Board: Planning Board

Date: 2026-08-27


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:21–00:49)

Okay, good evening, and welcome to the fifth meeting of fiscal year 2027 of the Milton Planning Board. At this time, I would like to now call the meeting to order, beginning with our administrative items. We do not have any new minutes currently. Oh, I'm sorry.

Yes. Let me begin first by introducing the members of the Planning Board and our staff. If you'd like to start, Cheryl. Sure.

Cheryl Tagaia, Secretary.

Speaker 2 (00:50–00:50)

Sean Fahey, Member.

Speaker 1 (00:51–00:52)

Maggie Oakfield member.

Speaker 2 (00:52–00:53)

Alan Munger member.

Speaker 1 (00:54–00:59)

And Meredith Hall serving as chair. And with us this evening, our staff, we have Avanti.

Speaker 3 (00:59–01:01)

Avanti Grady, assistant planning director.

Speaker 1 (01:03–01:40)

Liz Manning, planning director. Thank you and welcome all. Now, again, moving to our meeting minutes, we do not currently have any new meeting minutes to approve, so we can talk about our next meeting, future meeting dates. We currently have scheduled as our regularly scheduled meeting on September 24th will be the next meeting, and that will be followed by October 8th will be the next meeting date on that.

won't be available for the 24th. For the 24th, okay.

Speaker 4 (01:41–01:46)

And is there anyone else? You have town meeting October 19th?

Speaker 1 (01:47–02:15)

Yes. Is that right? Yes. 19th, 20th, 21st, I think that's all day.

So will we need a pre-town meeting meeting? Yeah, we probably should have one scheduled, although we don't have any articles but it's always Oh, I'm sorry, we do have that one, though. The zone, yes. So yeah, why don't we, that's a minor amendment, but we should probably just schedule a 7 o'clock pre-meeting.

Speaker 5 (02:15–02:43)

Yeah, I messed it up last time. I posted it too early. Does town meetings start at 7.30? 7.30.

OK, OK. So yeah, so 7 should be plenty early enough, right? Yes. And I know Lynn's great.

She usually books the room you guys usually use at the high school. All right, so good enough. So we'll post that. We'll post it for 10-19 and 10-20, two nights?

Or should I just post three, just to be on the safe side?

Speaker 4 (02:44–03:02)

I think there'll be a lot of our discussion on the articles. OK. OK, I'm guessing. So at least three.

Post at least three nights, just to be careful. And we get a, yeah. OK. So that would be the 19th, 20th, and 21st?

And then we have planning board on the 22nd? Mm-hmm. If we would normally schedule it.

Speaker 1 (03:02–03:13)

It's not a whiskey town meeting. So we could tentatively cancel that meeting if we didn't have, or move it to the 29th.

Speaker 4 (03:13–03:17)

I think if they have applications that come in.

Speaker 1 (03:17–03:21)

Yeah, I think we'll have to be TBD and wait on that.

Speaker 5 (03:21–03:23)

OK. Yeah, that sounds good.

Speaker 6 (03:23–03:23)

OK.

Speaker 5 (03:26–04:53)

Great. And staff update. All right, so I will go very quickly. I know there were some questions.

We have this later on the agenda. Actually, you know what? I'll hold off on that. It was some information about the fire station, so we can wait on that.

We got some update today from the town engineer about the Mass Works grant in terms of the design work in East Milton. So their consultant, gave a really detailed update of what's already been completed and what's to come. Didn't have enough time to kind of package that up for you guys, but we'll definitely get it out as soon as possible. But the public engagement I think is the key piece they're targeting until late October.

So we will continue to follow that for you folks. The housing production plan advisory committee is hosting their community housing forum on September 23rd. It's everywhere, hopefully. Gotta get it out on the town Facebook.

That's sort of like the next piece. The translated flyers are due tomorrow, so be looking for that next week on Facebook through the town. We have a meeting scheduled, hopefully tentatively, for September 15th on the short-term rentals in-house with the key flyers. So that'll be next week.

That'll give us, hopefully, have an update for you guys at our next meeting on that, on some progress there.

Speaker 7 (04:53–04:54)

Liz, what day is that next week?

Speaker 5 (04:55–04:59)

That is the 15th of September. That's right.

Speaker 7 (04:59–05:00)

Yeah, that's the 18th. Staff.

Speaker 5 (05:01–05:22)

Yeah, for staff, yeah. And then I was able to figure out how to get you all signed up for your APA memberships. Did you guys get emails on that? Yes.

Oh, perfect, okay. So you're all signed up for that as board members for a year. And there was a Nicolano sheet. Thank you.

Oh, sorry. Oh, thank you.

Speaker 4 (05:22–05:23)

Thank you.

Speaker 5 (05:23–05:52)

Since I asked you for that. I know. I know. I paid some bills today, too, which is like stacking up and stacking up.

I'm like, oh, I got to pay those bills. And then the 648-652-Canton Ave has applied back to the Zoning Board of Appeals. Um, I think it was August 28th. So more to come on that.

And I don't know if you have anything to say.

Speaker 3 (05:54–06:15)

Yeah, I think that's pretty much it. I'll mention that I met with Meredith and Liz and Craig for the open space and rec plan. So that was a good coordination meeting. So I talked with Liz today about the schedule.

So plan to reply back to him tomorrow and start moving forward with next steps. So yeah.

Speaker 1 (06:18–07:11)

That's all I have. Okay, and now we can move to item number three, public comment. If there's anyone online who wishes to speak on anything, please raise your hand. I don't see anyone here in person.

If there's any hands on Zoom. I'm not seeing any either. Okay, so as we have an application here for, it's a item number six, special permit, minor modification for 107, 111 Highland Street, Northridge Communities, Inc. Applicant.

The representative, legal representation is here with us this evening and has another meeting at eight. So we're gonna just allow him to, address this item and then go to the ADUs. That's it.

Speaker 8 (07:11–12:39)

Great. Thank you. I'm assuming I can be heard on Zoom. Thank you.

For the record, my name is Edward Corcoran. I'm an attorney here in Milton, actually no longer in Milton, Jamaica Plain, and I've been representing Northbridge communities for the last five or six years with their efforts to pursue the development of a memory care facility at 10711 Highland Street. We went through a robust set of hearings with this board and the Conservation Commission and others and secured a special permit a little over two years ago. We're getting ready to actually break ground.

The appeals have all run, and other things have been happening. And in April, we submitted for an application for a building permit, and we're still pending review of the building permit. It's interesting that there isn't a single person in town government who is in their seat. when we went through the four years plus of process associated with this project.

And so there is no institutional memory, no institutional knowledge about any of the details of what we've gone through. And so we have worked with the town to retain outside engineering review, building review of the building permit. I don't know where that stands at the moment, but I trust that it's in process. But we're still quite a ways away from securing a building permit.

And there is a provision in section 18 of the special permit under landscaping and tree preservation that says that no tree removal may take place without a building permit. building permits capitalized, so it's therefore an important item. We are approaching middle of September. We have a November 15th moratorium on opening the road, any off-site work that might have to happen, and we are at a point where we need to access the site.

At the Building Commission's recommendation, we have requested that we amend that language to say demolition permit. or the building permit. We've responded to requests as well from the engineering department and others that while we can begin tree removal upon the issuance of a demolition permit, we can't actually start doing demolition of the old buildings nor tree removal until erosion control measures have been installed Reviewed and approved by DEP and the town And we've agreed to that we think it's so probably wouldn't be able to do it anyway, but we think it's appropriate We would do that the second issue that came up during the discussion about the amendment associated with the name name of the permit that would give us access to the site is the fact that the There is a force main sewer force main that comes out the driveway goes across Island Street up the hill on Highland and up Spafford Road, and it connects to sewer in Spafford Road. Interestingly, there's no sewer in Highland Street.

All sewer from the latter streets goes down to sewer in Reedsdale, but there's none in Highland Street itself. At the time when the permit, when we were going through with the planning board, Marina Fernandez, who was then the town engineer, wanted the town to own the sewer line and maintain it. Newtown Engineer would like us to own it. It's more appropriate that the applicant owner would only force me, separate if it was a gravity-fed sewer line.

But they've asked us to own it. We've agreed that that would be appropriate, provided that we would not be responsible if there was a street opening within the trench that was approved by the town. The third party came to the town and said we need to access this for whatever reason, the town agreed, and there was damage, it wouldn't have been damage that was caused by us, and so we agreed that that would be appropriate. The town has agreed that that would be appropriate.

We've also agreed that we would hold the town harmless if there was a third party that came to us, if for some reason they asked permission. open internally, we would be responsible. The third party would be responsible to insurance and other provisions to us. So those are the two requests.

It's very simple. I think I had submitted with Liz a simple plan that shows sort of the contractor's access for the purpose. And if you'd like to see that, we can do a quick But really, the bottom line is, what's the ticket for us to actually enter the site and commit some level of work? And if we're waiting for a building permit, we could be here for a while.

That's ADU. I'll keep going to the left. Keep going to the left. There you go.

Speaker 2 (12:39–12:59)

I think you have to click OK first. While she's pulling up, how often does the, I'm not sure who's to answer this, but how often does a town such as Milton hire and outside consultants to manage the CA like we're doing here?

Speaker 8 (12:59–19:07)

It's not uncommon. I think it's less common with with towns that have larger departments And you know cities certainly have much larger right apartment, but it's not a it's not unheard of and in this case the delay was taking so long that you know was back and forth with Nick Milano and he asked if we would agree to to have third party do the building permit review. And we said, yes, but we did request that the town would bear the cost of that, that we would get a deduction from the cost of building permit himself. And he agreed with that.

It's a $24,000 review. The building permit fee itself is going to be north of $200,000. So, we thought that that, you know, a 10% offset from that. We also have, the town has put Tetra Tech under agreement to assist Liz in engineering and site review.

We're paying for that. We've submitted an initial deposit on that in there. We owe the town for the money for the Traffic Mitigation Fund, and there's one more number that's in there that we had to pay. So, the Tetra Tech was provided for as a condition in the special permit.

We understood that, we comply with that. So, this is the site, and I can, if it helps get up, just read. But on the right side is Highland Street. The north is this direction up to the north right-hand side.

There's an old barn, an old shed. in an area where 107 Highland Street used to exist. It was an old house that was demolished six or seven years ago. The shed and the barn remain.

This square is 107 Highland Street. It was a subdivision that was created in 1980. 111 is a substantial portion here, and 111 is a house well in with a driveway that comes in with a garage. Zero is sort of what I call Utah, the panhandle of Utah, down in here.

And then the last piece was actually part of the subdivision was Karen Bacardi's property to the south. There is a 25-foot no-disturb all around the property that we have to honor. And we've hatched in, the contractors hatched in the limits of work here. Those have been staked.

We were on a site walk last week with Liz and a couple of others. The idea is that this area ultimately will become stormwater control wetland replication here, but for the early phases will be construction, parking, lay down, equipment area. The primary access to and from the site egresses with this gate B, the existing curb cut exists. These buildings have to be demolished as an application pending with DEP for a permit approval associated with removing asbestos.

The town can sign off on the demolition permit itself. And there are some trees around here, and trees belong this right away that need to be removed. Before we can do any of that, we have to install the erosion control measures all along the edges of the wetlands. They have to be considered, reviewed, and approved by DEP.

Temporary fencing will come in, snow fencing. It's interesting. As we were out there, there's a whole lot of work that's happening on Karen Bacardi's property, and a fair amount of work that's been happening on our property associated with Karen Bacardi's property. I'm not sure what and why.

Six new cherry trees and some other things. There's also a robust amount of work going on next door at Winter Valley. you've got activity happening right up against the fence line, and there's some trees on our side of this property that are now potentially at risk, that would never have been touched associated with our project, so we're assembling information and trying to figure out what we're going to do about either of those things. forward.

So, as I said, the idea is to get access to this part of the property so that they can then start tree removal in the interior. We finished the tree survey. Liz, that's coming, identifying all the trees that will be removed. There's a significant number of them that are within a hundred foot setback from the edge of the wetland.

We owe the Conservation Commission a significant sum of money on the value of those trees, minus the value of trees that we get, that we replant, either here or elsewhere in town, and we're working on that. So, for this, we're really looking for two things. It's a minor modification to allow us access to the site via issuance of a demolition permit, understanding that we can't touch the buildings and the trees until the Erosion controls are all approved by DEP and the town. And second, to change the ownership of the sewer, which comes out and over and up, ties into town sewer.

That would open the question up.

Speaker 4 (19:08–19:25)

Ned, you mentioned tree removal in the area on another plan that's called Section C. So there would be the section A, section B, C, and D on the plan.

Speaker 8 (19:26–19:27)

Next sheet.

Speaker 4 (19:28–19:28)

Next sheet?

Speaker 2 (19:28–19:33)

Yeah. Right here? Page 12.

Speaker 5 (19:33–19:35)

In the construction management plan?

Speaker 2 (19:35–19:35)

Yeah.

Speaker 5 (19:35–19:36)

Oh, OK. I can pull that up.

Speaker 2 (19:37–19:38)

I'm sorry. I thought you were in there.

Speaker 5 (19:38–19:40)

Do you want me to pull that up? Sure.

Speaker 8 (19:40–19:46)

Yeah, this is different. Oh, I see. Yeah, that would be helpful.

Speaker 4 (19:47–20:30)

And I just want to be clear about this, because Ned, you probably remember some years ago, 333 Brush Hill Road, where there was a lot of tree removal and the site was left in a condition that when it rained, there was a lot of erosion and downslope, mudslide, et cetera. And so I think that's what we learned from that. And we put some provisions in the special permit not to have trees removed before they really need to be. So I want to understand if this sequence is actually correct, or are you planning just day one, remove all the trees until you're done removing trees?

Speaker 8 (20:32–20:39)

I don't know the answer to that question. It appears that there's a sequencing

Speaker 9 (20:45–20:50)

This one's separate. It's the last page.

Speaker 5 (20:54–21:01)

Okay, here we go. What's that?

Speaker 8 (21:01–21:04)

No? Keep going. One more, yeah. One more.

Speaker 5 (21:05–21:05)

More?

Speaker 8 (21:05–22:27)

Yeah. That's the one we just walked through. Okay. Oh, sorry, next page.

Yep, that one. This is early, 8 to 10 weeks, crossing over into the back. B, the road to the back, they have to do a crossing here, they have to do a crossing here to intermittent streams. C is within the building footprint area, looks like closer to 15 weeks.

That would be within three weeks, because that's the construction laid down there. You have to get in and access that, put a binder coat down. The early tree removals will be in this horizontal frame and then further out. not a long time away, certainly is the area within the building footprint.

Get it ready for the installation of all of the utilities that have to go in subsurface to the building and then the foundation work itself. None of that would happen, I don't think, without the building.

Speaker 4 (22:28–22:50)

I'm not trying to stand two to four, eight to 10 weeks and then two to four weeks. Two to four weeks to build section B, which has a bridge that obviously isn't building the bridge in that two to four weeks. So I'm trying to understand the timeframes that are- They're going to go as fast as they can.

Speaker 8 (22:50–23:09)

Oh, all right. All the way around. That's the best I can say. They've been held for, a long period of time, a certain amount of time when they can get work done before winter conditions set in, and then they're going to be getting it as hard as they can as soon as they can in the spring.

Can I ask a question?

Speaker 7 (23:09–23:26)

Sure. Is it, do any of these sequences overlap or are they all contrary? Because if you added the 10, the 4, the 18, and the 3, it's a 35 week duration. So are they saying that they're gonna start and it's gonna take 35 weeks or are these overlapping?

I think they're overlapping. Okay.

Speaker 8 (23:27–23:34)

It's more likely that they're overlapping. Certainly A is gonna get started before B does. Right.

Speaker 2 (23:34–23:37)

They have to get to B. That's 41 weeks, Sean.

Speaker 7 (23:37–23:39)

That's… Okay, 35.

Speaker 2 (23:40–23:45)

Maybe one of us is right. It's a long time to do, yeah. Just do site prep.

Speaker 7 (23:45–23:48)

Which is helpful.

Speaker 6 (23:48–23:48)

Yeah.

Speaker 7 (23:50–23:54)

Let's go, yeah, probably.

Speaker 5 (23:54–24:01)

This was provided at the sort of all hands meeting that happened on August 28th.

