the landfill and is authorized to issue a contract with that through the Board of Secretary. The Governor's Council also agrees. Yes. Senate Council?

Speaker 5 (01:09:02–01:09:13)

Senate Council agrees. Yes. And this is not a substantive change beyond his ability to accept it. I'm sorry?

This is not a substantive change beyond his ability to accept it.

Speaker 2 (01:09:13–01:10:54)

Correct. It turns out that this type of bill filed by the governor is subject to different rules than a bill that we filed. So we don't have the same restrictions on substantive amendments. I am told that it's acceptable to the Inspector General, to be more precise, they don't object to it.

As of this afternoon, they hadn't put that in writing, but they had promised the community and local affairs that they would. And it's acceptable to the other council lawyers in the various offices. And the next step is to have the community and local affairs consider it. And if they voted out, then at some point it would get to the Committee on Third Reading, where it got logged in before.

As I understand it, although I haven't seen it in writing, there is a hearing next week for the Committee on Local Affairs, I believe on September 9th at 11 a.m. I was told that by… Can you do this? Yes, can you do this legislation?

All I can tell you is that when a bill is filed that concerns a town or a city, that applies to a municipality, the committee of local affairs has jurisdiction to review it. It's within their area. And they're apparently the first stop. It's assigned to them.

Yes. It's referred to them. It's assigned to them. They're like the first review, first substantive review.

Speaker 4 (01:10:56–01:11:14)

OK, so they more or less would, on the behalf of the townspeople, review what if they feel that it was legally written correctly, or that some control or power was being changed from one hand to the other, I don't particularly understand.

Speaker 2 (01:11:14–01:11:32)

Well, I'm not sure either, because I've never been before them. But they have all of that authority. They can decide whether it's legal, whether it's in proper form from a foreign point of view, whether it violates any statute, whether it violates any constitutional provision, and whether it's a good idea.

Speaker 1 (01:11:32–01:11:33)

Could it have a purpose?

Speaker 4 (01:11:34–01:11:44)

Well, it makes sense considering that this new wording appears to give the board more power than we had before.

Speaker 3 (01:11:45–01:11:46)

Yes.

Speaker 4 (01:11:47–01:11:48)

Unquestionably more power.

Speaker 6 (01:11:50–01:11:53)

Well, the change that you talked about with the Chief Procurement Officer.

Speaker 4 (01:11:53–01:12:03)

Right. Yes. Right. And since we're not going before any…

We don't have a Chief Procurement Officer. But normally we go before town meetings when we have

Speaker 1 (01:12:05–01:12:12)

This is a very public, open way of doing it.

Speaker 2 (01:12:14–01:12:40)

But all I can tell you is they have jurisdiction to look at any aspect of the bill. Form, substance, whether it's a good idea, whether it serves a public purpose. By the way, they reviewed the first bill, too. bill that was originally filed after the town meeting and it passed through there and it was at the committee on third reading where the inspector general raised the issues there.

Speaker 1 (01:12:41–01:12:46)

So the project has received their approval from Milton as well as the force for Quincy? Yes.

Speaker 5 (01:12:46–01:12:55)

Does any member of the board wish to testify at the hearing on Tuesday?

Speaker 6 (01:12:56–01:12:57)

I'd be interested in attending a press conference.

Speaker 4 (01:12:58–01:13:05)

Well, I don't know if I'll testify, but I'll certainly plan on attending it. Are you speaking at it? You just said you've never appealed before.

Speaker 2 (01:13:07–01:13:43)

Well, I don't know if I'm authorized to speak, but I certainly plan to be there. You're a legislator. Yes. I didn't mean to be conceited.

Part of my job is legislative counsel. I will be there if necessary. I will speak. What was the time?

11 AM, September 9th. It's hearing room A2. So we'll post the meeting for the board. I believe it's in the annex in the back, if you will, the back building, the one behind the archway there.

If I'm doing anything differently, I'll let you know if you're on the phone. That's why I've been told by telephone. I don't have any writing on that.

Speaker 1 (01:13:45–01:13:49)

and the people's national should be there.

Speaker 4 (01:13:49–01:13:51)

So this is run similar to a public hearing, is it?

Speaker 2 (01:13:51–01:13:53)

Yes. Well, it is a public hearing.

Speaker 4 (01:13:54–01:13:54)

Oh, that's what it's called?

Speaker 2 (01:13:54–01:14:01)

It's a hearing of the Committee of Local Affairs, yes, run by the chairman.

Speaker 1 (01:14:01–01:14:01)

Whose name is it?

Speaker 2 (01:14:03–01:14:15)

The House chairman is Representative Marie Parenti. The Senate chairman is Susan Fargo, Senator Susan Fargo.

Speaker 4 (01:14:17–01:14:24)

How many members are on the board, David?

Speaker 1 (01:14:25–01:14:35)

I don't know. Go ahead and sit down and review that.

Speaker 5 (01:14:35–01:14:36)

Any further questions?

Speaker 1 (01:14:37–01:14:38)

I have 14.

Speaker 5 (01:14:42–01:14:46)

a license to the American Legion Post?

Speaker 1 (01:14:46–01:14:54)

This is not for a license or a new license. It's for a change in the manager who is named in the license.

