Board: Community Preservation Committee

Date: 2026-06-22


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:19–00:32)

Welcome to the June 22nd, 2026 meeting of the Milken Community Preservation Committee. My name is Tom Calhoun. I'm the chair of the committee, and I'm going to give student introductions.

Speaker 2 (00:32–00:33)

I'm Jenny Russell, vice chair.

Speaker 3 (00:34–00:42)

Pete Jackson, average member. Robert E. Bash, member. Steve O'Donnell, historical commissioner.

Speaker 4 (00:42–00:44)

Kathleen O'Donnell, citizen member.

Speaker 5 (00:44–00:48)

And Wendy Garpo from the Conservation Commission.

Speaker 6 (00:48–00:59)

And we have Al and Robby online. Do you want to introduce yourself?

Speaker 7 (00:59–01:01)

Robby Powers, representing the Housing Authority.

Speaker 6 (01:03–01:07)

Thank you. And Al, is Al there?

Speaker 1 (01:11–01:39)

Al may be away. I know he has job fair responsibilities tonight. He's juggling. Al Munger, Planning Board.

Sorry, guys. Thank you, Hal. Appreciate it. All right.

Okay, we are, the first thing on the agenda is to get right into the applications. So the first up is the Pine Grove Restoration, Marita Manny. Welcome back.

Speaker 2 (01:39–01:42)

Thank you. The whole year.

Speaker 1 (01:43–01:47)

Uh, and it's for the water distribution is often sure.

Speaker 2 (01:47–02:40)

I'm Maria Manning, a board member at M. R. E. And I put in an application a year ago for restoration of the Pine Grove at Winter Valley.

And it was approved by your forward by the warrant committee and the meeting for the 1st phase. So this is the 2nd phase. And obviously the first phase hasn't started yet, when the funds get released on the 1st of July. I don't know if anybody has any, some of you have taken a tour with me in the property.

And your suggestion last year to connect with Georgia Lee was very, very helpful. Oh, I remember that. Yeah, yeah. I remember.

She, Georgia has a great resource. Yeah, she had more than 50 years. Anybody has any questions?

Speaker 4 (02:41–02:43)

So what's happening with phase two?

Speaker 2 (02:44–03:05)

Phase two will be a continuation from where when phase one gets finished. Yeah. It'll be from where phase one ends until it gets to where the pond is. Oh, okay.

So it'll be a continuation of that. So did you have a, is this an estimate that was it based on? Yes. From the Hunt brothers?

Okay, for the stream work.

Speaker 8 (03:06–03:11)

What was the cost of, what did we fund last, the first phase? $10,000.

Speaker 3 (03:11–03:13)

$10,000? $20,000. $20,000.

Speaker 1 (03:13–03:21)

$20,000. So this is for 60, the request is for 60, out of our total project cost of $100,000.

Speaker 8 (03:21–03:24)

Right. Where's the $40,000 coming from?

Speaker 2 (03:24–03:26)

We're hoping to do individual grants.

Speaker 5 (03:27–03:27)

Okay.

Speaker 2 (03:28–03:37)

And we've also, we're collecting information for, to be unregistered on a national scale basis.

Speaker 4 (03:39–03:41)

Yeah, so it was 40,000.

Speaker 9 (03:43–03:43)

Last year?

Speaker 4 (03:43–03:46)

Yeah, at the April town meeting.

Speaker 9 (03:49–03:49)

It was 40?

Speaker 2 (03:49–04:02)

Yeah. Okay. Thank you. And will this be done when it's done?

Or is this phase two? No, it's phase two. the end of the movie.

Speaker 10 (04:02–04:47)

I think phase two finishes at the pine grove. As we noted on our walk there that the historic gardens are more extensive, so conceivably there could be continued work by phase three, four, five, six, who knows. But this finishes up the pine grove, this particular subject. I just know, because as you know, I've done the research on the garden and things like that.

The more formal garden, there's lots of things that could be done, but it's much more complicated. So there would be more study and things required before undertaking any significant restoration work there.

Speaker 8 (04:47–04:54)

So remind me, when this is then open, how does the community engage with the project?

Speaker 2 (04:55–05:06)

It's based somewhat on where the Spalding Garden is, and it would be open for Visitors, you know, but I mean, they're all the time for residents.

Speaker 8 (05:06–05:18)

And so could we do something similar that we have it? Like, would you be open to having open hours for the community?

Speaker 2 (05:18–05:47)

Absolutely. And just one more question. The current development is happening for the additional, I guess, 36 units or something like that. Yes.

About this or how close is it to the garden? It doesn't. So, behind this project, beyond it is building 5 and the new building 6 is behind that. So, it's walkable, yes, but not, it's not, but it's not.

Speaker 1 (05:47–05:50)

And there's some distance.

Speaker 2 (05:51–05:57)

Building 6 is underway. Yeah. August 2027.

Speaker 1 (05:57–06:04)

move in and that's the scheduled move in.

Speaker 2 (06:04–06:05)

Fantastic.

Speaker 1 (06:06–06:19)

So I know you haven't obviously started phase one yet, but do you, is there anything that's come up at this point that you, do you anticipate any problems with phase one?

Speaker 2 (06:19–06:24)

No problems at all.

Speaker 1 (06:24–06:48)

And so you'll be ready for phase two. When I come back, yeah. In May of 2027, the town meeting would have this in front of it. Yes.

OK. Any other questions? Thank you for the tour, by the way. That was really helpful for those.

Speaker 2 (06:48–06:50)

Anybody have done it, I could show them.

Speaker 8 (06:50–06:55)

Yeah, yeah, it was really. It's a beautiful, so I can contact you and you give me a private tour.

Speaker 2 (06:55–06:56)

Absolutely.

Speaker 8 (06:57–07:00)

I'll be contacting you. Yeah, I think that's right.

Speaker 2 (07:01–07:04)

You missed that. Yeah, I did.

Speaker 1 (07:04–07:04)

Thank you.

Speaker 2 (07:04–07:06)

All right.

Speaker 1 (07:06–07:23)

Thank you, Marita. All right. Next up on the agenda is Regina Campbell Malone in the Pagoda Circle of Restoration. So Regina, can you hear us?

Speaker 11 (07:23–07:24)

Hello, hello.

Speaker 1 (07:24–07:27)

We can hear you.

Speaker 11 (07:28–07:36)

Oh, great. I also have two collaborators that are listening in. And if they want to say something, they're welcome to raise their hands, I think, right?

Speaker 9 (07:38–07:39)

OK.

Speaker 1 (07:39–07:40)

So that's Alyssa and Christina?

Speaker 11 (07:40–07:41)

Yeah.

Speaker 1 (07:42–07:45)

So I can just allow them to talk.

Speaker 11 (07:45–07:45)

OK.

Speaker 1 (07:45–07:49)

And they don't have to if they don't want to, but that's OK.

Speaker 11 (07:49–07:59)

OK. And would I be able to share my slideshow with you? If not, it's not that big a deal.

Speaker 1 (08:00–08:04)

Yeah, so is it the one you sent with the application?

Speaker 11 (08:05–08:07)

No, it's an updated one.

Speaker 1 (08:07–08:09)

Did I send a slideshow with the application?

Speaker 11 (08:10–08:11)

No. No.

Speaker 1 (08:11–08:30)

Okay. So let me promote you to panelist. Got it. And if you accept the panelist invitation, You can then share your slide.

Slides. Only one slide is allowed. I'm just kidding.

Speaker 4 (08:33–08:37)

Yeah, you can allow your song.

Speaker 9 (08:49–08:52)

Allow. But that's a problem.

Speaker 1 (08:52–09:09)

Right. We can see the. Presentation and the only thing I would say is, if you could speak up a little bit, we were having a little hard time hearing and I don't know how to.

Speaker 11 (09:09–12:55)

Sure, no problem. You don't have to tell me twice, Tom, I got you. Okay. All right, so we, you know, just a quick refresher, we're addressing safety and accessibility and also some environmental restoration at the Dakota Circle.

Just to give you a really brief rundown, this is the area, let me see if I can't, can you guys see my pointer? Yeah, yeah. Okay. So this is the area between Hudson Street and Victoria Street, basically.

And we've got this more open area on one side and Oak Tree Stand on the other. And this is where we're located in town, so kind of south of the Tucker School. Um, and, um, the, the big, the biggest feature of this little park is that, that oak tree stand in that larger open area. Um, what we've found is that it's a huge asset for families that are within walking distance.

It's a local bus stop and, um, it's used for nature exploration and lots of small, uh, events and meetups, uh, for dog walking and other things. Um, and. Um, as a reminder, the space is not really large enough to support any larger team sports. So the idea is really to, um, try and refresh and revitalize what's there, including, um, evaluating the, the oak tree stand to see, um, what, what needs to be done to restore it and removing some invasive species that we know are there.

