But I'm just wondering, just the process, and I can see you go to the select committee tomorrow night, and they say it's a good idea. It's just like the land committee, put together a committee, we have representatives of the site board, the planning board, maybe this committee, and certainly the planning department. I'm just wondering, it seems to be that this parking lot has been talked about for a long time, about the lack of parking, has been talked about for a long time, and it seems to have run into an impasse. I'm just wondering how we break that impasse, and I'm wondering why there was an impasse.
Speaker 2 (01:21–03:01)
I think it's just, I don't know why there's an impasse. We were asked to help. We've helped. It's part of what we've done, what we've been asked to help, like at the landing.
As I said, the sort of planning around, we did some planning, as you know, Dick, around and neighbors will recall when we engage MAPC to help look at the whole campus, right? So if there's additional interest in continuing that planning effort, then that planning effort could still come through our committee, just the same as it did in Milton Village, right? But if there's not an interest in continuing that planning work, then it could go either to its deathbed someplace or it could go advance to next steps, which due diligence steps to me is you still need to do more engineering work to see what the, you know, sort of Geotechnical work a little more. I'd say feasibility in terms of, like, the cost estimate is very preliminary.
But if you engage with someone to do a little more engineering work on how you would support that parking lot, kind of refine it to see if it really makes sense financially. I'm saying we could continue that just like we remember in Milton Landing, we engaged for dredging, we engaged an engineer to help out there. Um, we ended up having zoning written those, you know, so it was multistage right there and. And then we, when we handed that off, there was a good bit of work that had already been done.
Speaker 3 (03:01–03:02)
Right?
Speaker 2 (03:02–04:01)
That's kind of the idea here. We get it to a certain level where it's at a decision point. We were asked at this juncture to get feedback, which is what we're willing to do, right? And we either that feedback will say, yes, keep going a little further feedback will say, yes, thank you.
We've done great work. We'll take it from here. So that's kind of. where we are with that.
The planning board in terms of what a planning board would do for something like this would probably be right zoning if a new use was going to be incorporated. So let's say, you know, it was going to be some mixed use of housing, which is municipal, right? So that would be the only reason a planning board would need to really get involved. If it's a municipal use, that doesn't go to the planning board for any review.
So there's no purview at all at the planning board for a municipal use. Some people think that it should be. But they're, because like Planning Board didn't review the fire stations, Planning Board doesn't review the schools or anything like that. Planning Board doesn't review the railroads, lowered fields, or some people have talked about that.
Speaker 1 (04:01–04:14)
But just like the lady, this would probably end up going to the Planning Department, who didn't let them. No, they did a lot of the dredging work. They dealt with childs. They dealt with- The contracts.
Speaker 2 (04:14–04:15)
I mean, yeah, but- Contracts.
Speaker 4 (04:15–04:29)
Administratively. Right. The Select Board institutes to move forward with this. Our responsibility is to develop the zoning for the planning board.
Speaker 5 (04:29–04:31)
If it was multifamily, we would work with them.
Speaker 1 (04:31–04:36)
But if it wasn't multifamily, then it would be us, right?
Speaker 2 (04:38–04:39)
The planning department? Yeah.
Speaker 1 (04:40–04:55)
I'm just trying to figure out where all these pieces fit, because one of the things that happens in these things, you get so many pieces of ball, then nothing happens.
Speaker 2 (04:56–06:16)
I mean, that's the worry, right? As I said, I spoke to Will and to Chris in preparation for tomorrow night's meeting. And I said, well, would you like to continue to have this committee continue to do some more work around this? They said, we're pleased that we're advancing this with this group's help.
And so if that can happen, we would like that to happen. But it's really just, you know, As we all talked about a couple times at these meetings, we were asked to go give a briefing to the board, and that's what we're doing. So it's really, they're gonna talk about the needs of the library, just like they have done here. And I'm gonna talk about what we've done today in terms of looking at the center.
Well, not really, I'm gonna talk about, I mean, briefly we'll talk about being able to, the analysis of the parking utilization. We haven't had any, Layouts from chase he's been unavailable to do them with a little short of staff check staffing shortage there. So Josh touched base with them last week and he wasn't hasn't been able to but josh has looked at it and thought that it's what 20 spaces 18 spaces feasibly if
Speaker 4 (06:17–07:16)
huge emphasis on if. You could technically fit about 12 spaces where the green shed is behind the chemical building. You could technically fit six spaces, you know, sort of egress from Town Hall onto Can-Nav. That's what I've shown you all in the last two MPEC meetings.
But literally, I think both of those proposals are unlikely. Highly unlikely to happen. There's the statue there, the sculpture that I don't think anyone wants to see lost, including no one wants to see additional brain space lost. The green building behind the chemical building has a long Long ways to go if it is taken down at some point, or falls down, if it's on the court.
And there's been no planning efforts or discussion in any meaningful way from any committees or from the Board of Chiefs to move that building.
Speaker 2 (07:16–07:22)
That building is also one of the contributing buildings in the Historic District, I looked up.
Speaker 6 (07:22–07:42)
Yes, a couple of things. So, we'll get to the table. Introduce yourself. So, with the spaces, Josh, when you're talking about the egress, you're talking about if you're leaving Town Hall, going up to Canton F.
Exactly, yes. Where they already park.
Speaker 7 (07:43–07:43)
Yes.
Speaker 6 (07:43–07:55)
On the side. So, right now, that's what people are already doing. And it seems like you might only have to bring that granite curbing in a little bit. I want to see what Chase thinks about that.
Speaker 4 (07:56–08:04)
Yeah, I can tell you what Chase will think is that it's about fire access, right? Its width is about the fire trucks.
Speaker 6 (08:04–08:06)
Because the fire truck is getting down there.
Speaker 4 (08:06–08:27)
Yeah, but it's legally mandated to not be parking there, even though people speed and people litter. It's not what we can allow. That is the width that is allowable and required under the fire code. So it would have to be widened at least the width of a car to allow for parking because of those statutory requirements.
Speaker 6 (08:29–09:23)
So I think that was one thing. The other thing is, I know I had mentioned, I didn't know in the meantime if the library has reached out to the churches to see about any kind of a partnership or something with getting more spaces, especially if we're talking about Potentially a crosswalk in across Canton Ave, you know, a lot of times businesses will do that. and work out something where they pay a nominal fee or whatever to use the parking lot at different times. So do we have any idea from the library if that has been attempted, and if so, what the response is then?
Because I know, for instance, they had said, for instance, on, I think it's Tuesdays, in the mornings, or something, that they have a big need for parking. They'd like to bring in more programming. So my question is, perhaps that is something that is explored a little bit. you know, a few hours on these different timeframes.
Speaker 2 (09:24–09:35)
I don't think we have any representatives from the library here tonight since the focus has been getting ready for the presentation, but you're reading from our line.
Speaker 4 (09:39–09:55)
To the crosswalk that you mentioned, we're expecting final design documents from beta this week, and Chase is progressing with that project. I think it's no longer an if and will be a when for that crosswalk.
Speaker 2 (09:57–10:06)
There was a question about, I think, on that crosswalk about a light. Do you know whether, like, a button to put a light?
Speaker 4 (10:07–10:26)
set designs for RRFBs. I don't know what the first R stands for, but it's the rectangular flashing beacons. So you press the button and it would flash, but it wouldn't be like a stoplight, but the crosswalk sign itself.
Speaker 2 (10:26–10:29)
So that's what's planned right now?
Speaker 4 (10:29–10:32)
That's what's expected. I haven't seen the design yet.
Speaker 5 (10:32–10:32)
Okay.
Speaker 2 (10:34–10:51)
So really, I think our next steps, we'll know better and we can discuss at our next meeting. Is there anything that you want to share with us? Any other thoughts that you may not have shared with us at the last meeting?
Speaker 8 (10:51–11:14)
I just have one follow-up question. As you know from our last meeting, we didn't have an interest in the screen shed. How long has the library been seeking additional parking and Did it date back to our initial fire building design and planning meetings where that parking lot was evaluated to an extent?
Speaker 2 (11:15–12:06)
I think back to 2012, it's my understanding that the library was looking for parking, but they were focused more on the resale at the time. And I had to get evaluated for wetlands, you know, so it gets flagged and then it has to get mapped onto a survey. And then there's a layout for what parking would fit there. So I think that took a little bit of time.
So maybe the, I'm not sure about the only one of the meetings were for the fire station. I know we asked for the fire station building committee to come to meet with us just so that the fire stations wouldn't be looked at only for their purposes and that precludes something sort of with the rest of the campus, you know, sort of thinking like it's the campus holistically.
Speaker 8 (12:07–12:51)
I remember extended conversations about that part in particular, ensuring that it was, it continued to be a one way so that the fire truck could exit down to Reedsdale from that direction. But that area had been looked at for an extended period of time. And it's interesting that we're going back to look at that same area as kind of concluding the fire station work. Yeah, I think we ensure that these conversations continue from committee to committee so that we're not backtracking in time and additional cost and time to
Speaker 2 (12:52–14:12)
That is a really good question because, as you know, staff members change and many members change. And it is one thing about this committee is that Dick and Tabor and I have been on it from the beginning. So there is some continuity, but it doesn't get lost. And I do remember the conversations, too.
with some planning efforts, which I think you all were when MAPC was taking a look at where we could add parking. And it was pretty much just a few spaces, maybe here and there, right? Which the library has said isn't ideal for them because it's across the street and it's not the number that they need. And the times that they need during the day are when the town is the most occupied from the work that Josh is talking about.
So the library feels as if the town center piece of it isn't going to meet their needs, they said, at our meetings. And I think they'll probably mention that again tomorrow night at the select committee meeting. Because it doesn't get them close to the number that they'd like. And they'll go over the reasons why they'd like to get the numbers.
But basically, it's a very popular facility. And they can't do as much programming as there's demand for because they at certain popular times because of not having my partner.
Speaker 9 (14:14–14:16)
Cheryl, I'm sorry, I wasn't here at the last one.
Speaker 10 (14:16–14:25)
You and I just don't know what all the individuals are. Oh, sure, yeah, I'm not sorry. Jennifer Renz, I am a neighbor of 48 Walmart Street.
Speaker 8 (14:26–14:29)
I'm Marie Connelly, I live at 20 Walmart Street.
Speaker 11 (14:30–14:35)
Hi, I'm Lynn Donovan, I'm at 7 Taylor Road. I'm originally on Walmart Street.
Speaker 3 (14:35–14:35)
Thank you.
Speaker 2 (14:36–16:32)
So there were participants in the Fire Station Building Committee planning, which we really were not so much. But when we had MAPC take a look, we asked the Fire Station Building Committee to come to us just so we can make sure that they were thinking more holistically. And probably the largest input that we had was, the old fire station piece that's going to be used for training, but also potentially for community use, knocked off immediately into parking spaces so that as people walk out of a meeting or even a large group had to exit out, that there's a little bit of like a, you know, people will talk to each other on the way out, like a little closet-like space in front of it. And then we also really asked them to really think a lot about the circulation We had youth participate in that planning, so from Pierce in the high school.
And there is some walking that occurs through the area. And we talked about the basketball court, which is in the green space there. And I don't know if you know that Administrator put in for a grant to the community preservation committee to improve the basketball court and the committee recommends that get funded and that'll go to town meeting in May. So there'll be some funds to To prove that and then the other thing that the our committee really want to make sure that the pedestrian connection to the council on aging is there in a way that is accessible to that population.
So they can cross over on that. And we recommended sidewalks on that. That's something that gets turned over to the. that came up in the fire station.
Speaker 10 (16:32–16:58)
Yeah. Brian wants to talk to you recently about that. Oh no, I haven't talked about it recently. Okay, because the last fire station building committee meeting, I thought they were right, but Maria was there.
And they did talk about the path, but Maria was the one who brought up, but there's no sidewalks. So then it kind of went a little, correct me if I'm wrong, back and forth about, well, Is that Cheryl with the Municipal Information Committee, or is that DPW, or is that so?
Speaker 2 (16:59–17:34)
It's DPW that would follow up on it now, follow through with it now. Okay. It was clear that they couldn't make that part of their project, but the path through the park, I understood, was still going to be part of their project. Right.
And then, you know, some of the things that are That's the thing about this committee with the planning work. It dabbles in different things, like you mentioned other committees and other work. And so we did ask, I think, when Chase was in about those sidewalks, Chase and Berkley was in, and they're probably on a list.
Speaker 4 (17:34–17:45)
Yeah, the engineering staff at DBW has a master list of their whole repaving program, and repaving also includes the new sidewalks, but that's on a slightly different
Speaker 8 (17:47–17:57)
Yeah, he says together to ensure. Things don't fall through and we need to circle back.
Speaker 2 (17:58–18:35)
So that's 1 of the things that we do continue any planning further planning. You know, if there was. another kind of report, a handoff report that came from that. We kind of just left that at the fire station building committee interface.
We didn't really leave it that we were done with town center planning. So if we did more, we could look at making that something that you could then go and ask for some priority, where that goes on the list.
Speaker 8 (18:35–19:09)
I don't know. Yeah, the street needs to be repaved because of all the pipe work that had been done previous to the fire station building being complete. But they wanted to wait for the paving to be done until the fire station was done. Why would they repave if they're going to, you know, two years down the road, put in an extension of the sidewalk, just making sure things are occurring in a logical order.
and how can we continue to follow the bouncing ball through from start to finish.
Speaker 2 (19:11–19:19)
I guess, I don't know Roxanne, in terms of the select board having any role in those sidewalks being added.
Speaker 6 (19:19–19:37)
Well usually, my impression is that usually when they do the repaving on a project, if they're going to add the sidewalks, they'll add it then. But again, we'd have to do that by chase. I mean, that's my understanding. And there's a certain list of streets and things that are getting done at certain intervals.
Speaker 2 (19:38–19:43)
So would it make sense, have you asked Chase where one of those would be considered?
Speaker 8 (19:43–19:59)
We asked at the fire station, and they said they had given Chase the all-clear for their heavy equipment on the road. So it was clear to recave. OK. But they did not have any control over the sidewalk piece of it.
Speaker 2 (19:59–20:19)
I know some people have come to the select work for things like speed bumps or other things, but I'm just wondering if they don't have a response from Chase, do you have a suggestion of what they might do next?
Speaker 6 (20:19–20:25)
Well, I mean, if you tell me exactly what you want me to ask him, I'm happy to do that because I actually have to talk to him anyways for something else.