Speaker 2 (01:14:59–01:15:01)

John, do you want to?

Speaker 3 (01:15:02–01:15:02)

Yes.

Speaker 2 (01:15:03–01:16:17)

There are two issues here. Number one is the request to change manager. I was asked to look into it. It appears to be properly filed.

The entity that holds the license is asking you to change the manager. There are some procedural forms to file which I believe they have filed. You and the state ABCC get the opportunity to rule on this. Your local regulations provide that a manager shall be of good moral character.

You are permitted, although you don't have to, look into the background of a proposed manager. And for example, you would have the right to approve a request subject to a background check. If you chose not to do that, the ABCC would do so in any event. The request is properly before you.

I guess the issue is whether there's any reason not to approve it. And the reason from your regs would be, well, two reasons. One, if there's any misstatement in the application, I can't tell you that there is any misstatement. Or the second reason would be if the proposed manager is not a person of good moral character.

And the normal way to determine that is through a background check, a criminal record. Not all communities do that. You're not required to by statute, by your own rights, but you do have that standard.

Speaker 4 (01:16:19–01:16:20)

Did we do that?

Speaker 8 (01:16:20–01:16:20)

No.

Speaker 1 (01:16:21–01:16:24)

We're neutral at the ABC.

Speaker 2 (01:16:24–01:16:31)

The ABCC tells me that most communities don't do it, but we're certainly neutral.

Speaker 1 (01:16:31–01:16:40)

If there's any interest at all, you could approve this subject to a clean bill through our record check process. That would be a good thing.

Speaker 5 (01:16:40–01:16:44)

There'd be no harm to having a local check?

Speaker 9 (01:16:44–01:16:47)

No harm at all, thank you.

Speaker 4 (01:16:47–01:16:58)

There wouldn't be any harm to any check. Nowadays, with the drunk driving concern, I would think we'd want to get whatever information we can obtain legally.

Speaker 5 (01:16:58–01:17:05)

Do you want to have a motion to approve subject to a background check? Second.

Speaker 7 (01:17:06–01:17:09)

All in favor, please say aye. Aye.

Speaker 2 (01:17:12–01:19:36)

Certainly a question was raised as to who is or should be the license holder. As I understand the history of this, way back at some point in time, there was legislative authority by a special act to issue a liquor license to the Legion Post. It's provided by statute and you follow the proper procedure. There was also an act of the legislature that allowed the NBC, I believe, to convey the land on which the Legion Post is located.

to the Legion Building Corporation that was and is the owner of the land. I understand that historically that was the original license holder, the local Milton Post 114 Building Corporation. But somehow, for reasons no one is sure of, it evolved to a situation where today the license holder is the post, the membership, the Milton Post 114 American Legion. You were asked The question was raised by someone as to how, if at all, you change, if you so desire, the liquor license holder from the Legion Post Building Corporation to Post 114.

Yes, I'm sorry, the reverse. To change it from the post to the building corporation. I discussed that with the general counsel to the ABCC, because I can't find it addressed in the statute. The only way the statute provides for a transfer of a liquor license is if the holder requests, assents to it.

There's a statutory procedure for a transfer. And often, if you sell the business or something like that. So unless there's a- Once they have it, it appears to be theirs. Yes.

And if they don't agree to it, there's no way to involuntarily transfer it from one to another. The only exception to that is if you have a seizure for not paying your taxes, but that's not what you're talking about here. The only other possibility, which you mentioned to me, is if you have a situation where it's clear that you have a clerical error, where your records are incorrect, and you have the wrong entity on your records, that can be addressed administratively. But if that is not the situation, and if you have a case where two entities disagree, and the one that doesn't have the license now wants it.

But the one that has the license doesn't want to transfer it. There's no statutory vehicle to accomplish that.

Speaker 1 (01:19:36–01:20:13)

Just as clerical error, if it was a clerical error. Yes. And we're just going to have to go back to the ancient records to see what it said at first. and research it from their back to see if there ever was a…

if there ever was any, owned by any kind of… to report to you on that.

Speaker 8 (01:20:13–01:20:15)

Any other council members here?

Speaker 1 (01:20:15–01:20:49)

Who else was… I don't know. I'll be involved in that, but look, why don't we tackle that one more time. This is an agreement with the chairman.

the change orders with the government that have been negotiated to resolve a number of items.

Speaker 5 (01:20:49–01:22:12)

I called Paul Cantor and asked him to run this by me. He said there have been a number of changes and basically the way they occurred is that for the Forbes Road project, we originally planned to tie in 29 homes and then three additional homeowners wished to join in. So in the end, 32 were tied in and that resulted in an increase in costs. Additionally, in doing the work, the contractor found two MWRIA water lines that were unknown, the water lines that go up over Long Adams Street.

And that also cost additional work both for the contractor and for the engineer. And in the case of the, okay, let's just talk about the contract. For the contractor, there was an increase in cost due from the number of houses being increased from 29 to 32. There was an increase in cost related to the two MWRA water lines that they had to work around.

And there was a decrease in cost because the town is going to do the asphalt work. We can do it at a lower price because we can get a lower contractor price than Perdoni Brothers can get. And then there's an additional cost for the engineer because there again the discovery of the MWI water mains required additional engineering time to redesign and additional time for a resident engineer.