And, um, the CPA mechanism seemed like a really great. Um, way to do this in 2024, we received phase 1. Funding, um, and that kicked off a, um. A community engagement process that was long and very important.

Um, was part of that process. Thanks to some funding from the pick. They did a whole visioning process. There were surveys and listening sessions and two visioning sessions held for a wider audience.

We've engaged with Lombardian landscape architects to try and determine what is feasible in that area. And for the amount that we still have, and actually it was, I believe it was $12,000, we are gonna be able to have them put together three renderings of what may be possible in the area. And we also have decided to go with Hunt Tree Service, which has worked closely with Lombardi in the past. uh, in order to evaluate tree health.

Um, so, um, what we're applying for now is, um, is money to be used once we have those three variations in hand to gain more community feedback and buy-in, uh, and, and will allow us to submit a full proposal in, uh, in September with those three variations in mind. Um, we also have some, uh, you know, we haven't touched on yet, um, the road replacement. Uh, and that is just a note for us to check in with DPW on that. Um, there's, there's some concern that, that somehow the road replacement has been missed in this area.

Um, and so what may have been missed in these areas?

Speaker 1 (12:55–13:00)

Um, one resident might have been on the schedule and then skip.

Speaker 5 (13:00–13:00)

Yeah.

Speaker 11 (13:00–14:18)

Yeah, there, there, one, one resident who's been there for 20 years says it hasn't been done since she, she moved in. So we want to check on that and see and see what the status of that is and see what type of. Um, traffic mitigation measures can be put into place there. So, um, so we, we think that these really, um, these goals match the open space and recreation, um.

Ideals and goals of the CPA and that. Ideally, um, these plans also align with the master plan and the shade tree initiative. as we're trying to restore that oak stand. In brief discussions earlier this month, we had a chance to speak with Bill Madden and to sort of provide him with some of the feedback from residents and our small working group.

about the types of things that the neighbors are interested in seeing and some things that they're absolutely not interested in seeing. So we're looking forward to seeing what they can draft and what types of things are possible for this little beloved park.

Speaker 1 (14:23–14:44)

Okay, anybody else from Alyssa or Christina? Does anybody else want to say anything? Or we can just open for questions from the committee. Hearing none, questions from the committee.

Speaker 8 (14:44–15:36)

I'll just say that I live not too far from this community. And yearly, they have a Pagoda Circle party. I don't know if some of you have been there. And just anecdotally, Last year, we typically have brought ice cream and stuff there, and we brought the ice cream truck up, well, the ice cream case up to around where this woods were, and we heard this crackling sound.

and a huge limb fell off a tree. And almost, I mean, massive, like probably five feet away from us. Could have killed any, could have killed New Yorker, Skillin, one of those from Smith. So they absolutely, like, you know, there is some major tree work that needs to be done up there because there's some maintenance issues on the trees and whatnot.

So, you know, anecdotally I would say that, you know, they totally,

Speaker 4 (15:36–15:37)

Because the land is towned up.

Speaker 8 (15:38–15:42)

It is part of it. It's part of it.

Speaker 1 (15:42–15:44)

Jenny, you have one.

Speaker 2 (15:44–15:51)

Two questions. Does the Lombardi landscape, was that part of an open bid? And does it have to be part of an open bid?

Speaker 8 (15:51–15:52)

No, it's under 50.

Speaker 2 (15:53–15:55)

Under 52,000? 50, 50, 550.

Speaker 8 (15:55–15:59)

50, OK.

Speaker 2 (15:59–16:08)

Thank you. And then I was just also curious about the mulberry tree conflict that was mentioned. Can you talk about all that?

Speaker 11 (16:08–17:28)

Yeah, yeah. So one part of the conflict was resolved by nature itself. Half of the mulberry tree kind of got hit by another tree as it was coming down. And so that was removed by DPW following a big storm.

So only one part of it is still remaining and it's still, you know, it's limping along and it's already starting to put out berries that should be ready by the end of this month, maybe beginning of July. So was the conflict whether to keep it or not? The conflict was whether to cut down that, certainly to cut down that branch that was relatively horizontal and had a hole in it that you would stick your arm through. And now, you know, in keeping or removing the mulberry tree are going to be part of the variations that are put forward.

We will also lean heavily on the the arborist to help us with that decision. And if that person and their expertise tell us that the tree is not salvageable, then what we'd love to do is perhaps plant a new mulberry tree in its place in a nod to the history of that tree and the connection that a lot of people have to it, so.

Speaker 1 (17:34–17:38)

Yeah. That's not a question. Other questions, yeah.

Speaker 10 (17:39–18:04)

Yeah, what you've outlined here, your slide that's up, it says phase two proposal. But I think those first three things is the work that was supposed to be done with the first phase. And as I understand it, that's ongoing. And then the money that you're asking for us now is really implementation funds, which would come after that.

Speaker 11 (18:04–18:08)

Yes, so that's where the submitting the full proposal.

Speaker 10 (18:09–18:18)

Yeah, the scope of work for this proposal is not that. The scope of work will be outlined in your full proposal in September. Yes, yes.

Speaker 1 (18:22–18:25)

Yeah, that's important. Thank you.

Speaker 3 (18:27–18:27)

Wendy.

Speaker 5 (18:27–18:57)

Thanks Tom. Real excited to hear you talk about the potential of this being considered under the historic preservation bucket. And could you please tell us more about the aspects of the Pagoda history and how that was included in the planning process with MAPC?

Speaker 11 (18:58–19:54)

Yeah, yeah. So one of the things that we found really interesting was the the namesake of Pagoda Circle is a pagoda, a small like relic pagoda that was up in the woods themselves. And it was put there by the Forbes family that had deep ties to the Chinese, or trade with China. And so one of the aspects that we wanted to engage with is trying to figure out what that history was, what that pagoda looked like, and perhaps to incorporate an educational and historic awareness piece that might involve a board that has that information on it.

Maybe if we can find a rendering of what the pagoda looked like and some of the history behind it, that would be ideal.

Speaker 5 (19:56–19:59)

Have you reached out to the Forbes House Museum?

Speaker 11 (19:59–20:01)

Not yet, no.

Speaker 5 (20:02–20:24)

It would be wonderful if you guys could collaborate in some way on this project. We here at the Community Preservation Committee have been working closely with the Forbes House in the past on different projects, and I would imagine they'd be amenable to collaborating with you folks on something like this.

Speaker 11 (20:25–20:31)

Absolutely. It'd be great if there was an intern or anyone else available to help us with some of the research.

Speaker 1 (20:34–20:43)

They are, I think, going to be with us until Essex for their own application. Yeah, that's great.

Speaker 2 (20:43–20:51)

Sorry, I just wanted to follow up. There's still a difference between the total project cost and what you're asking, so you're hoping the difference is coming from where?

Speaker 11 (20:52–21:01)

Are you talking about the balance? Yes. The balance of funds? Yeah.

Can you be more clear? Are you talking about the $82,000?

Speaker 2 (21:01–21:07)

Well, $82,000 what you're requesting, but you have listed the total project cost of $97,000.

Speaker 11 (21:09–21:21)

Yeah. Yeah. So we will look to additional resources, additional granting agencies, and possibly fundraising to try and raise some additional funds.

Speaker 2 (21:22–21:26)

So nothing confirmed at this point? Nope. Okay.

Speaker 8 (21:26–21:28)

What was the estimate based off of Regina?

Speaker 11 (21:29–21:55)

Um, it was based off of other projects of similar size. So Peverly Park, um, we looked at, um, a few other small initiatives in Mattapan. Um, but really it, it's going to boil down to what those variations look like from Lombardi. So we'll have a better idea of the numbers, uh, going forward before we submit our proposal.

Speaker 1 (21:55–22:03)

All right. So because it's over 50. So Jenny's just asking whether it has to be an open day. It would.

Speaker 4 (22:03–22:05)

It will because it would be done by the town.

Speaker 1 (22:05–22:07)

Yeah. Yeah.

Speaker 11 (22:07–22:15)

But the variations right now for Lombardi, those are covered by our phase one funds. So that direct.

Speaker 6 (22:15–22:16)

Right, right, yes.

Speaker 8 (22:16–22:41)

But the next stage. My only comment, Regina, would be, because this is Parkland, you'll want to, what I would suggest is reach out to Carolyn Cahill, who's the chair of the Parks Department now, and try to get on our schedule so that you can present to them once you're in the process to get support. Because it will be administered through them, through the parks.

Speaker 11 (22:42–22:53)

Got it. So they'll handle all of the, like, any bidding process that might have to happen, and they'll Um, yes, maybe not. Yes. Question mark.

Speaker 8 (22:54–23:03)

Okay. Yes. I mean, because we're such a small town, I, I think it often happens through Nick Milano and folks. Yeah.

Speaker 10 (23:04–23:08)

But they'll be looking for you to provide the information to go out to bidders.

