Board: Planning Board
Date: 2025-02-13
Transcript
Auto-generated; may contain errors.
Speaker 1 (00:51–01:17)
Good evening, and welcome to the 22nd meeting of the Milton Planning Board Fiscal Year 2025. At this time, I would like to now call the meeting to order. We will begin with our administrative items, which include first, the approval of minutes. And first, we're going to introduce ourselves.
Yes, thank you. I'd like to begin by introducing the board and our staff. If you'd like to begin, Sean.
Speaker 2 (01:17–01:20)
Sean Fahey, member. Jim Davis, member.
Speaker 1 (01:20–02:18)
Cheryl Tagaya, Secretary. My UOFIL member. And Meredith Hall, serving as Chair. And with us, but not in the room, she's in her office, we have Julia Gettman.
Unfortunately, Cheyenne is out with the flu, so thinking of her and hope she feels better soon. Now we can move to the approval of our minutes. And Cheryl, we're still working on edits for those. There were two sets of edits that were from the 28th of January.
And we'll check the dates. But since we don't have the edits… The 23rd and the 28th. The 23rd and the 28th.
Oh yeah, Julia. So since we're still working on the edits, they are not ready to be approved this evening. So I would ask for a motion to defer the minutes. So moved.
Speaker 3 (02:20–02:20)
Second. Second.
Speaker 1 (02:21–02:21)
Okay, all in favor.
Speaker 3 (02:22–02:22)
Aye.
Speaker 4 (02:22–02:23)
Aye.
Speaker 1 (02:23–05:34)
The next discussion of the next meeting dates, we currently, we had to schedule a meeting for next Thursday, the 20th, which should be a very brief very brief meeting, it is essentially to, because of the zoning articles, at our last meeting, at the last public hearing that we had, we moved to discuss them on the following Tuesday, but we actually did not take a vote to continue the public hearing. So in that case, what happens is it ends the public hearing. So we are going to simply, on next Thursday, reopen the zoning articles. We can't make any changes unless the Warrant Committee recommends that we make a change.
That would be an opportunity, and that is, I guess, the good thing about having it right before town meeting. If there are any changes that are needed or suggested by the Warrant Committee, we would have an opportunity to do that. If there are no changes, we would simply close the public hearing on that. And so that will be next Thursday.
Hopefully everyone can make it. Is it a Zoom or in person? It's fully Zoom. It's fully Zoom.
It's fully remote for that meeting. And it should be very brief. I mean, a half hour. 7 o'clock?
At 7 o'clock. Yeah. So that is on the 20th. And then we will have, Julia is reserving the room for us.
I think, Julia, did we say 715? Yeah, I think you were going to reserve them. So on Monday and Tuesday night, just if there's anything that comes up that we would need to discuss, we will have that and have a room reserved before the town meeting on the 24th and 25th. and then we have a regular scheduled meeting on the 27th.
At this time, we don't have anything that we absolutely have to have on the 27th, so because we will have had quite a few meetings, I know we'll discuss yours, but at this time, I think we, unless we have something that's extremely urgent, I think the 27th meeting, we could consider canceling that meeting. Because we will have had Monday, Tuesday, possibly Wednesday town meeting. And we will have just moved, had that the 20th. So we will have Bassett Street coming back on the 13th.
So certainly we could continue any other public hearings until the 13th as well. I don't know if anybody- 13th of March. And then that would be 13th, yeah, it's confusing because we have a tonight 13th and then the March 13th meeting. And if something did come up that we needed to, we could add a meeting that first week in March.
But I think at this time, we will be through our zoning articles, which will be great to have those. And hopefully we have a few other things that we've been able to wrap up to.
Speaker 5 (05:34–05:39)
And we'll have to talk about a forum for East Milton overlay?
Speaker 1 (05:40–06:01)
Oh, yes. And then that is one thing. Julia, and we'll discuss that. I think when we get to that, when Josh comes on, is that we'll want to schedule a public forum and have him come.
And that could be that first weekend, depending on how soon he can do it and how soon we can post it and let everyone know to come. But we'll discuss that later.
Speaker 2 (06:01–06:03)
So for now, we'll plan for the 13th of March.
Speaker 1 (06:04–06:04)
Yes.
Speaker 2 (06:04–06:05)
Okay.
Speaker 1 (06:05–06:41)
Yep So we're we're going to go a month without a regular scheduled meeting We will meet well, we'll have the 24th the 25th the 20th 24th 25th pre meetings and then I And did we did we Because Tim Bassett Street there they couldn't get into the ZBA. So that's why they're not until the 13th I know later on the agenda.
Speaker 6 (06:41–07:05)
We have discussion of the East Milton overlay zoning as well as MBTA zoning. Mm-hmm and We talked about having East Milton zoning submitted for the Maytown meeting. So how does, when does that opportunity to submit, is the warrant closed?
Speaker 1 (07:05–07:24)
Well, I thought we would discuss that tonight. The warrant closes, we would have to have our article, and if we, depending on how we feel tonight, if we feel ready to submit it, the 27th is that deadline for the article. For getting the zoning articles in that's when they were asking for them.
Speaker 6 (07:26–07:31)
Okay, so you think there's adequate time Without needing a meeting for a month.
Speaker 1 (07:31–08:14)
I think if tonight We feel comfortable We could submit it now and at least let town council I'd like to get let town council get as much time to review it as possible and just see if there's any recommended revisions, but get it to you know, I at least after the Warrant Committee, after their stretch of meetings. Not that they're going to want to look at another article, but at least they'll have it and they can schedule at their convenience. But I thought we could decide that. If we decide we need that 27th, after Josh comes, we certainly could get that back.
So maybe we just leave it open for now until we get through tonight and see. I think that would be good to do.
Speaker 6 (08:14–08:15)
Yeah. Yeah.
Speaker 1 (08:15–08:28)
And so we'll discuss all the items on here. But just I was just tentatively thinking about that in advance. Staff update. Did Cheyenne give you anything, Julia, that you wanted to discuss?
Speaker 7 (08:30–08:45)
Only that there's an A&R coming for 572 Harlan Street. He dropped off some plans on Tuesday and an application. So we should put that on an agenda. Okay.
All right.
Speaker 6 (08:45–08:46)
What was the address?
Speaker 7 (08:46–08:48)
572 Harland.
Speaker 1 (08:50–08:55)
Yeah, 572. And we'll want Cheyenne to review that too.
Speaker 6 (08:56–09:10)
But there is a requirement for opening the hearing on an A&R upon receipt. I don't recall how many days, but that's something to look at with Cheyenne as well before deciding about the meetings.
Speaker 1 (09:11–09:21)
If the 13th would, yeah, if that was, we'll have to check if it's 45 days or how many days. And you might know.
Speaker 8 (09:21–09:31)
How quickly do you have to get an A&R? I thought it was 30 days, but it can be on a meeting, it's not a hearing process.
Speaker 1 (09:32–09:33)
Okay, we'll confirm.
Speaker 6 (09:33–09:45)
Yeah, we'll confirm that because yeah, we want to make sure that that's because you know, while we're not required to advertise it's been our practice to because Residents neighbors have asked us to do that too, right?
Speaker 1 (09:45–10:22)
So we do need to be mindful of that too So and I did want Cheyenne to look to look over the A&R to make sure that they're everything that they need to submit that they have properly submitted so with her being sick, she wasn't able to take a look at that this week, but just to make sure that it does qualify as an ANR. Okay, so the next thing we have is our citizen speak. If there's anyone from the public who would like to speak on something that's, yeah, great. Welcome.
Speaker 9 (10:23–11:38)
Joke joke aren't graft and a half. I want to just talk about the East Milton overlay district. I Spoke at the select board meeting and I heard while you were speaking you're gonna meet with the residents Which is what I asked to make sure the select board did and I heard that you're gonna have this forum and that makes me very Happy, I won't repeat everything. I said at the select board meeting some of you were there Want to commend you on what you've done and that's what I tried to say in that meeting I know this has been a long hard process and I'm appreciative of it the the forum is really for me is the last part of this my neighbors as a precinct seven town meeting member have been asking me about this and It's important to us and I do appreciate everything that you're doing the only thing that I'm Unsure of and I'm not looking for a response now is I as in watching this I think there's some sort of Three-year look ahead where you can come back and change it without potentially coming back to the citizens and I don't know if that's true but I just I Saw it somewhere and some of the conversations potentially, and that just bothered me if that were true.
And I know you have a lot of work to do, so thank you very much.
Speaker 6 (11:39–11:51)
It's not true that we could change the zoning without going back through town meeting if it were adopted, but the one thing that we can change are the guidelines, design guidelines.
Speaker 9 (11:51–11:52)
The design guidelines.
Speaker 6 (11:52–11:55)
Okay, maybe that's where I'm confused. Yeah, that does not require town meeting.
Speaker 9 (11:56–12:00)
Yeah, okay. Thank you very much and I look forward to the forum and my readers also.
Speaker 1 (12:00–12:08)
Yeah, and everything will be on the website so you can look at all the different documents. Anyone else? Yes.
Speaker 10 (12:13–14:49)
Brian Kelly tell me the number from the precinct 711 hope that At a recent planning board meeting regarding the fan nurse respects nursery special permit renewal There was a complaint regarding a gathering on the property. I Maggie Oldfield is a politically active member of the Milton community. And when I asked if we could hold a poll, I feel kind of guilty about this, because when I asked if we could hold a political meeting in one of her beautiful flowering gardens, she was more than happy to oblige. It was a delightful evening we gathered for potluck to eat and strategize and celebrate recent political victories.
This was not a dance party. It was citizens with concerns about Milton's future. I am here because I heard discussion about perhaps requiring a gate or a request to require a gate at the nursery to stop unpermitted activities. I am here to speak against any such action as it could very well impede our civil rights to gather.
It may be possible that the complainant does not share some of our political views and is trying to stop us from gathering. I don't know if that's true or not. Someone did call the police and they came and they left without an incident and we continued our meeting. The right to political gathering is a fundamental aspect of civil rights primarily protected under the First Amendment of the United States Constitution.
This amendment ensures the freedom of assembly, allowing individuals to gather peacefully for political purposes, express their views, and petition the government for redress of grievances. From a civil rights context, civil rights are designed to protect individuals from discrimination and ensure equal participation in political and social life. The right to assemble is a vital part of these protections, allowing citizens to engage in political discourse and advocacy. In Massachusetts, local zoning laws are governed by Chapter 48 of the Massachusetts General Laws, which gives cities and towns the authority to adopt ordinances and bylaws to regulate land use.
However, these laws generally cannot prohibit political gatherings outright. And the last thing I'll leave you with is, according to the ACLU, they have a statement on this. The right to assemble and protest peacefully is among the most important in a democratic society, and the ACLU has long been a champion in this field. We work to ensure that governments do not charge unreasonable costs for the right to protest, deny equal rights of expression for viewpoints or speakers with whom they may not agree, or otherwise unlawfully restrict the right to gather and express.
Speaker 4 (14:52–14:53)
Thank you. Thank you.
Speaker 1 (14:55–15:11)
Anyone else who would like to speak? And we have, I don't know who we have on Zoom too, but yes, if you'd like to please come. There's two hands raised on Zoom. Okay, I just want to make sure we let people know that they will get to speak as well.
Speaker 11 (15:11–16:47)
I'm just taking exception to what the recent gentleman said. I did vote no. And it's part of the zoning law of Milton. And the thing I'd like to say is that Maggie could have held the gathering at her house.
She has plenty of space. Denny could have held the gathering at her place. She has plenty of space. Instead, for some reason, it was held behind my house.
And it was not, I agree it wasn't a dance party, but there were loudspeakers, there was chanting. It was more than, there were some comments last time about, well, what if Josh decided to have a party? And Cheryl pointed out he can talk to his neighbors. The Reschettes live at 270 Hillside Street.
They have parties routinely in the summer. I have never made one comment about the Reschettes. And I don't mind if they do what they want to do. But the Reschettes parties are nothing like the gathering that was held at Thayer Nursery.
And I think it's great for people to have the right to assemble. Fine. But they can do it. They can do it at Maggie's house, or they can do it at Denny's house.
They don't have to do it at what is basically my house. That's all I have to say.
Speaker 1 (16:49–16:56)
Thank you. OK, and Julia, if you can let us know who's up.
Speaker 7 (16:56–16:58)
Eric Hockenship.
Speaker 1 (16:59–17:01)
OK. Welcome.
Speaker 12 (17:03–19:48)
Thank you, Eric Wilkinson. Throughout the campaign leading up to last year's vote on the MBTA zoning, a lot of arguments were made about the trolley not being rapid transit and how it wasn't fair that Milton was classified as a rapid transit community. Instead, many argued that Milton should be an adjacent community. And the chair of the Select Board reiterated this recently.
It's not about being anti-housing, but about being fair. Tonight, I'm not here to debate about whether it's rapid transit or not. But after last year's vote, the planning board committed to developing two zoning articles for the town. One is if Milton were a rapid transit community, and one is if it were an adjacent community.
Nearly one year later, we have neither. And now the planning board is unequivocally stating that it has no plans to produce either. While the nullification of the guidelines by the SJC last month effectively extended the deadline for compliance, The planning board and a group of residents are now attempting to rewrite the law by creating a new category for Milton and for Milton alone, a category that would require even less zoning capacity than an adjacent community. This is contrary to what the planning board publicly promised it would do and what many of the no voters even said was fair.
The date, the public has not heard the planning board cogently explain why it is ignoring the plain language of the statute that requires HLC to develop regulations for compliance and why it is pursuing the singular path instead of preparing for all potential outcomes. Based upon recent conversations and news reports, many believe that the planning board is still going to develop plans for both 25% and 10% alternatives, but are unaware of the effort to do and to do only less. Because the only result of this action will be even more legal costs and less state funding at a time when we are discussing a nearly $10 million override, it is only fair for the planning board to explain to residents, whether they voted yes, no, or not at all, why it is not preparing for all possible outcomes. The SJC was clear, Milton must comply with the law.
While the form of that compliance may not be finalized yet, Milton residents deserve to be ready to comply with the law, whether we're rapid transit or an adjacent community. The planning board has had time to make progress on these plans, and it's time for the board to do what it promised it would do, to plan for the future of this town. Please resume discussions on the district's scorecards, re-engage the town's consultants, and more importantly, invite the public to speak sometime other than a Thursday night at 7 p.m. A good start would be to reschedule the public meetings that the planning board canceled last November.
Please do your part so that we will be ready to comply with the law. We know we will have to, and that's what's fair for us. Thank you.
Speaker 1 (19:49–20:39)
Thank you. And Julia, who else do you see? Yeah, Carrie White. Okay.
Welcome, Carrie. Go ahead. I believe you're still muted, Carrie. Carrie's hand is down.
Do you see her hand is down now?
Speaker 7 (20:39–20:43)
Yeah, her hand is down. We have Douglas Hine, Ms. Hanbury.
Speaker 1 (20:43–20:48)
Okay. Welcome, Doug.
Speaker 13 (20:48–26:11)
Good evening, everybody. I'm Doug Hine, 453 Elliott Town Meeting Member, Precinct 2. I know we've got the action plan deadline due in about four and a half hours. Don't think we're going to make that, but that's actually not why I wanted to say a few words today.
I want to pose a question, and this is not rhetorical. It's a legitimate question that I want each of you to kind of hold in your own hearts, and that is, Do you acknowledge the possibility that at some point in time we may be required to comply with a zoning scheme that categorizes us as a rapid transit community? And like I said, that's not a rhetorical question. The reason why I'm asking something I guess so basic is that I've got about 22, 23 years of being an attorney under my belt.
And it's very common for clients of mine to come into the office and want something to be true so badly that they simply can't acknowledge the possibility that the outcome they desire is not what's going to happen. And I think there's no question that the supermajority of this board you know, feels that the HLC guidelines are unfair, improper, illegal, and I have some real deep reservations about them as well. I've been pretty vocal about the fact that I don't like what's going to happen to my street if we have to have a plan that complies with the rapid transit community designation. But be that as it may, if it's the law, it's the law.
What I'm suggesting to you all is that we need to be realistic about the possibility that we're going to be forced to take action at some point in time. Eric said a lot of the points I wanted to make about going forward and drafting a plan that complies with a rapid transit designation. And also, it doesn't limit your ability to draft alternate plans that either have us as an adjacent community or something entirely different. I certainly don't think it's a bad idea to have different options on the table.
But here's the reason why I think you should continue to work on a rapid transit categorization compliant plan to prevent the worst case scenario. And the worst case scenario is the thing that people, I think, don't like about the MBTA Communities Act to begin with. Loss of control. Loss of control over our zoning.
And I'm not saying this to, you know, use hyperbole or try and scare you or anything like that. The Commonwealth itself, in their pleadings, have asked as relief to have the court appoint a special master to dictate precisely what our zoning would be if we don't do it ourselves. That's the worst case scenario. And it's something that really should concern this board in this town.
And I don't think people are worried about that possibility. That's why I started off by asking the basic question. Do you acknowledge that's a possibility? It is.
It's something that grave you have to guard against. The only way to do that is to go forward with a rapid transit plan. That doesn't mean that you have to put it to a vote at town meeting. It just means that you have to have a plan ready to go.
Because if you don't, and if the worst case scenario does happen, and if a special master is appointed, that person might look to the past to find a compliant plan. And by that, I'm certainly referring to the one that passed town meeting, but then was ultimately defeated by a townwide vote by a significant margin. I think the residents of East Milton should want you to come up with a rapid transit plan, compliant plan. The work that's been done over the past summer, I think, were steps in the right direction and addressed a lot of the fears from that section of town and took a lot of the newly zoned housing out of East Milton.
away from the on-ramp and put it in different parts throughout town. But if you don't go forward with that plan and at least have it ready to go, if a special master gets appointed, the folks at East Milton might be looking at you and asking, well, why didn't you have an alternate plan ready to go? And certainly, when doing that, whether it's drafting that plan or alternate plans, have community meetings. Let the public know about what you're thinking, what you're trying to do.
I think that's the best thing that you can possibly do to guard against that worst case scenario. And I've kind of accepted the fact that there's going to be some form of litigation in this case. I think there's just no two ways about it. I wouldn't be surprised if we get sued in the near term emergency guidelines and the action plan.
I think that would be kind of a dumb suit, but it doesn't get at the real heart of what I think people have a problem with, with the regulations. But, you know, those chips are going to fall where they may. Guard against that worst case scenario. You might not want it to happen.
You might not think it's going to happen. I mean, I have life insurance. I hope I'm around for a long time, but I pay those premiums every year because you got to guard against the worst case scenario. And moving forward, drafting a variety of plans does that.
So I urge you to continue that hard work that you folks started.
Speaker 1 (26:12–26:13)
Thank you. Thank you.
Speaker 11 (26:14–26:15)
OK.
Speaker 1 (26:15–26:40)
All right. I think it's time we should move on at this point. I think that was everybody. So next item on the agenda is our East Milton Square zoning with MAPC.
And Julia, do we have Josh with us? Is Josh here? All right, so we can let him, invite him in.
Speaker 14 (26:47–26:48)
Good evening, everyone.
Speaker 1 (26:49–26:50)
Hi, Josh. Welcome back.
Speaker 14 (26:52–26:55)
To turn my video on, I will need to be a panelist.
Speaker 1 (26:56–27:22)
Okay. Julia, can you make Josh a panelist? Oh, there you are, okay. Great, thank you.
Speaker 14 (27:30–27:31)
So do you want me to start off?
Speaker 1 (27:31–27:39)
Yes, all right, I didn't know if you were all set. Okay, ready. Welcome. If you'd like to begin just by introducing yourself again for those who are.
Speaker 14 (27:40–27:47)
Josh Fiala, Principal Planner and Land Use Manager at the Metropolitan Area Planning Council, been assisting the town with the East Milton Square zoning.