Speaker 1 (01:22:13–01:22:17)

Who's error was it?

Speaker 5 (01:22:17–01:22:21)

I don't know.

Speaker 1 (01:22:23–01:22:27)

I ask it at that particular point because I have a suspicion.

Speaker 6 (01:22:30–01:23:22)

Do you know the answer? I asked him how that was provided for in terms of the designer and he reported that the price was finally cut in half what the engineers wanted. So that's what his report was as to how the engineer absorbed

Speaker 1 (01:23:27–01:23:40)

All right, that's appropriate. There's no question they will put you additional design expenses. They want it running that line down the sidewalk.

Speaker 5 (01:23:44–01:24:04)

The cost of the project still comes in at an estimated $30,000 less than the total appropriation. These were fortunate discoveries that, among other things, delayed the project and put the network through a lot of extra time living with the construction.

Speaker 6 (01:24:05–01:24:18)

I think the other point is we're going to be asked to make a payment tonight, but more importantly, we're going to withhold $17,500 because the contract still has repairs and work to do in the neighborhood, some of the neighborhoods where there's been damage.

Speaker 5 (01:24:19–01:24:20)

You went across from Dr. Oken?

Speaker 6 (01:24:21–01:24:22)

Yes.

Speaker 3 (01:24:22–01:24:22)

Yes.

Speaker 5 (01:24:22–01:24:24)

or more serious?

Speaker 6 (01:24:25–01:24:27)

Irrigation problems or landscaping problems?

Speaker 5 (01:24:27–01:24:38)

Damage to an irrigation system and Fredonia is going to have to do more work to repair them and so we will withhold a payment to be sure that that work is done.

Speaker 6 (01:24:38–01:25:17)

That's the 17th item and also at the top, this item 6 on page 2 of the original document has to do with the septic systems. It's supposed to properly abandon the septic systems and there's at least three that he hasn't satisfied the town's engineers that he's properly abandoned and filled them with sand and whatever else you do for septic systems. So that's another reason we're all panicked because it's three of those homes that haven't been taken care of. So the 17-5 is really against the final contingency plan.

Speaker 1 (01:25:17–01:25:54)

The company that sold the contract, the grinder pumps, the key components, and who we will be relying on to provide service into the future, hasn't yet paid. And so, you know, it's just clear that if we can get the payment processed tonight, we'll thank his workers. And that's a big bill. It's passionately a big bill.

Speaker 5 (01:25:55–01:26:06)

John, I presume you reviewed this amendment, and from the language it appears that we may, in a sense, be avoiding going to court over claims and incurring a lot of expenses.

Speaker 2 (01:26:06–01:26:10)

Seven actually did, but he followed it from day one, but that's true.

Speaker 5 (01:26:11–01:26:39)

So this will resolve issues regarding payment and possible claims of the town against Perdoni or Perdoni against the town?

Speaker 6 (01:26:42–01:26:44)

on that.

Speaker 5 (01:26:45–01:26:58)

It deletes the paving overlay bid, provides assurance that Perdoni-Barber, this will pay all subcontractors upon the receipt of the next payment, sets the final amount at $441,551.11.

Speaker 6 (01:26:59–01:27:35)

All right, that's the amended amount, right? That's after taking into consideration the elimination of the paving. And the 17. And the 17-5 is still within the 441.

We're just not going to issue a warrant. So we're going to back you up. The 441 is after taking out the 68,786, right? Yes, that's correct.

All right. I would move that the total contract as amended be set at 441,555.

Speaker 5 (01:27:37–01:27:49)

Second. All in favor, please say aye. Aye. And do the motion to sign that amendment.

I think we need a motion to sign.

Speaker 6 (01:27:50–01:27:56)

I'll move that the amendment deleting 68,786 dollars be signed.

Speaker 2 (01:27:58–01:28:00)

That's technically a change order.

Speaker 5 (01:28:00–01:28:37)

Okay, I'm looking at this page, Rick, this seems to break it out into amendment, change order, certificate and amendment. So in terms of the attachments to be signed, this relates to the documents we have.

Speaker 6 (01:28:41–01:28:50)

So is it 62,000 or is it 68,000?

Speaker 2 (01:28:50–01:29:08)

They may be in reverse order. The reduction is in the amount of 62,000 plus and that is change order number 1. It might be below change order number 2 in your file. There are two change orders.

Speaker 8 (01:29:09–01:29:11)

We actually, no, we need to change it.

Speaker 2 (01:29:12–01:29:20)

All right, there are a few of them that are in this packet.

Speaker 3 (01:29:22–01:29:23)

Okay. Okay.

Speaker 4 (01:29:24–01:29:26)

I'm going to make a motion and put it right after these.

Speaker 6 (01:29:26–01:29:28)

I just see what you're going to recognize.

Speaker 4 (01:29:28–01:29:34)

Okay. There's change order number 2 is right here. That's change order number 1.

Speaker 6 (01:29:34–01:29:36)

All right, so change order number 1 was, let's take a look here.

Speaker 5 (01:29:43–01:29:53)

We're deleting the overlay bid. Is there an added cost or a remaining cost? for the doing, Perdoni doing the castings.

