Board: Milton Board of Park Commissioners

Date: 2025-05-29


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:50–01:43)

I think I printed out a few, I printed out again but left it off. I first want to just address the schedule. I know last meeting, I had emailed you guys yesterday. Last meeting we had said we would do next Thursday.

But in regards to your guys' concern about only getting results in a week, I think it was supposed to be two weeks. I was originally trapping on that meeting to have it worked out in two weeks. So I can't make a prompt. That sounds like both of you can work it out.

Speaker 2 (01:43–01:44)

June 12th, okay.

Speaker 1 (01:44–03:24)

Yeah, and then Bonnie, is that, are we okay to do it in the firehouse? So you have on your print material, then I'll just, I'll project it as well. So then we'll confirm it, so it'll be three o'clock to six thirty. Does that work for everybody?

I know it's a little bit of the afternoon, but then at least, my proposal is, is that we do interviews between three We basically give an hour each to each consultant from 3 to 4, 4 to 5, 5 to 6. And then from 6 to 6.30, we would make a decision. And the format that I would prefer is that we give each consultant 30 minutes to present to us, give 20 minutes for questions and answers, and then 10 minutes for us to score them. And so what I'm thinking is because in the RFP, just like we did originally, to the scoring, I think we would keep the same scoring formula.

It's just a new, it's a new beginning because it's an interview, and we would go through that sheet again. The only thing is, Ted did it right. You only put Xs, but the Xs basically would have meant three. I basically just changed yours to give us four.

So the tops were three, two, one. So I changed where you were in Xs, and we'll review that in a second. Basically, for that, within 10 minutes after the interview, They have it, they would score it. We would then, at the end, just like this, we'll combine the scores, review it.

It doesn't mean it's set in stone, and we may have some other things to do with it before then it's discussed. And then we, I know Nick is, is that Nick on the phone?

Speaker 3 (03:24–03:25)

Yeah, Nick Connors is on.

Speaker 1 (03:25–04:40)

Nick, yeah, I guess my only question is for this, as we go through the interviews, we're gonna go review our combined scores now to see the top three, and we'll discuss who goes to the interviews. One question is, The fees are submitted separately. Could, do we need to wait until the interviews to open up the fees or can we open them up now to see what the fees are? For instance, I'll give a case basis.

If the top three that we scored, one of them is $100,000 or over our fees, we would know that they legitimately couldn't be in the running. So why would we interview? I guess it's my question for you. So is it possible that we review the fees before the interviews, or should we wait until the interviews?

Yeah, so typically… We didn't say that. Well, I think that's… I think it's planned like that for a reason, so it's not biased.

So, I think, you know, we already did the scoring initially for the five, but, so, I mean, my question is to you is, is it possible to look at the fees today? Because some of them, you know, I wouldn't want to invite a consultant whose fees are, like, way out of whack with their budget.

Speaker 4 (04:43–05:54)

Yeah, you know, I understand the concern. I would like to know the way to set up this. You know, tomorrow we'll figure it out for you. Yeah.

Okay. Because you could, the town could always negotiate that later anyway, right?

Speaker 1 (05:54–06:14)

Let's say, hey, we have this then for the next person. All right, that makes sense to me, and I just wanted to make sure. Okay, so with that being said, is there any, so then, yeah?

Speaker 5 (06:14–06:21)

So do the companies that put forth the RFPs, do they know what our budget is? I mean, it's kind of public information.

Speaker 1 (06:21–06:57)

It's public information. If they wanted to, they would kind of know. And someone, when we had a pre-bid conference, Some of them asked, some of them knew where the CPC is. It's all public information, what this piece is.

So if they did their homework, they would know. They should be. Yeah, we'll see. So is there anything else?

Does anyone else have any questions about this format? If there's anyone okay with this. Again, no other questions or anything?

Speaker 3 (06:58–07:07)

I can mention just a quick note that we'll retain the records for records procurement, our scoring sheets, whether they be written digital doesn't matter.

Speaker 1 (07:08–07:56)

Once we get I'll give you both of you. Yeah. Okay. So Nick, I guess my last question too, because this is like the first time I'm doing this as well.

My proposal was as well is to do, do we grant, when we go and interview, what's the scoring procedure to basically evaluate the three consultants that we interviewed? Could we use the same scoring sheet, which is what I thought would be fair through the RFP, that we would go and redo that again? because then you at least have a basis of what was in the RFP to go through it, or do you think it's simply a ranking between three people that we just say, one, two, three? I guess the question is, how would you propose we do it?