Speaker 7 (24:02–24:08)

Yeah, these are all preliminary tasks. Move you good into light construction because this is the pre-construction category, yeah?

Speaker 5 (24:09–24:11)

So, there it was, site work.

Speaker 7 (24:11–24:12)

Site work done.

Speaker 8 (24:12–24:13)

Tree removal.

Speaker 5 (24:14–24:15)

Yep, the model.

Speaker 9 (24:20–24:24)

Back up. Back up. Oh, sorry, guys. I can't.

I can't.

Speaker 7 (24:24–24:32)

I'm trying to reason out those two screens at once. Yeah, it's on two pages. It starts on the previous sheet. So it starts at site task 98.

Speaker 2 (24:32–24:44)

Task 98, it goes to 11, 12, 13 to 524. That's all site work, right? So that's finished up, too.

Speaker 7 (24:44–24:49)

Yeah. So it's six months.

Speaker 1 (24:56–25:03)

So the wetland crossings in November, that's temporary.

Speaker 2 (25:03–25:03)

Yeah.

Speaker 7 (25:12–25:15)

They may be concurrent.

Speaker 8 (25:15–25:20)

I'm certain that there is some concurrence. It doesn't make sense. Yeah.

Speaker 7 (25:20–25:22)

Not be touching any of the other phases.

Speaker 8 (25:22–25:31)

Yeah, no, they're going to… When it's logical for them to break into the next phase, they're going to be going while they're still working back here, you know.

Speaker 7 (25:32–25:45)

Well, you know, once it starts, as long as they're in compliance with everything the town needs them to be in compliance with, we want it to happen in a compressed period of time for the benefit of the neighbors of the town, right?

Speaker 4 (25:55–26:01)

Didn't it give you an idea of how much longer it would take to get the full building permit?

Speaker 8 (26:01–26:08)

No. I don't even know if the outside consultant has started the review.

Speaker 5 (26:08–26:40)

So I have an email from Michael White, August 20th. Um, and he said to ensure we can start right away, I'd file with the planning board, try to get an amendment to the special permit, allowing you to take down trees and get the existing buildings demolished. So that was sort of, that was the, you know, the, the direction from the, from the building department. I think at this time, which was August 20th, I think he was in the process of reviewing the, um, the scope from the third party firm.

Speaker 8 (26:40–26:43)

Jensen something. Jensen Hughes. Jensen Hughes.

Speaker 5 (26:43–27:03)

Yeah. So, that's going back, let's see, that's three weeks ago. So, and I think he was hoping, based on this, that he would have his review of their scope, you know, shortly. I believe he may be out this week.

He's back Monday.

Speaker 8 (27:04–27:29)

And I reached out to Nick Milano today to see if he had any update on when, whether that contract had been awarded and when any work had started and he didn't have anything. Based on that, I would tend to say that they haven't begun any review. And it was, I think they were saying it was at least two full weeks of review once they got tasked to go.

Speaker 2 (27:34–27:45)

And just to reiterate, I believe you said this, both of these changes were made by, were requested by the town, the building commissioner and the town engineer.

Speaker 8 (27:45–28:32)

The building commissioner requested that we change the nomenclature to demolition permit in response to our request to the town. to gain access to the site. We need a ticket to entry. We need something that gives us the permission to enter the site, to start the preliminary work before we run out of time.

Because if we don't get going now, November 15th is tomorrow, practically, and that's the deadline for opening the streets to do any preliminary work. utility work out in Highland Street. And everything just gets shelved off till the spring.

Speaker 7 (28:34–29:24)

Yeah, just… In the last meeting, when this was discussed in the last meeting, my comment was that I thought it would be better to issue a foundation permit, but given that, given that what's the limiting factor here is the town, the applicant is unable to start because our resource is unable to service the applicant timely. I'm in favor, and especially if Michael has advised that a demolition permit is what would meet his expectations, my opinion is we should do what we need to do to allow the applicant to move forward It's issuing a demolition permit. We should do what we have to do to make sure that they can do that.

Speaker 5 (29:26–30:39)

And if I may, and I feel that they've been extremely responsive to the town's requests and requirements, especially with the third party review, which it's anticipated in the special permit language, but it's not, I don't know that it was necessarily full construction administration. So that's a huge help. And, you know, It's been, you know, we were out on site with, you know, 8 or 10 folks. I mean, they got a whole crew out there.

They got the arborist. They have no issues with the arborist, right? That's really an important piece for these trees that need to be protected in this 25-foot, you know, sort of buffer area. And to ensure that those, you know, all of those provisions have been, are in place before, before the work starts.

So there's been, I feel that the team has been extremely responsive. I also feel that, you know, the building commissioner has had his opportunity to kind of weigh in, the town engineer has weighed in. So, seems like a fair, seems like a fair, you know, resolution.

Speaker 10 (30:40–31:35)

So my question is, how many trees are, have the trees been tagged that are coming down? Yes. And how many trees are being taken down at this point in time? There was a site up in Randolph and not too far outside of Milton and they cleared the site and they did nothing for the site for quite a long time and it looked like a war zone.

So I don't want this area looking like a war zone. And I would not want to see that the whole site has been cleared of trees at this late date. So I would wanna know how many trees do you need only to do your demolition of what's needed, your carriage house and your barn.

Speaker 2 (31:37–31:46)

What does that get them? if they were just to take down the trees needed to get to the, right? My understanding is they're trying to move forward with the whole project, so how does that?

Speaker 10 (31:46–31:52)

Which I understand that, but I don't, like what, do they need to take them all?

Speaker 5 (31:52–31:59)

Is there a way to hold off? Yeah, to do it in stages. Is there a way to kind of phase the tree removal? Is that sort of it?

Yes. Is that what your question is?

Speaker 10 (32:00–32:05)

I mean, taking down 300 trees is devastating.

Speaker 8 (32:05–32:12)

If that building permit is issued a month from now, Those trees are gone.

Speaker 10 (32:12–32:12)

Like all 300?

Speaker 8 (32:12–32:13)

They're all gone.

Speaker 10 (32:13–32:14)

Yeah.

Speaker 8 (32:15–32:34)

Every tree that's slated for removal has been tagged, identified, measured, surveyed. We know what they are. And it's going to be, I mean, let's face it, we're building a big building in the middle of a forest and the middle of that forest is gone. There's no other way to put it.

Speaker 7 (32:36–34:17)

To be fair to the applicant, the reason we're in this situation is because we're unable to respond in an expeditious way to an applicant. And, you know, and I understand, I know how you feel. I think I know how you feel. But, you know, to restrict a normal sequence in the work, I don't think would be fair either, no matter what the face of the work is.

In this particular case, you're talking about tree removal, but my feeling is I think we need to allow them to execute the work in the normal fashion, like they would have a permit issued to them. The idea isn't to just give them an opportunity to become active. The idea is to remove an impotent and allow them to progress with their project. And so in that respect, I feel like we shouldn't limit what they can do.

If we're going to allow them to begin, we should allow them to begin. And I would even encourage the applicant or, you know, you to make sure that, you know, if we're allowing this to move forward by an action that we take here, that the building department is able to keep progress moving. What I said last time we met in regard to a foundation permit, If they can't issue a full building permit, seek a foundation permit so your sequence of work doesn't get stopped. Do you know what I mean?

Absolutely. We shouldn't do it. No building department should issue a foundation permit if they can issue a full building permit, but if they can't get there, keep it moving. I don't love The activity that's gonna take place on Highland Street, it's a ton of work.

It's gonna go on for a long time. I think the best that can be managed and contain it is what we're responsible for for the residents.

Speaker 8 (34:17–34:54)

And there are strict protocols in the special permit and in both the conservation documents about what, when, how, what kind of protections for the entryway, for the neighborhood, the traffic control, everything. And we have to be carefully following all of those, you know, Tetra Tech, good firm, they're going to monitor very carefully what's going on. I think there are, you know, your controls are in place and with the support of third party consultants, we just, you're right, this thing.

Speaker 10 (34:56–37:38)

And I guess in me saying this, I don't want to prejudice your client either. But we have, as a town, we've just gone through a struggle, and this neighborhood has gone through a struggle with the 40B on Randolph Ave. So a lot of those residents who live on Highland Street have been struggling with tree removal, which are supposed to be protected, and they're not. They weren't protected.

In that special permit, that applicant was supposed to do street cleaning at the end of every day, and the town didn't have the resources to effectively manage it. So that whole neighborhood, and again, I know that's not your client, but I'm sensitive to that whole neighborhood because I've seen the removal of trees for those residents on Highland Street with this 40B in the, in their backyard and literally it has been cleared up, cleared up until the property line where they should not have touched it. And it's devastating to that neighborhood. So I'm trying to help reduce the more devastation and if it's possible to do it in phases, could we do it in phases?

And I don't know if that's possible, but we do jobs all the time in phases, and you take trees out in one section, and then you go and take them out in another section. And Tetra Tech, to be honest with you, I wasn't really impressed with Tetra Tech back when we went through this review process. Tetra Tech was supposed to be for the town, and I can't remember when, and I didn't have the bandwidth to go back and look, but I just remember, and I can't even remember the consultant's name, I was just disappointed that he didn't represent the town and the residents as well as he should have. So I'm glad, you know, your client is taking responsibility and paying for them to help the town review.

And I think that's really needed. But again, I don't know, maybe there was someone better out there. And then, I had another thought and now I've forgotten it.

Speaker 4 (37:39–39:25)

What are you thinking? I'm just going to mention again, 333 Brush Hill Road. There was a challenge prior to litigation related to that because of the runoff where construction stalled. And so I just want to make sure that since all the parties are new, that it be emphasized that there should not be a delay here.

Because if we grant this, I am very sensitive to the fact, like Maggie said, I think I'm the only one left on the board who is here for that. You had neighbors coming in showing photographs of mud in their backyards coming from the property next door that was clear cut. And so, and it was, it costs, you know, the town and, you know, additional engineers had to be hired, a council had to be hired, and it was a settlement and all of that. I'd hate for that to sort of become a challenge here.

And I think to Maggie's point too, having been on the board long enough and worked on plans where you think there's a lot of protections put in them, they're only as good as the enforcement and the applicants, you know, ability to keep their, hold their contractors to them. And, you know, we've seen success like I think at Wolcott Woods, we saw success, but we haven't seen it always. And so it's really important. And I just like to make sure that that message gets back to the building department because it's it the things that people remember residents remember are the ones that don't work out well they don't remember the ones that do work out well if i could just just a point of clarification i do have

Speaker 5 (39:26–39:33)

an attendee who has their hand raised. And I know this isn't technically a public hearing. No, that's, I think we should, this is, yeah. So that was my other point.

Speaker 10 (39:33–39:51)

If it's time, if it's what's appropriate. That was the other point was, were the neighbors notified about this going on? And were they, you said a bunch of you guys went to the site. Did any neighbors go to, on the site walk and did they voice their opinion or suggestions

Speaker 5 (39:52–41:11)

So what's happened to date is we did a certified butters mailing, and the website for the project has been launched. I am going to follow up on the detail that's there, because there isn't a whole lot of detail yet, I'm assuming, pending the outcome of this discussion tonight. will sort of trigger some of the upfront schedules and things like that, some of that information. I reached out to two neighbors on Stafford because the special permit calls for a neighborhood representative to be part of a pre-construction meeting with the police department and the building commissioner.

on the police details and sort of the traffic management stuff. Haven't heard back yet from either of those two folks. The emails that were on file from a couple of years ago, neither of them went through, so I ended up doing snail mail. So I would imagine that this neighborhood representative, once we make that contact, that would probably be the person.

I think that was anticipated to be kind of the point person for the neighbors. So those are the things that have been done to date under that.

Speaker 10 (41:12–42:28)

And even today, you know, we were just notified that the construction management people have been changed. You know, it was one company back in 2023 and then now it's a different company and there were some changes within the construction management plan, which I haven't had a chance to review yet. So I don't know how extensive the changes are. And so to me, that's kind of a big change.

Maybe in your world it's not, but if I was a neighbor, I probably would think that's kind of a big change and that maybe they should have been notified about it. So I don't know, I just, you know, what keeps going into my head is the site in Randolph. And it was terrible. It was just an awful, awful site.

And I understand it's going to be a huge change to the neighborhood and the town. And I'm just trying to minimize that as much as possible, if at all we can do it.

Speaker 4 (42:28–43:11)

So, Maggie, one thing I think has been common when we get the preliminary construction management plans. They're preliminary because contractors haven't been engaged yet. So I think that that was probably the case here too. So I wouldn't be too alarmed by that having changed.

And as the new company has delved into it, like really getting ready to mobilize, they probably had to make some adjustments or felt like they should make some adjustments. And maybe their ideas about the timing of things based on when they're beginning their permits, et cetera. So I'm not too alarmed by that. And I would trust that the building Commissioner is looking at those changes.

Speaker 8 (43:13–43:46)

I know that Liz looked at them very preliminarily as I did. They basically took the CMP that was put together by Erland and put their own, put the platinum name on it. Erland's name shows up a couple of times. I saw that too.

There are a couple minor reformatting of a couple of things, but without changing any of the substance, but certainly that that'll be important document for the building department to review as we move forward.

Speaker 1 (43:46–43:52)

All right, let's allow the resident to speak, to join us.

Speaker 6 (43:57–43:59)

Hello, can you hear me?

Speaker 1 (43:59–44:00)

Yes, welcome.

Speaker 6 (44:01–48:55)

Hi Meredith, this is Bart from 11 Stafford Road. I apologize, I'm in the car driving my kids to hockey, but thank you, Ned, for the presentation and the updates. I just had a couple of comments. I think touching on what Cheryl and Maggie had said, and you know, I actually read this, I think it's called SAMP modification application before the call.

And, you know, it reads that in order to start demolition on the barn or, you know, carriage house, whatever it's called, that requires the removal of, I quote, some trees. And so to me, that reads like an intent of clearing trees in the immediate vicinity of the barn. But now I guess from hearing the, you know, what's been said and following along, it sounds like we're changing it to say, they want permission to start clearing 300 plus trees as soon as possible. So I guess the question there would be then why wouldn't that application just read and say that instead of saying, you know, we need to clear some trees to do the demolition, which sounds more reasonable.

You know, if you remember, and you know, I know not everyone here was part of the robust special permit process, but one of the biggest concerns in the neighborhood all along has been the tremendous amount of water that's in this hill and the tremendous amount of water that goes across this site as explained by the applicant civil engineer. And, you know, we have yards and basements that flood already as a result of paving over acres of land nearby. So, you know, if A lot sits vacant for two months during the rainy season, as is forecast with the San El Nino. You know, that water is going to move differently than it would if the site was actively being worked on and if the vegetation was preserved, if the trees were there.

So I think there's, I would have significant concern that, you know, I get it, the town, you know, the town has certain constraints that are living in the applicant. We don't want to slow them down. but we also don't want to see detrimental impacts happening because they have to wait two months after they've cleared all the trees. So I would say, look at their application.

If they've asked to clear some trees so that they can demo those buildings, that's one thing and we should, that's one thing to consider. But if they're saying we want to clear everything, then they should have written that in that application clearly. And I would raise concerns with that because part of the reason the town is struggling, it seems, to process all these permits is because there's just so much work going on right now in town. So many projects happening at the same time.

And, you know, that's probably a sign that we're struggling a little bit to digest everything. So I would just keep that in mind that, you know, we do have this water issue that was here. We don't want it to get worse. We spent great expense with the DEP to really force the applicant to design a proper drainage system with adequate retention and, you know, rate control for when there are successive storms because the original plan didn't meet the standards.

on they could start demo and not have to do the whole thing. Waiting a few weeks is not, it wouldn't be a huge deal. And related to that, I appreciate the Tetra Tech stepping in to help with the construction management. They were the ones that kind of were pretty perfunctorily looking at, I believe when we had asked ComCom for hydrolysis to look at this, and the planning board had asked for that too, Tetra Tech took it on board and basically did even less of an analysis than the applicant's own civil engineer and our experts, which largely corroborated the groundwater bonding issues.

Tetra Tech basically just said in one sentence, yeah, we acknowledge that the underlying hydrology will change, but we don't think it'll be a significant issue without any supporting backing analysis. So yeah, I mean, It would be a preference to put that out to bid to someone else, but obviously, we don't have control over that. But those would be my comments. And thank you all for your time and consideration.

