Board: Milton Conservation Commission
Date: 2024-02-20
Transcript
Auto-generated; may contain errors.
Speaker 1 (01:08–01:42)
Welcome to the February 20th 2024 meeting of the Milton Conservation Commission. The commission members are appointed by the Select Board to implement the rules and regulations of the Wetlands Protection Act, as well as the Milton Town Bylaws. As a matter of formality, we invite everyone to speak and ask questions and make comments, but to identify yourself in the process. Secondly, as a matter of formality, we introduce ourselves.
My name is John Kiernan. Philip, I'm just reading across the screen. Philip, could you introduce yourself?
Speaker 2 (01:42–01:44)
Sure. Philip Driscoll, Conservation Clerk.
Speaker 1 (01:45–01:50)
Arthur Doyle. Arthur Doyle, member. Ingrid, are you there?
Speaker 3 (01:50–01:52)
Ingrid Beattie, Commissioner.
Speaker 1 (01:53–01:54)
Wendy, good evening.
Speaker 3 (01:55–01:59)
Good evening, I'm Wendy Garpo, one of the commissioners.
Speaker 1 (01:59–02:02)
And Tom Palmer, I saw you and I lost you.
Speaker 4 (02:02–02:04)
Tom Palmer, commissioner.
Speaker 1 (02:05–02:20)
Great, all right. Did I miss anybody? I don't think I did. I did not.
All right, we're ready to begin and we'll go right to the beginning of the agenda. Notice of intent of 38 Bottons Lane. PB, Harmon Zuckerman.
Speaker 5 (02:20–03:13)
PB, Peter Vitalessa & Harmon Zuckerman. PB, Peter Vitalessa & Harmon Zuckerman. Unfortunately, we didn't have a DEP number at the time. So the commission was unable to close the hearing at that time.
We since secured a DEP file number, forwarded that to Phil and the commission on January 22. It's 46-0641. I'm happy to re-review. plans that we last reviewed in December and at the site walk, if appropriate, but otherwise, I think the commission was prepared to close the hearing and issue an order of conditions in January.
And if that's the case, I would ask the board to do so, or the commission to do so.
Speaker 1 (03:13–03:23)
Can you give kind of a 10 word summary of what the issues were? I recall, Dan, this is for the benefit of the public.
Speaker 5 (03:24–05:18)
And I'm going to quickly share a screen. Can you all see that? Yes. So the Barry's are undergoing a major renovation of their home at 38 Barton's Lane.
The Barton's Lane is to the right of this plan. A portion of the work that's being proposed, the development of an outdoor, some outdoor living area to the rear is within 100 feet setback. The edge of wetland is here. 25 foot no disturb is right here.
There's an existing shed here that's going to be modified. There's a foundation element on this portion of the shed. There's another portion that's more recent. It's on cinder block that's going to be removed.
There's some planters that are going to be added here. And then at one point there was a concern about whether plants that were being proposed were native or non-native. The plan was modified to address the issue of the fact that they're native. And I think the last thing that the commission requested was a specification for a dry well within this location to capture runoff from the new, outdoor surfaces.
And so that detail was added to the plan as well. And then finally, there is an old boardwalk in very, very poor condition within the wetland itself. And we're requesting permission to remove that with hand tools only and to clean that area up. I think that's the overview of the project.
Speaker 1 (05:20–05:30)
All right, and I have a clear memory of the site walk when we were there, and I know that Arthur and Tom were there, and Wendy, I think, Ingrid, I can't recall.
Speaker 5 (05:30–05:40)
No, there wasn't a quorum. There were only three members there. I think it was just Tom and Arthur.
Speaker 1 (05:41–06:00)
All right, well, I'm comfortable with your presentation and I was comfortable with the wetland lines there and the plan. Tom and Arthur, I'd ask you to ask if Wendy or Ingrid have any questions. Tom, you're good with the plan?
Speaker 4 (06:01–06:02)
Yes, I am.
Speaker 1 (06:03–06:10)
Okay. And Arthur as well? Same, Mr. Chairman.
Good. Any questions from Ingrid or Wendy?
Speaker 3 (06:12–06:16)
No, thank you, Mr. Chairman.
Speaker 6 (06:16–06:35)
I'm here either. I just want to add, I just this morning came across a really great list of resources for native plant material from the master gardeners. And if you, you know, if you wish, I'd be happy to share that.
Speaker 1 (06:38–06:44)
If you're asking Paul and Susie. That question goes to you.
Speaker 5 (06:45–07:01)
I think the answer is we'd be happy to see it. I think the landscape architects done a really good job of designing and adopting a list of natives. If I can find a way to.
Speaker 6 (07:01–07:17)
I don't have, it must have been in the last packet. It wasn't in this packet, a copy, since it was a continued hearing. But I'd love to take a look at the list if it's easier for you to forward it.
Speaker 5 (07:18–07:26)
Yeah, I can do that. This is the list of the, I think the natives that were being added. I can increase the scale on that.
Speaker 1 (07:35–07:36)
Did you see that already?
Speaker 6 (07:37–07:47)
Yeah, I do. I do. And it's heavy. It's heavy on on natives.
And yeah, no, I think that's that's fine. So it sounds to me like you're you guys are you folks are all set.
Speaker 5 (07:48–07:56)
Great. I know that we the last thing we really paid attention to was the issue of making sure that the plan schedule was all native within 100 feet.
Speaker 1 (07:59–08:10)
All right. It sounds like we're ready to entertain a vote. Are there any members of the public that would like to ask a question or make a comment? Tom, where in the world are you?
Speaker 4 (08:11–08:21)
That's pretty nice. Yeah, that's a porcelain berry hanging on that big cottonwood.
Speaker 1 (08:21–09:22)
Well, I didn't hear from or I don't see any hands raised or members of the public or others. So I'll entertain a motion to issue the order conditions with our usual provisions and for Paul and Susie's benefit, the usual conditions require that you keep your equipment outside of the jurisdictional area for purposes of overnight storage and or refueling. I think it should be easy to do for you. But that's generally what we require in addition to any erosion controls that would be necessary.
Tom, I don't, or Ned, maybe you can answer that. I think that that area of outdoor dining or the patio area was far enough away, but are there any, I don't see it in front of me right now, but are there any erosion controls that are there, scheduled to be there?
Speaker 5 (09:23–10:22)
Yes, if I can get back to my screen. There is a pretty robust, oh here we go, there is a pretty robust erosion control plan. Let me pull this back. Yeah, there's a fairly robust erosion control plan right along here at roughly at the 25 foot no disturb and coming around the existing shed that would be installed.
I think there's actually, it's already, there is erosion control out there because of work that's being done back in here to protect wetlands from any erosion that's happening with with soils that are being stored as a result of excavation for foundation, et cetera, with the existing work.
Speaker 1 (10:22–10:51)
All right, thank you. With those additions, that is the overnight storage and refueling and the placement, as put on the plan, the placement of the erosion controls. Is there a motion to issue the order of conditions? I move, please.
Tom Bahama, thank you very much for the motion. Is there a second? Thank you very much, Arthur. Any discussion among commissioners?
Let's have an individual vote. Tom Palmer, how do you vote?
Speaker 4 (10:52–10:53)
Yes.
Speaker 1 (10:53–10:57)
Wendy, how do you vote? Yes. Ingrid, how do you vote?
Speaker 7 (10:57–10:58)
Yes.
Speaker 1 (10:58–11:14)
Arthur, how do you vote? Yes. and I vote yes as well, join Karen. So you have an approval, Paul and Susie, you've got your order of conditions and you'll probably be able to pick that up within the next week or so from Philip at the DPW office.
Speaker 5 (11:16–11:19)
And we'll get it and record it and they'll be ready to go.
Speaker 1 (11:19–11:21)
Perfect. All right. Thanks all very much.
Speaker 5 (11:21–11:22)
Thank you.
