Board: Milton Planning Board
Date: 2024-04-16
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:50–00:56)
Good evening and welcome to the 29th meeting for fiscal year 2024 for the Milton planning board.
Speaker 2 (00:56–01:31)
At this time, I would like to now call the meeting to order. We can begin with our administrative items. There was only one set of minutes that were to be approved, but Cheryl is still working on the edits on those. So for tonight, I would have a motion to defer the minutes from Two sets of minutes.
We have, all right, we also have the other. I'll do those for the next meeting. So the waiting of the minutes for tonight and the dates of the meeting again, Julie, do you have that?
Speaker 1 (01:33–01:51)
The ones that were in executive session? That was the 26th. The 26th. Those are before the select board right now.
Those are for the select board. So we're going to motion to defer those. And March 14th and March 28th will be submitted.
Speaker 2 (01:51–02:31)
Okay. And we're just waiting on the edits on those. So if I could have a motion to defer the minutes from 3.14, 3.26, and 3.28. So moved.
Second? Second. All in favor? Aye.
Aye. Thank you. And then the discussion of our next meeting dates, right now we have on the schedule April 24th as our last April meeting. And then May's meeting would be our regular scheduled, unless otherwise changed, to have the 9th and the 23rd of May be the following dates.
Speaker 3 (02:32–02:34)
The 9th may be town meeting day.
Speaker 2 (02:37–02:38)
Oh.
Speaker 3 (02:38–02:39)
OK. Monday, Tuesday, Thursday.
Speaker 2 (02:41–02:57)
OK. All right. So let's defer. We could possibly meet on the 8th then.
if members could meet on the 8th. So it would be May 8th and May 23rd.
Speaker 3 (02:58–03:33)
at this time. Just a note on that and our meeting next week on the 24th. We're going to have to be fully remote for that meeting next week. MATV will be covering I believe the school committee meets on Wednesdays.
I don't have their schedule in front of me. I suspect if they meet on a similar schedule Wednesday On the 8th may also potentially be a fully remote meeting. If not, obviously, we'll have MATV coverage, but we'll keep you all posted after checking in with MATV on that.
Speaker 2 (03:34–03:52)
Perfect. Great. Thank you, Tim. So, for now, we'll leave it at the 8th, but we may need to reschedule and then fully remote on the 24th.
Our next item is any update from our Director of Planning and Community Development.
Speaker 3 (03:54–04:24)
Thank you, Meredith. There is an agenda item later on that we're not going to be able to get to, but I can preview for you right now, relative to the MAPC contract for our East Milton zoning work. I have been talking to Josh Viola over the last couple of weeks, and in order to have enough time to kind of fully execute the scope of an artifact, FAPC is proposing to, if the board, yeah?
Speaker 2 (04:25–04:26)
Your mic, you just faded out?
Speaker 3 (04:27–04:42)
All right, I'm gonna actually plug my camera in in just a minute, and that should do that. Great. So just give me half a second. Is that better?
Speaker 2 (04:43–04:43)
That's great.
Speaker 3 (04:44–06:46)
All right, wonderful. MAPC is requesting to extend the term of the contracts so that they can fully execute the entire scope that we discussed. And the broad outlines that Josh laid out for me was basically being able to have a zoning language deliverable ready for the original term of the contract. It goes like through June, I believe.
And that's going to be important for the grant that's funding this project to be able to have that deliverable. And then to extend the contract, I believe, to November to have enough time to execute on the design guidelines portion of the scope. And that'll be able to be funded through internal sources. We have other grants that don't have a deadline, as well as other MPEG funds for that.
So I think We'll talk about it next week. You'll have the language in front of you. My thinking here is that we want to take as much time to do a good job, but we'll review for next week that contract amendment language, and we can take action on that next week. And we've got interviews lined up for some promising looking candidates for the assistant director position.
Those are going to be happening early next week. So hopefully there'll be news. And then finally, The deadline for the RFP that we put out for consultant services for MBTA community zoning purposes, the deadline for that was Monday. So it's going to be a really quick turnaround on that.
You'll get those probably Tuesday morning from me. Any responses that we get. We'll have an agenda item for Wednesday. If the board can make a decision, great.
If you feel like you need more time or we need to reschedule something, that's also fine. But you'll have that stuff in advance of next week's meeting, but with a quick turnaround on reviewing it.
Speaker 2 (06:48–07:06)
That's great, Tim. Thank you. And so with that, we can now move to our citizen speak. And anyone from the public or on Zoom, Tim, if you can let us know and we can invite them to come in.
Is there anyone who would like to speak this evening?
Speaker 4 (07:14–10:27)
Yes. Hi, everyone. Gene Erwin, 120 Highland Street. After attending a few years of meetings here, it's apparent to me that I think the whole town needs to brush up on our sewer codes.
And I've brought them, and if I may just take a couple of minutes, it may save this board several years of hard work in the future. As I've repeated once before, Massachusetts General Laws, Part 1, Title 14, Chapter 83, Section 1, Authorization connecting sewers and approval of plans. A city or town may install and maintain in any way therein where sanitary sewers are constructed such connecting sewers within the limits of such way as may be necessary to connect any estate which abuts upon the way. Okay, that's the state.
The Town of Milton DPW Public Works Sewer Regulation. Public sewer, and these are definitions, and the first definition is shall. And shall, according to the DPW's rules and regulations, means mandatory. A public sewer shall mean a sewer in which all owners of abutting properties have equal rights and is controlled by a governmental agency or public entity.
the definition of available sewerage. A public sewer shall be considered available when the property upon which a building is situated abuts a street, an easement or right-of-way in which the public sewer is located. If said building is more than 150 feet from the nearest public sewer, application may be made in writing to the board to declare public sewer not available. Then it goes on a little bit further.
Any drain layer in violating of any provision of these regulations shall, in addition to the general penalties provided by the violations of these regulations, in Article 9, forfeit his license. CMR, 360 CMR, Massachusetts Water Resources Authority, 10.007, paragraph 11. The issuance of a permit by the authority shall not relieve the permittee of its obligation to comply with all applicable laws and regulations. I think the state and I think this town is as clear as can be, crystal clear, that Properties like the one at 107 Highland, and maybe plenty of others, cannot attach the sewers to streets that they do not abut.
It's crystal clear. I thank you very much for your time.
Speaker 2 (10:27–10:40)
Thank you. Anyone else from the public wishing to speak at this time for CitizenSpeak? Tim, is there anyone with their hands up on Zoom?
Speaker 3 (10:42–10:43)
There is not.
Speaker 2 (10:45–11:01)
Do you see another's not? Nope. Okay, great. Thank you.
Then with that, we can now move to opening the public hearing at 111 Highland Street, special permit continued from April 9th. Welcome, Ned, to the table.
Speaker 5 (11:02–11:16)
Good evening. For the record, Ned Corcoran, on behalf of North Bridge Communities LLC, who's the applicant in this case. I think you may have forgotten to introduce yourselves at the start of the meeting.
Speaker 2 (11:16–11:23)
I'm sorry, we did. I apologize. Thank you. You know what?
We'll do that real quickly. Kim Davis, member. Maggie Ilfill, member.
Speaker 6 (11:24–11:24)
Sean Fahey, member.
Speaker 2 (11:26–11:35)
Cheryl Tagaia, secretary. And Meredith Hall, serving as chair, and our staff with us this evening. And on Zoom, Tim?
Speaker 3 (11:35–11:37)
Tim Zerwinski, Director of Planning and Community Development.
Speaker 2 (11:39–11:39)
Great. Thank you.
Speaker 5 (11:41–11:46)
Okay. I just want to make sure that I can be properly heard. Is that got to be better, bringing it closer?
Speaker 7 (11:46–11:48)
Yes, that's better, thank you.
Speaker 5 (11:49–12:48)
So thank you. I know that we have had a long and robust set of hearings and meetings relative to the memory care proposal. I think the last thing that we may need to present would be updates to the landscape plan. And I've got Sashie Meisner available to log in.
She's on the Zoom and she can share screen and go through the latest plans that we filed. And I think that's that may be it from our end We'll look forward to Getting into a discussion about the proposed special permit conditions. It would be Imposed with respect to that If there's anything else that you obviously want us to address Please let us know and we'll make sure we do that we'd like to be Obviously as complete and thorough as possible understanding that we have we've set a deadline for closing this hearing for next week. So.
Speaker 2 (12:48–12:54)
Great. Thank you. Yes. Yes, if you want to bring Sasha, is she on?
Speaker 5 (12:55–12:57)
She's on Zoom. All of our team is on Zoom.
Speaker 2 (12:57–12:58)
Okay, great.
Speaker 5 (12:58–13:08)
So there she is. And if she can share screen, we can walk through plans and maybe we could dim the lights in front of the screen, if that would be helpful.
Speaker 7 (13:10–13:14)
Yeah, is that on that side?
Speaker 8 (13:17–15:25)
Hi, everyone. Sashi Meisner, Landscape Architect for the project. As Ned said, we are presenting the plans that we have updated a couple of weeks ago based off of comments that we heard from the planning board and the community members. So I'll just walk you through some of those changes quickly.
And I've been on the last two planning board meetings just listening in. So there's a couple of things I can respond to that I've heard in the discussion that we can clear up. And then if there's any questions after that, we can respond to those. Some of the things that we've done in response to comments are increasing the plantings at the rear of the property.
So we've added some evergreen trees along with the deciduous trees and increased that buffer. There was some comments about that. In addition, we also have, I believe it's 50 feet of woodlands that are not being disturbed between the property line between our property line and the plantings. So we feel that this is a pretty good buffer that we have going there.
So that was one thing. On the plans, one thing that I feel was not super clear on my plans is coordination with our environmental consultant. There were a lot of plants not shown on my plan that were represented on the civil engineering's plan because they were part of the wetland replication, as well as mitigating some of the invasive plant material on the site. So I now updated my planting plan to show those plants, and you can see where Previously, we hadn't had, we just had a space open for this, but I really.
Speaker 2 (15:30–15:31)
We just lost you.
Speaker 5 (15:35–15:36)
Sashi, we just lost you.
Speaker 9 (15:40–15:40)
She's lost us.
Speaker 8 (15:40–15:42)
She wanted 12 trees.
Speaker 5 (15:42–15:49)
Sashi, Sashi, we just missed you for the last 30 seconds. I'm not sure what happened.
Speaker 8 (15:50–15:50)
Okay.
Speaker 5 (15:51–15:58)
So I was just getting started on the planting plan within the wetland replication area.
Speaker 3 (15:59–16:08)
And can I can I can I just say, we did not lose Sashi on the zoom. So I don't know if that's something in the room. I heard everywhere. She said, Oh, okay.
Speaker 8 (16:10–24:59)
So I'll just go back a little bit. Really, we wanted to show, we wanted to, we had to coordinate our plans with the environmental consultant. So he had done some, proposed some plantings on site to reestablish wetlands that were disturbed due to the roadway, the entrance drive going in. And then he had had some plans to add additional plantings where invasive plant material is and where we're removing some of that and replanting.
So I updated my planting plan to show that and I feel like it really reflects more of the quantity of plants that are going into this site. So we have We have a new wetland that's being replicated here. Additionally, there are some plantings that are going into the wetlands that have been approved. And these are part of the removal of the invasive plant material and then reestablishing native plants that will be better for the ecosystem in this area.
So a lot of these plantings along this side in response to that. Additionally, outside of the wetland area, we added plants. We added a lot of evergreen trees, a lot of deciduous trees, native plant material that will be beneficial for the ecosystem, the wetlands, and for screening. I just want to make sure that that was clear.
There is a 25-foot no-disturb buffer zone around the wetland, and this can all be planted. The more plants that go in adjacent to the wetland, the better for the wetland. We have additional room that we have added more plant material along this side within the buffer that is completely beneficial to the wetland as well as providing additional screening for views through the already established woodland area. Additionally, we decreased the height of the street of the lights, the pole lights along the driveway.
So the request was to reduce those. And we did. We reduced them from 16 feet to 14 feet. We're still able to get the light foot candles that are required along the ground plane.
And so there's adequate light But the views into the site, you can see when I show the renderings that it's a little bit more residential in scale. I'm going to just show, we updated our rendering. So one of the requests was to create a more residential style entrance. A lot of the entrances to some of the larger residences along this roadway have nice stone walls that kind of Emphasize the entrance so we did add some of those along the entrance and I think this is really improves the look and feel of the space.
We had requests for showing plant material at a younger. younger growth. And so this is an attempt at doing that. We decreased a lot of the sizes.
The difficult thing with these images is it's very difficult to reflect what's actually out there. And there is quite a bit of plant material out there, a lot of established trees that will be staying. But we've reduced some of the sizes. We provided a vantage from coming down the road and showing the view in from entering the site from the direction of the hospital.
We also have a summer view, which obviously will be much more screened due to the leaves being out. But you can see the roof line from this vantage point. We updated the plant material in the circle. We reduced the amount of trees in here and added one focal tree, a tulip tree, and that was recommended.
We added more buffering along this side within the buffer area, and then we added We changed a few of these plant material, a few of the trees along the side of the building, because when the footprint of the building shrunk, we had additional room to plant. So we could get some larger trees in here. And this also shows the updated windows on the building. This is a view right up the driveway.
So if you're standing here or walking, this would be the vantage point. Or if you're across the street, here you can see the reduced scale of the light poles, which is definitely an improvement. And you can see the way that the sign, this is still in, it's still in design. This is not complete, but this is kind of what they were thinking of.
and having these curved walls and natural stone that kind of just sets off the tone of the residential side of this site and creates a nice entrance. Here is the view in summer. Obviously, getting the actual plant material that's on site has been challenging. We do have some locations, but we don't have a lot of the locations within the wetlands where there are quite a few trees.
We were asked to do a section through the entrance drive showing where we would be planting and the size of the plant material within the first five years of growth. And then trying to, I just used some images from the site. So looking out towards the road, showing some of the plant material at, I think these were between 12 and 15 feet height, and some of the shrub plant material that These are taken from one section and one representation of where this section would look like crossing through. And then I have the photometric plan, which I think you've already seen in our submission.
I did want to mention that at the last meeting, I heard I believe it was Maggie had mentioned how it was unfortunate that a lot of the four-inch caliper trees were being removed because they provide a lot of the screening for the actual site because their canopies are much lower and are kind of level with your eye. And I was just wanting to say how many new trees we are planting that are that height. And so I feel with this planting plan that we have established, I think there's 183 trees that will be either four inch in caliber or greater than seven foot height. Those new plants in this space will provide a lot of that understory level screening that I think there was concern that some of these were being removed or adding back quite a few in there.
So that seems like a positive in my view. So that's all I have. I'm happy to take questions. And I'll go back to the plan in case there's anything people want to reference off of this.
Speaker 9 (25:02–25:35)
Questions from the board on this planning plan? So I have a question on the photometric plan. I went to the cut sheets that were provided to us at the beginning of this application, and I saw a sort of a building wall mount or wall pack fixture, but I didn't see where it is on the photometric plan. And I was wondering if it's accounted for in the, in that photometric plan and where those are planned to be used.
Speaker 8 (25:36–25:42)
Some of those might be down lights in the canopy.
Speaker 9 (25:43–26:08)
I saw that. There's one that's got a building, I call it a wall mount versus the ceiling mounts. And maybe it's in the loading area, so it's not going to be used very frequently. So all of the sort of building level lighting is either bollard or recessed.
Is that right? I didn't see others.
Speaker 8 (26:10–26:11)
You're looking at the B1 and B2?
Speaker 9 (26:11–26:30)
I'm not sure which ones are B1 and B2 because I saw the fixture in the cut sheets but not on this photometric plan. So maybe that fixture is no longer being used or plan doesn't.
Speaker 8 (26:30–26:45)
It would not be used. Those we haven't resubmitted the fixtures because we're using the same fixtures. If there's one that's not accounted for on this plan, then it's not in the site anymore.
Speaker 9 (26:45–26:52)
OK, thanks for clarifying. Question, yeah.
Speaker 6 (26:52–27:17)
Sashi, could you go back to your rendering, showing us the view up the entrance drive? Thank you. Can you briefly describe the retaining walls? Once you get past the natural stone, if you would, please.
So this is what has been described as the ready rock?
Speaker 8 (27:18–27:37)
Yes. Yeah. So with the stone facing on, I mean, not natural stone, but it's the ready rock finishes, which it hasn't been selected yet. But it would be one of them with the texture of a stone.
Speaker 6 (27:39–27:41)
OK. Texture and color.
Speaker 8 (27:42–27:54)
Yeah. Yeah, we would draw off of the stone that gets used for the walls and try to coordinate that with the coloring that goes into these ready rock walls.
Speaker 6 (27:54–28:17)
Okay, so there'll be an intention to match as best you can a ready rock wall to the natural rock. Definitely. Okay. And as that wall reaches the end of the drive and opening up into the circle, the wall on the plan indicates a radius.
Is it really a radius, or is it a segmented wall?
Speaker 5 (28:21–28:30)
I think, I'm wondering whether Paul Avery should answer that question. I'm not sure that, if you can answer it, great, Sashi, but if not, we can punt that over to Paul.
Speaker 6 (28:31–28:46)
Sashi, can you go up to the area that I'm referring to, bring us up the rendering? Great, thank you.
Speaker 8 (28:48–29:27)
Yeah, I don't know the answer to that. That would be a Paul response. I believe it is a radius. Because we had discussions about altering some of the layout to accommodate the radius that this wall can do.
I'm not sure what the difference is from what you were. The question is, a segmented wall versus a radius?
Speaker 6 (29:27–29:39)
Well, I guess my question is, if Ready Rock is just a rectangular-shaped block, it won't look like a radius unless it's cast as a radius to the radius that you show on the plan.
Speaker 8 (29:40–30:24)
OK. Yeah, I'm not sure if they have. I know they have certain limitations with the radius that they can go, because that was discussed. And I'm assuming that these radii are pretty standard parts.
OK. But I don't know for sure. But my gut is telling me that it's a radius and that it was dictated by what Redirock has available and what they're capable of doing, because they would want them to fit extremely tight. It would be difficult to do that if it didn't have an actual radius to it.
Speaker 6 (30:24–30:26)
I understand. Okay. Thank you.
Speaker 9 (30:28–31:21)
Related, I do have a question related to that wall as well. Um, if we, Sasha, if you can go back to one that shows from the street and the, um, The section showed as if the wall construction is the same on both sides of the roadway. The plan indicates a different graphic. I just wanted to ask Paul if the graphic inconsistency is not significant, that it's actually proposed to be the same wall.
C-301 is the plan that I'm looking at. it shows as if the wall type is different on the right side of this image compared to the left side of this image.
Speaker 8 (31:25–31:48)
Tim, I'm not sure if Paul is in the Zoom or not. I do know that the wall on the right is different in that it's lower. It's more flush with the finish grade of the entrance drive, and we have the fence along that side. The wall on the left.
Speaker 10 (31:48–33:04)
Hi. You want me to talk about the wall? I couldn't speak earlier because I wasn't a panelist. I'd raised my hand.
So the ready walk walls, what I understand is, is that the blocks themselves are not curved, but they can set them at, you know, to make certain radii. The wall on the left and the wall on the right, looking at this thing, are different. The wall, the side, and look, this, on the entering on the left, there's a parapet wall that sticks up, whereas on the right, it's flush, and we have the guardrail and the sight fence along the sidewalk. And that's what's shown on the sections on C, whatever it is.
It's one of the detail sheets. Yeah, that's the same thing. Okay, so we've got the parapet on. This is now looking towards the street, so it's the opposite way.
There's the parapet on the right as you're heading towards Highland Street. And then we have the different detail on the left. And all of this was done to just minimize the width of the corridor and therefore minimize wetlands impacts and that type of thing.
Speaker 9 (33:06–33:21)
So the block finish is intended to be the same on both sides all the way to the street? Or is there a point at which it stops being this type of wall on the side, the north side, I think?
Speaker 10 (33:22–34:09)
The finish for the walls is what's shown on the section as a photograph of the proposed finish on sheet. What is it? Give me a second. I can call it up.
Yeah, give me a minute. It is sheet 505. If you want me to share screen, I can call it up.
Speaker 2 (34:13–34:14)
Yes, please.
Speaker 10 (34:15–34:48)
Can you see that? Yes. Okay. So this is what's, you know, the ledge stone texture.
This is what's proposed. And in this photograph, you're seeing, you know, how it bends to form curves. And the section here is the same as exactly what Sashi had on the screen a moment ago.
Speaker 9 (34:51–35:02)
And Sashi said that that wall on the north side is lower and closer to grade. How far is it that way before it's really necessary to use this type of block?
Speaker 10 (35:06–35:09)
I'm sorry, can you repeat the question?
Speaker 9 (35:09–35:11)
Yeah, so can you go to C-301?
Speaker 10 (35:12–35:37)
Sure. So where it's hatched in gray, this is the parapet detail. And where it isn't is the top of the wall is flush, and we've got the site fence and the retaining wall.
Speaker 9 (35:37–35:46)
All right, so the top of wall there is 121, the bottom is 118. So you have three feet. So you don't really need a ready block for a three foot high retaining wall, correct?
Speaker 10 (35:51–36:28)
What we're trying to understand is… We could do it with other materials. We looked at a number of different configurations for the entrance wall here. and went with this particular plan, but I mean, there are a number of different wall products.
The design, we're just keeping it simple and continuing the ready rock wall until basically the amount of retaining that we need to do is small enough that it just becomes part of the landscape wall. So that's about three feet here.
Speaker 9 (36:28–37:15)
Well, we've talked about that entrance. And so what we want to understand is how much of that really is required to be ready rock and how much can be part of that image that Sashi showed with more of a stone wall tied to those curves. Because we're looking at what this looks like from Highland in terms of being of the aesthetic, the ready rock is not, I would say, on par with the stone. And so as far down we can get the ready rock and have the stone extend further, the visual would be better.
The aesthetic of the entrance would be better.
Speaker 10 (37:16–37:55)
So what we're looking at here is a fairly steep embankment. So, you know, right at this particular point, we're ending the wall where, you know, top of 121, bottom 118, you know, that drops off fairly quickly. So, you know, I don't think we'd be able to go another 20 feet. with the landscape wall before, you know, and further the road is rising up.
So the real reveal on the wall increases rapidly. We could get a little more distance out of it, but I don't think like we could go, you know, to the crossing or anything like that.
Speaker 8 (37:56–38:40)
Well, another thing to think about is that the, the ready rock wall, the top of the wall is flush with an entrance drive where the landscape wall is, I think we're at 18 inches or two feet. I forget how. So that would make that wall two feet higher than the 121 because 121 is pretty much not visible when you're coming down the entrance drive because it's flush with the sidewalk. So if we continued the landscape wall, we would be adding more height to that wall.
on that side.
Speaker 9 (38:41–38:54)
So an alternative to bringing the Ready Rock up two feet to be a curb would be to put guardrail there and have the height of the wall lower?
Speaker 10 (38:57–39:01)
Well, we still need to retain earth because we've got to support the sidewalk.
Speaker 9 (39:02–39:27)
Right. But the wall, if it can be below the sidewalk on one side, it could be Below it could stop lower than that what it is now if we went back to that visual and have a guardrail there In place of that right because you're having a pretty steep drop. I'm surprised you don't need a safety guardrail there to prevent a fall
Speaker 10 (39:28–39:34)
We do. We've got the guardrail. I mean, if we zoom in on this, we've got the guardrail shown with the squares.
Speaker 9 (39:34–39:35)
On the other side?
Speaker 10 (39:35–39:38)
And some of the circle line type.
Speaker 9 (39:39–39:42)
Yeah, I'm referencing the other side. Parapet wall side.
Speaker 10 (39:42–39:43)
Oh, the other side?
Speaker 9 (39:43–39:45)
Yeah.
Speaker 10 (39:45–40:14)
Okay. That's a parapet wall that sticks up that serves as a guardrail. Again, you know, objective being that We're doing everything we can to minimize the wetlands impacts, keeping the profile as narrow as possible. If we introduce the guardrail, then we need a further setback to have the wall be flush and provide a guardrail in there.