Speaker 4 (07:56–08:47)

That's something I'm gonna ask you all. I think what you're suggesting is that we use a similar sort of formula, which depends on what sort of requests we have done, so what they would like to be prepared to drop off. You know, what requests would we ask for this time? This reference code, however, was just to say, like, we don't have the one, two, three, and not highlight it.

That's also fine, as long as you can ensure that I will, again, record that you all have done so, and then if you have any questions, you can ask the teacher. We also decided that it was going to be impossible to do the same sort of process of drawing. We did a mix evaluation, we did blood tests.

Speaker 1 (08:50–10:17)

Okay, so I think that was the easiest thing I thought I was like, okay, and it's literally in the RFP. This is how it's going to write. We've already did it wants to get down to three people. It's basically a new slate.

So I'm going to open up now are scoring. So The three of us, I scored, Ted scored, and then Carolyn scored. So we basically got a bunch of evaluation criteria, probably there's A through E, A through F, and then We are given basically from 1, 2, and 3, if you're highly advantaged, you'd get 3 points. Down to D would get no points, so it's 3, 2, 1.

So if we mark in the boxes, they would get points accordingly, right? And so, first of all, I just want to say thank you to all the consultants. I think all of them are really high quality consultants, right? Yeah, so it was really a hard exercise to begin with because I think we had five really highly qualified consultants and you'll see in scoring there, they're pretty close and there's some that are like, you know, that they are very close in the end, but- You almost have to.

Yeah.

Speaker 6 (10:17–10:27)

You had to do a lot of- I mean, you have to give someone a score, too, when you really want them to reach it because you don't want everyone to have 17s or whatever or 18s because they haven't reached something.

Speaker 1 (10:27–10:52)

Right. So I will say, straight off the bat, that all these consultants were really great. And we really appreciate all that being said to get down and whittle down. Whittle down.

So for me, and then I had just put there, so the total scores were on one line. And then I just put a ranking in based on my scores. I just put it there just so you see. I had timed on.

Speaker 6 (10:52–10:54)

I think that's mine. You just had it.

Speaker 1 (10:54–12:54)

No, this one's mine. This one was mine. So that one was mine. So yours is next.

So I had Ty and Vaughn with a score of 17. And then I had C.H.A. and Barry Dunn at basically two, three. So they were 17, 16, 16.

And then I had Gale probably in fourth position and then S.L. Lawton in fifth position. So then Ted, Ted's is next. He had also tied in bond, ranked in the first one, but tied with Gail.

So they were both up top with 15. And then his third position was with Barry Dunn close, but close there with 13 and SLR at 11. And then Carolyn, her last one was Barry Dunn was in first with 18, CHA was with 17, and then the third was Tie and Bond. So if we combine these scores, you can see they're pretty close.

You have three consultants within a point. So it was pretty clear that Tie and Bond was in first, because I think we had that at 48. But the other two was CHA was at 47. You can basically say tie for second place between Barry Dunn and CHA at the three.

And then the remainers were Gale was in fourth, not too far behind by a few points, I think they're really close. And then SLR was down the fifth place. So I think that's the scoring. And if you guys want to discuss, I think the scoring speaks for itself.

For me, the highlighted firms, the three, that's what I would recommend as protein. That's putting those firms forward. It was really tight. So do you make a motion to?

Speaker 2 (12:55–13:00)

I'll make a motion to put. I need to scroll up to see this. Yeah.

Speaker 1 (13:00–13:02)

I'll give you the three. Time, bond.

Speaker 2 (13:03–13:11)

Time, bond, CHA, Barry Dunn as the three firms we want to bring into interview. All right.

Speaker 1 (13:13–16:43)

Roll call vote. Yes. Yes. Yes.

Bob, yes. So I can reach out to the contact at each one of these. What I would suggest, too, is that time, I would go first to time, Bob, since they've met first, give them the opportunity to take this time slot in. And then I'll open it up to them.

Typically, when you do this, firm ended up that they'll want to go. If it was my firm, I'd want to go. That's usually the way. And then I'm going to forward them as well as the first sheet, that first sheet that just explains the format and what they're expecting so that they have a half hour questions.

And so I'll forward that to them and then try to lock in the date. I think we're pretty much set to go for that. Lastly, I think on our agenda, or at least on this matter, I had just compiled some this morning, because I like to brainstorm before I came in here. We can add any of your questions to this.

