Board: Community Preservation Committee
Date: 2025-06-11
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:22–00:25)
All right, thanks. So we're going to call the meeting to order.
Speaker 2 (00:26–00:39)
The seventh meeting of the Community Preservation Committee for FY25. I'm Tom Cunningham. I'm the chair of the Community Preservation Committee. And let me just go around and introduce ourselves.
Speaker 3 (00:39–00:41)
Jenny Russell, vice chair and a citizen rep.
Speaker 4 (00:42–00:48)
Rob Levesque, park commissioner. Pete Chegg, citizen rep and chair.
Speaker 5 (00:49–00:54)
And I'm Wendy Garpo, I'm representative of the Conservation Commission.
Speaker 2 (00:54–00:59)
And Cheryl, if you can unmute and introduce yourself. Yes. Okay, go ahead.
Speaker 6 (00:59–01:02)
Yes, Cheryl Togayes, representative from the Planning Board.
Speaker 2 (01:04–01:06)
Great. And Julia?
Speaker 7 (01:06–01:07)
Julia N. Clark.
Speaker 2 (01:08–01:19)
Thank you. All right. Administrative items. Upcoming meetings.
So Can you remind us of the upcoming schedule that we set?
Speaker 8 (01:20–01:21)
The 24th is the next meeting.
Speaker 2 (01:21–01:46)
Is that the only one that's set in stone? Is that the only one we set in stone? Yeah, I think so. Yeah, OK.
So we need to set others. So do you want to do that now? Yeah, sure. So the 24th, right?
So a Tuesday night? Yeah. What's the next one?
Speaker 4 (01:49–01:59)
We're looking at 24th of June. What's that? 24th of June. Two weeks.
Basically two weeks. I won't be here. That's okay.
Speaker 2 (01:59–02:19)
Okay. All right. We need it. So the week of July 7th, the week of July 14th, what do those weeks look like?
Vacations? Nobody takes vacations in July. Tuesday the 15th is good.
Speaker 3 (02:22–02:25)
It's not good for me.
Speaker 5 (02:25–02:29)
Wednesday the 9th. I do not do Wednesdays in the summer.
Speaker 3 (02:31–02:34)
Thursday the 17th or Thursday the 10th.
Speaker 4 (02:35–02:46)
Thursday is bad for a lot of time. Like I know Cheryl probably should write to find more. How about the 8th? 20 seconds.
Eight or Tuesdays? What about the 8th?
Speaker 7 (02:47–02:49)
I can't do the 8th.
Speaker 4 (02:49–02:51)
8th or the, well, what could you do, Kim?
Speaker 3 (02:53–02:56)
Yeah, I might be able to do the 22nd. I can't do the 8th.
Speaker 9 (02:56–03:06)
Is the funding application due the end of August or September? No, September. September.
Speaker 3 (03:06–03:08)
So 9th, 10th, or 11th? 7th?
Speaker 5 (03:08–03:10)
Is that Monday?
Speaker 2 (03:11–03:11)
Monday.
Speaker 5 (03:12–03:13)
Monday? How about the 14th?
Speaker 2 (03:15–03:27)
I mean, I like Tuesday is better.
Speaker 4 (03:31–03:41)
But the 22nd, if we waited till then, do you think it's only going to be? I think we might need two. You think we might need two? Yeah.
Do you think so, Pete?
Speaker 9 (03:41–03:48)
No. Really? Well, it depends how many we get. Yeah, probably.
But then usually, you know, you get the presentation during every meeting.
Speaker 4 (03:49–03:58)
Cheryl, you're on mute, I think.
Speaker 9 (04:03–04:14)
So I think we need two per presentations, the 24th plus one more, but then we usually have one meeting that's devoted to deliberation.
Speaker 4 (04:14–04:23)
So can we book one on the 22nd? Because that seemed to work for everybody. And then the other one would be the 14th?
Speaker 9 (04:24–04:26)
I think we need one before the 22nd.
Speaker 2 (04:26–04:27)
Yeah, the 14th.
Speaker 4 (04:27–04:29)
Yeah, I think we can make it work.
Speaker 2 (04:29–04:32)
All right, July 14th and 22nd.
Speaker 5 (04:34–04:42)
All right. So June 24th, July 14th, and July 22nd. And the 22nd, 100%, if needed.
Speaker 4 (04:43–04:51)
Yes. And as long as we have a quorum. That could be OK. And that's.
So yes, we can't meet without a quorum.
Speaker 5 (04:52–04:53)
Those are all 7 o'clock here?
Speaker 2 (04:55–06:03)
Yeah. And that's the other thing. For the deliberation meeting, we can do it on Zoom, if that would help. Okay, we can cross that bridge when we come to it.
Those are three dates that we have. Yeah. All right, good. Thank you, everybody.
Approval of the minutes from the April 28th meeting. Do I hear a motion? Motion to approve. Second.
Second. Any discussion? All in favor? Aye.
I think I have to do a roll call. Yeah. Denny? Aye.
Rob? Yes. Pete? Yes.
Denny? Yeah. Cheryl? Yes.
All right. Tom, yes. All right. All right.
We have some applicants in front of us tonight. I don't know who's been promised first slot here. OK. Some deference given to experience.
Speaker 10 (06:03–08:07)
Thank you. for having me again. Once again, Jackie Bolden here to talk about the Pepperdine Playground Project. Apologies, Lisa was not able to attend tonight.
But I just, I mean, we've heard this four times, I think, of this kid and update of what's happened since, I think, what was it, November, maybe, or something, and then what's coming. So I attach, so we're asking specifically for 143 because that's exactly what we need. That is the last step in this process. We have the land paperwork done so that it can be given to the parks department to have it be a town operated playground.
We have the RFP lined up. We're working with Nick Vilano on that. To select a contractor. Yes, to select a contractor.
We have created a 501c3. We have a GoFundMe. We did receive a construction donation. So we actually did work specifically with moving up the bottom of that because there were some restrictions on not being able to use it for labor.
So we worked having it be materials. We got 63, just over $63,000 for that. So that is the Bosworth construction. Yeah, I do have a, we highlighted what was in the itemized list for him.
So I can follow up with that if you want to see that as well. I don't have, I didn't submit an application. Yeah. So it's mostly like the excavation and putting the gravel, compacting it, putting two more inches, like doing the whole preps work for that.
Speaker 2 (08:09–08:16)
And then we… So just to be clear, it's an in-kind donation, that $63,000 cash donation.
Speaker 10 (08:16–09:00)
Yeah, we're not like paying him $100 and he's giving… Or yeah, like 63 back or like only giving him 40 for like the 100 that he's doing. He's doing the 63 total. Then we, so that's thus far.
We have been trying to get more private funding within the town without success this past spring, which is a little disappointing. Um, are trying we're going to go again in the fall to Copeland. We'll see what happens. Um, but we're.
Looking elsewhere around here.
Speaker 3 (09:00–09:04)
Um, so did Copeland give you a reject? Yeah. Did they say come back?
Speaker 10 (09:06–11:24)
Yeah. Yeah, I mean, we're running into this thing where it's like, I think we're. in their eyes too little, maybe, of a donation. I don't know if I really agree with that.
I didn't. I said no, and you guys gave us a donation. So it's just this little game that's going on. We shall see, though.
But in the meantime, I am presenting to the Chamber of Commerce tomorrow to hopefully see where that takes me. We are playing this. is kind of just gravy on top, but we are applying for a degree donation. I'm just waiting for the estimate from back from Thomas Nursery to finally submit that application.
We do have a application for funding into Fidelity. I have tried to reach out to the SUSE Foundation to see which will be placed on that avenue as well. We are pushing more on getting neighbors helping us with door knocking and flyers. It's obviously not going to pull in the 143 who need to start a shovel to the ground.
We are also, speaking from Milano, figuring out if this has to be fully funded before we start. We are, we're looking at saying, you know, we don't want to lose momentum, obviously with the construction donation. We don't want another COVID to happen. We don't want, you know, to come in and down our, play equipment is more expensive.
So we were seeing if we could do everything to get, the land preps, and then maybe just adding, you know, a display at the end that's needed to, but I don't think we're there yet. I think it has to be fully funded. So we're really just pushing to get that last chunk in our hands.
Speaker 4 (11:25–11:43)
Do you have a The updated estimates are I didn't like look through your application. So did Bill do you, but did Bill do your, do you like, I know that's your budget or whatever, but do you actually have a more detailed breakdown of the work?
Speaker 10 (11:43–11:46)
More than, oh.
Speaker 4 (11:47–11:47)
More than that.
Speaker 10 (11:50–11:53)
Yes.
Speaker 4 (11:53–11:56)
Did you submit it with your application?
Speaker 9 (11:58–11:59)
Did you say that?
Speaker 10 (11:59–12:09)
Yes, we have, well, we have a contingency. It's itemized as construction for $26,000.
Speaker 9 (12:09–12:14)
Oh, that would cover any installation?
Speaker 10 (12:14–12:34)
Yeah, we are getting a refresh on the equipment. We actually just reached out today to our Childscapes contact. to actually also see if we can bring that cost down a little bit to help this gap. We won't know that officially, but yeah, I know it also too, because it's probably stable.
Yeah.
Speaker 3 (12:40–12:49)
Jackie, it seemed like the last time you came here, you indicated that you were gonna be able to break ground before getting fully funded. So is that new information for you? Yeah.
Speaker 4 (12:49–12:54)
Yeah. Is that from Nick? He said you couldn't?
Speaker 10 (12:54–13:40)
It was suggested we should because so we don't have to go to RFP for the equipment that can be purchased directly. It's for the other work that has to go with that. Because if we don't have it fully funded, asking somebody to, I think we won't get a good, enthusiasm from a lot of return, like we're not going to get people's attention to submit the RFP, saying like, oh, we don't even know what we're doing. You know, like we don't even have this fully funded.
Like, I think to them it's at least a very timely thing.
Speaker 4 (13:40–14:09)
I think though, I think what's difficult is if you go out to an RFP, like a typical, if you were to do all the bid documents, what they haven't done, I don't think they'll have that done yet. So, We don't even know it's a theoretical budget that you're putting out there. This is where it is. So you put out a competitive RFP for the public bid process.
You could get back a few bids, which will help. It will also help this committee decide $143,000 on top of it. It's a lot of money.
Speaker 10 (14:09–14:21)
So that's why we were going back and forth on it. I mean, he said, fine, I'm going to give you the RFP with it saying that it's fully funded and
Speaker 4 (14:23–14:38)
I don't I mean I don't know I would talk with Nick about it because it's it's a lot of it it's fun and many projects go out to bid and yeah we what and figure out how much is left to cool your.
Speaker 10 (14:38–15:04)
Well, we even start with the rubber floor, and it was we were when we had to catch up with the child. Oh actually the number came in less than one okay. We'll take it. So it was an estimate.
And then you've got more from prison. So I'm with you on that. And that's why I'm pushed. So he did finally give us more yesterday, but it does say in the month.
He said fine, but I'm seeing in it that the project's not fully funded.
Speaker 4 (15:05–15:16)
But the bigger issue is. And the timeline's limited. Your timeline will be extended like a year. A year.
Because it'll be July until you would ever get this money. Yeah.
Speaker 2 (15:18–15:35)
whether John would allow it to go. I don't think they would. Well, no. So hypothetically, if we made a recommendation that still wasn't confirmed by the meeting, but that would be a good sign.
All right.
Speaker 4 (15:35–15:36)
Right.
Speaker 2 (15:37–15:40)
Yeah. Because there's a great if we make a recommendation in December,
Speaker 4 (15:41–16:01)
It's still five months before town meeting. Well, we're doing it right now. We're doing it right now for the townwide master plan. We don't have the money, but we went out to RFP.
We have interviews tomorrow with consultants. So there's precedent for that. But it's probably, we wait until town meeting that said. But that was after town meeting.
It was after town meeting.
Speaker 2 (16:01–16:33)
So that's when you would probably have to. Yeah, a window between May and July is an easy one because there's nothing that can stop you at that point. The weirdness is, it's, you know. It's a long time.
We've had three years of recommendations. Town Meeting has never denied a recommendation, but that's only three years. Yeah, I mean, it's conceivable they could vote no on something. Well, they would have to vote no on everything, but it's, you know, it's highly unlikely politically, but I'm not sure.
Speaker 3 (16:34–16:35)
Anything can happen.
Speaker 2 (16:36–16:40)
The legality of it and just, you know. The optics of.
Speaker 9 (16:43–16:46)
For us. yeah. But I think.
Speaker 4 (16:46–17:15)
I think if that's your schedule, that would also be helpful. whatever you can do to help minimize that cost would be helpful. If you can raise some of that money privately, it would be helpful. Because a big chunk of this is all coming from the CPC.
So I think that would be welcome from the board. So keep working. Keep working. You got a year.
