Board: Select Board
Date: 2026-08-31
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:18–01:37)
Good evening, everyone, and welcome to the Monday, August 31, 2026 Milton Select Board meeting. I will ask you all to stand and join me in the Pledge of Allegiance. Thank you all. I'm going to make a few adjustments to the agenda since we have a packed slate tonight.
I'm going to move public comment up. We will also be hearing some brief comments from our Warrant Committee Chair. We have the ability to allot 21 minutes for public comments with more if needed. Knowing that the agenda was posted and some folks may be coming later or waiting until after our interviews this evening, I can split that allotment where we can do nine minutes now and 12 minutes after our presentations if folks would prefer.
So in person or is there anyone who would like to speak in this window that we have now? I will let you know when you have one minute left.
Speaker 2 (01:38–03:52)
Okay, I think I'll take that one. Deborah Felton, town meeting member, precinct two. I want to voice my support to continue with the middle school and pre-k wing at Guile Road. We have discussed this fully and voted on this project at town meeting.
The process of suddenly thinking that we need an early childhood and kindergarten school has not been fully vetted. There has not yet been a full discussion of the two projects and the pros and cons of each by any of the boards involved, select board, school committee, or school building committee. We have an interim superintendent who has decided that this is what Milton needs, and I respectfully disagree. The school building committee has devoted countless hours and the town has invested many dollars in developing the Gile Road project.
I think we've allocated about $450,000 so far. The Gile Road site has already been acquired by the town in a land swap. The LaBarre site will cost the taxpayers millions of dollars. After five years of applying, Milton has been accepted by the MSBA for the Gile Road project.
bringing millions of state dollars, rather than directly from the pockets of Milton residents, it will go toward a Guile Road School. Milton should not leave those state dollars on the table for other cities and towns to use. If Milton chooses to pursue MSBA funding for a project at LaBarre, it will set the project back by at least another year, adding further to escalation costs. The elected town meeting members heard the experts from the school building committee and voted that Guile Road was the right plan for the schools.
Ask your school building committee what their recommendations are after they evaluate those plans. One final thought, as a former Tucker School parent, I would have to argue that moving pre-K and K across town to LaBarre is wrong for the Tucker School community. Thank you.
Speaker 1 (03:54–03:56)
Andrew Walsh.
Speaker 3 (04:01–04:39)
Hi there. Andy Walsh, I'm a town meeting member from Precinct 6, Kenilworth Road. So I just want to speak on this library college potential acquisition. I think it's obviously an exciting opportunity to purchase a piece of property that might turn over every hundred years or so, so like going to, you know, But as far as the schools are concerned, I think the alligator closest to the boat is the Pierce Middle School overcrowding issue.
And I've just not heard it articulated how this potential acquisition would directly address that. The plan may exist, I just haven't heard it. But I just want to make sure we're not expending potentially limited dry powder in such a way that we foreclose other options that might more directly address the Pierce.
Speaker 4 (04:48–07:39)
John Corey John Corey 1452 Canton Avenue. Thank you for allowing public comment a little bit out of order or breaking it like you said so I have many projects that are going in town these days between working on a village day for Milton village and I have a project, Unquity Green, trying to work with the DCR on more project. And then my Squantum Gateway project coming off of the Expressway. But I'm not here to talk about those great projects.
I'm here to talk about Upper Canton Avenue. And I'm gonna stay laser focused until we see some action. And I met with Representative Wells the other day. I says, you know, what's the DOT gonna do?
And he said, the DOT saw your report and I think you guys have seen it, saw your report. and didn't see any fatal flaws, and this is a report that I worked with my neighbors on, basic traffic calming and mitigation on Upper Canton Avenue. We still have a major problem, as you guys know. I've quoted many times a 78 miles an hour, cars going in a 30.
I had neighbors at my house last night, and there was an island put in a brush hill road, and that actually is working. He said that it's saving his fence, But what it's not saving is the signs that I put up about welcome to Milton. This is all broken in half. These are the car parts here from a Hyundai.
Here's the light that was all smashed open. This is the fender. I pulled it all off because I'm responsible for the island. I guess I have to say these cars are flying through there.
And I'm asking the select board. for either temporary meas in the ground to slow the many real drive from the select board to drive it forward, because it's just, I can't do much more than produce the reports, bother you guys, talk to the DOT. They don't even talk to me anymore because they say I have to go to the town. So I follow that.
So I'll listen later on, you guys have your public comment response. Perhaps you guys can, we can try to find maybe a motion next time, put it on the agenda, maybe some simple traffic, temporary mitigation measures just to get some cars to slow down through there. We have a major problem in that area and the DOT did admit back in May that there was an adverse effect from there so they know that they're on the hook so we have to capitalize on that. Thank you very much.
Speaker 3 (07:39–07:41)
Thank you.
Speaker 4 (07:43–07:44)
Mr. Christo.
Speaker 5 (07:55–10:54)
No mics, I guess, here. Everything's mic'd, they're all set. Three minutes, you said? One minute?
I'll let you know when one minute's left. Okay. Mark Christo, 17 Waldo Road. I'm here to ask that you retain ownership of the East Milton Firehouse.
I think it's paramount, and I would select Coastal as a tenant. I'll give 11 reasons, or they're close to it, within the three minutes I have. First, Coastal provides a vital service to all Milton residents at one critical time of need. Second, the East Milton Square location provides Coastal an added value by enhancing their ability to respond to emergency medical needs on a timely basis.
Third, the prospective tenant's presence is unlikely to draw customers, as retail does, so that eliminates parking exacerbation in the square. But four, of far greater importance and benefit, is the necessity to retain valued assets. Retaining ownership of an irreplaceable jewel in a growing dynamic neighborhood provides great benefit for our community now and in the future. Income stream and asset appreciation are great, but maintained ownership of the asset is paramount.
I think of the South End branch of the Boston Public Library and Tremont Street closed for years, but not for sale either because it's irreplaceable. Five, retained ownership ensures control of an asset's future for generations, plus the reward of capital growth, particularly for assets in a maturing, developing landscape. Six, it would be tremendously short-sighted to liquidate such an asset. Seven, do not lock in on a sale today.
Doing so will effectively lock out our ability to provide for those future needs of a growing community. Eight, the liquidation of a municipal asset is tremendously limiting, almost impossible to recuperate, to reverse. That short-sighted approach brought little financial reward in retrospect and tremendous opportunity loss with the sale of the Kiddo Library that served a real need in an under-resourced neighborhood. Its continued operation today would help provide relief for the main library events and services it provides.
Nine, let's not walk away like when the town took a pass, regrettably, when gifted the Milton Women's Club on Read Seal Road, a welcome place of assembly for the community, both for the Women's Club itself and its operations, but also for the Milton players and many weddings, local weddings that took place there. 10, rather let's take pride in and give thanks for the repurposing of the East Milton Library to an art center, this firehouse, for this meeting room, and let us take the necessary actions, excuse me, to retain the aforementioned community asset. My last point is that just last fall, a brainstorming session at the art center provided value feedback where the majority of participants concluded that continued town ownership and repurposing the East Milton Firehouse for future generations is the very best action of all. Please don't sell the building.
Speaker 6 (10:55–11:03)
Thank you.
Speaker 1 (11:04–11:08)
Seeing no hands raised online and no others registered in person.
Speaker 7 (11:10–11:14)
For public comment?
Speaker 1 (11:14–11:16)
Yeah. Well, we're going to be closing it right now.
Speaker 7 (11:17–11:23)
I'd like to do that. Kevin, let's just… Sure.
Speaker 8 (11:23–13:59)
Ian Gregorio, precinct 2, 41 Hawthorne Road. Lifelong Milton resident and I just want you to take a look around at this wonderful repurposed fire station that we get to use and It's amazing. It's amazing that we can keep this type of property in Milton. And my comment is, I don't really have anything written down, but when we had the meeting, Mark's got everything kind of on paper, exactly what we need to do.
But when we had that meeting, Wells said that, you know, we should maybe sell it for like, you know, I don't know, it was like a million dollars or something like that. And I said, why wouldn't someone just, it needs to be fixed. And I said there, why wouldn't we just somebody come in, lease it out like an ambulance company and repurpose it. And lo and behold, we have an ambulance company that wants to come in and lease it out.
It's a property that will never get back. And these other companies that are coming in, they're going to take those houses next to it. They're going to shine it up the front and give us a small little storefront or something, which we don't need, which we do need. But I would say that it's better to just keep it in the town, and then we can reuse it later on.
And I'm sorry, I get nervous. But I just really see, you know, my grandfather once said that, you know, you're not getting any property. Property is like the number one thing to save. And we have this property in Milton, and we should save it and keep it.
and you never know what we're gonna need down the line. It could be a bargaining chip later on. It doesn't need to be sold right away. I think we should just really take a moment and think about keeping it.
And my other closing comment is I support the Milton Fire and Milton Police and they need raises and they need a contract. And I would really highly, highly suggest that we… give them what they need. They're the number one, hardworking.
I don't think everybody realizes how much stuff goes on in Milton behind the scenes, besides the little snippets that we get on a daily basis. But there's a lot of nasty stuff that goes on. And they are worth their weight in gold here. That's it.
Sorry. Sorry if I dabbled.
Speaker 7 (14:00–14:04)
It's Donahue. Thank you.
Speaker 9 (14:05–15:48)
Thank you. Kevin Donahue, 203 School Street. I came tonight to discuss the library purchase I'd like to thank you as a board for Endeavoring to move quickly on that. I think having that asset under town control is a net positive My concern about the Milton public school is about the Milton public school building plan as library fits into it Part of the current facility's bottleneck is the result of some of the decisions that we made as a town in the last building process.
By way of example, I'll highlight the decision to combine the physical plant of the Cunningham and Collicott schools. That was a financial decision. And as a result, there's a single cafeteria there, which is one of the specific issues that contributes to the current space needs. I worry a little that if we pursue an early education center at LaBarre, addressing the overcrowding at Pierce will fall by the wayside.
It would be helpful to those of us in town meeting, making the decision to potentially authorize funding for the acquisition of LaBarre. If we can have a conversation meaningfully as a town about if there's still meaningful overcrowding at Pierce, And if so, are we committing to a second project to deal with that or tolerating it? Our current space needs are to some extent caused by our prior building program. And to the extent that there are future issues that we can anticipate and avoid by taking lessons from that process, I would like to.
Speaker 1 (15:48–16:41)
Thank you. Sir. Again, seeing no hands raised online, no others in person, I will now close public comment. We will respond at the end.
To our candidates for the East Midland Fire Station that are here, thank you for bearing with us. I just want to get one other point moved up to the front of our agenda in the name of sort of expediency and efficiency. I invited our board committee chair here tonight to discuss what is on our agenda, item six, H regarding the motion to move the question. I want to hear from the Warrant Committee before we deliberate later.
Now is the time for us to just hear from our Warrant Committee Chair. We may ask one or two follow-ups, and then we will deliberate later after the meeting.
Speaker 10 (16:41–18:34)
Mr. Funling, if you would. Thank you, Mr. Chair.
I'm Jay Funling, Chair of the Warrant Committee, and I live at 39 Sias Lane. I do have some written comments that I'm happy to discuss to the extent you think it's appropriate. So I understand that some residents have asked the Select Board to add an article to the warrant. I think it would be difficult for the Warrant Committee to have substantive commentary on this article before the warrant goes to print.
For people watching at home, I want to say some words about how I view the Warrant Committee's role. Our town legislative body is Town Meeting, with 281 elected members. It's not very practical for 281 people to research each issue that comes before Town Meeting, so it's the Warrant Committee's job to do the appropriate research and present that to Town Meeting, who can then make an informed decision. The bylaws say the Warrant Committee, quote, shall report in print in the warrant our recommendations for the articles that come to town meeting.
I take seriously the requirement to put our views in the warrant. Now, there have been times in the past when the Warrant Committee was not able to make a decision before the warrant went to print. It's happened before and it will surely happen again, but that is something we want to avoid whenever possible. It's my understanding that the warrant will go to print in the next week or two.
The Warrant Committee has a meeting scheduled for this Thursday. We still need to make a decision on the articles related to Laboree and the School Building Committee, and possibly there will be a citizen petition coming to us, which will add an additional article for us to consider. It's my opinion that if the article regarding calling the questions added to the warrant at this time, the warrant committee could not give the article the attention it deserves before the warrant goes to print. I believe it's likely that we'll have another town meeting before the annual town meeting, possibly in February or somewhere around there.
And I believe it would be appropriate to consider this article at that time.
Speaker 1 (18:36–18:48)
Thank you, Mr. Funley. Any questions for the chair while he's here? Thank you.
We'll take that, and we will use it in our deliberations later. Thank you.
Speaker 11 (18:48–18:49)
Thank you.
Speaker 1 (18:49–19:16)
Appreciate it. All right. To read a public comment is closed, but after our candidates speak, I will open in case there anyone joins us online or in person. And right now, we will move back to what we have as item three, presentations and interviews, responses to requests for proposal for the East Milton Fire Station, our first candidate being 525 Adam Street, LLC.
Speaker 12 (19:16–19:48)
I brought you all some proposals for you to have. I know it was submitted to you, but there's something inviting. And then here's the booklets.
Speaker 6 (19:49–19:52)
I don't know if I printed too many books.
Speaker 1 (20:02–20:06)
Are you planning a presentation of some sort?