Speaker 8 (23:10–23:15)

So you need to do a lot of work in the next, between now and September to get this project.

Speaker 11 (23:16–23:22)

Well, I think it's a good thing that I'm a teacher. And that works.

Speaker 1 (23:23–23:30)

All right. All right. Any other questions? All right.

Regina, thank you very much.

Speaker 11 (23:30–23:31)

Awesome. Thank you.

Speaker 1 (23:31–23:35)

For your stewardship of this and for the application.

Speaker 4 (23:35–23:42)

Thank you. Thank you. Thank you. The 1908 Atlas shows a talent on that person.

Speaker 3 (23:42–23:46)

Pagoda and talent? No, Pagoda, just a talent. There was a tower.

Speaker 4 (23:46–23:59)

Owned by the Blue Hills Terrace Company. Blue Hills what company? Blue Hills Terrace Company. How big of a terrace?

It was on Ferris Street. It was right there. Well, they lay it out on the lots. I mean, it was like five, you know, there was 10.

Speaker 8 (23:59–24:06)

Do you know anything? No. You're my, you're my like, read Wilton history.

Speaker 10 (24:06–24:08)

We've got some more figures.

Speaker 8 (24:08–24:11)

Yeah. Check the, was it 1906 at us?

Speaker 5 (24:11–24:14)

Yes. 1905. We've got another.

Speaker 2 (24:15–24:26)

The story of a breeze around here, you know, do you know anything about no, I've always been curious about how the fact department.

Speaker 4 (24:26–24:28)

Probably probably tax taking.

Speaker 2 (24:29–24:35)

Moving, I guess, maybe a contractor just, it was left out of the land.

Speaker 4 (24:35–24:59)

No, my suspicion is looking at the plan and my. used to what happens at the registry is that it was a subdivision and it was designed with the circle in the middle as an amenity for the house lots that were being designed. And so that's why it probably shows as Blue Hill Terrace Company because they would have held that as they would have owned the roads and all that sort of thing.

Speaker 2 (24:59–25:02)

I've not been able to find one at the time.

Speaker 1 (25:03–25:18)

When it was acquired? interesting. Okay, let's move on to the next John Therrien from the Conservation Commission on the Open Space Preservation Trust application. Good evening all.

Speaker 7 (25:21–27:47)

So mine is somewhat of a conceptual proposal because we don't have a specific piece of land for conservation restriction in mind right now. But our I'm speaking of the Conservation Commission. Our mandate, our charter, is to protect and preserve and enhance open space. I can give you an honest speech about climate change and the importance of battle climate change, because we've got increased flooding.

We're getting into flooding with rising sea levels. We've got increased severity of storms and whatnot. It's very important that we have open space. We try to be collaborative in our approach, and we work with the SAC, you know, the Shady Creek Advisory Committee.

We work with the Open Space Committee, which is now, I think, re-energized and is coming back strong. So we look to collaboration in identifying and inventorying all the open space that we have. That's one component of the proposal. The other is to figure out where all the conservation restrictions are.

because some of them are privately held and we don't know about them. We can categorize an inventory, what we know about. And we know a lot about that. The Master Plan Committee did it back in 2014.

Most of us use John Collins' inventory. That was sort of the basis of our inventory at that time. It's grown since then. What we really need to do, and this is the proposal, is to identify parcels of land that have enough space that could provide a conservation instruction.

Now, the preservation fund, the design, the dream design is to have enough money come in cumulatively over a number of years to buy land. That's a dream, because I don't think we could do what Norwell did. They bought 114 acres of open space with $3 million. And I contacted their more well, or well, yeah, well, and I, I mean, we don't have 114 acres of open space, I think, but if we could buy it would be great, but we don't have the money for that.

It would take a long time. I'd ask for 100,000.

Speaker 8 (27:47–28:09)

So, is this even. I'm just curious because I know like the Massachusetts, like the, we have the affordable trust here and we give money to it. Is there, is it a vehicle for the CPC to give money to an open space trust similarly? Is that even a vehicle?

Can you do that? Because what you're speaking of anyways is… Norwell did it. Norwell did it?

They did. That's my call.

Speaker 4 (28:10–28:30)

Well, no, it's what they don't have. I mean, conservation commissions have the ability to accept town funds for open space purchases. It's not a separate entity. Right.

Like affordable housing trusts are a separate entity. Right. And I don't think whether you're talking about… I question the legality of the town.

Speaker 7 (28:30–28:32)

Just like we have a revolving fund.

Speaker 4 (28:32–28:49)

Yes. So it would be money going to your revolving fund. If you're going into an open space acquisition fund under the conservation commission, it would not be like the affordable housing trust, which are separate statutory separately.

Speaker 8 (28:50–29:13)

But when you still think it's leaked, so I guess I just don't see. Here's my here's my issue with it. I'm all for open space, but this committee has the same power as you would like if we wanted to go out and get open space and put up a purchase. with the funds that we have.

Speaker 10 (29:13–29:18)

We wouldn't know. No. There's this committee, the CPC. No.

Or someone would have to be involved before.

Speaker 4 (29:19–29:26)

We would be providing money to the town for the acquisition by the town, by the Conservation Commission.

Speaker 8 (29:27–29:27)

Right.

Speaker 4 (29:27–29:28)

Be the custodian of it.

Speaker 8 (29:28–29:58)

Right, yeah. We'd still be the custodian of it. We wouldn't be the custodian of the town. But I guess my issue is this, like, just throwing, putting money into a fund that Hypothetically, we buy open space eventually.

It's like, okay, I'm just throwing money to a hole. And one thing I would say is that, you know, I remember I was, because I chaired this committee four years ago that you came before us for a project that I'm especially interested in is the bridge over by Pepperly Park. And I still have yet to see it constructed.

Speaker 7 (29:59–30:15)

We met today on the estimated time of completions on Cobra. I was with Darwin Salalas, who's Assistant Sky. I was with the Professor Duvosky from of University Engineering. They are doing the engineering for us.

Estimated time of completion is upcoming.

Speaker 1 (30:16–30:19)

All right, great. And that's the bridge? That's the bridge for East Hobbs Pond. Hobbs Pond, yes.

Speaker 7 (30:19–30:20)

Cavalry Park is underway. Right.

Speaker 1 (30:20–30:21)

Cavalry Park is underway.

Speaker 7 (30:21–30:48)

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway.

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway.

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway.

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway.

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is underway.

Cavalry Park is underway. Cavalry Park is underway. Cavalry Park is It was off the bid. And I had a deal with a neighbor that wanted to buy it and asked for $100,000.

And he said, no. So I need a pot of money.

Speaker 1 (30:48–31:08)

Right. So what is the conservation, as a housing guy, right? What is the conservation restriction cost? I mean, I'm sure there's a varied answer to this, but, you know, like a few.

No buildings. No buildings. No, no. What does it cost?

Like to buy a conservation restriction, it can be,

Speaker 7 (31:08–31:44)

That was a $100,000 contribution. It actually sold for $3 million. But at the time, they were bidding up from $2 million. So I had a bidder that was bidding into $2 million.

She got outbid. But she had agreed that if she could buy it for $2 without a warrant, that she would take that 6.8 acres, put a conservation restriction on the entire 6.8 acres, and provide public access with trails. It didn't work. She lost the bid.

I didn't win the money anyway. But I'm not suggesting that the $100,000 would have made it work. She was outbid by the developer.

Speaker 10 (31:44–32:05)

But the concept is similar, although the structure is the same. The concept is similar as how we fund the Affordable Housing Trust. To have money that's available so when something comes up, you don't have to wait two years to go through our process to get money, that there's funds that you could direct toward that kind of project.

Speaker 8 (32:05–32:10)

And how much would you be looking for per year or whatever? $100,000.

Speaker 7 (32:10–33:17)

Every year? Yes. Because if we put enough into it, we could buy the land. Now, I'm not suggesting we're going to wait 30 years to get $300,000, but I'm suggesting that the more money there, the more we can buy.

And it may be purchasing land. And some of it might be isolated land, you know, isolated by you build a, you know, four streets and there's a centerpiece and probably it's a pocket. So that's going to be pretty cheap. But there's other stuff that could be developed that is going to sound anti-development.

It is. We're trying to keep open space. So if somebody's got a two-acre project and they say, well, I could cut off one acre. I can go to the planning board with ZBA.

I can build a house there. He said, no, no. For $100,000, give us a CR on that acre. don't build a house, keep the trees.

That's where we're going to get open space support, we get stacks of the shade tree advisory committee, that the whole idea is get the tree canopy back, fight the climate change.

Speaker 8 (33:18–34:09)

It's not anti-development in the sense of- It seems like a really expensive venture when I'm looking at $6 million worth of projects here, right? And so it's also a 10th, you're asking get this and we can buy this here. So for me, it's tough to get there because it's, okay, here's $100,000. And I know an acre in Milton's a million dollars, right?