Speaker 6 (01:29:53–01:30:03)

Here's the situation. The original contract price was 467, 742 and 30 cents. There are two changes that net out to what we just voted, 441.

Speaker 4 (01:30:03–01:30:06)

So that's the first change, right?

Speaker 6 (01:30:06–01:30:10)

The first change brings it down to 405 and then we're going to go back up by 36.

Speaker 4 (01:30:10–01:30:13)

And then we're going to drop 36. Yes.

Speaker 6 (01:30:13–01:30:18)

Okay. So we've actually already set the full price. That's not a sufficient vote, huh?

Speaker 4 (01:30:18–01:30:20)

We didn't vote on it, though.

Speaker 6 (01:30:20–01:30:22)

We voted just to set the contract at 4.41.

Speaker 4 (01:30:23–01:30:27)

But you want to sign each change order.

Speaker 6 (01:30:27–01:30:39)

All right, so vote to sign each change order, which brings us to the 4.41 we voted. All right, so I'll move the first change order to reduce the original amount by 62,259.13 cents.

Speaker 5 (01:30:39–01:30:41)

Second. All in favor please say aye.

Speaker 6 (01:30:42–01:30:43)

Aye.

Speaker 4 (01:30:43–01:31:01)

I move the second change order to increase the amount by 36,000. Did you vote on that? Okay. Unanimous.

And I move the second change order to increase the amount by 36,071. Is that 94? Yes. 94 per grand total which we have agreed is 441,555.11.

Speaker 6 (01:31:02–01:31:03)

I second that.

Speaker 5 (01:31:03–01:31:09)

All in favor, please say aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye.

Speaker 8 (01:31:11–01:31:11)

Aye. Aye. Aye. Aye.

Speaker 6 (01:31:12–01:31:13)

Aye. Aye. Aye.

Speaker 2 (01:31:13–01:31:19)

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye.

Speaker 4 (01:31:20–01:31:21)

Aye. Aye. Aye. Aye.

Aye. Aye. Aye.

Speaker 2 (01:31:21–01:31:22)

Aye. Aye. Aye.

Speaker 6 (01:31:22–01:31:26)

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye.

Speaker 5 (01:31:26–01:31:28)

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye.

Speaker 6 (01:31:28–01:31:32)

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye. Aye. Aye.

Aye. Aye.

Speaker 3 (01:31:32–01:31:32)

Aye.

Speaker 6 (01:31:34–01:32:29)

All right, this one is 405,549 dollars and 65 cents which leaves parenthetically 17,500. All right, so I'll move the payment of 105,549 dollars and 65 cents. Number four is actually with Earth Tech, so the document here reads… Amendment number…

The fourth item we're doing is truly reads in the legalese here, it reads, this is amendment number two with Earth Tech. So, we would move to amend the Earth Tech contract. Let's see if it matches here.

Speaker 9 (01:32:34–01:32:38)

Let's take a look at the other one. Let's see what they all say.

Speaker 6 (01:32:41–01:32:48)

$60,000. Let's see.

Speaker 8 (01:32:48–01:33:00)

This one is going up $60,000 to $75,000. $60,000 to $75,000. $60,000 to $75,000.

Speaker 6 (01:33:00–01:33:20)

No, there's $47,000 falling out of the paper here. in the back there, C. C reads, deleting 60,800 and inserting 75,000 in the front. The last page is just the signature page.

Speaker 2 (01:33:29–01:34:08)

I think to answer that, Rick, you have to compare it to the original contract. 47,000 is compared to the original price. There apparently was an earlier agreement to, for other reasons, an earlier addendum, excuse me, amendment. I don't have the original contract in front of me but I'm reading this to say that number C there would increase the original price by.

See how it says as amended by number one? Where? Which document are you looking at?

Speaker 8 (01:34:08–01:34:10)

I'm looking at the amendment.

Speaker 2 (01:34:10–01:34:35)

Page 2, item C. The company memo has it looking at 47,000. I think what he's saying is compared with the original contract price, the phraseology they have used in C is to amend an early amendment, this one.

Speaker 1 (01:34:36–01:34:52)

This is the United States. I wanted very much for Paul to come in, and this all came, a lot of it came into us today. A lot of it I faxed you this morning.

Speaker 5 (01:34:52–01:35:10)

paragraph 4 doesn't agree with the contract it might go back to the first, but it needs to be clarified there's also a mention of one original amendment to the agreement, and I don't hear her there where is that?

Speaker 1 (01:35:10–01:35:11)

is that it?

Speaker 4 (01:35:11–01:35:20)

these are all number 2s 4 copies of that are number 2 right, there were 4 copies of this this is 94, yep

Speaker 8 (01:35:23–01:35:27)

Let's defer that.

Speaker 5 (01:35:28–01:35:46)

So we'll try that out next week. I guess we need the meeting next week. Famous last words.

Speaker 4 (01:35:46–01:35:55)

There might have been 17 not 47. on that last slide.

Speaker 9 (01:35:55–01:35:59)

I think that's my copy.

Speaker 4 (01:35:59–01:36:05)

That's fine. I gave you my copy of the document.