Speaker 13 (20:06–35:29)
Yeah, I submitted a presentation to Nick and I plan on just kind of introducing myself, our team, and then I was gonna allude to the presentation. Good evening members of the select board. My name is Kyle Harnish. I'm a lifelong resident of Milton.
I grew up here. I went to the schools here. I graduated from high school. I started my business here 20 years ago.
I'm a builder and a developer and I still live in town. I still operate my office in town. I develop real estate, primarily single-family homes, but have grown into more development space as of late. The Eastfield Firehouse has been part of my childhood and a place I visited back 20, 30 years ago now when it used to have CJ's Sandwich Shop next door and those park benches were always there.
We used to sit there and hang out, but it's a building that I've passed my entire life and never did I think this opportunity would come up. But I've been in and out of that building since I was a kid and understand that it needs significant amount of work being done to it to bring it up to today's standard and code. Now, you know, I find myself here tonight just byproduct of the opportunity that this specific property came up for sale, and I have put forth a proposal that I think warrants an adaptive reuse of the building. So, as I mentioned, my name's Kyle Harnish.
I'm here on behalf of 525 Adams LLC, which is a partnership between Dev Group, which is my company, and Falcone Companies. Bob's here tonight with me. For us, this proposal really starts with one simple idea. It's that the East Milton Firehouse is worth saving.
Contrary to popular belief, a lot of people assume that developers look at buildings and assume right away, what can I build there? What's the most I can do? Bob and I kind of look at things a little differently. It's what's the best use for that building, if it were to come available.
And in this scenario, it did, and we heard about it a little over a year ago now. And we look at projects as what makes the most sense, how can it benefit the community, not necessarily what yields the most units or what's the best way we could generate a profit from this building. That's not always how it's laid out. And I just wanted to kind of you know, approach it that we genuinely looked at this building as what can we bring to the town of Milton.
I think the Falcone companies, albeit, are vilified quite too often in this town, and I can offer a different perspective. I've grown up here my entire life, and without them, we wouldn't have some of the community assets we have today. namely Navarra Restaurant, which is a place everybody can go and gather and enjoy. The likes of Dabby Park is a restaurant that used to be video to go and now you can have a birthday party there and enjoy.
I can remember 30 years ago when there was nothing to do in this town, you'd have to go to Quincy, to Villa Rosa to go to dinner or go to Jabba Joe's to get coffee, but now the square has changed over the years, and I think it's changed progressively. Obviously, there's challenges. There's traffic challenges and things alike. We're not ignorant to those.
So I just see this as a continued tradition of something that I'm very deeply interested in, but also the Falconis have the track record of doing adaptive reuse of some of the historic buildings throughout town. So with that being said, You know, we recognize East Milton Firehouse has been part of East Milton Square for generations. It's part of the identity of the neighborhood, and we believe its next chapter should preserve that history rather than erase it. Our proposal is to make a significant private investment in the building, restore it, and transform it into a hospitality destination that can become a gathering place for the community for decades to come.
And more importantly, as I mentioned, we're Milton-based developers. So we're property owners in this town, we've invested here before, and we've successfully redeveloped historic properties, and we're committed to being here long after this project is completed. Not sure if any of you have toured the building, but the building is in a pretty severe state of disrepair. I think it bears to repeat that anybody who does acquire or perhaps rent this building needs to provide significant resources to restore the building.
I've toured the building, I've been down in the basement, and there's major structural issues, you have asbestos issues, you have lead issues, you have some pretty serious issues in the building, nothing that we're not used to as builders and developers, but something that I think, as our developer team has shown experience in the past, something that we're not necessarily afraid of, and we have the resources to restore that building back to its proper glory. So that comes into basically You know what we're proposing and how we're going to utilize the building. So what we're proposing is an adaptive reuse of the building. We read the RFP from the town, basically looking for some sort of retail hospitality concept.
So we're proposing a hospitality concept. Basically, it's not necessarily, I'm not here to pitch a restaurant. The restaurant is really just the mechanism that makes it economically viable for us. And what I mean by that is to acquire the building and then put in the capital that is required to bring it up to code and bring it up to accessibility.
That means handicap access, that means elevators, fireproof the whole building, you gotta insulate, we gotta redo the whole entire floor structure. you know, the significant capital and resources that are required just to get it up to code. And then in order to find a proper tenant that would, you know, make it economically viable to support such an investment, we fell on Restaurant. So, Basically our hospitality concept, like I said, it's not here to pitch an actual restaurant.
It's more to justify why we would go with the hospitality concept. So our intention fully here is to restore the building completely. We would keep the existing masonry. We'd repoint the brick very much to what you guys see on the outside of this building.
I thought they did a fantastic job here. They repointed everything. The one thing this building lacked and still lacks is accessibility. There's no elevator here.
But our goal with the project would be to restore the building to make it still in 10, 15, 20 years, be able to come down East Mill Square, still recognize it as the old East Mill Firehouse. Our restaurant proposal would pay homage to the firehouse. We would reutilize the brick, like I said. The interiors and stuff, we would play with some sort of concept that pays homage to the firehouse.
Not sure if you've been in the buildings that Bob and Felconi companies have done in the past, Ben's Cookie Factory, Navarra, even 5 Canton Avenue. If you walk down the halls, they pay homage to the existing building. There's historic artifacts in the building. They've made great use of those historic buildings.
So that's kind of the idea of what we intend to do here. One of the big things I noticed in the RFP was this desire to have what they call a third place, which is essentially a community gathering place. It's very common now. It's something that I have felt the town has lacked.
I grew up here. And like I said, there wasn't much to do for kids or places to go. We kind of hung out in the woods. There wasn't really many gathering places.
Now you do have places, you have restaurants, you have Starbucks, you have places you go steal and ride, Two Pence. So I'm encouraged to see that. We feel East Milton Square is obviously an obvious gathering place and this firehouse could potentially be a place where people could host events and people could gather and enjoy East Milton Square. The building itself would be intended to be part of the experience, not necessarily, we wouldn't wipe the slate clean, we would pay homage, like I said, to the firehouse, and we would very much want it to be part of the experience.
So you'd have the similar aesthetic as you have here with the two overhead garage door styles that you can open out to the patio. The building would remain, and I'll show you quickly through our renderings, it pretty much remains exactly intact as it is. Now, the experience I think is what comes into play in this kind of project because I don't want to underestimate anybody on this. It's a significant amount of work.
It's a very tight site, very difficult to execute this kind of project. As I mentioned, there's several issues with the building itself. I read the full engineering report of it. I know the structural engineer myself.
I read the assessor's report. As I mentioned, you got several issues there that require tons of coordination, tons of experience to be able to clean up and execute. and we've proven that in the past. Parking, that's obviously the elephant in the room, and we want to acknowledge that.
We understand that parking is an issue. It's always been an issue in East Milton Square. Now, the trick with adaptive reuse is, you know, you're not meant to change the building footprint. You're meant to keep the building footprint.
So it's not like we're tearing a section down to increase parking. We're made an adaptive reuse, you're made to use what you have. And that's exactly what's there now, limited parking. Our proposal to have a hospitality destination, we believe it's one of the few uses capable of working within a parking constraint because traffic demand is usually concentrated in certain hours, nightly hours usually, and we've, they've been proven in the, not only Milton, but other surrounding towns and communities in the city, restaurants are capable of not having parking.
Abbey Park is one of them that comes to mind. They use off-site parking. Navara has a little parking lot in the back, but We would work with the town and coming up with parking solutions. One that's been thrown about is, you know, perhaps you have some sort of valet parking service and you could utilize the parking lots that are on Granite Ave from the commercial buildings there, the Citizens Bank, Dunkin' Donuts, Milton Nails, things of that nature.
But we also recognize that in today's society, a lot of people do walk, a lot of people do ride share, and we would encourage that. economic and community benefits. We believe there's tangible benefits to the town. Obviously, this is a town-owned building, and I acknowledge that one thing that could come out of this is increased revenue for the town.
Right now, obviously, as a town asset, it's a firehouse not generating any income. I think we've proven as a development team that we've been able to take a underutilized asset and be able to capitalize it. So the one that most specifically comes to mind is Ben's Cookie Factory that used to just be the sandwich shop when I was growing up, and then that was bought by the Falconis and they completely adaptively reused the whole building, turned it into two commercial kitchens, five apartments, and then two office spaces on the top floor, generating a lot of income for the town. we're able to keep the existing structure and restore it all and bring that asset back to life.
Also, 5 Canton Avenue, which is the former Cole and Gleason funeral home, that building has been restored, stabilized, rented out. It's now pretty much a health and wellness. Tenants are over there. Navarra, I spoke on that, that used to be an old state movie theater, and the Falconis took that and developed it into one of the premier restaurants in town.
So I think we have a track record of being able to execute and be able to handle these kind of buildings and be able to carry out these kind of projects. Lastly, I'd say, you know, I think Wanted to kind of get across tonight that it's not really a restaurant pitch it's more it's more of our commitment to try to find a feasible solution for that building and Be the right team to to be able to execute something that is going to be as difficult and challenging that That building is going to require somebody to have the development experience to execute and that's kind of My pitch for this evening and I wanted to kick it to our presentation to kind of give you just a visual Of what we propose to do So we did some renderings these are just conceptual ideas We don't get hung up on name. We don't get hung up on the concept. Obviously, that has to go through town approvals and all that.
Basically, that's your existing building. If you want to click through, Nick, we start with the first elevation there. Obviously, you all know the location. I don't need to educate you on that.
The development objective, that's the original firehouse from 1940 up until 2025, and then where it would be if we were able to take it over and redevelop it. Let's go to the next. So there's your current condition right in the front of the building as it sits now. You see there's a few parking spots over to the side.
We would keep those. Next slide. So as I mentioned, existing masonry to remain. It still stays in the same exact footprint.
The granite keystones at the headers of the windows we would keep. We would repoint all the brick. And we would actually keep the garage doors, which I think are a nice feature, and they obviously look beautiful on the front of this building that we're in tonight. This is your Adams Street elevation.
Those are the park benches I talked about when I was a kid. We used to sit at them and eat. Those I would love to keep. I think those are a little nod to the history of the town.
We can show the proposed elevation there. Nothing changes. Basically, what you have to do here is you have to be able to accommodate new staircase. You have to accommodate an elevator.
You have to accommodate ADA bathrooms. So that would kind of keep within this structure here. We have about a minute left on the presentation portion. That's the Granite Ave, probably the least pretty elevation.
Basically just a reuse of the same exact area. That little addition in the back would be the only part we would actually build off. That's the existing footprint in the back. We would build a second story on that to bring up the staircase, bring up the elevator, and be able to service the second floor.
Proposed floor plans, you can buzz through these, Nick, for the sake of time. Essentially a first floor dining area, a second floor dining slash private event area where you could host a private event. And then if possible, we would proceed in trying to put forth some sort of roof deck that's a seasonal gathering space. Design inspiration for interiors, very much following the model.
I was in this room a month ago with J.D. and he was, we were going over to Millen Village and you guys brought up two pens, which I thought was an excellent adaptive reuse of the building. He kind of set the standard, our job is to follow it. And it would be very similar to what they did over there.
I know Dan and I know J.D. well, and they did an excellent job taking that building and restoring it with great design. And I would wrap up, 15 minutes.
Speaker 11 (35:29–35:29)
Okay.
Speaker 1 (35:29–36:20)
I just want to say one thing, a couple things before we go. We are not voting on awarding this tonight. I just want to say that for everyone here and everyone that is watching or may re-watch this. This is simply part of our information gathering to have these interviews.
I just want to make that clear. I'm going to ask, we have a list of questions here, I'm going to ask these. You've answered a few of them already, so I'll kind of jump around. And then I will also leave space and time on the floor for members to have follow-ups.
So first, in the renovation and this building being very specific, can you speak to any history you have with projects such as this in terms of renovation and keeping the historic nature, so the brick and all the things we spoke about that you would know as being a resident here.
Speaker 13 (36:21–37:43)
Sure. So I think I touched on that lately with the development team, Bob and the Felconi companies have obviously proven their track record. Namely, I think I've already talked about it, but Ben's Cookie Factory is a great example. We're able to restore and reuse a lot of the exterior facade at that building.
The Granite Block Foundation stays. The flooring, even if upstairs, and I rented the top floor office, it was still the original pine flooring. They did a great job with that. Navarra as well, obviously being an old movie theater, they paid homage to that.
There is exposed brick in the building in there. 5 Canton Avenue, very similar. They were able to keep the existing structure there. restore it.
It's not there. It's not in our nature and it's not in the Falcone nature to tear things down. It's to use the building and try to make the best reuse of it. And my experience is building.
And I've been in this town at that building department for 25 years. So I'm more of the of the person in the field that can execute the vision and do the day-to-day. So, my history is mainly in single-family residential, but I'm growing more and more into the mixed-use development space. So, I think that's why the partnership makes sense between myself and the Falcone's.
Speaker 1 (37:45–37:49)
For the next question, members, anything you'd like to follow up with from the presentation?
Speaker 14 (37:49–38:27)
I just want to… I do work for Mr. Falcone. I want to let that on the table.
So, if I… told I can't vote on it, I'll accept it. But I want to vouch for these two gentlemen. They're doing a project behind me, and they're gentlemen to deal with.
