Speaker 1 (00:18–01:18)
All right, thank you, everyone. Good evening, and thank you for joining us on Tuesday, September 8th for the meeting of the Milton Select Board. I would thank you and ask you all to stand with me for the Pledge of Allegiance. All right, we'll now open the floor for public comments.
We've allotted 21 minutes for public comments, three minutes each speaker. I will let you know when you have one minute left. If we have any hands raised online, I will try to just kind of go to the online attendees. I don't see anyone right now.
All right, so first on the list, John Corey.
Speaker 2 (01:23–02:38)
Thank you for allowing me to speak. John Corey, 1452 Canton Avenue. I grew up in Milton 53 years ago and since I've come back to town bought a house up by Eustis and I have been concerned about Upper Canton Avenue speeding along that street and safety and quality of life for many residents there. So I'd like to thank you guys for putting the Upper Canton Avenue item on the agenda.
I don't know if it's time to speak during that, but I think you folks know where I stand. I've offered proposals. Miguel is here, my husband. He's a pretty good architect and designer and he's put a lot of effort into plans and it went to the DOT and there were no There were no real problems with the design.
Now it's up to the town to take it to the next level. And there's a lot of residents counting on the town to give us some relief, quality of life, and also safety along that roadway. So thank you very much. I also see my, I think I'll be, I applied for the traffic subcommittee.
So if you guys see fit, I think I could add a lot to that committee. Thank you.
Speaker 1 (02:43–02:46)
I see Heidi Graf.
Speaker 3 (02:50–05:20)
I'm really bad at this, so I have to read what I've got with me. I'm here to talk. I'll just start with your name and address. Heidi Graf, 245 Atherton Street.
Well, I've been doing a lot of research, hours and hours and hours of research about surveillance cameras. I've read about lawyers who know about constitutional rights. And I've read a lot of very savvy technical professionals who understand the ways in which surveillance cameras can be hacked and our data shared without our consent. But I don't fall into either of those categories.
I'm just a resident. who's lived in Milton for over 30 years, and I have appreciated the professionalism and the kindness of our police officers that I've encountered throughout those years. The Milton police officers I know are very good at what they do. We live in a low crime town due to their hard work and their care.
They have been very good at community policing. Community policing is defined as a collaborative partnership between the law enforcement agency and the individuals and organizations they serve to develop solutions to problems and increase trust in police. We have had a low crime rate in Milton for decades due to good old fashioned policing by dedicated and knowledgeable officers. And I can't continue without personally thanking them for everything they do for our town.
However, purchasing and installing flock cameras without my consent erodes that trust. Milton Police Department's participation in a mass surveillance system that says I need to be constantly watched and recorded, just in case, erodes my trust and breaks down our community partnership. The only question I have tonight is who is going to restore that trust? Who is going to be the hero that we need right now?
Who is going to break the contract with Flock Group and take down the cameras that are watching my every move in my beloved town? Thanks for your time.
Speaker 1 (05:25–05:35)
All right, I'm going to ask for early forgiveness if I pronounce this name incorrectly. Jukka Heikka? Pretty close, thank you.
Speaker 4 (05:36–08:23)
No cigar though. I've heard every version, so it was not the worst by any means. So my name is Jukka Heikka. I live in 1793 Canton Avenue.
at the very end of Canton Avenue or as I like to think the very first house on Canton Avenue. It's the house that many of you know. in the middle of the intersection. People drive through our fences constantly.
Maybe one of you has driven through our fence. So we've lived there for 14 years or thereabouts, if my math is correct. And there's been numerous crashes with the fence over the years. I would estimate 20, maybe 30, including times when our car is upside down in our yard.
Luckily, nobody was hurt and including snow plows coming through the fence. So we've seen it a lot and we've been fixing the fence over the number of times. So we are grateful for the town and some of our neighbors or all of our neighbors who have kind of pushed for the traffic mitigation, the traffic island in front of our house by the end where I think the barn corner, because it's close to our barn, it certainly has helped a lot. A lot less cars have been coming through that part of the fence.
The speeds on Canton Avenue as cars come from Route 138 are still very high. There's no speed limit sign at the beginning of the street, so people still go at 50, 60. even faster speeds through there and of course some of those cones by on our the side fence on the Canton Avenue side though that helps a little bit and for us it specifically helps because it allows in most cases leaving our driveway rather more safely than it was before but there's more should be done to especially to lower down the speed so obviously the Randolph Avenue did need the did need improved safety, and it's a good job that the town has done there. But at the same time, it means that there's a lot more traffic in Canton Avenue, so something should be done.
One minute. Whether the responsibility is on the town or DOT, I don't know exactly how the responsibilities are divided, but all needs to work on that. That is what I'm here advocating for. Kind of unannounced note, I would like to second also the previous speaker that we should not have the flood cameras in town.
I had not meant to talk about that, but I'm just telling that.
Speaker 5 (08:23–08:29)
Thank you. Thank you. Appreciate that.
Speaker 1 (08:29–08:36)
Let's see, hands raised. So I see Jesse Krupp.
Speaker 6 (08:40–10:35)
Hi. Thank you for taking the time. My name is Jesse Grove. I live at 42 Lincoln Street.
I am here admittedly about a problem very specific to 42 Lincoln Street. This is a green biscuit. It's a hockey puck. I live right behind the hockey rink on Kelly Field.
I see these coming over my fence. every week, multiple times a week. There's technically no pucks allowed at the hockey rink, but people don't listen to it. And so I get these over my fence.
They're quite hard, as you can hear. I have a six and four-year-old who run around in the backyard, and I live every day wondering when one is going to hit them in the head. I've seen a hockey puck land right at my feet. They come over that fence all the time.
I spent the last three years begging the Parks and Rec Department to do something about this. The last two years they have been saying that they're going to build a net. I don't know that it takes two years to build a net. I checked in I think last week and they said they're debating between three companies to build the net.
Last time I checked in before that, they said two companies. So they added another company to the mix. I've seen zero progress on this. I don't know what you can do about it, but I was told that if I came here, maybe somebody would listen.
So here I am begging you, because right now this is a 42 Lincoln problem. But one of these pucks hits my kids in the head, it's gonna become a community problem. And so I wanted to let everybody know that that is ongoing. And anything you can do to help me out here, I'd really appreciate it.
While I'm here, I will third the comments about the flock cameras. It is outrageous that flock cameras were put into our community without any community input. Milton police still don't have body cameras. So they think they don't need to be observed, but we do.
It's offensive. Thank you for your time.
Speaker 5 (10:36–10:37)
Thank you.
Speaker 1 (10:42–11:37)
All right, seeing no hands on line and no one else in person, I will now close public comment. We will respond to public comment at the end of the meeting. Thank you, Ms. Molano.
What I will share for folks on the flock cameras, which we'll share later as well, is that Police Chief King will be here with us on the 22nd to discuss not only the citizen petition, which we will discuss later for town meeting, but also all of the emails and responses, like what you all have shared with us about FLOC and the reasoning. So none of those concerns are unheard. The chief will be here on the 22nd to discuss them. All right, thank you, everyone.
So we'll move to item four, discussion and approval of the sale and related matters for two series of the Town of Milton's September 26th general obligation bonds. Joanna, you gonna be joining us?
Speaker 7 (11:53–12:44)
Thank you. I'll do a quick intro that we sold two series of bonds last week. I'll let Treasurer speak about that a little bit more in detail, but there were two series issued. Series A was items and infrastructure with a shorter useful life of 15 years or less.
And then, you know, new vehicles, new equipment, investments in town facilities. And then, series B was a separate series of items with a larger useful life, such as the fire station project, Cunningham College attic, purchase of a new engine. So, we separated them out to try to secure interest rate savings on items that we didn't need to borrow for as long, put items that we were borrowing for a separate series. And I'll turn it to you for any additional details you want to share about the sale.
Speaker 8 (12:46–16:00)
Yeah, so I think the sale overall and what we heard from our financial advisor was that it was pretty successful. We got a good rate given the market and given the size of our series. As Nick said, there were two different series. I don't think you mentioned the bids.
So we had, for the first series, We had a series A. We had Huntington Securities come in at a total interest cost of 3.43%, which is fairly good. The next two bidders were right on top of each other, about four basis points more. So generally, pretty good offering there.
received pretty good results on our Series B offering. Roosevelt and Cross was the highest bidder there. Came in, actually lowest bidder, I should say, came in at a total interest cost of 4.38%, 4.39. And that, I had some color from our financial advisor.
They had done a issuance the day before, I think, for a similar size and a similar maturity and received our award was a better award. I do think the fact that the town was recently affirmed a AAA bond rating was very helpful with the interest costs that came through here. So the sale was on the 2nd of September. The closing is the 14th of this month.
I know you have a vote in front of you tonight to accept this, both of these series and the issuance of this debt. And just to be clear, these are pretty substantial amounts of money, but a lot of this has already been spent, right? So this is not new money. This is really where we're starting to make expenditures and where town meeting has already authorized the debt issuance.
In several of these instances, in these project instances, we went through a bond anticipation note process last year. So we short-term, well, we long-term borrowed for a year to get us to this place now where we're doing this long-term issuance and able to kind of pull a bunch of things together so that we do it at one time. Closing, like I said, September 14th, you have a series of closing document signature pages. I think Winston, I see that folder in front of you over there.
So pending your vote tonight, if you affirm this, I would just need your signature on several pages this evening. I brought some pens, happy to share those with you. I don't know if you have any questions in particular on this.
Speaker 1 (16:01–16:11)
Okay, I will open it for questions. Members on the board?
Speaker 8 (16:11–16:14)
It's boring, I know. I get it.
Speaker 1 (16:16–16:22)
No questions or comments for our treasurer? I will take a motion to approve.
Speaker 9 (16:24–16:40)
I will move to approve the It matters for two. Sound of Milton's September 2026 general obligation bonds in the form of the vote displayed on the screen and included in the select board meeting packet.
Speaker 1 (16:41–16:49)
Second. Or she may be seconded, which is critical. Yes, so we should. Yes, so yes.
Yes, myself.
Speaker 8 (16:49–17:10)
Yes, terrific. Thank you very much. We will get these signs great and there's one. Document in there actually to one for each series that are the secretary of the select board He you will be signing that all others will require each of your signatures So apologies in advance, but thank you very much.
Speaker 9 (17:10–17:20)
I appreciate it Does it matter the color of the ink not really I prefer blue, but yeah
Speaker 8 (17:22–17:26)
I try to avoid the pink and green, they don't show up really well on the scan. Thank you.
Speaker 1 (17:28–17:38)
Thank you. All right, let us move to item five, departmental update with Declan Ware, Director of Veteran Services.
Speaker 10 (17:45–32:57)
Good evening, everyone. Declan Ware, the Director of Veterans Services here for the Randolph-Milton Veterans District. It's a privilege to be here. I don't think I've met everyone yet.
You know, just like a little bit about myself to start off. I'm relatively young to be in the VSO world. I'm 28 years old. I served in the Army.
I enlisted at the end of 2016. I was honorably discharged in January of 2025. I served in the U.S. Army during this period.
I served as a cavalry scout, so I was like a Best way I could put it, I was like a light-wheeled reconnaissance guy. Served in the 25th Infantry Division and the 82nd Airborne Division. Deployed to Iraq in 2019, then deployed to Poland in 2022 when that whole situation kind of unfolded in Eastern Europe. Right after I was discharged, I jumped straight into the veteran services world and I was the director of veteran services in the town of Whitman, Massachusetts.
I did that until about July 2026, where then I kind of took on, you know, this new challenge in this position here. I've prepared kind of like a brief presentation for everyone on just kind of like what services I do and things like that. Opening slide here is the Municipal Veterans Service Officer. Next slide, please.
the mission of the VSO, I am the principal, you know, advocate for the veteran out there in our community. I kind of do very kind of wide encompassing really like my mission here. So it's everything where I always say I'm the unlicensed social worker, but I'm also the benefits guy at the same time. So I do everything from, you know, your local municipal benefits, and that's typically your clause, like 22, like tax exemptions on property.
I would do that excise tax for vehicles and then on the state side of benefits, I do things like Chapter 115, which is a needs-based program for our needy veterans out there in the community. It's means-tested, so the veteran has to meet certain income and asset criteria to qualify for Chapter 115. When we shift on the federal side, I kind of do really the big push on the federal side. It's really kind of twofold.
It's like VA health care for one. The other big thing is your compensation and pension claims. So that's like typically what you hear on the internet of filing for disability. The real term is compensation or pension.