Speaker 7 (11:22–11:31)
Thank you. We'll take that list of native plants too that you came across. Wendy, I think if you want to leave that for us also.
Speaker 6 (11:32–11:36)
Ingrid, I'll send it to Philip and he can forward it to you.
Speaker 7 (11:37–11:38)
Perfect. Okay. Thanks, Ingrid.
Speaker 1 (11:40–11:51)
All right. Number two on the list is request for certificate of compliance, 0 Central Avenue. That's the gas project. Yeah.
Is there anybody here from a gas company?
Speaker 8 (11:51–11:56)
Hi, Tracy. I work for TRC. I was the environmental consultant on the project.
Speaker 1 (11:57–11:58)
Sure. Welcome tonight.
Speaker 8 (11:58–12:00)
Thanks. Thanks for having me back.
Speaker 1 (12:00–12:15)
I think the last time we met, we had a couple of questions for you because on the original compliance letter from your engineer, he indicated that there were a couple of things that We thought might need an explanation like the missing sleeper blocks.
Speaker 8 (12:15–13:21)
Yep, exactly. So I had sent there were three items. Actually, one of them was that you needed the engineer stamp. So that was sent to Phil.
So he has that in your records. So there's that piece, the sleeper box. Here is the information from the engineers. The sleeper blocks were called out in the initial design in case they needed to provide additional support for the main adjacent to the culvert.
When the pipe that was installed is a very rigid steel pipe, it's steel with a concrete exterior coating. And typically for mains of similar crossings, they don't require the additional support. But it was determined that they didn't need the additional support with the sleeper box and as well the in-situ soil. Um, was determined to have provided adequate support for the main and the construction was condition was deemed adequate, which is why the sleeper box were not used during construction.
So, that is the does that make sense? So, it makes sense. They decided they didn't need the extra support.
Speaker 1 (13:22–13:50)
All right, but the approved plan required it. So, and I'm certainly not trying to play engineer here, but if your engineer has said that we need a revised compliance letter stamped by a PE, it says what you just said, that it's not necessary because it is a deviation from the plan. And I'm wondering, is it the same person? I'm looking at Charles Packer or Michael O'Brien.
I'm not sure which one.
Speaker 8 (13:51–13:56)
You're talking about? I don't remember which one the stamp was from. I can go look at what I had sent you.
Speaker 1 (13:57–14:02)
I think it's- Looks like Charles Packer. Charles Packer, yes.
Speaker 8 (14:06–14:10)
So you need the revised letter to state why they did not use this?
Speaker 1 (14:10–14:22)
Yes. Because what we've got in our record here doesn't work because it's just a deviation without an explanation. All right. So that was number one.
What was number two?
Speaker 8 (14:23–15:26)
The other item that you had asked, sorry, for an explanation. Where did that just go? So sorry. Hold on.
Let me go back to my inbox. I don't know why it just moved. The second one was why was vibration monitoring not used? They ended up using a coring rig that was handheld, had low RPMs, and the drill that was attached to the internal pipe support system limited the rotational impacts during the coring.
And the forces did not exert an impact force to the existing brick culvert other than the coring bit. Originally, they had anticipated to core from the exterior inward, and they thought they were going to need a larger, more powerful tool. And they didn't end up needing that larger, more powerful tool. They photographed the pipes before and after construction to show that nothing had changed.
So that was why they didn't end up needing that core, why they didn't end up doing vibration monitoring because they used a tool that wouldn't provide a significant issue.
Speaker 1 (15:27–15:34)
Understood. If you could have the engineer add that to his explanatory letter. Yep, sure. And then you can stand.
Speaker 8 (15:35–15:36)
Yep.
Speaker 1 (15:36–15:38)
And I thought you said there was a third point.
Speaker 8 (15:38–15:42)
I can't remember what the third point was just that you had wanted the stamp. So you have it now.
Speaker 1 (15:43–15:43)
Oh, okay.
Speaker 8 (15:43–15:47)
Instead of just the signature, you wanted the stamp as well as the signature on the letter.
Speaker 1 (15:49–16:02)
All right. Yeah, I know that Hans, who's not here tonight, was concerned with the vibration monitoring. I understand your explanation. Any other questions or concerns from commission members?
Speaker 9 (16:03–16:09)
Mr. Chairman? Yes. Just a note that the revised document will also require the engineer's stamp.
Speaker 8 (16:10–16:12)
You have that, we sent it over.
Speaker 9 (16:12–16:18)
No, yes, but that's not on the two additional pieces of information that the chair requested.
Speaker 8 (16:19–16:27)
Yes, I understand. The stamp is on the letter and the sample will remain on the letter, but we'll now have that additional information on it, yes. Thank you.
Speaker 1 (16:29–16:33)
Sorry, anything else? Tom, Ingrid, Wendy?
Speaker 3 (16:33–16:34)
No.
Speaker 1 (16:36–17:21)
Hearing nothing about it, members of the public? All right, so actually this is a request for certificate of compliance and I guess I'm not sure that there's any need for speed here. I don't mind doing a conditional one, but it seems to me that our questions have been answered by a professional engineer, but the vote would have to be continued upon receipt of the PE stamped letter of compliance with explanation. Does anybody have strong feelings about proceeding on a conditional vote?
And that is conditioned upon the receipt of the PE stamp letter. Or do you want to wait until next month?
Speaker 9 (17:21–17:28)
I concur with that, Mr. Chairman. It would move accordingly. Do we do it as a conditional vote?
Yes.
Speaker 1 (17:29–17:48)
All right. So do you make such a motion? Yes, sir. All right.
Is there a second to that motion to conditionally issue the Certificate of Compliance, the condition being receipt of the P.E. staffed letter with explanation that we've heard tonight? Is there a second, is that a yes, Wendy?
Speaker 3 (17:49–17:50)
Yes, I'll second.
Speaker 1 (17:50–17:51)
Is that a yes or a question?
Speaker 3 (17:52–17:52)
That's a yes.
Speaker 1 (17:53–17:53)
Okay, good.
Speaker 3 (17:53–17:54)
I second it.
Speaker 1 (17:55–18:07)
All right, any discussion? Hearing none, Tom? I vote yes. Wendy?
Yes. Ingrid? Ingrid Englund?
Speaker 10 (18:09–18:10)
Did you hear that? Yeah.
Speaker 1 (18:10–18:24)
Yay, okay, thank you. Arthur? Yes. And I vote as well, John Kiernan, yay.
So thank you very much. There's your certificate of compliance, but please, Tracy, if you would, get that letter in to us and that'll make everybody happy.
Speaker 8 (18:24–18:26)
Absolutely. Thanks, everyone. Have a wonderful evening.
Speaker 1 (18:26–18:43)
All right, you too, thanks. Next on the agenda is enforcement order at 510 Holland Street. Do we have the homeowner or representative?
Speaker 5 (18:43–19:37)
We have counsel for the homeowner, Mr. Chair, Ned Corcoran, on behalf of Roberta Williamson, who's the owner of the property at 510 Harlan Street. This matter was continued. It is an enforcement order.
It's continued for wetland delineation, development of survey, and development of plans, including a notice of intent. for work to be done. We do have, uh, wetlands have been flagged, you know, flagged on January 15 by Russ Waldron. We have a survey that is complete showing the location of those flags and the 25 foot and 100 foot, uh, resource area.
I can share screen and show you a draft of that, but we're working on a plan to come in with an NOI that would delineate the work that remains to be done or that wants to be done subject to an order of conditions.
Speaker 1 (19:39–19:41)
Can you share the screen?
Speaker 5 (19:41–19:42)
I can do that.
Speaker 1 (19:43–19:54)
Because one of my concerns is in pending the filing of the NOI, I just want to make sure that the piled soil is not eroding into the wetlands.
Speaker 5 (19:55–21:26)
Correct. This is the, can you see this? Yes. So this is 510 Harlan Street.