Speaker 2 (17:15–17:46)
Yeah, hopefully it will cough up some money. I mean, you have a lot of supporters in town. We would hope that some of those supporters also put in money, including us. But yeah, we're trying to stretch, as you know, a million dollars, which sounds like a lot of money, but it's obviously, it's three buckets.
And given the need in town for a variety of preserving projects, we're trying to make it stretch.
Speaker 10 (17:46–18:10)
And we appreciate everyone as far as this has been so far so good. So just following up, itemized list, more itemized than for the budget. Do you want it also to, well, we already have what's the funding thus far. So I think that's fine.
And then. I'm just wondering what.
Speaker 9 (18:11–18:12)
Oh, sorry.
Speaker 7 (18:13–18:15)
Yeah.
Speaker 2 (18:17–18:35)
And that can come in the full application rounds. Yeah, you don't have to do that. Just by September 26th. And obviously, hopefully, you'll have some good fundraising news in between then.
So you could update us on that. Any other questions?
Speaker 5 (18:36–18:54)
I have a question for you. Jackie, I'm speaking on behalf of the Conservation Commission now. I heard you say that you were in the process of of application for tree funding. Yes.
Is that is that to the Conservation Commission? Yes. Great. Great.
Speaker 10 (18:55–18:56)
Yeah, I know.
Speaker 5 (18:56–19:10)
Directed Bill and I'm to the right spot. Yes. There is an application for applying for free funding on the Conservation Commission's website. So I believe I sent you guys the link.
Yes.
Speaker 10 (19:11–19:25)
And so it says, like, what's the maintenance schedule and all that? Right. Yeah. Okay.
So, yeah, I was just I just talked to the nursery and they're just giving me back the quote on the true cost. I think that's the last piece and then I have to submit it.
Speaker 5 (19:25–19:36)
Great. Awesome. Great. Just rough estimate.
Any idea like what sort of frame we're looking at financially? I don't.
Speaker 10 (19:36–19:57)
I have no idea. We are. It's 19 trees, 11 down. I think there's like three red maples and then one other one birch, so I don't know if that helps.
Speaker 5 (19:58–20:43)
Yeah, yeah, typically trees are, you know, the rule of thumb that we use is about $500 for a two and a half inch caliper tree. Okay, so the diameter at breast height is the term. So I'm guessing it's probably going to be around $10,000 that we're looking at. Yeah.
Okay. Yeah. Great. So I would suggest that you ask for what you need, and then we will review the application in our monthly meeting and hopefully agree to fund as much as we can.
Perfect.
Speaker 7 (20:43–20:44)
Thank you so much.
Speaker 9 (20:44–21:01)
Just one question. You said that Nick indicated that the land is cleared for you and the park department is going to manage. So it'll be conservation land that the park department is going to manage and maintain.
Speaker 10 (21:01–21:13)
Yeah, we were in contact with the the woman who's been working on paperwork for everything.
Speaker 3 (21:13–21:14)
Yeah, very good.
Speaker 4 (21:14–21:55)
The last thing I'll say is that our last parks commissioners meeting, we had one person in the audience who asked about your project, who's a neighbor. So whatever public outreach you can do, I would advise on it because they weren't particularly fond of your project. But I would make public outreach too important and include some stakeholders because they just showed up. And they're like, this is the first time I've heard this.
And I was surprised that someone would be against the playground. That would be in the neighborhood. You'd be surprised. They had many questions regarding parking and whatever else.
Yeah.
Speaker 3 (21:55–22:00)
Especially the timing of everything, because it's going on so long. So then you're like, oh, is this really going to happen? Is this real?
Speaker 4 (22:00–22:10)
They were more concerned with parking and such at the playground. Thank you.
Speaker 2 (22:13–22:22)
Thank you for your work on this. All right. Leslie and team, welcome. Bring up some chairs.
Speaker 11 (22:31–22:40)
Lastly, I'm going to be technically ex-PTO president as of last night. I turned the reins over to… Co-presidents?
Speaker 8 (22:40–22:47)
Co-presidents, yes. Haley Byron, I'm co-president of the Tucker PTO, and Marisa Golden Silva.
Speaker 11 (22:48–25:38)
So we are here, thank you for considering the eligibility application for the Tucker Playground renovation. We submitted the application, I'm sure you want us to go through everything, but Ever since I'm a fourth grader and a first grader, and so ever since I joined Tucker, there's been talk of how we can really revitalize the Tucker playground space for our students, but also for the community, because hopefully Coveley Park will be breaking ground, but there really isn't a lot of community space on the one side of town. And so we really kind of thought the last couple of years of what we can do, and then realizing that CPC would possibly help us fund this project, we convened a committee working with the Tucker administration, the superintendents, all of them have been appraised in the past couple of months to form a committee with parents, Bill Madden was brought to our attention, and he very graciously worked with us in a pro bono capacity to help us in the early planning stages of the process. We did some fundraising with the Tucker community in the last month, and we are prepared.
We actually did retain a site survey to do a site and ground survey of the Tucker playground, kind of in that gap window between students being gone and the Tucker camp starting just in a couple weeks. And so we're working on going out to request RFPs for design work over the summer. And we put forth an eligibility application to fund some of the ground surface play structure and removal of the existing play structure. Um, we think it will be very much a phased project, um, because we're so landlocked compared to some of the other schools around town and really want to be creative with our space and work to the best of our ability.
And so that will require really, you know, like kind of taking everything apart and, and figuring out the, you know, multi-use, um, field might go here, the plate structure might go here, moving the wood chips. Currently right now, it's just asphalt and wood chips. So there's no, um, really safe for the kids to play on. It's not ADA acceptable.
Our kids, I get a call from the nurse almost every other day in terms of playing soccer on the asphalt and with the curbs. And so it really is much needed. And we actually, parents have been supporting this project for years pre-COVID. Parents put together, did some fundraising, and so there's actually funds dedicated to the playground that we'll be using from previous Tucker parents and we just raised $11,000 in the past month to put forward the site survey and are also looking to other grants within the state and private foundations to fund this.
Speaker 9 (25:40–25:52)
When you're defining, you talk about the playground and you're not just the play equipment, are you Basically looking at all of the grounds, other than maybe the front of the school or is it. everything.
Speaker 11 (25:52–26:58)
Yes, all on the ground. We have some wonderful teachers and parents that have really worked on revitalizing the side garden, which is not actually accessible to the students for recess, but the Tucker Garden Club utilizes that space. The preschool classes have their playground down there, and the PTO in recent years have purchased tables with actually the help of the Milton Garden Club to the little bit of outdoor classrooms. So that started sort of know, there's some work to be done there, but we feel like that would probably be phase three in terms of better utilizing that space.
Kind of the main phase that we're looking at in the next year or two will be the back playground where it's the asphalt soccer pitch. We've actually, we did install with the help of community schools, a basketball hoop a few years ago, and that really brought a lot more community members into the playground on the weekend. We all live in the neighborhood, and it's great to see people playing there on the weekend and after school. So the main, that would be, kind of the back part would be what we would look at to revitalize the space so it can be more of a community-centered space.
Speaker 9 (26:58–27:02)
Okay, so pairing up asphalt and putting something else down.
Speaker 11 (27:03–27:03)
Yeah.
Speaker 2 (27:03–27:08)
So what's the thought on the there's something else for the soccer pitch?
Speaker 11 (27:09–27:50)
So we've looked at different types of ground service for the rubber scent. We've also looked at different types of turf options, too. We understand that the CPC will not fund turf, but we are prepared to do our own fundraising to utilize that, recognizing that in a perfect world, we would all love a grass field, but that can be maintained by the custodians and the staff. So just really looking at the safest thing for our kids to plan.
It'll be durable for them to plan the weekend. After school, during the school year, we also have the Tucker Camp for the first time this year. So this really is a year-round phase that's used by the community.
Speaker 4 (27:50–28:01)
Who funded the Colorado Cunningham turf in the back? Bill worked on that too, but do you know where the funds came from?
Speaker 11 (28:01–28:18)
I don't, I'm not positive that the Copeland Foundation helped a little bit with that. I think they might have, but don't quote me on that. And I do know that the, kind of even calling that PTO for a fairly large chunk as far as, as well as some kind of family business donations for that.
Speaker 4 (28:18–28:33)
So, so excuse me, cause I didn't do my own, I didn't read through any of these eligibility applications. I know a great project obviously, but are you looking for funding to do the planning this round? And then you're going to be looking to do, The project or.
Speaker 8 (28:37–29:52)
Well, what so we what we our plan is now is we were looking for construction funding and we were going to try to sell funds be planning because we're trying to keep this project on a relatively tight timeline, given how serious parents are taking this and kind of how urgent the need is to replace the play structure so. What we were intending to do, we're going out to bid for a design company. We have one quote in already. So based on that number, we are starting a fundraising appeal this summer to the Tucker community to raise money for the designs, just so we can move right to construction funding to keep us on a timeline that potentially is breaking ground on a new phase next summer and finishing up in the 2027 school year.
that was kind of the only way we saw to stay on that timeline. But part of the reason that we really welcome the conversation tonight is we're wondering, we don't anticipate being able to, we may be able to fund those design plans prior to the September deadline. However, we don't think that work would be completed. So we're concerned about how viable our application might be if that work is ongoing while we're applying for construction funding, knowing that that was kind of our process.
Speaker 4 (29:52–29:54)
What was the estimate you got?
Speaker 8 (29:54–29:54)
$60,000. $60,000.
Speaker 4 (29:55–29:59)
$60,000. $60,000. $60,000. $60,000.
$60,000. $60,000. $60,000.
Speaker 8 (29:59–30:08)
$60,000. $60,000. $60,000. $60,000.
$60,000. $60,000. $60,000. $60,000.
$60,000. $60,000.
Speaker 3 (30:08–30:10)
$60,000.
Speaker 8 (30:11–31:05)
Well, Tucker is a very special community, but we don't always have the same access that other schools might. We were able to raise the $11,000, but that wasn't easy. So we had to get creative this summer. We're forming a subcommittee from the playground committee in order to come up with some maybe interesting fundraising ideas.
We have some existing funds, but we're not totally comfortable spending all of that down without more community engagement. The Santa Fe won't. but it's to say we're starting those conversations with our parents. So I think it's a realistic goal for us if we're given, you know, into the school year to raise that money, I think we can absolutely do it.
I don't think we could do it and have the plans done by September. I think we'll need to use the first half of the school year with the second half of the school year dedicated to completing that work from the first,
Speaker 4 (31:05–31:18)
So I guess you realize, so Peverly Playground's been four years now that we've tried to fund them. And the cost of that project is now boomed up to like $650 or something. And I wouldn't doubt if this project's up there.
Speaker 11 (31:18–31:23)
We think they're projected at $560. Yeah.
Speaker 2 (31:24–31:31)
So I'm guessing that's it. The budget they've asked for is $560. I mean, presented is $569. I'm asking for $200.
Speaker 5 (31:32–31:37)
Certainly it's a little more complicated too with permitting.
Speaker 4 (31:37–32:14)
But it is, to answer your question on getting this done in a year, it's going to be tight because you're going to do the design time and then put it out to just like you're gonna have to do the same thing that Pepperly Park does with like public RFP and all that and that takes a couple months. So to get a shovel in the ground I think is ambitious by July. That's my own feeling. Could it be done?
Probably. But you're at square one, right? And then going back to the design fee, like $60,000, that's probably all in though, right? That's all in to do all the construction.
Speaker 5 (32:14–32:18)
Does that include permitting? Curious. We talked about permitting there.
Speaker 9 (32:19–32:45)
So your design fee will be designed the whole Tucker grounds and then you will be carving out the field area as a phase one so that's what you're working on is trying to fund you know the first phase of that but you're design fees for the entirety of the grant.
Speaker 11 (32:45–33:08)
Right, so the design fee would cover kind of a two year project, but you'd only be asking for funds for the first year. All this also has to do, you know, we've been in touch with Tom McCarthy, who's head of town facilities, when we met with the superintendent to just make sure we had a follow-up conversation or email correspondence with Superintendent John Phelan. He's only been here 10 days now.
Speaker 4 (33:08–33:38)
I'm almost wondering if you could work with Phil and say, hey, can you give me like a master plan so that he could give you a phasing plan? that says, these are, I'm sure your project, maybe it can happen over three phases, and do the like early conceptual work and get that fee down so that you can do that, ask them to pare that down. And then you can always do that later. You're asking for like an all-in kind of fee, right, to do it, to do all construction.