Speaker 1 (01:36:05–01:36:31)

I don't think so. If you receive anything in writing regarding, you said you were awaiting something, write it.

Speaker 2 (01:36:33–01:36:38)

Because they try to fax in something in the afternoon and in the morning. Should they call before they fax?

Speaker 4 (01:36:39–01:36:41)

No, it just, if the computer crashes.

Speaker 1 (01:36:42–01:36:44)

Has it a seven page limit or something?

Speaker 4 (01:36:44–01:37:01)

No, I'm just not going to print off a computer 20 pages, but the day they were faxing it down. Sometimes the phone line, sometimes those wires just drive the computer incorrectly. She left a message. The best thing to do would be just leave a message, and then I'll check.

But it only happens occasionally.

Speaker 2 (01:37:01–01:37:05)

She tried that afternoon, then tried the morning. I said, call.

Speaker 4 (01:37:05–01:37:13)

We shut it down in the morning until it took care of that. But I have a backup, so if I am there, she could call, and I could turn the backup on.

Speaker 5 (01:37:16–01:37:32)

We're able to. Thank you, John. Thank you. Just the board wish to approve the following block potty requests.

We have Grafton Avenue, Burncroft Road, Martin Road, and Daly Road Extension.

Speaker 6 (01:37:32–01:37:34)

I move he's in pass.

Speaker 5 (01:37:34–01:37:37)

Second. Okay, please say aye.

Speaker 3 (01:37:37–01:37:37)

Aye.

Speaker 5 (01:37:40–01:40:14)

We have a letter from Richard Ring, Precinct Two Town meeting member, regarding the master plan for the Lowinna-Ponsett River. Rick and I both attended a meeting last night of the Lowinna-Ponsett Greenway Group. And this issue did come up. It was a long agenda, but this issue did come up.

And actually, it was raised by, I think, some people from Mattapan. because Richard Kleiman mentioned that the Neponset Greenway security plan for the area between the gas tanks on Boston Harbor and the Central Avenue T Station was being reviewed internally by the MDC and that within a week or two it would go out to public safety agencies. And because he did not mention any plan for the area between Central Avenue and Mattapan, the people from Mattapan were concerned about that. Additionally, we learned that the state had voted in a deficiency budget $8 million in cash for the Pope John II Park.

And that would probably only finish half of the park, the half that was the old, not the old Howell Street Landfill, the drive-in, because the drive-in is not as much of a problem as capping a landfill, so that the eight million would not do the whole park and they would definitely do the part that's going to be quicker and more easily done, which is the drive-in site. The landfill is, they still haven't picked an engineer for the comprehensive site assessment, so they've got a lot more work to do on the landfill. I think it may be more than that. I think it was $15 million to cap the landfill and then additional money for the park.

But there was also a concern that the safety and security plan wouldn't address the issues related to the park, except in a very general sense. But the issues were specifically raised with regard to the Natopan part of the project by the people who were working in the Orion Street playground. So this issue cause interest and concern and we do expect to see a plan probably in the next few weeks.

Speaker 6 (01:40:14–01:40:41)

After the meeting, Richard Kleinman said he would provide this for the department. And that's been the request of the board since the, probably going back a year and a half. So the fact that they may submit just a piece of the plan for the section from Central Avenue to Moon Village, that's not the whole plan.

Speaker 5 (01:40:45–01:40:56)

And additionally, they did pass out a letter from the T, which has closed the gate at the Milton T Station because of issues about liability and safety.

Speaker 1 (01:40:58–01:41:08)

This is a gate and a fence that runs parallel to the tracks. People carry a canoe.

Speaker 6 (01:41:09–01:41:15)

You know, it's a good inconvenience. Well, it's fairly dangerous crossing the streetcar track with a trailer.

Speaker 1 (01:41:16–01:41:23)

As a stop, as a trolley car stop, it's probably the best location to find.

Speaker 6 (01:41:23–01:41:47)

You know, one of the members there last night, who lives in Cedar Grove, suggested that they in fact have a rail system right down the right-of-way that they own. Right to the bridge. This is a resident who lives probably a half mile away. He said, he's got a reliability issue.

I think he's right. And the issue was, he said, let's portage your canoe right along the right-of-way, which is only, you can see, straight down the river.

Speaker 5 (01:41:48–01:41:51)

And build a new canoe launch as opposed to using the landing.

Speaker 6 (01:41:52–01:41:58)

He said, trying to cut across the streetcar tracks, I can understand why a railroad official would not want you to cross the railroad tracks for the canoes.

Speaker 1 (01:41:58–01:42:05)

Every time you get off, you head west, every time you get off the trolley, you cross the tracks.

Speaker 6 (01:42:05–01:42:14)

Yeah, but if you're trying to move a canoe across and you drop the canoe as the streetcars are approaching… But the streetcars have to stop at a stop.

Speaker 5 (01:42:14–01:44:30)

We do expect to see something within two to four weeks so that's an update. Does the board wish to approve and sign chapter 90 reimbursement requests in a final report? All in favor please say aye. Aye.

We're up to item 15, does the board wish to appoint a member of the capital budget advisory committee? And on Tuesday night, the school committee voted to appoint, to ask Brian Walsh, to appoint Brian Walsh as their representative to this committee so the selectmen would issue a motion. an appointment form to him. Well, it's the Selectmen's Committee so he, I think he gets a form.