Speaker 1 (27:47–28:00)
Great. Thank you. And if you'd like to run through, you had sent a memo with some of the updated changes, which were great. If you just want to go through and have any comments that you would like to make initially.
Speaker 14 (28:01–28:03)
Sure. Would you like me to bring that up on the screen?
Speaker 1 (28:04–28:09)
Sure. That would be great.
Speaker 14 (28:15–30:41)
Here's the memo that I prepared based upon the conversations, believe in the last two planning board, maybe not last two consecutively for the board but the last two which I have joined you with. And these were changes to both the commentary memo, the zoning language itself, and the East Milton Square design guidelines document. I would say relatively minor comments and changes overall, but I think some important, following up on important conversations that we had together. Let's see if I'll just touch on some of the more consequential, fewer typographical type errors that we don't need to go over again.
We did add an additional purpose statement at the suggestion of the board to preserve and enhance the historic character of East Milton. We modified some of the language around the historic preservation provisions to clarify those and when the additional review would be required if deemed historically important, making that clarification in the language. Clarified the Harmon Zuckerman, PB — He, Him, Hissssssssssssssssssssssssss clarified some items which are in the commentary memo only, more about just making sure that some of the references there were accurate, which are cleaned up now. And on the, so that all occurred within the commentary memo and the zoning language itself.
In the design guidelines document, we changed a reference to drugstores to a reference to pharmacies, and then modified the date ranges to correspond with the 1940 date cutoff to deem a property historically significant to further, to trigger further review, and therefore reorganized the date ranges of the percentages of buildings which were built within the different ranges to also hit 1940 so that that can be seen more easily.
Speaker 1 (30:44–31:56)
Great. Good. That was an excellent summary. Did anyone have questions on any of these changes that were made?
Josh, I just had one question. Could you pull up the memorandum document And on page 16, and I don't know whether this was during the change, but the first sentence isn't complete, and then it, I think it could be, let's see, at least in the draft that I have. Page 16 at the bottom, it would be under, at the very bottom, under maximum building height, below the looking forward quote. It begins with if the proposed zoning is currently recommended.
So if then what and I was thinking you could actually take out the tip at the bottom sentence and then you could say MAPC recommends that the town consider increasing. So you could just.
Speaker 14 (31:57–32:06)
Yeah, or I might suggest in that first sentence adding additional modifications might warrant exploration or something to that effect.
Speaker 6 (32:06–32:11)
Yeah, that's great. Is that acceptable? Can you show where that would go again?
Speaker 14 (32:13–32:46)
Right here. So that would read, if the proposed zoning as currently recommended is not successful in attracting future development, then future zoning, sorry, I said it better the first time, exploration of future zoning modifications may be warranted.
Speaker 1 (32:49–32:50)
I think that's excellent.
Speaker 3 (32:50–32:55)
I'd like to change. Now, is that an example of something that would not have to go to town meeting?
Speaker 6 (32:55–33:09)
This is the commentary, so it's not the language of the zoning. This is just in the commentary that I think would be on the website, on the town website. But it wouldn't be in the body of the zoning.
Speaker 4 (33:09–33:10)
Yeah.
Speaker 14 (33:11–33:17)
Just to be clear, though, what that sentence is suggesting would be something that would go to town meeting. Yes. Good enough.
Speaker 3 (33:18–33:18)
Thank you.
Speaker 11 (33:20–33:21)
Great.
Speaker 2 (33:22–33:42)
Josh, I just have one question and it just kind of surprised me. It read in one of the changes that you made that, I think it's a change that you made, that 17% of the parcels have no structure. Is that right? 17% have no structure.
It just struck me that there was that many parcels.
Speaker 1 (33:42–33:47)
Yeah, I was too. I was surprised.
Speaker 14 (33:47–34:06)
Yeah, I think the… The parcel lines may not exactly correspond to how people perceive whole properties. I think there might be some portions of a property may, for example, be split into two where the parking lot, for example, is actually technically a separate parcel, which adds to that percentage. OK.
Speaker 2 (34:06–34:12)
OK. Yeah. In that respect, that's a bit misleading. But maybe my interpretation was…
Speaker 1 (34:12–34:54)
Incorrect, so thanks So Josh then Not because it not to avoid being redundant The last sentence then says then MAPC recommends that the town increase Which I would like to say consider increasing Because I don't think it's absolute we would can we would consider it but Is that redundant to the first sentence that MAPC recommends? Or just MAPC recommends it taking then? I guess it's the then. Starting the sentence seems awkward.
Speaker 14 (34:54–35:07)
I don't know. OK. Yeah, I can clean that up. I do like giving the first sentence more general because we offer some suggestions, but there might be other things that the town might consider.
Speaker 4 (35:07–35:08)
Right.
Speaker 14 (35:09–35:10)
in the future that are not listed here.
Speaker 1 (35:16–35:37)
MAPC recommends that the town consider increasing. Would then? Let me see. Would then recommend?
MAPC would then recommend? Because it's reactive to the…
Speaker 4 (35:41–35:56)
Okay, yeah. Considering.
Speaker 14 (36:06–36:16)
I'm in trouble with the comment feature. Okay.
Speaker 1 (36:17–36:28)
Yeah. Yeah, that's. OK. Because sometimes those reports come back or those comments come back and it didn't capture.
Speaker 6 (36:29–36:32)
He's got it just as a note in the side. Yeah.
Speaker 14 (36:32–36:46)
Yeah, I've got I've got them here. So, yes, I'm sorry. I'm in a PDF right now, not the Word document. So it's I can't live at it.
But got it. OK. But I've got I've got them all as comments here. OK.
Speaker 1 (36:47–38:30)
So I thought those, any, any other comments from the board on anything? And I thought those were great. All those the changes that were made were good. The only thing I'm still struggling with the map.
So and and honestly, I don't know that we have to make a final decision on the map before we do a community forum. We might want to get public input from the community. And again, I'm fine with the post office because I do think it has some productive the underlying zoning would always still be there, which is commercial. It would just be, there would be triggers for historic.
So I did feel better about that. What I did think that we really should think carefully about is the food center is on, it's a residentially zoned parcel. And if you look at the map, it's the biggest parcel, which could have the greatest impact to the residential neighbors buffering it. So I would think, because I mean, the map would, it would be smaller, it would fall mostly along the Granite Avenue and Adam Street.
But by removing that, it would give us just additional site plan approval and, you know, if it was a significant change that I think we would have the opportunity to weigh in. If we did this by right, we're automatically allowing a height, a certain amount of height, a certain amount of…
Speaker 6 (38:32–40:24)
we can see through some of the applications that have come before us, which is businesses that have been operating or a business use has been operating on a property for decades and decades and decades. But yet the underlying zoning is not business. And so any change is risky and therefore it limits the opportunity for the property. And it really, I think, puts the use at risk.
So having a clear path is much better for everyone, I think, for the business owner, for the neighbors, and for the planning board. Because having to decide whether it jumps to ZBA or not, or whether permits are triggered here or there, when we have these uses that are you know so long business that there's it's just not productive to have residential zoning underlying it so if we're going to try and move our zoning forward it seems to me we should we should tackle that we shouldn't We shouldn't leave it out. I think we put the protection in site plan approval that allows us to guide. And this would have site plan approval even under as of right.
And I think, you know, we all spoke quite a bit at the Warren Committee about why we felt it was really important to keep that in. Right, right. So, you know, that's to me, strikes the balance, you know, of what you're talking about in terms of being concerned about a process. I think that site plan approval gives us a process, but it also gives us a more predictable path.
Speaker 1 (40:26–40:31)
Yeah, it's just something to consider. I think, Jim, you had brought up that. I think you were the one who brought up it.
Speaker 3 (40:31–40:41)
I'm really torn on this one because we're now changing the rules for, what, 20 abutters and then beyond in that neighborhood. And by right is by right.
Speaker 1 (40:42–41:01)
And I think that's where the advantage will be when we have a public forum and we get to hear from the East Milton residents. I would like to you know, not necessarily make the decision tonight, but I do think it's an important direction that we that we want to get public input on, especially.
Speaker 6 (41:01–41:42)
One thing I also want to neighborhood. Sorry. Yeah. Just one other thing is that when the Falcone's were looking at their property on Bastion Street, they and there was a lot of angst amongst the community, residents came to the planning board and said, give us an overlay.
Give us a clear path so that we don't have to negotiate each property. And we're not doing that if we selectively take some properties out. So that's just another thing that I think we should consider.
Speaker 5 (41:43–43:24)
And also we need to consider we're also undergoing an economic development plan at some point. And I think whatever sort of we decide on this business in this residential district would set a precedent for other businesses in other residential neighborhoods. So I would proceed with some caution because there are a lot of other businesses, mine included, that are in residential neighborhoods. And I really would advocate if we do for this one, we would have to do for all.
So, it is beyond, this conversation I think is beyond just East Milton. We have other, not just my business, but other businesses in residential neighborhoods. You know, you look down on Canton Ave at Franny's Corner. So there's a lot of, you know, down on Brook Road at Milton Food Mart, where we did pass some zoning in the past few years and nothing's happened there.
But that's another corner, as well as the 711 on Route 28. So if that's the road we want to go down, then I think that we have to look at townwide.
Speaker 14 (43:26–43:26)
We've been studying.
Speaker 1 (43:27–43:28)
Oh, yeah, Josh, go ahead.
Speaker 14 (43:28–43:54)
But I just wanted to add one detail to the conversation right there. That may differentiate this parcel relative to some other business properties in a residential zone. The property today is technically a split zone property. So it does have a portion of its front near Granite Ave corners, which are in the business district.
So it is both business and residentially zoned today.
Speaker 1 (43:56–44:18)
Right. Yeah, that's true. That's helpful. And I think in all of this, we'll just really will need to listen to the public and want to hear how.
how folks feel about it. But I agree with Cheryl, what you're saying, you know, this is one of our the goals that we're trying to achieve is to offer opportunities that prevent 40 B projects.
Speaker 6 (44:19–45:36)
So that's having a more predictable path provides opportunity for property owners that they don't have now. And that's I think something people need to recognize is one of the challenges that we have. We have, no offense to our applicant coming up, but we get Dover protected uses and we get 40Bs on properties that were something else besides single family when there's no other alternative for them than the single family. So we have to recognize that that's been an issue, and we should address that issue.
And it's, like I said, it's not I mean, some might wonder why we have had at least three daycare centers reviewed since I've been on the board, at least three. And we haven't had too many mixed use developments. We haven't had too many business. We've had some minor modifications.
But our business districts have changed very little in decades and decades and decades. And we have to recognize it's our regulatory environment that's causing that. in large part.
Speaker 1 (45:39–45:52)
I just wanted to put a pin in that because I didn't know if we wanted to express any opinion. My feeling is I'd like to wait through the forums and public hearings.
Speaker 6 (45:52–45:59)
But do we, are we, if we plan to submit… We keep it in. I think we keep it in. Yeah.
Because if we plan to submit, we need a map, as we learned recently.
Speaker 1 (46:00–46:01)
Exactly.
Speaker 6 (46:01–46:05)
If we've missed the maps, then we're not really having… And we wouldn't be adding more.
Speaker 1 (46:05–46:14)
We would be taking it, you know, during the process. So, okay. So Josh, continue if you want to highlight anything else topic-wise.
Speaker 14 (46:16–46:55)
I think that was it. I think that the map was, we have discussed previously, and it sounds like the board is comfortable enough perhaps to, as you just discussed, take it for further discussion, final discussion with the community. depending on how that conversation goes, we can make some revisions, but proceeding with, I would say that if the desire is to submit a package to get it in line with the warrant, I think you have a package which is ready to do so and then can be subject to further final adjustments.
Speaker 1 (46:55–47:20)
I would agree. Should we look at meeting dates now for a possible forum? We would have to post it, so we need at least two news cycles. So Julia, what would be sort of the earliest time frame that we could host a public forum?
Speaker 7 (47:22–47:50)
Well, I have to go into the paper the Tuesday before noon, before the paper comes out. So, looking at the calendar, we've got it posted on this coming Tuesday, the 18th. It could go in the paper on the 20th and 27th, and then we could have a forum on the 6th of January.
Speaker 1 (47:53–48:01)
Does the 6th work for people? Josh, does that work for you? March 6th. March 6th.
I think we had tentatively talked about the 6th as January 4th.
Speaker 6 (48:01–48:05)
Yeah, I think I put a hold on it. So that works for me.
Speaker 14 (48:05–48:10)
I do have another evening forum on the 6th.
Speaker 5 (48:11–48:16)
OK. All right. What about the 5th? Would the 5th work?
Speaker 14 (48:17–48:25)
The 5th, did that week. is tough. The fifth does not work for me as well.
Speaker 1 (48:27–48:39)
Okay. Um, and you're saying that whole week, cause we really, I think you would prefer to go to the following week then with that?
Speaker 14 (48:41–48:46)
The 10th, 11th, 12th. Is that, is that too late for the warrant?
Speaker 1 (48:46–48:51)
Cheryl and I have something on the 12th, a meeting on the 12th. But the 10th or the 11th?
Speaker 6 (48:51–49:09)
I have, that's when the Milton Marketplace is at the ZBA. So I don't know if that's the best time because people might be tuning in who would be interested in both. So maybe the 11th? The 11th?
Speaker 7 (49:10–49:11)
The ZBA is on the 10th.
Speaker 6 (49:12–49:19)
Right, ZBA is on the 10th. So we could meet on the 11th? Would that work, Josh, for you?
Speaker 14 (49:20–49:27)
That would work, I believe. Let me just see. I'm going to check my colleague's calendar so I can have it.
Speaker 1 (49:28–49:29)
And that's before, yes.
Speaker 14 (49:33–49:35)
Yeah, Tuesday, March 11th, that looks like it would work.
Speaker 1 (49:36–49:46)
OK, great. Let's plan on doing the forum on the 11th. Did we do it at 630? I feel like we did it a little bit earlier.
Speaker 6 (49:46–50:03)
I think it depends which room it's in. Like, if you do the library, you probably want to be at 630. I think we'd wanted to do it back at the arts center. At the arts center, right.
OK. So definitely, we need to check their availability. Yeah.
Speaker 1 (50:04–50:17)
All right. Why don't we do that, Julia? Can you tomorrow morning, if you have a chance, check the availability at the Milton Arts Center? and then send an email confirming with Josh and the board?
Sure.
Speaker 3 (50:17–50:20)
Yeah, I'm sorry, we're shooting for 6.30 or 7 at the Art Center?
Speaker 1 (50:21–50:28)
7 would probably be better for people to get home from work. So 7 p.m.?
Speaker 7 (50:28–50:34)
Okay, and would your second choice be the library?
Speaker 1 (50:36–50:54)
I think so, that the library would be the second choice. Yeah. OK. That would be good.
Great, Josh. You did a wonderful job with that last time. So that'll be great to have you back for that.
Speaker 14 (50:55–51:10)
Does the board have any suggestions or preferences about the format of that meeting? A presentation, I imagine. But do you have more of an open house or Q&A? Or what do you think the community might best benefit from in terms of form?
Speaker 6 (51:11–51:24)
I kind of like the same as last time with the survey and people were able to… Well, at this point, though, we're further along in the process, so… We sort of have our plan to present, and we will have already submitted it to the Warren Committee.
Speaker 1 (51:25–51:29)
Oh. Just for review, you know, just to start looking at it.
Speaker 5 (51:29–51:44)
So I guess the question is what… The goal of it is just to get feedback and allow for some revisions depending on the feedback.
Speaker 6 (51:45–52:35)
I think one thing I would suggest, if you think about the people who went to the last forum and didn't tune into the planning board meeting since then, just kind of bring them back up to speed to how you took the feedback and you adjusted the zone, or you drafted the zoning based on that feedback, based on all the content that you And the comments that you receive because that's what you told us Right some time ago, and then we've reviewed it a couple of times So I think it's just bring them along bring people along to how where we are today from there and I think we set the table that We've been at this a long time and we've taken a lot of feedback and we have some opportunity for some additional comment, but we hope that they agree that it's ready to go to a vote.
Speaker 5 (52:36–52:50)
And so maybe we can send this to the East Milton Neighborhood Association and have them distribute it, especially with all the commentary, so they understand how we got to.
Speaker 6 (52:51–53:05)
I would also say to the Chamber of Commerce, because remember, most of these property owners are business property owners, not residential property owners. So they have, in my mind, they should have as much of a say as anyone.
Speaker 1 (53:06–53:23)
And then maybe, Joshua, you could run through the design guidelines, because I think that just some pictures always help people. And you did a great job putting together some examples, just sort of highlighting things, not going in detail.
Speaker 6 (53:23–54:26)
So one thing I might suggest too, because a lot of people may not be familiar with how the process works when we say something's as of right on the three story. Let's just talk about what that looks like once this passes. Somebody wants to come in and they want to do an application for one of these properties. What does this zoning tell them?
And then what's the process? that they would follow in submitting a project, and how there's opportunity for community feedback during that application process. So, you know, because it can be very technical, and we're used to looking at zoning language, but for most people, I think we want to explain what it does for them, what's beneficial, like I said a few minutes ago, about setting a process that's more predictable. And people's comments have already been put into this zoning, and so those would stay.
They don't have to renegotiate all of those things on any application that comes in. I think those are the kinds of things that are important to communicate.
Speaker 2 (54:26–55:23)
I think, I'm sorry, to support what your thoughts are, this type of language, and there's a lot that's been prepared here. It's overwhelming for someone who's just picking it up to look at it. in trying to trying to ascertain whether they're supportive or whether they have questions. I think what you're describing is probably how a lot of people will be challenged by this, but if Josh could do some examples.
Let's say, for example, you know, and Josh create three or four examples of different projects that might, you know, this might be applicable for, and let people understand whatever those particular projects might be, how it would work. You know what I mean? I think it would be helpful for people, because an awful lot of people, it's, There's a lot of information here that's just not part, this is part of your language every single day, you know, but it's not, not everybody has your professional experience and background. I think it'd be really helpful.
Speaker 6 (55:23–55:28)
What do you think about that, Josh? I don't think Sean's asking you to design projects. Not at all.
Speaker 2 (55:29–55:51)
Not at all. No, Josh, but for example, say if an applicant that wanted to propose this type of a project and describe something, and just create a few of those scenarios that residents could hear you explain, and they'd be able to recognize how this overlay would allow projects to be built.
Speaker 5 (55:53–56:19)
And maybe take the Milton Marketplace as an example, that's the largest piece in this puzzle, and or the Citizens Bank on Granite Ave, and use that footprint and plop on a visual, like a worst case scenario visual. so people could see what could be there.
Speaker 6 (56:19–56:39)
Then he has to make some program assumptions and design assumptions. I think one thing you could do is take it and diagram out where the setbacks would be, what the building envelope could be, Josh. Maybe what the parking requirement would be if you maxed You reached the maximum floor area that you could build.
Speaker 4 (56:39–56:40)
Something like that.
Speaker 6 (56:40–56:46)
I think you started doing that at one point when you were showing us… Santander Bank.
Speaker 4 (56:46–56:48)
Yes, exactly.
Speaker 1 (56:50–57:25)
And I think opening up with the background and context that you've written, sort of going back to the beginning and telling the story about how we got to where we are right now and some of that history. And then I think your commentary, you could almost pull this up and go through your commentary and read from those sections, because I think those are really, really helpful. and maybe highlight some of those, touch on building height, what's in the zoning, rather than going through just the zoning, which is strictly, this is more.
Speaker 6 (57:25–57:55)
I think the important thing for people to understand, it allows a mixed use. It requires a portion of first floor commercial. It allows a total of three stories under site plan approval, which is the as of right piece of it. lay out what the parking requirements are.
But then I also would say, say lay out what the challenges are as you did, you know, in the commentary and lay out what we hope to, you know, accomplish with it. You know, that's, that's really the important part.