And we kind of get into that. you know, I can kind of explain in further slides. Next slide, please. Chapter 115 with the program provides, again, it's, I can provide through my budget, like monthly payments to eligible qualifying veterans if they meet certain income and asset criteria.
You know, that asset criteria typically does not include the veterans, you know, primary residence, you know, their vehicle. It's typically just countable assets that we can look in the veterans bank records and we can say, okay, yes, you're under the asset criteria. you're under the income criteria, you're qualified for Chapter 115, we can get them enrolled. Ultimately, everything that is approved by the Executive Office of Veteran Services for qualifying Chapter 115 payment, we get reimbursed 75% of what we pay out.
Next slide, please. This is just like the kind of the principles in the Mass General Law 115 of just kind of like what each section kind of covers here, kind of what my left and right limits are for everything. And this is just my basic structural guideline on kind of running the Chapter 115 program. Next slide, please.
case administration. So, with Chapter 115 and really even federal claims, there's a lot of case management that I have to take on for the veteran. So, pretty much, I need to know, you know, essentially, you know, how much saved for example, like a veteran, what they're paying for rent. Every six months, I have to know, okay, hey, what does this veteran have in their bank account?
Okay, hey, was there any changes to their social security or any income at all? There's all sorts of things that could go on. So, I have to manage every single veteran month by month and kind of follow up on them. I know here in Milton, we did have four recipients of Chapter 115.
We've grown to five. Realistically, I think with enough outreach, I think we can get that number up because I'm sure there's qualifying people out there that could be qualified for this program. And I'd like to get as many qualifying people on this program as we can. Next slide, please.
financial stewardship and reimbursement. At the end of the day, when we're paying out these Chapter 115 funds to our qualifying veterans and surviving spouses, there's a certain level of financial stewardship that I have to maintain. I have to be a steward of the funds here. And part of that, and where it can cause problems sometimes is, you know, we ran into it this last month where we submitted everybody for September and there was a few people still stuck in pending status up at EOVS.
I would say it would be borderline negligent if I just went ahead and paid them out before they were approved, because now, say for whatever reason they were denied, now we're not getting that 75% reimbursement back. So there's an element of, hey, we have to get people approved, then once we're approved, we're paying them out. Month by month, we can pay our qualifying recipients out. We get the 75% reimbursement if the veteran is approved by the Executive Office of Veterans Services, which is in Boston.
Next slide, please. federal benefits and VA advocacy. This, I would say, the federal side of the house is kind of really where, this is when we're talking about case management, this is really the big one here. So, for a lot of your federal claims of what we're doing, there is two main routes to be, you know, financially compensated by the Department of Veterans Affairs.
It's the compensation program and it's the pension program. have to think of the pension program as think of it as like federal level chapter 115 where the veteran is under a certain asset and income criteria. They could qualify with wartime service. They could qualify for a VA pension and we can get them on that program.
The other thing is, the big one here is compensation or what a lot of people say on the internet, it's disability compensation. Disability compensation or just compensation in general, really what that requires is We have to prove three things. A big part of my job is building the case for these people to present this big paper file to the VA for approval. The big three things are we have in-service illness, injury, or event.
we have a current diagnosis of medical condition, and then there's a medical nexus linking the diagnosis to whatever in-service injury or event that happened. And so, I have to go through all the paperwork, all the medical records, and build the perfect claim to go send off to the Department of Veteran Affairs to get that veteran compensated. I big advocate of this program, you know with the compensation program and the pension program in particular We have really the ability in the veterans office where we can change the direction of a veteran's life with this Potentially get a veteran, you know back paid in the hundreds of thousands of dollars for for qualifying injuries We can really change the trajectory of somebody's life. So if I put any emphasis on anything here is the federal benefits here, and that's where I like to really concentrate my efforts at.
Next slide, please. outreach, prevention, and community presence. So, another element, what I've been saying is there's a big element where I'm an unlicensed social worker for these veterans out here. You know, I'm not providing therapy sessions for anyone or anything, but I have to be the individual out here that the veterans can come to, somebody that they can relate to, somebody that understands their struggles, somebody that can help them, you know, adjust their life, get them going in the right direction.
And that's everything from, you know, education benefits. Maybe that veteran just needs somebody just to come in and talk to because maybe they have nobody else, whatever it is. But this also encompasses, you know, like Memorial Day effort, Veteran Day efforts. You know, in the future, I'd like to do Purple Heart Day, things like that.
Veteran observances, that's kind of what I do. And I kind of have to quarterback that program here in the community. Next slide, please. Again, case management and the veteran experience, the same things.
I mentioned it before. I'm the case manager for all these veterans that come in. They want to apply for benefits, whether it's education, compensation, pension, Chapter 115. I have to know the full story of every single veteran that comes through there, and I have to keep a record on them on everything that goes on.
Next slide, please. Just municipal leader responsibilities, I guess, you know, this is kind of like lays out just kind of like what I do and kind of how we need to interact. You know, I'm a human services function, but also an administrative function again. So, I'm that social, that human face to the veterans, but I also have to go and do the behind the scenes.
You know, the desk work behind the scenes to get these people tied in, you know, with their benefits and proper programs out here. Veteran services budget, you know, again, being a steward is just really what I have to do here. Next slide, please. The VSO is a community connector.
So, again, like, the veteran comes in, I may not have the resources on hand or I may not be able to handle everything that comes my way. However, I have to be tied in with people that can get answers and that could be the VA Boston Healthcare System. I have to partner with another VSO to assist veteran and maybe get them into housing, whatever the situation is. I have to be that community connector that bridges the veteran just to the broader world.
So that's a big part of the job there. Next slide, please. What success looks like. Just provide integrity for all programs to include Chapter 115.
I'd like to grow that Chapter 115 program a little bigger if possible. Cases are documented. Payments are auditable. That's a big one where if anybody wants to try to come in and automate I welcome them because we can see every single payment I've ever made with they was approved by EOVS everything so Everything I do there can be can be traced back on on paper and approvals from EOVS Again, I have to maintain a strong relationship with EOVS, the VA, the National Service Officers as a whole, and then the other big part is our veterans organizations out there in the community.
Here, it's the American Legion. I have to maintain a good bridge with them and help build up community events and things like that. Next slide, please. What we've done so far in my first 60 days here, we grew the Chapter 115 program by one applicant.
So we're up to five now here in Milton. We've recertified all of our applicants through December. We've done 68 separate VBA actions. That includes, I put on there, 21, 22 power of attorney submissions.
The 2122 Power of Attorney just appoints the Executive Office of Veterans Services as a whole, where we can take on the claim, the municipal VSO. We can take on any federal claim, whether that's compensation, pension, anything like that. But that's paperwork that we have to send into the VA. It's just separate actions.
The Power of Attorney, here's the claim behind it, so on and so forth. Events. We're hosting our first Veterans Coffee Hour here on this Thursday at 9 a.m. Veterans Day ceremony is already in the works.
and that's scheduled for Veterans Day, on Veterans Day. Here in the community, you know, the Hometown Hero Banner Program, that's a very hot ticket item I've noticed, and we just placed another order. We're establishing, working with Cody here, we're establishing, you know, standard operating procedures on how this thing is gonna go, you know, going forward in the future with, like, application deadlines and things like that and working with the DPW. And just on a very new note here, like our veterans department here, we're going to be like a qualifying VR&E program to the VA.
And we're going to be expecting to bring in like an assistant veteran here that's going to come in and help you out. Really, the big thing is just like continuity, because just like the way my schedule works is like I'm only here Tuesdays and Thursdays, Randolph, Monday, Wednesday, Friday. But through this VR&E program, I'm going to be able to bring on an assistant through the VA, and they're going to be able to be here throughout the week. So there's going to be continuity in the office here, and I think that's going to be very well received in the community, just a continuity of somebody in there.
Next slide, please. And this is just kind of like a brief one slider here of our Veterans Day ceremony of what we're going to kind of have going on. Just going to be a brief ceremony here, and we're going to have The idea is we're going to get the band, we're going to set up, you know, we're going to have a great guest speaker and seating, and we're going to deliver great remarks and the whole shebang, I guess. So, I guess, pending any questions, I'm sorry, I feel like I just chatted right there.
Speaker 1 (33:00–33:02)
Great. No, that's great questions, points from the board.
Speaker 11 (33:03–33:14)
What is the process for engaging? You said you wanted to grow the Chapter 115 program. How do you identify those folks or get them to self-select?
Speaker 10 (33:14–34:46)
I think it's one of those things where I think there's an element of, I'm not going to say like pride, but like sometimes you got to have those like individual conversations. And I feel like you have to really take like a grassroots approach to it. And I feel like it's like a, like a, like a coffee hour thing where we just kind of blast out like general information. We say, Hey, you know, if, you know, if you qualify for this program, you know, if this could be you or somebody, you know, like, please tell them to come in and see me.
Um, so I think it's really just kind of getting information out there. I'm a big social media guy, so I love Facebook and things like that. So maybe we could put a digital flyer or something on the website and then I'll put it out on Facebook, even if it's every quarter or something, we just put something out there. Because there are plenty of veterans and surviving spouses and eligible dependents that could definitely qualify for this program and it could help stabilize themselves financially.
I'm a big advocate for the Chapter 115 program because you can really stabilize, you know, not the best situation for these veterans out here. So I'm a large advocate. I really just think it's a grassroots approach and getting there on social media. And, you know, just kind of because I feel like once you put it out there, people just kind of trickle in and they'll come and find you, you know, but they got to know where to find me.
So that's a big part of it.
Speaker 12 (34:49–35:18)
I just want to say thanks for your military service. Thanks for what you do for the department as director. And I didn't know, I didn't realize you guys helped with the benefits applications. I mean, that can be really difficult for someone not familiar with the process.
So that, that seems like a great service as well as the power of attorneys. Um, you know, otherwise, you know, people just won't have those set up perhaps. So, um, you know, thanks for the presentation. I appreciate it.
Thank you.
Speaker 13 (35:21–35:25)
So who's been taking care of this lady before they hired you?
Speaker 10 (35:25–36:08)
It was a gentleman by the name of Alex Ortiz. So someone was taking care of this? Yes. Yeah.
And Alex was a very good VSO. And I still talk to Alex regularly. He's still big in the veterans community. And that's the thing.
If I could share anything with the world, it's all of us VSOs, we all talk. maybe somebody doesn't know something, we just jump on our Slack channel, ask the question, and somebody, you know, or call around, somebody has an answer. So, we all talk, and it's a very small VSO world, and Alex was phenomenal. You know, I thank him for everything he did, and he really set me up for success here.
Speaker 13 (36:09–36:12)
Thank you for your service, and thank you for taking this role. Thank you.
Speaker 1 (36:16–37:14)
All right, no other questions. Mr. Ware, thank you very much for your continued service. Thank you.
And the work you're doing with our veterans. And if there's any way we at the town can help you either with engagements or any issues you may come across, we are certainly here and available at your service. Thank you, sir. Thank you.
All right, before we move to I think we may have some folks that wanted to share, but may have missed that window. So if you want to join us here, just state your name and address.
Speaker 14 (37:14–37:21)
This one's on wheels too, so be careful. There you go.
Speaker 1 (37:21–37:29)
All right, so public comment, you'll have three minutes. I will let you know when you have one minute left. If you could just start with introducing, just saying your names and where you live.
Speaker 15 (37:29–40:24)
Good evening and thank you. My name is Chris Russell. I've lived in Milton since 1998. This is my mother, Lois.
She's lived in Milton since 2020. This is my daughter, Emma. She's lived in Milton since she was born in 2000. We live at 21 Brandon Road, apartment one.
And I thank you for opening public comment because this room is really hard to find. Also, you should know that Emma has a rare disease, muscular dystrophy, congenital myotonic dystrophy, and my mother's her primary caregiver and that I am her guardian. In 2008, Emma and I were honored as recipients of Celebrate Milton's Community Builders Award. In 2022, Emma approached the town's animal shelter about reading to its cats.
She loved volunteering there and reading to Jack the black cat, the shelter's permanent resident. But sadly, Emma was subjected to mistreatment and ultimately barred under this false pretense of safety. Encouraged by every single one of Emma's case managers, as well as the police department's new community engagement officer, we filed a meticulous, heavy documented complaint I cannot emphasize enough how stunned we were when the Milton Police Investigation claimed these well-documented events never occurred. While the former animal control officer subsequently retired, she now chairs the shelter's volunteer committee, thus leaving Emma feeling entirely unsafe to ever return to that public town facility, never mind volunteer there.