Speaker 11 (33:38–34:11)
So maybe you can maybe not necessarily don't we again without kind of getting the design plans are our fee estimated the removal of the ground of the of the existing playground structure and move the ground chips and then and then. resurfacing of the ground, and then we're looking for other private grants and other grants to help fund the other $400,000 that we anticipated. So it is kind of that first, we can't really do anything until we get everything out of there. So that's sort of what we're asking for in this first phase, at least what we think before kind of really getting
Speaker 4 (34:12–34:16)
So do you think you can fund the design? You're not asking for the design, so.
Speaker 11 (34:16–35:12)
No, because I think it's, to be frank, if we wait a whole of a year to fund the design, we're a year behind. So we really, I mean, we would love your funds, but we're going to get the design work going before next summer, before summer 2026, and then we just can't wait. We need to do it. Yeah, we're going to, yeah.
And there's actually, there's a tremendous amount of grants out there that we've looked at. that were helpful. I mean, and I think one thing that there's a lot of support from the Tucker community, we just had the Tucker mural installation, which is kind of our really initial phase of revitalizing the playground. Rick was instrumental in bringing that forward, but NEPA awarded a $27,000 grant to us to make that possible and there'll be community conversations.
And so this really is a source of pride for the not just the Tucker community, but the Tucker students and the Tucker family, but the entire Westside community of Milton. So we really feel like we want to keep this momentum going.
Speaker 3 (35:13–35:19)
So the $11,000 that you raised, will that go towards the design, or are you holding on to that? To the design. To the design.
Speaker 11 (35:19–35:31)
And to the site, that is happening in the week between the school and the camp starting. We've already retained Morris Engineering and paid them, the retainer, and they're in a couple of weeks to start the site survey.
Speaker 4 (35:31–35:39)
So this money is really for that first phase, whatever it is. Yeah, whatever that first construction groundbreaking phase would be.
Speaker 11 (35:40–35:45)
And if we were awarded it, does it have to be spent within, like, is there a time limit?
Speaker 9 (35:45–35:50)
No, you got it. It's whatever that means. Three years, three years.
Speaker 11 (35:50–36:03)
Okay. That is another piece that we are, we're constrained by the school schedule and we want to make sure that we use, we do the work in the best manner so we're not disrupting the students in the city and also the summer. And the summer, it's all the way.
Speaker 4 (36:03–36:28)
The nice part about CPC money is July 1st is when it's available, which is actually the perfect time. And you can, similarly to these other projects, you can line it up and do the all RFP. Then once your funds are, you have a contractor like award it, basically, then you can put it around July 1st. But there is a good amount of funding to get all locked in.
The other beauty of CPE
Speaker 2 (36:28–36:58)
A money is just, it can be very flexible. And that's why we, we, we work with projects and give them generally a three year, there is no hard and fast. And then if you're making progress, we're going to probably continue to allow an extension of money. We want to see the money used, obviously we don't want to be taking it back.
So we can, we've worked with every project applicant and make sure, you know, our rules don't, you know, unfairly restricts the progress you're making.
Speaker 4 (36:58–37:29)
I do like the idea of phasing it, though, because with Peppermint Park, it's been four years, and we keep giving a little bit, but the money just is kind of earmarked there. And that's why I thought there was going to be a shot on the ground this fall. I was trying to help Dying Light out, and I was hoping to raise private money for it. And I was like, you better put in for more CPC money, because I just didn't see the project going anywhere.
So it's It's tough, so I think it's better to wait it off in chunks, because as we know, it's a million bucks, and there's so many applicants.
Speaker 11 (37:29–37:59)
Phil gave us his proposal, and in some ways, we have the money, we have the reserves, we could go ahead and do it, but we feel like we owe the Tucker community to go out and get other competing bids to understand what we're really doing. So we want to make sure we're not rushing the project too much, that we're doing our due diligence and being good stewards of the money that families have given us. Right. We don't want to spend money without knowing we have money on the end, so we could buy the design right now.
Speaker 4 (37:59–38:06)
I mean, I know billions of people, but like to the same point, if I had a client in an organization, I would say, go out and get three beds.
Speaker 11 (38:06–38:12)
Yeah, that's right. Yeah, we're talking with Western Sanford tomorrow on Friday.
Speaker 2 (38:13–39:24)
So the one thing I would say, obviously, 200 is a big number compared to the million we have. That's 20% of the project. We have 14 applicants. Obviously, some are small, some are large.
you know, as you think about the final application, you know, think about, you know, if you got partial funding of that, what could you do with that? How much you could do with that? You know, and that's a vague thing. I'm not going to speak for the committee, but just, I think we genuinely, the last couple of years, have gotten into practice of saying to all applicants, you know, when it's possible, sharpen your pencils, think creatively about what you can do if we don't fully fund it.
You know, again, just, and we'll have this conversation again in September and maybe be in a better position after having heard from all the applicants, but just, you know, I'm probably not telling you anything you don't know, but that's probably it.
Speaker 4 (39:24–39:30)
And as you go out and get grants, it's nice to say, OK, we have some matching points here. Grants like to see that.
Speaker 5 (39:30–39:57)
Right. Yeah. Right. And even if you don't get the awards, it's very helpful to all funders, not just us, to to know like, oh, hey, you're applying for this grant and you're waiting to hear.
And that's that's very helpful to strengthen your application. Speaking of which, I know that space is really tight over there, but might there be space for two in your plan?
Speaker 4 (39:58–39:59)
Right through that turf.
Speaker 11 (39:59–40:30)
So that would be like a break ground, kind of trying to get the kids And the safe surface is summer 2026, number one. And then summer 27 is really looking at how we can, outdoor classroom, you know, really, we have some wonderful teachers that conservation and kind of environmental justice is really core to what they teach and core to what I think Tucker is about. We want to make sure that it's effective in our outdoor space. So we would love, we would love a rain on Oak Street if you want it.
We would love to bring an oak.
Speaker 5 (40:31–40:55)
I don't know if you if you heard when we were speaking with our folks that there is an application process on the Town Conservation Commission website. It's a very simple application. Just fill it out. Let us know.
Let the Conservation Commission know what what your need is. And hopefully we'll be able to help you out with that.
Speaker 2 (40:55–40:59)
Even though that's on school park land, you can still do that.
Speaker 5 (40:59–41:06)
Yes, public land. Yes, exactly. That's correct.
Speaker 3 (41:06–41:45)
The only other context I would add to Tom's grants is that the request that we have gotten is over $2 million. It's not 14 proposals each asking for 10,000, but it's all in the map of the totals. We're going to have to cut basically by half somehow. Now, some may drop out between now and applying for a full proposal.
I mean, some may combine with ours. Who knows? There might be other things that happen that will reduce the total overall. But for now, it's big.
Yeah. That's helpful.
Speaker 4 (41:45–41:48)
Although last year it was like $400 million or something. Yes.
Speaker 2 (41:49–41:56)
We have our work cut out. We still have our work cut out.
Speaker 9 (41:56–42:22)
It's such a burden to give away money. Yeah. for your funding proposal hopefully by the time you get to that you'll have kind of a specific you know what if it is the multi-purpose field you know identifying your master plan does everything around the site but the money we're looking for now is to concentrate on that project and that'll help us yeah so when you're going you're just when you're going out and meeting with your designer
Speaker 4 (42:23–42:52)
If you can have them focus on that, I know it's like a master plan. You want to make sure everything's there, but it would be really helpful to, when you're going out for this is to get a cost them to have an independent cost estimator. And it helps us to say, okay, here, this is actually what this is not just I'm thrown out in the air. Like here's a $200,000 project, but like to actually either.
Either you actually have them do it or you have, I mean, back for whatever, you know, a contractor who would do the field, whatever, getting hard numbers back to get to know what it is.
Speaker 7 (42:54–42:57)
Thank you.
Speaker 11 (42:57–43:21)
Yeah, I was actually there. Members, I'd love to talk to you.
Speaker 2 (43:21–43:27)
But you're staying on this project? Yeah. That was part of the deal, right?
Speaker 3 (43:29–43:35)
Well, you're here.
Speaker 2 (43:36–43:41)
We have time. Great. Great to see you.
Speaker 11 (43:42–43:54)
Thank you. Yeah, I'm ready from it. I put in an application for a piece of land. It's on the zone by MRE.
It's on the Winter Valley property.
Speaker 3 (43:55–44:12)
Originally, Winter Valley was part of the state. So when you go up Highland Street, it went from Highland Street over to where Winter Valley is now, and then up as far as where that house is. It was a caretaker's house. It's perpendicular to Highland Street.
Speaker 2 (44:12–44:18)
So the house is in District Barron? No.
Speaker 3 (44:19–45:14)
So anyway, this piece of land that's behind the community building in Winter Valley, it was set aside when the town purchased. So the town purchased the land for Winter Valley, and then the MRE bought it from the town. And that piece of land, which is about an acre, was set aside in perpetuity because it was felt that that was part of the original Olmstead design. And 100 years later, 104 years later, it's overgrown with invasives.
And I'm just looking to get the original plan and see what needs to be done in order to restore it. Winter Valley uses just a little bit of state Olmstead design. It's on Olmstead design property, but it's You know, there's not much of a focus on it. It's kind of too bad.
I don't want to see it kind of lost.
Speaker 2 (45:15–45:19)
Yeah. So this would be for a plan or a study?
Speaker 3 (45:19–45:41)
Yeah, just to make, sort of to get the original plan and make an assessment about what needs to be done. It's overloaded with invasive and the trees are a hundred years old. So, you know, some of them will often have to be replaced. So who would actually be paid to do this?
I don't have anybody right now. I mean, I would have to hire somebody.
Speaker 9 (45:42–46:10)
But you would be having somebody doing a restoration plan. A plan for it. Based on historic design. Right.
So I think this should be in the historic category rather than, you know, It's not recreation. She applied under both, under open space and guitar. It can't be open space, so it'd be historic preservation. Because the comment was made that we didn't have any applications for historic preservation.
Really? I figured that's just what's going on here. So that's great.
Speaker 2 (46:10–46:28)
In the 2000, this is going to seem strange given what I just said, but is that enough? I don't know. I don't think so. Did you just conjure that up?
I like it. I like it. I like your, I like your face.
Speaker 7 (46:28–46:31)
Yeah, I know.
Speaker 4 (46:31–46:33)
I think it'll be more fun.
Speaker 9 (46:33–47:11)
What would it be if it's just to, you know, go to you can either get the plan from the library of Congress. So just be somebody to look at that plan, look at the site, see, you know, what of that exists. It's not a big thing, probably, you know, five or $6,000. I don't think it's too, but I think, you know, it's part of a $6,000 that we're going to get on.
and it's sort of landscape architecting, look at the plan, look at the site.
Speaker 2 (47:11–47:32)
That's probably something that could happen between now and September 26th is getting a better sense from somebody in that business that could give you, okay, because you can change the number up or down. We'd like it to change downwards, but in this case, it would have to go up a little bit.
Speaker 9 (47:32–47:36)
But it's still a modest request. Thank you.
Speaker 3 (47:36–47:41)
And is MRE, is that a, is it actually incorporated?
Speaker 2 (47:41–47:50)
I believe it is. It will be funded for the affordable housing at Winter Valley. Thank you. That's who owns the property.
Yeah, yeah.
Speaker 4 (47:50–48:04)
And the 36-unit expansion. Okay. Where is this? Where is it?
Winter Valley? Yeah, no, I know where Winter Valley is. So this land is by the 36th. I don't know where this land is.
Speaker 3 (48:04–48:15)
It's right behind the community. You go up the driveway to the community building, which is where the office is on the left. This is kind of the second building on the left. This is about an acre just beyond that.
Speaker 4 (48:16–48:17)
So it's accessible for people.
Speaker 3 (48:18–48:23)
It is. Not today, it's not. Well, it's accessible. Just drive by it.
Speaker 5 (48:23–48:43)
There was a semblance of something that used to be there, at least when I was on site a couple of years ago, and I remember being very surprised, pleasantly surprised, that you could see where there was like some stone walls and some remnants of… Well, there's a pond.
Speaker 3 (48:44–48:46)
It's beautiful. Yes.
Speaker 9 (48:47–48:50)
It could be beautiful again. Yes, for sure.
Speaker 3 (48:51–49:18)
Maria, what's your vision for this? What would you like to see? Nothing, just to restore it. To restore it.
just doesn't go to kind of woods and fill in with Norway maples or something like that. Would it have been accessible in terms of walking around it? Yes. And that was one of the executive director was kind of concerned about.
And, you know, the residents walk the property.
Speaker 2 (49:18–49:23)
Yeah, that would be a nice resource for residents to take advantage of.
Speaker 3 (49:23–49:32)
And this little area just used to be where the pool was. just beyond the building, and they have the residents have gardens in there, like great gardens.
Speaker 4 (49:33–49:36)
I'm just curious. I would love to go see it.
Speaker 3 (49:37–49:46)
It looks like a woods right now. Yeah, it's just built in. So it's considered private property now, I guess, right? Can I ask you a question?
