Good evening, and welcome to the 43rd meeting of fiscal year 2025 of the Milton Planning Board. At this time, I would like to now call the meeting to order. We are all on Zoom this evening, so we'll begin by introductions of ourselves. If we would like to go around, let's see.
We can start with Sean.
Speaker 2 (07:13–07:14)
Sean Fahey, member.
Speaker 3 (07:15–07:17)
Jim. Jim Davis, member.
Speaker 4 (07:18–07:21)
Cheryl. Cheryl to guy a secretary.
Speaker 1 (07:22–07:22)
And Maggie.
Speaker 4 (07:23–07:24)
Thank you feel the member.
Speaker 1 (07:25–08:16)
And myself serving as chair and our staff this evening we have Cheyenne. And Frazier's assistant director plan. And Cheyenne will be here for the first part of the meeting and then we have Julia. Thank you and welcome all.
The first item on our agenda tonight is the approval of minutes. And thank you for getting these all over. Have the members had a chance to take a look? They are from April 10th, April 24th, April 30th, May 5th and May 6th.
If everyone's good with those I would entertain a motion to approve.
Speaker 3 (08:18–08:26)
I'll make a motion to approve the minutes from April 10th 24th 30th May 5th.
Speaker 5 (08:27–08:28)
And 6. Is there a second.
Speaker 3 (08:29–08:30)
Well second.
Speaker 5 (08:31–08:34)
Sorry Jim can you clarify as amended.
Speaker 3 (08:36–08:36)
Yes as amended.
Speaker 5 (08:37–08:37)
Thank you.
Speaker 1 (08:40–08:44)
Great. Okay, so we'll do a roll call since we're all on Zoom. Jim?
Speaker 3 (08:44–08:45)
Yes.
Speaker 1 (08:46–08:50)
Maggie? Yes. Cheryl? Yes.
Sean?
Speaker 2 (08:50–08:51)
Yes.
Speaker 1 (08:51–09:18)
And myself? Yes. Great. Thank you.
And we now have our our upcoming. Next states for our meeting will be we have next Thursday, a regular scheduled meeting is May 22nd and then we also with our following meeting would be June 5th is actually June to June 5th or June 12th. Double check that.
Speaker 3 (09:20–09:22)
Two weeks from the 22nd would be the 5th.
Speaker 5 (09:23–09:27)
That's what I had. Okay, the 5th. But it's usually the 2nd and 4th Thursdays of the month.
Speaker 1 (09:29–09:56)
Okay. Right, that's why I think I was… I think it… Yeah, so it's actually the 12th.
That's why I just… It's the 12th. Yep, yep. Okay, great.
So those will be our next meeting dates. And then, let's see, do we have any… Any other items, Cheyenne, that you would like to discuss?
Speaker 6 (09:58–10:14)
Just the main item is our town meeting articles for June. Those will have to be decided on tonight, sent in to the select board so that we can get everything done in time for the warrant. Great. Thank you.
Speaker 7 (10:15–10:24)
Good, so there's a Mylar here for Pine Gardens that needs to be signed. Just a reminder.
Speaker 1 (10:25–11:18)
Thank you. I think three people have signed and just we're missing two signatures, so whenever people can get a chance to stop in Town Hall, they're on the file cabinet. Thanks, Julia, for that reminder. So is that it, Cheyenne?
Yes, that was our one and all. Yeah, great. So the next, we can now move to our citizen speak. And if anyone would like to speak, you can please raise your hand and we will welcome you, introduce you and welcome you.
And there's one hand up from the attendees. Oh, there's a couple. Okay. First, we had Karen Friedman-Hanna.
Oh, you just muted yourself.
Speaker 8 (11:19–13:10)
I just unmuted. Can you hear me? Yes. OK.
Hi, I'm Karen Friedman-Hanna, town meeting member, Precinct 2. I live at 3 Norway Road. And I wanted to thank all of you for doing a really wonderful job, especially Cheryl Tagayas, for putting together the 25% plan. I am really, really hopeful that you will submit that plan.
And also the discussion that's going to be taking place regarding the new business down where the Bank of America building is down at the end of Elliott Street. I wanted to say that I support both plans. Well, I don't know what exactly what that plan is yet, but I support both concepts tremendously. I am very thankful that you're considering putting the 25% plan to us at town meeting.
I will support it, I am hopeful. Some of my neighbors did raise, they were a little bit confused by the map, the way that it shows, it says delete Elliott East and delete Elliott West. And I'm hoping that when you're in discussion, I'll be able to have a better understanding about that, of whether it still encompasses the areas that are within those red markings, the red outline or not. A few people were confused by it when I sent out information about it.
So I'm hoping that that can be clarified. But again, thank you so much. I am very hopeful that you will be submitting the 25% plan and that the Select Board will accept it and the Warren Committee will recommend it. Thank you so much.
Speaker 1 (13:11–13:15)
Thank you. And next, we have Meg's iPhone.
Speaker 9 (13:22–15:04)
Okay, hi. Can everyone hear me? Yes. Okay, wonderful.
Yes, kind of echoing what Karen just said, I want to thank the planning board for the tremendous job that you all have done. I know that this really has been a challenging task. So I'm calling in from Geofield from a softball game. So I'm a little, dogs are barking, kids are playing, but I just would like to say two things this evening.
I am in support of the 10% compliance plan. I feel really strongly that Milton was miscategorized. I am pro-development. I am pro-affordable housing.
But unfortunately, as we've seen, sometimes things get mislabeled. And I really feel like this is a strong example of that. I also want to say that I am also in huge support of the new project that will potentially go into the old Bank of America. I think this is a tremendous step forward.
for Milton and for this area. So I appreciate the thoughtfulness around that as well. Thank you so much for your time. And I'm going to try and mute myself again.
Thank you. Before you mute yourself, could you give me your last name and your address, please? Oh, sure. Yes, yes, yes.
Sorry. My name is Meg Meropol, and I live at 45 Avalon Road. Thank you. You're so welcome.
Thank you so much. Great.
Speaker 1 (15:05–15:07)
Thank you, Meg. Next, we have Matt Morong.
Speaker 10 (15:10–15:11)
Good evening. Can you hear me?
Speaker 1 (15:12–15:13)
Yes. Welcome, Matt.
Speaker 10 (15:13–17:27)
All right. Thank you. My name is Matt Morong at 136 Elliott Street. I think like everybody, I'm going to address two items, both the MBTA zoning and the proposal to Elliott Street.
To start really quickly, With MBTA zoning, first I want to share my sincere gratitude for advancing the 25% plan for consideration by town meeting. It's clear that many members of this board aren't necessarily in favor of this magnitude of zoning for our town. That said, I'm grateful that despite this, and in spite of all the difficulty we've had as a community reaching this point, you were able to advance this to the select board. I appreciate that you've left this option open, since it is currently the only legal option that we have.
I know that there are efforts to change that, but until that happens, and it seems that those efforts have no traction so far, this is it. Moreover, this is the only option that acknowledges the reality that we live in. We are a town served by rapid transit by the trolley that I use every time that I go to my office in the city. And we are in the midst of a housing crisis that shows no sign of slowing down.
So, thank you, sincere thank you for your hard work on this. The only option that I see as reasonable, and that we move ahead toward a resolution of this matter. To switch gears, I also want to throw my support behind the development proposal for 2 Elliott Street that's in front of you tonight. I'm a close neighbor of Steel and Rye.
It is unquestionably one of the best things about living on my end of Elliott Street. When my wife and I looked at our house at first, the Steel and Rye's location and the trolley were the two things that really sold us on this location as the best one in Milton. Steel and Rye has not only been a great restaurant with excellent coffee and baked goods and service, but it embodies the character of what I would hope for every gathering place in this town. It's a place to spontaneously run into neighbors.
It's a comfortable and welcoming place to work when I need a change of scenery. And it's a place to take family and friends from out of town to introduce them to Milton. Dan and his staff have created an institution that enhances our neighborhood. And I'm confident that they will continue this with their new market.
So I can't think of better people to continue to develop our district. And I'm really happy that they're interested in increasing their investment in our community. So thank you very much.
Speaker 1 (17:29–17:32)
Thank you. Next, we had Brian O'Halloran.
Speaker 11 (17:38–19:42)
Yes, hi. Good evening. My name is Brian O'Halloran, 7 Morton Terrace, Precinct 3. Milton's transit categorization by EOHLC and the MBTA should be based on analysis of the existing physical characteristics and operational ability of the Mattapan line, as well as the detailed comparison of the Mattapan line to other transit systems within the MBTA network.
It is abundantly clear that Milton's classification as a rapid transit community, the EOIHLC's MBTA Community Act guideline failed to account for the unique qualities of the MATAPAD line to distinguish it from the rest of the MBTA and rapid transit systems and should therefore be classified as an adjacent community. We now know by the MBTA's own admission that Mattapan High Speed Line was never converted to rapid transit. Mattapan Line remains a highly unique detached suburban trolley system, essentially untouched from when it opened in the 1920s. It should not be considered rapid transit.
The Mattapan Trolley Service is distinctly dissimilar and operationally inferior to Rapid Transit. The historic Mattapan-Ashmont Trolley operates on a short, self-contained, stand-alone route with its own two termini and eight trolley stops. spanning a short distance of a little over two miles in Milton, Dorchester, and Mattapan, with no direct access to Boston, and operates as a bus line on railroad tracks. In summary, reclassification will ensure that Milton, its transit riders, and all residents are treated fairly and equitably.
Please support a 10% plan. Thank you.
Speaker 1 (19:44–19:55)
Great. Thank you, Brian. And we have a phone number ending in 011. Next.
And you're muted.
Speaker 12 (19:56–20:05)
Hi. Hello, Meredith. Hi. Yes.
Hello. Good afternoon. It's Mark Crystal calling. Hello to you and the board.
Speaker 1 (20:06–20:09)
Hello, welcome. You can state your address for the record, Mark.
Speaker 12 (20:10–22:11)
Of course, 17 Waldo Road. I would like to thank the board for your tireless effort, and for your commitment in putting forth a 10% zoning plan for Milton. Contrary to what some have implied, Milton has not lost its case in court. The case brought before the SJC had nothing to do with correcting an unjust, punitive, sloppily assigned, faulty classification.
A court challenge for reclassification of the Mattapan Trolley is most credible at this time, considering HLC's inability or unwillingness perhaps to address our long-standing concerns. The fact that the SJC called HLC out for not having properly promulgated their own regulations is extremely telling. First, consider that HLC has failed to recognize the operational inferiority of the Mattapin trolley. The trolley is a single vessel with limited carrying capacity and has no ability to transport even one passenger downtown.
Also consider that HLC has failed to recognize that Ashmont is the rapid transit terminus. That is indisputable. The trolley sits entirely beyond that terminus and it only feeds into it just like a bus. And also consider that HLC has ignored the MBTA Board of Directors acknowledged abandonment of their very plans to convert the Mattapan trolley to rapid transit, giving no consideration to all the transit related material changes that would have resulted.
How much more time are you willing to give a Chelsea to responsibly step up and do the right thing. Letting the clock run out and hoping to force milk and it can be to comply to a plan that lacks 40 is simply too much and without basis. Worse yet it buys like a Chelsea and out for all the reasons stated I cannot endorse the 25% plan. But I am strongly supportive of moving forward to achieve a fair and equitable 10% plans adoption.
Thank you for all you do.
Speaker 7 (22:13–22:19)
Thank you very much. Are you still there? Could you give me your last name, please?
Speaker 12 (22:20–22:23)
Sure. Christelle, spelled C-H-R-I-S-T-L.
Speaker 9 (22:24–22:25)
OK, thank you.
Speaker 12 (22:26–22:26)
You're welcome.
Speaker 1 (22:29–22:30)
Great, thank you. And next we have Katie Willett.
Speaker 13 (22:35–23:31)
This is actually Carolyn Cahill, 40 Essex Road, Precinct 1. Welcome, Carolyn. I'm actually here tonight to first and foremost express my sincere support for the 2 Elliott Street redevelopment of the former Bank of America. Steele and Rye has become a community gathering spot and has completely immersed itself into our community.
This has been a welcome addition considering Our very first official restaurant in Milton came in 2009, not that long ago. I hope the planning board works with the developer and the owner of Steel and Rye to put together what's best for our town, which everything I'm seeing so far looks like it's doing that. So that's all I wanted to say. I appreciate it.
Thank you.
Speaker 1 (23:32–23:36)
Thank you very much, Carolyn. Okay, next we have Doug Hein.
Speaker 14 (23:41–25:53)
Good evening, Doug Hein, 453 Elliott Precinct 2, also a town meeting member. I wanted to first and foremost thank you all for your efforts to put forth both a 10 percent plan and a 25 percent plan. And I really thought about the board meeting last week a lot over the past few days. And the more I thought about it, the more I was just really I think impressed and grateful at the actions that the board took because I know it wasn't easy and I think it's some on some level maybe was the meeting with HLC earlier in the day that kind of a sense of realism and that might not be the right word but I guess, you know, prudence, you know, really crept in and this is the best we can do.
And I think actually, Mr. Davis might have even made that comment when when voting for the 25 percent plan. But I wanted to thank you because I know it's difficult to do something that you don't want to do, but you have to do. And that really kind of speaks to me because it's, it's a lot of it, it covers a lot of the mixed emotions that I've had about the MBTA Communities Act for a number of years and I've hated to see kind of what this time has gone through.
of the last couple of years where we're really not acting neighborly toward one another. And I think your efforts last week went a long way toward healing the town. And by putting forward both a 10% and a 25% plan, you don't foreclose any options. You keep options open.
And I know that's been a common theme of this body over the past year. And I want to commend you for that. That to me, what you did last week in voting for a plan that maybe you don't like, but you knew was the right thing, that showed a lot of character. It showed a lot of character.
And I know you invest a lot of time in this, more so than I think any of us can ever imagine. And I wanted to thank you for your time, for your thoughtfulness, and for your character. I really appreciate that from the bottom of my heart. That's all I wanted to say.
Speaker 1 (25:55–26:09)
Thank you very much. Next, we have Jeff Goodman. Welcome, Jeff. If you can unmute yourself.
Speaker 15 (26:13–27:11)
Hi there. Sorry, Jeff Goodman, 599 Adams Street. Welcome, Jeff. Hi, welcome.
Thanks for having me. First off, I agree that I would much prefer to be in the 10%. However, I feel like that decision has been made for us and we need to stop fighting this and spending money that would be better spent in other ways. I also would like to thank the consultants who I think did a great job last week.
And even though a lot of this was coming down to the wire, I thought they showed a lot of patience and grace helping us come up with two different plans that hopefully gets us past this point in the town's history. I also agree with Carolyn Cahill that Seal and Rod has been an excellent addition to the town and I support their new venture. Thank you.
Speaker 1 (27:13–27:18)
Great. Thank you. Next, we have Kathleen O'Donnell.
Speaker 16 (27:22–31:10)
Thank you. Thank you very much, Kathleen O'Donnell at 12 Belcher Circle, Precinct 7. And I call in to, first of all, echo the appreciation that's been expressed by all the prior speakers for the hard work that you guys have done to address the concerns of my neighborhood in particular that were raised by the the former zoning article and that you've tried to move this along and, you know, in a way that sort of addresses the successful, the loss of case in this SJC and the sort of effort by everybody to sort of include more areas of town to reduce the impact in East Milton. But unlike some of the prior speakers, I would point out that we did lose the case at the SJC.
The law is legal. The AG can enforce it and the Commonwealth can refuse to give us grants. And that has an impact all across the town, not just in the areas that are affected by this overlay district. For example, grants that we are trying to get for improving the marshlands and the deposit probably won't be awarded if Milton's name appears on the application, so we've been told.
So it has an absolute impact on us already. And so I know that everybody has said that, you know, you've listened to the residents and all that sort of thing. But I would say that when this article for the 25 percent or the 10 percent goes forward, that you've only had one public forum. A lot of people don't understand what has changed from the last version we looked at a couple of years ago.
I would say that in advance of town meeting, I think the planning board and staff are really going to have to do a lot more about reaching out to townspeople to explain the differences. If you go forward with 25 or if you go forward with 10, people need to understand what is going on, and I don't think they do. but they think they maybe are looking at the same article they looked the last time. And so I think that's important to get a lot more outreach than has been done so far.
And I do express my concern with the idea of going for 10%, which we know is not legal. So we continue to violate the law. We continue to fail to get grants. We continue to lose money.
We could go back to court and address the issue of the reclassification of the MATAPAN line. But we spent $300,000 on that case the last time. And when that argument was raised by our counsel, the Supreme Judicial Court Chief Justice cut him off. So I don't see the point of going forward and spending another $300,000 on a case that would be better handled by addressing the continued negotiations with the Executive Office of Housing and Livable Communities instead of going to court.