But I'll just, I can just go through some of the questions that I had on the top of my mind. Some of these may end up getting answered in the feeds over here. But my first question was, I think it's important to say that, make point of contact during this thing, and what their experience is with similar recreational use. You never know.

You never know, and who else, so a lot of times, people will put a team together, and are you making sure that the right person is the point of contact, so it's good to ask. My second question was, community engagement is a critical element of this project, can you join a collaborative with all states? My third question was experience with a financial plan, financial forecast. I think that's going to be a big piece of this, you know, in our town.

How do you, how do you go and finance this thing? That would be nice. That's my biggest part of this is free. Yes.

Anybody can come out and make every single field, but you know, Gillette and How do you investigate within? I mean, I think for all of these pieces, and then to figure out over a 10-year plan, obviously, let's say this master plan costs $10 million. It would just be good to ask the consultant, how do they see us managing this? And what's their experience with municipal governments?

you know, folks that have used CPC money or whatever, I think that would be, that would be crucial, especially with a town that doesn't have a lot of financial resources. So it's figuring out where to get capital, capital improvements throughout. So I think that one's a really important one. And then I think on here, in the proposal, they also have gone through the project schedule, and maybe that will get answered during the interview.

But it would be nice to know, just for them to review the project schedule, the milestones, the dates, and Like, when did they expect it?

Speaker 6 (16:43–16:55)

Can you give examples of projects that have been on time, projects that have gone over, things like that?

Speaker 2 (16:56–17:13)

Yeah, I think giving concrete examples is going to be important. So even like community engagement, can you give us an example of when you had to work with the neighbors to make something happen, you know.

Speaker 1 (17:14–18:28)

So I give examples of projects that have kept on schedule or have overrun schedule. I'm guessing it was probably more on the client. And then my last question was analysis and design of our fields and facilities on this project. How would you address this?

I'm specifically asking that question to some of these consultants, our planners, some of them landscape architects. I saw in some of your notes a lot of lessons in landscape architecture. CAJ, to me, has always been more financial and a planner that way. So that may differentiate that between.

So I think that's a big component of this piece. So that was my questions that I had off the bat. Do you guys have any other questions that you could think of on top of your head? The other thing is, between now and two weeks, you could also forward me your questions.

Speaker 6 (18:29–18:35)

Yeah, I'll do that. I'll definitely send you some. I'll definitely have one around, or something around.

Speaker 1 (18:36–18:45)

Milton is very unique. We have such a lack of space. We don't have an appointment. It would be easy for these companies to give an appointment.

Speaker 6 (18:45–19:03)

Oh, let's go with this. So I want them to give examples of a town hall. I think we probably know that we are splitting the little hills. It's like this, not much here.

Give examples of a town hall.

Speaker 1 (19:04–19:55)

How are we going to handle that? Are they going to address the open parcels that we have, like up the dump road? Yeah, so I think that was a part of our RFP was the last remaining parcels were on the dump road, and we know that they're grounded, right? So that could be a question that, hey, listen, to your point, is we don't have a lot of space.

We don't have land just out there, but in the land we do have. you know, our ground units, which is a whole other application. Have you addressed that before? And he's like, fine.

I know there's got to be a statement for ground units. So that would be a good question. Like, how do you go about that? Because to renovate a ground field type site, it's going to cost way more.

just a piece of it.

Speaker 2 (19:55–19:56)

What does Brownfield say?

Speaker 1 (19:57–20:17)

Brownfield is like so-called plus a town down. Yeah. There's like, when we went out and looked at it, there's cars there. It's basically, yeah, if you go up the dump road, before you hit the dump, to the right, so that we've somehow got hold of that land, which is great.

And it's a tough spot.

Speaker 2 (20:17–20:17)

Yeah.

Speaker 1 (20:17–21:53)

But it's ours. Right. It's ours. So if we could, like, you need to remediate everything that's there.

So I believe there's state funding and such for ground is who knows what the way the government is these days. So I don't know. But it's absolutely a question. I think that's a good one that about expansion opportunities.

So it's not only looking at this current stuff that we have, but also expansion. I think those are pretty much the only parcels left really for us to try to figure out. And they are included. So another component of this as well, Curry College, Milton Academy, these are all stakeholders that hopefully will be involved in the process so that we can all maybe figure out what they can do to help us.

