Board: Milton School Building Committee
Date: 2024-07-29
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:52–00:54)
So we called the meeting to order.
Speaker 2 (00:55–01:58)
We're now at agenda item two, which is citizen speak. We ask that for any citizen that wishes to speak, please raise your hand online. We do have one person in person. And we ask that when you come up, please state your name and your address and limit your discussion to three minutes and we'll start in person.
Ah, sure. Please, join us. Hi, I'm Phil Chauhen. My address is 23 Parker Drive.
I was stunned by the amount of money that was discussed at the select board meeting the other night. And I think when you look at many of the people in Milton who are like me, I'm 69 years old. I recently retired. I just cannot support a debt exclusion override.
of that magnitude.
Speaker 3 (01:58–02:10)
And I think, I respect the work that's been done by the committee and all the time that's been put in, but I don't know that the committee has emphasized affordability for a town of our size.
Speaker 2 (02:10–02:45)
And so I think you may have a very difficult time getting this passed. with a number of that size. And I would urge you to reconsider looking at some of the, I think you called it imagining, like going around and visiting other buildings. I think they're too fantastic.
you know, the ceilings, the libraries, you know, all those things are necessary, but not on that scale.
Speaker 3 (02:46–02:56)
I think back to the school I went to, I went to Catholic school, you know, affordability, cutting costs was huge.
Speaker 2 (02:56–05:16)
And my building was a cement block building with a brick exterior. They painted the cement blocks, looked white, looked clean. Did it bother me as a kid? Not at all.
When I went to high school, the building was over 100 years old. Same thing. There is no need for extravagance, especially when you look at the constituents who have to pay for it. What will I give up?
Will I give up insulin? Will I give up lunches? What will I need to give up to continue to live in this town in my house? I think you really need to reconsider what is the total cost?
What would be an appropriate cost for our town? What would get you a yes vote? And I think 173 million will not get you a yes. I also have written in the middle of time several times about operational overrides.
And I don't remember her name. She was superintendent for a long period of time prior to the jet. I asked her for all of the job descriptions for all non-teaching positions in health and public schools. And as I read through them, I, as someone who has never worked for a town or a city, only in the private sector, I didn't feel that there were any robust job descriptions.
And so, you know, I was reading in the middle of the time, so maybe they'll have to lay out a teacher. And my thought is, why not administrators? You know, why don't we look at administrators? What is their role?
How robust is their job description? What, you know, could jobs be consolidated? Could fewer people handle more tasks? I think the $5 million override, I think the $173 million debt exclusion is a real problem for you.
you probably need to succeed, but not with those numbers. I think you're going to have a real problem.
Speaker 4 (05:17–05:17)
Thank you.
Speaker 5 (05:18–05:19)
Thank you.
Speaker 2 (05:24–05:34)
Seeing nobody else in person, we'll go online. Yep, Mr. Jackson, you're recognized. Give me one second.
Speaker 4 (05:46–05:52)
Good evening. Can you hear me?
Speaker 2 (05:53–05:57)
Yeah, Pete, we can hear you. Just do your name and address just for the minutes.
Speaker 4 (05:57–07:26)
Yeah. Peter Jackson, 14 Capen Street. I just want to remind the committee that the EEA review of the Article 97 and Public Land Protection Act has not been completed. They did issue a finding related to natural resource value only, but even that determination says that the Secretary takes no position on whether it complies with the EEA Article 97 land disposition policy.
The review so far does not include the appraisal, the alternatives analysis, the suitability of the proposed replacement land for its intended uses, the equitability of the proposed exchange, it doesn't review whether it includes, whether it complies with the land use conversion requirements of the self-help program that funded the purchase of that land, of the land to begin with. And finally, there further has to be a filing of an ENF by the town that's required as part of the process. And I don't know whether that has started yet or not. I'd be happy to hear whether that process has started.
Thank you.
Speaker 2 (07:31–08:07)
Give it a minute. Seeing none, moving on to agenda item number three, which is approval of past meeting minutes, Monday, July 15, 2024. So obviously with everybody's packet that they got, we've got the minutes from our last meeting. So just see if there's any edits, comments, and you have a chance to work for it.
Speaker 6 (08:11–09:19)
No, this is the right time to say it, but I thought at this meeting we reviewed the feasibility presentation, and it was going to be given to the estimator the next day, who all along talked about needing two weeks to complete. And that was tight. But at this meeting, I do see the feasibility estimate was due on the 26th. And it was actually presented to the select board on the 23rd.
So there's obviously a lot of conversation going on the following week that I feel left out. and because the construction was developed in only one week's time. This is a problem. Here I am, the select board member of this committee, and I don't find out about the budget number until a select board meeting on the public front.
One makes judgments based on events that occur, and the fact that I was kept out of the loop. I said, I think this behavior breeds mistrust, and you're asking the whole town to trust you right now. And I don't think that people can make this decision without the facts and the backgrounds and the facts. And here I am among you and I don't have them.
I just wanted to say that.
Speaker 2 (09:19–09:31)
To be clear, the estimate came in. The first people who got it were the members of the school building committee. They sent it directly to everybody internally. I can forward you the email again.
Speaker 6 (09:31–09:31)
OK.
Speaker 2 (09:32–09:39)
So prior to the school building. When was that? It was Monday. If you need, I can pull the email up.
Speaker 6 (09:40–09:42)
supposed to be due on the 26th?
Speaker 2 (09:42–10:59)
It was. So essentially what we did, as I mentioned on previous meetings, the goal was to get a budgetary number to present to the Select Board on the 23rd, ideally some sort of window. The estimator was able to get us a finite number earlier based on the square footage cost and the estimate that he provided. The estimate provided is extremely detailed.
It's not like he just threw a big round number out there. If you look at it, there's breakdowns of everything. So For myself, as chair, when I got that number, originally thought it would be a window. When I got that finite number, I spread it with the entire school building committee first.
So the school building committee was the first ones to know about it, not the select board. Then, yes, as that became a public number, I was going from the select board on Tuesday. I felt it was warranted to get it out there because that is your request. You wanted a number, we got you a number.
So, in regards to the agenda and we can talk about the process later. In regards to the agenda item for meeting minutes, is there anything like that? Okay. Anyone else?
No, it's okay.
Speaker 3 (10:59–11:08)
Motion is approved. I'll make a motion to approve the meeting minutes.
Speaker 2 (11:12–11:20)
Further discussion? All right, roll call, please. Say aye, it makes it a lot easier.
Speaker 7 (11:20–11:25)
So all those in favor? Aye.
Speaker 2 (11:25–13:44)
All right, one abstention. Give it a chance. All right. So item four, a discussion approval land swap.
So as some of you are aware, the land swap over the past couple of weeks has been navigating its way through the House. It's gone through the Senate vote. It's gone through the Senate, it went over to the House. The House made some minor edits on there.
The Senate then concurred on following that concurrence. it's gone through two roll call votes through the House of Representatives and the Senate, all were unanimous, there was no, nothing against. So at that point, based on the process that Senator Timothy laid out to us, rather than the final step, it's actually sitting on the, technically sitting on the covenant status. So the hope is it's gonna be signed today or tomorrow, not today, tomorrow or the next day.
So essentially once that's signed, it's signed into law. That's kind of my update on that. I'll open it up if people have questions or anything in regards to it. Yeah, because the session ends on the 31st.
So basically with now, that's kind of where we're at. So for myself, I want to thank Senator Timothy. He authored it, got it going, and stuff like that. Then after that, Representative Driscoll.