Speaker 1 (57:55–58:21)
And there's a lot of protections in here for East Milton. So we want to let them know historic character, you know, what all the goals are and sort of the protections. So I don't know if like an hour dedicated to that, but I would like to allow, I want to hear from East Milton if we can at that time and allow them, you know, maybe the first hour we we present an overview and then open it up for questions for the residents.
Speaker 6 (58:21–59:39)
So one thing, just thinking about having watched and heard select board meetings recently and discussion of an override and hearing people comment about our structural deficit and lack of commercial tax revenue. One thing to think about is what kind of economic opportunity might this unlock in East Milton? I think that was one of the early drivers of this too is that our business districts aren't contributing a lot to the overall revenue of the town. So in part because our zoning really doesn't Has so many restrictions.
It's pretty difficult to redevelop any of the properties currently So I don't you know how Josh you did a build-out analysis in Milton Village where we kind of estimated how many? How much commercial space and how many units might? be yielded if, you know, a certain percentage of the property did change over. Is that a complicated or time-consuming thing to do at this juncture?
Or is there something that could give us some estimate of what the opportunity this zoning brings from an economic development point of view?
Speaker 14 (59:43–01:00:41)
They typically are a bit complicated and quite dependent on the assumptions that we make in terms of development program and approach to the various properties. It's unclear whether or not that effort would be helpful because it's not, as I think we've discussed this at length in other circumstances, but the The difficulty always with build-out analyses is that it compresses what is typically an incremental and long redevelopment and reinvestment process in a district to a single number. And it gives the impression that that type of change will happen overnight or with the flip of a switch or the approval of zoning. And that is not, in fact, how real estate reinvestment and redevelopment works.
Speaker 6 (01:00:41–01:01:13)
Years if not decades for a Substantial build-out and reinvestment to occur even with the zoning changes that we can talk about it But what about like if you were going to pick like two or three properties like Sean suggested and you would at least do the math to determine what that new development program might be and then we could look at what that might generate from tax revenue as compared to what's generated now and just use one example or two or three examples.
Speaker 5 (01:01:15–01:02:14)
So the concern that I have with that is similar to the concern with RKG's analysis with MBTA zoning was just this is for mixed use and they assume a fewer amount of kids in our school system. So that's what I'm a little bit hesitant. I've listened to conversations about new growth in the town. And even when I talked to the assessor, they're always talking about, oh, this is new growth, but they never really project new expenses.
So there's always a trade-off for new growth. So that's why I'm a little bit, So I'd like to see the revenue part of it coming in. But we have to also be realistic since we are creating the opportunity for new housing, more housing. There just would be more expenses too.
Speaker 6 (01:02:17–01:02:22)
All right, so maybe that's something that we can talk about without quantifying, maybe?
Speaker 4 (01:02:22–01:02:23)
Yeah.
Speaker 1 (01:02:23–01:02:29)
And I think the language that's in here is good, Taka, that Josh has written on opportunities in that area.
Speaker 6 (01:02:31–01:02:55)
So I think I'm comfortable tonight advancing the article for the Maytown meeting. I would make a motion. I'll make a motion to submit the East Milton mixed-use overlay. Did we call it a PUD by the way, Josh, on this one?
No. Okay.
Speaker 4 (01:02:55–01:02:55)
No.
Speaker 6 (01:02:55–01:03:05)
Okay. So the East Milton mixed use overlay zoning, uh, for consideration, um, for town meet the May town meeting. Is there a second?
Speaker 1 (01:03:06–01:03:09)
A second. Okay. All in favor. Can I just amend that?
Speaker 6 (01:03:09–01:03:15)
Sorry. With the map that's attached. Yeah. Which would have to go with it.
Yeah.
Speaker 1 (01:03:16–01:03:43)
Yeah. Second the amendment. Okay. Okay.
All in favor. Aye. Great. So Julia, we can send maybe, I mean, maybe we wait, just touch base, but we'll let the select board know this is going to be coming.
I know they were already thinking about Maytown meeting and what was going to be, what articles and what things would come forth. So we'll connect on that.
Speaker 6 (01:03:43–01:03:58)
So can I just say to Josh too? Josh, thank you. It's been a journey. It feels like a culmination of many, many years of work, and you brought us in this last leg of it, picked up the last leg, so thank you.
Speaker 1 (01:04:00–01:04:03)
You've done an excellent job. Yeah, I'm really grateful.
Speaker 14 (01:04:04–01:04:18)
Thank you all for your labors in it and effort and dedication to it. And we hope that the community receives it well at that final forum. And we believe it has been very responsive to the community's requests and needs. Great.
Thanks very much, Josh.
Speaker 1 (01:04:18–01:04:25)
Thank you. Nice evening. And we'll confirm with you as soon as we hear that Milton Arts Center or what the location would be.
Speaker 2 (01:04:27–01:04:29)
Fantastic. Thank you. Great. Thanks, Josh.
Speaker 1 (01:04:31–01:04:43)
All right, so next we have the 227 Pleasant Street Pine Hills Garden as built plan. We had a few things to come in today, but Marion, if you want to come and join us.
Speaker 5 (01:04:46–01:04:47)
And can I just say something?
Speaker 1 (01:04:47–01:04:48)
Oh, yes.
Speaker 5 (01:04:48–01:05:30)
All right. So I just wanted to let you know that I spoke with the State Ethics Commission today regarding the potential of an appearance of a conflict of interest, because my business has hired Attorney McGetrick and has hired the engineer Giselle Burke, who is involved in this agenda item. Ethics suggested I file a written disclosure, and I did that today with the town clerk. I'm just publicly stating that and they said because I do not have any financial interest in this Agenda item now that I'm able to participate in this discussion.
Speaker 8 (01:05:32–01:11:03)
Thank you I'm just here tonight to talk to you about an as-built plan for 227 Pleasant Street, which is pine gardens development It's a small development with pretty big houses. It's on a little hill off Pleasant Street, and it's taken several years to be completed, but all of the houses have been constructed. Mostly they were sold, the lots were sold, and then the houses were constructed by the developer with the new owner. And each house has an occupancy permit and is occupied.
We did finally have DeSalle Burke finish an as-built certified plan. The plan, the as-built plan, shows the lot layout, shows where the roadway is, shows where the utilities are, the drainage systems. It's not all of the pages of the plan for the subdivision, but it's important. And one other thing that had to be done with this as-built plan the scale had to be changed for this plan because DPW didn't like the scale they used in the original plan, and they did do that.
So, Meredith very appropriately asked me, I think today, I asked her whether you wanted large copies of the plan. If you approve the plan, then I will order from DeSalle Burke a Mylar, and then you will have to sign that Mylar. And I think right now where you don't have a regular, you only have an assistant planner, I think maybe the board members are gonna have to sign it. But you can do that as you're able to.
So the question from Meredith, though, was, do you have a letter from DPW or a letter from the building department? you know, whatever it is that you need at this point. And I have to admit, I wasn't sure. But then we sent out inquiries.
So I have to say, I really appreciate the response immediately today, because Walter White responded. He's our interim, one of our interim building commissioners. He's off today, but nevertheless, he did respond. and indicated that yes, each house has an occupancy permit and he personally was the one who did the inspections.
So as far as the building department is concerned, this development is done from a building code and occupancy permit standpoint. Then the next question was to the DPW and it's kind of a town engineer DPW question. Right now we have a DPW director, no town engineer, but she was the town engineer. So again, She was very nice to respond because she's out.
She's ill. But she nevertheless did respond. She provided a letter to the board. And if you haven't had a chance to look at it, I can read it to you.
It's one page. And she also said that she's looking for a grant of easement, which is correct. This is a private road. And like most of these developments these days, it's a private road, private drainage structures, private septic sewer line.
But the town does not do private water lines. They want to control the entire water system. So they need to be able to get in. They had to approve the water line.
It was installed by the contractor. But they need to be able to get in later to do maintenance. And we also have to be able to maintain the fire hydrant. And sometimes there's emergency access required.
So what I did was to take the grant of easement that I had done for Wentworth Farm several years ago. It's a bigger development, but the same type of private and not private infrastructure. And I sent a draft back to Marina to review. She probably, she may not have reviewed it yet.
because we kind of crossed. I sent the easement. She sent the letter saying I'm going to be looking for that. I also sent her a copy of the Declaration of Trust, because the Declaration of Trust explains in detail that all the things Marina expressed concern about here are private.
So the drainage system is private in all parts of the drainage system. The sewer lines are private. The road is private. The light is private.
Those all have to be maintained by these five homeowners. If we do get, when we do get an as-built plan approved, I'd like to record this grant of easements before this happens. But the Homeowners Association is supposed to take over management. And then they will become responsible, for example, for plowing.
So the developer is still doing the plowing. So of course, he would really like to be able to hand it over. But the grant of easements usually has to be reviewed by town council. Then it comes back to the town administrator at the next available meeting.
I believe they still do it this way the members of the select board have to approve it and then they sign it But what I like to do is to have a document ready for signature So what if town councils approved it then we provide that document they sign it at their meeting then I could take it and record it because I'll be able to get the the grant or signature ahead of time so it appears to me that that these sort of supporting elements are complete, and I managed to get a response, surprisingly, the same day that you asked. The only question really for me, at least, is on the plan itself. Do you have any questions? And do you have that so that you can look at it on your laptop?
Sorry that I didn't. I asked, my original inquiry was.
Speaker 3 (01:11:03–01:11:04)
Do you want to share it?
Speaker 8 (01:11:05–01:11:42)
No, that's okay, unless, I will if you have a question. So, what would you like to know? So regarding the easement, is that reflected on the plan? No, the easement is recorded at the Registry of Deeds.
But it typically would not be on? No, I don't, I suppose, well, I could ask them to put it, Actually, I don't have it recorded yet. That's the problem. If I get it recorded, and maybe that would make sense.
Let me make a note of that. I can have the engineer put a note on the plan. That would be, I think that's helpful. The grant of easement.
Just whoever's looking at that.
Speaker 3 (01:11:42–01:11:45)
Just for the water, though, not for the gas or the sewer.
Speaker 8 (01:11:45–01:12:37)
Well, it's to the recorded grant of easement. And then this is the grant of easement, which I'm supposed to pass out to you, but I didn't. So just so you can see what it says. This is just a draft.
It hasn't been approved. But there are two copies and one more. I have one here. So when someone looks at the development plan and they see the note about the grant of easement, they'll see the recording reference.
They look it up. They read it. They know if they're buying from one of these first buyers, they know what the easement says. And then there are, you know…
The grant of easement actually references a number of other documents, like the subdivision plan, like the subdivision control approval decision. So once you read the grant of easement, then you're led back to other documents that affect this development.
Speaker 1 (01:12:37–01:12:48)
That's why it's important, I think, that it's reflected. You're right. I was selling a house on that lot, and you wouldn't know about the easement, and then you'd have to go try to track it and find it.
Speaker 8 (01:12:48–01:13:10)
So if you're satisfied generally with the As-Built plan, I would not be returning with a Mylar until I have the engineer put that note on. And it might take a little while because I want to wait until I have a recording reference. That would be great. So I hope that the developer will be understanding of that, but we just have to have it that way.
Speaker 1 (01:13:10–01:13:36)
Yeah, but it sounds like everything's just in great shape and ready to, and it's a great, glad that all the homes are sold and it's a, yeah, a good project. There were also, it just, it referenced in just the letter, along with minor updates and adjustments to the submitted as-built plan. Do you know what those minor updates were? So the last, second to last paragraph, last sentence.
Speaker 8 (01:13:39–01:14:21)
And is that anything that should also be reflected in the plan? Well, I can tell you that until the minor updates and adjustments are explained and put on the plan, you're not going to get an S bill. You're not going to get a Mylar back to sign. So I just make a note, you know, you should expect to see it, but it won't be for probably for several weeks.
No, I don't know what that is, because I did see it, but I didn't want to call Marina at home, since she's not feeling well. But I will be talking to her to find out what that is. But I'm also assuming that Kyle, oh, no, not Kyle Harnish. I think the engineer called her to check on the status of this design plan.
Speaker 1 (01:14:21–01:14:21)
Is it Skye? Yeah.
Speaker 8 (01:14:22–01:14:32)
From the engineering department? I think they spoke directly to Marina, but they could have been talking to Skye as well. So we will find out. And you're right, there's, I'll make it just a little check.
Speaker 5 (01:14:33–01:14:34)
Didn't we get a letter from Stuyvesant?
Speaker 1 (01:14:34–01:14:39)
Yeah, well, it was the same thing. It was just another email that I just wanted to forward any correspondence I had.
Speaker 8 (01:14:42–01:15:10)
So the question is, the plan that you're looking at is still subject to minor adjustments. So what I will tell you I will do is, once those adjustments are on it, then we have to get another signature anyway. So I'll send it for information purposes to all of you, and that will be before I come back to get the signature on the Mylar, and before I put the note with the grant of easement. Let me just see if there's anything else that I didn't notice.
Speaker 1 (01:15:10–01:15:14)
Everything else looked good.
Speaker 8 (01:15:14–01:15:50)
Yeah, the notes about what remains privately owned, those are good comments to make, those are reflected in the Declaration of Trust. And the grant of easement only allows the town to go in and maintain what it owns. And the only thing it owns is the water line, basically, and the fire hydrant. That's great.
So I don't know whether, yeah. Do you, I'd rather not, so are you willing to take a vote that you're satisfied with the as-built plan, subject to the minor adjustments that are to be made, and then I don't have to come back for another vote for amusement?
Speaker 6 (01:15:52–01:15:53)
I will be fine with that too.
Speaker 1 (01:15:53–01:15:56)
Okay.
Speaker 6 (01:16:01–01:16:23)
So the actual vote is to accept the As-Built Plan. and that would be subject to the inclusion of the easement language and the minor adjustments referenced in the letter from Marina Fernandez, right? So that's my motion.
Speaker 1 (01:16:24–01:16:27)
Second. Any discussion?
Speaker 6 (01:16:27–01:16:28)
Nope.
Speaker 1 (01:16:28–01:16:29)
All in favor? Aye.
Speaker 8 (01:16:30–01:16:30)
Great.
Speaker 1 (01:16:31–01:16:32)
Thank you very much. Thank you. Thank you.
Speaker 8 (01:16:33–01:16:45)
Also, I'll just review the notes in here and if I think there should be more notes related to the OK, great. It's too small for me to read right now. But I'll make sure of that. So thank you very much.
Speaker 6 (01:16:45–01:16:45)
That's great.
Speaker 8 (01:16:45–01:16:49)
Thanks for meeting with me tonight. And I have a way forward now.
Speaker 1 (01:16:54–01:17:14)
Okay, so on our agenda next, welcome. We have our public hearing continued on site plan approval for Zero Blue Hill Ave, parcel B7-5, continuing from January 23rd. Welcome, if you just want to introduce yourself again for the public, that's great.
Speaker 15 (01:17:15–01:17:40)
Yeah, absolutely. Chris Fassenden with Viking Development here about Milton Avenue, Zero Blue Hill Ave. I'll happily share my screen if Julia wants to promote me and then All of our consultants are on the zoom link should be civil architectural and traffic great Julia
Speaker 16 (01:17:40–01:17:42)
It looks like she's getting you on.
Speaker 6 (01:17:42–01:17:49)
OK, great. And again, thank you for submitting your materials. I know in advance. Yeah.
Appreciate appreciate that.
Speaker 1 (01:17:49–01:17:55)
Even great. We've all been complimenting you for just how it's been helpful.
Speaker 16 (01:17:57–01:18:00)
OK. So.
Speaker 15 (01:18:01–01:20:47)
Is that loads? There we go. Last time, the conclusion of our meeting. There was a comment that we were getting close and that got me excited.
So we went back and we looked at some of the comments and takeaways, looked at the details, and it does feel like we are getting to those last little things. So I'm excited about that. With that, I'll say that I would like to set a goal for myself and maybe for all of us to maybe look at maybe a motion for an approval on this by the end with discussions of the last comments and any remaining comments. If conditions need to be discussed, that's that's completely okay, and I'd be willing to have those conversations.
Just looking back at all of this. We started in August. We started with pre up and neighborhood meeting and neighbors attended the first meeting and now we're here. You know, it's been six months of back and forth coordination, incorporating neighbor comments.
I really think we've developed a plan here, child care facility. I understand it's in the RA district, but it meets a lot of the regulations. I think it's a permissible project. Three meetings ago, we went through a full redesign, shrunk our building down, added additional buffer space to Butters.
Increased our natural buffer to the right of way, moved our detention system underground, removed a significant amount of retaining wall, limited disturbance, earthwork quantities, tree removals. We've now been through two peer review or a full peer review, two traffic counts. We've been through three reviews of a stormwater peer review. We're nearly complete on that.
We've looked at building exterior. We looked at retaining wall materials, plant layouts, those materials, snow storage location, parking quantities. I think you guys get the hang of it. I understand, and this is a point I wanted to make to you guys.
I think it was last meeting or maybe the meeting before, you guys made it clear you have a responsibility to the community to make sure everything's well planned, sustainable, beneficial to them. So I think that that's where our cooperation has been, trying to make sure you guys are able to do that while keeping in mind our brand, our prototype, trying to keep what the Gardner School is. So I'll run through the comments and takeaways page by page, plan by plan, show you exactly where everything was added. Feel free to ask any questions at that point and just kind of run through it that way.
Jim, you mentioned it right when we walked in. The first one is the window muntins. We had submitted this exhibit here as well as an updated elevation showing that revised design. It will go on all four sides of the building.
I don't know if you guys had a chance to look at it, have any questions. I think it was a good improvement.
Speaker 1 (01:20:49–01:22:43)
Well, I have a question. Just, and Jim and I, because I always agree with you that I'm always looking to do more of a classic look with more mullions. In this case, because there are so many windows and they're so tall, the biggest thing I look for in a building is consistency of some kind. And it's almost like you have two different styles going on, which…
to me, it doesn't look like, it doesn't feel like a cohesive look. And when I actually, because it was nice to see this, and I'm glad this is Jim, it was his suggestion, is that I think if you, to keep it uniform, if you went with the four over four versus the original, I think that it might look really busy with all of that on all of the windows. So I think I'm actually in favor of what they originally had as window. mullions.
I think it goes with the architecture, but, cause I'm normally always, that's more of the look I like, but because there's so many, if there weren't so many windows and I drove by the Goddard school today and you know, they do, they have like an eight over one, like they do, but it's broken up and they don't have nearly as many windows and they're, and they're shorter and wider. With this, I feel like it could get, really busy to do four over four on all of them. So, and I wanna hear from the rest of the others, obviously, but I think I originally, seems a little more simple and a little bit more appropriate maybe with the style of architecture. But I would open it up to everybody's thoughts on that.
Speaker 5 (01:22:43–01:22:51)
Do you have, can you easily bring up the original to compare? Yes.
Speaker 1 (01:23:09–01:23:15)
But I like that we're looking at both, so that's, I think it's.
Speaker 16 (01:23:17–01:23:22)
Now the guess is, what meeting did we? Do our particular.
Speaker 6 (01:23:23–01:23:25)
I think it was last meeting. Yeah.
Speaker 15 (01:23:30–01:23:41)
Yeah, so it was really, we've had it this way for a while in terms of but the one floor having it. So this is actually from two meetings ago.
Speaker 1 (01:23:41–01:23:51)
It was two meetings, yeah. It was when the architect was, I think he was quite ill. Yeah. So that was before.
Speaker 3 (01:23:51–01:23:54)
Let's see what I can't figure out.
Speaker 1 (01:23:54–01:23:55)
That's what we have now.
Speaker 15 (01:23:56–01:24:57)
This is from December. This is from our January meeting. So the difference is these windows here, down in this lower level. That's what had changed, right?
We've got six on the bottom, eight on the top, six long here. So we had made this inset portion uniform and then made the middle one thicker to give that double hung look. So I think to that was what, yeah, I think Jim's original question was more about making them look more like a double hung window. That's kind of what drove us to this change today.
