Speaker 1 (00:20–01:23)
Good evening, everyone, and welcome to the June 30th, 2025 meeting of the Milton Select Board. Please join us as we recite the Pledge of Allegiance. I pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all. Thank you.
So we're going to engage in a little parliamentary shuffle here. We're going to recess for a meeting of the Governor Stoughton Trustees so that we can hear a report from the fantastic Town Farm Committee, which I've had the pleasure of sitting in on the last couple of meetings for. So I'm going to make a motion that we recess from the meeting of the Select Board to open a meeting of the Governor Stoughton Trustees. We will return to the Select Board meeting.
I'm getting seconded by Ms. Hegarty. Voice vote's fine on this. All in favor?
Aye.
Speaker 2 (01:23–01:23)
Aye.
Speaker 1 (01:23–01:49)
Okay, we are recessed. And then I have to call the Governor, Stoughton Trustees to order. So I've now done that. So we are in order.
And I believe we have the chair of the committee here to give us a quick presentation. So Would you please join us, Morgan, and fill us in on the deliberations. I was there for some of them, as I said, but not for all of them. You guys have been working on this since January.
Speaker 3 (01:49–03:10)
Well, I would suggest that it's clear that Chair Zold was not there for all of them, if you call it fantastic. So we have worked hard. But I have no prepared minutes here, our agenda. You have our recommendation.
It's short and sweet. I do want to commend you, though, as trustees and your predecessors, for forming the committee. I think one of the greatest criticisms we've had is that we were not heard. And you certainly gave us that opportunity.
We talked an awful lot amongst ourselves. We talked an awful lot with as many people as we could engage with. So you've certainly taken that away. I also want to thank Nick Connors for maintaining decorum and peace amongst us.
He did an excellent job and kept us on track because we were getting derailed very regularly. We did want to deliver something actionable to you. We didn't want this to drag on. We wanted it short and succinct.
We know you're busy. We tried to distill everything into a succinct and a short recommendation as we could. It's really only two points. So that's all I have.
If you've any questions on those two points, please. There's some very, very qualified people here with me.
Speaker 1 (03:11–04:10)
Yeah, we had an excellent group and I can say that a lot of, even though it was a short report, I can tell you word for word, it was definitely very thoughtful and came with a lot of discussion. So I think there's a lot of really good compromise that went into writing this. So I would welcome, I've had the opportunity to sit with this group and ask questions already. So I'd welcome if anyone here has questions for the committee.
I do not. None for me. OK, well, maybe I will ask questions so that we haven't wasted your time. So it seems to me that, well, there was not like a broad consensus across everyone on a single plan, which is probably not surprising considering there's never broad consensus among anybody about something that's that specific.
But I'm wondering as chair if you might share some reflections of things that you learned about maybe either the site or about the neighborhood or about the idea of affordable housing.
Speaker 3 (04:11–06:45)
Yeah, I would just say I do think we had broad consensus that affordable housing is essential in the town. We disagree on whether the scale is appropriate for this particular site. Some of us disagree that the site is appropriate. We have to become educated about it.
It's not easy for us to understand what 60% of AMI actually means. Is it really poor in this area of the country? So we had an educational process that Nick guided us through a lot of the time to understand exactly who was going to be living here and how was it appropriate for Milton residents. We felt that there's an opportunity here to do something very special.
We just are not sure. And I don't think we're still sure that the scale of it is correct and that it's aimed towards the right people. And I use that word very broadly. We don't know who the right people are, OK?
But we felt there were some brilliant ideas. Could it be guided towards teachers, firefighters in the community? Would it attract talent to the town, administrators? and any of the people that perhaps would be qualified.
To live here, younger people, maybe this is an opportunity to. Improve. The quality and the breadth of people we would attract into town, but also there's an element that we feel it doesn't really help the poor. Could we get lesser numbers and have more or a lower AMI?
We didn't understand the mechanics behind the RFP, basically. So there was a huge educational element. And we haven't been working long. It's only been six months, really, since we got organized.
But we did, as I say, want to bring something to you that we felt you could work on. We don't want it to be stalled. And we did use the analogy that everyone loves puppies. We're firm believers.
We were unanimous that affordable housing is a very, very needed concept in the town, but perhaps not here and not on this scale. And again, we were divided, but not on that particular topic, I feel.
Speaker 1 (06:46–06:57)
That was the sense that I got from the last couple of meetings that I sat in and also had the opportunity to go on a site visit, which I think was helpful. It turned out you've got a pretty big number of folks that came out for that site visit.
Speaker 3 (06:57–07:17)
A great site visit, led by Steve, of course, who's our local historian and knows all about the site and is a font of knowledge and helped us understand and was really the architect of that second recommendation that we keep the character of the site. in the way it was meant as a town farm.
Speaker 1 (07:19–07:38)
So maybe if we don't have any direct questions for the committee, it might be an opportunity for us to, I don't think we have to come to any hard decisions here. I think probably we want to continue to reflect on the report and have some thought, but we could have a discussion about our own reflections on the report and what we might think of as next steps.
Speaker 2 (07:43–07:54)
I'm just guilty of being new to this and caught up in so many other things that I apologize, but I'm not the best person at this point in time.
Speaker 1 (07:54–08:34)
Totally fine. I don't know, Mr. Daly or Ms. Hegarty, if you guys have thoughts.
thoughts about the site or what we might want to think about doing next. So, this committee was charged with reviewing the RFP process and then also thinking of alternative uses that their charge ends today. So, again, we thank you for that. And we may decide that we want to to think about a different set of requirements for its future RFP.
We may want to decide to go ahead with the existing RFP. We may want to convene another committee and have them look at the site. I'm not so keen on the third. I feel like death by committee is a thing.
Speaker 4 (08:34–08:49)
Yeah. So if we've gotten to a certain point in a process with this, would that option necessarily restart everything? we want to have some action come out of this.
Speaker 1 (08:50–09:16)
Right. And I know that you guys were in touch with the…there was one remaining proposal on the…because the proposals were submitted last fall or last I think even longer. Yeah, even longer than that. And so with obvious fluctuations in the market, maybe we could say we were wondering if the prices still held.
One of them still held, but one sort of withdrew.
Speaker 3 (09:16–09:37)
That's correct. Yes. And we were appreciative of the fact that the developer of the one remaining RFP is a town resident. We thought that was a huge plus in the sense that he would have a sense of belonging in the town and a sense of place in the historical context for the site.
Speaker 1 (09:37–09:45)
Was there a discussion with the developer about the potential to reduce the number of units if that was something that would be economically feasible for them?
Speaker 3 (09:45–09:51)
We didn't get there. We actually make that a recommendation for you guys to further dig through.
Speaker 1 (09:54–10:01)
And my understanding, too, and you might know more about this, Mr. Daley, has this come up in the Affordable Housing Trust? Have you guys been discussing this?
Speaker 5 (10:01–10:46)
It has not. So I've only been on one AHD meeting so far since I've joined, so this was not a point of it. But I know when we were talking about this before, with there only being one RFP left, now we had initially thought of going back out for an RFP, but that may have some costs and some time constraints as well. I'm not sure if sticking with the one that we have left is the best way forward.
But perhaps if we were going to be able to have the units reduced, which I know was a main point of concern, perhaps that would be the way forward. But it's been, what, a year and a half now. It seems that the market changes. Maybe going back out would be the way we should do this.
Speaker 1 (10:46–11:01)
Would there be a way to do that, Mr. Malano, that would I mean, you can't give advantages to anybody, but for someone who's sort of stuck with the process, there's not really anything we could offer them other than maybe share some new ideas.
Speaker 6 (11:01–11:07)
But they'd be evaluating what comes in from whoever comes in and as it stands, as it was submitted.
Speaker 1 (11:08–11:18)
And when the committee was talking about potentially reducing the number of units, was there a sense of like, what would a number that, what was the range?
Speaker 3 (11:18–11:37)
We didn't get to that stage either, Ben, or Chair, excuse me. That's totally fine. We were just interested in seeing if those levers could be changed. We could take it from something like 80% DMI to 30% DMI, perhaps, and does that impact the economics?
We didn't get into that discussion, but we would love to understand that.
Speaker 1 (11:37–11:58)
And AMI, for those who are watching at home, is average median income, which for our easiest sake is actually about $100,000 in Milton. So you can think of 60% AMI as a salary of $60,000 a year for the household, or 30% being $30,000 a year. And okay, so it seems to me like, yes, John.
Speaker 2 (11:58–12:12)
I just was wondering, speaking of times when there's never unanimity, the committee unanimously recommends trustees undertake a feasibility study. what we're trying to decide here?
Speaker 1 (12:12–12:42)
I think that would be part of an RFP process. So for example, if we decided that we wanted to reduce it from 35 units to 25 units, for example, then we would want to look at a feasibility of How does that affect traffic? How does that affect utilities? I know there was some concern about runoff as well.
Some of those things we sort of put in the initial RFP after feedback from the local residents there. But I think that would…is that…
Speaker 3 (12:43–14:16)
No, just to back it up a little bit, we're slightly concerned that the infrastructure isn't adequate for the site. It's a quarter of a mile down a dead end lane and we don't have bus routes and we don't know if the obviously the lane is narrow. It's a single lane road. So we were trying to think that if the town could get a traffic assessment study done to see would that neighborhood support The 35 units are whatever would be proposed by the trustees.
We were also interested in access to the site. We had discussed proximity to bus routes, and that would appear to be in or around a two mile. radius so so that that was what we were trying to get to feasibility study is very very broad based it's slightly nebulous so but we were just trying to throw ideas out there that perhaps you could get some of the town employed advisors in just to I think appease or assuage some of the concerns of the residents, because obviously we live on that street. There's 12 houses.
If you're going to put in 35 units, we have visions of quadrupling the traffic count. How does that impact can't navigate a clock on a school morning? That kind of stuff. So that wasn't necessarily addressed, I believe, in the RFP.
Speaker 5 (14:18–14:35)
In the committee's review, we're saying 35 units, was there a conversation about the size of the units? We're talking about reducing these, one bedroom, two bedrooms, is that out there? Was there an idea of how many people 35 units means in terms of families or singles?
Speaker 3 (14:35–15:02)
Cheryl and Tom were very good because they have a background in affordable housing and helping us understand that it's not all three bedroom units. So it wouldn't be 35 families per se. There would be a mix of studios, one bedroom, two bedroom, that kind of thing. But we didn't get into the nitty gritty about what that would actually be in terms of a traffic count.
We kind of punted that back at you guys.
Speaker 5 (15:05–15:14)
And in terms of AMI, we're talking about AMI for combined in the units, right? Combined income is 60 or 30%?
Speaker 3 (15:15–15:20)
I think that's where it ranges from. I think it ranges between 30 and 60%.
Speaker 1 (15:24–17:03)
Well, any other questions or discussions on this? I want to drag out the point. So it seems to me like we might want to do a couple of things. And I'm totally open to suggestions on this.
So one, I think we should. maybe talk to the developer first to see if he has an idea about units and what would be feasible so that we don't have to go through an RFP process again. But if that seems like it's not going to be workable with his plan, then we might have to put another RFP out. I think it'd be helpful to get the Affordable Housing Trust's input on this.
They do have some resources and they may be able to help defray the cost. You know, if we decide that we wanna reduce it from 35 to 30 or 25, we could see if there might be some opportunity there from the Affordable Housing Trust to help support that. And then… Once we kind of have that information, I think we would know what might work best next.
And then we'd want to have another open session where residents could come in and also kind of hear the discussion about what would a standard proposal look like, a reduced proposal. And I don't know if we can do the traffic question would be one I'd throw over to you, Mr. Milano. If it's been punted to me, I'm punting it back, like a rugby match.
Speaker 6 (17:03–17:47)
chicken or egg things. You wouldn't want to do a traffic study for a 35-unit project if there's no intention to build out a 35-unit project. So that's why often you'll see them after something's been proposed. But I can understand the concerns.
It could help shape the number of units the road could accommodate. So we could look at having one of our consulting engineers submit a proposal and get a sense of what that might mean in terms of cost. But again, and then we're talking about who's gonna fund that work, whether the trustees should be paying for that work. It's a pre-development cost associated with the land, but also we try to hold on to that funds to go to what we can actually do with it.
Yeah.
Speaker 2 (17:47–18:02)
I was just thinking if we could do it as inexpensively as possible, it'd be nice to know what it could support. I mean, instead of coming out with a plan for a certain amount and then not knowing, it'd be nice to know.
Speaker 1 (18:02–19:19)
Yeah, so my recollection is when we put the initial RFP together, it was done under the guidance of the Affordable Housing Trust folks who had that experience with affordable housing projects. And basically, there is a sort of a floor for a developer of like what no longer becomes possible. And I think, so we kind of, at the time, I think we thought the floor was around 30, 32, 35. And there's also the added factor of as long as we're below 10% affordable housing in Milton, we're susceptible to 40B developments.
