Board: Warrant Committee

Date: 2026-08-10


Transcript

Auto-generated; may contain errors.

Speaker 1 (00:22–00:33)

Okay. Good evening. Welcome to the Warrant Committee of Milton, Massachusetts. It's August 10th, 2026.

Karen, can you call us to order? Do you need help seeing who's in the room?

Speaker 2 (00:35–00:37)

I just can't see who's keyboard writing.

Speaker 1 (00:38–00:40)

Okay. That is Lindsay.

Speaker 3 (00:42–00:46)

Hello. Hang on.

Speaker 1 (00:48–00:55)

Yeah, in the room. Let's just go around and say our own names in the room and then Karen you can call a roll for the remote people.

Speaker 4 (00:55–00:58)

Cecilia. Elaine Craighead.

Speaker 1 (00:58–00:59)

Lorraine Diddy.

Speaker 3 (01:00–01:00)

Lindsay Sands.

Speaker 1 (01:01–01:01)

Jay Fumling.

Speaker 3 (01:04–01:11)

And online you have Nicole Boysen, Larry Johnson, Levita Johnson, and Jimmy Stornaris. You have a quorum.

Speaker 1 (01:11–03:06)

Okay, we have a quorum. Great. The first thing I'd like to do tonight is to pull up the calendar that we looked at last week. And we'll look at this at the beginning and also at the end of tonight's meeting.

So am I sharing my screen? Yes. Possibly. This is what we talked about at our last meeting.

We met two weeks ago and we're meeting today, the 10th. We're discussing Laboree with guests and other fall articles. The question that we'll have to decide by the end of this meeting is, does this make sense or do we need more meetings? For example, the original plan was to take next week off, to meet two weeks from now and wrap things up with the goal of being able to vote on all fall time meeting articles then.

If they have to slip to the 31st, they could, and otherwise write the comments for the warrant on the 31st. So at the end of tonight, I think we'll all want to reconvene and say, I mean, I'm mentally putting the fall articles in two categories, LaBarre and everything else. For those two categories, are we okay with having just one more meeting? after this or do we need a meeting in between?

And also I'll mention that the chairs of the select board and school committee, I regret I didn't reach out to them until too late. I wasn't able, they aren't able to make it tonight. So that's, you know, that might be part of the question is how strongly do we feel about we want them to come speak to us in person? If so, does that mean we have an extra meeting?

You get my drift. We'll come back to this calendar at the end of the meeting see if this is enough or if we're going to need to add one more. So with that I will look at the agenda. Karen I don't believe we have any minutes to approve is that correct?

Speaker 3 (03:08–03:19)

We do not have any that have been circulated. Okay. And if I could just say one thing. Nick I'm trying to promote you if you could accept it if you'd like to be promoted.

Thank you.

Speaker 1 (03:21–04:22)

Okay. I will say I'm going to rearrange the agenda a bit. We're going to be electing a couple of people to serve on various committees tonight. I'd like to put that off until after we talk to our guest regarding LaBarre because we have a guest here from the school building committee and I'd like to get to our guest as soon as possible.

I will also tell you that for the other articles I expect to hear possibly from our town administrator remotely around 8 p.m. and our town financial director may be coming in in person around 8 p.m. So that's what the timing looks like. We don't need to, certainly don't need to rush through the school, the laboree, because we're gonna be waiting for the rest of them until 8 p.m.

So with all that being said, we have a guest tonight, Sean O'Rourke, Chair of the School Building Committee. Sean, I don't know if I need to give you any other introduction or preface or just turn it over to you. Uh, no.

Speaker 5 (04:23–04:24)

Good. Thank you, Mr. Chair.

Speaker 1 (04:24–05:42)

I will say, I'm sorry, I'm being rude. I turned over to you and then I'm going to jump in. I just want to set the stage of our discussion. It's early in our new term and just sort of remind us all our goal as committee is to collect enough information to make an informed recommendation to town meeting with topics, especially topics as interesting as this.

It's very tempting to discuss things that just sound interesting to us. Like, I'm sure all of us would be tempted to go in depth about the curriculum options and everything they considered and who's going to be dropping off the preschoolers and will they be dropped off at the same time as kindergartners? Those are all very interesting things to talk about. I do want to remind the committee to sort of focus on, we are going to discuss the curriculum a little bit, I'm sure, but let's focus on what information do we need to get the information to make a recommendation to town meeting for how they should vote on this article.

We could, I'm certain, all sit here one hour each and, you know, discuss the issue, but just remind everybody to stay focused on topic. So with that, I will cease interrupting you for at least a minute or two, Mr. O'Rourke, and turn the microphone over to you.

Speaker 5 (05:42–13:22)

For the record, I'm John O'Rourke, Chair of the School Building Committee, and not a town meeting member of the precinct eight. So, you know, with tonight, I basically have a short presentation that I can kind of walk through. I think the majority of tonight will be a lot of back and forth with questions. And outside of the presentation, there's other documents I can pull up.

So, you know, feel free to ask any question you have, and I'll do my best to answer it. But if it's okay, I'll share my screen. I think we can see it, yes. So what I want to do tonight is give an update on the ASEAN Library in relation to, I know there are two articles, one for essentially the purchase of the library site that's there, and then also the School Building Committee has a separate article in regards to funding for the design of there.

But I think the majority of these slides will walk through That's a black-and-white site, why we're considering it. But also, as a part of that, I think a brief update of where we are with MSBA as the overall school building project is relevant, mainly because there may be other questions associated with that. So, you know, to kind of give the committee an update is, you know, we got through Module 1, which was that first hurdle with MSBA. We got through it earlier this year.

We've been working on essentially forming a project team, which is what they call Module 2. We've onboarded TMA consultants as our owners, project manager, or you're hearing it through to his own PM. Now that we have PMA consultants on board, we're actually actively soliciting a designer, and that will come in October with MSBA through what they call their Designer Selection Committee panel. So once Module 2 is completed, hopefully in October, we'll be progressing into essentially a feasibility study.

So, one thing to keep in mind with MSBA is, you know, we were granted in, and once we got granted in, the output of Module 1 basically created boundaries for that project, which are essentially design options. And those design options, they attribute enrollments to the plan to the overall program. So the three options that we're allowed to look at is an addition renovation utility by Cunningham school of 1,400 students and that's like a baseline for any MSBA project. So the school you submit on, you need to have an ad reno as one of your options.

The only other two options we have for call it new construction would be a new elementary school grades K to five that would house 495 students plus preschool grade 7th and 8th at 660 students plus preschool. So that's when we talk our current process progress with MSVA those are the only two options that we're allowed to look at. Now those options are allowed to be attributed to different sites so everyone's aware right now the town owns a 6.4 acre Salon Gap road that we've gone through the land swap and then if the town is successful in the purchase of Laboratory College we could consider that. But MSVA right now does not allow us to consider it until we own it so we're kind of in a holding pattern with MSVA for that right now.

So, you know, in the framework at Gow Road, you know, we have the 6.4 acre site, no existing buildings and everything being constructed. We have essentially two options that we can look at, as I mentioned, the middle school and the elementary school. For Labyrinth College, We have 4.7 acre site, you know, there's existing buildings on it. So it would be renovating portions of them and do them.

And then also, you know, as of right now, we don't know what the acquisition costs for that's going to be. Looking at the enrollment, the options that we have, anticipation is a middle school probably would not fit on that site. The elementary school may fit on that site. And that's just very high level, using the kind of program that we had at Gow Road and placing it on here.

So, the key thing, as we discuss Labarré, and we layer in talking about MSBA, for MSBA at the Labarré College, currently, we'd only be able to look at two options, a middle school and an elementary school. There were non-MSBA applicants that we looked at from the school committee that, you know, there was – I think it was options that they've looked through, and out of them, pre-K, A, educational, that was decided. So, kind of diving into Laboratory College. So, the facility that's there is made up of three buildings.

Building A is essentially called the mansion, which is the big, you know, beautiful house at the front of it. Building B, which is attached to Building A, And then building C, which is in the back of the property, is basically the classroom space. We went toward it in April and looked at it. There's existing classrooms that are in there that are roughly 725 square feet.

But for the proposed program of pre-KK, they need larger rooms for the younger children. So one of the things we quickly came to accept is we'd have to do a large renovation to that. In addition, the campus doesn't have a cafeteria. It doesn't have a gymnasium.

Building C, when we looked at that, only has minimal bathrooms in it. And then the key thing we wanted to do, or at least with it, you know, we're working with the architect is, you know, we want to isolate our renovations so we don't trigger a large energy code renovation of the mansion. So the other buildings were pretty comfortable with renovations in there. We wanted to make sure in the options we looked at, we created a way to kind of isolate that renovation.

So the other part that plays in here that everyone has to keep in mind is There were certain roles that came out of this that each committee or board played. So the school committee prescribed what that enrollment would look like or what that educational program would look like at this site. The school building committee takes that program and we went out and hired an architect group, a DLR group. They also worked with a cost estimator and a structural engineer to look at the facility, to place that educational program into the facility, give what the layouts would look like, and then finally, what the cost estimates would be for those.

I had a new slide. I apologize. We're cutting a new slide. Here we go.

Sorry about that. So, what you see here is essentially a timeline. So, as I mentioned, the school building committee school committee. So we're joining you guys.

Speaker 1 (13:22–13:31)

Don, I don't know if anybody else is hearing this. Your sound is cutting out a little bit. I'm getting almost everything you're saying. Maybe if you could speak a little bit slower.

Speaker 6 (13:33–13:38)

Speak a little more into it. How's that? Yes. Thank you.

Sorry about that.

Speaker 1 (13:41–13:43)

Nope. That got worse again.

Speaker 7 (13:49–13:51)

It's okay for me, but.

Speaker 3 (13:52–13:55)

It might be in the room because it's fine online.