If there's an issue, they address it real good. And I've known Bob Falcone for a very, very long time, and he's just a regular joke. You can deal with him. But I just want everybody to know I do work for Bob Falcone, and I want that out on the table.
So, you know what I mean? make it a public, that's all.
Speaker 15 (38:27–39:03)
Thank you. I think one of the questions in the back are interesting. So we have a question here. So some residents have expressed concern that the use of the property could be changed or modified in the future.
mean anything could happen market conditions could shift including potentially adding housing to the existing structure do you anticipate any future changes to the proposed use and do you have any comments or commitments you would offer to address this concern no no
Speaker 13 (39:05–39:44)
There's no expectation, no desire to do units in a location like that. It's a very tight, restrictive site. The amount of capital required to get that up to a hospitality-type concept would require us putting in commercial kitchens, which cost a significant amount of money and resources at that point. It doesn't make sense to change the use of the building at all after that.
You have various challenges there in terms of obviously location, the tightness of the site. You're going to have height restrictions. It doesn't make any sense for us to go after units there at all. That's kind of what I was getting at earlier.
Speaker 15 (39:44–39:49)
Contrary to belief, it's not what you could… So you think the site's not actually suitable for housing?
Speaker 13 (39:49–40:03)
No, I do not. Not in any way. Again, it would be the only way to do that, supposedly, would be, I suppose, would be to tear the building down. It's not what we intend to do.
Speaker 1 (40:03–40:31)
Yep. On the hospitality concept, on your proposal, it was developing the concept in that first year of ownership. Are you able to, if this award requires you to give us a defined concept or development plan within a specified timeframe, would you be able to provide that? And are there any specific partners or operators that you are targeting for this?
Speaker 13 (40:31–41:36)
So great question. Our goal would be to use a local operator. There's several parties interested that we've worked with in the past that even the Felconi's rent to today. that would have interest in this, but we see it more as a development project that requires a proper team to execute the actual restoration of the building and the asset itself, and then go find the operator.
We don't see it bringing them in early as being any benefit to us. They would try to get their own concept approved and this and that. We want to be here to commit to actually restoring the building, getting essentially two commercial kitchens operable in the building, and then go find our partner. But certainly a local operator.
We've had, like I said, initial conversations with a few. Everybody's expressed interest. Obviously a high visibility location. But it would be something within that first year that we would secure.
that partner and we would bring it to the town and start working with the concept and fleshing that out, what that might look like.
Speaker 1 (41:37–41:47)
Do you have any preference on operating hours or form of concept? Is this a all day cafe moving into the evening or do you see more as a restaurant concept opening evening?
Speaker 13 (41:47–42:09)
I see it more of an evening destination, but I have yet to flush it out. Like I said, I didn't want to come into this with a restaurant pitch. It was just the only thing that made economic viable sense for the capital that we feel you're going to need to put into this building. And the only tenant that we could get to pay that kind of rent towards the end would be a hospitality tenant.
So that's how we see it.
Speaker 16 (42:11–42:25)
I just want to clarify that theme about not pitching a restaurant, but pitching hospitality concepts. Does that mean you don't have a specific restaurant in mind, but your focus is on some type of restaurant?
Speaker 13 (42:25–42:39)
Yes, it's definitely some type of restaurant. All operators want their own concept, I would say. But we're friends with every operator in town. They've all expressed interest.
So it'd be kind of a vetting process of what makes the most sense.
Speaker 1 (42:44–43:03)
You mentioned it a few times, and we're going to talk about this a lot tonight with parking. And I want, we'd like to know, how do you see yourself and your partners addressing those potential concerns related to traffic, parking, noise, additional delivery and also fit in the neighborhood?
Speaker 13 (43:03–44:29)
Yeah, so it's an obvious constraint to the site. We acknowledge that. One thing we've watched closely is the likes of Abbey Park and the likes of Navarre and how they're managing traffic today. this restaurant would likely be more of a reservation-based restaurant where you'd kind of be able to time it out.
More evening-based, less, probably no takeout. The takeout really jams up East Milton Square. People double parking, running in, running out. As you noticed, I think Abby and Navarro actually have sit-down, they have reservations, so that helps a bit.
So we don't want to add to that traffic problem. We don't want to, we don't anticipate doing Anything that would require, excuse me, double parking out front, excuse me, and takeout and all that, I see that being too problematic. So I think a complimentary valet service makes sense. And then encourage people to ride share, people to walk to our destination.
Being it's so accessible, it's right in the heart of East Belt Square, we feel like people would do that. We've watched along restaurants that are in Quincy or in Boston, you know, a lot of them don't have parking and they just simply offer valet. And then we can utilize some of the open parking lots that are on Granite Ave behind the East Mill Firehouse building and work, potentially work and deal with those commercial property owners to rent space from them.
Speaker 1 (44:31–44:44)
On financing, can you share with us your financing sort of plan and strategy to complete this project and How do you anticipate your timeline with us having a go to town meeting and then regulatory?
Speaker 13 (44:44–46:19)
Yep, so we offered 900,000 for the building. We know that's what it was assessed for. To be honest, I've walked the building several times and I acknowledged all the issues that were in the building. And what immediately struck out to me was not necessarily the acquisition price, it was more the rehabilitation price.
I do this for a living and the cost of construction is astronomical. and especially in adaptive reuse projects where you have to work within an existing old building that doesn't conform to code. So we have a box that we have to now mold for accessibility, and I have to fit a staircase, an elevator, ADA compliant bathrooms, kitchen, It's a bit of a nightmare, I'd say, and a bit of a hoarden's nest in trying to figure it out. So we offered a cash purchase of the building, and then we would set aside, I earmarked it, at least $2 million for rehabilitation of the building.
And I think that's what this project is going to need. I see it as being a considerable renovation project just to get it up to speed. You're going to spend at least a million dollars in fixing the building and getting it up to code, and then at least another million putting in kitchens and elevator and all that. So that nets us around a $3 million total investment, which is a significant amount of capital.
And I hope that answers your question, but that's kind of our financing target on this project. And you have the bank partners and all lined up? Yes. And I think we provided that as well.
Speaker 1 (46:21–46:25)
Remember, it's a follow-up. Anything that we feel we have gaps on.
Speaker 14 (46:29–46:36)
Would you and your team get discouraged if it was put out three more years?
Speaker 13 (46:36–47:05)
Yes. I think the opportunity is present now. I'm very concerned about the growing cost of construction. I can't build a house for what I could build it for three years ago.
We all know there's an affordability crisis in Milton and things are getting pricier and pricier. I do very much. I don't think I'd be interested in years from now just given the rising construction costs.
Speaker 1 (47:05–47:16)
I guess two final points if we don't have additional follow-ups. One would be, can you describe what you see as the positive benefits for the community with your project?
Speaker 13 (47:18–48:56)
Sure, so I think as I read the RFP quite carefully and thoroughly, it was creating this kind of third place, a place for people to gather. I touched on it early about what what happened with Navarre, what happened at Abbey Park. Those were, you know, really buildings that were kind of vacant, underutilized, not really used. And now they're places where people can gather and have family birthdays, parties.
I know certainly I visit them once a week. It's, it's something that in the real estate side of things, I told you, I kind of developed single family real estate. I have a lot of buyers that come from out of town. And one of the things that holds them back from buying in our town is the lack of things to do.
And I'm constantly finding myself kind of making up stuff and excuses. Obviously, we have great open spaces, we have great parks, we have great school systems. We lack in the department of having, I think, some hospitality destinations. I think what's happening in Milton Village is excellent.
I think JD and Dan are doing an excellent job with Steel and Ride. They did a great job with Two Pens. They're trying to invite more people and give them other places to go and gather. And that's kind of our goal with this specific project, is just give another place for people to gather and go.
That's, I think, the biggest community benefit. Obviously, there's a financial benefit. Town would be able to collect the income taxes and the revenue taxes from the restaurant, whatever concept we put there. So I think the town will benefit for years to come in that regard.
So that's kind of my answer to that on the finance side.
Speaker 1 (48:56–49:07)
And your proposal obviously gave us the offer to purchase. Would you and your partners be interested in a lease agreement or is that not as attractive to you?
Speaker 13 (49:08–49:38)
Not as attractive simply because who's going to fix the building? there's way too much money that's necessary to put that building up to code. So if the town's willing to commit the resources to rehabilitate the entire building, then perhaps a lease. But at that point, like I said, we're not restaurant pitching.
I'm not really a restaurant operator. We're more of a building operator. So I wouldn't be interested in that.
Speaker 15 (49:39–49:51)
So a question that just came to my mind, this idea of potential local meals tax revenue, you probably haven't crunched those numbers.
Speaker 13 (49:52–49:53)
No, no.
Speaker 15 (49:53–50:16)
In terms of square footage, you know, restaurant space, like viable commercial space in that site, how How would the overall square footage of this compare to other similar venues in town?
Speaker 13 (50:16–50:58)
That's a great question. We modeled it similar to the size of Abbey Park. And Abbey Park has, what is it, Bob? 80 seats?
What's Abbey Park got? A little over 100. A little over 100 between upstairs and out. So this we showed about 60 seats on the first floor and perhaps another 60 on the second, but the second floor we said could be a private event space for people to host, you know, parties and whatnot.
So collectively, maybe you're looking at 120 seats. So it'd be, I'd say in terms of revenue and stuff, I would look at what Abbey Park produces and pays. It'd be similar to that. Other thoughts or questions?
Speaker 1 (51:01–51:03)
I think that's all.
Speaker 13 (51:03–51:07)
Thank you all. Appreciate your time, Cody. Thank you. Thank you.
Speaker 17 (51:51–51:54)
Hi, next group? Yeah, Coastal, yes.
Speaker 1 (51:55–52:06)
All right, next group we have you as a… You can pull up around the state. So you walk in and just pull up a chair around. This piece here is just…
Introduce yourselves.
Speaker 18 (52:11–52:16)
Great, my name's Mark Contardo. I'm the Chief Operating Officer for Coastal Medical.
Speaker 19 (52:16–52:23)
Alex Dearest, the founder and chief executive officer of Coastal Medical Transportation Systems. Happy to be here.
Speaker 17 (52:23–52:26)
Good evening everyone, my name is Michael Peretti, I'm the chief quality officer and one of the paramedics at Coastal.
Speaker 20 (52:27–52:31)
I'm Kevin Mott, vice president of EMS services for Coastal.
Speaker 1 (52:31–52:38)
Thank you. I think we have 15 minutes allotted for your presentation.
Speaker 19 (52:47–53:56)
Thank you. So, as I think everyone's aware, we're the primary emergency medical services provider for the town of Milton. Right now, we've had trouble. trying to find a permanent home as far as buildings go, very limited opportunities.
So when we saw the RFP come out, we thought it would be a natural fit for us, considering the town fire department's been answering calls since 1952. We thought it would be a great opportunity to continue that tradition, if you will. So our proposal is rather straightforward from the perspective of We're happy to acquire the building at the valuation price and valuation that was done by the town, or we're happy to lease the building as well at fair market value. At a high level, we want to preserve the building the way it is.
We would like to continue to utilize the building in the same fashion. We don't have any alternative development plans or anything like that. Sole purpose is to continue continuity of service to the town.
Speaker 6 (53:58–54:00)
If you want to jump in there.
Speaker 18 (54:00–55:21)
Yeah, so, you know, I don't know if everyone's had a chance to look at the deck that we sent earlier. Great. So yeah, as Alex said, you know, the appraised value is what we're offering for purchase, but we're also happy to lease as well, depending on the town's preference, of course, with zero contingencies, no financing contingency, no zoning relief required, because we're not going to change the footprint of the building. And as we're saying here like 30 days to sign 60 days to close And and we'd like to you know again up to the town what you all would like to do whether it's a sale or Or we rent it or lease it from the town today.
We're in the at the DPW We're licensing a space at the DPW which is not ideal. We have a trailer that we've rented outside. We work very closely with Nick's team. It's temporary for us.
That licensing agreement ends September 29th. We're at a little bit of a loss for finding a space, a commercial space in Milton. So when we saw the RFP come out, we thought it would be as a team, as a leadership team, just a great opportunity for us to continue the legacy from that building since 1952.
Speaker 19 (55:21–56:12)
This is certainly like the first time that we've run into this scenario. We feel like we've exhausted certainly all options as well. We've surged pretty high and low from the through the network in the real estate space and looking at different opportunities, traveling through town, knocking on doors, trying to find a home. So at some level, from our perspective, we see it as a public safety issue.
How do we continue to service the town if we don't have a home? Nick and the team has been super helpful. Hopefully, we can find a solution here one way or the other. And just want to reiterate that.
whatever pathway the town chooses, we're certainly fine with. I certainly would love the opportunity to end up in the building and continue to service the town.
Speaker 20 (56:15–57:22)
Pretty straightforward. I just think from the response standpoint, property. It's kind of set up perfectly for ambulance service. Obviously right now it's been operating under the public safety auspices since 1952.
And from response plans and things like that that I know have come up, we would work with the community to make response plans from that. I know there's concern about traffic in East Milton Square, things like that. But those are all hurdles that can be overcome very easily by just moving resources around during those high-peak traffic hours and those kinds of things to make sure that the towns get the coverage. So obviously, you're kind of in that one corner of the town.