That land is one of the most expensive things in this, in this town. So if you came to me and said, Hey, I got a project that we can do a million dollars. I'm going to, you know, whatever this is. And then it's a little bit more tangible for me, I guess.

I guess I'm just having trouble to like throw money down into a, to a constant thing. That's going to be. $100,000 a year that will be.

Speaker 1 (34:09–34:52)

We don't have a source, we can't bid. Jenny's waiting, I'm waiting. Ben, you alright? I'm not saying anything.

No, no, no. I just want to make sure everybody gets a chance to ask some questions. One question, so Is the advantage of this is it gives you the ability to act expeditiously in a, you know, you wouldn't necessarily then have to go to town meeting and ask for their permission, right? You could just negotiate that CR and execute the CR.

Correct. Without any other approval. Correct. Okay.

Okay. Which is similar to the Affordable Housing Trust. It is.

Speaker 2 (34:53–34:54)

That's an opportunity fund.

Speaker 1 (34:54–34:56)

Yes. Yeah. So Janet.

Speaker 2 (34:57–35:03)

So I mean, if this is what the Trust for Public Land does, and so to what extent have you worked with them on properties here at Milton?

Speaker 7 (35:05–35:36)

We have not directly, but what we did, remember I said a collaborative effort. We keep an eye on the planning board and the CBA. We picked up about an acre of open space at Wentworth Farms. And when the infrastructure went in, we got land back for that permit when we did Let me see what Scott Woods was one lot of a tweak a lot.

It's it. I'll give you address 153 Hillside Street is a driveway and there's a web college actually bought a built it.

Speaker 4 (35:36–35:52)

We got a half an acre of open space because without public access that it has no public access on that Forbes that that Ford Hill Ranch Road conservation land that web column set up doesn't allow public access.

Speaker 7 (35:53–36:12)

Yeah, you're right, but I'll tell you. Right, that's what we're looking for. My goal, public access, handicap accessible. That's the goal.

CPA funding would want. Sometimes we get it, sometimes we don't.

Speaker 4 (36:12–36:15)

But then the problem is if it's already gone to them, we don't have any.

Speaker 1 (36:15–36:37)

We have no control over it. Well, wouldn't we in an agreement? Because like the Affordable Housing Trust, I mean, this is crazy variables, right? Couldn't fund non-affordable housing with our affordable housing because that's the restriction on it.

So presumably they could put some… It's in our chart that it would be 80 acre.

Speaker 2 (36:38–36:43)

Okay. So you have a portfolio of places where you're like ready to move right now?

Speaker 7 (36:44–39:08)

No, we don't. We wait for subdivisions to come in. We look at those. We did cluster zoning.

When we got up on Highland Street, Dennis and Martha Burke did a cluster zoning development. We picked up, I don't know what the AP is. It's not much, but it's a percentage of the parcel of land that we picked up there. So we're always looking, again, it's collaborative.

We're looking for it. And we're trying to work with the Open Space Committee. Avanti Grady is assembling a whole list of open spaces and what can be done there. We're meeting tomorrow, Wednesday, on Flatley Field.

That's already under conservation restriction. We're looking to see how we can address the conservation, make sure everything stays natural. That's the whole purpose. And so we, the conservation division, tries to work through planning board, DBA, trying to find what property is up for sale.

And we didn't get much at Walcott Woods and Ken Tabri's land. But Ken actually sold, I think, 30 acres to the, it was still the MDC then, DC&R. So that's what we look for. So we're trying to get on board.

We're trying to hold as many hands as we can. And I know with the Wildlands Trust, because when, Peter Jeffries and John Cronin and Ken Wendell, they basically dissolved the Milton Conservation Land Trust. They gave some of it to the Wildlands Trust based in Plymouth, and they gave some of it to us. So we've got all kinds of little spots, like down by St.

Michael's Church on Randolph Avenue. We've got, I don't know, four or five. In fact, there's one right on Randolph Avenue where School Street, that is. There's a fence there.

And so somebody asked, why is there a fence there? There's public land. So that's our mayor, it's supposed to take the fence down. But that's what we look for, pieces of land.

And that's what John Perlin and Ted and David Jeffries, that's what they would do. And they kind of handed the mantle to us and to the Wildlands Trust. So again, it's as much of a collaboration as we can do, but we need the capacity and put good care of it.

Speaker 10 (39:08–39:49)

I think the thing we have to remember is, This meeting is about whether it's eligible to move forward with the proposal. Once we have the proposals in, we're going to have to struggle with our budget versus the $6 million in requests. So that's kind of the next phase. But for right now, it's really to determine whether this would be an eligible project for a CPA application or not.

And I would guess that it is. I don't know that. out of the $6 million, how high it would float. But I think it certainly meets the eligibility requirements for CPA funding.

Speaker 1 (39:52–40:06)

Yeah, no, I compare that. I think others, other CPA funds, we can research that, but I think have- Yeah, but it doesn't say it does. Other questions, Kathleen, did you have questions?

Speaker 4 (40:06–41:02)

I just, you know, Wanted to point out that we've got two proposals so far that have been, we'd like to find open space, open space. We don't know what we have and we want to do recreation. We want to park someplace in an area that's underserved. And both of those things strike me as people coming to us when we really should be looking at the open space plan and the master plan, you know, and so.

So those ages ago when I was on the planning board, Allison Quinn was putting together the list of, you know, what open space is available. And I don't know what happened with that because just last week, I got this message from Meredith Hall saying, what were the parcels that Wildlands didn't take from the Milton Land Trust? Because I handled the dissolution of that trust. And so I'm like, I've provided this information to the town at least six times.

Speaker 10 (41:03–41:09)

And so, you know, so they have a consultant on board that is supposedly pulling that together.

Speaker 8 (41:10–41:30)

They've been pulling it together for two and a half years, the committee has been doing that for two years. So same reason why I asked about the bridge that hasn't been built for four years. So I'm happy that you're doing it, but let's move forward with some of these projects, right? So I hope, right, that we can move forward.

And that's the biggest thing.

Speaker 4 (41:31–42:18)

But I think all that goes to me is to say that, you know, I hate to see money kind of locked up somewhere that isn't getting used. People should know, I mean, when I work with other committees, Norwell is an example, other towns are an example, where they know that this farm is gonna pop, it's under 61A, the town has arrived at first refusal, we're gonna save the bazillion dollars we need to buy it. And they know that. And so everybody has like the wishlist.

And so we don't even know what we should have a wishlist for. And so I'm not comfortable with the idea of locking up money that we don't even have a shopping list for.

Speaker 1 (42:18–43:06)

I would just say that's fine. But I agree. But Pete's point is absolutely correct. This round is to ask for ideas.

And applicants have come to us to determine eligibility. We'll make a formal decision at probably our July 20th meeting on eligibility. And we'll communicate to everybody. I think you've heard the consensus here.

I think it is an eligible project. And you also are hearing the work in between that you might have to do to convince some of the committee members. But ultimately, we are in the eligibility stage only at this point.

Speaker 7 (43:06–43:27)

I'm sorry. To your point, part of the proposal is it's not going to shoot in front of you, but the detail would be public education. If we have the capacity to buy, we can then go to the public and say, listen, if you've got more than an acre, are you willing to sell it? I don't mean the

Speaker 4 (43:27–45:21)

Well, yeah, I mean, you know, as you know, I've been practicing real estate law for a bazillion years, and I just closed on a deal with Essex Greenbelt. And so, you know, Essex bought my client's property. Some part of that is going to be CR, some of it is asset. But people know we have community preservation money.

We're on the list. Everybody knows, a developer knows, all the people that do real estate development, Land Trust know Milton has CPA money, and they know that that's a possibility. So in that situation, Wenham actually bought a CR on some of the property, so that offset the cost to Essex. So people know that.

We've done our job of letting people know that we have CPA money available. So we expect somebody to come to us to say, hi, we've got, you know, we're interested in this piece of property, blah, blah, blah, some of it may not really work, but how about, you know, working with this committee. And Wendy knows that from her years serving on the Plymouth one, because that's the same thing. They came here and said, OK, fine, what can you do?

So far, that hasn't happened for us. There may be some developer that comes along in a few years for some project, and we would certainly be the place that you would come to this committee, because we have the money. And then we would be working with you to say whether or not this has any sort of conservation value to it, et cetera, et cetera, et cetera. But that's the normal process is that people come to the committee that has the cash, which would be us.

And then, and then we would fund whatever we decided to fund to get whatever we needed from the CR. But it's usually a combination of a lot of things and people want tax deductions and You know, they're going to be part of it's a gift and how are we going to get that through the IRS and dueling appraisals and all that kind of stuff. It gets pretty complicated.

Speaker 1 (45:22–45:56)

So it's not as simple. I'm not screwing you. I guess I think the one significant downside from that is the speed at which you can act, right? You can't act with any speed in that process because you're going to come to us in May and move us out of Denmark.