And I know with a couple of projects that are online with this, that will get us very close to being at 10% so we no longer would have the 40Bs. So I just, I kind of agree with Nick in that I hear what you're saying. I like the idea of a spitball estimate, but engineers are very lousy at doing spitball estimates. They are very precise individuals, which is why I'm not an engineer.
And they may not necessarily have that ability. But we could certainly ask if there's, I don't know if we want to ask, if there's somebody that we could ask if it's possible to get some sort of a back-of-the-envelope traffic study. I can ask her.
Speaker 4 (19:20–19:25)
And then I think if- We don't have any on-call contracts with planning
Speaker 6 (19:27–19:38)
We do, but it would be an on-call. Sometimes these, I would say between $8,000 and $15,000, depending on what we're asking them to look at.
Speaker 2 (19:38–19:52)
I'm thinking more off the seat of the pants, like a 20-foot road handles. X amount of traffic, or you know what I mean? Whatever the, you know, I don't know. Maybe that's asking a lot.
Speaker 1 (19:52–20:10)
I hear what you're saying. I think part of it too is just knowing, I also live on Canton Road, so at six in the morning versus eight in the morning, or Saturday versus a Wednesday rush hour, it's radically different. But maybe, Nick, you could just find out what that cost might be.
Speaker 4 (20:11–20:12)
Sure.
Speaker 1 (20:12–20:17)
And then do you know, Mr. Daly, when the next meeting of the Affordable Housing Trust is?
Speaker 5 (20:18–20:29)
Yeah, I need to check the calendar here. I'll put you on the spot. It'll take a minute. Sorry.
July 15th, I believe, pending right now.
Speaker 1 (20:31–20:41)
And then I think our next meeting is currently slated for, was it July 8th? That's the second Tuesday because tomorrow is a Tuesday.
Speaker 6 (20:41–20:48)
We had penciled in the 8th, but there was summer availability issues, so we're definitely locked in for the 22nd. Okay.
Speaker 1 (20:48–22:18)
Well, let's see about the 8th maybe. There might just be some pro forma stuff that we can do and then maybe have a more substantive meeting. So if the Affordable Housing Trust meets on the 15th and can provide us with maybe their read on this as well and their thoughts about additional resources that might be available, then we could reconvene as the Governor's Student Trustees on the 22nd. to continue the conversation at that point.
We might at least have ideas about what a traffic feasibility study would cost if not having something that's back of the envelope slash seizure pants. Does that sound like a good…you know, just to share my own personal opinion here, I think, you know, I agree that affordable housing is critical in this town. And I think a lot of the developments that we've seen have been a result of the fact that we haven't been sort of planning it out. Having been to the site, I think this site can support some affordable housing.
I hear the residents' concerns that 35 units may be too many. So, you know, in the spirit of compromise and making everybody You know, everybody has to give up a little bit of things. You know, if we can give up 10 units and then get some support from the Affordable Housing Trust and have some reassurance for the neighbors that the, you know, that the traffic situation wouldn't be out of control and if, in fact, there might be ways to utilize the project to improve the road or improve the facilities around there, that might be a
Speaker 2 (22:18–22:28)
I'm not familiar with the resonance. I'm just looking at the committee that we formed came back to us and unanimously said we should do a feasibility study. That's where I'm coming from.
Speaker 1 (22:30–22:40)
I know the committee was composed of several abutters. And we are very grateful for your service and for your leadership on that committee.
Speaker 4 (22:40–22:59)
So, yes. With the comments also on just infrastructure overall to the site, should, I mean, I know we're gonna do a traffic feasibility study, should we get, and should we consider getting an outside opinion on the infrastructure to the site?
Speaker 6 (23:02–23:05)
So we will, and it's what I wrote down in terms of sewer and water.
Speaker 4 (23:06–23:07)
I realize that might be incredibly complicated, but yeah.
Speaker 6 (23:08–23:44)
And it gets back to specificity to dictate what the anticipated flows would be, what the water demand would be, what the demand on the street would be. So it's, again, DPW can certainly provide analysis of the existing infrastructure broadly in terms of whether it would be able to support a new project. But to really nail that down, you need to know how many units, how many people you expect and all that. So that's the kind of level of specificity that would typically come later in the process.
But in order to try to get some answers, we can do that now.
Speaker 4 (23:44–23:51)
We could try to set like a couple of scenarios, right? I mean, the general sense was what? That the below 30 units?
Speaker 1 (23:51–23:52)
Well, 35 was the original.
Speaker 4 (23:52–23:55)
35 units was the floor.
Speaker 1 (23:55–24:32)
Yeah, so that's the other question, too, is we could ask…what's Ralph's company name again? I forget the name of the…they have a LLC there for Ralph's company. Sorry to refer to Mr. Parent informally, but we could ask…we also need to ask him to maybe provide some we could forward him this report and ask him to provide some thoughts.
And then I know sometimes when you're looking at a development, part of the development costs is infrastructure improvements to support whatever's being built. So we could maybe get some clarity from Mr. Parent on what that would be. Sure.
Speaker 2 (24:32–24:48)
It would also be nice to have some, if we're asking him if 35 is a, break number, can we have some numbers to back that up rather than just a comment that 35 doesn't work, less than 35 doesn't work, you know? Yeah.
Speaker 4 (24:49–25:11)
Also, too, I mean, I don't know if the Commonwealth has any grant programs to support affordable housing developments like this, you know, if there's like a Mass Works for affordable housing or something like that. That's not in my area of expertise when it comes to the Commonwealth, so I don't know.
Speaker 6 (25:11–25:34)
Can we test you with that also, Mr. Molano, for a little homework? There certainly is, but it's an annual program. There are some others, they've really migrated everything to one annual application under the One Stop program that closes in June of every year.
So in terms of a longer term time horizon, there are programs out there that would support that kind of upfront infrastructure project.
Speaker 1 (25:35–25:46)
Okay, well it feels like we have a pretty good consensus about some next steps in information gathering. Anybody else, any thoughts before we close our meeting of the Governor Stoughton trustees?
Speaker 2 (25:49–25:50)
Thank you for doing this.
Speaker 1 (25:50–26:14)
Thank you again for your service. You're released for now. And we may call back on the committee, depending on how things move forward. But again, it was so important to have that group of folks together.
And I know there was a lot of intense discussions around this. And we're very grateful for your volunteer service. And hopefully, the outcome will be something that everybody will feel, if not great about, at least good about.
Speaker 3 (26:14–26:16)
Well, we all appreciate having a voice.
Speaker 1 (26:17–26:58)
So thank you, guys. You're very welcome. So I'll entertain a motion to close the meeting of the Governor's Student Trustees. Oh, we have to approve the meeting minutes.
Thank you. So we have the meeting minutes from March 11th and May 21st. I don't know if we can approve the March… I would wait.
Yeah. We can't approve the March minutes because we don't have a quorum because Mr. Daley and Ms. Hagerty weren't here.
So we could approve the May ones though. Or we want to just wait until we, it's up to you, yeah. That would be fine. Why don't we, well, let's knock one off since we can't, so we can do that.
I'll take a motion to approve the minutes from May 21st.
Speaker 2 (26:58–26:59)
I'll second.
Speaker 1 (27:00–27:08)
Okay, I've made the motion and it's been seconded by, no, it's totally worked, Mr. Coyne. So I think this is just a voice vote. So all in favor of approving the minutes?
Speaker 5 (27:09–27:10)
Aye. Aye. Aye.
Speaker 1 (27:10–27:16)
Okay, that's unanimous. And now I will make a motion to adjourn. The governor, student trustees?
Speaker 4 (27:17–27:17)
Second.
Speaker 1 (27:17–27:19)
Seconded by Ms. Hegarty. All in favor?
Speaker 4 (27:20–27:20)
Aye.
Speaker 1 (27:20–27:57)
Aye. Okay, we are back to the select board for public comment. And I don't see any public comments, either online or in person. So we'll just give folks a minute in case they were wanting to put their hands up online or in the room.
All right, so we will skip public comment. And now we have discussion update approval, Susan Milliken and Stephen Geister regarding the Neponsa River Superfund Project public hearing and comment letter. Thank you for joining us, Mr. Geister.
Speaker 7 (28:04–28:07)
I'm just gonna roughly go through this quickly.
Speaker 4 (28:08–28:08)
Thanks.
Speaker 2 (28:10–28:14)
Thank you. Thank you.
Speaker 1 (28:14–28:18)
I'm sorry Richard's not here for this, this is his baby.
Speaker 7 (28:22–39:08)
Well, thank you Select Board and Mr. Milano. I just wanted to briefly get you up to speed on what's been going on with the Lona Ponset River site, EPA site, and I'll give you a real quick overview, and then I'll dive a little bit into this, but not too much detail. It's very, very detailed.
So just to start off, so the lower, the Ponset River, the bottom 3.7 miles from the Baker Dam up to the confluence of the Mother Brook and the river are all where designated a Superfund site in March of 2023. So it's been about two and a half years. I'm sorry, 2022 was added to the national priority list and activities began on the river at that time. The activities to date, well, first let me just tell you about, so I'm a member of the CAG, the Citizen Advisory Group, along with Dr.
Susan Milliken in town. And I've been part of it since the first meeting they conducted, the EPA conducted, just to get people educated a little bit about a year and a half ago. We formed the committee about a year ago, probably 15 to 20 residents of two in Milton, rest of everybody else is Hyde Park, and mostly Hyde Park right now because that's really what it impacts out of the gate. And then we've got a few Dorchester and Mattapan people on board.
We'll probably grow the CAG as we get downriver and it has bigger impact on Milton and Dorchester. So we meet monthly. We discuss different things. The EPA usually comes in and presents to us.
The EPA has hired per the CAGS will a company called SCEO and they basically advise us and help us coordinate as a CAG. It's pretty common at a Superfund site to have a CAG set up for the citizens to be able to give input into the EPA and I'm learning all this. This is my first time through on this. and they've been very helpful and they come to our meetings, they help us manage our meetings, they help us organize as a group.
We have a couple of different subcommittees. We have a technical subcommittee, which I sit on with some engineers, primarily a couple of gentlemen that are part of the Neponset Watershed Association that are very knowledgeable about this area, about in that area. They also have an outreach subgroup that is trying to get the word out to everybody and really just getting that activity going as we speak. just because there wasn't a lot to talk about.
Yeah, it's a Superfund site, but now that we start having details and we start having an understanding, we're trying to communicate, you know, what exactly is going on. So the Superfund details, like I said, it's a 3.7-mile stretch, and the EPA's been doing some remediation work on the side of the river. The Lewis Chemical was about two years ago, they started on it and finished that. It's a one-acre site on the Hyde Park side of the river.
part of the Superfund, but not part of this activity. It's kind of a separate entity that goes on, but was actually one of the major causes of pollution into the river. So that was cleaned up first. They finished it.
I think it was fall of last year. It was about a year project. It cost somewhere between three point nine, four million dollars to clean up that one acre. So it's very, very highly polluted with PCBs, primarily that they have since started on also further down the river on the same side of the river and Hyde Park on what they call the I'm trying to find the name of it here.
Anyway, it's Riverside Square, so I think there's kind of a strip mall there. It's behind that activity. And in the 80s, they had dredged the river and took all that polluted soil out of the river and dumped it on the shore. And basically, they're remediating that.
I haven't seen the overall dollar value for that, but it said it's at least a year project. And again, they're digging and hauling away. And so recently they completed the upper one mile of the river and what they call is an EECA environmental evaluation and cost analysis report. That report is somewhere around, I think it's 423 pages of tables and data and all kinds of data and things.
interesting, but you'll see in the packet I handed out, there's a summary of what they did, a little bit about the river, and a summary of the four options that they presented to us about a couple weeks ago. And so the process works, and when the EPA has finished, they finished their analysis of a section of a river, they come up with recommendations on how to clean it or what their recommendations are. They came up with four different options for this part of the river. And the first option is basically to do nothing, cost nothing, do nothing, which you know, we all know is not a solution.
And then they came up with three other options. Option three and four have, as part of that removal of the T&H dam, the Tyleston and Hollingsworth Dam, which is a mile down, and basically that's where they divided it up, one mile to that dam, and then 2.7 miles is the second phase, which is from that dam down to the Baker Dam down off Adam Street. And they have completed the, taking the samples of that as of last fall. It was about a year's activity.
A couple of us went down and visited them on the river and they were taking samples in the river, on the side of the river, water samples, soil samples. They actually did a bunch of mollusks. They actually planted them in there and let them grow in the river and then take them out and actually do analysis of them and how much pollution they absorb. So very detailed study going on.
We're hoping to see that report by the end of this year, which would be kind of a sense of how polluted is it below the T&H Dam up to the Baker Dam. But above the dam, it's very, very contaminated. The EPA has commented unofficially it's one of the top three most polluted rivers left in America that hasn't had any any remediation done to it or very little remediation. So it's up there.