But those are all things that we would definitely work with the community, work with Nick, work with Chief Madden, and Chief King. things to solidify that. The space itself, just kind of walking through it, again, it's set up perfectly for what we would have to do. Put some TLC into it and things like that to make our crews really comfortable and things, but pretty much you can move in day one with a nice cleaning.
Speaker 17 (57:29–58:07)
No, you know, I think, you know, we looked at the location and to echo some of the concerns I think that have come up, the very small number of concerns that have come up related to operations. striking distance the vehicles far side of town all easily overcome and you know we've studied deeply the patterns and the locations of calls as they come up and certainly there's EMS calls can happen anywhere within the town but you know historically you know staging and posting while having this call would not be a tremendous concern and you know it would be a really great home for Milton Carmichael.
Speaker 20 (58:09–58:35)
And one of the key parts of the proposal is really looking at it using the same, the building for the same use, right? And just kind of continuing that Nelson tradition, but also the way the citizens of Milton kind of deserve to have that response standard met, but utilizing it in the same manner. Obviously it's not fire trucks, it's ambulances. That's the only difference.
And that's how one of the things that when it popped that we decided this was something really important to jump into.
Speaker 1 (58:39–58:42)
Okay, let's go through our series of questions.
Speaker 14 (58:42–58:59)
In the contract, it says they have to be garage and melting, right? Yes. How long is the contract good for now? September right now.
They win the new one? I'm sorry? No. Do they have three more years?
Speaker 21 (59:00–59:04)
We've been in talks about the extension. There's options to extend it on the existing contract.
Speaker 14 (59:06–59:23)
So no matter what, whoever comes in, Is that going to be stipulation? I'd have no problem with their ambulance service. I just don't need it, I hope, at this point in my life. I know, I know, Megan.
I had to go to Milton Hospital in one of these, but I'm just saying.
Speaker 21 (59:24–59:30)
It would be our perspective that whoever is the operator, that it should be a requirement in the contract that they're staged in Milton.
Speaker 14 (59:30–01:00:08)
I know, but they were once at Pepsi Cola. Then they moved back down to Fallon Ambulance site. There is no garage space now. I know that because I have a lot of trucks and if I get booted out of Pepsi, I'm all done.
I got to retire. It's probably a good thing. But I'm just saying that's unrealistic. And I kind of wish when they did this fire station next door, we added a bay for the ambulances.
We could charge a rent like they're paying now. and put it into the fire budget, not the general fund. Let it stay with the fire department. You know what I mean?
Speaker 21 (01:00:10–01:00:13)
It's an option here, and that's, I think, why they proposed it.
Speaker 14 (01:00:13–01:00:27)
No, I know. I'm just saying, if we're going to go with either company, you're going to put a stipulation that they have to garage in Milton, or can they just be in Milton? Parked in St. Agnes, parked a lot, parked up on Randolph Ave.
Speaker 1 (01:00:28–01:00:49)
That's pretty uncomfortable. I think we want Burbank Ambulance Company to be custody here. So, yeah, that's all I'm trying to make a point. To your point, John, to ask these gentlemen, can you give us a kind of a scope of how many calls are you servicing or answering in Milton monthly?
Speaker 20 (01:00:49–01:01:13)
Sure. So we respond to just under 400 calls a month and we transport right around 200 patients to the hospital per month. So if you take a snapshot right now, the month of August, it's actually been a very busy month. We've transported 242 so far this month, obviously without today's data and that number, and we've responded to about 410 cases, um, just in August.
Speaker 1 (01:01:13–01:01:41)
And that's, and that's from your new location, your current location. That's from the DPW. That's correct. One of the main concerns we would have is one of the reasons the fire station is now vacant is to have the fire department on the other side of the highway for service.
How do you see your service times with being in that location, reaching the other parts of Milton, and what kind of analysis have you done
Speaker 20 (01:01:42–01:03:55)
So we have looked at kind of just resources, where they would be located, also where the call volume obviously is, heat maps, how do you get over to, you know, the 138 side in a timely manner, all those kinds of things. So one immediate thought, and I've, you know, just talking it through, I actually did talk to Chief Madden about this just in general, right, way before the RFP went out. But just how would that all line up, right? At rush hour, obviously that's the biggest part, but I know rush hour goes for like 12 hours, right?
So all joking aside, but we would relocate an ambulance. We would relocate an ambulance on the other side of the highway, right? So up towards the hospital area. leave one behind so that both trucks aren't necessarily posting.
If that truck gets a call, that other truck would have to go to the other side during those hours as well. So that way the flow just kind of keeps going, right? So then backup resources would all stage on the opposite side. They wouldn't go to the East Milton Fire Station.
They would just stage over by the hospital. the two trucks are busy, a third truck comes in, they would stage over at the hospital. So we would really look at it from that perspective. We would ask the town at that point for just kind of looking at timelines.
Obviously, we have our own thoughts on what the timelines and traffic flow is, but we would come to an agreed upon standard that would meet the town's requirements on that. And when I say rush hour, I'm saying morning and then afternoon. So two different times during that daytime that you would be posted on the other side to make this work. It really is the only way.
Then once the traffic is lighter, both trucks could stage there. appropriate coming from where we were over at 95 Elliott Street. It's not much different if it's just the opposite side of the town now, right? So calls coming from that location shooting over to this area of the town takes almost as long or even out to some of those other places from 95 Elliott Street.
did a pretty good job managing that. Obviously, the DPW yard is nice and central, so less of a risk there, except for coming out of the yard itself with the traffic onto those main roads. But just using the posting plan, I think we would just have to lock in on that. Once we do that, I'm pretty confident the response times would be exactly what the town deserves.
Speaker 19 (01:03:57–01:04:20)
That's not an atypical model either. It's a model that we're very familiar with with other municipalities that we serve, where we have these dynamics where there's only certain parts of the town that have commercial industrial space where we have ambulances housed and then we'll disperse resources throughout the community based on response time. So very, very familiar model for us.
Speaker 16 (01:04:21–01:04:31)
Just a quick follow-up on that, is there some kind of federal or local standard time that you want to try to be under if you think about far points in town and have you thought about that here?
Speaker 20 (01:04:31–01:05:06)
Yeah, so the NFPA standard is under eight minutes. So that is generally the standard that's used around and it's not necessarily an ambulance standard. a FIRE standard, right? So really that's the standard we would look at and most of our contracts all have that kind of language in it where it says under eight or under seven minutes.
So that's really the mechanism looking at that as far as an average and hitting the 95th percentile on being under that number is kind of the standard in Massachusetts anyways for the contracts that we service.
Speaker 16 (01:05:07–01:05:22)
And your prior answer, um, about staging in order to sort of be reachable, you don't have corners of town reachable took into account that type of exact requirement. Yeah, exactly.
Speaker 20 (01:05:22–01:05:57)
And again, if one truck at those high, you know, traffic timeframes, if one truck gets a call that's on the opposite side, the other truck would have to move at that point to come across. It's just the only realistic thing to be able to do. Keeping one truck at the station would just be kind of an employee. Nice part of it, right?
So that they don't always have to be in the truck moving around. But as soon as that call gets done, then someone else has to move. So that's how we would stage that. In the hospital area, it's kind of a thought process, move down towards that direction, or even by the police station.
Speaker 1 (01:06:00–01:06:01)
Other questions? Oops.
Speaker 22 (01:06:03–01:06:24)
I was just wondering about kind of thinking about rehabbing the building, right? I think one of the things that we're relocating our fire folks is just that building isn't that safe, right? So I'm just wondering kind of what your thoughts are for that. You mentioned kind of the relatively quick move in time and just thinking about the folks that work there.
Speaker 19 (01:06:26–01:07:25)
I mean, safety is obviously top priority for our crews. Flexibility from that perspective as far as, and we were able to pull together an interim plan now that works. Certainly flexibility on what needs to be done to the building as far as work goes as well. We certainly don't want to get into a major multi-million dollar rehab project in the spirit of transparency, right?
These contracts are not necessarily a very long-term contract. They're usually a three to five-year contract, so we want to be mindful of that and be fiscally responsible. But certainly, we want to bring the building up to par regardless of what pathway The town shows if we were chosen to either buy or lease the building under triple net terms, so certainly would do all the necessary cosmetic work to bring the building up to speed, et cetera. Hopefully that gives you a thorough enough answer for now.
Speaker 1 (01:07:26–01:07:41)
Would that be the case? I think we have it set in RFP at a five-year lease. Is that correct? Would that be the case if we had an initial five-year lease that Coastal would be willing to invest in some renovations for that TLC that we would?
Speaker 19 (01:07:41–01:07:54)
Yeah, certainly under a triple net lease, no issue there. We would expect that in the event that you chose the lease route, a lease and a contract would be consistent, so absolutely.
Speaker 16 (01:07:59–01:08:15)
So just to tease that out a little bit, would you look to share with the town necessary improvement costs, even in the case of a lease, or would you view that as Coastal's responsibility?
Speaker 19 (01:08:15–01:09:07)
It all depends on who the landlord is. We've had some scenarios where it's like a shared expense, and we've had scenarios where it's triple net where it's the tenant's requirement. Usually under a triple net, it's the landlord's expense as far as like structural and large mechanical things go. Every lease is certainly different, but I think we have flexibility from that perspective.
And in the event that the town chose that route, we want to be a good partner. So it's our responsibility to rehab the building, you know, under the lease, happy to do that. the town wanted to have some sort of partnership and shared expense in that, and sort of saying control over how the building got rehabbed from a cosmetic perspective, happy to have that partnership and collaboration as well.
Speaker 1 (01:09:15–01:09:22)
I just asked for you, just so this is entered for the folks that are listening, to go through this slide on what Milton gains and how you see the benefits
Speaker 19 (01:09:26–01:09:52)
over chosen to purchase the building, you know, tax revenue, jobs, et cetera. And those types of things naturally come. And then, uh, regardless of what pathway it's, it's preservation of, you know, public safety service and to the community and preserving, you know, uh, the team that we have here in Milton to provide a lifesaving services available to the public 24 seven.
Speaker 20 (01:09:54–01:10:36)
I think that's the key element we're looking at with this space, is it just maintains the EMS operations to the community. As the search continued, the gentleman mentioned the Pepsi plant, we have knocked on every door imaginable that we can knock on, and we probably shouldn't have. And this really brings it back to being able to maintain EMS operations in the community. this keeps ambulances here, keeps services going, and that's what the building was designed to do.
And I think that's, to me, that's the gain out of this, and also having somebody in that space.
Speaker 19 (01:10:36–01:10:48)
And we're committed to the community, which is why when the RFP came up, we had no issue stepping to the plate to make a purchase to preserve the services to the community.
Speaker 17 (01:10:50–01:11:50)
On the slide, you know, we, we, we didn't want to be disingenuous we don't the RFP calls for, you know, highly preferential use of this sort of third space right and that and that communities can members can gather there and that sort of thing, you know, a couple, a couple thoughts that we had which. Which probably don't match that right definition of a third space for the community, but, you know, would love to be able to hold training there. Right? It's it's a, it's a great apron.
It's a great public space in the square there, you know, doing. CPR training, right? Doing chest compression only CPR, AEB, stop the bleed, you know, set up first aid stations there as well, you know, offer it periodically for the community, I think would be, you know, open houses with the paramedics, you know, just like you have open houses at the firehouse from time to time, you know, would be something that would draw people in from time to time as well and be beneficial to the community.
Speaker 1 (01:11:57–01:12:14)
On the financing piece, which we'll ask everyone, can you speak to where you stand with whether this is leasing or purchase and how you see yourself financing with our meeting timeline, as well as your timeline for moving in with your lease being up on 29th?
Speaker 19 (01:12:14–01:12:58)
We don't have any financial contingencies for a purchase. We can move at any pace in which the town chooses they want to move either pathway. you know, on the ambulance side of the house, we do have, I think our license agreements comes up at the end of this month. So we'll either need to extend that in the event that this comes to fruition regardless of pathway.
But other than that, we don't have any timelines or constraints.
Speaker 14 (01:13:03–01:13:49)
This site more visible for us because no one knew you were at the Pepsi. No one could figure out you're underneath steel and rye. So, this will be real visible for you. It's not a bat cave anymore.
Right. And I think it would be an asset, you know. I just think we're getting a lot of new residents in that part of town too, eventually. So, yeah.
So, we're all stuck in a rock and a hard place here. You know, well, thank you for your presentation and this is more visible for you.
Speaker 16 (01:13:50–01:14:10)
I believe that your RFP response proposed two 10-year lease extensions, an initial three-year lease and two 10-year extensions. Do you have flexibility potentially if the town's interested on shorter duration lease?
Speaker 19 (01:14:11–01:15:24)
Yeah, I think we're certainly flexible from that perspective. You know, I think I mentioned earlier We like to have consistency with the contracts. I think maybe you might be referencing the lease between Coastal and the real estate entity buying that would be purchasing the property is where the confusion might have come from there. So apologies for that.
Maybe I misread that. So that wasn't for the permit. Maximus is a wholly owned real estate company by me, which would buy the property and then lease it to the Ambulance Business Coastal, which is also owned by me. So just structure essentially, but between the entities would be that long-term lease.
And I think that that's what the, But in the event that the town of Milton wanted to lease the building to Coastal, certainly open to a lease of a shorter duration, that's consistent with a contract as well. No problem there.