The wall would have to get wider. The whole corridor would get wider by a couple of feet.
Speaker 9 (40:16–40:18)
Can you go back to the section, please?
Speaker 10 (40:35–40:57)
So the guardrail here, the guardrail needs a certain setback from the back face of the wall. And the guardrail also needs, the face of the guardrail needs a setback from the curb line. so that if we took this detail on the left and put it on the right, the wall would move out and we would increase wetlands impacts and all kinds of things.
Speaker 9 (40:57–41:07)
But it looks like you have two feet there between the wall and the road, which is two, you have 21 inches on the left where you have the guardrail. So you could fit the guardrail in there.
Speaker 10 (41:07–41:36)
Yeah, but the guardrail needs to be set back from the curb further than that. We can't, I mean, I did this like a year and a half ago, so I've gotten what the actual metrics are, but this was the narrowest section we could do. That's why we did it this way, because this is the narrowest and therefore minimizes the wetlands impacts, which we're obligated to do as a limited project to do the crossing.
Speaker 9 (41:37–41:50)
And you're comfortable that the detail on the right meets code? for fall safety. So someone walking on the road next to that. I thought you need 42 inches high.
Speaker 10 (41:52–41:57)
There's no sidewalk there. There's no pedestrians. This is just a vehicle along the side of the road. The sidewalk's on the other side.
Speaker 9 (42:02–42:04)
All right. Those are my questions on this. Thank you.
Speaker 6 (42:05–42:28)
Paul, can I stay on that topic for a minute? I recognize there's no sidewalk on that wall section that Cheryl's talking about, but I see a safety risk here. Probably not an adult necessarily, but you know, young kids. What exposure is the top two block?
Speaker 10 (42:31–42:44)
I mean, how far is it above the grade? Yeah. It's maybe a couple of feet. I haven't called it out here, but it's what would be a nominal guardrail height.
Speaker 6 (42:47–42:53)
Is the Ready Rock, can it be engineered to anchor a railing in?
Speaker 10 (42:57–43:35)
I don't know. Um, you know, we went and, you know, we worked with the ready rock engineer a couple of years ago when we worked up this detail. And, um, at that point in time, um, we were scared away from doing that. Is it possible?
I don't know. I'd have to revisit it. Okay. It's my understanding that we do because the sidewalk isn't there.
That's not a pedestrian area that, you know, this is like, you know, the guardrail on the side of a road where there's no sidewalk. We don't need site fencing there. That's my understanding of the code.
Speaker 6 (43:35–44:04)
Yeah. Well, I guess in light of, I don't want to keep everybody on this topic for too long, but I just raise it as a concern. If that's only a two foot exposure of wall, granted the sidewalk's on the other side, you're expecting people to walk on the sidewalk, but somebody walking on that side of the road, if we only have two feet of exposure of block, we could have a safety issue there, or you could have, or the… I mean,
Speaker 10 (44:04–44:19)
If you look on the left side, the way the site fence tucks in there, it could be provided. I think we could fit the site fence in the space provided, but it's our understanding that we're not required to do it under code.
Speaker 6 (44:19–44:28)
Understood. I'm not questioning code. I'm just looking at it as a risk and what would be a good practice. But I'll stop there.
We can move on.
Speaker 11 (44:29–45:32)
Well, just as a follow-up, since you are in a residential neighborhood, I would think that kids might be out riding their bikes at night. So I have a business in a residential neighborhood and After hours, I have a lot of my neighborhood kids come in and ride their bikes and, you know, families walk in. So I would think they might be riding their bikes and using, you know, your parking lot just as something to do because Highland Street does not have any sidewalks on it. So they might actually be using this site, even though I know it's private property.
But you are part of a neighborhood, so I would think you would expect some neighborhood activity going on. So that'd be my concern. And also, what does the guardrail look like? Is it a traditional guardrail that you see along the street, or is it a more attractive fence?
Speaker 10 (45:33–45:52)
No, it's a timber guardrail. Okay, I'm going to detail it here someplace. I'm not sure what sheet it's on. It's shown on the renderings that we had.
Yeah, but it's a it's a timber guardrail. It's not the metal highway ones that you see. It's, you know, the timber one.
Speaker 2 (45:57–47:22)
So we have examples throughout Milton. Paul of Stone Veneer drives entrances into residential neighborhoods. And they're directly over wetlands, right on wetlands. We have multiple examples we can provide.
This is a residential neighborhood. And for these neighbors, it would be much, much I would have a strong preference to be able to do a stone veneer all the way up the driveway. And then when you really begin to need the retaining walls, transition where it's not visible from the street. Because as improved as Ready Rock is, it's definitely gotten better.
But it still has very much a commercial look and does not fit into this neighborhood whatsoever. So I would really like to see you go back and see if there is a way to do poured concrete. I've spoken with a contractor who does this all the time, just did a project in Milton right on the wetlands. You do have to be careful.
But it absolutely can be done. And I think it would make such a difference on this project to connect. Because right now, it's a very inconsistent look to have a beautiful granite entry and then all of a sudden go to ready rock. It's not cohesive.
Speaker 5 (47:22–47:27)
We're just not gonna be able to do that. I know that's a concern.
Speaker 2 (47:28–47:29)
We're just not gonna be able to do it.
Speaker 5 (47:30–47:31)
We've looked at it.
Speaker 2 (47:31–47:32)
It's a concern because it's mitigating.
Speaker 5 (47:32–47:39)
We've looked at it because you've asked us to look at it, and we don't think that we can do it. And what we've come up with is an alternative that we think is appropriate.
Speaker 12 (47:41–47:50)
Well, I mean, I drove up to Dover to look at your Red and Rock, and it's really, really industrial. I mean, this looks a little bit nicer.
Speaker 13 (47:53–48:00)
But is there a way that you could make the first three or four courses ready run and then on top of that do something face?
Speaker 3 (48:00–48:09)
Because I really… So whoever's talking, we can't hear them on the Zoom. So I don't know if the mic needs to be cranked up or what.
Speaker 14 (48:09–48:40)
All right. My thinking would be, I guess I'm skeptical on two levels. One, I don't think the ready rock is fitting for Highland Ave, a scenic road. And I also don't think that the vegetation is actually going to grow and cover it.
So if we can't create more of a dry bed in front of the wall and put up a lot more vegetation, I would really like to see something done with the ready rock. Whether it's the lower courses stay ready rock, and then above it becomes faced, or something. I mean, just to say we can't do it.
Speaker 2 (48:40–48:41)
I don't believe it can be.
Speaker 14 (48:41–48:45)
I think it definitely can be done. I mean, we filled the big dig. We can do a wall here.
Speaker 2 (48:45–49:04)
Ford Ranch Road, the example, Todd Hamilton's project, tight on wetlands right there. He brought stone veneered, beautiful sort of an entryway into a really nice residential neighborhood. This just does not fit in, I don't think, to Highland Street whatsoever.
Speaker 11 (49:05–49:18)
And my concern is even moving forward if we're setting a bad precedent. Because if we're allowing it here, would we then be allowing it in the future somewhere else?
Speaker 2 (49:20–49:57)
Yeah. Stonebridge Lane did it. Walcott Woods did it. We've been consistent in asking for this.
I think it's inconsistent in this situation to to have a nice stone entryway, and that what we're trying to create is not drawing your eye up and saying, you know what, this is a commercial site in a residential neighborhood. So I feel pretty strongly about that. Other items of the landscape.
Speaker 14 (49:59–50:40)
So I guess going back to the wall and the trees, Sasha, you're still there? Yes. So one of your renderings, if you look, I guess, facing north, the south side of the main entrance, and then as the wall curves around, If you look on the plan, there's the 25 foot non-disturbed zone and there's a very small dry area. And I guess I'm just skeptical that large trees, tall trees are gonna grow in such a small area without hitting the wetlands and then the root ball gets compromised and the tree won't thrive.
Is that way off to assume that or?
Speaker 8 (50:40–51:02)
Anything being planted, I'm not sure exactly where you're talking about, but anything proposed in the 25… Right where your cursor is.
Speaker 14 (51:02–51:18)
Just go down. Pull the cursor. Yeah, right in there. All that area.
I mean, how much of that is actually dry bed and how much of that is wet? And do you think those… What I'm looking for here is tall trees that will block the wall and then a little bit of the building as well.
Speaker 8 (51:19–52:01)
Yeah, I was just going to say, everything proposed within this edge are things that tolerate wet soils, so wet-loving plants. And there's numerous of them. And that's what's proposed through here. So hemlocks, the sweetgum, all of those types of plants are things that thrive in this area and are probably things that are already growing in the wetland itself.
So they will do well in this area, for sure. How tall is a hemlock at typically? Oh, really big, 40, 50 feet.
Speaker 11 (52:03–52:11)
That becomes a maintenance, long-term maintenance because of the woolly adelgid issues. So they'd have to be spraying.
Speaker 8 (52:13–53:22)
You know, that's why we went with diversity. You know, we're not using one species. We've modeled this off of ecosystem. So where you might have some things that are going to struggle.
We've chosen a variety of plant material, variety of heights, so that you really do get the coverage and it's not just one monoculture at one height so that when they all grow up, which is kind of what's in some of the back areas there, you know, everything's grown up and you don't have any screening. at your eye level. All of this new planting coming in, where we're using understory trees that will grow only to a certain height, along with some large canopy trees and large shrub material. All of the combination of layers will make this property better and more interesting to look into, for one.
better screening for whatever is visible on the other side of the wetland woods.
Speaker 2 (53:24–53:48)
And just to follow up to Jim, it does seem, and I understand the Bacardi, you know, the agreement with the Bacardi's to really protect and buffer that. So I appreciate that. But it does seem really sparse along that retaining wall on that interior. And even a little bit, I don't know if there's anything more you can do on Highland Street to protect those neighbors and give them a little more privacy as well.
Speaker 8 (53:50–54:34)
Yeah, I mean, I think because we had such a large buffer that was not being disturbed, we felt that the, you know, bumping up along the Bacardi line where we were close to the property line was a good idea. But where we have all the existing plant material within the wetland that will be remaining and will not be touched, that was kind of our using some of that existing. We did add more plant material along this buffer area. And all of these in here are really to mitigate all the knotweed that's in that area.
Speaker 14 (54:36–54:42)
So would it be possible to expand the dry bed area into the wetlands and then regenerate the wetlands somewhere else on the site?
Speaker 8 (54:46–54:49)
You really want to keep your wetlands established?
Speaker 5 (54:50–54:54)
We can't touch the wetlands without an order of conditions from the Conservation Commission.
Speaker 14 (54:55–54:57)
But you have done it somewhere else on the site, right?
Speaker 5 (54:57–55:24)
We are mitigating the wetlands that are being impacted by adding more area that is wet, but they are just on the north side, plan side of the driveways. We can't touch anything that's wet on the south side of that driveway.
Speaker 14 (55:25–55:28)
You can't because your order of conditions is already established?
Speaker 5 (55:28–55:55)
You can't touch wetland. unless you have permission to do it and you have to have a reason that's legitimate to do it. You can plant, I don't know whether you can plant in it. You can certainly plant within the 25 foot no disturb, which we're doing.
But we don't have any plans to go into the wetlands and touch the wetlands other than some minor impacts to wetlands associated with the stream crossings.
Speaker 8 (55:56–56:10)
They allow you to impact them for access, and that's where we had to replicate them for the access drive. You're allowed to impact them for that, but not for any other reason.
Speaker 2 (56:12–56:21)
So you're saying you could add more trees along Highland Street, though, and you could add more trees along that retaining wall, if you would like?
Speaker 8 (56:22–58:14)
But there's a lot of, you know, I was out on site and was walking through there. There's a lot of trees there. It's going to be really field locating things so that you're not disturbing the root zone of existing trees out there, where we're removing a lot of the, the knotweed and the other invasives, that's going to be an area that's going to be disturbed and is going to need to be planted and filled in pretty quickly. But there are a lot of trees out there.
So to show a whole bunch of vegetation along here that might There might not be any room for it because there are a lot of existing trees within this edge. This is not a barren site by any means. we could street view it and look at the vegetation there. There are a lot of established trees.
We might be able to move some things. I'm showing these plants here, but where they end up is going to be based off of trying to maintain the existing trees and working around what's there. We're going to be field locating a lot of these plants where we're not wanting to remove any additional trees. That was my reservation for showing a lot of plants in here because it's well-established.
And why we should just use those areas that already have a great mature stand of trees there. We should allow those to remain there and not disturb them. Add understory for sure, but where you have a good canopy, better do. use that existing canopy.
All right.
Speaker 2 (58:16–58:22)
Could you point out that there's nine trees that are 20 feet tall? Could you highlight where those are located?
Speaker 8 (58:22–58:46)
I don't know. I'd have to pull up my planting plan. I don't know exactly where they are. I know one of them is the tulip tree.
There's a few down along this edge. I'm not sure exactly where they all are.
Speaker 2 (58:46–58:48)
Are there any on Highland Street, along Highland Street?
Speaker 8 (58:51–59:02)
These are understory and shrub plant material. Which won't really- I know there are some in this area. There are a couple in here.
Speaker 14 (59:02–59:05)
I'm happy with that area. Yeah.
Speaker 8 (59:05–59:27)
But there's a whole ton of- I mean, the majority of trees are within the four inch or greater than seven foot height. So that's in the category of the concom, that's the highest size plant material.
Speaker 14 (59:28–59:34)
And how tall is the wall in the area that we're talking about right now? Right where your cursor is?
Speaker 8 (59:37–59:39)
Paul, do you have the wall heights?
Speaker 10 (59:45–01:00:40)
Sorry, yeah, I do. So this is like by the service area there? Yeah, service area up to the radius. Yeah, well, it varies because the, you know, I can just share again if you want.
It varies because this is sloping down. Hold on. Got it? Yep.
Okay, this is sloping down here. you know, it's, you know, 116 to 135 at the top, and then you get down to the bottom here and it isn't called out, but it's like, you know, in this area, we're 121, 122, and 118, so it's only three or four feet down, you know, in this area in here. But at the radius, it's 19? The radius of the wall?
Speaker 14 (01:00:41–01:00:50)
Oh yeah, up in here. 116 minus 135 is 19, right? Yep. That's a 19 foot wall right there.
Yeah. Ready rock that we're going to stare at from Highland Ave.
Speaker 10 (01:00:51–01:01:10)
Well, I don't think you'll see it from my because you've got all this wooded wetlands area here, so I don't know how you're going to see that from from this is all forest, basically. What about the way we're not showing the trees here, but this is all wooded. I don't think you're going to see it.
Speaker 9 (01:01:11–01:01:13)
What about the winter condition? Yeah.
Speaker 10 (01:01:19–01:01:34)
I'm not sure, but I mean, is the house, the existing house at 121 Highland, 111 Highland, is that one, can you see that from the street?
Speaker 11 (01:01:34–01:01:35)
Yes.
Speaker 14 (01:01:38–01:01:51)
Just barely, but that's not a 20 foot rock face. This is an issue for me. We gotta find a way to get more trees to cover that ready walk or change that ready walk to something a little more palatable, I think.
Speaker 11 (01:01:52–01:02:51)
And the problem, even though the plant material chosen can tolerate wet feet, they don't thrive. Plants don't thrive. having wet peat, so they'll grow more weakly, they'll grow spindly, they won't be full, they won't grow as quickly as if they were in a drier condition. So I feel like that's going to be a long-term maintenance issue.
It's just been wet. This whole season's been a very wet season. So I just think even, the plants are going to struggle. They'll just permanently struggle in that location, no matter what it is.
I mean, maybe the roadies might do the best, would be my guess. But they grow spindly. None of the evergreens are going to do well. Shadblow would be fine.
Speaker 2 (01:02:57–01:03:04)
So I think that retaining wall needs some attention and protection.
Speaker 11 (01:03:04–01:03:17)
Like you never see a densely planted wetland, no matter how many trees are in it. Wetlands are straggly looking, no matter how many trees are there.
Speaker 2 (01:03:19–01:03:23)
OK. All right. Any other comments before we?
Speaker 14 (01:03:25–01:03:25)
No, I'm good.
Speaker 2 (01:03:27–01:03:28)
All right.
Speaker 5 (01:03:29–01:03:33)
So we will take one more crack at it. We've got till next Wednesday.
Speaker 2 (01:03:34–01:03:42)
OK. We'll be looking for your plans as soon as you can. Send them over. That would be great.
Speaker 14 (01:03:42–01:03:48)
We'll see whether it's possible, and if it's possible, we'll do it. Use all your power, Ned. Come on, we're with you.
Speaker 2 (01:03:48–01:04:11)
And again, Stonebridge Lane, Mark Lane, look at all the projects that have. have used a veneer. We're not asking for a solid stone wall. We're asking for a veneer, a concrete covered veneer is all we're asking for in the entryway.
Speaker 5 (01:04:11–01:04:17)
The question is how far in makes sense.
Speaker 2 (01:04:17–01:04:21)
To the roadway, whatever's visible from Highland Street.
Speaker 5 (01:04:21–01:04:24)
And the other thing, just before we move on. That's presumably all the way into the circle.
Speaker 2 (01:04:25–01:04:29)
Basically, that's where I'm seeing it. And that would be a great transition to the ready rock.
Speaker 5 (01:04:29–01:04:31)
What I'm saying is that that's unlikely to be possible.
Speaker 2 (01:04:32–01:04:42)
All right. The other thing is in the permit, which we'll get to, you have a cobblestone apron. But that is, did I miss it? It doesn't seem to be referenced.
Speaker 5 (01:04:43–01:04:45)
It's on the rendering.
Speaker 2 (01:04:46–01:04:50)
But it's not in the, could we add it? Because you have the stone pillars in the permit.
Speaker 5 (01:04:51–01:04:53)
Oh, yes, absolutely.
Speaker 2 (01:04:54–01:04:55)
All right, just so it's consistent.
Speaker 6 (01:04:55–01:05:11)
Yeah, that's fine. Okay. Can I go back just to answer this question, just in the interest of trying to resolve as many things quickly? What is the reason, Ned, that the cast-in-place wall can't be built?
Is that an engineering reason, or is it a cost issue?
Speaker 5 (01:05:11–01:05:21)
I think it's probably a combination of both. But I would defer to the engineer to answer that question.
Speaker 10 (01:05:21–01:06:04)
I think it is both. I mean, the cost implications are significant. But again, we chose the ready rock system because it can be constructed from the inside. And therefore, we don't need to do work beyond the outside of it, which minimizes the wetland impact.
So this whole thing was driven by, you know, minimizing the impact of the project, you know, on the environment. So that's why we have this system. If we start to do precast concrete wall, we will be doing additional disturbances just to build the thing, you know, beyond the face of the wall. I can't speak to the financial implications, but I suspect they're significant.
Speaker 9 (01:06:05–01:07:26)
Well, as I, the line of questioning I had about the height of that south side of the wall is to reduce the amount of visual impact of that ready walk. So, I mean, it would be great if you could, give something on one of these suggestions to you, whether it's stone facing concrete or a different detail on how high that ready rock is coming up. We're trying to reduce the visual impact of a very industrial material. And wetlands interference or impacts are obviously important.
So we're trying to quiz you and have you think about anything else that you can do to address the concern that we have. I think we've had this concern. I've talked about these retaining walls. That's why I asked for the section with the landscape materials.
I was concerned that they wouldn't cover it completely or it would take a long time for it. And the visualization kind of confirmed that in my mind. So I mean, even if there's another finish on the ready rock, The visual the image that's in the plan set is not the most attractive finish if that's the most attractive that they have Even the coloration of it that sort of brown color. I mean these are all important considerations in terms of the visual impact
Speaker 2 (01:07:27–01:07:47)
And I did go on. There are some that are better than others, certainly. But I, again, would save those for the areas that are really those high retaining walls. In the backside, I think the driveway, that needs to be a stone veneer.
And I see it all throughout Milton, so I'm sure it can be done.
Speaker 6 (01:07:48–01:07:56)
Paul, one more question on this. Are you familiar with anybody that makes a gravity block that has a natural finish on it?
Speaker 10 (01:07:58–01:08:38)
Um, I haven't shot the product on this. Um, you know, this was sort of, we came up with in coordination with, um, Erwin, the contractor on it. Um, you know, we typically have gone with, you know, products like Versa lock and things like that. That isn't as good an application here.
I think those finishes vary. We can look and see what alternative products there may be of this type of system that might have better options in terms of the finish. Yeah.
Speaker 2 (01:08:38–01:08:52)
Yeah, this special permit calls for high quality construction materials, which not only include the building, but it includes the stonework, the walls, every aspect of this project in this special permit should be high quality materials.
Speaker 15 (01:08:53–01:08:58)
And it's going to be the first thing we see for a very long time.
Speaker 2 (01:09:00–01:09:06)
Yeah. We will be living with that. OK. Anything else?
Speaker 6 (01:09:08–01:09:46)
Well, I guess one more thing, and Sashi, this might be helpful, you know, to recognizing that your landscape plan shows new plants, and it's hard to depict the existing plants. And I understand what you were saying earlier, that as you prepare that planting plan, you're recognizing what's existing and fitting as much as you can in around it. Do you have photos that you could show us again? I feel like we've seen them already that might help us recognize the density of existing plantings that are to remain.
Speaker 8 (01:09:52–01:11:14)
I don't have, I mean, I could pull up my photos, but if we just, this is street view of the site. we can see what's out there. And these are all pretty good-sized trees, except where the old house was and the barn. But going down here, there's certainly more trees on this side of the road than there are on the opposite side of the road.
And a lot of these are some saplings coming up. It's very mixed traditional woodland. Here, this is that whole area where we have knotweed, which I'm sure is not a very pretty sight. This gets removed.
New plants, shrubs, and understory trees go in. But all of this is remaining. We're not thinning. they've done down at the Bacardi's.
We're not thinning the woodland. We're keeping it all as is. And this is pretty you know, pretty established in there.
Speaker 11 (01:11:14–01:11:34)
Well, just as a note, so you can see, Shawn, like a lot of those trees are already dead. And that's what happens in wetlands situation. Trees don't thrive. They're not full.
You know, and it's woods, and you're going to have a natural dying off of material.
Speaker 8 (01:11:34–01:11:47)
And those are great for wildlife. All of those dead trees are really great for birds and all kinds of wildlife. So in these areas, they're regenerating.
Speaker 11 (01:11:47–01:12:05)
But this is a fully leafed out visual. So if we drive by now, or a month ago, nothing was there. There aren't any evergreens in this view. It's all deciduous.
Speaker 8 (01:12:05–01:12:49)
On the survey that we had, there are evergreens. We do know that there are evergreens further in, not right on the roadway in this upland area. But on the survey, they did note what was deciduous and what was evergreen. And there are evergreens on site.
We can certainly add more along the upland buffer area, we can add more evergreens along the wall if that is desired. This is not wetlands that we're planting in, so they will be dry. Should have no problem surviving this area.
Speaker 2 (01:12:50–01:12:52)
That would be great to add some at that area.
Speaker 16 (01:12:55–01:12:55)
OK.
Speaker 2 (01:12:56–01:13:11)
I think we should move on from this. Now what I'd like to do is open it up to the board on just on other questions that we have for the team here.
Speaker 9 (01:13:12–01:14:14)
So one of the things that you know we should all be aware of is that things that we've talked about most recently are not reflected necessarily in the plan but are reflected in a draft decision as conditions. So the question I would have, Ned, is how many of those things can get incorporated into the plans? For example, the cobble at the end of the driveway. I had made a request for concrete sidewalks rather than asphalt.
I know they're still shown as asphalt. I don't know if the board agrees with me on that. But I'm just thinking about when the building commissioner goes to get a full set of plans, if the plans are inconsistent with conditions that are in a decision, it's confusing. I know that we would put that the decision has priority, but it's still easier to get as much into the plans as possible.
So that, I just wanted to, in looking through those, I wanted to point that out.
Speaker 5 (01:14:14–01:14:40)
I think that if we go through the proposed decision with the conditions that are in it, any additional conditions that want to be, that impose in or we can agree on, we can certainly add details to the plans and submit those, you know, in the near future. I would think that those would be minor details, not minor details, but details that can be added and addressed.