Harlan Street being down below, driveway entry here up to an upper parking area with the house. And the area in question where work was being proceeding was all up in this part of the house. Wetland flags have been delineated along here and here. You can see that any work that would be done here would certainly be within 100 feet.
There is a notion that we will replaced this paved driveway with a pervious surface that obviously would be within 25 feet. We'll need a plan that demonstrates that. There's some other work that's being done here that was halted pending the delineation and the proper filing of applications. So this is, as I say, a draft of the survey It doesn't show the erosion controls that were put in.
It should have that. And I will make sure that the erosion controls measures that have been put in place are delineated on the plan as well.
Speaker 1 (21:29–21:38)
All right. Other questions from commissioners? When do we anticipate the notice of intent filing?
Speaker 5 (21:39–21:45)
Um, we're hoping to file by the end of the month so that we can be on before the commission on March 12th.
Speaker 1 (21:46–21:46)
Oh, that's good.
Speaker 5 (21:47–21:51)
So I request to continue on March 12th and then, you know, we're, we're gunning for that date.
Speaker 1 (21:52–22:30)
All right. Um, that makes sense to me. Uh, other commissioners, uh, about his members of the public that have a comment suggestion, hearing none, then at your request, uh, I think we've got, I don't think we need to vote for this, but is there a consensus that we should continue this until the March meeting? Just a sort of a yes would help.
That would support that consensus. Unofficial. All right. Ned, thank you very much for the presentation.
We look forward to seeing the notice of intent and we'll see you at our March meeting. Great.
Speaker 5 (22:30–22:31)
Thank you.
Speaker 1 (22:31–22:40)
Thank you all. Thank you very much. Next on the What's the date in the March meeting? Philip, do you know?
Speaker 2 (22:40–22:41)
March 12th.
Speaker 1 (22:41–23:00)
12th. Perfect. All right. Four on the agenda is 24 Wentworth Farm.
Do we have a homeowner or this is an enforcement order that was issued some time ago and we're looking for some kind of a response from the homeowner. Is the applicant here?
Speaker 11 (23:00–23:59)
Yeah. Hi. Nice to meet you, everybody. This is Jordan and Stroman Bestcutter.
Hi. The enforcement order regards the placement of a gravity retaining wall with large boulders at the site of what was shown on the plans of initially was going to be a concrete retaining wall. The decision to change to a a boulder wall was on the basis of both cost as well as the fact that it was porous. We also thought that it looked better with the natural environment.
We have an affidavit from an engineer, Bowdoin Engineering, who states that it's structurally sound, that the septic plan, it wasn't changed at all in the process. And this is now reflected on the as-built plan that's been submitted to the town. We also have our contractor, PJ Antonek, online, if there are any questions about that.
Speaker 12 (23:59–25:10)
Hi, everybody. This is PJ from Oak Development. I haven't dealt with you guys much in Milton, but I've definitely been around the block with these meetings down in Hingham, as well as Scituate, Duxbury, and a couple other towns on the South Shore. Many times when we do retaining walls, we choose to use boulders.
for the aesthetic reason. And as Jordi said, the cost of either a poured concrete or a block concrete wall is pretty expensive. This site had a considerable amount of boulders that we took out of the ground. And instead of paying to remove them, we repurposed them and built the wall in the same location that was shown for the concrete one.
And like Jordi said, we have had an engineer stamp that it is structurally sound. I think Jordi and Bess are happy with the look of it and the natural look and feel of the wall over concrete. And that was really the main reason.
Speaker 11 (25:10–25:17)
And I'm happy to share a screen with the Commissioner Wills to show a view of the affidavit.
Speaker 1 (25:36–25:41)
And that's the retaining wall and the leaching field is on the other side of that, is that correct?
Speaker 12 (25:42–25:56)
That's correct, yes. And then the poly liner that was requested in the original is there, or the second plan.
Speaker 1 (25:56–27:03)
Well, You're clearly not in conformance with the order of conditions, the plan that was approved by the Conservation Commission, so that it's a deviation, whether it's a significant one or not, we have to decide that. As I understand it, the structural wall would require a building permit and that If this wall is insufficient, you'd have to go back to the building department to get approval for that kind of a wall. I have to tell you, I did talk to the Board of Health on this, and they're waiting for approval of the septic system, but they're waiting for our approval, and I'm not comfortable at this point that the rock wall or the boulder wall that you just showed us, A, it's not in conformance with the one we approved, and B, I don't have any assurance that that's gonna be sufficient to hold back the leaching field, if that blows out, we've got a problem because you're pretty close to the wetlands there.
Speaker 12 (27:04–28:50)
Well, what I can tell you is I have had extensive conversations with Barry in the building department. In the state of Massachusetts, there's no permit required for a natural boulder wall. It's considered a landscape wall. and we do it.
I know that's that's the problem and so I have spoken to Barry about it on site and he has no issues with it as long as an engineer has reviewed it and signed off on it and stamped it and voted engineering did a site visit reviewed it and has signed off and stamped on the fact that it it is perfectly fine as a structural law Just so you know, some of those rocks are larger than my Dodge 2500 truck. They're huge. They're not small boulders. So they're extremely heavy.
I mean, our excavator we rented was a Doosan 300 and it barely picked them up. It's an enormous excavator. So by no means do I feel, I feel confident that the wall is sufficient and my engineer agreed. And we've submitted that stamped affidavit to the building department.
And the building department is ready to sign off on our certificate of occupancy. And the health department emailed me the other day that they have agreed that it's sufficient and I forwarded that to Barry. So as far as our certificate of occupancy, we've completed all the steps and everybody involved has agreed that they're happy with the letter and it's sufficient to sign on.
Speaker 1 (28:51–28:56)
Well, number one, we don't, I haven't received a letter. Phillip, have we received a formal copy of this?
Speaker 2 (28:57–28:58)
No, we have not.
Speaker 1 (28:58–29:09)
All right. We haven't received a letter. I talked to Joe H and myself, and he was uncertain as to why you weren't in conformance with the plan that was approved.
Speaker 12 (29:10–29:56)
Well, to be frankly honest, I've changed retaining rules in the past and have never been questioned. And it's always been, to be honest, most conservation boards actually are in favor of a boulder wall over a poor concrete or a concrete block. And so I didn't really question it because I hadn't worked in your town. But I feel like we followed up with the appropriate steps to give the evidence needed to show that it was sufficient.
And of course, the engineer had said, listen, this isn't gonna work. We would take care of it. Everybody has agreed that it's fine. And we can get you a copy of this.
It is in the building permit file. We can get you a copy.
Speaker 1 (29:56–30:04)
Wait a minute. Wait a minute. You have to get us a copy. You're in violation.
We issued an enforcement order. You're in violation of the plan.
Speaker 12 (30:04–30:21)
I don't know if you realize that. I'm not sure why you're coming at me like that. I mean, I'm saying I'm going to get you a copy of the plan, or Jordy and Bess will. I think you'll be happy with the report that you get.
Speaker 1 (30:25–30:31)
Perhaps we will. Tell me about the drainage that was added that's not on the plan. Is that another of your field changes?
Speaker 12 (30:32–31:46)
Yes, that was a field change due to the fact that the pitch on the driveway was so steep. We do have a drain in front of the garage. But there are two issues here. One, we were concerned about just drainage on the driveway being too much going that close to the house.
And the second is the drainage in the street, the culvert in the center of the cul-de-sac, actually overflows. It does not drain completely. And as a result, the water actually comes out of that culvert and down past and Jordan's driveway. with the sediment that's in it.
And so as a result, we did talk to Todd Hamilton. We did say that we were worried about it, and he told me that he was not worried about it. But I didn't want the house getting flooded, so I chose to put just a simple drain in. We kept a silt sock in it until we were done to make sure no sediment got in it, and we just connected it to the same leader drain that the leaders are connected to, and it goes to the Caltech chambers in the backyard.
Speaker 1 (31:48–31:54)
And how does that impact your calculations for the size of the Caltech chamber? I don't know how much water you're adding.