According to them, it has very high visibility, which is good. From a funding perspective, they mentioned to us, but they won't share the details, there's 70 companies or former companies or companies that added to the pollution over the course of the last 50, 60, 70 years. Some of them still in existence and they're going through the process of trying to get as much money as they can to help with the cleanup of the river. And they don't really share that.
All they shared with that was in November of every year, they go to a board. I can't remember what it's called, but there's a certain board where they present what they would like to do to the river, option one through four. And then also what the funding is. And they try to say, OK, here's where we're at, trying to recuperate that money from the polluters through the years.
So we have no idea where they're at, and their other comment was as well, if all the money's not there, then they'll go to the federal fund, which there's a fund there for cleanup, and ask for that money there. So again, they haven't shared a lot about that. Will they come if they don't have all the funding, come to the state? I don't know how the whole process works.
They haven't shared that with us yet. But the current ask is that they submitted the ECA. On July 9th, they're having a Zoom call or a virtual meeting to go through the data package, and they have a presentation. I think Mr.
Milano forwarded you guys a link to a 17-minute video, which is basically somebody just walking through a slide deck, which is kind of much more detailed than what I'm providing, but not the same detail you'll read in 423-page documents. you'll have a chance to go through it. It's very well done, actually very nicely done by the EPA. Just released it last week, so we just got it.
And the idea is they give 30 days. The CAG has asked for another 15 days beyond that, because it's only, if the 9th to the 13th, we have to respond by the 13th, so there's only a couple days in there. We've asked them for at least two more weeks for us to digest presentation, digest what they told us, and then give us an opportunity to respond. So we think it's going to be two weeks beyond that 13th day that we'll have an option to respond to it.
The EPA unofficially has recommended option four. Of course, I mean, that's, you know, the way to go. Basically, what they said is if they take any of the other options, option two or option three, it doesn't fully clean the river to the same depth or the same level, and they may have to go back and do some additional remediation, especially after they've done the downstream work. And then the other discussion we've been having is what about downstream over the other side of the dam and out into the marshes?
That's what I was going to ask, yeah. Yeah, and there was a study done, I think Mr. Milano in one of his papers talked about that. I think there was 12 samples taken a few years back and it was polluted for sure.
And some of it's going over the dam for sure. The marsh is a perfect collection point for pollution. So I think that would kind of be the next step after they finish coming out with the ECA for the bottom phase two part of the overall. And so what I'm trying to do is just get the word out that this is available for people to review.
I'm gonna start leaving these brochures around town so people have a chance. I've talked to the CEO at Council on Aging. I've talked to the Milton Times. I talked to some other organizations just to get the word out there that, you know, what's going on and you have an opportunity.
Longer term is, is they're more asking, you know, what do we want to do with the water, the river when it's done? It probably will, depending on which course they take to remediate it and how they build it back up. It could change somewhat the course, the way it moves. Do we want to put boat ramps?
Do we want to put canoe ramps? Do we want to have, you know, picnic areas and those kind of things? So they're not, I don't think they're looking for that exact thing now, but they just want to start us to get involved with the process. And also the DCR has been part of this and the Ponset Watershed.
And they're all, we're all part of the CAG and we talk about these things. So they're really just looking for the town to start to participate in, you know, kind of the activities that are going on. I mean, that's kind of all, I didn't really come up with any formal presentation, but I'm happy to try to answer what I can. I'm an engineer, but not an environmental engineer, so it's kind of out of my realm, but I gotta say, I can't compare it to other ones, but the EPA has been spectacular to work with, they've been great.
They're very open, they're very, tell us, answer all our questions, they go out of their way to go to our meetings, to come to our meetings, They work some pretty long days, because they're on site during the week. And we have our meetings at night. And they're up and about at 8 o'clock, at 9 o'clock at night with us. So it's been a good experience for me.
I've lived in Milton 28 years on the other end of Canton Ave. And I pretty much walk the river almost every single day. And I've heard when I moved in, it was polluted. But don't fish there.
And certainly don't drink the water, but not to the magnitude. I think the primary, what they found is PCBs, but there's all kinds, there's heavy metals, there's all kinds of other carcinogenics and bad things that are in the water, but the PCB is the main thing that needs to be cleaned up, so. Thank you.
Speaker 1 (39:08–39:10)
Thank you very thorough. Questions from the members?
Speaker 4 (39:15–39:32)
It seems to me that sort of as you get to RA3, there's discussion of removing the dam. So that seems like a major, like that's a pretty big project, right? And does DCR currently own the dam?
Speaker 7 (39:32–39:43)
Yeah, they own the dam, and they said it would add about a year onto the project to do, because they have to clean up the upside of it very thoroughly, and then they have to demolish it and take it out and do it. It's a pretty big to do.
Speaker 4 (39:43–39:49)
Yeah. Yeah. His DCR weighed, I'm sure they're going to submit their own comment.
Speaker 7 (39:49–40:24)
I don't know if they have officially weighed in, but in all our meetings they said we need to take it out of there or we need to essentially rebuild it because it's in very bad condition and it really doesn't serve any purpose at this time. There was some discussion in our last meeting about what the water levels would be and how that would all change. One of the consultants that we, the technical committee brought in just to give us, they read it through and gave us our opinion, their opinion, and they were concerned about, the EPA had not done a good enough job of looking at the modifications of the water levels when the dam's gone, and how does that impact water flow and pollution.
Speaker 4 (40:25–40:40)
My next question was going to be, so over the winter we had the flooding on the trolley tracks, which presumably, correct me if I'm wrong, I thought it had something to do with the dam itself. Am I wrong?
Speaker 7 (40:41–40:41)
No, it did.
Speaker 4 (40:42–40:47)
And would this help future situations?
Speaker 7 (40:47–41:20)
I think it's so far up river that it doesn't really impact down below. The answer that I heard about the flooding was they had replaced all the wood on the top of the dam there. And so the water level has been significantly higher over the last month. And that wasn't the cause of it, but they said because of the water level so high, if there was an impact in the water flow, which there was because of the ice, it backed it up.
The comment from the DCR, that's only the second time that's ever happened in the history of that magnitude of flooding. But I would defer that to the DCR exactly.
Speaker 4 (41:21–41:21)
Yeah.
Speaker 7 (41:23–41:39)
Okay. Yeah, I mean, I wonder, because the dam, the Baker Dam was broken for a very long time. Right. It took a good part of a year to get it repaired and fixed, and now it's back to what they consider normal, and the water level's up significantly from what it used to be, so.
Speaker 4 (41:40–41:40)
Yeah. Yeah.
Speaker 7 (41:42–41:43)
Other questions?
Speaker 2 (41:44–41:52)
Not being an engineer either, but you would think if a dam was taken out, if anything, the level would go down. Yeah. You know what I mean? Because there's nothing to hold it back.
Right, right.
Speaker 6 (41:53–42:19)
And for the T&H dam, it's not a flood control dam, so it's not serving a purpose in terms of protecting those flows. And in fact, in anticipated heavy rainfall, the dam is lowered purposefully so that no water really builds up behind it. So it's managed to a degree, and it's lowered ahead of big storms or ahead of big rainfalls to let the water flow over it.
Speaker 1 (42:22–42:31)
And is the TNH, just looking at the map on the last page, the TNH dam, is that Milton right there, or is that?
Speaker 7 (42:31–42:38)
It's actually Hyde Park. Okay, yeah, it's Hyde Park. Yeah, the Milton started to just blow the dam on this side of the river. That's what I thought.
Speaker 6 (42:38–43:06)
The site, the cleared site, if you can make it out right next to it, that is what's been colloquially referred to as the paper mill site in the MBTA community zoning. So that site has been rezoned for 179 units under the approved rapid transit plan. in terms of the Superfund cleanup and everything in that area might make that site more potentially attractive down the road.
Speaker 1 (43:06–43:57)
I think the idea of having a nice cleaned river with a great waterfront and, you know, kayak or canoe access or something, that would be really lovely and a nice change. So, I know I'm sort of channeling Mr. Wells here because I know how much he cares about this and particularly the landing. And when he and I were speaking about this, it must have been like last year or something.
The marshland, as you sort of alluded to earlier, definitely contaminated. And I know since they're working from as far upstream as possible going down, just assuming that that means that things were gonna get churned up and sort of head down. So, is there sort of a commitment to then, after this work is finished, looking at what happens into that salt marsh there?
Speaker 7 (43:57–44:19)
Yeah, so right now there is nothing, you know, beyond that. I mean, I don't know if the town should start to petition the EPA or not. I'll ask that question at our next meeting, which is actually tomorrow night. I'll ask that question on, you know, kind of how do we continue the process?
I think the Ian Cook, who's the president or director of the Naponset Watershed, it's been on top of that. He probably has an answer.
Speaker 1 (44:19–44:25)
I'm sure they've thought about it. Otherwise, it's kind of like whack-a-mole and the PCDs pop up over here instead of over there.
Speaker 7 (44:25–44:41)
But in it gets down now, now in Boston Harbor, and it gets starts to get into that impact of that. And what what's what what's going on there? So, yeah, I don't I don't I've asked that question, but I nobody's really given me a good answer. It's like, let's, you know, deal with this piece for us and we'll we'll work our way downstream.
Speaker 2 (44:41–44:46)
So you would even think there would be some monitoring during the process?
Speaker 7 (44:46–45:37)
I believe there is. Yes. Yeah, yeah, yeah, yeah. And the other thing is that there will be a major impact when they start this, but we're a year away probably at best, maybe two, but from actually taking the material and moving it out from the river and how many truckloads and so on.
And I know for the Lewis Chemical one, it was coordinated with town and I know for sure that they were coordinating with the police department and DPW in regards to the Riverside area. I think it's 10 trucks a day or something. And I don't know if they had final, they just started hauling in May. and how much of it goes through, I think it just barely touches Milton or a couple of Milton roads, but I do know that they were, I asked the question, they said they were definitely coordinating with the traffic, it's not Lieutenant Alba, but whoever the new traffic lieutenant is, and the DPW.
Yeah.
Speaker 1 (45:37–45:41)
And so for us, we have this letter here.
Speaker 6 (45:41–47:14)
Yes, I drafted a comment letter that, has the town supporting the RAA4 alternative, which includes the removal of the dam. The letter also notes that it identifies the paper mill site that I just referenced. The full document that the EPA produced does identify the paper mill site as a potential staging and loadout area for the entire cleanup. So I think if that were to become the identified site, there should be some conversations about what those impacts might look like.
The transportation access makes sense because you can go down Truman and out and get out to the highway from there. But it would be a significant impact potentially in terms of if that's the load out staging area for this entire cleanup. And where that's where the dam is, it makes sense. However, I just note that the town would expect to have continued dialogue and communication about that potential usage.
That's great. And then I did… as was alluded to here, speak to the efforts that the town has had in terms of Milton Landing, in terms of the testing we've done before with Boston Quincy and the results we've gotten that show the contamination in the saltwater side below the Baker Dam. And just the recommendation from us in terms of how do we get the EPA to focus on it was just to bring it up at every opportunity you can.
So while this report has nothing to do with that, it's an opportunity to bring this up. So I've done that in the letter as well.
Speaker 1 (47:14–47:28)
It's always good to flag things early. So we have this comment letter. Any further discussion on this? I'll take a motion on the letter.
Somebody is?
Speaker 2 (47:28–47:29)
Was that letter in the package?
Speaker 1 (47:30–47:44)
Yeah. Yeah. OK. Our computer is restarting over here.
Yeah. That's all right. Oh, it did, sorry. Yeah, no worries, no worries.
It's 18% of the way there. All right, so.
Speaker 4 (47:45–47:54)
So, Mr. Chairman, I'd like to move to approve the comment letter to the EPA regarding phase one cleanup alternative of the Neponset River Superfund Project.
Speaker 1 (47:54–48:03)
Great. Do I have a second? Second. Seconded by Mr.
Daley. Any further discussion? All in favor? Aye.
Aye. Opposed?
Speaker 4 (48:04–48:04)
Okay.
Speaker 1 (48:05–48:10)
You'll have your letter, and please let us know how this continues to progress.
Speaker 7 (48:10–48:24)
It's very, very- Yeah, well, I'll keep you in the loop for sure. So I was with Mr. Wells. I was keeping him in the loop as we were going, but I certainly will keep you in the loop.
Thank you, Mr. Gaskin. I'm also going to make sure I reach out to the planning board, too, with the zoning and everything. That would be wonderful.
There could be some impact there. Thank you. Thank you, sir.
Speaker 1 (48:28–49:56)
All right, next item in our agenda is MBTA communities act and district compliance application. I just have a very short thing that I would like to read real quick if the board doesn't mind and then we can, I think we. Well, we'll see what we have to, we have to discuss the application letter. So, and I worked with town council to put this paragraph together.
So, I wanted to address some of the conversations that the select board had over the past couple of weeks in executive session around the MBTA Communities Act. Obviously, those conversations are all confidential, but I can share a few things. The first thing I want to do is thank Tom Doherty for his volunteerism and the time he's dedicated to the town on this issue and many others. There were a number of rumors circulating about this process.