Speaker 7 (13:55–13:55)

Yeah.

Speaker 3 (13:56–13:58)

Okay.

Speaker 1 (13:58–14:02)

Okay. Yeah. Whatever you're doing earlier was better than whatever you're doing just now, so.

Speaker 5 (14:05–17:41)

I'll try. No, no. I'll think actually. Sorry about that.

Essentially what I was showing here is a timeline for work of the school committee and school building committee over the summer. A couple of key things to keep on here is essentially in July 6th, the school building committee, the school district, and DLR group met with our early childhood education planner and the superintendent and we took the 3KK program and really dove into it with the architects to develop how many rooms they needed, professional spaces needed, basically everything that will when it goes into the floor plan. This is essentially called a visioning session. The one thing I caution everybody or just to be aware of is, you know, a lot of this work was done over the course of essentially two months, where a program like this to really get fully baked typically takes about a year.

But we were doing this in order to advise the town as best we can knowing the property is going up for sale fairly quick. So we had to be kind of agile in our response that we had there. So what we looked at were three options and I'll explain them. The first one, you can call it as a base option that we looked at very minimal additions onto the building.

And what could we get out of the building for essentially what it exists today? And essentially what we looked at was an educational program that would provide some 3K spaces, four of them total. Let me just move the roster so I can read this again. And two special ed spaces.

For general, for kindergarten, there were 10 spaces and one special ed, which didn't meet the programmatic requirements that we had out of that visioning session. So we went to the next step, which is essentially a two-level addition And with this two-level addition, we hit the classroom counts that were prescribed or asked for by the district. And then finally, what we did is said, you know, because we have a two-level addition attaching to a three-level structure, what would a three-level structure look like? This became essentially what we put out there as option three.

And option three, we believe, provides more future proofing for this site so that as we construct this, it would allow what is currently half day preschool to go to full day preschool, which was attractive to some people. And then hit all our other spaces along with some additional capacity. So the big parts of these that I know everyone's interested in is essentially costs. So looking at option one, which was the kind of baseline one, the overall project cost for it was approximately $42 million.

Option two, which basically hits the program that the district was looking at, was about $74 million. And option three was, which was the future build-out, the future proofing build-out of this was approximately $85 million. And again, I have more detailed floor plans, other things, cost estimates, if people want to dive into those, but keep the presentation short. That's my last slide.

Speaker 1 (17:43–17:59)

Thank you. While we're lingering on slides, can you go to the previous one just so that can hover in front of us? Thank you. So I'll ask my first question.

So the costs shown here do not include acquisition costs?

Speaker 5 (18:01–18:20)

It does not. So anything to do with the acquisition of the property is not the school building committee's role. The select board is the one negotiating. for that right now.

So, you know, anything you see here, just base project costs, there's no acquisition costs associated with it.

Speaker 1 (18:22–18:43)

Thank you. All right. I know that we have a, is the term subcommittee? Is the term not subcommittee?

I know we have experts being Elaine, Nick, and Nikki, who've looked into this already. Would any of you like to start off with some of the things you've looked into, discussed?

Speaker 4 (18:43–19:35)

If I could, I'll start. The school committee, I know five years ago or so, originally considered, I don't know if you can answer this question, Sean, because I would have asked it of somebody on the school committee. But if you can't, then I'll just ask it at the next meeting. I know that the original plan that got a lot of pushback from the neighborhood was to put a pre-K-K building at the high school.

And that was at least five years ago. And then the switch was made, believing that a middle school on Guile Road would be preferable. I'd just like to hear why we're back to a pre-K-K. Is it because of the space issues at Laboree?

Speaker 5 (19:38–21:40)

So yeah, I'll do my best to respond to the timeline. So I believe that the Early Childhood Education Center that you're referencing came out of the DRA study that was done in 2018. It was commissioned to the school committee as a space needs one. In that, they represented certain options.

And at that time, 3KK was considered. And that was actually before the school building committee. So I think I've been on the School Building Committee since the beginning. Our initial efforts was not an early childhood education center, but it was an elementary school, K-5.

And then as we progressed through, I think it was the first three or four years for School Building Committee, we saw a migration of the overcrowding getting up to the middle school. We actually have a video on it that we put together a long time ago. And at that time, that's where we made that transition to the middle school. Reverting back to a pre-KK solution right now, I think is coming up mainly due to the site that we're looking at and what would be the educational program for that site.

I don't think would fit there. And I only say that the Gow Road Company, like I said, is about 6.8 acres. We were having a tough time fitting the middle school on that before we were successful. To fit that on Ray's property of 4.7 acres, we just don't think it would have been possible.

So we're trying to look at the building for currently what it is and how we would best financially put some programs over there and KK was I believe the one that was it was prescribed by the school committee that they felt that it would be the best one for it.

Speaker 4 (21:41–21:51)

I see so it doesn't address that migration to the middle school that was addressed by the land swap acquisition.

Speaker 5 (21:53–22:50)

Yeah correct so I think You know, one of the things everyone's trying to do with this is compare and contrast, you know, a Labor-Ray project to Gow Road. And even the superintendent did not acknowledge it the other night at the select board of, you know, it doesn't address the middle schools. So I think what would be helpful, you know, if people are really trying to look at the two of these and compare them is, you know, we have a project at Labor-Ray that obviously would be less expensive than the project at Gow Road, doesn't address everything. And potentially, you know, if the overcrowding persists at the middle school, it may require a future project at the middle school that would then cost additional money.

I don't know what that would be. We didn't study that. But, you know, if you're trying to really get an even balance or a comparison against both of them, just acknowledging there would be a future project at some point in the school.

Speaker 4 (22:52–23:37)

OK, I have one last question, then I'll let somebody else have a turn. When these buildings that are in place now, well, all the schools, when they were built, we went through the MSBA and they would not allow the schools to be built for more than the number of students that was currently in place. If we go with the MSBA again, like start the timeline over and try to get the lab array thing on that timeline, Is the MSBA still going to prevent us from taking option number three, which would be looking toward the future and trying to address what happened last time, which is the future overcrowding?

Speaker 5 (23:40–24:49)

Question. It sounds like you've gone through an MSBA process before. So what happens right now is That's why I gave the presentation under the lens of what my industry wants them. So right now, the preschool K option would not be redundant for MSVA.

The town can re-engage with MSVA, and essentially the process would be we would go back to module one, yeah, module one, and restart that, and a new enrollment analysis would be done 3KK, that enrollment analysis would align with some new option. It probably wouldn't be option two or option three. And then if we decided to build out more than what that would be, the MSBA would not reimburse for that. And that would be the diluted store accounts that would pull down their respective reimbursement.

And if that's too confusing, I can try to simplify it a little.

Speaker 4 (24:50–24:51)

No, I understand what you're saying. Thank you very much.

Speaker 1 (24:56–25:01)

I'd look at Nick and Nikki since you're two of the other people that have been looking at this recently.

Speaker 8 (25:02–26:38)

I'm happy to jump in. Thank you so much, Sean, because I know this has been a long time for you working on all these projects. I have effectively similar concerns, but I guess for me, when I look at the old plan, which I was able to find online, it effectively said new middle school with pre-K attached, 660 students. This is the land adjacent to MHS on Guile Road.

And then Piercewood House grades five and six and some district-wide offices. So to me, I know that was the plan that was pre-Lobberay. I think this was the plan that people were pretty happy about. You figured out a way to fit the new middle school.

It would have some pre-K. Now, I'm not sure if it's the same amount of pre-K as we're looking at now. So that's one of my questions. And then Pierce moving to grades five and six and moving offices seems that it would solve overcrowding in all three genres of school, so elementary, middle, and high school.

So I guess my two questions are, one, does that old plan give us enough room for pre-K? And two, I guess if so, then is the La Buree more of a shiny object, we see a new building, and we want to buy it. And I don't mean to be dismissive or not kind, but it feels a little like we've got this nice plan going. Yes, it might cost more, but it doesn't address the overcrowding at the middle school, which perhaps isn't an issue anymore.

And I'm not exactly sure if it fully addresses the pre-K. So any insight you have on that would be amazing.

Speaker 5 (26:39–26:52)

Yeah, so the real plan, what we think The intention with the staff is the same as the students. I'm appreciative of that today.

Speaker 1 (26:52–26:55)

Sean, I'm sorry. We're really not able to hear you in the room.

Speaker 5 (26:55–26:58)

OK, there's some background noise going on. I'm not sure if someone's muted.

Speaker 9 (27:01–27:01)

OK.

Speaker 5 (27:02–28:41)

So the old program, or the middle school, preschool, existing preschool looks like, and that would not be full day preschool that I was discussing here. But what we tried to do, or one of the reasons at that project, we took preschool essentially out of the building and made a separate structure for it, was that at some point, hopefully in the future, we could expand on that building and build out full-day preschool. So that was the reasoning way back when that project was preschool and the middle school all integrated under one roof, and then we separated them, hoping preschool would have some way to expand in the future. The second question in regards to the the appeal of lab array, you know, for our end, you know, it's not up to school building committee.

You know, we're tasked, essentially our charge is to solve overcrowding in the town. And if the town is successful on buying this, you know, for me, since day one when this has come up, You've indicated School Building Committee's role on this is advisory only. So our job is to present options. The overall decision of what goes in there, I believe, would lay with School Committee and with the select board.

So when they do join a future meeting, that would probably be a better question for them to answer.

Speaker 8 (28:44–29:01)

Okay, great. So if the prior plan was to be enacted, there still is some concern that there wouldn't be enough space for pre-K, but Lava Ray Option 3 would be enough space for pre-K. So that is an interesting trade-off.