Additionally, we still have an opening for, one non-affiliated citizen. And I did consult with Mary Cobb on the school committee and got a list of several names from her and from the superintendent. And they're all good candidates. And I suggested several candidates whom they thought were good candidates.

I did try to contact one person today and was not able to reach him, but I do hope that we'll have an appointment for the non-affiliated citizen a week from now. We also had an author from Barbara Hearn on the prior commission that he would be willing to serve. in trying to make a committee that would represent all of the interests of the town. We do have an appointment for a member of the board of selectmen and one for a member of the school committee and then we're trying to have non-affiliated people because I think if we appointed a park commissioner we would be hearing immediately from the library trustees and the council on aging and some of the other groups, the cemetery.

Speaker 4 (01:44:30–01:45:34)

I today asked, and John Cronin asked me, the consistency of the committee. And there is no real stipulation that says the citizen has to be unattached. So we are postponing our judgment. But if there are other names submitted to you, since it's the full committee that appoints this, I'd like to know who the other names are.

And if anyone is interested, I think I just received tonight another, both Mr. Horne's letter was just given to us by you. But when letters come in for appointments to these committees, since it's the whole committee that reviews it, I feel the information has to be photocopied and given to us. I'd like a complete list of the names.

Mr. O'Harn had delivered a letter. He called me right after August 22nd saying, I delivered a letter to the Secretary's office. I hope you'll consider it, period.

And it wasn't in my packet. So tonight when I had asked, Kathy had it. You got it tonight now.

Speaker 5 (01:45:35–01:46:38)

I don't think I got it back again. Remember you made extra coffee? It may be in here somewhere. So you will get a copy of this document right here.

But I did call Barbara Hearn today and say that, okay, here we go. That's from Barbara Brown. That first of all, with regard to the Capital Budget Committee, when the Capital Budget Committee began, which was in 1994, it was given a pretty open-ended, which was to make a lot of decisions itself as a committee. And so that a lot of what has developed has developed over a period of time.

The actions and the directions that the committee has gone in often have been to a large part determined by the committee as the situation has developed. Certainly, you know, this board could choose to appoint an affiliated person, but in my opinion, the other boards would be very unhappy.

Speaker 4 (01:46:38–01:46:52)

Well, I just feel that, you know, the whole board has to, especially since he's called up to say, will you consider it? And I said I hadn't got any letter, but I'd like a list of all the residents that you're discussing or any, you gave us one resume, are there any others?

Speaker 5 (01:46:54–01:47:16)

No, and in general, I would just say that sometimes it's embarrassing to people who are, whose names are suggested for a committee who are not the person who are chosen to have their names released to the public or discussed on TV. So I generally do not, I'm not even going to mention the person whom I called today.

Speaker 4 (01:47:16–01:48:00)

In case he declines and he may not wish his name to be proposed. It's very simple that if someone's not interested, when they submit a letter to us, the board members, they can say please read, you know, my name's for public release or not. Because in appointing committees, it's important that we see the whole span of residents who might be willing to serve, especially if each one of us represents a different constituency. I mean, that's my hope, is that these committees will represent a wider background, maybe.

And I'd also like, if you could give us an update further, I didn't get to watch tonight's meeting, and you had the meeting with the… Could you give us an update on what happened at both of those meetings?

Speaker 5 (01:48:00–01:50:31)

Well, first of all, do you want me to report on… Did you have your first meeting? Capital Advisory, right? No, the Capital Budget Advisory Committee has not met since before time meeting.

Okay. I did have a meeting with Mary Cobb last Thursday night and she… I chose to bring Brian Walsh to that meeting and we agreed that it would be a good idea to have Charlie McCarthy at that meeting. He's a member of the Capital Budget Advisory Committee as well.

And I'll very, if you want to ask any questions I could expand on this but to be brief because it's a late hour. We discussed the purpose of the Capital Budget Advisory Committee. There was an exchange of information on the history of the Capital Budget Advisory Committee when it was formed, that it's appointed by the Board of Selectmen, who reports to how the priorities are determined. And there was some discussion of the underground storage tanks.

And at a conclusion of the meeting, there was a suggestion by the Chairman of the Warrant Committee that he would go to the school committee meeting on Tuesday night and report on some of these issues. And I suggested that the school committee attend the joint meeting of the Warrant Committee and the Capital Budget Advisory Committee in October that will be related to the school capital budget requests. There was a joint meeting, a series of joint meetings last year between the Warrant Committee and the Capital Budget Advisory Committee so that the department heads could come in and make their presentations one time to both committees. And both committees could hear the questions and the answers rather than have the departments have to go out two evenings.

And the Chairman of the School Committee suggested that when the Capital Budget Advisory Committee reports to the Board of Selectmen and makes a recommendation, which the Selectmen submit as an article, that they also as a courtesy report to the School Committee. And that's really for good communication, that the School Committee will hear directly what the recommendation of this committee as with regard to their request as well as the request for the other departments of the town. I think it was a very positive meeting. There were some perceptions that needed to be discussed and issues to be clarified and I think everybody really tried to you know, open the channels of communication and clear up any, any misunderstandings.