The Select Board could not make any decisions prior to our meeting on Thursday of last week, and any suggestions to the contrary are not factual. The last remaining question about our classification status was answered by Judge Gildea in his decision to dismiss the taxpayer lawsuit last Thursday, in which he referred back to the SJC decision that confirmed HLC's authority to set the status and Milton's designation as a rapid transit community. So I just wanted to say that. Obviously, what we talk about, as I said in here in executive session, is privileged.
But I felt like it was important to read that. Mr. Milano, we are going to go through the application here.
Speaker 6 (49:57–51:14)
I did distribute the District of Compliance application in terms of what I've been able to fill out. So what the application looks for is a description. You have to repeat where HLC has categorized us and our obligations under the statute and the regulations, and then describe each of the districts in detail, pulling from the compliance parameters that are produced by UTL in terms of their work and the planning board's work that went into it. So we describe each of the districts in accordance with the application.
It asks some additional questions in terms of the affordable housing components and requirements, and then ultimately does seek a letter from the town clerk that says that there are no other zoning bylaws. that are newer than this. So that is a draft of the application that I've shared with the board. I would note that we're not submitting it.
I don't expect this week. There are a bunch of materials that are required that the town clerk still has to prepare that go with any zoning bylaw, not particular to this. So I would expect that to go in early next week, hopefully, but certainly ahead of the July 14th deadline.
Speaker 1 (51:15–51:34)
If we retain our meeting on July 8th, we could potentially review, or is everybody here gonna be around on July 8th? So maybe we can review it one more time before we approve, because I think it would be nice to have all of the I's dotted and T's crossed.
Speaker 6 (51:34–51:44)
And the main missing material, it's referred to as the Form 7, which is a form that has to be prepared for any zoning bylaw. So that's what is not yet prepared.
Speaker 1 (51:46–51:53)
So we can discuss now, MBTA communities, if there's anything that folks would like to bring up.
Speaker 2 (51:53–53:06)
I just, I have a few words. Okay. Preservation of rights are three words with more significance at this point than I think most people realize. Town Council recommended including those words in our action plan at the time it was filed several weeks ago.
But there was resistance to include those words in our declaratory judgment case that was going to be filed by Tom Daugherty, a local attorney, and caused him to resign as he believed that we would not have cause without that clause. I realize some are concerned that the 25% plan is the best path forward, but the fact is we really don't know. So I feel it would be reckless of us not to include a reservation of rights clause in our submission. And here again, we're being asked again to submit a 25% plan.
And I would ask others, as others have before me, that we include a reservation of rights clause in a cover letter to our submission. So I would like to propose a motion that we include a cover letter with our 25% plan, reserving the right to challenge our classification at some point down the road.
Speaker 1 (53:08–53:32)
Okay, is there a second? In the absence of a second, we'll just move forward. But thank you for sharing those thoughts. Anything else?
I know, Ms. Hegarty, you probably don't want to participate in this discussion. Mr. Daley, is there anything you'd like to add?
Speaker 5 (53:32–54:40)
There's one thing, yes, that I would, this has obviously been contentious and has gone on for a while, but I think where we stand now with this being submitted in the coming weeks, what I think we, as the select board, hopefully in collaboration with the planning board, should be working on is the town comment. And whether that is town halls or whatever format we're putting that together, where we discuss with the town what the zoning means, there's been significant changes since this was initially proposed. We have new sites, we have new neighborhoods, new people who may not have been paying attention as much as all of us. have been, and I think we, they deserve the right to understand what all the zoning means, and they deserve the right to have questions on zoning, and I think we should not look at this as a set it and forget it.
I know that's been said before, that if we zone, that we're not allowed to change that, and I do not think that is correct, and I think we should be going out and setting together a plan for town halls, public comment, and sharing this with all the folks in Milton that would like to be informed.
Speaker 1 (54:43–55:03)
I think that is an important and excellent suggestion. I know previously when we worked on the last 25% plan, the planning board had hosted a couple of public forums. We know if they're planning on doing the same for this.
Speaker 6 (55:04–55:11)
I do not know. I don't have an update on that. Between now and the next meeting, I can connect and provide an update.
Speaker 1 (55:11–55:41)
I think the idea of a jointly hosted information session with both boards would be both, I think, helpful to have everyone there and also a nice display that we're working together on this. And my understanding is that the planning board also just voted on Thursday to undergo the economic analysis for the plan, which could help us raise the percentage of affordable housing that's set within.
Speaker 6 (55:41–56:37)
Yes, that's correct. We have a scope of work from MAPC that would study the zoning to, with an economic feasibility study, analyze whether additional limits of affordable housing would be supported by the zoning and by the market. So the zoning, as written, takes advantage of the 10% requirement that HLC did allow at the regs. The language also says that if If we get a study showing 15% is allowable, that goes into effect automatically.
MAPC's scope of work will look at 15%, 18%, 20%, as well as consider potentially more deeply affordable rather than keeping it at the 80% AMI. So there might be an opportunity to craft a bylaw to change the affordability requirements within it if it's backed up by this study. So that work will take place over the summer into the fall. So possibly ready for the October 10 meeting?
It might be a stretch, but possibly, yes.
Speaker 1 (56:37–56:41)
We don't want to throw a bunch of material at the Warrant Committee at the 11th hour again.
Speaker 6 (56:43–57:01)
But you said that if that was the case, the percentage would automatically go into effect anyways? It's automatically a 10 if we get the market study to show 15% is allowed. It automatically goes up to 15. To do anything beyond 15 at 80% AMI would require a bylaw change.
Speaker 1 (57:01–57:42)
So then I think…so if we're gonna meet on July 8th, I think it would be worth letting the planning board know that we would be interested in jointly hosting a couple of information sessions. I also would recommend that we may look at a couple of different venues so that we at least get to not be…not that I don't love the Council on Aging, but it might be nice to do something in East Milton might be nice to do something that's easier for the residents in different places to get to. But maybe, did you have a sense, Mr. Daly, of how many of those you were thinking about?
Speaker 5 (57:42–58:09)
I think that would definitely, that would depend on our schedule, but one or two, maybe, you know, Milton Arts Center, East Milton, maybe the high school, if we think they're gonna be a lot more attendees, the high school can be, a lot of parking, you know, not as big as a town meeting, but Yeah, something along those lines. I think if we're going to do it in the summer before school starts, we're going to need to have one or two because people are going to be away. And so being mindful of that as well.
Speaker 1 (58:10–58:41)
Sure. That makes sense. Maybe we could look at just sort of general availability of the high school and the MAC for a couple of those days. Probably, I would think like a weekday evening would be a good choice.
And that's something where, you know, even for our board, like as long as we can get three of us there, I think that would be good knowing that people are traveling over the summer and same for the planning board. Great.
Speaker 5 (58:42–58:57)
One follow-up question. Yes. I haven't had a chance to look at the planning board's last meeting. When you're saying 15 to 18 percent, you're talking about is that percentage townwide, or are we thinking about changing the percentages for different projects, or we're saying we want to be at 50 percent affordable in the town?
Sure.
Speaker 6 (58:57–59:54)
No, that's an important question. So, what I meant was it's for Applicable projects under the MBTA communities only. Okay. Under the new zoning.
Yeah. Okay. And, you know, as a lot of the zoning addressed, you know, making it easier to build, you know, a three-family. So those would be not included in the affordability requirements, would be any of the larger sites that allow for greater density.
Any project 10 units or more would require to be 10% affordable as it stands. If we're able to dial that up to 15%, then it would be eight units or more would have at least one affordable unit in there for each of the projects. And then the study will assess if there is a way to increase that to 18% to 20% or maybe keep it at 15% but go from 80% of the median income down to 60% of the median income, just for kind of round numbers. studies.
Speaker 5 (59:55–01:00:00)
Okay. And the goal would be to get to our needed 10% in the town?
Speaker 6 (01:00:01–01:00:06)
We're guaranteed 10%. So, no, I think in terms of the subsidized… Oh, you mean for a townwide 10%?
Speaker 5 (01:00:06–01:00:07)
For a 40B?
Speaker 6 (01:00:07–01:00:44)
Townwide, yeah. Yes, I'll just note that if all of the projects that have been approved in terms of the 40Bs are built out as designed, then we will be in excess of the 10% required for the subsidized housing inventory without any changes on MBTA communities whatsoever. Where that will change again is once the 2030 census numbers are done and our housing unit number changes, because right now our 10% is based on 2020 census housing units. So we're in good shape for probably once everything, assuming everything is built out as proposed, we will jump over that 10% likely until the next census.
Speaker 1 (01:00:49–01:01:29)
Any further discussion? Okay, so we'll review the application on the 8th and vote on it. So, item number six, anti-bias training. Mr.
Malana, we received, an email from Mrs. Beverly Ross Denny, who I think most of us know and respect very much as a former member of the school committee, suggesting anti-bias training. Do you want to maybe provide some remarks about both the letter as well as what this would entail?
Speaker 6 (01:01:30–01:01:48)
I don't have anything, Mr. Chair. I'm happy to look into some options for us that we have through our insurer. We have programs that we've, the town, in terms of town staff, have certainly taken advantage of in the past and have brought out, and we could, there are options for us if that is something that the board would like to consider from there.
Speaker 1 (01:01:50–01:01:51)
Thoughts from the members?
Speaker 4 (01:01:55–01:02:04)
So this is feedback or recommendations that all elected officials receive anti-bias training?
Speaker 1 (01:02:04–01:02:06)
I think it was.
Speaker 4 (01:02:06–01:02:11)
Do all town employees receive anti-bias training?
Speaker 6 (01:02:11–01:02:23)
Not as a regular kind of part of the job, but we have engaged with Maya for various types of training in recent years and made it available to everybody to attend.
Speaker 4 (01:02:25–01:02:53)
I'm sorry, Maya is our insurance. I think in the year 2025, like most organizations, I know in state government annually, we have to update our inclusive leadership training, anti-bias training. It's just kind of standard that I think, if anyone's asking my opinion, it's something that we should all be doing.
Speaker 1 (01:02:54–01:02:55)
We are asking your opinion.
Speaker 4 (01:02:55–01:03:01)
Yeah. I think it's kind of like bare minimum. Yeah.
Speaker 5 (01:03:02–01:03:35)
Well, I would say I think some elements of this have come up in a lot of different iterations. I think at town meeting, I've heard the phrase, representation matters, often. I think we have all of our No Before trainings that happen, that we're doing these things electronically in a lot of ways. So I think absolutely we should look into what our options are for anti-bias.
I think this, would this just be for town employees, or are we doing this separately for electeds?
Speaker 1 (01:03:35–01:03:42)
I think the suggestion was to do it both for town employees as well as for the elected board, so planning board, select board, school committee.
Speaker 5 (01:03:45–01:03:59)
Yeah. I think given the incident that's kind of, the incidents that have kind of led to this, I think it's important that we do at least, that we start researching what's available to us. terms of our relationships.
Speaker 1 (01:03:59–01:04:01)
Mr. Klain, do you have anything?
Speaker 2 (01:04:01–01:04:02)
Never hurts to learn.
Speaker 1 (01:04:02–01:04:44)
I agree. Actually, I'm a big fan of anti-bias training. I'm sure nobody is surprised to hear that. There's a number of online anti-bias trainings that you can sort of engage in individually.
There's things that I've done through work as required. I do think it is kind of a bare minimum thing. And if anything, it just helps folks to think about what it feels like to be in somebody else's shoes. And I will say that anti-bias refers to a whole swath of different things.
It doesn't just refer to race. And for that reason, I think it's really important. So I think it would be great if we could look in to see, would it be through Maya most likely?
Speaker 6 (01:04:44–01:04:56)
Yes, I mean, that would be a quick option for us. It might not be a five-star one, but we can see what they have, and I can report back from there.
Speaker 1 (01:04:56–01:05:22)
Yeah, maybe report back on what you've got. And then we have some individuals who live in town that work in this space as well. And there may be some interest if there is a citizen who maybe has qualifications here that would want to provide some insight. So that might be helpful.
OK, will do. Would there be a good committee that's in existence that we could get some reference from as well?
Speaker 5 (01:05:23–01:05:26)
I think that would be the Equity and Justice Committee.
Speaker 1 (01:05:26–01:05:52)
Yeah. Agreed. Maybe we could ask them if they also have thoughts. OK.
Anything else on this? Moving along. Oh, switching to the vest. The vest on.
I'm cold. So we are going to, so item number seven, fiscal year-end updates and transfers, request to increase revolving fund spending limits. Mr. Milano.
Speaker 6 (01:05:53–01:09:28)
Thank you, Mr. Chair. So we had previously, was that our last meeting? It may have been our, maybe two meetings ago, talked about how the fiscal year end was shaping up.
I did include in the packet an update as of June 25th in terms of where things stand presently. In terms of revenue, we remain on track to exceed our forecasts. Again, as we have the past several years, the projection right now is about a $3 million excess in revenue over forecast. So again, everything remains on track there.