Yeah, it comes in May or votes in the next. The money's the next July. Next May. Yeah, but it is a year and then funds released.

Speaker 4 (45:56–46:06)

But we could have always done if we had something that somebody came up to us for now, we could certainly say, okay, yeah, that's terrific and go into the October meeting.

Speaker 1 (46:07–46:34)

We have, we have such flexibility. This year we're going to be asked to do that at least once or twice. Yeah, yeah. No, good point.

All right. Anything else? Thank you very much. And thank you also for the update on the bridge.

We know that Northeastern has not, you know, there's been some… Yeah, they definitely have gone out of business.

Speaker 4 (46:34–46:40)

We did see the parking at the Ice House for the conservation plan, so… I think there's a picture of the parking.

Speaker 7 (46:40–47:00)

Yeah, yeah, yeah. I was excited to see it. And a pathway through that, and that's another one of your proposals. Yeah.

That we're still waiting for the connection from the past, the Pebbly Playground, to our new path, and then to make the whole thing handicapped access. So that's funded, but it's rich. Yes, and I know that's the whole point.

Speaker 9 (47:00–47:01)

Thank you.

Speaker 1 (47:01–49:35)

It's the number one question I get asked. Thank you, John. All right. We are right on time, and we're going to be a little ahead of time, because next applicant, Smilton, Lanley, and Bauhaus has asked to postpone their appearance until the July 6th settlement.

So I'm going to take this opportunity to update people so that they will be coming on July 6th. The other news on Appletanks is, I guess this is not 100% official, but I've been informed by the Houston Bioswale, if I'm pronouncing that right, project, that they are going to withdraw and not move forward. They're just quite ready, I think. They might, I mean, there was an issue about whether, you know, it's sort of, but we won't have to get into that.

They're going to get dropped, possibly to reapply next year, but they want to do some more thinking. And which budget was that? It was the Houston bioswale, using the tree lawn to have runoff sort of avoid going into the sewer, and it was an intriguing idea. I wasn't sure the private land versus the tree lawn and that kind of stuff, but it was a pilot project to test it along a 150-foot strip to see if it did have an impact on rainwater and stormwater.

So it was an interesting project a homeowner in Houston had, for both, so. But they are, I think, well, they have informed me that they're, so one less applicant. That made their job easy. But it was only 7,500.

How about one of the 100 applicants instead of 22? So one other update. just the Affordable Housing Trust voted at their last meeting $600,000 to the Milton Housing Authority. So I think effectively the Milton Housing Authority proposal is withdrawn.

Speaker 4 (49:36–49:38)

Oh, I was hoping that that would happen.

Speaker 1 (49:39–50:11)

And that's great. The Affordable Housing Trust is not because they're hoping Yeah, they're hoping to recoup some of those costs, obviously, but they've already, based on their surplus, not surplus, but based on their reserves, they have already voted at their last meeting, 600,000. So we're making some progress there. All right.

The next one on the agenda is Andrews Field, but Kevin is not here to fill in the pocket, I think.

Speaker 8 (50:11–50:12)

Yeah, I'd fill them in.

Speaker 1 (50:13–50:19)

Oh, you're going to cover it. Okay, so Rob is going to cover the next two then.

Speaker 8 (50:19–51:11)

Yeah, is it possible to pull up Andrew's application? Yeah. And then I have the other one. Then I can talk specifics.

But in essence, the Andrew Field restoration project, for those of you who we had put forth. It's basically the same application as last year and what we did was we pulled it last year. Remember, so we pulled that knowing that let's, let's figure out if that's the right location for it. And when we did, when we went through our study.

Uh, in the recreational master plan, we're getting close to the time that we'll be done with other things. Was it just. I'm just curious. I'm just, I think it was around 300,000, right?

Oh, I'm just looking at those.

Speaker 1 (51:11–51:14)

It is totally 100,000,985. 185.

Speaker 8 (51:15–52:26)

Okay. So, so. Basically, in essence, it's the same project, but I think so Milton soccer is given 10,000 dollars for it. I think Kevin was looking for around 100 something.

And. Whatever the request is 185 right. So, in essence, it's the same project, our consultant who did our recreational master plan figured out, like, the field should stay in the same place that it's in. And if my wife was here, she'd tell you how unsafe the field is because of the way the way it's been played on.

It's really used quite a lot in this restaurant. would do a ton of good for the programs that use it. So Milton Soccer uses it quite a bit. I know that Lacrosse uses it and Fon Fon actually uses it as well.

What I told my wife is I think the other two we should work on trying to get funding for because they are users of it and Milton Sacher has committed some money. So I think before the next application, we'll look at that with Kevin. But that's in essence the application.

Speaker 10 (52:28–52:31)

So it's really a reconstruction of the field, the grass.

Speaker 8 (52:32–52:33)

The existing grass.

Speaker 10 (52:33–52:40)

It's none of the infrastructure or any other activities it's taking. the grass surface of the playing field.

Speaker 8 (52:40–52:47)

Excavating down and building a whole new base to redo the surface, as grass as is.

Speaker 1 (52:49–53:06)

So it would only, all that work would only, they would only miss the summer? See, I mean, basically it would be ready for fall. It would be ready for fall, but could go, yeah, over That's, that's, I know nothing about this, but that seems.

Speaker 2 (53:06–53:09)

And where does the estimate come from?

Speaker 8 (53:11–53:19)

Kevin, he knows, I think he knows what the cost is to redo it. So that's, that's who gave the information back.

Speaker 2 (53:19–53:28)

I was sort of curious if there was an interest in having that be an AstroTurf and not obviously apply to CPA. Was there any support for that?

Speaker 8 (53:28–53:37)

No, and I think our committee like I don't, there's there's no interest that injures, it's basically to keep it to keep it grass.

Speaker 4 (53:38–53:40)

I don't think the neighbors will want to.

Speaker 8 (53:40–54:30)

I don't think the neighbors would go for it. But what I will say, an interesting topic for that is that potentially if there's fencing around it, I would be for fencing a field. Because if we're spending $300,000 on a grass field, we better make sure that it The surface remains that way, because dogs and stuff actually tear up the irrigation lines and stuff. So it's just something for us to consider.

And I don't know if the fencing would be included in this, but that would be something that we would want to figure out. I think you would be able to at least get in to the field. We wouldn't want to lock it up, but I think it's just so that. And that park is quite big.

Speaker 4 (54:30–54:33)

Well, I mean, there are a lot of dogs there.

Speaker 8 (54:33–54:37)

There's a ton. There's a ton. Yeah, there's a time.

Speaker 4 (54:38–54:40)

And they're mostly not on leashes.

Speaker 8 (54:41–55:00)

No, right. So if we just fenced it, but had it open so people could, anybody in the community can go and use it, great. But it would keep the dogs into the open space areas in the park. And it would help maintain that field for anybody who wanted to use it.

It would keep the dogs out. But to answer your question, I think turf and nanders is a bad idea.

Speaker 2 (55:03–55:05)

And what's the status of the,

Speaker 8 (55:06–55:32)

total plan so that it's coming the whole town wide recreational master plan will be I think it's going to be done in about two or three weeks and then we're going to present at the select board and similarly to what John said we're looking at flatly field as a potential And so we're gonna look at that.

Speaker 10 (55:32–55:37)

Has there been a draft circulated or anything to the public?

Speaker 8 (55:37–55:53)

So there's gonna be a public community meeting in the next couple of weeks. So once the plan is finished, then we'll go out to the community and have a community meeting in July. And then the next step would be to present that to the select board.

Speaker 2 (55:54–55:56)

Is this considered a priority within that plan?

Speaker 8 (55:57–56:06)

Yeah, I mean, it's one of the priorities in there. Yeah. Other questions?

Speaker 1 (56:10–56:13)

Okay. Any questions, Robbie, for Hal?

Speaker 11 (56:17–56:18)

No questions for me.

Speaker 2 (56:19–56:23)

Okay. Sorry, just assuming that the town is coming up with a different… Yes.

Speaker 1 (56:23–56:27)

Yeah. All right, the next project is also Rob.

Speaker 8 (56:28–56:28)

Geo.

Speaker 1 (56:28–56:31)

Geo. Yeah, so it's the softball fields.

Speaker 8 (56:31–57:06)

Yeah, so a lot of softball field is at the one at the high school. Yeah. Yeah. So, so we.

So what was interesting was, is that We did fund one project that phase one project for this for this project so on first baseline it's it's a new cage, but remember there was like stairs that went off the ADA right so. Kevin, myself, met with Bill, who's the lead.

Speaker 1 (57:06–57:08)

That project hasn't been done, obviously.

Speaker 8 (57:08–59:02)

Because of July, right? And so it's going to start within soon. On July 1st, it gets going. That project will roll out.