Speaker 12 (31:55–32:21)
We're not adding any, we're taking what was supposed to originally go into the drain at the garage. But I felt as though, in my opinion, having all the water go against the house, we were playing with fire with the house having problems. So we put it in as an additional drain to add more drainage to the existing runoff. All right.
Speaker 1 (32:24–33:20)
Well, I went back to the original plans and I consulted with the engineer that was responsible for the plans and submitted to us. And I understand that he would not sign off on this plan, on the as-built. So I'm concerned. So therefore, I then went to the Board of Health and said, what are you doing on the approval of the septic system?
And they said, well, we're waiting for the building commissioners. We're going to the building commissioner, and everybody's waiting for everybody. But those plans have not been approved by us. Let me ask you a question.
You can overtalk me if you want, but it's not going to work. I'm telling you, you're going to have to come in and demonstrate to us that that wall is sufficient to prevent a blowout of a leaching system next to the wetlands. And that's why the engineer would not sign off on it.
Speaker 12 (33:21–36:47)
That's a serious concern for us. I'd like to address some of your questions when you're ready. Go ahead. Well, first off, I don't, with complete, with all due respect, I don't feel as though I should be treated like a criminal, number one.
Number two, we made changes in the best interest of our clients As far as the drainage of our clients home and their investment and the fact that the roadway is overrunning onto their property is a potential hazard and a flood hazard for their property. So we put that additional drainage in. as a precaution. We are not, if anything, you guys should be looking at the drainage in the street that is not working properly.
Because that's what's creating the additional water that this potentially could take. As far as what's on site, it's not taking any additional water. Zero. It's just an additional a manhole that's going to collect anything in the driveway, as opposed to having it all pitched to the house.
In other words, we allowed the water to be pitched into the center of the driveway instead of the drain that was proposed. So we're not creating any extra water. It's the water on the street, that's a massive problem. And it's also a problem for you guys because all of the sediment inside that culvert washes out and down the street.
So that's an issue I think that you guys need to take a hard look at. That has nothing to do with us. But as a result of that problem is why we put this in as a precaution. And I'm happy to have an engineer take a look and confirm this with a letter and an affidavit and stamp it.
I'm fine with doing that. As far as the wall, I'm happy to have my septic engineer and my engineer that already signed off on it. address the situation with your concerns about the leach field exploding. I'm happy to take a look at that.
But at the end of the day, if a leach field exploded against this as opposed to against a concrete wall, a concrete wall is gonna have drains and it's gonna have gravel on the side of the leach field leading to PVC drains to allow water to free flow through the bottom. So regardless of if a leach field exploded on our wall or exploded on a concrete wall, it would still go through those trains. So I'm happy to have my engineer take a look at this and write an affidavit. And I'm happy to have my, I'm also happy to have an engineer take a look at this train.
But in my opinion, we've done everything we need to to satisfy the building department. not even in my opinion, I know for a fact that I have satisfied everything the building department wants. And we're happy to share anything that you guys haven't seen like that letter. And I don't think we're doing any, yes, we deviated from the original plan, but we're here to be proactive to figure out what we can do to make you comfortable with it and then put this to bed and everybody can move on.
Speaker 1 (36:48–36:58)
Sounds like a plan. Can you get that package of material from your engineer to us? It should go to Philip Driscoll at the DPW office.
Speaker 12 (36:59–37:18)
I can. I'm not sure. Will you want to re-meet on this on the 12th? Because I'm not sure I could pull it together that fast.
I thought it was already submitted to the town. Oh, this letter, yes. I thought you meant additional letters.
Speaker 1 (37:20–37:25)
I thought if you need additional letters, sure.
Speaker 12 (37:27–37:41)
Just get it to us as quickly as you can, because we need to make a decision. What we'll do is we will get you that tomorrow, and then you guys can review it and let us know if you need further information. And if you do, I'm happy to facilitate that.
Speaker 1 (37:43–37:52)
Sounds like a plan. How about commissioners? I'm just like Ingrid. I'm just looking across the screen here.
Any questions, comments?
Speaker 6 (37:52–37:53)
None here.
Speaker 1 (37:53–37:54)
Tom?
Speaker 4 (37:56–38:23)
I don't want to get off track, but we saw the photo of the cul-de-sac and a sort of a hole in the donut that looked like it overflowed. Is that what we saw? It looks like the middle of the cul-de-sac is supposed to be a stormwater basin, but the stormwater got out. Is that what happened?
Speaker 12 (38:23–39:39)
Yes, it's happened on two or three occasions when there's a severe rain because the whole road pitches down to that cul-de-sac and then the cul-de-sac doesn't actually pitch on all areas of the cul-de-sac does not pitch in. The area by Geordia Besses I haven't put a level on it, but it appears to be very level or may even pitch toward their house a little bit so that when this thing overflows, it goes onto their property. I'm sure there's some changes they could make with that cul-de-sac to stop it. But I think there's two massive issues here.
The first one is water that's draining on my customer's property that is supposed to be going into a cul-de-sac. And then the second is all of the sediment from all of the construction sites are going down that hill into that culvert. and then overflowing onto our job site, which is then flowing down toward the wetlands. Now, we have very good sediment controls in, but we don't have grass yet, because we're waiting for the growing season.
And we're supposed to be laying sod the end of next month. But it's a significant issue, for sure.
Speaker 4 (39:41–40:35)
Thank you. It did look like that was going on. And I do agree with you that that is a problem that goes beyond this particular lot. One other point, boulder wall versus concrete.
Boulder wall with big boulders. It just occurs to me that if you try to make a wall with boulders, it's going to be more porous than a concrete wall, just because there's space between the boulders. And I would wonder if that would be an issue that you will lose material between the boulders, maybe not all at once. But over time, basically, the sand runs out between the boulders and your wall isn't a wall anymore.
How do you prevent that from happening with a boulder wall?
Speaker 12 (40:36–41:27)
I mean, we have found in the past, in the past 20 years of doing this, that boulder walls are fine as long as it has growth on top of it, like grass, right? So as long as, like, yeah, if you don't plant grass, it's all gonna wash out. That's what happens. But once the grass is up and it's established and everything's grown in, we've never had issues with it.
Sometimes if there's an issue in like, if there's an area of a depression where the water collects, Maybe we'll put some filter fabric behind that area. But typically, we have never had an issue with it running out. Now, if you were to go look at it right now, that's what you would see, because we don't have growth. We don't have grass, right?
But once the grass is in and everything and all the water is pitched correctly, we don't ever have a problem with it.
Speaker 4 (41:27–41:41)
All right. Thank you. I just would like to add that I definitely support John in trying to make sure that we as regulators keep up with these changes and process them appropriately.
Speaker 12 (41:42–42:05)
Well, one thing that I could suggest is if you guys are still uncomfortable, you know, when we plant the grass next month, we can always dig the boulders out, you know, eight feet or five to eight feet and lay filter, you know, take a 10 foot roll of filter fabric and lay it along the rocks and then backfill it again. If that's something that is of your concern.
Speaker 4 (42:07–42:30)
It seems reasonable what you said, that when it becomes vegetated, it's unlikely to lose material. But I also agree with you that there are times when the vegetation might not be sufficient. So I support your idea. Yeah, I mean, it's a simple fix.
That's easy.
Speaker 1 (42:35–42:39)
Hey, any other questions, Arthur? I don't see you, but there you are.
Speaker 9 (42:41–42:43)
No, I'm fine with the direction being advocated.
Speaker 1 (42:44–43:23)
And so we will. Why don't we continue this for a. I should ask any comments or questions from others or members of the public. And what I say about is I don't know if you've looked at the agenda tonight, but, you know, the next next two items on our agenda are uphill from you and that detention basin is an issue and we are aware of it and we're in the process of addressing it right now.
And I don't know if you know this, I should and I don't, but who's responsible for cleaning out that detention?
Speaker 12 (43:25–43:32)
I would have to divert to Jordi and Bess on that because that was before my time, I'm not exactly sure.