Speaker 2 (01:14:40–01:14:56)
So, just for the purpose of efficiency of time, maybe rather than just opening it up for general questions to each of us, why don't we go through the actual draft of the special permit, and I think our questions will surface as we go through.
Speaker 9 (01:14:56–01:15:16)
Meredith, can we also go through the The memo which compares the zoning and whether the compliance component of the zoning because ultimately that's Do you want to should we do that first? Ultimately we need to make sure that we feel it's compliant with the zoning before we get to a decision, right?
Speaker 2 (01:15:17–01:15:44)
But I thought more specific items might come up doing the permit first and then the memo. or we could do either one. This is when I'm referring to the Ned's memo, which is the 111 Highland bylaw compliance, where he basically went through piece by piece, which was very helpful, Ned, on the special permit, and then how they how they believe that they complied.
Speaker 6 (01:15:45–01:16:02)
Can I go to two specific points before we get into that? Because I'm concerned once we get into that, that'll be hours long to get through that. The service drive, Ned, what is the vehicle traffic that will come down the service drive, either on a per day basis or a per week basis?
Speaker 5 (01:16:04–01:16:28)
I think the total trips that were Identified based on the council were done in Newburyport or 288 trips per day that would be 144 vehicles per day that would be including one or two delivery trucks shift changes and Occasional visitors to the site.
Speaker 6 (01:16:28–01:16:38)
So the the traffic I'm thinking of mostly is a delivery vehicle that's backing down that service drive and How many a day do you think that is?
Speaker 5 (01:16:38–01:16:39)
One or two.
Speaker 6 (01:16:41–01:16:45)
And is there a time of day that that is planned for or can that be planned for?
Speaker 5 (01:16:45–01:17:03)
Absolutely, between, we're proposing in the draft of the special permit I think between 10 and two. Certainly after any of the morning commute and before the afternoon high school mid-afternoon commute. But that's certainly easy to condition.
Speaker 6 (01:17:04–01:17:05)
And two vehicles a day?
Speaker 5 (01:17:06–01:17:08)
one or two deliveries per day.
Speaker 6 (01:17:09–01:17:10)
Is that seven days a week?
Speaker 5 (01:17:10–01:17:11)
Five days.
Speaker 6 (01:17:11–01:17:24)
Pardon me? Five days a week. So it's only Monday to Friday? Correct.
So on the weekends there'll be no backup alarms that the neighbors would hear? Right. Okay. And that's something that you're accountable making part of the conditions?
Yes.
Speaker 5 (01:17:24–01:17:41)
Okay. Separately there's one or two trash, recycling pickup, but that would occur out in the rear parking lot and not down in the loading area.
Speaker 6 (01:17:41–01:20:36)
Okay. I guess separately on traffic, and I don't believe it's going to show up in what you have here. But we've had plenty of conversation about traffic, and we've had conversation about traffic that's not memory care traffic. And the neighbors have talked for weeks, if not months, and maybe it is more like years, about the burden that they've had on Spafford.
There's, I think, an opportunity to reduce some of the burden off of Spafford. And I feel like we could reduce some of the burden off of Highland as well. And what I'm talking about is the hospital business traffic. And I have an interest in having the hospital, and I think the board members would agree.
But I have an interest in seeing the hospital business traffic enter and leave the hospital campus only via Reedsdale. And once that's achieved, we won't see any more photos of linen trucks or air gas trucks going up Spafford. I do also believe there's plenty of issues of traffic on Spafford that has nothing to do with the hospital. I happened to be walking up Spafford a recent evening, and there was a police cruiser coming down Spafford.
So there's plenty of traffic that's on Spafford that isn't the hospital. But my opinion is that if we can have the hospital business traffic and all of the business traffic enter and leave the hospital by Reedsdale, not only does it take that traffic off Spafford, it takes it off all of the ladder roads, and it takes it off of Highland. So I see it as definitely beneficial to the neighbors' concerns with Spafford, but it's also beneficial to take that traffic off a scenic road and away from that intersection that is, you know, Highland and Canton Ave, because that doesn't need any more traffic. So I had a conversation with Rich Fernandez today, and I believe you've talked to Rich today, too.
I don't know how the mechanics of this work, but Rich said he would make a commitment that the hospital would change the terms of the, he would address this within the agreements with the vendors that service the hospital. So I'm not sure how, but I think we can work through this so that this becomes, you know, part of the arrangement that the hospital makes that commitment. I know the hospital's not sitting here and the hospital's not the applicant, but I'm sure we can find a way to do that.
Speaker 5 (01:20:38–01:22:16)
Just thinking preliminarily about that, I think we can certainly agree to a condition that would require us to coordinate with the hospital on its efforts to curb its traffic. My only concern is if there's breakage and it's a hospital vehicle Who, how does it, what enforcement action is available under the permit? Because we can't be held ultimately responsible for enforcement action that might occur because a hospital delivery, doesn't follow the protocol. We're certainly putting ourselves in the bullseye for any failure of our employees and our deliveries to not follow the required routes and that includes fines for each occurrence and that we would be the the North Bridge will be responsible for those fines.
So I'll try to think through how we can manage that, but I'm certainly, look, I can't, it is beyond frustrating to me representing this applicant. to continue to see the videos and the photographs of hospital traffic using Spafford Road when, in my mind, it's a fairly simple management issue to address. And it's certainly burdened our ability to move forward with this project with this board.
Speaker 6 (01:22:16–01:22:47)
Yeah, I'm not, you know, I'm not here to beat up the hospital. I think the hospital has taken a pretty good beating. And I'm not sure that all of it's deserved. I appreciate Rich's commitment today to try to do something that he feels like he can do for the neighbors.
And I'm confident that, and it may be an overtime thing, right? I mean, it means retraining drivers, retraining vendors, and making sure, and yes, It might take a little while to get them all there. But.
Speaker 2 (01:22:48–01:22:48)
Signage.
Speaker 6 (01:22:49–01:23:26)
Signage. Signage. Certainly. Yeah.
I think there's. Surveillance. Yeah. There are ways to do it.
Rich all acknowledged that yes, compliance is a challenge. And you know, I have a leadership role in a company too. I understand what it's like. And you can get there.
It just, it takes a little work. It might be a little bit hard. But I'll leave it to you to have a conversation with Rich. And I honestly appreciate his commitment to make that condition better.
That's one that he feels is within his ability to control and improve, and he's committed to doing it. And I was grateful that he did.
Speaker 5 (01:23:26–01:24:15)
That's great, and what I can say is that I've spoken to Jim and Wendy about this as well, because they did speak with Regulate this afternoon, and they are on board with committing to some form of a condition that would require them to work with the hospital to help mitigate the traffic issues that are happening. Their concern obviously as I've addressed is you know, it is an enforcement ability to enforce and how do you enforce against? This entity when this entity isn't responsible But we'll work on that and I'm happy to try to draft a condition for review next week And we will continue to work with the hospital and try to find ways to make it better Thank you
Speaker 14 (01:24:18–01:24:24)
All right. So that's a great phone call. I didn't realize that happened. Nice job.
That makes me feel a lot better.
Speaker 6 (01:24:25–01:24:39)
You know, honestly, Rich is challenged, right? He's trying to do what he can. And this is an area where he feels like he can do something to help the neighbors. So he's willing to do it, and we'll figure it out.
Speaker 13 (01:24:40–01:24:41)
Well done.
Speaker 2 (01:24:41–01:24:58)
Great. All right, so why don't we go? I think we should go through the permit, because it's more specific on There's more detail in here to go through this first and then go through the memo. Does that sound good as questions arise?
Speaker 9 (01:24:59–01:25:46)
Or did you feel a reason to go through the… I just would point out that there are some of the site design standards and building design standards that are more subjective and I think that's where when we look at a decision in terms of what conditions we place on it. It's in the context of those subjective parameters. So we don't have to go through necessarily all of the things that are, does it meet the front setback and the rear setback and so forth.
I would think that if… You would prefer to go through the memo first. At least the standards, the design standards, if… All right, if everyone's amenable to that.
Speaker 2 (01:25:46–01:25:55)
Tim, could you pull that up? The April 5th compliance bylaw from Ned.
Speaker 9 (01:25:55–01:26:02)
And I can get to the page which is the standards.
Speaker 3 (01:26:04–01:26:05)
Mary, do you want me to put that up?
Speaker 2 (01:26:05–01:26:06)
All right. Yes, please.
Speaker 9 (01:26:13–01:27:02)
Yeah, because page 1, A and B, C. Yeah, well, actually, it's more than just the standard. So if we look at, I would say starting with OpenSpace, so where the language says that OpenSpace you know, should be left in its natural state or landscaped. And then there's percentages and there should be, you know, trees of certain height.
I guess that's where, when we get to the planting section of the decision, We can refer back to this and decide whether. So that's the top of page four.
Speaker 2 (01:27:03–01:27:09)
Top of page four is where we're starting. Tim, if you want to scroll to the top of page four.
Speaker 11 (01:27:10–01:27:14)
It was from maybe from Tim.
Speaker 9 (01:27:16–01:27:48)
And this idea about the view. So when we're thinking about the planting plan and the landscaping, we can look at this and where the zoning itself, the language that is, um, I guess the standard text, not the italicized is taken from the zoning language itself. So where it says that, um,
Speaker 2 (01:27:51–01:28:03)
Which shall enhance the prospect of the building viewed from outside. Exactly. And provide alternative views from within the building. Attractive views.
Attractive views from within the building.
Speaker 9 (01:28:03–01:30:30)
So that's where we have judgment to make about the driveways and the sidewalks when we think about the materials. Two, I think we can refer to that. So that's… And then I think…
when we look at what's been proposed for parking, the parking requirements here, you know, have, we've delved into this quite a bit and they reduced the number, but again, this is what we can refer back to. And then keep scrolling, Tim, on the sign, which is on the top of page five, Again, the design materials, appearance of the sign, the final signage design would be outside of this process, but certainly our input into how it's integrated into the entrance I think is important. So that's where it's referred to here. I'm just tying back the things that we've been discussing to the actual zoning language itself.
I'm going to keep scrolling down to design standards now at the bottom of page five. Item 10. Item 10, right. So this is something we've talked about quite a bit, the existing terrain, the earth moving and retaining walls.
Again, this is where it's a balance between impact to the wetlands and cut and fill and retaining wall. But then it becomes a question of, have we hit the right balance? And what are those retaining walls, at least in my view? And then the existing significant trees and growths of trees and natural features to be preserved and integrated into the landscape.
Again, this is why we've been talking about this quite a bit and the conditions we can continue to think about with respect to that. The driveway, the layout, to avoid extreme cut and fill again there.
Speaker 5 (01:30:30–01:30:41)
Could I just jump in just to correct one thing in that compliance on trees. I re-reviewed the order of conditions today. The requirement is 3 1⁄2 inches, not 4 inches.
Speaker 9 (01:30:44–01:30:57)
For every tree with 3 1⁄2 inch caliper? Correct. Okay. And you have a calculation on the plan set that we have.
of how many trees are being removed, the caliper total, how many are being provided, right?
Speaker 5 (01:30:58–01:31:23)
I think that's right, yeah. I do know that as part of the order of conditions, we have to provide an accounting of every tree that is actually removed, and we have to provide that to the conservation agent. and that will ultimately define the replication that's necessary or the payment that's necessary.
Speaker 11 (01:31:26–01:31:41)
So my question is when they make the payment, does that go into the Conservation Commission's account or does that go into Town of Milton like general fund and then who then gets a say as to where those trees get planted in town?
Speaker 5 (01:31:42–01:31:47)
That's a good question. I don't, I think.
Speaker 11 (01:31:50–01:32:22)
Because if the trees are being removed from this neighborhood, I would think they should be replaced in this neighborhood. And even if it's a long, you know, people's Private property because Spafford doesn't have in particular does not have a sidewalk So they don't have a public tree lawn area. So I would think that maybe trees would then be You know on private property if people want to raise their hand and ask for trees We're happy to plant
Speaker 5 (01:32:24–01:33:07)
Because every tree we plant is a tree that we don't have to pay for. But specifically, I don't know where that fund is maintained. It is presumably, it's not subject to the general fund. It is a specific account that's used to then acquire and plant trees in other parts of town.
Where those go, I have no idea, I really don't. But I don't have, I tend to agree with your thought that we should plant as many in the neighborhood as possible, and that would be, obviously people would have to be willing to receive trees, but we'd certainly be open to that.
Speaker 9 (01:33:10–01:34:44)
Okay, so driveways, again, talking about the existing terrain and landscape features. And the width, the construction, the lighting of those access roads and driveways. So again, our focus on that is really tied back to the design standard. Then scroll down to D, the creation of an attractive initial view from existing streets and neighboring properties in harmony with the neighborhood.
Again, that's what we're talking about quite a bit. E, the building being located and oriented to be compatible with the terrain and features of the land. We've talked quite a bit about that. I think that that's not something that there's really condition can be related to, but the parking areas.
The landscaping and lighting related to the parking areas, again, topics of conversation quite a bit with us. Sustainable practices, one of the things I would say here is that the lighting controls are an important part of the site sustainable practices. Energy use on those, and we'll talk about those controls a little bit further, I think, in the conditions. the use of environmentally friendly materials.
I think, Sean, this can get to what you had suggested, perhaps using pervious pavement at the rear parking lot. So that, again, ties to one of the design standards here.
Speaker 11 (01:34:45–01:34:59)
Sorry on that. So the town is looking to adopt the enhanced stretch code. So would this be subjected to the new enhanced stretch code.
Speaker 9 (01:35:00–01:35:09)
Like that stretch code, if it were to pass, I think it would be probably the January effective date.
Speaker 11 (01:35:09–01:35:10)
Isn't it coming?
Speaker 9 (01:35:11–01:35:29)
It's in the Maytown meeting, but I don't think you can make it effective as of July. There's only two dates in the year that you can make it effective, and I'm pretty sure it's July and January. And if it's adopted in May, I don't think you are allowed to make it effective in July. So it depends when they are able to file for the building permit.
Speaker 11 (01:35:29–01:35:45)
But if it went- So it's at the time of when the building permit gets- Correct, yeah. So it probably, it takes what, three months for the EEG's office to approve the bylaws. So if it gets approved in May, then it doesn't come into effect for at least 90 days?
Speaker 9 (01:35:45–01:36:12)
I think it's probably January effective date. Because you usually have an effective date a bit of a gap because some people who are working on their documentation would have to basically, they need this kind of period to build up to it, to prepare for it in the building department as well. But I'm pretty sure that's in the information that Sustainable Milton put together in terms of those dates.
Speaker 11 (01:36:13–01:36:41)
Because I would think if the town of Milton as a whole adopts it, then that's, you know, because I'm your Climate Action Committee representative. And so if the town of Milton adopts it, then I would think that this project would want to, it's all happening in this one same year that we're adopting it, and this project could be pulling permits.
Speaker 9 (01:36:41–01:37:12)
Yeah, I mean, this project's subject to the updated stretch code. Right, which is in July 1st. I mean, I imagine that they won't be filing for the building permit by then, but I suspect that the difference between the two, there's going to be some differences. But the stretch code, as of July, will put into place, I think it puts into place controls for lighting.
Don't quote me on that.
Speaker 11 (01:37:12–01:37:34)
Well, even like going electric, the whole build. You know, I'm just thinking if the average homeowner, you know, if it gets adopted in town, if the average homeowner is subjected to the advanced stretch code, and I'm not taking a position one way or the other, if it gets adopted, then I would think that we would want our municipal buildings and our new commercial buildings to be subjected to it.
Speaker 9 (01:37:35–01:37:50)
They're mandated to be. It's not just a residential, it's commercial as well. Right, commercial, yeah. Yeah.
So this particular piece is referring to the site, but there's another part on the building for sustainability here as well.
Speaker 2 (01:37:51–01:38:02)
The last sentence, the use of environmentally friendly materials will also support the enhancement of indoor air quality and reduce life cycle costs.
Speaker 9 (01:38:03–01:38:03)
Right.
Speaker 2 (01:38:03–01:38:05)
And the building envelope is referenced.
Speaker 9 (01:38:06–01:38:29)
Yeah, so that's going to be in the building portion as well. On the landscaping. Thank you, Sasha. You are a landscape architect and you've been preparing the plan.
So that is a zoning requirement. Again, the screening of the building and the parking areas when viewed from off site. It's a requirement in the zoning.
Speaker 2 (01:38:30–01:38:42)
I'm going to keep going down. in a manner that will enhance and screen the view of the building and parking areas.
Speaker 9 (01:38:46–01:40:31)
Then I think from here I'd like to scroll down to the building design standards and number 11. So the pieces that we need to look at in this section Is the building consistent and coherent in all its elements and compatible with its surroundings and form, scale, and massing, and treatment of all facades in a consistent manner? The scale of the building not overpowering its site or context, having an inviting and human scale. Let the entrance be distinctive, principal entrance.
That windows and doors have appropriate detail. and be set back or protrude forward. We haven't talked about some of these details in the architectural, but they are here. And then the exterior lighting on the building itself, which we spoke about a little bit, the roof lines, and then building materials being of high quality, traditional materials and colors.
So we need to talk about that a bit. This is where the unrelieved flat surface is on the facade and the windows. And then something that we haven't talked about, it does say here that compressors and other mechanical equipment for systems in the building shall be visually screened and audibly buffered so as not to exceed 50 decibels. So I don't know, Nat, if you have any information on the The only piece of equipment I can think of at the moment is probably the generator.
Speaker 5 (01:40:32–01:41:18)
But if you had some… The generator will not be on the roof. That's in a well on the backside of the building that's pretty well buffered. There are mechanicals proposed for the roof.
They're in a roof well. It's an obligation as part of the certificate of compliance, really, that when operating, The noise levels are at or below here. That will be a subject of review by the building commissioner, both with the submittal of plans and obviously when they look for an occupancy permit.
Speaker 9 (01:41:18–01:41:27)
Yeah, I just think that where we're granting a special permit, we would want to say that that's a condition that be reviewed and approved by the building commissioner.
Speaker 5 (01:41:27–01:41:28)
I think that's fair.
Speaker 9 (01:41:29–01:42:07)
Okay. And then on the sustainable building practices, you know, part of this is material use. Part of this is whether you have an all-electric building. You've already said you're not planning to put in solar panels.
It doesn't make sense. But it might make sense in the future. So we could make a condition that it be solar ready, which is part of the new stretch code, the specialized stretch code. That would take into consideration roof loads, the design of the structure of the roof, as well as the electrical infrastructure.
So that could be a condition that we consider.
Speaker 14 (01:42:08–01:42:11)
So how would it be ready for solar in the future?
Speaker 9 (01:42:12–01:42:16)
You have, while your roof is designed to take the load of it.
Speaker 14 (01:42:16–01:42:22)
I'm sorry, I'm sorry. I'm afraid it's a question. How would it be attractive for solar in the future if it isn't now?
Speaker 9 (01:42:23–01:43:06)
What would change? You could have tree loss. You could have someone changes the, I mean, they have one company analyze it. There could be another company that comes and analyzes it and has a different take on it somewhere down the road.
I mean, the technology continues to change. Just because I know, Meredith, you want to get to the decision itself. I'm going to try to quickly get, that's it. The rest of this is what they submitted to us in terms of what the requirements were, which I believe they submitted everything we've asked for.
So that's it. Yeah. That's a nutshell.
Speaker 2 (01:43:06–01:43:12)
I'm just going to re-emphasize high quality materials to be used.
Speaker 7 (01:43:16–01:43:20)
OK.
Speaker 2 (01:43:20–01:43:43)
Yeah, then we can go through more. The architectural. Anything else that people wanted to add that stood out? Yeah, I guess H on page 11 is something to highlight that I've.
OK. OK.
Speaker 7 (01:43:47–01:43:52)
Great, all right.
Speaker 2 (01:43:53–01:44:06)
Okay, so let's start, then let's go through, because I think we'll be able to address many of these items. Tim, can you pull up the special permit and site plan approval draft that NED has provided?
Speaker 3 (01:44:14–01:44:16)
Just give me half a second. Sure, thank you.
Speaker 11 (01:44:52–01:44:57)
Much better.
Speaker 16 (01:44:57–01:44:57)
Yeah.
Speaker 2 (01:45:00–01:45:16)
OK, great, Ned. Sorry. The screen is behind me, so it's all right. So in walking us through this, most of this is boilerplate page one here.
I don't know if anyone had any questions.
Speaker 9 (01:45:16–01:45:34)
On the page one and part of page two, where it's a list of what's incorporated, it's listing plans, but it's not listing other reports. like the construction management plan, the tree preservation plan?
Speaker 5 (01:45:35–01:45:38)
Those are identified as separate exhibits.
Speaker 9 (01:45:38–01:45:41)
Okay.
Speaker 11 (01:45:41–01:45:43)
Which page is that? Sorry.
Speaker 5 (01:45:43–01:45:44)
On page three.
Speaker 11 (01:45:44–01:45:45)
On page three?
Speaker 5 (01:45:46–01:46:04)
There's a construction management phasing requirement. It's exhibit C. Tree preservation protection is exhibit D. Those we would simply attach to the plans that were submitted.
Unless they need to be amended.
Speaker 9 (01:46:06–01:46:41)
So just I'm just looking at the language. So it says that under the drawings, it says that they're incorporate that the permits incorporated the plan set down below. Does it say that those are actually incorporated? those other documents being incorporated into the site plan approval?
Because everything gets lumped together under site plan. Every single document. So I just want to make sure that it's actually in the definition of site plan that all of these documents are included.
Speaker 2 (01:46:49–01:46:56)
I think it does. The permits incorporate a plan set entitled containing the following sheets.
Speaker 9 (01:46:57–01:47:22)
It's the sheets, but it doesn't say containing the construction management plan. So we have to look at the language down further. It should say following sheets and construction management plan or that you're just using that as the example. I was using it as an example because then it says what Ned's referring to on page three.
I'm just trying to understand how that's actually becomes incorporated into the site plan.
Speaker 5 (01:47:22–01:47:47)
If you look at the first sentence in the first paragraph on page two. The documents listed above comprise the site plan. Which is incorporated into the permits by reference and made a part of the permits as Exhibit A. And then I relist them on Exhibit A.
And it includes the Conservation Commission's order of conditions.
Speaker 2 (01:47:49–01:47:59)
and the common wetland bylaw.
Speaker 7 (01:47:59–01:48:00)
Does that?
Speaker 9 (01:48:00–01:48:15)
Well, I'm just trying to understand. We can look at this a little further. I wasn't sure that what the way it's phrased down later, saying that that's a requirement is the same as incorporating them into the site plan documents.
Speaker 5 (01:48:16–01:49:15)
This is the way the Walcott Woods permit was drafted. And that's the most complete special permit that I think has come out of the planning board. And so I use that as the starting point for the draft. I didn't change anything that didn't need to be changed, but I can enhance some of that to make it clearer that, But I did, so for example, in the Walcott Woods, the plans were all listed and those were identified.
And then separately, there was an exhibit, you know, an exhibit C for construction management and phasing. There's an exhibit D, tree preservation. They are still incorporated clearly into the obligations of the permit, because the permit has to read overall as a consistent document.
Speaker 9 (01:49:16–01:49:18)
Thank you.
Speaker 11 (01:49:21–01:49:24)
I have a different topic. Is that okay? Are we done with this topic?
Speaker 2 (01:49:25–01:49:26)
I think so. Does that clarify?
Speaker 11 (01:49:27–01:49:33)
So under enforceability and enforcement… What page are you on? Oh, first page. Okay.
Speaker 2 (01:49:36–01:49:37)
Second paragraph.
Speaker 11 (01:49:37–01:51:46)
Yep, second paragraph. It says the requirements are independent obligations of the applicant and run with the land as an obligation of all subsequent owners and leases. So a lot of this, the permit was all based on who the applicant is today. So it has, testimony has been given to us as This is a company that is highly respected, that they are good neighbors, that they care about the community in which they do business in.