He got it at the end of June and basically really ushered it through, you know, from now to where we are now. It's amazing. So he, both of them, Senator Timothy, Chief of Staff Jones here, Adam, has been in contact over the past couple of weeks constantly, and Representative Driscoll, and Representative Fluger, who is also a co-sponsor. And so I just want to say thank you.
You've done a lot of work. Any other questions in regards to the light swapping? All right, item moving on. Let me just see if there's any other members.
Sometimes forget if somebody shows up late.
Speaker 8 (13:45–13:49)
I just want to see.
Speaker 2 (13:49–14:06)
In case Tim or Glenn's going to be late, he said he'd be on while I do all of this. All right, so item five, new business, item A, discussion update from the architects, and we'll jump in at the top, review feasibility estimate. I think Shanali is with us.
Speaker 5 (14:14–14:36)
Shanali is still there. We can't hear you, shall we?
Speaker 9 (14:36–14:36)
We can't.
Speaker 5 (14:37–14:38)
OK. There you go.
Speaker 9 (14:38–14:39)
There you go. OK, great.
Speaker 5 (14:39–14:40)
Much better.
Speaker 9 (14:40–15:00)
OK, excellent. I can't turn on my video, but I think that's fine because I think Seamus is going to share the screen. So the first item of discussion is the estimate. And I'm just going to do a high-level review of it to show.
Speaker 2 (15:01–15:02)
One second, Shalini.
Speaker 5 (15:11–15:35)
All right. Can everyone see that screen? Mostly, I think so. Great.
Speaker 9 (15:42–18:59)
So Seamus, I think if we could just go to the summary page so we could just talk a little bit of the high level component pieces. If you want to just zoom into that top section where it says new middle school, new pre-K, that would be great. So if everybody can see here, PMC, who's the cost estimator, took the gross floor areas that we provided to them and did a detailed breakdown of all the components of what would go into the construction of the new middle school and the new pre-K, and came up with the $72,601,000 for the middle school and then the roughly $11 million for the pre-K, and then did a site work phase two component Which was that $11,534,000 that. If we look down a little bit, site work phase one at that roughly $2.3 million, the reason it's below the line is because it's excluded from the GC.
So there's some savings on the markups there, which is why it's down below, because it's considered a separate package. So we were able to get some savings with that site work phase enabling package, and that includes clearing the site, moving Guile Road, and preparing the site at a horizontal level for what we call the vertical construction, which is the building construction going back to the top of the middle school and the pre-K. Site work phase two includes the finish work of the landscape once the buildings are constructed. And that brings us to that total of the $133.5 construction costs, not project costs.
We've been a little conservative on the design and pricing contingencies. And he's included escalation for the enabling part, as well as the construction of the building part, as you can see in the middle section. And then included all, of course, all the insurance and the bonds and the bilge risk. So this is a fairly robust.
Estimate for the building for the 2 buildings rather as well as the site work, including the moving of Cal road. This also includes geothermal. I went for playground furniture. There's a allowance for signage and wall graphics.
So we've gone pretty detailed in terms of the level of items included. Mark will be glad to hear it does include projectors and whiteboards and all of those things that people do get concerned, rightly so, that get forgotten in the estimates and all that stuff is included. I'm happy to answer questions if people have a specific question. We can direct it to any page if people are interested.
Speaker 2 (19:02–19:12)
I'm just wondering, what's the typical variance on these numbers when you get to completion?
Speaker 9 (19:14–20:28)
Oh, that's a good question. Honestly, it's the time delay between the design and the construction. So the longer you take between now and the start of construction is where you're going to see the biggest gaps, but we're not talking huge numbers. You'll see some single digit percentage gaps.
I think Mark actually, Mark Lurie could actually probably speak to this a little bit better about the gaps, but it's been a little hard to predict quite honestly at the last five years because of the pandemic and the escalation costs of construction materials and labor costs, but we don't see We don't see hundreds of millions of dollars differential. We don't see those kinds of extravagant differentials. The sooner you can design the project, and the more often you have the cost estimate at the different phases, the more you can control the costs as you move forward, and as long as you can control the scope. So as long as there's no scope creep,
Speaker 2 (20:31–21:04)
but I'm sorry. Another question for you on the estimate, maybe another way to ask the same question is, does the estimator give you a plus minus with it for accuracy? They'll say, you know, at some levels they might say plus 20% and other levels they might say plus or minus 5%. I don't know if he gives any level of accuracy like that, That's where they're designing first at this point.
Speaker 3 (21:05–21:08)
So right now we're at 15% and that'll come down with each estimate.
Speaker 2 (21:09–22:18)
As we get more and more refined design, the number that they'll carry for design price contingency will decrease. Understood, but he also gave a plus-minus. Contingency is different than that level of accuracy. in an estimate.
So I don't know if he puts that in a write-up anywhere or not. I mean, honestly, I would expect it to be really low because this is what he does. And all these schools tend to be somewhat similar from town to town to town. And I'm sure he gets all the metrics back at the end of all these projects of the actual costs.
So I would expect it to be a really small percentage as far as the plus-minus goes. even at this stage. And then I guess the other question I had for you was, when you have a budget like this, do you, so now does this set what you design to from a budget perspective? You know, you have, you look at, I've got, you know, call it $100,000 for each classroom.
And then when you go into the next phases of design, are you keeping that in mind as a target to hit or underrun as you design that part of the process?
Speaker 9 (22:21–23:11)
I'm sorry, I don't know if people can actually hear me when I'm speaking. We can hear you now. OK, great. So I'm not sure who was speaking prior about the design contingency, but I just wanted to revisit that for a second, that it's correct, that the design contingency does get reduced with each um next estimate level because the drawings get more and more specific and so that is your buffer going forward that accounts for um uh any changes in the assumptions as you move towards the design and so it does help us stay on target so that people understand that that number that 133.5 is is the goal to stay right there um but going back to
Speaker 5 (23:14–23:16)
Mike dropped out.
Speaker 9 (23:22–23:22)
Is that working?
Speaker 1 (23:23–23:24)
Yes.
Speaker 9 (23:24–24:02)
Okay. I realize I'm going to have to hold my headphones up. Okay. So, um, As I was saying that plus or minus other estimators have used that as a tool, but Peter is so experienced in school projects that he's able to test these numbers against a large swath of projects across the region.
And so what we found when we spoke to him that these construction per square foot costs are right in line with what he's seeing in the market today. I hope that answers your question.
Speaker 2 (24:02–24:20)
Yes, that answered the first question. One follow-up question for you was just how do you use this estimate as you go into the next phase of design? Do you use that as your benchmark for how you're designing it so you look at it as your budget to stay within?
Speaker 9 (24:20–25:04)
So we're still really early in the process. I know that a lot of you have been working on this for five years, but from a design point for the building, we're still really early. The main goal for the next phase for schematic is to stay at that 152, 177 square footage. As long as we are able to get in all of the bag of house and designing the locker rooms and the bathrooms and all of those things that are in that grossing factor that we've talked about before, as long as we could stay at that 152, 177, then we feel pretty confident as we move into DD that we're going to stay on target.
But that is one of the key tasks for that next schematic phase.
Speaker 2 (25:06–26:54)
So one of the things, too, you'll see when Shanali talks about schedule is, as we go through the next stages of the project, there are check-ins on costs. So it's not, you know, follow the cost estimate, whatever you want to do, but as the design progresses, we do that and then kind of auto correct. As Sean said, there's a contingency budget that we have. And as things start coming up, as we're progressing the design, we're drawing the contingency down.