Speaker 15 (01:15:24–01:15:29)
Does Maximus have any other real estate holdings in any other municipalities?
Speaker 19 (01:15:30–01:15:56)
Yeah. You own like your other… A lot of the sites in various parts of the state, yes. Yeah.
Every municipality is different. Some of the municipalities run fire stations and pay rent that way. Some municipalities I have sites that I own. It all depends on what's available and what makes sense and what kind of partnership.
Speaker 15 (01:15:56–01:16:07)
So what you're saying is, or like the question I'm getting at is, you're already a property owner. of this type of function.
Speaker 19 (01:16:07–01:16:08)
Oh yeah. Or space.
Speaker 15 (01:16:08–01:16:13)
Yeah. So you have experience with like maintaining ambulance buildings.
Speaker 19 (01:16:13–01:16:33)
That's right. EMS buildings. Yeah. We have a, I own a 60,000 square foot building in Quincy next door.
We bought that. We rehabbed the whole place, put a state of the art communication center in there, et cetera, and have done the same thing in other parts of the state as well. So yeah.
Speaker 1 (01:16:36–01:16:47)
I think, well, a lot of our questions were surrounding parking and other foot traffic, which won't be necessary with this particular proposal, but if there are no other questions or follow-ups from the members.
Speaker 14 (01:16:52–01:16:56)
Just that your team does a good job servicing the town of Milton.
Speaker 19 (01:16:56–01:17:18)
Thank you, appreciate you sharing that. Take a lot of pride in what we do, and we're very fortunate to have built a strong team and certainly a team that, you know, A lot of the EMTs and paramedics have been in the communities for a long time, and they know the team members on the police and fire department, and they know the streets inside and out. And so we've been very blessed and fortunate from that perspective.
Speaker 14 (01:17:19–01:17:26)
It's noticeable, please. One good thing about the DBW ad, you won't have to worry about getting stuck in the winter.
Speaker 19 (01:17:29–01:17:33)
You'll be able to get out of there real fast. Hopefully it's a little more mild than last year, right?
Speaker 14 (01:17:35–01:17:37)
That's the plus of that, yeah.
Speaker 19 (01:17:37–01:17:43)
Exactly. Exactly. Gentlemen, thank you. Thank you very much.
Speaker 7 (01:17:43–01:17:49)
Thank you all very much. I appreciate it. I can't hear you.
Speaker 23 (01:17:49–01:17:54)
I can't hear you. You see anybody else? You see anyone else here clapping? What are you doing?
Speaker 17 (01:17:56–01:17:57)
Thanks very much.
Speaker 7 (01:17:57–01:18:34)
Thank you very much. Thank you. Who came up with dances? It's a cool move.
Good evening.
Speaker 24 (01:18:35–01:18:40)
Yes, Milton Fire LLC. I am waiting for a PowerPoint to get pulled up.
Speaker 1 (01:18:40–01:18:43)
If you just introduce yourself in the meantime, you can get that up.
Speaker 24 (01:18:43–01:19:08)
My name is Gordon Glass. I'm an attorney with Johnson and Borenstein, a land use law firm located out in Mandover, here on behalf of Milton Fire LLC. Its principal, Stephen Niosi, while committed to the project, was unable to make it here for the RFP process tonight. Oh, I don't know, I heard a round of applause off the last presentation, so maybe that one's taking my time here tonight.
Speaker 21 (01:19:15–01:19:20)
I see you have 15 minutes for your presentation, and if you get close to that time, we'll give you a heads up.
Speaker 24 (01:19:20–01:26:51)
We're certainly not. I think we're going to save everybody some time. Pretty straightforward this evening. So just starting with a brief overview of Mr.
Niosi and his development entities. He's a local developer out of Quincy with over 15 years of experience, specifically a wealth of experience renovating and redeveloping neglected, defunct properties. Consistently redeveloping those properties, harmonious with the surrounding built and natural environments and geared towards benefiting the members of the local community first. and a very strong proponent of the benefits of adaptive reuse, the notion of thoughtfully preserving our existing architecture while strategically investing to bring it up to modernity, to the economic benefit of the municipality and of residents.
Yeah, so there's just a list of some of his representative projects where he's done some adaptive reuse recently. I just want to provide that. I think we've provided that in writing before so that the board could follow up and do its own research on some of these projects. I was recently involved working in the 29 to 31 Newcomb street project in Quincy, which is a great example where a sort of defunct two unit tenement got turned into a 16 unit building, 14 additional units, I think that project showcases the developer's thoughtful approach to blending the existing development with the additions.
I think if you look at that project, it doesn't look like anything there has been added any more recently than anything else. You can go to the next slide. Okay, so with that in mind, what does adaptive reuse look like in this case? We're talking about restoring and revitalizing the firehouse, preserving its historic character, but contributing some meaningful improvements to the structure to modernize.
So in this case, that looks like restoring and refinishing the masonry and the exterior brick facade. replacing the aging windows with high-quality, historically compatible, colonial-style insulated windows, as well as a comprehensive interior rehab using modern building systems. Mr. Niasse always stresses using energy-efficient materials and high-quality finishes.
Most importantly, preserving and incorporating the significant historic elements of the building wherever feasible. That includes the fire pole, the bell, photographs, facade, other notable architectural or historical features. Modernizing the mechanical, electrical, plumbing, and life safety systems. And not to be overlooked, landscaping and exterior site improvements to blend the renovations to the structure, the modern renovations with the existing structure of the lot.
It's a small lot, but currently the lot is relatively unattractive old paving. I think you'll see if we move on to the next slide, we can showcase what we have in mind for the site. So this is what we're looking at right now. And you can go ahead to the next.
And this is Mr. Nyosi's proposal. You can see in the rendering, the existing bell has been preserved and elevated, the facades in place, the flag is still present. The building itself stays relatively the same on the exterior except for, and we believe this is the largest component that differentiates our proposal, the four-season atrium thrust to the front of the building.
We think that probably the best underutilized potential on the site is in its front setback. plenty of room there to extend out and to make an attractive space that foot traffic will see as a good point of interest to stop in on. Especially, as you can see, the atrium's designed kind of to attract the attention of anyone passing by. We have one more rendering of that if you want to go to the next one.
They were not married to the idea necessarily of a roof deck, but a roof deck could work in harmony not the only proposal to add to the roof. Again, we think the big differentiator is getting people on the street, people on the ground floor interested. But we do think that there is, I think there's an existing small roof deck up there and we think that there's a good opportunity to continue to develop up there. But we think that overlooking the front setback space and the opportunities to attract foot traffic there would be a neglect of the site.
So just kind of summarizing what I'm saying here, we're looking to do adaptive reuse correctly, which is about creating a vibrant space that blends with the historic architecture, but also, you know, has a modern flair to it that attracts the eye, that makes the corridor feel friendly and walkable and attracts the local community to use the space. And again, I think, you know, This developer has a history of adaptive reuse and of internal rehabs. But really, other than the internal rehab, really, we think the big differentiator here is attracting that foot traffic off the streetscape. And then just a few specifics of the proposal, put in a high bid waiving the mortgage contingency.
That is subject to a comprehensive review. You know, these fire trucks are heavy. We know that there have been some identified structural defects. Comprehensive property structural environmental review and inspection.
Though Mr. Niosi is committed to cooperating with the town on its closing and on the development timelines, and we think the bid that Mr. Niosi put in reflects his commitment to bringing bringing all guns blazing to making this project work, to putting in the necessary investment, to turning this into a vibrant local hangout for local residents. We think the goal here should be, we know one of the alternative proposals isn't oriented this way, but we think the goal here should be retail.
It's a retail corridor. And we think putting this in as a kind of shiny gem of the corridor that preserves the existing architecture while while attracting new faces is the highest and best use of the location. And frankly, that's pretty straightforward. That's what we're here to say.
There are some details for Mr. Niasse and some details for myself at the bottom. Happy to answer any questions. Lowly attorney can't answer tonight as a sole project team member here.
Speaker 14 (01:26:53–01:27:08)
Members, questions? John? The bell's going to go to the new fire station. That's not staying.
And you, this man developed the old 7-11, right? Down the street.
Speaker 24 (01:27:11–01:27:34)
Next to the Burger King? I'd have to double check with him on that. He has a reasonably robust development portfolio and I don't represent him in all of his development. Yeah, I knew we weren't aware that the bell was moving, though, just like everything else, Mr.
Niasse would be happy to cooperate with the town. entertain other ideas for utilizing that space to reflect the existing structure.
Speaker 15 (01:27:39–01:28:24)
So similar to the question that I asked Mr. Harnish, would you ever So yeah, some residents have expressed concern that the use of the property could be changed or modified in the future, including potentially adding housing to the existing structure. Do you anticipate Any future changes to the proposed use? Are you fairly certain you'll be locked into a retail type of use?
And could it could it plausibly end up being housing in the future if market conditions were to change or something?
Speaker 24 (01:28:24–01:28:55)
Fair question. I think during an RFP process, there's a lot to come down the line. So answering that is obviously extremely difficult. All I can say is that our analytics, our view of the site, all our initial work on this has indicated that it's a retail corridor and that commercial and retail use is any alternatives for housing, and we're not eyeballing this as a site for housing.
Speaker 1 (01:28:57–01:29:13)
On the retail side, are there any partners that have expressed interest, or partners that Mr. Niosi already has existing relationships with, or what sort of retail would we be targeting?
Speaker 24 (01:29:14–01:29:45)
Yeah, I think Mr. Niasse is expressive based on the way the corridor is set up. Really, any number of retail, it could be a bank, it could be an urgent care. That said, I know he's had, I would have to double check, get some names, but I know he's had some productive conversations with local restaurateurs.
at least as far as I'm aware, has at least two parties who are interested in bringing a restaurant retail use to the area.
Speaker 1 (01:29:45–01:29:47)
Are you able to share who those partners are?
Speaker 24 (01:29:49–01:29:57)
If we could do a, because I'd have to double check with Mr. Nyers, if we could do a, I'd be happy to send that communication in writing to follow up if the board follows up with inquiry.
Speaker 22 (01:30:03–01:30:31)
Yeah, I'm just, I guess I'm a little stumped. This one is, I think, the most vague for all of us in our, you know, some, we've heard some from town members just trying to understand, like, what does this really look like? And I appreciate kind of the renderings that you brought here. I think the thing I'm just, you talked a little bit about hangout, but it could be a bank or an urgent care.
And I think it's kind of hard for us to understand where we're going here.
Speaker 24 (01:30:32–01:31:35)
Right. So I think you can see from the renderings that the renderings envision it being. point of saying that it could be an urgent carrier bank is just addressing the practical reality that there's some flexibility in the development process going forward, that it's a little bit awkward, but the RFP process comes, well, in advance of getting final permits and approvals. And there it's just, we're going to have to deal with zoning and planning and, you know, In the end, that's going to shape the project.
But maybe that's why, by necessity, Mr. Myers is a very practical man. By necessity, he's kept it kind of broad and vague because he doesn't want to put forward a proposal that he knows could get altered during the permitting process. But the proposal, the renderings we've set forward reflect our intent for the site and our hope of what we could get to through the permitting process.
We just don't want to, you know, condescend to the board by pretending that we don't have a long process ahead of us to get to a final approvals on the project.
Speaker 22 (01:31:35–01:32:02)
I think what our townspeople are looking for is they're concerned about traffic. They're concerned about like, right, what is in the variety of what this building could be? I think the traffic needs are very different depending on whether it's like you mentioned, you know, walk up retail space versus, you know, an urgent care where you would think that people would drive. I understand that you have to think through this whole process, but that's where I think we're trying to represent the folks in our town.
Speaker 24 (01:32:03–01:32:33)
Understood. I understand that parking in the area is very difficult. And the best I can say about that is Mr. Niosi is aware of those concerns.
committed to working with the town throughout the development process to try to address those concerns and bring up a Use to site that benefits the town economically and benefits the local community without stressing the town's infrastructure Yeah, I think
Speaker 1 (01:32:34–01:33:39)
In the design and the front setback being extended, do you know if in that design there was some consideration for parking? Didn't see any of that in the images in terms of where the cars would be, how you see the concept happening. But I think that concept looked like more of a restaurant concept than necessarily retail, more hospitality. So that is a major concern for us in that area, in terms of foot traffic obviously is okay.
um, timing, uh, where folks would park deliveries. And it does change depending on to, you know, I remember Nolan was sharing like what would go into that location. So I think we would need to have some follow up on. a little bit more ironing out the specifics of what we would envision going into that space.
Because I don't think any of us would want to award and then it's something that doesn't fit. Right. It just does not work for the community. So I don't know if that's been in discussion or if this has worked in other proposals that your group has worked on or how you've seen yourself working with towns, municipalities and these sorts of situations.
Speaker 24 (01:33:40–01:35:20)
Yeah. So I think that that kind of circles back to what I was saying before, which is I think we all understand this is While we could be ambitious about it, this is likely the start of a somewhat lengthy process to redevelop this site. And throughout that process, Mr. Niasse is committed to cooperating with the local permitting authority.
I mean, even RFP process, like I said, is just the tip of the iceberg on what would have to happen before the site could actually be used. So I don't have with me any sort of comprehensive parking plan for the site, but some of that is due to the nature of how much you can invest in a project before you've taken it to a certain point. At this stage, we don't necessarily know what the final project will be. We just know what we bring to the table, which is, and I think that's the more important thing, obviously, to focus on because no matter which bid the town ends up selecting, what it's really doing is committing to working with a partner on the redevelopment permitting process.