Speaker 11 (43:33–43:47)
Do you know? I don't know. Yeah, I believe it was part of the common spaces which ultimately fall until the construction of the last home to the developer, Todd Hamilton.
Speaker 1 (43:48–43:55)
All right. And do you agree that that's filled up and clogged now? I don't know if that's the reason it's overflowing or it's just not big enough.
Speaker 11 (43:55–44:13)
Yeah, I can tell you, the drain there fills with leaves quite a lot. And when there's a heavy rainstorm, it gets clogged and that backs up and it can be sizable to the point that it's overflowing the street and onto our property.
Speaker 13 (44:13–44:30)
It's also a bit of a safety concern because the basin is downhill. When you get to the cul-de-sac, it's not easy to see it at first, and at night especially. And my concern is that somebody is going to end up driving their car into there.
Speaker 1 (44:34–44:50)
Understood. All right, no, I appreciate that. And that's the topic of the next two agenda items as to how to keep the erosion out of that. But I see what's happening because you're at the, you're downstream, I get it.
Speaker 11 (44:50–44:51)
Yeah, quite literally.
Speaker 1 (44:51–44:58)
All right, so we look forward to getting your materials and we'll put this on for March 12th. I'm sorry, March 10th.
Speaker 14 (44:58–45:01)
Commissioner, I'd like to.
Speaker 12 (45:01–45:41)
I'd like to add one more quick thing and that is just so everybody has kind of a visual of how far downhill they are from the elevation of the, I guess we'll say the cul-de-sac to the bottom of the hill where we put that drain where the flat surface in front of their garage is roughly like 12 feet off the top of my head. It's a significant drop. Right. So it's not like it's a couple of feet and we're we are being overcautious with this extra drain.
It's a significant drop and it's a large amount amount of water when that thing overflows. And that was our concern.
Speaker 11 (45:42–45:54)
And I would add to that, that at the time before we initially had the drain, we were getting flooding in the house. Yeah, that's true. And that has since gone away since the placement of the drain. So it was
Speaker 13 (45:55–45:56)
It was definitely needed.
Speaker 11 (45:58–45:58)
Valuable.
Speaker 1 (45:59–46:07)
Understood. All right. We look forward to getting your materials from the engineers. Thank you very much.
Okay. Thanks, guys. Take care. Thank you so much.
Thank you.
Speaker 14 (46:07–46:07)
Thank you.
Speaker 1 (46:07–46:21)
Next on my list is enforcement order at 12 Wentworth Farm. And that is the one that Philip, we received a request.
Speaker 2 (46:21–46:24)
We received an email earlier that they could continue until March 12th.
Speaker 1 (46:25–49:16)
All right, and I am informed that at that, I wanna make sure I've got the, I did talk to the homeowner. And for the rest of the commission's benefit and the public's benefit, we sent out two enforcement orders, because Hans and I went out on January 13th, which was a Saturday, to the ice house. Because there was a breakout there during construction, and there was erosion materials going into Pine Tree Brook. So the two of us went down there to look at that.
That was a tough sight. But Johnny Bosworth, we Connected with him that night, and he got a crew up there pretty quickly. I think that weekend of Monday was a holiday the 15th. And I haven't talked to Hans.
That's near his house. So I think that's been rectified, and it was done pretty quickly. After that, on the 13th, I went up to Wentworth Farm and looked at these properties here, and I saw that there was a lot of erosion, just as the last applicant indicated, a lot of sedimentation. coming off of the unsecured landscaped land and just going right into the drainage system and much of it going right into the detention pond.
So we issued the enforcement order and nothing was done. So a couple of weeks later, I just happened to go back and it was still a problem. So we issued a second set of enforcement orders. And at that point, Mr.
I think it's Justin Kessler called me and he is at 12. A lot nine is 12. And he said that he had retained Jason Sanitella to put in some siltation. I think that has been done.
Nevertheless, they have requested a continuance until March. So there is something there, although I understand it's a six-inch silk salt, and it probably needs something larger, 10 to 12 inches perhaps. But at least there's been some effort to do something. I don't have the same information for lot number seven, which is 20, which I think is right next to Jordan Strom, who was the last applicant before us.
And I sent some pictures tonight And I don't know if Philip, could you screen share those? Tom, you may want to go up there and take a look. When it rains, it's bad.
Speaker 4 (49:18–49:33)
I saw your pictures, John. They were flash pictures of asphalt. And there was an awful lot of sand. It sure looked like it.
Yeah, the sand was just flowing off the landscaped area onto the road in quantity.
Speaker 1 (49:33–49:49)
And heading, that's the house right next to the detention basin that we were just talking about. Well, it's probably had an effect in that basin. Yes, absolutely. Blocking the drain.
But to my knowledge, it still is.
Speaker 4 (49:52–50:02)
Yeah, you know, not only do they need to fix the street edge, but somebody needs to go to that basin and see what's there.
Speaker 1 (50:02–50:12)
I have no idea if there's a homeowners association or it's still on the developer to do that, but somebody needs to clean it up.
Speaker 4 (50:13–51:18)
People who are just on, they were saying that their lot is pitched and once the water comes to the edge of their dirt, There's not, as I said, there won't be any more, any grass for six months. So they can lose a lot of material down the hill. And I guess it would go in a wetland. So it's sort of semi-emergency situation, it seems to me, to try to prevent the movement of material.
I agree with you that a six inch sock is likely to get pushed aside by a heavy flow. Um, yeah, so I don't know. It does. It sounds like this is pretty bad growing pains for this subdivision because the main road follows the grade straight down the hill and is now acting as a shoot for a lot of materials that it should.
No, I agree.
Speaker 1 (51:18–51:57)
I agree with it. Um, uh, All right, well, you know what we do? Because the applicant is not here and we've got a formal request for continuance to the March meeting, why don't we continue what would be number five, which is 12 Wentworth Farm, and that's Mr. and Mrs.
Kessner, and then go to the next one, which is 20 Wentworth Farm, and I think that is lot seven. Are those applicants here? And that's the one that's closest to Dr. Strong.
Speaker 4 (52:00–52:16)
You know, the people that are losing the dirt probably aren't any happier than the people that are getting it. So the fact that they're not doing anything about it suggests that they're not there or… Well, it sounds like they're not here tonight with us anyway.
Speaker 1 (52:16–52:24)
That's number six on our agenda. So Philip, can you write them another letter? Sure.
Speaker 2 (52:25–52:28)
They're not living at the property, they live somewhere else.
Speaker 1 (52:29–52:31)
Oh, they do? All right. I was not aware of that.
Speaker 2 (52:31–52:45)
They live on, I want to think, Gerald Road, if memory serves me correctly. But I can write them another enforcement letter.
Speaker 4 (52:46–53:05)
This is the worst time of year to try to keep dirt in place because it freezes low, And then you get a warm rain on top or maybe a snow melt. It's, you know, it would be nice if it could be stopped right now, but I'm not sure how that would be done.
Speaker 1 (53:10–53:22)
All right. So, Philip, can you see if you can find out where they, if they don't live on the premises and find out where they are, or perhaps contact them if the general contractor is still on site?
Speaker 2 (53:23–53:25)
Right, I can find out where they're living.
Speaker 1 (53:26–53:41)
OK. All right, because it really does need some immediate attention. And I've been out there twice since the 13th of January, so nothing's been done. Mr.
Chairman?
Speaker 9 (53:41–54:01)
Yes. Noting Tom's comments in adding to it the impact of wind at this time of the year, We're not going to be addressing this until a month from now. Is there any possibility to water erosion barriers to be put in place on these properties? Well, that's what we did.
Speaker 1 (54:03–54:18)
What's the last enforcement order say? It says install erosion barriers, I think. Yeah, that's what we've done. The first one and the second one.
Speaker 9 (54:18–54:20)
But they're not in place, correct?
Speaker 1 (54:20–54:21)
Correct.