Everyone knows if you're a litigator, I'm not, but I've always been told by litigators that that's the last thing you wanna do because it's an outcome you cannot control. Negotiations we can. And so I highly recommend you proceed with the original vote to do the 25% and to continue to negotiate the fine points of that 25% plan with HLC. And the 10% plan, as far as I'm concerned, is a non-starter.
People who have taken an oath to defend the Commonwealth of Massachusetts laws and that sort of thing should be following the law, not leading us down to continual violation. Thank you very much. Thank you.
Speaker 1 (31:10–31:23)
And we have two more, and then we'll have to, if you can be quick, we'll get both of you in, and then we're going to have to move on to our next subject. So I'm seeing, we have Helmunger.
Speaker 7 (31:29–31:33)
There's Liz Goodman. Oh, I thought she took her hand down.
Speaker 1 (31:33–31:36)
I'm sorry, Liz Goodman. Oh, that's okay.
Speaker 17 (31:37–32:59)
I just wanted to say, so I'm Liz Goodman. I live at 599 Adams Street in Precinct 7. I just wanted to echo what Kathleen O'Donnell said about pointing out that sort of people have this misunderstanding about what's going forward. And I noticed that last year, even during the vote, that People had a misunderstanding that if they voted to allow this to pass, then we were automatically going to have an extra thousand homes in town, whereas what we were just trying to vote for is to do the right thing by the law.
I felt there was a lot of miscommunication around that, especially living in Easton Square. I think we do need to, like she said, we need to stick with that original 25%. We need to actually do what the law is telling us that we have to do. There are ways to deal with it once we go past, but we can't continue to hemorrhage money to fight something that has been decided and every other town around us has decided that this is what we need to do.
I also want to express support for 2 Elliott Street. Steel and Rye is a great location. I think that business has done a wonderful job and I just think that area is also a great area. So that's my other, those are my other two cents.
Thank you very much. And Helmunger. Oh, sorry, go ahead.
Speaker 1 (32:59–33:05)
All right, that's all right, thank you. And Helmunger will be our last speaker for tonight because we will need to move on.
Speaker 18 (33:05–33:07)
Hello.
Speaker 1 (33:07–33:19)
A phone number before Helmunger. I think that's Mark Christo who spoke earlier. Okay, forgot to put his hand down. Sorry, okay.
Speaker 19 (33:19–33:19)
Hello, thank you.
Speaker 1 (33:19–33:20)
Yes.
Speaker 19 (33:21–34:08)
Hi, thank you for letting me speak. I wanted to echo some of the things that were said tonight and express my sincere thank you and gratitude and congratulations to the planning board, the town staff, and the various consultants that worked diligently over the last several years, especially over the last year to get us to this point. of a compliant 25% plan. And I look forward to the next steps where we bring this forward to the public and have robust and sometimes difficult conversations as we proceed to the town meeting in June, where hopefully we'll have a meeting and a conversation with the public that will get us over the finish line in compliance with the state.
Again, I just wanted to say thank you to the planning board. All the members have worked very hard, a lot of hours, and look forward to the next steps. Thank you.
Speaker 1 (34:09–36:18)
Great. Thank you. And we are we are excited that we will be hearing from to Elliott Street. But before we before we open that public hearing, I just felt like we needed to just discuss something as a board, which is which is critical because the select board is currently meeting.
Since our last meeting, and I think many of you who were at that meeting and know how hard we were working to do both a 10% and a 25%, I personally have been struggling with this decision, with the decision to send a 10 and 25%, particularly as Kathleen O'Donnell mentioned, that we have not even had a chance to offer a public forum for the 25%. for people to understand what impacts that would create. For many reasons, I am concerned and feel that really moving the 25 percent may be premature. As there are many uncertainties right now, including the restoration of Milton's reclassification and the unfunded mandate, I also felt that a lot of the board members that I was pushing for that 25, but that a lot of the board members felt uncomfortable voting for that.
Therefore, tonight I just wanted to provide the opportunity to open that discussion with our board and confirm whether we indeed do want to move that 25% forward. or do we want to, the 10% and the 25, or do we just want to move a 10% forward at this time? So I just would like to invite my fellow board members and understand how difficult this is for our board, and we understand the responsibility to do the right thing for the town. Cheryl, I see your hand up if you would like to go first.
Speaker 5 (36:20–38:09)
Yes, thank you. I think we have a responsibility and an obligation to move forward at least with a 25% plan. And I'm willing to go forward with both as a way to see what would happen between now and the Junetown meeting. I don't think we should deprive town meeting members who are elected to represent the entirety of our precincts of the opportunity to vote to become compliant and to become eligible again for grants that we are no longer eligible for.
It's not our decision to decide whether to pursue any legal actions. It's our responsibility to deliver zoning options. I know that people still believe and people are working on an opportunity that they think might exist with HLC for reclassification. I've pressed those of you who have been in meetings to be clear about what you've heard.
I don't think anything has been decided and given clear direction given back on your meetings and the results of the submission of that 10% option that we submitted to HLC. So I think we should proceed with submitting both the 10% and the 25%. And if we have some decisions before the Junetown meeting, then one of them can either be withdrawn or sent back or denied. And then we would have at least the option available to us to become compliant by the deadline of July 13th.
Speaker 1 (38:11–38:14)
Right, Cheryl. Thanks. I see Jim has his hand up.
Speaker 3 (38:16–40:42)
Yeah. Thanks, Meredith. I guess you're right. I have been thinking about this since our last vote.
And what's pushing me to rethink it is that I've heard that the Falcone Project in East Milton Square Because we've overlaid them with about 50 more units, they're thinking about adding more units. I didn't hear it directly from Falcone, but it might be a rumor. So if that happens, more units means more storage. You can only go up in that area on that parcel.
So I think if we do seven or eight, This goes through and we have seven or eight stores in East Milton Square. I think that would be devastating to East Milton. I think it would be devastating and set a dangerous precedent for Milton in general as a town. And I don't want that.
I put those units there thinking they would never be built. And if there's a chance that they're going to be built now, I think that's a risk I'm not worth, I don't personally don't wanna take. And I think the only way to remove that risk is to remove those additional units. So it leads me to kind of like my next point about this is that we're still tweaking districts, right?
Cheryl made some suggestions with the Fairmount area. Now, I think we should adjust East Milton Square. And then if what's true in East Milton Square may be true at 711 Randolph, right? I mean, who's to say they won't add a few more stories, units, whatever.
I think we have to go back and rethink that one. So I don't think the 25% plan is ready yet. I think it needs to be scrutinized a little bit more. And I think Kathleen O'Donnell might be right where we do need a lot more public input.
We should have at least one more forum. Even if we schedule it a week or two from now, we should have that. But we have a lot of work to do here. And I think it might've been a little premature And then we also need net new numbers before we vote on anything.
I think in the future, we kind of rushed that and skipped over that, but I really think we have to look at net new numbers and see what's going where as a true comparison. So that's where I am right now. I mean, I've got more, but I'll stop there.
Speaker 1 (40:45–40:54)
Maggie, I see your hand up. If you'd like to go. Are you muted?
Speaker 4 (40:54–43:44)
Sorry. As you know, I abstained from voting last week and I abstained because I didn't feel like I had enough information to take a position. And if I was feeling like I didn't have enough information, and I've spent three years in this chair, listening and talking with all of you guys, listening to the consultants, how could the public realistically understand and have enough information? I still don't have enough information even, you know, a few days later.
So I was hesitant to vote no last week. But if I have an opportunity again, I would vote no. And I didn't say this last week, but one of the reasons I, which is something that's really bothering me, is I do feel like during last week's citizens speak, a resident kind of was a bully and stated that if the planning board didn't put forth a 25% plan, then he would petition the select board to put forth a 25% plan. And I don't take kindly to bullies.
And I don't think that's a respectful thing to say to an elected board, especially a board who's been working on this for three years. And no good decision ever comes from a position of fear. And if a decision is made out of fear, then it can only lead, I think, to a negative outcome. And if this is gonna be the new reality, that residents in this town don't trust the work of the planning board, and they're just gonna hijack the process and go straight to the select board, then why do we need a planning board?
Like, why are we needed? Why waste all of our time if we're being threatened that our work has no value and no respect? So I'm a little annoyed at that.
Speaker 1 (43:45–43:52)
Maggie, let's just stay on the 10 and 25, because I want to let everyone have a chance to speak on that.
Speaker 4 (43:52–45:06)
And I appreciate your comments. I think we all support a 10%. I think I think we should move forward with the 10%. I don't think we actually voted to move a 10% plan forward to the select board in the Warren committee.
I I'm afraid following Jim's comments about the Falcone building, we all know that Falcone and Corcoran got $5 million, you know, an interest-free loan to proceed with their 40B. And the understanding is they're going to receive another $5 million from the state when they're a little bit further along in their, So I am afraid that they're going to take advantage. And we don't have any net new numbers. And if you're going to open up the discussion, if we should move a 25% forward, then I'm ready to be more definitive in my vote.
Thank you.
Speaker 1 (45:06–45:15)
Thank you. And I know Cheryl, you have your hand up. Sean, did you want to comment at this point or wait till after Cheryl?
Speaker 2 (45:16–45:22)
I'll wait till after Cheryl. I have some questions, but let Cheryl go, please.
Speaker 5 (45:23–47:43)
All right, Cheryl. I just wanted to mention a couple of things with respect to timeline and forums. right after the referendum over a year ago, I suggested to all of you that we should develop a very robust public engagement plan that we needed to make the public aware of what the Supreme Judicial Court's decision was and what we were going to do as a result of that decision. We spent $50,000 of taxpayer funds working with UTL for the last year plus.
We were working at a good pace through the summer until the fall when a resident advised many of you and tried to advise the board as council that we shouldn't be working on a 25% compliant plan at all until the SJC issued its decision. So the public forum that we had scheduled for November was canceled. or rescheduled until the middle of April. Then we didn't resume work with UTIL until after that Supreme Court decision in January.
And even all along, I've continued to say we needed to hold more public forums and we needed to have a realistic timeline. And so I take some of the comments about how we're at this time and we need more time. We've had ample time. We've had almost three years to work on this.
And we have worked on it. we should have had more public input, but we are up against yet another deadline that keeps us out of compliance. And we have a responsibility to use the next six weeks or whatever, however many weeks it is between now and June 16th town meeting to bring the public up to speed with where we are. And I don't think we should continue to continue to spend taxpayer dollars chasing plans that we know aren't going to work We have a plan that can be tweaked, but we have a plan that works, that has a lot of work that's gone into it, and I think we should move forward with it and let the voters at town meeting make a decision.
Speaker 20 (47:44–47:45)
Great.
Speaker 5 (47:45–47:46)
Thank you, Cheryl.
Speaker 20 (47:48–47:48)
Sean?
Speaker 2 (47:51–57:13)
Well, I am certainly struggling with this. I've struggled with it since our meeting last week. I think my point of view was pretty well outlined last week. And yet, when Cheryl proposed, I seconded.
So I certainly was advocating to support what Cheryl had in mind for the 25% plan. So that's a fact. But I am struggling with this. One of the things that I That plan has 1,526 units for the side of town that's essentially from the Milton Station area all the way over through Mattapan, 1,526 units.
It breaks down for 555 Elliott Street, you know that's the tears 123 Milton station East Western Bridge 609 units. and then Mattapan and Blue Hills, 362. So that's a total of 1,526 zoned units for that side of town. I think it's overwhelming, you know, that side of town and it's overwhelming our neighborhoods.
And the only reason we're overwhelming our neighborhoods and overwhelming that side of town is because we have something that I think is unjust and unfair and improper, and it's driven by the classification. I have very strong concerns for the negative impacts that many people in town can't see or don't see or maybe prefer not to see. I am aware of the expressed concern of a $300,000 case to litigate if it costs us that to litigate. But I think an awful lot of people are ignoring what the cost would be if we ever had 25% zoning and what happens to our town.
In the years ahead, I think $300,000 is will pale in comparison to what we will pay as a town. And I, you know, obviously, if we're paying it as a town, it's the taxpayers that are paying it. So I think the cost ahead is many, many, many multiples greater than the expense of pursuing classification. I do believe that a select board should pursue classification.
It's the opportunity, although a speaker earlier tonight said that we lost, we didn't lose. The fact is that there's been no ruling on classification. I said it last week, it has yet to be adjudicated. Nothing has changed with respect to the adjudication.
And that opportunity exists. And I would urge our select board to pursue adjudication and get to a conclusion if our classification has been fair and get there to the court system. We started in January of 24. talking with HLC or meeting with HLC.
So it's not that HLC is not aware of this, but HLC has done nothing to provide us relief from the 25%, nothing. And it appears to me that HLC is reluctant to do anything to provide relief to Milton. And the only way Milton can get relief is if we pursue our classification and go back to the court. The 10% zoning that we submitted, that is a, That is a zoning plan that we 100% undoubtedly are responsible for.
We are within a half mile of three commuter rail stations. And I've never been a 0% person. I've always been a 10%, and potentially more than 10%. I think we have an opportunity to increase beyond 10%.
without an opportunity to have a compromise from HLC for something that might be a middle ground between 25% and 10%, I don't like being in the position where we're pushed and forced to 25%. I don't know if people that are watching tonight saw Senator Driscoll's presentation last week to the Senate body. It might be I don't know, it might be 15 minutes long. Maybe it's a little longer.
Maybe it's 20 minutes long. But it was an excellent presentation. And it outlined Senator Driscoll's reasoning for why he feels Milton is being unfairly treated in this. We also have the leader of the House who has come out and stated essentially the same thing, that he feels that Milton isn't being fairly treated.
We have residents, you know, there are residents that were once in favor of the 25% that are now speaking for and advocating for a compromise between 10% and 25%. And I didn't expect that, but that's out there. You know, RKG's cost analysis that says that this would be cash positive, I don't believe that for a moment. We have no internal or second-party assessment of cost analysis.
So we're placing all of our faith in RKG's cost analysis. And I don't think that's sound judgment for a zoning initiative of this magnitude. And I do believe that RKG's cost analysis is not inclusive of all of the real and actual cost outcome. Just the simple fact that their projection includes only 275 additional students 275, 275 additional students.
from zoning that would add 2,461 new units. That alone should cause everybody concern because that can't be real. I've talked at length about what I refer to as the empty nester transition. When these units are built, families that live in Milton that no longer need the homes with the number of bedrooms they have, they likely would sell their home and move into one of the units that would be built.
And when I questioned RKG what they had calculated for the number of students that would be derived from that, they calculated zero. And the reason they said they calculated zero was because they didn't have a model to use to derive a calculation. Well, I don't think that's responsible, because we all know that many of the residents in town, if they have the chance to move into one of these units, they very likely will. And their home will then be occupied by a family.
So to assume that we're not going to have students derived from that transition is wrong. The cost of this, I believe, hasn't necessarily been assessed. And when you consider a public initiative, and whether it's a federal initiative, a state initiative, or a local initiative, when has an optimistic outlook in terms of cost ever really materialized? The answer is probably almost never.
You know, and our most recent example of this is with our fire stations. You know, we set forth with a budget to build three fire stations. And what have we learned? we only had enough money to build two.
So for those that think that this is gonna be cash positive and it's not gonna create a financial burden for the town of Milton, I think that's a very, very risky and I will go as far as to say an incorrect supposition. So I have huge concerns with 25% and I'll think a little bit more about this as we continue this conversation. And I would like Meredith to understand if we withdraw this, is there an opportunity, what happens?
Speaker 1 (57:15–58:06)
So if we vote, if we vote to withdraw the twenty five percent, I think we all are in agreement. At least a 10 percent is what we would want to submit to the warrant committee and to the select board. We would make we would make a vote. And the reason why I'm putting it on early is because the select board are meeting tonight as well discussing zoning articles.
And I just wanted to when they get to the agenda item, be able to hear from what the intent is of the planning board so that they're clear with decisions that they need to make. Is that helpful? So once we decide what we want to do, Cheyenne is going to send an email to Nick just letting him know.
Speaker 5 (58:07–58:36)
So I think it's completely irresponsible to be at the same night that the select board is meeting to decide to make a different plan of action. And I think it's also disrespectful to the applicant who has a public hearing scheduled for 7.05 to be wrong for this conversation. Some of you said that UTL should pull all-nighters in order to do the work that they've prepared for us that we have yet to discuss. No one said that, Cheryl.
Speaker 1 (58:36–58:40)
That is not accurate. People did not say UTL should pull all-nighters.
Speaker 2 (58:40–58:45)
I think actually what happened was UTL had said they wouldn't pull all-nighters. I think that's what was said.