So I think that kind of is that we're looking for. Basically, this isn't the only time we're going to do a POS. We're going to be doing POS along the way. Yeah, I was expecting that.
But I also, I guess, have an expectation that when you set a budget, the design team works. to that budget. It's our job to hold them to that. You know what I mean?
It's weird for me to be on the owner's side now, because every other time I'm on the other side of, like, where you are, Shanali. And that's the game of, like, you do a project, you take it to a certain schematic design, you set a budget to it, and then that's what you walk into. And that's essentially what we're trying to do, is get to what that budget is, Progress the design and then that's where us as a committee have to make hard decisions of. Hey, this is going to cost too much.
We need to reduce. We need to do this. There's certain trade offs that we're going to have to do and that's. I know for us for the past 5 years, we've been working on land and, you know.
scope of what we're building and all that, but we're getting into, you're starting to see stuff on paper. It's up to us to make those decisions. You know what I mean? As they progress and we do these processments, if things are looking, getting more expensive, it's up to us to figure out how to get it back on in the intended direction.
Speaker 3 (26:54–29:36)
Yeah, I can just share my own experience. I completely agree. Again, got to just consistently work, even once the construction project happens, right? Costs will come in higher than you expected, or there's some unknown, and that increased costs.
And so you have some contingency, but you got to obviously manage it. And a lot of you are very experienced, obviously, within construction, but so mostly maybe just for the public here. And then within design, right, the architects will have some great ideas, and you're going to have to value engineer those out in order to, like, save costs and say, like, well, actually, maybe we don't want to design those. Actually, the 133.529, maybe we want it at 130, so we have some buffer until something comes up.
The other thing is, from my experience of these, the cost estimator is trying to hit at about 50th percentile. And so in public bidding, that is sometimes good because you can actually get a bid because you have to choose the lowest bidder. And so sometimes it's good because you can get somebody who will underbid it and be at maybe the 30th percentile. So instead of 133, it's 120, 125.
It's also possible that you bid at a time where your project, for whatever reason, is not a factor based on when you're bidding it, right, other details around how you're bidding it. Maybe you're a town that doesn't pay your bills on time and contractors know that and don't want to work with you and so they'll charge you more and you'll be like submitted for, you know, go above that rate. So like all these various things, I think my experience with Peter specifically is I've had jobs where I got the price and it was more than what Peter bid. And some of that was like unique site logistics that maybe he didn't consider as much or we weren't as clear about within our write-up.
Got another jobs where he nailed it right on the head. I've had another job where they were a little bit under. I'd say most of my jobs he's either been kind of at it or under given the public bidding process. But again, it has been more volatile over these last couple of years.
I think it's been hard for contractors. Contractors will overbid work because they're just not actually sure what things are going to cost when they get the contract in 12 months. How much is lumber actually going to be? I'm going to carry a 7% markup from what it is now because I don't have any idea.
I'm going to protect myself as a contractor. All those things just make it very hard. But this cost certainly isn't going to go down, I think, unless we can somehow significantly reduce square footage. There's just no way in 12 months or however many months, if things even settle, that this will settle in a downward trajectory.
Speaker 2 (29:37–32:08)
So the one thing to note on that, too, is to get ahead of this, You know, some of the unknowns we were trying to identify early on, soil conditions, you know, rock, stuff like that. So, that's part of the work we did, too, of going out and taking boring samples and everything in there. The boring samples were all dirt, which was good, and that's basically the majority of where the building's going. The hazmat analysis on the soils that were removed more so everybody knows that there was some front-end work done for that, too.
Any other questions on the estimate or anything like that? James, can you just kind of page through this for people online? I mean, we've got 34 pages of this here, you know what I mean? So, I'm sure at some point people will request the estimates, so just to kind of walk you through.
I think one thing that was good on that, maybe it was the cover page, but where it separates the cost for the pre-K building versus the 7-8, it's good to see there's significant difference for the pre-K being a separate building as a lower cost. Yeah, could you go to that on the front page on the square footage box? It's kind of focusing on your topic. or 570 for the 78 and 441 for the 3K.
That was a great result. The other thing on this page, Sean, that I was kind of interested in was we've got escalation in there at 5.33%, assuming the start of next October. What I'd be curious from the estimator is if we didn't get approval in the cycle and we had to wait longer, what do we think that escalation would be and how much would that increase that cost? Then we go from 173 to some bigger number.
But it'd be good to get an independent opinion of what that increased, you know, call it a year, what would increase that escalation be and how much more would that cost the town? Rough numbers, I would say you could assume 5.33 for another year.
Speaker 3 (32:08–32:20)
I'm not, it's tough in conversation with a few of these, you know, with escalation, he kind of runs it on a yearly basis anyway. So, we'd have to, we'd just have to ask if you were going to carry that for two years, would you carry the same number or would you carry a different number, right?
Speaker 2 (32:20–34:04)
Right. Yeah. No, I would leave that one to him. But it's another 5%, there's $5 million that we spent just because we waited a year.
And we get nothing in return. So the one thing, sorry, back to your comment on accuracy too. Yeah. So if you look at MSBA's graphs that they publish on their website for pricing, and you know, they have a, it was in my presentation on last Tuesday, they have a trend line of cost when things are bid out and they actually have data back.
But then when you look at what they're estimating right now, the number that he quoted, I think the total number at the bottom was something, 877 a square foot. So when you plot that into that graph and look at it, you're basically right where it's expected to be for that there. So that was one of the other ones I did when I got this to, you know, really just give it a check. Yeah, give it a sanity check against, you know, the stuff that's out there.
One other thing I wasn't sure where to incorporate it or how to incorporate it or get to incorporate it was the all the tax credits that we're going to get for net zero, wasn't that something like $9 million? Potentially. Yeah, so we're not doing net zero. We haven't.
Well, yeah, geothermal. Geothermal had roughly 34% tax rebate. And Shanali, correct me if I go off on this. I believe, can you go to the mechanical portion of geothermal?
Speaker 9 (34:07–35:07)
So it's a little difficult. I will preface this. It's a little difficult to. estimate the tax credit because the portions of the geothermal are split up into different sections.
But Kate, our Director of Sustainability, is looking at it to see if she can refine that number. So this 133 number does not include any of the credits, and we're working on that number. Now that we have the estimate, we're going to be able to refine that a little bit for you. It's still an estimate, obviously, but it will give you a better, clearer idea of what to expect.
Speaker 2 (35:08–36:47)
So, let's start with the site and the equipment. So, it's like a breakdown, you know what I mean, of the plant equipment. I think overall, when you look at the front-end mechanical, it's roughly around $20 million. So, the tax credit is based on that.
I looked at that, too, against what Keith when she came in to give her presentation, and the estimate is basically in line with what she showed. Yeah, so to answer your question, the $133 million that's there doesn't show any of that stuff. So, But when we do a debt exclusion, we need to finance the full amount. And then basically, when we get that money back at a different portion of time, how the town wants to utilize that for debt service is kind of on that.
But the good news is we've been getting money back. I guess my thought is that somehow it would be good to incorporate those potential refunds in here. Yeah. just even as a note or something so it's understood.
Yeah the problem is like Peter's job is to just estimate it you know as we develop because the other part of this is we have soft costs so you know I mean the 30 percent that we're doing there for us we need to you know that's why we gave a presentation was this construction cost and then overall project costs for everything. We do that overall project cost as we start publicizing that even more formally That's what it would appear to. Okay. Anything else on this?