Speaker 11 (49:46–49:50)
There's a new memory care center going on right behind there.
Speaker 3 (49:50–50:11)
Would that be affected by… No. Many of the road entrances off of Highland Street and our new building 6 will be behind building 5. And then the memory care is beyond that.
And as I said, all their entrance is off of Highland Street.
Speaker 5 (50:12–50:18)
So the plans for building 6 don't impact this one acre that you're speaking of. Good.
Speaker 2 (50:21–50:22)
Thank you.
Speaker 3 (50:23–50:25)
Thank you very much for being so accommodating.
Speaker 2 (50:25–50:48)
I always, one of the things about this committee is I learn about new projects. Yeah, it's cool. That we never previously known. You know, the Neponsa estuary that Arthur Doyle took us over last year, this project, the gardens off of government, I mean, I mean, I'm learning so much about the town I've lived in for 30 years.
Exactly.
Speaker 3 (50:48–51:03)
This was a little write-up that was, I only have that one copy, but it was a write-up that somebody did about Winter Valley. Will you scan that and send it to us? Yeah. Just how the Whitney's developed it.
Speaker 7 (51:04–51:05)
It's great.
Speaker 5 (51:06–51:24)
But Rita, I'm wondering if the Norton Garden Club might be able to help you with this research that you have in mind. They may even have some information in there. I was going to say, Georgia is your gal. Yeah.
I know she has some plans and things.
Speaker 9 (51:24–51:27)
And once she starts talking. Yeah.
Speaker 3 (51:27–51:34)
Yeah. Yeah. Yeah. She's in the Whitney house.
Speaker 5 (51:34–51:52)
And she was actually saying recently that she has some history about her house and the surrounding property. I don't know if that's information that's available elsewhere, but certainly she'd be able to point you in the right direction.
Speaker 7 (51:52–51:54)
Okay.
Speaker 5 (51:54–51:55)
Fantastic.
Speaker 7 (51:55–51:57)
Thank you. Thank you.
Speaker 2 (51:57–52:19)
All right. So, What's the pleasure of the committee, should we just go through the 14 applicants quickly. If there's any concerns about eligibility. Is that yeah.
Speaker 5 (52:19–52:20)
That sounds like fun.
Speaker 2 (52:20–52:35)
All right. So going sequentially here on the spreadsheet that Julia put together for us, affordable housing trusts, through the creamers, through the $50,000 request, that's obviously eligible.
Speaker 9 (52:36–53:29)
Hello? Did you want to discuss things? Yeah. Oh, yeah.
They're eligible. Last time we had an affordable housing in Victor Valley, we suggested that they go through the trust. Yes, because they've got the expertise to negotiate things like that as an imposing one, you know, it just, so it's going to increase in affordable housing, but I don't know whether he's going to provide more units. He said something about providing a greater level of support, but we're not in a position to help negotiate that.
And I think the affordable housing trust might be. So I don't know if it makes sense to give this, you know, whatever we decided to give it to the affordable housing trust and ask them to work with them. Which is what we've done.
Speaker 2 (53:30–53:40)
We established that precedent with Winter Valley. I think that is, I personally think that's a good precedent. And yeah, so.
Speaker 9 (53:40–53:43)
She's got a hand up that's probably been up for half an hour.
Speaker 7 (53:44–53:45)
Thanks, Tom.
Speaker 2 (53:47–53:51)
Cheryl knows how to make herself heard. So Cheryl, go ahead.
Speaker 6 (53:52–54:11)
On the Tamposi application, I will recuse myself. I live near 648, 652 Canton Ave. So if you don't mind holding that one, the special, until later, when I can leave the meeting. Um, but that would be okay.
Speaker 4 (54:11–54:13)
We'll move on. We can do that. We'll move on.
Speaker 2 (54:13–54:34)
All right. So one of the things that I just wanted to, before we get to, and we'll defer the 10 project month later, but the, I was just, the only thing I was trying to say earlier is the affordable housing trust application is eligible, obviously, because we funded them three years ago. That's. That's all I was just trying to check that out.
Speaker 4 (54:34–54:38)
Yeah, which is not eligible. They're both eligible.
Speaker 2 (54:38–55:43)
And I think we'll come back to the tempos. So number three is probably the most interesting discussion we have. I think the Forbes House restoration, the portrait restoration, you know, we funded the four plus investment. This is clearly a late application.
And, you know, I think that to me, that's the only difficult part of this. It's a it's a. I think a worthy project. We did, as many of you remember, a couple of years ago, allowed a late application from Peverly Park.
There was some confusion about emails and there was enough confusion that I think, at least for Me as one member, I was convinced that we should allow that because it felt like there was some legitimate technology issues. This one, it doesn't seem like that was an issue. It was just like, so.
Speaker 5 (55:43–55:45)
Was there any communication at all prior to?
Speaker 3 (55:46–56:08)
I worked there on Saturday and I told Heidi that the applications were due and I'm like, you know, put it in, maybe they can slip it in. So it's not, it's nothing on their end that, you know, that they're, if like, I encouraged them to do this the last minute, so nothing on their end that is.
Speaker 2 (56:09–56:27)
Well, it's, I mean, so, I mean, I hear what you're saying, but it is on their end in that they didn't meet the deadline. Now you encourage them to, to maybe file a late application, but it's… By one day.
Speaker 5 (56:27–56:54)
It was maybe a day or two late. As somebody who writes grants in a professional capacity, if you're late, you wait until the next cycle, unfortunately. And I would discourage our committee from So bending that rule, because if you do it for one, then you have to do it for everybody.
Speaker 4 (56:54–57:10)
I mean, this is what happens. I mean, we have the same thing. And if we're not in for a minute or two minutes late, we're out. And unfortunately, I think it's just a slippery slope that you create by letting applicants in that are beyond the deadline.
That's my feeling.
Speaker 5 (57:10–57:37)
And it's nothing personal against the organization or against against the director, I think we all here are very supportive of the Forbes House. But I think it would be a mistake to make exceptions that we're not willing to do for everyone in the community.
Speaker 2 (57:40–57:54)
Yeah. I agree. I've been a grant writer for most of my career. And literally, I've been late since.
You wait till next year. You've been a funder.
Speaker 12 (57:54–57:54)
Yeah.
Speaker 2 (57:55–58:11)
So should we take a vote on this? Did other folks want to weigh in? But I would be inclined to agree with Wendy that we should not accept this as an eligible application.
Speaker 4 (58:12–58:16)
Do we make a motion to?
Speaker 7 (58:16–58:22)
There's no other. There's no other historic preservation applications there.
Speaker 2 (58:22–59:19)
Well, based on my email, it was 10 days late. So the deadline was May 30th. The email from you is June 10th, saying that we got it. But I think what you're hearing, Julia, even if it was one day late, it was late and we can't, you know, what if somebody approaches us tomorrow, this is a public meeting, if somebody approaches us tomorrow and say, well, hey, we want to slip in.
It just is, I know it's drawing the line, but I think it's an important line to draw. The other one was, I think a different case where there was a legitimate miscommunication and this is just a late application. So I don't think we can, I don't think we can go there personally. So yeah, probably if you want to make the motion.
Speaker 4 (59:19–59:33)
Make the motion to what? To disqualify the Forbes House porch restoration for this funding cycle. Yes. Is the motion.
Speaker 2 (59:33–59:40)
So it's a motion. Second. Second. Any further discussion?
Wendy?
Speaker 5 (59:40–59:51)
I just would like to express how regretful I am to have to vote this. And I think I'm speaking on behalf of all of us.
Speaker 2 (59:53–01:00:06)
Yeah, no, it's not an easy decision. I just think for the health of this committee, speaking about future committee representing upsetting that precedent is just not I think that's something we should do.
Speaker 3 (01:00:06–01:00:08)
How does it affect the requirement?
Speaker 2 (01:00:09–01:00:54)
So it doesn't really because we can set aside what our requirement is to set aside 10%. We don't have to actually have funding. We don't have to award funding of 10% to each year if we don't have applicants. in a certain category, we have to set aside that money.
So we have reserves. So lots of towns that don't get applicants in each category every year, certainly some of the smaller towns definitely do not. So yeah, that's where they reserve and build up sometimes strategically build up.
Speaker 4 (01:00:54–01:01:29)
I guess here, like, that's good information for like, we're just basically putting $100,000 in the back. Yeah. So this is a really hard decision. Yeah.
I mean, Yeah, I mean, I still agree with the decision, I believe, because it's a slippery slope to take, but it's not like, you know, it doesn't help us, like, make our decision easier. We still have to, to your point, we have to set that 10% aside, right? So it is, it's a bummer. It's a real bummer.
Speaker 2 (01:01:29–01:01:48)
Yeah, yeah, since Cheryl's on the phone. So we have a motion, a second, any further discussion? Let's go to the roll call vote. Jen.
I vote in favor of the motion. Yes. So yes. Yes.
Wendy. Yes. Cheryl.
Speaker 7 (01:01:48–01:01:48)
Yes.
Speaker 2 (01:01:50–01:02:31)
Tom. Yes. So we will communicate with Forbes. I'll reach out to them by phone and just communicate and just have a conversation expressing their deep regret to be having to do this.
yeah yeah so okay um all right continuing on andrews park reno um an application from kevin chrism and parks departments um any comments um on this it's eligible it's eligible but i thought
Speaker 9 (01:02:31–01:02:46)
purpose of the master plan was to kind of identify and identify priorities. And, you know, that hasn't been done yet. So, you know, do we wait to see where this rises in the priority list? And it's done.
Speaker 4 (01:02:47–01:03:17)
But what I will say. Mark's representative here. So what I will say, and I have that comment probably for a lot of these projects, but it's also a year away. We're going to start July 1st.
We're interviewing candidates tomorrow to lock in a consultant. And that should happen and be finished within nine months, I would hope. That's the hope. Be done within nine months to a year, and this funding would happen in July.
Speaker 9 (01:03:17–01:03:26)
So during that time, potentially, we could figure out where it would be. part will rise to the level of being a priority.
Speaker 4 (01:03:26–01:03:27)
Right.
Speaker 9 (01:03:27–01:03:28)
Yeah.
Speaker 4 (01:03:28–01:03:30)
Right.
Speaker 9 (01:03:30–01:03:48)
I think intelligently. It's definitely eligible. Yeah, it's definitely eligible. So we just think that the idea of the master plan was to look comprehensively and based on a comprehensive look, establish some priorities.
And I think we should wait for that for the most part.
Speaker 2 (01:03:48–01:03:51)
What's the timeline on the master plan?
Speaker 4 (01:03:51–01:04:03)
I know you're going to get started right away, July 1st. July 1st. So I said, it could be anywhere between nine months to a year. It's going to take time, and a lot of stakeholders and everything else.
Speaker 9 (01:04:03–01:04:05)
So it would be the first of the year at best.
Speaker 4 (01:04:06–01:04:07)
Yeah.
Speaker 9 (01:04:07–01:04:10)
Yeah, at best. So that gets your line full.
Speaker 4 (01:04:10–01:04:11)
I don't think it's going to be that much.
Speaker 9 (01:04:11–01:04:17)
But that'll give you an opportunity then to get projects in.
Speaker 4 (01:04:17–01:04:27)
But I will say that I think we should listen and let applicants speak to their projects because it's worth it.
Speaker 2 (01:04:28–01:04:39)
We're not passing judgment on whether we would fund it. It's just inviting to the full application. Bicycle wayfaring signage.
Speaker 3 (01:04:40–01:04:49)
The only question I had on this, and I couldn't quite, it sort of sounded like it was in Milton, but then I was like, is this going to be in Milton or does it matter that it may not be in Milton?
Speaker 4 (01:04:49–01:04:58)
I think that's what I saw, because it's on a deposit rail, so it's like part of it maybe. So I don't, it's a little loosey-goosey about it.
Speaker 3 (01:04:58–01:05:06)
Yeah, that's mostly a RANDSAPP initiative. Well, but that doesn't mean that the project isn't Milton.
Speaker 9 (01:05:06–01:05:17)
Well, there might be a couple of these signs in Milton looking at what he shows most of it's in Randolph. That's a good question.
Speaker 3 (01:05:17–01:05:18)
None.
Speaker 5 (01:05:19–01:05:23)
That will still benefit Milton residents when they use it.
Speaker 2 (01:05:23–01:05:49)
That's true. There is technically no, this is maybe strange, but there is no restriction in the statutes that you could do in projects or whatever. There's been some really on the affordable housing side, there's been some, I don't know if they've gotten funded, but there's been some proposals for one town to build affordable housing in another town. Or to share, which is very controversial.
Speaker 12 (01:05:49–01:05:51)
That seems very controversial.
Speaker 2 (01:05:51–01:06:07)
Yeah, regional collaboration in a better way. So it actually technically could be funded, you know, whether we want to justify to Milton town meeting, I don't want to make something random.