Speaker 9 (54:23–54:42)
So why don't we say something to the effect they've got X number of days pending the imposition of fines for any day thereafter until they're installed.
Speaker 1 (54:42–54:53)
We already told them that. That was after the first one, we sent the second one, and the second one was accompanied by a letter that said, you know, you're subject to fines up to $300 a day per violation.
Speaker 9 (54:53–55:03)
I didn't see that, so thank you. Well, what's the next step? What's the next option we have?
Speaker 1 (55:04–55:10)
Well, this has been, I think both of these have been filed in the Registry of Deeds, correct?
Speaker 14 (55:10–55:10)
Yes.
Speaker 1 (55:11–55:27)
All right. So I would suggest that we impose a fine starting today and just give them notice. It's going to accumulate. You've got to do something.
Speaker 9 (55:28–55:31)
What's that? Do you need a motion to that effect?
Speaker 1 (55:32–56:29)
Yes. Well, we actually have to have a motion to verify the enforcement, or in fact, we've got two of them. Because under our regulation, it can be issued by any commissioner or the agent, and then it's to be confirmed at the meeting of the Conservation Commission. So we need to confirm all of these enforcement orders to stay in compliance with our own regulations.
So the first motion would be to confirm the enforcement orders at, we should do it for all of them, 510 Holland Street, 24 Wentworth Farm, 12 Wentworth Farm, 20 Wentworth Farm. And then I suggest we could have a separate motion to impose the fine starting today, tomorrow, because this is, Two enforcement orders, notice of the fine, and they don't show up.
Speaker 9 (56:30–56:40)
Yeah, I can see 510 Holland, 12 Wentworth, and 20 Wentworth. But we have work underway at 24 that we've agreed to.
Speaker 1 (56:40–56:54)
I'm not suggesting a fine for the others, Arthur. I was just saying, under our regulations, we have to vote to confirm the issuance of the enforcement order. It's already gone.
Speaker 9 (56:54–56:55)
OK.
Speaker 1 (56:55–57:01)
So Philip signed it. And we're supposed to support, and I asked him to do it.
Speaker 9 (57:02–57:08)
All right, so if you need an order to confirm the issuance of the enforcement orders on these four properties, then we'll accordingly.
Speaker 1 (57:09–57:52)
Right, that's the first motion. Then the second one would have to do with a fine or doing something to get some kind of a response from number 20 Wentworth Farm. So first motion. I had asked Philip to do it, so I'll make the motion to confirm these enforcement orders 5, 10, 24, 12, and 20.
That's my motion. Does anybody second that? I second it, John. OK, Wendy, I saw your hand first.
So we'll take a voice vote, and that goes to Tom. How do you vote?
Speaker 4 (57:52–57:53)
Yes.
Speaker 1 (57:53–58:21)
Wendy? Yes. Ingrid? Yes.
Arthur? Yes. And John Kiernan, aye. Yes, as well.
Thank you. That's the first motion. And the second motion is to impose a fine beginning immediately of $300 a day for failure to install the erosion controls that were first ordered back on January 16th and then the second order. Philip, do you have the date of the second order?
Speaker 2 (58:22–58:23)
January 31st.
Speaker 1 (58:23–58:27)
So the 16th and then the 31st.
Speaker 2 (58:27–58:28)
Right.
Speaker 1 (58:29–58:34)
And a letter telling them about the fine and a request to appear at tonight's hearing.
Speaker 2 (58:35–58:35)
Right.
Speaker 1 (58:36–58:39)
So I'd propose a fine of $300 a day.
Speaker 6 (58:41–58:43)
Confirmation of receipt of both, I assume?
Speaker 1 (58:47–58:51)
I think the DPW delivered it. Did you also send it by mail, Philip?
Speaker 2 (58:51–58:54)
I sent, yes, I sent it both local and certified.
Speaker 6 (58:57–59:02)
And so you got the certified receipts back for both, both notices?
Speaker 2 (59:04–59:25)
I did not for, no, I did not get anything back. I got, when I sent one certified for 20 weren't worth fine, they sent it back and said they didn't live there. Then I did a little investigation and found out they lived somewhere else. And I sent it there and they did not send me the entire back, but I haven't received it back.
So I assume that they received it.
Speaker 1 (59:28–59:29)
Oh, you mean it was not returned to you?
Speaker 2 (59:30–59:30)
No.
Speaker 1 (59:32–59:32)
All right.
Speaker 6 (59:34–59:41)
Well, we don't want to get notice.
Speaker 1 (59:45–01:00:04)
Well, if, if it's gone by, DBW to the house, albeit they're not living there, and it's gone by both regular mail and certified mail to where they are living. I think that constitutes adequate service.
Speaker 6 (01:00:05–01:00:10)
But Phil said he didn't get the receipts back for the certified mailings.
Speaker 1 (01:00:13–01:00:55)
That's correct, but there's a presumption even on the regular mail that it was properly delivered by the US Postal Service. Do you wanna hire a sheriff and have them served in hand? I mean, it's escalating and it's becoming more complicated. I'm comfortable that they've got notice with regular mail and actual mail.
and certainly deliver it to the, I'll say, the building. Do you wanna, I don't know how else to get a hold of them. I don't know what else to do.
Speaker 6 (01:00:55–01:00:59)
Do you say you sent it to their address?
Speaker 2 (01:01:00–01:01:40)
The first time I sent it to 20 Wentworth Iron Road and it came back undeliverable. And I found out that they live, I want to say Gerald wrote it, but I'm not sure my memory's not serving me correctly. So I sent it there and it hasn't returned to me, nor has the card they sent. If they signed it, it's returned to me either.
Which, I mean, I would think if no one was there that it would have came back non-deliverable. And I mean, if they don't find it, they don't find it.
Speaker 1 (01:01:45–01:02:23)
I'm comfortable with the service of process here by mail. And if, in fact, they can back in and say, look, we never had notice, then we could certainly reconsider the fine. But otherwise, we're doing nothing. I'm not sure where else we could do it unless the town would agree to go out and do it and bill them for the work later on.
I don't think DPW would appreciate that. But as Tom said, I think we've got an emergency situation at the bottom of where we're at.
Speaker 6 (01:02:23–01:02:28)
Yeah, it looks terrible.
Speaker 1 (01:02:28–01:02:43)
So in any event, all food for thought. I make the motion based upon my conclusion that mailing and certified mail, even without the return received requested, is sufficient to stop the process.
Speaker 9 (01:02:47–01:03:03)
I'm fine with that, John. Can we go back to the cul-de-sac? Yes. I think there should be an erosion barrier placed there.
I don't know whose responsibility it is, but until that's remediated, that inner circle should have an erosion barrier.
Speaker 1 (01:03:04–01:03:11)
The problem is it'll make the- I know, I know what you're gonna say. And write down to Dr. Strom's house.
Speaker 9 (01:03:12–01:03:15)
Right. I know what you're gonna say.
Speaker 1 (01:03:20–01:04:04)
Well, I think one thing we could do is run to ground who is responsible. I don't know if there's a homeowners association there. I don't know if the developer is still responsible for the last house that's sold. And it may be, it's not the last house, it may be the last lot that's sold.
So it would be the lot slash house or homeowners association. I don't know the answer to that question, but I can certainly find out. And I will do so. All right.
Ingrid, would you be more comfortable waiting a month and not doing anything?
Speaker 6 (01:04:05–01:04:07)
No. I mean, I do think we need to act.
Speaker 1 (01:04:11–01:04:14)
All right. If there is another month.
Speaker 6 (01:04:15–01:04:30)
Yeah, I mean, you know. They may be hiding behind the door here. I don't know. But how much does it cost to hire a sheriff to handle everything now that Phil has identified an alternate address?
Speaker 1 (01:04:32–01:04:37)
I don't know that, and I don't. Probably a couple of hundred dollars.
Speaker 6 (01:04:39–01:04:39)
Yeah.