Speaker 5 (29:02–29:30)

Well, yeah, just clarification. So there is, under the Dow Road Option, there is enough room for a half-day preschool. Okay. So all the…

The enrollment that we have in preschool would be not that high here at Valero. It would not be able to under the current program. Today in preschool, and we could expand it in the future, as I said.

Speaker 10 (29:37–31:08)

These are all great. And Sean, I think you've been awesome in going through all the questions and the facts and everything. But I guess, and this is all I think inherently important for the potential things that are going to be on the upcoming special town meeting. I think the two things are actually on the town meeting warrant.

One are, should we buy the Labrade property? And we still haven't seen a number on that yet, right, at an actual cost estimate. And then the other question is, allocating funds for designing that property, should we do it, right? So I guess, to me, there are three things, and I'm not sure you know the answer to those questions, is one is, economically, less expensive than the project at Guile Road?

Seems like it probably is, depending upon how much it costs to acquire that land. The second thing is, does the school committee think this is a solution that they find attractive? I haven't heard that one way or another. And then the third thing is, what's the fallback plan?

Let's say we buy it, and for whatever reason, we decide not to build the school there. What's Milton's exit plan with regards to that property? And I haven't heard anything about that either. And I'm not sure you're in a position to answer those three questions.

But to me, those are the three things that are really important. They're wrapped up in what we're going to have to approve at TownMeeting or recommend and then TownMeeting to vote on. But they're kind of the next step after all this happens.

Speaker 5 (31:10–31:29)

Yeah, thanks. You know, I mean, I have similar questions. So I So I think it's important for us to collaborate on them more than me.

Speaker 10 (31:29–31:30)

Great. I appreciate that. Thank you very much.

Speaker 1 (31:39–32:31)

So Sean, I have a question. I think, I think I, I think you and I've talked about this, but I want to be sure if I remember it. So the MSBA process, we're currently not in the process for pre-KK. I'm rephrasing what I think I heard you say to me previously, which is we could do that process.

We are not in date. I would phrase it as what I thought I heard. I'm sorry. What I thought I heard was we could do that process with a pre-KK.

They would probably allow us to look at the pre-KK, but it would set us back in time. So the risk there would be that it would be slower but not much of a risk that they would say, nope, sorry, this isn't an option you can consider an MSBA. Did I summarize that correctly, Sean?

Speaker 5 (32:35–33:49)

So yeah, we're under an MSBA project right now. And we were advised by MSBA as we graduated out of module one. At the time, when we graduated out of module one, Labor Day was such an addiction. and basically confirm the options I designed for them.

USDA, we're not the first one to have this happen before something new come up, but what they warned us is it would create a delay because now we would have to go back to the beginning option, restart and do the enrollment analysis again, and basically get to where we were. And just as a timeline, that module one, When we worked on this last year, we got everything done. We had a 270-day window to complete everything. We completed it in 90 days.

It still took us close to 270 days to get there. MSVA, they probably don't move as quickly as I would like. And if we had to restart, again, I don't think they would be in any rush to help us move along faster.

Speaker 1 (33:51–34:08)

Understood. So it would be a delay, but we're reasonably sure that yes, we're in the program, yes, we can link this option to the program, and that would reimburse us. Are we still talking 45% of allowed costs? Is that the right way to say it?

Speaker 5 (34:10–34:38)

Yeah. So they indicated to us that 45% of eligible costs would be reimbursed. the work previously with our OPM, there's essentially a calculated average that would loop that 45% down to an effective rate of 8%. You cut out at just the perfect time.

28%. 28%.

Speaker 10 (34:39–35:20)

Yep. But to put numbers on that, if I think I heard your conversation at other meetings in the past, the middle school project as is currently considered after the reimbursement is going to cost Milton approximately $130 million. This project, even for option three, is $85 million plus land acquisition costs. So it seems like you could do better with the MSBA, which might, you know, maybe offset with extra time and you maybe get some inflation costs in there or whatever.

But from a dollars and cents perspective to Milton, if the school committee says, yes, we are enthusiastic about this plan, then it seems like it's a pretty clear savings to Milton.

Speaker 5 (35:22–35:55)

Yeah. The one caveat to that is that's dollar to dollar comparison. Educational program to educational program. You'd still have to assume there's some future middle school project of an It would be 85 million plus acquisition costs.

Whatever that delta is, you'd have to assume that project would be less than that. And that's just when you're truly trying to compare apples to apples comparison.

Speaker 10 (35:55–36:14)

That's a great point. And I think I also heard you talk about the fact that there could be some additional reconfiguration costs of the elementary school buildings. when you take the kindergartens out there to make those classrooms a little bit more appropriate for other elementary school students, there might be some additional reconfiguration costs there also.

Speaker 5 (36:16–36:32)

Yeah, our take on the reconfiguration costs is what option, you know, if it's a lot of pre-k and pre-school, it's going to be, you know, absorb costs for one of those that are there for us. We acknowledge them, but we don't really think it's a differentiator.

Speaker 10 (36:33–36:33)

Okay. Thank you.

Speaker 1 (36:43–36:46)

Okay, I'll open it up to the floor. Cecile?

Speaker 2 (36:46–37:03)

Yeah, I just had a logistics question. I think last year in the fall special town meeting, we voted to extend the, like, I think the deadline out by five years because of, I guess, the process taking longer. Will we need to vote to move that out? Likely, if you have to go in February?

Speaker 5 (37:06–37:38)

No, so the what you're referring to is the extension to the land. That is good to announce that actually made its way through its past. The governor signed it, so it has extended it to 2033. There's no intention right now.

For example, if the town was successful on Laboree and we pivoted to do this program at Laboree, we probably would not be doing obviously a second project at Gowell Road.

Speaker 1 (37:53–37:56)

Looking around the floor literally and virtually.

Speaker 10 (37:56–38:07)

I would just say it's incredibly impressive how much The school building committee working with the architects and stuff like that seem to have gotten done and the school committee in such a short period of time.

Speaker 1 (38:16–39:38)

So I'll ask the committee. I think Nick did a very good job of boiling down three questions that we need answers to that we don't have answers to. And I'll admit this. I'm the chair.

I should be on top of these things. I don't know when we're going to arrive on a price for the property. Presumably before the warrant goes to print. But yeah, that's going to be pretty key for us knowing that before we have a vote.

But also questions about what else we do with the land and about what about the program. So, and I apologize for some of you who joined late. We don't have members of the select board and the school committee joining us. I reached out to them later than I should have and they weren't able to make it tonight.

I'm gonna see, I know, I think the chair of the select board, I believe said he could meet us two weeks from now, but I think I'll reach out to both the chairs of both boards and see when they can meet us. Again, for those of you who joined us late, we're going to have to discuss, do we meet next week, or do we go on our two-week cycle? See when they can meet us. Even if it's not on a Monday, I'm going to take it upon myself to say, we really want to meet with the chair of the select board of the school committee.

Even if it's not on a Monday, we'll see when they're available, and I'll line them up. So.

Speaker 11 (39:39–39:45)

Can I ask a question? Yes, go ahead. What is pre-K exactly for purposes of all of this?

Speaker 1 (39:45–39:46)

Sean, are you able to answer that?

Speaker 5 (39:48–40:04)

I think as best I can as a parent, partly as, you know, I can't recall the exact age, I just know it's before kindergarten.

Speaker 12 (40:04–40:12)

But is it, do you know, is it two years? You would go two years before kindergarten or is it really just that one year before you're enrolled into the kindergarten?

Speaker 5 (40:13–40:44)

I think it's two years and And potentially, like, you know, with my daughter, she actually had three because she had an IEP. Preschool, I just know this specifically, that if a child has an IEP at that age, they were trying to take them, I believe, at the age of age six or something like that. I don't remember exactly. You know, preschool isn't universal for everybody in the town.

I believe there's a lottery for certain

Speaker 13 (40:49–40:54)

Yeah.

Speaker 1 (40:54–41:00)

We had a hard time in the room hearing you again. Did we get the gist? Yeah, I think I got the gist.

Speaker 12 (41:00–41:01)

Okay. Thank you.

Speaker 1 (41:03–42:34)

One other thing, and this is sort of straying off my rule of sticking on topic, but I think in the past when people have asked why do we have a pre-K, our answer has been we're offering the bare minimum of the kids who need it, because there are special needs, and then you have to have sort of, I'll say, non-special need kids in there because of the way it's set up. So we've been doing, I'll say, the bare minimum. Now, then there's the question of will we be doing more than the bare minimum. Again, I'm breaking my own rule of sort of getting off topic.

That'll be something that people will want to discuss with the school committee more so than with you. So we haven't wrapped up this topic. Obviously we've got, I mean, at the very least, how much is this property going to cost along with a few other questions for the school committee and the select board. But from Mr.

O'Rourke, from the school building committee, you know, I know it's difficult. It's difficult for me. It's difficult for all of us to realize this committee's job is this and this committee's job is that. But to the extent that we understand this is the school building committee's job, do we have more questions regarding the school building committee after tonight?

Which they can be asked. Our experts can ask Mr. O'Rourke. We can ask by email.

Obviously, it's not the end of the road. But do we think we have more questions from a school building committee point of view?

Speaker 10 (42:35–43:07)

I guess I have two questions. One is, I know that they've come up with the estimates and the designs in a very compressed timeframe. How accurate do they think they are if they move forward? And two, what kind of inflation do they think the projects could incur if they're going to the MSBA program and that takes us another, you know, 12 months or 18 months to get approved and you're 12 to 18 months further out than you are right this second?

Speaker 5 (43:10–44:51)

Yeah, so good question. Like I mentioned, the work that we were doing was a compressed schedule of a month. We had one meeting with the district, kind of go over everything. I think the program would need to get further refined to really get specific The specific floor plans we have of layouts of where rooms are, where professional staff rooms are, we haven't been able to go back with the district and sit down with them to kind of walk through all that.