So my question is, because this whole permit and bylaw was based on the applicant, What happens if the applicant is no longer, the owner is no longer this owner? So that's, I'm struggling a little bit. Again, it goes back to what was presented at town meeting. And there are a lot of not good operators out there.
So how do we know who they're gonna sell to and when they're going to sell to? And I know they're gonna have to follow the special permit if a special permit is granted. But it just, I think it needs to be pointed out that we don't know who our neighbor, and the neighbors don't know who their neighbor could be in five years or 10 years. And I think that's kind of a challenge.
Again, we talked about steward healthcare. Who knows who's gonna come in and buy this? So I think that is an important thing to pass, not to look over and pass over. The potential is there for somebody who's not as reputable.
That's it.
Speaker 2 (01:51:46–01:51:49)
It says it shall be enforceable in court by the town.
Speaker 9 (01:51:51–01:52:01)
I think Maggie's getting to its applicant, the successors or assigns, right? Yes. All right, flag it for now.
Speaker 11 (01:52:01–01:52:03)
That was just my, I'm pointing it out.
Speaker 9 (01:52:04–01:52:39)
Good. I did have something on page two, and I think Meredith, you did too, which is the paragraph right after the numbered. If modified, it's the second to last sentence, if modified in that process, the site plan, SO modified, and the process referring to DEP, shall become the final site plan, a copy of which shall be provided to the board as a minor change. My suggestion is that it would be provided to the board for determination to whether it's a minor change or a change requiring an amendment.
Speaker 2 (01:52:40–01:52:43)
Yes.
Speaker 11 (01:52:43–01:53:04)
And just also like strict compliance, I've run into that issue before, the definition of strict. Is it strict or is it substantial? Substantial. So, you know, I don't have an opinion, but there is a difference there.
Speaker 17 (01:53:06–01:53:10)
Would you like me to be editing this as you go along, or are we?
Speaker 9 (01:53:10–01:54:03)
I think if you, maybe you could just highlight, Tim. I don't think we have to change language on the screen. But yeah, if there's proposed language. The one thing that we ran into previously, I think it was with the 131 Elliott Street when it said strict compliance.
If you have a product manufacturer change, because maybe that product's no longer available, it had to come back. And then we've modified that special permit to change it from strict to being substantially, in substantial compliance. And then gave the, It's Tim or the person in that position, the authority to decide whether it was substantially compliant or not. And Tim brought things to the board for consideration as he felt appropriate.
Speaker 2 (01:54:04–01:54:09)
And I think we would want that opportunity to determine if it is a minor change.
Speaker 9 (01:54:10–01:54:23)
But strict really means you're going to have to come back and do an amendment for something that could be pretty minor. Whereas substantially means you could treat it as a minor change versus an amendment. That's the way I understood it.
Speaker 5 (01:54:27–01:55:31)
I am reminded by Jim and Wendy that they are separately subject to very strict protocols under the control of the State Office of Elder Affairs, and any transfer of interest in the property would be subject to a review and approval by that office. It's not simply handing off to somebody else, that next operator would have to be certified and have a track record with the state in order to be able to take that role on. Having said that, 20 years from now, you're right, it's very possible that at some point, somebody else is operating. But for the foreseeable future, it's Evita, Milton.
I did notice maybe a little levity at the moment in the first full sentence under enforcement. Spellcheck didn't correct.
Speaker 6 (01:55:32–01:55:34)
There's an extra S there, isn't there?
Speaker 5 (01:55:37–01:55:40)
I got it. Spellcheck doesn't correct words that are spelled properly.
Speaker 3 (01:55:45–01:55:47)
There's a family public hearing, everybody.
Speaker 2 (01:55:56–01:56:00)
All right, so we'll change that. OK.
Speaker 6 (01:56:00–01:56:01)
I have a question.
Speaker 2 (01:56:01–01:56:01)
Yep.
Speaker 6 (01:56:01–01:56:07)
If we're only flagging, when will we get around to adjusting language?
Speaker 9 (01:56:08–01:56:18)
Well, I haven't prepared any language change. I've just flagged. So I'm not prepared. But if you are prepared with language change, I think we could show it if anybody else is prepared for it.
Speaker 5 (01:56:22–01:56:24)
I think we'd appreciate that opportunity to do that.
Speaker 9 (01:56:26–01:56:34)
Otherwise… I'd rather run through the whole document first, and then if we have time, come back and work on language. Determining what… Unless somebody has language already prepared.
Speaker 5 (01:56:35–01:56:57)
Or if you have… If you flag issues and concerns and you have a thought about what a condition should read, that'll give me time to work on language and get to you within the next couple of days so you have a chance to review it. That's fine. And any additional…
Yeah, any additional conditions that you think should be imported into, you know, we'll work on those.
Speaker 9 (01:57:01–01:57:30)
And then in this under the paragraph determination of compliance with standards and grant permits, the last sentence says no construction shall deviate substantially from the requirements without the approval of the planning board. I think we might want to think about what our definition of substantially is. In my experience that the building department had approved some changes that later the planning board, the thought should have come back to the planning board. So it's just something for us to think about.
Speaker 2 (01:57:31–01:57:47)
So in that record read, no construction shall deviate from the requirements without the approval of the planning board. And then we determine whether it's issue, but there are minor things, too.
Speaker 9 (01:57:48–01:58:09)
Again, maybe we could give an example of what we think is substantial or insubstantial as a guide, but I don't have an answer. I just wanted to point it out as something for us to think about.
Speaker 2 (01:58:12–01:58:14)
They changed the material of the walls.
Speaker 11 (01:58:15–01:58:27)
Exactly. Or like at Goddard, you know what I mean? They had that jagged hardy board. Yeah, the shingles.
Speaker 2 (01:58:27–01:58:30)
Wasn't great.
Speaker 11 (01:58:30–01:58:37)
But that probably would have been considered OK, because it wasn't too substantially different.
Speaker 2 (01:58:43–01:58:45)
So do we have a preference on how this should read?
Speaker 6 (01:58:47–01:58:54)
Well, why don't we follow what Cheryl had suggested earlier? Let's go through all of it, capture what we want, and then go back and see if we can.
Speaker 2 (01:58:55–01:59:17)
Because I would be more concerned about materials on that. All right. So that's flagged. OK.
All right, on three. So traffic mitigation. There were a couple of conditions that we had talked about with Sean Reardon.
Speaker 9 (01:59:18–01:59:44)
So if you keep going in the document, I kind of got caught into this too. Meredith, on number 15, it has conditions. Yes. So this is just referring, I think, to the document.
Is that right, Ned? In general. that the requirements include these particular plans, but then later you can address conditions related to these, it looks like.
Speaker 18 (01:59:46–01:59:47)
I'm sorry.
Speaker 9 (01:59:47–02:00:01)
So I'm just confirming that here you're just listing these as required documents that are required to be followed or enforced. Later you have conditions related to these topics. Correct.
Speaker 5 (02:00:01–02:00:03)
And the conditions should probably be
Speaker 9 (02:00:04–02:00:05)
Cross-referenced here?
Speaker 5 (02:00:05–02:00:07)
Cross-referenced into the exhibit.
Speaker 2 (02:00:07–02:00:14)
That's what I was… So I'll let you determine how that was cross-referenced.
Speaker 5 (02:00:14–02:00:21)
Yeah, I was kind of struggling with how to manage that, but I think I have a… Yeah, that would be helpful. I think I have a better sense of it.
Speaker 9 (02:00:21–02:00:23)
I think for all three of those, the numbers two, three, and four.
Speaker 5 (02:00:23–02:00:26)
Right.
Speaker 2 (02:00:26–02:01:04)
Authorized development, I don't think I have anything. Did anyone have anything else on three? I mean, I think D is to be determined, but… Yeah, so in three?
Yeah. But in this format, I think it's appropriate to leave as is. And this does have any change to the architectural design of the building shall be subject to review and approval of the planning board.
Speaker 9 (02:01:05–02:01:08)
I'm sorry, which one are you looking at?
Speaker 2 (02:01:08–02:01:15)
Sorry, on D. Oh, on D, okay. The bottom of page three. But it does say prior to issuance of building permits.
Speaker 9 (02:01:16–02:01:38)
So that's good because that's when the building commissioner is reviewing the plans and comparing to the permit because the plans that are submitted for the building permit are going to be far more detailed. If they choose to want to change something between the time of this permit and the building permit, they would have to come back. to us for that change.
Speaker 2 (02:01:39–02:01:42)
Like Walcott Woods asking to change their stone veneer to the ready button.
Speaker 6 (02:01:43–02:01:57)
Isn't the challenge that what is the definition of any change to the architectural design? How do you define that? We'll come back to that.
Speaker 9 (02:01:57–02:01:58)
We can come back to that, right.
Speaker 6 (02:01:58–02:02:09)
I think it ties to that, it ties to, that this other one that we had in the determination of compliance. I have a couple of thoughts on that.
Speaker 18 (02:02:09–02:02:11)
We can come back to that.
Speaker 2 (02:02:13–02:02:18)
OK. All right, so three, site plan design.
Speaker 9 (02:02:27–02:02:34)
Basically, these are reciting what we just went through on the zoning.
Speaker 11 (02:02:35–02:02:47)
So are we putting comments like the site layout takes into account the existing terrain? It really doesn't, because we're bringing in 20,000 cubic yards of fill.
Speaker 9 (02:02:48–02:02:58)
So then it becomes whether it's that balancing the intrusion into the wetlands, because if you don't
Speaker 5 (02:02:58–02:03:15)
it actually does take into account the site terrain because we're creating an area where construction is taking place and the rest of the site's being left alone, and we're minimizing the impacts to the rest of the area by the use of these retaining walls.
Speaker 9 (02:03:16–02:03:43)
Yeah, I mean, that's one of the challenges that I've had is that By using the retaining walls, we have the walls, but then they're not disturbing. If you didn't have the walls, you'd have regrading and loss of more trees by more gradual. What's been concerning is the height of some of those retaining walls. Okay, driveway and parking areas.
Speaker 2 (02:03:45–02:03:46)
Again, we'll…
Speaker 9 (02:03:47–02:04:05)
Yeah, so here, I think we're going to get into parking. We're going to come into materials later, I think, on this. So I'm good with this. Yeah.
Now we get into open space.
Speaker 11 (02:04:06–02:04:49)
So are we discussing if we approve or think that it's enough parking or if it's over parked? discussions we've had, we've talked about eliminating all these parking spaces, every parcel, every lot is over-parked. So, you know, again, it goes back to this project was sold as there would be, you know, nobody was driving, there'd be employees were taking the bus, taking the bikes, walking. you know, do we really need or should, are we gonna discuss the number of spaces or is that a condition, you know, reducing the number of spaces?
Speaker 5 (02:04:50–02:05:02)
I can respond to that. 45 spaces is the number of spaces that will be developed on this site. We've been through that. It would cost us less money if we could do less, but we can't.
Speaker 11 (02:05:05–02:05:09)
Okay, so that's non-negotiable.
Speaker 19 (02:05:10–02:05:15)
Excuse me, Madam Chair. Yes. Can I just ask a quick question? Sure.
Sorry to interrupt.
Speaker 2 (02:05:15–02:05:16)
Yeah, no.
Speaker 19 (02:05:16–02:05:34)
Since you're going through the draft. Yeah. Oh, sorry. Yeah.
For the record, Dan Hill, I represent the neighbors. Since you're going through a draft approval decision, is it safe to assume that you guys have voted to approve the project versus deny it?
Speaker 2 (02:05:34–02:05:35)
No. No.
Speaker 19 (02:05:36–02:05:39)
OK. So is that going to come after you go through the?
Speaker 2 (02:05:39–02:05:55)
Yeah, well, there's definitely things in here which I personally feel are not ready, that still need to be worked on. So this is just highlighting what we need to improve on this before we would get to that discussion. So yes, this is not.
Speaker 20 (02:05:56–02:06:00)
Because if you're going to deny it, then it would be pointless to go through all these conditions.
Speaker 2 (02:06:00–02:06:05)
Yeah, I think we're still in the modifying the project stage.
Speaker 5 (02:06:05–02:06:19)
So thank you. I don't anticipate any vote until we've gone all the way through it. You determine whether or not it's properly conditioned. My experience with this board is that the last thing you do is take a vote.
Speaker 11 (02:06:23–02:06:47)
And you'd also, kind of like I think about MBTA zoning, If for some reason, say it passes, you would want all these conditions, I would think, in it to offer more protection. Right. You know, so that's why we're kind of going through it.
Speaker 9 (02:06:48–02:07:39)
Well, the idea, too, is that can you mitigate the potential impacts through conditions beyond what they've already said that they have incorporated into their drawings? you know, to the point of you get to the end and you say, okay, does it meet the zoning? Have they mitigated the potential impacts to, you know, the neighborhood? And is it providing for the public good, right?
Which is one of the main things in the zoning in the beginning. But you can't answer it until you've kind of come to the end of your discussion with them, with the applicant on all of these matters, right? That's the way I see it anyway.
Speaker 6 (02:07:39–02:08:21)
I see it the same way for Attorney Hill who asked the question. I have 15 of my own conditions that I wrote, and if what Ned has prepared doesn't include those conditions, and we either add or don't add, and I'm sure other members have their own conditions, but in my mind, this project will hinge, for me, on whether I accept or won't accept based on the conditions that are prepared. So that's how I look at it. I think this is a necessary process, and I could be satisfied in the end, or I may not be satisfied in the end.
Speaker 9 (02:08:25–02:08:28)
Okay, so we're on parking, or then we went to open space, right?
Speaker 14 (02:08:28–02:08:37)
Quick question on parking. Wasn't there talk about using the hospital space across the street for holidays? That has been agreed to. Is that in here anywhere?
I didn't see it.
Speaker 2 (02:08:38–02:08:49)
We do not have it in this, because it would not be the applicants. within their permit, but it would be maybe the hospital may provide a letter, I'm not sure where we.
Speaker 11 (02:08:49–02:09:01)
Well I would think that they would, just like I think Novara, I mean, or Abbey Park, that's part of their special permit is their parking agreement with whoever. So I would think it would be part of that.
Speaker 14 (02:09:01–02:09:05)
That's the reason why we were able to reduce the back parking lot spaces, right?
Speaker 9 (02:09:07–02:09:29)
Right, exactly. So what we could do is that the parking, Any additional need for parking for special events will be accommodated off-site. I mean, we could put something like that, because we don't want them to come back for an amendment to add parking either.
Speaker 6 (02:09:31–02:09:39)
Well, the site is at its max at 45.
Speaker 9 (02:09:40–02:09:45)
So somehow, so the question becomes whether there's some condition related to that off-site parking.
Speaker 11 (02:09:46–02:09:57)
Yeah, well, you could just require a lease. I mean, even if it's a $0 lease, it would be part of the special permit. You'd have to provide a lease for Milton Hospital.
Speaker 6 (02:09:58–02:10:09)
Ned, how do you propose that this could be bound to the agreement that you have with the hospital?
Speaker 5 (02:10:17–02:10:37)
Let me come up, try to come up with some solution to that. I understand that and there is a draft of an agreement between the developer and the hospital that memorializes the agreement. So how we reference that, you know, we can work on.
Speaker 11 (02:10:37–02:10:41)
Because the hospital has one with Saint Eve's for their parking.
Speaker 2 (02:10:45–02:10:51)
All right, so we'll need a reference to the hospital parking.
Speaker 5 (02:10:51–02:11:00)
Possible to make it sort of exhibit E or F, whatever the next exhibit would be. Okay.
Speaker 7 (02:11:00–02:11:01)
All right, great.
Speaker 2 (02:11:03–02:11:07)
And open space, did anybody have a comment on that?
Speaker 6 (02:11:11–02:11:12)
I don't have any.
Speaker 2 (02:11:12–02:11:15)
Again, minor more conditions.
Speaker 9 (02:11:23–02:13:28)
I don't have any on that. Actually, I did on the last one, sorry, on C. In some situations, we've had a bond required for damage to trees that were agreed to be protected. Do you have that kind of requirement with the CONCOM?
Or does it come purely because you're removing trees and you have a replacement? Because we have some that are in the protected zones, right? But you're pretty close to construction to some of the trees and some of the tree bases and the root balls, et cetera. And I've seen now in my time on the board where we have a tree protection plan, and then you go visit the site and you see equipment.
Parked right underneath the tree that the protection has not been put in place or in force and we all know that Construction impacts for trees will show up later Maggie I'm taking your Maybe some of what you've talked about but in my experience to like it'll show up about five years later and you end up with these large tree loss so So incorporating that in the tree preservation plan. We had something very, you know, I thought strong in the Wolcott Woods protection and the tree protection plan there and a requirement on behalf, with respect to the developer to make sure that they were following through with every contractor and subcontractor and having a pre-construction meeting and going through these documents so that they all were responsible for it.
Speaker 5 (02:13:29–02:13:46)
So… I'll take a second look at the draft of the tree protection plan itself. It's five or six pages long. It's essentially word for word from what was in Walcott Woods.
I can't remember specifically, but it's pretty close.
Speaker 16 (02:13:47–02:13:47)
Okay.
Speaker 9 (02:13:48–02:13:52)
I don't recall if there's a bond there, and I didn't get a chance to review that.
Speaker 5 (02:13:52–02:13:56)
I don't know whether there was or not.
Speaker 11 (02:13:56–02:14:11)
And then also, if the tree is supposed to be protected, if it's a 50-foot tree that was supposed to be protected, and then it wasn't, and then that 50-foot tree died, obviously we don't want it to be replaced with a seven-foot tree.
Speaker 5 (02:14:12–02:14:21)
No, it would be subject to paying into the fund administered by the Conservation Commission for the value of a 50-foot tree.
Speaker 9 (02:14:22–02:14:33)
But you have some areas that are open space outside of wetlands and concom jurisdiction, so we would have to cover. in our decision, right?
Speaker 2 (02:14:33–02:14:39)
And there was a specific language on that, on the development off of Brush Hill Road.
Speaker 11 (02:14:39–02:14:41)
Yeah, on Beechwood. That's what I thought they had.
Speaker 2 (02:14:41–02:14:51)
Because there was a significant beech tree that died. And it died. And they cut the, during construction, and that, so if we could look at that maybe to see how that was.
Speaker 9 (02:14:52–02:15:26)
We had Woodmere too, where, I know there were some trees that were flagged as, they weren't committing to being able to preserved but would make every effort to, so those got a different color and got flagged and the tree protection was pretty good there during construction, but they still had some trouble. It's one of the things that I think has turned up as a problem on many construction sites in my time on the board, so I would like us to make sure we give it as much as we can.
Speaker 2 (02:15:29–02:15:33)
Agreed. Okay. So somehow incorporating a bond for tree protection.
Speaker 7 (02:15:37–02:15:40)
Okay. All right.
Speaker 2 (02:15:42–02:15:43)
Page five.
Speaker 9 (02:15:49–02:16:13)
So I would like the sidewalks to be concrete rather than asphalt. I think it's the aesthetic looking up. It's one of the few components of the design as you look up from Highland. And I think the concrete is definitely more durable.
Speaker 11 (02:16:15–02:16:37)
So my question on that, and not about durability, but looks, at least asphalt is black. It disappears. With the concrete, to me, that's more commercial looking, and it's white. I mean, could it be dyed concrete or stained concrete?
It's just white. It looks like a road, not a driveway.
Speaker 2 (02:16:39–02:16:43)
That was my only concern as well on that. I don't know.
Speaker 6 (02:16:44–02:16:58)
I kind of favor like charcoal concrete. Yeah, I think it's substantial it you know, it's it's um There's a permanence to a concrete that I prefer. I understand what you're I understand what your point.
Speaker 11 (02:16:58–02:17:07)
Yeah Maybe the neighbors might have a preference Walcott Woods has a
Speaker 9 (02:17:09–02:18:50)
Our bylaws call, I mean, our standards, rules and regs call for concrete, honestly. So if it were a roadway, the requirements would be for concrete. I think it's in part for durability. It's better, honestly, if you look at concrete, I mean, sidewalks around town, many of them are not accessible because the asphalt just has more movement in it, and if you want to keep this accessible, it does have a slope, so you also, you know, you can texture the concrete for slip, so it's just a- And I totally get all that, but this is still a driveway, not a road, so I don't, you know, I understand the durability part of it, that was just an aesthetic point of view.
I'm thinking about you have all these different materials. You have a fence to keep people from falling. You have a guardrail to keep vehicles from going there. You have a sidewalk, you have a curb, and you have a driveway.
So the curb is granite, I believe. The granite and the concrete would blend together in terms of visual. And then it sort of separates your vehicle. That curve separates your vehicle from your pedestrian and everything else.
So even for, let's just say somebody's a little bit visually more impaired, that distinction between roadway and pedestrian zone, You get that with that color distinction.
Speaker 2 (02:18:51–02:19:04)
That would be my preference. All right. Maybe revisit that. I appreciate that.
Speaker 11 (02:19:04–02:19:07)
Can you put a dye in it? A stain?
Speaker 2 (02:19:08–02:19:08)
OK.
Speaker 11 (02:19:09–02:19:10)
Make it gray. OK.
Speaker 2 (02:19:11–02:19:25)
Can you? All right, walls. Several locations where retaining walls should be used.
Speaker 6 (02:19:28–02:19:57)
I think the big issue here is the material discussion that we had earlier. And I sent you a link. to a manufacturer called Conigliaro, and they use natural face stone on gravity block walls. Maybe you and Paul Avery could take a look at that.
It's nice looking walls. It's the same type of wall, gravity block, so big concrete block, and they just face them with natural stone.
Speaker 2 (02:19:57–02:21:54)
Can you send that to Tim so he can distribute to the other members too? That would be great. That might be a possible solution that would help. OK.
So let's, for now, take that last sentence and hit pause with that. Front entry to the site. Front entry shall be framed with two stone pillars and curved stone walls on the site plan. The walls may incorporate a sign announcing the presence of the development.
The sign may be eight foot tall and contain a max of 10 feet. It may be uplighted. I completely appreciate you're doing the stone pillars, doing the stone wall at the front. My concern is this is still a scenic roadway, which is in a residential neighborhood.
I would like to see something more of, and I, because I did say embedded, so it is embedded currently the way it's presented, but it just cries out for a commercial building. And what I would really like to see is, If you could have those stone pillars put lanterns on top, so you feel like you're coming into a residential area, and somehow incorporate the way Walcott Woods did, a sign which would be a vita. It could be a good size, but have something that's etched in stone the way Walcott Woods is. I think that would be far superior to having something so commercial.
You know, soft uplighting would be fine, but lanterns on top, I think it just gives it, incorporates on a stone pillar. It says residential, and it just would fit into Highland Street in a far better way.
Speaker 5 (02:21:55–02:21:56)
We'll take a look.
Speaker 11 (02:21:56–02:21:58)
And do you think eight feet is too tall?
Speaker 2 (02:21:58–02:22:12)
And that was, I was gonna say, and that size would be reduced because it would be, if you take a look at Walcott Woods, they have it in the pillar, it's in the post itself. So I think it could be really an elegant entry to this facility.
Speaker 5 (02:22:14–02:22:19)
The eight feet and the 10 square feet just reflect what's authorized in the zoning.
Speaker 2 (02:22:21–02:22:26)
Yeah. So I would suggest taking those sizes out.
Speaker 9 (02:22:28–02:22:39)
The front entry, I guess this is where we could capture the cobble coming in. Yep. But I really would like that on the plan with dimension so we know how far it is.
Speaker 5 (02:22:39–02:22:42)
I think it is. It's shown on the plan. We'll double check that.
Speaker 9 (02:22:42–02:23:00)
And not on the civil drawings. At least I didn't see it on Paul's drawings. It might be on the landscape plan. But there's no dimensions.
There's no material pulled out. We'll double check that. It's graphically there, I think. It definitely should be dimensioned.
So we know how much area it is. Yeah.
Speaker 2 (02:23:01–02:23:30)
I just think the Walcott Woods entrance is such a nice entrance off of a scenic roadway. It's just appropriate. It fits in. It's still a multi-family, you know, multi, large development project, but it just, you don't, your eye isn't drawn.