So that, that middle one we made thicker and then uniformly, you know, there's those, what would it be? Three on the first floor here. And then the doors, we had added them. If I can find out where the original, yeah.
Speaker 6 (01:24:57–01:26:14)
So I would say that given that you have window types that aren't double hung, thickening or widening that center mullion to me makes it too different than the other windows. So where they all have the same thickness, then having a different pattern in them seems to make more sense. Because then, if you make it look like a double hung, then you begin to question why they all aren't double hungs, I think. So I think the way it was previously, I agree with Meredith.
That would be my preference. I also am, given that I'm an architect, the architect has his vision and design here, and he's not here to ask what his preference is, but… I think he is on Zoom, he can weigh in. Ah, okay.
If you like what he designed.
Speaker 2 (01:26:17–01:26:35)
Chris, was this the original? I'm sorry, Maggie. Was this the original? Was this the first elevation presented?
No. So I can go back further. Just, I guess, for the sake of seeing what has started.
Speaker 16 (01:26:36–01:26:39)
You like to have options.
Speaker 5 (01:26:39–01:26:41)
You like to see the options.
Speaker 16 (01:26:41–01:26:44)
Right. So if I share this one with you guys.
Speaker 1 (01:26:45–01:26:51)
Josh has his hand raised. I think your architect might have his hand raised.
Speaker 2 (01:26:51–01:26:59)
Can everyone hear me? It does seem that his window type was aligned with his siding. You know, he had a different design where he has vertical siding.
Speaker 1 (01:27:00–01:27:01)
Josh, would you like to add something?
Speaker 2 (01:27:03–01:27:04)
Can you hear me?
Speaker 1 (01:27:04–01:27:05)
Yes, now we can hear you.
Speaker 17 (01:27:06–01:28:04)
All right, wonderful. Yeah, so going back to kind of the design on what would be those double hog windows, So the way we created it, and still using the same system we have now for the best performance, is that we are essentially using a traditional mullion as the wider section. So it would actually match the outside of the framing. Those internal ones are actually much, much thinner.
So it is essentially a different character than what you would see typically. I would agree that I think doing the two separate designs how we are now is a little busy. I would prefer to stick with one idea over the other. I don't know at this point that I'm dead set on either one.
If we enjoy the double hung book, we can certainly do that across the board. But I agree, I think as a whole, it would make more sense to keep continuity throughout all windows.
Speaker 1 (01:28:06–01:28:10)
What was the difference in what your very original plan was and what we're looking at?
Speaker 17 (01:28:12–01:28:27)
Very original. So the original was twice the size of a single story, if that's what we're referring to. But the windows were essentially the ones that are on the towers on the right and left.
Speaker 1 (01:28:27–01:28:31)
That's what I remember. Can we try to find that?
Speaker 15 (01:28:32–01:28:34)
You want the single story one?
Speaker 1 (01:28:34–01:28:36)
It would have to be the single story.
Speaker 15 (01:28:36–01:28:46)
And that's fine. I was just going back to when we transitioned to the two story. So four prime innovations.
Speaker 2 (01:28:49–01:29:07)
Josh, while Chris is looking at that, I just want to make sure I understand what you said. Are you saying that for all the windows, you would prefer same window everywhere?
Speaker 17 (01:29:09–01:29:39)
In a sense, yes. So to create a little bit of proportion to this building, we do have different sizes in general. So the lower story is slightly smaller just because of the floor-to-floor ratio, and when you're standing there, they do not need to be as big to feel equal. So the second story is actually larger, but I think character wise, it would make more sense to do the same design on both sizes, whether that's the double home or what you're seeing here with the.
Speaker 2 (01:29:39–01:29:57)
The kind of lower and upper divider. Yeah. And that also would be regardless of what the siding style and material is, right? Same window no matter what.
Correct. Yeah. True. Yeah.
What's the overall length of the building from far right corner to far left corner?
Speaker 17 (01:29:59–01:29:59)
Let me see.
Speaker 2 (01:29:59–01:30:04)
It's not very long. I mean, it's a relatively small building.
Speaker 15 (01:30:07–01:30:08)
132 feet.
Speaker 2 (01:30:08–01:30:09)
132.
Speaker 16 (01:30:09–01:30:17)
And I think 70, 68 feet deep. Yeah.
Speaker 17 (01:30:17–01:30:19)
Correct. It is 132 by 68.
Speaker 6 (01:30:23–01:30:32)
If you think about 132 feet relative to, let's just say, an average home. That's what I'm thinking. It's a lot longer or wider than an average home.
Speaker 2 (01:30:32–01:30:32)
Yeah.
Speaker 6 (01:30:32–01:30:47)
So having these things where you're breaking down the scale into these, what is it, like five volumes a little bit? And changing the material and the color.
Speaker 2 (01:30:48–01:31:12)
But still, a colonial could be 30, right? The facade, about 30 feet? 32, 34? Something like that?
Yeah. So you were saying, I think I interrupted your train of thought, right?
Speaker 6 (01:31:14–01:32:25)
Yeah. For me, the… The windows, I prefer to see continuity in style than differentiation in style on the windows because there's not a lot of three-dimensional variation here. It's not like it's 20, 30 feet where you have kind of a different wing.
You really have some articulation of a rectangular box. And so, Whether it's, if you look at that right now, that window is basically the same size, right? Right to middle and left. And yet, you know, the mullion pattern is different.
So the question then becomes why. And to me, sometimes, if I'm looking, I'd say, okay, I might do that if I had ganged the windows together, or if I had a wider window, but I have the same opening size, and now I have a different subdivision within it. It doesn't seem to me to have the logic that I might expect, and I'm not trying to be critical of Josh here, but I think he's saying he liked the idea of continuity, and I would say I agree with him on that.
Speaker 2 (01:32:25–01:32:56)
I do too. I agree with you as well. I think, and you know, I mean, the reason I asked the question about the length of the building is it kind of leads into the, there's not a lot of distinction here. It's not a big, it's not a very, very large building and I prefer continuity.
you know, throughout, regardless of, regardless of, you know, the difference in size from top to bottom, or regardless of the, of the different siding materials, I think continuity would be preferred.
Speaker 5 (01:32:57–01:33:45)
And especially, I agree, and especially since the siding, you already have a difference in siding. So you have the, the horizontal gray and then the middle Again, I don't have the language of an architect. But then you have the vertical in the middle, and then at the top, you have the shingle side. So that's three.
It's still sort of the same in planting. You plant in odd numbers. So you have three different elements there with the siding, three different sidings. So then I do think you need something that ties those three elements together.
So I think I like the continuity.
Speaker 2 (01:33:46–01:34:17)
Yeah, and since we're talking about continuity, we're talking about windows, I happen to prefer the 4 over 4. I think it has a schoolhouse kind of theme to it, for me anyway, but I'm maybe a little bit of a too much of a traditionalist in that respect. But that's my preference. So I would view continuity as a desirable aesthetic, but I can be open-minded in terms of style.
Does Gardner have a position?
Speaker 15 (01:34:17–01:34:42)
So my thought there would be looking at everything, looking at the doors. I think the doors would be hard to get that kind of too short, one long in the middle layout. I think we could go with that four over four look. I guess the doors would be three, six squares, but it would look the same.
So I think we should make those end ones four over four and make it consistent that way.
Speaker 1 (01:34:42–01:34:51)
I think that would be nice. Just to switch out those windows, just to be consistent.
Speaker 2 (01:34:51–01:34:58)
Absolutely. I agree as well. Which windows? Who has the cursor?
I do. So can you just drag the cursor to where?
Speaker 15 (01:34:59–01:35:08)
So these would be 4 over 4 and then these would become 4 over 4 and these would become 4 over 4 and that would make you consistent across the whole thing.
Speaker 2 (01:35:08–01:35:16)
Okay, and in regard to the entry, the entry stays as it is. This here? Well, the double doors, the side lights.
Speaker 15 (01:35:16–01:35:26)
Yeah, so this could become, the two side ones could become four over four, and then the door, we're leaving the door as it is just because of signage, hours of operation, addressing, it gets really busy.
Speaker 2 (01:35:27–01:35:28)
How do you guys all feel?
Speaker 3 (01:35:28–01:35:36)
Yeah, I love that. And then the other doors remain six light? Correct. I wouldn't change that.
I like that too. I wouldn't either.
Speaker 15 (01:35:36–01:35:43)
The light above the top, it kind of gives the eight. And then we would carry that across all sides. So these would get them as well.
Speaker 6 (01:35:44–01:35:45)
Four over four.
Speaker 15 (01:35:45–01:35:46)
Correct. What do you think, Cheryl?
Speaker 6 (01:35:47–01:35:48)
Yeah, I think that's a good move.
Speaker 2 (01:35:52–01:35:53)
Okay, cool.
Speaker 1 (01:35:53–01:35:58)
Yeah, if we could just do that revision, you can send it out, we can give you feedback, because that was.
Speaker 6 (01:35:59–01:36:08)
Yeah, I mean, I think if we're, honestly, I think if we're good, otherwise, tonight, I think we could just have those follow. Yeah, those revised elevations follow.
Speaker 1 (01:36:08–01:36:09)
I agree.
Speaker 6 (01:36:09–01:36:38)
Yeah, it's closure. Actually, I would, yeah, that's because we can't accept documents after we close the public hearing. So isn't that right, Marion? Yeah.
Hmm. Well, you know, we can have you, I think, come in by Zoom, you know, like if we say that the last remaining document that we have to bring in is a revised elevation.
Speaker 15 (01:36:39–01:36:59)
Yeah. And if there's things like this, Hearing, I don't know if I could get in next week, it sounds like your schedule is crazy, but that's a simple change that I could have to you in a week. So I'm okay, I just, I can't, I'd like to work towards not having to wait till a month from now to finalize this.
Speaker 6 (01:36:59–01:37:06)
And I think if this is the last remaining document that would need to come in, then I would think we could do that on the 20th next week.
Speaker 15 (01:37:07–01:37:17)
Is there a situation where you could write a condition on all windows being 4 over 4 or something like that, or prior to building permit issuance?
Speaker 2 (01:37:19–01:37:20)
Something along that path.
Speaker 1 (01:37:20–01:37:22)
We do have, just not to check.
Speaker 2 (01:37:23–01:37:24)
I think I'm going to say the same thing as you.
Speaker 1 (01:37:24–01:37:25)
The stormwater?
Speaker 2 (01:37:26–01:37:29)
Oh, no. No, we have a meeting next Thursday.
Speaker 15 (01:37:29–01:37:34)
And yeah, and if you guys are willing to consider that for us, that's fine. Would you be okay with that?
Speaker 1 (01:37:34–01:37:41)
So I just wanted to, because it sounds like the stormwater had some revisions, but did that get peer reviewed? It sounded like that was not peer reviewed.
Speaker 15 (01:37:41–01:37:47)
Yes, we received comments this morning. Bowler's on. They can speak to the minor items that are left.
Speaker 2 (01:37:47–01:37:56)
That is one of those items where… We would need to have that as the… Maybe a suggestion, Chris, why don't we get through everything and then we talk about… Yeah, sure.
Speaker 1 (01:37:56–01:37:59)
When we have all of our issues… But we want to try to get you… Yeah.
Speaker 15 (01:37:59–01:38:01)
I appreciate you guys working with us.
Speaker 2 (01:38:01–01:38:12)
Can I ask a question while we're on that elevation? It looks like at the top of your towers, what is that round element? Can you blow that up? What's your intention there?
Speaker 15 (01:38:13–01:38:26)
Yeah, so it would be our logo medallion, depending on signage ordinance and what would be allowed. Trying to find a plan just to show you what our logo is.
Speaker 17 (01:38:26–01:38:28)
Chris, I believe he was referencing the corbels.
Speaker 15 (01:38:29–01:38:37)
Yeah, so well, above our letter signage, we typically put a logo like this in a black and gold aluminum painted.
Speaker 1 (01:38:38–01:38:42)
That's sort of what the Goddard School did. They have that sort of a circular logo.
Speaker 2 (01:38:42–01:38:48)
And it seems like you have a number of them on the building. Is that really the intention to have several?
Speaker 15 (01:38:48–01:39:01)
Yeah, for branding purposes, we like to put them on each of the gables that are visible. So I think as a starting point, it kind of ends up in all gables. But certainly, you can see on this elevation here, they're not shown.
Speaker 1 (01:39:01–01:39:06)
Yeah, you see on the front, it's… Oh, I didn't realize… Yeah, so these guys… I noticed the one in the middle, but…
Yeah.
Speaker 15 (01:39:08–01:39:27)
And we're open to it. In any signage committee review that we go through, you know, you have a certain amount of square footage and all of that, so you end up in areas, maybe that center one, because it's so tall, you would put one there. Maybe you only put them on the front three, not on the other north, south, and west elevations.
Speaker 2 (01:39:28–01:39:29)
Is that representative of the size?
Speaker 15 (01:39:31–01:39:35)
Josh, do you know if those are drawn 30 inches? 36 inches?
Speaker 17 (01:39:35–01:39:38)
I believe they are looking at this.
Speaker 2 (01:39:39–01:39:49)
So that's the scale. Yeah. I don't know. My own point of view, it's a little unusual to see three of the same sign across the front of any building.
Speaker 5 (01:39:53–01:40:01)
So one good thing is that that's not facing The road, correct? This is facing the road.
Speaker 15 (01:40:02–01:40:08)
So all the other sides, I'd have absolutely no issue taking them off. It's limited visibility.
Speaker 1 (01:40:08–01:40:13)
Yeah, I think I would prefer to see one over the middle, but not on the two sides.
Speaker 2 (01:40:13–01:40:14)
What do you think, Cheryl?
Speaker 1 (01:40:16–01:40:17)
Because it's sort of a busy logo.
Speaker 6 (01:40:17–01:40:33)
Yeah, I kind of also, you have the words the Gardner School below the logo, the logo saying the Gardner School. What do you think about having the logo on the two ends and not on the center above the words?
Speaker 5 (01:40:35–01:40:41)
And if it's black and gold, that is more preferable than… It's black and gold.
Speaker 15 (01:40:41–01:40:43)
Oh, you're multicolored.
Speaker 5 (01:40:43–01:40:45)
Yeah, then you're multicolored.
Speaker 15 (01:40:45–01:40:58)
So, question for you guys. Does signage fall into what we would discuss here or is there a separate process for it? I just don't want to discuss and commit here and then go to someone else and.
Speaker 1 (01:40:58–01:41:01)
Yeah, we do tend to touch on signage and talk about signage.
Speaker 6 (01:41:02–01:41:08)
We don't get into the details of the design, but the general location and sizes, we do.
Speaker 15 (01:41:09–01:41:13)
I just would hate to go in this direction, show up, and they're like, wait, they already told you what to do.
Speaker 1 (01:41:14–01:41:18)
No, this would follow, but they would sign off on the final. And even on a special permit?
Speaker 5 (01:41:19–01:41:21)
Because I don't go to the sign review.
Speaker 15 (01:41:22–01:41:23)
It's a different committee, right?
Speaker 1 (01:41:24–01:41:32)
It changed since you did your signage. It's now a sign review committee. It used to be the select board. It's gone through different iterations.
So it is now.
Speaker 5 (01:41:32–01:41:33)
Even under a special permit?
Speaker 1 (01:41:35–01:41:38)
You still have to go. It depends.
Speaker 15 (01:41:38–01:42:10)
I think illumination would trigger selectmen or select board, as far as I've done research on. We had talked a little bit about the monument sign last week, and I just wanted to make sure that it wasn't crossing. So I have no issue there. If we like them on the two ends and not above Gardner or Gardner with it because of that taller gable, I think our preference would be to have as many of them on this front facade as we can, just as a brand element.
Speaker 2 (01:42:11–01:42:32)
I can show you a picture. I honestly and definitely don't like three across the front. You know, I mean, maybe would you suggest that Cheryl, one on each of the ends and just the gardener's school in the middle or the gardener's school in the middle with just one above it, but not three.
Speaker 15 (01:42:34–01:42:42)
Let's take the one out of the middle. I'll approach it that way. Maybe we stack the, on top of Gardner to fill the space a little bit more.
Speaker 6 (01:42:42–01:42:51)
That's what I was going to say, that leaves that sort of empty, so that would be, yeah. Yeah, I think you could look at the scale of those, the size of those letters in the center.
Speaker 15 (01:42:52–01:42:57)
Yeah, this is a bigger, you know, plate for signage than we've had in the past.
Speaker 1 (01:42:57–01:43:15)
So that would, yeah. Okay, and I just had another follow-up question to architecture. And you had, we had talked about the type of materials for the retaining wall as you come in. Did you settle on a certain?
Speaker 15 (01:43:15–01:43:47)
So, that's actually my next item. I haven't, I've settled on, in my response to you guys, I had said I'm open to either option that we've proposed for that stone veneer for that wall along the entry drive. My preference would be, and maybe this is handled in the approval or the conditions what might be, I don't want to stick to one product over the other at this point, just because of cost, lead times, all of those things. I want to get the retaining wall to design it, figure out which of those products they like to work with better, all of that.
But I have no problem working with one of those products.
Speaker 1 (01:43:47–01:43:49)
One of the Conigliaro products?
Speaker 15 (01:43:49–01:44:07)
Yeah, Conigliaro or the natural stonewall solutions. I like that one better. If we want to specify one brand over the other, I'm okay there, but in terms of the block, we'll match the color and nature of our stone along the base of the building. I just don't want to get all the way down to one block.
Speaker 1 (01:44:07–01:44:08)
Do you have a sample, Jim, of the other?
Speaker 3 (01:44:09–01:44:17)
Pine Gardens used it, actually, on Pleasant Street. If you look at those two stone walls, those are pre-manufactured. And they're beautiful.
Speaker 5 (01:44:17–01:44:45)
Well, in their response, I like your response. I agree with you that you shouldn't stick to any particular brand because it might go out of business. You might change. So I'm OK with not having a brand.
But I do like how you said it is with natural stone finish that complements the other natural elements. So I think that language is probably sufficient.
Speaker 6 (01:44:45–01:45:39)
Yeah, so what I would suggest is on the elevation, if you can have like a photograph of the stone, so that way we'll have kind of the color and texture idea of it. And so when you go to get your final. You remember how we had a question come up with the Goddard School of the siding and we went out to the site and looked at the stone and everything. I'm just trying to make it clear, as clear as possible so we don't have any questions come up during construction.
That's not what we thought when we said these two options. Sure. It doesn't have to be on the drawing, it could be a separate attachment, but something which shows the coloration, size, kind of the texture of it.
Speaker 15 (01:45:42–01:45:50)
That'll be another quick and easy thing for us. I had submitted one of, when he had originally brought up natural stonewall, I had sent something in.
Speaker 5 (01:45:50–01:46:07)
And I know this is getting picky, but since you're going with kind of black and white, would the stone sort of be like grays, not in the browns, but my intent would be to pick something as close to this material going at the base of the building. Yeah.
Speaker 4 (01:46:07–01:46:07)
Okay.
Speaker 15 (01:46:07–01:46:12)
Yeah.
Speaker 4 (01:46:12–01:46:12)
Okay.
Speaker 15 (01:46:14–01:46:41)
Um, Next item on my list was the cobblestone access drive. We had talked about that. I went and spoke to the traffic engineer, touched base with the civil engineer, and that response, it kind of outlined some safety concerns as well as DOTs, just not a standard pavement type. We are comfortable putting the granite curb in, adding some aesthetic to the entry of that.
I just don't feel comfortable putting that in for snow removal sliding as you approach 138.
Speaker 5 (01:46:41–01:46:47)
And I did speak to two commercial snow plow drivers and they agreed with you.
Speaker 15 (01:46:47–01:47:24)
Okay. I'll be honest. It wasn't the first thing I thought of, but when traffic brought it up, it made sense. Oh, there was an issue or a comment brought up last time about snow storage.