Local receipts have been strong. Property tax revenue remains high collection rates there as well. And since we talked about that a bit already, I'll leave that there. In terms of on the expenditure side, As again, we've talked about previously, the pressures on the budget this year have been in our employee benefits, particularly in health insurance, as we had higher numbers of enrollees than the budget could absorb.
And snow and ice, as we've had a more expensive winter than we had the past couple of years. So where that stands in terms of closing out the year is that We had $1,265,000 in the Reserve Fund. The Warrant Committee controls the Reserve Fund, has to approve any transfers out of it. They have approved a million dollar transfer out for the Milton Public Schools.
They did at their meeting last week, which leaves $265,000 in the Reserve Fund. Amy Dexter and I met with the Warrant Committee last week to talk about the same forecast on where we expect things to land. We told them, we informed them that we'd be requesting $265,000 from the Reserve Fund for health insurance. So we would draw that reserve fund down to a $0 balance, and then in order to balance the rest of the budget, we would recommend various appropriations transfers to take money from Budget A to Budget B based on where departments will end at the fiscal year-end unspent dollars.
So the legal budget, the select board budget, the police department budget, and a few others are anticipating pretty decent turnbacks. So we'll seek to move some of those monies around to move it where there are deficits currently. To take money from one budget to another requires the approval of both the Select Board and the Warrant Committee. The Warrant Committee voted to designate Steve Rines as the member who has the authority to sign off on these, as long as they're in keeping with what we presented to the Warrant Committee last week.
So where that leaves us is we'll have a meeting next week, it sounds like, July 7th, July 8th, excuse me. So we can try to have more exact numbers in terms of what we expect to move and where. And we can present that on the 8th, or the select board can vote to designate a member to sign off on these, designate the select board finance committee to give the final approval to them as the finance committee. So there are a couple different options how to handle it.
Since we do have a meeting between now and the deadline to take all these actions, which is July 15th, we can revisit on the 8th, or if the board feels strongly about setting and making a decision now, it can certainly do that.
Speaker 1 (01:09:28–01:09:37)
Well, it seems to me this is a finance committee charge. Are you guys going to have a meeting before in the next week or two?
Speaker 4 (01:09:37–01:09:42)
I don't think we have a meeting set, but we can get one on the books.
Speaker 5 (01:09:42–01:09:50)
Yeah, if we're set with signing off on this, I think we would arrange a meeting so we can go through the books.
Speaker 6 (01:09:51–01:10:00)
If the board's comfortable with that, the board, I would think, tonight, should vote to authorize the Select Board Finance Committee have authority to approve any necessary year-end transfers.
Speaker 1 (01:10:01–01:10:16)
Barring any deviations from standard. Okay. I'll take that as a…that language, I'll take it as a motion if anyone wants to make it. All right, I'll make it.
Well, because we're charging the finance committee.
Speaker 4 (01:10:16–01:10:20)
I don't think we should necessarily make it. Yeah, you shouldn't make it, so. Okay, I didn't realize. Give us the authority.
Speaker 1 (01:10:20–01:10:45)
I mean, I'll make it, but… Yeah, I'm happy to pass the buck as it were. So motioning that the finance committee meets… They'll review it and sign off on any moving funds from pot A to pot B so long as it doesn't disrupt the already existing plans for government, just if the select board budget is under by $200,000.
the police budget is over by $100,000, then we can move $100,000 from one to the other.
Speaker 2 (01:10:45–01:10:46)
A second.
Speaker 1 (01:10:46–01:10:55)
OK. Any further discussion? All in favor? Aye?
Aye. You guys should vote, because otherwise we don't have a quorum.
Speaker 2 (01:10:55–01:10:55)
It's on the pause.
Speaker 1 (01:10:56–01:11:06)
All right. OK. Item eight, we have Milton Budget Coordination Committee charge and membership. Mr.
Milano.
Speaker 6 (01:11:06–01:11:41)
Sure. Thank you, Mr. Chair. Just in terms of updates, since we talked about this again probably about a month ago and then didn't discuss it at the town meeting, select board meeting, so we incorporated a couple changes since that last discussion, which was to have the committee report back to the Select Board School Committee and Warrant Committee in terms of a recommendation on its charge and whether it should continue into Fiscal 27.
We added one resident to be appointed by the Select Board and one resident to be appointed by the School Committee. And those are the two main changes that have been changed.
Speaker 1 (01:11:42–01:11:46)
And I know, did we, we didn't officially appoint Mr. Walker to that? Not yet, position.
Speaker 4 (01:11:47–01:11:47)
Okay.
Speaker 1 (01:11:47–01:12:07)
So, any further thoughts on this committee from folks? We've discussed it at length. So, I would accept an approval, or I would accept a motion to approve the committee charge of membership, if anybody wants to make that.
Speaker 2 (01:12:08–01:12:11)
I'll make a motion to approve the committee charge in membership.
Speaker 1 (01:12:11–01:12:11)
Great.
Speaker 2 (01:12:11–01:12:14)
Second. For the Milton Budget Coordination Committee.
Speaker 1 (01:12:14–01:12:26)
And seconded by Ms. Hegarty. Any further discussion? All in favor?
Aye. Aye. Would it be out of scope to, I know Mr. Walker wanted to be appointed to that, should we wait for a future meeting?
Speaker 6 (01:12:27–01:12:36)
I was just making a note, what we could do at our next meeting is actually appoint both the members of the select board and the resident who will be serving on it. Perfect, that's a perfect solution. So I'll put that on the next agenda.
Speaker 1 (01:12:36–01:12:46)
Thank you. All right, so item number nine, discussion approval contract with Capital Strategic Solutions for a financial and operational review.
Speaker 6 (01:12:47–01:14:38)
Thank you, Mr. Chair. Mr. Milano.
This is something that had been discussed. Now I'm looking for it on the packet. Did I not include it in the packet? Does anybody remember seeing it?
I don't remember seeing this in the packet. I was like, what is this? I will describe it, and then we could approve it on the 8th if the board is open to it, or the board could approve it tonight. So we had talked a couple of months ago with the school committee about the benefits of having not so much an outside audit, but more of a municipal public administration type firm come in and talk with staff and review processes, procedures, controls, and offer suggestions for improvements, offer review software that's being used, identify places where improvements could be made there.
So we sought proposals to do that. We received one from Capital Strategic Solutions, didn't receive responses from a few other firms that we reached out to. They're a firm that had done a similar project to this in Marblehead, I believe, recently, and have retired folks on their team that would come in with tons of experience and be able to talk to staff and identify potential rooms for improvement, what's working well, what's not working well. And the cost is $28,000, which we would be able to, with where the budgets look right now, be able to absorb under fiscal 25.
So I apologize that I did not include it. But that is the broad scope. And I was just trying to pull it up so I could describe in more detail the three things that they're really focused on looking at. Give me one moment.
Speaker 4 (01:14:54–01:14:59)
what is the end product that this engagement seeks?
Speaker 6 (01:14:59–01:16:07)
A summary report, a roadmap for improvement, and then a presentation to stakeholders as we kind of see fit. So something to hold and look at, but also time to sit and engage. And this is primarily with the schools, or is it also with the process? No, we've broadened it to be town and schools to incorporate all of us.
I think the opportunity here to do that, I think, is helpful. This came up because of how the year played out, but we all acknowledge that there are things we can all do better and differently. So to go over financial policies, adequacy of budget development and monitoring, analyze our policies and where we need better policies in place, internal controls and operational practices, town school communications, organizational structure, HR, payroll processes in terms of both the process that we use, the software and technology that we use or don't use, and then to take it all together into a report that provides both short-term and long-term recommendations.
Speaker 5 (01:16:08–01:16:10)
Have we done one of these before?
Speaker 6 (01:16:10–01:16:43)
The only kind of corollary was that in 2013, the Department of Revenue did a financial management review of the town and identified more like governance suggestions. So like, you know, appointed treasurer versus elected treasurer and budget document suggestions and town meeting suggestions and suggestions for the Warrant Committee. This is more about kind of getting into more of the nitty gritty in terms of how, you know, staff are working or not working and how systems are working or not working.
Speaker 5 (01:16:45–01:16:47)
How long would the project take?
Speaker 6 (01:16:48–01:16:56)
They said three to six months, depending more on terms of engagement with the town and how long it takes to get meetings on the books and information shared.
Speaker 5 (01:16:57–01:17:01)
And we would share this with the town once completed? Yeah, meant to be very public.
Speaker 4 (01:17:03–01:17:52)
Can I just ask, so I know that given the events of you know, the start, or it's like, what was it, February, when all of the school budget issues were coming to light, or January. So will, so it seems like the scope has expanded to the town, and like that's always a good idea to have a health check on processes and procedures and systems. So in terms of the decision to expand the scope, will the school department still get the focus that it needs if the town's processes are also lumped in with it?
Speaker 6 (01:17:53–01:18:06)
Yes, because it's pitched very much as town and schools. The lead on the project comes from a school's background, an extensive school finance background. So that has been part of the name.
Speaker 4 (01:18:06–01:18:22)
Like the question that I'm asking is, they're going to get to pay attention, give MPS the attention that it needs and not, you know, like if we have a problem on the town side, like it's not going to divert from the primary focus of MPS. Okay.
Speaker 2 (01:18:24–01:18:27)
Do we need school buy-in, or are they?
Speaker 6 (01:18:28–01:18:43)
I've met, I mean, so it came out of some of those joint conversations that we were having all along. When the proposal came in, we shared it with them. We shared it again in the last couple of weeks, and I met with the superintendent to talk about it, and he's on board.
Speaker 1 (01:18:43–01:19:19)
So, I think it would probably be responsible for us to look at it before we vote for it. But let's put it as a July 8th item, and then I don't think that will make a week's difference, I guess, in terms of getting operational. Obviously, it's much needed, I think. And I guess my question would be to, is there, what would be the role for our big budget committee, or what are we calling it?
The coordination committee? Yeah, NBCCC. NBCCC. Like, is that our,
Speaker 6 (01:19:19–01:19:32)
I would think that that would be a body that might be involved in that or… It feels like the more natural place for it to land so everybody here is the same information and can have the same kind of feedback.
Speaker 1 (01:19:32–01:19:48)
And then people can report back out from that. Okay. So we'll consider that on July 8th and we'll stand by for the agreement. Sorry about that.
No problem at all, Mr. Milano. Okay, item 10. Discussion approval, liquor license.
Speaker 5 (01:19:48–01:20:32)
Mr. Chair, before we move on. Yes, Mr. Daley.
I just want to stay on that last point. This is occurring to me now. So, if we move forward with this audit and the report lands with this new finance committee, do we need to put in the charge of the finance committee that they make suggestions or they're responsible for implementation of the suggestions? Like, how would that work?
Because we're going to have at least one person from most of the elected bodies in town. If we get a report that has, let's say it has 10 suggestions, and we think four are things that we should move forward with, what would be the path for that? Does that committee then present to the select board? Does it then present?
Does it move forward to the warrant committee? Do we?
Speaker 4 (01:20:32–01:21:46)
Yeah. Well, also, too, it's just if, you know, I want to make sure that the school committee feels appropriate ownership of this as well. I think this kind of treads an interesting line between the bigger committee and the school committee in terms of, I would hate for there to be findings from a report that really the school committee needed this, definitely, for Shawar at this time. Not saying the rest of the town government doesn't, but I would hate to have decision making outside of them and for them.
In terms of people's lanes, right? If this were an expanded lane, would the school committee feel the same level of ownership over the recommendations and implementation? I guess is the question.
Speaker 6 (01:21:46–01:22:15)
I don't know if there's a good answer there. I just note that this larger committee doesn't have the authority to change anything. The school committee does, so it's more about having a- As long as that's, yeah. Yeah, the school committee need, or by the flip side, this committee can't necessarily direct town and their departments to change.
So it has to be, you know, everybody has to take ownership for their piece, because ultimately that's who has the authority to make the implement changes.
Speaker 1 (01:22:15–01:22:26)
Yeah, and then ultimately the authority sits here at the select board for the whole kit and doodle. So I think those are good questions. It's something good to keep in mind as we move forward with this.
Speaker 4 (01:22:26–01:22:30)
I just know all too well how government works. You touch it, you own it.
Speaker 1 (01:22:30–01:22:30)
Right.
Speaker 4 (01:22:31–01:22:33)
Or someone might not own it.
Speaker 1 (01:22:33–01:22:35)
Right, it could turn into a hot potato.
Speaker 4 (01:22:36–01:22:37)
Just got to ask that question.
Speaker 1 (01:22:38–01:23:08)
It's something for us to keep in mind, I think, as we read through what Mr. Mullin is going to send to us, and then as we think about both this committee as well as our continued fiduciary responsibility to the town, how we'd want to interact with this group. All set? Great.
Moving along, discussion approval update, liquor license zones per request of the Joint Committee on Consumer Protection and Professional Licensure for the home rule petition for five additional liquor licenses, House Bill 4089.