But I'll capture that later. And then if you guys, in the next two weeks, to your questions, forward them back to me, and then I think what I'll do during the interview, I'll open it up to both of you. One of you, I think, should just take up the asking questions process. So over the next two weeks, just forward some of your questions.

And then it's our side as well. But if you guys have other additional questions that aren't here, then just forward them to me, and I'll get them included. And then we have to add 20 minutes or whatever. Some of these won't be easy.

They probably might be addressed by some person.

Speaker 6 (21:53–21:58)

What's the structure of the interview? You're going to give them, like, 10 minutes to get into?

Speaker 1 (21:58–23:46)

30 minutes presentation, 20 minutes questions and answers. 20 minutes of questions and answers. And then 10 minutes will take them. Once it's done, we'll wrap it up and say, OK, we'll go back to our instructions right after.

And then we go on to the next one. end up being there. So that, is there any other questions regarding this process? You guys will get with it and we'll put this to bed and May 12th will be the, sorry, June 12th will be the next date that we'll have to plan it.

Good? June 12th. June 12th, June 12th. All right, so then, yeah, we're, Nick, I think we're all set.

All right, thank you, thank you. So I think just lastly for this meeting is we just wanted to cover like any new business with Kevin. I think just something to note is the CPC applications, the eligibility applications are due tomorrow. So the two, there's one for, I guess it's under, it's both, both of them are going to be under a sense of combined, as a combined application, at least that wouldn't go up.

The one is for the field, the reconstruction, dangerous field, the soccer field. And you have all that, you have that all set together. It'll go up to that. CPC, roughly around 180.

But that's all based on if we get money from capital.

Speaker 6 (23:46–23:49)

How much do we need from capital? What's your balance?

Speaker 1 (23:49–24:04)

$300. But capital gave us nothing last year. $300 include events? So then we have some wiggle room.

I don't know if you guys want events yet.

Speaker 6 (24:04–24:11)

Maybe we're going to fight events. I would like events. Just makes it more exotic.

Speaker 1 (24:11–24:28)

It would be four feet high, just a rectangle. Nice. And I should stand around it. It would help maintain the field.

I'm totally on board, trust me. I mean, there's plenty on land. What about the neighbors? Maybe walking dogs.

We don't know that they're not.

Speaker 2 (24:29–24:36)

But they would still have space to be able to walk.

Speaker 1 (24:36–24:38)

I think we'd cross the bridge when we get down there.

Speaker 3 (24:40–24:43)

Yeah, we can vote on it next meeting.

Speaker 1 (24:44–25:34)

Um, yeah, yeah, I don't think just for the eligibility application. Yeah, and then the other, the other application is a. We're going to be configuring so it's the pitching. The pitching warm up area, I think that would be good.

Kevin, I went out there and looked at it. The issue is the hill that's coming down. There's a lot of shrink chocolate. So, it needs to have a retaining wall.

You spoke to a few contractors who were interested in the project, but obviously it's not up to bid, but you have to put a retaining wall back there. You have to. Now the question is, how big, how long? But to do the project right, you have to do a retaining wall.

Speaker 6 (25:34–25:41)

A retaining wall would go from like, You're deep in right field, left field. How far down?

Speaker 1 (25:41–28:40)

Is it the light post back there? It's a light post to the left, an old one, that you have to stop there. If you're down there in the bullpen, you'll see it. But we could put a grabber I'll be honest, like the last couple I've been there, not many times, and it's pretty awful because you have to cut in and out.

come all the way around to go back into that dugout. And it's really hard. We need to find access to that project. So I think we can figure that out later.

But I think to your point, it would be good to just even put something. We need a little bit of a walkway. We need a three-foot walkway, probably. That will be part of it.

And just to let you know how CPA works. I know Rob does. Ted does. So you ask for money, obviously.

But you have to have the people using the product involved in it. And you have to give monetary value. So our next meeting, we'll have some figures about what power can contribute to these two projects, what softball is going to contribute And I've reached out to Farm Phone as well, because they use that field. And Andrews.

Everybody will contribute, and then we'll have better numbers. But we can't vote on it or anything yet. But we do need to put in. So it's just an eligibility application.

So Kevin and I will put in numbers, but then we'll have to vote on it later to get it. Things can change between an eligibility application and a farm application. So if those numbers move around a little bit, But we want to make sure that we're close. We're not just throwing in like, oh, we think the project's $30,000, $70,000 or something.