But once we were there, because we needed surveys and whatever to get that project done, some of the softball board was they said, OK, well, we have another we have another ask or we're looking for doing the next phase, which is what's here. And so I was there and I said, well, what about just like a lot of these projects doing the study? The design for this is to help rebuild the hillside. But it continues as anyone who knows like that goes down that by the high school, there's a huge range.

And at the bottom of that ramp, the idea is to push that ramp back a bit and create better stands. So right now, a lot of folks go up by the parking lot. So it would be improving spectator amenities between the dugouts, fixing the ramp, and helping for safety. Right now there's a lot of washout too.

I don't know. I go over there all the time, probably from my kids, but there's a lot of washout from the top of the hill and it goes down and it basically washes out to this ramp. So we would fix that as well. And then I think I talked to you, Tom, about whether or not this was eligible, like if a press box or a concessionary, if it was open or not, I don't know.

I'm just wondering, like, if it's not a completely fixed But this anyways is for the design and study of doing these amenities for it. But I don't know if in the future, would the press box or the concession area be fundable? I guess that's a question back to you Kathleen.

Speaker 1 (59:02–59:03)

I don't think it is.

Speaker 8 (59:03–59:08)

I don't think it is. I don't know for sure. I don't give a defendant.

Speaker 4 (59:09–59:21)

People have and they've included in the whole redo of the field. You know, so like there's, you know, concession stands and press boxes and all that lights and all that sort of stuff.

Speaker 12 (59:21–59:21)

Right.

Speaker 4 (59:21–59:34)

I mean, I think it's been included. Not, I don't think it's a great idea, but I think it's been part of the whole project. Okay. Um, and not called out as that, and that seems to have worked.

Speaker 10 (59:34–59:47)

Okay. But if it's, if, if the project is not a whole project for the field, it's solely to put in a, concession stand and press box, then it's a different thing. Yeah, it's a different thing.

Speaker 8 (59:47–59:52)

This is more about like regrading ramp and like the stands.

Speaker 4 (59:52–59:54)

And making it more accessible and all that.

Speaker 8 (59:54–01:00:25)

Right. And I think, too, so why this came about, too, was because the first phase and we were going to put we're putting steps up to that ramp so that it's easily accessible over there. it's like a natural progression, like that goes into where these stands would be. So that's why we're like, okay, let's put this forward so that while they're designing the phase one, that there's a thought about phase two to make sure that it's coordinated well together.

Speaker 10 (01:00:25–01:00:30)

So the phase one project is putting stairs at the bottom of this ramp?

Speaker 8 (01:00:31–01:00:34)

So it's in the middle of the ramp. So where the cage is-

Speaker 10 (01:00:35–01:00:38)

if you're putting stairs, then it's no longer an accessible ramp.

Speaker 8 (01:00:39–01:00:56)

It's still accessible. The stairs come off the side of the ramp. Also, that stair that's coming down has a landing, so that landing potentially goes into seating areas that's kind of on the landscape.

Speaker 10 (01:00:57–01:00:58)

We'll see a plan at some point.

Speaker 8 (01:00:58–01:01:34)

Yeah, at some point. But just keep in mind that this was only for design work and stuff. I said, listen, same thing. Let's be smart and plan for this first before you go in and just say, hey, we're going to spend however x amount of money while you're doing this first phase.

Do the planning for it. And more importantly, it's also the engineering. So it's like survey and the geotechnical engineering for that as well. And then Milton softball has a group, like they said, we'll put 10,000 in the parks department, we'll put 10,000.

So they're looking for, we're looking for 30,000. That's it.

Speaker 1 (01:01:36–01:02:10)

Questions? Thank you for adding that. Yeah, it is a plan. Yeah, it's a design work.

Yeah, exactly. Okay, any questions? All right. We are at Steve and the Olmstead Landscape Assessments.

We're supposed to be at 8.30 and it's 8 o'clock. We're doing good.

Speaker 10 (01:02:10–01:02:15)

There's no A in Olmstead. There's no what? A in Olmstead.

Speaker 8 (01:02:16–01:02:18)

The landscape architect knows enough.

Speaker 1 (01:02:18–01:02:27)

Oh, on the agenda. on the agenda. Oh, it was. That was my mistake.

Speaker 13 (01:02:31–01:04:44)

Right. Milton Historical Commission proposes to undertake an inventory of projects planned by or designed by the Olmsted firm. I think everybody knows the Olmsted Landscape Firm, Frederick Olmsted. And I think a lot of people don't know that he was active in Milton.

Besides its work for the Metropolitan Parks Commission, now DCR, Blue Hills Reservation, the Ponsonet Reservation, the Ponsonet Valley Parkway, and Blue Hills Parkway, all of which properties have extensive records in which are listed on the National Register. The review of the firm's records in finds 18 project numbers assigned to work in Milton, including three for the town, two other public projects, two semi-public, and 11 private. The study would include a review of records to determine the extent of each project, what was actually implemented, try to ID current owners and seek their awareness of the projects and their history, and locate any records of planning, design, or changes over time, and where possible, visit and document existing conditions. A report would be prepared to summarize the findings and make recommendations that could be used to preserve, protect, and restore these landscapes and help to understand the legacy of the importance of these landscapes in Milton.

We intend to engage landscape architect Peter Jackson to undertake this study, which may be really an outgrowth of his previous study of the Pine Grove and landscape at Winter Valley. Mr. Jackson estimates that this project report and presentation will take approximately 1,000 hours and incurred between $500 and $1,000 in direct costs for obtaining documents, printing images, creating the report, and public presentation. This is a somewhat nominal sum for a project of this sort.

Mr. Jackson has indicated that the difference between this amount and the realistic cost of the project would be a donation for the community benefit. I thought you were retired. Yeah.

Speaker 8 (01:04:47–01:04:49)

He just can't help himself.

Speaker 13 (01:04:53–01:05:47)

I took the tour of Winter Valley with Marita and Peter, and I was impressed with what I found there. I mean, the sunken garden, the pond, the grove, the whole thing. Who knew about it? Marita probably did.

But who knew about it? Well, who knows about what else is in town, perhaps not preserved to that extent? I'm sure that some of them have disappeared because of development, but it would be really nice to determine who, when, why, and what, and how. And, you know, we just heard a lot about conservation and open space.

You know, maybe this is part of a homestead landscape that would be out of a conservation researcher. I don't know. But until somebody looks, we don't know.

Speaker 2 (01:05:48–01:05:53)

So of the 18, how many do you think are still in existence?

Speaker 13 (01:05:54–01:06:12)

Well, I can think of one in particular that I know is gone, and that's the white property on Brescia Road, which is now Beach Lane, Beach Street. It was Charles White's estate.

Speaker 10 (01:06:12–01:06:18)

I know that's gone. Whether there are remnants around on the property, I don't know.

Speaker 8 (01:06:18–01:06:20)

I'll go look.

Speaker 10 (01:06:20–01:06:21)

I'll go look tonight.

Speaker 13 (01:06:22–01:08:12)

And the only reason I know that is there was an issue when the house that was there had a fire wanting to be demolished. And one of the items that came up in research is that it was an Olmsted designed property. Landscape had been allowed to deteriorate, but Mr. White was said to have brought in specimen trees from other parts of the world to landscape the property.

So, you know, okay, it's a five acre process property. The developer wanted to build five houses. Well, can't we do something other than that? So we know that, or at least as far as I know, that was totally lost because of the development.

The others, if you look at the names that show up in the Olmstead files is Wiggleworth, Russell, Slater, Kennedy, Brooks, Kimball, Whitney, which would be Winter Valley, Cobb, Forbes Estate, Milton Women's Club, the Elliott Street School. The Elliott Street School was never built. That's the playground on Elliott Street. The land was purchased for a school.

The school was never built. It was turned into a playground. Milton Parks, Civil War Memorial, Town Hall, Elliott Memorial Bridge, Milton Central Station. I don't know what…

The train station. So, I mean, these are the… Now, this is right on the…

Speaker 3 (01:08:14–01:08:23)

Yes, all set records. All right, questions for Steve? All right.

Speaker 8 (01:08:24–01:08:47)

So I guess one question would be if this is, if some of these pieces are private land, right, they're privately owned. Is this for like inventorying this in a study basically to see what's available in here? Okay, so then. Yeah, right.

Is that right? Basically, it's basically like what Pete did for the last time, right?

Speaker 13 (01:08:47–01:08:48)

Essentially, yeah.

Speaker 8 (01:08:48–01:08:58)

Yeah. Right. Okay. But there's also pieces of this that potentially are town owned or.

Corrupt. Or. We don't know what we don't know.

Speaker 1 (01:08:58–01:09:05)

We don't know. So, yeah. So, there could be action items. from that assessment.

Speaker 10 (01:09:05–01:09:21)

I guess even if there aren't action items or something's been lost, you know, creating a historical record that collects the historical plans and what it was and it's part of the legacy of Milton, that would be nice to recognize.