Speaker 10 (36:48–38:09)
I have a question. I think it's more of a comment that I think to speak to the comment that we heard earlier, that we have gone through the exercise to try to, you know, be more conservative in terms of the size of the school, right? We could have, I mean, in the early designs, Right? Gone.
But added all these wonderful things and got crazy with space and you know, our kids would benefit from it. But we tapered that to get to a more reasonable square footage. in layout. So that exercise, I think it just needs to be noted that that was done.
In that, I think the other point that we made, which I appreciated during the select board meeting, is that the number is the ceiling. We wouldn't sort of continue to add to it, but we would manage the cost. so that we can come like the early offer. And that's important to know.
And I think the other piece that I'm sinking in yet again, and I always say it all the time, but I think it's important for us to know that delaying this project just makes it more costly. It doesn't take away from it. It doesn't make it easier for the fund to do what it needs to do.
Speaker 2 (38:19–38:43)
So, a lot of questions. We'll move on. So, agenda number 5A2, project schedule update. Yeah, we got that there.
Yeah.
Speaker 9 (38:44–43:04)
Sure. Great. Thank you. So, just to give you an overall idea of how this schedule is set up the 1st, 3 lines are meetings that will track.
Moving forward through the process, as things get scheduled, we'll add to this. But we basically cover the select board meetings, the SBC meetings, and then the working group meetings. So we can track those horizontally across the top of the schedule. The next section is the SD pricing set.
So we are officially in schematic design, and we are barreling towards the September 13th deadline. We are expecting the consultant narratives and drawings to come in around September 6th. We are in the process of meeting with them, coordinating with them, getting more information into our drawings as we develop them. And we're aiming to deliver that drawing set along with narratives to Peter on September 13th.
And we're holding two weeks to get back a cost estimate, which is that green dot. Very happy dot to get an updated estimate. As we are prepping to move into the next phase, you're going to see that there's an estimated town meeting in October, that vertical gray line. Seamus, if you could sort of zoom in from where it starts with environmental perfect.
Thank you. Exactly. As you can see, there's that October special town meeting that will be held sometime in October, then the November election. And then after that election, assuming everything's moving forward, we're going into environmental permitting and design development.
And that's going to happen concurrently. We are holding three months for design development, and we are estimating that we will also get a cost estimate at that phase as well. That other gray line is if we happen to push to May for the vote, there is this possibility of continuing with the environmental permitting and the design development so that we have a more robust number at that green cost estimate. for that April or rather May vote.
Sorry, apologies. I should have moved that gray line over. The other blue line there is the early site package. So what happens is when you're in DD, and this is for the public, There are certain parts of the project where you get enough information and detail that you can start parts of the onsite preparation early while you're finishing the building drawings.
So going back to the cost estimate that had that phase one site enabling package, that's what's happening there. We're wrapping up those drawings and we're starting that site enabling early in the summer of 2025. And then if you move to the left, which hasn't been identified yet, but will happen in that gray zone once we get a little bit more information after the votes, is we'll do an early foundation package. We'll do an early seal package.
These are all the things that help us keep the costs, overall project costs, in line and in control because the earlier you get some of these expensive pieces out and running, the easier it is to lock in those costs and hold to a project schedule. And schedule is key to financial success on a project. And then we'll move into design CDs and all of that after we get into that sort of grade portion. But right now, the goal is to get a successful vote, whether that happens in November or in May.
And I should also just note, contractually, the red is where we have our contract, and then we'd have to revisit that contract after that green cost estimate dot.
Speaker 2 (43:07–43:34)
So just Point of clarity to the October special town meeting that would be anticipated if we're on the November ballot. So, so there is a, yeah, just just for the public's understanding, there isn't a planned October meeting yet. But essentially on the process, if it was on the November ballot, ideally, we would have a town meeting prior to that.
Speaker 5 (43:37–43:42)
The. So you had a question, Mark.
Speaker 3 (43:43–44:32)
No, honestly, my question was the last point she made, which is just where does our contract end? Because I know a bunch of great work they're doing. We have a limited budget when we brought them on and at some point it runs out. So if we are unable to get on that November election timeline, October election, it seems like, that we at least need to figure out a way to get additional funding for the project, otherwise we're sitting on our hands and the project really isn't moving forward at all.
Not even just from a construction standpoint, but even at the design standpoint, if we're just waiting around until April or May for full funding. So I guess probably we can discuss after we figure out what happens going forward.
Speaker 2 (44:35–45:59)
Any questions on the schedule? The one other thing to note, too, is the early site package for Galbraith, the anticipation was to do that in the spring. So again, if it doesn't happen in November, we don't have funding. Essentially, that part of the project gets pushed out.
That's the one, if that gets pushed out, the goal of opening by 2027, just for the window. if you remember when we selected the architects there, finish time I think was like June, if you go back to the presentations there. So if we push that out, you know, we've got a very short window there to like finish the project, like open the school in this fall. So if we don't hit that, you know, we're not going to open the school in February.
You know what I mean? It's going to push to the following fall and stuff like that. So that's one is we've been going through this whole thing. why for me it's been extremely important trying to hit this deadline in November and stuff like that, not only for the amount of people voting, but also for the overall project schedule and stuff like that, hit it.
So we kind of hit the ground running in the spring to move Galbraith and clear the site and then, you know, follow up with the other projects. Any other questions?
Speaker 9 (45:59–47:01)
I just wanted to point out 1 other quick thing of Sean, you and I discussed it earlier. Seamus, if you can zoom into the bottom. Left this was. In last week's meeting, a couple of the.
Meeting members were talking about MSBA and going back and getting to MSBA to get through their approval, and I just sort of mapped out quickly what that would mean from today moving forward. So it's one year additional for application and acceptance. And then there's a one year for designer selection. And then it's one year to one and a half years for feasibility and schematic.
So if MSBA is still on the table, I just want you all to be aware that's adding three to three and a half years to your timeline, roughly.
Speaker 2 (47:02–47:11)
Sounds like a reset. Assuming you get in at the next correct. Correct. Yeah.
So that's upon acceptance to the program.
Speaker 11 (47:11–47:16)
This is an optimistic view, assuming acceptance.
Speaker 2 (47:19–47:25)
Any idea what escalation will be over that timeline?
Speaker 3 (47:25–47:30)
We're doing 5.5% a year over three and a half years, $26 million.
Speaker 9 (47:35–47:40)
Actually, yeah, that's a good point too.
Speaker 2 (47:40–48:33)
Yeah, because that must be able to force us to. So, the classrooms that we agreed on when we did the vision and kind of bringing it back. We looked at what the size for the existing peers was and. The size that MSBA told us to carry was actually bigger.
So we're allowed to scale it down because the teachers were like, yeah, the rooms we have are fine. If you go with MSBA, there are minimum requirements for the classroom size that you have to do. So this is going to get bigger too. So it's another one to keep in mind.
You take the number of classrooms that we counted when we did all the studying. And, you know, add whatever percentage that is. I don't know off the top of my head. It would equate to the largest square footage size.
More square footage, more cost. Um, I'm just, Chanel, are you done sharing your screen?
Speaker 9 (48:33–48:40)
Yeah, I have nothing else unless people have other questions. No questions.
Speaker 5 (48:40–48:44)
I'm just going to share mine.
Speaker 6 (48:55–48:59)
Was that scheduled in the packet, in the meeting?