Speaker 6 (01:23:08–01:23:49)
Mr. Milano? Thank you, Mr. Chair.
We discussed this briefly before town meeting one night, but I don't have And just for people watching, the town did approve a home rule petition at town meeting in February to authorize five additional liquor licenses anywhere in Milton. for Milton, and the feedback we've received from the committee that oversees these bills and the legislature has been our request to refine where in Milton these licenses might go. So we owe a map, essentially, that identifies where in town these should go. We have not prepared it, so I'll kick that to July 8th, if that's okay with the board.
Speaker 1 (01:23:49–01:24:06)
And my remembrance from our discussion at the school was that essentially we're just thinking that this is a map of where we have existing commercial zoning so that nobody's going to have a restaurant pop up next door to their house.
Speaker 6 (01:24:07–01:24:08)
It would still be subject to zoning.
Speaker 1 (01:24:08–01:24:26)
Yes. Right. OK. All right, so then we'll look at the map on July 8th, which is suddenly filling up a little bit.
Then we have discussion update October 27th, 2025, fall special town meeting potential warrant articles and timeline.
Speaker 6 (01:24:27–01:25:47)
Yes, thank you, Mr. Chair. So I put hopefully in the package a timeline of what it would look like to get to that Monday, October 27th special town meeting deadline with the warrant closing in early August, which would give the months of August and September and really the first couple of days of October for the Warrant Committee to review, vote on, and write comments on the warrant articles. So, again, that's a deadline of August 8th to submit any articles to the Select Board for inclusion on that warrant so we can get them to the Warrant Committee.
There's nothing I'm aware of outside of the lighting bylaw that's been discussed in the and not yet acted upon, as well as the one about alcohol in town land. Those are the two kind of outstanding warrant articles that were at town meeting, but not getting any kind of final action. So if there's others that this board is interested in, please let me know. And then we should also talk about as a board next steps on those two articles, what that might look like, and what process that might look like to get into versions that should be submitted to town meeting.
Speaker 2 (01:25:48–01:25:52)
Based on our experience with the last go around, could we frame this?
Speaker 1 (01:25:54–01:25:54)
Good tattoo.
Speaker 2 (01:25:54–01:25:56)
I like the dates.
Speaker 1 (01:25:56–01:27:56)
So, you know, on the lighting bylaw, I felt like that one was pretty close to being wrapped up. It was more of a worry, I think, about the time that was going to take on the floor than the language itself, which I think had gone through some revisions. And our former member, Bradley, was kind of the point person on that. So would it be Do we have that language that was the most recently updated?
So maybe what we can do is forward that language that we have now to member Bradley, former member Bradley, and ask if there's any other changes that she's aware of to that language. And if not, I'm not gonna say July 8th for that one, because I feel like we've already plugged a bunch of stuff in that, but we could do that one on the second meeting in July. And then for the, and I'm open to suggestions on that too. Okay.
And then for the probably more sensitive topic of do we want to have…or do we want to extend the right to have a one-day liquor license beyond town buildings to including outdoor town property? We did have a…well, we had a public hearing on both of these prior to Mr. Daley and Ms. Hegarty joining.
The lighting one had really no citizen comment other than they thought it was a good idea. The liquor license one, to me, seems like the one where we had some thoughtful input from the who Ms. Carol was representing.
Speaker 4 (01:27:56–01:27:57)
The Coalition. Yes, the Coalition.
Speaker 1 (01:27:57–01:29:20)
Thank you. And it seemed to me like we were going to think about adding some of that language. But it might be helpful to circulate a redlined version of it where we have the additional language. And these were suggestions like having tips-trained bartenders, having bracelets for folks, having areas, to the extent that it was possible, where liquor was permitted.
And then I think if we could circulate that now, and then also have that as a discussion on our July 25 meeting, is that what it is, July 25? 22nd. 22nd. Then I would think that would give us, everyone will be, we know that everyone's here for July 22nd, because we did the, he's not.
Oh, Mr. Cohen's not here. So maybe, Maybe we can just look at it on July 8th. And then Mr.
Cohane, if you've got any questions or thoughts about it, you can make them then. We won't necessarily have it finalized, but we could at least start the discussion then. And then if we agree to it, then we could maybe, we don't have to put it on the 22nd, or if we want to make more changes. I know that Mr.
Walz also wants to comment on it.
Speaker 4 (01:29:20–01:29:43)
Have we, I feel like the, So we have had a lot of really thoughtful input. We also, I feel like with this particular item, have struggled with making the rounds with the stakeholders. Do we have a good sense that everybody has seen the most recent version before we take it up?
Speaker 1 (01:29:44–01:29:45)
I think that's a good question.
Speaker 4 (01:29:45–01:29:58)
Just to make sure that we are sort of done with it. Because I feel like what happens is we get close to town meeting and then people show up and say, but you haven't spoken with us.
Speaker 1 (01:29:59–01:30:30)
So the Board of Health had thoughts about it. The Milton Coalition had thoughts about it. The Chamber of Commerce had thoughts about it. And we've heard from all three of them.
So I think you're making an excellent point, Ms. Segarty. So what we could potentially do is, on the 8th, just look at the language and then circulate it for public comment. And then have it again on the 22nd.
And if people have additional thoughts, they could come in there. And then we could certify it. And then everybody gets two bites at the apple. in addition to the previous bites that they've had.
Speaker 4 (01:30:30–01:30:32)
Five bites of the apple.
Speaker 1 (01:30:32–01:30:42)
Just a core at the end of it. I can do that. And then members, other articles, suggestions for the fall town meeting.
Speaker 4 (01:30:46–01:30:46)
Okay.
Speaker 1 (01:30:47–01:31:36)
Yeah, my guess is that through the process of not to get too back into the MBTA communities discussion, but with the input of citizens and the town halls, my guess is there may be at some point some refinement to that. But given the timeline, it probably won't happen in that timeframe. fall town meeting unless there's something that's glaringly obvious that everyone's missed. But you may want to have a hold on there if for some reason we get the economic feasibility study back that would allow us to move up the affordable housing.
Nope, that's a good thought. Okay. Okay. All right.
Going once, going twice. How long do you want town meeting to be in October?
Speaker 6 (01:31:37–01:31:51)
And I'll just, I should have flagged, but MPIC's term and charge does expire at the fall, technically at the fall town meeting, whenever that falls. So there may be an article potentially related to MPIC, but I haven't received anything.
Speaker 4 (01:31:52–01:32:20)
So I think we are discussing that. So we're right now, MPIC is working on its final report. Um, and. you know, going through the last sets of action items and we should probably pick a date in the fall for us to come back in report to the select board prior to town meeting to start that conversation.
Speaker 1 (01:32:21–01:32:23)
Yeah, I mean, that makes sense.
Speaker 4 (01:32:25–01:32:27)
So maybe September sometime.
Speaker 1 (01:32:28–01:32:55)
And then I don't know if the Climate Action Planning Committee, I know that Mr. Hasha is hoping to come in either on the 8th or the 22nd, so we can give him the dates of those. But I don't know that they're thinking about anything for the warrant. Yeah, I don't believe so, but I can check.
It'd be worth asking. OK. All right, going once. All right, going twice.
Let's move on to Town Council and Labor Council update, potential recommendation for Labor Council services. Mr. Milano.
Speaker 6 (01:32:56–01:34:00)
Thank you, Mr. Chair. No recommendation tonight. We completed interviews with five Labor Council firms over Tuesday and Wednesday, and then on Thursday, we interviewed Town Council firms with a group that included myself, Assistant Town Administrator Nick Connors, the chairs of the Conservation Commission, the Board of Appeals, the Planning Board, the Town Moderator, and the Town Clerk.
So I think that was all the, everybody covered, I think, in terms of those types of bodies that would interact regularly with town council. So we discussed a bit in terms of how we felt the interviews went. We're doing some follow-up homework on the firms that have applied, the attorneys in particular that have been identified as lead for the town, doing some reference checks, and then we'll reconvene as groups to circle back and deliver some feedback to the select board. So no recommendations tonight, just an update that that process is underway and moving forward.
Speaker 1 (01:34:02–01:34:39)
Great. Well, now I know why Mr. Walsh is here. I think we have a discussion about the future use and disposition of the East Milton Fire Station, 525 Adams Street, and the request for proposals, process, and goals.
Am I guessing that you're joining us here, Mr. Walsh? Thank you. My kids, for the record, think a boba shop would be the best use of this plan.
I asked them as we were driving into East Milton yesterday, and that was their verdict. So I hope that's what you've got lined up for us.
Speaker 8 (01:34:40–01:44:47)
That's some bubble tea. Well, actually, Mr. Chairman, if you would, I'd like the opportunity to just make a couple of comments in general. This is the first time I've had the opportunity to address the floor with the two newest members.
My chance to say welcome. Uh, and I wanted to explain very, very briefly where we are and a couple of important things coming up. So, um, quick update. I think, as you know, the headquarters are done and the headquarter station is done and where the FSBC fire station building committee, the fire department, we're all very proud of it.
We think it came out terrific. And if you haven't had a chance to really see it and go in, uh, I'd encourage you to do so. And if I could help you with that, uh, a tour, I'd be happy to do that. Um, So one thing, the East Milton Station, commonly referred to as Engine 2, has actually, the new one, has actually begun.
If any of you have gone by, you've seen the fencing, and you've seen a lot of piles of dirt. But it's really slow-moving stuff right now. had to do a lot of work with the dirt, make sure there was nothing dangerous underneath where they're gonna pour it, had to really work to confirm where the utilities would come across the property, utilities that will serve both the new fire station and the existing St. Agatha's Rectory, which is right next door, right close by.
And so even though that work has started, The fire station building committee feels is important to have a groundbreaking ceremony. And 1 of the reasons I'm here is to invite you members of the select board. We think it's going to be in 3 to 4 weeks in the groundbreaking. We'll, we'll, we'll really be about.
They'll be starting the pouring the pad and building the structure, right? That's that's the point. I will be happy to. Get the date when it's finally nailed out to miss Milano.
And honestly, I'd love to see the opportunity for any of all of you if you could attend. You know, the East Milton station, significantly smaller than the headquarter station, but significantly more visible. And, you know, we've got a very active East Milton community, and I think it'd be terrific if we could get as many of you to attend that groundbreaking. And just as the course of the project, at that point, there'll be about 12 months to completion.
And we'll have two other ceremonies. They have a capping off ceremony. We did this at the headquarter, right? The highest beam at the building.
It's a very quick thing. And of course, the ribbon cutting, which we hope will be in about 12 months. Now, interestingly enough, I know you have the item on the agenda for the old East Milton Station. One, especially for the new one, very, very brief update that station is the second station that's occupied that location and I don't find that many people know that it came on board in 1951 to 1952 right in that area.
Ironically, in 1954, the state and federal government decided they were going to sink the expressway. So that station was built before the current configuration of streets around that sunken expressway. And I got to tell you, there's no doubt in my mind that we would not have rebuilt that station there had they foreseen that. And why?
75% of the East Milton Engine 2 District is on, for lack of a better phrase, the Milton side of the expressway versus the Quincy side. And it takes, on a good day, the fire engine a full minute to get around right over to the post office. And even at my advanced age and withering capabilities, I could probably hit the post office with a rock from the East Milton Fire Station. So in losing a minute, the national standard for all fire stations is to get to 90% of your residents within four minutes or less.
So losing a minute is a big deal, and frankly, that's on a good time. They lose a good minute and a half anytime it's around morning or evening rush hour. So the new location, by the way, is significantly better for that. If you can kind of visualize it, if they come out of the station right on Adams Street, a very wide straight, Street with very great lines of sight visibility and they'll have a light there, but they can go left and then quickly take a couple of different rights and get to up to most of the 75% significantly faster for the folks that are on the.
Quincy side, they come out of that station and take a right on Squattam Street, and they can get, in fact, that's another large street, it's not as congested as Adams Street is down by East Milton Square, and they can get quickly up to those things. So, you know, it's one of the reasons, by the way, there was no ambiguity about we had to do the headquarter station first. The control systems and everything were all there, and some of them were really archaic. I mean, they had like a ticker tape system.
We kind of did a film at town meeting at one point. But in any event, what was the best second station? It's really because of that problem of not being able to quickly serve the area they're supposed to in a timely fashion. So I'm here, both as an individual and as a member or a representation of the Biostation Building Committee, to tell you we want you to sell.
the old East Milton station. And for very selfish reasons, we're gonna need more funding. When we started seven plus years ago, we were gonna do all three stations at once. Both our owners, project manager and the architects that we were working with said, look, if you put out to bid all three stations, you'll get a much better price because it'd be a nice long project for them.
And so we were about to do that and COVID hit. And COVID did two things that are plaguing us even to today. The first thing it did is it drove up the prices of a lot of the materials, especially with the unknown future. And then it also drove up the cost of borrowing.