And it's nice to sit in and hear you speak. I appreciate all the work you're doing for the town.

Speaker 1 (48:56–49:01)

Thank you, Bart. Any comments on

Speaker 7 (49:02–49:20)

Well, I just have one just to follow up on, I guess, some of the comments made. Probably the best time of year to start this project is past us. You know, it would have been ideal, especially if you're talking about a site that you have concerns with water.

Speaker 3 (49:21–49:21)

Dry summer.

Speaker 7 (49:21–50:39)

Dry summer. The next best time to build a project is winter. You know, those are the two times a year that are best if you have water conditions. The longer that we delay the applicant from being able to start the project, the worse the spring is going to be.

But the sooner the applicant can get going, the better the chance they can capitalize on advancing the project through the winter when soils tighten up, and it'll be in a better position in the spring. The longer we delay it, the poor the position the project will be in when the spring comes in, when the rains return. So if we want to have a chance, you know, for the applicant to stabilize the site and when I mean stabilize it, I mean in terms of like moving it forward towards the drainage system that's designed, get them going and don't restrict them to a certain amount of trees. You know, if we want to create an opportunity for the applicant to come back and say, hey, not my fault, restrict them.

That's how you can do it. But I mean, you know, if you tie the hands and give them only a limited amount of approval and it doesn't work out, what would you expect the applicant to say? Right, that's my opinion. And as a guy who's been on that side and has had to build projects, I think, you know, my experience is probably influencing my point of view.

Speaker 4 (50:41–50:59)

And yes, so I'll just go back to striking that balance of keeping the construction going and making out of all the people in this room's control is when that permit's going to get issued. And there could be a lag and the people who are down slope definitely have risk in that.

Speaker 8 (51:01–51:18)

So, you know, we really- I mean risk down slope, there's the wetlands down below it. All right. Well, it's the wetlands down below. DEP is on this.

There's no one else at risk. Water goes downhill.

Speaker 6 (51:19–51:46)

It's not going up. I would respectfully disagree that the abutters there, their water drains into those wetlands. So if those wetlands fill up, they have no place for their water to go. You know, Teresa O'Brien's house, the site of 120 Highland, the Fioravanti's house, those are all several feet higher than the wetlands.

Their water drains there. And the houses behind them are up higher. So those people's water drains into their yard. So it's all connected, if you pardon my interruption.

Speaker 8 (51:48–51:52)

We're down gradient and the water's going downhill.

Speaker 2 (51:52–52:30)

So Ned, you said that initially you put in for the building permit, how long ago? April. April. So that's five months now.

And so if site work takes, based upon that CMP, I think it was but we're a little unclear in terms of, I think it's about 18 weeks, but there's some overlap, right? So let's say that's four months or so. I think you said earlier, have you been given any indication that by the time the site work is nearing completion, that there's no, it's not unreasonable to think that you would be getting a full building permit?

Speaker 8 (52:31–53:11)

Our expectation is that sometime in the next four weeks, we should have access to a building permit. Is that wishful hoping or some indication from? I don't have any indication from anybody that that's what's happening. We know that we agreed to fund the peer review for the building department.

And we expect that that work will have commenced soon, if not already. But we've got a November 15th date looming at us, which is there's a road closure in Horium. We can't touch Highland Street after November 15th, which is a big blow in the schedule.

Speaker 4 (53:11–53:15)

But that's not necessarily tied to removing 300 trees, right?

Speaker 8 (53:15–53:44)

Yeah, it is. It's all part of it. We have to get access. As Sean said, he's absolutely correct.

The best time to do this work is as soon as possible and get it done through the winter so that when we are installing all of the drainage systems, they all have to go in before the building goes in. All of that work is preliminary to the building foundation getting in and we need access to the site. We need access to the site to get the project going.

Speaker 4 (53:44–53:48)

Understood, but you're not going to start that building foundation until all that other work is done.

Speaker 8 (53:49–53:57)

And we can't do any of that other work without getting access to the site, removing trees, clearing all the area that needs to be supported by that.

Speaker 11 (53:59–54:00)

Can I ask a quick question?

Speaker 1 (54:01–54:04)

Yeah, can you please state your name? Yeah, sorry.

Speaker 11 (54:05–56:23)

This is, yeah, this is Teresa O'Brien at 42 Spafford. And I'm sorry to interrupt, but I have to go drive kids around. So I just wanted to ask, I felt like someone mentioned that there was a walkthrough. I'm a direct butter and I didn't get invited on the walkthrough.

And also the letter that we got in the mail was dated September 1st. It was Labor Day. Someone mentioned no neighbors were there. I just want you to know that we were given a week's notice pretty much.

So unfortunately we weren't, but we are all still involved and we would appreciate more notice because I was trying to look at the plans today and that we should be able to find out what's, what is the plan. I would love to know in advance, um, directly across the street. So anyone is affected by 300 trees being cut down. I can definitely tell you it's us.

Um, so I don't know who is, who's on the list, but please 42 Stafford, knock on my door any day. I would love to know what you're planning for a construction schedule and give them more notice for any of these meetings. And I'm sorry, I now need to run, but I really, I'm hoping, you know, I probably would have tried to go tonight if I really thought you're cutting down the 300 right away. But again, as Bard said, the notice said a couple of trees barn so um I just hope you're doing the barn as you can tell we already have enough construction going on in the street and the other day I don't know what they're drilling but it caused a major delay when kids were going to high school so just please consider the traffic and everything else and I you know you're I know you're all our town meeting or planning board members, but no one really lives right here.

So I know Sean is saying it's a great time, but unfortunately, you know, it's easy when you're not affected to say it's a good time to do it, but being a neighbor and being directly affected. Yes. And no offense, Ned, I don't think you have a construction degree, so maybe you should leave that to the other people. Thank you.

Speaker 5 (56:24–56:48)

Thank you. Teresa, you were one of the individuals that I had contacted by email, but it bounced back, so I apologize. Potentially to be the neighborhood representative. So look for some more information there and I will definitely be in touch with you and I'd be more than happy to walk the site and do whatever I can.

Speaker 11 (56:49–56:58)

Yeah, please, again, knock on the door, 42 Stafford. So if that email doesn't go through, let's go old school and knock on the door. Thank you.

Speaker 7 (56:58–57:14)

Thank you, Teresa. For Teresa and anyone else that's listening, my opinion has nothing to do with my street address, where I live or where anybody else lives. It's just based on my experience as a guy who's 40 years in construction.

Speaker 8 (57:16–57:19)

Meredith, I'm running against my 8 o'clock start.

Speaker 4 (57:20–58:40)

I'll just say that I am not opposed to proceeding as Michael White suggested, but I also would like some assurances from the building department that there will be no delays in the issuance of the building permit. so that it can move from this demolition plan, this demolition, the removal of trees and the demolition of the buildings. And then by the time they're done with that, that they will have the full building permit in hand. And as far as the utility portion of this, this town engineer's recommendation wants to change it.

no basis for challenging what the town engineer wants to do with that. And so I have no trouble with that change. But I'm not sure how to handle this in terms of the building permit. But Ned or Sean, what's the reasonable expectation of how long it would take to remove trees associated with the demolition of the buildings?

Is that something that's done in four weeks, two weeks, six weeks? How, what kind of period are we looking at for that work before they begin the rest of the trees?

Speaker 7 (58:43–59:27)

I don't, I don't think I know the project like at a level, at a level of detail that I could answer that. I honestly, I don't. Most tree removal components of projects, if you're Unless there's a reason to stage the tree removal, you do it all at once. You come in and take all the trees out.

That's not a small task. Sometimes if you had a limited amount, it would be a small task. This is a legitimate tree removal company that's coming in. I think Charlotte would go for all of it and do it all at once.

Speaker 4 (59:27–59:29)

So maybe what can be done.

Speaker 2 (59:30–59:48)

Could I just add to that? The sheet before that, that we were looking at earlier, does say the activities, including the tree and stump clearing cut and export duration four to six weeks. So I think we might have missed that a little beforehand. So that's saying that the expectation is the trees would be removed within six weeks.

Speaker 4 (59:49–01:00:11)

So I think one thing that would be helpful to the neighbors is to understand what tree removal looks like. What is that in terms of vehicles? I've had trees removed, big trees removed from my property. They have big cranes come in.

They have big trucks come in. And how many trucks a day? What time are those cranes coming in? When are they leaving?

In terms of planning, I think we had construction activities related to the school time.

Speaker 8 (01:00:11–01:00:23)

Very specific times when vehicles can enter and exit the site. It's not during the school. And I'm gonna need to run to start this other,

Speaker 5 (01:00:23–01:00:27)

And we do have one more neighbor, just so you know.

Speaker 4 (01:00:28–01:01:12)

I'll just go back to saying, if it looks like it's a four to six week process that that work will take, and they'll begin on the rest of the trees, even if it's eight weeks before the building permits issued, I think the timing will work out fine. I don't think it'll work out fine if it's a lot beyond that. So that's just my… Basically, really, and ask back to the building department in terms of the building permit.

If Sean says a foundation permit, if that's going to help it continue to move along, I'd like to see that rather than more than construction to lag.

Speaker 2 (01:01:12–01:01:45)

because the expectation is that the applicant's drawings are complete. Sometimes when you go through and you're trying to get a foundation permit, it's because the architects and the engineers aren't done with their design yet, right? And they're trying to get ahead of it. This is already completed.

So all the information is there for a foundation permit, which I think last time I might've raised a question about too, when you said that I didn't understand it fully. Now I understand that all the drawings are complete, that the building department could issue that foundation permit. based upon all the information that's already there.

Speaker 10 (01:01:45–01:04:02)

Yeah. And I know from a construction standpoint, it's easier. It's easier for the construction company to work on a blank slate. Like, no one is questioning that at all.

But I know, you know, when I lived in my old house, I left my house across the street was a wooded lot. When I came home at the end of the day, every tree was gone. I wasn't notified. And in fact, they cleared all the way onto the town's property.

And the contractor said, oh, I didn't know, which I didn't believe them. And I went over and that poor contractor got an earful for me. And I said, this was not necessary. It was not necessary.

So I don't think 300 trees have to come down. I just don't think and I don't think I can support taking down all of them. I'm okay and I understand you have to clear a site. I think trees have to come down to plant new ones but I don't think I can support taking every single tree down.

I believe in a phased a phased scenario. If right now they're just starting with removing the carriage house and the barn, you know, I think they'd have more buying from the neighborhood and it would serve the contractor and it would reassure the neighbors, you know, if you do a little bit of change at a time. And just imagine, not just from the neighbors, but the whole town. Highland Street is a highly traveled street.

I can just imagine all the calls, people are gonna be like, what is going on? Like, it's cleared. Like, where if you take down, you know, across the street, you know, it's hard to see that house get removed. But I understand, you know, two houses are going there, but I don't understand what the harm is for a phased removal of trees.

Speaker 7 (01:04:03–01:04:53)

Well, just if that schedule of four to six weeks is the period of time, that is based. I mean, they're not gonna disappear in a day. They won't disappear in a week. The volume of work is too great, but I think there's limited things that can be done to make the neighbors necessarily happy.

I get that, but prolonging it, and taking out trees that could come down in six weeks, over 12 weeks, I don't think it makes it any better. It's almost like more slowly stripping the bandaid off instead of doing it quickly, right? What's the advantage to doing it over 12 weeks rather than six weeks? Is it an acclimation to a land parcel just losing its trees?

Speaker 10 (01:04:53–01:04:56)

Yeah, psychological.

Speaker 7 (01:04:56–01:05:44)

Yeah, well, I'm not sure that that actually behooves the neighbors by slowing a part of a project. As I said earlier, I hope the town's in a position to hold the contractor and the applicant responsible for how they build the project. And the more restrictive we are, the less we are able to hold them accountable. I don't want the contractor to have an out.

I don't want them to be able to say, hey, I wouldn't be in the situation if I wasn't told to remove them in phases, or if I wasn't delayed six months, you know, I'd be in a different position. We should eliminate the excuses and put the position in the town to hold the contractor and the applicant responsible. That, in my opinion, is a better way to serve the interests of the neighbors.

Speaker 4 (01:05:46–01:06:02)

So since we have you as our construction expertise person, since we don't have the applicant's construction expertise here, John, the November date and the roadway, that's for utility connection?

Speaker 7 (01:06:02–01:06:04)

It'd be for opening the street, but I don't know.

Speaker 4 (01:06:04–01:06:06)

But why do we need to open the street to demo the buildings?

Speaker 7 (01:06:06–01:06:07)

I don't know.

Speaker 4 (01:06:07–01:06:11)

And to remove trees. I don't know. That's what I don't quite understand.

Speaker 7 (01:06:11–01:06:12)

I don't know that.

Speaker 1 (01:06:12–01:06:17)

I think it was tied to utilities, bringing utilities onto the site. and getting those.

Speaker 10 (01:06:18–01:06:40)

And I'm sympathetic to the November 15th because I had a November 15th deadline that I had to meet and I didn't, I wasn't able to meet it. And so I am respectful and understand all that, but I, mine was for the drainage. I had to connect, I had to connect my drainage to the town's drainage system. So I don't know if that's part of it.

Speaker 4 (01:06:40–01:08:09)

So if that's what it is, if it's utilities, I have no trouble with that. I have no trouble with the demo. I have no trouble with the removal. trees to get started, but this idea that the sequencing of the construction is first thing is to remove all the trees.

and then you're not gonna get to the building for how many months, you're gonna be doing other things. Well, while that's just sitting there, and I see there's some staging on that one plan we saw, but there's a lot of it that's just gonna be blowing in the wind, or have to have water down, or have puddles on it, or whatever's gonna happen until you get to building that foundation. And so, I just don't, I understand too, seen it where sites are clear cut and it's you know like as an architect we try and save trees where we can and then we go to the construction site and it's just oh we'll just take everything down um and it takes a long time for those trees that you're trying to preserve to come back but and it does seem like um here it's probably the timing is probably going to work out um hopefully it sounds like is going to work out, that it's not going to cause a delay in terms of that sequence. But I do think that it wasn't that clearly explained about the trees and tied to the November 15th.

But I think really what it is is a construction start date.

Speaker 7 (01:08:10–01:08:25)

I think it's a different task. It's probably not tree related at all. It probably is with respect to connecting utilities in the street and I'm sure if we had Ned, we could ask him that question.

Speaker 1 (01:08:26–01:08:28)

I think that's when he was referencing.

Speaker 7 (01:08:28–01:08:28)

Utilities.

Speaker 1 (01:08:29–01:08:33)

Utilities and getting the building permit was critical to get those utilities.

Speaker 7 (01:08:33–01:10:14)

So there's a period of time where you can cut into Highland and if he doesn't get it done before the 15th, then he's not going to be able to do it until spring date, whatever date that is. I don't know, it is probably an April date. But with respect back to trees and the project, The clearing and grubbing, right, is a phrase that's used for prepping and removing, you know, trees and brush from a site and stumps and so forth. And the next phase is generally earthwork.

And it's not reasonable to do earthwork in like areas of small phases. You've had much experience around construction as I have although I've been building and designing and so but still it's not reasonable to do earthwork in sections it's just it's it just isn't reasonable, and we shouldn't restrict them that way. We need to allow them. I would say this for any project.

I don't even know who the builder is. I could kill us who the builder is, but it's an applicant that has approval to build a project on the town, and I'm only speaking from a process standpoint because I feel like the process here is broken. They submitted an application, they can't get a permit issued. It's not their fault, it's our fault as a town.

So restricting them doesn't make sense, and restricting them by allowing them to do a portion of a certain task at a certain time is not going to make it a better project. And removing the trees allows them to comprehensively approach the earthwork. And, you know, earthwork means the entire site. I mean, there's some areas of that earthwork that is probably going to be stripped and moved off the site.

There's other portions of that earth that's going to be scraped up and it's going to be used in a different area of the site.

Speaker 4 (01:10:14–01:10:20)

Sorry Sean, but they can't do that until they get the building permit, right? No, I think that they're allowed to do is trees, right?

Speaker 7 (01:10:20–01:10:28)

Well, I don't know. I'm not sure what this means I mean if it means you can only cut the trees down you can't take the stumps out of the ground and you can't begin earthwork This is that really?