Speaker 5 (48:59–49:13)
No, she just did it for today. Anything we're presenting. Okay, thanks. She just got that plus five.
Is my screen showing? I see it on my screen.
Speaker 2 (49:13–52:51)
Yeah, you were just presenting a different one. So just run through real quick. So similar to schedule. What I tried to do, so the process for the vote on this, for what we've been doing, it's complex.
I mean, it's taken a while to kind of get there, but what I tried to do is essentially to everything we've done on this project, we're going to have parallel paths. When we were going after Fon Fon, we were still keeping count. I mean, what we were doing, what we were looking for land, we were developing a program. So this should come as nothing new to us.
But essentially, what I tried to do is lay out steps, numerical for what the ballot question is, and then alphabetical for what town meeting needs to be. So when we look at this, first thing, construction cost estimate, we completed that. The next thing is basically a vote from the select board to get it on to the November election. So to do that, I'm just going to, as you mentioned last time, we've got to give it to the town clerk.
Town clerk certifies it, sends it up to the select board, to the secretary of state, correct? So what I tried to do for people, just so you know, this is essentially what the ballot question would look like. There's no dollar value associated. So what this does, and the reason I bring this up is, if you go back to the timeline on this, the ballot question is there to basically just authorize, to tell the town that they want us to go above and beyond about 2 1⁄2, right?
The warrant article that we do for town meeting is where the dollar value comes in. So when you look at the, as we go to town meeting for this, this is essentially, My daughter probably touched my laptop. But essentially, you can see here, like any other warrant article we have, this is where we ask for the money. So what this does now is, you know, by the time the warrant article goes to print, we'd have to have that all finalized, right?
We'd have to need to finalize prior, so we go through the warrant committee and everything else there. What that allows us to do is, as we heard tonight, the cost is too high, people are concerned. It allows us time to revise what we have right now before town meeting to bring the number down to make those hard decisions that I talked about, and then have it to a number that would be reasonable. And I say this mainly more for us and also for the public, though, you know, was there sticker shock when the number came in?
I think everybody can agree. I mean, it was much higher. And, you know, imagine it, as you mentioned, Dr. Miranda, if we went with the visioning statement of 200,000 square feet and 871 square foot, we'd be, you know, be a very expensive project.
But obviously there's concerns with what the cost is. I share it too. I'm a taxpayer, a single income. I don't want to drive Ubers to pick up the school.
But I mean, I think we're at that weird point now where we all understand the needs there. We need a school, right? And we are forced to. And this is kind of the work that's going to come on this committee to kind of work out, to figure out how we do it, what we're comfortable putting up there for a number what we can scale back on further than what we did.
Speaker 3 (52:52–53:07)
Yeah, and also just to add to that, also to convince other, like, lay out the logic to the town as to this is why, and then ultimately they will decide if our argument is good or our project is a good one that they're willing to fund or not.
Speaker 2 (53:07–54:37)
Yeah, and essentially, to kind of just walk through this, you know, A is, you know, for us to prepare the warrant. But we get a draft now that showed. The next would be have the select board recommend it or not recommend it, similar for the warrant committee to recommend it or not recommend it. And then it goes to town meeting where we need two-thirds approval.
So I think the select board doesn't recommend it and the warrant committee doesn't recommend it. That makes it very hard to sell a town meeting for a two-thirds approval. But essentially what happens is, After town meeting approves it with that warrant that's on there and the dollar value that's on there, when the voters go with item four that you see there for the presidential election, they would then have the number what town meeting, assuming town meeting agreed to it, they would have that number there when they went to make the thing. And as you mentioned, That gives us my presentation for the other night.
It's that gives us those months for what I call engagement, public meetings, walk through working. Now that we have the number, we're working through what the tax impacts will be. So, I mean, I'm assuming that's going to come out fairly soon. I know the town administrator's been working on it.
So, you know. We're getting there, you know, but the 1st part was getting this process, but now the balls are starting to roll. So, but I just wanted to put this timeline just so everybody kind of understood what the process is because we've been talking about it a lot and. Let's just see a more visual or stuff like that.
So nobody has any questions.
Speaker 10 (54:38–54:45)
Very helpful. Thank you.
Speaker 2 (54:45–55:39)
So, in regards to the project schedule. Any other questions or comments? So, new business item B, which is discussion approval recommendation of ballot for ballot question on debt exclusion to fund new school in November 2024 election ballot. So, you know, we have taken a vote previously of this committee for the recommendations for that.
I just feel we should, now that we have a number for it, we should kind of reiterate that. And it's eight o'clock, I'm just checking to see if the flames are on too, just in case. So, you know, essentially with this, I'll open up for any discussion or purpose or anything like that that anybody has.
Speaker 6 (55:47–56:21)
I just say for me what, unfortunately, what I have to consider also is an operational override. And I feel an operational override is, unfortunately, the timing's odd. The operational override is the most threatening to everything, including the school. has to come first.
Speaker 3 (56:21–57:02)
I'm sorry, to clarify it from your perspective, there's like no ability to have the town consider the school project before an operational override. So that means that the vote for a possible vote before the school project couldn't occur until next November, right? A year from now. Spring, worst case, spring.
That's when the operational override is occurring. The operational override has occurred first. I guess you're saying simultaneously?
Speaker 6 (57:02–57:07)
I mean, maybe simultaneously, but certainly not after.
Speaker 2 (57:11–57:12)
What?
Speaker 6 (57:13–57:14)
Operation after death.
Speaker 10 (57:17–57:23)
Are you saying the school building could not have happened faster?
Speaker 6 (57:23–58:03)
Well, I don't know what it does to everything. All I know is that has to come first. I mean, we just had the schools come up to us for last year, $415,000 they needed. I mean, we have a threat, I mean, to the schools right now.
And we don't know the answer to it. We just dodged a bullet. And we don't know, you know, so we had a budget together for next year before this happened. What does that tell me about next year's budget?
It questions it. And I understand, my wife is a special needs teacher. I understand it's totally unpredictable, but that's what we're faced with.
Speaker 2 (58:04–58:18)
So if you could ask respectfully, for the items that you would need to improve the school, is it only that it's the operational budget that's going on. If the operational budget was not happening, this would go in November, in your opinion.
Speaker 6 (58:20–58:28)
Yeah. I mean, certainly we could vote on putting it on the ballot.
Speaker 2 (58:28–58:35)
Yeah. I mean, what I'm trying to understand is You know, for us, we needed to do this, you know. And I'm speaking.
Speaker 5 (58:35–58:35)
I'm speaking.
Speaker 2 (58:36–59:08)
No, no, if we can. I mean, I'm just speaking from school building committee to select word as best we can, right? Because essentially, you're our conduit. You and Glenn Hoffman are our conduit at this point.
If you guys choose not to put this on November ballot and send it, it's your guys' votes. That's, you know, that's why you guys are elected and stuff like that. However, if you do decide to do that, us as a committee need a to-do list of what it's going to take to get you to a yes. That's what we need.
Speaker 6 (59:08–59:09)
You need a to-do list of what?
Speaker 2 (59:10–01:00:16)
Of what it's going to take to get this to a yes. For Tuesday? Not for Tuesday. No, what I'm saying is, come Tuesday, if you do not vote to put this on the November ballot, we're a good committee.
We work hard. We need a to-do list from the select board. what it's going to take, so essentially come May or come next November, see an analyst. Because for you guys to make your vote, it has to be four out of five, right?