Speaker 4 (01:50:31–01:50:35)

What's the meeting in October again? Did you say that's an annual meeting?

Speaker 5 (01:50:35–01:51:23)

Last year for the first time, because this capital budget process is new and it's developing and every year it's a little different as the committee sees, you know, a better way to do things. We even have the committee chairman, Ed Spelman, has actually sent out new forms this year which we think will work better. Last year there was a series of two or three meetings by the Warrant Committee and the Capital Budget Advisory Committee together in the Warrant Committee room. The department heads came in and made their presentations.

of what their department was requesting for capital items. And there was an opportunity for questions by both boards. And as I said, there was a good sharing of information that everybody was hearing the same thing. And obviously, it was much more efficient for the department heads to make one stop rather than two stops.

Speaker 4 (01:51:24–01:51:54)

I know other towns have done something that I remember we did when I was on the Warren Committee. Once the information all comes through, they had a tour of the town to visually see what the capital needs were. They had school committee, what we did, Warren Committee, school committee, school assignment. And I think that's very productive.

Other towns actually, even a lot of town meeting members, they recommend, you know, if you'd like to come and take this tour so you'll see what we're talking about. So did you ever do that last year?

Speaker 5 (01:51:54–01:52:26)

I think the schools generally have a tour of the schools every year for the Warren Committee, and Capital Budget Advisory Committee members are invited. I know we went on the tour of the schools in 1995, that Frank Desmond got the V, and then we all rode around town together. And the Capital Budget Advisory Committee did go on that. I did not go on a tour of the schools last year, but the Warren Committee certainly was open to the Capital Budget Advisory Committee.

There was also a tour of the DPW yard and capital budget advisory committee members, some of them went to that, some more committee members.

Speaker 4 (01:52:27–01:52:40)

I'd like to attend this year's tour. Fine. I think that it's important to do it annually and so when a member of the school committee might be concerned that you don't understand our needs, aside from having a child in just one of the schools, you know, we can visually see it with them.

Speaker 5 (01:52:41–01:52:47)

Yeah, that's no problem. I'm sure they'd be happy to have Selectman along. In fact, in 95, the Selectman were all invited to go along.

Speaker 1 (01:52:47–01:52:50)

That one will be on for next week.

Speaker 5 (01:52:51–01:55:19)

Then the other issue was Tuesday night, I just went to the school committee meeting. Charlie made an excellent presentation and I I felt that as a Chairman of the Board of Selectmen I should not be participating in school committee discussions and additionally I hadn't reported back to this board so I just spoke very briefly. I do want to hand out the documents that Charlie McCarthy gave out at the school committee meeting. to be a little chopped off.

He passed out the documents for this year, the instructions, the forms. And then he passed out, begins with this page. This was the next few pages he passed out at town meetings. They were the recommendations of the Capital Budget Committee before and after the Warrant Committee requested a cut.

One of the issues was who requested the cut. in the original recommendation of the Capital Budget Committee, and it's quite clear that the Warrant Committee requested a reduction. And the Capital Budget Committee change was due to that request from the Warrant Committee, an attempt to take a prioritized approach to having to make cuts. And then after that is a series of pages which are the five-year plan, which at this point is a listing of requests by departments.

And departments are now adopting a procedure which is to request items in different fiscal years. So if they see the need to replace a truck in five years, they see that it's really going to need replacement, that that need can be anticipated ahead of time.

Speaker 4 (01:55:19–01:55:22)

When they photocopy these pages, can they shrink them?

Speaker 5 (01:55:22–01:56:28)

Yeah. And all the information? Something got chopped off here. And then the last section was done primarily in fiscal 1997, but it was an attempt by the Capital Budget Advisory Committee to determine what is the proper amount of debt for the town to have.

And in order to do that, we looked at what other towns took as a target, and then we looked at what the town's debt was for old projects that we're still paying the principal an interest on, and possible future debt needs. And so this analysis of what is the right amount of debt, neither too high nor too low, It's as bad for town to not carry debt and not be repairing their buildings as it is to have too much for debt. So 5% is the target and we're not there yet but we're getting close.

Speaker 6 (01:56:39–01:56:41)

in this famous sign?

Speaker 5 (01:56:41–01:56:48)

Oh, yes. Okay, let's go back to item 17, the famous sign. Did you ever get to see one? I never.

Speaker 6 (01:56:48–01:56:52)

I saw, I've seen one of the, not the woodcarts, I've seen the other one.

Speaker 4 (01:56:52–01:56:54)

The one that was removed.

Speaker 1 (01:56:54–01:58:34)

No one has ever seen this sign before. This is a custom. Yeah. Designed to make it look like Milton Village and, and, uh, It is hand to wood side, it's hand carved, it's attached to a chisel tab, and the chisel goes to the leather and paints it white.

The chisel goes to the eagle, and the eagle is painted blue and has a white feathering. It's a standard Bank of Boston green color, and the post is that color. It's a 10-inch post instead of the 21-inch that they were pushing. I think this is more of a scale.

It's custom-designed. I've been writing on the paper with John Robbins and Jim We actually cut a 20-inch post in half in order to make this design that you are looking at. It's on our CAD CAM machine. So we think this reflects the type of concerns that the board was expressing.