Speaker 9 (01:06:07–01:06:14)
We'd be crucified if we were using this money when we have so much demand in town. I agree. Yeah. So I just think it should.
Speaker 3 (01:06:15–01:07:05)
Well, I'm personally with town. Okay. I would push back on that because I mean, I do a lot of biking around town and I must say that the signage is pathetic. I mean, there is no signage for where you're going, where you're ending up, how far it is or anything.
So any signage is good. Well, coming in, I mean, around the hills. On the roads. Yeah, definitely on the roads.
I mean, where they're… So I appreciate the fact that it's like, oh, that's a really good idea. That would benefit a lot of Milton residents. And I'm surprised, actually, that it's this Um, it's a, it's not a lot of money really.
Um, so I don't know, I would vote for it to stay in.
Speaker 2 (01:07:06–01:07:43)
I mean, two are on, I mean, he has the five locations. Two are on the Milton Randolph. One's on the Milton Randolph border. One's on the Milton Boston border.
Yeah. The North and the South side. Right. And then yeah.
ComCom sign. I assume he means the Milton sign on the Ponce Trail at the Comcom sign and Blue Hills Parkway, which is by the ice house, I believe that's the one he's referring to. So I think they are Milton signs. Sounds like it.
Speaker 3 (01:07:43–01:07:48)
We also have to go before the Sun Review Committee.
Speaker 2 (01:07:49–01:08:02)
Yes, yes, absolutely. So I think it's eligible, whether or not we fund it is a different question, but I think it is eligible. Yeah, I think it's hard because it's Milton Sandwich.
Speaker 5 (01:08:04–01:08:19)
I think that perhaps something we could communicate to the applicant is the importance of stressing the benefit to the town of Milton. That's a great idea.
Speaker 9 (01:08:19–01:08:27)
They should what? Find a Milton partner for this application. I mean, he's, he's a lifeguard in Randolph.
Speaker 12 (01:08:28–01:08:28)
Yeah.
Speaker 2 (01:08:29–01:08:48)
Yeah. Find a local partner. That's a great idea. So let me just back up again, though.
So signage on a bike path. Right. This is so capital improvements to recreation facility. Right.
As we know, we funded dugouts and. Right.
Speaker 4 (01:08:48–01:08:50)
baseball and I think it's, I think it's eligible.
Speaker 2 (01:08:50–01:08:56)
I think it's eligible. Signage is a capital improvement. Yeah.
Speaker 4 (01:08:57–01:09:15)
Yeah. Yeah. I'm pretty sure it's eligible. The other question is that like, he's a, he's a Randolph person, right?
Like, I mean, is that, is there precedent of other people coming into another town and getting funded? I just don't.
Speaker 2 (01:09:15–01:09:20)
I think there's a limited precedent on that, but we can, I mean, we could ask Stuart.
Speaker 3 (01:09:20–01:09:26)
I think it's worth a call with him to see if there's a move. Okay.
Speaker 6 (01:09:27–01:10:16)
So Tom, can I jump in here? Yes. Milton had a fairly active bicycle advisory committee. I don't know if it's still as active since Lee Toma left.
But that would be a great partner to look into or to suggest. They were very involved in the pedestrian bicycle master plan that the select board adopted. And this interconnectivity is something DCR is really interested in, getting people from one community to another community through other communities. So I do agree with Jenny that it's worth considering as being eligible.
And I think what some of you have said about having a local partner makes a lot of sense too. So I mean, hopefully the Bicycle Advisory Committee could be that partner.
Speaker 2 (01:10:18–01:10:23)
Yeah. That's a good suggestion. I will call the applicant and have a conversation.
Speaker 5 (01:10:23–01:10:24)
Thank you, Tom.
Speaker 2 (01:10:25–01:10:26)
All right.
Speaker 7 (01:10:26–01:10:29)
This is great. This is why we do this, right?
Speaker 2 (01:10:29–01:10:57)
Yes. Great. Boat ramp replacement is the next one. It's a continuation.
From last year to this year. We rejected this last year, ultimately. We didn't fund it. We didn't fund it.
It was eligible, certainly. It doesn't look like there's any further information from last year's application, really.
Speaker 9 (01:10:59–01:12:27)
I know when I spoke up against this last year, having been involved in boat ramp design, I don't think it's feasible to put a boat ramp there. And so I think we're throwing money away. I don't know why the town feels that they can have a public boat ramp, Sherry, they just can't. Why?
You've got to be able to manipulate a pickup truck with a trailer to back down that ramp. which there's really not room to do it. You possibly could, but most of the people going to a public launch aren't that good of drivers. And then you need a place to park your truck with your trailer while you're out using your boat, and there's no place down there to park anything.
I just don't think it's really feasible to have a public boat launch there. Wouldn't you think that Nick would know that? Well, we asked him last year. I mean, he hasn't done anything.
I would have expected to get the consultant at least to, you know, look at an aerial photograph and show us how the movements could work and where the barriers would mark. But, you know, he hasn't done that. And we could ask him to demonstrate feasibility. Well, I think that's what he's asking for, actually.
Well, he's looking for permitting and, you know, requirements for permitting and all that kind of stuff.
Speaker 2 (01:12:27–01:12:30)
Well, it's stunning. It continues to be stunning.
Speaker 3 (01:12:30–01:12:44)
The feasibility project allowed the town to plan for design and construction funding through the capital budget. So, I mean, that would be a nice leverage, too, if the town picked up, if it is feasible.
Speaker 5 (01:12:46–01:12:58)
Honestly, even if it was just boats that people could have on top of their cars, like kayaks or a roof rack. But I mean, what's the ramp that's there now is hostile.
Speaker 10 (01:12:59–01:13:06)
That's a nice way of putting it. I took one look at that and I'm like, what the heck. It's a historic piece.
Speaker 2 (01:13:06–01:13:14)
It is historic. Yeah. Would you want to have a conversation with Nick about this, just to follow up? Because I think.
Speaker 6 (01:13:15–01:13:18)
So Tom, can I add some background to this one?
Speaker 2 (01:13:18–01:13:19)
Sure.
Speaker 6 (01:13:19–01:15:13)
I haven't spoken to Nick about this application, but the Master Plan Implementation Committee led a study with the Metropolitan Area Planning Council at the beginning of our committee's term. And we handed off a report to the select board. The idea that came out of the master plan was to increase public access to the landing and to the Milton's waterfront. And in that public process, it came out that that boat dock or that launch, or whatever it's called officially, where you have that antiquated system, it's extraordinarily limiting to who can go in and out there, and it does limit public access.
So it was recommended at that time to study replacing that. And after the That report was delivered to the select board. They appointed a landing committee and that committee is still working. And so I would like to suggest a representative from that committee be contacted, or at least Nick report out to you, Pete, if you speak to him, what is the committee's current thinking and planning?
I know that they've had some leases, they have, you know, I forget Dexter school I think was one of the folks who was awarded a lease as well as Milton Yacht Club and they took away the space where the Yacht Club was storing those cradles that are required for that current boat ramp because it The storage of cradles in a prime waterfront wasn't deemed to be, I guess, highest and best use there. But I've only followed this bits and pieces of it since it was handed off. But I know that it's ongoing work. And it would be useful to understand how this fits into the bigger picture there.
Speaker 9 (01:15:13–01:15:51)
You should go down and take a look at what's down there now. There is a huge Dexter Southfield Pavilion, dexter salt field on it and you know dozens of boats you know there's no private it's private they privatized that area it's not public it's privatized oh well that's unfortunate it's a public asset so i yeah i i haven't seen that talk to them about what the committee's feeling is and just see if they have any thoughts okay thanks i'm not much of a voter i'm not a voter at all i think
Speaker 2 (01:15:52–01:16:03)
What Wendy said about, even if we could make it more kayak launch friendly, that would be a worthy goal. And I mean, that's not.
Speaker 3 (01:16:04–01:16:07)
Well, there is a kayak. Well, there is a lot of kayak. At the end of the parking lot.
Speaker 9 (01:16:07–01:16:10)
Well, there and down at this ranch. And the kayak.
Speaker 2 (01:16:11–01:16:13)
I put in there. It's not. It's not.
Speaker 9 (01:16:13–01:16:37)
Well, the new dock system they put there, the huge big elaborate dock system, that's very friendly for kayaks. going down the ramp to the yacht club, old wood docks, I put in there, put in there, they've got, you know, over a dozen kayaks that people pay to store there. So it's very actively used by kayakers.
Speaker 12 (01:16:37–01:16:37)
Okay.
Speaker 9 (01:16:38–01:16:44)
All right. So you're going to talk to Nick. I'll talk to Nick at the committee. He's a good idea.
Speaker 2 (01:16:44–01:16:54)
All right. Next one is the Brook Walk from Jeff Stone. He was supposed to be here tonight.
Speaker 7 (01:16:55–01:16:58)
No, he'll be here next week.
Speaker 2 (01:17:01–01:17:03)
So, I think that's eligible.
Speaker 3 (01:17:03–01:17:12)
Yeah, I was sort of confused between this and the Milton Greenway. So, it seemed like there was sort of similar things going on.
Speaker 9 (01:17:12–01:17:40)
Well, we had prompted him to do a study, and they did a great job on the study. Well, they could submit it to us, but That's the great way. We did a study of doing that whole thing. So I'm a little confused.
This isn't implementation that he's looking for. Now he's looking for further study. And I don't really understand how that fits in front of the picture. So when he comes.
Speaker 2 (01:17:40–01:17:54)
Yeah, I think he's eligible. Yeah, we'll talk to him in two weeks. All right. The next one is the Fox Street Bocce Court.
Speaker 3 (01:17:55–01:18:00)
So why this was not part of the town center court part, I wasn't quite sure.
Speaker 2 (01:18:00–01:19:40)
Yeah. So my understanding is, so as you know, we funded the basketball court, I think it was $40,000 level. Nick has, informed us that big bids were coming in much higher than that. So the 40,000 wasn't enough to get a new basketball court.
So they have gone back to the drawing board. They're coming in. Independently of that, there's really like three moving parts here. The COA has really latched on to the project in a good way and wants to have a bocce court.
And then the third, the neighborhood. There's a group of residents in the neighborhood that have wanted to support, I think, both projects going forward. So I'm not sure. I've been away for two weeks, so I'm not fully up to date on every word in all these proposals.
So I do think, though, Julia, Naturally. Jenny, if you're on the track of saying we should encourage them to talk to each other and submit a joint application, I know there is some conversation going on. But Nick's proposal didn't include the vaccine. Oh, it does.
Speaker 9 (01:19:40–01:19:49)
Yeah. So we should just talk together and submit a single application for the final. Right.
Speaker 2 (01:19:49–01:19:57)
Okay, I agree with that, so. So who wants to do that? I can, why don't I talk to.
Speaker 9 (01:19:58–01:20:00)
Well, wait, you're talking. Yeah, you're taking.
Speaker 3 (01:20:00–01:20:01)
You're talking to Nick anyway, right?
Speaker 9 (01:20:02–01:20:06)
Yeah, I'll talk to Nick Connors about this one. Okay.
Speaker 2 (01:20:06–01:20:09)
Oh, sorry. It's Nick Connors.
Speaker 9 (01:20:09–01:20:11)
Nick Connors, yeah, that's fine.
Speaker 2 (01:20:11–01:20:22)
Do you want to talk to Christine Stanton too, or? Sure. I mean, we need to talk to both parties at some point. Yeah.
Or I can talk to Christine. No, let's not confuse it. OK.
Speaker 5 (01:20:22–01:20:26)
And the neighborhood group that you spoke about?
Speaker 2 (01:20:27–01:21:10)
I had some outreach too. He went to the meeting. Yeah, so a variety, Mary Ann Zulus. I don't know what they call them.
There's been that. Yeah, top streets, Fairbanks, those streets. They were very interested in seeing this project go forward. So they reached out to me.
They invited me. I couldn't make the meeting. Pete went to it. They hosted a neighborhood meeting to basically brief people on this.
Speaker 5 (01:21:10–01:21:19)
Yeah, I got an invitation. I was like, what's this? I was so excited. Unfortunately, I wasn't able to attend the meeting, but I'm glad that you are.
Speaker 2 (01:21:19–01:21:20)
You're a neighbor.
Speaker 5 (01:21:20–01:21:22)
I'm a neighbor.
Speaker 2 (01:21:22–01:21:34)
Yes. Right. So, yeah. So, I don't know.
They don't necessarily have to be a formal applicant, certainly, but they can be supporting each other.
Speaker 9 (01:21:34–01:21:39)
Supporting letters or one application. Yes. Yeah.
Speaker 5 (01:21:39–01:21:46)
So, is the neighborhood group already in communication, though, with the select board about it or with the COA about it?