Speaker 11 (20:25–21:03)
Um, just actually looking back, there was an email that we sent. I think you had asked us to follow up after the last meeting with the D. P. W.
Right. I see sidewalks and we did. And she's got back and said our plans are to reconstruct class street in Walnut Street this upcoming construction season. But we do not have hard dates on one year.
There currently is no plan to create new sidewalks in a crosswalk. at Walnut and Platt, but the fire station project will be building a new sidewalk across the street on Walnut from the consulate on aging front walkway towards the town hall through the grass. So I think that's the pathway.
Speaker 10 (21:03–21:33)
Yeah. So that's what we brought up to Brian Walsh at the meeting. We said, oh, that's great. If you have this beautiful path, where is it going?
And they all were a little like Yeah, you're right. And they looked at the, they had a, I don't have that drawing and there's nothing there. So then they brought up your name, like, oh, OK, well, I think we need to talk to you. So it's a little mishmash.
And that's why we're going to that's why we're going to this meeting.
Speaker 11 (21:33–21:58)
And I just thought that this was that, you know, we can evaluate building new sidewalks, continuing them all across. It would be possible, basically, unless they switch sides of the street. It'd be across the consoling, consoling, consoling. quite a lot.
Yes. And so they he's like, we have to see if there's support that small package involved.
Speaker 2 (21:58–22:07)
Alright, so I guess it's worth figuring out then how do they get that? How do they find out that support? I don't know what they typically do when they if they've been asked.
Speaker 8 (22:08–22:24)
I guess the recommendation was for the path to go from the Council on aging across the park on the side of the fire station building. But we're missing a piece of that, which is what's it connecting to?
Speaker 2 (22:24–23:21)
Right, so the master plan itself talks about improving the pedestrian connections amongst the municipal uses, right? The Council on Aging, the library, etc. And so that's why in our planning effort, we said, okay, those connections, you need sidewalks, right? Especially you're talking about youth population that's coming and going and another population that's crossing, you really need sidewalks, right?
So that's where all of that came from. And we helped fund the Bicycle Pedestrian Master Plan, which was also, and then we have in town, the Complete Streets Program. And so the Complete Streets Program is where DPW has a plan. And in that plan, when they work on the roadways, like Josh was saying, they are to also be looking at the sidewalks.
Speaker 4 (23:22–23:26)
And every sidewalk gets ADA accessibility.
Speaker 2 (23:29–24:13)
So I don't know if that street is in that plan, but it's worth checking. And then in terms of prioritization of the missing links, if you will, it's generally like if it's near the schools, right? So that students can walk safely on sidewalks. And I don't know how else in that, pedestrian and bicycle master plan that he prioritized.
But that would, I guess, those are my thoughts of where those priorities could be, if anywhere outside of our planning efforts.
Speaker 4 (24:14–24:36)
Yeah, Walnut's not in the complete streets prioritization plan. That, sure, is about it. It's part of that general ecosystem. And the Bicycle and Pedestrian Master Plan has certain general recommendations that would apply to this, but does not include Walnut Street as a part of that connected network.
Speaker 2 (24:36–24:45)
So would it help, then, for us to write a letter of support based on our planning efforts, saying this was recommended in our planning efforts?
Speaker 1 (24:45–24:56)
I would completely mystify what's going on here. You want a sidewalk built Yeah, where you live, right, which is around where you live.
Speaker 8 (24:56–25:17)
The point of this walkway that was recommended by NPIC to connect the Council on Aging to the front of the fire station in front of the town hall is incredibly difficult. And so we have this pathway that leads to nothing. How are the members of the Council on Aging going to cross safely?
Speaker 1 (25:18–25:25)
So you've made the, well, you've talked to Chase, and Chase said it's somewhere in, there's another world where it's the government.
Speaker 10 (25:25–25:27)
I mean, we haven't made a formal.
Speaker 1 (25:27–25:31)
Well, maybe, maybe that's almost what you need at some point.
Speaker 10 (25:31–25:48)
But I really don't think this is, this is us. I think this is more of an AP decision. This isn't, you know, this came, the path came from, right, MPIC. So I would think, Your path has to lead somewhere safely, right?
Speaker 2 (25:48–25:51)
Well, these sidewalks were recommended at the same time as the path.
Speaker 10 (25:51–25:52)
OK. But they're not.
Speaker 2 (25:52–26:12)
So I was just trying to see if. And we were told, though, by the fire station building committee that they could just do the path, that they couldn't be responsible to do the sidewalks in their project budget. That makes sense. So they did say that.
So then from there, it gets passed on, which is the piece that you're trying to figure out. Right.
Speaker 9 (26:12–26:41)
Sure. Sorry. I just wanted to add a comment. I think given where we are today and this missing piece, it might be worth providing a letter to your suggestion of, here's the history, because they're not in the Complete Streets, what do you call it, program.
But that was also completed a while ago. But we're in a different scenario now. There wasn't a path at that time. And so I think we need to just make a recommendation and provide a history to see if we can move it forward.
Speaker 4 (26:42–26:49)
So did you find it? No, the last thing I have is from May and you only say sidewalks.
Speaker 2 (26:49–26:49)
Okay.
Speaker 3 (26:50–26:51)
With no details.
Speaker 2 (26:51–27:14)
All right. So I was just trying to see if we could pull up the MAPC plan, which I could. We could do. Does everybody recalling the plan or would you like me to try and call it up now?
The MAPC plan, which is from Where the path is? Yeah, where the path and where the sidewalk recommendation is.
Speaker 12 (27:14–27:22)
The sidewalk recommendation is not actually that long. It stops where the Council of Aging. It needs to come across.
Speaker 8 (27:22–27:39)
I think it's just an example of ensuring that all committees are communicating and things are being accomplished the way everyone had agreed and envisioned.
Speaker 3 (27:45–27:46)
It's related.
Speaker 12 (27:53–27:58)
Number seven would be the cross-slot which doesn't exist either, right?
Speaker 2 (27:59–28:04)
But the Fire Station Building Committee took responsibility for this.
Speaker 10 (28:04–28:09)
Oh, that's interesting. Is that the crosswalk that you're pointing to?
Speaker 2 (28:09–28:29)
Did they just do the path and not do the crosswalk? Because I thought that they were going to do the crosswalk. No, I noticed that too when I came up today. But this path, the configuration's changed a little bit, but my understanding was Um, but that was staying in the project.
The last fire station building.
Speaker 8 (28:29–28:36)
Yeah, in the plan, but it as number six leads to nothing.
Speaker 3 (28:37–28:39)
There's no sidewalk.
Speaker 10 (28:40–29:28)
So seven, right on seven on here. Is that a walnut? This is walnut here. Okay.
So this is I see. So there's no crosswalk in their plan in their plan designs. There's no sidewalk and everything. So I lost a lot in there.
I don't know. No, I feel like I need to show that. Yes. Well, we're too much.
Oh, no. Yeah. So. OK, so they are.
So they have kept the path. Yeah. But there's it just goes to nowhere. So.
we're looking to, you know, get like an ADA sort of compliant sidewalk curbage, something and then right at crosswalk here.
Speaker 13 (29:29–29:35)
So that our… I'm sorry, Josh, can you can you outline where she's pointing? Because I can't see it.
Speaker 4 (29:35–29:40)
I've been following it as best I can.
Speaker 2 (29:41–29:44)
Thank you. Sorry, Regina.
Speaker 12 (29:44–29:51)
Is there a sidewalk on both sides of the water? No, I didn't have a spot. Is it down further only on one side?
Speaker 11 (29:52–29:58)
There's no sidewalk on either side.
Speaker 4 (29:59–30:04)
So the sidewalk exists up until this blue line.
Speaker 2 (30:07–30:11)
So that was the missing piece that was recommended to be put in.
Speaker 8 (30:15–31:31)
You know, there's so much traffic that goes through there. If you were going to be highlighting this safe route to go from the Council on Aging, even for all of the middle school students that cut through to go through to the teen center or to the library, there needs to be some safety factors insured upon. And this pathway is going to attract pedestrians, but it feeds into a dangerous part of the street because it goes people fly up Walnut, it crests, and you cannot see that part of the street. And then they don't even stop at the bottom of Walnut, and they bang a hard left onto Clap.
There are no sidewalks over there. It can be a very dangerous corner. So for attracting more pedestrian use there, we really do need to make sure all of these pieces come together. Because you had recommended them, that piece of it is not in anybody's plan.
And it's not us as, we're invested in this area, this neighborhood, it's our home, but also to ensure that all of these conversations are continuing to meet the same goal. Right, okay.
Speaker 2 (31:31–31:54)
So I think we could write a letter that is addressed to Jake's private relations. and we've picked up the nickel on them and select more. Sure. And we're happy to help, you know, try and nudge things along as we do, you know, as we've done as a committee.
So.
Speaker 12 (31:54–32:06)
I think there's a hard deadline coming up with the repaving, so that's a good time to do it, to say we really don't like the idea of repaving unless you're going to do it the right way.
Speaker 2 (32:06–32:13)
OK, so Do I have a volunteer to draft the letter? Elaine?
Speaker 9 (32:14–32:20)
I don't have all the history. Can you put at least some bullets together and then I'll draft the letter. Great.
Speaker 10 (32:21–33:03)
Thank you. And if they don't have money or whatnot, the pathway was through the MPIC. The neighbors were fine with it just being green space, right? I mean, we kind of agree.
So that's where we're like, OK, so we're we're listening, we're, you know, we're, we're going with this, okay, there's going to be a path, we just want to make sure that it's safe for our children, or our parents who are using the Council on Aging, that again, as you were saying, that all parties, all committees are communicating with one another, and that we're going to make this work and be accessible to all in a safe manner.
Speaker 9 (33:04–33:11)
And I think that aligns with our goal too. Really appreciate you bringing it to our attention.
Speaker 10 (33:11–34:25)
Yeah. And just make one point what you brought up about seeing if the churches would partner with the library. Taking down the green shed, that would impact where I live. It's a barrier to just a lot of things that are going on around there.
Michelle's house abuts that area right there, the green shed. That would be a concern for the neighborhood. Well, I'm not talking about the green shed, I'm talking about like the existing lots. No, I think that's wonderful.
You know, if we could partner with that instead of a possibility of removing the green shed. Removing the green shed would change the So, if there is a partnership or and again, it sounds like the library doesn't want to really deal with that anyways, because it's across the street, but if it's a possibility. To us, that's a better way to go than the thought of the green shed going. I just want to check.
It's not a pretty green shed, but we'll take it if we have to.
Speaker 2 (34:26–34:47)
It's interesting, too, because it's not. It's one of the contributing buildings to the National Historic History Center. Yeah, because I was looking up all of the town's historic national salons. districts, and that's one.
I wouldn't have known, but it is one of the contributing buildings. It's like… The Green Shed is a historic… Yeah, they're right.
Speaker 7 (34:47–34:50)
They're actually it. You've got to have the funds to say it's competitive.
Speaker 13 (34:50–34:53)
Am I hearing that right? The Green Shed is a historic building?
Speaker 2 (34:54–34:55)
I'm sorry, Regina?
Speaker 13 (34:56–34:59)
Am I hearing that right? The Green Shed is a historic building?
Speaker 2 (34:59–35:07)
Well, you might be surprised, but it is one of the buildings listed in the National Register Historic District for the town center.
Speaker 3 (35:09–35:10)
Okay.
Speaker 2 (35:10–35:12)
In the 1800s.
Speaker 3 (35:12–35:15)
It could be painted. It doesn't have to be green.
Speaker 2 (35:15–35:32)
They don't all have to be. There's no property that people can decide. But it is, I just thought I'd point it out. I noticed that.
I was a little surprised. Okay, so Alex, I'm sorry, because I thought we were going to be quicker.
Speaker 8 (35:33–35:55)
My son is one of those colleagues who walks through gates. We're looking out for his safety. They currently cut through the Council on Aging parking lot, and they feed out of their driveway and have nowhere to go. So it would make a lot more sense to just cross right there.
Speaker 2 (35:56–36:14)
And we were able to recommend, and Chase was able to implement the new crosswalk on Canton Ave. Do you think he would be able to do that with our recommendation here as well? I don't want to put you on the spot. I don't remember how he came up with the funding to be able to prioritize that.
Speaker 4 (36:15–37:49)
That's, I think funding is the challenge, right? Because there was, there's a certain amount to help with Additional non-originally budgeted line items. Crosswalks would be an easier financial lift for DPW than additional sidewalks. in the LRM, I think you could likely see crosswalks, whether that crosswalk has flashing beacons or stuff that may be more tricky, especially given how long the flashing beacons.
But just to say that, like, there are variabilities in costs for the development of a crosswalk, and that kind of additional cost is key. Would be a challenge. The repaving schedule is also a budget, right? It's not just a timeline.
It's sort of part of DWM's budget. There's no harm in writing a letter. One of the key challenges or stuff like this that isn't Officially in a specific budget or in a specific sort of additional fund is that especially on transit related things, MassWorks, we're not currently eligible for additional grant funding for projects like this.
Speaker 13 (37:49–37:51)
Is CPA funding at all possible?
Speaker 4 (37:51–37:57)
No, it's not allowed to be used for sidewalks or transit things really.
Speaker 13 (37:57–37:58)
Got it. Okay, thank you.
Speaker 4 (38:01–38:09)
So A letter and pressure is always good. But from my experience, I can guarantee.
Speaker 2 (38:10–38:15)
Are we not eligible or at a disadvantage on the Complete Streets grants as well?
Speaker 4 (38:17–38:41)
Yes. Any discretionary grant. is able to take this into consideration. And all of our sort of conversations and experience indicates that they are taking compliance into consideration, whether that's on their scorecards or on how they sort of determine priorities between sort of otherwise equal budgets.
Speaker 13 (38:43–38:47)
And just to be clear here, we're talking about the MBTA communities compliance?
Speaker 4 (38:47–39:00)
Yes. Yep. Basically, our departmental budgeting is assuming that we are unable to acquire any new discretionary grants for anything that hasn't been applied for yet.
Speaker 2 (39:07–39:14)
So matching grants from MAPC, even though we pay into MAPC? Maybe we get those? Maybe.
Speaker 3 (39:15–39:15)
Maybe.
Speaker 2 (39:15–39:35)
But that's not funding a set of glasses. Yeah. But if they can't do it in the repaving, does that mean they wouldn't do it until the 30 years from now when it needs repaving again? So do you know?