Speaker 4 (01:10:29–01:10:48)

I'm asking because all we're saying that condition, I'm looking back at the permit, the condition said no tree removal. It doesn't say earthwork. I would assume you can't do the earthwork and the utility work until you have a building permit. Yeah, that's right.

Speaker 2 (01:10:49–01:11:13)

But it does allow you to get the street to disconnect existing utilities that are there for the demolition, right? The tree clearing and the demolition of existing utilities come onto the site can be removed before November 15th so that hopefully between now when the moratorium ends in the spring they can have that work completed so that when that comes back on they can start to connect the sewer and they can bring in any new utilities to the site and do the earthwork. Right, I think that's what you're getting at.

Speaker 7 (01:11:13–01:11:53)

I think if Michael, if Michael said apply for a demo permit. I'm thinking that he, although it's not a building permit, he can't put a foundation, he can't build a building. I think what Michael was offering is an opportunity to start the project. why I suggested a foundation permit last week, that's usually a definitive permit.

If you get a foundation permit, it's only suggesting that you will get the balance of the building permit, but just not as quickly as you can get a building permit. I mean a foundation permit, and that usually is a go. If you get a foundation permit, that means that you can start your project.

Speaker 1 (01:11:56–01:12:07)

All right, we have one other hand. I believe there was one more. Someone on Zoom would like to speak. Let's see.

Speaker 12 (01:12:07–01:16:26)

Okay. Hi, everyone. Nadine Hanna, 11 Stafford Road and town meeting member, Precinct 9. Thank you guys once again for coming together to discuss this big happening in our neighborhood so diligently.

I did miss some of the beginning of the meeting, and I will try not to be repetitive, but I think this really goes back to basics. And, you know, we have rules, we have processes. They don't have a building permit. Why are we going to now jump ahead and go out of order to assist an entity who's, you know, hasn't exactly proven their good neighbor standing throughout all of this process.

They didn't even contact Teresa for the site visit going into this latest, you know, development here and their request to expedite what, you know, previously stated timelines. We live here. I don't think anyone in the neighborhood or in the town feels that they need to step out of line to help get these guys going sooner or, you know, in what is obviously supposed to be a financially better plan for them so that they can cut ground, you know, get into the groundworks and the foundation and the et cetera, et cetera. because all these trees are gone sooner than expected, while we have to sit here and live with it.

And hey, guess what else? Plans don't always go accordingly. What if the bottom on the project falls out after so much time? And what could be their good or their poor planning?

Then the neighborhood is going to live with all this tree cutting, a deforested area, while somebody scrambles to figure out what next. I mean, if you're a citizen in town in Milton, you go, you follow the process. Nobody's cutting in line. Not no one that I know is cutting in line.

You know, we're standing in the proper order, putting our paperwork in, getting our yes and our no to our hopeful plans and, you know, following it along. And I would love, as I kind of heard in the room, a little bit of foot stamping saying we need to get this done. to happen, you know, to work for me every once in a while, but I don't do it. And I don't understand why it is that we should all sit back and just kind of nod along while they go over there and pull out, you know, all of their trees in four to six weeks and then halt.

So our winter is even more barren and, you know, desolate. And don't forget the health impacts of expediting, pulling that amount of, you know, organic matter up and out of the ground. All the dust, if you go by the Irwin's former residence, that is such a small thing relative to this site or in the overall and it's making a huge impact already. There's so much dust, there's so much debris, you know, they're talking about the barn coming out at some point, there's a building back there and whatever else, all the vermin they're going to displace, you know, right now we had what like a very hot summer.

I'm sure that the The birth rates are not down as far as all the nasty little critters who are back there. We're going to start, you know, in and create an influx into our neighborhood, which, yeah, I don't want to look in my backyard the next time of the project and see rats out there. So, you know, for the kids around here who are, you know, playing one, keep them healthy for the families who are here. We want to keep it's not just the aesthetics of the aesthetics.

And I agree with Maggie, of course, psychologically, there's an impact on the surroundings that you live within. We all know that. For Teresa at the top of the street, making her live and her family live with prolonged exposure to a semi-cleared out site and a dragged out process of demolition and building and all these things. And once again, without those families at the top of the street, because it was confirmed that other families also weren't given any notice.

I won't say their names if they didn't already speak up, but we're the neighbors who live here. not just on Spafford Road, but obviously the surrounding community throughout all of Milton, we try to be good community members. And we do believe in the process by which our town operates, even if sometimes it's a little longer than we want, there's a reason for that. And if we have multiple large scale buildings coming in town, coming up in town at the same time, and somebody else has to wait a little bit longer, then probably that's in everyone's best interest.

Thank you.

Speaker 1 (01:16:27–01:17:55)

Okay. So I appreciate all the comments. And are there any other comments from anyone else? Because we are at 820 now and we really do have to get to a lot more on the agenda.

No more hands. No more hands. Okay. All right.

I completely understand. I'm hearing what everyone is saying, but my concern is doing this tree demolition and some of this other work. getting into the spring. And if it can be done prior and get the drainage system in before spring, I think that makes sense.

And I do believe that now that there's a peer reviewer, that the building permit hopefully will be issued, and it will be a seamless transition from getting this work, which would be the first phase anyway, moving into the next steps and moving this project along to get the infrastructure in, before the rainy season comes. And those wetlands really do become problematic. Because I think that's more likely what's going to create problems if there are for the neighbors. And we've seen the flooding and the water that runs through there.

It's a really delicate, delicate site. And having had a dry summer and early fall, I just think it makes sense.

Speaker 5 (01:17:57–01:18:10)

I would ask if there's any other comments, and if not… We do have another participant who's asked to speak. Okay, let's welcome that person in.

Speaker 13 (01:18:13–01:18:43)

Hi, this is Sharon Rich, 43 Spafford Road. Thank you everyone for allowing us time to speak this evening. I just want to say that I am backing up and have same sentiments as all of my neighbors had said this evening. So thank you for your time.

I agree with all of my neighbors. This is a little unsettling. It's a lot of trees and there's a lot of changes in this neighborhood. So thank you for your time.

Thank you, Sharon.

Speaker 10 (01:18:45–01:18:53)

So I have a question, is there any way we can, a motion be made so it separates the two requests in the application?

Speaker 5 (01:18:58–01:19:21)

The thing about the sewer? Yeah, that was a specific request from the town engineer. So I mean, yeah, it could be done. I don't know that that's super time sensitive necessarily.

Speaker 2 (01:19:21–01:21:00)

I understand that the concerns and the comments that are made by the neighbors. I don't live on Spafford and I live in this area, but I do live over in East Milton and other changes that have gone on there. And I can understand how it's disconcerting to see change happen all of a sudden. At the same time, and again, the new kid on the block, this was already approved in the special permit by this board and they have they have permission to do the project.

They're just asking to go to amend when they can begin. The tree removal is going to happen now or in the near future either way. So the loss of 300 trees and the replacement of those either through funding or through replacement on site or elsewhere in town is going to happen one way or the other. It's just a matter of when that's going to happen.

And so I understand that There's frustration with perhaps the perceived lack of process with alerting neighbors. I think we can always try to improve and always try to be better with communication. I'm not saying that it wasn't done, but we can always try to be better. Absolutely.

I think that just to Cheryl's point, if there's a way to convey to the building department that this should be not delayed in any sort of manner so that we're not getting to the point where there's a possibility of X, Y, and Z, the 333 Rush Road. I don't see, it seems like there's consensus through comments here that we should move forward with this on board. And if I'm not sure the right process, but if we need to make a motion to proceed, I would be willing to do that.

Speaker 5 (01:21:01–01:21:12)

Just a point of order. We do have a, member online who is asking to speak a second time.

Speaker 1 (01:21:12–01:21:14)

OK, we'll let that person speak as well.

Speaker 12 (01:21:14–01:22:30)

OK, very cool. Hi, meeting Hannah, 11 Stafford Road, town meeting member, Precinct 9. Yeah, I lived in East Milton for 10 years. I get it.

Things change. Everything that happens in a neighborhood, no matter what part of Milton you're in or where you live, it's impactful. I just want, I would be remiss if I didn't make this comment. Having heard now after anyone in here who's listening or has paid attention to this particular project, knows that we as neighbors on Stafford Road and specifically within my household between myself and Bardhai Rezai, who by the way, on November 15th, we'll be celebrating 26 years together.

So I'm gonna mark the date in my calendar. We have discussed wetlands at length And now to hear that that particular subject is being used as an example of why they should accelerate their project instead of slow it down is absolutely blowing my mind. I'm gonna drop it right there, but I think if I couldn't sleep tonight if I didn't point that out. So I guess thank you for paying attention to wetlands now, I just wish they would have been more in our favor.

Understood, yeah.

Speaker 7 (01:22:32–01:23:45)

I'm sorry, I feel responsible to respond to Nadine. It has nothing to do with wetlands. It's progression of a construction project to get it to a point where you can have drainage controls in place. Wetlands isn't the reason to start the project or stop the project.

The simple progress of the project means that you go from from clearing grub, removal of trees into earthwork. And because of the nature of the project, you do need to put in your drainage utilities and your drainage control measures, your retention, detention ponds before you can, you know, before you can have a site established to start a foundation project. That's a normal sequence. My comments earlier and what I'm suggesting has nothing to do with wetlands.

It is not a wetland even topic. It is about advancing a project so you can put your drainage control measures in place. Very different.

Speaker 4 (01:23:48–01:25:42)

One thing I just want to say a little bit. What you said about the project's been approved. Project's been approved by the planning board, a special permit. And that's not a full set of detailed documents.

So we do expect the building department to do their review at a rigorous level on those set of construction documents that are far more detailed than the documents that we reviewed. And I appreciate that they're busy and I appreciate that the tenant administrator offered to bring in an outside peer or outside plan reviewer. And I think that's what communities need to do if they're inundated with a lot of work. Because to your point, they do have a right to proceed with a project.

And they have an expectation that the building permits are going to get issued in a timely manner. agree with that. And I think where the building commissioner is, um, has offered, um, what he thinks is a way to start the project and the town administrator has offered a way, um, to speed up the review. I think that's good governance.

I think it's a good thing for them to be doing. And I, I've heard from others that other permits have been taking a long time, small to large. And if we have a capacity issue that can't be solved by bringing in outside plan reviewers, then we need to look at the department. The department needs to advocate for itself for more staffing, in my opinion.

The department does receive permit review fees, which cover the cost, or should cover the cost of review. So it's not as if it's an unfunded expense. So I guess with that, I would make a motion to approve the request.

Speaker 7 (01:25:44–01:26:18)

Before you complete your motion, can I reinforce what you just said? The only reason we're having this topic on our agenda is because we've been unable as a town to issue a permit in a reasonable amount of time. this project would be under construction. The neighbors wouldn't be talking to us now about their opinions.

It should be under construction. Five months is too long to wait for any building permit to be issued. You're right. That's the only reason that the planning board has this topic on the agenda.

Speaker 4 (01:26:18–01:27:30)

And before I make the motion, I just, again, want to reiterate how In our decision, the keeping an open line of communication with the neighbors was really important. We did that also on the Wolcott Woods special permit, and that worked well, I think, and I just I know they set up the website, but having a cell phone for the job super and all of those things I think will be super helpful. And laying out the expectation for here's what we're doing in the next two weeks or four weeks, whatever time period they feel is valuable to them as neighbors, then they're not being surprised by the activity on the site. And so I think that's just, I know we asked for it, I just want to reinforce it now.

And then if we're ready, I'll make a motion to approve the modification to the special permit and site plan approval for 107-111-0 Highland Street as presented to us tonight in the documents in our folder.

Speaker 2 (01:27:33–01:27:33)

I'll second that.

Speaker 1 (01:27:35–01:27:40)

Any further discussion? Maggie, you would want it to separate these, but I don't know that it's going to matter.

Speaker 10 (01:27:40–01:27:41)

No, that's fine.

Speaker 1 (01:27:43–01:27:51)

Okay, so all in favor? Let's do all in favor. Aye. All opposed?

Speaker 14 (01:27:52–01:27:52)

Aye.

Speaker 1 (01:27:53–01:27:55)

Great, okay.

Speaker 5 (01:27:55–01:28:07)

Thank you and… I just saw another neighbor had asked to speak for a second time. I apologize, I'm just seeing it now. Okay, I think we're…

Speaker 1 (01:28:08–01:29:04)

Since we voted, I would welcome anyone to reach out to us. And really, we will follow up with the building department and just communication with the neighbors to make sure that everybody feels involved. And on behalf of the neighbors, I would hope the invasives are removed, because that was one of the concerns is there's a lot of invasives on that site along Highland Street, which do affect the neighbors. So maybe that'll be part of it when they go in.

Okay, all right, so moving on to the next agenda item. This will be the ADU site plan review, 531, 535 of Brooke Road. And if we can pull that up, that would be great.

Speaker 3 (01:29:24–01:29:39)

Yeah, I think I'd probably start with just showing the site plan. I think that's primarily what we'll be looking at.

Speaker 1 (01:29:41–01:29:44)

And do we have the applicant with us on Zoom?

Speaker 3 (01:29:45–01:29:53)

I believe Katie is on Zoom. I believe she's the owner.

Speaker 5 (01:29:54–01:30:06)

I unmuted her, so are you able to speak, Katie?

Speaker 15 (01:30:06–01:30:11)

Can you guys hear me?

Speaker 1 (01:30:11–01:30:13)

Yes.

Speaker 15 (01:30:13–01:30:15)

All right. Thank you for having me.

Speaker 1 (01:30:17–01:30:18)

Great. Welcome. Thank you, Katie.

Speaker 3 (01:30:21–01:30:27)

So I just Figured I would go over the staff memo that was in the… That would be great.

Speaker 6 (01:30:27–01:30:27)

Perfect.

Speaker 3 (01:30:28–01:35:12)

Plain board materials folder for this project. And then, yeah, if there's anything Katie wants to add after that, we'll go from there. Okay. So this ADU is for…

531 Brooke Road is currently in the system as 535 Brooke Road. And so there's been an application for this ADU that was stamped in on August 12th. And so from there, we kind of formally reviewed the materials. So this address number may change just due to how they've been assigning addresses for other ADUs.

So that's just kind of a heads up for the owner. It may change to like 531R Brook Road. So I just wanted to note that. So the applicant submitted a plot plan as well as architectural plans for the ADU.

And there's also in the planning folder plans for the primary dwelling. And so Katie, she's been very responsive to our questions. So there's been some back and forth just regarding details about the plan. One of those updates was parking spaces.

So I think if you go to the next page here, yeah, you should note the red boxes. I think for this ADU, the technical parking requirement is three spaces because there's a two-family and it's in residential C. And then there's the ADU. the parking space.

Liz advised that there should be at least one parking space that is dimensioned by nine by 18 feet. That is a conversation we had there. But yeah, it's in a residential zoning district. It's over a 1000 feet from away land resource area.

They do itself is 812 square feet. It's a 2 story to tax structure located to the rear of the principal dwelling. I believe it's one bedroom, two baths, two entrances total. And the ADU complies with setback requirements for an accessory structure.

The building commissioner did provide his zoning determination that this, you know, follows or meets current zoning based off of a donor Dover amendment. So that was good on that end. The proposal complies with bylaw requirements. Only one ADU is proposed.

It will remain accessory. At 812 square feet, it complies with the 900-square-foot cap and the proportional size limit. The primary is a two-family. It's 5,300 square feet.

So in terms of square footage, it fits the bylaw requirement. Let's see. What else? So yeah, just a couple of notes from building and safety standpoint, just fire noted just for the address for the ADU should be visible from the street to inform emergency responders.

In terms of the distance from the pool to the structure, Katie did response saying that that was 13 feet long. So I think from a safety standpoint, that's pretty good. Of course, I'll defer to the building commissioner for that. So that's not my expertise.

And then, yeah, in terms of landscape and utilities, everything exterior is going to remain the same on the site. I did reach out to the town engineer and he had recommended pointing out existing water and sewer utilities, even if they're existing. That was the response I got from him on that. Yeah, and then the only other thing I'll point out is just, you know, with the exception of the fence, there's not any sort of screening in the back.