Speaker 2 (01:21:46–01:21:55)
They have been, they have been, they've talked to Nick Milano I know. Okay. So, very much, so I don't know.
Speaker 4 (01:21:56–01:22:35)
I still, so I don't know too much other than a lot of people have come to me about the basketball court that's just sat there vacant for a long time. And this still continues to be a thorn in my side because that's under control of the select board. And it may always be, but I don't know why. I mean, I guess because it's on this property.
So, But I go back to the town, I go back to the master plan. And I don't know why, to me, this seems like a big project and it's got a lot of planning involved in it. So I don't know why that wouldn't be included in the planning for that.
Speaker 2 (01:22:35–01:23:24)
Well, it's partially, I mean, the interesting status of this is it's partially funding, right? They've got $40,000 from us that's sitting there that is not usable until they get full funding for the full idea. I mean, you're raising good points, but it also feels like a little bit of money can put them in a position where they could complete this project. We've already partially funded it.
So that doesn't mean we have to do it, but it's just, you know, we've expressed support by funding and town meetings expressed support by funding it partially at least. We thought we were funding it at the time, but we didn't get that.
Speaker 4 (01:23:25–01:23:34)
But to me, there's two projects here, right? It's the basketball court and the park. And the bocce court. And the bocce court.
There's three projects here, basically.
Speaker 9 (01:23:34–01:23:51)
It's not really the park. I mean, I think it's probably the park. Because the bocce court is physically connected to the basketball court. I mean, as they got it, it's just doing that park.
And it has those two facilities in it. So I think it's one project it doesn't matter.
Speaker 2 (01:23:51–01:24:11)
The thing I like about it is it's got seemingly it's got neighborhood sports, obviously the select board, you know, coming next to next year been supportive of this and COA is newly engaged in this project and wants to make sure it turns into a resource.
Speaker 4 (01:24:12–01:24:18)
So I guess my one question is, so why there's two applications here, so can one just be.
Speaker 2 (01:24:18–01:24:28)
That's what we're talking about. That would be the goal. Cheryl.
Speaker 6 (01:24:32–01:25:13)
Sorry, I just had a question about the recreational master plan that parks is going to be working on. Is that going to include? the passive recreation that's not associated with organized sports teams like this park. It's under parks, but it's really not been something that has had any programming or management to date with parks.
This has been something that's been used by the neighbors in the neighborhood. I'm just curious where Council on Aging is the applicant here, Would the Council on Aging be one of the stakeholders in the master plan?
Speaker 2 (01:25:15–01:25:18)
I thought this land was under select board. Okay.
Speaker 6 (01:25:19–01:25:40)
All right. Then, yeah, I think it's, given that, I don't think it needs to be tied to the master plan. So I guess I'm agreeing with those of you who were saying it's got the support of the Town Administrator and the Council on Aging, and it already has funding. So I agree that it's eligible.
For sure.
Speaker 2 (01:25:41–01:25:52)
Yeah, it's definitely eligible. I think, I think the goal would be to get COA and the town administrator's office to.
Speaker 9 (01:25:53–01:25:59)
Christine's thing at the end, the organization from COA and select board. Yeah.
Speaker 3 (01:25:59–01:26:02)
In theory, or it's weird that they had to.
Speaker 2 (01:26:02–01:26:19)
Yeah, I think we can resolve that by our final application, so. OK, the Geofield baseball field. Rob, your name is on this one.
Speaker 4 (01:26:21–01:26:51)
Do I need to? No, first before you. I mean, do we really do we? I can tell you about the project if you want.
Just quickly, yeah. It's along the first baseline. There's a pitching pen there today. It's the first baseline.
Oh, the baseball field. Geo. You're going down Geo. On the softball field.
It's Geofield.
Speaker 9 (01:26:51–01:26:53)
I've never heard of the name.
Speaker 4 (01:26:53–01:27:02)
Where the two dugouts are, on the first base side, there is a pitching pen.
Speaker 9 (01:27:03–01:27:07)
It's not the hitting cage.
Speaker 4 (01:27:07–01:29:00)
The baseball owns the two hitting cages. This is a pen which Milton Softball is supposed to take care of. It's overgrown. There's pitching rubbers thrown out and everything else.
The baseball owns the two cages that are on the other side. It's always been said, if Baseball would always have rule over the cages. If softball came, we had second dibs or whatever to those cages. So this project is to try to make use of that space and use it for pitching, but also use it for hitting.
And we would put up a net like we did in Cunningham. I don't know if anyone's seen. In Cunningham, we put up a batting cage over there. Milton Softball paid for it completely.
And then the thinking is for this is Milton would put in, Milton Softball would put in a chunk. Harrison Reck would put in a chunk and the rest would come from CPC. And then Kevin had some people come out and look at it. The challenge to that is that as you, the grade comes down really hard and fast there.
So the water's coming down really hard. So we have to put in, why it is the price it is, is because you have to put in a retaining wall with proper drainage around there, catch basin on the other side, to make sure that it's usable and get around there. And then one challenge to the project, which we've now known because we keep coming around it, that dugout's completely completely closed off. So if anyone ever comes in there, I think it was done for safety reasons.
So like if other visiting members ever come in, you come in and you have to come in through the other third base dugout to get into that dugout. So is it used during games as a warmup? It would be used during games for warmup, right? But it would also be used for hitting.
You could use it.
Speaker 3 (01:29:00–01:29:05)
There was some mention of adult use. What was that? There was a mention of adult use.
Speaker 4 (01:29:07–01:29:13)
Sure. I mean, it would be used for anyone in the community.
Speaker 3 (01:29:13–01:29:17)
So I noted, I made a note of it. I was like, well, there is there.
Speaker 4 (01:29:17–01:29:21)
There is there is adult leagues as well. Right.
Speaker 3 (01:29:21–01:29:25)
Last year, adult softball leagues that use the field.
Speaker 4 (01:29:25–01:29:31)
Yeah. Now there's an old man's league.
Speaker 5 (01:29:31–01:29:32)
Yeah. Thanks.
Speaker 2 (01:29:34–01:29:36)
It's high quality softball.
Speaker 5 (01:29:36–01:29:38)
Is that what it's called? Old Man's League?
Speaker 4 (01:29:38–01:29:40)
Yeah, the Old Man's League.
Speaker 5 (01:29:40–01:29:40)
Really?
Speaker 4 (01:29:40–01:29:40)
Yeah.
Speaker 5 (01:29:40–01:29:43)
Do they kick women? Yeah.
Speaker 4 (01:29:43–01:30:04)
Yeah. Actually, there is a little old lady. The funny thing is we were talking this basketball court out here. There's a woman in town who's looking to get other women involved and play an outdoor women's league, too, because there just isn't that many.
There really isn't that many adults, you know, other than tennis and golf and fishing.
Speaker 3 (01:30:04–01:30:11)
I think this is an eligible use.
Speaker 2 (01:30:11–01:30:43)
Just moving us along here because our time is ticking away. Milton Greenway applications. This is from the town administrator. And this is connecting Quincy and Smith.
This is that doesn't have a cost to it. Right.
Speaker 9 (01:30:43–01:31:02)
We don't know. So we don't know. And it seems to me that it's assumed as part of the estuary project that they've been doing all the way. And and all the, you know, Brookpath stuff that Jeff Stone has been doing.
Speaker 2 (01:31:03–01:31:06)
Right, this is a much bigger project than the Jeff Stone project.
Speaker 9 (01:31:06–01:31:20)
Oh yeah, I'm just thinking that there's three kind of linear path projects being proposed here and it doesn't sound like they're taking into account the work that the other groups are doing.
Speaker 3 (01:31:21–01:31:28)
Well, I don't think the Neponset one is, that's separate. I would put that on a different category. Well, the slopes along there.
Speaker 2 (01:31:28–01:31:29)
Yeah.
Speaker 3 (01:31:29–01:31:38)
This would be inclusive of that, I think, because it talks about… It's a great way to connect the Quincy and East Milton Square to Readville. To Readville? How do you do that?
Does it show a map?
Speaker 2 (01:31:39–01:31:46)
No. Oh, yes, it does, actually. So it's using the Neponset Greenway.
Speaker 9 (01:31:46–01:31:53)
It shows a… It does show a map, I'm sorry. Most of it is brook roll. in the street or maybe adjacent to it.
Speaker 2 (01:31:55–01:32:20)
So again, for tonight's purposes, I think it's eligible. We should have some conversations with them about the other proposals that we got, because not one applicant doesn't necessarily know we got other applicants. So I think it is eligible. We need a lot more information about this, including a press tag.
So this is clearly a placeholder that Nick put in.
Speaker 3 (01:32:21–01:32:27)
Julie, maybe you can just make sure that Nick comes to one of our meetings. Okay.
Speaker 5 (01:32:27–01:32:40)
Yeah. I didn't read. I didn't do my homework either. I did not read these proposals in depth, but I'm curious, did they list any project partners with that?
Speaker 9 (01:32:41–01:32:53)
It would be a stud basically. A stud. I think they mentioned the bicycle plan, the bicycle committee or whatever it is. anything to rely on.
Speaker 3 (01:32:54–01:33:04)
That's the schools that goes through the next three public schools, Milton Academy, Curry College, Turner Park, Monza River, and Quincy, and Torete Mountain Commuter Rail Station.
Speaker 2 (01:33:05–01:33:14)
I think it's building off some work MAPC has done. Got it. Identifying potential greenways through towns. Cool.
Speaker 9 (01:33:14–01:33:47)
One of the little bit of concerns. Yeah. One of the concerns I have a little bit, and this might not be the place where we talk about it, But we got lambasted by the select board and the board committee about study, study, study. And now the town administrator is proposing another study.
I want to concentrate on putting some work in the ground. So we shouldn't, we should, you know, when we're paring down. Yeah. They get under our budget, I think we should.
Speaker 2 (01:33:47–01:34:00)
We showed that over 90% of the funding has gone to actual projects now. But we should be aware and cognizant of that. Absolutely.
Speaker 9 (01:34:00–01:34:06)
And these many things, you know, with low price tag on it, it's hard for us to know where that sits.
Speaker 2 (01:34:07–01:34:17)
All right. So let's move on. It's eligible. We'll talk to them about coming to a future meeting.
The Ponce Estuary Trail, Arthur Doyle's project.
Speaker 3 (01:34:17–01:34:21)
Well, this is a good example of it. It had been a study, and now it's into the shuttle.
Speaker 2 (01:34:21–01:34:39)
Right. So that's great. So I think that's eligible as well. Beverly Playground, we just heard.
Town Center Park, we just had previously dealt with. Parker School Playground, we've That was in the winter valley. So as long as there's no.
Speaker 3 (01:34:40–01:34:46)
As long as there's no. Arthur Doyle.
Speaker 4 (01:34:46–01:34:51)
So then there's two more meetings that we're going to.
Speaker 9 (01:34:51–01:34:57)
How many of you have to find out for the next one? You said you've got Jeff.
Speaker 7 (01:34:57–01:34:59)
Yeah, I got just done.
Speaker 9 (01:34:59–01:35:00)
And I think.
Speaker 7 (01:35:01–01:35:03)
All right.
Speaker 9 (01:35:06–01:35:09)
We really should try to have fun.
Speaker 7 (01:35:09–01:35:10)
Yeah, I mean.
Speaker 4 (01:35:12–01:35:24)
So. Well, I'm just wondering if we can. Pair some of these down, like do we need? Do we need everyone here?
To come before the committee?
Speaker 7 (01:35:28–01:35:35)
Nick Connors and the campuses. And are OK.
Speaker 3 (01:35:35–01:35:38)
So I don't know if we need Arthur Doyle.
Speaker 5 (01:35:39–01:36:12)
I know that Arthur had envisioned perhaps another site walk with our committee with the consultant who is coming up with the proposed plans so that we might be able to provide as a committee some feedback and guidance to what they actually put in the final proposal? It's a big ask. It's 275.
Speaker 3 (01:36:13–01:36:14)
It's a 275.
Speaker 4 (01:36:16–01:36:21)
Is it? Yeah. It says 275.
Speaker 3 (01:36:21–01:36:22)
Yeah, no, it's in there.
Speaker 9 (01:36:28–01:36:29)
So the notes are coming?
Speaker 4 (01:36:30–01:36:38)
So this is, yeah, maybe it's just, maybe they simply put it on the sheet. Says TBD again. Yeah, it's not.
Speaker 3 (01:36:38–01:36:41)
No, it's 275. It's 275, yeah.
Speaker 4 (01:36:44–01:36:46)
So that's about over the two million or whatever it is.
Speaker 7 (01:36:47–01:36:47)
Yeah.
Speaker 2 (01:36:47–01:37:17)
Mm-hmm. Got it. Yeah, I think we should have… I mean, I think we've done three tonights.