My family's here tonight because the Select Board holds the ultimate executive oversight, policy, and budget authority for this town. When the internal reporting system fails a disabled resident, the buck stops here with you to fix it. We have faced unreturned calls and emails from within this body, so tonight we are here to publicly ask, what steps will this board take to audit this failed investigation, to ensure accountability, to guarantee that public volunteer spaces in Milton are genuinely safe and accessible and free from hostility for residents with disabilities? And finally, what will this board do to make matters right and just for Emma Russell?
I'm requesting a formal written response from the select board or the town manager within the next 14 business days, which will be Tuesday, September 29th. We want to know how this body plans to initiate an independent administrative review. to review the conflicting evidence of this investigation, as well as what specific policies will be implemented to protect disabled town volunteers from exclusion or retaliation. We will leave your contact information and a copy of our original complaint with the board secretary.
Thank you for your time and for your attention and for listening.
Speaker 5 (40:24–40:24)
Thank you very much.
Speaker 1 (41:07–46:17)
move to item six, discussion, update, approval of the Laboree College acquisition. I will fill in where I feel we stand right now, and Mr. Delano, please jump in where I have missed. For everyone in the town, we have reached, in principle, an agreement with Laboree College for purchase of the Laboree facility and land for $11,750,000.
We have a purchase and sale pending with Labouret. I'm waiting for their response. It will also go through legal before we are able to officially ink that intention. Of course, that has to go before town meeting for ultimate approval, and that will happen in October.
Last week, myself and Mr. Milano attended the Warren Committee's meeting where some questions were asked about the article, information they felt they needed to have before making a recommendation. That is ongoing, but there are a few things that I will flag for to bring light to before we have our discussion about questions from the Warren Committee. One was just kind of the narrative around how we got to this buy price.
It's higher than our appraisal value. We are not yet able to share the other piece from Labouray on their appraisal and how we got to this price. Once we have the go-ahead to share that, we will share that with the Warren Committee so that we have that not just for the Warren Committee but also for town meeting on how we arrived on this price and where we thought it was a fair value. Second was the, it is very hard to separate the Labor Day purchase on its own merits versus, obviously, the conversation we're having about using that facility and that land for a school.
At town meeting, the vote in front of us is for the acquisition, but there will, and rightfully so, be questions about what happens next. That came up at the Warren Committee, they asked questions about the impending school, ask questions about that versus Guile Road. Also some questions about the analysis of Guile versus Laboray as well as RE's thing. That, we express further study on that will happen versus the school, what goes there, and that's a longer conversation with us, the schools, school building committee, the entire town.
What's in front of us is LaBarre, and to say that our reason for buying LaBarre, which we can discuss as a board, as we've said, is one, the opportunity to buy a piece of property and land as valuable and useful as LaBarre does not come up often for us here in the town. So outside of the school, I believe this board would have moved to purchase that land, and that was a conversation that we had. the ability to use the Laboree facility, which already has been used for educational purposes for a number of years and potentially continue the ongoing project we've had about space in our schools and the crowding in our schools, was then particularly attractive also about acquiring Laboree. Could this be a more efficient solution to the overcrowding in our schools that has been going on?
Would it be particularly fiscally more beneficial for the town to have lab array versus the Gal road project looking at this as one continuous project about the big issue of Space within the schools and that's a conversation we've had but we have not been able to have it again, more full-throated without having the property under purchase and sale, which is something that we can do now, even without that ink being wet, considering what are we going to do next. I can share that tomorrow we will be having a conversation with Select Board, School Building Committee, and the schools about what happens now. Put this under agreements, even without the signatures, when do we start mapping, how do we map out this plan about who needs to be in the room, what happens over the next few months after town meeting, even leading up to town meeting, both of those as well, because we will need to present the town meeting about the purchase. And then after town meeting, assume that it does pass, what are the steps that we're taking about community engagement as well as selecting programming and the impact not only on the town budget, but the school budget and making sure that we are not skipping steps in what will happen.
This, to me, is also a continuation of the work of the School Building Committee. That work that was done early on about school space and the needs still remains relevant. We'll still be informing what we're going forward, but we will also have a new opportunity at Lavaray, and our schools are in a different place. How can we find out what those numbers are and what it means for what we may build?
So that's a bit of what we've been talking about. I think for us here tonight is not only discussing purchase and then what goes forward, but also from the body. Are there items that we want to discuss and decisions that we could not make before to be made now in terms of our next steps? So Milana, am I missing anything from that?
Speaker 7 (46:18–46:56)
I would just add that there have also been questions about if it's not a school, what would that process look like? And I think two points there is that if the town owns it, the town has the control to decide what will take place there, both from a zoning perspective, but also from the ability to set terms in any potential future sale. So again, getting back to a parcel of land of this size in Milton coming online, and having the ability to control that future redevelopment, whether it's a school or not a school. I think that control is just an element we just wanted to reiterate in terms of both pathways there.
Speaker 1 (46:56–47:14)
Yeah, I'm sorry for missing that. That's certainly part of the reason we would have moved to acquire without the school is control and the ability to make the decision on what happens on that piece of land. So any questions, points from the board, things that we want to discuss right now about.
Speaker 12 (47:21–52:28)
You know, thanks for that information, Winston. You know, I think a lot still needs to be clarified. I mean, I think, you know, I think in terms of where should we talk about, I would like to better understand or at least identify that we're not gonna know now, or perhaps not gonna know by town meeting. I think, let me take a step back.
I think it's important we try to sort of lock in, preferably by document. what we visualize that process to look like and what is sort of premature and we're not gonna have locked in and it's just gonna have to keep evolving. Like perhaps tomorrow we'll shed more light with the meeting with school representatives about, but I'd like to better understand if any of you have a more specific vision on planned for deciding whether to put a school there and plan for, you know, pursuing, you know, contingency uses. I mean, there's a lot in there.
And I'm not expecting like a response like, this is all, you know, down to a scientific, you know, level yet. But I do think there's some key criteria within that of how that might look and how that might go that would be really helpful for town meeting voters to better understand. I could raise a couple of those to get us started, if that would be a useful way to go about it. Or, you know, maybe that's just enough to kind of like open for, you know, put it back to any of you guys.
I think we can raise those points. So, you know, I think for the school process, you know, I think it's really helpful, it's going to be helpful to know, you know, what's that comparison process going to look like to, or will there be a comparison process to, you know, evaluate LabArray versus Guile? What does that look like? How long of a time period will that be to look at those?
And ultimately, you know, who decides? I'll give my sort of best understanding for you guys to react to what that could look like. I think there will be, you know, a period of, some period of additional you know, diligence to kind of refine the numbers around the library option. I'm not sure exactly what that looks like.
Um, and then ultimately, um, you know, as close as we can to an apples to apples comparison to try to just make the right overall decision for the town. Um, I've been advocating for parent education and community involvement during that process. I think there's sort of a consensus there from this board, but correct me if I'm wrong. And ultimately, I think however long that process is, whether it's a month, whether it's five months, I think it will lead up to some sort of decision by the select board with input from the school committee, perhaps school building committee too, you know, which project are we going to focus on?
Am I, I mean, I'll pause there. Is that the roadmap that could look like you guys or is it premature? And it's just going to have to continue to be mapped out. This is complicated stuff for sure, which is I think all the more reason it would be highly beneficial to sort of be breaking this down step by step as best we can.
Maybe there's parts we just have to say, We can't know the timing. We don't know whether it's going to be a month or six months. We may have to wait until we hear from the MSBA. I'm just trying to push to see what can we try to sort of lock in so that the debate is really on the substance, not process.
Speaker 1 (52:32–59:02)
I'll add some context. I think that's useful for what you just raised, Pete. But who decides, I think, is multifaceted. I will say personally, well, I think that's a discussion for us to have tonight.
We have not said, maybe briefly in the summer, in our conversations, we have not said that the board is specifically going to engage and drive with the schools on positioning Lab Array as an alternative to Guile and running the numbers on that and doing a deep dive analysis. And that is where the board would like to go. We've not said that. I think we've intimated it a bit.
We've talked about it, but we've not said specifically this is where we would like to drive. So that's a conversation that we can have. There have been some preliminary numbers. I think they were requested by the Warren Committee.
That's been sent by the School Building Committee. on preliminary savings. I think we saw that a bit in the architectural guide that we got as well in terms of their bid for, well, their assessment of what Lab Array would cost, and we have the assessment for what Guile Road would cost as well. So it's still for us to sort of debate and decide if that's where we want to go and say that's where we want to drive with this project.
And two pieces I think that makes this a little bit more difficult is October is just purchase, right? October at town meeting, as we're talking about putting together a presentation and the fiscal analysis of the purchase, and then somewhat what may happen after, our request to the town is buying LabCorp. That is also coupled with the second article, which was brought up by the Warren Committee, just so everyone understands the conversation, which is funding if, if we, depending on what happens with the MSBA, that we would have 1.2 million, I believe, to study at Labor-A. So two articles in there, both questions from the Warren Committee, because one is approval of sale.
The second is approval of funds for the study. I think what we can talk about now, Pete, and go to the other parts you're saying is, is that where the board would like to go with our conversations? Do we want to say that we purchased Labor-A as a great opportunity? an opportunity that has not come around a lot, an opportunity for control of a particularly valuable piece of property, and that we would like to move forward with working with the school committee, school building committee, all associated parties, with discussing if Labarré is a better or more viable option for any number of reasons that we uncover, some we may already have discussed, for relieving the space issues in the school.
I think what that drives us to is then the conversation that happens tomorrow with the schools, I think we've talked about it a bit, then becomes us putting in the items that we want to see in the report and what we want to research, making sure that in the aspect of the schools that we're speaking not only to the school committee and the school building committee, that we're also speaking to the superintendent and that we also have direct communication with school principals, all of the early learning folks, all of our special education folks, that we are thinking about every implication of a school that goes there, benefits, possible detractors, possible negatives, and that is a thorough process for what happens with the schools. I think that's an important piece that we can lay out there. The other piece of, and this came up often at the Warren Committee, about what else could it be? That's something we can discuss tonight, I think, as well.
The point I made to the Warren Committee is that regardless of use, we cannot do any of those things without the ownership. So even the discussion of non-school only happens after the town of Milton owns the Labouret property. My own personal opinion on other use is that if we decide tonight that we want to drive forward because the school, you can bring the points of this to why I would say the school's cost not only in the short-term but the long-term, about building a new school, as well as what it would mean for the school budget to add staff at either location, or the continuation of not adding staff, all of those fiscal points, is that if we drive forward with the school, I think it's something that we need to be doing 100% lock-in. Because this is a massive project.
This is a huge undertaking. It is also a continuation of an undertaking that's been going on for a decade about the space in the schools. I would not want to have us have parallel committees running because that only leads to comparison. I think we're already going to have comparison about Galroad versus LaBarre, if we drive on the schools, um, to have a third comparison, say Galroad, LaBarre or what both committees are talking about.
I don't think it would be fair for either project. If it came, you know, the committee said we wanted a stop and shop. I don't think it would be fair for either of those projects to say it's a school versus stop and shop. So I do think we have to say, what is the plan A that we're going to drive on?
Because we as a board believe this is the most important usage or target for us with Labouret. And if it is not approved by the town, if we fail somewhere, you know, so don't have fingers crossed for purchase. If we fail somewhere in the schools or somewhere down the line, we feel the schools does not look viable, Do we then look to plan B, but are we driving specifically on one item because we think the implications are the most important and most… And for us and where we think the town is going, that this is the space that we would recommend the town go with the library problem.
Speaker 9 (59:03–01:04:44)
So my feeling on this, is, so we have, we have a school building program underway and in place. And at the outset of the school building program, there was likely an alternatives analysis, right? Of various sites, what's advantageous, what's disadvantageous. Unanticipated, new alternative has arrived that we can and should evaluate from both a cost standpoint and an overall value standpoint whether or not this site meets a the programmatic and educational goals of the Milton Public Schools, right?
And to me, that involves a full evaluation of OPEX, CAPEX, and the program, right? So we need to look at this, not just from the price tag of, you know, how much is the capital project, but also in the reimbursement rate and how that all pencils out in the end. We need to know how this is going to drive the operating expenditures and layer into the baseline for the town's budget. Because this decision, any school building decision is going to have implications for the baseline for the town budget.
But choosing one over the other, will similarly have implications for our operating budget growth. And then there's this question about the overall program and comparatively, how would Guile versus LaBarre now and into the future need to be modified or a change as projected growth hits? It's not easy to do, but I think it's a nice benefit. It's a nice opportunity for a new school building project overall to be able to have another bite at the apple and evaluate an additional alternative.