Speaker 13 (01:09:21–01:09:26)

Right. I mean, we try to document houses that have been lost.

Speaker 12 (01:09:27–01:09:27)

Yeah.

Speaker 13 (01:09:27–01:09:35)

This is an opportunity to try to document landscape that's been lost as well as landscapes that still survive.

Speaker 5 (01:09:36–01:10:22)

All right, Wendy. Pete, not that I want to expand your scope of work that already you would be donating significant time for, but I do think it's worth noting in some capacity that Olmsted was also a teacher to many other landscape architects of significance here in town, including Fletcher Steel, for example, the Fletcher Steel Gardens, which we've funded the… So if it's possible to somehow document Olmstead once removed, that would be… Olmstead, et cetera.

Speaker 10 (01:10:22–01:11:01)

A big part of it would be to outline the legacy of the Olmstead firm and many, many because the firm was in existence until 1980. And, you know, so some of the things that are called Olmsted Landscapes, they're certainly not Frederick Olmsted or his stepson, John Charles, or his son, Frederick Jr., but there's a whole cadre of landscape architects who've worked all over the country that descend from that firm. And so I think writing some of the history of that firm to give background and recognition It could be a good one.

Speaker 4 (01:11:02–01:11:05)

Was the woman who did the garden, that thing, will we be on?

Speaker 8 (01:11:06–01:11:10)

Yeah, the Shipley, was she? Ellen did 11.

Speaker 10 (01:11:11–01:11:19)

Yeah, Shipley. Yeah, I don't know. I don't think that, I don't know that she was.

Speaker 13 (01:11:20–01:11:30)

We looked into that during the whole hearing situation. Yeah. And I believe it's, we didn't see any of them on the show.

Speaker 8 (01:11:30–01:11:33)

Hopefully that part's being saved, all that stuff.

Speaker 13 (01:11:33–01:11:45)

That is fenced off. Now, of course, nothing's been done to it, and I suspect it's very much overgrown. But it is fenced off as best as can be seen from outside.

Speaker 1 (01:11:46–01:12:31)

Yeah. OK. Great. Thank you for that.

And yeah, so let me just wrap this up by saying that we We saw five projects last week, or heard from five projects last week, six this week. Is that it? No, no. And that means we have 10.

I tried my best to smooth this out so that it would be roughly even, but more people opted for the July 6. And obviously, we have more. Were you here for a pilot? She's not.

Interested resident.

Speaker 4 (01:12:32–01:12:34)

Potential volunteer. Yeah.

Speaker 1 (01:12:36–01:14:15)

So let me just, so we are, we will have, just to summarize, the Milton Landing Boathouse presentation next week, and not next week, July 6th. The Brooksfield LED lighting the Mary C. Lane Safety and Field Improvements, the Winter Valley Solar Lighting, the Affordable Housing Trust, the Atherton Street Fire Station, the Blue Hill Parkway Historic Markers, that's a Joe Mondagno proposal, the Milton Lockup Slate Roof Repairs, the Forbes House Plant House, and shed, and the one that's coming from the town is the monuments and historic markers restoration. There's a little bit of work potentially with the Joe Mondoneo and the town project, both talking about monuments and historic markers.

But that's the 10 we will have. And I believe with the one withdrawn project, we will have seen 21 projects. Once we meet, you know, the last three meetings. So, so stay, stay tuned for a later night.

Since we can't, we can't get through 10 projects in. Yeah. I mean, that's not that bad.

Speaker 8 (01:14:15–01:14:16)

It's only eight.

Speaker 1 (01:14:16–01:15:25)

Yeah, no, it'll be like, yeah, I wanted this one to have a couple more and I tried my best, but. Some of those are pretty complicated, but we'll just, yeah, we'll do our best. I'm scheduling, I put in the tentative agenda with the town administrator and I scheduled a few of them like Atherton up top and gave them 15 minutes. And then some of the others that I think are shorter gave them just 10 minutes.

So I'm trying to manage the time a little bit more. So the last two things on the agenda are approval of the June 8th, 26 minutes distributed via email. Do I hear a motion to approve? A second?

Second. I have to do a roll. Dan? Aye.

Steve? Yes. Robbyn? Dan, do you want to say something?

Yes. Yeah. Okay, again, Kathleen? Abstain.

You're abstaining. Rob? Yes. Yes, and Al?

Speaker 14 (01:15:25–01:15:26)

Yes.

Speaker 1 (01:15:27–01:17:35)

Okay, all right, so we have Seth and Tom, yes, so seven in favor, two abstentions, and thank you for that. And then update and introduce. Pete's NMI were able to do interviews for the administrative, the CPC, clerk, or I forgot exactly what we called it in the job description, but the administrative clerk position on Friday of this week, or last week, rather. I've been in touch with Carla.

I'm not sure how to pronounce Carla's last name, Fee, the poor Fee. But been in touch with her. She is the director of HR for the town. She is going to follow up.

Um, with the candidates and ask for references and, um, and try to facilitate this moving very quickly. Um, is, uh, the good news I got from Carla, uh, just, um, just actually before this meeting. So, um, so we do, um, we have, I think, two great conversations, uh, with town residents and, um, um, hopefully we can move quickly to, right, Jenny? to bring this person on board.

As I see her minutes there for the next meeting. I think Pete and I were, I don't want to mention any names because privacy and stuff like that, but I think we were very pleased with the conversations we had. Hopefully we'll have some news at the next meeting I don't know how quickly the town can do. I don't know if we'll have somebody employed by the next meeting, but we would hopefully have an offer and an acceptance.

And yeah, if that whole mechanism can happen quickly, maybe we could have somebody under contract. So anyways, that's the progress report.

Speaker 8 (01:17:39–01:17:43)

well, that will also be hybrid if we want, if we're traveling.

Speaker 1 (01:17:43–01:17:54)

Correct, yeah. It will be hybrid, like all of our meetings have been, and it will be here for those that are in person, but I think they've already reserved this room for us.

Speaker 8 (01:17:55–01:18:00)

I may be out in the ocean somewhere, so if I have an internet connection, I will try to go in.

Speaker 4 (01:18:02–01:18:06)

Okay, great. I will not be at the next one. I have a dress rehearsal.

Speaker 1 (01:18:07–01:18:07)

Okay.

Speaker 4 (01:18:08–01:18:10)

or a concert on July 11th.

Speaker 1 (01:18:10–01:18:40)

Oh, you were asking about the July 20th. Oh, so when's the… So there's two meetings scheduled. July 6th is the meeting that I just mentioned that will have all the applicants come in, and July 20th will be our deliberation meeting.

Just on eligibility. Oh, just on eligibility. It's pretty easy, yeah. The only ones I actually have a question about are the historic markers.

restoration. I'm not sure that I'm not 100% sure that's all.

Speaker 8 (01:18:41–01:18:47)

But this boat house thing, is that eligible? It can't be eligible.

Speaker 1 (01:18:47–01:18:51)

I think, well, yeah, it could be. And that's another question. Yeah. Yeah.

Speaker 9 (01:18:52–01:18:52)

Yeah.

Speaker 1 (01:18:52–01:18:59)

So. All right. So anything else? Any other questions?

Speaker 2 (01:18:59–01:19:04)

Was there any follow up about the Joe Kane from last year?

Speaker 1 (01:19:04–01:19:17)

Yes, Joe has actually, thank you. Joe has sent me documentation that I need to distribute to the committee. So I will do that. What's that?

Speaker 14 (01:19:17–01:19:37)

I just wanted to touch on right. Tucker elementary came to us about the playground and we know that sometime in early July, we have to have articles ready for town fall meeting. Did you have any conversations with Nick about that, Tom?

Speaker 1 (01:19:39–01:20:45)

I haven't yet, so I will do that. I will also put on the agenda for July 6 discussion in July 6. I think we have, so depending on what Nick, if it really is, I mean, that will both be for the fire station and potentially for Tucker. We may have to vote on a warrant article for both of those projects if that is the community's desire.

So we don't want to miss it just because of a tiny issue. I think that's the only other way. It is a discussion upon those two projects. No, but Atherton, yes, the bond.

But what about the Tucker? Tucker is asking us to fast forward the application. Because Tucker has this unique thing that they can only do the work in the summer.

Speaker 9 (01:20:45–01:20:46)

In the summer, right.

Speaker 1 (01:20:46–01:21:25)

And Nick is, the town is saying you can only go forward with the preliminary contracting if we know you have all the funds secured. The only way to know the funds are secured, it would be for a town meeting vote. So Tucker is asking us for the first time ever, although it would be the second time ever, is the afternoon, to have an article on fall town meeting approving funding for that project. So it's a unique request.

Speaker 8 (01:21:27–01:21:32)

But what I'm trying to get, That would be funded in July, right?

Speaker 1 (01:21:32–01:21:42)

They still would only get the money in July, but they would have the approval. They would have this. Are you sure about that?