I'm sorry to put you on the spot. Is that you?
Speaker 4 (39:36–40:12)
Yeah. So all I can speak to is what I've experienced in my time here and what I can reasonably assume. It's certainly possible that we can get new sidewalks. I think given the proximity to Pierce and to the high school, Safe Roads to School, which is a federal program managed by the federal DOT, we could probably leverage that as a way to secure additional funding through a grant that isn't state managed.
Speaker 2 (40:14–40:53)
So I have another suggestion with the kids kind of crossing that you see, and then we can include that. I mean, it could be the other, you know, counseling for others too, but I mean, I think to your point about the safe routes to school, I don't know if the Council on Aging has any grant opportunities, you know, for connections or, I know that walkability for health benefits, you know, is something that, you know, is in ARC, even like, you know, American Autism and Diversity.
Speaker 8 (40:53–41:02)
I cheat classes on the basketball court, so I would think that they would have an interest in the safety of their members.
Speaker 2 (41:03–42:05)
And with the repaving, one of the things at the CPC, So I'm the planning board representative to that committee as well. That we talked about was a lot of the funding goes for youth programming, which is fine for the kids. But having a little bit there, the seniors can benefit from that improvement to that kids right across the street. So maybe other classes could be held there.
So I do think. That accessibility piece of it for multiple populations is probably a good thing that we could put in the letter. But having your experience, you know, it's something that we reference, we can attach to our letter could be beneficial too. Right?
The way it would work is we review a draft, you know, in a public meeting. So we would review that at our next meeting.
Speaker 3 (42:05–42:25)
things don't happen overnight, but it's not time to commit to work. All right. Thank you very much. Thank you.
Speaker 4 (42:25–42:31)
I've carried plenty of chairs this evening. Thanks, Josh.
Speaker 3 (42:33–42:51)
I do a musical gesture in my hair, right? There you go. Yeah, we're going to go to you. Thank you for your patience.
I'm glad you had a good discussion with us today.
Speaker 14 (42:51–43:00)
I think you set it up. Just like you were going to find this. Right there? All right.
Speaker 3 (43:01–43:05)
That's what I wanted to talk about.
Speaker 2 (43:06–44:41)
All right. So I remember at one point, Josh had said when we talked about sustainability, which was a long time ago in terms of the topics we've talked about now, that we had the Climate Action Planning Committee. And they were getting started. We had Sustainable Milton coming.
But was that you guys came in? No. No. Who came in from Sustainable Milton?
Tucker came, and I believe Juan. Okay so um so we now are going to fill this in a little bit with the climate action planning committee in terms of our um the master plan we're looking at how it could be updated that's something about a 10-year it wasn't very specific in terms of sustainability um goals and we've talked about um That's 1 of the areas that could be updated. Things have changed a lot in 10 years, right? Some things don't change that rapidly, but that is 1 area obviously that has and.
I think we talked about knowing that the new energy code was coming along and that maybe that would be a recommendation that came out of the action committee, but. So I saw that you made the presentation to the Select Board making the request on behalf of Sustainable Milton for the opt-in specialized energy code. So I thought that would be, we could cover both of those tonight and the rest of the committee can be brought up to speed.
Speaker 15 (44:41–44:59)
What order would you like to take it and a few slides together on. It almost helps to start with something more specific. Okay. So, when you talk about timelines for directing plans, it's not totally abstract.
Speaker 3 (45:00–45:21)
So, maybe I'll go with it. Okay. Can you see that, Regina?
Speaker 5 (45:23–45:24)
Yes, ma'am. Excellent.
Speaker 15 (45:27–51:58)
I really detest the speed of these transitions, but I'm not going to change it. Maybe I will just… Is this big enough? If I do it like this?
I'll live with the slideshow transitions. I want to introduce the topic with a really fast overview of what's happening in Massachusetts regarding climate change and the state's plans to address it. So in 2021, the Commonwealth passed a law committing Massachusetts to achieve net zero emissions by 2050 with legally binding targets in 2030 and 2040 as well. And it's found a massive effort at the state level to do all the things that that implies.
And for purposes of this discussion, I think it's important to understand the broad shape of that strategy, which is a focus on electrification, because while the electrical grid doesn't have the capacity today, to serve the anticipated demand. And obviously, it uses a lot of fossil fuels to generate our electricity today. There's a pathway that's possible and fairly well understood to expand the grid and power it with renewable sources over a multi-decade timeframe. So that's one branch of a strategy.
In parallel, taking these activities of daily living that depend on fossil fuels, primarily driving around and heating our homes, and transitioning those to electricity from fossil fuels in parallel. So while today, if you buy an EV, the electricity that you charge it with is going to be partially generated with fossil fuels, over the lifetime of that car, electricity is getting greener and greener. And then a third piece of the puzzle is a laser focus on energy efficiency. Because if we just convert everything to electricity, but we are wasteful about it, then it becomes a lot harder to meet the demand for clean electricity.
So this is the bulk of the plan. And then carbon sequestration, maintaining and stewarding Our natural lands resources in particular, their buildings, carbon is the net and that's 0. so that's 4 pieces on the slide. So, where does the specialized opt in municipal building code fit into all that?
So. Emissions from heating and cooling buildings. Are 1 of the biggest sources of greenhouse gas emissions in the state. In Milton, it's transportation is the largest.
Buildings are close 2nd, and 1 of the reasons transportation is largest because we have highways and lots of traffic. So, for many similarly sized communities that don't have highways, buildings are the single largest source of emissions. Since 2008, I believe, when Massachusetts passed the Green Communities Act, municipalities have had two levels of building code to choose from. The base code that was pre-existing code follows the International Energy Conservation Code, which is a national consortium of builders that developed these codes in Massachusetts.
more or less adopts that with some small amendments. And then the Green Communities Act added the stretch code, and Milton adopted the stretch code as part of becoming a green community in 2011. So that is our current building code. And after the passage of the climate law, There were some gaps between what the stretch code requires and what's necessary to achieve the state's climate goals, in particular, electrification of buildings.
So the specialized code was mandated to be developed as an add-on to the stretch code that would bring it into alignment with the state's climate goals. So the current situation is we're on the stretch code, The stretch code has updates every three years. And there are updates going into effect in Milton July 2024. So those are happening regardless of the outcome of any vote on the specialized code.
The specialized opt-in code, as you might guess from the opt-in, requires a town meeting vote. to be adopted at Milton. And that was what Sustainable Milton asked the select board to put on the board. So it's actually a request that came from Sustainable Milton.
And when we talk about the Climate Action Committee, I'll explain that we're still kind of in a research and information gathering mode. And so we're not, we haven't yet made any recommendations. So this is a sustainable meal plan request. Any questions so far?
Speaker 6 (52:01–52:16)
Yes. So when I look at the pyramid, what is the difference between what's going to happen in July of 2024 versus the specialized food? So what changes will be brought in in 2024? The July of 2024?
Yeah.
Speaker 15 (52:17–52:40)
Do we know? I think there are some slides on that. Yeah. So I think there are There's more angst about those changes than about what's in the specialized code.
It might help to address it once we've introduced the terminology. We're just looking at the pyramid. Yes.
Speaker 2 (52:41–52:59)
One thing I'll say is I understand that the The base code is basically being revised also, and it's going to make the stretch. Basically, the stretch code won't exceed the base code for much longer.
Speaker 4 (53:00–53:25)
I think that may be correct in the sense that, like, the base code is being updated and will meet at some point where the current stretch code is and will continue to become deficient regardless of our adoption of stretch or specialized codes. And that's not to say we shouldn't, but like the stretch code, the base code becomes more efficient every update.
Speaker 2 (53:27–53:48)
Yeah, I guess what I'm suggesting is that they all keep going. So what's coming up now probably will not far exceed what's going to become the base over time. So, I mean, that's my understanding, but the timing of that I don't know.
Speaker 15 (53:49–53:56)
David, I think there is an IECC code update expected for 2024.
Speaker 2 (53:57–54:02)
It's supposed to come out, I think, already, but it's behind schedule.
Speaker 4 (54:05–54:11)
But the stretch code will always be more efficient than the base code, and specialized will have additional requirements at the top of the stretch.
Speaker 2 (54:11–54:26)
Yeah, it depends on if some people are successful at the base, making it so that it's not opt-in. Because stress code is still locked in for people who haven't opted in already. In other words, some communities are still based, but in any case, they could.
Speaker 15 (54:27–01:01:29)
Yeah, so I want to start with the kind of high level that I hope you'll take away from this discussion, then I'll go into details and then. And resurface and show you this again and see if you still agree with me. I can see the details. So, the key points are that.
The new requirements and the specialized code that's that's what. Changes if, if the 1 article is adopted versus what would happen anyway, it's a stretch code. Those new requirements apply to new construction only. not to existing homes and renovations.
You may have heard about requirements that apply to significant renovations of existing homes. Those are all in the stretch code and we'll be enforcing those either way. The purpose of these additional requirements is to encourage all electric construction in new buildings, not required. So there's still mixed fuel pathways for compliance.
And as of today, all electric building construction is a cost-competitive, healthy option. A lot of large multi-family buildings are going this way just because it's the most economical way to build and, furthermore, necessary to address climate change. Keep that in mind. I like to think of it as preserving choice for present and future energy needs.
So, you know, heating with natural gas isn't Many situations, not all, but many, like the most economical way to keep it on today. Natural gas prices are expected to increase significantly in coming decades. And of course, nobody knows the future. The cost of electricity and natural gas will change in the future.
These building code requirements make it easier to electrify without needing costly retrofits. It's much easier to put in the right service size and the right wiring when the walls are down than later when the building's occupied. What are these incremental requirements? One, pre-wiring for electrification.
So new buildings that use fossil fuels must Must prewire for future application. Maybe shouldn't have included EV charging because that's actually part of the stretch code. So that's not a requirement. Prewiring for EV charging is part of the stretch code.
But this is things like making sure you have the right number of 50-amp circuits for heat pumps and EV chargers. 200 amp service on a new single family home, which I think most builders would do anyway. There's a solar requirement for new buildings that use fossil fuels. Need to install a certain amount of onsite solar to offset their emissions.
Not, not like a net 0 offset, just there's a. A formula based on the square footage and there are exceptions for. Sites that are shaded and then for large homes and large multi families. Uh, there, there are more stringent energy efficiency requirements.
That's going to. The names for those, which is a little beyond my pay grade on a subsequent slide. But again, they don't affect renovations or additions to existing homes. And the point is to remove obstacles to future necessary electrification.
And the additional construction costs associated with these are more than offset by lower energy costs once the building's occupied. So, I started to get into this. Pre-wiring is adequate electrical service, designated circuits for heating, hot water, cooking, clothes drying, electrical vehicle charging. So, this is maybe where we can start to actually, let me look at this slide first.
I think before we start talking about what's in the stretch code versus the specialized code, it's useful to introduce this definition of a HRSE index, H-E-R-S, Home Efficiency Rating System. All right. So this is basically a single number summary of a home's energy efficiency, where 100 is a typical home as of 2006. And a lower number means that the home consumes less energy.
So we made big strides on home energy efficiency since 2006. The average New building constructed in Massachusetts, and I don't have it on the side. I think 2022. That was 58.
The stretch code requires here. Currently requires a person next, I think, 53, something in the 50s and the change that's coming in July is that number is dropping down to. 42 or 45 depending on whether you're all electric or mixed fuel. The number is established by certified HRSA raters using a complex process that I cannot begin to explain.
You get different credits for installation or installing different appliances. The efficiency of the appliances. I think we have several members of the committee who could explain that. So yes, HERS zero means the home produces as much energy as it consumes, not that it consumes no energy.
And you'll often hear about passive house standard, which I'm told is roughly about 20.
Speaker 1 (01:01:31–01:01:51)
When does the first raider get involved? Usually too late. Is it like a mass-saved energy audit? Do you invite the person in, does the person show up, and do you request them to come in and do an audit?
Speaker 2 (01:01:51–01:02:08)
You hire them depending upon how much, how big it is and how much renovation it is. You hire them to get as part of the building permit process. So they take the information from the- And these are private companies.
Speaker 1 (01:02:08–01:02:09)
Yes. Yes.
Speaker 4 (01:02:09–01:02:17)
This thing has a list of certified vendors that they have provided support for.
Speaker 2 (01:02:19–01:03:42)
You can do- Well, if you're doing both. So then there's an initial piece, which is to get the building permit, and then they have to come during construction. And I think you can wait till the end, but you might want them to come before the end, because what they're going to do is lower door tests, which is basically going to see how tight, if you will, your building is, that you're not having air leakage. Because that air leakage is, you can put in as much insulation as you want, but if you've got air leakage in places, you're not going to have energy efficiency that it's designed for.
So they'll come out and test for that. And if it doesn't pass, it doesn't meet, then you can't get your certificate of occupancy until they submit the report. So something might have to be corrected if it doesn't meet it. that monthly family, they have to test individual units and they don't have to test every single unit, but they have to test a certain percentage of units.
That's the, you know, it's either there's already energy code compliance report required to get a building permit. It's just a different method, but they use software. They both use software.
Speaker 15 (01:03:42–01:03:45)
Not at the cost of the spreadsheet.
Speaker 4 (01:03:46–01:03:50)
It doesn't add any additional inspection costs to the project.
Speaker 5 (01:03:50–01:03:55)
That's at least above and beyond what the building inspector is willing or capable of doing.
Speaker 12 (01:03:55–01:04:01)
I don't know if he's capable of doing it. I want to defer that to somebody else. It's a problem.
Speaker 2 (01:04:02–01:04:34)
Yeah, well, the building inspectors aren't certified to be heritage raters, so they rely upon, I mean, just like on a commercial building, the building department relies upon the architects and engineers stamps on their drawings. As far as the testing on a bigger building, they're going to have to do a lot more than just a heritage rating kind of thing. They're going to have to do commissioning on the equipment and so forth. So all of that is good for the the big buildings anyway.
For example, schools today, they all follow this process anyway.
Speaker 15 (01:04:35–01:04:46)
Did that start to answer your question? Do you have more questions? I don't have many questions.
Speaker 6 (01:04:46–01:04:55)
I'm wondering a little bit about Marshall. Is that a certain size commercial building? I don't know that it's that.