It was basically a first pass. So when we looked at this, The construction contingency that the estimator carried was roughly 15%, and I want us to increase that to 20%, mainly just due that we had a very minimal design. So for me, I would look at these as lower end costs, and I hesitate saying that, but it's just the reality in design and construction that I don't want people to hang their hats on a number that was developed in essentially a two-week design period and a one-week review period. You know, when you're talking about an $84 million, $5 million project, I just get cautious that things may have been missed in that time and that, you know, additional things may come out.

And I'm not trying to say that to play up what I think the higher cost would be. It's just Um, you know, my design experience, anything that's been done under a month is very schematic.

Speaker 10 (44:52–45:36)

That's great. So, so process wise, I guess this is a question for everybody. I think process wise through these two articles, um, before upcoming, before town meeting, let's say the town meeting decides to try to purchase library and incur the design costs with the architects. So that would have to require an override vote by the town, which would happen later in the fall.

And then the architect would go and do the, you know, more detailed analysis and design work. And that would come hopefully before the town meeting again in 2027. And that would require another override for the construction costs. Is that what we're kind of thinking, right?

Yeah.

Speaker 5 (45:38–46:43)

Yeah, correct. And just depending if it, you know, knowledge purchase and funding, we're trying to do is, again, be reactive to this as quickly as possible. So for designer funding, we have currently 1.5 million appropriated to school building committee for what I'll call our MSBA process or claim that we're doing there. If it's decided to purchase LabArray, not go back to MSBA, and just go on a faster path to address this thing, that is the reason we're proposing that other angle to provide a separate funding lane.

They're both individual. We're not going to do both projects or spend both funds. We'd only draw down on one or the other. depending on which way this goes, and we only wanted to put that there so that if the decisions are there, we want to go quickly and effectively on this, that we didn't have to wait for a future town meeting to allocate that funding.

Speaker 10 (46:44–47:09)

And broadly speaking, this might be more for Jay, right? So if there's two potential override votes for the town on just this one project, then there's still the fire station override and potentially an operating override in the next couple of years. So that's a lot of asking to people. But it is what it is, right?

Just important, I think, for us all to kind of be aware of it.

Speaker 1 (47:12–47:39)

Yeah, can I get Sean to clarify what you said? So Article 7, which is $1.2 million for architecture, et cetera, we would use that if we don't go the MSBA route. And if we do go the MSBA route, we would, then what money? I'm a little confused.

Do we use previously allocated money? Previously approved money?

Speaker 5 (47:39–48:29)

So the 1.5 million that was previously approved, currently operating with the MSBA kind of lane that we're operating in, that is there, we're utilizing that right now to fund our existing owners for Medicaid. The additional funding, what this article is doing is setting up a separate funding source outside of MSBA that if we were to purchase LabArray and be successful, Essentially the next decision point if we're successful there from school committee and select board is do we stay with MSBA and restart the program? Or do we just go on our own and faster pace and complete this project and move on? If we go on our own, we can't use the funding that's allocated for MSBA designers.

We have to have separate funding for it, and that's the reason for that.

Speaker 1 (48:30–48:52)

Thank you, thank you, that'll be. Important to make clear to town meeting We approved $1.5 million last year. We're approving $1.2 million this year. We're going to use one or the other, but not both.

Thank you for making that clear to me. And it'll be on me, as well as others, to make it clear to Tommy. Thank you.

Speaker 12 (48:53–48:59)

Sorry. So has the $1.5 million been drawn down yet for the MSBA? Any portion of it?

Speaker 5 (49:00–49:42)

I would say a very small portion for the initial efforts that we have the OPM working on and I'm talking, yeah, nothing close to even the high number that's there. And we're being cognizant of, you know what I mean, with these, is everything the school building committee working in parallel. I think this is like our first time on this effort that we've been looking at. two different options for, you know, our overall change.

So I think we're pretty well represented at this point.

Speaker 1 (49:42–49:47)

Okay. Do we have other questions for Mr. O'Rourke from a school building committee point of view?

Speaker 4 (49:49–50:03)

I just want to thank you, Sean. Other people said this, but you've been doing this a long time. Really appreciate your efforts. And sorry, you were the lone person here to get the grilling from all of us.

Speaker 5 (50:03–50:39)

I have to jump on. I mean, I know this is a very big decision for everybody in the town. And I mean, as I said at the beginning, we have a long history, our whole committee. There's five appointed members of us that have been on the entire time.

One other appointed member from select board that we've had in. The other is that you can then, as elections change. But you know, Mr. Chair, as you have the other members of school committee and select board, I'm happy to come in and join them just in case a lot of things may come up.

So feel free to just let me know when that date is.

Speaker 1 (50:40–51:15)

We'll try to minimize our demands on you, Mr. O'Rourke. Thank you. Thank you for the offer.

Okay. Do we want to discuss among ourselves? I mean, we should talk either As I said, we'll be talking at the end of the meeting. When are we gonna meet next?

What more do we need? Should we have, putting that aside, should we talk among our, is there more discussion among ourselves now, or do we want to wait till we speak to more guests?

Speaker 14 (51:15–51:18)

From the school committee and the select board and myself, you know.

Speaker 1 (51:18–51:18)

Yep. Yep.

Speaker 14 (51:19–51:20)

A lot of information about us here.

Speaker 1 (51:21–52:03)

Yeah, and that's certainly not on them, it's on me. I reached out to them too late, but I will be coordinating with them when they can meet with us. If that's that for this week, I'd like to move to other items on the agenda. We have two committees in town that have representation from the Warrant Committee on them.

There's the, I'll call it the Capital Committee. I'm getting the name wrong, but for all intents and purposes, it's the Capital Committee. We have one representative to that capital committee. This past year, our representative was Lorraine.

And so let's elect a representative for this year. Elaine.

Speaker 4 (52:04–52:15)

I'd like to nominate Lorraine D as the representative from the Warren Committee for the Capital Improvement Planning Committee, which is the title you were looking for.

Speaker 1 (52:15–52:27)

Thank you. Lorraine, are you willing to? Yes. Lorraine, can you speak a bit?

As I said, you served on this last year. Can you say a bit more about… I know you've been on it for more than just the previous year.

Speaker 15 (52:28–53:47)

Yeah, I've been on it in the past as a citizen also. I think twice as a Warren committee, but here's where the projects come up that are capital improvement and it talks about Free cash and bonding and what allocations should go to those projects in what year should those projects come up and so usually there's a whole list of a couple of pages and Deciding on is it this year next year and it's always what's put to the town in the warrant and there's always a lot more projects, but you can only do so much in a year with free cash and how much you're going to bond, you don't want to bond, over bond. And so it's spelled out over a couple of years. And because there are people who put in projects saying, we're not going to need this for a year or two years, but they're holding their place because of how things have spread out.

And there's representation from multiple people and we make suggestions and it gets put forward as comments and in the warrant. It comes back to the select board and then it comes back to the warrant committee.

Speaker 1 (53:47–53:52)

Your previous, so how many years in total were you on this committee and when was it?

Speaker 15 (53:52–54:23)

This year, I mean this past year and then I was on probably another year as a citizen, but it was a couple of years. And then I think the first time I may have been on it is when I was first on the Warrant Committee, which was back with Katie Conlon was the person. Yeah. So, I mean, I find it very interesting and looking at the bigger projects and over long-term.

So.

Speaker 1 (54:23–54:56)

So we've had a nomination. I'm not sure if I heard a second. Second. Okay.

We've heard a second. It can be competitive. Is there other nominations or discussion of other candidates? Or if not, then we will vote on the one candidate we have in front of us.

Hearing none, we have a motion and a second for Lorraine D to be our representative. Karen, can you call roll, please?

Speaker 2 (54:58–55:01)

Yes. Nicole?

Speaker 16 (55:02–55:05)

Yes. Irene?

Speaker 15 (55:07–55:15)

Yes. Yes, sure. I didn't know I could vote for myself.

Speaker 14 (55:15–55:16)

Eric? Yes.

Speaker 17 (55:18–55:18)

Alavida?

Speaker 13 (55:22–55:23)

Yes.

Speaker 10 (55:27–55:27)

Sue?

Speaker 1 (55:28–55:29)

Who? I didn't hear that one.

Speaker 3 (55:29–55:34)

Lindsay. Oh, yes. Lindsay. Yes.

Ron. Okay, Ron.

Speaker 10 (55:35–55:35)

Yes.

Speaker 3 (55:36–55:37)

Jimmy.

Speaker 10 (55:38–55:38)

Yes.

Speaker 3 (55:39–55:39)

Nick.

Speaker 10 (55:40–55:40)

Yes.

Speaker 3 (55:41–55:44)

Cecile. Yes. And Jay.

Speaker 1 (55:45–55:48)

I'll vote yes. Okay.

Speaker 3 (55:48–55:49)

The other.

Speaker 1 (55:50–57:06)

The other position, thank you for your service, Lorraine. The other position to fill are the two positions on the joint budget committee. This is a new committee last year. I would say it largely is regarding coordination between the major committees, school committee, select board, warrant committee, we have a representative from the planning board, making sure everybody knows what's going on.

It didn't have a hundredth success rate last year, but it was better than not having it. And also, you know, to the extent that if elbows are getting thrown a little bit, you know, sticking up for the, the prerogatives of the Warrant Committee that, you know, we are not a rubber stamp. We are a part of the process, just like the rest of the committees are. Last year it was Brian, who is not on here anymore.

is Brian and me. I would prefer not to serve on it again, just because I'm going to be involved in these discussions as the chair in some sense. And if I have two others of you involved in these discussions also, the more the merrier. So I'm opening up the floor to self-nominations or peer nominations to anyone who would be willing to serve on the Joint Budget Committee.

Speaker 10 (57:11–57:13)

I'm interested in participating on that committee.