We will learn things. And I think that I'm in favor of having some type of third party financial analysis of this. I know that folks have put a lot of work into the Guile Road site. I appreciate everything that has gone into that.
I went out and supported it and campaigned on it myself. I think that we only have to gain by taking a beat and looking at an additional alternative parallel to this. I also think that there should be a robust community review process. But if for some reason, right, that we go through evaluating a LaBarre alternative, If it turns out it's not gonna get us the best value in the end, I just think we pivot and work with our partners on the planning board to develop what is the envelope that we want for this site.
There are a lot of tools at our disposal where we can impact what happens there if we, if we choose not to, um, operate and maintain the site on our own. Um, so, so I think that this, I think that by the end of the day tomorrow, we're going to have, um, a pretty good roadmap or the big, some good bones for a roadmap on the, on the alternative for school. But I think also too, like we can probably start to talk with our planning board colleagues to see what thoughts they have about how they might address or what tools could we start to unpack or use for the site if it doesn't become a school. But I don't think we can necessarily launch both processes in the public domain at the same time, because it would just, it would just be too crazy.
And I think the school's question is going to come up a lot sooner than the site. That's why I'm okay with this. I don't know if that helped anyone.
Speaker 12 (01:04:46–01:04:48)
Can I call time out and ask for voting on anything tonight?
Speaker 1 (01:04:51–01:04:55)
We're going to vote at least to move forward with the sale, I believe. Yeah.
Speaker 7 (01:04:55–01:05:01)
Not until we have a purchase of sales ready to be approved. There's no action required of the board tonight.
Speaker 12 (01:05:01–01:05:09)
Just curious. Just curious. I'm going to take turns here.
Speaker 7 (01:05:10–01:06:33)
I don't know if this is helpful, but just as you have been talking, I have been plugging in kind of deliverables that I'm hearing, and I can share that just as kind of taking a temperature as to what, if I'm hearing everything correctly so far, just to start running kind of a list of what will get done and by whom. So obviously Gage owned the school community, and you know, that should be in I have this broadly school committee, the school administration, but, and then in terms of the school programming, you know, hearing about the rationale for an early childhood center, the middle school enrollment and the space of the middle school question that the superintendent did address briefly with us, but probably hearing an interest in hearing more about that, then high school space impacts if the administrative spaces go to locker A. And I think thinking about when we would want more responses and answers on those by might be helpful. And then transitioning to the finances, you know, we have a preliminary assessment in terms of library addition renovation.
What are those operating expenses? Still something that has to be figured out. Looking at Guyler Road, which I haven't updated for status, but we have schematic design of two buildings at Guile Road. We have schematic design level cost estimates.
So those are pretty thoroughly.
Speaker 9 (01:06:33–01:06:35)
You need OPEX for Guile Road too.
Speaker 7 (01:06:35–01:07:16)
I have that as next. There was a preliminary, an initial evaluation of that, but that would need to be refreshed. And then again, just even as on an interim basis with Laborere for the day we get the keys until a project starts, what is our expense going to be? That's something that we're, we're pulling together.
that service forecast, we provided some to the Warrant Committee, but we couldn't do. So I think, you know, teeing up and asks of other committees and trying to map out when things would be complete by might be helpful. So I don't know if this is helpful or not. I can pull it down, but I just wanted to, as I was hearing things, I was just trying to put this together to make sure we can continue to track this report publicly on progress.
Speaker 1 (01:07:17–01:08:32)
and get some of those questions answered. I think this is great. This is something that we'll try to flesh out as well with the group that we're trying to build and grow. A point I would have is like, in school committee, I think we have to drill down to get some direct input just from the school leaders.
not just the school committee or the superintendent, that at some point we're gonna need to have principals, early learning folks, special education folks, telling us directly what this means for programming and where they see benefits or negatives. I think my hope would be like, moving forward the school project that no one board holds the entire piece, that this is a collective effort through all of our boards and the folks within the schools. I would hate to see that it just kind of sits and then it's just like one person who is holding all the weight and all the information and all of the history. I think the best way forward is that this is first started as a ultimate group project.
Speaker 12 (01:08:34–01:08:53)
We're on there with the further, perhaps, third party evaluation, or whatever. I know we're not decided yet that it's a third party, but is that encompassed with multiple steps? That's just a Megan thing.
Speaker 9 (01:08:54–01:08:56)
I don't know if anyone else likes it, but.
Speaker 1 (01:08:56–01:08:57)
Third party analysis?
Speaker 9 (01:08:57–01:08:57)
Yeah.
Speaker 12 (01:09:00–01:10:03)
Yeah, no, it's I was just, you know, I don't know if it's a list yet. I, you know, I, this is really helpful to transition to talking in this way. You know, just be straightforward. I haven't, I still have an open mind to both projects.
Based on where I'm at, you know, today. You know, I still think Guile is the more airtight plan, but it's naturally, it's much further along. And it's just very uncertain to me that the cost savings from LabArray, you know, is the right trade-off for not addressing the middle school. But that's why that's an important deliverable on this sheet.
Speaker 9 (01:10:03–01:10:42)
So here's also something, too, I hope to get out of this process. It is not clear to me, as a member of the select board who's been engaged in this topic and has been having conversations for a number of years, the definitive challenge or issue at the middle school pertaining to space. Would love to get the final verdict on what that is so that we can know what yardstick we're using to measure progress against or to know what the solve would be for the middle school.
Speaker 1 (01:10:47–01:12:55)
There's a piece of history that we're gonna need to put together for this, because this has been going on for so long. Myself doing some deep dives for older documents when we started. The initial project was Early Learning Center. We started that when we engaged with Fontbonne.
And some other, I think St. Mary's, maybe some others in town. And the plan there was to review and analysis for the same early learning center. What I've missed, to Megan's point, is I don't know when we changed the conversation to the middle school.
Because that is the piece that does stick with folks now, saying, you know, what about the issues at the middle school? And so we do need a new analysis or update about how does this impact the middle school? Do they find that the middle school is a bottleneck? Does it have space issues?
Or are our issues still the elementary school, or the trade-offs of taking the pre-K and kindergarten out of the schools, what does that mean for space, and how do they see it offsetting for the middle school? I think that's a longer conversation with the schools, because we do have this history, but is it still the current, you know, current lay of the land, right? Does the middle school still feel it has a bubble? Or, you know, I remember we were talking about we have this rise in students coming in, and then we're going to hit that piece.
But now our kids that went through COVID six years ago, they're in the middle schools, or some of them are transitioning out. Are we still in that bubble? Or is this issue still at the elementary school, the elementary spot? So I think that part of history you're talking about, Pete, and also our current our current capacity and space needs, needs to be updated.
It's just not a conversation that we've had. And that's the part that would also be in all of this analysis, is what does this mean for our students?
Speaker 12 (01:12:57–01:14:27)
And, you know, I think, you know, the conversation probably reveals, you know, us all trying to get this right, even if we're you know, there may be deltas in the directions we're leaning, but I think there's a lot of common ground here in terms of like what we think should happen next to study this. I have maybe one other, one or two other schools thing, and I just want to try to, as brief as I can, just touch on the pros and cons of the contingency planning in parallel or after the fact. But on the school piece, You know, I guess if there is some sort of additional study leading up to comparison with community engagement, with input from multiple stakeholders, I think we should surface for discussions briefly, like what that means for timeline for the Guile MSBA project. Like I'm picturing right now, But I'm raising it because I want to make sure we're not thinking different things about it.
I'm picturing that proceeds on track until there's a reason, you know, there's a clear reason for it not to.
Speaker 9 (01:14:27–01:14:41)
Is your question, Pete, whether an analysis of a laboratory alternative will interrupt the the schedule for Guile Road.
Speaker 1 (01:14:42–01:15:07)
This came up at the Warren Committee a bit with the second article about the funding. Nick, would you mind walking us through how our re-engagement MSBA, assuming purchase and sale goes through smoothly, about Labarere and our timeline with Guile? I know we've already engaged a lot of folks at OPM and all those projects going on, but how does this work in parallel?
Speaker 7 (01:15:09–01:17:19)
Yeah, so they're right now just for complete clarity or hopefully try to get to complete clarity. We are in the MSBA program for a school project, which is either a K-5 or a 7-8. That project can look at any site. It can look at Guile Road, it can look at Laboree, it can look at some piece of property we haven't heard about.
So MSBA will allow us to study any site that we want to study. The limitation is an enrollment of K-5 for 495 students or grade 7-8 for 660 students. So that is the bracket we have to work in for the MSBA project. That work can proceed on its course without stopping as long as the town elects for it to proceed without stopping.
If the town wants to explore a lab array further, it can do so on its own in parallel to whatever's going on with the MSBA project. Or alternatively, we can go to the MSBA and say, hey, look, we really want to study a pre-KK laboree, what is it going to look like for you to add that to our study? Everything that we've gotten is it's going to be kind of going back, not quite to the beginning, but kind of back where we were about a year ago. So those are kind of the options.
So really the question is, do we want to continue the MSBA project and then have the town fund on its own continued study of laboree? and see where it takes us. That's some of the decision. The Warren article, as we talked about it several months ago, had language that said we wouldn't spend money studying laboratory unless we had exited the MSBA program.
So that was a little bit of a restriction we had talked about putting it on because at the time the conversation was we don't want to tell to appear that we're going to study and design two full school projects. I think that has created a little bit of confusion and hesitancy in hindsight, because I think there's an interest in maybe we should have some money set aside to further the analysis of Labire prior to making a decision on which pathway to go.
Speaker 1 (01:17:19–01:17:26)
So keep moving forward with Labire, but not stopping specifically God. Correct.
Speaker 7 (01:17:27–01:17:52)
And I'll add that there's a lot of benefits of the MSBA process specifically around, there's going to be a lot of educational programming work. There's a lot of visioning work that's going to take place. The downside to all of that is it's done within a K-5 or a 7-8. So we're not, again, we have to kind of do all of that work on our own on a separate path at Library as things stand today.
Speaker 1 (01:17:53–01:17:54)
What would you anticipate the cost would be?
Speaker 7 (01:17:56–01:19:31)
We got that going. So we have spent about a half million dollars, I think, with the project manager and the architect to get the Guile Road prior project to like a schematic design level where the school building committee felt comfortable with the cost estimate that they arrived at. So I think that's probably a good rough ballpark. However, what kind of additional due diligence would architects want to do when it's now a renovation.
So there might be a little bit more money that might be helpful to do that. So that's a number we can work on, and I can talk to the school building committee chair about that. But it's half a million over a number of years. I think we could move on that pretty quickly.
That half a million that the school spent on Guyler Road, that was over the course of a year, I'd say. The other thing I just want to add is, if pre-KK was in the MSBA program, we would be doing all of this work anyway. Because if our options with MSBA were pre-KK, K-5, or 7-8, we would be doing all of these studies in parallel as it is. Really, the first question to the town is, MSBA is not covering this, so do we just want to do it on our own?
Otherwise, we would have been doing it if we had had that enrollment in mind when we were setting those parameters with MSBA. So it would not be an unusual thing to study a variety of different options, even with MSBA.
Speaker 12 (01:19:38–01:21:10)
a lot of difficult financial competing factors I get. I'm going to pivot to the other use topic and whether it makes sense. Essentially, as I think about it, Does it make sense to launch in parallel a contingency planning effort if the property is not used as a school, or do you wait on that to only trigger that effort if there's a subsequent determination not to use it as a school? I just want to spend a minute on that.
I understand the point about creating a third option, dividing resources. I want to pressure test that a little bit. The reason I've been raising that option is because I think it de-risks from a perspective the transaction. I think that it sets in motion what's a lengthier process to explore, you know, other uses, I think, where if you wait to start that you know, next year sometime, if you end up in that situation, maybe you don't end up in that situation.
I'm just thinking about additional carrying costs.
Speaker 9 (01:21:10–01:21:19)
You mean a little bit more by de-risking the transaction by having a parallel, like, competing process?
Speaker 12 (01:21:19–01:22:35)
Yeah. I think that unless we know for sure that we're putting a school there, I think that you're in a lane where, you know, however you want to characterize it, we each might characterize it differently. It's reasonably likely you put a school there, you may put a school there, whatever it is. You know, there's a non-zero possibility that you're not putting a school there.
And that's a, in my view, and based on sort of research of what other towns do, that's a, a lengthy process to evaluate that. Call it 12 to 18 months from my perspective. So you're just pushing back, getting started on that process, and, you know, perhaps adding another year of carrying costs to the property, you know, in the meantime, where you're not able to act as nimbly to, you know, think about what else to do with the process. So it might just be sort of a, are you willing to kind of stomach whatever additional property carrying costs come from waiting on that diligence, you know,
Speaker 9 (01:22:35–01:22:58)
I think we have to move pretty quickly to determine whether Labere would be a school or not. Like, whether it's a viable alternative to Guile or not, no? Do we know the date? My impression was, like, we would have to know relatively soon.