Speaker 2 (01:21:43–01:21:45)

Um, well, July 27.

Speaker 1 (01:21:45–01:21:54)

Yeah, yeah, yeah. That's not an issue for them. The fact that money came in in July 27, they told me that.

Speaker 4 (01:21:54–01:22:06)

I mean, normally when when we do this and we do it in a meeting in October, We're doing it for this year to fund it out of this year's money. So I don't understand why.

Speaker 1 (01:22:06–01:22:16)

I don't understand. It's the same reason why the funds are not available. When town meeting approves it in May.

Speaker 4 (01:22:16–01:22:18)

Oh, no, no. I get that part.

Speaker 1 (01:22:18–01:22:20)

It's the same.

Speaker 4 (01:22:20–01:22:31)

I know, but normally when I do a meeting in October, beyond it, and it's in the current fiscal year, I'm voting the money out of this year's fiscal year, money.

Speaker 10 (01:22:32–01:22:38)

We don't have that money. We've already committed the money.

Speaker 8 (01:22:40–01:23:31)

I know it's a bit early, but here's the issue, right? If A, we'd be going at a sequence with all these other applications. So here, that's a big jump to say, hey, we're going to commit X amount of money before anything else. It would be, or early before, like it's not that many months early.

The other bigger issue is this is absolutely a public bid job. And they, and from what I've heard- And that's why they need the lead time. Yeah, but this being said, this, they're also asking us, this is a one and a half million dollar project. They've done a great job of fundraising, but there's still a big gap.

And before you go out to go get public money, from what I've heard is that Nick has always said that the money all the money needs to be there to go out to bid. So there's still a big gap even without the planning.

Speaker 1 (01:23:31–01:23:53)

I agree. And that's why Nick is coming for multiple projects. He is going to be talking about the Atherton Street fire station. He's going to be talking about the monuments and historic markers restoration and the Milton lockup.

But he's also going to be speaking to the Tucker project and answering questions of

Speaker 10 (01:23:54–01:23:59)

Is he presenting Atherton or is the fire station building committee?

Speaker 1 (01:23:59–01:24:11)

I don't know. Nick is definitely going to be here. I have not gotten any response from emails to the fire station.

Speaker 10 (01:24:11–01:24:45)

I believe the application, Nick was the person who filed the application for Atherton. the decision on the Atherton Street Fire Station would likely take at least the two hours that we've got on the day. Seriously. So we can't see 10 applicants and then go through the discussion about bonding $3 million.

That's a big. The questions I've got about Atherton Street.

Speaker 4 (01:24:46–01:24:48)

Well, we already know, I mean, we know it's eligible.

Speaker 1 (01:24:49–01:25:03)

Yeah, I mean, so why don't you say it's eligible this time. But Hal's question about Tucker also applies to Etherton. We're going to have to have, the town's going to want to have a warrant article. Right.

Speaker 10 (01:25:04–01:25:09)

We feel that it's possible. I don't think it's possible.

Speaker 1 (01:25:09–01:25:14)

So I'll try to talk to Nick tomorrow about all of this timing issue.

Speaker 14 (01:25:15–01:25:22)

And Tom, others obviously know more than I do, but I was told that you could have a placeholder article for that July 7th.

Speaker 8 (01:25:22–01:25:45)

I don't know what that actually means, but you can. But my big issue with that, which probably is similar to yours, is and we're just picking $3 million out of a hat. Where's the details for this for an October to be ready? Does this construction company, we're taking a lot of liability to say, hey, let's just put the bottom $3 million.

I have no idea what that $3 million buys.

Speaker 10 (01:25:45–01:25:57)

And the $3 million has got to be specifically related to historic preservation. And so all the elements have to qualify and be done consistent with the Secretary's plan.

Speaker 8 (01:25:57–01:25:58)

I just don't know if it's going to get done by October.

Speaker 1 (01:25:59–01:26:21)

Well, that's why Nick is coming. If people have bumped into Brian, they can purge him to attend as well. I think that would be good. But Steve is right.

And the application did come from Nick's office.

Speaker 8 (01:26:22–01:26:25)

It came from Nick's office. And not the fire building.

Speaker 4 (01:26:26–01:26:32)

Well, I think it's probably more appropriate to come from, I mean, the town's building. Yeah, sure.

Speaker 1 (01:26:33–01:27:38)

Yeah. All right. So I want to since this wasn't on the agenda, I think this is a good conversation, but I don't want to get too deep into it. But so I will reach out to Nick tomorrow morning and try to get some clarity on the timing.

I think the place, Al, to your point, the placeholder just means there's a number, you know, warrant article 16 is for the fire station, you know, for Atherton Street or for Tucker School or for, and it doesn't really have any content. And the content is to be filled in by a green sheet or purple sheet or whatever color sheet it is at town meeting, sometimes before town meeting, obviously, but so let's, yeah. So the town also has a history of, you know, giving early deadlines for worn articles and, um, and those deadlines slip a little bit. So, um, so there might be some flexibility that would be consistent with our July 20th meeting too.

Speaker 8 (01:27:39–01:27:44)

So, but I mean, I guess the other question for that one is what's the urgency on that one?

Speaker 1 (01:27:45–01:28:03)

Or is like, they're going to the ballot for the whole, the whole bonding. Yeah. Okay. So, it will be proposed.

Yeah. Yeah. So, yeah, so some issues we have to deal with in our lunch.

Speaker 8 (01:28:04–01:28:25)

But to your point, though, if there's 10 applicants. Should we, should you just, like, those, those 3 projects alone, right? Just talk around this 1 is bonding. 1 is bonding and those 2 projects are going to take 2 hours to Tucker already went.

Tucker's done. I'm already done. Yeah. No, Nick is going to speak to that.

Speaker 1 (01:28:25–01:29:36)

He's going to speak to some of the timing and the specific timing issues that he has instructed the Tucker PTO about. The reason they're asking for this is because of Nick's advice. When they sat down with Nick, Nick basically said, well, you need then CPC approval in a fall time meeting, as opposed to, they didn't just dream up this idea, it has come from depth, is my understanding. So, yeah.

So Nick is going to be key to add to that July 6th meeting, obviously, and have a conversation with him. Again, we're only accepting Federal's warrant articles, we're only deciding that eligibility, And I think the placeholder gives us an out if there is a strict deadline where, so the Podana, Tucker, Podana, and if they have to get built. and if they get told, they get told, or if they get told.

Speaker 8 (01:29:36–01:30:16)

Question for, like, procedure-wise, because we have this two-step process, is it something, if we're gonna go do this, right, is this like, okay, this is really easy, the eligibility, but if we have these early projects, like we're proposing, should the committee propose that if you're going to an October time meeting, which, because it's pretty simple, it's usually October or May, if we're doing October, if the eligibility time period is here, If you want to go to something earlier, should the committee consider an earlier final submittal? You need to be in by a certain amount so that we can review that for a certain amount.

Speaker 1 (01:30:16–01:31:30)

Yeah, I think you're great. It's a good question, and I think it raises a number of issues. I think what I told the Tucker BVO folks is what they, I mean, this is not on them, but What the committee has to realize is this sets a precedent that we could anticipate other projects doing getting in line or trying to do the same thing. Now, Tucker has, we'll evaluate what Nick has to say, but Tucker has a particularly compelling timeline piece, I think.

to be made. Now, it's up to the committee to decide on whether it's compelling enough. But they do have a unique set of circumstances where it's a school playground. Reconstruction of that playground during school year would not be feasible, it seems to me.

The public bid process means it's got to start early enough so that they can be ready to go the day school ends. All these moving parts, at least when I sat with them, seemed unique and compelling, but not to say somebody else couldn't come up with a unique and compelling set of circumstances.

Speaker 10 (01:31:30–01:31:39)

But if on the 6th we find them eligible, when are they going to submit their full proposals for us to accept and fund the proposals?

Speaker 8 (01:31:39–01:32:06)

I will say that for them, they are getting out early. They came before our parks committee, and I said, hey, let's, don't come back to us, let's vote for support. So they do have full support from the PAR Committee. They have really, yeah, they're ready.

I mean, they have plans almost ready. So in their, you know, but it's not an insignificant amount of money. All right.

Speaker 1 (01:32:06–01:32:19)

I will entertain a motion to adjourn. So moved. Second. And then we will take a roll call.

Jenny? Yes. Pete? Yes.

Rob? Yes. Andrew? Yes.

Steve? Yes. Kathleen? Yes.

Speaker 2 (01:32:19–01:32:19)

Yes.

Speaker 1 (01:32:21–01:32:21)

Rob.

Speaker 2 (01:32:21–01:32:22)

Yes.

Speaker 1 (01:32:23–01:32:34)

All right. And Tom. Yes. Thank you, everybody.

Perfect tenants. And we will see you July 6th. Thanks, everyone.

Speaker 15 (01:32:35–01:32:35)

Thanks.