I'll just point out what we're talking about there in this area here. The grading has a steep three-to-one slope, so I had Bowler kind of adjust the grading there, create a little bit more of a flat space, designated kind of a snow storage area there in this hatch that kind of captures the parking lot.
Speaker 6 (01:47:26–01:47:27)
That's an improvement.
Speaker 15 (01:47:27–01:47:38)
Yeah, they graded it a little better. So a portion, you know, in low flows will drain to the parking lot and through the system. And then we've confirmed that if anything goes south, it'll be maintained in that swale and on our property.
Speaker 2 (01:47:39–01:47:41)
And what's that surface going to be, Chris?
Speaker 15 (01:47:43–01:47:45)
That should be a seeded material.
Speaker 2 (01:47:45–01:47:45)
OK.
Speaker 15 (01:47:49–01:48:11)
Yeah, OK. Let me get back to the site plan. Next one, just to point out, we talked about a guardrail on the eastern parking there above the slope. I think that was a good one for us to catch from a safety perspective for parents and kids.
We had that drawn in here along the curb line.
Speaker 6 (01:48:12–01:48:13)
And that's wood?
Speaker 15 (01:48:13–01:48:15)
Correct.
Speaker 6 (01:48:15–01:48:16)
And that's called out as such?
Speaker 15 (01:48:16–01:48:46)
Yes, proposed wood guardrail here. Great, thanks. We've put that in a couple schools. It looks very good.
Shrubs at our culvert under our entry drive. We just wanted to add a little bit of visual barrier from the roadways. You didn't see the rock riprap at the bottom of the soil there. So we've kind of enhanced the planting here.
I believe we even pulled it south a little bit. As a reminder, there's also a topo change there. So three or four feet of a vertical buffer as well.
Speaker 5 (01:48:48–01:49:01)
And it's a good selection of plants. It's a collection of deciduous, as well as evergreens. And I think with the crab apples are a little bit shorter, as your visual goes up to the maples, which are taller. So I think that's a good mix.
Speaker 2 (01:49:02–01:49:15)
Chris, can I just go backward for a minute, just for clarity? That guardrail is 100% wood. So it's wood horizontals on wood posts. Correct.
It's not wood on steel posts. No. We have wood posts, wood rail. Great.
Speaker 15 (01:49:15–01:49:18)
Yep.
Speaker 11 (01:49:18–01:49:18)
Good question.
Speaker 15 (01:49:18–01:49:50)
Planting on the east edge, big focus on us trying to make that non-linear, so we added some depth kind of up and down the slope here. We had also talked about getting a tree in this landscape island here. Because of the underground detention, I can't actually get it in the island, but we got it right on that edge there. Actually, in some of these changes, guardrail included, we had to shift the underground pond or underground system a few feet to the west.
Shade trees. I think we got three more shade trees into the parking lot area. A couple on the South.
Speaker 6 (01:49:51–01:49:53)
Yeah. Much better. I'd say.
Speaker 1 (01:49:56–01:49:57)
Yeah, that's great.
Speaker 15 (01:49:59–01:51:48)
Nice. Took out two parking spaces, made the parking lot symmetrical there in that bottom corner. Exterior lighting. We did a little bit of research on this one just to try and see what really made the most sense.
What we determined was the, North, south, and west sides are fully enclosed by gates. And so the timer of those building lights will be on the standard timer, which is off an hour after close. I'm not sure why this sheet's not loading. There we go.
So north, south, and playground side west, those will just be normal hours off an hour after close, on an hour before close. The main entry facade, any lighting there, and parking lot will go to a motion sensor an hour after. So 7 PM, those would go to a motion sensor with the intent being at a dimmed level when triggered. Something we haven't talked about that I thought also played into this was when the parking lot used to be behind the building, we were concerned about questionable activity.
So I think that helps also from a security perspective. Gooseneck downlight on the monument sign. We kind of talked about signage there. I don't have any problem looking at an option there.
I think we would ultimately look to pursue maybe an illumination on that main Gardner School sign, but I have no problem looking at some sort of lighting on that monument sign to match that. construction management plan Bowler had pulled something together Cheyenne had shared with us the Milton memory care one. I think they dove into Construction hours, they may have even put a traffic haul route plan together discuss dust control and a few other things I'm not sure if you guys had a chance to look at it. Do you have any questions?
Speaker 2 (01:51:50–01:52:50)
Can we talk about that for a few minutes, yeah They did a good job, Chris. I thought they did a real good job. I just had a couple things I'd like to mention and ask the board members to weigh in. I think something that I'd like to make sure becomes, you know, a requirement is that prior to the start of work.
There's a coordination slash review meeting with the police and your builder, whoever the builder ends up being. And that's if the police choose, but I think it should be offered. So the police and the building department, if they so choose, at the time that the contractor finalizes the construction management plan. Because the reality of it is that someone's going to take this at some point, and they're going to fine tune it.
And I'd like to make sure that there's a meeting that occurs so that you get concurrence from the town officials that they're OK with whatever the final construction management plan is. Is that fair?
Speaker 15 (01:52:50–01:53:02)
Yeah, absolutely. And I think there's a lot of permit requirement items that'll do that. I don't know if police gets triggered in that fashion. But Public Works, Engineering, they would all be out there.
Speaker 2 (01:53:02–01:53:28)
They make note throughout this of their intention not to affect traffic. They make note of not causing queuing out on the roadway or not having queuing out on the roadway. They make note of using police details to make sure. So I think it would make good sense that the police department have a chance to meet since the public roadway is their responsibility.
Speaker 11 (01:53:29–01:53:29)
Yeah. Yeah.
Speaker 15 (01:53:30–01:53:44)
I have no problem with that. I read the police detail part two and figured there was going to be some sort of coordination. And it makes sense not to make the first time be a problem. And that's why they're doing it.
We'll coordinate with them ahead of time.
Speaker 2 (01:53:44–01:55:06)
Yeah, again, we've asked this in the past. I believe we asked this on the memory care clinic, that there be a point in time where that builder, whoever it is, because at this stage, you cannot submit a construction management plan that's not going to change. There'll be some changes. So, that was one.
And something else that I think is really beneficial, and I'm not sure how this happens, but whoever you choose to build this will have in the industry, we call it a short interval schedule. So, a two-week schedule, or most of us now use a three-week schedule. And at least for the residents that live nearby, if that… two-week or three-week look-ahead schedule is available somehow for them to be able to just understand what's happening.
Do you know what I mean? And I'm not even sure how we make that available within the town. I don't even know if there's a portal where large projects have that kind of information. So any resident, somebody who's nearby could say, okay, I'd just like to understand what's going on the next two or three weeks.
Click on the website. They got a big earthwork activity. At least they're forewarned. And the town has less problems.
The town then has less issues with people calling the building department saying, hey, what's going on over there? You know, the information's out there. The residents can understand it. I think it's just managing expectations that probably save you some heartache, too, and the builder.
So I don't know how to effectuate that.
Speaker 16 (01:55:06–01:55:11)
I just think it's a good idea.
Speaker 15 (01:55:12–01:55:24)
Other than the communication aspect of it and how we get it out to them, we have weekly meetings with the contractor to get updates. So that schedule is constantly there. You're going to have it. Exactly.
Speaker 2 (01:55:24–01:55:24)
You want it.
Speaker 15 (01:55:24–01:55:26)
So it's just a matter of how we get that shared with them.
Speaker 2 (01:55:26–01:55:36)
Yeah. And I don't want it to be a burden for any town officials. I just would like it to be available so that any resident could see it. So I don't know if you can help figure out how to do that.
That'd be great.
Speaker 15 (01:55:37–01:55:44)
Yeah. Well, I'll brainstorm. And I talked with the contractor, most likely who builds this has built our other ones and we can work something out there.
Speaker 3 (01:55:45–01:55:51)
Do you have like a new projects link to your website where you could put this project up?
Speaker 15 (01:55:51–01:55:54)
Yeah, we would have like a coming soon with a rendering or something.
Speaker 3 (01:55:54–01:56:00)
Maybe a drop down box or something into that where you just click on the new Milton project in the schedule?
Speaker 15 (01:56:03–01:56:03)
Possibly.
Speaker 2 (01:56:03–01:56:05)
We don't have to solve it here.
Speaker 15 (01:56:05–01:56:11)
Yeah, right. I'm worried about sharing too much information, getting too far ahead of us, what comes with public information.
Speaker 5 (01:56:11–01:56:23)
But it might be easier for you to be in control of the information than having town officials be in control of the information.
Speaker 1 (01:56:24–01:56:56)
Well, it might be what we used to receive like when Walcott Woods was going on. There was just a periodic just sort of, this is where we are right now, this is our next phase, or this is what we're doing right now. So it wasn't even weekly. It was maybe a month in advance.
But it could be distributed to the DPW, to the engineering department, the DPW. It was distributed to the neighbors, too. It was also distributed to the neighbors. So it was a really nice thing.
Speaker 15 (01:56:56–01:57:16)
I have an abutters list from the neighborhood meeting. So we've heard- Abutters and CC, yeah, DBW and- DBW, engineering, whoever else is involved there is probably out there on a pretty regular basis. But I think that's a good approach. I think as long as I have emails, I could probably get- It was really nice to be able to get those.
Speaker 6 (01:57:16–01:57:37)
It was like, there was a look ahead, probably like a three week look ahead probably. And then, I found them to be helpful, so that if we did hear from neighbors, we were familiar with where things were, what the progress was. And the neighbors appreciated it.
Speaker 1 (01:57:38–01:57:41)
I think they knew what was going on.
Speaker 15 (01:57:42–01:57:48)
Yeah, I have no problem with that. That would likely fall on me and I would take that on.
Speaker 2 (01:57:48–01:59:20)
You'll have less heartache if you do it. What's that? You'll have less heartache if you do it. Yes.
Construction hours. I just want to make sure what they've written is that the hours of site and exterior construction shall be 7 a.m. to 5 p.m. And I'm not sure, you'll have to, I'm not sure that there's a distinction between exterior and interior, but that's something for you to comply with the building department requirements.
But also, I want to make sure that we note, if your construction activities are starting at 7 a.m., most construction sites have arrivals earlier than that. So, you know, many are coming to life at 6 o'clock. People, you know, if you're going to be working at 7, you can't arrive at 7, right? So, just, you know, add some, I think you should just add some clarity that arrivals, you know, could be as early as 6 o'clock in the morning.
And the other thing that I'd caution you on, under your parking of construction equipment, you know, consider that site equipment oftentimes, if they're going to work at 7, they're trying to start up their equipment earlier, certainly in the wintertime, and I don't think that's allowed. You know what I mean? I just want to be careful that we don't have equipment starting at 6.30 and running from 6.30 to 7 so that they can be operating at 7. I just make sure that the startup time of equipment is not earlier than 7 o'clock in the morning.
Speaker 6 (01:59:20–01:59:36)
Also, really, delivery shouldn't start until 7 because if there's no one there to take the delivery, then you're going to have idling. If you have a big vehicle, it's not a roadway that you want idling during morning rush or any rush hour time.
Speaker 2 (01:59:37–02:00:15)
The activities prior to 7 should only be passenger vehicle activity arriving on the site. You know what I mean? Yeah, subcontractor parking and things like that. And you also note in here, and I'm just, for some reason I'm questioning this, you have Monday through Friday, 7 a.m.
to 5 p.m. Monday through Friday, and again, that distinction, you have to sort out exterior, interior. I'm not sure that you have the availability, I'm not sure they have the opportunity to work interior after a certain hour. but you also have 7 a.m.
to 5 p.m. on Saturday. I don't think it's allowed at 7 a.m. on Saturday.
Speaker 1 (02:00:15–02:00:19)
I thought it was, I was gonna say the same thing, I thought it was 8 a.m. on Saturdays.
Speaker 2 (02:00:20–02:00:20)
It's 9.
Speaker 1 (02:00:20–02:00:21)
9? It's 9 on Saturday.
Speaker 2 (02:00:21–02:01:10)
So just check the hours, those are established hours, Chris. It's nine, okay. And I only have one other item. Your construction worker parking, you indicate that all your parking will be on site.
And that's to be expected. But I think you should just consider the fact that you may have some activities that won't allow you to be parking on-site, and just clarify that now. Certainly when you're paving, you know, there'll be nobody parking on-site. There'll be off-site somewhere.
So I'm not saying you can't park off-site. I think you should just note that, you know, for all of the project, you will park on-site, except for maybe some distinct activities that force you to not be able to park on-site. I don't want you to write a plan that you can't comply with. Do you know what I mean?
So you may as well recognize now
Speaker 15 (02:01:10–02:01:12)
Except for select activities.
Speaker 2 (02:01:12–02:01:20)
Yeah, and those those should be those should be identified well in advance Sure, just so just so the neighbors.
Speaker 15 (02:01:21–02:02:05)
Yeah That's all I had Just a couple more ornamental fence material we had talked about that a little bit last time I sent that back in Request for no disturbed buffer area right away in property lines. We added a couple notes just to clarify that the limit of disturbance is just that and kind of what we're approving. So we need the contractor to maintain that. I had Boulder kind of put some notes in here.
No disturbance beyond limit of work. I believe somewhere there may even be a note in one of these that kind of clarifies that as well.
Speaker 1 (02:02:06–02:02:09)
And what will you be putting up for the no disturb to prevent?
Speaker 15 (02:02:09–02:02:21)
Is that like… Julia, is Andy or Luke on?
Speaker 7 (02:02:21–02:02:23)
I'm not seeing them.
Speaker 11 (02:02:23–02:02:23)
Okay.
Speaker 7 (02:02:24–02:02:25)
Oh wait, there's Luke. Hang on.
Speaker 16 (02:02:26–02:02:29)
I believe we have discussed some sort of a construction fence.
Speaker 1 (02:02:29–02:02:36)
Yeah, just something that's… Inevitably, somebody will say, oh, I didn't know that was the no buffer zone until.
Speaker 15 (02:02:38–02:02:47)
Hi, Chris. So Luke, did we put something in the plans about how we were going to delineate the limit of disturbance?
Speaker 18 (02:02:47–02:03:02)
Absolutely. For the record, Luke, Gustaf, and Owen Boller, on the construction management plan, we specifically called out a six foot high construction fence that would basically delineate the limit of work line.
Speaker 1 (02:03:04–02:03:12)
Perimeter protection under that, a secure, great. Great, it's in there. Okay, I just wanted to double check.
Speaker 15 (02:03:14–02:03:58)
And then the last item I had, thank you, Luke. was shade around the playground. We did do a little bit of revised grading, adjusted a little bit of the planting area there, got four additional shade trees kind of on the south and west areas there. Then I submitted the shade structure for what the playground typically has and should have here.
So with that, that was everything we had talked about last time. Like I said, I think we've really gotten to a good place with this. Something I didn't say earlier that I meant to is I do feel like all of us neighbors, board, design consultants, this is probably the most effective and efficient school we've put together, Gardner School has put together.
Speaker 5 (02:03:58–02:04:07)
I was going to ask for a review of us. Make a customer survey at the end.
Speaker 3 (02:04:08–02:04:11)
Sorry. Is that painted or is that left natural?
Speaker 15 (02:04:11–02:04:21)
Natural. And we'll typically make sure it's sanded down just because we've been talking lately about kids like to run their hands on things. So we'll make sure it's got a smooth finish.
Speaker 2 (02:04:22–02:05:11)
I had a conversation with one of our members and we both agreed that you have made the process easier for us too. not to take away at all from any of the attorneys that represent clients. It does make a difference when the client's sitting at the table and can actually have the discussion and negotiate solutions while we sit here. And that, I think, has been really helpful because we've solved some of the concerns at the table with you.
We don't always have that opportunity, and it's likely because our the legal representative doesn't always have that opportunity. Not because they don't want to, but having you here, having Josh available, having Bowler available, it makes a difference.
Speaker 15 (02:05:12–02:05:28)
I appreciate that, and I don't think it really saves anybody time if we just stand here with legal people and have that conversation. We end at the same place. Let's be careful. We have great respect for the legal people that are here with us.
Speaker 2 (02:05:28–02:05:31)
Great respect.
Speaker 1 (02:05:31–02:05:47)
So I guess the only other thing that we're waiting for, which I just was going to touch on, is the final letter, the peer review, following up the, there were a few outstanding items that you were addressing. Do you want to just talk about that for a minute?
Speaker 15 (02:05:47–02:05:58)
Luke, do you want to talk about those remaining items? Do you think there's a path here where we can get those wrapped up, worked out with Horsley-Whitten in the next week?
Speaker 18 (02:06:04–02:06:08)
That's it. Chris, did you ask me that?
Speaker 15 (02:06:08–02:06:14)
Yeah, yeah. I spoke briefly with Andy earlier about the comments.
Speaker 18 (02:06:14–02:06:49)
Yeah, no, Andy and I discussed it. And really, the remaining Horsley-Whitten comments are, they're very technical, nothing that we have any issue with complying with. They're all just, you know, add a note here, revise a detail type thing. We would recommend if the board saw fit that these would all be resolved prior to the issuance of a building permit as a condition of the approval.
Because again, there's nothing in the final letter from them that is any real concern to us.
Speaker 6 (02:06:55–02:07:34)
All right, I would, yeah. So it sounds like we have a few, a couple of documents to come back to us. So it seems as if we need to continue the public hearing to be able to accept those documents. But I don't see myself having any outstanding issues or comments after that.
It'll be just a matter of receipt so that I think we could close the public hearing next week if we get those documents in. Yeah, we'll work on the windows, the stone. I don't know if everybody agrees with me on that, but… I agree with you, Cheryl.
Speaker 2 (02:07:34–02:07:34)
Yeah.
Speaker 1 (02:07:34–02:07:47)
Okay. And then the order of conditions. Do you have somebody who's going to be preparing? Or is that…
You mean the decision? The decision and the order of conditions. Do you typically have somebody?
Speaker 15 (02:07:47–02:07:49)
No, typically in the past the town is prepared.
Speaker 6 (02:07:49–02:07:55)
Okay. which we could use. I think we could probably use the Gardner School as a template. Don't look at me.
Speaker 1 (02:07:56–02:07:58)
No, I think we should.
Speaker 2 (02:07:58–02:08:02)
It's just what you wanted. We now get to write a decision.
Speaker 1 (02:08:02–02:08:11)
We're short staffed. So what I was going to suggest is we do have. We have four people here. We have the Gardner.
We have an applicant here. Jim, you want to take a stab at it?
Speaker 3 (02:08:11–02:08:14)
I'll take a stab. Might not get done by next week.
Speaker 1 (02:08:14–02:08:26)
What I was going to have, when Cheyenne is better and feeling better, and if she's watching, having her pull up what our approval decision was for the Gardner School.
Speaker 6 (02:08:26–02:08:30)
And we also have the one from
Speaker 15 (02:08:30–02:08:32)
So you're using Goddard.
Speaker 6 (02:08:32–02:08:54)
I'm sorry, the Goddard school. I'm sorry, they're so similar. The Goddard school. The other school, though, that was on Blue Hill Lab also.
Little Sprouts. Little Sprouts. I think looking at both of those, I think Ned Corcoran probably drafted the one. And Marion, you probably drafted the one.
So those would be good sample base. So, Shawn, so… Shouldn't we be having a lawyer do this at this point?
Speaker 5 (02:08:55–02:09:00)
Well, we probably have an attorney. Well, Cheyenne… What's that? I was gonna say Cheyenne…
We probably have an attorney. Yeah.
Speaker 3 (02:09:00–02:09:01)
Do you have somebody that can draft it?
Speaker 15 (02:09:05–02:09:41)
I guess I can. I typically don't, only because the towns have had a pretty boilerplate method for how they do it. I would think… Right, this would be my fifth or sixth project, and I've never been asked to draft it myself.
Okay. Yeah, we have some attorneys who typically come in with just… We ultimately will end up writing or amending… Right, because there's a summary at the beginning and all that stuff, which typically comes from your side, and then we would just make sure that we're in agreement with the conditions.