Like, go, no, go.
Speaker 1 (01:22:59–01:23:04)
Hold that thought for a second. Megan Dolan, I think you wanted to say something. I want to give you space to do that.
Speaker 11 (01:23:04–01:24:24)
Thank you. I've been kind of thinking about this. I hear what Pete's saying too. Is it really, how many paths is it?
What are the options? I see this as like three paths. One is guile. One is la beurre with MSBA.
And then one is guile without MSBA. And I think at different points, one is the go, no go. At what point do we, And I think we keep moving along with Guile until we decide whether or not, until we hear from experts to say whether or not this is a viable option, the LaBarre site. And then I guess the question is, when is the, to Megan's point, when is the go, no go for Guile?
When do we get to a point where we're putting in a lot of money and can't turn the bus around? And I think about, to react to Pete's point about the alternative use option, I would think that, to Megan's point, that we would try to move quickly here, because I do think having too many different views about what this could be will just distract us from making this first initial decision. And I do think we need to make it relatively quickly, but also thoughtfully.
Speaker 1 (01:24:24–01:24:29)
Any dates for upcoming expenditures related to the Dial project?
Speaker 7 (01:24:31–01:25:25)
We are spending a small amount now because we have a project manager on board. So those are just kind of minimal administrative expenses. However, October 6th, October 20th, we're at the designer selection panel. We should have an architect signed up by the end of October.
mid-November and then they will really get working and we'll start to see that expenses start to add up then because they're gonna begin with you know visioning and programming and that work with school leadership and in the schools and the principals the community so that's it's gonna be a lot of work they're gonna start doing any kind of due diligence they feel is necessary so we could triage that a little bit but I would say by middle of November that project will be beginning in earnest and that's when money will start to be spent at a much more rapid clip.
Speaker 1 (01:25:25–01:25:34)
So come November there will be new expenses for furthering the GAL project that we have not had yet.
Speaker 11 (01:25:35–01:25:53)
And then I guess the other question is when we have a good sense if people do a study about whether or not this is going to be a viable option for us. Will we have that by November?
Speaker 12 (01:25:53–01:26:09)
I think that's a critical question because if we have to procure someone alone, that takes time. I don't know the leanest way to do that, the quickest way to do it, probably not November.
Speaker 7 (01:26:10–01:27:05)
To that point, so we have done The architectural and engineering work we can do at LabArray without engaging in a much longer procurement process to this point, because we've used the architect TLR group to do some work. But if we were to do any kind of additional work at LabArray, we will need to do not only designer selection, but we'll have to procure an onus project manager. So we have an onus project manager for the MSPA projects. We're getting a designer for the MSPA project.
We would also need to get an onus project manager LabArray study. and a designer. So it's probably four months to complete that procurement process on the fastest possible timeline before they could even begin to do that analysis. So if the interest is having additional architectural or engineering done at Laboratory, I think you're talking about that not starting until at least four months after you give the go ahead to start procurement.
Speaker 9 (01:27:06–01:27:21)
Do we absolutely need more architectural and engineering work? in order to get the capital expenditure figure that's acceptable.
Speaker 7 (01:27:23–01:27:41)
It feels like they did a pretty thorough job. I would defer to the school building committee. I'd be interested in hearing their take on that question and we can bring that to them in terms of what is the level of comfort with work? The work's been completed to date.
If you had X many months and this many dollars, what would you do?
Speaker 9 (01:27:41–01:28:21)
Like you're not, we will never have like a true, we'll never be at the percentage design. It's not even worth it to go to the full percentage design on library that you have on guile. Right. I, I really do not feel like The operating expenditures for both alternatives have been paid close enough attention to.
I want to see that. I think there's been a lot of focus on capital and not a lot of focus on operating.
Speaker 1 (01:28:24–01:28:27)
Is there any item you're specifically concerned with in terms of expense?
Speaker 9 (01:28:27–01:28:35)
Transportation. staffing, utilities.
Speaker 11 (01:28:40–01:28:48)
Nick, can I ask you a question about what is procurement? What's involved in that? That's like by sourcing the design?
Speaker 7 (01:28:48–01:29:33)
Yes, so under in Massachusetts for public construction projects, if you expect the cost of that construction project to exceed 1.5 million dollars, you need an onus project manager. And then if your design expenses are gonna be either greater than 30,000 or the project is gonna be more than $300,000, you need to procure an architect under the designer selection law. So it's a qualification-based procurement that we would put out an RFP or a request for qualifications for an onus project manager, get applications, interview, evaluate, rank, pick, contracts and then do that again on the designer front. Same thing, RFQ, applications, interview.
Speaker 11 (01:29:33–01:29:35)
Four months for each?
Speaker 7 (01:29:35–01:29:44)
I'd say four months total probably would be the fastest timeline. So four to five months from start to finish to get both on board.
Speaker 13 (01:29:44–01:30:46)
Okay. John? You got to think of the public, the voter. You know, all this conversation has been very interesting and appreciate everybody weighing in on it, but we talked about a lot of things and it's going to take a lot of money.
It's going to take away from budgets and everything else. We're definitely going to need a couple overrides. The way I see it at this point. And don't forget, Mossfield turned down their second one.
Know what I mean? So I don't know if the appetite will be out there for I don't know, I don't have the pulse of it, but I'm just saying a lot of my people I know, they pay a lot in taxes now. You know what I mean? So I got to think of the public too, but I want to help the kids and do the best for them.
So this is a tough question. Glad I got four competent people.
Speaker 9 (01:30:48–01:30:52)
We're trying, John. We're trying.
Speaker 13 (01:30:53–01:31:02)
But like you said, Megan, we haven't even weighed in on the transportation, the staffing. We're having trouble funding what we do now.
Speaker 9 (01:31:04–01:31:59)
Yeah, we just, we just need like a, we need like a good session to just really, and, and the thing is too, like I, I hope we get to a point, the worst thing that we can have as if one group runs around with their numbers and the other group runs around with their numbers. Perhaps some of that will be inevitable because financial models are constructed. There are variables within them that can differ based on who's opinion of what factor goes in there. But like we, we need to come to some kind of consensus as to what is in these baselines.
And I think there's a lot of conjecture still in some of these conversations that I think we need to harden some of these figures.
Speaker 1 (01:32:02–01:33:09)
We don't have a complete foundation yet. We haven't started that. And now we to go back to the warrant, which we'll discuss, but the articles in the warrant with, I think it's article seven, being contingent on stopping MSP with guile. And I think this came up a bit with the warrant committee.
It's that language that we may be thinking about editing if we want to not stop guile immediately. And do we need to do some financial analysis on that? What's our expenditure come November? Are we comfortable with keeping that expenditure as November, December, January would put us in a better space in terms of learning about LabArray?
Or not learning about, but completing or getting closer to complete with our analysis, moving forward with our analysis.
Speaker 7 (01:33:14–01:34:47)
I have a good answer. At this time, I think that language we can certainly take out and revisit with the school building committee if a lesser number would get what folks are looking for. And so that would mitigate some of that risk. The appropriation for the feasibility study with MSBA is $1.5 million, of which we would get reimbursed 44% to 45% of that.
So together, I mean, you're looking at upwards of $1 million to $1.5 million of town expenses to study all of this. So I think it's worth going back to the School Building Committee to think. I think this was a higher number to get it to a higher level of certainty, but we may not need all of that. And then the highlighted language that we had drafted in the recommendation, we can certainly withdraw.
And the recommendation is the Warrant Committee's motion. It's just up for their discussion. That's not, we control the non-bonded font up above. The Warrant Committee controls the recommendation.
So they seemed inclined to pull that language anyway, but we can, the board could say that they agree with that as well. If you as the board would want the School Building Committee to have the flexibility to access this appropriation for continued analysis at Labor Day. knowing that it would add to our overall expenses at this stage, but perhaps at an outcome that might provide more answers.
Speaker 1 (01:34:48–01:35:08)
So that would be funding both projects at the same time, not pausing Guile unless we felt comfortable with. If we pause Guile, is that something that can be restarted? Does pause mean that the project is killed?
Speaker 7 (01:35:10–01:35:36)
I would want to preface all this with. the MSBA might start to ask questions about what our plan is. So I just want to put that out there that if we were to be doing two studies at the same time, they might say, you got to decide what you're doing and put more pressure back on us. So how the MSBA might react, I don't, I can't speak to.
Pausing it, I don't know that they would love that. I think they'd want to see we're making progress.
Speaker 9 (01:35:36–01:35:46)
If perhaps- Well, the MSBA have their own staff and their own contracts in place that they, you know, Yeah, they don't want to wait on us.
Speaker 7 (01:35:46–01:36:07)
And they expect that our project will go up. They budget based on when they expect the projects to be actually spending a lot of money for their own finances. So they want to see progress. Maybe we could go a little bit slower if we had to, but they're going to be expecting us to hit certain deliverables throughout that preliminary design stage.
Speaker 9 (01:36:11–01:36:25)
At what point, so I'm also assuming that the school committee would probably have to take a vote, right, and decide that they want this.
Speaker 1 (01:36:26–01:36:39)
Yeah, the stop is not just gonna come from us. That stop's gotta come from the school building committee, it's gotta come from the school committee. And I think on that side, it's hard for us to say before this,
Speaker 9 (01:36:39–01:36:43)
If the school committee says no Laboret, then… Right.
Speaker 1 (01:36:43–01:38:29)
And if the school committee says no Guile, that's also a situation. But at what point, which is again, points where one of many meetings coming up is to, do we want to collectively put in a drop-down date? And if we are putting in something that's drop-dead, what are the points that we have to hit that we say, OK, we've hit these points. We find this works.
We are going to put a freeze. And this is the project that we think we want to move forward with and put in front of the town. There are a lot of other pieces that go with that, right? If we, I don't wanna go too far down, I guess we have to.
If we said pause Laboré, I mean pause Gallup, move forward with Laboré, if the articles pass in October, and then we come back for the school at Laboré in a year or a year and a half, and that doesn't pass, and that means both projects are gone. Now maybe that's, a kind of a fair measure, because if LaBeret fails in a year and a half, it would probably stand to reason that Guile would fail in three years. I'm just putting the dark side of what could happen there, right? If one fails, is it fair to say that both would fail?
Because that would be the analysis that we're all making in terms of choice, right? Cost, programming, services, opportunity, and
Speaker 12 (01:38:37–01:39:04)
I think our best guess at a drop-dead date's a good idea, even just to, you know, with a caveat that we may be pressured externally, you know, to move quicker, but it's almost like it pencils down, like, let's just take our best judgment at what this roadmap looks like so that people can, you know, debate and build off that.
Speaker 1 (01:39:05–01:40:12)
And if we want to put into maybe, The best way for us to move forward a little bit here is put in some dates for us in terms of if we go around and we're in agreement in that we want to move forward with working with the schools and all associated boards and the community. in researching and doing analysis for Labor Day and the project of Labor Day. We can talk about that tonight. And then for us, we can also put in not only a discussion of drop dead date with the schools, which they have to be a part of, but then a timeline for review for us.
While I may not think that we should have a parallel committee running at the same time, I don't think there's an issue with us building and saying, 10 months from this date, we need to re-engage as a board and say, where are we? How is this going? Do we need to have a contingency plan and start putting that together?
Speaker 9 (01:40:12–01:40:38)
Could it also be an option to just engage the planning board and to say, to ask the planning board, like, hey, what's your best thinking of an approach if this, if we have to pivot to you and this falls in your lap, like what kind of framework, like, what if we asked for a framework for how it could be approached?
Speaker 1 (01:40:39–01:40:50)
I think even that is something that we would have to give them maybe least, well, give this, if we're talking about doing this as plan A, I think we would at least need to give that plan A. Oh yeah, totally.
Speaker 9 (01:40:50–01:40:51)
Six months to start.
Speaker 16 (01:40:51–01:40:52)
Yeah, yeah, yeah.
Speaker 1 (01:40:52–01:40:55)
Planning board and you know, we're doing housing production plan.
Speaker 17 (01:40:55–01:40:55)
Yep.
Speaker 1 (01:40:55–01:40:58)
We're going to talk about economic development plan that's coming up for this fall.
Speaker 17 (01:40:59–01:40:59)
There's a lot already going on.