So just we'll have y'all consider just screening and whether or not that's needed for for the ADU. That's pretty much what I have for the staff memo. And Katie, if you have anything to add, you're more than welcome. Otherwise, I'll leave it to the board.

Speaker 15 (01:35:14–01:35:27)

Not too much to add. You did a great job recapping it all. I will just say this is just basically an interior renovation of an existing space. So pretty simple and self-explanatory there.

Speaker 7 (01:35:30–01:35:43)

Great. Questions? I have one. The site plan of Ante, what is the reasset back required?

Speaker 3 (01:35:43–01:36:36)

So according to the building commissioner, the essentially the applicant can pick and choose between the accessory or the principal dwelling setbacks. So for this one, it's kind of interesting because it's an angle. So currently the setback is 9.1 and 9.5 on the barn. And then for It being a residency, the setback requirement is eight feet from the rear lot line, so it does meet the rear setback.

That was an initial concern Liz and I had, because it is pretty close to that back property line. But according to Michael, since it fits within the setback for an accessory structure, it is allowed.

Speaker 4 (01:36:37–01:37:00)

So one thing I would suggest for future applicants in the zoning table, if they would include the requirements for the accessory structure, because here it's just the row C primary structure. And we know that the accessory can be closer to the property line subject to the height, whatever the height is, but we don't have that on the document. So that would just be helpful.

Speaker 5 (01:37:01–01:37:02)

Yeah, I agree. Okay.

Speaker 4 (01:37:03–01:37:06)

But I mean, I don't want to hold this up because of that, but I just wanted to point that out.

Speaker 1 (01:37:09–01:37:44)

and it is within the in-existing structure. Question I'm wondering just is, with the addition of the new parking, you're now gonna be seeing more vehicles parked outside. And Novanti, you just alluded to whether there should be screening. I'm not as concerned with necessarily the pool house, but maybe some of those cars in parking, and I think, we had asked to have some screening, you know, around parking areas in some of our site plan review.

And I don't know how the members feel about that.

Speaker 5 (01:37:44–01:38:09)

If that could be just screening the cars from the road, like a simple… I think the way it's written is it's if the parking area goes right up to the edge of the structure. Right. That there has to be that three foot buffer area.

So, I mean, the way they're showing this is the spaces are sort of away from either structure.

Speaker 4 (01:38:09–01:38:15)

And even that is suggested. I don't think it was allowed to be mandatory.

Speaker 7 (01:38:16–01:38:46)

In this particular case, I'm looking at the applicant's property on Google Earth while also looking at the plan. There is already like existing substantial screening. Oh, yeah. know the two spaces will park like in here and then the other space parks right in the other direction it looks like yeah it's really already pretty well screened there is a well a large yeah i don't know what that tree is but looks like a good japanese maple or something like that

Speaker 1 (01:38:48–01:38:50)

And it is already paved area.

Speaker 7 (01:38:50–01:38:51)

Right. Yeah.

Speaker 1 (01:38:51–01:38:59)

Okay. I didn't realize that that was already an expansion that just currently paved. So that was not adding more impervious. It's all there.

Speaker 7 (01:38:59–01:39:07)

I think, I think the way I read it, that just indicating that the, the parking space for the ADU is going to be right there on top of it.

Speaker 1 (01:39:07–01:39:10)

It's not adding another impervious.

Speaker 7 (01:39:10–01:39:22)

Right. But the, you know, um, Avante mentioned something, uh, you know, the, the structure's been here, and I don't know how it's been used.

Speaker 1 (01:39:22–01:39:26)

Which is the best way we like to see within an existing structure already.

Speaker 7 (01:39:26–01:39:44)

Right, exactly. It's not being expanded. It's staying at 812 feet. However, it's nine feet from the property behind it, and it doesn't look, it's hard to tell, but it doesn't look like just any screening between the properties.

Speaker 4 (01:39:45–01:39:55)

If you go to the very last page, there's a photograph of that. And it's pavers and gravel.

Speaker 7 (01:39:55–01:39:58)

Right, yeah. I just did a Google Earth image of it.

Speaker 5 (01:39:58–01:40:31)

I can see that a little bit. I think that's probably the best one to see kind of, you know, the perspective of what's on the rear. And I feel like those two windows are removed. Correct?

On the elevation, on the rear elevation, aren't those two windows removed? I feel like there's just that one little, unless I'm not remembering this correctly. Katie? There's one window.

Do you want me to speak? Yeah, is that? Yeah, so the elevation is just showing, yeah, just that one.

Speaker 15 (01:40:32–01:40:46)

Yeah, so that's just existing there. Hold on one second. Actually, there is one. There is an additional one in the garage stall that's not here.

So it would be to the left of that other one that you saw in that photo.

Speaker 5 (01:40:47–01:40:58)

OK, so you're showing just one window in the center. The living area is going to be to the- Exactly, to the right. To the right. And then those two garage stalls remain.

Speaker 2 (01:40:59–01:41:01)

The plan shows two windows.

Speaker 5 (01:41:04–01:41:05)

And the black- The new plan.

Speaker 4 (01:41:05–01:41:07)

Boxes for storage.

Speaker 15 (01:41:08–01:41:09)

I'm sorry, what was that?

Speaker 4 (01:41:09–01:41:12)

The black boxes that we see in the photograph.

Speaker 15 (01:41:13–01:41:15)

Yes, that seems like yard storage right now.

Speaker 4 (01:41:18–01:41:28)

So then you've got… So the screening that you were asking about, Avanti, is in that zone?

Speaker 3 (01:41:30–01:41:51)

Yeah, it was just like a thought point just because you do see like the building across the property line kind of pretty close on the other side. So there's just like, you know, just a contemplation whether or not that was needed. So, but I believe that is an angle. That was a response that we got from the owner.

Speaker 15 (01:41:51–01:42:16)

Sorry, may I speak for a second? Sure. Um, So in the back side, part of like us, our point of view for this is that we want to add more privacy. So we plan to add some like tall, I don't know what they're called, hedges there so that we have privacy and that that neighbor isn't looking directly into ours.

Speaker 4 (01:42:17–01:42:33)

which was my, I see that it looks like a patio there. And so it did seem like you might want a little more screening. Um, but yeah, if that's what you intend to do, I don't think it necessarily needs to be mandatory on our part. Yeah.

Speaker 10 (01:42:33–01:42:48)

Yeah. Because I feel like it's an existing, so it's really too hard to, um, make them do anything. If it was a new build, I wouldn't have a difference of an opinion. Um, I mean, I love more trees, so I think that'd be great.

Speaker 4 (01:42:49–01:42:59)

But I think in this situation, it's… So which brings me to the question of, did this need to come to us? Because it's within an existing building without an additional renovation.

Speaker 2 (01:42:59–01:43:02)

I was reading the bylaw, and it does say detached.

Speaker 4 (01:43:02–01:43:03)

Yeah.

Speaker 5 (01:43:03–01:43:04)

Yeah, it's detached.

Speaker 2 (01:43:04–01:43:08)

Even if it's existing. That doesn't… I was… Okay.

Speaker 5 (01:43:09–01:43:24)

Yeah, I think… It's not the sort of thing I think we contemplate. I think so. I mean, that's the reading of it.

I mean, maybe there's, there could be some more discussion about that. Maybe, maybe it could be read more narrowly if there's already, if there's already a boxed in volume.

Speaker 2 (01:43:24–01:43:25)

If it's a new detached.

Speaker 5 (01:43:26–01:43:39)

Regardless of the use, right? Because you probably, you are going to have garages being repurposed. So do those all not come? That's, I think that's what we contemplated.

Yeah. And maybe that's the case.

Speaker 10 (01:43:39–01:43:44)

And I think if it's new windows with lights, you know, for a neighbor that might be, you

Speaker 7 (01:43:44–01:44:29)

different you know you might there is changes to parking and more impervious or maybe you know if there's if there's significant change to the existing and I guess that would impact neighbor doesn't seem like they're changing not here anything willing to entertain a motion can I just make one yes it's really more for the applicant and this is what I mentioned earlier the rear elevation shows one window that, as you said, there really are two. There's two shown on the plan. So maybe it's for Katie more than anybody else, because I don't think it makes a difference to us. But the building department.

But it looks like the window in the living room is not showing up on the rear elevation. That's probably for you, Katie. Yeah.

Speaker 15 (01:44:30–01:44:46)

So in the plan, I think he has sketched in the new ones. So it's just the elevation that we did that show current state, that's where it's missing. But in the future state, there will be a window added.

Speaker 7 (01:44:46–01:44:50)

I understand, so your elevation is existing, not your proposed, got it.

Speaker 15 (01:44:50–01:44:52)

Exactly, yes, that's correct.

Speaker 7 (01:44:52–01:44:53)

Okay, got it.

Speaker 1 (01:44:58–01:45:01)

Okay, so with that I would entertain a motion.

Speaker 2 (01:45:02–01:45:05)

I'll motion to approve this ADU as presented for us.

Speaker 1 (01:45:07–01:45:31)

I would second. All in favor? Aye. Thank you.

Thank you. Thank you very much. Okay, now item number five ADU site plan review 136 Indian Spring Road. If we have this applicant with us.

All right, allow him to talk.

Speaker 5 (01:45:33–01:45:33)

Okay.

Speaker 16 (01:45:37–01:45:38)

Hi, everyone.

Speaker 1 (01:45:38–01:45:39)

Hello, welcome.

Speaker 16 (01:45:39–01:45:42)

Thank you for joining us tonight.

Speaker 9 (01:45:45–01:45:47)

Yes, please.

Speaker 1 (01:45:49–01:45:51)

We're pulling it up right now. Thank you, Jaron.

Speaker 3 (01:45:52–01:45:54)

Yeah, if you could show the plot plan for…

Speaker 1 (01:46:05–01:46:08)

Is this the owner or the architect?

Speaker 17 (01:46:10–01:46:17)

I am the applicant. I will be the general contractor on the project. I do believe we have the owner on the Zoom here tonight as well.

Speaker 1 (01:46:17–01:46:18)

Okay.

Speaker 3 (01:46:22–01:49:21)

So yeah, I can just kind of do the same thing. Go through the staff memo for this one. So this is for a ADU application for 136 Indian Spring Road, or 136R Indian Spring Road. Complete application was received on August 12th, 2026.

So formal review began at that time. property. It's located in a residential A district and it's over 700 feet from a wetland resource area. The ADU itself is 792 square feet and it's a one-story detached structure.

It's a, I believe, one-bedroom, one-bath ADU with three entrances. It meets the definition of an ADU under Chapter 275, Section 3.23, self-contained dwelling located on the same lot as principal dwelling. It fits with bylaw requirements. Only one ADU is proposed.

It will remain accessory. And at 792 square feet, the unit complies with both the 900-foot square cap and the proportional size limit. The primary is 4,758 square feet and is a single-family dwell. The proposal meets the bylaw requirements for parking.

Existing dwelling has a three-car garage and there is proposed parking as well shown on the site plan and Pedestrian access to the ADU is both safe and functional looks like it connects to the Existing paper driveway that's proposed into the ADU Yeah similar to the last one, I'll just point out that the address for the ADU shall be visible from the street to inform emergency responders. One question I do have is just the distance from the pool to the proposed structure. That's just been a question that the building commissioners had on ADUs. So that's a question I have.

And then or else on September 4th, the town engineer just requested adding proposed sewer and water type materials to the plans. The utilities are shown on this plan. And so yeah, and then just another question I had as well is just the relationship with the ADU to the fence. I know there was conversation in the past about the fence being in front of the ADU, but it looks like it abuts.

right on top of it or as part of it. So I would love any clarification on that. And yeah, go from there, Jared, if you want to add anything.

Speaker 17 (01:49:24–01:49:52)

No, that about sums it up. There is, I'd like to add, there is significant buffer to the left side of the property, particularly by the extra parking area, as well as the walkway. the owner would like to add any areas for buffer on the back left corner of the property for privacy that may not be shown on the plot plan. Otherwise, I think you described it pretty well.

Speaker 7 (01:49:55–01:50:07)

Jared, could you describe the back left side of it? So is it on the side that the applicant would add? landscape?

Speaker 17 (01:50:09–01:50:33)

As you look at the plot plan, you'll see the walkway that leads up to the ADU. It would be in that back left corner, if there'd be anything to add. The lot has significant trees on it, particularly to the left currently. We were gonna add some landscaping there in that back left corner, which would be mainly for the owner and privacy.

Speaker 2 (01:50:39–01:50:57)

And while not part of our review, just for my own edification, in the packet that were provided, there's the existing building, the existing house, and the addition to the existing house. Am I reading that correctly?

Speaker 7 (01:50:58–01:51:21)

Yeah, that project was done. That's already completed. Okay, okay. property, I live in the neighborhood.

So what you see in the drawings is the construction set of drawings for the primary that's already completed. That's what they refer to as the primary home. The second PDF is just the ADU.

Speaker 5 (01:51:21–01:51:30)

We try as best we can to kind of like cull through old plans to save people money. move things along. So that's part of the reason why we did it that way.

Speaker 2 (01:51:30–01:51:39)

Okay. Well, I think that's helpful because it gives context to the proposed ADU and the aesthetics that's being proposed and comparing those two. So that was helpful.

Speaker 7 (01:51:41–01:51:56)

Thank you. You know, I'm not, there's a proximity of the proposed structure to the pool and I'm not familiar. You mentioned it already, Avanti, and you're going to take a look at that with Michael or Michael is looking at it. Is there a dimension?

Speaker 3 (01:51:57–01:52:37)

I just know he's has commented on other applications requesting that they specifically dimension out the distance between the pool and to like any like existing like structure so I think One example was like a covered patio. Like he wanted the distance between like the pool water edge to the covered patio. And I assume it's probably like a safety standard, but I'm not 100% certain. I just know that's been something he's had conversations about.

Speaker 7 (01:52:37–01:54:24)

It's definitely an electrical concern, I think, you know, proximity of electrical, you know, to pool. But offline, maybe eventually, you know, when you get to Michael, I'd be curious to know what that is. This to me, well, let me go backwards. When we wrote our ADU language, I don't think I ever contemplated hot tubs in ADUs, but This ADU may be the only ADU in Milton with a hot tub, but it has a hot tub, or it has a proposed hot tub.

It looks to me like it functions a lot like a pool house. You know, the steps, if I'm interpreting the documents correctly, it looks like the steps that step down from the covered porch, you know, onto the pool deck. It's an ADU by application, but by function, it might be something different for the property owner. But the previous ADU applicant also was adjacent to a pool.

And from a safety standpoint, I'd love to have a better handle on what the requirements are just for safety as a pool owner myself. It's probably the only thing that I'm looking at that I'm not certain with, what is required, what's not required. As the homeowner, we'll have to take responsibility for that because it looks like the fence ties into the structure. So the pool is enclosed and the completion of enclosing the pool is connecting the fence to the structure.

Is that the way that it's designed?

Speaker 17 (01:54:26–01:54:41)

That's the way it's currently designed. I believe the owner here is on the Zoom as well, and he might give you a little more insight on how he intends to use it. He should have his hand raised here on the Zoom.

Speaker 7 (01:54:42–01:54:50)

The use of it really isn't my business or our business, honestly. It's the safety of the fence enclosure that is the only thing that I'm uncertain about with Michael.

Speaker 5 (01:54:51–01:54:57)

I know there was language in Permit I's kind of back and forth, Jared. Um, like early on about an alarm system.

Speaker 18 (01:54:59–01:56:40)

Uh, hi, everyone. This is, um, can you hear me? This is Tyler Ross, owner 136. Yes.

Yes. Just for, um, you just brought it up. Yes. Um, I believe my architect, Bo Baker, Rockwood design, um, was in communication with building department, whoever, whoever it may have been.

The existing pool fence that encloses the entire perimeter of the pool is going to be used as the border. So the fence will stop at the corner of the ADU and then basically at the other corner of the ADU. There is a covered patio, which you've noted the hot tub. The existing hot tub is going to be pushed underneath the covered patio and also in communication with the building department through our architect, all of the pool facing, all the doors and windows that are inside facing the pool, inside the fence perimeter pool will have to be alarmed.

So that is already unplanned. You know, alarmed access to any doors that open into the pool area. And as far as, you know, ADU versus pool house, I think like it was mentioned, Truly just, we plan on having family visiting, staying. You said this is not really part of your review, but it's not something that we're looking to rent.