Speaker 5 (58:45–59:28)
In any case, they did a lot of work that in between our meeting on Thursday and today, and we have that work to review yet. And I think we should give that careful consideration. And I would rather not delay that further the 705 public hearing for the 2 LESG project. and so that we can come back to this discussion and give it the due consideration that it deserves and review the work that's been submitted, not only by UTL, but by Nick Milano in terms of the zoning language, which I spent time this afternoon reviewing and providing edits for.
We can't do that and continue to delay the public hearing in good faith to the- Correct, Cheryl, and I do-
Speaker 1 (59:28–59:58)
Yes, no, and I that is we we need to get through that tonight because we need to get to the warrant committee, but this is an important conversation because it's going to direct that later conversation. I told Nick of my concerns and he asked that we we make a decision early in the meeting and let so he can let the select board now. So that's why I'm. And my apologies to the applicant for 2 Elliott, but I'd like to wrap up this conversation in the next five minutes.
Speaker 5 (59:58–01:00:32)
Can we wrap it up without having a review of the materials? It's assumptions about rumors that somebody can do development when they have a six story building approved and we haven't reviewed the fact that what's in this zoning allows for four and a half stories. So we haven't talked about the realities of what's being proposed against rumors that I haven't heard. But we need to work on facts.
And we need to review the presentation and show what the facts are in the presentation.
Speaker 1 (01:00:32–01:01:46)
And Cheryl, we agreed to a plan. I mean, what we voted on last week was the districts and the number of units. And we now are working on the zoning language. So we know, and it was presented to the residents, publicly what that plan looks like.
Even if it's minor tweaks, I get that. It's more of the impact of the overall decision of a 25 percent plan at this time. I understand your feeling on this. I think our work was not in vain.
We may ultimately need to use a 25 percent plan. I just don't think we're, to me, I don't think we're there yet. We have to get something to the warrant and I fully intend to have a plan set forth for our Junetown meeting. I think it should be the 10 percent at this point and then if we need to, we have a 25 percent plan that's pretty much ready to go.
Speaker 5 (01:01:46–01:03:04)
Back to my comments about facts. Sean, you made a comment that we are going to have 2,461 new units. We know that that's not true. We know that it's more likely to be 1,600 or less net new units when we factor in the existing housing units that are in these districts.
I think we have to be careful about using fear or saying things that may cause fear if that's not even the intent of the speakers who've said them. But saying things about Falcone can do more building. So they're going to suddenly change their plans or we have more net new than what we actually have. And then also speaking about Senator Driscoll's bills or amendment that he withdrew.
and other amendments that failed. There's been amendments put forth to change our designation and other things about the MBTA Communities Act none of which have advanced. Their final regulations were issued not long ago. You know there's at a certain point we have to accept where we are as other speakers have said.
I don't support just sending a 10 percent plan. I think it's our obligation to submit both.
Speaker 3 (01:03:05–01:04:00)
Right. It would be an awful shame if we submitted our plan, it got voted in, and then the unfunded mandate ruling came down and it was determined that towns actually would get money for this mandate, the MBTACA Act. That would be such a huge missed opportunity. And I think that given the fact that the town's broken, we did a $9.5 million override, that we actually should wait to see what that unfunded mandate ruling is.
And the way I understand that, and this is not fact, I don't know for a fact, but I think within the next 30 or 60 days, that's gonna come down. I think in June, a ruling is due. I personally am dying to see what happens there. And I'm almost sure that if we pass zoning, we lose the opportunity to benefit from that unfunded mandate ruling.
Speaker 5 (01:04:01–01:04:18)
But so you're saying to take away the right of town meeting to actually make a decision. You're saying the five of us should make a decision whether town meeting has the option to be compliant, to vote, to make a decision themselves. You'd rather the five of us decide we should not deliver them that option? That's what you're saying all the time.
Speaker 3 (01:04:18–01:04:22)
Well, we've been making the decisions all along, Cheryl. At some point, we have to keep making the decisions.
Speaker 4 (01:04:24–01:06:30)
I would like to just follow up on a couple of facts too on about RKG. So RKG, we hired RKG to do a fiscal analysis. And at the time that we hired them, I can speak for myself. I did not know that RKG was paid by the state of Massachusetts to build the compliance model.
So they built the compliance model that every single one of these 177 towns use. They then got paid by the state to be consultants for some of the 177 communities. And during the process with RKG, we learned that. We also learned that their beginning numbers were incorrect.
They didn't even have the population of Milton accurate. So the starting number was incorrect. They also, the compliance model did not allow for parcel assemblage. They couldn't even tell us that.
So this goes back way back. So for those people listening, we have been through this. We have made certain decisions. I have made certain decisions based on information that we've been receiving for the past three years.
So Sean has focused on the number of school kids that he questions and I question everything else about it because I think they entered with a bias and they should not have been listed as one of the consultants. So that's a fact because they stated that publicly. They stated publicly that the population was incorrect and they didn't have the information or the time to fix it. And they stated publicly that they're the ones who created the compliance model.
So those are facts.
Speaker 11 (01:06:33–01:06:33)
Okay.
Speaker 1 (01:06:33–01:07:18)
All right. So I think I don't think there's new information. I think we've we've all struggled with this. And I think we've done a lot of really good work in getting us.
you know, close to a 25, but at this time, I think we need to make a decision and we need to take a vote so we can let the select board know what we would like to do. And the process on that would be, we would need to, we actually need to take a vote on the 10% and we need to take a vote to rescind our vote on the 25% plan. and if we can have a motion I'm going to open it up back up for discussion.
Speaker 5 (01:07:18–01:07:32)
I don't think we can take a vote on the 10% without reviewing what the language is that we would be voting on, which is what was submitted to us as zoning. We can't submit something that's not zoning.
Speaker 1 (01:07:33–01:07:42)
That's how we voted on, we voted on the 25% that way. So maybe then we don't need to rescind that vote because we didn't have that language either.
Speaker 5 (01:07:43–01:07:57)
Right, I thought, I mean, my understanding was that we were going to vote the language tonight. We voted to the intent of what we approved was always needed to be finalized by UTL, right?
Speaker 1 (01:07:57–01:08:07)
So that was- Let's vote on the intent. All right, let's vote on the intent then, because that's all that we need to do this per Nick's request at this point at the meeting.
Speaker 5 (01:08:08–01:08:56)
So can I just ask all of you, I didn't hear, I maybe got three emails since our last meeting, two thanking us and one saying that they supported a 10%. So how did all of you between Thursday and tonight all of a sudden totally decide that this was not the direction that we should go in? Was there some kind of meeting I missed? Was there some kind of email exchange amongst a lot of people that I missed that somehow I wasn't included on because I have a different point of view on this?
I'm just curious because you all have a very similar. I think it's what we had over the weekend, over Mother's Day weekend. You all have a new reflection.
Speaker 2 (01:08:56–01:09:15)
I think it's really insulting that you're asserting that you're excluded from a discussion that we had. I'm sure you have volumes of emails from people you communicate with, Cheryl, that are never shared with us. I am insulted that you'd even assert that.
Speaker 5 (01:09:16–01:09:27)
All I'm doing was ask if there was anything that I missed, Sean. I'm just wondering how this changed so rapidly over a few days. period of time.
Speaker 2 (01:09:28–01:09:30)
I don't, there's nothing that I know that you've missed.
Speaker 3 (01:09:33–01:09:39)
It might be so simple as when it was brought up tonight, I was able to rethink my decision.
Speaker 4 (01:09:39–01:11:04)
I haven't changed my position and How it allows me is to take a more firm stance and however I know people don't like me talking about my business here on the planning board, but it was Mother's Day weekend and I was super busy and I've had so many people come in and express their concerns about the 25%. They had questions about the 25%. They said, oh, is the planning board putting Are they endorsing a 25% plan? Because that's not what they've heard from the planning board for the past three years.
And I said, I am not endorsing a 25% plan. There was some pressure, you know, put This is how I explain it. There was pressure. I felt there was pressure put on the planning board at the last week's meeting.
And maybe that's why some members felt like they were pressured into it because it was either we do it or it was going to be circumvented. So that's how I explained it. But I've been pretty consistent. So I've worked all weekend.
Speaker 2 (01:11:06–01:12:00)
I don't think I have to explain myself. I mean, I spoke pretty strongly last week about how I felt about our case and the pathway to resolve this through adjudication. And nothing's really changed in my mind in terms of pursuing that. I feel like the town should defend its residents against the 25% zoning plan.
by utilizing the courts to adjudicate and determine what our classification should be. That's no different than what I had said in our last meeting, and I feel really strongly. Senator Driscoll's presentation was pretty influential for me. Here he is, the senator representing our area, and he is an ardent 10% person.
That is very influential for me too.
Speaker 1 (01:12:05–01:12:55)
I would agree that presentation and I did have a lot of people to reach out to me with with concerns individually so but even prior to that I I really felt like we were under a deadline. I was trying to get this pushed so we could get this to the war committee and I regretted, I felt like it was hastily done. And I know we've had a lot of time. People will say that we've had a long time to work on this, Cheryl, but the regulations only came out a few weeks ago.
So there've been a lot of unknowns and there's still a lot of unknowns. And I just wanna make sure that we are not putting something forward that we will regret. And I know I'm comfortable with the 10%, It's the potential impacts of the 25%. I just don't know if I'm prepared.
Speaker 5 (01:12:57–01:15:53)
This board promised the residents of the town to deliver both a 10% and a 25% plan. The emergency regs and the final regs are virtually the same, a few minor adjustments that basically reaffirmed yeah reaffirmed that we were a rapid transit community as of February. So we've known that we that's the view of HLC is that we're a rapid transit community and they communicated that my understanding is to both you Meredith and Sean as well as our town administrator and assistant planning director. And so really the only way to not be considered out of compliance is for a different body, the select board to, well, we'll still be out of compliance as far as HLC is concerned, but either the law changes, which to date hasn't succeeded, as I mentioned, or the select board makes a decision to pursue legal action.
But we don't have the authority to make that decision. So the things that we have. Authority to do are present. Um, a 10% and a 25%.
Uh, compliant plan through the work. Um, that we've done and through. The work of that, the town staff and our consultant and taxpayer dollars are funded. to give the town the opportunity to continue to negotiate, but also to have a compliant plan in hand for town meeting in June so that we can stop the loss of funding that we currently sit in.
I mean, folks have been keeping track. It was mentioned $300,000 in legal fees. There's also the cost of the referendum vote itself at 40,000. There's lost grants.
pushing well over a million dollars. And that's going to continue. And I think from a point of view of our responsibility as people who took an oath to uphold the law, the law is what the law is at the moment. And town meeting members took an oath too.
And if we don't get them an opportunity to vote on a compliant plan, what does that say about us as the body that's supposed to deliver town meeting, the zoning that allows them to decide the right path. I continue to think that the five of us have an obligation to deliver the zoning. It is not our obligation to decide whether we remain or whether we will be compliant or not. That's up to town meeting and we should give them that opportunity to decide it.
Speaker 20 (01:15:54–01:15:55)
I, I appreciate that.
Speaker 3 (01:15:56–01:17:57)
I think it's our obligation to support our state rep and our state Senator and all their efforts they're making on Capitol Hill. So if they're up there saying that we, you know, we're a 10% community, we have a hard time finding 25% and then we just pop up a 25% plan that is pretty flawed in my opinion, and we're undermining their efforts and that's doing a disservice to the, to the, uh, all the Miltonites who actually voted for those guys. They're working real hard to try and represent Milton, and we're basically undermining them with a 25% plan. I also want to add that before this mandate came down from the state, I didn't meet one resident who said, hey, you know what we ought to do?
We should increase our housing stock, our zoning by 25%, because this is going to be great for the town. Nobody wants this. It's been forced upon. It's a mandate that's been hammered down on Milton.
And now people might want it, but they don't want it in their backyard. They want it when it's on Granite Street or they want it off of Elliott Street. I mean, it's just nobody is happy with 25 percent. And as long as there's a decent chance for 10, that's what I'm going to support.
And I'm not gonna say I'm one of them, but I do know that there are plenty of people who would wanna see this taken all the way to the US Supreme Court, where they feel that we'll actually get a fair shake in a non-biased court. Now, that's one side, the other side is 25%, and the middle of the road, the compromise is 10. If you're saying the select board's gonna get together with the resident that was pretty adamant about giving us an ultimatum at the last meeting that if we don't do what he's gonna, I can't control the select board and what they do. I think that's no different than a developer saying, if you don't approve my development, I'm gonna go 40B.
I mean, nobody likes it when that happens, but if ultimatums are where we're at, I agree with Maggie. What's the point of having a board here?
Speaker 5 (01:17:59–01:18:35)
Okay. So can I just ask about this? Everyone's saying that a resident giving an ultimatum Residents don't have the authority to give us ultimatums. I think residents have asked us to do what they think is the prudent thing to do, which is give town meeting the opportunity to take this vote.
I don't like the characterization of us being threatened. I don't think anyone felt threatened at our last meeting about a vote that they needed to take. I think people felt perhaps conflicted, but threatened.
Speaker 3 (01:18:37–01:18:46)
Well, I felt backed into a corner, honestly. If I didn't vote for this 25%, this guy would go to the select board and do his own thing.
Speaker 4 (01:18:48–01:20:13)
I'm not threatened by that, but I did weigh heavily on my decision. June 16th for a town meeting is an arbitrary date. It's an arbitrary date. If we feel like we need more time, perhaps we should petition the Select Board to push back the town meeting date.
And that would allow possibly the Plymouth Superior Court to make the decision on the unfunded mandate. It would also allow our Senator Driscoll to make his case with more of his peers at Beacon Hill. So I would think a prudent thing that our board could do would be request more time and push back the town meeting from June 16, which is an arbitrary date, which I know some people, the argument is people go away on vacation, but you know what? This is a very, very impactful zoning change for the whole entire town.
And if people feel a strong way one way or the other, they should reschedule their vacations. Okay.
Speaker 1 (01:20:14–01:20:19)
You know what, Cheyenne had her hand up. I just want to hear if Cheyenne had something to say.
Speaker 6 (01:20:19–01:21:06)
Yeah, I just have a little bit to add. I think on one note, yes, June 16th is an arbitrary date, but we have had July 14th for a while now, so we've had a little bit of time to get some stuff in the works, but on another note, overarching, it's been an hour on this topic, and we do have our applicants here. They're supposed to start an hour ago, so I think we do need to figure out something, whether we wanna wait till the end of this meeting to take a vote after we review materials, which we did have UTL work on it for the last few days, so they spent a lot of time, and we're spending a lot of money having them do that, so I think it couldn't hurt. But again, we do have our applicants waiting.
Yes, so I agree should be a little more.
Speaker 5 (01:21:07–01:21:15)
I would like to continue the conversation after the public hearing on 2 Elliott Street. I think there's plenty to continue to talk about.
Speaker 1 (01:21:15–01:21:30)
I know Nick has asked that we make a decision and then we can talk whatever we decide. How are we making a decision? Meredith he's requested to give the information to the select board because it's an item on their agenda.
Speaker 5 (01:21:31–01:22:06)
They they as far as they're they know as far as I know this board did not talk about this until this meeting. So as far as the select board knows we took a vote last Thursday. So I don't understand why our timing of this discussion and whether it's rushed or not when we're when we have a public hearing scheduled at 7 0 5 it. It doesn't seem right to me.
I mean, this board took an action last week. And as far as the select board knows, that's still the action that's sitting on the table. So why are they asking us to reconsider something?
Speaker 1 (01:22:06–01:22:25)
I think it's the determination. I don't think it is. Cheryl, I think it's going to determine how we spend our time later this evening and the material that we're going to be going through. Because if we're not going to move forward with the 25, if we're going to vote for that, we should focus our time on the 10% and going through the zoning language on that.
Speaker 5 (01:22:26–01:22:48)
I disagree. I think we need to talk about both. We have both prepared for tonight. We asked UTL to spend a ton of time on it.
Our town administrator put zoning language together. I reviewed that language. I spent a lot of time looking at it before that even arrived in preparation for this meeting, not knowing that this was going to be reopened. And I feel as if we need to spend the time to discuss it before taking a vote.
Speaker 4 (01:22:49–01:23:48)
So I would like to just say I've been an applicant before. I do apologize to the applicants. But as an applicant, you understand that sometimes you have to wait an hour or two or three. So I do apologize in advance to the applicants.
They are Milton residents. So I would think that they would be appreciative of all the time and discussion around this. topic because it will affect them personally at their residences. It will also affect their businesses.
So I think it I apologize to the applicants but thank you for your and I think We just need to take a vote now. I will make a motion to rescind the decision from last week to put forward a 25% plan.
Speaker 3 (01:23:49–01:23:57)
Is there a second? I'll second it if that's the motion you need. Did that make sense? Any further discussion?