Which I would do next week.
Speaker 6 (02:09:41–02:10:03)
What I would ask from you is at least a list of all the documents that you think are the final documents. Okay. And then the dates. And so we normally have that they were submitted, let's say it was August and it was amended four times.
You would have the original date, the list of the sheets. and then each amendment date on it. So that gets, so if you would at least put that together.
Speaker 1 (02:10:03–02:10:27)
You know what, I'll have, when Cheyenne or Julia, what we should do is similar to what we did with the construction management plan. We sent you a sample of what we look for in it. So we can send you what our approved site plan approval for those two preschools. And you can see the documents that were, and how it was formatted and what we would need to put into our decision.
Speaker 16 (02:10:27–02:10:31)
Yeah, because I have them here, and there's no list of documents from what I can tell.
Speaker 6 (02:10:33–02:10:35)
Marion, there should be a list of documents, right?
Speaker 8 (02:10:35–02:10:41)
Usually when I write a decision, I do. I can't speak for what's in there. I would have to go back and look.
Speaker 5 (02:10:41–02:10:44)
Or we have recommendations for attorneys.
Speaker 15 (02:10:44–02:10:54)
Yeah. I have no problem doing that. That would also help everybody to know exactly what's being approved, what's the latest, what's the date on that document, all of that. So I can pull together that list, no problem.
Speaker 6 (02:10:54–02:11:06)
And it's helpful if somebody has a question when construction is underway, and is that really what got approved? And then at least it's easy to identify the documents.
Speaker 15 (02:11:07–02:11:10)
Okay, with dates, and then we also want to track the amendments.
Speaker 6 (02:11:10–02:11:17)
Exactly. Okay. Because the site plans, those have been amended a few times.
Speaker 1 (02:11:18–02:11:31)
Right. So what I was thinking is, I was thinking of having Cheyenne draft it, put it together, and then running it by town council. I think we definitely need an attorney looking it over.
Speaker 6 (02:11:31–02:12:07)
And if Chris can supply the list of documents. Yeah. I think at least then we can compare that to what he thinks are his final documents. Because, you know, honestly, the way we have the electronically all the documents, they come in in a folder for a particular meeting.
And so, you know, you probably have the best Tracking system for what you think are the most current documents and then we can make sure that that it's consistent with What we have and think sure Do you want me to include?
Speaker 15 (02:12:07–02:12:20)
fence shop drawings all of that cut sheets Okay, everything. Yep, and then I'll add on that list at the end. Whatever documents are being updated for next time, correct? Yeah
Speaker 6 (02:12:23–02:12:42)
That's great, so. All right, so we're ready to continue the hearing. Continue the hearing to February 20th. So I'll make a motion to continue the public hearing for site plan approval for 0 Blue Hill Ave, parcel B-7-5 to February 20th at 7.05.
Yep.
Speaker 3 (02:12:45–02:12:45)
Second.
Speaker 1 (02:12:47–02:12:53)
All right. So Julia, we'll add that to the, did we vote? Oh, sorry. Yeah.
Speaker 2 (02:12:53–02:12:58)
Just for clarity, that's a Zoom meeting. That's not an in-person meeting. It is a Zoom meeting.
Speaker 1 (02:12:59–02:13:02)
Oh, right. It is a Zoom meeting. We're scheduling it as a Zoom?
Speaker 2 (02:13:02–02:13:03)
Easier only.
Speaker 15 (02:13:03–02:13:05)
Is that? I appreciate your clarifying.
Speaker 1 (02:13:05–02:13:07)
Yeah, it is. Yeah, good.
Speaker 15 (02:13:07–02:13:10)
Sitting here alone. Zoom you from here.
Speaker 1 (02:13:11–02:13:14)
Yeah, so it'll be on Zoom. OK, so there's a motion. Is there a second?
Speaker 15 (02:13:15–02:13:15)
Already seconded.
Speaker 1 (02:13:15–02:13:20)
Sorry. All right, all in favor? Aye. Thank you.
Thank you. Thank you, Chris. See you next week. Thanks.
Speaker 12 (02:13:21–02:13:21)
You're welcome.
Speaker 1 (02:13:23–02:13:23)
Thank you.
Speaker 4 (02:13:23–02:13:24)
Thank you, Josh.
Speaker 1 (02:13:27–02:13:41)
Okay, all right, so moving on. Julia, do you wanna just, this is the discussion of the util budget. Did you have any information on that?
Speaker 7 (02:13:44–02:13:54)
The discussion is just basically to decide how much you wanna spend because the PO has been tapped out.
Speaker 6 (02:13:55–02:14:38)
So one of the things that I recall is that we had grant money that had restrictions and it had to be used for compliant zoning. And then we had planning board funds. So when you say the contract, do you know, Julia, if that's the, how that contract is, the fee was allocated, does that mean they're out of the grant funding part of the contract or just? Shane didn't mention.
Because, you know, I don't recall how much we had left in our fiscal year funding.
Speaker 1 (02:14:38–02:14:48)
We have. Yes, because she did go through. And I think, Julia, was that in the budget you gave me or is that for future?
Speaker 7 (02:14:48–02:15:06)
I haven't looked at the budget that I gave you the utile. The last bill that we got from UTL, we had to draw from our miscellaneous budget to pay half of it because we didn't have enough. For which budget, Julia? I'm sorry, what?
Speaker 6 (02:15:08–02:15:10)
You said you had to draw from which budget?
Speaker 7 (02:15:11–02:15:15)
We had to draw from the $50,000 planning board.
Speaker 6 (02:15:15–02:15:18)
Right, and how much did we have to draw from that?
Speaker 7 (02:15:20–02:15:21)
I think it was $4,000.
Speaker 1 (02:15:21–02:15:53)
Yeah, it was a small amount. Okay. So here's the $50,000, yeah. So at the beginning of January, we pretty much had our whole, we hadn't spent any money yet from our budget.
So we've just dipped into it just a little bit. So we do have significant funding to finish that. But they need a contract extension. So I almost feel like we should wait.
I would like to discuss that with Cheyenne.
Speaker 6 (02:15:54–02:16:15)
Do you think we can discuss that next week and maybe have a recirculation of that? I know we all discussed and approved the contract. If we're going to extend it, we should see if there's any modifications we want to make to it. Yeah.
So and I think we shouldn't we should not wait until a month from now for that. So I'd like to have that be discussed next. I agree. I think so.
Yeah.
Speaker 7 (02:16:19–02:16:21)
So you can put this on the agenda for the 20th.
Speaker 6 (02:16:22–02:16:28)
Yeah. Why don't we just so we can. And their contract, not just their budget, but their contract.
Speaker 11 (02:16:30–02:16:30)
OK.
Speaker 1 (02:16:34–02:16:38)
So it would be the same line at a discussion of utile budget slash contract.
Speaker 7 (02:16:40–02:16:40)
Okay.
Speaker 6 (02:16:42–02:16:51)
Great. And are you when you're ready to go to the next?
Speaker 1 (02:16:51–02:18:22)
Yep. All right. So that's good. All right.
Are we ready? So the next item we have is the MBTA community zoning discussion. So this I just I put on because I want it just it should always be on there because there's always going to be until we are fully compliant have this on so the zoning discussion so obviously there's a select board meeting tomorrow morning which will give us more clear direction, I would say, and what the select board's approach will be. What we know right now is we're still in the comment period with the regulations.
We know that the law is legal and enforceable by the AG. the regulation period, just for those who are watching, there's an open comment period. I think the select board's talking about what comments they would like to submit. That comment period is up on the 21st of February.
So then the comment period will be closed and then we'll await the final regulations. So then we have We have a time frame, which Cheryl, when you filled out and submitted, and I appreciate you're doing that, a draft action plan it with the planning board met. We agreed with all that sort of all the time frame of all the dates that we were scheduled to make sure that we have compliance zoning by July 14th.
Speaker 5 (02:18:23–02:18:30)
But before that deadline, are we going to submit comments? to the select, I know the selectmen are.
Speaker 6 (02:18:30–02:20:55)
I would like to talk about the comments too, but can I just say that I'm still in the dark a little bit about the meeting because I couldn't find a recording and there's no minutes yet. Did you see the draft? I saw what Cheyenne sent after, but I haven't had the benefit of knowing what the discussion was. And so I wouldn't mind a recap just so I'm not in the dark.
I had hoped to be able to watch the meeting on Milton Access TV, but I haven't been able to locate it. And I asked Cheyenne if she could send a link. And so I don't know. Maybe it's available now.
The last I checked was yesterday. I do think the comment, it ends on the 21st, we have an opportunity to comment. I do think beyond what I think you discussed, which was rapid transit aspect of the guidelines, there are other aspects of the guidelines that I think we should comment on. So I understand that you took a vote and you sent to the select board an action plan with an appendix that largely reflects what Mr.
Dougherty submitted, which is stating that We don't believe that we're rapid transit or we don't even believe that we're adjacent and that the commuter rail capacity is only dictated by the 15 units an acre. But I don't think that's really been thought through very well what that exactly means in terms of districts. We haven't really looked at what does 15 acres look like within a half a mile of the commuter rail stations. And so I think the public needs to start hearing about that.
And I think they need to hear about it soon, just like the two speakers who spoke earlier. I do think that we've done some work on the rapid transit piece, and I think we probably are pretty close to having something to take to the public and get their feedback on. But I don't think we're anywhere close on something else, whether it's 10%, whether it's 15%, or whether it's something that's really 5 or 6%. And I don't think that we have the luxury of waiting a month to start talking about that, honestly.
Speaker 1 (02:20:56–02:24:07)
So the question is, will we, well, first of all, just to recap, just real highlight, an overview. So we basically, we started the meeting going through your draft first. We wanted to go, I wanted to make sure everyone went through everything that you had put in, because I thought you put in some very good language, some of the housing initiatives that we're going through right now. I think we, then we went to where we had been in our original, our last time when we met and we were discussing the action plan where that, where we were on that draft.
What we were, we sort of synthesized some of what you had in there with your language, but the, what we the reason why I think we ultimately decided not and the board can also weigh in on this that we decided not to at this time take a position on where what type of community we are is because we don't know the regulations are still in the comment period and we don't have final regulations. We have emergency regulations, but those might not necessarily be the regulations that whatever zoning we put forth in July, that those are the regulations. So the regulations could change. There was also the fact that there was a meeting, and you might not have known this either because I found out last minute, that Representative Wells and Bill Driscoll were going to be meeting with the head at Augustus.
They met They met the day after we were meeting, and they were going to go in and talk to them about the fact that, because rapid transit is in the regulations. So what we were saying is what we know right now is what is in the statute. And the statute language very explicitly says subway. It doesn't say any extensions.
That was HLC adding that language into their regulations. We wrote something based on the fact that what we have is, right now, the regulations are not legal and enforceable. There's emergency regulations. But what we know is what's in the statute.
So we wrote, and that's why we didn't We didn't want to just randomly pick a category. I think the majority of the board feels we should be, if we are going to follow what is in the regulations and the regulations are properly promulgated and finalized, that we would be an adjacent community simply by the fact that we do not have a subway in Milton. Our trolley is, by definition, is not a subway. I think, Sean, you even read off what the definitions were.
So that's where we were coming in. We were saying, you know, and we were trying to express that we intend to be fully compliant, A, with the law, and then, you know, depending on where the regulations fall.
Speaker 6 (02:24:07–02:25:08)
So as far as I understand, the emergency regulations are legal? and are in effect. For 90 days. To say that we don't have anything I think is not quite correct.
And then yes, within 90 days we'll have regulations and we don't know that they're going to find us not to be rapid transit. And then the question is, do we accept that as a town? And, you know, if we, yeah. And as a board, we said our responsibility was to prepare zoning that would be compliant with rapid transit and would be compliant with adjacent community.
And what you submitted was not even adjacent community in what you suggested based on the statute. So now we're talking about third. option And there's no criteria for that option. There's nothing in the guidelines for that option nor is there really for Adjacent community because hlc hasn't defined us as that.
Speaker 1 (02:25:08–02:25:42)
So so we're now at a period where the select board is making some determination tomorrow. They've also opened a door for the discussions with HLC. HLC has said that they would be open to a conversation with Milton on looking at a potential possible adjacent community. I don't know where that discussion will go, but I would, you know, I think we're going to know a lot more within the next week or two.
Speaker 6 (02:25:43–02:26:28)
So, you know, I think you both were at the meeting the other night as I was. Right. And Chair Wells said they still said that we're considered rapid transit. So, you know, I think It's not going to be something that is going to be decided at this table.
So we need to decide how we're going to advance zoning. And we need utile assistance. And we need the public's input. I really think that we can't chart a path that doesn't bring people up to speed to where things are.
Speaker 1 (02:26:30–02:27:45)
And I think we've been getting a lot of input. We've been getting a lot of emails. But the question is, we… There's nothing that we can feed the public right now, which I would love to do.
I'm pushing ahead with the East Milton overlay. I love the idea of having public input. But until we have people who are coming and saying the regulations are law right now. I think it's been very confusing.
I think the ADU process has been very confusing. I think the MBTA. the fact that the regulations were found by the SJC not to be legal and enforceable. I don't even know if they are properly promulgating right now the new guidelines, the new regulations, because they're asking for an action plan.
And this was a big piece of our discussion. They were asking for an action plan before the comment period is over. So does that mean they're just ignoring comments? They wanted us to submit an action plan based on regulations which have not been finalized and have not been properly promulgated.
So we have, this is, you know, I would love to move forward with something. I would love to have a definite, this is what we are. But we don't have.
Speaker 6 (02:27:46–02:28:40)
But we do have something. If you, what we were doing in the zoning that passed previously, looked at having some areas of lower density and some areas of higher density averaged out to 15 units an acre but what was what you've described in the action plan as meeting this the statute is 15 units an acre and within a half a mile of a commuter rail station. It's taking what the statute says. What does that look like?
Where is that? Which properties are affected? Which property owners need to be up to speed on what that means? Because we can't wait until zoning is written and then take it to the public and say, by the way, this is the best plan.
I hope you like it. They need to be a part of the discussion. And we can't wait another month to decide when we're going to schedule a forum.
Speaker 1 (02:28:41–02:28:58)
We would not move forward without having a discussion on that. And in many ways, I think what we know is in the statute, but it would be almost an adjacent community because we would get to choose where we put it, where we put a higher density vote.
Speaker 6 (02:28:58–02:29:04)
But the statute says a half a mile Commuter rail stations. It doesn't give you flexibility. The guidelines are what give you the flexibility.
Speaker 5 (02:29:04–02:29:20)
But if you look at the Blue Hill Ave, the Blue Hill Ave commuter rail, half mile actually extends into one of our districts, which is, well, into Unquity House that we've already looked at.
Speaker 6 (02:29:21–02:29:27)
So it also goes into Capon, which is the Elliott Street Corridor and the Blue Hills Parkway Corridor.
Speaker 5 (02:29:27–02:29:38)
we have already started looking at some zoning for that area. So I think we've already have a good little start.
Speaker 6 (02:29:39–02:30:22)
But the problem is, if we follow the logic of you're only going by the statute, 15 units an acre, what does that start to look like on those parcels? Because it's different now you're taking single family lots and you're saying you're going to rezone those for 15 units an acre. That's a lot different than the Elliott Street corridor where it's single family lots and it's capped at three or perhaps if we change this to four. Yeah, so, and then, does that mean you're going to bump up on Quittie House?
Because you don't have to, you can keep it at 15, but you're not being, I don't think you can pick and choose which of the guidelines you think are proper.
Speaker 5 (02:30:22–02:30:25)
No, that's why I'm not, that's why we're not doing that.
Speaker 1 (02:30:25–02:30:34)
That's why our plan at this time was not to until we have finally properly promulgated regulations.
Speaker 6 (02:30:34–02:30:37)
So it's not to work on zoning until the 90-day period's over?
Speaker 1 (02:30:38–02:31:08)
No. Well, I think we'll know if the discussions with the state, how the state discussions go. I think we still need some clarity on if these are regulations that are going to be finalized. The 21st, I don't know how soon we'll have them, but I would say- Do you know if they're going to be finalized?
I don't know how soon after the comment period that they'll be finalized. I know they will be finalized. I just don't know how soon after the comment period that they'll be finalized.
Speaker 5 (02:31:09–02:31:16)
I feel like it's still good to try to find- How soon was the ADU finalized after the comment period?
Speaker 1 (02:31:16–02:31:19)
It was fast. It was fast, yeah. And I would predict this would be the same.
Speaker 5 (02:31:19–02:31:22)
Yes, yeah.
Speaker 2 (02:31:22–02:31:35)
We could work on a 10% plan. from what we understand, that's the discussion that is being had with HLC.
Speaker 5 (02:31:36–02:31:42)
And we were directed by the select board to work on a 10% plan.
Speaker 1 (02:31:45–02:31:59)
I think that would be, yeah, I think that would be, and I think we could pull that together pretty quickly. But I think, again… The regulations, something will… I think…
Speaker 6 (02:32:00–02:32:53)
We should work on the 10% plan, but we should also work on the 25% as we talked about. And I think coming back to, well, I really feel like this public part of this should happen sooner rather than later. And we have to figure out what the best way to have that public input. I don't think these meetings are the best way when you have a public comment period.
You know, when Tim was doing the zoning, He had monthly sessions, some were in person and some were on Zoom. I think it would be good to have an in-person session and maybe at the Council on Aging where something could be projected, maybe with maps that people could look at and understand the areas in which they're being discussed. But I think we should have somewhat of a plan.
Speaker 3 (02:32:53–02:32:56)
Yeah, I think we should have a 10% plan and then show it to the public.
Speaker 1 (02:32:56–02:32:57)
And then show that.
Speaker 3 (02:32:57–02:33:06)
And we could talk about- Just like we did with East Milton Square. We had a public forum, we spent a lot of time on it, and now we're going to have another one after the zoning is done. Not that it can't be tweaked.
Speaker 6 (02:33:07–02:33:46)
But the issue is people made a lot of comments that we We didn't get comments on the zoning that passed town meeting until very late. And people became very concerned because once they understood what it was, some people didn't like the choices that had been made, but they didn't feel as if they had an opportunity in advance to weigh in. When we say adjacent community, does that mean it's tethered to the trolley? Is it tethered to the commuter rail stations?
Speaker 3 (02:33:46–02:33:53)
So the way I understand it, adjacent community is it can go anywhere in town. It doesn't have to be within a half mile of the trolley.
Speaker 6 (02:33:53–02:33:57)
But I think it should be. Or commuter rail.
Speaker 3 (02:33:57–02:34:01)
Or commuter rail, right.
Speaker 6 (02:34:02–02:34:24)
But I reread the guidelines today before I came, and those districts, need to be something that HLC is going to approve. And their preference is close to the public transportation. So we need to have conversations with folks about where.
Speaker 3 (02:34:24–02:34:29)
So what do you mean that HLC's preference is to keep it near the commuter rail, but it can go anywhere in town?
Speaker 6 (02:34:30–02:34:37)
I don't think it can go anywhere in town if you… I think an adjacent commute, the way I understand it is it can, but… So you're confusing.
Speaker 5 (02:34:37–02:35:31)
This is kind of the problem. Let's just focus on the statute. The statute, and I know I've been saying this for, you know, three years, and I think that's a great starting point. Focus on the statute.
Let's look at the areas within the half a mile of our commuter rail. And then we get that down. So we've met the terms of the statute. And then we look at the next bump up.
If we are determined to be an adjacent community, then we can bump it up. It's easier for us to kind of agree on a smaller amount, because I think we all have a pretty good understanding where we would like to see some development in town. There's opportunities in town. start with a smaller amount and then slowly add to it.