And the question is, do they have a wealth of experience with adaptive reuse? Are they showing commitment by the nature of what they bid and proposed for the project? And are they showing up to continually communicate with the municipality on making the project what it needs to be? And I think Mr.
Niosi is committed to all of those things. And that's part of what was previously referred to as vague, that's part of why it's been left as kind of a broad project proposal, is because we know that this is going to be a collaborative process getting this thing to the final stage.
Speaker 1 (01:35:21–01:35:40)
That location for hospitality retail does need some upgrades. In your assessment, has your group done any analysis on how much it would take or what the cost would be for yourselves to handle the renovations to work with?
Speaker 24 (01:35:42–01:36:30)
Yeah, I don't have any figures off the top of my head, but I have reviewed quite a few documents, and I've spoken with my client about this. And yes, part of this would come out in the, as referenced in the presentation, would come through in the due diligence period. So we can't necessarily have ascertained all costs until due diligence is completed, especially if you're talking about phase one or phase two environmental assessments, you don't know if you're gonna need But based on what we know to date, my client has run through what the expected expenses would be, especially when it comes to the issues with the fire trucks in the garage and the temporary shoring in the garage and what actual structural alterations will need to be made long-term.
Speaker 1 (01:36:41–01:37:03)
much I think that's that's all I have as well I think in terms of questions and calls and answer if there's nothing more from the members I think if we have anything additional which we may we'll send it in in writing follow up there no public follow up or anything All right, we'll see if you get a round of applause.
Speaker 25 (01:37:04–01:37:08)
This is why we don't clap. Now we have expectations.
Speaker 1 (01:37:09–01:37:28)
Thank you for your time. Thank you. Thank you very much. Thank you very much.
Have a good evening. You too. Thank you. Is everyone OK with like two minutes?
Sure. Is that all right? Yeah, it's great. All right, I'm declaring a recess for the next just three minutes.
Stay in stretch of leg.
Speaker 11 (01:37:43–01:37:46)
All right, everyone, welcome back from our brief recess.
Speaker 1 (01:37:48–01:38:56)
We will, to complete, just sort of wrap up item three on the presentations and interviews, no vote this evening. We all have our rubric and scores, which we can update and send to Mr. Milano for, and then he will compile our feedback, and we will, if we are going to award or choose another path forward. Any questions before we move to comments?
All right, with that, I will reopen public comment for anyone who was not here earlier. I think we may have six, nine minutes left. I said nine. Nine minutes left.
So if there's anyone in person or anyone online that would like to share comments, Seeing no hands raised. You can't increase your airtime.
Speaker 25 (01:38:56–01:38:59)
Sorry, Ian, as much as we love you.
Speaker 1 (01:38:59–01:39:09)
All right, I will declare public comment closed. I'll move to item five, discussion update, library college potential acquisition. Mr. Malauulu.
Speaker 21 (01:39:10–01:39:16)
Nothing to report at this time. Continuing to engage with the broker and hopefully we'll have some news to share in the coming days.
Speaker 16 (01:39:18–01:43:22)
Thoughts, comments, members. I just had a handful of comments mostly geared towards, you know, thinking about what deliverables that I think would be helpful. If we do acquire the property, I recognize that we cannot discuss the status of at this point. But, you know, just a couple thoughts.
You know, in my view, I felt like, you know, acquisitions an attractive opportunity for two discrete reasons. One, you know, available land like this, it's 4.8 acres, you know, land is a limited resource at Milton, and the acquisition will allow town to control what happens to the property. Two, for consideration to address the school overcrowding if we decide to put a school there. I think what, you know, three things that I brought up before, so it's nothing new, but that I think will only enhance our property I'm hoping we can further nail down plans on that soon if we find ourselves in the position of a post-acquisition stage.
One, I think a timeline of key decision dates for us regarding whether we place a school at the property would be really helpful. I think that any necessary town meeting dates would be helpful. I'm also thinking about projected dates when we'd have to coordinate with the MSBA and potentially decide between Laverie and Argyle. I just think seeing that in a visual way would be really helpful for residents, recognizing there's still some timing out of our control there.
That's one. Two, just bringing up again, I think the community engagement plan. we really want to make sure the residents are well informed and we hear from them on these big decisions. So, you know, having the opportunity to map that out, see what that looks like.
You know, I think we need to be thinking about that one pretty urgently once we, you know, if we find ourselves in the the post-acquisition state chair. Last, I brought this up before. I think that some kind of contingency planning for the property could be smart if a school doesn't go there for whatever reason. You know, I'd be happy to, you know, I've been looking at what other towns have done in this situation, you know, whether it's leaning towards, you know, considering other uses or, you know, something else, you know, I'd be happy to put some thoughts down and share the other committee members what that might potentially look like.
Um, you know, I've been thinking about it a bit, but just trying to make sure, you know, all the T's are crossed here for, for the next stage. You know, I recognize on the one hand, we want to get each step right here. Um, and we're not at some of this stuff yet, but I really want to hit the ground running with some of it. Um, if we can.
Speaker 1 (01:43:22–01:43:24)
All the points. Thank you. All this.
Speaker 22 (01:43:28–01:44:19)
Yeah, I just want to echo what Pete said. I think, you know, as we're kind of talking, we're hearing from members in the community as well. I think it's clear that we need to do a little bit more sharing of what our thought process is right now. And I think it's hard to share because we are still, we're like in, have two kind of parallel pathways to just love, raise a good opportunity.
We don't want to miss it. And we also have guy out road. And so at what point do we, and share our thoughts a little bit more openly with the committee and community. I agree that we should share more about those sort of key decisions as well and in what dates.
Speaker 14 (01:44:23–01:45:02)
This property gives us another option, too. The only option was Guile Road until this came about. So this gives the voters a lot more options. And I just hope we get the fastest and the best plan moving forward for the kids.
And this just gives us another option. So the way I look at it, everybody said they're not making new land, so and it protects the neighborhood from getting housing for now. You know what I mean? So I think we're in the right track.
Speaker 1 (01:45:08–01:45:10)
All right.
Speaker 15 (01:45:10–01:45:11)
Okay. I'll keep us on time.
Speaker 1 (01:45:11–01:45:21)
Thank you all. I'll close item five. We move to item six, discussion update approval of stressful town meeting one.
Speaker 21 (01:45:21–01:45:47)
Thank you, Mr. Chair. One through five are under review by the Warrant Committee. Obviously, six and seven have been discussed with the Warrant Committee at a higher level, but waiting on some news related to Lavaret to really take up those articles in earnest.
And that leaves the additional article. As mentioned earlier, the Select Board received a request from residents to consider adding an additional article related to the town meeting procedures.
Speaker 1 (01:45:50–01:48:07)
75-7 of the town meeting of the town bylaws which relate to So that is what is before us right now if we Want to as a board reopen the warrants to discuss this article, which is what one committee chair shared earlier the article is late according to our calendar. It is not of, it's not an emergency or something that is, in my opinion, I think is impending. It does not impact anything directly, immediately. So, We would need, we could leave it for a future town meeting if we're going to have one in February or annual town meeting and have the same discussion.
We are also in the space where there is a citizen's petition that is out there that may come to us for another addition to the warrant that we're not discussing yet. So it is here for us on the board to discuss if we are to say, well, it's late in our process. It's a lot to ask the Warren committee to read, to review all these articles. and get the warrant out and printed and updated and have all the members, including ourselves, up to date on all the issues and how we would choose to move forward on this piece.
I would say, I'll express my opinion here is that I do feel that we should leave the warrant as is and then have this article. move to a future town meeting. If there is a citizen's petition, then we will take it up. But I would not want to reopen the article, ask the Warrant Committee to review again.
Ourselves, we have not reviewed it completely and spoken about it as a group. So we would need to review it at our next meeting on the 8th as well. And I don't think the best process is for us to be in a rush on any item in the warrant. I'll say for my short time on the board, What's really important to me is that we as a board are very prepared going into town meeting and also very prepared to discuss all the articles in the morning.
But that's just, I wanted to express that as my opinion. I'll open the floor for comments and thoughts.
Speaker 15 (01:48:07–01:50:14)
So I think that this article is worthy of rigorous debate and I appreciate all ideas to make town meeting more efficient. In that same vein, we did already close the warrants. So I think it's fine to sort of leave it in the backlog for February and it can, get the attention and, you know, the proponents can have more time to work on it. I know a lot of work has already gone into it.
But, you know, there can be more polishing of the apple. But I do agree with Chair Daley's sentiments that we are trying from our vantage point on the select board to make sure that things are very well vetted and that the warrant that we submit to the warrant committee Has been well thought out and that we're not giving them too much and We're not giving too many items that haven't been fully vetted that then sort of leads to a Disorganized debate and sometimes these things can have You know when they're drafted on the fly or they're a lot of green sheets. I mean those that That will happen in the normal course of business, but I think we should strive to minimize that as best we can on our end. But I do look forward to the duet on this.
Speaker 16 (01:50:14–01:52:23)
How many nights? I'm just gonna I Think I'm landing at the same place But I'm gonna say just two or three things about what the proposal is just so you know to plant that seed So this was a proposal submitted by 11 town meeting members, a proposed bylaw amendment to the Milton Town Meeting Procedure. The group indicated trying to balance thoughtful deliberation at town meeting with efficiency, specifically amending Chapter 75-7 of the bylaws, where, you know, there's more to it, but my understanding of the gist of it is After 30 minutes of debate of an article, a town meeting member may move the question and the body can vote to determine if a majority has felt they've essentially received enough information through debate that would end the debate. In other words, after 30 minutes, request a vote for folks to say if enough of the body has thought there's been enough debate, we can just move to have a vote without further debate.
There's other contingencies if it doesn't reach, excuse me, a two-thirds threshold. Others, feel free to clean that up. I'm doing my best. I think it's a thoughtful proposal.
The group cited other towns that hit similar rules. But I think I'm most moved right now by the Warren Committee chair's comment that they wouldn't have enough time to give the article the attention it deserves to be ready for this October. So I would support the select board coordinating on our end. to have this teed up for next meeting.
But I think I'm going to agree with you guys.
Speaker 22 (01:52:23–01:52:41)
I will also agree. I think it's really important that what these 11 members have brought forward. And I think it's worth discussing. I do think we need more time to be prepared.
So I wouldn't want this to go way down the line. So I'm hopeful that we can discuss
Speaker 14 (01:52:45–01:52:54)
If they need more time or ask for more time, you won't hurt to wait for another town meeting. That's a no-brainer. I vote yes.
Speaker 1 (01:52:57–01:53:16)
Well, that's—I will say this article, some of the pieces of it was brought up at a town meeting, I think maybe three discussion going for a bit of time. So it's ironic the discussion to short discussion was a long discussion.
Speaker 14 (01:53:17–01:53:25)
Isn't there a mechanism now to stand up and ask for it to be moved? I remember get up and say we've heard enough, can we move this?
Speaker 1 (01:53:26–01:53:30)
Yeah, I think this institutes a time limit.
Speaker 16 (01:53:31–01:53:58)
I think the current process if there's a motion for previous question allows, you know, prevents the same town meeting member from speaking twice and can limit comments from 10 to five, but this would, you know, go further to just end debate.
Speaker 1 (01:53:58–01:54:02)
So if we are seemingly in agreement to leave it off the warrant,
Speaker 21 (01:54:04–01:54:10)
no action the action would be to put it off the warrants so no action would be to decline doing so.
Speaker 15 (01:54:10–01:54:14)
Nick will just keep it on his list and we'll talk about it.
Speaker 21 (01:54:15–01:54:25)
And we can do is coordinate with the group involved to have them come to a future meeting this fall to debrief with the select board regarding it since they are asking this board to sponsor the article.
Speaker 1 (01:54:26–01:54:51)
Yeah I think that would be best because there's some nuances in their writing that I think we really need to discuss around timing like That's a comment from the moderator. She didn't want to be in. Okay, we'll move to item seven, committee reports. All right, housing production plan.
That is myself and Megan Nolan. I was not able to attend the last meeting.
Speaker 21 (01:54:53–01:54:57)
I left this list on since the prior meeting.
Speaker 1 (01:54:57–01:55:22)
So you may not all have any report I think this I think it's been a series of emails. So nothing yet production plan We will have an update probably at our next meeting because we are coming close to having a Close to final product as well as the community engagement piece that should be scheduled for September and October All right, Fire Station Building Committee.
Speaker 14 (01:55:22–01:55:50)
I did meet with them once in designing the Atherton Street Fire Station. And there's a little bit of conflict of which one to go with. There's one that's already been approved by the Historical Commission, but now they want to go to a different route. But there's a couple of members that want to stay with the first one.
So it's an interesting meeting. moving forward.
Speaker 1 (01:55:52–01:56:04)
I think we're also getting a cost-benefit analysis from the fire stations on different options on design that's been requested. Milton Budget Coordination Committee.
Speaker 15 (01:56:05–01:59:18)
So the Milton Budget Coordination Committee had its first FY27 meeting earlier this month and And we kicked off the meeting with several new members from the Warrant Committee. We basically reviewed the new cross-departmental town budget development calendar. which is a really exciting product from last year's work, where basically, month to month, we have identified who will be doing what and when, because a lot of different streams had crossed, And we had had a lot of conversations over the past year on when it's optimum for certain committees to receive certain items. So, for example, the Warrant Committee functions best if Select Board and Town Administrator send them something by the beginning of January, right, which then requires us to have So we're going to be reviewing that calendar.