Speaker 15 (01:04:55–01:05:31)
I can't read the other side of that. This slide is an attempt to boil down several slides I've seen so it's a little more digestible and one of the places where I redacted details on the commercial. So there's actually multiple classes of commercial and slightly different Requirements more variations more on the stretch code side. So if we wanted to, um, I don't know if this is the right place, but I can give you 2 slides that sort of.
Expand this to 2 slides worth with a whole second.
Speaker 6 (01:05:31–01:05:42)
And then the other question was, um, with, with municipal use buildings. Yeah. So, you know, new school, for instance, things.
Speaker 15 (01:05:42–01:05:55)
I think I will just. So, roughly speaking, it fits under that commercial, those kinds of shoulders. Schools get there on specific tweaks.
Speaker 2 (01:05:56–01:07:01)
One thing about these also is like, I think, as Alex mentioned, is the operating expenses are a lot different for buildings that are built to these standards. I have a client where we designed basically a net zero, and he said he doesn't really have to run his heat in the winter months because of the construction. We've had other clients in multi-families where they've said that because, you know, if you think about commercial buildings, you only have so much exposure. depending upon how complicated the building design is, but only so many exterior exposures.
So the more complex the design, the more complex and difficult it is to get all that air sealing done. But the energy efficiency, so for example, in a municipal building, your operating expenses should be less than they would have been for something, let's say, built in this era.
Speaker 12 (01:07:03–01:07:20)
Does a municipal building have to meet the same kind of need as a commercial building? Or is it? I only say it does, but is that true, John? I mean, municipal buildings seem to get a pass on a number of different things, but I don't know if that's true.
I think roughly, yes, they are in that source bucket.
Speaker 15 (01:07:21–01:07:28)
To add another acronym at you, TEDI is the sort of metric that they use as opposed to HERS or FIHR.
Speaker 3 (01:07:47–01:07:51)
It's only new buildings.
Speaker 4 (01:07:51–01:07:56)
Yes, and the specialized code, to be really, really, really clear, is only new buildings.
Speaker 3 (01:07:56–01:08:08)
So that's the only thing that is changing.
Speaker 15 (01:08:10–01:08:23)
Is it worth going through this slide in detail? Okay, more knowing that the resources there, it's probably so you're going to be enjoying.
Speaker 2 (01:08:23–01:08:30)
I understand that organizing a public presentation, right?
Speaker 4 (01:08:30–01:08:36)
Yes. Do you want to finish your slides before you see what's left?
Speaker 15 (01:08:36–01:09:14)
Yeah, there was a return to the key points here just to. To research this new construction only, it's about encouraging location, not mandating it. This is not not reasonable. All electric.
In Milton at this time, preserving choice so that so that, you know, as. the economics of electricity versus fossil fuels shift that people can take advantage of that without super expensive projects.
Speaker 2 (01:09:17–01:10:08)
I will add that Boston adopted the Specialized Code, so all of the commercial, institutional, et cetera, and the city and its approval processes have been requiring all electric buildings such as laboratory buildings. So pretty complex buildings and the design teams have been able to make that all electric. So it is, it's not impossible. You know, so when you talk about just where the state is heading with it, the more people are doing it, the faster, it becomes the norm.
And then the pricing also follows that it's just standard practice.
Speaker 15 (01:10:09–01:11:31)
One of the things that I've been focused on since I spoke to the Warrant Committee was looking into schools that are being built, have been built in the last few years, are being built nearby. Which way are they going? And they are, I think there's data which I can share that Cost the construction premiums generally. 0, or less than 1%, and then that was before that sort of a wave of generous incentives.
Uh, when now I think people are finding that building building all electric, geothermal heating. And solar is actually the lowest cost way to even construct the building and then. The operating costs are at the place, so it's just. a financially wise thing to do.
Acton and Cambridge built net zero schools in the last few years. It found that that was the lowest cost construction option. I think Westwood is So I very quickly found about 30 people who had experience building an all-electric school who are willing to say good things about it.
Speaker 4 (01:11:31–01:11:40)
Our famous environmental coordinator, Mary Patel, works for a sustainability design firm that's working with Somerville Public Schools to do the electrification.
Speaker 15 (01:11:40–01:11:43)
And again, this code doesn't require the school to be all-electric.
Speaker 1 (01:11:44–01:11:58)
Just pointing out that it's not. So I think I understand the pros for this. What are the cons? Why wouldn't people do this?
Speaker 15 (01:11:59–01:12:36)
Well, I think there is additional construction costs up front. So I think there are concerns about its impact on housing affordability. evidence, good evidence that VAD is more available for reduced operating costs. In many cases, incentives will reduce the overall construction cost, too.
But I think it would be silly to say that there was no case in which somebody was talking about
Speaker 1 (01:12:37–01:12:58)
I'm just saying, you have to bring those here. You want to bring them before the town meeting in May. I mean, that's just sort of the date. So you're going to have, obviously, the questions are going to come out, that, okay, you told me it's time to start crossing more money, really, or if it does cost more money up front, then that, after a fact, is going to be…
People to all less than where I am right now.
Speaker 15 (01:12:58–01:13:03)
So, what's wrong with the exceptions to that complex change?
Speaker 1 (01:13:03–01:13:16)
Somebody somebody's going to get in a situation. I don't mean, I'm talking about things. What would be the what would be the objection against something like this? I can tell you what I've heard.
Speaker 15 (01:13:16–01:14:05)
I don't I don't. find them convincing. That's OK. That's not for us to decide.
I'm just interested in what the… So I think one fear is that there is a process by which the codes are updated every three years. And we can't know with any certainty what will be in future code updates. So when we adopted the stretch code, we adopted it with language that automatically check on any updates to the stretch code.
And that's why in July of 2024, the updates to the stretch codes will apply in real-time regardless of any tombo. And so it's exactly the same with the specialized opt-in code, this language that says adopt the code as written and any updates that may be needed.
Speaker 2 (01:14:05–01:14:17)
So, I think for Milton, you know, so much started to build a lot of people, the construction permits on percentage basis are probably renovations and additions, which this wouldn't apply to. Right?
Speaker 15 (01:14:17–01:14:29)
Well, so the concern I heard of the Warren committee was what if they change the specialized opt in code to not just apply to do construction. Which I suppose is possible.
Speaker 5 (01:14:32–01:14:36)
Who's they? The Warren Committee. No, no, no. Who would they be?
Speaker 15 (01:14:36–01:14:47)
They being the state of Massachusetts, or the International Energy Code Committee. Yeah, so the consortium. There's too many C's, too many E's.
Speaker 2 (01:14:48–01:14:52)
I thought that, like in the case of the opt-in, didn't the governor have to sign off on it?
Speaker 15 (01:14:53–01:15:00)
On creating the third code tier. That's right. Existing gets updated on on a cadence.
Speaker 12 (01:15:01–01:15:45)
Like, I think what Dick was saying, if this comes to a 4 count meeting, there's going to be a lot of, I mean, basically everything, big news and whatever, and a number of people are going to come up and say, I had to pay so much more money for my addition or for my new porch or whatever, because of the energy code. And so it's, it's, it's going to be some kind of a speed bump or hurdle overcome. And, um, you know, examples of who's done it already. So we're not pioneers that we're actually following all these other channels.
And that's the kind of crucial evidence, I think, to be able to demonstrate that, yeah, it's going to cost more money either way, but this way you're controlling something across and you're doing,
Speaker 15 (01:15:45–01:16:08)
I think what I often see in activist communities is they want to minimize the fears. And I do think fears can be overblown. It's easy to inject some misinformation. But it's also wrong to say there's no risks at all associated with changing the energy system.
Speaker 1 (01:16:08–01:16:11)
That goes back to the misinformation. You have to get it both ways.
Speaker 15 (01:16:11–01:17:21)
That's why you have to have a pretty good… So as somebody who is very strongly in favor this push for electrification, let me tell you what worries me about it. It is not a foregone conclusion that doubling the capacity of electric grid over 20 years is going to go smoothly at all times. It just isn't.
I think we have always depended on, the utility is not, capitalist free market, right? It's always been a simply managed, very bureaucratic thing, and it still is. But they're taking it very seriously. I personally think that I'd rather have a big change going on the utilities, so that it attracts the kind of people that are working on the changes, rather than treating it like the tea, and let's just keep it the same for another century, and see what happens.
But there's risks, right? you know, relying on electricity for all the things, what if there's a power outage?
Speaker 2 (01:17:21–01:17:58)
Well, it's also the transmission system, right? It's vulnerable in places, right? In terms of the power outages with you. That's one of the things that, you know, some places where like we have the transmission above ground and then poles amongst trees and all of that, right?
And the more severe weather events that we have now, it does put some of it at risk, right? But the tighter homes, like I said about the climate virus that we've turned the heat on, at least it's safe on that. That's why I think the situation is such a… Well, yeah, I agree.
Speaker 1 (01:17:58–01:18:35)
I just say that this seems to be a topical Situation that we're going to be talking hopefully you'll be talking about in May that I think that looking at past events and not to be a precursor of what could happen in the future is that I think we're all better off having. factual pros and factual cons, as opposed to getting into this misinformation trope that we can get involved in. So you're going to make me bring up that risk. No, I just spent two weeks with a good friend of mine who's in the solar energy business.
So I get all the good stuff.
Speaker 16 (01:18:36–01:18:44)
And when we sit down, I said, what if you have a solar eclipse that goes for six months? You know what that was then? already seriously exposed to those kinds of risks.
Speaker 2 (01:18:44–01:19:29)
I've had an all-electric house for 26 years here in Milton. We took out the old oil heat when we bought the house and we put in electric heat pumps back then. They weren't as good as the heat pumps that we have now. There was probably one winter when it was down to six degrees and inside it was cool.
But everything else, we upgraded our electrical service to now have on-demand hot water, to have electric vehicle charging and induction cooktop, et cetera. So it's even possible in a home that was built in the 1950s where you're not tearing it apart to bring all of these upgrades in.
Speaker 1 (01:19:29–01:20:00)
Sure, I agree with the choir on that. I mean, I think that's the whole idea. My mother had the first whole panel on a house in Nova in the 70s. So I get all the good stuff.
I'm just saying that everybody's all for it. And I think this is a very interesting topic. You made a great presentation. I'm just trying to be a little bit ahead of ourselves, saying that if it goes to the TAMI, which I hope it does, that the conversation is, listen, you're going to do it.
Here's all the information you need. I'm just seeing what could happen. But I think this is the best thing.
Speaker 15 (01:20:00–01:20:30)
And just to speak to the risk of power outages, you just mentioned The all-electric school in Westwood, it's an all-electric, net-zero school, but my friend from Sustainable Building, who's a good friend of mine, says hi to people. The city was there, sort of looking around on the day that they were installing the natural gas backup generator. So you can have fossil fuel backup generation in an all-electric building. It's just that it's not…
Speaker 12 (01:20:31–01:20:55)
It's not being used on a daily basis. Well, there aren't so many houses in town that aren't all electric right now anyway. Because even if you have natural gas, you can't start that furnace or you can't light your stove or you can't have hot water unless you have a spark. And the spark comes from the electric grid.
It doesn't come from a lighter. So you might have come from a lighter back in 1970. So you can still do it, but you don't want to do it.
Speaker 15 (01:20:55–01:21:06)
To be completely fair, it takes You can get that spark with a five kilowatt gas generator. It's a little harder.
Speaker 12 (01:21:07–01:21:18)
But I think you can do it on a battery, too, because you might want a workaround. But still, right now, the whole town of Milton and many other towns have pretty much been dependent upon an all-electric scenario.
Speaker 15 (01:21:18–01:21:23)
Most of us are without heat if the electricity's out, in the status quo.
Speaker 4 (01:21:25–01:21:34)
It's a mixed fuel, just to avoid the… misnomering of all electric being not using that sort of on-site combustion outside of generators.
Speaker 12 (01:21:35–01:21:41)
But it's a risk that we've all been taking for the last 25 or 30 years since we got rid of pilot lights.
Speaker 15 (01:21:41–01:21:53)
So rather than trying to sort of paper over the risks of doing this, I'd just like to emphasize that there are risks of not doing it too.
Speaker 5 (01:21:55–01:21:56)
If you look at
Speaker 15 (01:21:57–01:24:07)
how the state is managing utilities and kind of going all in on electrification and actively putting boundaries on investments in the natural gas infrastructure. Even under a sort of low electrification scenarios, I have a slide on this. Natural gas prices are expected to rise significantly in the coming decades. So if you're stuck with a natural gas furnace for a $10,000 renovation, Upgrade your electrical service and.
This is, we're talking about buildings that will be constructed in 2025 and beyond. Um, be ashamed knowing what we know today to put the residents of those new buildings in that situation. And then that's ignoring the, you know. My background is in climate science.
That's how I got on this. decades ago, and there's not very effective discussion in the media that I'd say, yeah, there's all this talk of 1.5 or 2 degrees C, but it does sound like, I'll just turn the thermostat up a little bit, what that really relates to is the kind of abrupt, irreversible, and very large changes that can happen more among the proceeds beyond those thresholds. I do think there's some uncertainty. Is it 1.5?
Is it 2? Is it 2.5? I have hope that even if these projects, these transitions take a decade longer than we'd like them to, that there's still plenty of hope. I also think that if you set a goal for 2050 and you don't get started, It's going to be $2,400.
Yeah. So I think that this kind of small, low-hanging fruit, it really just applies to new construction, relatively low cost impact, and only to non-residents. People don't live here yet.
Speaker 3 (01:24:08–01:24:21)
It should be not the most controversial thing that comes out of the climate, not the climate change. It would like to be in May, right? That's my goal.
Speaker 6 (01:24:22–01:24:55)
I was wondering, I know that like California had rolling blackouts quite some time today and fed a lot of energy efficiency. So I guess my question is, if all of the towns are all doing this, I know you alluded to the fact that they're going to get prepared and so forth. But my concern is when you look at a state like California that's been doing a lot of energy efficiency for a long time. Energy efficiency or electrification?
Speaker 4 (01:24:55–01:25:18)
When I was in California, I was with Sierra Club, I convinced San Francisco, not I, I was part of the team that convinced San Francisco to adopt an all electric building. We did, it's called reach codes, it's supposed to stretch codes across the state, but black codes are largely driven by the inefficiencies in the system and well owners.
Speaker 6 (01:25:23–01:25:40)
But how is Massachusetts going to prepare for this? Because if all of these towns are looking at things like this, I'm just sort of wondering how quickly they're going to be brought up to speed to handle this if towns are doing all of this. Yeah.