We have a pretty good idea on the estimate. And then, of course, if we can get other folks in and invested in the project, it'll look good. But for final numbers, on our next meeting, we'll put it on the agenda. I don't think, I forget when the final one's due.

I figure it's like three months or something. September. Is it September? I think it's, yeah.

Right after Labor Day sometime. And no one else, so no one else in town has come to you? I don't know. I reached out to somebody else about heavily.

I spoke to them a few weeks ago, and I said, why wouldn't you just put it in just in case? I'm like, just in case there's a $200,000 shortfall. You are an entrepreneur, you are that. But it's also their application.

I reached out and said, I talked to Bill Madden. And what did he say? He said he was going to reach out to someone.

Speaker 5 (28:41–28:42)

OK. OK.

Speaker 1 (28:42–29:53)

I can't make him do it. Yeah, yeah. But the longer it goes, well, the idea that goes by quick. But it's up to them.

I think the CPC would be, you know, they have that project, it's just earmarked. Here we go, it's a year away. You know, 10%, absolutely. A question on the June 12 meeting too.

Do you want that to be our June meeting? I think, yeah. Yeah, I would do it. So I think we could do the two votes.

And if there's anything that we need to discuss, we'll just add it to the agenda. So can we do, and I wouldn't do, we shouldn't, I guess we would have to do public comment. If it's like a regular meeting, we'd have to do public comment. It's already a long I think we should personally I think we should separate Okay, that's fine.

Speaker 3 (29:53–29:55)

I just didn't know what you guys okay separate the meeting.

Speaker 1 (29:56–29:56)

Okay, what do you know?

Speaker 3 (29:56–30:11)

Yeah, and as long as I know in time I'm happy to add whatever to the agenda as long as I know in the 48-hour window that I can add it, you know, I Mean, yes Right now for the two votes.

Speaker 1 (30:11–30:12)

That's all I know.

Speaker 5 (30:12–30:12)

I

Speaker 1 (30:12–31:30)

on the CMPs, CPAs. I mean, is there any, but there's no urgency. I know we can wait till July. So what if we do that, we do the interviews on June 12th, and then the next, I guess for now we should figure out another date for July, and then make that our regular schedule.

Then this stuff will be done, and then we can take that up. So what works, obviously, is this, what Thursday works, I wouldn't do the 3rd or the 4th or the 5th or the 6th or the 7th or the 8th or the 9th or the 10th or the 17th or the 12th or the 13th or the 14th or the 15th or the 16th or the 17th or the 18th or the 19th or the 20th or the 21st or the 22nd or the 23rd or the 24th or the 25th or the 26th or the 27th or the 28th or the 29th or the 30th or the 30th or the 30th or the 31st or the 31st or the 32nd or the 32nd or the 32nd or the 33rd or the 34th or the 35th or the 36th or the 37th or the 38th or the 38th or the 39th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or the 40th or I think. Part of the dental appointment that day, which means I should be. The title seems to work right now for me.

Does that work for you? So does that work for you guys?

Speaker 2 (31:30–31:31)

Yeah? Yeah.

Speaker 1 (31:31–31:47)

Narrow gave us a month or whatever. So why don't we, that'll be our next one. We'll do it there. And then we can address that.

Sounds good. Does that sound good? Paul, you got anything on there? No.

You're all set.

Speaker 3 (31:48–31:51)

He'll probably be down in the camp, so.

Speaker 2 (31:53–31:58)

Is that canopy day?

Speaker 1 (31:59–32:04)

All right. I think that's it.

Speaker 3 (32:04–32:05)

I'll be a standby.

Speaker 6 (32:06–32:13)

Yeah. from last year coming back.

Speaker 1 (32:13–32:21)

You want to keep those? You have the printouts? Yeah. And the printouts, you can keep them.

Speaker 3 (32:21–32:28)

If you want. Are we good? Do you have all digital scoring tweets? Or just forward all of them?

Speaker 1 (32:28–32:32)

I'll email all of them. That combined Excel sheet, I'll forward it to you.

Speaker 3 (32:33–32:34)

Or just send it to Nick.

Speaker 1 (32:34–32:38)

Yeah, to Nick also. Yeah.

Speaker 3 (32:38–32:40)

And then I'll reach out to you.

Speaker 4 (32:44–32:46)

Yeah. Yes.

Speaker 7 (32:50–32:56)

Yes. All right. Thanks guys.