And so we had a funding formula for the fire stations, which was terrific. It's a special purpose stabilization fund that says as the retiring debt from the six building school project and the library retires, we froze it. and said, that will fund the stations. Well, the station's more expensive now, and the cost of money is more expensive.
So we really, really will need as much more capital as we can get. And so I'm lobbying heavy that you will strongly consider selling the old East Milton station and allocating it to the fire station so that we can complete after them. There's also, no doubt in my mind, to be fairness, and I've talked to Nick more than once about this, we're probably going to have to find another funding source to complete the Atherton. We thought the Special Purpose Stabilization Fund was going to do it, complete all three stations.
It doesn't look likely now. We still don't know. There are things that can happen to our favor. But there's no doubt we could use the proceeds of the old engine, too.
So I think I've hit all my main. Oh, and I have a strange question. There are areas in town as I travel around that I recognize as being a fire station guy. And I know of at least one serious inquiry, someone that would really be a serious buyer for the old station if you sell it.
And I don't know, who do I direct that to? Nick, okay. I don't want to field that. I know you probably have other folks.
Yeah, I think that's it, so. Again, welcome. Thank you. I hope that helped a little bit on the fire station project.
And I am very serious, by the way. You're all residents of Milton. If you haven't had the opportunity to kind of go in and tour that, Mr. Milano knows how to get ahold of me.
I'd be happy to take you on a little tour. It came out terrific, even for little things. The glass doors in the front, we went around and looked at some 12 stations that were recently completed to get ideas. And we stumbled across that.
And the fire chief at that time made an extraordinary, first thing he did, he said, hey, do you have a garage door or have you ever had a garage door for your house? And I have for more than 30 years. He said, you know, sometimes they break, don't they? You've got to open them up and you can't open them.
And that's happened to me. He said, well, when I break, You know, not being able to open them is a problem. We've got to get there quick. And there are actually, you can even Google and find it, there are cases in the country where a fire truck has had to drive through a door to get to a call.
So in any event, those doors there, they open like a bifold. And they just won't, they're designed, they cannot get stuck closed. And they also are incredibly much, much easier. They're all, all of these doors are so large, whether it's the old overhead doors or those bifold.
They all have an electronic option to open them, but sometimes that, who knows, power failure, that fails. And so this chief or this other sister walked over, he said, let me show you something. He grabbed the door, and he was in his 60s, and he easily opened one bay, and they had four bays. Then he closed it, and he did a manual lever, and he grabbed it again, and he easily opened all four bays.
And that's a big safety advantage. And then especially where our headquarters is located, there's a nursery school on one side and one on the other side. The Council on Aging is right behind it. Town Hall is right in front.
It's a busy spot. And having all that pure glass wall for the firefighters to see out before they ever make a move to come out of there just adds a whole level of safety. And with that, I'll stop my… my pitch on behalf of the fire stations.
Speaker 1 (01:44:49–01:44:57)
And it's a beautiful station and you're right to wax poetic about it. And we thank you for the update. So questions from the members?
Speaker 6 (01:44:59–01:46:56)
If I could, Mr. Chair, just to add to kind of put some additional color on this. So in terms of where we are at is with 12 months, 14 months that this building will be out of use, it's time to start thinking about what we want to do there. You heard from Mr.
Walsh in terms of sell and move on and use that additional proceeds to help a future capital project, in particular, the Atherton Station. You know, if we're going to do an RFP, then we'll need to think. We just want the expectations clear in that and the goals clear in that, so folks are responding to what we're looking for. If it's not to sell it, it's to lease it.
So we have an option, then we need to kind of make a decision around that. Are we going to require that the building stay? Do we have attachments to the building that we want it to stay, or are we OK with no restrictions if we sell it or lease it? Those are kind of the two big go-no-go questions.
And then ultimately, any kind of sale or a long-term, like a 99-year lease that's effectively a sale, that kind of land transaction would require a town meeting vote. So I'm thinking about the timeline to get to town meeting. It's a scheduling question in terms of, do we go to town meeting and request authorization to sell it or long-term lease it? and then we do the procurement, or does the select board want to do the procurement and say, okay, we pick somebody now, it's subject to town meeting, and deliver kind of a done deal to town meeting.
different ways to sequence these and different ways to game this out. But we need to start engaging on those conversations earnestly. Not necessarily, obviously, this evening, but thinking about that timeline, as we saw with the Town Farm RFP. These can take a long time, but we do want to keep the wheels of government trying to move here so we have resolution on this project one way or the other.
Speaker 2 (01:46:57–01:47:10)
Mr. Clayton? In keeping with what others have said, trying to get community involvement, is there a way we can somehow do that, let people know, maybe some kind of an event at the God Center? I don't know.
Speaker 6 (01:47:10–01:47:39)
No, I agree 100% with that. And it's, again, getting to the point where are there any things that folks are, are we just opening it up to kind of broad feedback? Do we want to go in with, you know, The board's inclined more in this way. What kind of feedback do you have about that idea?
So again, that makes sense. It's smart to do. We would certainly want to enroll that in. It's just a question of what and kind of with how much detail do we go out so that there's actually something to respond to.
Speaker 2 (01:47:39–01:48:04)
I'm just thinking it's always nice for anything to go out before decisions are made. So if you can go out there before the decision, I know in the case we have here, we're behind the eight ball because it's already been made. But this is a case where we could, and I'm happy to do what I can, it's my neighborhood, to help set something up.
Speaker 1 (01:48:06–01:48:36)
Yeah. You can talk some more. No, I think that's a good suggestion. It'd probably be good to get the chamber to weigh into, what do they think about.
And then for all of us, I think we should be thinking about Is it worth doing like a 99-year lease like we're doing with Town Farm or a total sale? I think whether we keep the building or not, those are all… The building, I can't imagine. Some people have bizarre attachments to things, but that building's not great.
Speaker 8 (01:48:36–01:49:28)
Mr. Walsh? After our project started, we actually became aware of a problem at that station. And in fact, we had to spend some $50,000 shoring up the floor.
And when that station was originally brought into service, both the first time and in this particular building, it had two engines. In fact, at one point, it actually had a ladder truck before part two and a half. That station right now cannot support two fire engines in those bays. We spent $50,000 shoring up the floor, but it's still not strong enough for two fire engines.
So at some point, someone, depending on whatever use they determine to be, will have to do a real analysis and decide what they can really do with that building. Firehouse Subs was a name that came up.
Speaker 1 (01:49:30–01:49:42)
As long as there's bubble tea there. So it sounds like there would be, I totally agree with Mr. Cohane in terms of thinking about getting some resident input on that.
Speaker 6 (01:49:42–01:49:58)
And so maybe we should be working towards a date in September, October, once people or folks are back, kind of right after, get through the start of school, try to do something over at the art center or something, and keep it broad. There's a future reuse kind of visioning and feedback type conversation.
Speaker 1 (01:49:58–01:50:24)
Yeah. And I think that would give us a little bit of time to at least get some sense of what the market might hold if we wanted to sell the site. Because I know, for example, the task force may want to think about that as a youth center. And then what would we lose in revenue in terms of creating that versus finding other space for a youth center?
So I know there'll be lots of interesting ideas, no doubt, that will come up.
Speaker 2 (01:50:26–01:50:29)
It's not just the neighborhood. Yeah, yeah, yeah.
Speaker 6 (01:50:29–01:51:11)
And I should have noted we did do We tried to do an expression of interest phase, where we put it out to say, give us your thoughts and your feedback. And we've had good conversations with folks who are interested. People have been reluctant to put in a proposal out there, or even the concept of a proposal out there. Because we haven't engaged in much of a process.
They didn't want their name tied to something that's just kind of concept. They didn't want somebody else to steal the idea. So it left us in kind of a tough spot. You know, one-on-one conversations with a few people are interested in potentially purchasing the station, but we know that would need to go through a public vetting before any decisions are made.
Speaker 1 (01:51:11–01:51:42)
Yeah, I think maybe if we could target end of September, early October. In the meantime, we'll start just percolating the ideas around. If there's something on the town website, maybe if people just have ideas or thoughts about what the old station could be, might be a good way to get some of the ideas turning. We'll definitely take the recommendation very seriously from the committee in terms of the money.
Speaker 8 (01:51:42–01:52:16)
I'm going to take just a brief amount more of your time. The one thing that I stressed about the beautiful new headquarters that I was remiss in not mentioning, an extremely important part about that building is the absolute increase in safety and health features for the firefighters. Just isolating the engine bays so the fumes aren't rising up to where they sleep and eat, to dress down areas, to wash down areas, et cetera. So those are all things.
Many things are important, but that clearly is an important feature of new buildings. And all three of them need it.
Speaker 2 (01:52:18–01:52:22)
I did the tour. I saw that, the wash down areas. It was pretty impressive.
Speaker 8 (01:52:22–01:52:23)
Very cool.
Speaker 2 (01:52:23–01:52:24)
Pretty impressive. Yeah.
Speaker 1 (01:52:25–01:52:53)
All right. Well, thank you. Thank you. Mr.
Walsh All right, did I miss the inclusion of the I saw for the so our next item is the town administrators evaluation In the packet. I think there was a there is the addendum for You're for setting the next evaluation for December 31st, 2025.
Speaker 6 (01:52:55–01:53:03)
What else? We have an evaluation from yourself and Aaron Bradley. That's what we've received so far.
Speaker 1 (01:53:03–01:53:22)
Just from me and from Aaron? Okay. Well, I think that we can't… There are consequences for you on the pay side.
I know what my evaluation was. Did Carla turn in anything that we can, do we have anything that we can improve?
Speaker 6 (01:53:22–01:53:28)
And just since there was only the two of them, we didn't take any, do anything with it. So, or she rather.
Speaker 1 (01:53:29–01:53:29)
Okay.
Speaker 2 (01:53:30–01:53:33)
Was Roxanne also included in that?
Speaker 1 (01:53:33–01:53:37)
Did Roxanne not submit, I mean Redmiss must have not submitted. Not before she had left the board, no. Okay.
Speaker 2 (01:53:38–01:53:39)
Was she asked?
Speaker 1 (01:53:39–01:53:42)
Well, she was asked last year, too. Oh, I see.
Speaker 2 (01:53:42–01:53:43)
Last year.
Speaker 1 (01:53:43–01:54:10)
Okay. And this year. And this year? Well, we were having these discussions before the election because Mr.
Milano's pay depends on this evaluation. Maybe, Mr. Malone, if I come into the, well, first I would say, Mr. Cohane, if you can do anything for Nick in terms of submitting any kind of evaluation.
Speaker 2 (01:54:10–01:54:26)
I had spoken and it just, the period ends today. Right. And so I'm just saying the period ends today. I should have a little bit of time after today to put it together.
I don't have anything.
Speaker 1 (01:54:26–01:54:27)
No, no, no. This is for last year.
Speaker 2 (01:54:28–01:54:36)
I don't have anything to do with that. I just started. They're just like these two. They don't have anything to do with last year.
This year, correct?
Speaker 1 (01:54:36–01:54:41)
Well, you would have had like May and June of last year.
Speaker 2 (01:54:41–01:54:44)
So, but they're not doing one for this year.
Speaker 1 (01:54:44–01:54:53)
Okay, let me talk to, I'll talk to Carla about it on Thursday and see what we can do. No, and I agree, I think- I know that you only have the two months. Two months, right.
Speaker 4 (01:54:53–01:54:53)
Yeah.
Speaker 1 (01:54:54–01:55:01)
And then the next evaluation date was December 31st for that reason. Moving forward, correct. Moving forward to try to resize the item, right.
Speaker 4 (01:55:01–01:55:04)
So then Winston and I would participate in the next?
Speaker 1 (01:55:04–01:55:20)
Yes. And to the extent that you have interacted with Mr. Milano for May and June, you would provide that guidance. There's not like a perfect solution to this between the election cycle and the fiscal years.
I'll ask.
Speaker 8 (01:55:20–01:55:21)
No, no, no.
Speaker 1 (01:55:21–01:55:56)
You're right. You're right. I was just thinking in just in terms of like having one more input, even if it's just for a month, but that's… Let me see what…
And then maybe, could you ask her to reach out to Mr. Wells and Ms. Musto one more time? And then either way, let's put it on our July 8th agenda and I'll, whatever she's gotten to it, whatever she and I can cook up, we will have at that point.
And do you need us to approve the amendment language, yes?
Speaker 6 (01:55:56–01:56:13)
Yes, this will just formally change the cycle to get away from the issue we're describing here and now. So the way that would work is we'll do the fiscal 25 evaluation and then we'll come back and go through the process again in six months just to get it to a December to December timeframe.
Speaker 1 (01:56:14–01:56:25)
Got it. So I would take a motion on the amendment language there. If anybody is so inclined. I'm also happy to do it.
Speaker 4 (01:56:27–01:56:35)
Mr. Chair, I would like to move to amend the employment agreement.
Speaker 1 (01:56:36–01:56:37)
Approve the amendment.