Speaker 15 (01:25:42–01:26:41)
So they don't have a problem. Like I said, I wouldn't tell you that there's no risks of pickups in a transition of its size. If they happen, the state will have no choice but to carve out alternatives, right? Because what will happen is you'll go for an interconnection for a 400M service, and then every source will say, we can't.
do that for you for 28 months, because there's no back up on this transition, right? And then if there's a sufficient volume of that, I don't think the state could just sit there and forget it. We're not billing anything. A reasonable mindset would prevail.
Every source has filed plans to increase grid capacity by 180% to support the
Speaker 3 (01:26:44–01:27:02)
working on it. Regina, do you have any questions?
Speaker 13 (01:27:04–01:27:05)
Nope, I'm all set.
Speaker 15 (01:27:08–01:27:12)
Okay. Thank you so much.
Speaker 13 (01:27:12–01:27:13)
I appreciate it.
Speaker 3 (01:27:14–01:27:16)
Oh, you're welcome.
Speaker 2 (01:27:16–01:27:25)
Yes. If you want to briefly talk about the climate action plan. Yes. Let me just know what you're sort of up to, if you will.
Speaker 14 (01:27:25–01:27:27)
Tell me what your timeline is.
Speaker 15 (01:27:28–01:30:03)
Yes. I'll do my best there. I think we're still working that out. Yeah.
serve the charge. The Climate Action Planning Committee was authorized in, I think, January of last year and started meeting in June with a charge to develop a climate action plan that identifies the necessary actions to reduce townwide greenhouse gas emissions in alignment with the targets set by the 2021 law. 50% by 2030, 75% by 2040, and that's early 2050 for minors. And to 50% offload.
Yeah, sorry, I don't have the words. The charge, which is linked, and I'll make this kind of double two-faced. The charge gives those details. It's 1990 baseline.
Oh, my goodness. So we are on the way. I don't know what 50% by 2030 is looking great, but we're certainly not at zero. We're meant to be looking at greenhouse gas emissions reductions, but also mitigating climate risks, energy efficiency, and renewable energy deployment in general.
To do this by soliciting public input from experts, stakeholders, and residents, and ultimately to prepare a written plan, take the charges for consideration by town meeting. I'm a little unclear, so I might what the right kind of endorsement of a plan like this is. Obviously, it'll have recommendations in it that themselves require something like the specialized code, which has to do with a town meeting. I don't think putting in a plan is a commitment to do it when it might cost money.
So I'm not sure exactly what the end point is for a plan like this. But certainly, back to the select board, for review and approval. And then once the plan is in place to measure and facilitate the implementation and progress of deadline action.
Speaker 3 (01:30:04–01:30:05)
Any questions about this?
Speaker 15 (01:30:14–01:33:30)
So here's my best, The 1st, uh, 2 or 3 months, we were getting organized and figuring out, like, what, what topic areas are we focusing on? Who's doing what? What does success look like? And from.
July through September, we were. So generating a research outline, like what are the major categories of emissions that we need to reduce? What are the major categories of risks that we need to learn about and research? And we developed sort of very short key action proposals and strong proposals.
So there's something more specific than let's solve climate, because we're getting taken around the two people who might be involved in implementing those actions and start to get feedback. So since the beginning of this year, we have been taking those key action recommendations to have sort of small one-on-one or small group discussions with experts and stakeholders. So, for example, Arthur Doyle is focusing on waste, solid waste, and he's sort of leading with the DPW to explore emissions reductions and opportunities in our solid waste programs. So I think that kind of one-on-one outreach, meeting with people who know a thing or two about some specific thing that we're considering incorporating in the plan, I feel like that has begun and we'll just have to keep doing that forever.
Some of our earlier plans put end dates on that, but now that I'm doing it, That's an ongoing thing. It's a brand new committee chair who's taking it to the next level. I welcome any input from this group about how not to get lost in the details. So we're working towards starting a sort of broad-based community engagement.
I think it At the beginning, I would be more focused on building awareness of the fact that the committee exists, what kind of things we're working on, making sure people know how to contact us if they want to, and then getting a draft plan written so that we can get into more action item-based public feedback. Uh, by, um, the 3rd quarter of this year. Um, I think by the end of this year, we want to have a time that we can bring back to the slept board. Um, and that start that kind of more formal process of review of feedback, uh, hopefully leading to an endorsements.
Speaker 3 (01:33:30–01:33:38)
And then transition into the. Implementation things, but.
Speaker 15 (01:33:39–01:34:55)
I think we have a lot of challenges to figure out. Many of the things would require at least staff to oversee them. I think there's some really cool opportunities around helping residents access the financial incentives that are available for electrification and have successful projects. is a pretty steep learning curve.
I just went through replacing my oil boiler with heat pumps and it made sense financially, but only after I thought about it for like two years. So it's certainly, it's not an easy path today. And I think that the talent could really help with making the information available, helping people connect with reputable installers so that, you know, if people are doing these things so that need to happen for the state to meet its climate goals. They're having a successful experience and they're not getting heat pumps that don't work.
That's not going to be good for the overall effort. It's not good for the residents as well.
Speaker 12 (01:34:55–01:35:25)
This is going to be ongoing, though, regardless of whether we adopt the, not the stretch code, the specialized. That's right. the town meeting for the specialized code is sort of like free advertising. We either make it or you don't, but either way, you're, you're, you've got a podium for a little bit to speak about the pros and the cons and hear the cons so that you can then use that.
That's for the next sales pitch, I guess.
Speaker 15 (01:35:25–01:35:59)
But I think definitely if you, uh, Disc warrant article as an opportunity to make a good impression and not burn a bunch of bridges trying to win at all costs. Because this is just the first of many things. If serious concerns are raised at town meeting and it doesn't go our way this year, that there's always next year that we can spend more time to resolve the problems that they're identifying.
Speaker 2 (01:36:01–01:36:24)
One thing to think about with the timing is all of the, I don't know how many of the large 40D projects have applied for their building permits yet. What would the time frame be for enforcement or effective when, if it was adopted or approved in May, it's not in effect until December?
Speaker 4 (01:36:25–01:36:42)
So it's less than six months and then it could either be July 1 or January 1, after that, with a specialist. It could be a lot of them. I remember Campbell's lawn had her hand raised. I don't know if it's still raised, but.
Speaker 13 (01:36:42–01:38:03)
Yeah, I just want to say thank you to Alex for raising the point that making this decision is both challenging and signing on with reputable folks is an obstacle too. I mean, just completed a heat pump project myself. I consider myself a pretty informed person when it comes to climate and when it comes to being able to access resources. And yet it still was a real uphill slog.
And now going through the process of adding solar panels to our house, same thing. I think I'm probably still maybe a year out from being able to complete that project just because of how opaque the process can be and how challenging it is to feel comfortable with the decision-making process of who to go with and how to make things happen and also if you are making decisions between loans and other things. So thank you. I just want to thank you for acknowledging the challenge that there are good people out there who want to do this stuff and that it's more than just hitting a button
Speaker 15 (01:38:04–01:39:06)
Absolutely. Yeah. I think, um, I think of it in terms of, uh, technology adoption curves. Uh, and then I feel like heat pumps are where Tesla was, you know, eight or nine years ago where it's still kind of, uh, uh, off the beaten path.
Right. And so the important thing over the next few years is to make sure that people are motivated to do that. Uh, have a great report because it's about generating community around it, generating positive word of mouth. Most people are going to do this because all their neighbors have done it.
That's where you get into the steep part of the S curve and trying to push into that part of the transition too quickly, you're going to lose buy-in because It's an expensive project to have go awry.
Speaker 12 (01:39:06–01:39:33)
Does the state subsidize any education for technicians, for scholars, for engineers? Because one of the problems I found in my end of the book work is that all these great ideas as long as they're just ideas, because as soon as you try to implement it, the supply chain gets all bogged down with, we've got the unit, we don't know where to install it, or we've got the installer, but no units. And then people lose faith, because they've been stuck, and they hear their neighbor got stuck, so I'm never gonna touch that.
Speaker 15 (01:39:35–01:39:46)
So I think workforce development is a big part of the state's roadmap as well. We need more electricians, more HVAC technicians.
Speaker 5 (01:39:46–01:39:49)
I gotta say that,
Speaker 15 (01:39:50–01:40:36)
while I was having my heat pumps put in, I had no fewer than 12 HVAC guys in my house, day after day, but different ones, not all at the same time, usually like three at a time. I have some put in, I didn't have, I was, I guess I was lucky then. And they're all, um, you know, super professional young men with a great job. I think that people who make a good, I mean, part of, People kept leaving the company while I was getting the project set because I think there's demand.
So people are hopping around and getting raises. So it's good work for the upcoming generation.
Speaker 4 (01:40:37–01:41:00)
The Mass Clean Energy Center does do a lot in terms of that workforce development training and doing the tracking of that. I think they found about just shy of 50% kind of space doing communication, but they did see awareness of those jobs that some people who want to go into that field and people who know that they exist as a resource.
Speaker 15 (01:41:01–01:42:55)
But you're right that every single person in Milton tried to answer the call today and try to get a heat pump done this year. Right. I think this is one of those things where we have to get started and we have to go as fast as we can, but not faster because I didn't say it interface with this. So it doesn't massive offers.
So that's one of the things I'd like. I personally like to work on the climate action. Planning committees, electrification programs, there's models to follow in towns like Lexington and Wayland. There are town-led programs that offer a range of services around this.
Key pump coaching is one like volunteer. Usually a somewhat town staff person manages a team of resident volunteers who have done a project or are engineers, so they're interested and want to help their neighbors be successful. I actually, back in 2020, worked with a ping-pong coach, Waylon, who came and nerded out on spreadsheets. He was trying to get his practice launched, and now they're more focused on that.
That's a model that that is there to follow. I think it would realistically require some budget and staff to oversee it, although there's also grant programs. I think the Lexington program has one full-time sustainability director and the grant funded by the MassAid Community Outreach Grants for a part-time outreach coordinator.
Speaker 4 (01:42:56–01:43:17)
interviewed and met with the Building Electrification Accelerator, which is a statewide initiative. And I talked about what it would take to launch an energy coaching program in Milton. And for us, the hurdle is staffing capacity. We don't manage that stuff.
That sustainability of work here would potentially get us over that hump.
Speaker 15 (01:43:17–01:43:35)
So that was one of our first, my first stakeholder and expert conversations was to sit down with Nick Vaughn. mentioned stuff like this. Now I guess we're in line, right? There's a few other folks who've been waiting longer for staff meetings.
Speaker 14 (01:43:35–01:43:37)
I'm sorry.
Speaker 16 (01:43:38–01:43:47)
Staff is always going to be an issue. We have to start somewhere. We have to start. When the lottery gets by, it's there, right?
Speaker 6 (01:43:47–01:44:15)
Are there any scheduled opportunities to talk to people? I think this is one of the things I asked. Are there going to be any forums or anything for people to learn more about the code? I'm thinking more like the contractors, homeowners, things like that.
About the code? About this potential new change and about what's existing. Because I think some people don't understand that we're going to increase even more naturally. So just like you explained today.
Speaker 15 (01:44:15–01:44:15)
Yeah.
Speaker 6 (01:44:15–01:44:24)
So is there any upcoming informational session or anything, Josh? Yeah, we're planning for it.
Speaker 5 (01:44:24–01:44:26)
with roughly similar content.
Speaker 15 (01:44:27–01:44:54)
I would really like to record video content that you can watch faster than you can watch a public forum to try to get these messages available on more channels. So that forum is Thursday, the 4th of April. It's at 6.30 at the Council on Aging.
Speaker 5 (01:44:54–01:45:12)
Alex and I will be there, as will the Link Commissioner, Joe Achu, as well our Environmental Coordinator, and Alex in such space with Dylan Patel at DOER, which is a regional liaison, and he might be there as well to talk about it.
Speaker 4 (01:45:12–01:45:32)
But as Alex said, there'll be some more time spent clarifying what the stretch code is versus the specialized code and what the stretch code means, regardless of what happens at the time of meeting. I don't think it's getting advertised. Well, we only set up a date on Friday. Do you have any recommendations, Ben?
Speaker 15 (01:45:33–01:45:33)
Yeah.
Speaker 4 (01:45:34–01:45:44)
I post things to the town of Facebook and Twitter, and I think it gets about three sort of hits and views and engagements, so, you know.
Speaker 2 (01:45:44–01:46:18)
I just shared the East Milton planning session with MAPC, three different Facebook pages today, so I think If people can do that, but they get on the big Facebook groups and not the town and get on, like, everything Milton. I mean, if you put it through the channel, I share it when it comes out on a planning board initiative. I share it on those other groups that I know. we'll have a bigger draw.
But I just post, just share exactly the commentary, exactly what they're posting. Yeah. I mean, the times.
Speaker 4 (01:46:18–01:46:37)
Yeah. Yeah. So we've sent a link to our micro-grid stuff to CIPC work. The Sustainable Milton newsletter is pretty big.
And we've been working with them all to get that out to their audience. And this is an event that the COA, which I work with,
Speaker 9 (01:46:40–01:47:00)
It's great to have a newspaper and it has paid service. Is there free? People can sign up and get email notifications through the town. I do think so.
There is. I signed up for certain communities. Right, certain things. Not like a general.
Speaker 4 (01:47:01–01:47:06)
And then on the front page, the website too. We do news items.
Speaker 5 (01:47:08–01:47:13)
And if you are subscribed to that, you'll get that sent to you. News. The news.
Speaker 4 (01:47:15–01:47:30)
But I think those are the people who are already engaged. Yeah. And we don't see that typically reaching folks that wouldn't have already reached. And it's all, we don't have a manual, like the Milton
Speaker 15 (01:47:31–01:47:38)
monthly newsletter that we curate and send out to every home. Is there any way to target town meeting members?
Speaker 2 (01:47:38–01:47:48)
Well the clerk will send an email with an invitation because it's going to be a town meeting article.
Speaker 15 (01:47:49–01:47:57)
Definitely need to know the most and then I think town meeting members are likely to have a network of neighbors that
Speaker 12 (01:47:59–01:48:28)
especially if it comes out just instead of like a notice saying, Hey, here's an invitation, please forward to your neighbors. And it's really, this is designed for town meeting members, but we would love to everybody to participate because I, my wife's a town meeting member and she gets these things that are very official looking notices. But by the time you're done reading it, it's really all about it. It doesn't get to the heart of it.