So if you're a no vote at this time, the other member who may be a no vote or there may be multiple, I mean, we need to know from those no votes, what is the to-do list that we need to do? And we're willing to work, we're willing to do whatever we can, but until we get that feedback, we can't find it. So for us, I'm sure what I don't understand is why they can't both happen at the same time.
Speaker 6 (01:00:17–01:00:29)
Well, they can't happen in this timeframe at the same time. Why not? Well, because we would have to have, we have to put the budget together for the override, which we don't even have yet.
Speaker 2 (01:00:29–01:03:34)
So I think it's that the override will happen in the spring. We're talking multiple different things. Let me try to frame it. Essentially, for Ms.
Cohan, to get both of them on the ballot for November, the town would have to develop all their funds. Nick has done draft budgets from a very high level, I agree. It's nothing as finite as you would want for an override. But essentially, they would have to develop what these budgets are to come up with a dollar value to say for the operational override, we need this much operation every year.
To do that, he has to project it out. You don't want to do an operational override every year. So they have to make it a little higher than what they need next year. And then basically just fine tune it over the next four or five years.
Like we've done seven years in total. the debt exclusion, you know, we've got our number now, we're there. So, technically, from a truly technical point of view, yes, you could put both of them on there. They'd have to get everything by next week, which they won't.
But technically, if Nick threw a number out there and you guys voted on it and everything, they couldn't. But the reality is, they probably won't, right? So, what we're asking you to do is to put the debt exclusion right now on November. We've got our number.
We're ready to go. We're going to find it between now and September. And then, you know, when that refined number comes out, select where you'd still have to vote on, you know, whether they approve or not approve. You know, it typically happens at town meetings.
Whether they approve it or not approve, then the Warrant Article will support it. And then similarly for the Warrant Committee. And I just brought that up tonight because it gets confusing for everybody that's there. Like the question we're asking the select board now is just essentially allow people to vote.
That's all we're asking, right? What that number is, if it's 173 million people vote and they feel that's way too much, then it gets voted down. At least, you know what I mean? They're the ones who decided to do that, yeah, directly.
But to Ms. Kohane's point, please correct me if I'm wrong. As I said, you can do both in the fall, or you can do both in the spring. And the spring is typically when the Crown sets all their budgets, so they're more comfortable doing operational overrides then.
But then again, it falls on behalf of the select board, whether they want to put them both together or spread them out. And I think that's where Mark was going, is that if we do an operational override in May, When do we come back to do the school if it's not paired within the spring and just correct me if I'm going wrong when I'm saying this If it's not paired together in the spring When then in the future are we going to do it because that's the concerning part because if it keeps getting pushed off Specifically because we run out of funding. We're out of money come september everybody These guys go away architects go away and it's just us and I
Speaker 6 (01:03:35–01:04:04)
The only correction there is still open-minded to them both together, not 100% decided either way, but the operational can't be after it. So the operational has to be ready to go and it's not right now. Still, Pierre, we don't know. I have projections, and I have a spreadsheet that shows us over budget this year and continuing for every year after that.
But the actual numbers are not in yet. Can I ask a hypothetical? Yeah.
Speaker 2 (01:04:04–01:04:21)
So while we're in this wrong, all right? Last year, we were hearing at the same time that we're in the inaugural. We got through without one. If we got through without one, Does that logic still stand that you will not support it until an operational override comes?
Speaker 6 (01:04:22–01:04:23)
We need to answer the question.
Speaker 2 (01:04:24–01:04:46)
We don't know. I hear, you know… But the question is, is come May, if we don't do an operational override, if, you know, the budget gets figured out towards the end of the year. So we're going to know probably January, February, whether we need an operational override or not, right?
If there's no operational override next May, Will you support the school first?
Speaker 6 (01:04:47–01:04:57)
I'd put it on the ballot. In May? If that situation you described happens, that we don't need an override, and we determine that first, I would.
Speaker 2 (01:04:59–01:05:07)
That's fine. It's all hypothetical, but I mean, that's kind of, you know, and I agree with you, most likely we're going to need an override, but you know.
Speaker 3 (01:05:08–01:07:58)
Yes, and again, I'm crossing my seats here, my school committee and my school building committee, so apologies. I'll just say like the frustration I have, John, with that answer is that from a school committee perspective, we asked the select board for an override last year. We asked for an operational override last year, last year to say we need this, we're gonna run out, we know we're at the end of the rope, we need the funding. The select board said, no, we're not gonna give you an operational override.
And so, right, that is what it is. But then now the select board's decision not to give an operational override, not to allow the town the ability to take a vote on an operational override, is being held against the schools again by saying we're now going to point Sean made, the delay is going to delay the school for another year, right? So we have another year of kids who will not have the benefits of the new school building. The 5.33% escalation on $133 million project is $7 million extra to the town.
All of those things are occurring because the school project is ready. In the timeline, we said it was gonna be ready starting 12 months ago. But again, that's being held against the school building committee and the kids because the select board made the determination, we don't want to do an operational override next year, but we're worried we might need to do one this year. We're not even 100% sure we need to do one next year, this year, but we might need one.
And so we're going to kill this project temporarily until we're sure. And so again, it just feels like time after time, this is what the rest of the select board feels. And again, I only say this because obviously one vote lost is we can't lose any other votes. It just feels like an insult backhanded to the kids and to the staff at the school saying, hey, we're not gonna give you the additional resources through this override and we're not gonna give you the school because we didn't give you those additional resources.
So we're getting hit on both ends. And so I just don't know how to rectify those things. and to go back to the staff that you and I talked to and saw, and saw the real impacts of this problem, right? And express that to you and to me and have, I've done- My kids are there, I've done multiple tours, right?
But yeah, so anyways, that is the thing I struggle with is that it's like both, it's kind of feels like it's like we're talking about both sides of this battle. And so that I struggle with that.
Speaker 10 (01:07:58–01:09:33)
Yeah, I know that's not… The other part that I would say as a tactic, I'm having a hard time because of the delay of the book. As a taxpayer, I care about the schools. I care about the services that the town has.
I want to live in a town that is able to do what it needs to do. And so we knew this was coming, that that was a need. We've known that. So delaying it by an extra year hasn't taken care of the issue.
The issue is still there. Now the school building, the project, we delay it even further, it's going to cost me more. It's going to cost our residents more. So the logic of it, on having a part-time resident.
Because I think as, you know, members who are volunteering our time, working towards the town, that we should be working in unison to make both happen. Because we need both. And the further delays, that's the part that I'm like, you know, just simple math, but ultimately, it's not good for me, my household, and it's not good for the rest of the residents. So it's just the logic.
I'm having a really hard time. That's been challenging. And just, you know, it's important we hold it and, you know, keep pushing towards the timeline that we have set for ourselves. Otherwise, we aren't the same valuable community.
Speaker 2 (01:09:33–01:09:33)
Yes, sir.
Speaker 6 (01:09:34–01:10:43)
It appeals to me, in response to both, that last year's override was, putting it off, was a mistake. And this year, I'm on the finance committee. And we had one meeting. And I brought up the subject of the impact of the school cost on it.
And we have not had any more meetings since then. So I have the feeling that those are being held back, what had been being held back for this, and that was a mistake. That's, I'm new at this, but that's the way it appeared to me what happened to me personally, since I started. It's been put, nobody wants to talk about the override until we get past this.
And we can't do that. It's one thing to face it and put the data out there. It's another thing to shuffle it off to the side and not show people it. And that's what I'm seeing.
What are we, what, I'm sorry. The override, the operational override.