We're going to be reviewing that product from the schools in, I think, October. So anyway, we reviewed that calendar. So we're going to see, you know, we're piloting this approach. We're going to see how it works this year.
And the next, the September BCC meeting, we're going to look at the results of the We surveyed our members to see what suggestions they have for how to improve what we're working on. The town administrator and school department are starting their discussions with departments on, you know, initial passes at departmental needs and identification of beginning of the revenue forecast. So we'll hear an update from Nick and the school department on that. And then we are also looking to update the town forecast with some sketches of the capital projects that we have coming down the pipeline and You know, hopefully, hopefully we can have our collective bargaining agreements finalized.
So starting to understand what impacts that is going to have over the next five years and what how long we will be able to last before going for another override. So a lot to do, but very, very exciting work ahead. in my opinion.
Speaker 16 (01:59:18–01:59:21)
All right school building committee.
Speaker 15 (01:59:21–01:59:24)
Winston loves it too.
Speaker 16 (01:59:25–02:00:43)
Short update and it actually relates to the next agenda item 8 but but in our last meeting We now have the OPM on board, who this board helped approve a few months ago, to help run meetings for school building committee so that perhaps our school building committee chair is only spending 20 hours a day, not 21. They're helping guide us right now through the stage in the MSBA process where we're selecting a designer for the MSBA project now. And part of that, where we're at now, is creation of a Milton Designer Selection Subcommittee, which I'm sure Nick will speak to in a second, but basically select board designates a member, school committee designates a member, and the superintendent designates a member to be on the subcommittee to work with the OPM and other MSBA staff to ultimately choose a designer. So I'll pause there.
There's nothing else there. And Nick probably wants to tee that up a little bit more or not.
Speaker 1 (02:00:44–02:00:51)
We can move to item eight. Appointment of a select board member or designee to the MSBA designer selection panel.
Speaker 16 (02:00:52–02:02:14)
I can keep whatever you want. I can keep running with it or you can want to go so The actual I don't know this specific numbers, but the actual committee For our towns MSBA project to choose a design designers like 15 people or so in Milton appoints three of us 15 the others are MSBA staff and I don't have a list in front of me. So our body or our board would designate one of those three. It could be anyone who we designate.
It doesn't need to be someone on the school building committee, but we did at the last school building committee, you know, ask around and see who wants to be considered as a member. So, I'll share my thoughts and who I think we should appoint, but feel free to suggest anyone else. While I indicated I could do it, I think it makes sense to have one of the other school building committees with a little bit more to the school building committee. So.
So far.
Speaker 21 (02:02:15–02:02:41)
Have have there been other appointments so far. and the school committee makes a pick, so that would be the three. Superintendent would designate, school committee designate, site plan designate. So this board has a choice of who to put on from your membership or from the school building committee or otherwise.
Speaker 15 (02:02:42–02:03:38)
So I would agree with Pete that Glenn Hoffman would be an excellent choice I served on the school building committee last year. So Glenn, uh, for those of you who don't know him, he has an architectural background and deep expertise in, um, this type of, um, development and I think he would be this basically this person is working with the other members on the procurement of the designer correct so it's under really understanding qualifications and you know, being able to evaluate the work of the folks who are proposing, so.
Speaker 1 (02:03:39–02:03:41)
He's expressed interest in this.
Speaker 15 (02:03:41–02:03:46)
Yeah, that's what Pete just said. But I would support Glenn, 100%.
Speaker 16 (02:03:47–02:04:10)
Yeah, I think there'll be, there's currently a list of interested firms who have participated in initial steps. I think there's the subcommittee will narrow the list, conduct a few interviews, ultimately make a recommendation of who to select. So if, unless there's other.
Speaker 1 (02:04:11–02:04:12)
I know the candidate, I just, it's my bad.
Speaker 16 (02:04:15–02:04:37)
Great. Do we have any other candidates? There was probably seven or eight of the committee members of the 11 who said that they're open to doing it, but I don't… I have that list somewhere, if it would help walk through all of them.
But, you know, it's pretty… Folks were pretty open to let each other do it. So Glenn was the one who jumped out at me.
Speaker 15 (02:04:37–02:04:42)
And he's been with this project from the very beginning. Yeah.
Speaker 16 (02:04:43–02:04:54)
I will take a motion. All right. I'll move to appoint Glenn Hoffman to the MSBA designer selection panel. Second.
Motion made and seconded.
Speaker 1 (02:04:54–02:05:08)
Mr. Driscoll. Yes. Mr.
Popovich. Yes. Ms. Nolan.
Yes. Ms. Haggerty. Yes.
Myself, yes. Item nine, discussion approval appointment of Christine Stanton to the old colony elder services board of directors.
Speaker 21 (02:05:08–02:05:30)
Thank you, Mr. Chair. So Old Colony is now performing senior services for the town of Milton. And as a result of us being a member of that district, they sought out a Milton representative to serve on their board of directors.
And we think the logical person to fill that role would be Christine. Thank you for the board's request.
Speaker 1 (02:05:30–02:05:35)
I certainly agree with that. I know she's interested and wants the role. So I will take a motion if there are no objections.
Speaker 15 (02:05:36–02:05:54)
I will move to appoint Christine Stanton, Director of the Milton Council on Aging, or nominates, excuse me, I'll restart. I will move to nominate Christine Stanton, Director of the Milton Council on Aging, to the Old Colony Elderly Services Board of Directors.
Speaker 1 (02:05:54–02:06:14)
Second. Motion made the second day. Mr. Driscoll?
Yes. Silver-Shotland? Yes. Stallworth?
Yes. Sagrid? Yes. Myself?
Yes. All right, now I'd attend discussion approval of boards and committees. First, the Bicycle Advisory Committee, which I believe all three are eligible. So if there are no objections, I will take a motion.
Speaker 14 (02:06:17–02:06:35)
I make a motion for the Bicycle Advisory Committee, Robert Gormack, Brooke Watnick, and Vincent Verbansky. I'm sorry if I murdered their names, All right, we got your motion made.
Speaker 15 (02:06:36–02:06:36)
Second.
Speaker 1 (02:06:37–02:06:41)
Motion made and seconded, Mr. Driscoll. Yes. Oversham.
Yes. Snoha. Yes. Saggity.
Speaker 15 (02:06:42–02:06:42)
Yes.
Speaker 1 (02:06:42–02:06:49)
Myself, yes. Move to item 11, excuse me, item 10, Climate Action.
Speaker 14 (02:06:49–02:07:01)
Make a motion to approve Benjamin Zoll for the Climate Action Committee as a designated, no, as a member, right? Yep, designated. Designated member for the board.
Speaker 1 (02:07:02–02:07:08)
All right, motion made? Second. Seconded by Mr. Obersheimer.
Mr. Driscoll? Yes. Mr.
Obersheimer? Yes. Haller?
Speaker 11 (02:07:08–02:07:08)
Yes.
Speaker 1 (02:07:09–02:07:09)
Sagerty?
Speaker 11 (02:07:09–02:07:09)
Yes.
Speaker 1 (02:07:09–02:07:23)
And myself? Yes. I'll move to item 11, discussion approval of the one-day liquor licenses. If there are no objections or questions, I will take the motion.
Speaker 15 (02:07:23–02:07:47)
I would like to move to approve the one-day liquor license to the Milton Chamber of Commerce. and Vance Welch of Novara of 556 Adams Street, Milton, Mass. Dated Friday, September 4th, 2026 from 4 p.m. to dusk for the Back to Business event at Manning Park.
Speaker 1 (02:07:47–02:07:50)
Motion made. Seconded by Mr. Driscoll.
Speaker 21 (02:07:51–02:08:45)
I just offer, just as a follow-up from our last conversation on this, So we had, where we had left it was whether we felt a bare garden was more appropriate or whether the board was comfortable with no explicit limitation on where one could consume alcohol. The chamber did reiterate that they're open to either scenario. They would prefer a no bare garden option. I did speak to the chief who was comfortable as well with either option.
They've committed to all the other requirements in the bylaw. They've provided their insurance coverages per the bylaw. They will do ID checks and wristbands, TIP certified servers, among the other requirements in the bylaw. So the only real question was whether there was a preference from the board to require alcohol consumption only take place in the designated area or whether the board was comfortable with the deck itself being that designated area.
Speaker 1 (02:08:47–02:08:55)
Thoughts from the members. I'm actually right now drawing a blank on where we left with our public health folks in that last discussion on beer garden versus the restricted.
Speaker 15 (02:08:57–02:09:02)
I thought we were going to get input from public safety on where the beer garden was going to be.
Speaker 21 (02:09:02–02:09:08)
And the chief was comfortable in either scenario from a public safety perspective, was okay with either.
Speaker 22 (02:09:11–02:09:32)
I think it sounds lovely to have it in the whole park, right? I think you're less restricted. It allows you to mingle as intended, right? Versus being restricted to the one, the little piece of grass.
And if it's as long as our chief thinks that that's acceptable, I support it.
Speaker 1 (02:09:32–02:09:33)
I think I'd be of the same mind.
Speaker 21 (02:09:34–02:09:56)
It's in this general area. And this is just an overlay of what that will look like. So the band would be on the new stage on the left-hand side of the screen, and there would be tables for area businesses and nonprofits throughout, just to kind of stroll around. How are we handling the wristbands?
Speaker 1 (02:09:56–02:09:58)
When and where do you get ID'd?
Speaker 21 (02:09:59–02:10:12)
So they have it identified here. I don't know if you can see my cursor, but there is an ID check. adjacent to the serving location, so you stop at the ID table, get your wristband, and then be able to proceed to purchase.
Speaker 14 (02:10:17–02:10:30)
Other thoughts? Chief's happy with the way they want to do it, and they're doing it the regular way, Nick?
Speaker 21 (02:10:31–02:10:41)
Well, this is the first time under the bylaw, so we can obviously take feedback as well if it doesn't quite work and adjust it for a future event.
Speaker 14 (02:10:41–02:10:49)
But they've never had a problem, right? With the old way of mingling? Correct. I'm all for that.
Speaker 15 (02:10:50–02:10:59)
Yeah, I mean, if the chief signed off on a designated area, then… Well, this general area is designated.
Speaker 1 (02:10:59–02:11:00)
Yeah, okay.
Speaker 14 (02:11:01–02:11:12)
I think it would go across the street. Correct. So it's going to be a red solo cup event? They usually bring nicer cups than us.
Speaker 1 (02:11:14–02:11:19)
So let's start again. I will take a motion if there are no other.
Speaker 14 (02:11:19–02:11:43)
I make a motion for a one day liquor license for Milton Chamber of Commerce, Vance Wells, Novara, of 556 Adam Street Milton Mass for Back to Business event on September 4, 2026 from 4 p.m. dusk at Manning Park. Motion made. Second.
Seconded by Ms.
Speaker 1 (02:11:43–02:11:48)
Nolan. Mr. Driscoll? Yes.
Ms. Arborshamer? Yes. Ms.
Nolan? Yes. Ms.
Speaker 25 (02:11:48–02:11:49)
Taggart? Yes.
Speaker 1 (02:11:49–02:11:54)
And myself? Yes. Move to the next. I'll take a motion on Forbes House.
Speaker 22 (02:11:57–02:12:17)
Move to approve a one-day liquor license to Forbes House Museum located at 215 Adams Street, dated Tuesday, September 15th, 2026, from 6.30 to 8.30 p.m. for Lanterns and Legacy Models. That whole motion just sells itself, doesn't it?
Speaker 1 (02:12:17–02:12:21)
A second. Motion made and seconded by Mr. Oreshiro. Mr.
Joyceville? Yes. Mr. Oreshiro?
Yes. Miller?
Speaker 6 (02:12:21–02:12:22)
Yes.
Speaker 1 (02:12:22–02:12:22)
Baggerty?
Speaker 6 (02:12:22–02:12:23)
Yes.
Speaker 1 (02:12:23–02:12:31)
Myself? Yes. All right, meeting minutes. I'll take a motion to approve the meeting minutes dated August 4th.
Speaker 14 (02:12:31–02:12:36)
I'll make a motion to approve meeting minutes for August 4th, 2026. Second.
Speaker 1 (02:12:37–02:12:45)
All right, motion made and seconded. Mr. Driscoll? Yes.
O'Shaughnessy? Yes. Snoder? Yes.
Sagerty? Yes. And myself, yes. All right, that brings us to our time administrators report.
Speaker 21 (02:12:47–02:17:32)
Thank you, Mr. Chair. So just as a reminder, tomorrow is the primary election day. and elsewhere, so please get out and vote.
And thanks again to our Town Clerk staff, all the election workers. It's quite a long day out there, so appreciate the work. We can do it all again in about eight weeks. Special town meeting, just as a reminder to start holding that date October 19th.
We had two departures from Milton DPW this week. Assistant Town Engineer Sky Berube left for promotion with the city of New Bedford's engineering department. Sky lives on the southern part of the state, so a little bit more convenient, but a nice opportunity for him in a much larger engineering department to grow. He came here out of college as a civil engineer and had done some work through the town through UMass Dartmouth's engineering program and we were able to hire him from there.