Speaker 4 (01:04:45–01:05:31)
That seems like not a whole lot of money. to hire a sheriff and to serve what? Yeah. Um, John, when you were there, I don't want to get off track, but did it seem to you that it was bad enough that something needed to be done right away?
And yeah. And did it also seem to you that you have an idea of what could be done? Like, ah, well, yes. All right.
It's easy. It's sad that we know what needs to happen, but we can't make it happen. You know, that's sort of where we are, isn't it?
Speaker 6 (01:05:34–01:05:40)
In the greater scheme of things, John, did I hear you correctly in saying that the fine was $300 a day?
Speaker 1 (01:05:40–01:05:44)
For a violation. That's what our regulations say. Yes.
Speaker 6 (01:05:44–01:05:57)
Right. OK. So then, you know, an investment of, you know, $200 and $300 to make sure that the applicant has gotten notice seems to be reasonable.
Speaker 1 (01:06:02–01:06:10)
If you're uncomfortable with the amount of the fine, then why don't we come with a lesser fine and say I'm starting immediately. Here's the enforcement order.
Speaker 6 (01:06:10–01:06:14)
I'm not uncomfortable. I'm not at all uncomfortable with the amount of the fine.
Speaker 1 (01:06:14–01:06:26)
Then why don't we do both? Just issue the order. I mean, what I was anticipating, we'd issue the order and say the fine's beginning now and serve that by a sheriff.
Speaker 6 (01:06:28–01:06:34)
Yeah, that's exactly what I was thinking. Oh, good. Okay, thank you. All right.
Speaker 4 (01:06:34–01:06:35)
I'm good with that.
Speaker 6 (01:06:35–01:06:43)
Okay. Yeah, my question was whether or not these folks are getting anything or if they're deliberately avoiding getting anything.
Speaker 1 (01:06:45–01:07:02)
Understood. So then the motion will be to issue a third enforcement order. And as part of that will be a fine for non-compliance of $300 per day for non-compliance and have that order served by the sheriff.
Speaker 4 (01:07:07–01:07:20)
That's the motion. I think that's fair. And if it turns out that they're in Florida or something, they're not just picking up the mail, well, Maybe this will get their attention.
Speaker 1 (01:07:23–01:07:38)
Correct. Correct. All right. So if that's the motion, is there a second?
Second. OK. Ingrid, thank you for the second. Any discussion?
Individual vote. Tom, how do you vote?
Speaker 4 (01:07:40–01:07:40)
Yes.
Speaker 1 (01:07:40–01:07:41)
Wendy?
Speaker 14 (01:07:42–01:07:42)
Yes.
Speaker 1 (01:07:43–01:08:11)
Ingrid? Yes. Arthur? Yes.
And I, John, care to invoke yes as well. So that's unanimous. If you need any help getting the sheriff, Phil, in terms of service of process, just give me a call. I'm on trial right now, but I'm back usually late afternoon.
OK. But we do it all the time for litigation. All right.
Speaker 2 (01:08:12–01:08:14)
Okay, and I thought North Fork Sheriff's Office?
Speaker 1 (01:08:15–01:08:46)
Yes. Civil Division. And just ask how to serve process. And they have a process service division.
Seven is approval of Conservation Commission meeting minutes for May and June 13th. I get that. Did I get a letter? I get an email from Steve today.
And I thought he was still out on the high seas. Did you get that Phillip or did anybody else?
Speaker 14 (01:08:46–01:08:48)
Yeah. Yeah.
Speaker 4 (01:08:48–01:08:51)
There's a word document.
Speaker 6 (01:08:52–01:08:55)
I guess he's got service out there on the high seas.
Speaker 1 (01:08:55–01:08:58)
Okay. All right. But are those the minutes that he's working on?
Speaker 2 (01:08:59–01:09:06)
No. These are minutes that were tabled from the last meeting. We could, um, you hadn't reviewed them.
Speaker 14 (01:09:08–01:09:08)
All right.
Speaker 2 (01:09:09–01:09:18)
They're being asked to be armed by the memory care, who's opposing the memory care. They want to see them.
Speaker 1 (01:09:20–01:09:31)
You're right. I've got those at my home, and I do not have them. I'm at the office. I don't have them in front of me.
Has everybody read them? Is everybody ready to vote on that? Because I don't want to hold it up.
Speaker 4 (01:09:32–01:09:34)
I looked at them, and they looked all right to me.
Speaker 9 (01:09:37–01:09:48)
Father, Wendy? John? I would approve them subject to Steve and I cleaning up item number 12, additional business.
Speaker 1 (01:09:48–01:09:55)
Okay, I don't know what that is, but. Are they in the packet or no?
Speaker 2 (01:09:55–01:10:02)
I didn't include them in the packet. I thought you'd have them previous. I could have included them, but I just needed my paper.
Speaker 9 (01:10:03–01:10:32)
There are simple things, John, such as, He has touched the positioning of 676 Brushdale Road with the Riverside Avenue Marsh and ZVA instead of CPC. So it's just minor clarifications and repositioning some of the items in there.
Speaker 1 (01:10:32–01:10:45)
All right, are you able to do that before he returns? Because I don't think Steve is actually returning. I'm sure it's March 2nd. Is there something you could do on your own?
Speaker 9 (01:10:46–01:10:47)
Yeah, I think so.
Speaker 1 (01:10:52–01:11:00)
All right, so can we approve them subject to office revisions?
Speaker 4 (01:11:04–01:11:06)
Yeah, I will move we do that.
Speaker 1 (01:11:08–01:11:09)
Do you second to that?
Speaker 3 (01:11:09–01:11:10)
I'll second it, John.
Speaker 1 (01:11:11–01:11:20)
Great, thank you. And let's vote on that. Arthur, how do you vote? Yes.
And Wendy?
Speaker 10 (01:11:20–01:11:21)
Yes.
Speaker 1 (01:11:21–01:11:22)
Ingrid?
Speaker 10 (01:11:23–01:11:23)
Yes.
Speaker 1 (01:11:24–01:11:51)
Tom? Yes. And I join Karen and I as well, so that we're good to go on that. And Phillip, and just work with Arthur to just revise the section on additional business.
All right, so that takes us to additional business. Any additional business? Arthur, do you have any? I have none, Mr.
Chairman. All right.
Speaker 4 (01:11:52–01:11:58)
Hey, John, could you tell me about the breakout at ICES where it was and what was going on?
Speaker 1 (01:11:59–01:12:42)
Yeah, it was a pretty big rainstorm that weekend, Friday and Saturday. And actually what happened, Hans was walking his dog down by the, on the other side of the Blue Hills Parkway, you know, on the high school side of it. And he saw some sedimentation. in the brook.
So I followed it. He just followed the stream up. And you gotta get a hollow ways. Oops, that's where that's where it's coming from.
And then he called me and I went down there and just, I didn't know he was there. But by happenstance, we met on the site. And that's where you see those pictures. That was a bona fide breakout.
That was bad.
Speaker 4 (01:12:43–01:12:48)
And I close to the brook though, really. So how to get to the brook?
Speaker 1 (01:12:48–01:12:50)
Oh, it's a long way. You are correct.
Speaker 14 (01:12:50–01:12:51)
Yes.
Speaker 1 (01:12:51–01:14:04)
It was channelized, you could see the channelization going through there. So I called, I called Marion McKettrick, because I know she, you know, she represents Charlie Bosworth. I didn't know how to find him. So Marion gave me his number and I found him on an airplane in Washington, D.C.
He called me back. He was very courteous and said, listen, I thought we had taken care of that because it was a storm the week before that they had set up for. And he said it held for the first storm, but the second one, it blew through their silt socks. And they were big ones.
But he said, listen, I'm on my way back to Boston right now. This is Saturday night, probably at about 7 o'clock, 7.30 at night. And I asked Hans to check on it, because it's right across the street. And he did.
And they had a crew down there. Monday was the holiday, the 15th. I don't know if it was Monday or Sunday. I'm not sure.