Speaker 6 (02:35:33–02:36:19)
I don't understand, you know, how we're going to determine how we're compliant without fitting the criteria that has been established by HLC and the guidelines, other than if what you're talking about is a flat 15 units an acre. And I think that needs to be sort of understood. Um, one thing I, If we think about other comments to HLC, which is a letter, you know, comments would have to go in next week. What we could comment on really is what we learned from the rapid transit work that we did.
And, you know, I personally think that we ran into challenges with the minimum subdistrict size of five acres.
Speaker 5 (02:36:19–02:36:22)
Yes, that was going to be one of my comments.
Speaker 6 (02:36:23–02:38:31)
if the board doesn't plan to submit a comment letter, I do plan to submit comments myself, that would ask for that to be lowered. We also, I think, heard concerns about not losing businesses and impacting our business districts. And there's a cap on how many units can be in a mandatory mixed use district. And I think we should comment on that and that we think that we should be allowed more.
And then to your point, Jim, about other places. in town have a comment about wanting to be thoughtful about where those places can be. And I think being in a location which has access to MBTA bus line and other amenities, if they're not as great as some places like East Milton Square, but at least amenities that those, I don't know if you all recall, but Tim had been given authority by the select board to ask if Granite Ave would be acceptable. And East Milton Square would be acceptable.
But he didn't ask about Randolph Ave sites, if those would be acceptable, because those were further away. And so the comment that I would like to have go back is, we should get assurance that those could be acceptable locations. for reasons that we think that there's opportunity for some development on some of those parcels. So the five-acre piece would get to the paper mill.
It would get to two Granite Ave because those by themselves are smaller than five acres. And then we didn't get to count all of what we would have liked to in the business district. So I think that could be quite a beneficial comment. And then this other piece about the locations.
I have two thoughts.
Speaker 1 (02:38:31–02:38:51)
Either we should find out if the select board are submitting comments, because I think we don't want to have conflicting comments coming from various different boards. So either I would say possibly submit your comments to Nick Milano. Well, Nick just sent us an email.
Speaker 2 (02:38:52–02:38:57)
Yeah. They select what is submitting comments, and Nick's asking for comments as well.
Speaker 6 (02:38:58–02:39:01)
He said that we could either submit together or separately.
Speaker 2 (02:39:02–02:39:06)
Yeah. There's a letter that he sent that's drafted, and he's asking for comments.
Speaker 1 (02:39:06–02:39:08)
Did he include his letter in that email?
Speaker 2 (02:39:08–02:39:09)
He did, yeah.
Speaker 1 (02:39:09–02:39:20)
All right, so I think that maybe… we should send our comments to him. I don't mind you, Cheryl, sending as an individual either, if you want to send your own comment letter.
Speaker 5 (02:39:21–02:39:24)
And also, I'd like to increase our affordability.
Speaker 1 (02:39:26–02:39:43)
Because right now, the guidelines require you to pay a consultant, an economic development consultant, verify that you can do that. It would be nice not to have to pay more money to simply increase it within a certain margin.
Speaker 5 (02:39:43–02:41:32)
Because the crisis is for affordability. And we all know, we've discussed, that this has nothing to do with affordability. And we are desperately trying to create more housing that is affordable So I I think that they should be willing to increase it from 10% up to something higher Also, we've talked about smaller If we're allowing for smaller development We've talked about how there's not enough profit for the developers to do one affordable unit if it's three units. There's not enough money in it, so they're not going to do it.
So the other question is, in lieu of getting a full affordable unit, maybe there could be a payment to our affordable housing trust. And I think it should be tied to like the assessment of it or the sale of it, a certain percentage, not just a dollar amount, but a percentage in actual, yeah. So then it could fluctuate. The contribution to the Affordable Housing Trust is really dependent on what the sale price is.
So if the market is a little bit softer, we're not sort of hindering the developer from maximizing their asset. And if the market is a little bit stronger, then they're contributing a higher percentage to our affordable housing trust.
Speaker 6 (02:41:34–02:42:35)
Well, you know that they cap it at 20% even with the economic development study in part because they don't want to make it financially inviolable to do these projects. And the differential on a market rate unit to sell versus an affordable unit is Last I spoke was to Connelly's at 131 Elliot. It was a half a million dollar differential. So if you're going to make up that half a million dollars, you need a lot of places to make it up and a lot of units.
And that's why you see the 40Bs try and push as many units as they can, because they're trying to make up that differential. So I think whatever percentage, I think this is something we did talk about when we were working on this. I think to try and get some kind of a contribution in for the smaller development. So I think it's a good thing to put out there to them.
Speaker 1 (02:42:36–02:43:03)
So I would send your comment. I think you should send your comments to Nick. I think anyone should maybe forward your comments to Nick. With Cheyenne being out and having the flu right now, and the deadline for the comments being the 21st, I don't…
I think it would be… more efficient to send our comments or draft our own letter if folks feel inclined, but to send comments and add it to Nick's.
Speaker 5 (02:43:03–02:43:12)
Yeah, because we won't have enough time to meet. If we're meeting on the 20th and then we have to vote for like an official planning board letter, is that what your fear is, is we're not going to have enough time to do that?
Speaker 6 (02:43:12–02:43:20)
I don't want to add it. Well, I think their plan is to vote. Their comment letter before then, I think they're going to vote it on the 18th.
Speaker 5 (02:43:20–02:43:23)
Okay, so we don't really have an option.
Speaker 6 (02:43:23–02:43:30)
So we have to just send it as if we had, we could discuss a letter on the 20th if we wanted to send one in on the 21st.
Speaker 1 (02:43:31–02:43:41)
If they have a draft, if he has a draft, he does. I mean, but if he has our comments put into a final draft, we could vote on that.
Speaker 5 (02:43:41–02:43:50)
So my only concern is if we send in individual comments. are comments actually going to end up in the letter?
Speaker 6 (02:43:51–02:43:55)
And the question is whether they're planning board comments or individual planning board member comments.
Speaker 5 (02:43:56–02:44:06)
And so… Yeah, because if it's individual comments, the likelihood of them having to accept them and put them in their letter, they wouldn't have to.
Speaker 6 (02:44:06–02:44:09)
They wouldn't have to in either case, I think.
Speaker 3 (02:44:10–02:44:15)
But at least it's a stronger… I intend on signing mine, Jim Davis, planning board member, Town of Milton.
Speaker 6 (02:44:15–02:44:16)
Your comments.
Speaker 5 (02:44:19–02:44:29)
Yeah. I just would hope that they would incorporate our individual comments knowing that we are under our time constraint that we don't have a meeting before their next meeting.
Speaker 6 (02:44:35–02:44:43)
It looks like their comments are focused on. I haven't read it. When did he send it? I haven't read it, but I just did a quick…
8.56 p.m.
Speaker 2 (02:44:44–02:44:44)
tonight.
Speaker 6 (02:44:45–02:44:46)
It's probably erased.
Speaker 2 (02:44:46–02:44:52)
That letter is from Nick to the Select Board and the Planning Board. It's probably best that we don't talk about that letter much more in this meeting.
Speaker 6 (02:44:52–02:44:55)
Well, this is a public meeting and a public document. It's not executive session.
Speaker 2 (02:44:56–02:45:01)
I don't remember. My battery's died. I can't read exactly how he had written it, but… Yeah.
Speaker 6 (02:45:01–02:45:32)
I mean, it'll be a public document once it's filed, too. I think if you don't feel as if we can come to a consensus about what the comments should be as a board in time for theirs, which I don't see how we could for their inclusion by the 18th. That means we'd have to decide tonight. So then it's either we do our own comment letter or we do individual comments to HLC.
I think that's really the option. I don't think there's really an option for us to have agreed upon comments to the select board.
Speaker 1 (02:45:33–02:45:40)
But if there's anything that we see that we think is important to add to Nick's letter to that. Thank you.
Speaker 5 (02:45:40–02:45:54)
Or would we send our comments to Cheyenne and then Cheyenne collects them and then she sends them saying these are the planning board comments. So it looks a little bit more official than us just sending individual.
Speaker 6 (02:45:55–02:46:12)
Except that they wouldn't be. Discussed or… Correct, we couldn't discuss it. It wouldn't have been discussed in a…
Correct. It would be just individual comments. There would not be a board comment at that point. Right, and then we could review it on the 20th.
Speaker 7 (02:46:14–02:46:18)
I just want to remind you guys that Monday is a holiday.
Speaker 6 (02:46:18–02:46:45)
Yeah, so if we wanted to do our own letter, I think then what you say makes sense, Maggie, is to circulate comments to Julie and Cheyenne to put together. And on the 20th, we could decide whether we could agree on those or not and submit a planning board letter. Or then if we can't, then individually submit our comments.
Speaker 1 (02:46:45–02:46:55)
That's good. All right, so everyone will send comments to Cheyenne and Julia, and then put those all together.
Speaker 3 (02:46:55–02:47:00)
We send them to Julia, and then she edits them, and then we get them back and vote on them?
Speaker 5 (02:47:00–02:47:02)
No. No. No, we don't have time for that.
Speaker 3 (02:47:02–02:47:04)
She edits them and then just sends them in?
Speaker 5 (02:47:04–02:47:09)
I don't even know if she edits them.
Speaker 3 (02:47:09–02:47:10)
OK.
Speaker 5 (02:47:10–02:47:12)
We just send it to her.
Speaker 3 (02:47:12–02:47:16)
Do we send our comments? She puts it in the form of a letter? But we also have letters.
Speaker 5 (02:47:17–02:47:25)
And just say, these are the comments I've received from planning board members. And then submit it to the select board.
Speaker 3 (02:47:34–02:47:36)
OK. Do we also reserve the right to write our own letter?
Speaker 1 (02:47:37–02:47:46)
Yeah, you certainly can as an individual. I don't even think she would send it to the board. The select board probably will have already submitted their letter though.
Speaker 6 (02:47:46–02:47:46)
Yes.
Speaker 1 (02:47:47–02:47:50)
I think that's it would go directly to HLC.
Speaker 6 (02:47:51–02:47:54)
So what we would I think if you we wouldn't have time.
Speaker 4 (02:47:55–02:47:56)
Yeah.
Speaker 6 (02:47:58–02:48:17)
Unless you want to send comments. But if they're going to vote on Monday and I mean Tuesday and Monday is a holiday. I mean, I think giving us a day on the comment letter is probably just informational at this point, even though the email says submit comment.
Speaker 5 (02:48:19–02:48:22)
Well, that's unfortunate. We weren't included, Breyer.
Speaker 6 (02:48:23–02:49:22)
But I do think if we think about the things that we are more uniquely experienced with, like we talked about earlier with these guidelines, Because if they come back and keep us rapid transit, at least we will have commented on the things that we found challenging in applying the guidelines here. And it will improve our ability to do the zoning if they make those changes. Very much so. Yeah, okay.
So, I mean, I think it's stronger if it comes from us as a board that way than individually. And, you know, people, if we have things that we don't agree on that we want to send individually, fine. But at least on the things that we think that we can agree on, like, I think that what you said about affordability, I think what I said about the other things, it seems like we have agreement on those. If there's anything else.
Speaker 2 (02:49:22–02:49:36)
I think HLC would be hard-pressed to consider individual comments. They need a board. So I agree with you. It should be board comments.
I'm not sure how they're ever going to deal with individuals.
Speaker 6 (02:49:38–02:49:39)
And I think, you know.
Speaker 2 (02:49:39–02:49:43)
It's just my own opinion. I mean, at some point, I think that people.
Speaker 5 (02:49:43–02:49:56)
So can we just take a vote right now that we support adding a quick we increase in affordability, a decrease in district size.
Speaker 6 (02:49:57–02:50:09)
increasing the cap on the units that are allowed in a mandatory mixed use, and allowing the sub-districts to be along an area served by an MBTA bus line.
Speaker 3 (02:50:10–02:50:11)
And less than five acres.
Speaker 5 (02:50:11–02:50:14)
Yeah, less than five acres and a monetary contribution.
Speaker 6 (02:50:15–02:50:22)
On the less than 10. I think we capped it. Well, I mean, we had said that we thought that the affordability would kick in at 10 units, I think.
Speaker 2 (02:50:22–02:50:23)
That's right.
Speaker 6 (02:50:23–02:50:26)
So I think we said anything less than 10, we'd like a contribution.
Speaker 5 (02:50:26–02:50:31)
So those are like five things. Are those five things we just… Did you get that, Julia?
Speaker 6 (02:50:31–02:50:32)
Julia has more.
Speaker 2 (02:50:33–02:50:33)
Poor Julia.
Speaker 6 (02:50:35–02:51:15)
We can send them to you, too. I've already started to write the three that I mentioned. I was planning to put a little map from one of Util's presentations in to kind of graphically, you know, kind of show so they can visualize the constraints that we were up against and show that we were actually studying them, you know, like that the mapping would show that we studied them. So I'm close to that.
So if you wanted to write something up on the affordability, I think we could have a draft ready to review and vote on next week if you want. Yeah, I think that would.
Speaker 5 (02:51:17–02:51:26)
Does that sound good, Julia? Yeah, but we need to submit it by Tuesday. No, we're going to submit it separately. OK, you want to submit it separately?
OK.
Speaker 6 (02:51:26–02:51:44)
I think the planning board will do their own. Oh, OK. I think, well, the things that we just talked about agreeing to. I think the select board, we can see what their letter says, but they will probably address different things.
They're probably more big picture.
Speaker 2 (02:51:44–02:51:50)
It does. I don't know how what we just talked about is going to fit into the letter that I read. I just don't think it will.
Speaker 1 (02:51:51–02:51:56)
So we should keep ours. Ours are more technical because that's the level. And those are more of an overview.
Speaker 6 (02:51:56–02:52:39)
I think they'll show that we've been grappling with how to comply. And I don't think that's a bad thing to demonstrate that we have. Good. Okay.
Okay. We are in agreement on that. So, so can I just want to last statement on what we're going to, when we're going to engage the public on a timeframe. I would like to.
We know we have time to come up. We know we have East Milton Forum coming up. We're going to have a May town meeting. I just don't think we should get something on a calendar.
Speaker 2 (02:52:42–02:52:58)
An opinion that I'll offer. It would be. The engagement we had from the public happened after they had something to consider, right? Something that was developed that they could consider.
Speaker 6 (02:52:58–02:54:13)
Yeah, Tim had a monthly the whole time before we had any zoning to consider. And it just brought people up to speed. And I think There's a lot of uncertainty about where Milton is in this right now. And so I don't think we have to show any districts.
We can basically say where we think we are, what we think we're going to do next, and how we want to address some two different paths. knowing that the outcome is still of what our classification may still be open. I have my doubts about that myself. But I think what we could say is, you know, these are the two directions and we should put some parameters on what we think, how we would approach it.
And we would have to discuss that. I don't think we have to decide that tonight. But if we set a forum up for a month or so from now, we will have time to discuss it. We were going to have UTIL do a presentation in November.
They were preparing a presentation for that. And it was going to just bring people up to speed on what we had looked at to date there.
Speaker 5 (02:54:13–02:54:29)
So we also have to remember, Tim had those meetings because nobody knew anything. Like, nothing. No one even knew MBTA zoning. So a lot of it was just getting…
A lot of people still don't know it very well, Maggie. Including, like, ourselves.
Speaker 3 (02:54:29–02:54:32)
After that last town election, I think a lot of people know a lot more.
Speaker 5 (02:54:32–02:54:58)
So I think we're a little bit further along in the process than we were However, I do think we should have a forum Should it be the end of March or should it be? the end If you know if we have March 6th is East Milton and then the next We have a meeting the next week after March 6.
Speaker 6 (02:54:58–02:55:20)
So maybe we have zoning for for something in July or even May. I mean, May or July if we don't get the process going. And so my feeling is if we have to, you know, I spoke about this a lot in the last year that we need to have a map out of schedule.
Speaker 1 (02:55:21–02:55:26)
So why don't we say early April? We'll think about early to mid April.
Speaker 5 (02:55:26–02:55:35)
So it gives us March to at least come up with… Don't forget there's school vacation in April.
Speaker 3 (02:55:36–02:55:37)
So after school vacation?
Speaker 6 (02:55:38–02:55:45)
No, I think it should be before. How would you even have anything ready before July if you don't even get engaged the public until the end of April?
Speaker 5 (02:55:45–02:55:54)
So if you look at May and June, You can have two public forums in May and June. So that's a total of four public forums.
Speaker 6 (02:55:56–02:56:14)
Well, that's just, you would have to have your summary written by then. I mean, you would have to have submitted it before then if you're going to have a hope of getting it in July. You need to get, I think, I mean, we should be looking at the end of March, I think.
Speaker 1 (02:56:17–02:56:32)
At that point, all we would be able to present is all the different districts that we've potentially looked at. Is that what you're wanting to go in? People are going to say, well, what are you going to do with those districts? What is your plan?
I feel like I want to, yeah.
Speaker 6 (02:56:33–02:57:11)
No, because here's the thing. If you said, we can adjust what was previously approved as a rapid transit community by taking some zone capacity out of East Milton and putting it where? One option is to put some more in the Elliott Street Corridor. Another is to put it in a district on Randolph Ave.
You don't have to have everything ironed out. That's a general concept. What do you think about that concept? You might have people in the Elliott Street Corridor wondering, well, how much more and what does that look like?
And so we'd have to have some answers, but we do because we've looked at it.
Speaker 3 (02:57:11–02:57:14)
So we should work it out as a board first.
Speaker 6 (02:57:14–02:58:01)
So for example, I think the 25% rapid transit we have options for and we can take that to the community, but we don't have the options for really are the adjacent or. the statute. So we would need to spend some time thinking about that between now and then. But even then, we don't have to have it all ironed out.
We could say, here's the areas that are within a half a mile of the commuter rail. The largest one is near Blue Hill Lab, which overlaps with the trolley. And we think this is a good area to concentrate and just start the conversation with people. before we say, yeah, that's it.
This is the district. And we used 20 grand of UTIL's time, and we have to backtrack.
Speaker 2 (02:58:02–02:58:23)
If we could get as far along with 10% as we have with 25%, I think then we'd be in a good place. You're right about 25%. We know what our options are. We've discussed some of the changes that you just mentioned.
We've done plenty of work on 25. We've done no work on 10, none.
Speaker 6 (02:58:24–02:59:29)
We've done, well, we know where the zones are within the commuter rail. And I said in the email that I sent all of you, where that action plan was attached, I think we should focus around the Blue Hill Lab because of the overlap with the trolley. And I think we could, if we're meeting with UTL on the 13th, is that when they're coming next? We haven't scheduled them yet.
Well, we should schedule them because we can start talking to them about that area in the paper mill in the paper mill That's fine, too so If we set ourselves a goal of a meeting, then we have to think from the end out. If we're really going to try and hit July, we need to jump on, that's why I was asking earlier about waiting a month to have a meeting, because we need to start jumping on that alternative option. and then have public input.
Speaker 2 (02:59:30–02:59:41)
My point is, I have no issue having a public forum, but we can't show them what 10% looks like if we have a public forum. What are we going to say?
Speaker 6 (02:59:42–02:59:46)
Well, where do you…this board needs to discuss where… That's my point.
Speaker 2 (02:59:46–02:59:47)
That's all I'm saying.
Speaker 6 (02:59:47–02:59:49)
That's why I'm saying we can't wait a month to have a meeting. No, no, no.
Speaker 2 (02:59:49–03:00:00)
What you're saying is you want to have a public forum before we have something to show people. No, I should have… We can have a public forum. The question is going to be, can you tell us what the 10% plan looks like?
And what are we going to say?
Speaker 6 (03:00:00–03:00:11)
What I'm saying is we set a date for a public forum and we work to get something to show for a 10% plan for that forum. We've had over a year. That's fine, Charlotte. We haven't done anything.
Speaker 2 (03:00:11–03:00:13)
What calendar would you like to do that on?
Speaker 6 (03:00:13–03:00:24)
We have a month that we're talking about not having a meeting, right? And I'm asking when UTL is coming next and they're not scheduled. In fact, we have to talk about their contract next week.