Whereas I think an advertisement that was written as an email as an invite might be more effective because it would encourage people to distribute it to your friend group.
Speaker 2 (01:48:29–01:48:57)
So, when we had the webinar for the village, Sony in 2020, we asked the clerk to send an email out. And the email was short, but at least made every time meeting members aware and the same for communities that. public forum that Tim and Josh did for that, an invitation was sent out to all town meeting members.
Speaker 1 (01:48:57–01:49:35)
So definitely- How do you contact the town meeting members? The town clerk sends out- Because I'm a resident, I couldn't contact my town meeting member by email. I know. It's the clerk.
Thank you, Josh. I appreciate that. No, but I appreciate that. But no, I mean, I was just wondering in terms of getting in touch with the town meeting members, if I wanted to get involved.
If I wanted to get in touch with my town meeting members, I'd have to write them a letter. Yes.
Speaker 2 (01:49:35–01:49:53)
Well, the clerk has offered that people can opt in to having their email address available, but it's still a process that requires. someone to send the email, right? I mean, I don't, I forgotten exactly how the system works.
Speaker 9 (01:49:53–01:50:04)
It's like you're, like I'm preaching sad. You can send it to all and it gets sent to like a distro.
Speaker 4 (01:50:04–01:50:10)
There's also things about the deliberation. It's not easy.
Speaker 6 (01:50:10–01:50:28)
The other thing is you have something. So it wouldn't be the right way. So if I seem to want to open up some emails from, you know, making some flyers and all that, that's what we do. But the building department would be good because that's where your contract is going.
Speaker 2 (01:50:29–01:50:48)
The building department should have its own notices about the changes in the stretch code because they don't want the builders to come in and file for a permit on August 1st and be surprised, you know. I can tell you that change is happening across the state.
Speaker 5 (01:50:49–01:51:01)
Builders and contractors have had a ton of outreach from the state on that. And as business owners or business people are obviously interested in this.
Speaker 4 (01:51:02–01:51:09)
And I strongly doubt that our contractors out there aren't aware of these requirements. And they certainly won't be once they change.
Speaker 15 (01:51:09–01:51:21)
I think there's enough complexity in what's specialized, what's What stretch that. You know, I know it's coming because they haven't actually have to go through the compliance process yet.
Speaker 2 (01:51:22–01:52:17)
There's so what is exactly what is different pathways? You know, you can do. You can use a certain kind of installation, or you can use a different method of doing your installation. It's not.
I mean, it's 1 thing to give it to say, here's the number, but to actually achieve the number, it's the devil's in the details and you've got to show where every business, all of your ceiling is going. So, yes. It's true because architects have been made aware of these things too. But it's still until you're doing it on part of your day-to-day practice as the builders and as the architect, there's still some learning to how it's best applied to a specific project.
I do think the builders are going to have a little bit of a learning curve. Because it's one thing at a high level, it's another thing at a medium level.
Speaker 6 (01:52:17–01:52:32)
Well, I think the cost will be It will be a good thing, but I think as a consumer, the cost will be more upfront, you know, potentially. So I think the homeowners would be interested in this as well.
Speaker 2 (01:52:33–01:53:19)
I think one thing is, like I said earlier, when you have a new basically a practice, new practice. And the construction industry, like when air barriers and sort of house wrap air barriers first came out to being, there was, you don't think of it now because it's just standard practice, but that was like, how do you get that done? And how do you make sure that's really done properly? And on the commercial side, there was a lot of uproar about it and there had to be a lot of inspections.
Now it's just standard practice. That will just be something like that. It'll just be a little bit of a curve for everyone. Maybe some contractors will want to charge a little more in the beginning, because they're not as familiar with it.
But once they and all their subcontractors, that's their standard practice, it'll be different. Just like Tesla or other new technologies. It's going to be that way here too.
Speaker 4 (01:53:20–01:53:33)
Yeah, just to speak to resources and outreach, because we've given or five presentations between the two of us at this point on the subject. All of our presentations are on the town website.
Speaker 5 (01:53:34–01:53:37)
You're on community, we have all the resilience and sustainability.
Speaker 4 (01:53:37–01:54:18)
It's Stretch Energy Codes that has all the presentations we've given, including the one I gave to the select board and the planning board that has DOAR's breakdown of the costs for electric versus gas construction under the code for both small and large buildings. Under the stretch code, builders typically see $20,000 to about $30,000 in savings, and homeowners see about $550,000 in a large building and just over $1,000 in a small building based off of this study that I shared to the planning board and select board. Just to do a cost point,
Speaker 15 (01:54:19–01:55:03)
I originally wanted to keep the focus on the specialized code when I was first trying to put materials together, because it's like, oh, well, the stretch code's not affected by this vote, so why talk about it? I changed my mind because it's a good opportunity to just let people know about that. It affects them. It's related to this Warren article.
As long as we make it clear that how people vote on the Warren article doesn't affect whether that happens or not. It's a good opportunity to give people information and to give them an opportunity to not be surprised at the last minute.
Speaker 2 (01:55:03–01:55:41)
Yeah, I think one of the challenging things about the stretch code that's just come into practice in the last year is that if you have an existing home and you're doing a renovation or an addition, if you can't isolate the addition, you're required to bring the whole thing, your whole house, the existing part up to code. And that can be a big expense for someone who's not planning to do that. I see as one of the more, it's in the stretch code now, so it's not.
Speaker 1 (01:55:41–01:55:42)
What does isolate mean?
Speaker 2 (01:55:43–01:56:23)
Well, let's just say you had an area where you kind of close it off, either with doors or, you know, so when they do the testing, you're not drawing in the kind of air from an existing house so that That's what I mean by isolated, but let's just say you're, you're doing an addition where you're opening up rooms to 1 another and the flow of space and everything. Is it means that you couldn't sort of shut the new off from the old. Then you're going to be required to bring the whole thing, your whole house up to. Is it a 1,000 square feet?
Yeah, yeah, yeah.
Speaker 4 (01:56:24–01:56:37)
So there's, if it's a smaller home, it's also more than 50% of the building sort of footprint. If it's, if that is less than a thousand, so it's like an 1800 square foot home, it would be triggered by that.
Speaker 2 (01:56:38–01:57:17)
So it's really, I think it's just some sort of setting expectations for people when they're beginning to think about what their renovation plans are or their expansion plans are. Um, you know, in small addition, it's not going to trigger and, But if it did get triggered, you know, you're looking at windows, you're looking at insulation, you're looking at, you know, a lot of things. So it's, but it's all the, if it can be incremental in terms of what you need to do brings the whole building up, it goes better. All right.
So thank you, Alex.
Speaker 3 (01:57:17–01:57:22)
Any other questions? Thank you.
Speaker 4 (01:57:22–01:57:36)
Okay, no, it was on the 21st. Your next meeting, it's on the 21st.
Speaker 15 (01:57:37–01:57:47)
If you are Jones before and you can always just reach out to me. Yeah, thank you.
Speaker 4 (01:57:48–01:58:02)
And tomorrow night, the select board. Agenda item 14 is on the renewal of our community electricity aggregation program. I've sent some details to Alex about that.
Speaker 5 (01:58:02–01:58:05)
They presented to us the other week.
Speaker 4 (01:58:06–01:58:18)
But that's another sort of energy efficiency, green energy component, sort of makeup that is on the agenda. Is that something we… Can I ask if you have a chance of opting out of it or something?
Speaker 5 (01:58:18–01:58:18)
Yeah.
Speaker 4 (01:58:19–01:59:04)
Well, you can always choose to not be in the CEA and opt into either, by default, you're in Milton Green. You can opt up to be in 100, or down to Milton Basic, or you could go for a general Eversource. The savings have been significant, about $1,400 a person per household since the program started, and just over $9.5 million in talent. What we're expecting to see sort of in a big sort of way is that it'll stay the same generally, but Milton Basic will move from 10% additional Class 1 RACs to 20% additional.
Speaker 2 (01:59:05–01:59:55)
So we opted into the 100% last year, and I just was finally able to download and get our tax deduction amount. So we still have to go back and compare all of our numbers. But it is interesting too, when you look and see where they're getting the clean energy from, or the renewable energy from, when you go to that website where you actually get the tax information, they have a lot of information. So the town website has certain information, but then the So like a non-profit, this was a little bit unclear to me when we were first doing it, but there's another place, another entity that you actually get the tax information.
Speaker 4 (01:59:55–02:00:21)
Yeah, so the Good Energy is the group that manages, and they manage it for most of the CEAs across the Commonwealth, and actually then there's a There's a whole sort of supplemental green municipal aggregation program that makes sure these are platform reps. But in terms of also nonprofits that are doing great work on this, Sustainable Development has a like how to guide on greener energy on how to opt out to green money.
Speaker 2 (02:00:21–02:00:38)
That's awesome. All right. So I think Josh, you're going to work on the sustainability part of our report, okay?
Speaker 4 (02:00:38–02:00:43)
Don't I know mechanically how to write it down? You're going to be responsible for it.
Speaker 2 (02:00:43–02:00:58)
Okay. Excuse me. So let's just go quickly back to next meeting dates since I skipped those earlier. Do these dates work for everyone?
Speaker 6 (02:00:58–02:01:27)
I think the 13th might be second week of term meeting. And we don't know. We don't know. Well, I mean, do you think we're going to go that long?
I don't know yet. But usually it's Monday, Tuesday, and then Tuesday, Thursday, Thursday, and then the following Monday, Tuesday. Because it's a six. It's a first night.
So this is kind of why I was getting it. Yes, I'm not with the May one. I'm with the April one. What's the April date again?
Speaker 2 (02:01:27–02:02:04)
Yeah. Given our schedule, well, all right, we can come back to that. If it doesn't get pushed to, you know, May 20th, then, you know, we're going to have a bit of time in between meetings. But so that we could hold the 13th and always, you know, switch it to the 20th, right, if 13th would work.
Meeting minutes. Thank you, Josh, for putting those together. Did anybody have any comments about the minutes?
Speaker 4 (02:02:06–02:02:11)
Sorry, what was the date of that? February 12th. February 12th, OK.
Speaker 2 (02:02:11–02:02:22)
So then I'll take a motion. I'll take a motion to accept the meeting minutes of February 12th. I'll second. I'll second.
OK, all those in favor, since Regina's remote, we'll do a roll call. Regina?
Speaker 13 (02:02:22–02:02:23)
I'm in favor.
Speaker 2 (02:02:24–02:02:25)
Favor?
Speaker 13 (02:02:25–02:02:25)
I'm in favor.
Speaker 2 (02:02:26–02:02:28)
And I, in fact, abstain. Dick?
Speaker 13 (02:02:28–02:02:30)
Yes.
Speaker 2 (02:02:30–02:02:41)
Roxanne? Yes. And Cheryl, yes. You just gave us an update, Josh, on the meeting, a couple of meetings.
Do you have any further updates for us?
Speaker 4 (02:02:45–02:03:26)
Do I? Hard to keep everything that might be relevant. But if it was really important, I would be remembering it. So I think I can give you my update.
Thank you. All right, I'm ready to go. Yes, March 25th. Cheryl alluded to it, but the.
That's on Monday, two weeks from now. Us and our planning consultant, MAPC, are having our second committee forum about the East Fishers Square mixed-use earthquake zoning. So that'll be at York Centre at 7 o'clock, as it was last time.
Speaker 2 (02:03:27–02:03:29)
That's what I shared today. I shared your difference.
Speaker 4 (02:03:29–02:03:43)
All of us. If you're ever looking at the town meeting, the public meetings calendar, it's featured then on the top corner. I couldn't log in to Twitter today, so it's not on Twitter, but it's on here.
Speaker 7 (02:03:43–02:03:44)
What's the date, Ken?
Speaker 4 (02:03:44–02:03:46)
The 25th, two weeks from today.
Speaker 3 (02:03:46–02:03:46)
And time? 7.
Speaker 14 (02:03:46–02:04:09)
All right, thank you, Josh. All right, I'm going to go to eight for Elisa's piece of this. I was offered the opportunity.
Speaker 2 (02:04:14–02:05:50)
So I put two options together for us. We've talked about this a couple of times and we haven't really talked about whether we think we need an extension or how we plan to make recommendations for an update. So the first one that I put together was to add one year to the committee. And that would give us time to follow up on if we needed it to follow up on anything further with the library or town center planning.
And if there was anything else as we try and finalize these recommendations that we thought we might have a little bit more follow up before we submit our report. So that was the sort of first page of this. And then the other piece was just to add to the list of sort of expertise that somebody who had never been on the seats, you know, and this has come up before that maybe we shouldn't spend the kinds of, I guess, experiences that people have for individuals. So that's the first one.
Well, whether we wanted to think about the committee just having an expanded charge to do the update ourselves. So that would be an addition of another year or two years for the committee.
Speaker 14 (02:05:53–02:05:55)
So I open it up to discussion.
Speaker 3 (02:05:59–02:06:04)
I think the first point,
Speaker 12 (02:06:06–02:06:31)
Yes, I think it's kind of problematic. As far as expanding the charge with the succincting committee, especially since three of us were here for the last one, it doesn't give the town or other people the opportunity to have serious input other than edgy.
Speaker 2 (02:06:32–02:06:33)
We could all sit down now.
Speaker 12 (02:06:33–02:07:16)
Well, I'm not suggesting that we all have to sit down right away. I'm thinking it's kind of time for the newer concerns. And I think the implementation of it was good. We've done some things and taken a fair number of those things off the orbital.
I'm saying that there are probably some things on the old master plan that maybe aren't even relevant now, and therefore, maybe some of those should come off, and people have got new ideas. I'm not so sure that we, as a committee, should influence the new ideas too much. We should probably give advice after the new committee has said these are the things we really think are important.
Speaker 2 (02:07:18–02:08:07)
So the thought about it was that we're going to make these recommendations for, because what we've talked about with bringing all these folks together. So is it going to be somebody else that's starting from scratch, not having heard what everybody else just told us over this last year? It's not to say that it wouldn't bring new people into the committee. And then, you know, would a new committee take a long time to get formed and up to speed if it would have to go to town meetings?
you know, would that be like next year that it would get formed because it would be like a Maytown meeting? So I guess I was thinking maybe there's some efficiency to having it be just a slightly different chart since we're not recommending a wholesale rewrite. We're recommending just some portions. Other thoughts?