But they did respond. And I was asking, I have not been back since, and I was hoping Hans could participate tonight and give us an update on that. But it was a quick reaction by Charlie Bosworth.
Speaker 4 (01:14:07–01:14:14)
Where on the lot line was it freaking out? Do you remember? Was it the back line or the north?
Speaker 1 (01:14:14–01:14:17)
When you walk in the driveway, it was to the right.
Speaker 4 (01:14:17–01:14:18)
Yeah.
Speaker 1 (01:14:19–01:14:21)
You remember when we saw all the gold cars?
Speaker 4 (01:14:22–01:14:26)
Yeah, right there, huh? Yes. I'm curious.
Speaker 9 (01:14:26–01:14:38)
I'm glad that they respond. Well, we had asked for remediation of that a long time ago. That's true. Including removal of the old cars.
Speaker 1 (01:14:38–01:15:03)
All right. So I will ask Hans to give us a report on what it looks like today and maybe get some pictures because you're right. Those pictures, they don't look good. All right, anything else on additional business?
Hearing none, is there a motion?
Speaker 2 (01:15:03–01:15:04)
I do actually, sorry.
Speaker 1 (01:15:04–01:15:05)
Yeah, Phil.
Speaker 2 (01:15:05–01:15:16)
John and Ingrid, I need you to send me your selections for the MAGC conference on the 2nd of March. I have you signed up for the turf field.
Speaker 6 (01:15:17–01:15:22)
Right, now that's hybrid. You can either do in person or Zoom. Is that correct, Phil?
Speaker 2 (01:15:23–01:15:25)
Yes, I believe it says that. Did you want to go hybrid?
Speaker 6 (01:15:27–01:15:37)
I think so. I was going to go out there, but I think it might be better if I do Zoom. Okay.
Speaker 2 (01:15:40–01:15:42)
So that would be the only one that you're going to sign up for?
Speaker 6 (01:15:42–01:15:55)
I think so. Because the other one I was thinking about is the Vernal Pool one, but that one is not hybrid. Right. Okay.
Speaker 1 (01:15:57–01:16:00)
Do you, Ingrid, do you have them right in front of you?
Speaker 2 (01:16:01–01:16:01)
I do.
Speaker 1 (01:16:02–01:16:12)
Can you email those to me? You probably already did, Philip. I'm sorry, I get entirely focused when I'm on trial, and I haven't even looked at them. I apologize.
Speaker 2 (01:16:12–01:16:14)
Not a problem. I'll email them first thing in the morning.
Speaker 1 (01:16:14–01:16:21)
All right, great. Thank you very much. All right, is that it for additional business?
Speaker 6 (01:16:22–01:16:53)
Super quick thing. I just actually went and saw one of the three vernal pools in Canton at the Mass Audubon site there. It was amazing. I mean, it was just the most textbook, beautiful thing.
And everything is starting to wake up. There were just those little fairy shrimps. There were all sorts of really cool things happening. My question is, do we have any vernal pools that we need to check on?
Speaker 3 (01:16:55–01:16:58)
Good question, Ingrid.
Speaker 4 (01:16:58–01:17:45)
I know where they are generally in town. Most of them are in the Blue Hills Reservation. Once you get a certain density of development, you don't have vernal pools anymore. And that goes for most of the town, I would say.
The closest ones to developed areas are, there's three on the Bend to Woodland Drive where they put in that log driveway years ago. There's also one on the, in Woods, but it's actually on the whole big side of the boundary there. Those are the ones that I'm aware of that are closest to
Speaker 6 (01:17:45–01:17:56)
Because weren't we talking over the years, I remember talking, there was one by the horse place off of Randolph Ave, and there were the other ones near.
Speaker 1 (01:17:56–01:17:59)
That's certified.
Speaker 6 (01:17:59–01:18:01)
Right, that's what I mean.
Speaker 1 (01:18:01–01:18:04)
That was certified, yes.
Speaker 6 (01:18:04–01:18:17)
To look at health and well-being, and then there was another one up on the, Uh, you know, the, the town farmland that the development up there, I can't remember what the name of it is.
Speaker 4 (01:18:17–01:18:28)
Yeah, that is right. As you're going up the steep driveway, is it on the right? There's actually one on both sides.
Speaker 6 (01:18:29–01:18:30)
That's what I thought.
Speaker 4 (01:18:31–01:20:03)
Yeah. And, uh, the one on the right is behind that big base. And you see, as you go up and the one on the left is on the generally on the flat. underneath that rock cliff.
So yeah, there's quite a few of them around town, and it's an ambitious project to keep up with what's going on inside them. It could be done, of course, but I have a lot of records of inverts and amphibians from pools, but I don't go back year after year, at least for most of them. I would say most of the interest for me in that regard has been on Hemingway Lane, because that's where the state-listed vernal pool amphibian lives, the blue spots. And curiously, yeah, curiously, despite my efforts and the efforts of some buddies, we have not found where they are breeding.
We just know they go back and forth across the road. they're breeding somewhere down by the edge of the fowl meadow where it just gets wet gradually rather than in discrete pools. So yeah, certainly there's plenty of room for more information, that's for sure. What did you see besides fairy shrimp?
Did you see any talamanders?
Speaker 6 (01:20:03–01:20:11)
The salamanders are expected in a couple of weeks. I asked them to let me know.
Speaker 4 (01:20:11–01:21:20)
The place everybody goes traditionally in Milton is at the intersection of Chickataw and 28th. They park there and walk down the gas line to where the ditch starts to go, wind down in the wetland under Chickataw. and where the stream comes through and underneath the pipeline is a pool where you will often see a gaggle of people with flashlights in late March. That's a convenient place to see the salamanders, but in that case, it's the yellow spots.
The most salamander egg masses I ever counted in a vernal pool was 400. And that was in the so-called CCC pond. I don't know if you know what I'm talking about, but if you go into the Blue Hills from Route 28 across from Island Street, that entrance, and you go like a half mile, you see a little pond on the right. It's an impoundment with a little dam.
Speaker 6 (01:21:21–01:21:27)
That's where there's the little tiny parking lot where there's only like, it could fit like three cars. Yeah. I know that.
Speaker 4 (01:21:27–01:22:09)
I know that. Yeah. Yeah. That's a little pond.
400 egg masses is a lot. But of course, the strength of the population depends on the quality of the upland habitat around it. So that place is surrounded by mature upland woods. That's where they live during the rest of the year.
Are there little pools that don't have salamanders? Yes. Like the one at Home Inc. I don't think it has salamanders.
But it's still a vernal pool. And that may be true for the one at Pulte, too, because I never saw any of them there. But it might still be.
Speaker 6 (01:22:09–01:22:15)
But the discussion I was having was the impediments to the animals traveling from one to the other.
Speaker 4 (01:22:16–01:22:21)
Yeah. That's an issue always.
Speaker 6 (01:22:24–01:22:41)
All right, and I just, it's not just, you know, protecting X amount of, you know, real estate around, you know, no development around it, but what we always need to keep in mind is the ability of the, of the creatures to travel from one to the other.
Speaker 4 (01:22:41–01:22:44)
They need to do that.
Speaker 6 (01:22:45–01:23:09)
They need to do that for genetic diversity. Yeah, well, if anybody wants to go see some, you know, textbook, Christine, Bernal pools, the, uh, the mass Audubon place in, in Canton, uh, that estate is got three of them there and they're just literally textbook. They're beautiful.
Speaker 3 (01:23:12–01:23:13)
Thank you, Ingrid.
Speaker 1 (01:23:13–01:23:29)
All right. We ready to adjourn. Yes, so moved. All right.
All in favor. Aye. Aye. Good to go.
Thanks all. Good night.
Speaker 2 (01:23:29–01:23:31)
Take care.
Speaker 10 (01:23:31–01:23:33)
Good luck with your trial.
Speaker 1 (01:23:33–01:23:35)
Thanks.