It just fits in with the area. So, but yeah, and having the cobble in the plan is good. Okay, parking number 13.
Speaker 9 (02:23:33–02:23:49)
Actually, on the walls, I just wanted to ask, there are retaining walls that are at the rear and south and I guess west that are associated with outdoor spaces. Are those ready rock too?
Speaker 5 (02:23:52–02:23:55)
My sense is that all of the retaining walls are ready rock.
Speaker 9 (02:23:58–02:24:27)
I can understand, you're not in the wetlands in those locations, so the logic for using those, I think, in those locations is different. Maybe it's cost, but I'll be interested to see what this other product beside ReadyWalk is, because I, you know, as much as you've talked about peaceful courtyards for residents, there are those lower levels where people are looking out at that retaining wall from their unit, which is
Speaker 2 (02:24:28–02:25:00)
and family members who come to visit, sitting outside. I didn't have anything on parking. So I guess this would be the area to do the pervious pavement.
Speaker 21 (02:25:00–02:25:00)
Yeah.
Speaker 2 (02:25:04–02:25:13)
And is that a solid? Explain that, because I don't love the pavers, but what are the options on that, just from somebody who does this?
Speaker 6 (02:25:13–02:26:24)
Well, pervious pavement is actually asphalt. Yeah. And it's a material that has Voids in it. You know you look at most pavement.
It's bound together tight with different sizes of aggregates, so it does It does tighten up the idea of pervious pavement is it has voids and it allows the water to you know to Yeah, absolutely great, and you know the issue that Ned brought up is you know it requires maintenance For it to continue to perform that was one of the issues certainly I think The reality of it is this is a low-use parking lot, so it shouldn't require as much maintenance as a lot that would have a lot of vehicle changes daily. And, you know, I think by the time a vehicle gets to that area of the site, they've already traversed a long drive. And whatever may have been on their tires as they came into the site could potentially have been, you know, lost in the page. So there's some reasons that it might work.
There's definitely some maintenance involved in it. But.
Speaker 5 (02:26:25–02:26:52)
I think two things. One is obviously maintenance. you know, sometimes fluids leak off of, you know, oil and other fluids leak off of that, that then goes into the ground and can leach towards the wetlands. These are outside of the, at least the 25 foot, I think maybe even outside of the 100 foot from the back wetland, I'll double check that.
Speaker 10 (02:26:53–02:27:25)
The other thing on this is porous pavement is an infiltration practice and it then requires separation from groundwater and everything else. The section on this is fairly robust. There could be some implications of grading changes with doing that. It isn't just simply swapping out the paving material.
It could increase the earthwork and other project impact, so it's not just as simple as just putting down a different type of paving.
Speaker 6 (02:27:26–02:27:29)
There could be some implications to what, Paul?
Speaker 10 (02:27:30–02:27:51)
Grading, because there's a robust section of courses that need to go underneath it to be compliant, and then we'll have separation from groundwater and everything else. It's technically more complex than just changing out the payment material.
Speaker 6 (02:27:52–02:28:01)
Yeah, I'm aware of it, Paul. I'm actually doing it this week on a project. So I'll take a look at it, a further look. It'd be good if we had Sean here.
I know Sean would want to.
Speaker 10 (02:28:01–02:28:03)
I think he spoke about it last week, actually.
Speaker 6 (02:28:04–02:28:04)
Pardon me?
Speaker 5 (02:28:06–02:28:11)
I think Sean expressed some concerns about it last week, but we can certainly follow up. Yeah, I recall it.
Speaker 6 (02:28:11–02:28:12)
Yeah.
Speaker 7 (02:28:15–02:28:16)
All right.
Speaker 2 (02:28:18–02:29:03)
Anything else? Not to belabor it, but I'm just thinking at number 11, we're talking about the entryway. I think it would also be much better to have a symmetrical entryway where the two different walls, that also would draw attention to this project. So that cohesive, if we could embed that sign and do something that's more symmetrical, I think it would be a nicer entrance.
Just wanted to add that, but anything else on parking? Then let's go to lighting, and you had brought up a few questions, which are good.
Speaker 9 (02:29:04–02:30:49)
The light fixture that's closest to Highland, does that provide lighting at the crosswalk? I think we talked about there was a street light nearby. But I just wanted to make sure there was adequate lighting at that crosswalk. I'm thinking wintertime conditions when it's dark at 4 o'clock or 5 o'clock when there might be a change in staffing.
But on the conditions, I was thinking that You have here that the lighting at the rear lot would be turned off from 1130 to 6. I'd like to suggest that all the rest of the lighting be dimmed down to 30% during those same hours. If there was some need for security purposes to increase above 30%, maybe that could be on an occupancy sensor. Or the controls could be such that certain areas are a little bit different, maybe at the front door or an exit door than the rest of it.
But I'm thinking in particular street lighting and parking lot lighting because, you know, Winter Valley and the hospital are nearby and their lights, street lights and overhead lights are on a lot. And it's a lot of nighttime lighting. We're talking about dark sky, but it's not, You say it's dark sky compliant, you're talking about an individual fixture, but if they're all, a bunch of these 14 foot high light fixtures running throughout the evening, it seems like we should dim those down.
Speaker 5 (02:30:51–02:31:03)
So the last sentence of the proposed condition says the lights shall be dimmed except as necessary to provide safe access and egress for evening visitors and shift changes. Is there a,
Speaker 9 (02:31:04–02:31:05)
Dim to 30 percent.
Speaker 5 (02:31:05–02:31:08)
We can say dim to 30 percent except as necessary.
Speaker 9 (02:31:10–02:31:21)
And then is there daylight sensor? It says sensors and dimmers but are you talking about daylight sensor?
Speaker 5 (02:31:22–02:32:31)
I was thinking of So it gets turned on. It's a slightly inartful way of addressing the issue of sensors. So my understanding of how a sensor would work, they would sense a vehicle or a pedestrian approaching, and that that would then cause the light to turn on. One of the issues with sensors is what happens when critters are crossing, because one of the things that the Conservation Commission requested is that we actually have a larger box culvert on the front in the first crossing, which increased the height of the walls, et cetera, because they wanted to make sure that deer could cross between the 107 Highland property and get to round to the rest of the property.
So we redesigned that culvert specifically to address the commission's concerns. So my assumption is there will be deer and other critters that may be otherwise touching off sensors.
Speaker 9 (02:32:31–02:32:47)
Well, that's why I said it. I don't think you need the street lighting, the parking lot lighting to be on an occupancy sensor. But if you need it for security reasons, let's say at the courtyards or at the entrance, that seems reasonable.
Speaker 5 (02:32:48–02:32:54)
I'll work on some additional language. If you can shoot something through Tim to me, that would be great as well.
Speaker 9 (02:32:54–02:33:30)
And then just one other thing, it's just a photo sensor. So you can do these on the fixtures themselves, or you can do it through a sort of an integrated system, like a wireless system. I don't know if Sashi, who's ever helped prepare the lighting, the photometric plan, could speak to there. their contact about that, they should be able to come up with a suggestion for these controls.
But the idea of all of this is really on energy consumption, that we don't need these parking lot lights and street lights on at times when they're not needed.
Speaker 14 (02:33:31–02:33:37)
So that's where the- If nobody's parking back there. If no one's parking back there, I mean, are we sure that no employee's gonna be using that back parking lot?
Speaker 5 (02:33:37–02:33:50)
Yeah, we're agreeing to that as a condition. Okay. The permit is that the third shift will park by the building. and that the rear parking lot would be vacant.
Totally empty. Totally empty. Okay.
Speaker 9 (02:33:50–02:34:05)
But the other part is just on this photo cell or on these controls is to have the lights timed with daylight, you know, so that they turn on when it's dark and turn off when… No, I understand it all.
Speaker 15 (02:34:05–02:34:11)
I'm just concerned about security. If my daughter were working there and she had to leave in a dark parking lot, I'd be concerned. Sure.
Speaker 16 (02:34:12–02:34:12)
Okay.
Speaker 15 (02:34:12–02:34:14)
because we're saving energy.
Speaker 8 (02:34:14–02:34:35)
And this is actually just to say that the lights will have a photocell sensor. So in daylight, they'll turn off automatically. And they can be wired in to respond to whatever needs to happen, whether it's turning them off or dimming them. They have all the capabilities of doing those things.
Speaker 9 (02:34:35–02:34:48)
So I didn't see that feature as being included on the cut sheet. I've looked at that today. So if you could just provide that language, Sasha, to Ned for a condition, we can cover it there.
Speaker 11 (02:34:51–02:35:02)
Okay. Jess, you mentioned the employee count of 25. So would the condition be there'll be no more than 25 employees per shift?
Speaker 5 (02:35:03–02:35:17)
I'm not sure I can agree to specific maximum counts. Those numbers might change for different reasons. But generally speaking, we're pretty close to what the employee counts would be.
Speaker 11 (02:35:18–02:35:28)
And those employee counts also include like any physical therapy or occupational therapy, like extra services that are needed?
Speaker 5 (02:35:28–02:35:35)
No, if those were contracted by a specific occupant or their family, that would be on top of employees.
Speaker 11 (02:35:39–02:36:09)
And so there's no way of knowing how many occupants will need those additional services. So even though, you know, you've said the traffic would be 288, it could actually be more than that because you don't really know, you know, what client is going to need what services at any one time. So there's, you know, that's.
Speaker 5 (02:36:09–02:36:25)
I think the highest volume of staff would be in the building between noon and three, roughly 35 employees.
Speaker 2 (02:36:25–02:37:34)
And I just wanted to, the example of the lighting that will be on the taller 14-foot poles, which has sort of a gooseneck hanging over, my experience in seeing those is they tend to lose the black, the paint or whatever, I know they use like a finishes. Yeah, what is the product? It's That they would be sprayed with the enamel or the paint. It's like an enamel Well, it can it can vary but I really like the lighting that wall cut woods did because it doesn't have that gooseneck It doesn't have all of that surface area that just when it starts to peel and chip it just looks You know, you've seen it.
You see it all over. You see it in the lower mills area where you drive in. They look awful. It just looks awful.
And if it could be considered to do something, and I just sent Ned a speck of the lighting that was done on the streetway at Walcott Woods, it would really enhance the project, I think.
Speaker 5 (02:37:38–02:37:49)
So I'm just advised by the client that those additional services are included in the traffic count. Okay, cool.
Speaker 2 (02:37:49–02:38:01)
And that, I mean, Tim, I will send this, just this lighting just to let the others take a look too. So if you could share it with the board.
Speaker 7 (02:38:06–02:38:07)
I'll send that out.
Speaker 2 (02:38:18–02:38:43)
Anything else on lighting? Most timing and having dimmed, those are all good additions. So yes, traffic deliveries, which we're on. Ned was just bringing up.
The two deliveries. We have here between 10 and 2 p.m.
Speaker 6 (02:38:44–02:39:09)
So this doesn't indicate the Monday to Friday commitment that you spoke of earlier? We can add that. And it doesn't also indicate the number of deliveries that you mentioned earlier? Is it possible to do that?
Sure.
Speaker 2 (02:39:09–02:39:14)
So number of deliveries in the days. Okay.
Speaker 11 (02:39:14–02:39:15)
Which was two, no more than two?
Speaker 7 (02:39:17–02:39:18)
It would be two deliveries a day.
Speaker 2 (02:39:25–02:39:39)
Okay. And the size of the tractor trailers. Prohibited from this. All right, we've gone over these conditions for employees.
Is there any…
Speaker 9 (02:39:40–02:40:06)
Yeah, I was wondering whether we should include a requirement that allows the building commissioner upon request to view these documents and videos so that if the building commissioner is receiving complaints that he has access to documentation, he or she has access to documentation.
Speaker 7 (02:40:12–02:40:13)
Okay.
Speaker 11 (02:40:13–02:40:19)
And then what happens if, is there a fine?
Speaker 2 (02:40:21–02:40:22)
Yes, $250. Where is that?
Speaker 9 (02:40:26–02:40:36)
That is, it's in here somewhere. That's under the construction management, I think, just in 16. Was that just, oh there, okay.
Speaker 11 (02:40:38–02:40:46)
So is that, will that be applied for employees and deliver, you know, anybody leaving the site?
Speaker 9 (02:40:49–02:40:53)
That fine is only listed under construction management, it's not listed under this.
Speaker 11 (02:40:54–02:40:55)
Yeah, so do we put it under there?
Speaker 14 (02:40:55–02:41:03)
A fine to the business, right?
Speaker 11 (02:41:03–02:41:14)
To the business, correct. because the special permit is going to the business.
Speaker 6 (02:41:27–02:41:45)
Okay. All right. So just, I know, Nick, you've obviously talked a little bit about how do you manage compliance with this, right? I just want to think through that for a minute.
So who is reviewing the surveillance?
Speaker 9 (02:41:47–02:42:11)
Well, I would think it's management, right, at the business. But then let's say there's complaints. Then the building commissioner should be allowed to request to view these documents that they've asked the employees to sign and any videos where they're recording the truck activity, right? That's what's required here.
Speaker 11 (02:42:11–02:42:13)
Because the building commissioner is the code enforcement officer. Right.
Speaker 6 (02:42:13–02:42:19)
Agreed. So is there a period of time that the surveillance should be maintained for?
Speaker 9 (02:42:22–02:42:26)
Probably. They override them probably every 30 days.
Speaker 6 (02:42:26–02:42:41)
Can you look into that, Ned? Because I think it could be a situation where someone may have a complaint and the the surveillance from that particular day is no longer available. If you could help us understand how that's gonna work. Sure.
Speaker 5 (02:42:50–02:43:22)
If I understand what you're asking is that there be a condition that the building commission would have the ability to request copies of surveillance. Such surveillance should be maintained for X amount of time and be available. And then with respect to any violation observed within the surveillance, it would be a fine of $250.
Speaker 9 (02:43:23–02:43:38)
I also thought that just to have an assurance that these forms are being actually prepared and signed by employees, that those records should be kept and available to be viewed as well.
Speaker 14 (02:43:40–02:44:02)
We should probably get into a registration or a plate number. Because the way I see this happening is the same little blue Honda takes the right and goes down Spafford every day. The neighbors say, hey, this car keeps coming down the street. I'm sure they're working at the hospital.
They complain. They pull a video. You can link it to an employee. The fine is levied.
That's the way I see it.
Speaker 5 (02:44:03–02:44:12)
Yeah, agreed. And the surveillance would show whether or not that little blue Honda was going out the driveway, taking a ride, and then showing up on Spafford.
Speaker 14 (02:44:13–02:44:18)
To Cheryl's point, if you have documentation of the employee and maybe their registration, you can put it to bed.
Speaker 9 (02:44:21–02:44:28)
It's just a way to be able to enforce in a condition that otherwise how do you enforce, right? Right.
Speaker 11 (02:44:28–02:44:56)
So in my permit, I have a review of required records and it stated the following records shall be kept, you know, in the sales office and shall be made available for inspection and copying by the building commissioner and or his designee at the building commissioner's request. Records shall be updated on a regular basis as relevant information is received or changed.
Speaker 9 (02:44:58–02:45:03)
I remember that. Not the exact language, but I remember that it was there.
Speaker 6 (02:45:07–02:45:31)
I think a reasonable amount of time for the building inspector or anybody would be 30 days. If they could maintain it for 30 days. If you can't manage it within 30 days, or no one has complained within 30 days, I don't know what's possible. And if there is a fine, where does the fine get paid to?
Maybe it should go to the Traffic Mitigation Fund.
Speaker 18 (02:45:32–02:45:32)
Yep.
Speaker 6 (02:45:32–02:45:33)
Yeah, any fine.
Speaker 18 (02:45:33–02:45:33)
Yeah.
Speaker 6 (02:45:33–02:45:38)
Yep.
Speaker 14 (02:45:38–02:45:44)
OK. So with your required records, do you give them your registration and your license number, plate numbers?
Speaker 11 (02:45:46–02:45:48)
Like a privacy thing? They have a list of all my trucks.
Speaker 9 (02:45:53–02:46:12)
And then on this next condition, are we ready for that? Mm-hmm. Yeah. to pay the town's cost to adjust the timing and then make this contribution of 5,000.
I think it should be more than 5,000.
Speaker 5 (02:46:14–02:46:48)
Well, the way the mitigation fund is set up, the maximum payment is based on the number of parking spaces. So there's 45 parking spaces at $350 per space. That's $13,500. That's the maximum that the board could impose for mitigation, which would include, presumably, the cost of adjusting the timing mechanisms, which we estimated about $5,000 per.
Speaker 2 (02:46:51–02:46:55)
So with the additional amount, if speed bumps were going to be added to SPAC.
Speaker 9 (02:46:55–02:47:16)
So you are looking at some conditions here. We're addressing one of the largest issues that we've heard about for two years. And you're telling me that you can't go above what the minimum or the maximum required in that particular section of the bylaw. I'd like you to reconsider that.
Speaker 5 (02:47:17–02:47:35)
Okay, but at the same time, you're asking me to mitigate somebody else's problem. And we're not creating the problem of the existing traffic. We're committed to work with the hospital to try and help the hospital figure out how to mitigate its traffic.
Speaker 9 (02:47:36–02:47:56)
There's no traffic generated today on this property. There will be traffic generated by this use. And the degree to which that is going to have an impact on neighbors is not, there's not agreement on. But I think everyone could agree that going from zero to a new use is something, right?
Speaker 5 (02:47:56–02:48:24)
I don't disagree with that, but we don't trigger any of the thresholds that require payment of mitigation, right? We don't decrease the level of service, right? We don't increase the volume of traffic by more than 5%. the level of service on the island street.
Well, it's hard to decrease something from F to F. No, but you have to go from one to another, and we don't change the level of service from one to the next.
Speaker 9 (02:48:25–02:48:32)
My point is that if the level of service is so low that you can't drop it any lower, then you're not going to have a change in level of service.
Speaker 5 (02:48:33–02:48:42)
But the alternative to that is, are we increasing the volume of traffic by more than 5%? And the answer is no. That's an either or calculation.
Speaker 9 (02:48:43–02:49:10)
So this comes down to the question of mitigation and whether impacts can be mitigated. mitigated and $5,000 doesn't go very far in doing a study. The residents are interested in sort of a broader traffic study. $5,000 is not going to get very far.
So I'd like for you, as I said, to consider it further.
Speaker 5 (02:49:12–02:49:26)
I'll consider a specific number. I really need, I'm not gonna negotiate against myself here, so I don't know really what to do. I think the board needs to determine what they think is appropriate, and we need to react to that.
Speaker 2 (02:49:28–02:49:42)
Well, you mentioned, it's sort of like the vernal pools. Technically, you accepted those when you didn't need to, which I appreciate. You said 13,500 would be the number calculated?
Speaker 5 (02:49:42–02:50:26)
If you follow the requirements of the traffic mitigation, and I don't think it's been used yet, I may be incorrect. but the calculation on what the maximum amount to pay into, assuming you trip thresholds, is for a commercial property, it's $350 per parking space, or 450, whatever the number is. times 45, it's $13,500. That's the maximum that you have the authority under that traffic mitigation bylaw to impose.
Speaker 9 (02:50:27–02:50:28)
So do you want to suggest a number?
Speaker 11 (02:50:29–02:50:34)
The question about whether it's been… 350 times 45 is 15,750.
Speaker 9 (02:50:34–02:50:49)
I just, I'm gonna respond first to the question about what has been used before. 440 Granite Ave came to us for a site plan approval, and part of that was a voluntary contribution to this fund as part of the decision for that particular project.
Speaker 5 (02:50:51–02:50:53)
What was the calculation? It's $300 per space.
Speaker 9 (02:50:53–02:50:54)
Oh, 300?
Speaker 5 (02:50:54–02:50:56)
I misspoke.
Speaker 11 (02:50:56–02:51:00)
Yeah. So 300.
Speaker 5 (02:51:03–02:51:26)
So we're not saying no, you can't impose it. And we're agreeing to make a payment. But the payment has to be reflective of what the town put together when it created the Traffic Impact Mitigation Bylaw. You just can't go off in some other area that's arbitrary because you think we should do more.
Speaker 9 (02:51:27–02:51:50)
Well, I mentioned that this other project did a voluntary contribution to address a concern that was expressed by neighbors, and that's what I'm asking you to consider here, given the concern that's been expressed about the matter. But as far as the board's concerned, you know, other members feel as strongly as I do about it. You can chime in, or if you think that, you know, this number should be 5,000, or if you think it should be more.
Speaker 6 (02:51:50–02:52:00)
I think it should be more. Yeah. I think you're right. we can be criticized for being arbitrary or not, right?
And we may very well be, but.
Speaker 11 (02:52:03–02:52:10)
10,000? Well, how much was 440? We'd have to look to see, before we assign something. I feel like 440 was 10,000.
Speaker 9 (02:52:11–02:52:13)
I don't recall the number. We'd have to check that.
Speaker 11 (02:52:13–02:52:15)
Maybe we just need to review what other.
Speaker 6 (02:52:15–02:52:16)
Let's think about it.
Speaker 9 (02:52:17–02:52:18)
Yeah, okay.
Speaker 14 (02:52:18–02:52:20)
And how did you land at 5,000?
Speaker 5 (02:52:20–02:52:50)
I assume $5,000 per intersection. There's two intersections where the timing sequences have to be adjusted. We understand the cost associated with doing that work, including police details and whatever is about $5,000 per intersection. And we added $5,000.
So that gets you to $15,000, a little bit more than what would be covered under the traffic mitigation bylaw. But that's how we arrived at that.
Speaker 14 (02:52:52–02:52:53)
and you assume that they have to be adjusted once?
Speaker 5 (02:52:54–02:53:11)
The recommendation coming from our traffic consultant was that each of those signals should be re-sequenced. It's a matter of a technician going out and taking out,
Speaker 14 (02:53:12–02:53:16)
I understand where it is, but it's gonna happen once or twice, or what do you think?
Speaker 5 (02:53:17–02:53:19)
I'm assuming it happens once and it's done properly.
Speaker 9 (02:53:20–02:53:23)
And is that DPW staff that does it?
Speaker 5 (02:53:23–02:53:24)
I don't know, probably.
Speaker 9 (02:53:24–02:53:31)
I mean, if it is, it's really, it's just an expense that's already included in the town budget.
Speaker 5 (02:53:31–02:53:38)
Assuming that DPW has the staff capability of doing that, I don't know if they have to use contractors to do that.
Speaker 14 (02:53:39–02:53:56)
But even if it's done once, you're paying for the 5,000, right? If it has to get done again to make, because I see guys adjusting intersections all the time, the same ones. So if it happens twice, that's 10, right? But you're not paying for the second adjustment.
I'm just trying to.
Speaker 5 (02:53:56–02:54:04)
No, we would pay to adjust each under the purview of the DPW once.
Speaker 9 (02:54:05–02:54:21)
So I would suggest that we find out whether the DPW does these adjustments with staff that they have. Is there any expense related to it? Because unless it's an outside contractor, I doubt what's the expense that's related to it.
Speaker 11 (02:54:21–02:55:07)
Yeah, and it's the bigger question I have. And this is not really you, but it needs to be consistent. So for instance, like fines are kind of a big thing. I was fined $1,000 because I started piece of machinery 15 minutes before my start time.
And I was fined $1,000 for failure to notify. the building commissioner on having a truck on site. So there is inconsistency in fines across the town and my experience it was left up to the building inspector to negotiate the fine. So just that's a bigger issue that maybe we need to kind of look at at some point.
Speaker 2 (02:55:13–02:55:19)
So let's just think on that and maybe see what we did for 440 granite up. Tim, do you recall?
Speaker 3 (02:55:23–02:55:24)
What's the question?
Speaker 2 (02:55:25–02:55:34)
Sorry, do you recall what the traffic mitigation amount was that was paid into the fund by 440 granite?
Speaker 3 (02:55:35–02:55:37)
Not off the top of my head. I can try to grab that, though.
Speaker 2 (02:55:38–02:55:40)
Yeah, if you happen to come up.
Speaker 11 (02:55:41–02:55:42)
And the rationale.
Speaker 9 (02:55:42–02:55:47)
What was the rationale for it? And have there been any other payments into the fund? I guess was the other question.