Speaker 2 (01:24:00–01:24:58)
Seeing none, all right. Well, I guess, I guess, before you go to a roll call, I, I, I think every decision has risks. Um, and, and this decision certainly has risks. Um, the decision of the select board makes whatever they do, whether they pursue adjudication or not.
Um, has risks. So, um, this is a hard one. Um, I'm okay to go for a vote, Meredith. I don't, I don't, the reality of it is, you know, whether, whether we move it forward or pull it back where we're taking a risk.
Speaker 1 (01:24:59–01:25:15)
Okay, so there's. So we have a motion and a second. So we'll do a roll call. Maggie.
Speaker 2 (01:25:17–01:25:20)
Sorry. Can you restate your motion?
Speaker 4 (01:25:21–01:25:46)
My, sorry, I didn't plan a formal motion. So my motion is to rescind the 25% plan that was put forward last week at last meetings.
Speaker 1 (01:25:47–01:25:54)
And we should probably amend it and just say, and with the intention of putting voting on a 10% plan.
Speaker 4 (01:25:59–01:26:18)
My motion is to rescind the 25% plan that was voted at the May 8th planning board meeting and put forward a 10% plan.
Speaker 5 (01:26:22–01:27:04)
I'll second that. I'm going to make another comment. I think this is a grave mistake. And I think it reflects very poorly on this board to decide that it knows better and shouldn't send to the select board and to the town meeting something which would allow the town to be compliant with the law as it exists today.
We all took an oath to uphold the laws of the Commonwealth and it is a law of the Commonwealth whether some of us like that or not. And I think I'm really disappointed in the rest of you, and I plan to vote no.
Speaker 1 (01:27:06–01:27:14)
All right. Thank you, Cheryl. And I appreciate this, because this is not an easy decision. All right.
Speaker 20 (01:27:14–01:27:23)
Let's start with Cheryl. No. Sean.
Speaker 2 (01:27:31–01:27:32)
Yes.
Speaker 20 (01:27:34–01:27:34)
Okay, Jim?
Speaker 2 (01:27:35–01:27:36)
Yes.
Speaker 1 (01:27:37–01:28:34)
Maggie? Yes. And myself, yes. All right.
Thank you and apologies. And thank you for everybody who's here and all of your comments because This is not an easy one. OK, so with that, I would like to now move to open the public hearing for two Elliott Street and we can invite the applicants in. Who are at Town Hall, I understand, and I again apologize for the delay.
Oh, Cheyenne. Yes. Can you please send Nick an email letting him know so he can let the select board know and cc me on that? Yes.
Of the vote that we took? Yeah. Okay, great. Thank you so much.
Okay, sorry, Ned. Go ahead. That's
Speaker 21 (01:28:35–01:30:04)
Thank you, Ned Corcoran, and I'm sitting here with J.D. Wild in Tim Zerwinski's old office. We didn't get the memo that this meeting would be remote, and so here we are at Town Hall. And we're heartened by the number of comments that came in during CitizenSpeak in support of the project that JD and his team have put forward.
I think the last time we were here was April 24th. There were several specific requests for us and JD's got a PowerPoint to share. But I think there were, as I as my notes indicated that you wanted to see a roof plan with a parapet. a bike rack located on the site, elevations with lighting, the heights of lights, lightings, and lanterns, treatment for the corner at Elliott and Adams, and separately, not directly a part of site plan, but we acknowledge that we'd agree with the work with the town regarding the replacement of the tree.
And so with that, we have a brief PowerPoint that responds to those specific questions. And so Cheyenne or Julia, if you can allow J.D. to share screen, and we can move forward.
Speaker 7 (01:30:04–01:30:09)
Thank you. Thank you.
Speaker 22 (01:30:09–01:30:19)
Good evening, members of the board. I'm going to share my screen. Can you guys see my screen?
Speaker 1 (01:30:20–01:30:21)
Yes.
Speaker 22 (01:30:23–01:42:40)
Okay. Good evening, members of the board. I appreciate all of your time. I know it's getting late in the evening, so I'll jump right into it.
I've updated the slide presentation to reflect the items that were brought up at the last hearing, as Ned has indicated. So one of the comments that came up was around the discussion regarding the seating that we are proposing at the intersection of Elliott and Adams. What you're looking at is an existing conditions photo. At the prior hearing, everyone, including ourselves and your board, agreed that it's a really important corner in that it needs to be thoughtful and that seating there is appropriate, but the concern specifically was regarding the planters that we had proposed.
One of the comments that came up was that the concern was that the planters might actually feel like they encroach on the sidewalk based on the height of the brick wall and that they're solid. So what I've done today is I've brought back the image that we presented last time just to refresh the board. This was the visual that we provided at the last hearing. And again, the comment was that the concern was can we see something else that it maybe is an alternative to the planters.
So what I've done is I've come up with a concept that keeps the existing railing. So if you look at this existing conditions, you'll see that there is a black iron railing. So we explored a lower, more modest planter that incorporates the railing. And that's what you're seeing right here.
what we've done is we've put together a concept including the railing with a low modest planter with flowers and kind of seasonal growth that'll flow down and then more vine-like growth that will come up because it is important that there is screening there. It is a busy intersection, you know, for people to sit outside. We do want to create a little bit of privacy there and make it feel a little bit intimate and romantic on that corner. you know, a lot of our design intent and a lot of the theme, I've referenced, you know, kind of the energy and design, but what we've been targeting is like a behind-the-book store.
I even pushed at one point for a name called Among the Flowers, but Dan wasn't too happy with that. So we really want to kind of carry that energy in this design, so that was the intent behind this slide. So What I've done is I've kind of thrown together a sample of the planting that I would kind of anticipate in those lower planters to execute on this vision. We would try to incorporate some small maybe dwarf boxwoods, some astilbe, some hostas.
It's a part sun location so we don't get a ton of sun on that corner that that large pear tree does. have a pretty big presence over on that Adams Street elevation. It does block some of the sun. So a lot of this was based around sunlight, you know, busy intersection, low maintenance.
So what you're looking at is a, you know, kind of a visual representation with those specific plants. And then on the right is an actual photograph of a planter box that I was kind of using as inspiration for color, texture, So that's how we came up with an alternative for the corner. So again, this is what we proposed. This is the other alternative that we're bringing to the table.
The next issue that came up was board members had questions about the lanterns that we had proposed. There was two main questions. One was a request that we consider incorporating gas lanterns. Another was curiosity on elevations and how they were gonna kind of line up on the exterior of the building.
So what we've done is we've changed from all electric fixtures on the building to four gas lanterns and the remainders will be electric. So the four gas lanterns, we've located at the two main entrances. And from a design standpoint, what we've done is we've actually oversized those fixtures. So the electric fixtures will be the same exact fixture.
There will be a slightly smaller version. They're a 20-inch total fixture size. The gas fixtures will be a 26-inch total size. So they'll be a little bit more prominent.
The exact same fixture, same manufacturer, just a different light source. So the other thing that came up was when we started to play with that design was that it felt odd to keep them on the exact same plane on the building. Because of the difference in size, we really want to kind of separate the two lines. So what you're seeing in this slide is, you know, the four gas lamps will be at the two entrances, evenly spaced around the entrances, mounted at consistent height of 74 inches above the average grade at the handicap entrance there.
This is the intersection we were just talking about. This is the vantage there. So these fixtures will still be electric fixtures, again, matching the front. This individual slide, I actually overlaid the specific fixture to replace the one we had provided in the rendering originally so that you could see what the actual specific fixture would look like.
This other slide, you can see those are the original ones that we proposed that were electric. They are going to be the same matching ones. You can see it over here on the left-hand side. I did leave it in this visual.
It was a somewhat difficult task to kind of overlay that. And these ones will be at a higher elevation when we were when we were working on what height to have these ones that we chose the center line of the upper sash of the window. There's a currently an existing floodlight on the exterior of the building, excuse me for jumping around. You can see there's a pack floodlight right here, right at the center of the sash.
It feels appropriate. We spent a lot of time standing over at Extra Space Storage, standing at one Elliott corner, kind of looking and trying to figure out the height. They drape down. They have a nice presence.
They provide low-level lighting. So we wanted them high enough as to where they're clear from traffic, but not too high as to where they felt like they were floating. So that's the design intent and how we arrived at those specific heights. This was just a slide I thought was helpful just to show you that it's a nice clean line on the corner where we're proposing presenting them.
Those white dots are just meant to reflect the sconce locations because sometimes it gets lost in these busier visuals. One of the other comments that came up was a question about a little more detail on the roof plan and the mechanicals that were going to be placed on that roof and how we were planning to screen it. So what you're looking at in this slide is the existing conditions. So this is taken standing in front of the hardware store across the street.
I did zoom in just for conversation purposes. It's really hard to have this conversation without being a closer view. So something I want to point out before we jump into the content is you're actually seeing an existing condenser. This is the condenser that was on the building from Bank of America supporting the forced hot air system.
We did remove that in anticipation of all these new mechanicals. So this is a Google Earth picture from last year. But you can see that that did protrude from the parapet. And quite honestly, I think most of us probably look past it.
I don't think it was overly offensive to the point where it came up in conversation. This copper vent is actually still there. That is also going to be removed. So this is the vantage of the existing conditions.
This is a detailed roof plan that we put together. So there's four Four mechanical items that we're putting on the roof for this conversation. One is a makeup air unit for the kitchen and for the rest of the building. One is a kitchen exhaust.
One is a gas fired cooling condensing unit and then another is a mini split condenser that we are using for some of the smaller offices and rooms. We're going to put individual heads in those rooms for both makeup air and heating and cooling. So those are the four units. The way we've intentionally aligned them on the roof is to put the lower height units in the front and put the taller height units in the back.
Again, when you're standing on the sidewalk and you're looking up at this, because there is a parapet, because You are looking up at advantage, it does help hide things. This condenser that you're seeing in this picture was almost 40 inches tall sitting on four foot, excuse me four inch wood blocks. So, even though that barely shows above the parapet that is from the roof line that is 44 inches up. So, We did put these units on the roof.
The make repair unit is 39 inches in height in the front and the kitchen exhaust is 36 inches in height. And then if you look at this, we also added a screening, which we're going to go over, but just so everyone can see it here. We did present it on the backside of the parapet. The reason being that it also can double as safety railing for service of the equipment on that flat roof.
This is just another vantage to help the board. One of the questions that came up was orienting the flat rubber roof when we were talking about it for context. So up top is just a key zoomed in version of the flat rubber roof. The lower is actually the third floor of the building.
If you're looking down, you can see that the flat rubber roof is accessible from the third floor from that iron fire escape staircase. So again, this is the third floor floor plan up here. When you look at it from an aerial, this is the rubber roof we're talking about, and this is the second egress fire escape from up there. So that's the roof plan.
Next, I'm going to present to you what we're proposing for screening. So again, this is existing conditions. Our design intent and the thoughts we had was what materials and textures do we want to use for this screening? We really had two to work with.
One was this white shiplap. It's hard to see in this picture, but this is actually a nickel-gapped shiplap material on the exterior. It's also on the cheek walls of these dormers. So we explored that.
To me, it felt too solid. It felt like it was very fancy. It felt very full. So what we decided to go was to match this Chippendale railing on the top.
So what we're proposing is to actually replicate that railing on a lower elevation. And once we started playing around with that, it immediately felt right. I actually think it feels better than it does without it. It feels very naked.
And I've mentioned earlier hearings with this board that that backside has always felt too much brick if it feels off. So I actually think it breaks it up nicely. What is also reflected on this slide is the depth of the parapet that came up in the last conversation. So it's 16 inches from the top of the rubber to the top of the copper parapet cap.
And then we're proposing a 26 inch reveal on this railing. So a total of 42 inches. And again, it doubles as our safety rail for service of the mechanicals on the roof deck. The last and final item that came up was a bike rack question about where it was going to be on site.
So this is the style and specific bike rack that we're proposing. It can handle seven bike spots, so one, two, three, four, five, six, seven. We're actually going to put it in front of the pad-mounted transformer that we need to add to the site, and it's going to serve as our A little bit of screening, but it's also going to replace some of the ballards that we replaced there. So we're actually going to mount this to a concrete pad.
So it's doubles as a ballard. So we kind of killed two birds with one stone. It also is a good location in the sense that it gets the bikes out of the parking lot. It gets them to a place that, you know, you can easily handle seven bikes.
And as well, as I mentioned on the prior hearing that over here on Adams street, We do have two additional U-style bike racks just like this. So there's another additional four bike rack spots on Adams Street sidewalk. So it's a total of 11 bike spots provided at the site. And those are the specific items that we had to address from the last hearing.
I do have the rest of the deck available to me if there's any further questions, but a welcome conversation.
Speaker 1 (01:42:43–01:43:04)
Great. So this is very exciting, um, JD and, um, I'd open it up to the board for comments or questions at this time. Cheryl. Oh, sorry.
I didn't see you Cheryl. That's okay.
Speaker 5 (01:43:04–01:43:25)
Can, can you, uh, thanks for the update. Um, can you go back to the, um, the roof plan and the image of that low roof. Is the rubber roof onto the right side of that fire escape also?
Speaker 22 (01:43:25–01:43:27)
Yes.
Speaker 5 (01:43:27–01:43:46)
OK. And the exhaust, is that going to come? Now, can you go to the image, the photograph? So that exhaust is going to come up above the gutter line on the left side there between the gutter and the fire escape.
Is that right?
Speaker 22 (01:43:46–01:44:15)
It'll be below that line. This railing, this top of the fire escape railing, this is a 36 inch railing. And if you see this is sitting on top of the parapet, it's got about a six inch iron deck that it sits on. So I would approximate this about 42 inches to get you up to about the gutter line.
The hood exhaust is 36 inches tall. So with a 16 inch parapet, approximately 20 inches will be revealed.
Speaker 5 (01:44:16–01:44:23)
So describe how that hood works. Is it coming up and having a hood turn towards the outside parapet? Is it?
Speaker 22 (01:44:25–01:44:35)
Yeah, it's actually this style. So it's a central fan style hood. So it's not a typical mushroom head.
Speaker 5 (01:44:39–01:44:47)
OK, so the way it'll be blowing out towards the parking lot, not towards the fire escape, correct?
Speaker 22 (01:44:47–01:44:50)
That's correct. Yep.
Speaker 5 (01:44:50–01:44:59)
And the unit that's 56 inches high, which I think is the makeup area unit that will rise above the gutter line. Is that right?
Speaker 22 (01:45:00–01:45:11)
We don't intend any of it to rise above the gutter line. Um, excuse me. So the, the condenser, uh, is 56. The makeup area unit is actually long and rectangular lays down.
Speaker 5 (01:45:13–01:45:41)
Okay. And thank you. And then can you scroll through the slide again? I keep going.
Keep going. Right there, the bike rack. From there, you can get up to the entrance on Elliott Street, correct, on the left side of the building?
Speaker 22 (01:45:41–01:45:50)
That is correct, Cheryl. So this is a handicap ramp. I assume you can see my cursor. This is a ramp right here that takes you all the way out to Elliot Street.
Speaker 5 (01:45:53–01:45:59)
Okay, and the striped is for the for the handicap spot next to it. Is that right?
Speaker 22 (01:45:59–01:46:01)
That's correct. This is a handicap spot right here. Yep.
Speaker 5 (01:46:01–01:46:08)
So the bicycles, when they're in that rack, wouldn't be protruding into that handicapped maneuvering zone?
Speaker 22 (01:46:09–01:46:25)
No, it would not. There might be a little bit of overhang of the rear tire here, but there's a good four feet or so right here in front of the pad without the transformer. So realistically, a majority of the bike is going to remain on what's currently a mulch bed in front of it.
Speaker 5 (01:46:26–01:46:40)
And my experience with the utility companies, they need direct access to the front of their transformer. Are they going to be getting that then from where the dumpster enclosure is or you would have to move the bike rack or how would that work?
Speaker 22 (01:46:40–01:47:16)
Nope. So the transformer, this is what you're seeing right here is actually the pad. When the transformer comes, it sits on the rear. It's got two double doors in the front.
They require us to put ballards in the front for safety with cars. So their access is actually behind the ballards. We're proposing to put the bike rack in line with the ballards, so it shouldn't encroach on their transformer. It will be removable as well, Cheryl.
So if there ever was some sort of, just like the ballards, obviously if it's an emergency, they need the ability to, but.
Speaker 20 (01:47:18–01:47:23)
Okay, those are my questions. Thanks, J.D. Sean, go ahead.
Speaker 2 (01:47:24–01:47:49)
Yeah, hi, J.D. I think, like everybody else, I think it probably It's probable that everybody feels like it looks great. Can you go back to the mechanical roof area for a moment? So those two units, the makeup VA unit and the condensing unit, those dimensions of height 39 and 56, is that inclusive of the curb or will the curb be additional to that height?