Speaker 7 (57:13–57:17)

I'm also interested in participating in that committee.

Speaker 1 (57:19–57:45)

OK, that was Jimmy and Nick that we heard from. Yes, OK. We've got two volunteers. I won't say suckers, I'll say volunteers.

Is there anyone else who has an interest in this? Excellent. I will. Can someone officially make the motion for Jim?

OK, Elaine.

Speaker 4 (57:46–57:52)

I'd like to nominate Nick and Jimmy to be our representatives on the joint budget committee.

Speaker 1 (57:52–57:53)

Joint budget committee.

Speaker 4 (57:53–57:57)

Great. Any second?

Speaker 1 (57:57–58:02)

Cecile seconds it. OK. Karen, can you roll call, please?

Speaker 16 (58:03–58:07)

Elaine. Yes. Paul.

Speaker 1 (58:10–58:11)

I didn't hear that.

Speaker 16 (58:11–58:15)

Sorry. Yes. Yes. Lorraine.

Speaker 15 (58:16–58:16)

Yes.

Speaker 16 (58:18–58:18)

Larry.

Speaker 17 (58:20–58:28)

Yes. Savita. Yes. Lindsay.

Yes. Ron. Yes. Jimmy.

Speaker 18 (58:31–58:31)

Yes.

Speaker 19 (58:33–58:34)

Yes.

Speaker 17 (58:34–58:35)

Cecile.

Speaker 2 (58:35–58:37)

Yes.

Speaker 19 (58:37–58:38)

And Jay.

Speaker 1 (58:38–58:57)

Yes. Excellent. Thank both of you for for stepping forward. So now we are at exactly 8 p.m.

I couldn't have done it more perfect. Other fall town meeting articles. I'm not sure if our town administrator has joined us.

Speaker 3 (58:59–59:02)

I believe he has just joined.

Speaker 1 (59:02–59:14)

Oh, OK. And our town finance director, I think, may be showing up in person. soon, but is not here yet. You think Mr.

Molano has joined us?

Speaker 20 (59:16–59:18)

Yes. Good evening. How are you?

Speaker 1 (59:18–01:00:21)

Oh, hello. We're just about to start talking about all the articles that are not related to La Barre. So we'll begin at the beginning. I hope you all got the draft article, the draft warrant that was sent around within the past week.

The first article, so, and I know some of these, you know, all these have experts assigned to them, and I totally understand. Some people have not had time to look into it, and that is completely understandable. So when I sort of poke at you and say, what's going on with this, we're not going to shame you if you say, I still need to do more work on it. Let's sort of go through them one by one.

Article one is, changing the appropriations for fiscal year 27. So I believe I asked Andrew and Jimmy to look into this. Andrew or Jimmy, would either of you like to speak to this or should we ask Mr. Milano to give us an overview?

Speaker 7 (01:00:24–01:00:28)

An overview wouldn't hurt, but I do have some questions for sure.

Speaker 1 (01:00:28–01:00:31)

Okay, Mr. Milano, can you say a little bit about what this article is?

Speaker 20 (01:00:35–01:02:34)

I included in those warrants a draft comment that gives a very kind of high level overview. Every year we set the reserve fund that is part of the operating budget for that fiscal year. This money can only be transferred out with a vote of the Warrant Committee and it's supposed to be used for extraordinary or unanticipated expenses. So it's a nice, set aside of money that we're able to access at year-end to address, typically at year-end, I should say, to address unexpected expenses that occur throughout the year.

Recent examples include snow and ice and other overspends on certain budgets for essentially one-time overspends. Why we have this article for the fall town meeting is because through the state budget process, the House of Representatives and the State Senate significantly increased the amount of money that was going to state aid from what the town's budget relied upon when we set our budget for town meeting, which was the governor's budget, which was released in January. So the House budget comes out in April, the Senate budget comes out in May, and then the final state budget typically approved at the end of June, early July. So once the final state budget was set, cities and towns across Massachusetts, including Milton, benefited from that infusion of additional money into state aid.

So what we propose to do is to appropriate those funds, but for fiscal 27, to put those into the reserve fund rather than paying any additional new expenses or recurring expenses, but set it aside in the reserve fund to be used if necessary. If not, the funds would go unspent and close out at the year end to be part of next year's budget surplus. So that's what we propose to do here. Again, just take the additional state aid that was included in the state budget, put it into the reserve fund for fiscal 27.

Speaker 7 (01:02:37–01:02:58)

Thank you. I guess my question is, you know, are there any anticipated departments that require it now or is it Is every department okay at the moment and not needing any additional funds?

Speaker 20 (01:03:00–01:03:49)

Yes, I mean, correct. It's, you know, we're lucky it's the first month of the fiscal year that at this rate, you know, everybody should be on budget. There's nothing that's come up that's been immediately critical. As you know, the committee was discussing earlier this evening, there's a potential acquisition of Library College.

If that goes through, there's certainly some additional added operating expenses for the balance of this year that aren't included in the fiscal 27 budget in any way. Otherwise, if we have another heavy winter like we just had, you know, think about snow and ice. If mechanical equipment were to break down, need to be replaced, that we can't wait for the next capital round, then that's a potential use of this money. It's there to be used if necessary.

There's nothing necessarily at this time that we have earmarked these funds for.

Speaker 7 (01:03:52–01:04:09)

And then as the year progresses, what do you do if additional funds are required by each department? Is it easily transferable or does that require a vote?

Speaker 20 (01:04:10–01:05:01)

Generally what we do is we're able to absorb anything that happens throughout the year within departmental budgets for the most part. And then we will address any deficits at year end, but we usually have a decent line of sight as we make our way through the fiscal year. But yes, the funds would need to be approved to be transferred out of this fund by the Warrant Committee. So we would have to come back The most recent example of kind of being out of cycle was a couple years ago, and the chair sometimes talks about this, is we had a wood chipper that crashed, and our operating expense to rely on private companies to do that would have been significant.

So we came to the Warrant Committee, I think in like November or December, to request that funding. But generally, we wait till the end of the year, but it does require an approval, a vote from this committee to transfer money out.

Speaker 7 (01:05:01–01:05:13)

Okay. And then how did you arrive at the 363, 469 figure? It's 121% more than last year. How did you arrive at that?

Speaker 20 (01:05:16–01:05:38)

That's not the kind of number I came up with. It's the delta between what we used for our state aid allotment when we set the budget and what actual state aid is going to be. So that 363 represents the difference between what we've included in the budget when we built it in the spring versus what was actually approved by the state.

Speaker 7 (01:05:41–01:05:43)

Okay. I have no additional questions. Thank you.

Speaker 1 (01:05:47–01:06:27)

So, Nick, I have a question, and you might be able to read my mind, but if we have an extra $363,000, to me the two obvious places it could go are here or the budget stabilization fund, which then, or sorry, the override stabilization fund, which then can, you know, help us get a little bit, you know, a tiny bit, but a tiny bit farther to the next override, make the little next override a tiny bit less painful. you and this, how do I, is this your recommendation that it goes in this account? What was your thinking for recommending that it go with this account as opposed to the override stabilization fund?

Speaker 20 (01:06:27–01:07:30)

Well, we talked about that, but I, in my view and what the select board ultimately voted when they submitted the article was to put it into this fund. It gives us a little bit of flexibility if necessary in this fiscal year. Certainly, it's preferable that we don't have to spend it, in which case it would close out to a future year budget surplus and translate into free cash in a future year. So it's pretty similar in that respect.

It's obviously, as you know, a little bit easier to use these funds because it would only require a vote of the Warrant Committee rather than, if it were to go into a stabilization fund, require a vote of town meeting to take out. And then just based on our experience with this past winter, We were certainly lucky within this fiscal year to be able to absorb a very significant deficit in our snow and ice, but that's not going to be the case in all budget years. So, you know, just having a little bit more money set aside here we felt was prudent. But ultimately, they accomplish, I would say, very similar goals.

Speaker 1 (01:07:32–01:08:05)

I think I'd agree. I guess my concern is if we don't use this here, then it closes free cash, which people view as one-time money. And people are understandably very nervous about, let's say this is free cash. I can't even do the math.

One, two years from now, people are then very nervous about using that free cash for ongoing expenses, whereas if it's in the override stabilization fund, tomato, tomato, possibly. I don't know. I don't know if there's a question in there.

Speaker 20 (01:08:07–01:08:28)

I think you're expressing the same internal conversation that we had. And then ultimately, where you landed was that a recommendation just to put into the reserve fund for the share was logical. And like I said, ideally, we don't touch it. And then it still builds into those reserves.

But if we need it, it's going to be because we need it for a reason.

Speaker 1 (01:08:29–01:09:08)

And so again, this is adjusting the FY27 budget. We are currently into FY27. We approved the FY27 budget last May's town meeting. This is adjusting it.

People on Zoom can feel free to take themselves off mute. I'm looking around. Are there questions? And if not, then my question to the committee would be, are we comfortable voting on this recommendation tonight?

I'm seeing nods from people in the room. The floor is open to a motion.

Speaker 7 (01:09:10–01:09:19)

I would just wait for maybe Andrew if he has any, you know, if he wants to opine on this, but I'm ready to go.

Speaker 1 (01:09:22–01:10:00)

Understood. Understood. I have mixed feelings. I certainly You know, I asked Andrew to look into this.

He's not here tonight. On the other hand, a quorum of the Warrant Committee is a quorum of the Warrant Committee. We can do business. I have faith that if this body acts tonight, and if Andrew wants to look into it, wants to raise issues, that this body would listen to Andrew and, you know, consider changing our actions.

So I hear what you're saying, but I also, you know, we have a quorum tonight.

Speaker 2 (01:10:02–01:10:10)

So process-wise, if we vote today, and then if Andrew comes back with additional findings, what is the process like to amend our?