Speaker 3 (02:55:49–02:56:00)
Yeah. I think the only other project that's paid into that fund is Walcott Woods. And I believe that that was commensurate with whatever's in the regulations in the bylaw.
Speaker 9 (02:56:02–02:56:02)
OK.
Speaker 5 (02:56:03–02:56:23)
I'm not sure that that's right, but we should double check it because I think Walcott was permitted before the traffic mitigation bylaw was put in place. I remember we, in that case, Walcott was agreeing to traffic signage and other things.
Speaker 2 (02:56:23–02:56:25)
That's what I was going to say. Those speed, yeah.
Speaker 5 (02:56:25–02:56:39)
you know, sharrows and different things. But we didn't, I don't remember addressing the issue of the traffic mitigation bylaw because I don't think it had been adopted yet.
Speaker 2 (02:56:43–02:57:03)
Okay. All right. So moving on to 16, construction management plan and project phasing. We talked a little bit about things that we, may want to add to that.
Conditioned.
Speaker 9 (02:57:04–02:57:21)
So did we have, I need to re-review the plan, but is there a prohibition on construction workers parking on the ladder streets? And is there a fine associated with construction workers if they're found parking there?
Speaker 5 (02:57:22–02:57:25)
There is not, but there's no reason why there shouldn't be one.
Speaker 9 (02:57:31–02:58:14)
And the restrictions that are put in for truck traffic, I'm concerned about the number of trucks related to construction, particularly the tree removal and the cut and fill. And I'm concerned about truck traffic, particularly during school time. So when students are on their way to Milton High or the Pierce, and also on their way home. So I'd like to have a limit in the construction management plan when those trucks can be active.
Time of day.
Speaker 2 (02:58:18–02:58:19)
And perhaps not on weekends?
Speaker 5 (02:58:20–02:58:21)
No, there's no construction on weekends.
Speaker 2 (02:58:21–02:58:24)
No construction, because I know we talked about that before, okay.
Speaker 5 (02:58:24–02:58:28)
And maybe some interior construction once the building is
Speaker 9 (02:58:28–02:58:30)
Right, okay, but nothing exterior.
Speaker 5 (02:58:30–02:58:31)
But nothing outside.
Speaker 9 (02:58:31–02:58:40)
Sean, do you have any thoughts or suggestions about that with respect to what the industry expects?
Speaker 6 (02:58:44–02:58:45)
Specifically to?
Speaker 9 (02:58:46–02:58:47)
Hours limitation.
Speaker 6 (02:58:47–02:58:58)
Yeah. Trucking. Pardon me? Trucking, right?
Yeah. This is… This is a difficult site to truck to, really difficult.
Speaker 9 (02:59:00–02:59:12)
I mean, it's not just cut and fill of the concrete and others, but the tree removal and the cut and fill are going to be substantial.
Speaker 6 (02:59:12–02:59:21)
Yeah. Yeah, the earthwork phase is probably the most substantial. Yeah.
Speaker 9 (02:59:23–02:59:44)
I'm concerned about, residents have said they're concerned about safety. I know that if you restrict the hours, you're lengthening the duration, right? Because if you're doing less than one day, it's going to take you longer to do the total job. So that's a factor in doing the limitations.
Speaker 6 (02:59:46–03:00:12)
Yeah. Yeah, I mean, you could stretch the project out if you create too many limitations. I think it would probably be best just to let the hours of the construction be what hours of construction are, you know, by, you know, our town construction set hours and not restrict it.
Speaker 9 (03:00:13–03:00:19)
So you wouldn't agree to restricting, let's say, a start of 9 o'clock? That's what I was thinking. 9 AM.
Speaker 15 (03:00:20–03:00:23)
If I lived next door, I'd want it done as quick as possible.
Speaker 2 (03:00:23–03:00:29)
But you also don't want to be driving your children. You don't want children walking to school, driving, you know, teenagers.
Speaker 14 (03:00:30–03:00:33)
My son bikes down that road every day from Center Street to the school.
Speaker 2 (03:00:33–03:00:34)
I mean, I… Well, I know.
Speaker 5 (03:00:34–03:00:42)
This just adds… They're probably the safest vehicles on the road. Trucks coming to and from the site.
Speaker 9 (03:00:43–03:00:56)
I just saw the truck that's removing the trees on that site on Central. It's a big truck with a lot of big tree trunks on it. And we're talking about how many hundreds of trees here?
Speaker 6 (03:00:56–03:01:24)
So coming in and out? That'll happen fairly fast. I mean, that'll happen within a couple weeks. I understand your point.
I don't know. I think I'd want to think about it a little bit more. Ironically, the best time of the day to avoid children is earlier. But I understand what you're saying.
If you go to 9 o'clock, if you're 9 to 2, you can really restrict the hours of vehicle traffic to and from a site.
Speaker 9 (03:01:25–03:01:50)
If a typical construction site would be seven to three, right? So the high school starts at what, eight? So you could, maybe you could do 8.30, maybe eight, but seven o'clock seems to me prime time. Between seven and eight would be prime time for lots of people going to and from school.
Speaker 6 (03:01:52–03:01:57)
Did you propose hours? For construction traffic?
Speaker 5 (03:01:57–03:02:00)
No. Only for deliveries.
Speaker 2 (03:02:01–03:02:16)
Yeah. Paul, can we ask you, what has been your experience in residential areas? Is there a time that has worked? And I don't know how many truckloads we're talking about for 20,000 cubic yards of fill.
Speaker 10 (03:02:18–03:02:38)
Yeah, I think there's some guidance on that in the construction management plan. That isn't really my expertise. It is fairly common to restrict reasonable hours for projects in residential neighborhoods. That happens all the time for exactly these reasons.
Speaker 6 (03:02:39–03:02:58)
You know, if we change the traffic flow so it only came down Randolph Ave, you know, all of the construction traffic, how would you feel about that? That way you're keeping it off of Canton Ave and probably away from a lot of the foot traffic for whatever hours it is.
Speaker 9 (03:02:58–03:03:05)
But if you go down Randolph, you're going to go to Reedsdale to Canton Ave, right? And have to make the left onto Highland.
Speaker 6 (03:03:07–03:03:12)
You've got to come up Highland. It's either that or make a left at the lights at the old dump entrance.
Speaker 11 (03:03:13–03:03:52)
And I really feel like that's really going to be hard to manage. I know I can probably beat up the applicant pretty good, but I think To be honest with you, all the truck drivers want to come in at seven. They're in and out quick. My concern is the number, like 20,000 cubic yards of fill.
So Sean Reardon said it's 20 yards per truck. I get in 50 yards per truck. So even if it's 50 cubic yards per trailer, so that's 400 truckloads. to equal 20,000 cubic yards?
Speaker 5 (03:03:54–03:04:29)
So the estimate for the net volume of fill, trees is a different issue, and other materials coming in is a different issue, but just for the net volume of fill, 11,500 cubic yards, it's 20 cubic yards of material per truck, that's approximately 575 truck trips required, Anticipate a 19 week period working five days a week. That's six trucks per day. Delivering. I'm good, they can start at nine.
Speaker 9 (03:04:30–03:04:32)
There's plenty of time for them.
Speaker 5 (03:04:34–03:04:54)
So staging those trucks in, in the way the site's built out, they're gonna be coming periodically. We can check with the contractor on the issue of the delivery of fill, whether or not they can live with a stricter timeframe.
Speaker 2 (03:04:54–03:04:58)
Ned, could you repeat the amount of fill that you're stating, how many cubic yards?
Speaker 5 (03:04:58–03:05:54)
The net cubic yards, they're gonna reuse as much as they can on site. They won't be able to use all, obviously. But the net amount of fill is approximately 11,500 cubic yards. Okay.
Okay. Divided by 20, which is 20 cubic yards per truck, is 575 truck trips. They estimate 19 weeks, working five days a week, total of 95 days, 575 divided by 95 is an average of six per day. Some days it'll be a little more, some days it'll be less, but it'll be approximately, that's just fill, that doesn't deal with trees, that doesn't deal with concrete, that doesn't deal with block, that doesn't deal with other stuff.
Speaker 9 (03:05:55–03:06:30)
letter. It's entitled the Earthwork Memo. And it says fill 20,369 cubic yards on page four. That's the number that The number you're talking about says net remaining net fill import slash export.
Speaker 10 (03:06:30–03:07:31)
So what what this does was this just looks at you know the earthwork for the earthwork sake and so when you look at the table on this we just looked at the gross volume difference and then you know, there's fill that's necessary to change the grades, but then, you know, of that material, sort of the net volume change, there's a certain amount of this that's, you know, are select materials. In other words, you're going to need to bring in, you know, pavement. You're gonna need to bring in the gravel base courses for the pavement, no matter what you do here. You know, there are underground drainage systems and all these other things we broke out.
So basically, you know, it's the 11, 496, 11,500 cubic yards. That's the amount of fill that's required to basically, that's the cut fill in balance. It's net positive on that too. How much material I have to bring in for the purpose of fill as opposed to construction.
You can understand what I'm saying.
Speaker 6 (03:07:32–03:07:41)
So Paul, are you saying that that's the import, 11,500, and the rest of the earthwork volume is actually on site and just
Speaker 10 (03:07:42–03:08:55)
Yeah, so if you look at this whole thing and you just, you know, if you're looking at the table on, I think it's the third or fourth page, page three of six on this thing, at the summary, it just goes, you know, here's the gross cut and here's the gross fill. So there's the net cut bill. That's just looking at the difference between the existing and the proposed volume surfaces, okay? And then, you know, we say, okay, you know, but we have to do, we have building slabs, we have pavements, we have all these things that we listed out in the next part of the table.
So that of that, you know, you're bringing in, you know, 4,100 cubic yards of select materials that just need to be brought in anyway, because they're specific base materials and things like that. And so then, you know, the net import for just, you know, I mean, all those materials need to come in in trucks too. So for the purpose of, you know, what are the trucks, you know, you probably need to look at the gross cubic yardage on this thing. It's just like what Ned was saying, this concrete, there are a lot of other things that need to come in.
But this exercise was prepared because the board requested that the engineer do an earthwork takeoff, so that's what this is.
Speaker 6 (03:08:58–03:09:55)
I think one of the issues that you'll face Net is it won't stretch out. Earthwork normally wouldn't stretch out over five months. That's six trucks per day. I understand the math.
If Erwin said 19 weeks, 575, you do the simple math. But that phase of earthwork, and when you think about filling to put that roadway in, that's going to be a surge of trucks when that is happening. And it'll be a lot more than six per day. Because what will happen is six trucks will dump within two hours.
And then the site guy's dead for the rest of the day if he doesn't have a constant flow of trucks. So maybe you could ask Erland again how that'll happen. I suspect that when import is coming to the site, you're just gonna get a huge volume of it in a period of time. It won't be stretched out like that over 19 weeks.
So that's one we'd really have a concern because there'll be so much truck traffic.
Speaker 9 (03:09:55–03:10:22)
And I don't know how much analysis went into what the existing soils are and if they're actually reusable as structural fill. I think a lot of it is kind of clay-based, which wouldn't be structural fill. So I don't think there's been a geotechnical report done here to tell us some of this. So I think it's probably going to be more, that rather than less, in terms of the number of trucks required.
Speaker 6 (03:10:22–03:10:25)
Paul, are there test pits done on the site?
Speaker 10 (03:10:29–03:10:55)
Yeah, we did test pits for stormwater purposes. And then there was a geotechnical report as well that characterized the soils. I mean, Cheryl's point is valid that I don't think that material is suitable for structural fill. But I mean, I do believe that a lot of it would be suitable for just borrowing material in certain areas of the site.
Speaker 11 (03:10:59–03:11:35)
So just on that, if we're getting all that truck traffic in a short amount of period of time. where are all the employees, the construction guys, going to park? Are they going to be parking along Highland Street? So then, you know, even just, I know my neighbor has undergone this project right on the corner, you know, for the past four, five, six months, and it's been a challenge for me to get my trucks in.
I'm always asking them to move their trucks out of the way.
Speaker 9 (03:11:35–03:12:02)
I think we put there's no parking on Highland. No. And if there's not enough adequate parking on site, they'll have to do some kind of offsite parking arrangement and get people over there. That's what happens in the cities all the time or in really tight sites.
So, you know, this is going to take at least a year to build. You can't expect that these construction workers are going to park and make the traffic problems far worse than what they already are. There's no park on Highland. No.
Speaker 2 (03:12:02–03:12:07)
Or on the latter streets. It would have to be the hospital parking lot somewhere.
Speaker 5 (03:12:09–03:12:32)
Even that's unlikely because the hospital parking is full during the week. So they will have to stage their parking, employee parking, elsewhere in Carpool. But certainly no construction worker parking allowed on Highland or the ladder streets.
Speaker 2 (03:12:33–03:12:38)
No problem with that So is that so that will need to be put into the construction management plan?
Speaker 6 (03:12:39–03:12:51)
Yeah Should we I know you say Highland in the Lattice Street. Should we just say not on any of the public streets Yeah, I don't know where you don't know where you would park.
Speaker 5 (03:12:52–03:12:59)
I know that's what I'm thinking Yeah, because there's no place to park on Canton Avenue, there's no place to park on Reedsdale Road There's no place.
Speaker 9 (03:12:59–03:13:14)
Well, there are some parking spaces on Canton Avenue Opposite Town Hall. Those are striped as curbside to the library Okay, but there's Those are intended to be for the library as well.
Speaker 11 (03:13:15–03:13:20)
Well, maybe the town of Milton could rent some spots at DPW.
Speaker 14 (03:13:20–03:13:21)
Or the church.
Speaker 11 (03:13:22–03:13:26)
Well, then the town gets it if it's at DPW.
Speaker 6 (03:13:26–03:13:31)
Yeah, what concerns me, if we don't say that, we'll have Wendell Park full with cars, you know?
Speaker 2 (03:13:31–03:13:31)
Right.
Speaker 6 (03:13:31–03:13:34)
I mean, construction workers will find any place to park a car.
Speaker 5 (03:13:35–03:13:43)
Yeah, I'll work on it. On public roads. I hear the concern.
Speaker 9 (03:13:43–03:13:49)
Yeah, I think DPW would be great if they could make an arrangement there if they have room. They do have a lot.
Speaker 6 (03:13:52–03:14:16)
Ned, that paragraph 17, I think some of the language in there really belongs in 16. You know, when you get to that last couple sentences, the applicant shall maintain and submit copies of such surveillance with the building commissioner and town planner on a monthly basis. The applicant shall pay a fine of 250. I think that's part of 16, not 15.
No, I'm sorry, 16, not 17, isn't it? Looking at my copy, I don't see it in 17.
Speaker 5 (03:14:16–03:14:21)
It is in 16 in mine. I see it on 16. Do you not see it in 17?
Speaker 11 (03:14:21–03:14:22)
I see it in 17.
Speaker 5 (03:14:23–03:14:23)
No.
Speaker 11 (03:14:25–03:14:28)
How many sevens do we have?
Speaker 5 (03:14:28–03:14:34)
We have a few. This is another thing with 17 is utilities, water and sewer.
Speaker 9 (03:14:35–03:14:39)
Might be from this draft. This is a draft that was 4-12-24.
Speaker 6 (03:14:41–03:14:43)
Yeah, that's what I'm looking at.
Speaker 2 (03:14:43–03:14:47)
I'm on 4.5. I'm on 4.5. Oh, yeah, I have 4.5. No, this is 4.10.
Speaker 6 (03:14:47–03:14:50)
I don't know how you ended up with 4.5.
Speaker 2 (03:14:50–03:14:53)
I'm on 4.10. I have 4.10.
Speaker 6 (03:14:53–03:14:54)
It's been pretty consistent, though.
Speaker 9 (03:14:56–03:15:02)
Well, he added the conditions from Sean under the stormwater. I don't know if there were other changes.
Speaker 14 (03:15:02–03:15:04)
OK. Two more pages, people. Two more pages.
Speaker 2 (03:15:04–03:15:05)
4.10.
Speaker 14 (03:15:05–03:15:07)
I have 4.10.
Speaker 16 (03:15:08–03:15:08)
OK.
Speaker 5 (03:15:11–03:15:18)
But they should be in the proper sections. I agree with that. It might be in the 410. It's definitely in 410.
Speaker 2 (03:15:18–03:15:19)
Here's the 410.
Speaker 6 (03:15:19–03:15:19)
Yeah.
Speaker 2 (03:15:23–03:15:25)
It's in 16 and 410.
Speaker 6 (03:15:26–03:15:29)
It is. I see it there. Yeah.
Speaker 9 (03:15:29–03:15:34)
Yeah. Mm-hmm. Not because it came Friday. No.
Speaker 16 (03:15:37–03:15:38)
It's not in the chair. Yeah. OK.
Speaker 9 (03:15:39–03:15:43)
I think it came Friday. Is that right? What's that?
Speaker 5 (03:15:43–03:15:43)
I think it was Friday.
Speaker 9 (03:15:44–03:15:44)
Yeah.
Speaker 7 (03:15:45–03:15:48)
Friday, yeah. Let's check that.
Speaker 2 (03:16:01–03:16:34)
Yeah, the chance conditions. Okay. Are we ready to move to 17? Okay.
Utilities, water, and sewer. And this is flagging a question based on our CitizenSpeak comment. Halfway down, the water and sewer lines shall be installed in accordance with town specifications. So I think that should be verified
Speaker 9 (03:16:35–03:16:45)
They would, if the DPW doesn't find their plan satisfactory, they won't get the permit.
Speaker 18 (03:16:45–03:16:46)
Correct.
Speaker 9 (03:16:46–03:16:57)
So, I mean, that, I think this sentence, you know, that's the process that happens. The DPW makes that decision, that determination.
Speaker 6 (03:16:57–03:17:22)
I don't know. I think this sentence, I just wanted, you know, it's, It might need to be changed a little bit. The water and sewer line shall be installed in accordance with the town specs, you know, that sometimes refers to, you know, a pipe, you know, a connection, you know. I wonder if there's a word other than specifications that should be used.
Speaker 5 (03:17:23–03:17:30)
Could say standards and or subject to town DPW approval. Yeah. Mm-hmm. Okay.
Speaker 7 (03:17:33–03:17:33)
That sounds better.
Speaker 6 (03:17:33–03:17:34)
Yep.
Speaker 4 (03:17:35–03:17:37)
How about rules and regulations?
Speaker 9 (03:17:43–03:17:55)
It's still to be determined by the DPW. That's their jurisdiction. So the rules and regulations is fine, but it still flows through the DPW.
Speaker 2 (03:18:05–03:18:12)
Did anyone have anything else on this? I'm good. I'm good with that. Okay.
Drainage storm water management.
Speaker 5 (03:18:19–03:18:23)
This is where I adopted, I did incorporate the recommendations that came from Sean.
Speaker 7 (03:18:23–03:18:24)
Right.
Speaker 9 (03:18:28–03:18:54)
And so, yeah, go ahead. this initial funding of 5,000. Yeah. Is that up there, Tim?
Yeah. It's at the top of page seven. So that's under allowing for a third-party inspection of the stormwater system installation.
Speaker 2 (03:19:00–03:19:19)
And I thought Sean said it should be checked monthly. Like it should be like a, not just like a one time, but a periodic. So I wanted to follow up with him on how frequently that third party inspection of stormwater management systems during the installation phase should be made. Because it.
Speaker 9 (03:19:20–03:19:52)
So he mentioned there's a minimum if you look. There's sort of three, right? The bottom. That's the minimum, yeah.
and then prior to backfill of major systems and then periodic. So, you know, you could say not to be less than a certain number of visits, I suppose, if you want to make sure that there's how many periodic really means. So we know that he's already outlined two, right?
Speaker 2 (03:19:54–03:19:59)
So with that, I thought, let's table that and just ask Sean about that. Or maybe we can get that answer.
Speaker 11 (03:20:01–03:20:15)
Yeah, so in mine, I have a condition that I have to provide an annual report shall be submitted to the town engineer documenting the maintenance of the system.
Speaker 9 (03:20:16–03:20:20)
I think that's the third condition in Maggie, if you looked at it.
Speaker 11 (03:20:20–03:20:31)
I had also, a report for the effectiveness of the drainage 12 months and 24 months after completion.
Speaker 9 (03:20:32–03:20:56)
So those are… Well, I like the 24-month, 12-month effectiveness because that was something that I think I mentioned, making sure that it's functioning as designed and as anticipated. That's sort of the idea I set up commissioning.
Speaker 2 (03:20:59–03:21:01)
So this has a 12 on an annual basis.
Speaker 6 (03:21:03–03:21:16)
There's two different types of inspections. One is oversight of the installation during construction.
Speaker 9 (03:21:16–03:21:21)
That's number one. That's what's covered under the first condition.
Speaker 6 (03:21:21–03:21:21)
Yeah.
Speaker 2 (03:21:23–03:21:30)
then it's following the completion of installation, and then it's an ongoing maintenance. So there's three.
Speaker 9 (03:21:32–03:21:41)
Right, so the second one is upon completion. And then the third is the maintenance.
Speaker 5 (03:21:42–03:21:45)
Second one's also prior to the issuance of an occupancy permit.
Speaker 16 (03:21:45–03:21:45)
Right.
Speaker 2 (03:21:47–03:22:18)
And I just was going to add after the $5,000 to cover the cost of the basic inspections, assuming the work is executed in an organized way. Otherwise, additional funding may be required. That seemed open-ended on who was it may be required, but who's going to pay it. So I just thought to be paid by the applicant maybe should be added on that.
Because that $5,000. if additional funding is required.
Speaker 5 (03:22:18–03:22:26)
Specifying, the town's not paying. We can clarify that.
Speaker 6 (03:22:26–03:23:20)
I just adopted Sean's language. I don't think $5,000 is going to go very far at all. It'll go nowhere. I actually feel like what it should read is the applicant shall allow for and fund third-party inspection of stormwater management system.
and all earthwork activities, because they're part of it. The earthwork and the stormwater, they work together. That's really what the oversight should be. It's the geotechnical part of the site, you know, is really what should be asked for.
And I don't think it should be a technical consultant designated by the board. We don't want that responsibility for designating who it is. You know, that should be the project team's responsibility.
Speaker 9 (03:23:21–03:23:24)
Do you want to be independent of the project team, though, don't you?
Speaker 6 (03:23:24–03:23:30)
I should be, yeah, but it should be, you know, Paul probably works with plenty of geotechnical consultants, you know.
Speaker 9 (03:23:30–03:23:35)
How about by, just approved by the board, that way?
Speaker 6 (03:23:35–03:23:37)
Approved by the DPW director.
Speaker 9 (03:23:37–03:23:40)
By the DPW director, yeah.
Speaker 6 (03:23:40–03:23:59)
Yeah, I don't think we have expertise to approve a geotechnical person, and we shouldn't take that responsibility, but it should be somebody qualified. and it shouldn't be our responsibility to do it. I'm not even sure the DPW would want that, but their responsibility.
Speaker 10 (03:23:59–03:24:24)
For earthwork and things like that, there'll be specifications in the construction documents. There'll be specific requirements and compaction. On projects like this, it's not a and they would just sort of do that as, you know, just a matter of standard practice. So, you know, those reports could be made available.
Speaker 6 (03:24:24–03:24:40)
Yeah, I mean, I would expect for a project of this size that Northbridge would have an independent testing agent and probably a geotechnical, you know, both of those parties are important to make sure that this investment they're making.
Speaker 9 (03:24:40–03:24:44)
They'll be required to by the building code and building officials anyway.
Speaker 6 (03:24:44–03:24:51)
And maybe the lender, if they have a lender involved in it. So I think this needs a little bit of work, Ned, a little bit here.
Speaker 10 (03:24:51–03:25:12)
There'll be submittals on materials to make sure, and I'm just talking about the site work here, that the materials conform to specifications in terms of gradations, and there'll be in-situ compaction testing and things like that. All that stuff is spelled out in specifications just as a matter of practice.