Speaker 1 (02:08:09–02:08:12)
How often are we supposed to do a master plan?
Speaker 2 (02:08:12–02:08:14)
Well, it was 10 years for this, right?
Speaker 1 (02:08:15–02:08:19)
There's a time to do another 10-year master plan, and that time would be illogical.
Speaker 2 (02:08:19–02:08:30)
Well, if we talked about it, it can be either a wholesale. I remember the this one was the this one that we've been working on was wholesale because it hadn't been updated since the 1970s. That's right.
Speaker 1 (02:08:30–02:09:13)
But I think there's a lot of there's a lot of new issues. I think they've come to bear since since we started the original master plan, going back to the original format of having open meetings, having people just like people like to do this. And we asked, you know, what's up with the new best? I think there's some of the things, and the whole hanging through, we did a pretty good job with that.
Some of the things are still dangling out there that are important to me, like East Rome Square, for example. I think it really, really needs some attention. Town Center, there's some other things along the way. But I think that if we're gonna do a new math plane, that might be a good chance to do a real switch to some new people.
Speaker 2 (02:09:14–02:09:42)
Yeah, I guess my concern too is a new master plan when we did it 10 years ago was 125,000. We're looking probably at like $200,000, whether it's going to be funding, having an override potentially on the ballot next year. I guess I was a little concerned about full rewrites, whether there would be ample
Speaker 1 (02:09:42–02:10:28)
Well, it's supposed to be a living document anyway, so we have to really try to figure out how to maybe figure out some of the things that are in there that may be a little antiquated and add in some new issues. We've seen a number of fairly good-sized issues come up in the past, you know, two or three years that we haven't even thought about before. And I think that, you know, having people have an opportunity to weigh in on the master plan. I would like to think everyone knows we have a master plan.
I'm not quite so sure that's the case. And I think that people have asked me, how do we import, how do you use KN for the master plan? Is there a way to change the master plan? I guess we could, the group could probably change it, but is that the best way of doing it?
Speaker 14 (02:10:29–02:10:29)
Regina.
Speaker 13 (02:10:30–02:11:25)
Yeah, I guess, um, my, my big question in terms of whether, whether to, you know, go for this idea of a brand new from scratch master plan, or sort of an addendum or an update is. Have the things that that have arisen in the last 10 years, do they fall under completely new categories or are we talking about, you know, let's say accessory dwelling units or affordable housing as like updates or more critical action items than before? What are the big, huge inflection points that have really changed over the last 10 years? And that's an honest question, like an open question.
Speaker 1 (02:11:25–02:12:05)
I think we just heard one tonight. I don't remember a lot of conversation regarding sustainability. I know that certainly came up in our conversations, but it wasn't as a pressing issue as it is right now. Accessory dwelling units even though it wasn't, I don't think it was really totally mentioned in the master plan, offering different types of housing opportunities for residents of Milton on new residents of Milton was never really identified and that could be a whole different conversation.
I mean, I think that when we came up with the accessory dwelling units in the past, I think it's back at the Back with you at the planning board, isn't it?
Speaker 2 (02:12:06–02:12:07)
Was it in the housing production plan?
Speaker 1 (02:12:08–02:12:23)
Right. But in terms of that discussion, I don't think there was a vote on it. I'm not sure there was escalation up or down on ADUs. It was sent back to the complaint board for further study.
It was.
Speaker 4 (02:12:24–02:12:32)
And, but to your earlier point, it is in goal three of the master plan to amend the accessory department bylaw.
Speaker 1 (02:12:32–02:13:25)
Okay. Okay. Well, that's something we can talk about again. I mean, there's other talk, one of the issues that I think Cheryl and I have talked about is that what do we do with some of these larger states in Melbourne?
Could we do some sort of a condo conversion? a more updated Congo conversion type opportunity as opposed to what we had in the Burma States or Clinton Brook. We needed one acre for every unit plus two, which I thought was absolutely bizarre, but that's what it was. But that helped us with different housing housing choices and also deal with some of the AD40B situations that we've seen out there and give owners of properties opportunities to do other things with their property.
So I think that there's a number of different things and of course we just had this whole conversation with the MBTA
Speaker 2 (02:13:25–02:14:09)
uh communities law and how does that work so one thing i'm going to answer you about regina is that actually the manager plan is um doing them i guess is establishing the state law so there are categories that have to be covered um so that the um you know i was looking at this too back to the charge where it references um this the Chapter 41, Section 81D. And so the categories that you find, like in the seven goals, those are the categories you have to, your plan has to include housing, open space and recreation, public facilities, economic development, transportation,
Speaker 5 (02:14:13–02:14:17)
Okay, that was a pretty good list.
Speaker 13 (02:14:17–02:14:20)
So Cheryl, that was pretty good. I gotta tell you.
Speaker 2 (02:14:20–02:14:29)
Yeah, so those topics are required. And that's kind of why the master plans are organized around those topics. Yeah.
Speaker 3 (02:14:31–02:14:34)
Cultural resources. There you go.
Speaker 2 (02:14:34–02:16:37)
I'll try to do that one, right? So actually, I have it right here, too. But as far as housing, You know, if you look at sort of planning over the last 20 years, there's some common themes in Milton. You know, the business districts, looking at making them mixed use, looking at our housing options that, you know, some of these things like before it was even on the planning board, which is now.
I'm about to enter my 10th year. So, you know, kind of conversion was something I was working on. I was working on ADUs before this last round. I worked on that probably like eight years ago.
You know, there are things that get brought up and they get kind of, they get this set back for further study and they kind of just die. And so there's, there's a lot of that in these, um, in some of these housing initiatives because they're only changing their heart. They're really hard. So at the end of the day, so, You know, they've been put in plans.
The housing production plan, which I will point out, was approved by the Planning Board and the Select Board, is the way that we get a temporary safe harbor on the 40Bs we make progress on. So making progress is important. And so the things that are recommended in that plan, including the ADU, but also town-owned property for affordable housing. They're identified sites.
The planning board and the site board are responsible for implementing that plan. There's some commonalities in the plan that we have. It definitely needs some updates. We've talked about that.
That's why we've had people come through and we talked about diversity, equity, and inclusion kind of being rolled into every one of these. Sustainability really being rolled into every one of these.
Speaker 1 (02:16:37–02:17:21)
That's what I'm getting at. I think we have some tremendous transportation issues, whether it be I'm not talking about just traffic and parking in this town. I mean, if there's another person that talks to me about, you know, the traffic in the town of Milton, I mean, this is one of those things that, you know, I don't, you know, it doesn't solve itself. I mean, I think we need forums like that for people to come in and it's fencing, that's one thing, but also weigh in and try to get some information as you, You know, they can identify what the problem is.
We can tell them what the history is and maybe come up with some ideas, what the solution should be. And I think that was sort of the idea behind the implementation committee.
Speaker 2 (02:17:21–02:18:19)
One of the things I think that's important we saw is the people who joined the meeting early on is that, you know, initiatives, plans get made, initiatives, the traffic mitigation committee, all these committees that do great work, issue great reports, and then what happens? And I think that's a common, what they've expressed here tonight was a common theme. It's like, what's the implementation? A lot of it has to do with budget and staffing, right?
So it's a matter of prioritizing and it's something that I think I certainly have felt that the master plan, while it's adopted by the planning board based on this law, it's really something beyond planning board. It's really the town administrator, because there's town departments at play, that the planning board has no control over that town facilities. It really is something. If it is a roadmap to how the town evolves over time, that's what it's supposed to be.
Speaker 1 (02:18:19–02:18:47)
I think these four ladies that came in tonight epitomizes the issue. I mean, they're basically saying, hey, we've been going to a number of meetings. We've talked to a number of people. We don't know where to go.
We just want to sidewalk those. And all of a sudden, we're all like, oh, you have to do this, or we have to do that. Maybe you want to do this, and we'll do this. I mean, that's crazy.
If you sat down and told someone, that's how it worked, they'd say you were nuts.
Speaker 6 (02:18:47–02:19:30)
Oh, I know. And I think part of the issue, though, is we have a lot of committees. I honestly think we have too many committees in general. And what happens is one committee says one thing, another committee says another thing.
Nobody talks. We have a strong town administrator. Really, the way it should be done is that it funnels up to the town administrator, and he funnels it off to whatever department needs to do it, whether it's the sidewalks or whatever. But when you have this committee and another committee, and they're both hearing the same thing and not communicating, That's where the disconnect is, and that's why we have these problems.
It's like the right hand doesn't know what the left hand is doing at any time.
Speaker 1 (02:19:30–02:19:55)
I totally agree. I think that was one of the arguments to have a strong administrator. I think when we talked about this in the past, we were on that traffic mitigation committee. I think it's also a very quick way of having people saying, I'm not going to get involved in your ministry.
It was going to be a waste of time. If nothing's going to happen, you're going to have a hard time getting people who want to donate their time on a regular basis to make this town a better town.
Speaker 2 (02:19:56–02:19:59)
You're talking to those of us who've been on this committee for a long time.
Speaker 1 (02:19:59–02:21:15)
I'm talking about people in general. I'm not going to pick on the Traffic Mitigation Group. We spend a lot of time And when I was asked, I said, I will not be on this committee, but just kind of sit on the shelf. And so at the end, we had a big fight as to who was going to be in charge of implementation of the report.
And it was going to be the town administrator. And that made it pretty simple to me. You have the town administrator, and he's in charge. He said, listen, I'll take care of it.
I'll make sure it's whoever it is, all right? We're still talking about it. And that was in 2020. So I think that when I'm going thinking about this in my own mind, and I'll stop talking about this is that if it's 10 years, a lot of things have changed in this town, including people.
And they have their ability, they have a forum to listen to what people have to say, what they want to see done in this town. I think it's important to engage public sentiment and get people in the same room together and talk about mutual issues that are important. They might not agree, but you'll have a pretty good forum, ongoing forum, to discuss those types of issues. And that's just my two cents.
Speaker 9 (02:21:15–02:23:36)
What were you going to say? Yeah, no, just a couple of things. I think it's late, so sorry if it comes up. The community members that came in earlier made me think that it, you know, I would love to see our committee follow along with projects like that a little more closely in the future, even if we do extend it.
And for whoever's on the committee, I just think, you know, that having a pulse on all the different projects that kind of follow the master plan. So the master plan says we should be doing X, Y, and Z. And this project or this initiative is in line with the plan. And it's maybe following those a little bit closer in hopes that some of those miscommunications or whatever, we might be able to catch or see or whatever.
But I think I would love, I would love to be able to do that to see, you know, go through each category and have better understanding of what's going on in the town and kind of how we can help support those things. As far as the committee and go as in terms of extending and whether we revise, I don't think it's a complete revision. I think it's a, like you said, to your point, we brought all these kind of experts in on all the topics and heard from them, and there's definitely a revision, they would probably all agree that there's revisions. I don't know that there's $120,000 worth of, you know, revision work that needs to take place, but I do think it's worthwhile.
I've seen so many different committees reference the town's master plan, it's in the master plan, and it should be, in my opinion, a living document that's changed as as things change in, you know, in the town as well as, you know, the state. And I think, you know, to your point, there's probably a lot of other people who might love to get involved in crafting that, you know, revision. So, you know, my recommendation would be to move forward with, you know, extending the committee, but maybe bringing in a small group to work alongside us as we maybe transition some of that or work with some additional folks to come up with some change in it.
Speaker 2 (02:23:36–02:24:39)
Yeah, so the actual recommendation would probably want to have a consultant, you know, who would facilitate an update. But, I mean, if the board wanted to do it, we could do a similar, I mean, the committee wanted to do it, we could do something similar as we did in Milton Village, where we would lead, you know, town contact, if you will, but we brought in MAPC, and they led the community process, and we gave them direction. And that was the way that it worked with the master plan itself, but what happened was there was a master plan committee, and so Dick Tabor and I served on that, along with Watts Shiner, so other people. And that committee was chaired by a member of the planning board, Emily Ennis at the time.
16, I remember being a big group. Regina, please, go ahead. I see that hand, I'm not gonna keep talking.
Speaker 13 (02:24:39–02:25:03)
No worries, no worries. I just was curious, how are the goals of the master plan tracked on a departmental level or on a municipal level? Is there a management system like Trello or something that allows jobs to be tracked? What is that mechanism?
Speaker 2 (02:25:03–02:25:15)
Because I think- That's a good recommendation for what should be in there, Regina. But you know, the way we did it over the last 10 years was phone calls and emails, manual, and a spreadsheet.
Speaker 13 (02:25:15–02:25:50)
Yeah, there is a spreadsheet. Yeah, but what I'm trying to get at is that allows us to track and to reach out, but it doesn't allow for the assignment of jobs to particular people and they're sort of reporting back on status without us individually reaching out. And so I'm just curious about what's behind the curtain in terms of, you know, DPW has to have some type of management system for the workflow.
Speaker 2 (02:25:50–02:26:48)
So, the only authority that we have is the implementation of the plan and the plan itself was only adopted by the planning board. It wasn't adopted by the select board or the town meeting, or this is the town administrator. So that's 1 of the issues. I think over time that I would.
thought about, Regina, is that we can reach out and ask, hey, are you aware that this is in the plan and you're listed as the lead responsible party? But if they don't have the resources, either staff or funds, or if they haven't been asked or directed to do it by the town administrator or whoever the responsible party is, then they don't own it in a sense, right? So it is- It's like voluntary compliance, right?
Speaker 13 (02:26:48–02:27:01)
Yes, yes. And what, can I ask about the history of why the select board or town meeting were not involved in adopting?
Speaker 2 (02:27:01–02:27:18)
The past general law that I referenced before, It actually is specific to listings who adopts it, and if it says the planning board. So this is one of these, it's kind of, it's one of these state law things.
Speaker 13 (02:27:18–02:27:22)
State law requires that only the planning board adopt it and not?
Speaker 2 (02:27:23–02:27:33)
Yeah, so if you look at, you can look it up, like if you just do a Google Math Journal Law chapter, what was that?
Speaker 7 (02:27:36–02:27:37)
One second.
Speaker 13 (02:27:38–02:27:53)
No, no, that's fine. I'm just, I'm just curious. Like, I get it if the planning board was required to adopt something. What I don't understand is why then we didn't, why there wasn't buy-in from the other groups as well.