Well, I mean, we've declared one in Alameda. So we're now down to, and essentially we've done four, because we've just got a brief presentation from Rob. Yeah, that's what I'm saying. I don't know, we're up to nine applications, so I think we're in shape.
Speaker 4 (01:37:17–01:37:26)
What I would suggest, though, if you have Kevin come to do the Andrew's part. Yeah, yeah.
Speaker 3 (01:37:28–01:37:31)
Well, and also the town center and the collapsed street.
Speaker 4 (01:37:32–01:37:38)
That might be good to have them all elements. Yeah, absolutely. Yeah.
Speaker 2 (01:37:38–01:37:38)
Okay.
Speaker 4 (01:37:39–01:37:39)
All right.
Speaker 2 (01:37:42–01:38:07)
Let's try to go through quickly the rest of the agenda and then we can release Daryl and go back to the Tamposi discussion. So I don't know. These might be quick discussion CPC public outreach follow up with jack rabbits. You know.
you're always going to connect yeah. That hasn't been done yet?
Speaker 4 (01:38:08–01:38:21)
Okay, that's fine. Well, there was some back and forth a little bit about like, what are we gonna do? Like, do we really wanna do that after that email? So I think it's, I don't know, I guess the question is back to, do we want to do that?
Speaker 9 (01:38:21–01:38:27)
Do we still- I saw Linda's concern about spending money on- Can we just tamp it down a little bit?
Speaker 2 (01:38:28–01:38:55)
Let's wait, let's defer that to a meeting that Linda's at, then we can have that discussion. Instagram, there isn't, Milton CPC Instagram that I set up, it hasn't been extremely active, but you can go to Instagram, Milton underscore CPA, I believe it's called. Check that out. I think I'm a follower.
It's got one follower, Jenny.
Speaker 5 (01:38:55–01:38:59)
Jenny, well done. Jenny.
Speaker 2 (01:38:59–01:39:16)
Milton underscore CPA. I've got that app on my phone. So I use some of the presentation that was made at Tom's meeting, some of the graphics from that. I actually, the last post.
92 followers. I got six likes.
Speaker 3 (01:39:16–01:39:18)
92, that's good.
Speaker 2 (01:39:18–01:39:18)
Wow.
Speaker 3 (01:39:18–01:39:21)
We have 92 followers. 92 followers, yeah.
Speaker 2 (01:39:21–01:39:45)
I didn't know that. So actually, okay, this is working. So we need to, Yeah, but that could be part of the conversation with Jack Rubin if we decide to do it, how to amplify that. So, but that's actually better than I thought.
I'm not sure, what's the difference between a follower and following? We're following 115 different.
Speaker 3 (01:39:46–01:39:46)
Oh, you did that?
Speaker 2 (01:39:46–01:40:35)
Yeah. Oh, okay. So that's one of the ways you get followers. You follow them, they follow us hopefully.
But that's good that we, are up to 92. So a blazing start. So take a look at that. If people have any feedback, let me know.
And I can make changes. If you have ideas for posts, please share them. It could be something we proactively, as we get application or re-evaluate it, we could be posting summaries of, or a lot of times we get a map for the, you know.
Speaker 5 (01:40:36–01:40:37)
Project update.
Speaker 2 (01:40:37–01:41:01)
Pictures of projects. I think that's more appropriate in the final eligibility, final application stage than this early stage, because partly we get more robust stuff to share. I'm a little concerned about that, because does that imply, if we're posting it, does that imply bias towards that project, so maybe we should wait till after recommendations.
Speaker 4 (01:41:01–01:41:24)
Yeah, personally I think they should be like either projects that are in construction or done, I think things need funding. I mean, I'm just thinking too, even like the LED lights that were done at Upper Guile. I just knew like a week ago, the bill that came back was only like 300 bucks, which typically it's a couple of thousands of bucks.
Speaker 2 (01:41:24–01:41:34)
So anecdotes like that was great to say. You know, by the way, great picture of a night game. Yeah. That would be great to post, right?
Yeah.
Speaker 7 (01:41:34–01:41:38)
Do you want to put the applications on the website?
Speaker 2 (01:41:38–01:42:11)
So that is a good point, Julia. I think we do. Yes. I think that is one thing we heard from the Warren committee or, um, and I thought that was a good point.
Um, I don't know if you remember that, but we, we did get pushed on that. Um, and I think, I think we didn't make a commitment to that, but I do think it's a good idea. This is public information once people. submit an eligibility, I think we should be transparent about what we're getting.
So, Julia, I can, we can talk about how to do that. How do you share this?
Speaker 4 (01:42:13–01:42:15)
Or you just put on the, what do you put on her CDC website?
Speaker 12 (01:42:15–01:42:16)
Yeah.
Speaker 4 (01:42:16–01:42:20)
Yeah. So, yeah, it would be in some sort of shared folder.
Speaker 2 (01:42:20–01:42:27)
Do other tenants do that? I think some of them, yeah, Austin does, I think. Yeah. So,
Speaker 4 (01:42:27–01:42:38)
Um, I can chat with see, but I do think it's a good transparency thing and probably also helpful for other applicants that are like, yeah, see, hey, there's.
Speaker 3 (01:42:39–01:42:48)
Yeah, it's not that I was surprised that the limited amount of applications we have this time around.
Speaker 4 (01:42:49–01:43:04)
I do think, you know, to be fair, I do think this having both the way we have it set up is very beneficial, because when they come before us, they may completely change their application to give them. It really does help.
Speaker 2 (01:43:04–01:43:13)
Yeah. Okay. All right. So the last thing or no sign committee updates.
Speaker 4 (01:43:14–01:43:30)
So Pete emailed me. I've been so crazy busy with work as I sit here and do work. So I just got to, Pete, what I would suggest to you is pick a date and I'll pencil it in my schedule somewhere. It won't be the go over it.
Speaker 9 (01:43:31–01:43:59)
So it's you and me and Kathleen. Yeah. I mean, you know, I think we should continue to have a construction sign. And as far as I'm concerned, the one we've got is fine.
So we could order some more dollars and, you know, require everybody who's doing construction to display our sign in a prominent place. So that's very easy. It's more difficult.
Speaker 2 (01:44:00–01:44:05)
Which is almost has to be a kind of case-by-case thing. Do you think it's a case-by-case? Probably, right?
Speaker 9 (01:44:05–01:44:17)
Really? I can't imagine. Or maybe we have not, because I don't think we have what the wording is, you know, what the wording that we put on it, but exactly how they design it. And we might have a couple of examples.
Speaker 4 (01:44:18–01:44:38)
I think more importantly to Kathleen, we're writing, like, whatever their award is, right, that we get that in there. Because there could be some, like, for the four steps, I'm thinking, like, all that work that's there. and the money that we put for that. It's like, okay, then we should put something in there that says, hey, we want a lot.
Speaker 9 (01:44:38–01:44:39)
Right. So yeah.
Speaker 4 (01:44:40–01:44:40)
Yeah.
Speaker 2 (01:44:43–01:45:25)
How specific we get, you know, like when the nonprofit I used to run, we built a building and we have a donor loan. So if we didn't get CPA money, but if we got CPA money, I don't think we would have done a separate plaque. but we would have put the CPA on the donor. So I think that's where we have to be somewhat flexible.
I think we probably do a donor or something. And so it feels a little intrusive to say we have to have a special plaque, especially if we're not. I would say that there has to be permanent recognition.
Speaker 9 (01:45:25–01:45:31)
Yes, permanent recognition. And to be worked out when submitting. I think that's right.
Speaker 2 (01:45:31–01:45:42)
yeah yeah so we'll we'll talk to Kathleen at the next meeting about um so should we we're putting that in the grant agreement so that we have some leverage.
Speaker 4 (01:45:42–01:45:56)
So one question I have so are we we're out of signs for the CPC we're at and so what I'm wondering is because July 1st is coming up very soon. Did you already order one? We should order. We should order.
Speaker 3 (01:45:56–01:45:58)
I was just going to ask about that.
Speaker 4 (01:45:58–01:46:00)
Yeah, I think we should. I think we should order 20.
Speaker 9 (01:46:00–01:46:01)
Let's order 20.
Speaker 7 (01:46:01–01:46:02)
Let's order 20.
Speaker 2 (01:46:03–01:46:11)
I think the design is fine. I agree. I agree. Yeah.
Yeah. OK. All right. So, Julia, thank you.
You can handle that order.
Speaker 5 (01:46:12–01:46:15)
Thank you. There is a sign of Spalding Garden, by the way.
Speaker 2 (01:46:15–01:47:09)
There is? Yes, there is. I'm sure there will be some event there. yeah that they had right because i just happened to be driving by and there was a whole ton of cars which you never see cars parked on that street yeah so i said that must be swallowing garbage the garden club doing what projects may get funded this july right yeah is there a period yet yeah we'll start with this order and quality science yeah yeah i'm sure that there's gotta be something right yeah okay all right so um maybe you don't need to meet maybe we just talk We put this, continue Julie, on the agenda so that's when Kathleen can have a conversation with Kathleen about putting it in the grant agreement.
Putting some kind of consistent language in the grant agreement so that it forces a conversation between the applicant and us about signage.
Speaker 5 (01:47:09–01:47:35)
I would also like to add to that conversation that we consider adding to our grant agreements a requirement for recording. so that poor Julia doesn't have to chase after these folks. And so that we get the… I think it's really, really important that we as a committee are informed of the status of these projects, especially for these that go on for three years.
Speaker 4 (01:47:36–01:47:44)
And there'll be something where it's like, hey, you report back or you'll lose your… That's what it should be.
Speaker 2 (01:47:45–01:48:02)
Julia, for the next meeting, let's put an agenda item that's a broader conversation about grant agreement requirements, including signs and people. And reporting. Yeah. Right.
Speaker 5 (01:48:02–01:48:22)
And that too, that way we would have content for our social media person. Right. And, you know, For anybody who is familiar with grants, that's very, very much a routine thing.
Speaker 2 (01:48:22–01:48:26)
Absolutely. Good. Good suggestion.
Speaker 3 (01:48:26–01:48:36)
All right. Well, he's on the board, and most of the project is going to be parks and rec. So where's your update, Bob?
Speaker 2 (01:48:36–01:50:38)
He just got a locker. All right. Update on CPC member term assignments. So I don't know if anybody else has an update on this.
I know I have had a conversation with Ben Zoll, the new chair of the select board, just letting him know about our concern that the appointments last year were not done correctly in that they were not intended to be all on their terms. So it's a little tricky, right? Because six of us are appointed by a board or commission. And so those, I mean, I'm not exactly sure legally how that goes, but we serve at the pleasure of our board, right?
If the CPC voted tomorrow to replace me as the CPC representative, then I'm gone from this committee and a CPC representative replacement. Yeah, so I'm not even sure that the select board overstepped its bounds by appointing me and appointing you and Rob, because it's really kind of common. Yeah. It's up to their committees to choose who's going to do it.
It should be J3 and Kathleen C. And those should be, in my opinion, rotated. One in one year term, one in two year term. So Ben was sensitive to that.
And I think we should probably just make a formal request that when the select board does the renominations for this coming year, that they keep the one, two, and three year thing in mind.
Speaker 3 (01:50:38–01:50:40)
Did you get a renewal?
Speaker 9 (01:50:41–01:50:57)
I got a renewal. You are? That was a three-year renewal or something. You had that list.
You got a renewal recently? No, not this year, but the last time I was here. No, I just got a renewal. You got one this year?
From that, yeah.
Speaker 3 (01:50:57–01:51:03)
So nine, two, three years. Three years. Three years. Three years.
Three years. Three years.
Speaker 9 (01:51:03–01:51:08)
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Speaker 5 (01:51:08–01:51:13)
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years.
Speaker 4 (01:51:13–01:51:17)
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years.
Speaker 2 (01:51:18–01:51:32)
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years. Three years. Three years.
Three years. Three years They'll put appointments in.
Speaker 4 (01:51:32–01:51:59)
Yeah, so that's, so hopefully that will get done at the next housing authority board meeting. So is the, I mean, so for the individual communities that we represent, for those of us that do, that comes, that's a three-year term, right? Unless that person gets taken out. I can get on that.
Speaker 2 (01:52:00–01:52:07)
Interesting way to put it. I don't know if there is a term for notice, or is it like you said?
Speaker 4 (01:52:07–01:52:08)
Originally, it was three years.
Speaker 2 (01:52:08–01:52:09)
Was it?
Speaker 4 (01:52:09–01:52:24)
Yeah. OK. Originally, that was three years. One citizen was two years, and the other two were one year.
Right. Right. But as you know, many members change. Can you add that to your NIC list?
Speaker 1 (01:52:25–01:52:26)
OK.