Speaker 3 (01:10:44–01:10:52)
Let's say from a finance committee perspective, which she and I are both on for the school committee. But again, we're getting a little… We're getting off agenda.
Speaker 2 (01:10:52–01:11:10)
Can I circle back to my original question was why it couldn't happen at the same time. And it sounds like the feeling is the override has to happen first. But I guess I don't understand why the operational override would have to happen prior to allowing the tenant to vote on a school or not.
Speaker 6 (01:11:10–01:11:20)
Because it's the risk of shock. And the operational override is the most, getting that approved is the most important. To right now, to the schools right now.
Speaker 2 (01:11:21–01:11:24)
I don't understand the risk of shock.
Speaker 6 (01:11:25–01:12:02)
Stick of shock, like after voting on 175 million, then we got to ask them to vote on an operational override. I mean, and you see it, look around in the towns all around us, they're shooting them down. It's not like it's a done deal. What I hear about my job is to minimize risk.
Minimize risk. And this is the biggest risk right now. We have to answer the question. It's going to say, gee, we don't know what the override, if it's needed or not.
We don't know. So until we do know, we need to know.
Speaker 2 (01:12:05–01:12:11)
The one other one I'll bring up for everybody is when we talk about delays.
Speaker 5 (01:12:11–01:12:21)
we've already been delayed a year, just to be clear. So just reminding people, go back in time two years. We had the land swap in May, 2022.
Speaker 2 (01:12:22–01:17:22)
And going into that town meeting, we had Conservation Commission, Warrant Committee, Select Board, everybody in favor of what we were doing for the land swap at that time. We voluntarily pulled back. We revised it to use a third of our conservation land. We made it better.
We delayed this project by a year already. So, that's one that a lot of people forget about. I mean, this project has already been delayed a year. And, you know, once we pass the land swap, I think nobody should be surprised that we're at where we're at.
My presentation of select board when we were, it was April 6th, 2022. And you know, the member of the select board at the time asked me when we would be doing an override. It's stated then 2024, 2025, this exact time. You know what I mean?
So myself or a committee point of view for us, I'm very proud that we're on schedule. We are there. And I mean, projecting two years out saying this is where I'm going to be in two years is, you know, it takes a lot to say that. I get in trouble sometimes because I go out and say things that I probably shouldn't say because I'm doing things.
But as I say, give me a deadline, I work better towards it. So, you know, obviously when we made that push there, 2024, 2025, and now we hit it, you know, you got to understand the frustration that, you know, for two years we've been working towards this date. The big reason we're working towards the state is the presidential election. The turnout for a presidential election is roughly 18,000 voters a million.
The turnout for an April election is 5,000 voters, 13,000 voters different. So just, I need everybody to put that in perspective, because people, the concern of why we're so pushing for this, is that to get as many of the people in the town that it will affect to vote on it. That's all we're asking them to do. If it's 173 million and they vote it down, at least they vote it down, not us, not anybody else, the town.
I know there's concerns that, you know, trying to get a campaign or something there, if you didn't see, like, there's a lot of parents involved in this. There are roughly 80 parents outside of Select Board when we showed up last week. That number has organically been growing. I think it started with one mother showing up for a select board meeting probably a couple months ago, slowly growing from there.
You know, this is, my concern is parents gonna come back from vacation, but every parent they talked to was like, we already voted on it, we get the land, we're done, it's over. Nobody realizes we don't have the funding. This thing is now gonna get put on pause, you know, at least for, three or four months until we get additional funding. Because our funding runs out in September.
Most likely there's not gonna be a town meeting until December. We're not gonna get appropriations assuming free cash is like we were lucky last year. So if free cash isn't there, we're dead till May. So that's now eight months that we're just on pause.
We're gonna do meetings like this and talk. But that's kind of where we're at. So I've asked the architects and the OPMs tell us what their numbers are going to be to continue this design. That's why Chanel is showing it because the money we got was overall cost.
We've got a fraction of a percent of the overall project for design cost. So typical OPM and designer fees are 12 to 15 percent of the overall project, right? So when we're looking at that, we're talking $10, $15 million. They've been working on a small budget.
The architect's been working on $500,000. This next phase is going to be higher than the $500,000. I don't know what the number is. That's where I get in trouble on the side of them.
But we're going to need additional funding to keep this going. Otherwise, we're on full pause for a long time. So, yeah, that will be news, I think, to a lot of parents, you know what I mean? When they get back from vacation and start school, they start realizing, like, what?
The school, you know, everyone thinks 2027 is when it was coming because that was kind of our project schedule for everything. And now it's going to be sometime later. So. Um, you know, with with kind of back to the agenda item of the motion, if anybody else says discussion or comments, but.
Essentially, you know, this is the discussion approval. So, essentially, if you guys are so inclined.
Speaker 4 (01:17:34–01:17:34)
Okay.
Speaker 5 (01:17:35–01:17:37)
You need to say it loud too.
Speaker 10 (01:17:37–01:17:52)
Sorry. I hope that we continue to go with the plan of the debt exclusion to fund the new school on the November 2024 election.
Speaker 2 (01:17:52–01:17:56)
If I can just make a friendly amendment, it's a recommendation.
Speaker 10 (01:17:56–01:17:58)
It's a recommendation to the select board.
Speaker 2 (01:17:58–01:17:59)
Yeah, sorry about that.
Speaker 10 (01:18:01–01:18:05)
learning, learning the rules.
Speaker 2 (01:18:06–01:18:17)
It's only been five years. Any second? Second. Any discussion?
Speaker 3 (01:18:18–01:19:37)
Mark? I just I do think it's important because now we have a number. I do think that it's important to say to the point that you made, it's like, you know, we have cut down the building I think what you made, we have time to continue to look at that number, refine, figure out ways to cut down, see if there are other things we can do to decrease the numbers. I do think the number is larger than everybody at this table was expecting the number to be.
And everybody would like that number to be smaller. Everybody understands a smaller number has a greater ability to get past and to complete a school for our kids, which is what we want. That's the goal of this committee. So I think maybe in the future discussion, any additional kind of feedback from Arrow Street or PMA on things like these are options for some space cuts that there's like approximately how much this would, we think it would cut based upon this estimate.
I think that type of conversation, some direction on that would be useful. So I just, I think that should be named because I don't think I'm not trying to recommend it at the $173 million number. I think we can and should try and get it to be smaller, but we definitely agree with the recommendation too. move this forward.
Yeah.
Speaker 2 (01:19:37–01:19:54)
So just clarity on that. So, yeah, we're not recommending that. We're not. We're not recommending a number.
So it's just to get the ballot question on November so that people can vote on the number will come up the next one. But it's again, it's just a recommendation. So we'll jump on that later.
Speaker 3 (01:19:54–01:20:11)
No, I think that's good clarity. I just think from a public perspective, people are going to potentially tag on to say you're recommending this project at this number. And so we're saying we've been clear that that is not. We have opportunity to continue our plan.
Speaker 2 (01:20:11–01:20:22)
Any other comments? I keep looking down this way, but there's no members over here, so probably folks at that end. Those are our workers. They're doing a great job.
Speaker 10 (01:20:22–01:20:25)
Can you just talk to see if one's on?
Speaker 2 (01:20:25–01:20:37)
Yeah, see if one's on. Oh, he might have texted me too. I'm trying not to check my phone. That's probably him.
Yep, there he is.
Speaker 5 (01:20:41–01:20:47)
Hey, Glenn.