Speaker 22 (01:47:50–01:48:16)
Yeah, so the curb will likely be additional to that height. This is the model spec dimensions. This sits on a plenum. My estimate is that it's probably four to six inches.
It's not a huge plenum, the makeup air unit. The gas-fired condenser doesn't, I mean, it sits on the pad. It's a rubber roof. There's certainly solutions.
You can do like anti-vibratory pads if we need to go with something thinner, but what I'm reflecting is just the dimensions of the unit itself.
Speaker 2 (01:48:16–01:48:55)
Okay, so they're probably gonna be a little bit higher, at least the makeup unit will probably be higher. I mean, most curbs in my experience is probably 8, 10, 12 inches. And I guess one other question on that. I do think I like, I like the idea that you're utilizing a parapet that replicates what's at the high roof.
It might be okay for that to be a little higher, you know, to screen a little bit more. Can you go back to that image of this? Yeah, is that dimension, that 26, is that the same dimension as the high roof?
Speaker 22 (01:48:56–01:49:12)
No, the high roof is a 36-inch high rail. I was proposing 42. If this was built today, I think… Actually, there's no mechanicals up there, so I don't…
It's probably okay for today's standard, but because of the mechanical access in the fall, I think 42 is probably required here.
Speaker 2 (01:49:13–01:49:18)
But you're trying to stay under the gutter line? Is that why you have the height of 26 on top of the…
Speaker 22 (01:49:18–01:49:35)
No, I just, I was presenting it as a 42 inch high rail. I could certainly make it taller. I was just doing the minimum for safety. You know, I wasn't sure if this board was going to be concerned with too much height.
So I thought that was the minimum that I needed for safety rail. Okay.
Speaker 2 (01:49:35–01:50:26)
Yeah. I'm just, I'm just, I guess, throwing it out there that if you find that those units, you know, are, you know, more visible than you'd like above that, maybe making that higher than 26 inches might be helpful. Yes, sir. I mean, this is the back of the building.
I'm not too hung up over this, but if you're making an effort to screen it in six inches more in terms of that type of a whatever we want to call it, might help it hide the top of the units. So it's, I'm not real hung up over JD, I'm just offering it.
Speaker 22 (01:50:27–01:50:45)
I appreciate that. Yeah, as you know, the property owner and someone myself who's investing significant funds in this project that my, my goal is to make sure that we're thinking through these things and executing on them well because it serves me in many fronts, not only in front of this board in front of the town but also as a proprietor of myself.
Speaker 2 (01:50:45–01:51:04)
So, yeah, well I think architecturally. using a system here, same as top, is going to look good. You'll keep some, you know, some consistency in aesthetic. And anyhow, I'll just leave it, I'll leave it up to you for further consideration if you want to make it a little bit, you know, taller.
Thank you.
Speaker 4 (01:51:09–01:51:11)
Yeah, go ahead.
Speaker 1 (01:51:11–01:51:13)
I can't see hands up, so go ahead.
Speaker 4 (01:51:14–01:52:29)
So just to follow up with Sean said, even though it is the back of the building, a lot of residents from the town will actually see it coming down Adams Street. So I think more people will actually see it than maybe looking at the front of the building. So I think that is a good suggestion, making it a little bit taller if you can, just to hide it a little bit more might be helpful. The other thing I'm concerned about is you mentioned that it's a flowering pear on the street.
And I know it's a town, it's the town's responsibility to care for the street trees, but pear trees are now not being favored as a street tree and actually are considered being invasive. So if for some reason the pear tree does decline and needs to be removed, would you be willing to do a different type of tree instead of letting the town do it? Because the town seems to put in undersized trees in their sidewalks.
Speaker 22 (01:52:29–01:52:50)
Yeah, um, I mean, I'm obviously heavily invested down the village as a whole. I think our interests are all aligned in the sense that, um, you know, what it could be and what it is are two different things. So, um, I'm open to that conversation. I, anything that's going to improve the village as a whole, I'd, I'd love to be a part of that conversation if I can support it and help it.
Um, it's certainly on the table on my end.
Speaker 4 (01:52:53–01:54:20)
Um, so, um, I love the idea of keeping the the fence, I think that looks really pretty and classic box was a classic plant choice. And I, like the idea of a smaller planter um. I like the oversized lights. I feel like a lot of times people undersize their exterior lights and I think all of your choices seem to be very thoughtful and I just want to say thanks for for all your efforts.
And I know we haven't talked about the right side yet, but I like if we're going to keep the railing as the black wrought iron railing, then I think maybe keeping the other hardscape elements to a minimum. Because I think, if I recall, you have a brick wall with maybe a granite cap. And then if you go down the, the walkway to access the ice cream window, I think there could be a concrete wall. There's just slight grading changes.
So it would be nice to kind of minimize all the hardscape elements and keep it to the wrought iron, brick, and granite.
Speaker 22 (01:54:20–01:54:23)
Sure. I would agree with you. I think that's fair.
Speaker 4 (01:54:24–01:54:28)
And I love the name, if you're going to stick with 2 Pence, even though I love flowers.
Speaker 22 (01:54:30–01:54:33)
That's entirely Dan's call. So I think we're sticking with 2 Pence.
Speaker 1 (01:54:36–01:54:37)
OK. And Jim, did you have any?
Speaker 3 (01:54:38–01:55:24)
Yeah, so I'm walking because my computer is about to die. But I love it. I got to say, J.D., I love the fixtures. I think those gas fixtures are gorgeous.
And the way you match the electrical fixtures, you know, the electrified ones are fantastic. I agree with Maggie. I love the railing. I think it's a great idea to keep that.
You know, Boston Ivy grows great. I'm sure there's a lot of Ivy you're gonna make that look fantastic. And yeah, I just like what I see and I gotta reiterate what the board says. Thank you very much for doing this.
I mean, that area is screaming for food and I'm glad you're doing it. I understand you're investing in a lot. And I'm ready to vote when it pleases the board. Thank you.
Speaker 1 (01:55:25–01:56:05)
And so I just want to, just a couple of items. One, I really do like, it's actually a beautiful iron fence that's there. So I love the idea of preserving that. Yeah, it just fits with that corner.
It's open, it's welcoming, inviting. I love, just in this photo, you also have the use of lattice with some climbing things that I think could be great in that patio area as well. But definitely, and if you can keep on, can we go to the pergola, the side with the views of the pergolas?
Speaker 22 (01:56:06–01:56:11)
Um, oh, you want to, uh, from the last presentation.
Speaker 1 (01:56:12–01:56:16)
I know from, from this one, you have some, just maybe it's from the last one. Yeah. You had some photos.
Speaker 22 (01:56:17–01:56:17)
This one.
Speaker 1 (01:56:18–01:56:28)
Yes. Yes, exactly. So maybe, and there's one shot where it shows a little bit, um, to the right, the stone, the wall. Oh, that's where you would Mount this.
Speaker 22 (01:56:28–01:56:34)
Yeah. It's from the, um, yeah. Sorry.
Speaker 1 (01:56:34–01:57:57)
Yeah. There's two different versions. Yeah, so I think keeping it simple so it's not detracting from the building and I think a couple of those slides were examples of that. Really keeping it sort of minimalistic.
not to detract or be too busy to detract from the building. But the question is, and I know this is how you would have this installed, is it possible, because I think I've seen it where you actually would have the footings on the right-hand side on the high street side to mount within the stonewall area so that you could maintain that gate. I'm thinking of consistency on, you know, you've got the beautiful iron railing off to the left, and you've got it stair-stepped going up High Street. If there was any way to mount it inside, into the brick or somehow, I don't know how you would do that from an engineer and architect's standpoint, but if you could preserve that, yeah, if you could preserve that and have that, you would obviously take off that inside gate, but have it mounted within the high street wall, the high street gates.
Speaker 22 (01:57:57–01:58:05)
Sure. That's fair. I think that's achievable. Yeah.
The interior one that you're looking here is actually a retrofit. It's a aluminum kind of fake gate.
Speaker 1 (01:58:05–01:58:06)
Right.
Speaker 22 (01:58:06–01:58:13)
I think we could, we could certainly find a way to preserve this, especially if we're going to keep it on the Ellie and Adam intersection as well.
Speaker 1 (01:58:13–01:59:01)
I think that would look great. It's actually a really, really pretty iron gate. It needs some TLC, but it's a beautiful iron. So that would be that would be a preference.
I love what you've done with the lighting. I really appreciate that. And, you know, the tree selection again. I had mentioned a Princeton Elm, but I would leave that up to you.
I just know Princeton Elms are doing really well down in that area. And you had mentioned doing a tree guard around that. And I can send you some examples. There's a company that did Assembly Square tree guards all throughout Assembly Square, if you're ever over there.
And I can send you the company name and the link for that. And they have various options. But I'm sure you have other sources, too.
Speaker 22 (01:59:02–01:59:05)
Sure. Yeah. I'm open to the conversation. So.
Speaker 1 (01:59:05–01:59:21)
Yeah. And so and so my just my last question is, because you do have in that little courtyard or that gathering area outside, you do have the concrete retaining wall. How do you treat that?
Speaker 22 (01:59:22–01:59:25)
You talking about the existing one right here on this side?
Speaker 1 (01:59:25–01:59:31)
So that comes out, correct? I think there's right on the back of that wall, like where this is all.
Speaker 22 (01:59:31–01:59:39)
Yeah, it's all going to stay. So there's an existing concrete retaining wall here on the backside, and then there's one right here on the handicap ramp side. We're going to reuse those walls.
Speaker 1 (01:59:41–01:59:42)
You're going to wet those walls?
Speaker 22 (01:59:42–01:59:45)
We're going to reuse those walls. They're existing. We're going to maintain them.
Speaker 1 (01:59:46–01:59:53)
OK. I didn't know if there's anything you could put like a lattice or anything on them. I haven't looked at them closely, but I'm sure you'll.
Speaker 22 (01:59:55–02:00:35)
Full disclosure, they're not the prettiest right now. Our intent is to put planters on top, grow stuff around. We're trying to minimize the hardscape package. When we revisited this project after our initial preliminary presentation to this board, we talked about how do we simplify the execution?
How do we get open? The number one thing we keep hearing from people in town is how excited they are and when are we going to open. So we wanted to simplify the project and kind of strip it down to the bare essentials. So we thought that minimizing the amount of new masonry and walls and hardscape was a pretty big impact on the budget and schedule.
So that's why we landed.
Speaker 1 (02:00:35–02:00:43)
Okay. And just on that takeout window, it looks like, do you have to take out, do a cutout of that window or can you reuse the current opening?
Speaker 22 (02:00:44–02:00:53)
Yeah. So there's an existing window right here. We're going to widen it to the left. So we're going to use this existing opening and then we're going to just widen it to the left.
Speaker 1 (02:00:53–02:00:58)
Okay. Can you match the trim detail to the current window?
Speaker 22 (02:00:58–02:01:00)
The wood trim?
Speaker 1 (02:01:00–02:01:01)
The wood trim. Yes.
Speaker 22 (02:01:02–02:01:09)
Absolutely. Yep. Yeah. We'll carry this a soldier detail of the brick on the header line here as well.
We'll make it look like, you know, we weren't even there.
Speaker 1 (02:01:10–02:01:18)
Right. Perfect. Great. Yeah.
So. I think this looks very, very good.
Speaker 5 (02:01:19–02:02:39)
So, um, uh, along the lines, can I jump in here on the next slide over? Um, well, actually, even on that one, in terms of the. the header for the window. It was one of the reasons that I had suggested submitting building elevations because I think what we're going to end up needing to do is have a decision which describes some of these details, or at least you're going to have to have some call-outs on the drawings just so that it's documented.
Uh, you know, I believe, but you're going to do what you say you're going to do, but we still have to have the documentation. So. I think, um, certainly something like that can be called out on. In this set of images, or in the language of the.
Um, decision, but. It's those details that are going to be really important, as you know, and we just want to make sure that they get in the documentation. Can you go to the next one? It looks to me like I asked, I think, the last time whether this pergola was going to attach to the building or detach.
This looks detached, which I think is actually a better approach. I don't know if you've given more thought to that, JD, in terms of how you're thinking of doing it.
Speaker 22 (02:02:40–02:03:23)
I would prefer to attach it. What we had anticipated doing was ledgering it to right here below this window course here. We'd explored early on when we were doing these renderings detached. I really liked the idea of coming up that handicap ramp and having the pergola go over it.
You know, one alternative to attaching it to the building would be to post down right on the inside of the building. It does require more footings and more you know, obviously earthwork, but, um, I, I personally really liked the idea of the pergola spanning over the handicap ramp, having the bistro lights and the, all the greenery kind of flow over it. So it feels more like a, like a really grand entrance from the parking lot. It also was a really nice transition down to the parking lot from the L H L H street side.
Speaker 5 (02:03:24–02:03:58)
Um, One thing you could consider is cantilevering over the walkway and then having a, um, a gutter. you know, on the side closest to the building, in which case you, yeah, so instead of a post, like you have a post there coming down, I think, to the right side of the ramp, right? In this image? Yeah, so if the pergola extended, it's pretty high up to provide real weather.
Speaker 22 (02:03:58–02:04:32)
Protection I think that this Louvre, two things so one is the Louvre roof is waterproof, so it does when it closes it is waterproof. It is an aluminum frame not a steel frame, so I would have concerns with cantilevering and snow load. So that was one of the design considerations we had. It's going to provide more protection in the elements.
And it does, it's actually one of the nice features about the product we're using. It does have an integrated gutter system into the frame as well. So there is no exterior gutter. It is actually integrated into the tube frame.
Speaker 5 (02:04:34–02:04:41)
Okay. Well, so you've selected a particular product. Do you think that that this is representing?
Speaker 22 (02:04:42–02:05:03)
Are you sure? These pictures are correct. Yeah, these are of the design inspo. We have two manufacturers we're currently working on custom solutions with.
Both have a very similar product. It's pretty competitive space, actually. There's a handful of people that provide almost identical products, just depending on sourcing, different levels of customization.
Speaker 5 (02:05:04–02:05:48)
Okay, so, like, that image on the right where the heaters are, like, against the brick. Yeah, 1 of the things I think it's typical with historic properties is to tread lightly with how much you attach to the, or change the existing, like, if it was, um. Like, a national park service. Secretary of the Interior Standards of Historic Preservation, they would want you to do things that could be removed without damaging the existing building.
I guess what I would suggest is just as you think about those heating elements, as you think about that connection to the building, to see if you can do as much as possible to tread lightly on that brick wall.
Speaker 21 (02:05:49–02:05:49)
Sure.
Speaker 1 (02:05:50–02:06:24)
JD, I'm looking at the top left, the pergola on the top left, and it almost has a little bit more of an architectural detail. It's obviously aluminum or steel, but it looks like a molding trim on it. which has a little bit more of a classic look, which I think would, if you could find something that looked like that, that has a little bit more of a less just flat, you know, super modern, something a little bit more classic, I think would be great too.
Speaker 5 (02:06:34–02:07:10)
But I think it's… I think I would be comfortable asking Ned if he'd like to draft a decision, but I'd also like these slides to have further notations that correspond to that draft decision since we don't have architectural elevations for this. Then we could review those at our next meeting. and hopefully wrap it up at that time.
Speaker 1 (02:07:13–02:07:25)
I would agree if the board would agree to that. I don't know if our next meeting is next Thursday. I don't know if that's too soon, Ned, for you to draft something.
Speaker 21 (02:07:26–02:07:57)
I can certainly make every effort to get it there in time. I have a simple A&R presentation. Also, yeah. Thursday, we'd love to wrap this up next week if possible.
So I will endeavor to have a decision, a draft of a decision out for review by, you know, the end of the week. And that gives us, gives you opportunity for additional comment. And hopefully we could, you know, share a screen with a draft, the final draft and make whatever final modifications are necessary right in front of us.
Speaker 1 (02:08:00–02:08:03)
Does the rest of the board agree to that?
Speaker 3 (02:08:03–02:08:05)
That sounds great. I like that.
Speaker 4 (02:08:10–02:08:24)
That's fine with me too. Another question I have is, did Cheyenne go through a checklist? You know, sometimes she provides a checklist that everything's been submitted properly.
Speaker 21 (02:08:27–02:08:28)
I think she did.
Speaker 1 (02:08:29–02:08:42)
I think she did also, but I can confirm that with her. She's on vacation. Actually, she might not be back, Julia, right? Next Thursday, she won't be here.
Speaker 7 (02:08:45–02:08:47)
Yeah, she won't be back until after Memorial Day.