Speaker 2 (01:52:27–01:52:36)
Just to see what they're doing. I mean, that's encouraging that you got a three-year renewal, but… I don't know anything else.
Speaker 3 (01:52:36–01:52:43)
I just forwarded it to you, Julia, so you'd have it for your record, so you'd know my date of termination or whatever it is.
Speaker 4 (01:52:43–01:52:58)
And termination is another… But it is interesting because the select board, right, when they, right after spring election, they go in and they reorganize their board, right? But so for the CPC, what happens?
Speaker 9 (01:52:59–01:52:59)
We did that too.
Speaker 4 (01:53:01–01:53:02)
We did.
Speaker 9 (01:53:02–01:53:03)
We appointed you.
Speaker 4 (01:53:04–01:53:06)
No, I know that, but I'm saying your individual members.
Speaker 2 (01:53:06–01:53:34)
We still have to be at the beginning of the fiscal year. I don't know if we have to necessarily that time. We could do it. We could overthrow you.
You can overthrow me any time. Please do. Yes, I'm looking forward to that. Yeah.
I'll also talk to Stuart, just to see how our talents do it. He might have a technical, you know.
Speaker 4 (01:53:34–01:53:44)
I think it makes more sense to keep in the three years because there's so much, like, you would be, you would be, yeah, you might potentially have like a whole brand new committee.
Speaker 2 (01:53:45–01:54:07)
And also to keep it staggered too. So that's why I think they should be three-year renewals for everybody. But we need to get to a system where about a third of the board roughly every year is coming up. That makes sense.
And I think it's good for one of the public members every year to be up. Yeah, for a three-year target and just rotate it.
Speaker 9 (01:54:08–01:54:36)
And the others? they're automatic, you know, so I don't think the select board appoints you, it's your board that does. And whether they let you go for the next 15 years, as long as you're heart conditioners, I mean, continuity is good. To a point.
To a point? Right. Unless somebody gets stale. Yeah.
All right. I will take that.
Speaker 7 (01:54:36–01:54:39)
So he starts falling asleep every week.
Speaker 4 (01:54:39–01:54:42)
I wonder if that really is true.
Speaker 9 (01:54:42–01:54:43)
I can't stand waiting.
Speaker 4 (01:54:43–01:54:54)
Kathleen, I think, might have gotten a re-appointment. Because I think it was on display. Yeah, she did. Oh, she did?
Did she get three years? Do you know how many years? Three years, probably.
Speaker 3 (01:54:55–01:55:03)
Well, I haven't seen her in three years. But I mean, I haven't looked it up on the internet.
Speaker 2 (01:55:03–01:55:09)
And Pete, you think you're up? through 27, I believe. And you're through 28?
Speaker 4 (01:55:11–01:55:18)
So maybe Catherine's up. Next year? Next year. She should be up next year, based on that.
Speaker 2 (01:55:18–01:55:22)
But whether… Maybe she just got a new appointment.
Speaker 9 (01:55:23–01:55:24)
We'll see.
Speaker 7 (01:55:28–01:55:34)
Should be. If any of you have access to the shared folder and saw all the terms are in there,
Speaker 2 (01:55:35–01:55:43)
Oh, okay. Under what folder?
Speaker 7 (01:55:48–01:55:52)
Member information, probably. Term dates.
Speaker 3 (01:55:52–01:56:05)
Member information? Yeah. Member terms. As of last August 2023, it says.
Yeah. Oh, yeah, that's old. So this is old.
Speaker 4 (01:56:06–01:56:09)
That's Ted Carroll on it.
Speaker 3 (01:56:09–01:56:16)
That's Ted Carroll. And Rich. Yeah, this is not too good.
Speaker 4 (01:56:16–01:56:21)
Rich Hall. Rich was on this. Wait, is he?
Speaker 3 (01:56:21–01:56:34)
We're not looking at the dates. Cheryl's on here. She's the newest member. Original planning board representative.
He might have been. He was. Oh, I see. So you have to scroll.
Speaker 12 (01:56:38–01:56:39)
I think this.
Speaker 1 (01:56:45–01:56:48)
Yeah, I'll do this one.
Speaker 2 (01:56:49–01:57:09)
OK. So we can check with Kathleen and see what she was reappointed for, if she was reappointed. And OK. And I'll talk to Serge.
But I think we're making progress on this, at least. All right. Cheryl, I think you can sign off now, if you're still on.
Speaker 6 (01:57:10–01:57:17)
I still am on, yes, Tom, and I will sign off now. Until next time, good night folks. Okay.
Speaker 2 (01:57:17–01:57:19)
Good night, Cheryl. June 24th.
Speaker 6 (01:57:19–01:57:20)
Got it.
Speaker 7 (01:57:20–01:57:21)
Okay, thanks.
Speaker 2 (01:57:21–01:57:21)
Thank you.
Speaker 7 (01:57:21–01:57:22)
Bye. Bye.
Speaker 2 (01:57:28–01:57:46)
Okay, so going just back to the Tamposi application, Beatty, you were expressing a desire that we encouraged them or we instruct them to work with the affordable housing trust for any.
Speaker 9 (01:57:47–01:58:38)
Now that worked for Winter Bell, but that year the affordable housing trust didn't get separate funding. All they got was this and wouldn't trust if, you know, if we were going to give Tamposi money or give trust money to work with Tamposi, Would the trust be mad that they didn't get separate funding? But I think it would be great for them. They're the ones who have the expertise to negotiate.
If they give us $300,000. Are we getting value? Yeah, are we getting the right value? And do we want to get people that instead of at 80%, they're at 60% or 50% we're not in a position to do that.
Speaker 2 (01:58:38–01:58:50)
Yeah. No, I agree. I think we set that precedent. I don't know the answer to how the full trust would evaluate this proposal, but I think that's why we have an affordable housing trust.
Speaker 9 (01:58:51–01:59:04)
But if the money that we're going to grant to Tamposi, if we do, if that replaces the 350 or whatever the housing trust wanted, that helps us with our total budget too.
Speaker 12 (01:59:04–01:59:05)
Yeah.
Speaker 2 (01:59:05–01:59:52)
So you'll have a discussion with the press and as well. It's sort of two conversations. I can talk to Julie. I will talk to Julie and then tell her that this is what we were thinking of doing and get her initial reaction.
Julie is at least one member of the trust that's definitely experienced with this. Through her professional responsibilities, she has seen CPA money do this type of either add extra units or additional affordability. So she's very familiar with this type of negotiation. So.
Yeah, talk to her about it, see what she's saying.
Speaker 3 (01:59:52–01:59:54)
Well, I'm curious why Tamposi didn't go to the trust plan.
Speaker 4 (01:59:56–01:59:57)
It probably just wasn't.
Speaker 2 (01:59:58–02:00:16)
Yeah, possibly not everybody knows about the trust. and housing developers should probably be aware that the town has addressed and has some funding, but, you know, this was maybe, I don't, it's hard to evaluate without having talked to them.
Speaker 3 (02:00:16–02:00:21)
I mean, that seems like a pretty, I mean, they've asked for 500,000, but it's pretty flexible.
Speaker 2 (02:00:21–02:01:28)
So we're in agreement that that's the direction we should go is trying to encourage, not encourage, we can either, just like we did, we required Winter Valley and the trust to work together, we could do the same. It doesn't imply that they're gonna get funding, the private trust, obviously, but we asked them to work together on a joint proposal. I suppose if the trust rejects, I mean, I'm just thinking out loud here, if the trust says, we don't like this, we don't think that is a good use of our money, then. That's up to the trust.
That's up to the trust, but that means it's not going to be a joint application for the final round. Right. And then we have to decide whether we're in a position to work. So if Tamposi has an eligible application, they could decide to still come to us and we can make a final decision in September.
Speaker 9 (02:01:28–02:01:33)
Personally, I go for greater affordability rather than more units.
Speaker 2 (02:01:34–02:01:34)
Yes.
Speaker 9 (02:01:34–02:01:36)
I think that's the problem.
Speaker 2 (02:01:37–02:02:01)
Well, affordability units are pretty high. Eighty percent. Eighty percent for renters is a high threshold. I'm sorry, Rob, you had a question of would we- I'm sorry.
Is that your question? No, it wasn't. That wasn't his. He had a question about Temposey or the trust, or…
No, I think we're good.
Speaker 4 (02:02:01–02:02:27)
We're good. I guess in the future, because you're setting up like a precedent for this, Winter Valley already came. I was questioning, like, should we just have something so we don't have to waste our time or another applicant's time to come before this committee? But it sounds like you don't want to set that precedent regardless because if they don't go in as a joint applicant with affordable housing, you want to leave the door open so that someone could still come.
Speaker 2 (02:02:27–02:03:13)
I think our role at this stage is we've defined it as, is it eligible or is it not eligible? It's definitely an eligible application. We can communicate to him our strong preference is to fund all of the housing stuff through the trust and he can then pursue a conversation with the trust if the trust rejects him for whatever reason, then I don't think we can tell him he can't submit a final application, but the chances of us, if we've already expressed our bias towards funding through the trust, he should know that that's got an uphill battle at a minimum to get funding from us in September, so. I just don't know how absent the trust, how the town would determine
Speaker 9 (02:03:14–02:03:15)
whether we're getting good value.
Speaker 2 (02:03:15–02:03:31)
I think that's their expertise. That is important. That's their expertise and not ours. And there's some good people on the trust.
Yeah. There's some OK people. Some of them are good people.
Speaker 4 (02:03:31–02:03:33)
Some of them are good people, Tom.
Speaker 2 (02:03:33–02:03:34)
I don't know. All right.
Speaker 7 (02:03:34–02:03:38)
Do you suggest that I reach out to Julie or to Camposys?
Speaker 2 (02:03:38–02:03:46)
I'm going to do both of those. I'm going to first talk to Julie. And then based on that conversation, I will talk to him.
Speaker 4 (02:03:46–02:03:54)
To your point, it's more about buying affordability into it and not putting more units on.
Speaker 9 (02:03:55–02:04:16)
Well, that would be my preference, but the trust knows a lot better what's best. But I would like to see some units like what we funded at Winter Valley is allowing some of the units to go down to like 30%. And I would rather see the funds going there. and the 40 B's are 80% units, it's a high threshold.
Speaker 2 (02:04:16–02:04:28)
Which is, in my mind, are the people that are in need of debt. Yeah, so. No, I think this will be a good thing for the trust to wrap their hands around and figure out.
Speaker 9 (02:04:28–02:04:48)
And that kind of reinforces our precedent that we go into the valley, that we want to handle the affordable housing. If Habitat for Humanity came in and then they had a two-family home or something, we might fund them separately. But it could go through the trust also. I think that could go through the trust too.
Speaker 7 (02:04:48–02:04:53)
Anything else you would be animal shelters for the affordable housing?
Speaker 2 (02:04:53–02:05:27)
There's a lot happening, yeah. There was a meeting last night at the top on the review committee. And so probably by next Monday, we'll have a recommendation that's going back to the select board slash Governor Stone and trustees. Can you give us a preview?
What exactly that recommendation is going to say, I'm not sure of yet. We had a pretty good discussion last night. Oh, maybe we should adjourn the meeting. Yes.
Yeah.
Speaker 3 (02:05:28–02:06:26)
One other question, just to make sure, Julia, did you write all, everybody to make sure that they were acknowledged that we received their eligibility? Yeah. Proposal and stuff so they know that they're in review right now. Yeah.
Perfect. I would like to, I sent them an email saying that we were meeting and if they wanted to speak to their applications, they should come to the meeting. But another question I had was, um they're they're going to want to know how to go forward and we don't really have a plan for the funding aspect of um going forward you know because people are well they'll they all will get a letter saying your eligibility for home that's been approved yeah and expect a full proposal by september 26th whatever right so um yeah in that letter it's kind of like you want to tell people what to expect now that they've been Yeah. Right.
So step one, review process. Step two, approved or not approved.
Speaker 4 (02:06:27–02:06:39)
But remember, it's a two-step process. So they come. This is one. They get some feedback.
They're going to come with whatever the funding, which will be a lot more robust. And then you'll give them feedback then, too. And it's not a final.
Speaker 2 (02:06:41–02:07:13)
Yeah, I think what we've done is we've written pretty custom. I mean, they're a template, but we've customized some of those letters based on the feedback that we're getting right here. But we wait until the end of funding. I think we wait to our July 14th.
And just send out all the congratulations. You've been awarded. You've been approved at the eligibility stage. We invite a full proposal.
Speaker 4 (02:07:13–02:07:17)
But we didn't make any. We haven't deemed any tonight ineligible.
Speaker 2 (02:07:17–02:07:35)
for the date submitted now. All right. Motion to adjourn. I guess we can dispense.
Speaker 1 (02:07:36–02:07:39)
All in favor, aye. Thank you, you guys.