Speaker 7 (01:20:47–01:20:49)
Hey, how you doing? Sorry, football started tonight.
Speaker 5 (01:20:50–01:21:01)
No, no, no. I miss football. Yeah, coaching for a while. It was great.
Well, I'm not sure how I apologize.
Speaker 2 (01:21:01–01:21:08)
I wasn't watching the, uh, uh, the gallery, uh, but yeah, do you have any comments or anything you want to say?
Speaker 7 (01:21:09–01:21:14)
No, not at this point. I'm just kind of listening to take it and everything that's being discussed right now.
Speaker 10 (01:21:15–01:21:21)
Okay. So when you heard the motion, I heard a motion.
Speaker 7 (01:21:21–01:21:27)
I didn't get the exact wording. It was a little, Tough to make out.
Speaker 10 (01:21:27–01:21:44)
Go ahead. I'm going to try again. I just want to make sure. And I move that the school building committee make a recommendation to the select board for ballot question and vet exclusion to fund the new school on the November 2024 election.
Speaker 4 (01:21:45–01:21:46)
Have it.
Speaker 5 (01:21:47–01:21:48)
Got it? Thank you. Great.
Speaker 2 (01:21:50–01:22:08)
Oh, sorry. One second. Uh-oh, uh-oh. Uh-oh, talk about it.
Talk about it. Hello. That's an entrance.
Speaker 6 (01:22:09–01:22:09)
Most important.
Speaker 2 (01:22:10–01:22:36)
Most important. Thank you. The big, big buzz. I'll second it again.
Thank you. Sorry about that. All right. Seeing no further discussion, and we can't do a nice hands up.
We didn't want to slow it a lot, so I'll do a roll call vote. Scott Parishad? Yes. Mark Warren?
Yes. Dr. Miranda? Yes.
Terry Garland?
Speaker 10 (01:22:36–01:22:37)
Yes.
Speaker 2 (01:22:37–01:22:38)
Ms. Gohan? No.
Speaker 5 (01:22:39–01:22:55)
Glenn Hoffman? When we know you on the boat.
Speaker 2 (01:23:02–01:24:00)
So, yes. Plus, he throws the vote off and then Sean, sorry, I lost my sound there for a minute. It's all right. So, we just did a roll call vote for the motion.
Yes. Thank you. All right, so agenda item 5C, discussion approval, recommendation for fall town meeting prior to the November 2024 election to consider the debt exclusion refunded new school. So this is basically us again, requesting select board.
If you do the vote in November, we'd also like to have the, as I showed on the schedule, to have a town meeting prior to that. So that when people go to the ballot, the number would be solidified at that point for them.
Speaker 3 (01:24:06–01:24:16)
Make a motion for recommendation to the select board for a fall town meeting prior to the November 2024 election to consider debt exclusion to fund the school.
Speaker 2 (01:24:17–01:24:31)
I'll second it. Any further discussion? Hearing none, we'll do a roll call vote. Scott Tereshek?
Yes. Mark Lauren? Yes. Dr.
Morales? Yes. Teri Hurley?
Speaker 6 (01:24:31–01:24:31)
Yes.
Speaker 2 (01:24:32–01:24:33)
John Corleone?
Speaker 6 (01:24:33–01:24:35)
Yes, I raise a no.
Speaker 2 (01:24:35–01:25:06)
Glenn Hoffman? Yes. And Sean O'Rourke? Yes.
All right, now to the fun ones. We get to cut checks. Item 5D, review and approve project invoices. So as part of your packet that you got, we got invoices for PMA invoice number six.
And then we've got also, we'll take up the next one after. So essentially, you know, for those, again, revising the motion or people have comments or anything like that.
Speaker 6 (01:25:07–01:25:15)
Forgive me if I've seen this somewhere, because I'm not great at getting everything. Is there a breakdown of where we are so far, or is that something you could share?
Speaker 5 (01:25:15–01:25:19)
Yeah, so that's one of them. So you look at the overall, like what we had budgeted.
Speaker 2 (01:25:19–01:25:53)
Yeah. I know for the architects, it was $475,000. So if you look, $200,000. Yeah, they're at $200,000 now.
Oh, yeah, sorry. Yep. The total is 236. So ours is built to date $39,076 out of $160,000 budget.
Your budget? Yeah, our budget was $160,000. Total budget, though, for this phase, like, is there a- Well, we have it broken down by each insult.
Speaker 6 (01:25:53–01:25:54)
Okay.
Speaker 2 (01:25:54–01:25:55)
Total budget for this phase is $610,000.
Speaker 6 (01:25:55–01:25:58)
Forgive me, because I'm getting up to speed.
Speaker 2 (01:25:58–01:26:18)
Built to date is 239,076. but including the PMAs. So remaining bills 379, 24. So essentially the agenda item we're talking about now is PMAs, Arrow Streets.
Yep. Oh, was he doing PMAs first?
Speaker 5 (01:26:18–01:26:20)
No, Arrow Streets. Oh, PMAs.
Speaker 2 (01:26:20–01:26:48)
You're right. You're right. Sorry about that. Yeah.
PMAs. So $8,250. So Sean was saying it's a percentage. 169,000.
169,000. 169,000. 169,000. So it's about 25%, right?
It's that math, right? It's not 40, 40. 24%. 24%.
Yep.
Speaker 6 (01:26:49–01:26:59)
Of course, the English is just looking at budgets. Yeah. You know, it's a good point. We'll just put that on as a detail sheet moving forward.
Speaker 10 (01:26:59–01:27:00)
Thanks.
Speaker 2 (01:27:01–01:27:24)
Any other questions or comments? Hearing none, we can wait for a motion to approve. And make a motion to approve PMA's invoice number six, I believe it was. I'll second.
Second. Further discussion? Hearing none, roll call vote. Scott Tereshak?
Yes. Mark Warren? Yes. Jonathan Miranda?
Speaker 10 (01:27:24–01:27:24)
Yes.
Speaker 2 (01:27:24–01:27:25)
Terry Irwin?
Speaker 10 (01:27:25–01:27:25)
Yes.
Speaker 2 (01:27:26–01:27:43)
John Dwayne? Yes. Glenn Hoffman? Yes.
All right, and Sean O'Rourke, yes. Item 5D, number two, Arrow Street invoice for two, which is their second invoice for $100,000.
Speaker 3 (01:27:43–01:27:52)
I'll make a motion to approve Arrow Street invoice number two, amount of $100,000.
Speaker 2 (01:27:53–01:28:57)
Yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, This one's, it's all depending on what comes out of the next select board meeting. I would say for us, we probably would like to hold, you know, probably two weeks out. I don't think we need to meet next week or anything, but I would hold two weeks out right now. If that works for everybody.
And the others, our attendants will have to make it work for them. I hear from you guys.
Speaker 5 (01:28:58–01:28:59)
Yeah, sure.
Speaker 2 (01:28:59–01:29:10)
And that's part of our standing. Yeah, we're standing on two votes. All right. Last and best, item seven, adjournment.
Speaker 10 (01:29:10–01:29:12)
Motion to adjourn. All right.
Speaker 2 (01:29:12–01:29:29)
So moved. I'll second. I'll second it. Second.
We'll call the vote. Dr. Herschak? Yes.
Mark Loring? Yes. Dr. Miranda?
Yes. Gary Early? Yes. Glenn Hoffman.
Yeah. Thank you.
Speaker 1 (01:29:31–01:29:34)
Thanks Glenn. Thank you.