Speaker 1 (01:10:10–01:10:25)

It's a little messy. If we have to undo something we did, then somebody makes a motion to undo what we did, and we vote to undo what we did, and then we vote for the new thing. I mean, that's my job. That's why I get paid the big bucks, because I shepherd it through.

Speaker 2 (01:10:25–01:10:26)

Doesn't sound too bad.

Speaker 7 (01:10:27–01:10:30)

That's all. Thank you.

Speaker 19 (01:10:31–01:10:35)

Are there concerns that there will not be a quorum at the next meeting?

Speaker 1 (01:10:36–01:11:20)

I don't have that concern. My concern is just sort of watching the clock. You know, we've got one or two more meetings to take care of all these. you know, several of these things I know we won't get done tonight because they just came up.

So if I can cross, if we can in good faith cross something off the list tonight, I'd like to, but I'm not going to twist anybody's arm. Does that answer your question? To directly answer your question, no, I'm not worried about a quorum at the next meeting. I just, you know, save 10 minutes off our next meeting.

Was there a motion?

Speaker 4 (01:11:20–01:11:31)

I'm just trying to word the motion in my head. I'd like to make a motion that the Warrick Committee recommend approval of Article 1. Is that how to do it?

Speaker 1 (01:11:32–01:11:47)

Sure. As printed in the draft warrant sent around the past week, I think that's perfectly fine. You can also say to adjust the reserve fund allocation by $363,469. OK.

So choose.

Speaker 4 (01:11:49–01:11:52)

That's what I just said.

Speaker 1 (01:11:52–01:12:11)

Second. OK, we have a motion and a second. We have a motion and a second. Now there is time for discussion, if discussion is needed.

Seeing none, Karen, can you take roll call for the first article approval of this new warrant committee?

Speaker 16 (01:12:14–01:12:21)

Elaine. Yes. Paul. Yes.

Lorraine.

Speaker 15 (01:12:21–01:12:23)

Yes.

Speaker 16 (01:12:23–01:12:23)

Larry.

Speaker 19 (01:12:26–01:12:38)

Yes. LaVita. Yes. Lindsay.

Yes. Ron. Yes. Jimmy.

Speaker 1 (01:12:38–01:12:38)

Yes.

Speaker 19 (01:12:40–01:12:40)

Nick.

Speaker 1 (01:12:41–01:12:43)

Yes. Cecile. Yes.

Speaker 19 (01:12:45–01:12:46)

Motion carries.

Speaker 1 (01:12:46–01:13:01)

Thank you very much. Okay, the next two, I believe I am looking at Lorraine. Lorraine, would you like to speak to Article 2? And or would you like to tap Mr.

Milano to introduce Article 2?

Speaker 15 (01:13:03–01:13:04)

It's Article 2, the bonds.

Speaker 4 (01:13:05–01:13:09)

Article 2 is the fire engine.

Speaker 15 (01:13:09–01:13:26)

Article 2 is the bonds, yes. If he wants to speak about it, he can. pretty straightforward. Is he still on?

Are you asking Mr. Mullin to speak about it? I mean, if he wants to, I can just speak about it and then he can add stuff to it. How's that?

Speaker 1 (01:13:26–01:13:27)

Okay, okay.

Speaker 15 (01:13:27–01:15:51)

This one is pretty straightforward here. It's authorizing the transfer of surplus bond money, which is if there's money left over from previous projects that were approved, but the money wasn't completely needed to complete that project. So the two of them that have come up is the DPW locker room and cemetery garage had a surplus of $350,000. And then there was the Pine Street Brook flood control dam at $75,000.

If the surplus is Less than 50,000, the select board kind of decides where it goes, I guess. Over 50,000, it has to go to the town meeting members to vote on it. So what was suggested is that back in, I don't know, 25, the town meeting approved Fire Engine 2 to be replaced. at a cost of $1.1 million, and that was going to be delivered in the winter of 26.

What's being asked here is that they take the combined $350,000 and $74,000, which totals $424,000, use that surplus towards the engine replacement, which is going to cost, it would have cost 1.1 million, if we put the 424,000 to that, then we would only have to bond, we would only have to, reducing the cost, we would only borrow $675,998. So basically, there's money, There's a surplus, the projects that was being used for were completed, this money's extra. The suggestion is instead of borrowing 1.1 million, we take the surplus of the 424,000 and put it towards the fire truck and therefore we're left with less money to borrow for the fire truck.

Speaker 4 (01:15:53–01:15:54)

That was good. I had a long day.

Speaker 15 (01:15:54–01:16:03)

I'm sorry. That's kind of it. I don't know if Nick wants to say something else about that.

Speaker 20 (01:16:05–01:16:45)

Well, thank you. You covered it. And just a little color on why we chose that capital purchase. We are required to put the surplus proceeds to something that has an equal or longer useful life.

So the fire truck at a 20-year useful life, we're able to transfer that money from these bonds that were issued for 20 years and 15 years to a fire truck, which we could issue bonds for up to 20 years for. So that's why we chose this piece of capital equipment. And as she noted, it's already been previously approved. an additional fire truck.

This is something that was already approved by the town meeting. We're just offsetting the future borrowing costs of it.

Speaker 12 (01:16:46–01:16:51)

But it is to replace one, right? So we won't have an extra, not an extra.

Speaker 20 (01:16:51–01:16:55)

Yep. Replacement of the engine that's operating out of the East Mountain Station currently.

Speaker 1 (01:17:00–01:17:01)

Any discussion?

Speaker 4 (01:17:04–01:17:15)

I just want to say this seems like a no brainer to me. We could, of course, I'm open to discussion, but this is about saving the town from having to bond additional costs, so.

Speaker 11 (01:17:20–01:17:26)

Were there other assets that were of equal or longer depreciation or was this the only one?

Speaker 20 (01:17:30–01:18:05)

Yes and no. We have a fire ladder replacement that is coming, but we expect to receive it in September. So we can only move these proceeds against a future expense. So we didn't really have anything else that really fit both the useful life and was something that was previously approved that we haven't completed yet.

So this fire engine, which was approved last year at town meeting, hasn't arrived, we haven't paid for it, has it like long enough useful life. So it kind of check the boxes to be able to apply these proceeds against.

Speaker 11 (01:18:05–01:18:11)

Thanks.

Speaker 1 (01:18:11–01:18:11)

Do I hear a motion?

Speaker 4 (01:18:14–01:18:29)

I'd like to make a motion that the Warrant Committee recommend A yes vote on Article 2 as printed in the draft warrant that was sent out last week.

Speaker 1 (01:18:30–01:18:31)

Is there a second?

Speaker 4 (01:18:32–01:18:32)

I'll second.

Speaker 1 (01:18:34–01:18:40)

Any discussion? Karen, can you do a roll call, please?

Speaker 16 (01:18:42–01:18:48)

Lorraine. Yes. Paul. Yes.

Lorraine.

Speaker 15 (01:18:48–01:18:48)

Yes.

Speaker 16 (01:18:50–01:18:51)

Larry.

Speaker 19 (01:18:52–01:18:58)

Linda. Yes. Lindsay. Yes.

Ron.

Speaker 10 (01:18:58–01:18:58)

Yes.

Speaker 19 (01:19:00–01:19:00)

Jimmy.

Speaker 10 (01:19:01–01:19:01)

Yes.

Speaker 19 (01:19:02–01:19:03)

Nick.

Speaker 10 (01:19:03–01:19:03)

Yes.

Speaker 19 (01:19:04–01:19:10)

Cecile. Yes. And Jay. Abstain.

Thank you. Motion carries.

Speaker 1 (01:19:11–01:19:16)

Okay. Lorraine, it's falling on your shoulders again. Can you speak to Article 3, Lorraine?

Speaker 15 (01:19:19–01:22:12)

All right, this is about replacing the water system throughout the town. It's kind of a rotating project given the age of our water system and having to replace them. But this basically was submitted by a select board that allows the select board to apply for and use federal funds, state funds, MWRA, or any other kind of funds, and appropriate them to a project. In previous years, because again, this is rotating, and they're going around replacing them.

In previous years, has to go to the town meeting. The town meeting in 24, 25, and 26 approved $1,790,000 to improve projects. And again, it's a rotating basis. The Department of Public Works, what they're doing is preparing a package for the water replacement improvement projects.

But they wanted to be able to be seeking the opportunity to increase the total appropriation and make it available for a larger bid package. The additional work they're thinking of adding on to this is Governor's Road, which apparently had some kind of leakage, breakage of their main at one point in the past. And the other one would be Franklin Street and Bassett Street, which I think had an issue with the water main also. But what they're suggesting with that is if they can do it now while there's construction already going on in that area, they would be able to do improve both the underground infrastructure and the road work.

And that would be less of a disruption later on. So now that the whole area is disrupted now because of the construction, which is going to get finished. If this can be done at the same time in that area, it would be less of a disruption and you wouldn't have to rip the whole thing over again. after.

So it is an addition to what's normally been appropriated, but they're just asking to see if they can add these two other projects to it for the reasons stated. You know, unfortunately, it's not even something, I mean, it's a system that it's old and it just is going, so we keep up with it. So that is it. So increase the funding, the appropriation to 2.2 to finance the rehab replacement of the town water system of what they have plus these two additional projects.

Speaker 1 (01:22:14–01:22:23)

Is this 2.2 plus whatever we approved in May? Or instead of whatever we approved in May? Mr. Milano, do you know that?

Speaker 15 (01:22:23–01:22:31)

No, this is, it's just to borrow the, well, this is to authorize the bar, so isn't this what we do? I think it's in addition.

Speaker 1 (01:22:31–01:22:43)

I guess it's coming up this year? I assume we did something in annual time meeting in May, and this is in addition?