Speaker 1 (02:08:49–02:08:55)
OK, so you know what? I'll check in with Nick on that because I think he's been working with Cheyenne.
Speaker 21 (02:08:57–02:09:10)
So I'll check in on that. Well, I know for a fact that she asked us for a couple of additional components at the time that we filed that were based on the requirements of the checklist.
Speaker 20 (02:09:10–02:09:11)
That's what I thought.
Speaker 2 (02:09:11–02:09:26)
Yeah. Meredith, one question. I'm going to lower my hand. I've had my hand there.
Oh, sorry. No, no worries. JD, have you made any further progress with your billing permit application?
Speaker 22 (02:09:27–02:09:54)
I did receive a round of comments in between the prior hearing and now. So that is good news that things are moving on that side. So I'm hoping it's still not too late to kind of move this forward in parallel. So I'm hoping to return responsive to those comments this week.
And then my hope would be by the time this decision gets signed and appeals period elapses and the billing permits being issued about the same time, that would be my hope. Okay, great. Thanks for that info.
Speaker 1 (02:09:54–02:10:01)
All right. And I'm texting Cheyenne because she's She might still be available just to ask about that checklist.
Speaker 2 (02:10:05–02:10:47)
Well, Meredith, just one more. I don't know. It's probably a statement, not a question, but back to Cheryl's suggestion about staying away from the brick. I think it looks to me like it's a separate structure, the canopy.
is whatever you want to call that. Looks like your designer has kept it separate from the brick, but Cheryl's point is probably, you know, there might be some connection at the roof elevation to the brick just to keep, you know, keep that roof weather tight. But it does look like a separate structure that looks like the meters are hanging from it, not attached to the building.
Speaker 22 (02:10:47–02:11:24)
It can be either, so you can either attach to the building or you can, instead of, you know, again, ledgering right here, you can post down as well. You know, I mean, the only real difference, I think, from my end is that I obviously have to post down to footings. Right now I have mulch, so I'd have to dig and excavate footings. I'd want to try to create coverage for this takeout area here, so that does introduce a post.
Um, somewhere in this location, um, that I'd have to figure out. But if that, again, if that was something that the board felt strongly about it, I've solved harder problems. So I could say.
Speaker 1 (02:11:25–02:11:44)
I think that would be great JD. Um, and what might be nice also, if you're concerned about coverage for that, um, takeout is an awning. Maybe you could do something separate so you wouldn't have to carry it over. I don't know, but I think doing the separate posts would be, would be wonderful to not attach to the building.
Speaker 3 (02:11:54–02:12:04)
So JD, if you do that, would the awning be watertight to the building if you post down as opposed to ledger it? Or would there be a little crack where water is going to get in and run down that wall?
Speaker 22 (02:12:06–02:12:33)
Yeah, it's a great question. It's certainly if it's ledger to the building, it's a lot easier to flash it. We probably would have to find a way to incorporate the flashing. into the brick course.
I don't know. I'd have to think that through, but I mean, again, I, I could solve it. Um, if we did ledger to it, it would, it would, it would make it easier. We could do a gasket or silicone on the top line there.
So nothing gets behind the ledger.
Speaker 3 (02:12:35–02:12:41)
So, and then wouldn't that be more comfortable for your customers if they're sitting, are there going to be tables against there or just the handicap?
Speaker 22 (02:12:41–02:12:49)
Just the handicap ramp in the service window. All the tables are out here. All right. So it's not that much of an issue.
It's not all right.
Speaker 1 (02:12:50–02:13:27)
And Cheyenne just got back to me that everything when they came was complete and Julia should have the scan in the server, she believes. So. So she had everything as complete to Maggie's question. OK.
All right. So does that sound like a plan that we will wait to see and Ned if you get that done in advance of our meeting you could send it over to Julia and she can distribute it.
Speaker 21 (02:13:28–02:13:40)
I'll send it as soon as I can. I would ask the board to continue to next Thursday evening so that this is obviously a date that's on the on your calendar. Yes. Otherwise you'd have to repost.
Speaker 20 (02:13:40–02:13:40)
Yep.
Speaker 21 (02:13:40–02:13:47)
Yeah. If for some reason it's not ready, you know, we can, we can continue it. We do a continuance.
Speaker 1 (02:13:48–02:14:00)
Right. Okay. Great. So I would entertain a motion to continue the public hearing for two Elliot street to, um, seven Oh five on May 22nd.
Speaker 7 (02:14:00–02:14:09)
So you have to do it at, um, seven 10 or later because the, um, the, uh, the other public hearings at seven Oh five.
Speaker 1 (02:14:09–02:14:11)
Okay, sorry, 7-10.
Speaker 3 (02:14:13–02:14:18)
All right, I'll make a motion to continue the public hearing for 2 Elliott Street to 7-10 on May 22nd. Second.
Speaker 1 (02:14:20–02:14:25)
All right, roll call. All in favor, Sean?
Speaker 18 (02:14:25–02:14:26)
Yes.
Speaker 20 (02:14:27–02:14:29)
Cheryl? Yes. Jim?
Speaker 18 (02:14:30–02:14:30)
Yes.
Speaker 20 (02:14:31–02:14:31)
Maggie?
Speaker 3 (02:14:36–02:14:37)
Didn't hear you, Maggie.
Speaker 20 (02:14:38–02:14:38)
Yeah.
Speaker 3 (02:14:38–02:14:39)
I think you're muted.
Speaker 20 (02:14:39–02:14:43)
You're still muted. I'm not. There you are.
Speaker 19 (02:14:44–02:14:45)
Okay. Now you're muted.
Speaker 9 (02:14:45–02:14:45)
Yes.
Speaker 1 (02:14:47–02:14:51)
And myself, yes. All right. We'll see you next Thursday then.
Speaker 21 (02:14:52–02:14:54)
Great. Thank you. Thank you.
Speaker 1 (02:14:54–02:15:37)
Thank you very much. Okay. Okay. So now Moving on to the only other agenda item that we had was discussion of the MBTA zoning.
We can either pull up the districts, the map, and what we have for the 10% plan, or we can start with the language, the draft language that Cheyenne has sent to the board. Do we wanna just, why don't we, for the public who is just watching, Julia, do you have the slide deck I sent over?
Speaker 7 (02:15:37–02:15:44)
Do you want the thing that was sent by Nick today?
Speaker 1 (02:15:46–02:15:57)
The one that I sent to you for the 10%? And then we'll look at the language. But just to review what the maps look like and what the districts are.
Speaker 18 (02:16:04–02:16:21)
We can walk through.
Speaker 1 (02:16:36–02:19:46)
So while she's getting that, this was the plan that we had voted to send to HLC for their review. And you can scroll down, Julia. OK, so you can go back up. This was just looking at.
The districts within the half mile of the commuter station is on the next slide. Right here. This was just reviewing the 74 acres. Within the half mile.
Thirty seven and a half acres of developable station land, you can go to the next one. So this is the plan that we had voted again to send with all of the. for the adjacent community plan, we have still, we have our many of the same districts in this plan, the Granite Avenue North, the Paper Mill site, the Blue Hill Ave Station, the Blue Hills Parkway Corridor, Elliott Street Corridor, and the 711 Randolph. Go to the next one.
This was the Blue Hill Station area mapped. All right, next. Yep. And then Blue Hills Parkway corridor.
And these are within the half mile, and then this is our this is how we came out with our our units, our numbers that we all had agreed to. On this, so. Forty eight. And that's on our website.
And this is all on our website, just so folks can take a look. Our minimum open space, the height of the buildings, the number of parking spaces, lot size, units per acre, et cetera. And you can go to the next one. And actually, we added, and then, yeah.
So this was the also, and this is not in, this should be above with the other districts. We'll have to realign these for a presentation, but this is the Granite Avenue North District, 8.9 acres, yep. Paper Mill Site, 3.5 acres. Elliott Street Corridor, 711 Randolph Ave.
I think that was the last one. We'll have to make these maps consistent and we'll have to provide the street addresses so folks know. But this is at least a general location and map area, which we've been discussing in both the 10 and the 25 percent plans.
Speaker 4 (02:19:47–02:19:51)
And we would list out every parcel. That would be.
Speaker 1 (02:19:51–02:20:01)
Yes. Util has that. They have that ability to do that quite easily. So that would be available as well.
Speaker 4 (02:20:01–02:20:12)
So that would be on our website because it would be helpful for people to know if their property is affected or if their neighbor is affected.
Speaker 1 (02:20:13–02:20:18)
I agree. Yeah. And we would want that to be part of the presentation for town meeting.
Speaker 7 (02:20:21–02:20:30)
Yeah. Meredith, this deck is dated May 2nd. There was one sent by Nick today. You want to take a look at that one?
Oh, sure.
Speaker 1 (02:20:31–02:20:41)
That's, I didn't see that. I just saw the draft zoning language, but maybe that's, he's added incorporated this. Yeah. Okay.
Thanks.
Speaker 4 (02:20:52–02:20:57)
Maybe Nick needs to be aware that we like to get our materials the Friday before our meeting.
Speaker 5 (02:21:10–02:21:14)
Pretty hard to do when the meeting was the Thursday before the Friday you're speaking of.
Speaker 7 (02:21:15–02:21:37)
Now that's rapid transit. I guess I'm thinking of rapid transit stuff that he sent, but there is a… Yeah, I didn't see the districts.
Speaker 1 (02:21:39–02:21:47)
Because we'd sort of finished with that and then moved to the 25% work. Right. Okay.
Speaker 4 (02:21:47–02:21:58)
May 8th, I feel like the May 8th site deck that UTL did, they combined both the adjacent and the rapid transit into one.
Speaker 1 (02:22:00–02:22:56)
Yeah, which is the same. These were pulled from that. Okay. So I think what we want to do is make sure, I know There were some updates to the zoning language.
Julia, can you pull that up? Sure. And we'll walk through that. And that was dated May 6th.
But there might be a more recent update. I'm working from the draft from May 6th. And I think, Cheryl, you had some edits. Was it both to this or was it just to the rapid transit?
Speaker 5 (02:22:59–02:23:02)
I did not focus on this. I focused on the rapid transit.
Speaker 23 (02:23:02–02:23:07)
OK. OK, so.
Speaker 1 (02:23:10–02:23:24)
This. Did anyone have any? Did anyone have anything on this first page?
Speaker 18 (02:23:32–02:23:34)
I'm trying to print, sorry.
Speaker 4 (02:23:49–02:24:01)
So on the May 6th, you know, I just need to print it out. Yeah. So it's the May 6th one.
Speaker 1 (02:24:01–02:24:19)
Yeah. And Nick had a few comments. You'll see, I believe these were Nick's comments in red. Or Julia, is that correct?
Like under purpose, review purpose clause.
Speaker 7 (02:24:21–02:24:33)
Yeah, this is what he provided today. I'm not seeing any red, though.
Speaker 1 (02:24:37–02:24:41)
Oh, this is on. I just have things highlighted, like under.
Speaker 7 (02:24:41–02:24:48)
Yeah, things that are highlighted.
Speaker 1 (02:24:49–02:24:54)
Right, yeah. I had some comments.
Speaker 2 (02:24:56–02:25:08)
Meredith, there's another email from Nick. It was 321 today. And I, Julia, you might, and he had his changes in red on it.
Speaker 1 (02:25:09–02:25:10)
That's what I, yeah.
Speaker 2 (02:25:11–02:25:13)
And that's not reflected on this.
Speaker 5 (02:25:16–02:25:27)
Yeah, this was because the 321 one has the Rapid Transit with edits that I suggested. I did not supply edits to this one.
Speaker 2 (02:25:28–02:25:33)
Okay, so that's… Okay, he had sent that. Oh, okay.
Speaker 1 (02:25:34–02:27:25)
So on May 6th, we were emailed one with a couple of And these are just some language, some slight language changes, which I think we can look at later. I think what's most important as we make sure that, the question is, that Nick really had for us is we wanna make sure that the numbers are all correct, the inputs, but as the planning board, do we want to, now that we have approved the site plan approval, Do we want to make it subject to that site plan approval? And instead of having the design standards, maybe when we get down to that, we can talk about it. And I can, you know what, why don't I read off just what I have in the red comments.
So under purpose, Nick has highlighted review the purpose clause. And I'm not sure if he just wanted, if he wanted to change that or if he had thoughts on that. So he had reviewed that purpose clause on there. Um, then on page, he was fine with everything was fine.
Page two and three, these were all the definitions that were essentially, um, lifted the only one, if you scroll down to page four, Julia, Can you go down? Sorry, the pages aren't numbered. Oh, okay. So, if you can go down, it's the very last, when you go down to the definitions, the very last definition is subway station.
Speaker 4 (02:27:38–02:27:43)
Yeah, so this, we didn't even, May 6, it's the May 6.
Speaker 20 (02:27:44–02:27:45)
Yeah.
Speaker 4 (02:27:46–02:27:47)
In the email.
Speaker 7 (02:27:50–02:28:03)
Is that what you're using, Julia? I'm using the May 6 now, yeah, but if you can see, this came in today. And I'm would think we'd want to use the one that came in today.
Speaker 1 (02:28:04–02:28:43)
We can do that and let me just see if he made the changes. If you scroll down to the last definition, so it's number 28. You can see this is where This is the highlight, it just doesn't look right on here. But under subway station, this is not the same.
This is from the statute, but it's not what the regulations say. So I think we'll have to probably look at changing that language. But we can ask Nick about that or.
Speaker 4 (02:28:45–02:28:48)
You don't think it should be consistent with the statute?
Speaker 20 (02:28:49–02:28:51)
Well, that's what's in there.
Speaker 1 (02:28:57–02:29:18)
Yeah, this was just a comment that he had, but I think we should. Scroll down further, he didn't there was nothing for the next page, then when it comes to the community spaces, yeah, right here, Julia, if you want to just stop up at that. So.
Speaker 4 (02:29:18–02:29:22)
District school up a little more.
Speaker 1 (02:29:22–02:29:33)
Yeah, so this. This was for the. The Granite Ave subdistrict.
Speaker 18 (02:29:34–02:29:39)
OK, yeah, OK.
Speaker 1 (02:29:39–02:29:48)
So when we go down to lot size, a lot of this is templated from the 2023. So lot size.
Speaker 4 (02:29:49–02:29:51)
Yeah, there is none.
Speaker 1 (02:29:51–02:30:15)
There's none. The number of stories is six. The minimum height, the maximum height, 75 feet. And then.
The height is four and a half. Yeah, and then OK, then standard the minimum parking, none.
Speaker 4 (02:30:16–02:30:22)
Did we change the minimum open space to 30 percent or was that only in the rapid transit?
Speaker 1 (02:30:24–02:30:38)
That was 30 percent. We had had that, which was interesting when I was looking through it because we changed it in the rapid transit plan, but we originally had it as 30 percent.
Speaker 4 (02:30:39–02:30:42)
Okay. So in the May 6th edition, it's 40 percent.
Speaker 1 (02:30:42–02:31:09)
Wait, you know what? I'm sorry. I'm looking at this and it had been 40 percent. So he has made some adjustments to this because we had previously 40% and we had maximum units per acre at 45.
Speaker 4 (02:31:09–02:31:15)
Did we get a copy of this? Because this one is dated 5-13.
Speaker 7 (02:31:15–02:31:27)
Yeah, this is what he sent me today. On the left, this one over here is from 5-6. So it does say 40% there, and it says 30% here.
Speaker 1 (02:31:32–02:31:36)
So did he provide a new calculations chart, Julia, for this?
Speaker 7 (02:31:39–02:31:49)
I don't know. He just sent me this as an attachment. You know, this should be highlighted if he changed it, I would think.
Speaker 1 (02:31:50–02:32:38)
You know what, but what's interesting is, you know what, he might've done this correctly in making these changes because if we go back and we pull, can you pull up to, can you pull up what the chart was that we had in that little slide presentation? We can do a side-by-side, is that possible? The one from last week? The one that we just started with tonight, where it has- Your slide.
Yes. Because that's what HLC, I mean, that's what UTL- And it did say 30 percent there, so maybe he was correct in changing this.
Speaker 11 (02:32:40–02:32:40)
Okay.
Speaker 4 (02:32:40–02:33:12)
So just so I'm clear, we're looking at adjacent community version two. And that's what he emailed us today at like 12. At 12.27, he emailed us. three different or two different articles.
Speaker 1 (02:33:15–02:33:16)
Mm-hmm.
Speaker 4 (02:33:16–02:33:17)
Well, that's what we're looking at.
Speaker 1 (02:33:18–02:33:26)
Correct. But what we need to make sure is the inputs that he's added correlate with the UTL's calculations.
Speaker 4 (02:33:28–02:33:32)
So that's the correct one.