Speaker 4 (01:56:37–01:56:46)
Sorry, approve the amendment to the employment agreement with the town administrator regarding the Section 5 performance evaluation.
Speaker 1 (01:56:47–01:56:51)
Great. Can I have a second? I'll second. And all in favor?
Speaker 4 (01:56:51–01:56:52)
Aye. Aye.
Speaker 1 (01:56:53–01:57:15)
All right. So it looks like I'm going to have a busy day at town hall on Thursday. Just in time for the fourth, we are now at board committee appointments and reappointments. I would be very happy if somebody wanted to speed read through the motions here.
If you'd like to do that.
Speaker 2 (01:57:16–01:57:20)
Do I need to say something ahead of time or just start reading? Motion to approve, right?
Speaker 1 (01:57:21–01:57:24)
So right here, you could just read this one here.
Speaker 2 (01:57:24–01:57:25)
OK.
Speaker 1 (01:57:28–01:57:43)
Unless we have any discussion about this. I did talk to, on the Affordable Housing Trust, I confirmed that everybody who is on there currently is reapplying and interested in reapplying. So correct. That's pretty much the only one that I looked at.
Speaker 2 (01:57:43–01:58:04)
So just, you can just do the proposed motion. I move to approve the following individuals to the Affordable Housing Trust for the one-year term. Sean Bentley, Thomas Callahan, Kevin Krizan, Jr., Kathleen Conlon, Julie Kramer, Eric Hawkinson, Warren Lizio, and Matthew Moran.
Speaker 1 (01:58:04–01:58:12)
Can I get a second? Second. All in favor? Aye.
And we've already appointed Mr. Daly to that committee. So then you go to this next one.
Speaker 2 (01:58:13–01:58:26)
Move to reappoint the following individuals to the Airplane Noise Advisory Committee for a one-year term. Kathleen Conlon, David Goodine, and Raju Pathak.
Speaker 1 (01:58:26–01:58:29)
Can I get a second? Second. Second by Mr. Daly.
All in favor? Aye.
Speaker 2 (01:58:29–01:58:39)
Aye. Move to approve the following individuals to the Council on Aging. Board of Directors for a three-year term. David Cornish and Yvonne Reddy.
Speaker 1 (01:58:40–01:58:51)
Seconded. Seconded by Mr. Daley. All in favor?
Aye. I think you went backwards, actually. I pulled my pages weird, yeah.
Speaker 2 (01:58:51–01:59:00)
So here we go. Move to appoint Sherry Palo as Associate Member of the Council on Aging Board of Directors for a one-year term.
Speaker 1 (01:59:01–01:59:03)
Second. Seconded by Mr. Daley. All in favor?
Speaker 4 (01:59:04–01:59:04)
Aye.
Speaker 2 (01:59:05–01:59:17)
Move to appoint the following individuals as advisory. Move to appoint Marie Zinkas as ex-officiata member of the Council on Aging Board of Directors for a one-year term.
Speaker 1 (01:59:17–01:59:20)
Second. Seconded by Mr. Daly. All in favor?
Aye.
Speaker 2 (01:59:20–01:59:30)
Aye. Move to appoint the following individuals as advisory members to the Council on Aging Board of Directors for a one-year term. Caroline Kinsel and Sarah Truong.
Speaker 1 (01:59:31–01:59:34)
Second. Seconded by Mr. Daly. All in favor?
Aye.
Speaker 2 (01:59:34–01:59:44)
Aye. Move to reappoint the following individuals to the landing committee for a one-year term. Richard Burke, Ted Carroll, Thomas McCarthy, and Nicholas Milano.
Speaker 1 (01:59:45–01:59:47)
Second. Seconded by Mr. Daly. All in favor?
Speaker 4 (01:59:47–01:59:47)
Aye.
Speaker 1 (01:59:47–01:59:50)
Aye. Yep.
Speaker 2 (01:59:51–02:00:03)
Move to reappoint the following individual to the Shady Tree Advisory Committee for a one-year term. Nancy Chrism, Marita Manning Cronin, Maura Daugherty, Fiona Javon, William Madden, and Fred Taylor.
Speaker 1 (02:00:03–02:00:05)
Second. Seconded by Mr. Daly. All in favor?
Speaker 2 (02:00:06–02:00:11)
Aye. Move to appoint Helen Russell to the Shade Tree Advisory Committee for a one-year term.
Speaker 1 (02:00:11–02:00:13)
Second. Seconded by Mr. Daly. All in favor?
Speaker 2 (02:00:14–02:00:27)
Aye. Move to reappoint the following individuals to the Sign Review Committee for a one-year term. Lawrence Johnson, Deborah Azaraj, Sabona, Laura Simondi, and John Sikowitz.
Speaker 1 (02:00:27–02:00:29)
Second. Seconded by Mr. Daly. All in favor?
Speaker 2 (02:00:30–02:00:35)
Aye. Move to appoint Stephen Gentile to the Sign Review Committee for a one-year term.
Speaker 1 (02:00:35–02:00:37)
Seconded by Mr. Daly. All in favor?
Speaker 2 (02:00:38–02:00:52)
Aye. Move to reappoint the following individuals to the Equity and Justice for All Advisory Committee for a two-year term. Rabbi Alfred Benjamin, Sarah Myrie, Sarah Porter, and Ralph Barrett.
Speaker 1 (02:00:52–02:00:54)
Seconded by Mr. Daly. All in favor?
Speaker 2 (02:00:54–02:00:54)
Aye.
Speaker 1 (02:00:55–02:00:57)
Aye.
Speaker 2 (02:00:57–02:01:06)
Aye. Move to appoint Jonathan Bokary to the Equity and Justice for All Advisory Committee for a two-year term.
Speaker 1 (02:01:06–02:01:09)
Second. Seconded by Mr. Daley. All in favor?
Aye.
Speaker 2 (02:01:09–02:01:20)
Move to reappoint the following individuals to the Local Historic District Study Committee for a one-year term. Andrew Hoffman, Larry Laufer, Ryan McLean, and Brian O'Halloran.
Speaker 1 (02:01:20–02:01:22)
Second. Seconded by Mr. Daley. All in favor?
Speaker 2 (02:01:23–02:01:23)
Aye.
Speaker 4 (02:01:23–02:01:23)
Aye.
Speaker 2 (02:01:24–02:01:36)
Move to reappoint the following individuals to the Payment and Loan Taxes Pilot Committee for a one-year term. Jennifer Hine, Matthew Keswick, Nicholas Milano, and C. Robert Reitz.
Speaker 1 (02:01:36–02:01:39)
Second. Seconded by Mr. Daley. All in favor?
Aye.
Speaker 2 (02:01:39–02:01:51)
Aye. Move to reappoint the following individuals to the Traffic Commission for a one-year term. Mary Ann Driscoll and Steve Geister. Second.
Speaker 1 (02:01:51–02:01:53)
Seconded by Mr. Daley. All in favor? Aye.
Speaker 4 (02:01:53–02:01:53)
Aye.
Speaker 2 (02:01:54–02:02:07)
Move to appoint the following individuals to the Youth Task Force for a one-year term. Griffin, Angus, Christina, Lillehook, and Rachel Pozar.
Speaker 1 (02:02:07–02:02:10)
Second. Second by Mr. Daly. All in favor?
Aye.
Speaker 2 (02:02:10–02:02:12)
Move to approve the… Yeah, you did it.
Speaker 1 (02:02:12–02:02:47)
I did it. And with many, many thanks to all of those town individuals, including you, Mr. Milano, who made a couple of appearances there for your time and dedication and volunteering for the town. We really, really appreciate it.
And the quick reading of that is really to just emphasize how much we appreciate it. We don't even need to really talk about it. We just appreciate it that much. So we have discussion approval meeting minutes, May 27, 2025.
Any comments on the minutes, or I'll take a motion.
Speaker 5 (02:02:50–02:02:52)
Move to approve the meeting minutes dated May 27, 2025.
Speaker 1 (02:02:52–02:03:02)
And we were all present for that one, yes? So, seconded by Mr. Cohane. All in favor?
Aye. Aye. Town Administrator's Report.
Speaker 6 (02:03:03–02:05:19)
Thank you, Mr. Chair. We sent out a note through the town website and elsewhere about tax bills starting to appear in mailboxes. So those are sent out at the end of last week, starting to arrive today.
Just in case you notice a change, it does incorporate an estimate for the override that was approved by voters in a town meeting earlier this year. The reason for that is if we did not incorporate any change, then all of that change would have been felt on the final tax bills. So it was adjusted from the preliminary, the preliminaries were adjusted from the prior fiscal year to account for the estimate for the override approval. So, there are resources if you're looking for assistance through the assessors and the Council on Aging and others on the tax burden.
In additional news, the Assistant Director of Planning and Community Development, Cheyenne Frazier, has given notice that she'll be leaving the town as well as the state. She'll be moving out of state. So, we wish her the best of luck. She'll be with us for another three to four weeks and leaves towards the end of July.
So that segues nicely into our job postings. We do have town engineer posting still out there, a director of planning and community development as well as the assistant director, which we will post. Hopefully, we can close on a planning director soon and then staff up that department back to where it where it needs to be. The new Veterans Service Officer has been in Randolph, but will start in Milton next week.
Alex Ortiz, they're cleaning out his office right now on the Council on Aging. So we look forward to welcoming him. And he should be, again, working as of next week. In addition to that, we have hired a new building commissioner, a former commissioner in Bridgewater and West Bridgewater, Michael White.
He'll start July 14th. That position has been vacant since December. So again, we're excited to get that office as well back up to full staffing where it needs to be. And that concludes it for me, Mr.
Chair.
Speaker 1 (02:05:19–02:05:40)
Thank you. The chair's report, oh, I should ask any questions for Mr. Molano from his report first. The news about Cheyenne, it's unfortunate.
I know that she's pursuing a professional opportunity by going to law school in Texas, so we understand that. She's a law school grad.
Speaker 6 (02:05:40–02:05:42)
Law school grad, sorry.
Speaker 1 (02:05:42–02:08:39)
No, she's taking the bar. And congrats to her for that. I feel like I issue this every couple of months and it's always worth saying it is for all of our residents to just remember how hard our town staff work on behalf of this town, how dedicated they are. We are really grateful, Mr.
Malano, to you and to all of the other folks that do the hard work of keeping this town running. We had a presentation from DPW last meeting. It's probably worth thinking about who our next, maybe you and I and Mr. Cohane can talk about who might come in for a future meeting when we do an agenda planning session.
But it's really, you know, in a time where people can be pretty nasty to each other. I think it's just really important to remember, you know, you can send me nasty messages is fine, but please be gentle and kind to our town employees who are doing the very best that they can do to keep this town running. And we're, again, very grateful for that. For my chair's report, I just want to, so successful, even with a little bit of threatening rain, Saturday and Sunday sessions out on Governor Hutchinson Field.
I know the Copeland Foundation is involved in that. I know Mr. Wells is very involved in that and many, many other volunteers, both for the music festival on Saturday and the Celtic music celebration on Sunday. And so thank you to everybody who came out to that and made it a great success.
Also this weekend, this past weekend, there was a dedication of a bench to Milton resident Kate Middleton who passed away last year around this time on Turner's Pond. And I recommend if you are going on a walk on Turner's Pond, there's a lovely bench that's set, I guess that would be on the south side of the pond with a quote that was selected by her daughter. It's a very lovely location and there was a good turnout of folks at that dedication. I'm trying to think of what else we've done in the last week.
I don't know that there's that much else. Does anybody have anything else that they'd like to shout out? I know there was, we talked about the water main and sinkhole and everything. The DPW and the fire department had a very busy weekend.
I think that was, was that two weekends ago? And so we're grateful for their response to all those. late activities. So with that being said, I don't think we have anything for public comment response.
Future meeting dates, we have July 8th and July 22nd. Future agenda items.
Speaker 6 (02:08:41–02:08:42)
We already filled up the meeting.
Speaker 1 (02:08:42–02:09:50)
We pretty much filled up. And I know that we're going to put Mr. Hashim and the Climate Justice Committee on one of our July meetings. So I might suggest to him the July 22nd meeting for their presentation.
And then I know for the first executive session, we can skip it. Are we in for this second executive session? If we could. Yes, please.
Okay. So I am going to propose that we move to adjourn from open session and enter into executive session to discuss strategy with respect to collective bargaining. Milton Clerical Unit of Southeastern Public Employees Association, Milton Professional Management Association, Milton Public Employees Association, Milton Firefighters Local 1116, Milton Police Association, Milton Superior Officers, Milton Library Association. Based on my belief, the discussion of the matter in open session may have a detrimental effect on the bargaining position of the Select Board.
The Select Board will not return to open session. Can I have a second? Second. Seconded by Mr.
Daley. This is a roll call vote to move into executive session and adjourn. Mr. Daley?
Yes. Ms. Hegarty?
Speaker 4 (02:09:51–02:09:51)
Yes.
Speaker 1 (02:09:51–02:09:57)
Mr. Cohen? Yes. And myself, yes.