Speaker 1 (01:40:59–01:41:37)
There's already a few big, big programs that we have to kind of push. If we say in six months, let's re-engage with the planning board, eight months, 10 months, let's re-engage as ourselves. Where do we see things in terms of contingencies? Do we want to put that group together and start thinking about that?
I believe these are soft timelines, we're just throwing out months there. But maybe that is a way that we cover and we are not just covering, this is not just performative, that we are putting plans in place for all these potential outcomes.
Speaker 12 (01:41:40–01:43:16)
One aspect about engaging with the planning board, which I think is a good idea, is we chatted with them a bit about this in June, May or June. And I probably should have said this, but part of my thinking of like, starting at some point on the plan B is that they indicated they would need to engage outside expertise to really roll up the sleeves on that type of other use planning. Now, I think that's subject to further discussion. That was June, I'm not gonna quote them on that, but then you again get into procurement delays and et cetera.
So I just think, I'm not saying that needs to start in September. What I think that could look like when we decided to trigger that is for early formation of the group, consideration whether they need outside support or not. And if so, procurement, you know, considering options, engagement, recommendations to us. That's a lot of work.
I think some of that early stuff could start sometime later this year, next year, without being a threat to kind of cloud the dialogue because it's not going to be that far along. But, you know, I understand the point about trying to do too much at once. So, you know, I sort of see it both ways a little bit.
Speaker 1 (01:43:23–01:43:36)
We want to make a formal decision as a board first to move forward with the analysis of LaBarre, the school site.
Speaker 12 (01:43:40–01:43:45)
I'm not sure what we're deciding.
Speaker 1 (01:43:45–01:44:09)
We will be moving forward with the school committee, school building committee for new school. I think we said it was a potential, but I don't think we've said it explicitly that that is our intention. I don't know if there needs to be a vote, or if this needs to be us being in agreement.
Speaker 7 (01:44:09–01:44:21)
It's up to the board. I think it's clear there's a consensus here that continued working on library for a school is the priority right now. But if the board wants to express it as such as vote,
Speaker 1 (01:44:22–01:44:25)
Do we want to express it as a vote or do we want to have it as an understanding?
Speaker 17 (01:44:27–01:44:31)
I think we should have it documented. I think Megan's writing it down, right?
Speaker 9 (01:44:31–01:44:34)
Yeah, I got a draft motion here. You guys want to hear it?
Speaker 1 (01:44:34–01:44:34)
I think Megan's got a motion.
Speaker 9 (01:44:34–01:44:49)
Go ahead. All right. I would like to move to approve moving forward with the school committee in pursuit of an analysis of La Verre as a school site alternative.
Speaker 5 (01:44:49–01:44:50)
Also the school building.
Speaker 9 (01:44:51–01:44:58)
And sorry. Right?
Speaker 12 (01:44:58–01:45:17)
Why do we need a vote? I mean, it's where it's happening. I just I guess we can vote on it, but now I clarifying questions about does that mean for sure we're putting aside contingency planning or is it just truly mean? Because we're just going to look at the school and it doesn't mean anything else.
Speaker 1 (01:45:17–01:45:47)
It means that we're formally, to me it means that we are formally saying as a select board, we are engaging with the schools, school building committee, all relevant parties to truly explore Labouret as a site for a new school because we have not publicly stated that. I think the contingency plans we can discuss after this vote about when do we want to put in either dates to to re-engage on the process and what we want to do in terms of contingencies.
Speaker 17 (01:45:49–01:45:53)
And won't we have a better sense of those kinds of things after the meeting tomorrow?
Speaker 1 (01:45:54–01:46:17)
I don't know if I'd guarantee that. I think that's the first step. Tomorrow may just be the first time we can be in a room with Labor-A under agreement. So, you know, that may take three meetings before we have something that's really, really good enough to share in front of all of our folks.
Maybe it's two. Or maybe we're, you know, incredible work is the day we have everything kind of laid out.
Speaker 12 (01:46:18–01:46:28)
I just, you know, my preference would be to defer this until the process is a little bit clearer from those meetings. But, you know, just my preference.
Speaker 1 (01:46:29–01:46:46)
I'd say the engagement with them is based on us wanting to move forward with the schools. to engage with the schools doesn't make much sense unless we're trying to move forward with Lavaray. Putting everyone together, I think, is a step. Yes.
Yeah.
Speaker 12 (01:46:47–01:46:49)
Hey. OK.
Speaker 9 (01:46:51–01:47:05)
All right. So I am going to make a motion to approve moving forward with the school committee and the school building committee to pursue the analysis of LaBarre as a school site alternative.
Speaker 1 (01:47:05–01:47:20)
Motion made. Second. Motion made and seconded. Mr.
Driscoll. Yes. Mr. Obershaw.
Abstain. Stolen. Yes. Ms.
Haggerty.
Speaker 9 (01:47:20–01:47:20)
Yes.
Speaker 1 (01:47:21–01:47:56)
And myself, yes. Do we then want to discuss, since this is going to move forward, a timeline or date for re-engaging on our progress? This is also assuming that things go well at town meeting, I guess. Do we want to say six months to talk about contingencies or six months to talk about engaging the planning board?
10 months or do we want to just wait till maybe our next meeting and think about this a bit before that continues?
Speaker 11 (01:47:56–01:48:01)
I think so. I think it's really hard to put any kind of dates on anything right now. It's just a pie in the sky.
Speaker 1 (01:48:03–01:48:08)
Fair. That also may be something that comes out of meetings with the schools, which we can report back on.
Speaker 12 (01:48:08–01:48:26)
Do you think that, um, voters will, do you think that acquisition has greater chance at passing, um, if there's more framing around the plan B or do you think it's irrelevant?
Speaker 1 (01:48:28–01:49:41)
Um, I, I think that's a really hard question. I don't think plan B would pass, would be the reason either of these. I think, um, My guess would be that the vote for purchase would pass initially because folks believe in us buying the property. And then there'd be some other folks that support the schools as well.
I think the even more difficult vote is what happens with it. And I think we're at least assuming that this passes at town meeting, assuming that it passes for the special election. we're at best a year before we're back in front of the town with this plan. So we will leave dates and further conversation on whether contingencies or our communication and pieces that Nick has drawn up there about information that needs to be shared and gathered in dates.
At least we just put it to our next meeting, right, 22nd.
Speaker 7 (01:49:43–01:51:03)
And I will distribute what I pulled together just for any additional comments or additional items. I did add a section around school building projects in terms of getting the school building committee's sense of, is any additional analysis of library needed? Is any additional that Gail wrote needed in order to make these informed kind of advisory opinions? And then lastly, As the conversation went along, if we're going to seriously consider library for a pre-KK, we may want to just commence that procurement now because If we're going to do additional analysis, we need to do the procurement.
If we're going to design it, we need to do the procurement. So it may make sense to just start that work this fall. So at least we have a project team ready to go. And that project team might be asked first, do more due diligence, or they might be saying, hey, look, we're going in this direction.
So I think just a little bit of a Tactical procedural item on the current piece might be just actually get the ball rolling on that because it's gonna take so much time anyway And you and you need to do it anyway, so just another piece that came out of this conversation I Think I want to regroup and we may want to wait until at least the MSBA procurement is complete and then so it's not like we have too much going on at the same time around this and
Speaker 1 (01:51:06–01:51:48)
It's a future item. God, I almost want to say something that's lost my train of thought. So many words. All right, so I think we're okay on Lab Array.
More to be reported at our 22nd meeting. All right, so. Item seven, special election date for the library college debt exclusion ballot question, December 15th. That was the date shared by the town clerk.
Parents will still be around, it's before Christmas vacation. And that would just be the only thing on the ballot, correct?
Speaker 7 (01:51:50–01:52:21)
Yes, so far, the state may not have any other ideas. And we did look at earlier dates, but just with the conflict of closing out the state election on November 3rd, that will take the office quite some time to get that complete, get the ballots done, out of here for new ballots to arrive for a special election. So December 15th felt like the best date in that window for their office. and if we can start to share that date now, we will follow up with the formal ballot question at our next meeting.
Speaker 1 (01:52:25–01:52:32)
Okay, item eight, discussion update approval of the October 19th, 2026 special town meeting warrants. Mr. Milano, please.
Speaker 7 (01:52:33–01:54:57)
I shared the warrant in the packet. Town Council has made a couple of small modifications to a couple of the articles at the meeting on Wednesday night with the Warrant Committee. had some requests around the recommendation for article six, which is the proposed purchase of library college. So we made those changes along with town council and distributed that back to them.
Articles one through five have been voted on and approved by the Warren committee at this point. They're continuing to work on both article six for the acquisition of library, the school building committee appropriation, as we discussed a little bit before. And then lastly, the citizens petition. So we do have a citizen petition related to establishing a new general bylaw around surveillance technology.
That petition was submitted last week. The town clerk's office completed certification of that at the end of the day Friday, so there were sufficient signatures. So that article through the citizen petition process by law must appear on the warrant for the fall town meeting. the Warrant Committee is beginning discussion around that tomorrow night.
I know they've invited Police Chief King to that conversation. And I did have a conversation with Town Council today on the petition itself. So procedurally, it's been submitted and meets the requirements. Procedurally, Council did raise a couple of concerns related to the definitions in the petition, how expansive they were and maybe not well-defined, the lack of some exceptions.
And they also identified a general bylaw requiring a town department to seek town meeting approval for operations as stepping out of what the legislative branch should be doing. So, you know, the executive branch of the select board sets policy and manages operations. The citizen petition proposes to require a department go to town meeting for approval to do certain things within their operations. So council's concern is that is taking power away from the executive branch, which is the select board.
And it's a legal issue that comes up from time to time with citizens petition. So something that they're looking at and they're preparing a memo regarding the citizen's petition that we can share once it's complete, just for kind of that deeper dive around the proposed language.
Speaker 1 (01:55:01–01:55:47)
So for the procedure question, where do we, how do we, or are we able to ask for edits? Because I can say on the citizen's petition, I thought surveillance technology was not defined well, and it was very broad. But if we are at town meeting and this is gone, we haven't had time to review it. It's already with the Warren Committee.
Is it just for us to make a recommendation on yes or no? the options with us?
Speaker 9 (01:55:48–01:55:52)
We wouldn't be able to edit something that people have been signatories to, right?
Speaker 7 (01:55:52–01:57:05)
If you can't unilaterally amend it, you could move that it be amended at town meeting. So a couple of, so we have the petition, the petition will appear in the warrant exactly as presented to us. Also in the warrant will be the warrant committee's recommendation if they complete their review of the citizen's petition by the time we go to print. So that's kind of the first place where potentially there might be some changes.
The warrant committee recommendation could define surveillance technology differently in their recommended version of the bylaw. The warrant committee could say to vote no, could say to vote yes. but any kind of amendments would be allowed to be brought to the floor of town meeting when we got to that point. The other thing is if the Warren Committee doesn't complete their work or chooses to wait on this recommendation, then there might be some time to present some proposed edits and amendments to the Warren Committee for their consideration prior to them doing the recommendation.
So process-wise, there's a few different avenues. At the end of the day, this board always has the right to offer any amendments at town meeting.
Speaker 1 (01:57:05–01:57:11)
And if this does not pass, when are they able to submit it again?
Speaker 7 (01:57:11–01:57:38)
Citizen petition could be resubmitted with 100 signatures for a special town meeting or 10 signatures for an annual, or this board or another board or committee of the town could present it and submit it as an article for consideration to be included on the warrant. So there's no automatic comes back unless the town meeting votes to, I don't want to get into that, but it would have to be resubmitted by either petitioners or by a board.
Speaker 1 (01:57:38–01:57:56)
And from the position of our town council in that this bylaw may be executive board on working on procurement of these items. Is that a, are we going to get their recommendation this week or that week?
Speaker 7 (01:57:57–01:58:02)
They're working on a memo to the board related to the petition and just a legal analysis.
Speaker 1 (01:58:06–01:58:11)
Thoughts, questions from members on this or any other items?
Speaker 12 (01:58:12–01:58:31)
So on this, on the citizen's petition, we're talking with Chief King on the 22nd, and then either that day or someday before town meeting procedurally, we'll be, sorry if you just asked this, we'll vote for the select board's position on the citizen's position.
Speaker 7 (01:58:32–01:58:57)
The board will typically vote its position on all the articles that can take place. Now it can take place the night of town meeting. You really have any, any time in that window. or alternately whether the board could vote to say, hey, we want to submit this amendment so that all that work can take place between now and town meeting.
Speaker 1 (01:58:59–01:59:04)
We okay with the process on the citizen's petition or understanding of it?