Speaker 20 (01:22:43–01:23:08)

This 1.7 is what has previously done both in this town meeting and prior, and this 2.2 would be in addition to that. Thank you. We draw down this money from the MWRA, which is our water supplier, and we're able to do so 10 years at no interest from the MWRA. So it's a no interest loan over 10 years for any water main and sewer main projects through the MWRA program.

Speaker 10 (01:23:09–01:23:09)

Thank you.

Speaker 1 (01:23:10–01:23:14)

No interest as always. Thank you. That's great.

Speaker 4 (01:23:14–01:23:42)

Yeah. It's mentioned here, Nick, that, you know, the select board can accept grants and gifts from the Massachusetts Water Resources Authority. But are we expecting that? And if so, is there a ballpark amount on that?

Or are we going to be I mean, interest-free, are we going to be ponying up as a town the whole almost 2.3?

Speaker 20 (01:23:42–01:24:21)

It's the standard language we use because the MWRA program sometimes can fluctuate. Generally on the water side, it's a loan-based program at a 10-year loan at no interest. The sewer side often has a grant component. In this case, we expect it to be a 10-year no interest loan only.

It is possible that sometimes the MWRA will release additional funding that's just grant funding. That's why that language is in there, but I would say we expect in this case to be that 10-year no interest loan.

Speaker 7 (01:24:27–01:24:34)

Any other questions? Do we know what enhancements they're making

Speaker 20 (01:24:37–01:24:59)

Right now, the work proposed by DPW is water main replacement. So it's complete replacement of the water main that's in the street. The, because the baby is 1915, 1932. Franklin is 1926.

So we're talking, you know, 100 plus year old water mains at this point that are just being replaced in their entirety.

Speaker 7 (01:25:02–01:25:02)

Okay. Thank you.

Speaker 1 (01:25:07–01:25:19)

Does someone want to make a motion? Do I hear silence because we don't have enough information to decide tonight?

Speaker 12 (01:25:19–01:25:21)

I just think it's worded weird.

Speaker 1 (01:25:22–01:25:33)

I don't doubt it's worded weird. I also bet it's worded the exact same way in the past 10 warrants. We could double check, but I suspect it is.

Speaker 10 (01:25:34–01:25:36)

I was waiting for Elaine's leadership again.

Speaker 4 (01:25:38–01:25:53)

I guess I just have a question for Nick. Lorraine said that the reason to do it now is because of the construction going on in the area. Are there other reasons to do it now, that we should move this money now?

Speaker 15 (01:25:54–01:26:16)

Well, there's also an issue. I think they said Franklin Street had a flooding also. Oh. And Governor's Road had one, so these would be additional.

OK. So they just thought timing-wise, If they could do it now, it doesn't mean, you know, if we don't do it now, we have to do it later and it would be more disruptive. It's my understanding.

Speaker 4 (01:26:18–01:26:44)

All right. I'd like to recommend, no, I'd like to make a motion that the warrant committee recommend a yes vote on article three as written in the draft warrant that was sent out a week ago. You're so good at this. For the sum of $2,280,000.

Speaker 1 (01:26:45–01:26:54)

I'll second it. Any discussion on this motion? Karen, can you do a roll call vote?

Speaker 16 (01:26:56–01:27:03)

Elaine. Yes. Nicole. Yes.

Lorraine.

Speaker 15 (01:27:03–01:27:03)

Yes.

Speaker 16 (01:27:05–01:27:06)

Larry.

Speaker 19 (01:27:07–01:27:14)

Davida? Yeah. Lindsay? Yes.

Ron? Yes. Jimmy?

Speaker 7 (01:27:15–01:27:15)

Yeah.

Speaker 3 (01:27:17–01:27:17)

Nick?

Speaker 1 (01:27:18–01:27:18)

Yes.

Speaker 3 (01:27:19–01:27:22)

Lucille? Yes. Anne Jay?

Speaker 1 (01:27:23–01:27:23)

Abstain.

Speaker 19 (01:27:25–01:27:26)

The motion carries.

Speaker 1 (01:27:26–01:28:17)

And certainly, one takeaway I got from that last discussion was that I think we made a good choice in who we appointed as our capital representative. Thank you for explaining the ins and outs of the pipes to us. The next two articles, and the last two, not counting Labere related, were new. I'll say new articles.

I wasn't expecting them until I saw them in this draft warrant less than a week ago. They're not on the agenda to vote tonight. We're not going to vote tonight. I did ask two Warrant Committee members to take a stab at seeing what these are.

I don't know if they're prepared to speak to them tonight. Article 4 regarding a Community Preservation Committee grant for a playground. Ron, are you prepared to speak to this?

Speaker 21 (01:28:19–01:28:28)

Hey, Jay. No, not yet. I'm going to talk to Tom. I hope to get them this week and then I'll come back and share more information at our next board committee meeting.

Speaker 1 (01:28:28–01:28:42)

Okay. So Mr. Milano, it sounds like we'll be hearing from the community preservation committee. Uh, do you have anything real quick you want to say in this?

I mean, I guess my number one question is why is this coming up now and not at the fall time meeting?

Speaker 20 (01:28:45–01:30:37)

You mean at spring? Uh, so it's late. Um, so, We had let the Community Preservation Committee, depending on the committee, request for the Manhattan Street Station from CPC for historical preservation. So they had, and I asked them to consider including that on the fall town meeting.

It also turned out that this project, which is the playground replacement at the Tucker School, It has a bunch of other funding as well, part of it, trying to walk towards the summer 2020 construction projects. Logistically, it's a bit challenging for procurement sake and for contractor coordination, contract administration, et cetera. So ideally, they would have as much of their funding committed and appropriated prior to really this winter. So then we can assist them on procurement bidding and contracting to line up a contractor so that the playground equipment is delivered, that the contractors are showing up, you know, that third week of June right away to work all the way through the summer.

So as much as complete as possible by September. So that's the reason to have a cpc project out of cycle is really about having the money in place ahead of like the bidding and procurement uh for a potential summer project that has to be done on a very tight timeline so cpc can speak to it and ron i can send you the contacts for a couple of the folks organized with the tucker school pto who can speak to the project as well okay that'd be super helpful thank you

Speaker 1 (01:30:38–01:30:47)

Okay, yeah, I think in the room we got a little more than half of that, but I think our friends on Zoom got all of it and we'll be hearing back later.

Speaker 4 (01:30:47–01:31:00)

I'd like to make a motion to have the speakers in here checked before our next meeting. I'm just joking about the motion, but it's really hard to make out some of this information.

Speaker 1 (01:31:00–01:31:26)

Yeah, I don't know if this is, I know this room is used often. I don't know if we're the first ones who've had this problem, but we'll talk to our friends at MATV Yeah, we're muddling by. So that's that one. We're going to put that on hold.

Article 5, Lindsay, I don't know, again, I'm putting you on the spot. Do you have anything to say about Article 5?

Speaker 12 (01:31:27–01:31:28)

No, not this meeting.

Speaker 1 (01:31:29–01:31:39)

OK. It looks like, Mr. Milano, can you say a little bit about Article 5 and why it's coming up? Or should we just be patient and collect information for a future meeting?

Speaker 20 (01:31:41–01:33:01)

Yes, sorry for the technical issues for those in the room. And then I will follow up with MATV as well. But Article 5 is really a housekeeping item. This is MBTA community zoning related.

The MBTA community zoning allows for affordability requirements and units of projects with 10 units or more to have 10% of the units be affordable unless we have an economic feasibility analysis that says that Milton's economy can support a 15% affordability requirement. So we have completed that economic feasibility assessment that has been submitted to the state. The state has accepted it. So the town's effective requirement for affordable housing requirements in MBTA communities projects is 15%.

So this is, I would characterize it as a housekeeping article to strike the reference to 10% of units, just for clarity's sake, moving forward. So what is in place now is that eight or more units, projects of eight or more units, 15% of those units have to be affordable units at 80% of AMI in all projects coming out of the MBTA community zoning. There haven't been any to date, but this is for future projects and this article just cleans up and clarifies that zoning language.

Speaker 1 (01:33:03–01:34:26)

Thank you, Mr. Palano. And I think what also will be important to emphasize to town meeting and to the Warrant Committee is Article 5 is the paragraph we see in front of us. So town meeting cannot take action on more than the paragraph in front of us.

Town meeting cannot, as a result of Article 5, say, we're going to get out of MBTA Communities Act, for example. So I think that will remind the people at town meeting Our discussion is limited to this paragraph. We'll remember that in the Warrant Committee. And we'll do some of our homework.

And I appreciate your input, Mr. Mono. Any more discussion on this? So then that leaves us with, it's 8.30, God, it feels later.

That leaves us with articles that are not gonna be on the fall town meeting article, on the fall town meeting warrant. One of them being the local historic district, which I understand the select board opted not to put on the warrant. I'll fully confess, I started listening to the select board meeting today. I didn't get far enough to hear their full discussion, but I understand that was the result is that it's not gonna be on the fall town meeting warrant.

I'm not sure that there's much more to say about that.

Speaker 18 (01:34:27–01:34:29)

And I will second that.

Speaker 1 (01:34:31–01:35:11)

You'll second that? I thank you for your support, Ron. Ron and I were going to be the experts on this one. And so now we're sitting back drinking martinis or something.

And also there's the, sorry, why am I drawing a blank? There's the fire station. And there's the short-term housing laws, both of which are not going to make it to the fall town meeting. I don't know if there's anything anyone wants to say about either of those at this meeting.

I think, and I'll, you know, I'll, I think one thing I'd like, oh, sorry, Larry, go ahead.

Speaker 14 (01:35:13–01:35:35)

I didn't actually want to do any research on the fire station because I saw that, you know, I'd heard that it was, it was going to be pulled, so. But it does seem like they might, there was some talk about a special town meeting in like January or something like that. Are all three of these articles? Do we know anything about that?