Honestly, it's my wife's family that's going to be staying there, so we wanted them to be maybe not so close to the rest of the family in the house.

Speaker 7 (01:56:40–01:56:42)

And that might be their profit still?

Speaker 18 (01:56:42–01:56:43)

Yeah, yes.

Speaker 7 (01:56:44–01:57:00)

Yeah, so I just pulled up Google Earth, so I think I can I can see, so under the trellis, now I have a better visual of where it's going and how it relates to the pool, and I think I understand it better now.

Speaker 18 (01:57:01–01:57:42)

Yeah, so that existing gazebo or trellis is going to be removed. I would say, to answer your question, I mean, I don't rough guesstimate, is we're at least the over 10 feet by 10 feet wide. No, I'm not on property to measure it obviously, but I would say that 10 feet would be the minimum easily.

Speaker 7 (01:57:44–01:57:45)

Great.

Speaker 1 (01:57:45–01:57:56)

Thank you. Then do you want to scroll down to the architectural, the exterior?

Speaker 18 (01:57:57–01:58:24)

And I don't know if you want me to elaborate on this, but matching the, we just, you know, completed the renovation of the main home. And the plan here is to match the existing siding, you know, roofing, window design, everything is going to match the newly renovated main house.

Speaker 1 (01:58:26–01:58:27)

That's great.

Speaker 7 (01:58:32–01:59:14)

questions I guess I just have one last question and does the pool location move looking at Google Earth it doesn't look like there's enough but that 26 foot dimension for the ADU and then a 19 foot 5 dimension back to the property line just looking at Google Earth it doesn't doesn't look like that space exists but but I imagine it does Is the fence around the property line that would show on Google Earth, is that the property line, the fence line?

Speaker 18 (01:59:14–01:59:50)

The fence of the pool, you're asking? Yes, yeah. No, that is deceiving in that way. OK.

The two large trees towards Indian Spring Road are well within our property line. OK. There's those two evergreen trees in the back right corner, which we are hoping to not disturb, those are well within our property. There's probably another, I don't know, six feet from those two trees in the back right to our property line with our neighbor on Indian Spring.

Speaker 7 (01:59:52–02:00:01)

Okay, yeah, now I think, so that existing PVC fence is really the facing, the face of the ADU as it faces the pool.

Speaker 18 (02:00:02–02:00:15)

Correct. And that was, yeah, that pool fence was strictly put in just to surround the pool and then connect into the backyard for the previous owners, kids and dogs.

Speaker 7 (02:00:15–02:00:38)

Yeah. So the building, right here, it goes back here like that. Kind of where the grass is right now. Yeah, exactly.

Yeah. So there's still screening between that and the adjacent house. Yeah. There's actually, those are pretty mature trees too.

Yeah. I don't think I have any further questions. Thank you. Thank you.

Speaker 4 (02:00:39–02:00:58)

I would entertain a motion on this. I'll make a motion to approve the 136 Indian Spring Road. Yes. 136 Indian Spring Road ADU site plan application.

I'll second. All in favor?

Speaker 1 (02:00:59–02:01:24)

Aye. Thank you. Now, we can move to item number seven, Economic Development Plan. Comments?

We've received a draft proposal. Oh, sorry, you know what? Yes, I'm sorry, I was gonna just… We did.

We did approve. Okay, do you have anything for us to sign this evening?

Speaker 5 (02:01:26–02:01:41)

I'll have to go next door and present. unless, I wish I could do. I actually have a printed copy. It's a decision.

I think it has draft. It's got draft.

Speaker 8 (02:01:41–02:02:02)

Oh. I think it's fine. Thank you for the vote. Now that the signature is coming.

Okay. Obviously, we're able to build upon it. But as long as we're building upon it, we'll be ready tomorrow to approve. Thank you very much.

Speaker 1 (02:02:05–02:02:30)

Good evening. Okay, so back to review of the draft of the economic development plan. By scope of work draft for review and discussion

Speaker 10 (02:02:33–02:02:45)

So just for clarification, this says phase two. So this really is just the whole proposal right here.

Speaker 1 (02:02:46–02:03:11)

We're not adding phase one to it. So in references in here, phase one is the existing conditions that was done. So that work is completed and that was, you know, as the initial part of our economic development plan work. So they're just they're saying that was phase one and everything going forward is in here.

Yeah. That was a good question.

Speaker 4 (02:03:15–02:05:23)

So one thing that. in terms of kind of the project understanding and scope. One of the things that we've talked about a lot is how to encourage local business rather than just business in general, particularly on the retail side, and independent business as compared to chain. And so I don't know if that's something that we can be a little more explicit about.

Like if you read the project understanding, it says, to enhance the mix of economic activities, which is fine, to better meet community needs and sustain economic activities with retention, expansion of existing businesses, focus on economic activities, support growth and intensification of use that are generally consistent with the town's physical scale of activities, expand the commercial and industrial base. So that's very general, I think, but I think we've all spoken of being a bit more, and we hear a lot from residents about being third place kinds of business activities, you know, places to go, places that generate kind of sidewalk, you know, activity, places, not just purely business for business. And I was reading how some places they're kind of being more micro maybe about how you define business, like what kinds of businesses rather than just like retail? Because we've all heard people say, we don't need more nail salons or hair salons or real estate offices.

You know, so like, is there a way to think about that? And this, I guess, is my question. And do you all agree with me? That's something that we would like to be thinking a bit more about rather than just the general less described there.

Which paragraph were you writing in the beginning? So the second paragraph. Let me make sure I make a note where that is. Under project understanding?

Yeah.

Speaker 2 (02:05:23–02:05:36)

Commercial, light, industrial, mixed use. So more than trying to drill in, more than just saying commercial, trying to give specific examples of what we think would be beneficial to the town?

Speaker 4 (02:05:36–02:06:12)

Well, or just what like kind of business is generally going to be interested, the community will be interested in, right? Because we've heard some with the fire station, and I think we've heard it when talking about the mixed-use overlays. Because like extra space storage is a business. Now, is that generating any kind of foot traffic or generates tax revenue.

But what kind of business are we talking about? Is that granular? Is that going to be in this analysis? I think it should be.

What kind of business are we talking about?

Speaker 1 (02:06:12–02:07:22)

I think that would be good feedback for us to put from the community to say we're looking for less chains, more local small businesses. I really think this really comes to mind and brings to mind the ice house and the fact that that those spaces have not been leased yet. And there's now alternatives that are looking to, you know, to come in that are not that sort of the market sort of, you know, what people want, you know, a coffee, a local coffee shop or a local, you know, place to go pick up some eggs and bread on, you know, have a little marketplace. And they have not been able to, we've not been able to see that.

And I've reached out to a couple of contacts and, you know, I know there's, there's someone who's looking to, to change that zoning. So to allow for other types of use. So it's hard when we're, you know, what we want There's, it doesn't seem, even though there's such a demand, you would think that, you know, a business would try to come in.

Speaker 4 (02:07:22–02:08:37)

So sometimes it depends, right? Like if that's a condo, commercial condo, that's a lot different than leasing a space when you're looking at an operator to come in and lease a space versus buy a commercial condo. And if they're going to use a bank, go to the bank and they're starting a new business and they're buying a commercial, condo, like who are they going to sell it to? What's the resale if their business doesn't succeed?

Those are the sorts of things that I think we should understand, because when we write a permit, like that's the CBA permit, but that impacts what kind of business. So that's kind of, I think in part, what influenced 131 Elliott. you know, what kind of corn shell did they provide? What's their lease rate?

Are they giving a build-out allowance? You know, when there are places when the permitting requires that they do more, because it's easy to say, ah, we tried, but we just couldn't get anybody in here, you know? And it's not necessarily face value. So I'd like, you know, us to understand because some places are successful.

And some places, you know, a lot of it has to do with price point.

Speaker 10 (02:08:39–02:09:58)

So I have a question. So, you know, my, my context, don't always want a coffee shop. My peers want a place to rent. They don't want a retail.

They're local business owners in town. They're electricians, plumbers, HVAC, carpenters, landscapers. They're tradesmen who live in town. And they want a place to rent in town.

So right now, fortunately, we have the Pepsi plant where many can rent. But other than that, there's really no other place. So I really think we should be looking at having places in town that it's not attractive to retail and walkable amenities, but I find it to be a huge need in town. And so in this under project understanding, it says to expand the commercial and industrial tax base.

So what is the true definition of industrial? Because what I'm talking about fits under industrial.

Speaker 1 (02:09:58–02:09:59)

Light industrial.

Speaker 10 (02:09:59–02:11:48)

Yeah. Yeah. And in a lot of these carpenters, like I can speak, you know, personally, my husband is a self-employed carpenter and, um, It's challenging for him to find places to rent. He's rented all over.

And they don't need a lot of space. But if you have a commercial plate in town, it has to be garaged. So you have to put it inside someplace. You need space for your tools, your equipment, a couple trailers.

And you personally don't need your own bathroom or kitchen space, but maybe there's a communal bathroom or kitchen space available for the people who rent the space. So I really think we, you know, it goes back to a question I had last time, are we in the business now of reaching out to property owners and asking if this is a type of use that they would be willing to entertain. And fast forward to the firehouse, Coastal Ambulance is exactly in need of a place to park their ambulances too. So I don't think we should only be looking at coffee shops.

I think there's just a huge need for other types of businesses and also workspace you know I know there's a push for people to go back to work but there's still times when people need office space to rent and maybe there's like a we were type of situation you know that we can look at too.

Speaker 1 (02:11:50–02:12:12)

So I think that's what this what this I think this does contemplate that and in various locations so I don't know if we need to alter, does this need to say anything differently or is that going to be where the community feedback and input comes in? What do you want your voice?

Speaker 4 (02:12:13–02:13:13)

Even to Maggie's, it's more specific. You could say industrial is a warehouse. I don't think you're talking about a big warehouse that Amazon wants to put in places. So I think it's like, when we talk about industrial, what are we talking about?

Business, what are we talking about? And I agree about office. And there's a place for services. I'm not critical of the service industry.

I'm in one. But to think about what's appropriate street level in East Milton Square and Milton Village as compared to someplace else. And, you know, where are there appropriate places for different kinds of businesses? Rather than just saying business and industrial, I really would like to be more granular.

And if we're because if we think about what is there going to be some kind of zoning initiative following this or more planning initiatives following this, you know, this should set some, you know, we're going to seek public input. So we should set a bit more than way up here with it. I think we need input on at least the next level down of detail.

Speaker 10 (02:13:13–02:14:01)

And I don't necessarily think it's just the average resident we need to be looking for public input. It is really the business owners in town. And it's not just the physical brick and mortar business owners. It's all these other craftsmen type people, tradesmen in town.

And they don't necessarily belong to the chamber. And I remember years and years ago, I did reach out to all of these types of businesses and I had a whole long list of them. I'm like, what do you need? And it didn't really go anywhere.

We just had some initiative with the planning board at the time and I kind of have forgotten what it was. But there are so many in town. There are just so many.

Speaker 4 (02:14:01–02:14:21)

Well, my own architectural office about a year ago before we renewed our lease Boston, we looked in Milton, very little in Milton, nothing that worked for us. So we renewed where we were. So I'm sure there's others who would contemplate it. But I think my point is to be.

Speaker 5 (02:14:21–02:15:29)

Can I just interject, if you don't mind, Cheryl? One of the questions that Nick Milano had posed to us was, do you think that there is a need to have a broader community meeting sort of at the outset, which would be ahead of this community survey, which is this Subtask 1C. Would that be a way to sort of inform the work better, sooner in the process? I mean, so he was asking that question.

At the time, honestly, my sense was sort of, you know, jumping right in on these focus areas. under task one to get you know sort of sit down with the these you know kind of focus groups for these areas of interest but it but it could be that it would make sense to kick it off with a larger effort and maybe that maybe that helps to kind of suss out some of that what like that more sort of granular desires like up front I don't know

Speaker 7 (02:15:29–02:17:18)

I have a thought, and it's a place to start that would be not the area that you're suggesting, Liz. The reason that spaces don't become occupied, and you've heard me say this before, is because they're not viable, right? A business owner's not going to take a risk and sign a lease or buy a commercial condo if they don't think they can succeed in business. So, you know, how do we better understand what is needed to make it work?

We have so many businesses in town that are succeeding. You know, we should go to them and say, what is it that makes it work for you as a business owner, whether you're a restaurant owner or whether you're a service provider of some sort or whether you're a coffee shop? I'm not sure that we understand well enough what they need, what the business owner needs. going to the community and asking the community what they want, what happens is we create excitement and we may create false hopes.

We may create these hopes that we can have the business that they want and it's not viable. It doesn't work. We don't have the parking. We don't have the foot traffic.

We don't have whatever. But, you know, there are so many businesses and they're extremely discerning, you know, on the risk that they take, you know, before, you know, they decide to put, you know, themselves, you know, at risk. And I, I think it's better to gain an understanding from those that are succeeding and of why they are succeeding, what they need to succeed before we begin to have a conversation with our residents about what might be possible.

Speaker 2 (02:17:19–02:17:28)

Would you also loop in Maggie's cohort of light industrial people, right? The people that want to succeed that maybe have not been able to thus far. Exactly.

Speaker 7 (02:17:28–02:18:27)

What's the barrier? Why doesn't it work? The rent's too high. You know, whatever it might be, there's so many reasons that people won't take a space at the ice house or won't.

You know, we see a lot of empty storefronts, but, you know, and we always wonder why is it empty? I think the answers are out there, but we might be going in the wrong direction to try to figure it out. I would I think we all go through these town centers and, you know, wish we had in some of these town centers what they have in some of the town centers that we don't have. You know, there's some beautiful town centers in the way where the Eagles and the Chiefs of the Wish House was as vibrant and had all of the different, you know, components in those town centers.

Figuring that out, will help us. And before we get MAPC running down this road, it might be helpful that we have an understanding that they probably can do it too. If we said to them, hey, we want part of your work to be to solicit the information from the current business owners so we can understand better how do they succeed and what's the barrier to success?

Speaker 4 (02:18:27–02:19:22)

That's one of the, right? I think that's part of the engagement as the focus group. with business owners, but I think it's also the ones who have thought about a business here but haven't opened it here. I mean, like I just said, there's nothing suitable from my architectural office here because the type of office space here is very limited.

So there are others who haven't opened other kinds of businesses here. Maybe they went and opened in Quincy, in St. Dan's Studio, moved out of Milton to Quincy because they didn't have suitable space in Milton. We had Milton players, no place for them to perform here.

They left Milton and went to Canton. And there's more. So we have to not just talk to who's here, but who might like to be here. And we don't have the space for them to be here.

Because if we're talking about opportunity, there's a gap, I think, in the kinds of space that we have available.

Speaker 2 (02:19:23–02:19:36)

And they did a lot. I'm perusing through it quickly here. a lot of time to that subtask of community business focus groups, right? So that seems like it's, we're agreeing with what the scope is saying.

Speaker 4 (02:19:37–02:20:40)

But as to that larger, I think it would be beneficial for the public at least to be aware that this is happening because if you, You know, if you pay attention to any social media, like on the East Milton Fire Station, there are a lot of sorts of ideas people throw out about what they'd like to see. Or at the Ice House, every now and then it'll pop up. Why isn't there anything there? Well, I'd love to see this there.

And you know, people have lots of ideas. But they don't necessarily know where to go with them. And so I think if we just had something And we don't have to say that we're setting up any expectations, but we just want to hear what do you think, you know, is working well? What do you think we're missing?

What would you like to see? Because a lot of people also, when we had the override… Do you think we need that earlier, rather than… The override, people were talking about, we need more commercial, we need more commercial tax base.

What does that look like? We need to talk about that. Exactly.

Speaker 1 (02:20:41–02:20:42)

I'm sorry, Meredith.

Speaker 4 (02:20:42–02:21:03)

I was going to say, are you thinking… I mean, obviously, I think… I was thinking early on, like Liz asked, maybe we do need something early on, I don't know, maybe we can be covered with what, I mean, MAPC's done a lot of community outreach before, so I think that they probably have a good idea and handle on it.