Speaker 9 (03:25:14–03:25:35)
Just because of the importance of this, having that be another peer review is basically what this is. If Sean, you believe like the whole earthwork aspect of it, then maybe there should even be a peer review of the specifications that come in on the final construction documents. I mean, this is one of the critical issues.
Speaker 10 (03:25:35–03:25:47)
I would ask Sean whether he thinks that's warranted or not. Okay. I'd ask him. I have a feeling how he might respond, but I'm not going to try to speak for him.
Speaker 2 (03:25:48–03:26:29)
And the last thing that we discussed was a bond. I put a call into Chase Berkeley on if the system, for whatever reason, is not functional, if there is an issue, just as a recourse to have some sort of a bond. just during the construction phase. And also, with the amount of trucks coming in, it could be incorporating a small section of Highland Street, if there's damage to the roadway with coming in and out, just that there would be a bond, as we typically would do, to be released once satisfactory.
Speaker 5 (03:26:31–03:26:44)
I'm not aware of any bonds that are required for the protection of public ways. There may be one that I'm not aware of it. But I think the question is, what are you bonding?
Speaker 2 (03:26:44–03:26:46)
I was gonna ask Chase about that, yeah.
Speaker 5 (03:26:46–03:26:50)
I think the question is, what are you bonding? Certainly there are.
Speaker 2 (03:26:51–03:27:31)
There would be two different bonds. Well, actually, we've actually talked about three. We've talked about a tree removal, an accidental tree removal bond. a stormwater mitigation, a bond, if there's any determination of, you know, an issue.
It was, Sean recommended, it was one of his things that he said, definitely, you should have some sort of bond. I just didn't know on a project what his recommendation of, would be for the amount of how much to bond. and then if there was damage to the roadway.
Speaker 11 (03:27:32–03:28:00)
Yeah, I thought about damage to the roadway because if we were getting, I was just thinking, 400 truckloads of fill at 50 cubic yards, I would anticipate that Highland Street is gonna get pretty beat up. And it seems like it's already getting pretty beat up now. So it's just gonna get worse. So I don't know, even if you just pave up until the project,
Speaker 12 (03:28:00–03:28:02)
They're going to have to dig the sewer, right?
Speaker 14 (03:28:04–03:28:10)
We've got to cut the street up for the sewer. Can we require them at the end to put a final top coat?
Speaker 6 (03:28:10–03:28:15)
Paul, can you describe the forced main where it goes?
Speaker 10 (03:28:16–03:28:56)
Sure, the force main starts in the service area at the site, which is where I mean, I call the drawing from when I just talked through it, but it then goes out the driveway and it goes along Highland Street to Stafford. And then there is a gravity brake manhole that goes in this stub on the last manhole on Stafford. But we'll just call that a little gravity brake manhole, which was requested by the DPW. And that's how it makes sense.
I can call it the plan if you want to look at it.
Speaker 6 (03:28:56–03:29:06)
And what is the intention of the offsite work with regard to the roadway after you, you know, install the force main?
Speaker 10 (03:29:07–03:29:38)
you know, at face value, it would just, I mean, it's a force main, it's not a big pipe, okay? It's only like two inches. You know, there will be other utility work in Highland Street to put the water in and underground electric and things like that. So, you know, there'll be some utility work in Highland and, you know, at a minimum, we would do trench patches and if, you know, the amount of disturbed pavement warrants, you know, Complete overlays for section of it.
Speaker 5 (03:29:39–03:29:57)
Then, you know, that's something you can discuss All right, so finally at the end of day Highland Street would have to be restored to the standard determined by DPW Yeah Is there a joint is it probably, you know?
Speaker 10 (03:29:57–03:29:58)
Yeah. Yeah, exactly.
Speaker 6 (03:29:58–03:30:02)
Whatever DPW is there a commitment to do that anywhere?
Speaker 16 (03:30:02–03:30:02)
I
Speaker 5 (03:30:04–03:30:17)
Only other than, not specifically in here, but certainly a commitment to comply with all requirements of the DPW. We have to comply with every other town requirement.
Speaker 6 (03:30:17–03:30:42)
Yeah, but I don't know that there is one necessarily. I think we should just think about that, Ned, so it's not a point that's debated later. What was said during the meeting, what wasn't. There's a limit to where your work will take place on Highland.
From what Paul described, it's no further than Spafford and in one direction, and it's no further than, I think it's probably right at the front door.
Speaker 10 (03:30:42–03:31:03)
But maybe a little bit further. Going north, we're putting in a crosswalk. So the northern limit on Highland Street would be at the crosswalk, which is heading towards 107, and then up to Stafford Road, and that's it.
Speaker 14 (03:31:06–03:31:24)
Where does the water main come from, north or south, in relation to the entrance? But towards Canton Ave or up towards Spafford? Where's the direction flow in the water main itself? I forget.
Yeah, it's right on Highland, right? You're tapping off of Highland. Yeah, it's on Highland Street.
Speaker 10 (03:31:24–03:31:29)
It runs under Highland and we just tee off of it at the driveway.
Speaker 6 (03:31:30–03:31:59)
In my opinion, I think Chase should get an opportunity to say how he wants that street restored. And if he said, hey, I just want the applicant to follow the standards of trench cut and trench repair, then that's what it is. And if he says, boy, there's substantial disturbance of the road, I'd like that section to be repaved. Let's give him a chance to say, I just don't want to discuss it, debate it later.
Yeah, no, I hear you. That's fine.
Speaker 7 (03:31:59–03:32:05)
Great. All right. So that.
Speaker 6 (03:32:08–03:33:33)
There's one I'd like to bring up related to what you had mentioned. You were talking about stormwater and we've had so much conversation about stormwater and what's been said, inclusive of, and Sean's not here tonight, inclusive of Sean saying this design will work, right? You don't have to tell me. I will tell you that he said that.
But, you know, we've got neighbors that feel that they have a concern. They have an anxiety. Is there… How, you know, how, is there any way to address that, you know, to pacify the concerns of the neighbors?
Do you have any thoughts at all? You know, there's, as I know it, there's 22 homes on Spafford and, you know, many have this concern that their condition is only gonna get worse as a result of this development, yet you have said that No, that won't happen. You know, we have designed something in compliance with the stormwater management system. Sean feels that way too.
It has to go to DEP. DEP is going to render an opinion. But while all that has been said and all that is either, you know, past us or, of course, the DEP approval is ahead, is there something out there for the neighbors that the applicant would be willing to do?
Speaker 5 (03:33:37–03:34:18)
We'll put our heads together and think about it. From an initial perspective, we heard a lot of testimony about existing flooding basements. How do you quantify what's different? And how do you then establish a right of action, if you will, where the person making the assertion has to prove that there's been, you know, an increase in infiltration to a basement.
I don't know how you start there. We'll think about it. I just don't.
Speaker 10 (03:34:18–03:35:22)
This project is not going to affect basement water on Stafford Grove. It just isn't. You know, that is a gradient of, of the site, it won't. And, you know, we've designed this to, as I said, to meet the standards and, you know, we've got climate change going on as everyone's been talking about and, you know, I don't.
I don't, I just don't see, it's not that you're not, I can say with confidence that we've designed this thing, you know, do with the standard of care that's required for projects that complies with the rules. We've done everything we're supposed to do. You know, all the standard practices, we've run the models by, you know, accepted practices, which have been scrutinized and you know, it will work. Okay.
Now that to say that this will work and to say that nobody, along Highland Street is going to ever have stormwater problems again. It's like those, those are two different things. And I don't know how you would separate the two.
Speaker 6 (03:35:24–03:35:43)
Yeah, Paul, I'm not, I'm not going to say it is easy to separate them. But You just spend a little bit of time on Spafford, right? You see just, I wouldn't say it's every home that's pumping water, but an awful lot of them are. So I understand and I appreciate why they're concerned.
Speaker 5 (03:35:43–03:36:15)
I'm not debating that that's happening. The question is how do you establish a baseline Against what I don't have a we're next and I just don't know that I don't know how you do that I don't know and and I don't know how you How anybody could reasonably other ever? prove that they were entitled to some level of compensation because There's been a change. Yeah, I don't know how you do that.
I don't even know that takes that takes engineers and Takes a lawsuit. Yeah, I mean I went through it.
Speaker 16 (03:36:15–03:36:15)
I
Speaker 6 (03:36:16–03:36:18)
Yeah, it might not be possible.
Speaker 5 (03:36:20–03:36:27)
As I said, you've presented the issue, we'll think about it, and I'll try to come up with something. I can't promise that I'll get there.
Speaker 14 (03:36:28–03:36:49)
I know you don't represent the hospital, but the only thing that I could conclude is that the back parking lot in the hospital could possibly be running into the backyards of Spafford. I don't want to push it with the hospital, but I'm just wondering, is there a way to do some kind of a storm water study just to say, hey, is this water really running towards Stafford or running down towards Reidsdale?
Speaker 5 (03:36:49–03:36:50)
Well, we've done that.
Speaker 14 (03:36:51–03:36:54)
You have? Not you, but the hospital has done that?
Speaker 5 (03:36:54–03:37:31)
Well, I don't know what the hospital's done because their issues are, that's a different watershed than ours. Right. We know where our water's coming from. It's coming from up from Highland Street, it's coming from the properties above us on Highland Street, and it's coming from Winter Valley, the back of Winter Valley, and it's coming down through two intermittent streams, meeting together at a vernal pool, and going off site through the stone wall and down through a channel to the town wetland.
We're below all those who claim to be affected by changes in groundwater.
Speaker 14 (03:37:31–03:37:41)
I don't think it's coming. I do believe that the two watershed theory, and I do believe that Highland Ave is what was the, a drum one, and it splits the watershed. I get all that, I'm just.
Speaker 5 (03:37:43–03:38:01)
I mean, Spafford Road from Highland Street goes up the hill and then down the hill. The top of that hill establishes which way the water goes. Got it. On one side it goes down to our site, and the other side it goes down to Reedsdale Road.
That's just, that's fundamental laws of gravity.
Speaker 14 (03:38:01–03:38:11)
Yeah. The only thing I'm thinking of is that if you look at the hospital rear parking lot, it does have the potential for the water to run off the backyards of Spafford.
Speaker 5 (03:38:11–03:38:48)
Yeah, I understand that maybe 20 years ago there was a whole bunch of Activity that went on between Spafford Road neighbors and the hospital. I don't know what the outcome of that was But there were claims made that there were groundwater effects associated with Some of the work that went into the hospital. I don't that's all I'm Anecdotally aware of that. I don't know anything more than that But I I mean, I don't know what we can do relative to what may be happening at the hospital.
Speaker 11 (03:38:49–03:39:08)
All right, I do wanna- Yeah, can I just have one question about, since we've talked about Sean Reardon, our peer consultant, has he provided us with his insurance of liability? Since he is advising us if something were to go wrong, is he liable, I wonder?
Speaker 2 (03:39:10–03:39:14)
I would believe that that should be on file with the town as a part of his contract.
Speaker 9 (03:39:16–03:39:23)
Tim? But the responsible party is the design engineer. So that's Paul.
Speaker 2 (03:39:24–03:39:53)
That would be Paul. All right, that's good. All right, given it is 1040 right now, I think something that is really important, and not that I want to I want to, we're going to have to, you know, talk about 20 through 24 as well. But construction materials, because as part of the special permit, the quality of construction materials is, is relevant.
And so why we have, do we have the architect?
Speaker 5 (03:39:55–03:39:56)
She's not here tonight.
Speaker 2 (03:39:56–03:41:01)
She is not here tonight, okay. So I have some strong observations or concerns with some of the construction. The first materials of the project, back in the special, it's referred to the exterior siding as vinyl clabbered and I, First of all, that's not sustainable materials. And I think it's a real inexpensive and a cheap look to what we're trying to create as a high-quality project.
Typically, we've looked at clabbered. We've looked at other things that would be, again, low maintenance. We're not trying to add to maintenance and require real cedar shingles, or we're trying to, but something, an alternative other than vinyl, I would ask the other members if there's materials that you would prefer to see as well.
Speaker 14 (03:41:04–03:41:14)
I like the hardy plank, or natural wood, but natural wood is just so difficult to paint. Looking good. Hardy plank's a great product.
Speaker 9 (03:41:14–03:42:18)
You can get a pre-finished, generically, fiber cement board, which is basically what a hardy board is. And not all fiber cement is of the same grade and quality. So you'd want to get the level that's a higher density, a higher cementitious content, so that it has more durability. But it can come pre-finished so that The disadvantage of something like a natural wood would be maintenance, I think.
But the high-density fiber cement is used in commercial applications regularly. So I do think it's a more sustainable material. It has a different visual than the vinyl. but was used at the Goddard School, for example, which is maybe not quite as close.
Speaker 2 (03:42:18–03:42:26)
Which would be the closest looking like actual real wood, the composite or the both composite? I mean, both composite, but a hardy plate?
Speaker 9 (03:42:26–03:42:39)
Well, you can get it with the texture, or you can get it smooth. So even hardy makes them both that way. Vinyl doesn't come with that kind of a wood texture that you can get with the fiber cement.
Speaker 14 (03:42:41–03:42:45)
The problem is you're gonna most likely do PVC trim.
Speaker 2 (03:42:46–03:42:47)
Right, that's what they have on here, too.
Speaker 14 (03:42:47–03:43:10)
Yeah, I mean, you almost can't avoid that. Yeah. So, I mean, that is never gonna look like real wood. You can dress it up with back bands and cornices and things like that.
Right. I mean, the hardy plank, or a fiber cement product, or PVC trim is probably, you can make it look really nice, I think.
Speaker 15 (03:43:11–03:43:17)
I mean, the next nicest thing is real wood. And it's just so tangible. It's so hard to maintain.
Speaker 2 (03:43:17–03:43:28)
No. And either of those options, I would think, would be fine. It's just a vinyl siding on a building, I just think is.
Speaker 5 (03:43:28–03:43:35)
This is the first time I've heard the term vinyl used in the course of this hearing. I wasn't aware that they were proposing a vinyl drawing.
Speaker 2 (03:43:35–03:43:51)
I didn't either. I didn't realize until it was in the memo and it was describing. I had not caught that because I assume that builders don't even use vinyl siding anymore. I thought it was a sort of a 70s era that we're away from.
Speaker 14 (03:43:51–03:43:52)
He can get some decent vinyl sliding.
Speaker 5 (03:43:53–03:43:58)
Yeah. We'll take a look at that. I mean, obviously, it needs to look right.
Speaker 2 (03:44:00–03:46:00)
And the other thing that we were talking about is the windows. And on the plans, and I was trying to look, the way that the sections are cut for the elevations, I don't want to put Tim on the spot to pull up I don't know if that's too inconvenient, but I couldn't find a site section that showed the right wing because when I asked for the, there had been some small windows off to the left side where there was sort of an office area. They put full-size windows in there. I think there's small windows.
When I was looking at one of the depictions, it showed smaller windows off to the right side when you would come around the driveway from the right side, and I just couldn't find that elevation. I don't know if you could… We don't have to pull it up right now, but I wanted to flag that because if you drive in, you have a beautiful entryway, divided lights, the building's supposed to look consistent per our special permit. And if there's a set of small windows off to the right, I think that's going to really throw off the look of the building.
So I just wanted to clarify that. And there was also an elevation where there's like six small windows. It was a sort of a random elevation. And I thought maybe we would want to revisit that to see why that was done the way it was.
Because it looks, it just looks odd on the building. Because it's a very attractive building from the front, but there was just a site section that looked just like a bunch of small random windows, which, and I have large size elevations, but it was really that, for the front, especially when you come in the front drive, I just think that's really important.
Speaker 9 (03:46:00–03:46:13)
Well, there's different, there are elevations here that show small windows, but you'd have to go back and look at the plan, what's happening behind there, to see why that they're small like that way.
Speaker 14 (03:46:13–03:46:18)
I think they're on a side wall or something, right? I think. Is that what you're looking at? F17?
Speaker 2 (03:46:20–03:46:58)
And then the windows that are on the, off to the right wing, do you see that? The right wing. Looking at the front, yeah, there's the, that I just wanted to make sure those had full-size windows as well. And so that you could just, that could be a question for the architect since she's not here, that we would be consistent with full-size windows across the front and any sides that would be viewed from the drive.
Speaker 9 (03:47:05–03:47:08)
It'll take a little bit to sort that.
Speaker 2 (03:47:08–03:47:25)
And I guess, and also, what window? We're assuming they're energy-efficient vinyl, probably, windows. But if there's a variety of qualities, I don't know if those specs were in there, what style window they're using.
Speaker 3 (03:47:28–03:47:30)
Meredith, I grabbed those elevations if you want me to share.
Speaker 9 (03:47:31–03:47:38)
Oh, good. All right. All right. So it says vinyl slash fiberglass window white with white trim on the elevation sheet.
Speaker 2 (03:47:43–03:47:49)
All right. So. So, Cheryl, what would the.
Speaker 9 (03:47:50–03:47:53)
I'm trying to find the. Q15.
Speaker 2 (03:47:54–03:47:59)
See, I guess this was the area that I was looking at. There's like six small windows there, which is random.
Speaker 11 (03:48:01–03:48:02)
Might be on the next sheet.
Speaker 2 (03:48:02–03:48:05)
Right behind Sean. On F13? Oh, yeah. On the right.
Speaker 14 (03:48:07–03:48:09)
It probably bumps out, though, right?
Speaker 2 (03:48:09–03:48:09)
Yeah, on the right.
Speaker 14 (03:48:10–03:48:11)
That little gable probably bumps out.
Speaker 2 (03:48:13–03:48:23)
Yeah, but those are on the first and second floor. That's like on the main floor. I just think that is odd looking for, oh.
Speaker 6 (03:48:29–03:48:31)
What is it? I can't even see it now.
Speaker 16 (03:48:31–03:48:32)
No, I can't. Yeah.
Speaker 2 (03:48:36–03:48:43)
So an F13. There. Press the button.
Speaker 16 (03:48:43–03:48:44)
You can hold it. Got it. OK.
Speaker 2 (03:48:46–03:48:59)
So this area is odd-looking. This, I couldn't tell. That was normal. I think full-size windows.
That area is odd.
Speaker 9 (03:49:00–03:49:43)
And I just, and then Cheryl, I don't know what the… F13 looks like, if you look at that plan on the right, it's on the, if you go down, Meredith, with your pointer, to the very right on the floor plan, if you go over further to the right, that's calling out as F13. Nope, all the way over, the top right. Right here.
That facade, that last facade on the top right there is F13, which is the elevation you were just looking at. Yeah, that. That one. So that looks to be in that corner on the upper right corner where those windows are.
Right there.
Speaker 5 (03:49:44–03:49:48)
Those, if that's the case, those windows are below the level of a retaining wall.
Speaker 9 (03:49:50–03:49:57)
Two levels, but yeah. Then you'd have to go look at the plan and see what's happening in the plan in that room.
Speaker 2 (03:49:58–03:50:07)
What's inside that? And then what I was… Let's see what section. This is our front entry right here?
Speaker 13 (03:50:08–03:50:08)
Yeah.
Speaker 2 (03:50:08–03:50:58)
So this area, the way it's depicted, you can't really see a direct what this looks like. We changed those to full-size windows here. But I'm concerned that these might have some of those odd-looking windows here. So that would be L1, A403, and L, yeah, just in this, so L13.
L10. Because this is going to be really visible when you come in that front drive. So 17, 13, 10, and 1. Is that possible to scroll to those, Tim?
The L17? L17, yeah.
Speaker 6 (03:50:59–03:51:02)
It has a lot of little windows on it. Just go to A403.
Speaker 5 (03:51:04–03:51:10)
I'm just getting a note that some of those are bathroom windows. Yeah, it's typical.
Speaker 2 (03:51:10–03:51:27)
Okay. And those are on the back, so that's, so, yeah.
Speaker 9 (03:51:27–03:51:38)
Most of the bathrooms are interior. On the floor plan I'm looking at, L1, no in those.
Speaker 2 (03:51:38–03:52:03)
So see, this is how, is this A1? Yeah, so here's the attractive front, and then you've got, is this visible on the front side, these two? L10, see how these are, like they're just, L10, all those.
Speaker 7 (03:52:06–03:52:06)
17.
Speaker 2 (03:52:10–03:52:24)
I'd like to, if the architect could look at those and just making full-size windows, especially what's visible from the front drive. These are, Cheryl, can you tell what the dimensions are on those windows?
Speaker 9 (03:52:29–03:52:57)
Like how small are they? I'm not a fan. I'm looking at the floor plan, though. So some of these, these are studios.
So there's a primary window on one wall, which is the big window. And then there's a smaller window on a side wall. And it could be that they're trying to minimize the impact on how you lay out furniture in these rooms.
Speaker 2 (03:52:57–03:53:01)
Well, that's if it's a bed wall. But if it's on the front of the building?
Speaker 9 (03:53:01–03:53:21)
The front of the building also has staff areas, staff lounge, a parlor, office, hair salons, et cetera. So can you show me which elevation you were looking at again, but in plan?
Speaker 2 (03:53:24–03:53:30)
It was the front wing, so it encompassed a few of these, because it angled.
Speaker 6 (03:53:30–03:53:31)
L10? It was 10, 13.
Speaker 9 (03:53:31–03:53:44)
10, this one right here. So that's a side window in a studio. So it's where the dresser and chair are shown and planned.
Speaker 2 (03:53:46–03:53:55)
So maybe if that, because that is visible from the front drive. That could be considered a side window.
Speaker 9 (03:53:55–03:53:58)
And is there another elevation you're looking at?
Speaker 6 (03:53:58–03:54:00)
L1 was one of them, wasn't it? L1.
Speaker 9 (03:54:00–03:54:01)
Yes, L1.
Speaker 6 (03:54:02–03:54:03)
Yeah, just to the left.
Speaker 9 (03:54:03–03:54:28)
Oh, yeah. In this right here. So all the way. Yeah, so it looks like what they have is one of the walls in the studio room has a large window.
And if there's other windows in that studio, that they're small. That's a bed wall. That one right there is a bed wall.
Speaker 21 (03:54:28–03:54:37)
Mm-hmm.
Speaker 2 (03:54:37–03:55:07)
Yeah, I think anything visible from the front driveway should try to be a full-size window, but we can look at that again closer, but I just wanted to, those were just a couple things that I, mostly the materials of the, of the outside. Did anyone else have anything for the architect that we should be taking note of to maybe have answered for next time?
Speaker 7 (03:55:12–03:55:18)
No, not for me. Yeah, it was just, let's see.
Speaker 9 (03:55:19–03:55:24)
Sean, you mentioned you had 15 conditions. Yeah. Do you want to share those with us? Yeah.
Speaker 6 (03:55:24–03:57:57)
I have some. We've already talked about some of them. One I just talked about, which was water mitigation. Previously, we talked about sidewalks on Spafford Street.
I think Ned had said no. The applicant wouldn't do that. I'm not even sure that the neighbors want that. You know, some neighbors are in favor.
Some neighbors don't want it. Speed bumps, some form of traffic calming measures on Spafford Street. A traffic mitigation fund we've already talked about. DEP approval is written in here.
I had a note for size reduction of building. I think the reality of it is, after talking about this last week and listening to Sean, where Sean describes most of the pervious area being roadway, parking lot, or that round, you know, paved surface in front. Reducing the building size would be de minimis, you know, with respect to improving groundwater conditions. That's at least, you know, his takeaway from last week.
You know, I had a note about moving the delivery drive to the rear of the building. which is why I asked Ned about the traffic, you know, how often would a vehicle be going down the delivery drive, how many vehicles, days per week. I find it to be less of an issue if it's 10 to 2 and it's 1 to 2 vehicles and it's Monday to Friday. You know, I was concerned that there was going to be a lot of traffic and a lot of backup alarms and just be disturbing to the people that could hear it.
Construction days, hours, you know, I still want to work through that. That's one. In some way, there could be another review by CONCOM, depending on what happens, I think, with DEP. You could end up back there again.
So that's a condition I want to make sure that we… I think it's already written in here. Porous pavement of that upper parking lot, we talked about that. That was one.