Speaker 12 (01:59:06–01:59:28)
I guess the only article, I don't know if we're approving these articles tonight or not. The agenda says discuss, update, approve. If we are approving, I just think we probably have to talk about seven quick and whether we, the school building committee appropriation, whether what we do about that highlighted language.
Speaker 7 (01:59:29–01:59:55)
So what the board needs to approve tonight is the articles. not the bolded language. So you need to approve the warrant, which means the articles as the articles are written, not necessarily the recommendations. And then we'll post the warrant, and then we'll get the process going.
I forgot that was in the recommendation, not the article. No, no. The bolded language sits with the warrant.
Speaker 1 (01:59:55–02:00:03)
That's actually my follow-up. So if there are no further questions or comments, I think I'll take a motion.
Speaker 12 (02:00:05–02:00:21)
Move to approve the warrant for the October 19th, 2027 special town meeting. Sorry. What's that? Okay.
Move to approve the warrant for the October 19th, 2026 special town meeting.
Speaker 1 (02:00:21–02:00:50)
Motion made seconded by member Haggerty. Mr. Driscoll. Yes.
Yes. Yes. Yes. Myself.
Yes. All right. Item nine. Discussion update responses to the East Mill and Fire Station request proposals and evaluation.
I'm going to keep this one brief. Please submit your evaluations to the town administrator. I will not say which ones of you have not, but you know who you are.
Speaker 11 (02:00:50–02:00:53)
Definitely me. I was on vacation.
Speaker 1 (02:00:53–02:01:26)
I'm not saying who did or who didn't. I'm sorry. One or two people have it yet. Once you do, I think we'll then put it on a future meeting.
I think we may have it on the 22nd right now for discussion. Maybe not a final decision, but at least the 22nd for some discussion or questions. And we can send out those forms again. All right, item 10.
Discussion of the approval request for traffic calming on Upper Canton Ave.
Speaker 9 (02:01:27–02:01:40)
Mr. Chairman, I am going to recuse myself since MassDOT, my employer, is the owner of the roadway. As much as I would love to stay and participate.
Speaker 7 (02:01:43–02:01:47)
Talking about a study that HSH performs at MassDOT's direction.
Speaker 9 (02:01:47–02:02:00)
Yeah, so MassDOT would be involved, it would be conflict for me to impact the outcome. As much as I want to, I can't.
Speaker 1 (02:02:01–02:02:35)
I'll just, I'll start the conversation with Ms. Milano and I had a conversation earlier today about taking all of the assets and products that the citizens have created and sending that to the Traffic Commission. The traffic commission is meeting, I think, next week. So for them to review and look at potential interventions and to get their opinion, not only on timeline, but efficacy and what could be installed, that's certainly our first step here.
But I'll open it to the floor for Uwe Solano, if there's something you want to add.
Speaker 7 (02:02:35–02:04:52)
I'll just add that there's a number of things that are a little bit easier to address in-house, additional signage, some signage that we're already working on, curb street markings, line markings. So that is a number of items that we flagged for DPW as potentially able to handle in-house. I think where we're going to need both the traffic commission's input as well as our consulting engineer, which is tool right now input is on some of the more impactful, I don't want to say impactful, some of the other mitigations such as raised intersections where we're going to want to have their take on that as well as concept designs. I think there are a couple of places where there might be an option to look at kind of reconfiguring some of the intersections.
You know Canton and Atherton, that is a very broad, wide section, so there might be opportunities to narrow the roadway and achieve some results. But I think what we had talked about the last meeting was the board was looking for kind of a quick read of what we felt was doable quickly and stuff that we need further study. additional signage, additional pedestrian signage, additional markings we are working to address. The more expensive and larger implementation is something that we would want a little bit more feedback on and which we'll work to get and bring back to this board pretty quickly.
We do have every year right now $80,000 worth of traffic engineering services that we budget for. We have not tapped into that yet so far in fiscal 20, whatever this fiscal year is, fiscal 27. So we have that available. And as we all know, we do have the traffic calming work commencing as well, which we'll be looking at kind of a more townwide focus, but that is where I view kind of the appropriate next step, but happy to take any, different direction or additional questions.
Speaker 1 (02:04:52–02:04:58)
Members.
Speaker 12 (02:04:58–02:06:25)
You know, I think I just want to acknowledge, I think getting the feedback that we got. Required some advocacy and you know. Your relationship Nick with DOT. I found the feedback informative.
It does seem like what we can do in-house, per your definition, does seem to address, if you're just looking at like a list of the requests, like over 50%. I don't mean in, you know, I'm sure John and others would value some of those items differently. So it's not one for one for all of them. But that seems like a start, you know, pretty responsive start to knock out, you know, I mean, there's a number of signage.
I don't know if landscape, you know, cutting back foliage fits into that or not. And as I understand it, it might leave for further input from traffic commission the raised intersections in the traffic islands. Seemed like the big ones.
Speaker 7 (02:06:25–02:06:50)
And as part of that, or in lieu of that, the always stops, which Howard St. Hudson was pretty clear would require some engineering study of those alternatives, but I think you know, trying to triage those and figure out what, hear from the commission as to maybe what their priority would be and try to tackle them from there would be a good step.
Speaker 12 (02:06:52–02:07:00)
Is there any, is anyone looking at like, whether there's any grants available for work like this in town?
Speaker 7 (02:07:02–02:07:59)
The state has a complete streets grant program, which we applied to the last, we applied to this year. We were unsuccessful last year we had applied for design money for redesign of a portion of Brook Road, where We really need to repave that road, so we were hoping to get some design money to incorporate some traffic calming elements. So that's the big one, is the Complete Streets grant program through the state. There are some smaller other ones, but the primary one is the Complete Streets one, which we have applied for grant money.
It's unrelated to Camp Nav, but related to other places in Milton. And that Complete Streets program has funded a lot of the work that's been done around the middle school and the intersection at Central and Reedsdale. And no, I'm just forgetting how the streets, right there at the middle school. Brook Road and St.
Mary's. Yeah, exactly.
Speaker 11 (02:08:09–02:08:20)
No. I think we need to do something on Upper Canton. It's not just because I live there. So I'm glad we're discussing and I'm excited about the next.
Speaker 1 (02:08:21–02:09:39)
Do we have in-house? I know we started a few of these items. Do we have others that are pending and any sort of dates that residents may look for some of those interventions happening? I can get details and report back.
What was the item? Sorry. Just if we have any in-house items that are pending, that are going to happen, we can share with the residents when those are expected to start and what they will do. Fair to share.
All right, no other questions. So with this piece going to traffic commission, also looking in-house and what we can have installed so we can share with the residents and then at the traffic commission deciding what interventions they'll recommend and if we'll be engaging with tool and our engineer on next steps and implementation. All right, Megan, you can come back. Now move to item 11.
Discussion, update approval of the traffic mitigation subcommittee appointment.
Speaker 7 (02:09:42–02:10:37)
Mr. Chair, so two select board members need to be appointed. The language also does allow for up to five residents. I included the first three are currently serving on the traffic commission.
I did not hear from Marian Driscoll. So we had inquired, we wanted to give them the right of first refusal for lack of a better phrase, but both Steve Geister and Judy White-Orlando did express interest in serving. We received an application from Mr. Corey.
Tom Doherty had also previously inquired. I reached out for an application from him. I did not receive it. So we could hold on him until the next meeting just to confirm his interests, but I wanted to include him on the agenda because he had reached out pretty much immediately after the board's discussion when the committee was first discussed.
So that's the membership. So just to reiterate, I did not hear from Marion Driscoll and I did not hear from Tom Doherty.
Speaker 1 (02:10:38–02:10:55)
So when we make the motion, we'll just do it for those three, and then wait until verification from Mary Driscoll and Tom Dart. So Steve Geister, Judy White-Orlando, John David Corey are folks that we can approve this evening. Questions, thoughts from the members?
Speaker 9 (02:10:56–02:11:36)
I think all three individuals are excellent advocates for traffic. and agility, or right, like mitigating traffic. It's late, you guys know what I mean. Yeah, I think Steve and Judy, I know really well.
They're very passionate, they're very hands on, as is John, I don't know as well, but you've been here like every meeting for the past couple months. So I think you've earned your spot as well. So I'm good with all three.
Speaker 12 (02:11:38–02:11:54)
Second. So I move to appoint Steve Geister, Judy White-Orlando, John David Corey to the Traffic Mitigation Subcommittee for a term to expire on June 30th, 2027.
Speaker 1 (02:11:55–02:12:05)
Yeah, seems like a short term. Motion made and seconded. Yes. You're strong nine months.
Mr. Driscoll. Yes. So which hour?
Yes. So, yes. Exactly.
Speaker 18 (02:12:05–02:12:06)
Yes.
Speaker 1 (02:12:06–02:12:32)
For myself, yes. Congratulations. Now for the two select board members, we need to do that as well, right? Are there any members who'd like to volunteer to join the traffic committee?
Megan Nolan, any others? Are you already on this? I'd like to volunteer to be on it. All right.
Two volunteers, does anyone want to step in front of the bullet? No, two volunteers it is. All right, so I'll take a motion to appoint our two members.
Speaker 9 (02:12:33–02:12:43)
I would like to move to appoint Megan Nolan and Peter Obersheimer to the Traffic Mitigation Subcommittee for a term to expire on June 30th, 2027. Second.
Speaker 1 (02:12:43–02:12:54)
Motion made and seconded. Do they vote or just the three of us? It's up to you. It's up to them.
You guys want to vote? All right, Mr. Driscoll. Yes.
So wish I were it. I'm staying. Ms. Nolan.
Speaker 11 (02:12:54–02:12:57)
Yes, I vote for me and Pete. All right, Ms. Nolan. Yes.
Speaker 1 (02:12:58–02:12:59)
And myself, yes.
Speaker 13 (02:12:59–02:13:11)
All right. I thought we already voted his on. This is just- He voted on four times.
Speaker 1 (02:13:11–02:13:55)
Thank you. Thank you. All right, item 12. discussion of date approval of the MAPC proposal for an economic development plan I will say on this I think we just recently got all of these documents I'll move this until the 22nd for us to have time to send edits to mr.
Milano or on this economic development plan also time for the planning board to do their own review I think that we're reviewing in the meeting this week, and they will have comments as well. So just to say, we have it now, go through, read it, send your comments, planning board will do the same, and then we'll discuss on the 22nd for approval.
Speaker 7 (02:13:55–02:14:30)
And they did revise the proposal to meet the available budget. So it's a $50,000 proposal. We have $50,000 available between the planning board and select board. So if, in thinking about scope, if there's things that you are looking for that you're not seeing, it may be due and you think is really important to include, just keep in mind that that might mean we need to either tweak by dropping something or go looking for additional money.
So that's, so it does meet the budget, but it meets the entire budget.
Speaker 1 (02:14:30–02:14:50)
20 seconds. So, you know, homework assignments, East Mountain Fire Station, MAPC review. All right, we'll move to item 13, discussion approval of boards and committees, the Taxation Aid Committee and Susan Koch-Vaser. Thoughts, questions, or I will take a motion.
Speaker 9 (02:14:53–02:15:06)
I'll move to appoint Susan Koch-Vaser, I always said it lesser, Susan Koch-Vaser to the Taxation Aid Committee for a term to expire on June 30th, 2027. Second.
Speaker 1 (02:15:06–02:15:11)
Motion made and seconded. Mr. Driscoll? Yes.
Mr. Obersheimer? Yes.
Speaker 9 (02:15:11–02:15:11)
Ms. Nolan?
Speaker 17 (02:15:11–02:15:11)
Yes.
Speaker 1 (02:15:11–02:15:12)
Ms. Haggerty?
Speaker 17 (02:15:12–02:15:13)
Yes.
Speaker 1 (02:15:13–02:15:29)
And myself, yes. Okay, item 14, discussion approval of one-day liquor licenses. First, Eustis Estate, any thoughts, questions from the members? If not, I'll take the motions.
Can we take them all collectively or should we go individually?
Speaker 7 (02:15:29–02:15:32)
You can approve them as they appear on the agenda.
Speaker 13 (02:15:32–02:15:53)
I make a motion to approve historical New England Useless Estate, located at 1424 Canton Ave, October 11th, 2026, from 5 p.m. concert in the mansion David Brewer in, I'm gonna kill that name, L.A.T.
Speaker 1 (02:15:53–02:15:58)
Chisinau, sorry. You can just say, you can just make the motion as written, I think, right?
Speaker 7 (02:15:59–02:16:01)
As they apparently agenda.
Speaker 13 (02:16:01–02:16:07)
make a motion to approve just the first one. I mean, it's historical or all of them.