Speaker 1 (02:33:33–02:35:08)
Yeah. And I'm going to pull it up because I can read through this. So everyone doesn't die. So I'm going to just, I'm going to share this with the board right now, because we can then look at, or I'll send it actually, Julia, to you.
And I don't know if you can share it now. I'll share this because it's, Are you emailing it to me? I'm going to email it to you. It's what I sent to you, which is just the slide presentation.
So everybody will see the table, because what we want to do is to make sure that the table is consistent with what is in the zoning language, because those are our calculation numbers. So I'm going to send it to everybody right now so everyone can pull it up. Is this what you wanted? It's the entire chart for all the districts, so we can do a side-by-side just comparison to make sure what we have.
And everybody hopefully just got that?
Speaker 2 (02:35:09–02:35:10)
Not yet.
Speaker 1 (02:35:10–02:35:14)
Okay. So it's right before the thank you.
Speaker 2 (02:35:14–02:35:16)
You got it.
Speaker 1 (02:35:16–02:39:38)
So we can open this up. So when we look at Granite Ave North, that's what the Granite Ave is what we're looking at right now. There is 30% in there and it is six stories. So that's correct.
We just want to make sure. And it's 48. So the changes that Nick made in here are the correct changes to what UTL provided us. That's what I just wanted to make sure.
OK, so 3848. This is all correct. Setback frontage. Front yard setback 30.
Side setback 1020. 20 and 1.1. Yeah. OK.
OK, great so. So moving down Julia. Those changes were all made. Paper mill sub district.
Which page are you looking at? So now it's now going to the paper mill. He only had one comment under eight. So it's eight.
And he may have made these changes. Right there, yeah. So the site where it says exceptions, renewable energies, installations, the site plan review authority may waive the height and setbacks. And I think he wanted just to change that language to say.
Oh, he made that change because it had said a special permit granting authority, so he's made that he's made that change already. And then the following. That's all good here. Going down to be going to the Blue Hill.
Of subdistrict here, he. Under number two, not even square and the Blue Hill of commuter rail station. Yep. So he's he updated that.
Previously, it just said across from Mattapan Square. And he wrote in the Blue Hill Ave commuter rail station. So he's made these edits for us already. So continuing down, this is the minimum under the table dimensions here again.
This was the minimum lot size, 5,000 square feet. The lot area per additional unit, 1,000. Height, six stories. Maximum height in feet, 75.
Minimum open space, 40%. Maximum units per acre, 45. None. Front yard setback, 15, 5, 20, going down 30, 1.1.
So, that was all completed. Let's see. We didn't have any other comments going down further. Applicability.
Can you go to Blue Hills Parkway Corridor Subdistrict, yep, number two. So, an applicant, he had highlighted an applicant may develop multifamily housing on certain parcels within, okay, we had said in the original draft, it had said an applicant may develop multifamily housing on certain parcels within a half mile of the Mattapan station along with, along or adjacent to Blue Hills Parkway in accordance with the provisions of this subsection. So in close, so he changed it to say in close proximity.
Speaker 4 (02:39:40–02:39:43)
Why? Because somewhere outside the half mile?
Speaker 1 (02:39:43–02:41:55)
Yeah, probably. We can ask him, ask about that. Yeah, so. I would assume that that is why so that he just highlighted that previously, but.
Yeah, in close proximity. OK. Right, standard, all right, looks like under five. Units per acre, he has that blue there to be added.
And that's all consistent with with what we had previously. OK. And then on Elliott Street under number three. Let's see.
He had changed this to 7,000. The use is permitted as of right. The parcels, 7,000 square feet or more. And he made that change.
So that's been corrected in here. Going down on the chart, Julia, if you can stop right there. He had changed it to be lots 7,000 to 9,999 square feet with 0.50, and then 10,000 to 14,999 square feet, and that's 0.4, and then lots 15,000 square feet or more, 0.27. So those are correct.
Those changes were made. Okay. Going down. So 711 Randolph Avenue.
Yep. This all looked good. There was not anything in here except for under maximum open space. He added the words units per acre.
So that is That is correct.
Speaker 4 (02:42:00–02:42:16)
So just as a side note, on 711 Randolph Favre, does it have existing 40% open space? Was that part of their 40B application, do you know? And maybe you don't know.
Speaker 1 (02:42:16–02:42:26)
I don't. I don't know. Because that was if that was consistent with what the 40 B zoning was.
Speaker 4 (02:42:26–02:43:18)
Yeah. I don't know if we need to clarify what open spaces. So on this particular 40 B and I did talk to Nick about it. This developer cleared every last tree up to the property line.
So there's nothing, there's nothing. We actually took down trees on the neighboring yard because I saw it and I showed Nick pictures of it. So I don't know, and I know it's a 40B and I know that they have different requirements and they don't have to follow basic principles, but can we put in Like open space, maybe it just needs a clarifier. Open space just means like soil.
Speaker 1 (02:43:18–02:43:23)
It's in the definitions, Maggie, is open space, and I'll try to.
Speaker 4 (02:43:23–02:43:24)
Yeah, OK.
Speaker 1 (02:43:25–02:44:24)
pull it up because it does address open space. Under number 20, and I'll just read this, for the purposes of this subsection, open space shall mean a portion of a lot or of adjacent lots in common ownership exclusive of any building or buildings and or their associated driveways and parking areas and shall include parks, lawns, gardens, landscaped areas, community gardens, terraces, patios, areas left in their natural areas left in their natural condition, athletic fields, open air, open air athletic courts, playgrounds, open air swimming pools, or any open vegetated areas, driveways and parking areas, permanent or temporary shall not, shall not be considered open space. So that's the definition.
Speaker 4 (02:44:25–02:44:35)
Okay. So there's no, there's no set like setbacks do not disturb area of like five or 10 feet or anything.
Speaker 1 (02:44:36–02:44:49)
No, we didn't have that. And it wouldn't affect this anyway, Maggie. I mean, it wouldn't affect the 40 B because this is, Overlay zoning, so.
Speaker 4 (02:44:50–02:44:50)
Thinking.
Speaker 1 (02:44:52–02:46:40)
They already have their permit, so. Yeah. Yeah, but for other projects OK so. Alright, so we are.
Going down exceptions. Yep, so this was all. All consistent with what we had. Up until the point where we get to be the general development standards.
If you scroll down, yeah. Yep, right here so. Here we have this was prior to. Our.
Oh wait, OK, so he's put this in. Let me see. Projects proposed in accordance shall be subject. Section 275 site plan approval.
Alright. So he did he did. Yep. All right.
So he did take this because basically what had been in here with the design standards, if you remember in the May 6th, it listed basically all the design standards which are currently now implemented and incorporated into the site plan approval. So rather than duplicating and having all of these standards that were previously listed, this just simplifies the article. Does that make sense?
Speaker 18 (02:46:41–02:46:41)
Yeah.
Speaker 1 (02:46:43–02:46:49)
that we don't need to have both. Yeah.
Speaker 4 (02:46:49–02:47:11)
I mean, the only benefit of including it in is it just saves applicants from having to reference another part of our bylaw. That's the only benefit of having it in. But again, I printed out the May 6th, and that's like 35 pages where this is 10 or 12 pages.
Speaker 1 (02:47:12–02:47:15)
Right. It just makes it a cleaner article.
Speaker 18 (02:47:17–02:47:20)
I'd like to keep going.
Speaker 1 (02:47:20–02:48:03)
And so design guidelines, the site plan review authority may adopt and amend by simple majority vote. And this was all in, um, what had been in previously and then the affordability requirements. Go down to that. Okay.
And Nick, um, thinks it's reasonable for us to put in the 15%, as we had discussed previously. He does not think that there will be an issue with that with HLC. So he felt that we should put that in and send this for review. But this is consistent with what other towns are being approved for.
Speaker 2 (02:48:04–02:48:09)
And he also feels we can bring the unit count to eight.
Speaker 1 (02:48:12–02:48:13)
To eight or more.
Speaker 2 (02:48:13–02:48:14)
Yeah.
Speaker 1 (02:48:15–02:48:16)
Yeah, that's what he did.
Speaker 2 (02:48:16–02:48:17)
Rather than 10.
Speaker 1 (02:48:19–02:48:40)
That's what he had suggested, which is consistent with what other towns like Newton are doing. And and he felt and if you remember our when we were working with a consultant on our economic feasibility plan. It was. They were thinking that we would be fine with this too.
Speaker 4 (02:48:43–02:49:40)
now it doesn't have any reference to making any type of contribution to the affordable housing trust right if it's if it's um a development less than eight because yeah this does not address that so can we so that's what i had sort of suggested we we do is um you know, we should make as much of a contribution to the Affordable Housing Trust or Housing Authority, and maybe it could be based on a percentage of the sale price or a percentage of the rental if they don't sell, just so we are generating some additional funds that we could help the Affordable Housing Trust in developing additional units. So now we.
Speaker 1 (02:49:41–02:49:52)
Cheryl, what have you seen? Other other communities. How how are they calculating that? Typically.
Speaker 5 (02:49:54–02:50:27)
Or do you I don't know what others have done on the MBTA communities on whether HLC will allow a contribution, I've heard that. They haven't been amenable to that, but I'm not certain if they agree to it for any community. I understand that this at eight is as far as they were willing to go. But like I said, I don't know for sure if somebody else has done it or not.
Speaker 1 (02:50:28–02:50:40)
All right. So that's a question that I can follow up with Nick on and ask them, ask him, that seems like something we should we should ask about if we can ask HLC if that's something that would be allowable?
Speaker 4 (02:50:41–02:51:30)
Because many of our sites are actually going to only possibly generate three units. So I feel like we're missing out on an opportunity. And it doesn't have to be, we don't have to gouge them because I fully understand that it's either a resident taking advantage of an opportunity that their house falls within this district or it's going to be a smaller developer. A local developer hopefully.
So I don't want to gouge them but it might be that's why I was thinking a percentage of the sales price as if it's a down market and they're not being penalized. And if it's an up market than perhaps a contribute a little bit more.
Speaker 1 (02:51:33–02:52:07)
Okay, all right, well, I'll follow up with that and try to get that information. So we could get language for that if it's possible. All right, so we can go down. Yeah, he put this language in.
just to protect ourselves if for some reason they don't allow it.
Speaker 2 (02:52:09–02:52:11)
And we return back to the standard language.
Speaker 1 (02:52:12–02:53:07)
Right, right. Yeah. So that way we still have at least 10% affordability in there. Development standards, this was all consistent with what was in before.
And then severability. and then the town vote. So I know it's been doing, and Cheyenne had been doing a lot of work on this, and a lot of this language is the same language that would have been in the 25% plan. Cheryl, is there anything that you, that jumps out at you that you would want to see amended In this, were there items that were?
Speaker 5 (02:53:07–02:53:23)
I haven't done a cross comparison between the rapid and this, so I don't know for sure whether there would be something I would want to change.
Speaker 1 (02:53:26–02:53:53)
Yeah, everything was mostly the same except for, obviously, the inputs, the lot size, the height, and so forth. But as far as the language, severability, administrative, you know, everything that we've gone through other than those, the title of the districts and the inputs.
Speaker 5 (02:53:54–02:54:16)
Well, if we review the rapid transit compliant language, then we can see where the differences are and see if we wanted to incorporate any of them. Do you have what you're that was my red line? You all have it because Nick sent it at, I believe, 320. It was.
Yeah. So just for the purpose of time.
Speaker 1 (02:54:19–02:54:22)
Do you but all right. Do you do you have a red line version?
Speaker 5 (02:54:23–02:54:56)
Your red line markup is that that's what yes, that's what OK, what I sent to all of us at 320 today. So so it does. I just want to make sure. Yes, so if you intend to review the 25% rapid, then we can look at it and compare if there's, if there are things that I marked up that we would want to incorporate into this 10%.
But I have not, I haven't done a markup of the 10%.
Speaker 1 (02:54:58–02:55:13)
Okay, let's, Julia, can you pull that up to see if there's, if there were language changes that were made to the text that we could incorporate?
Speaker 7 (02:55:18–02:55:20)
Do you want to see the actual article?
Speaker 1 (02:55:21–02:55:21)
Yeah.
Speaker 18 (02:55:22–02:55:32)
If you could pull that up.
Speaker 1 (02:55:35–02:56:06)
Are you talking about for rapid transit? For the rapid transit, yeah, there's a red, Cheryl did a red line version. So we can just see the language changes to see what we would want to incorporate. Cheryl, you know what, would it be helpful for if you pull it up and keep this on the screen and we scroll through together?
That might be easier, and then we can edit this document.
Speaker 2 (02:56:08–02:56:09)
Can I offer a suggestion?
Speaker 1 (02:56:09–02:56:10)
Sure.
Speaker 2 (02:56:11–02:56:27)
What if we just pull up the document, the RAPID that Nick sent out at 321? If we just go through that and look at the red changes, we could just say whether or not we agree that those should also be applied to the 10%.
Speaker 1 (02:56:29–02:56:29)
Okay.
Speaker 2 (02:56:29–02:56:33)
Do we have to change it while we're here or can we? Can we?
Speaker 1 (02:56:33–02:56:40)
I would be fine with that.
Speaker 2 (02:56:40–02:56:56)
Because looking through it. I think we're going to find that. A lot of these. Maybe applicable to both.
Yeah, yeah.
Speaker 7 (02:56:56–02:56:57)
Do you want to see them side by side?
Speaker 2 (02:56:59–02:57:20)
I think we could look at the, no, I think we just look at the document that Nick sent at 321, and we might be able to acknowledge that the changes in that one should also be changed in this one.
Speaker 7 (02:57:45–02:57:51)
Are you able to do that, Julia? Yeah, I'm scrolling through the rapid transit. I'm just not seeing any markup.
Speaker 3 (02:57:54–02:57:57)
Yeah, me neither. Really?
Speaker 5 (02:57:57–02:58:02)
You have to have the one that says to Gaius Edits, and it has to be the one that was sent to 321. Yeah.
Speaker 3 (02:58:04–02:58:06)
I got one sent at 320, not at 321.
Speaker 5 (02:58:09–02:58:16)
You have to have the review on. to see the markup. I don't know what your settings are for Word.
Speaker 2 (02:58:17–02:58:24)
The specific email from Nick read, I attached some track changes to the rapid transit text from Cheryl.
Speaker 23 (02:58:25–02:58:26)
Yeah.
Speaker 2 (02:58:27–02:58:33)
That's the one. If you open up that attached document, I see the tracked changes in red.
Speaker 7 (02:58:35–02:58:37)
They look purple to me, but.
Speaker 2 (02:58:37–02:58:38)
Oh, really? OK.
Speaker 4 (02:58:39–02:58:50)
You have to download them. Download the document. Then it comes up green on mine. Are you guys seeing this from Cheryl?
Speaker 20 (02:58:52–02:58:52)
No.
Speaker 2 (02:58:53–02:58:56)
I just have it on my own computer.
Speaker 1 (02:59:00–02:59:04)
We're still seeing the previous article, the 10% article.
Speaker 3 (02:59:06–02:59:11)
Yeah, Maggie's right. If you download it, it comes up.
Speaker 1 (02:59:14–02:59:23)
Cheryl, do you want to try to share your screen? Would that be easier?
Speaker 18 (02:59:27–02:59:34)
Let me open it.
Speaker 5 (02:59:59–03:00:48)
All right, can you see it? Yes. Is it large enough? Yep.
I noted that they, you two had renamed the Madapan station district, the Blue Hill Ave station. I just think that's very confusing. We've been talking about a Madapan station district for three years now, and it's the same district. When I first read it, I thought he was talking about like the Blue Hill Ave, like triplex.
And so it will require the util chart to be consistent with Madapan, but that's my, I called Nick about that, actually, and he agreed.
Speaker 4 (03:00:51–03:01:05)
But just on that point, isn't it, doesn't, isn't it tight and tight title, the Blue Hill lab station, the commuter rail station? Should we be consistent with what it's actually called?
Speaker 5 (03:01:07–03:01:55)
It's just the sub-district has been called Mattapan Station for a long time. I think it's confusing to change the name of it at this point in time. There's two stations. There's Mattapan Station, and then there's the Blue Hill Ave Station down the road.
The closer one is Mattapan. We're calling it the Elliott Street, et cetera. Those aren't close to the commuter rail station. It seems to me that the consistency for people talking about the public understanding the differences between what was done previously and what we're what's being proposed here.
I think the changing the name of the district is confusing. But if you if you disagree then you could vote to keep it the way it is.
Speaker 4 (03:01:56–03:02:03)
So that was a good point that it's two stations. So that's correct. My mistake.
Speaker 1 (03:02:05–03:02:08)
Let's make sure, we'll just check to make sure these are all consistent.
Speaker 5 (03:02:09–03:02:46)
Okay, yeah. So next is making sure that we date the map. So that's on the same paragraph. This is the consistency of the naming of that sub-district.