Or is that still just in discussions? Mr. Milano? At least for the fire station one.

Speaker 20 (01:35:36–01:36:00)

So yes, nothing, no town meeting for the spring has been called. What would work best for the fire station project going forward would be to have a special, an additional special town meeting January, February, and March time frame ahead of the annual town election, because that project will require both a town meeting vote and a question vote on the election.

Speaker 9 (01:36:00–01:36:13)

So in a way, if there's a spring special to the meeting, late winter special to the meeting, the town meeting could vote, and then there's going to be a question vote on the annual town election, and if we have a special election in some minutes, it'll work.

Speaker 20 (01:36:14–01:36:28)

The conversation project, select what is yet to call it, set a date, And I can't speak to the timeline for the short-term rentals, although I think there is consensus among select board and planning board to have something completed at least prior to the annual town meeting.

Speaker 14 (01:36:31–01:36:33)

Okay.

Speaker 1 (01:36:38–01:37:02)

That's good to hear. I mean, I certainly, I would, I would throw in my two cents as the, The short-term rentals, if those could also be on the, let's call it a February town meeting, for lack of a better term. The more we can spread the love, the better, because then we can do our job better to prepare for the annual town meeting.

Speaker 14 (01:37:04–01:37:21)

Have the annual town meeting mostly focused on budget, and I'm sure there'll be a few other things in there, too, but that would be easier. Yeah, I think it is. And plus, town meeting can You know, sort of focus on that short-term rental because it's so important, you know, and we really want to get it right.

Speaker 1 (01:37:23–01:37:49)

Yeah, I think that'd be great. I want to organize my thoughts a bit more than they're organized right now and maybe express that to the planning board. So no other, I mean, we don't need to discuss those other articles much. So let's go back to where we started this meeting, which is looking at the calendar.

I'm going to share my screen.

Speaker 10 (01:37:49–01:37:59)

Before we do that, do you think, can we ask Mr. Milano some of those questions and see if he can give us the answers that we might've had or an indication of when we might be able to get those answers?

Speaker 1 (01:37:59–01:38:13)

Yeah, please do. There, there, Mr. Milano, we had some questions regarding the, um, laboratory, which were sort of out of scope for Mr. O'Rourke.

Nick, do you want to take it away? Sorry, Nick Tangny, do you want to take it away to speak to Nick Milano?

Speaker 10 (01:38:14–01:39:21)

Yeah, sure. So I think we have three questions. I don't know that it's fair to ask you those questions, but there seem to be three key questions as it relates to the Laboree and recognize that the actual, you know, construction of Laboree is sort of a decision, different decision in the future, right? But one is, you know, how much is the acquisition going to be for?

And I guess you guys are in negotiations on that. So you may not be able to give a number, but maybe you could give a timeframe. The second question is, do we know what the school committee's view of this is? It would seem like really important for them to endorse that they're enthusiastic or not about building the pre-K and K program that's being discussed at LaBarre.

And the third thing is, so what happens if we buy LaBarre and then somehow decide not to build the school there? What is the exit plan for Milton with regards to the utilization of that property? And you might not be in a position to answer those questions, but I think we discussed earlier, at least in my mind, those are three important questions that will be valuable in helping the Warrant Committee form the recommendation.

Speaker 20 (01:39:28–01:42:03)

Questions? So in terms of acquisition, yes, we just in terms of what has happened is we've been engaging with the and directly numerous times. So we've been in close contact with them throughout this process. We conducted an appraisal.

We've received that appraisal and the select board has transmitted an offer to La Buree accordingly. Our understanding is they are accepting it first through the end of this week and then we should be sending out for that. So we expect to be able to share more news in terms of potential acquisition cost in the near term. But for now, that's I'll characterize it as that.

And once I'm able to share more, I will do so. Obviously, just trying to protect our ability to negotiate as well. School committee view, you know, we had I obviously missed the first bit of your meeting, so I don't know if the school committee was in attendance at this meeting, but school committee chair McLaurin did attend select board meeting last week where you can see both his comments and the superintendent's comments about the pre-KK use of the facility. But I would certainly encourage a future meeting or joint meeting between school committee and our committee or at least representatives of such to speak directly to that.

And then what happens if we buy it in a school project for whatever reason doesn't go forward? I don't know, we've had some conversations about that at the select board level. And there's been, you know, some consideration of how do we not muddle some of the messaging around this and what the intentions are. So I think we've focused primarily on determining whether it's viable for a school and plan to proceed with, you know, the viability that has come back through the work that school building committee has done in a very short amount of time.

And we thank them for that. You know, one of the members of the board and others have talked about whether there needs to be another committee or another group kind of working on the non-school idea. It's still something that the select board is considering and looking at. We've had some conversations about, but focused mostly on the school piece.

So I can bring that question back and provide additional information at a future meeting with the Warren Committee about that aspect and how we would go about handling that a little bit more directly.

Speaker 10 (01:42:04–01:42:05)

Thank you.

Speaker 1 (01:42:12–01:42:54)

So unless there, thank you, Nick. That's a thank you, Nick. And thank you, Nick. So I'm going to share my screen again for the calendar.

So what I'm hearing is, and to inform Mr. Milano, no, we did not have members of the school committee or the select board here tonight. Let me double check my email. So it sounds like we think it's very important to have member representatives of the Select Board and School Committee visiting us.

So, and I'm trying to talk and do other things at the same time, which is dangerous. Okay, forget that.

Speaker 10 (01:42:55–01:43:07)

I think one important thing is, do we know when we think we might know what the number is for the acquisition if the offer is accepted? Because I think that kind of meeting before we know that doesn't seem to make a lot of sense.

Speaker 4 (01:43:08–01:43:08)

I agree.

Speaker 10 (01:43:09–01:43:10)

Good point.

Speaker 1 (01:43:11–01:43:20)

Mr. Milano, could you narrow that down? Like if we were to schedule a meeting for a week from today, would that be foolish? Because that'd be before we know that the purchase price.

Speaker 20 (01:43:24–01:43:34)

We know what we can control at this point, I just. I can't opine on one laboratory and what have been happening.

Speaker 9 (01:43:34–01:43:36)

I can say we have experienced two.

Speaker 1 (01:43:42–01:43:53)

I apologize. We're not hearing anything you're saying. Wow. Nope.

Speaker 4 (01:43:54–01:43:58)

It sounds like it would be better to wait and not meet next week at least.

Speaker 20 (01:44:00–01:44:06)

I would not expect to have anything for next week. I think that is fair by the end of the week.

Speaker 1 (01:44:07–01:45:06)

Thank you. Thank you. We are pushing up against warrant printing dates, but so it sounds like the answer is next week would not make sense to meet. I'll put an asterisk in that, unless, like if the only time that is convenient for members of the school committee to meet with us is next week, then maybe we would.

But we'll definitely be meeting on the week, I'll say the week of the 24th. We usually meet on Mondays, but it sounds like we might have to roll with things. And to a certain extent, I don't like cutting things to the last minute. But if we didn't set the warrant printing deadline, we're not setting the deadline of when we know about the purchase price.

So I'm still a little confused. The number that we gave to La Beret, that's secret, Mr. Milano?

Speaker 20 (01:45:10–01:45:28)

I think it's time it exists, because we would be anything about the purchase price we would view as part of our negotiating strategy with them. So we would hold that as confidential until it's rejected, the deal goes a different direction, until an agreement is reached.

Speaker 10 (01:45:29–01:45:47)

Okay. All right. Can I ask one question related to that? Why, if this is something that the town has enthusiasm for, and I don't know if that's true or not, why not look at acquiring the property not through an open bidding process, but through eminent domain.

Speaker 20 (01:45:53–01:46:18)

Eminent domain taking is possible for, you know, to be done by town. It's just that library has some, I'll just kind of leave it there.

Speaker 10 (01:46:18–01:46:19)

Okay, thank you.

Speaker 1 (01:46:20–01:46:23)

Okay, so our friends on Zoom heard all of that?

Speaker 12 (01:46:23–01:46:24)

Yeah, maybe Nick can repeat it.

Speaker 1 (01:46:27–01:46:31)

Yeah, we're hearing from our members pretty well. Nick Tiny, can you repeat that?

Speaker 10 (01:46:32–01:46:46)

Let's see if I can get close to what Mr. Milano said was they're proceeding currently with the bidding process and they want to see how that plays out. is what I heard.

Speaker 1 (01:46:46–01:46:51)

Okay. So a very diplomatic answer. That's what I heard. Yes.

Okay.

Speaker 18 (01:46:51–01:46:56)

I mean, it's like a legal proceeding, right? It's not, it's probably not the first place you would go.

Speaker 1 (01:47:00–01:47:43)

Probably not. Maybe not as easy as some of us are imagining it. So I think where we land is that we're not meeting next week. We're meeting on the 24th.

that probably makes it somewhat likely we'll meet on the 31st, possibly have to call an audible and have like a midweek meeting at some point. I'm not, I'm just trying to prepare for the worst here, but the immediate future is not meeting next Monday. I will talk to my colleagues on the school committee and the select board, do whatever I can to get them to meet with us. If not on the 24th, then some mutually agreeable time.

Speaker 10 (01:47:43–01:47:43)

Okay.

Speaker 1 (01:47:44–01:47:47)

Is that, was that just me being a dictator? Does that sound?

Speaker 4 (01:47:48–01:47:52)

Sounds fine. Okay.

Speaker 1 (01:47:52–01:48:02)

Okay. I don't think there's anything else we need to discuss. Yes, Elaine, the final motion of the night.

Speaker 4 (01:48:02–01:48:05)

I'd like to make a motion to adjourn. Okay.

Speaker 1 (01:48:05–01:48:10)