Speaker 7 (02:16:07–02:16:16)
They're all, um, they're all for that. They're all for historic New England and Eustis State, and they all appear on the agenda accordingly.
Speaker 13 (02:16:16–02:16:28)
All right. I make a motion to approve all on the agenda items for the historical New England Useless Estate located at 1424 Canton Ave. All right, motion made.
Speaker 1 (02:16:28–02:16:34)
Second. Motion made and seconded. Mr. Driscoll.
Yes. Mr. Obersheimer. Yes.
Ms. Miller. Yes. Ms.
Hagerty.
Speaker 19 (02:16:34–02:16:34)
Yes.
Speaker 1 (02:16:34–02:16:49)
And myself. Yes. Thank you. Now, item 15, discussion approval application to use the town green barren Hugo gazebo.
questions or I'll take a motion.
Speaker 9 (02:16:49–02:17:25)
I will move to approve the following applications for use of the town green and Baron Hugo gazebo for bow shoe on behalf of the Milton Asian American Pacific Islanders neighborhood group on Saturday October 3rd 2026 from 4 to 6 p.m. for the mid autumn moon festival Jocelyn noise Burke on Saturday November 7th 2026 from noon to 3 p.m. for a retirement picnic honoring Madame Brown, Milton Public Schools French teacher.
Speaker 1 (02:17:27–02:17:40)
Second. Motion made and seconded. Mr. Driscoll?
Yes. Mr. Arbushammer? Yes.
Ms. Snow? Yes. Ms.
Snow, please. Item 16, discussion approval meeting minutes August 25th.
Speaker 9 (02:17:41–02:17:48)
I'll make a move to approve, a motion to approve the meetings of Meeting minutes dated August 25th, 2026. Seconded.
Speaker 1 (02:17:48–02:17:53)
Which made the seconded, Mr. Driscoll? Yes. Sobhashan?
Yes. Snola?
Speaker 9 (02:17:53–02:17:53)
Yes.
Speaker 1 (02:17:53–02:17:54)
Saggity?
Speaker 9 (02:17:54–02:17:54)
Yes.
Speaker 1 (02:17:54–02:18:03)
Myself, yes. All right, item 17, excuse me. Town Administrator's Report, Mr. Malauulu.
Thank you, Mr. Chair.
Speaker 7 (02:18:05–02:19:10)
Do you have the Housing Protection Plan dates there? So the housing production plan will be holding a community housing forum on September 23rd at six in this room. So we invite the public to join us for that. You'll also start to see work related to the tool design group traffic calming master plan commencing.
We are planning a open house on Tuesday, October 13th. which is more of a drop-in and chat with folks and look at and make your way around the room at different stations. So October 13th, a time to be determined. And then also as part of that tool, we'll be doing a couple of pop-ups where they'll table at certain locations where targeting potentially joining the PorchFest.
to have a couple of hours for them to be available for folks who are out to engage and talk about traffic calming at TorchFest. So we'll have more to share of that in the next week or two, but wanted to put at least those on people's radars.
Speaker 1 (02:19:11–02:19:43)
And I think that's it for me, Mr. Chair. Thanks. Since September 23rd, right?
Yes. Chair's report. I honestly do not have much to say. We were just in here a week ago.
Happy back to school for all the kids and parents. It seems to be going off very well so far. I'm out of that game now. So happy back to school, everyone.
Nothing else really from the chair's report. More on the 22nd. So I will then move to the members. Anything the members would like to share?
Speaker 13 (02:19:45–02:20:17)
I went to that back to business, spoken to the nation event Friday night. It was very good. and well attended. Yeah.
Great job by the Chamber of Commerce for sure. Yeah. Yeah. And Mr.
Zoll had a pretty good beat with his wife. They were playing when I got there. He made a special appearance. And the stage is good.
Good. Glad to hear.
Speaker 1 (02:20:17–02:20:43)
I will add one thing actually from the chair's point of view. Thank you to Brother Dennis and the folks at the Methodist Church on Blue Hills Parkway. They put on a great kind of community event over the weekend. I had a great singer, Phaedra Butler, kind of a Boston R&B singer from, you know, back in my time.
So she had a great performance. It was a really good turnout. And so thank you to them for the event.
Speaker 9 (02:20:43–02:20:59)
On the budget and finance front, We have a couple meetings coming up this month. I've lost the Select Board Finance Committee meeting in my calendar. Do we have it this Friday?
Speaker 7 (02:20:59–02:21:05)
I don't think any of us have it in the calendar.
Speaker 9 (02:21:05–02:21:11)
We can set one. I know we set like a bunch of dates, but I'm not seeing it in the calendar.
Speaker 7 (02:21:12–02:21:15)
I'm not either. I will, we can get that locked in.
Speaker 9 (02:21:15–02:21:49)
We'll look back at the, there's definitely, we worked on it over the summer. It's definitely, it was mapped out. We just got to get it plugged in. Yeah.
Um, but I, I do think we, I thought we were going to have one this Friday coming up, but, um, So select board finance committee meetings are imminent and Milton Budget Coordination Committee next meeting is next Tuesday the 15th at 7 p.m.
Speaker 1 (02:22:08–02:23:35)
Good, all right. Okay, item 20, public comment response. I believe we kind of responded to the folks on Camp Nav who stayed. I will first begin with, I'm actually forgetting their names, but the family who shared the incident with the animal control officer.
This is Chris Russell and his family. Thank you, Chris Russell and his family. I'm not sure any of us knew the details of that incident, so we will be endeavoring to find out more. We left some paperwork here for us to review and share, and certainly a follow-up from us at the board and yourself, Mr.
Milano, to find out the details of what's happened here and how we can move forward. The hockey pucks on Lincoln, I think we also will be sending an email to the Parks and Rec commissioners as well as staff to find out what's going on there. If it's been three years to put up a net, it seems a long time to be waiting for a net. If we are waiting for a vendor for some reason, you know, issues could come up.
Is there some sort of temporary mitigation that we can work on? Something that's not perfect, keeps pucks out of the neighbor's yards. You can put on notice now.
Speaker 9 (02:23:37–02:23:43)
Is there a no puck sign? I don't play street hockey down there, so I don't know.
Speaker 1 (02:23:43–02:23:54)
Yeah, I have to look. I don't know. And if you said there were no pucks, right, but kids are down to play.
Speaker 12 (02:23:54–02:24:09)
Is there a specific like hockey ball? I more commonly see balls, tennis balls. So, you know, then the leagues down there use balls. Um, so I'm not sure.
I haven't thought to look at the signage about that before.
Speaker 1 (02:24:09–02:24:48)
I didn't know it was an issue. Signage could be a good start from that signage. Like, do not use a buck here. And the folks who shared about FLOC, as we said, the chief will be in here on the 22nd for us to have a longer conversation and get into the details about not only the community response, but the process for FLOC being procured and used, all of those questions.
So it'll be a follow-up on the 22nd. To the members, is there anything that we would like to say, public comment, anything that jumped out for you?
Speaker 13 (02:24:52–02:24:56)
Didn't they always have cameras at intersections and stuff?
Speaker 7 (02:24:56–02:25:33)
Correct. We have video cameras at a number of intersections and locations around town. This was, it's an additional camera that captures the plate of the vehicles that go through. But we have, you know, we will observe the traffic cameras from time to time.
And we'll use cameras like as a quick implementation in certain locations as necessary if there's been reports of issues. But the flocks are real sophisticated. They're an automated license plate reader. So they'll take pictures of plates and catalog the plates that travel by them.
Speaker 1 (02:25:36–02:27:12)
So part of the issue, John, is the camera's supposed to only pull in license plates. And I think that remains the case. But the usage of it across the country has been a lot of A lot of folks would misuse the information. They're either tracking an old girlfriend, old boyfriend, or using it maliciously.
So there's a lot of questions about the data, how it's stored, how it's used. And this company has also run into a lot of violations. But the chief will ask all those questions of the chief. But that is the reason for the public's cry for not having these cameras, because of the way surveillance tech is being used.
All right, we'll move to item 21, future meeting schedule. I believe we still have October 6th on the board, it's tentative October 13th as well. I don't think we had the 27th, so just the 6th and 13th. Then town meeting is the week of the 19th, so the 20th is out.
I guess we can figure if we want to come back on the 27th. Three in October may be a bit much with time. Special time meeting Monday, October 19th, Tuesday, October 20th, Wednesday, October 21st, Thursday, October 22nd. Then item 22, future agenda items.
Anything the board would like to make sure we follow up on?
Speaker 12 (02:27:20–02:27:33)
I don't know what cadence we're going to meet with the planning board, but I still think there's a good idea to have periodic joint meetings. I think the last one was in June, so it probably takes a while to plan.
Speaker 9 (02:27:35–02:27:37)
Maybe time for a quarterly meeting?
Speaker 7 (02:27:38–02:27:48)
For sure. I think we had talked about October around the time the housing production plan was being close to wrapped, but I think we're approaching that time.
Speaker 1 (02:27:48–02:28:17)
Yeah. Thinking about town meeting, other things coming up. Do we want to think about doing it November, in our November meeting? Because then we'll have economic development plan, hopefully, maybe on the way.
We'll have a better picture of the housing production plan that we want to discuss. Yeah, so maybe November. It's time to bring it back in. And then we can do a cadence for 2027.
Yeah.
Speaker 16 (02:28:18–02:28:55)
I forget when we also do like budget, like fall budget updates. Because I know that we've got, like, we may, we may want to go through the updated, like, cross-board calendar with everyone just to kind of show what we're, what we're trying to hit, like, the target on. Because I think even our budget development process and vote is, a little bit sooner than it's been in the past, right? Am I wrong?
Speaker 7 (02:28:56–02:29:06)
No, you're right. I think we can sit and map out whether it's the 22nd or one of the early October ones, just for an update and kind of here's what's to come and when.
Speaker 1 (02:29:06–02:29:33)
Can we make that the 22nd, even if we run out of time and we don't have the ability to sort of go long form on the calendar, but at least be included for all of us in the packet. So we can see that. And so, cause we're going to need to start putting many, many things on our calendar for updates. So soon better on those items.
If nothing else, future agenda items.
Speaker 20 (02:29:37–02:29:40)
Do we need a DPW update at any point soon?
Speaker 1 (02:29:41–02:29:43)
We probably do because Tom hasn't been
Speaker 7 (02:29:44–02:29:50)
Tom was in as Facilities Director, not as DPW Director. If we'd like to invite him in, we surely can.
Speaker 5 (02:29:50–02:29:53)
Do you want to do it late November for snow?
Speaker 9 (02:29:54–02:30:09)
Snow and ice. The snow and ice briefing. I mean, it was a tough snow and ice year last year. We should talk about how we close the gap on that.
It's a bad year for the state, too.
Speaker 7 (02:30:10–02:30:11)
Help us out.
Speaker 9 (02:30:11–02:30:12)
Yeah.
Speaker 11 (02:30:12–02:30:19)
I don't know, I was reading Farmer's Almanac. It's early snow this year. That's polar vortex. If that polar vortex.
Speaker 1 (02:30:19–02:30:23)
You put that almanac away.
Speaker 11 (02:30:24–02:30:26)
I put no stake there, Farmer.
Speaker 7 (02:30:26–02:30:33)
You can't have two rosy ears back to back. Yeah, I think I can tee up with Tom and invite him to come in.
Speaker 1 (02:30:33–02:31:40)
November, December time. Sure. Before it snows to ground. OK.
If we forget, I'll remember at some point. All right, item 23. I move to enter executive session to consider the purchase, exchange, lease, or value of real property, Elaborate College, 303 Adams Street. Based on my belief, the discussion of this matter, an open session may have a detrimental effect on the negotiating position of the select board.
The select board will not return to open session. I don't know where it says open session, but I'll take a motion. I also move to enter into executive session to discuss strategy with respect to collective bargaining the Milton Clerical Unit of the Southeastern Public Employees Association, Milton Professional Management Association, Milton Public Employees Association, Milton Firefighters Local 1116, Milton Police Association, Milton Superior Officers, Milton Library Association. Based on my belief that discussion of this matter in open session may have a detrimental effect on the bargaining position of the select board.
The select board will not return to open session.
Speaker 18 (02:31:41–02:31:42)
Second.
Speaker 1 (02:31:42–02:31:50)
Second. Mr. Driscoll. Yes.
Ms. Obersheimer. Yes. Sullivan.
Yes. Taggarty. Yes. And myself.
Yes. All right. Say goodnight, Gracie.
Speaker 11 (02:31:50–02:31:51)
Goodnight, Gracie.