Speaker 1 (03:00:24–03:00:46)
So if we talk about their contract next week, I'm thinking we could have UTL come on the 13th and discuss and have them come prepared to start Sure. If we get the person who can do things in live time, we could get a significant amount done on the meeting on the 13th on a 10% plan.
Speaker 2 (03:00:47–03:00:53)
My point is I think we absolutely should do that before so we can show the public something.
Speaker 6 (03:00:54–03:00:58)
Right. So I think we can ask them to work on.
Speaker 1 (03:00:58–03:01:19)
And I'm happy to ask Cheyenne to schedule. She had said when. And this is all that I mean it's been sort of with her now being out. I just didn't know what we were going to hear from the select board and what you know what we were going to ask you to.
And I just didn't want to start spending their money and time with until we have it.
Speaker 6 (03:01:19–03:02:01)
We don't know their availability either, so I would ask if Cheyenne's able to get in touch with them before the next week's meeting. Yeah. That we can see what their schedule looks like and ask if they can begin to work on looking at the area. Yeah, the overlap between the commuter rail and the Mattapan trolley in the generally in the Blue Hills Parkway area I have felt that we really didn't study the parkway areas thoroughly as we should have before and I think we can ask them to start looking at that before and they can bring something to us the next time so that we don't lose all the time in between.
Speaker 1 (03:02:01–03:02:12)
I was going to exactly so I think that's I think having them come that that date would be would be great and we could have it
Speaker 3 (03:02:12–03:02:17)
Yeah, so I don't think a whole 10% plan should be around the Blue Hills Parkway area.
Speaker 5 (03:02:17–03:02:17)
Oh, we can discuss that.
Speaker 3 (03:02:18–03:02:19)
It's down 10 away.
Speaker 1 (03:02:19–03:02:19)
No, I get it.
Speaker 3 (03:02:20–03:02:20)
I get it.
Speaker 1 (03:02:20–03:02:30)
But I don't want to just… Yeah, I think we'll, based on some of our options that we've been looking at… Yeah, I think… Exploring that is one of the options, but…
Yeah, it's just the… It was the largest area, and it's an overlap of
Speaker 6 (03:02:30–03:02:37)
to transit assets, so it seems a good place to start. But there's also extra space storage, which is great.
Speaker 3 (03:02:37–03:02:38)
There's the whole village.
Speaker 1 (03:02:38–03:03:02)
We already know all of those, though. What we could do with those is my point. But I'm saying if what we want to present, I think that would be an option. But let's try to see how far they could get in pulling something together.
I hear what you're saying. We should have them definitely explore that because that's an area we haven't fully maybe looked at closely enough.
Speaker 3 (03:03:02–03:03:15)
Yeah, my feeling is if you look at Ketch's Law and you look at Granite Ave North and you look at the village and you look at Elliott Street, by the time you get to Blue Hills Parkway, if you include Unquity House, I mean, you're there. You're at 10%.
Speaker 5 (03:03:16–03:03:17)
All right.
Speaker 1 (03:03:17–03:03:54)
Let's not try to do it tonight. We're at 10 o'clock, so 10 after 10. So I think that's great. So I will reach out, we'll find out UTL's availability and ask them to come.
And if they, yeah, I'll have them, we'll put out some dates, so. And I don't want to keep adding other dates, but if they couldn't come that week of the 13th, we could consider having just an MBTA meeting.
Speaker 3 (03:03:54–03:03:55)
That's what we should do.
Speaker 1 (03:03:55–03:04:08)
We should do that on the week before. And maybe take the 6th and say, let's just see if they're available on the 6th and just do MBTA only.
Speaker 6 (03:04:08–03:04:42)
And if we do that, we can let the public know that there's going to be ample opportunity for them to listen, learn, and provide comment. in advance of a bigger public forum. Because the problem that people have is when it's a piece on the agenda, they don't know when it's going to be. Is it at 8 o'clock or 10 o'clock and how much time is going to be devoted to it?
It's hard to get people to put it into their calendar. If they know it's a meeting that's dedicated to the topic, then I think it's much easier.
Speaker 2 (03:04:42–03:04:44)
Agreed. Makes sense.
Speaker 11 (03:04:44–03:04:44)
Yeah.
Speaker 1 (03:04:47–03:05:02)
All right. Bye, Maggie. Great. Thank you so much.
That was a good discussion, because certainly we will be compliant by July. Thank you, Maggie. Have a good night. That's good.
Speaker 2 (03:05:02–03:05:03)
Good night, Maggie.
Speaker 1 (03:05:04–03:05:28)
OK. And so the last item on our agenda is the Thayer nursery special permit discussion. Oh, this is our public hearing is closed. So we're I'm Thank you.
Sorry about that. The public hearing is closed on this. So we have our Sort of the draft and Cheryl you had some edits. Did you have something?
Speaker 7 (03:05:33–03:05:34)
Yeah
Speaker 1 (03:05:37–03:05:42)
that I'm talking to her. Is that Julia? Yeah, I think somebody was just talking to her. Oh, OK.
Speaker 7 (03:05:42–03:05:43)
Yes, sorry.
Speaker 1 (03:05:43–03:05:44)
Oh, that's all right.
Speaker 7 (03:05:44–03:05:48)
Do you want me to bring up the permit? Is that helpful?
Speaker 1 (03:05:49–03:05:51)
We all have a copy now, so actually.
Speaker 6 (03:05:53–03:06:03)
Cheryl, do you want to go through it? But I think for the public, it would be beneficial to have it on the screen. And then pull it up, Julia.
Speaker 2 (03:06:06–03:06:12)
I do have one question, and I have one comment, but whenever you guys are ready.
Speaker 6 (03:06:12–03:06:22)
So the yellow is where I had a question, and the red, you know, edits are where I made a couple of changes.
Speaker 2 (03:06:23–03:06:26)
Well, we may have a similar question.
Speaker 6 (03:06:26–03:06:29)
All right, go ahead. You ask first.
Speaker 2 (03:06:29–03:07:09)
Yeah, this is just, I think, writing it in a way that's reflective of how it should be written. So under findings, which is section four, when you go over to paragraph C, And in yellow, which, Cheryl, you highlighted, and the restriction that the business cannot be sold to any new owners, including the children of Maggie and Josh Oldfield. I think it should just say Maggie, the children of Maggie or Josh Oldfield. Because I don't think it's likely that Maggie and Josh Oldfield are having children.
Speaker 6 (03:07:09–03:07:18)
But also, I had a question about that. Not so much so direct as serious. Mine had to do with, let me see.
Speaker 2 (03:07:19–03:07:26)
I do think that language is necessary. I mean, we have an attorney here that, you know, someone could question that later and say, well.
Speaker 6 (03:07:27–03:08:08)
Well, I even questioned the existence of the sentence in there. Because under, on page 9, under 8, transfer of property, It says that in the event that the property and or landscaping business shall be transferred to a third party. That seems to mean that you can sell it because in that case then that third party has to seek to continue operation of landscaping business on the property, then a new application is required. So, if that's the case, then how can you say it can't be sold elsewhere?
Speaker 2 (03:08:08–03:08:17)
Well, I mean it does say, I'm sorry if you're there on 8, in the event that the property into a landscaping business, so the property could be sold, right?
Speaker 6 (03:08:17–03:08:44)
But the landscaping business could too in that sentence. So can I just ask a clarifying question then of Marion about whether there's an inconsistency in these two provisions? Do you see that as an inconsistency?
Speaker 8 (03:08:44–03:09:14)
I think the first provision just draws attention to the fact that It's a very limited permit that's only able to be used by the children of Margaret and Robert Oldfield, and those two children who are currently using the permit are Maggie and Josh Oldfield. So there is no one eligible to use this permit. after Maggie and Josh Oldfield decided they no longer want to operate the nursery.
Speaker 6 (03:09:14–03:09:17)
But if they sold the business, somebody else could apply for a permit.
Speaker 8 (03:09:17–03:10:56)
But they wouldn't be eligible. Because this particular permit… This particular permit is limited by the original nursery permit. The nursery permit was issued personally to Robert and Margaret Oldfield.
So this bylaw is written the way the landscaping bylaw is written. It's tied to 2012 operation of a landscaping business. And it's tied to the way that landscaping business and nursery business was permitted in 2012. The permits for their nursery were issued many years ago.
But they were issued personally to the parents because of the very sensitive, I think, because of the sensitive location of this business. And so that limitation on the nursery permit becomes a limitation on this permit, on the landscaping permit. And so the reality is that you cannot continue this landscaping business beyond the, I say the working life of Maggie Oldfield, of any child of Margaret and Robert Oldfield. So is it maybe?
So then is this a paragraph? The other language, the second paragraph, That's taken directly from the language in the 2016 special permit. So it's just general language saying that if someone does want to buy the business or they want to operate the nursery, they have to apply for another permit. except that it turns out in this case, there isn't going to be anybody who's eligible to apply for it.
And I think it's important for everyone to realize that.
Speaker 6 (03:10:57–03:11:06)
Well, that's why it's confusing to me that it implies on page nine, section eight, that it can be done.
Speaker 8 (03:11:06–03:11:20)
Well, that's the second paragraph, right? The second paragraph says, but they have to be eligible to apply for the permit. But then you're saying that nobody's eligible.
Speaker 6 (03:11:20–03:11:23)
Well, that's true. So it just seems confusing.
Speaker 8 (03:11:27–03:11:45)
Now, I'm aware of those two sections, and I realize you might find them confusing. And if you'd like to, you could take out the first, you know, the permit. Take out the first one, refers specifically to Maggie and Josh. It's just an interesting fact about this permit that it is not something that can continue indefinitely.
Speaker 6 (03:11:46–03:11:54)
Well, should we just take out the transfer of property? I think we should just take out that whole section, transfer of property.
Speaker 1 (03:11:55–03:11:59)
Because that's going to be up to the Yeah.
Speaker 8 (03:11:59–03:12:16)
Well, first of all, you can take it out because what you're doing here is you're incorporating, by reference, all of the findings and all of the conditions in the 2016 special permit. Right. You've already incorporated them. Right.
So if you prefer not to include that paragraph, strike it.
Speaker 6 (03:12:16–03:12:16)
I would just strike.
Speaker 8 (03:12:17–03:12:19)
And it is confusing. I understand that.
Speaker 6 (03:12:19–03:12:20)
OK. Thank you, Marian.
Speaker 8 (03:12:20–03:12:26)
And since we didn't list everything in the 2016 permit here, the question will be, well, why did you choose to list that? Right. Right. It makes sense.
All right.
Speaker 6 (03:12:27–03:12:59)
Thank you. All right, so the other thing that I say while you're here, just because another just what I thought seemed contradictory. On page three, number seven, it says there are no wetlands on the premises and then it continues. And then on page seven, letter H, it says the wetlands delineation and drainage plan remains in compliance, et cetera.
So if there's no wetlands on the premises, then isn't it just a drainage plan?
Speaker 8 (03:13:02–03:13:07)
Well, the plan is a wetland. It's a wetlands delineation plan and drainage plan. That's what it's called.
Speaker 6 (03:13:08–03:13:16)
But if there's no wetlands, then there should be nothing on that plan that's related to wetlands, if there's truly no wetlands on the premises.
Speaker 8 (03:13:16–03:13:25)
Well, there could be wetlands off the premises. OK. All right. Because there's a lot of drainage that comes onto this property from property above.
All right.
Speaker 6 (03:13:25–03:13:26)
OK.
Speaker 8 (03:13:26–03:13:32)
All right. That's fine. That's the reason. OK.
OK. contradictory.
Speaker 6 (03:13:32–03:13:38)
Yeah, I was, again, just confusing, but I understand it could be something off property.
Speaker 8 (03:13:38–03:13:50)
All right. Thanks. This is testimony that was given at the hearing. Yeah.
By the applicants. Yeah. Okay. So if you, you know, you can leave it out if you want, but it was testimony that was given at the hearing.
Thank you.
Speaker 11 (03:13:50–03:13:50)
Okay.
Speaker 6 (03:13:52–03:14:28)
All right, so then on page, if you want to go through my, on page five, the letter was signed by? The building commissioner. Building commissioner, yeah. And our interim building commissioner.
And then on page nine, we had this like being clear about the engineer. in other permits? Yeah, I thought the same thing when I read this too. So just, yeah.
Speaker 2 (03:14:28–03:14:32)
So is it licensed or registered? Do you know which term is right? Or are they interchangeable?
Speaker 6 (03:14:32–03:16:24)
I always think of myself as a registered architect, but I guess I'm licensed to practice in Massachusetts and other states, right? So I don't know if it's interchangeable or not. This is the language we had in the memory care. I think okay, then we'll leave it alone or Definitely in another permanent and in our site plan of approval.
Yeah um and then I thought in c here that um I know this was something of concern to neighbors so i'm just going to read what this provision is about the These are the decision with some of the conditions. As Marion said, the conditions and the other permits are all included by reference. And then this provision, so I'm just going to run through these because of public interest. A, it says by July 1st of 2025, the applicant shall have their drainage system inspected by their choice of either their engineer, who shall be a Massachusetts licensed civil engineer, or a town of Milton engineer.
The inspecting engineer shall attest that the drainage system is operating as designed by providing a letter to that effect to the planning board. Prior to application for any renewal of this special permit the applicant shall again have their drainage system inspected by their choice Of either the town engineer or their own engineer. Do we need to make that same change here? I'll be licensed You think you might as well put it in yeah, I would say um So i don't know julia if you can just copy it down to the The other line.
Speaker 1 (03:16:24–03:16:28)
Who shall be a Massachusetts licensed civil engineer?
Speaker 7 (03:16:30–03:16:31)
You want it to go where?
Speaker 6 (03:16:32–03:17:41)
Just copy that? Copy it. And then put it down, let's see, one, two, three, four, five lines down from there after the words their own engineer. Yep, right there after that, yeah.
And the inspecting engineer shall attest that the drainage system is operating as designed by providing a letter to that effect to the planning board. So what this does is by July 1st of this year and then at the renewal times again. So that's what we spoke about, but that's included there. And then in letter B, the applicant shall remove posts remaining from the relocation of the sound attenuation fence to ground level.
C, any evergreen landscaping that is in poor condition along the Parkwood Drive lot line shall be replaced with similar plantings at the next available growing season, such that the plantings provide visual screening and dust control. Is it only evergreen plantings, though, or is it plantings in general?
Speaker 8 (03:17:41–03:18:01)
I think it's all evergreen landscaping because it's designed to It's designed to block view all year round. So that's my recollection anyway. And so that's why it's specifically evergreen. It doesn't just mean tall trees.
It can mean smaller bushes, but they're evergreen.
Speaker 6 (03:18:02–03:18:07)
And then D, this special permit is for a term of three years from the date of this decision.
Speaker 2 (03:18:07–03:18:30)
I just have a thought, just because we don't have clarity on size of these plantings. Now, maybe similar plantings means not only similar in plant species, but similar in size. But for the benefit of this, do you think we should say that they should be replaced with similar plantings of similar size or greater?
Speaker 6 (03:18:30–03:18:32)
Sure.
Speaker 3 (03:18:32–03:18:41)
Well, I thought of that. I mean, what if Arborvitae is going to be 20 feet high? How are you going to replace a 20 foot high Arborvitae? That's true.
I mean, I walked back there.
Speaker 8 (03:18:41–03:19:51)
Things are growing pretty well back there. This language was in the 2019 renewal permit, again, to provide a little clarity about when you had to replace plantings. Again, those conditions are incorporated by reference into this decision. But because this is a specific topic of discussion during your hearing, It's a specific condition.
And it brings attention to the fact that there were complaints that some plantings along that lot line have died or are not in good condition, and that they must be replaced by the next planting season. So the issue about exactly what they should be is actually in the conditions in 2019, that it can be something similar. And the reason for that is you might plant one thing in 2016. It turns out it doesn't do that well in that shady location.
You shouldn't have to plant the same plant over and over again and have it die. You want to plant something that's pleasing in the sense that it provides the protection and is nice to look at. And so that's why you say similar. You don't say exactly the same.
And you don't say exactly the same size either because you're planting something new and it's going to grow.
Speaker 6 (03:19:51–03:19:58)
And I thought the clarifying language here is we want to make sure it provides a screening and dust. Yeah. Right.
Speaker 2 (03:19:58–03:20:01)
That implies a certain size too, doesn't it?
Speaker 6 (03:20:01–03:20:05)
A certain size and a certain closeness and how filled out it is, right?
Speaker 2 (03:20:05–03:20:10)
Yeah. That's probably better than any other stipulation on size.
Speaker 6 (03:20:11–03:20:18)
Because then if something else dies and it doesn't provide screening, then they need to put it back in. That makes sense.
Speaker 2 (03:20:19–03:20:20)
OK. That makes sense.
Speaker 7 (03:20:20–03:20:24)
You want to get rid of the similar size operator?
Speaker 6 (03:20:25–03:20:26)
Yes, I think so.
Speaker 1 (03:20:32–03:20:36)
And then we want to eliminate the transfer property.
Speaker 6 (03:20:37–03:22:01)
Yeah, the whole paragraph. There's no section 8 anymore. You want all of this gone? Yes.
And then you can remove the highlights that I put in, I think, in a few places, Julia. So that's good. Did anybody else have any? You guys hit the one day you guys address those.
All right. So then we take a motion. Yes, I would entertain a motion. All right, I'll make a motion to approve the special permit for landscaping business use and site plan approval for 270 Hillside Street and 0 and 24 Forest Street.
Joshua Oldfield and Maggie Oldfield applicants as written in the decision reviewed and edited tonight.
Speaker 2 (03:22:03–03:22:04)
I'll second that.
Speaker 6 (03:22:04–03:22:04)
Okay.
Speaker 1 (03:22:04–03:22:18)
Before we take a final vote, are we sure on page five that we put in building commissioner in there? Lillia, did you catch that? Interim building commissioner. Yes.
Speaker 6 (03:22:18–03:22:22)
Interim building commissioner rather than inspector.
Speaker 1 (03:22:23–03:22:36)
Yes, it's in there. Okay. Yeah, that was that was from your units. Okay.
Great. And then we'll unhighlight that. The other language accepts all the changes and accept all the changes. Yeah.
Great. So we have a motion in a second.
Speaker 6 (03:22:41–03:22:57)
I just wanted to make sure we're Yeah, I mean, if you want to just I think before we sign it, we can just make sure that those things are incorporated properly.
Speaker 1 (03:23:03–03:23:12)
Okay, so motion second, then a vote. All in favor? Aye. Great.
Thank you all. Thanks.
Speaker 2 (03:23:12–03:23:17)
Meredith, how will that decision, do we need to come and sign it at some point?
Speaker 1 (03:23:17–03:23:19)
We'll need to come sign, yeah. All right.
Speaker 2 (03:23:20–03:23:22)
And Julia will let us know when it's ready for signature?
Speaker 1 (03:23:22–03:23:42)
Yes. And it has on the back of the decision at the bottom, bye, thank you, good night. At the bottom, it's just the four of us signing. But we'll come in and sign.
Okay. So I don't know if we'll have it. Maybe at the next meeting we could possibly sign it.
Speaker 7 (03:23:43–03:23:50)
I can print it out right now if you want. Because the next meeting is remote.
Speaker 2 (03:23:50–03:23:52)
Are you in the office, Julie?
Speaker 7 (03:23:52–03:23:53)
Yeah.
Speaker 2 (03:23:53–03:23:58)
Let's sign it before we leave. If you don't mind, Julie, that would be great.
Speaker 1 (03:23:58–03:24:13)
Talk about efficient tonight. All right, good night. Yeah, Julia, that's great. If we can print it.
And then I would entertain a motion to adjourn.
Speaker 2 (03:24:13–03:24:16)
I'll make a motion to adjourn the meeting. Seconded.
Speaker 1 (03:24:16–03:24:18)
All in favor? Aye.