Oversight of construction, we've talked about that. Somehow that'll be captured here. And that was oversight of construction in terms of the practices of the site. The other one is oversight of construction of drainage systems, just to make sure that the stormwater management system is built properly.
I had noted the NPDES permit, which there was some conversation about this previously. You know, stormwater runoff, but that's a standard. I don't think we have to write that. You're going to be required to do that anyway.
Speaker 5 (03:57:58–03:58:00)
We also have to do a SWIP. I'm sorry?
Speaker 6 (03:58:00–03:58:32)
We also have to do a SWIP. Yeah, exactly. And then my last two were related. One was related to Milton Stormwater Bylaw Standards, which is written in here already.
I think Ned has that in here. And I had a note here, a landscape plan to be submitted for approval to CONCOM. You know, I think we talked about that at one point, but I don't know. That's a condition of the order of conditions.
Okay. So those were the 15 that I had. We've covered them in some ways. We've covered a lot of them.
Speaker 9 (03:58:33–03:59:28)
Okay, thanks. Meredith, I did have one thing architecturally that I had neglected to add. The zoning requirements and the design standards for the buildings require that the windows be either set into the facade or project out. Oftentimes windows are flush and it provides for very little relief in the facade.
I know there's lots of ins and outs in the massing here, but I would ask that the window detail be such that the window is set back from the face of the facade. They don't have to necessarily provide a detail, but I'd like for that to be noted, at least in our conditions.
Speaker 2 (03:59:29–03:59:38)
Shouldn't we have the specifications of the window style? Isn't that typically on the plan? Because it didn't, it just says white vinyl.
Speaker 14 (03:59:40–03:59:42)
Like a simulated divided light?
Speaker 9 (03:59:42–03:59:50)
Well normally, yeah, and we would just have the spec on what window. It shows the operation, like some are awnings and some are… Double hung.
Speaker 2 (03:59:51–03:59:55)
But it's not specific to the brand or style.
Speaker 6 (03:59:55–03:59:59)
Yeah, exactly. I think they're leaving themselves latitude, you know, to choose.
Speaker 2 (03:59:59–04:00:02)
They're going to want to branch that out competitively. Right. I understand.
Speaker 6 (04:00:02–04:00:16)
Yeah. And they probably have a preference to have the spec be open. And they could go anywhere from a Harvey to a Pella, an Anderson. I'm assuming that's why they don't have anything picked.
Speaker 9 (04:00:17–04:00:55)
But we would expect that to be a high-quality window. On the one hand, the thing about windows is that the sight lines or the dimensions of the members can vary quite a bit, which can change the look. So if we had one enlarged window with the dimensions, of the sash members, et cetera, trim members. That way, at least there can be some confirmation when it comes through for the building permit that it's not significantly different than this.
Because you can look at a beautiful rendering, and it can be a lot different the way it gets executed.
Speaker 6 (04:00:56–04:01:02)
Is it possible in there that the architect has what manufacturer they want to use for a window?
Speaker 5 (04:01:04–04:01:13)
Probably. We'll have to check. I'm getting a note that says high quality window needs to meet thermal requirements in the code.
Speaker 2 (04:01:14–04:01:20)
Well, high quality is, you know, Anderson windows. It's like, there could be a whole spectrum. Or Marvin windows.
Speaker 5 (04:01:20–04:01:22)
I'm sure she's got something in mind. We'll see what she's got.
Speaker 9 (04:01:22–04:01:51)
She could have something which is the basis of design. And so then that sets the baseline. And they can vary from that. As long as it meets that same, and you know, I've seen it where you say the basis of design in dimension and quality and in U-value and so that you're not just leaving it open, but these sightline dimensions can be significantly different depending on the window.
Speaker 2 (04:01:51–04:01:57)
Is that something that we would want to put in subject to approval, a final decision? of a window?
Speaker 9 (04:01:57–04:02:12)
Well, I think as long as we have a basis of design, that's adequate. If they send us what that spec is by email, we can look it up.
Speaker 2 (04:02:14–04:03:02)
We'll be able to take a look at an example. And the only other thing that I had, too, just on that is to have a dark colored enclosure for the trash area. I've seen some of this. Needham has a white plastic.
It just looks cheap, to be honest. So something that's darker, maybe a material that's a little bit more substantial. Dark green to blend in with the trees would be nice. It's been moved to the back, which is much better, but a dark green or a darker color that is of a decent quality material for closure.
And I think that's great.
Speaker 11 (04:03:03–04:03:17)
And under, can we go on to affordable beds? Yes, sorry. So there's no condition from like Milton residents? Should we have a condition, Milton residents?
Speaker 5 (04:03:17–04:03:18)
Cannot discriminate.
Speaker 14 (04:03:20–04:03:21)
Can't give Milton priority?
Speaker 2 (04:03:21–04:03:25)
I thought there was a preference. We did at one time talk about a Milton preference.
Speaker 5 (04:03:25–04:03:28)
There's no preference in the zoning for Milton residents.
Speaker 9 (04:03:30–04:03:40)
I believe we discussed it. Well, I would say that this has been approved by the Affordable Housing Trust, so maybe a question to them about that would be appropriate.
Speaker 5 (04:03:41–04:03:42)
Okay.
Speaker 11 (04:03:43–04:04:00)
Well, their definition of Milton resident is once you live here, then you're a resident. So I don't necessarily agree with that definition. So I think Milton resident is like someone who's here, maybe someone in the neighborhood to is dealing with the impacts.
Speaker 9 (04:04:01–04:04:47)
There are fair housing, you know, requirements. There has been acceptance, I guess, at the state level of a Milton preference for a certain percentage. Yeah, wasn't it like 70%? But that's not…
I did attend this webinar put out on by the AG's office that had part of it dealt with fair housing. They are concerned about that kind of provision in permits. I don't know how, if it applied to a memory care facility, how they view that, because what they were looking at was more just traditional housing on the other.
Speaker 11 (04:04:47–04:04:58)
Because again, this was sold to town meeting as an amenity to Milton residents. So just trying to make it.
Speaker 2 (04:04:58–04:05:11)
And Northbridge definitely told us when we first started. I mean, I do remember very clearly saying, and there's folks here who talked about it. It says it, yeah, in all of our early applications.
Speaker 22 (04:05:11–04:05:23)
Okay, that's great.
Speaker 2 (04:05:23–04:05:35)
Exactly, absolutely. That's great. So Ned, if we can look into sort of adding, somehow adding that, if it's appropriate.
Speaker 23 (04:05:37–04:05:42)
What does that mean if it's in the permit, but that it's not legal?
Speaker 2 (04:05:42–04:05:44)
Well, we need to find out before we put it in if it is. Yeah.
Speaker 23 (04:05:45–04:05:48)
No, I think that's how it was sold, though, to get the permit, right?
Speaker 11 (04:05:48–04:05:54)
To get the bylaw passed. I don't know who sold that.
Speaker 5 (04:05:54–04:05:54)
I didn't.
Speaker 24 (04:05:54–04:06:05)
I guess the question. Yeah, the practical side is, typically, residents are coming in and paying for a period of time that they run out of funds.
Speaker 16 (04:06:05–04:06:06)
They have priority within the local units.
Speaker 24 (04:06:07–04:06:15)
So we're trying to accommodate and support families when they potentially need the housing loss.
Speaker 9 (04:06:15–04:06:26)
The actual zoning says there shall be a preference for Milton residents for units, including the subsidized units, insofar as legally permissible. Exactly. So that comes to the Fair Housing Law.
Speaker 3 (04:06:32–04:06:43)
Meredith, is someone speaking? We can't hear anything of what's going on.
Speaker 18 (04:06:43–04:06:43)
Oh, yes.
Speaker 5 (04:06:44–04:07:13)
Sorry, that was Jim Coughlin. He does not have a microphone. which Jim just, Jim is the CEO of the North Bridge Communities. What he's basically saying is that to the extent that it's otherwise, as the bylaw says, to the extent that it's legal, there will be a preference for Milton residents.
Speaker 9 (04:07:13–04:07:19)
Okay. So that could be put into- You can add that. That paragraph.
Speaker 2 (04:07:20–04:08:06)
Yeah. Okay, good question. Commencement and completion of construction. Are we ready to go into that?
Or did we still have more with the affordable? I think that's been approved by the Affordable Housing Trust, so. We should be good there. Construction shall be commenced within one year.
I'm fine with those dates for you all. Amendment of these permits shall be amended.
Speaker 7 (04:08:08–04:08:10)
Substantial amendment shall be subjected to the usual.
Speaker 11 (04:08:12–04:08:19)
Should they be required to check in with the neighbors and provide like an update?
Speaker 2 (04:08:24–04:08:27)
for amendments or for the construction?
Speaker 11 (04:08:27–04:08:43)
Or just for during the whole construction process so neighbors kind of know what's coming and how long that phase should last. And maybe there's just one neighborhood representative. They don't have to do everybody.
Speaker 2 (04:08:43–04:08:51)
Yeah, that was actually Walcott Woods did that and still does. And that's worked nicely, I think, to keep people updated on what phase
Speaker 5 (04:08:51–04:09:03)
The order of conditions requires look-ahead schedules to be provided to the town. We could certainly provide to a representative, a designee of the neighborhood.
Speaker 2 (04:09:05–04:09:11)
I think that would be helpful.
Speaker 14 (04:09:11–04:09:15)
Did Walcott want to do it with some kind of a website or just email blast?
Speaker 2 (04:09:15–04:09:20)
Inviting an email list, yeah. That seems reasonable.
Speaker 12 (04:09:24–04:09:27)
Should you do some kind of email blast to the residents?
Speaker 5 (04:09:29–04:09:51)
It certainly can be done. Currently, when I'm filing anything, I email it now because most of them are represented by council. I email it to the various attorneys who are involved. But for a while, I was emailing it to a much broader list among the neighborhood.
So it certainly can be done. It's a simple thing to add or subtract a name to it.
Speaker 14 (04:09:51–04:09:53)
Sounds like a nice thing to do.
Speaker 6 (04:09:54–04:10:30)
Can I speak from a builder's perspective? This will become the builder's burden. I think it would be better to choose one designated representative and have that person be the recipient and let them decide. Because otherwise it could open up channels of communication that could become very difficult to manage.
So if the neighborhood has a designee, my recommendation is just choose that person, you know, and they get submitted to the building inspector and also to whoever the neighborhood representative is, and the neighborhood representative takes it from there. It'd be a little easier.
Speaker 9 (04:10:30–04:10:57)
Tim, can you scroll down to the last paragraph? Number 24. Just, I think it's, The word's Town Planner. It should be the Director of Planning and Community Development.
All right. Thank you, Tim.
Speaker 6 (04:11:04–04:11:20)
Does that recording have to go to the Town Clerk or just to Tim? What does it normally go? To the clerk? She stamps it.
Speaker 5 (04:11:24–04:12:13)
If there's a permit that's issued, it goes to the town clerk. It sits with the town clerk for 20 days to determine whether or not there's been any appeal. If there is no appeal, then it gets recorded at the Registry of Deeds. And then you provide a copy of the recorded document back to the town planner or to the conservation agent as appropriate.
If there is an appeal, then nothing gets recorded until the appeal is resolved. Okay. So back to Tim. Yeah, I think in this case, Tim would be the appropriate keeper of the record, either he or the building commissioner, but presumably the director of planning.
Speaker 3 (04:12:14–04:12:42)
Yeah, we don't typically have county recorded documents then go back to the town clerk. The county registry of deeds is like the super clerk. They've got everything that's the official copy. Yeah.
All due respect to the TOW clerk who is a super clerk. No, no.
Speaker 6 (04:12:43–04:12:44)
Well cleaned up. OK.
Speaker 2 (04:12:45–04:12:59)
All right. So at this point, it's 1115. I think this is a good time to continue the hearing. I don't know if, would you like to, someone like to.
Speaker 25 (04:12:59–04:14:50)
I just wanted to comment on one thing that was specifically discussed tonight. Yep, yes. So just I understand they're doing some work to the landscaping possibly as a result of your comments tonight So I just wanted to pass around There was a question about what this looked like this area now, and I actually have a folder a piece of paper in it that actually shows you. And it's quite contrary to what was on the screen.
It's extremely sparse there. So that's what's there now. And I would specifically ask, I think I asked the last time the landscaping was discussed, we'd really like to see when we drive up Spafford Road, it's the closest spot to that building is right there on Highland. It's not that long, beautiful entrance.
We're looking at the side of the building right there in that area you're going to see in the picture. And I think a pretty big retaining wall. I know that retaining wall is 19 feet in some areas. So I would really ask that we slow down and be certain that we're going to be able to mitigate, because we have this scenic road, beautiful residential neighborhood, and I wouldn't want to speculate about what plants are going to be able to cover this 19-foot retaining wall, especially since the landscape architect appears to be under the impression that it's a quite you know, green space, and it's really not the vast majority of the year.
So I'll leave it at that, and we'll have additional comments.
Speaker 6 (04:14:50–04:14:59)
Can I ask a question? Sure. This looks like it's further up Highland. Is that, what residences are we looking at?
Speaker 25 (04:14:59–04:15:03)
I think that's the, can I show it to you, Bart, because it was part of your slide show?
Speaker 6 (04:15:03–04:15:10)
It looks to me like that's the Bacardi residence on the right side of the photo, and the next residence up on the left side of the photo.
Speaker 25 (04:15:10–04:15:28)
Yeah, so if you go up sort of across from, that's correct. If you go up this street, so if you're driving up Spafford, you see kind of the site in front of you, and then the Bacardi residence, and then over that would be like the top of Buckingham.
Speaker 6 (04:15:28–04:15:33)
But isn't this further up the road than the site? This looks like it's further up the road to me.
Speaker 14 (04:15:33–04:15:36)
It says adjacent to 107 111.
Speaker 2 (04:15:37–04:15:43)
It is fairly sparse. It's not, it doesn't, yeah.
Speaker 6 (04:15:43–04:15:54)
I'm not suggesting that, but I'm just, I guess I look at that, that's not the site the way I see it. That's up the road. That's in front of Bacardi and in front of, I don't know who the next resident's up to.
Speaker 2 (04:15:54–04:15:55)
It's hard to tell from that angle.
Speaker 25 (04:15:56–04:16:02)
The Bacardi residence is right, you know, snug up to the site.
Speaker 6 (04:16:03–04:16:14)
Yeah, as I look at that, if you look at that again, Manette, it looks like it's from in front of Bacardi and in front of the residence to the left. The condition where you're describing might be just like it.
Speaker 25 (04:16:14–04:16:22)
I see what you're saying. So this is Highland here.
Speaker 6 (04:16:22–04:16:22)
They're both Highland.
Speaker 25 (04:16:23–04:16:35)
Right? This is Highland and that's the Bacardi residence right there. And this is from… I guess regardless.
Speaker 6 (04:16:36–04:16:48)
As far as the area. Well, the reason it's important is it's further up the road. It's not in front of the site. It's further up the road.
You look at it, Ned. It doesn't look like it's to me.
Speaker 25 (04:16:50–04:16:58)
That's pretty much the site. I honestly like, adjacent to 107 to 111. I mean, if you go and look.
Speaker 6 (04:16:58–04:17:00)
You're going to build in front of the Bacardi residence then.
Speaker 25 (04:17:00–04:17:05)
Well, do you know the Bacardi is 25 feet away. I understand that.
Speaker 6 (04:17:05–04:17:10)
It looks like it's right in front of it. It looks like it's going to be built in the front yard.
Speaker 22 (04:17:11–04:17:57)
Can I just make one comment about landscaping? In the zoning, we did talk about it a lot. Do you want to hold the microphone? Yep, sorry.
Hi, sorry. Teresa O'Brien, 42 Spafford. We did talk about trees and landscaping a lot. And one of the things was 20-foot trees to be planted.
And tonight, it didn't sound like there's many 20-foot trees planted. So that's in the zoning. It's section H that all trees should be 20 feet tall. And if the wall's 19 feet, it'd be great if we could get more of the 20 foot trees.
Because we did talk about, I'm sure you remember, that was a lot of zoning. Thank you. Thank you. And I can send you a picture for my deck.
That looks better.
Speaker 2 (04:17:59–04:18:07)
Thanks. OK. All right. So at this point, oh, sorry.
Yep. Pardon? Thank you. Thank you.
Speaker 16 (04:18:09–04:18:15)
Could I just ask, will we have a chance to speak at the next hearing, or how would you like to handle that?
Speaker 2 (04:18:15–04:18:17)
Yes, you will have a chance to speak at the next hearing.
Speaker 16 (04:18:17–04:19:40)
Okay, so I'll save my comments. I think just to, I think probably what Minette, my neighbor, was trying to express is that for significant parts of the year, that's sort of what you see, even though that is the neighbor. It's very sparse in the winter, and so that's why the evergreen plantings are so important. But our concern is, of course, that they don't really do well in the wet area.
So to the extent that more evergreens can be planted in the upland, The problem with that is, as you know, they're building on almost every square inch of the property, so it's hard to plant a lot of evergreens. And so what we're facing is that the majority of the year you're looking at 19-foot retaining, industrial-grade retaining walls that are not really… Cohesive with that spot that site the neighborhood the town So yeah, I'll leave it at that But I think that's that's part of the concern and if you look in the wetland area even on some of those Google Street images there's a kind of a Gap where there's just dead trees because nothing really grows the tall trees are further back and then there yeah there are a few young saplings in the front, but there's just all Japanese knotweed in the more recent pictures. So it is quite remarkable, the difference between summer and winter.
But thank you all. I'll hopefully have some time to give more expansive comments. Yes, thank you.
Speaker 2 (04:19:40–04:19:53)
Going to be continued. So. Great. OK, so with that, was there anything else from the board before we have a motion to continue the public hearing?
Speaker 3 (04:19:53–04:19:56)
Meredith, we do have Nadine Hanna with her hand up on the Zoom.
Speaker 2 (04:19:57–04:20:02)
OK. Nadine, if you would need to speak tonight, but you will have a chance on the 24th as well.
Speaker 26 (04:20:04–04:23:36)
Hi, Meredith. Thank you so much. Nadine Hannah, Lowenstafford Road. Thanks, Tim, for noting that my hand was up.
The full album that I was unable to show last week, just due to the time that it was submitted, I was awarded the opportunity to walk the private residence side of the property line multiple times over the course of many recent significant rainstorm events. quite a bit of those albums. If you have a chance to review them, we'll show you all of the standing and moving water throughout the adjacent properties. But also, I do take pictures from Bacardi property line all the way past down towards the entrance on the Highland line, you know, past the driveway and showing that stable or barn or, you know, whatever else we have on the farther of the proposed site.
And you will see the scarcity of plantings and of trees. And there are trees and they're not talking about removing the trees up at the Highland line, but it would kind of show that whether the angle of the picture that Manette was showing was, you know, directed towards Bacardi or not, it's irrelevant because a lot of the screen, quote unquote screen currently at street side is, you know, dried reeds and so on. I do beg you guys to take a look at that. I'm not asking to present it right now, but it does show the entire street side view, you know, pick by pick.
So that and, you know, just one comment from something that was said earlier, it does still sound like no matter what happens, contractually between the proposed site and their vendors, it'd be much like the hospital and the current vendors, where really the onus and the burden of proof of, you know, how people are operating, what streets they're using will still come down to the residents locally. And that would really be all of us on Stafford Road. So I don't really hear anything different And in fact, I heard quite a bit tonight of much the same, and the same was the answer of no to so much of what you had asked of them and their legal counsel. And so once again, thank you for everything, but just let's all really be cognizant of the fact that they had a site, excuse me, they had a build, they had a business that they wanted to put in Milton, And this is just a location that they're going to try to wedge it into.
They already had, you know, the scale of it, the scope of it mapped out from a business perspective and everything else either checks their boxes or it doesn't. So it's really, you're our last line of defense. We appreciate you. I don't really believe that they're going to bring it down any much in size or impact.
The traffic situation will only get worse. and what you can do to help combat that, we appreciate. So thanks once again, please look at those pictures and have a great night. Thank you.
Speaker 2 (04:23:36–04:23:48)
Thank you. Thank you. All right. So with that, can I have a motion to continue the public hearing for 111 Highland Street?
Speaker 3 (04:23:49–04:23:52)
Meredith, we've got Diane Agostino with her hand up in the Zoom.
Speaker 2 (04:23:53–04:24:02)
Okay. Do one more comment before we Welcome Diane Good evening.
Speaker 27 (04:24:02–04:26:00)
Sorry to be so late, but it was the first time I heard about the 19-foot retaining wall and I just wanted to present tonight the concern or the request that the planning board look into a the issue that a 19-foot retaining wall may have being built on that particular site. In fact, a quick review of the building code, very quick review that I can provide to you all later, mentions that a superintendent may have to, I was trying to read it to you, may have to review and investigate the soil. As we know, a general retaining wall would require about a two to four foot footing to make sure that it's supported. And I understand there was some mechanism that they suggested which would not require going into the earth because most likely they would run into water.
So I hope you will review this with the building inspector to understand what the code requirements are. Because if pilings are required to be put in to have a 19-foot high retaining wall, that would be something that you would definitely want to determine any impact to the whole area by having pilings put on. I'm not an engineer, but I did quickly look at the building code, and I would suggest that you gather additional information knowing that under that land is water, so that pilings would have to go way down to get firm footing for a 19-foot tall retaining wall to be safe. Thank you so much for all the work you're doing on this permit and your requirements.
Appreciate your work. Thank you.
Speaker 9 (04:26:01–04:27:20)
Thank you very much. So can I just make a comment about the, you know, one thing about these ready block and other manufacturers of these products, like Paul mentioned before, they engineer them. So it's the final design is not going to be something that we see. So I guess one of the conditions that we could put in is if it's if the design ends up being substantially different than what has been submitted to us in these drawings, that it come back to us.
So for example, if it splays, or if it has to have multiple steps, or I don't know what the engineer will come up with for any of these walls. But we already talked about some changes we wanted to see in the type of wall. Sean, thanks for sending that product. It looks like it's a much better product, so hopefully they can take a look at that.
And take a look at not having the wall come so high because you're not using it as a curb. And so instead of it being 19, maybe it's 17. All of these things will make a difference. So I just wanted to suggest that we consider that as a condition as well.
That once it's engineered, if it's substantially different than what we've seen, it comes back to us.
Speaker 6 (04:27:22–04:27:49)
Ned, one thing that would be helpful, there's not that many top of wall, bottom of wall denoted elevations. You know, we can, we, Jim found the 19 foot because there is a location near there. Do you think Paul could help us and just give us a few more? locations along there where he denotes top and bottom so we can see what kind of wall exposure we have.
We know we have 19 feet. I'm not sure how long we have 19 feet. There may not be a lot of 19 foot high wall, but you know what I'm saying.
Speaker 9 (04:27:50–04:27:52)
He could draw an elevation of it, honestly.
Speaker 6 (04:27:52–04:27:55)
He could. He could do that, too. Just so we could see the wall.
Speaker 9 (04:27:55–04:28:23)
And get a much better idea of the visual impact of it. Yeah, it could be 19 feet in it for just a really short that inside part of the race I don't know, but it'd be helpful understood So I'll make a motion to continue the hearing for 111 Highland Street special permit to April 24th at 705 Great Second second.
Speaker 6 (04:28:23–04:28:23)
I'll second
Speaker 2 (04:28:24–04:28:42)
All in favor? Aye. Aye. Aye.
Great. Thank you so much, everyone. And that's fully remote. Yes, it's fully, it's on Zoom, fully remote.
It's because the school committee's meeting that night, so we're, yep, I'll be online.
Speaker 21 (04:28:43–04:28:47)
Thank you.
Speaker 2 (04:28:47–04:29:08)
Will everybody step out? And while they do, we have old business on the agenda, but at this point, I feel that it might be a good time to, you know, unless people want to get into this. I think all of this could wait till Wednesday. If we have time on Wednesday.
Make a motion.
Speaker 5 (04:29:08–04:29:09)
Sounds like a motion to adjourn to me.
Speaker 2 (04:29:10–04:29:14)
I'll make a motion to adjourn. A second? Second.
Speaker 28 (04:29:15–04:29:17)
All in favor? Aye.