Speaker 2 (02:21:06–02:21:34)

Cheryl, could it be as simple as having these business community focus groups be publicized so that the public could attend and just hear these, right? I'm not suggesting that it is going to be in secret, but it doesn't have to be in secret, right? It could be a public thing where people can come and attend and listen and hear what business leaders in town are saying about what is a hindrance and what they would like to see done in town.

Speaker 4 (02:21:34–02:21:50)

I think one thing just to say, it's kind of a high level overview of what this plan is all about. What's this initiative all about? Like, you know, what we're trying to do, what are the steps going to be? What's the end product going to be?

and, you know, your input's gonna be sought here, here, here.

Speaker 2 (02:21:51–02:21:53)

So layout for the community, what the goal of this is.

Speaker 4 (02:21:53–02:22:09)

Just an overview, because, you know, otherwise you're asking them to comment on something and they're not sure of the context of it. I mean, we all have been reviewing this and know we started it a couple years ago, but the average resident doesn't. And Ian's gonna tell them all about it, though.

Speaker 10 (02:22:09–02:24:40)

You know, back to really the project summary, it says, The plan will establish a town-wide framework while concentrating the most detailed engagement analysis recommendation on the Randolph-Fab and Blue Hill Lab corridors. East Milton Square, Milton Village and other non-residential areas will be considered as part of the town-wide context but will not receive the same normal corridor specific analysis. that's in the summary and then if you go under the project understanding the second paragraph number one under the overarching project goals are to create an economic development plan for Milton's key commercial areas. So aren't those two statements in conflict with each other?

So our summary is saying we are not going to look at East Milton, Milton Village, but then number one says we're gonna look at it for Milton's key commercial areas. So, you know, I think that's conflict. And also, you know, I did go back and I listened to our joint meeting with the Selectmen, and, you know, I had spoken specifically about that I wanted, you know, existing businesses to be a big priority. Yeah, and this, it's not here.

Instead, it's like Randolph-Ave. And I don't think anybody on Randolph-Ave is excited to become Route 1. I don't necessarily think that they want more businesses up on Randolph Ave. From the people that I've spoken to, they're not really interested in making that, you know, busier than what it is.

And they want at least the 240Bs to settle down, kind of like East Milton. East Milton, my understanding is, and again, I don't live there, is they want, you know, the 40Bs to just get built and then they can live with the consequences. The people on Randolph-Ave feel the same way, so I wouldn't put Randolph-Ave as a priority in this economic development.

Speaker 4 (02:24:40–02:25:04)

but you realize that all the businesses are not zoned for business, every single one of them on Randolph Avenue. So they are those that you are talking about. They are all pre-existing non-conforming. So maybe that should be the focus because then zoning can be crafted that doesn't make it so cumbersome and difficult for them to make any changes to their businesses.

Speaker 10 (02:25:04–02:26:02)

And people are fine with doing that, but they're a little bit afraid when you put the focus on Randolph-Ave that MAPC is going to identify different areas or different lots of land. And it goes back to, you know, one of the proposals for CPC, you had mentioned it was a playground on Randolph-Ave. And that's why I wanted to see and review the proposals. And I looked at the proposal for the playground on Randolph-Ave and I contemplated you know, playground, not on town on land.

And so people up in that neighborhood are, you know, they're just concerned. They just, there's a rotary coming in and they're fine with everything kind of the way it is, but they don't want to add more. They're kind of a little bit afraid if we're putting a focus on Randolph-Ave. that MAPC is going to come in and all of a sudden be.

Speaker 4 (02:26:02–02:27:31)

So with all due respect to your personal conversations, I think those conversations should be part of a public process and that we identified Randolph-Fab I think at one of our meetings or maybe that joint meeting because it has a lot of pre-existing non-conforming businesses. And we identified Blue Hill Lab because residents on the west side said they'd like to see some more amenities. So I do thinking of where we have the most pre-existing non-conforming is Randolph Ave. So I think it is a conversation that should be had with those residents.

And it says the residents will have a focus group. Just for them, but then part of the larger plan I think one of the things that all residents need to think about is that all neighborhoods have something that's a benefit to everyone people who live near the library or town hall here or the high school or the elementary schools or the DPW, you know, those all have Some, they benefit all of us and the services that are provided, but they have impacts that are closer, you know, to East Milton Square, you know, so Randolph Ave, you know, we have to think about the residents who are on that street and the businesses on that street. And we have to think about it in the larger context of the town, just like every other. But I don't, I don't see how we're addressing pre-existing nonconforming if we don't address Randolph Ave.

Speaker 10 (02:27:32–02:27:41)

Yeah, I just, I'm fine with, people are just afraid of the expansion into other areas.

Speaker 4 (02:27:41–02:27:44)

And that can all be communicated during that process.

Speaker 1 (02:27:45–02:28:58)

So I do have a few things that, this has been expanded greatly compared to what we were, our initial scope of work. But one thing that I would like to request that is, sorry, on these, under the top of page two, where it highlights East Milton, Central, Northern Milton, just what we were discussing. Inclusive of looking at Milton Academy and Beth Israel Deaconess and Curry College, we intentionally did not even do that during MBTA zoning. Those are assets to the town that I don't think those are privately owned, I think they're nonprofits, and it sends the wrong message to those wonderful institutions that, you know what, we're going to consider doing something different on your property.

And I just, I wouldn't want if they came to us and wanted to do something, but I don't think we should be going in and looking at, because it may be their nonprofit, I'm not sure, I don't know why those were added to the list, because we didn't even consider those.

Speaker 4 (02:28:59–02:29:17)

One thing about Beth Israel though, is if you had medical office, let's just, instead of them having their offices in Quincy, you could get tax revenue from it, so it is an economic, There is some tie to economic development there.

Speaker 1 (02:29:17–02:29:28)

I can see your point about Milton Academy, but- Yeah, I would like to take Milton Academy, I think the college- Well, there are already doctor's offices at- There are doctor, yes, I was listening to that.

Speaker 4 (02:29:28–02:29:51)

There's no zoning there that sort of allows for it, so I don't know. It's like they have to go to the ZBA for special permits for everything. We don't review anything that they do. If you had a medical, overlay district that had site plan approval, we might get to review what kind of lighting they put in their big parking lots that they just added.

Speaker 1 (02:29:51–02:30:21)

I think it's zoned residential there, and I think the impacts and we just heard the memory care and how impactful that's going to be. I just and what's happened with the 40B of Butters. I think I would like to see Beth Israel still go through a ZBA process and have a public process on that without just going ahead. And I appreciate your I appreciate what you're saying and having the offices there.

Speaker 4 (02:30:21–02:30:44)

But don't you think that is a economic development opportunity? We may not want to choose it. But if you don't talk about it, then aren't you leaving something off on the table or off the table that. It's one of the largest employers in town.

Yeah. And it does drive some economic activity. Shouldn't we understand it?

Speaker 2 (02:30:45–02:31:35)

Well, I think I totally agree with what you're suggesting, that we should be looking at Curry and Milton Academy and Beth Israel to rezone it or change it in any way. And that I think I agree with that. What I'm reading here, though, is doesn't it benefit the town to understand what is and who is at those locations to better affect what could be on the peripheral or connected to or affected by Curry College? There are a lot of students that go to Curry College.

I don't know the college intimately, but there's a lot of students that are there. could they want to have something that's nearby that could benefit them and benefit the town? We don't know that unless we include that in the analysis.

Speaker 4 (02:31:36–02:31:45)

That reminds me that they have like, I think Einstein bagels and some other business on their campus.

Speaker 2 (02:31:46–02:31:57)

Again, not to rezone it, but to use them as a data point in terms of what is already in town and how that could affect any sort of economic development.

Speaker 10 (02:31:58–02:32:41)

I guess how we… How do you phrase that? My question of the joint meeting when I, you know, I think Winston asked me, what are your thoughts? And I said, my thoughts are we should get list you know the existing conditions plan was phase one but it's not accurate so you should have an address of Curry College and then on it you have the businesses that are at Curry College same with what I said then was the Rockland Trust building We have Rockland Trust and within it is all the businesses, the names of the businesses, but also the industry type that they're categorized as.

So we do have a better understanding of what type of industry types we have in town.

Speaker 5 (02:32:42–02:33:05)

Yeah, they do have some language under Subtask 1A. about refreshing the existing data as appropriate, but we should tighten that up. And I know you had mentioned more up-to-date local information, permitting information or licensing information from Town Hall should help with some of that.

Speaker 1 (02:33:07–02:33:56)

I mean, I understand what you're saying, Hal, but this is for planning purposes, and so planning and taking action leads to recommendations for possible zoning changes. So I think we could receive this data without including these institutions as part of a development plan, because development is development. I mean, let's see further things. I think there is a way to recognize that some of what these institutions provide, for example, The high-end real estate market is greatly supported by Milton Academy, families who come and purchase and keep the property levels up in Milton, which is hard, but it's a reality, but it helps the tax base.

Speaker 4 (02:33:56–02:35:26)

Are we- But Merethi, go back and read this. It says the economic development plan will provide analysis and recommendations on townwide geographies that are loosely defined below, and that may take firmer shape as the planning process proceeds. And then the areas of non-residential activity include. So they're not saying, now, here's what they could say is, as you have suggested that Milton Academy shouldn't be changed, but it is a driver of something.

So, you know, it's not that they're not necessarily saying that this is something that will change, but it is a driver of of that aspect of town. Right. So it may drive home sales in that part of town. You know, kids.

I know a lot of kids from Milton Academy walk to lower mills and, you know, retail and other things. And so that may be something that says, well, you know, is there some opportunity if you're looking at, I don't know, town center, for example? Well, the fact that you've got however many kids at Milton Academy as a purchasing power, or you have however many students at Curry College as a purchasing power, does that influence your economic development plan? I think in that context, it makes sense.

It's not necessarily saying you're going to change zoning in those campuses.

Speaker 1 (02:35:26–02:35:38)

I just want to be clear that that's, it was like, it was just why we didn't consider looking at it during MBTA, Wollaston Golf Club. You know, there could have been a lot of areas that we could have, you know.

Speaker 4 (02:35:38–02:35:41)

I think that maybe this gets clarified a little bit based on this discussion.

Speaker 10 (02:35:41–02:36:34)

Maybe that would be helpful. And I think Meredith, that's a valid point. Cause I think I've said this before and it's come up recently too is, you know, you say these committees do all this work. And then all of a sudden we pivot from the work, you know, there's an opportunity to pivot in a different direction.

And then there are people saying, oh, but that committee has been working for five years. Isn't it disrespectful or insulting to that committee that we're not, we're dismissing all their hard work? So to your point of a development plan, there are people in town who think, oh, well, we worked on this. and they had an expectation it was going to come.

So I am a little bit afraid of that because we have seen that happen.

Speaker 4 (02:36:34–02:37:15)

I think one of the things that when you think about the way people reacted to the last override is you, I think we owe an economic development plan to say here are all, here's our condition. We have these non-residential things. that generate this or that. Maybe Milton Academy generates traffic on Canton Ave or Central Ave or whatever, or Curry College generates other activities.

But that's part of the context of our town, understanding our town from an economic development perspective.

Speaker 1 (02:37:16–02:37:22)

So maybe that could be just some clarifying language, Liz, on that, on why we're studying those, the purpose.

Speaker 5 (02:37:23–02:37:35)

I mean, I just sort of noted myself, not for rezoning purposes. Yeah. I mean, if that's like, that's kind of, that's kind of, I know that's kind of like, you know, whatever, getting right down.

Speaker 1 (02:37:35–02:37:38)

I think you want to set those expectations going into the forums.

Speaker 5 (02:37:38–02:38:14)

It doesn't have to be that sort of crystal clear, but it's funny because honestly, like, I didn't read it that way at all. I didn't read it. I didn't read it that you would be thinking about, about rezoning and, and, um, but yeah, it's fair. It's fair because, because you start a process and it starts to go down a certain road.

It has momentum. And then the other thing about like, you know, your comment to your comment, Maggie, about Randolph-Ave, I liked how it said Central Milton, you know, roughly along Route 28, Randolph-Ave, inclusive of Milton Academy, Beth Israel Deepness, because it's sort of like it's a neighborhood.

Speaker 2 (02:38:15–02:38:15)

It's defining the area.

Speaker 5 (02:38:15–02:39:05)

Yeah, it's like an area as opposed to like a corridor plan. And we did have a conversation, I think it was the Cody case, the Assistant Town Administrator, he had said that some of the language, he felt it was a little problematic because it sort of tries to mix a corridor plan, right, with sort of like a town-wide economic development plan, like you were just referencing, you know, like if they're trying to up the tax base, what are our options, you know? And a corridor plan is different, like a corridor plan is like, you know, very specific types of, initiatives like in a very well-defined area. So I think some of that, there was some conversation about that and I think based on this conversation tonight too, I think we can go back to MAPC and try to…

It's kind of funny because right here it says, I don't like these names.

Speaker 10 (02:39:09–02:39:13)

I did not like to be identified as Central Milton because I don't believe that I'm Central Milton.

Speaker 5 (02:39:14–02:39:25)

Well this is like, I can't think of the word I want, but this is like the I hate it when I can't find the word I want, but it's sort of like the… How do you define the Midwest?

Speaker 2 (02:39:26–02:39:27)

Well, yeah, exactly.

Speaker 5 (02:39:27–02:39:28)

Exactly, right?

Speaker 10 (02:39:28–02:39:30)

How do you define West Milton?

Speaker 5 (02:39:30–02:39:40)

It's just a quadrant. There's no whatever, there's no history, there's no culture, it's just a quadrant. You're either in East, West, North, South, that's it.

Speaker 10 (02:39:40–02:40:24)

And my other point is this connection to Metro Common 2050 and strategic priorities. So I had no idea that was, so I went on NADC's website, and I'm like, what the heck is MetroCon in 2050? And this is all about working an equitable, sustainable, collaborative, climate resilient future for people who live and work in greater Boston. And I don't necessarily think that's, I don't feel like that's my job and role on this.

You know, I don't think that's important and I probably would recommend removing that whole section. Because I don't think that's relevant to us.

Speaker 1 (02:40:24–02:40:25)

That caught my eye too.

Speaker 5 (02:40:28–02:40:34)

I think that's probably pretty standard language for their consultant.

Speaker 1 (02:40:34–02:40:52)

And I think he did point that out to us in the very beginning when we did phase one, that that is part of, that we would be agreeing that those would be goals and hiring them. There were just some general goals that they use.

Speaker 4 (02:40:52–02:41:39)

It hurts to point it out, you know, what we do with the recommendations is what is the choice of the town, you know, I don't think I think we need to remember we don't live in a bubble, you know, and our. home sales are tied to the greater Boston economic activity. They're not just tied to Milton. And so our jobs, most of us probably aren't focused, well, some in this room are focused on the workers solely in Milton, but a lot of people that live in Milton, their jobs is not focused on Milton.

They're not employed by somebody in Milton. And so we are part of this larger context. And so I don't think it hurts to keep it in. we can decide what to do with it.

Speaker 10 (02:41:39–02:41:53)

Even though I'm located in Milton, I'm fortunate enough that my reach goes into greater Boston, and people come to Milton to go to the country. That's what I hear.

Speaker 4 (02:41:53–02:42:57)

I thought the community engagement aspect of it was robust. Yeah, so I think that's good. So I just want, I think, setting out some expectations in the beginning for the public, making sure that we get some of the more specific types of business definition, industrial definition. And what are our opportunities, you know, for economic development, realistically?

And what would the trade-offs be for that, perhaps? Like, if you did sell more property for industrial, what would the tax revenue be that you could expect? And if you did it for industrial versus commercial or retail, is there a different tax that might come in or a different amenity? opportunity that came in, so that people can see what trade-offs there are in the decision-making.

Speaker 5 (02:42:57–02:43:04)

I don't know that they're going to be able, within this scope, they'll be able to sort of attack that type of analysis.

Speaker 4 (02:43:04–02:43:12)

Could you just ask them what that might cost for another phase? Because I think that's… I don't know.

Speaker 5 (02:43:12–02:43:19)

I'm just thinking that people are going to be… More of a fiscal impact analysis type of work.

Speaker 10 (02:43:19–02:44:54)

And the only other thing I'd like to make sure that they reach out to, you know, the disabled in town. So, you know, I would encourage them to reach out to like the Special Education Parent Advisory Council. You know, they're an important resource. I do believe that our, our residents with special needs.