The lighting is from the ground. There will be floodlights on the ground shining up. There will not be any lights hanging from the sign. That's tasteful.

It will be double-sided. It will be angled so I get the corner of Elliott Street. Adams Street, so there won't be two signs.

Speaker 5 (01:58:35–01:58:42)

Will it be in the same location that the sign is in now at Adams Street and Elliott Street?

Speaker 1 (01:58:42–01:58:45)

I think there's a corner inside of French on the line.

Speaker 5 (01:58:45–01:58:50)

It's inside, it's definitely on Adams Street, not Elliott. You can't see it from Elliott.

Speaker 1 (01:58:50–01:58:59)

I think this is the intent of both Franklin Street and Adams in East Milton. He intended to recommend it be at an end.

Speaker 5 (01:58:59–01:59:25)

I can't visualize. I went down and looked at the sign that they had now and felt that… I was looking at what he had, what's there now, and I would agree to a poll sign and Adam Street because you couldn't see it otherwise.

Speaker 1 (01:59:26–01:59:38)

I'm not too happy about a pole sign.

Speaker 5 (01:59:38–01:59:47)

I'd still like to see whether they could do a ground sign.

Speaker 1 (01:59:47–01:59:59)

I think it looks so much nicer that the old one's gone.

Speaker 5 (02:00:00–02:00:11)

Yeah, but down at the lower mills, because there is a lot of fairly high shrubbery and trees there, and the fence, you couldn't use a ground sign.

Speaker 1 (02:00:11–02:00:16)

So this one is right in the village, right?

Speaker 5 (02:00:16–02:00:18)

If it's at the same location.

Speaker 1 (02:00:20–02:00:22)

Same location, same orientation.

Speaker 4 (02:00:22–02:00:23)

What does the application say?

Speaker 1 (02:00:24–02:00:25)

It must be the same location.

Speaker 6 (02:00:26–02:00:37)

This is getting rather casual. Just tell me what you want. I want this at the same location. I'll see if you like that.

This is at the village.

Speaker 5 (02:00:37–02:00:42)

Same location, same orientation. Vivid green post?

Speaker 6 (02:00:43–02:00:48)

I want the sign at the village at the same location I think.

Speaker 5 (02:00:48–02:00:59)

Second. All in favor please say aye. Aye. I would like to see a sign close to the ground.

Speaker 4 (02:01:00–02:01:08)

Similar to the Quincy location down the street. I mean, Woodside. The height, yeah.

Speaker 1 (02:01:08–02:01:12)

This is at the Old South Boston. Old South Boston.

Speaker 5 (02:01:13–02:01:28)

I was in Weston last week, and there are three banks in the village business area of Weston. And I'm sure the people of Weston find their way to the bank, but those banks are very tasteful, very understated.

Speaker 4 (02:01:28–02:01:32)

Well, especially with big banks. by the back, even the life science method.

Speaker 6 (02:01:32–02:01:36)

The only one we voted was the village.

Speaker 5 (02:01:36–02:02:01)

We only voted the village. Okay, this is… AT&T is interested in attaching an antenna to the water tank. Well, they're doing studies.

To do a study. Okay, that's fine, to do a study. We seem to be missing some language in the last… How much will they pay us for it?

Speaker 6 (02:02:01–02:02:02)

$20,000 to do a study.

Speaker 5 (02:02:03–02:02:04)

No, that's a surety.

Speaker 6 (02:02:04–02:02:09)

Well, it's actually a payment to you. Non-refundable?

Speaker 5 (02:02:09–02:02:12)

Non-refundable fee. It's $20,000 a year.

Speaker 6 (02:02:12–02:02:16)

Well, wait a minute. That's what you negotiate after. $20,000 to do the study.

Speaker 1 (02:02:16–02:02:30)

Any license or lease would have to comply with the rules of the NBC. So whether they're successful or not, we'd get $20,000.

Speaker 5 (02:02:31–02:02:39)

Now the question is, would the revenue, if there's an annual fee, go to the MDC, to the town, or to both?

Speaker 6 (02:02:40–02:02:44)

That's subject to the discussion.

Speaker 5 (02:02:45–02:02:49)

And we also have a RFP put out by the city of Quincy.

Speaker 1 (02:02:49–02:02:51)

This is just one of several that I have.

Speaker 5 (02:02:51–02:02:53)

A lease of space on city water tanks.

Speaker 6 (02:02:54–02:03:26)

I think we ought to take this in consideration with what's been done by CAM. We've been doing informal discussions. Frankly, I've been involved in some of them. And I think we've talked, we've been trying to offer informally to the various vendors town properties.

For example, the hospital, again, is in a prime location than the police station because of the height of the hospital. So even though I talked about the police station and three or four companies, in reality the hospital was a primary source, really, because of the height.

Speaker 1 (02:03:26–02:03:29)

And you said Canton did recently a satellite one, right?

Speaker 6 (02:03:29–02:03:37)

Right. And even the DPW guy had no idea that, again, the hospital was close enough to the DPW guy that they thought the hospital was a better location.

Speaker 4 (02:03:37–02:03:40)

I heard 9X, or some company, was…