Design guidelines is a paragraph later in the document. I felt that definition shouldn't have been stricken. It had been taken out from the 2023 version, so I put it back in. OK, so I would agree with that.
Speaker 1 (03:02:47–03:03:04)
We wanted to have. That added back in because we should comment on these as we go so right so. So the 1st. We want to make sure that our districts are consistent with the language.
Right, so then.
Speaker 5 (03:03:04–03:05:17)
The map had a date. The design guidelines has a definition. Section 3A of spelling out that it's Chapter 40A, the Zoning Act. Clear about what that is.
I didn't like using in higher density because it's still mid-rise. I felt like all of the sub-districts that are allowing six stories are considered mid-rise. In the applicability section, most of them have more than just what was included here. They have more definition of the Area, so I added to be more consistent with those other districts.
Something here to define this district better. Yeah, I'm fine with those. On the rapid transit, we had said that Grand Avenue North would not have a parking space requirement. The way the chart is set up is maximum spaces.
So I felt as if we should leave maximum spaces and add a line for minimum spaces. And the minimum would be no minimum space requirement in this particular subdistrict for the rapid transit. And then Under bicycle storage, the requirement to have the bicycle storage be enclosed for residential makes a lot of sense, but on the commercial. It's oftentimes at the entrances into the commercial space and outdoors.
So I added this sentence.
Speaker 1 (03:05:17–03:05:25)
Cheryl, I just, while you're here, I'm just, I'm concerned that we had no parking spaces per residential dwelling unit.
Speaker 5 (03:05:26–03:05:28)
Yeah, that's what we.
Speaker 1 (03:05:28–03:05:30)
Maximum under this parking spaces.
Speaker 5 (03:05:31–03:05:39)
If that would throw off the unit. That's what we had agreed to with you two last week.
Speaker 1 (03:05:39–03:05:54)
Yeah, that was in the rapid transit plan. I'm concerned it might throw off. If we start fiddling with the parking spaces on the adjacent, it might throw off. Correct.
Yeah.
Speaker 5 (03:05:55–03:11:07)
This is for the rapid transit. Yeah. I think we wouldn't want to make that change here for the 10 percent. but I think you could make the bicycle parking change.
Yeah, I agree. Yeah. I didn't think that these were necessary. Nick had flagged these and they were designed for the Granite Ave South.
I think he had put a question in whether we wanted to keep these in or take them out. And I think they might be in both of the 10% and the 25%. I don't think it's necessary for Granite Ave North to have these in. I just added again kind of a little more description to the on the paper mill district on the uniquely situated because it is uniquely situated and that kind of justifies some of the other things that we had agreed to there.
Again, we had the supplies to the rapid transit on the parking, just like Grand Ave North. In fact, I should have put this same sentence here about the bicycle storage. I didn't, that would be an ad here. This is the renaming of the, was allowed back to the Mattapan station that carries through in a couple of places here.
And then to your point, Maggie, this, I, um, I think this is where it had been included as both stations. And I think Nick had put this one in. Yeah. Um, another place tracing that through.
This is that same bicycle parking come change. Um, The parkway I added the, the commuter rail station here as well. Yeah, that Nick had made that. Yep.
Yeah. So he made it in the other 1. In the matter, Pam, but he didn't put it in the parkway. So it seems like it should be in both.
Um, there's some numbering corrections. Instead of just units per acre here for consistency, we we've had maximum units per acre. And this is the Randolph Ave access road, uh, sub district. Um, this is before.
We got the presentation, which these had been blank before on these setbacks. So we would probably want to make these consistent with what you submitted. Although I. I do think a greater front yard setback here, like we talked about last week, so that the buildings would be further away from the residential buildings at Front Randolph Ave.
I don't know that UTIL made that change. We'd have to double-check that. In Milton stations, central lab. So that's the three districts that comprise the Milton station, east, west, and bridge.
I had suggested some different setbacks here based on the kind of conditions that exist. Again, I think UTL's got those a little different than that. So we could be consistent and keep with UTL. This is the bicycle storage.
This is I think East Milton Square is the same thing in terms of the setbacks. Our business districts don't really have the setbacks. The historic buildings are pretty much right on the sidewalk. The building meets the sidewalk without the setback.
I think previously we had put larger setbacks in just to make sure that East Milton Square overlay was more attractive than this, but I don't know that those considerations need to be held for this. Then again, this is East Milton Square is not included in the 10 percent, so this is all related to the rapid transit on this. Those were next changes. I have made a couple of minor changes here that are in red on my screen, and that's it.
Speaker 1 (03:11:09–03:11:54)
Okay. All right. So I would agree, you know, I think most of those, and to be consistent, I would agree with those changes that are relevant. I think we just want to make sure that what we're labeling our districts align with what our maps say.
So, which I believe in the adjacent plan, they do. Because they, UTL hadn't changed the maps for the adjacent plan. But we can double check it.
Speaker 4 (03:11:54–03:12:06)
Is Nick going to send us a complete package that would include the zoning language, the map, and the Excel spreadsheet of all the parcels?
Speaker 1 (03:12:08–03:12:40)
Yeah, I can request that. Yeah, so basically incorporating everything we have in our slide presentation with the correct, the maps all corrected and consistent, the zoning language and the Excel spreadsheet. for the package that would be presented to the Warrant Committee and the Select Board.
Speaker 4 (03:12:41–03:12:49)
So we're not piecemealing it, it's just nice to get one complete package.
Speaker 1 (03:12:49–03:13:16)
Correct. And I would also say we could, Cheryl, what do you think is the easiest to send? Nick obviously has your document because he shared it, but that we ask that he makes the changes that are relevant to the adjacent plan using your amended language? Or do you wanna go through it?
I don't wanna ask you to do it.
Speaker 5 (03:13:17–03:13:24)
No, I don't plan to do it for the 10%. So however you think it's best to have it done.
Speaker 1 (03:13:25–03:13:38)
Okay, so I'll ask Nick to go through, was there any, did everybody agree with the language changes that Cheryl made? that would be, that were relevant, like the bicycle?
Speaker 2 (03:13:38–03:14:42)
Yes, yes. Yes, I think there was only one that, let's see which one, there was one that was not applicable to both. It was one that we said we wouldn't apply to both.
Speaker 18 (03:14:42–03:14:47)
It might have been. Trying to find it now.
Speaker 1 (03:15:22–03:15:59)
And while he's looking, I just double checked all of the zoning, the referenced districts are all consistent with what we have. in our Jason the plan that you to put together for us. So I think those changes were made Cheryl it with the 25% but but granted at North paper mill site. Blue Hill at station Blue Hills Parkway corridor.
Elliott Street corridor and 7.11 Randolph that that's that's the way the language read so we don't need to make any of those changes on that. First paragraph.
Speaker 5 (03:16:01–03:16:09)
But you said you wanted the data. I don't think the blue lab station should be called blue off station. It should be called Medapan stations. Is that what you were referring to?
Speaker 1 (03:16:09–03:16:19)
I'm just, I'm saying what we, what you teal had labeled it and what's in our language. Is consistent, right?
Speaker 5 (03:16:19–03:16:45)
So. I just think that we just have, we'd have to change it for the public. That's all. And when I spoke to Nick about that this afternoon, because I said, okay, I hadn't seen the YouTube presentation yet when he sent that and I said.
Is this is this the triplex? I thought we're not doing the triplex. And I think that's the same confusion people are going to have when they see it. If we don't get the.
Speaker 1 (03:16:46–03:16:51)
Language change back to call the blue hill of station Madapan station. Right?
Speaker 2 (03:16:51–03:16:52)
Yeah. Okay.
Speaker 1 (03:16:52–03:16:55)
So long as we're consistent in both, I'm fine with that.
Speaker 2 (03:16:55–03:17:11)
I had the same reaction as Cheryl. I thought it was referring to the triplex. So, you know, and the counts are, it's either called Matapan and you include the Blue Hill units in Matapan or you do vice versa.
Speaker 1 (03:17:12–03:17:20)
Right. Okay. That's easy to change. UTL can make that change on the maps.
Speaker 3 (03:17:20–03:17:24)
Yeah, I totally agree with the Matapan warning and it was a good catch on Cheryl's part.
Speaker 2 (03:17:26–03:17:30)
It was one item, I can't find it now. It was one item that we said was not applicable to both.
Speaker 5 (03:17:32–03:18:03)
It was the no parking requirement for Granite Ave North and Paper Mill. Actually, it's not Paper Mill. Paper Mill, there is no parking requirement, but there is a parking requirement for Granite Ave North in the 10 percent. You'd want to make that change in the Paper Mill site, That's how you were getting the density up.
They took the parking away. But they had kept it in the Granite Ave North for the 10%.
Speaker 1 (03:18:04–03:18:14)
I'm just nervous about changing parking requirements that we would throw anything, any of the unit count off.
Speaker 3 (03:18:17–03:18:39)
I'm actually afraid of the parking maximum. I wouldn't want to deter- Maximums, yeah. You're really tying someone's hand saying, you know, that there's a maximum. What if they want to build a few less units, but allow two cars per unit, which I think is the most marketable, but that's just my opinion.
Watch the maximum.
Speaker 5 (03:18:39–03:18:43)
It's the language that was there from 2023, the maximum.
Speaker 3 (03:18:43–03:18:53)
I understand that, I just don't agree with it. I don't think maximum is a good thing to have in there. Well, whenever it was put in there, I just personally think that it's wrong because you're tying developers' hands.
Speaker 4 (03:18:55–03:19:12)
So maybe definitely for the Granite Ave sub-district, I kind of agree with Jim, and that sort of has been our argument on other developments too, is just the developer is going to do what is marketable.
Speaker 3 (03:19:15–03:19:21)
forcing him to do one spot per unit, he might just not do it, or she, or they.
Speaker 4 (03:19:24–03:19:34)
Because I would think at that district, you probably would need more than one Clark.
Speaker 1 (03:19:37–03:20:46)
Juliet, would you mind pulling the 10% plan back up? So we can look at those parking real quick, go through those real quickly for each district. Here it comes. Okay.
So yeah, we can leave it on this. So we have Granite Ave North. Maximum parking spaces per unit.
Speaker 4 (03:20:49–03:20:49)
One and a half.
Speaker 1 (03:20:55–03:20:59)
One and a half. I'm sorry. So do we want to just change that to read minimum?
Speaker 4 (03:21:02–03:21:03)
So we do have minimum.
Speaker 5 (03:21:05–03:21:37)
Underneath, but it's no, it'll change the compliance model completely because now you're going to, you have to have something on the parking, which sets. That's how the compliance model works. It calculates parking requirements. I don't think that's something you can change.
All I did with the other one was make it consistent with what was agreed to at the last discussion with you two. But changing this would change the unit capacity. So I think we should leave it.
Speaker 3 (03:21:42–03:22:42)
Yeah, that's fine. I mean, I'm just looking at it from a practicality standpoint. $2,500 a month. Is that what the going rate is?
It's got to be close to that. So if you've got to pay $2,500 for a one bed, that's 30 G's a year after tax income, right? So you probably have to be making three times that, you know, one third of your income goes to rent, two thirds goes to everything else. So that's 90 grand a year.
Um, and then the other thing is, If a young couple is living there, it's gonna be two incomes to make that 90 grand probably. And two incomes will probably require two cars. That's just my thinking. So it's kind of, it's not practical to max it out.
And just because I've been in that situation, not as a renter, but as a landlord, I had a hell of a time trying to rent an apartment in Milton with one car parking. It was very detrimental.
Speaker 1 (03:22:43–03:22:58)
So Cheryl, if we made it a minimum, it could be up to the property developer how many units they wanted to create. We're not forcing them to create all the units that are allowed for?
Speaker 5 (03:22:58–03:23:28)
I think the maximum is the key that is in the compliance model, because it subtracts out what the requirements are for land area for parking. The way I understand, it's been explained by you too. So it will make a difference in the zone capacity. So I don't think you can change this without consultation with you too.
Speaker 1 (03:23:28–03:24:36)
Okay. All right. So I'll ask Nick to get back to us on that question. But for now, we'll leave that.
All right. So is that. Does that sound good to everybody that we. Vote to.
Send this to. The Warrant Committee for their review, subject to incorporation. Of Cheryl's. Zoning language amendments where where appropriate.
where applicable, update our maps, request Util gets our maps consistent, and we date that. And then we have an Excel spreadsheet for all of the units. And we reach out to Util for the question on parking.
Speaker 4 (03:24:37–03:24:40)
What's an Excel spreadsheet for all the properties?
Speaker 1 (03:24:40–03:24:42)
For all the properties, yes.
Speaker 5 (03:24:45–03:24:50)
Meredith looks like Julia's hand raised. Yeah. Julia.
Speaker 7 (03:24:50–03:24:59)
I didn't mean to do that. Sorry. That's okay. All right.
Speaker 4 (03:25:05–03:25:06)
Still moved.
Speaker 1 (03:25:08–03:25:15)
Does that sound good to everyone at this point?
Speaker 4 (03:25:15–03:25:50)
I'll make a motion to vote to send this MBTA community's multi-family overlay district adjacent community bylaw to the Warren Committee for their review subject to Cheryl's amendments, along with the updated maps and Excel spreadsheet for all the affected properties.
Speaker 3 (03:25:55–03:25:56)
Second.
Speaker 1 (03:25:56–03:25:58)
Second. Okay. All right. Roll call.
Speaker 5 (03:25:59–03:26:00)
Before you do the roll call?
Speaker 1 (03:26:00–03:26:01)
Sorry. Yeah.
Speaker 5 (03:26:01–03:26:40)
Discussion. Yeah. I'm going to make a comment. I'm going to vote no, but I want to say why I'm voting no, because this board has promised for a year and a half.
In fact, in 2023, it was promised to residents in the town that just with a little more time, the board could come up with compliant zoning. Fully a year and a half later and $50,000 later, the board's deciding to submit only a 10 percent plan and I can't endorse that. And so I plan to vote no.
Speaker 1 (03:26:40–03:26:46)
I understand. Okay. With that, we'll have a roll call vote. Maggie?
Speaker 4 (03:26:47–03:26:56)
Yes. After doing our research and in consultation with our consultants, I vote yes.
Speaker 20 (03:26:59–03:26:59)
Okay.
Speaker 3 (03:27:00–03:27:05)
Jim? After realizing how bad 25% is for the town, I'll vote yes.
Speaker 20 (03:27:07–03:27:08)
Okay. Sean.
Speaker 3 (03:27:08–03:27:09)
Yes.
Speaker 1 (03:27:10–03:27:35)
Okay. Cheryl. No. Right.
And myself. Yes. Thank you very much. Um, and thank you all.
Um, I really appreciate it. This is a challenge and it's a challenge for our community. Um, and we'll continue to work, um, on seeking compliance. So With that, I would entertain a motion to adjourn.
Speaker 18 (03:27:38–03:27:39)
So moved.
Speaker 5 (03:27:39–03:28:01)
Before the motion to adjourn, I'm going to, again, acknowledge that we asked you, Teal, to do a lot of work for us last Thursday for tonight, and we didn't discuss it tonight. And I sure hope that you plan to have that on the agenda for the next meeting and that you plan to personally thank you, Teal, for doing that work, even though it wasn't discussed.
Speaker 1 (03:28:03–03:28:24)
Absolutely. No, it's been great. And I don't think it's a waste of time. I really don't.
Because we need to be prepared to have a backup. And I think we are well positioned should we absolutely need to do the 25. So thank you. I appreciate that again.
Speaker 3 (03:28:24–03:28:40)
And I'd like to say, Meredith, nice job tonight for walking us through the 10% It was a logistically tough meeting, and thank you for getting us through it. And Cheryl, thank you for all your edits. There was a lot of work also.
Speaker 1 (03:28:42–03:29:09)
And unfortunately, we are up against a real tight timeline here. So I'm glad we're submitting this. We can always do more, but I think we at least need to demonstrate that we are trying to work to create zoning in Milton. All right, was there a second to that?
Motion to adjourn, was there a motion?
Speaker 3 (03:29:10–03:29:11)
Well, I said so moved.
Speaker 1 (03:29:12–03:29:18)
Is there a second? Second. Okay, we'll do roll call. Again, Sean?
Speaker 2 (03:29:19–03:29:19)
Yes.
Speaker 1 (03:29:20–03:29:23)
Cheryl? Yes. Jim?
Speaker 18 (03:29:24–03:29:24)
Yes.
Speaker 1 (03:29:25–03:29:29)
Maggie? Yes. And myself, yes. Good night.
Speaker 23 (03:29:29–03:29:31)
Good night. Good night.
Speaker 11 (03:29:57–03:29:57)
you