They start as our children and students in town and then they become our adults. And I haven't found, so I have a sister with special needs and I have a niece with Down syndrome, so it's really important to my family. And I don't necessarily think that they are a group that is given the attention I think we talk about equitable and being inclusive, but I think that's a population that is overlooked in town. So they have their own unique needs and challenges.

And I just want to make sure that they're included in this because as we see through our special education, we have a lot more from kids in town with developmental disabilities.

Speaker 4 (02:44:54–02:44:56)

Okay. Are you thinking like employment opportunities, Maggie?

Speaker 10 (02:44:56–02:45:39)

Employment opportunities. Services. Volunteer opportunities. There's just not a lot of them.

Housing opportunities, group home opportunities. We had set up a group home for my sister. So like here in town, we have working. So, you know, working with, I'm not really sure.

There are a lot of groups out there, but we just, the population is increasing and they need to be recognized. Yeah.

Speaker 4 (02:45:45–02:45:57)

in a total budget of $50,000. I think we talked about some of that coming from our budget but not all of it, is that right? Am I remembering correctly?

Speaker 2 (02:45:57–02:45:59)

I thought it was shared.

Speaker 4 (02:46:01–02:46:08)

So are you looking for an approval of a scope and a budget tonight, Liz? Or is this more for feedback?

Speaker 5 (02:46:08–02:46:09)

I think it was more feedback.

Speaker 4 (02:46:10–02:46:10)

Yeah.

Speaker 5 (02:46:10–02:46:18)

Because I think there's some more work is needed here. And then I know I'm pretty sure that, I don't know how much it was discussed Tuesday night with the support.

Speaker 1 (02:46:19–02:46:27)

It wasn't. It wasn't. Yeah, they had just received it. And a lot of them hadn't had a chance to review it yet.

So they put it to their next meeting.

Speaker 4 (02:46:27–02:46:30)

So I guess we could share our comments with them.

Speaker 5 (02:46:30–02:46:43)

Yeah. Yep, and we'll get and hopefully have a revised scope. Ideally, we'll have a revised scope as soon as the next meeting, responding to the comments.

Speaker 1 (02:46:53–02:47:15)

Okay. So with that, we can move to our final Discussion item number eight, East Milton Fire Station proposals. And I don't know that we have to have anything formal, but I thought it would be good to share comments with Liz, and Liz could be able to share those comments with the select board.

Speaker 5 (02:47:17–02:48:20)

And there were some questions at the last meeting about a public process. So I just had a quick chat with Cody Case, the Assistant Town Administrator. and he outlined how there was public participation had been and was still being received via the town's website and that he had personally received some comments back on that and that the select board is now in their evaluation process and they will be discussing it again at the next meeting so yeah I think it's like a week and a half I think that, yeah, I think it's, yeah, so they met Tuesday, so two weeks from this past Tuesday, yeah. So it's definitely, certainly within the time frame of continuing to provide them feedback, and I'll do what I can to reflect what you guys want to pass along.

Speaker 2 (02:48:20–02:48:33)

Did Cody indicate that there would be any further direct outreach to the public or just soliciting comments from the public?

Speaker 5 (02:48:33–02:49:02)

Right, that's my understanding is that those two opportunities, one is continuing to have that option of the information that's on the website and then allowing people to contact him directly and then the discussion of the next board meeting. So those are the only two sort of public engagement opportunities that he was aware of.

Speaker 1 (02:49:02–02:49:03)

Comments anyone?

Speaker 7 (02:49:04–02:49:11)

Yeah, we had an opportunity to send our comments to you.

Speaker 5 (02:49:14–02:49:18)

Those were for the questions for the interviews.

Speaker 7 (02:49:19–02:49:23)

Are we being asked for comments or thoughts or suggestions?

Speaker 5 (02:49:24–02:49:58)

I think it's, you know, again, my understanding is it's still at an evaluation stage and now Since you guys gave feedback on questions that you wanted answered during the interviews, the interviews have been conducted and there's more information coming out of that, coming out of those interviews. So if you folks feel that you want to continue to provide feedback or certain things that need to be followed up on more carefully,

Speaker 7 (02:49:59–02:50:05)

Could we, is it possible that you could reach out and see if there were answers to the questions that we had provided?

Speaker 1 (02:50:05–02:50:17)

Or any clarity? I listened to the interviews and I think quite a bit, there was a lot of overlap with our questions and with what they were asked.

Speaker 10 (02:50:17–02:50:32)

Yeah, I don't think any of my questions were asked. So I wanted to make sure there was asked if there was going to be, if they would commit to not having a cannabis store, a dispensary.

Speaker 4 (02:50:34–02:51:43)

So Maggie, that brings me to, I reread the attachments that were part of the RFP, including the purchase and sale agreement and the land development agreement and the lease agreement. And I don't think there's adequate protections in any of those to get a use that was submitted in the RFP. So I've kind of coming away with, you can do a lot more with a new RFP to control the land use outcome that you want. And I kind of thinking that's what I would like to see.

A new RFP that that does a better job. And I've been doing some research on it, and I can go into more detail. I've got in various notes, and I probably would rather write it up more succinctly. But that's kind of where I am with it.

You know, there's nothing in there to protect against somebody using it for a totally different use, for not preserving it properly, or not going down a 40B route.

Speaker 10 (02:51:44–02:51:57)

Those were all my questions. I wanted commitments that they weren't going to do that, that they were not going to assemble properties like other people did down in East Mall Square.

Speaker 4 (02:51:58–02:54:28)

And I think it's really written in a way that favors highest price and not public benefit outcome. And the public benefit outcome could still be business uses, but it could be that there's some give and take. Maybe there's some tax abatement. Maybe there's some zero lease arrangement for a while to justify the improvements so that you can rent at a lower rate.

I think I've talked about this a little bit where when my office was in the Fort Point Channel and Berkeley Investments was buying some property and they wanted to attract amenities because they wanted to be able to entice office tenants and residential buyers. And so they offered very sweet arrangements with tenants who would come in and open up cafes and restaurants and so forth. And they realized that for those tenants to be successful, they needed a financial incentive because they were ahead of the market. to go in day one.

And so it's like you can set up a financial incentive as a town to be able to get that local business user. Whereas if you're going, if you're selling it at the highest in the market rate, and you're going to have the highest renovation costs, your tenant might need to be a change because they've got the balance sheet that the bank wants to see in order to lend you the money for that renovation or that purchase. So I think there's more that we can do in a tighter RFP. And it should be a little bit clearer what our goals are, rather than just saying a third space.

I mean, one of the things in the RFP asks for letters of intent from prospective tenants. None of them provided that. Maybe the ambulance did. But it also assumes the tenant would have at least three five-year options to renew given that the tenant is expected to complete extensive renovations.

I'm thinking that's actually in the appraisal report. You know, so there's The financial benefit to the town, like what kind of tax revenue would generate was asked for, but not supplied by any of them. So, you know, I think it's vague what you're going to get in the end because there's no teeth in the legal documents, or at least from my reading of them.

Speaker 7 (02:54:32–02:55:28)

You know, we could spend a long time talking about this tonight. I am I tend to be very closely aligned with where you are on this. And I am not a believer that the town will benefit from the highest price. The best quality proposal will not be the highest price proposal.

We have to consider much more than just price. And this is a primary property built in a number of, you know, where it is, the number of vehicles that pass by there. I mean, it's historical place in the town. There's so much involved in this, and I hope we don't, I hope we don't just look at price and sell price.

Anyhow, I won't say anymore. I don't want to prejudice the process by saying something here that I shouldn't say.

Speaker 10 (02:55:28–02:56:52)

No, I don't mind doing that. I know. And so, you know, they asked our opinion, and to Cheryl's point, You know, I think, you know, you guys plan to need to get reviewed. But so that all means to me that we should go with retaining it, owning it, and at least now just renting it out, leasing it out to Coastal Ambulance.

Coastal Ambulance, their contract with the town is they need to be garaged in Milton. And they don't have a garage in Milton. So they're putting our public safety at risk by not being here, and it buys us time. They're looking for a three-year contract, and it buys us time to get a proper RFP and to allow all the development in East Milton to play out.

You know, we've just learned a lot with the sale of Kidder Library. You know, we sold an asset, and now we've got people on the west side of town looking for a community center, and we don't have it. So I'm for long-term planning, and I'm all for retaining our properties.

Speaker 4 (02:56:52–02:57:26)

I think the long-term lease It's probably a good way to go, but I don't think buying time with the ambulance company is the right way to go. It's counter to everything the public said they were interested in. And you know a three-year lease isn't enough to pay for the kind of improvements that that building needs. They're going to want to exercise their options for much longer.

And you're going to be looking at least 10 years before it goes back out to any public use. And they also said that they need a second location because it's not central enough.

Speaker 2 (02:57:26–02:57:31)

so another ambulance somewhere like right over by Town Hall just sitting there all day.

Speaker 4 (02:57:31–02:58:16)

Yeah because it's not central enough to get all the way across town. I don't think that that's a goodbye time kind of opportunity. I think it's just we can they can work on another refined RFP and think about some of these things that I'll put in writing about ways to control and make sure that it's not. And I think when you do that and you think about the way that the town can participate in order to get the kind of use that they want, then we might get more end users or we might at least get more applicants who have a tenant letter of intent with them because it's not so risky.

Speaker 7 (02:58:17–02:58:59)

it'll be better to slow the process down and get to the right answer, even if the town uses it for its own uses temporarily until a good decision can be made. But I'm not in favor of rushing the decision. East Milton is going to change so much in the next 18 months with the completion of those two projects and the absorption of homes, residential units, We may view East Milton a little differently once that takes place. It's a tremendous change.

And I'm in favor of a slower decision-making process.

Speaker 1 (02:58:59–02:59:00)

And a tighter RFP.

Speaker 7 (02:59:00–02:59:02)

A hundred percent.

Speaker 1 (02:59:02–02:59:13)

Oh, yeah. I think this exposes Milton to, you know, depending on which decision they make, to some really bad outcomes. And that should, you know, if they decide to sell.

Speaker 4 (02:59:14–03:00:42)

When you own an asset, you actually have an opportunity to control better. Like we put zoning in place and we do plans and we try to attract the kinds of people that we think we want. And we hope we get them. We actually have more leverage when we have an asset ourselves.

Totally. And when, like we said before, you know, this is not unlike, say, a town farm where the town wanted to put out an RFP for affordable housing. you identify a need and you use your asset to help you gain that need. And we're not taking that leverage and taking it far enough, in my opinion, with what's been done to date.

And it might be that it's not the same dollar value as the appraisal. I mean, they all came in with what the appraisal was. And the appraisal said that they were assuming that the condition of sale or lease was that the building could not be demolished. Their highest and best use was a commercial first floor with residential use on the upper floor.

That's how they determined their highest and best use and their price point. The highest and best use is based on the underlying zoning in the overlay district. So what if we said, okay, you know, you're not tied, your purchase price isn't tied to those assumptions, for example. You know, there's just a lot of things that you could do to control this that I haven't heard discussed.

Speaker 2 (03:00:42–03:00:52)

Cheryl, is there a way, or not specifically Cheryl, but is there a way to better control the outcome without putting it back out for another RFP?

Speaker 4 (03:00:53–03:01:42)

I think you're kind of tied to those RFPs, like listening to the way it was discussed on the town farm. You can ask the town administrator about that, but I'm pretty sure that you're kind of within the confines. It was advertised through the RFP. There were sample purchase and sale agreements and sample land disposition or land development agreement.

I suppose you could come back and say, here's our preferred vendor or preferred applicant, and we want to rewrite these agreements. Maybe it can be done. But, you know, it's still, I still don't know if that's enough, really, because you're not putting things, potentially putting things on the table, like a tax abatement or a deferral of rent.

Speaker 2 (03:01:43–03:01:47)

Which could open yourself up to different operators coming in there. Yeah.

Speaker 4 (03:01:51–03:01:57)

Okay. And this is not, these are things that are done in other communities. I'm not like, I'm picking them up myself.

Speaker 1 (03:01:57–03:02:20)

No, I absolutely agree. Yeah, because there's some concerns the way it's right now that we're exposed on a lot of different levels. It's demolition. Just to say we intend to do something.

There's no teeth in that.

Speaker 4 (03:02:25–03:02:30)

So I guess we could send that as our recommendation.

Speaker 5 (03:02:34–03:02:39)

I could… Just like a slower, more deliberate.

Speaker 4 (03:02:40–03:03:37)

Well, just something where I can tell the land use outcome and we use tools that are available to the town to get that third space that we were talking about and get those uses that people were interested in. To think that you might get a bookstore cafe and maybe a small little exhibit space, well, maybe you make that. 20% of the required use has got to be that in your RFP. And then the rest of it could be something else.

And part of that might be, okay, well, that might make the perform a little more difficult. You say, okay, well, then we'll do a tax abatement, or we'll do a rent deferral for a period. You can put things in there that get you closer to getting to some of the things that you're going, that the community expressly said they were interested in seeing there. And then you get some more activation on the corner.

Speaker 2 (03:03:38–03:04:05)

So much like the discussion we had earlier about the economic development plan and trying to understand from business owners that are here and business owners that want to be here, what are the hindrances and what do they need to see change or whatnot in town? How do you get to that point that you're getting, which I totally understand that. How do you get to that point with writing the RFP if you're not engaged with a specific person that or applicant that is shown interest?

Speaker 4 (03:04:06–03:04:49)

Well, you still have to put the RFP out on the street. I mean, one of the things I suppose you could do is a little bit of feasibility study, if you will, to see if people in the industry think that the market would respond to that. You know, I think looking at some examples of what's been done in some other communities, like the things that I'm throwing out to you is stuff that I've found by just kind of digging a little bit. But I know Liz probably could find some things through the MAPC network of communities also.

Speaker 1 (03:04:49–03:06:39)

I think… But I do, I like the idea of making it economically feasible for a long-term lease situation because we've heard a lot of people say we want to keep the building but we want to activate and I will say having been working on the preservation of the Millicent Yacht Club with consolidated facilities, it has been painful. The CPC money that was approved, we just now got the windows put in. It has been dreadfully slow.

We have repointing to do, and that's a very small building, but it's been layer and layer of doing that and very slow. you know, maybe CPC could still fund some of those projects, but somebody who would come in who business is renovating, you know, and, and, but, but somewhere where we know it's not going to be 40 B, we know it's not going to be torn down, you know, but we give incentives to that person to, to, to fix up the building and really make improvements on it. And I know ambulances are, it's, you know, thinking what should be there. But that's also, think about, because right now Fallon Ambulance is sort of near, was near my neighborhood.

Those calls are going out all the time. And to go out and to, having an ambulance have to go into East Milton Square, into that gridlock right now. I would not want an ambulance coming to get me to have to go through that at rush hour and get across and get in there. We're right now, Randolph Avenue is a pretty good location at the DPW.

But they're not allowed to stay there. They're not allowed to stay there. Yeah. And I do want to.

Yeah.

Speaker 2 (03:06:41–03:06:54)

Right. That's not what Nick said at the meeting, though. unless there was information since I did the interviews, I thought it was expressly said that they could extend the lease with the town.

Speaker 10 (03:06:54–03:07:00)

Yeah, my understanding is with the coming of the winter, DPW doesn't want them there.

Speaker 19 (03:07:02–03:07:04)

That was not, that was not what they were saying.

Speaker 1 (03:07:04–03:07:10)

Yeah, and not to get in, because I think it just goes back to saying that if the RFP could be tightened or something could be.

Speaker 4 (03:07:11–03:07:33)

So maybe, Liz could draft a letter, and if you guys are interested, I'll take a look at it first and with some of the things that I mentioned tonight, and then circulate it to everybody for comment before sending it to the select board. Thank you. Are you in agreement on that?

Speaker 2 (03:07:33–03:07:34)

Oh, yes. I'm sorry. Yes.

Speaker 1 (03:07:34–03:07:52)

All right. And we'll take a look at anyone's comments. there's anything else if that's I think that's good then we are to item number nine and I would entertain a motion to adjourn.

Speaker 7 (03:07:53–03:07:54)

Motion to adjourn.

Speaker 1 (03:07:55–03:07:55)

Second.

Speaker 20 (03:07:57–03:07:59)

All in favor. Aye. Good evening.