Speaker 2 (02:27:53–02:28:20)
I'm not sure if there wasn't buy-in. It's just that when you start, like if you, You know, it wasn't given to, like, if the planning board doesn't have authority to impose that plan on anyone either. So we can't say, you know, Mr. town administrator or miss town administrator, you're responsible to implement this plan.
Right.
Speaker 13 (02:28:21–02:28:42)
So, but then why why wasn't the select board. Or was the select board interested in signing on to that plan so that then there could be funding and other things attached to some of the standards?
Speaker 2 (02:28:42–02:30:06)
So our committee is supposed to recommend the resources necessary to implement the plan. And we're supposed to recommend that to the planning board and to the select board. Um, so the timing, the resources and the responsibilities, which I think generally when we have where we've. Um, through outreach or through particular topics, like, when we worked on zoning or done a more study, um, we've got.
You know, we haven't looked at that spreadsheet in a while, but we did do a lot of outreach in putting that spreadsheet together. It's worth all of us looking at it again for any updates. Like, I'm sure on the zoning side, I can have some updates for that. But, um, So, you know, I don't it's not as if there's not buy in on it.
I don't think I just think it's just 1 of those accountability things that you would have different if it were a different type of organization. Like, if you're thinking of your educational institution or business or whatever, you know, there would be some pretty clear reporting and tracking. I think. We've done what we think is a good amount of work on the tracking, you know, trying to get on the tracking side.
It's just we don't have that reporting side. There's no requirement to report to us, right?
Speaker 12 (02:30:06–02:30:11)
Yeah. For all the other committees to keep up with it or even for us to keep up with it.
Speaker 9 (02:30:11–02:30:21)
Yeah, we agree. Can I ask if Josh, do you have an opinion or does the planning department have an opinion on this?
Speaker 3 (02:30:21–02:30:25)
I won't be content.
Speaker 4 (02:30:25–02:32:08)
But all the work that Tim and I do as a department outside of the many, many sort of like administrative changes with regards to permits and managing the planning board and their requests, any, in the bygone days, any discretionary grant, that are sort of above and beyond the very specific management of what already exists, and particularly permits and that permitting process. We use the master plan as a guide, and whenever we're on committees and in meetings, part of our job is to be aware of, but there's not a sort of You know, any time I am doing a project, right, every meeting on the microgrid, for instance, has a discussion of where in the master plan, which sections does it say, this is something that's important. And then there's also subsequent, sorry, where in the hazard mitigation works, and where in our MVP workshops, and where in our biodestination master plan, the hazard protection plans. There's a lot of plans that So mechanically, Tim and I have the responsibility and the intention, I guess I could say, of doing some of the implementation of, you know, right, like if we get a transportation-related grant to do a project, it would be because that grant was highlighted in the master plan, in the complete streets prioritization plan.
Speaker 2 (02:32:09–02:32:14)
And that's part of why you want a plan, because it makes you eligible for certain grants.
Speaker 4 (02:32:14–02:32:27)
And it also guides our work, right? Like, without the master plan, right, there would be nothing for us to point to when we do position work. Or the planning board.
Speaker 13 (02:32:27–02:32:29)
You'd just be putting out fires left and right.
Speaker 4 (02:32:30–02:33:31)
Yeah, and a lot of our job, without, you know, stealing any of Chief Madden's salaries, putting out fires. It needs the plan and that plan to guide, but like, as a member of camera one was saying, we don't have performance metrics. a cross-departmental tracking of this is the master plan goals and and then the cascade of well this is also the housing production plan and this is and how that affects every department. A lot of that is mainly in the interest of myself and Tim and we're in these spaces.
We do that to the best of our ability and you know everyone else is aware of these plans Chase very much so for DPW work but it's a it's a guide for us rather than functioning as a mandate.
Speaker 9 (02:33:31–02:33:36)
Right. That's important. I think that speaks to how important it is to have that guide be up to date.
Speaker 4 (02:33:36–02:33:56)
Certainly. When I was helping insist on the need for a Climate Action Plan and that committee, it was so that we could do the work to actually do climate implementation and apply for certain grants because this is where it says so in the Climate Action Plan.
Speaker 5 (02:33:56–02:33:56)
Yeah.
Speaker 4 (02:33:57–02:34:04)
So it's necessary as a guide, but we can't do everything and there's nothing that ties us to be flexible.
Speaker 6 (02:34:05–02:34:05)
Yeah.
Speaker 4 (02:34:06–02:34:13)
Yeah. If a recommendation on coming in all has X amount of programs in the map that doesn't pick.
Speaker 2 (02:34:14–02:34:14)
Yeah.
Speaker 3 (02:34:15–02:34:16)
Make it sound perfect.
Speaker 2 (02:34:17–02:34:32)
So what I've been hearing is that maybe we should go for an extension of the time for one year at the current charge. And we keep talking about the best way to go forward. I don't think we're going to solve it tonight. I just wanted to put it out there for discussion.
Speaker 4 (02:34:32–02:34:37)
The article you sent out seems to read from 10 to 12 years.
Speaker 2 (02:34:37–02:34:48)
I did two different ones. I did one for one year. I didn't see that one. Oh, there was the front end of that.
It says the big old one. Did you send me one of those?
Speaker 4 (02:34:49–02:34:51)
I didn't get that. What Cheryl sent today.
Speaker 2 (02:34:51–02:34:52)
I had two pages, no?
Speaker 4 (02:34:53–02:35:02)
I only have this. The document that I opened. I only had the two-year one. That says 12-year.
You have two pages? Do you know? I only had this.
Speaker 2 (02:35:03–02:35:11)
That's what I have. I'm sorry. Yeah, I'm sorry. I said the wrong thing.
You don't have this 1.
Speaker 4 (02:35:11–02:35:16)
I just have the 2, the 10 to 12 year. Yeah, I'm sorry.
Speaker 2 (02:35:16–02:35:18)
I'm sorry. I said the wrong thing guys.
Speaker 3 (02:35:20–02:35:21)
Thank you.
Speaker 2 (02:35:22–02:36:11)
This was in my hurry up, I have work to do for my office. Everybody has a job, let's stop it. I actually have no excuse. It was basically that, but I did plug in and change the board of select went to select board.
And I just said, To see if the town will vote to authorize the select board and the planning board to continue to appoint. I don't know if it needs to say that or not. But anyway, it's basically John and then adding, you saw the same terminology I did, about sustainability, climate change, conservation, facilities management, construction, public policy, and the first statement. Because those are the things we talked about that were kind of not in these categories.
Now, is there any other category that?
Speaker 1 (02:36:11–02:37:42)
No, no other category, but I do have a comment. I think that, you know, we reference the master plan, and I do this a lot. I have to be careful when I do this. It implies there has been sufficient resident input, buy-in, and general agreement to what we say.
This is a master plan. So in order to keep that current as part of a livable document, we're going to have to change to change this because we were relying on information given to us, either recently, anecdotally, or 10 or 12 years old, right? So I think that sort of causes a little problem because like any town, there is a change in people. And in terms of what, so we're saying to people, listen, this is what people said 12 years ago.
And I can say to my son who moved here five years ago, I said, well, that's great. No one asked me about this. And I think if we watch this, there's a fair amount of transition, if nothing else, in town with new people coming and saying, gee, that's interesting. But no one asked me my opinion on this.
so do we want to have an opportunity at some point maybe not next year money's going to be tight this could be a you know could be a free cash type situation but does it does it should we be thinking about at some point maybe trying to do a redo not maybe not a total redo but a redo looking at the different categories we have in terms of the master plan going forward well we have to do the categories that are required but i you know i think you know our
Speaker 2 (02:37:43–02:40:29)
We're going to give us a little bit more time on the report, but I think we don't have to just make recommendations about. the topics I think we could make a recommendation about a process for updating it which I don't think should be 10 years you know maybe it should be every two and there's some kind of forum we haven't really talked about that yet but I do think it's it is worth talking about that I mean this lane this whole committee the language of it that was looking at the plan today It's, it's the exact language that was recommended by the consultant. It's in the master plan itself, the language that was in this established the committee, but, um, you know, thinking about. You know, the expense of it, I can see why you're not going to do it every couple of years, but just getting, you know, maybe even every year, there's like a one time opportunity that gets reported that here's what the plan is and kind of gives a broad overview of the plan.
And if you have interest in a particular topic, you know, the committee might be talking about that, you know, at some point, just give us your feedback. I mean, I'm just telling you that. I think everybody can sort of think about what ways. And then the other thing is, you know, really, is there a way to make sure more people know about it, right, and how we do that?
Because some people know about it well. They'll refer to it like applicants for projects, like with the memory care facility or, you know, Some people rely heavily on the words protect the character of the town, but they don't read beyond those words where it says a plan for its future. You know, so there's this kind of, you kind of have to protect your plan that's in the plan, but you know how that kind of gets, it's such a big document and how to use it I think has always been something we've grappled with, right? For the average citizen to learn about the basics like, okay, you know, why aren't there more businesses or can I have a business near here or there's too many businesses or whatever, you know, they want to know something about businesses.
Why can't I walk to something? Or, you know, is there, why don't we have ADUs or why do we have ADUs? Like, not everybody's going to be interested in the depths of information that's in the plan. And the other thing I'll say about not doing the whole plan again is a lot of it's just background information.
We have two volumes of background information that we don't want to repeat, I don't think. A lot of it's good information.
Speaker 9 (02:40:29–02:40:48)
And maybe we, as a net, one potential next step is we can get some, we can find out how much it would cost to work with a consultant if they were envisioning. not necessarily that we would be doing it, but what are, like, what's the cost that we're looking at? It does sound like we have consensus over that there needs, there's some revision that needs to happen at some point.
Speaker 2 (02:40:48–02:41:18)
Yeah, now the revision really is the responsibility of the planning board in looking at the state law, not to take it and delegate it to us, really, like, you know, the board did before. Yeah. And then the board takes a vote on the work. So, You know, if there was an update committee, you know, it could have somebody from Sustainable Milton or the Higher Action Planning Committee, the Diversity and Inclusion Committee, you know, kind of these other things.
Cheryl, don't add another committee.
Speaker 6 (02:41:18–02:41:53)
That's why I was keeping it. That's why you don't even write a committee thing, because it's too many committees. So, back to my suggestion earlier, which is to have a little reformation or the charges, you know, every so often every couple of years, you do another revision. I mean, I don't think it needs to be.
In my opinion.
Speaker 2 (02:41:54–02:42:24)
All right, so can I just tell you what I had in mind while I sent you off? It's going to be a hot jar. I'm just going to say to revise the charge to include recommending targeted updates to the town's master plan and to submit those recommendations to the planning board and select board members. And I was making that two years instead of one.
So that was really when I started off. I'm sorry. I thought you all had this.
Speaker 14 (02:42:24–02:42:26)
And I think we were on one.
Speaker 2 (02:42:26–02:42:29)
I think we do it in a year. But it can always be less and more time.
Speaker 9 (02:42:29–02:42:35)
I think we do it in a year. But it can always be less and more time. I think we do it in a year. But it can always be less and more time.
I think we do it in a year.
Speaker 3 (02:42:35–02:42:36)
But it can always be less and more time.
Speaker 6 (02:42:36–02:42:39)
I think we do it in a year. But it can always be less and more time. I think we do it in a year.
Speaker 2 (02:42:39–02:42:46)
But it can always be less and more time. I think we do it in a year. But it can always be less and more time. I think we do it in a year.
But it can always be less and more time. I think we do it in a year.
Speaker 3 (02:42:46–02:42:47)
But it can always be less and more time.
Speaker 2 (02:42:47–02:43:08)
I think we do it in a year. But it can always be All right, so do you want to include what I said about the charge or not? I just read to you provided the charge to include recommending targeted updates to the town's master plan and to submit those recommendations to the planning board and select board for approval. That's not in our charge right now.
Speaker 12 (02:43:09–02:43:13)
So you're reading it out of our charts.
Speaker 2 (02:43:13–02:43:20)
It's not in our chart. And I was going to add that. And I was going to add.
Speaker 4 (02:43:20–02:43:30)
Once I get it, I'll send you the added expertise that you detail and what was enough. Yeah. And then the time, the lifespan added.
Speaker 2 (02:43:30–02:43:33)
So did you want only one more year? You sure?
Speaker 4 (02:43:33–02:43:34)
Yeah, let's do it.
Speaker 12 (02:43:34–02:43:37)
We can extend it for a year if we have to.
Speaker 2 (02:43:37–02:43:59)
All right. So, Regina, are you in agreement on that, the charge, the expertise of the one year? I'll send that out to Josh and I'll talk to you all about it. It's going to go to the select board tomorrow night.
Are you all good with that? All right. That's it then, guys. We'll talk about it later.
Speaker 1 (02:43:59–02:44:00)
Thank you.
Speaker 2 (02:44:00–02:44:00)
Motion to adjourn. Second.
Speaker 1 (02:44:00–02:44:02)
All those in favor? Voting with my red button. Yes. Yes.
Speaker 2 (02:44:02–02:44:03)
All those in favor? Yes. All those against?
Speaker 1 (02:44:03–02:44:03)
Yes. All those against?
Speaker 2 (02:44:03–02:44:04)
Yes. All those against? Yes. All those against?
Speaker 1 (02:44:04–02:44:04)
Yes.
Speaker 2 (02:44:04–02:44:06)
All those against? Yes. All those against? Yes.
All those against? Yes. All those against?
Speaker 1 (02:44:06–02:44:06)
Yes.
Speaker 2 (02:44:06–02:44:07)
All those against?
Speaker 5 (02:44:07–02:44:07)
Yes.
Speaker 13 (02:44:07–02:44:08)
All those against? Yes.
Speaker 2 (02:44:08–02:44:09)
All those against? Yes. All those against? Yes.
All those against? Yes.
Speaker 14 (02:44:09–02:44:10)
All those against? Yes. All those against?
Speaker 2 (02:44:10–02:44:10)
Yes.
Speaker 14 (02:44:10–02:44:13)
All those against? Yes. All those against? Yes.
All those against? Yes. All those against? Yes.
All those against? Yes. All those against? Yes.
All those against?
Speaker 5 (02:44:13–02:44:14)
Yes.
Speaker 14 (02:44:14–02:44:16)
All those against? Yes. All those against? Yes.
All those against? Yes. All those against? Yes.
All those against?
Speaker 5 (02:44:16–02:44:19)
Yes. All those against? Yes. All those against?
Yes. All those against? Yes. All those against?
Yes. All those against? Yes