So, unfortunate to lose somebody who grew up It's been here as long as I have really, so it's nice to see him grow from civil engineer to assistant town engineer and now to move on. So we always are sad to see people go, but happy for them to grow in their career. So we wish Sky all the best. Dean Alexander is retiring after 15 years here at Milton.
many years working, so we appreciate Dean's work. He was the, if you've seen him out on the catch basin truck, which I'm sure you have, or just a key, key, key part of all of our snow and ice operations. So thanks again to Dean and best wishes. So we posted the jobs at DPW, the assistant town engineer.
We also posted for a civil engineer, just to see what market is out there. These are very interesting hands-on project management type roles. You're dealing with a ton of infrastructure projects. So if you know anybody who might be interested in that kind of entry level into municipal engineering and infrastructure and capital project management, these are great opportunities.
We also have roles posted in the treasurer collector's office for an assistant collector for tax and assistant collector for utilities. So again, admin jobs here in town hall that offer competitive salaries and good benefits. Earlier this, actually last week, S&P Global Ratings confirmed the town's AAA bond rating, which was some good news. We've maintained AAA ratings since 2014.
So excited to keep that in place. They identified The overall health of the town's finances, the positive budget results in recent fiscal years, our slow adoption of additional policies was specifically highlighted, and they had reviewed closely our reserve policy that the board adopted last year. So that work does show up and is meaningful to the ratings agencies. In terms of weaknesses, they identified some of our longer-term liabilities, specifically our retiree health insurance liability, which is something that a lot of cities and towns face.
So it was good to see not a specific kind of Milton liability, but more of a general liability that everybody else is working against. So happy to keep that. We have a bond sale coming up. on Wednesday, so maintaining that AAA rating, especially when the rates are much higher than they've been historically, that AAA rating does start to make a big difference.
If rates are low for everybody, they're low for everybody, but when they're high, we do see that premium and savings on the interest rates that we're able to get on our money, and especially as we consider additional big capital projects, maintaining that AAA rating will result in savings for taxpayers. And then lastly, just a couple of procurements that we have processing right now. We have design docs out for a renovation to the basketball court here beside the fire headquarters, along with the installation of a new bocce court in partnership with the Council on Aging. That's funded by the Community Preservation Committee.
So that's presently out. We have an RMP for payroll and HR services as we're looking to modernize And then lastly, we're starting to get work together on a lower guile bid documents to get that project moving as we have passed through that appeals window. So the lower guile project, the turf field project is able to proceed. And we're working out the procurement strategy and bidding strategy and the construction timeline for that, and I'll continue to keep the board posted.
And that is my report.
Speaker 1 (02:17:34–02:21:17)
Thank you. For the chair's report, I just have two things that I actually want to just speak on, and I'll speak on them briefly, because they're very important, and I don't want to just do this off the cuff and make it seem flippant. So I'll be very careful what I say, and there'll be more to be said in the future. First, with all of our students back to school, I'm going to speak on the article that was in the Globe recently about our residency.
which was on the heels of another incident that had happened at the Tucker School. I will say that while I was very unhappy with the way the Globe framed not only the town, but the school's residency policy, that doesn't change the impact that that policy has had. and regardless of your intent, if your policy has an outsized impact on any community, any population of people, that needs to be reviewed. So that was brought to our attention and is important, and we are working with the schools.
I know the schools are working on that to review the entire policy. One thing that was really important to me that came out was the use of police officers and SROs in the investigations around residency. We have met with the police department as well as the schools to review and change that policy and figure out how we either remove the SROs and create a better process for our school investigations going forward. There's more to be said on that as the schools work through that policy as well.
I don't think anyone, while everyone understands and knows our SROs and loves the work that they do, I don't think anyone is particularly happy to see the police at their door. and folks have asked us for a more human and community approach in these things that we need to do, and that is something that we need to listen to. And so I look forward to working with not only the police officers and the police department, but also with our schools, we're creating a better, more equitable policy. And then also working on the impacts of who is being pulled into the sweep.
The schools have already eliminated this anonymous tip line. I'm not sure how often that was used. All of these things are what we need to communicate with the community about the work that we do and how it impacts our families. I think that's incredibly important.
So more to come on that and more to come from me. This is kind of me moving past being angry at what was written in the Globe and then moving to changes that actually work for the people of this town. Secondly, the flock cameras. We have received your emails.
We've received your phone calls. And I think we've spoken about this before, but we do intend to have the police chief and not only to discuss the school policy, but also to discuss the flock cameras. That is a hot button issue, not only here in Milton, but also throughout the country. And it's important that the chief talked to us about how that's used and that the community is heard in terms of whether they want those cameras in town or not.
So that will be at a future date. I believe the chief has been away for a bit, and so we've not been able to schedule that meeting. But that is the intention on both of those issues. Both really important, different, but also not, because in both of those, it is hearing from the community about no matter how good or sound or sane you think a policy is, the impact to the people that we are here to serve is what's most important and tantamount.
And so we will be working on both of those issues going And that is all from me on the chair's report. Members, anything? No, nothing going on, Megan?
Speaker 15 (02:21:18–02:21:19)
Just budget coordination committee.
Speaker 1 (02:21:20–02:21:20)
Chilling?
Speaker 15 (02:21:20–02:21:23)
Yeah. All right. Very excited.
Speaker 14 (02:21:25–02:21:26)
Did schools open up all right?
Speaker 25 (02:21:26–02:21:26)
Yeah.
Speaker 14 (02:21:27–02:21:30)
Yeah, everyone's doing great. Good. Back to school for everybody, right?
Speaker 1 (02:21:31–02:21:35)
Everybody's back to school. Not my kids. Not your kids. Next week.
Speaker 22 (02:21:35–02:21:36)
Yes. After Labor Day.
Speaker 1 (02:21:36–02:21:38)
UPS, lazy.
Speaker 22 (02:21:38–02:21:51)
It's exciting that the kids are getting back to school, right? I think a fresh year, it always feels good, this kind of season where things start getting a little colder and getting the kids off to school, it's exciting.
Speaker 1 (02:21:51–02:23:25)
Good to hear. All right, then public comment response. I'll just respond to a couple of things as I wrote them down here quickly. About the schools, to Ms.
Felton's point, and Mr. Obersheva, your point that you've made with us, there will be, the intention is for there to be an incredibly robust communication with the community about the potential at Labouret and that also versus what we have at Guile. Labouret came on in the spring, it's very fast. This may be the fastest the town has ever moved on any sort of acquisition.
Also very fast and during the summer when our families were not here, but we would be making a serious mistake to not be shared with community, how we see all of these projects not only mapping against each other, but also how they fit into the future of the town and what the and what the resources may be so there will be and we're hearing from. not only with Spelman, but others in the community about, well, what does this mean for us? And what does it mean for Dow Road? And what does it mean for the schools?
And this entire picture that is being laid out. So if we are fortunate enough to get a yes on our bid, I believe that is the time, that next day is when we begin to talk about how do we now talk to the community about what's next. I'm saying a lot, others on public comment response before I keep going.
Speaker 16 (02:23:26–02:24:28)
Thanks for that. For Mr. Corey's response on Upper Canton. And I also think this ties back to something we discussed in a prior meeting about finding a time to sort of return back to that issue following receipt of comments from the state to their group's suggestions.
So, you know, I don't know what the timeline is to sort of process these comments, but, you know, maybe we could just plan out when we can get that back on the agenda if folks are open to it in an upcoming meeting. if next week is rushed, maybe we can do it, you know, in an upcoming one. So, Nick, I don't know if you have a thought on how much kind of time there might be before we can kind of talk about that again.
Speaker 21 (02:24:30–02:25:20)
I have not had it. So we received a response from just so the public is aware. So Mr. Corey and The group put together some proposals related to certain intersections along Canton Ave.
We shared that with MassDOT. MassDOT had one of their contract engineers, Howard Stein-Hudson, review it. Howard Stein-Hudson has reviewed it, provided a memo back to the town with comments and suggestions regarding those ideas for implementation along Canton Ave. So that is where it stands now is they submitted it to MassDOT, MassDOT reviewed it, provided comments back to the town.
We have not met internally to go through it yet, but we'll just coordinating between breaks and everything else. But I think we can include it on the 8th at the very least. And if we have more concrete feedback, we'll provide it by that time.
Speaker 16 (02:25:20–02:25:41)
I mean, but I also don't want to, like, it's potentially a lot to read through. And I also don't know if it should go to traffic commission first or to us. But I guess I'd be in favor of putting it on and just doing a first pass through it.
Speaker 15 (02:25:41–02:25:59)
Well, I think ultimately what you want to have is a response and an advocacy on particular interventions, because you're going to have to go back and ask MassDOT to make the investment in the intervention, no?
Speaker 21 (02:26:01–02:26:16)
I think it's been some of them were kind of low touch, some of them were bigger. So I think that's kind of going through and triaging what we view as easily feasible in-house or not, I think is kind of that first step that we want to undertake.
Speaker 16 (02:26:17–02:26:22)
Yeah, I mean, I think a key thing is prioritization of some of the feedback.
Speaker 1 (02:26:26–02:27:14)
I think the report we got kind of came in an awkward time for us. We didn't have any meetings coming up. And so we will need to individually review what we received from MassDOT going into whichever meeting we add. just to the agenda.
And for me, it's that split of what are the things that we do as Milton, what are the things that the state does and that we look for. Because if there are things that we can do, then how quickly can we, the parts that we ask the state to do and so on. Others, public comment or response? I think there's a slobbering.
Speaker 22 (02:27:15–02:27:34)
Yeah, in the choir station, I think it's helpful to think about how it's good to hear from folks about what their thoughts are. And I think certainly my thoughts have evolved as we've had our folks come to present. It's very different having a conversation with folks and what's presented on paper.
Speaker 15 (02:27:35–02:27:51)
I agree. It's kind of like you get a little bit more of a sense of what kind of a partner each of the proponents might be. Yeah.
Speaker 1 (02:27:51–02:28:35)
And so anyone that's listening, I'll continue to send your input. We've received a few from the RFPs that are online. Obviously, this meeting will be online. So it's always great to hear from the community.
There's also aspects of follow-up for any of us if we want to send additional questions to any of the candidates. All right, let's move to item 17, future meeting schedule. Looks like we're back here, Tuesday, September 8th. And then September 22nd, October 6th and 13th are tentative.
Any preference on the 6th or 13th?
Speaker 21 (02:28:39–02:28:49)
We may need both, just depending as we head into that town meeting. So maybe commit to the 13th and hold the 6th if folks are available, continue to hold it open.
Speaker 1 (02:28:53–02:29:35)
Can we just say, let's hold both? And if that week, that week leading into it, if it's not there, we'll cancel. That's fine. Sure.
We'll plan on both. Special time meeting, Monday, October 19th, Tuesday, October 20th, Wednesday, October 21st, and if necessary, October 22nd. If we are there on the 22nd. Any thoughts on those?
Speaker 25 (02:29:37–02:29:38)
It's what it is.
Speaker 1 (02:29:39–02:30:04)
If you're there on the 22nd, I'm blaming you. All right, 18, future agenda items. I think traffic, as Mr. Obersheimer has pointed out, we should put that on the future agenda, about 138 in Mr.
Corey's report. Making sure we solidify the date for the chief. And are there other items?
Speaker 22 (02:30:04–02:30:14)
And when is this school, Are we going to have folks come back from the school building committee just as we're moving along and we want to kind of wait and see?
Speaker 1 (02:30:14–02:30:28)
Yeah, I think that's another tentative one depending on what Elaborate comes back to us with. I think as soon as they come back to us with hopefully a yes, we schedule them. And then we may need to maybe even schedule a recurring meeting.
Speaker 15 (02:30:37–02:30:47)
All right. Have we heard anything lately on the economic development plan? Should we get an update on that?
Speaker 21 (02:30:48–02:31:06)
While I was away, we did get a revised proposal from MAPC that met the budget that we had set out. But I have not looked at it yet. But we can include it on the 8th for a discussion. And I can circulate it in the meantime.
Speaker 1 (02:31:16–02:31:42)
I will move to enter executive session to consider the purchase, exchange, lease, or value of real property, Laboratory College, 303 Adams Street. Based on my belief, the discussion of this matter in open session may have a detrimental effect on the negotiating position of the select board. The select board will not return to open session. Second.
Which means seconded by Mr. Driscoll. Yes. Roshawn.
Yes. Sullivan.
Speaker 6 (02:31:42–02:31:43)
Yes. Sagerty. Yes.
Speaker 1 (02:31:43–02:32:15)
And myself, yes. I will also move to enter into executive session to discuss strategy with respect to the collective bargaining. Milton Clerical Unit of the Southeastern Public Employees Association, Milton Professional Management Association, Milton Public Employee Association, Milton Firefighters Local 1116, Milton Police Association, Milton Superior Officers, Milton Library Association. Based on my belief that discussion of this matter in open session may have a detrimental effect on the bargaining position of the select board.
The select board will not return to open session. Second. Meeting seconded, Mr. Driscoll.
Yes. Yes, it's normal.
Speaker 11 (02:32:16–02:32:16)
Yes.
Speaker 1 (02:32:16–02:32:16)
And myself.
Speaker 11 (02:32:17–02:32:19)
Yes.